MON DESCRIPCION IU COEF. INC % INC -MARZO 15 Lo INDIC DIC 15 lr lr/lo
1 2 3 4=3x2 5 6=5x2 7=6/4
MANO DE OBRA INC.
M LEYES SOCIALES 47 0.42 100.000% 523.15 523.150 544.59 544.590 1.04098
PLANCHA ASBESTO-
P ACERO DE
CEMENTO 59 0.138 100.000% 205.82 205.820 229.26 229.260 1.11389
CONSTRUCCION
CORRIGADO 3 48.360% 515.52 249.305 468.66 226.644 0.90910
CEMENTO PORTLAND
CA TIPO I 21 0.122 51.640% 389.65 201.215 389.65 201.215 1.00000
450.521 427.859 0.94970
B BLOQUE Y LADRILLO 17 0.053 100.000% 750.04 750.040 733.6 733.600 0.97808
ASFALTO 13 42.470% 1297.19 550.917 1396.39 593.047 1.07647
AA AGREGADO GRUESO 5 0.073 57.530% 400.7 230.523 405.27 233.152 1.01141
781.439 826.199 1.05728
M MADERA NACIONAL PARA ENCOF. Y CARPENT. 43 0.11 100.000% 797.1 797.100 850.76 850.760 1.06732
MAQUINARIA Y EQUIPO N 48 45.240% 352.93 159.666 364.86 165.063 1.03380
FM FLETE TERRESTRE 32 0.084 54.760% 469.08 256.868 465.71 255.023 0.99282
416.534 420.085 1.00853
1
INDIC BASE
MON DESCRIPCION IU COEF. INC % INC -MARZO 15 Lo INDIC ENE 16 lr lr/lo
1 2 3 4=3x2 5 6=5x2 7=6/4
MANO DE OBRA INC.
M LEYES SOCIALES 47 0.42 100.000% 523.15 523.150 544.12 544.120 1.04008
PLANCHA ASBESTO-
P CEMENTO 59 0.138 100.000% 205.82 205.820 229.26 229.260 1.11389
CONSTRUCCION
CORRIGADO 3 48.360% 515.52 249.305 473.87 229.164 0.91921
CEMENTO PORTLAND
CA TIPO I 21 0.122 51.640% 389.65 201.215 405.81 209.560 1.04147
450.521 438.724 0.97381
B BLOQUE Y LADRILLO 17 0.053 100.000% 750.04 750.040 732.29 732.290 0.97633
ASFALTO 13 42.470% 1297.19 550.917 1396.39 593.047 1.07647
AA AGREGADO GRUESO 5 0.073 57.530% 400.7 230.523 404.49 232.703 1.00946
781.439 825.750 1.05670
M MADERA NACIONAL PARA ENCOF. Y CARPENT. 43 0.11 100.000% 797.1 797.100 854.85 854.850 1.07245
MAQUINARIA Y EQUIPO N 48 45.240% 352.93 159.666 368.18 166.565 1.04321
FM FLETE TERRESTRE 32 0.084 54.760% 469.08 256.868 465.71 255.023 0.99282
416.534 421.587 1.01213
1
INDIC BASE
MON DESCRIPCION IU COEF. INC % INC -MARZO 15 Lo INDIC FEB 16 lr lr/lo
1 2 3 4=3x2 5 6=5x2 7=6/4
MANO DE OBRA INC.
M LEYES SOCIALES 47 0.42 100.000% 523.15 523.150 544.12 544.120 1.04008
PLANCHA ASBESTO-
P CEMENTO 59 0.138 100.000% 205.82 205.820 229.26 229.260 1.11389
CONSTRUCCION
CORRIGADO 3 48.360% 515.52 249.305 477.98 231.151 0.92718
CEMENTO PORTLAND
CA TIPO I 21 0.122 51.640% 389.65 201.215 408.40 210.898 1.04812
450.521 442.049 0.98120
B BLOQUE Y LADRILLO 17 0.053 100.000% 750.04 750.040 738.49 738.490 0.98460
ASFALTO 13 42.470% 1297.19 550.917 1219.04 517.726 0.93975
AA AGREGADO GRUESO 5 0.073 57.530% 400.7 230.523 407.36 234.354 1.01662
781.439 752.080 0.96243
M MADERA NACIONAL PARA ENCOF. Y CARPENT. 43 0.11 100.000% 797.1 797.100 865.96 865.960 1.08639
MAQUINARIA Y EQUIPO N 48 45.240% 352.93 159.666 370.35 167.546 1.04936
FM FLETE TERRESTRE 32 0.084 54.760% 469.08 256.868 465.71 255.023 0.99282
416.534 422.569 1.01449
1
INDIC BASE
MON DESCRIPCION IU COEF. INC % INC -MARZO 15 Lo INDIC ABRIL 16 lr lr/lo
1 2 3 4=3x2 5 6=5x2 7=6/4
MANO DE OBRA INC.
M LEYES SOCIALES 47 0.42 100.000% 523.15 523.150 544.12 544.120 1.04008
PLANCHA ASBESTO-
P CEMENTO 59 0.138 100.000% 205.82 205.820 229.26 229.260 1.11389
CONSTRUCCION
CORRIGADO 3 48.360% 515.52 249.305 442.80 214.138 0.85894
CEMENTO PORTLAND
CA TIPO I 21 0.122 51.640% 389.65 201.215 408.40 210.898 1.04812
450.521 425.036 0.94343
B BLOQUE Y LADRILLO 17 0.053 100.000% 750.04 750.040 721.32 721.320 0.96171
ASFALTO 13 42.470% 1297.19 550.917 1174.50 498.810 0.90542
AA AGREGADO GRUESO 5 0.073 57.530% 400.7 230.523 397.63 228.757 0.99234
781.439 727.567 0.93106
M MADERA NACIONAL PARA ENCOF. Y CARPENT. 43 0.11 100.000% 797.1 797.100 863.63 863.630 1.08347
MAQUINARIA Y EQUIPO N 48 45.240% 352.93 159.666 364.31 164.814 1.03224
FM FLETE TERRESTRE 32 0.084 54.760% 469.08 256.868 463.41 253.763 0.98791
416.534 418.577 1.00491
1
INDIC BASE INDIC MAYO
MON DESCRIPCION IU COEF. INC % INC -MARZO 15 Lo 16 lr lr/lo
1 2 3 4=3x2 5 6=5x2 7=6/4
MANO DE OBRA INC.
M LEYES SOCIALES 47 0.42 100.000% 523.15 523.150 544.12 544.120 1.04008
PLANCHA ASBESTO-
P CEMENTO 59 0.138 100.000% 205.82 205.820 229.26 229.260 1.11389
CONSTRUCCION
CORRIGADO 3 48.360% 515.52 249.305 460.66 222.775 0.89358
CEMENTO PORTLAND
CA TIPO I 21 0.122 51.640% 389.65 201.215 408.40 210.898 1.04812
450.521 433.673 0.96260
B BLOQUE Y LADRILLO 17 0.053 100.000% 750.04 750.040 717.21 717.210 0.95623
ASFALTO 13 42.470% 1297.19 550.917 1174.50 498.810 0.90542
AA AGREGADO GRUESO 5 0.073 57.530% 400.7 230.523 402.47 231.541 1.00442
781.439 730.351 0.93462
M MADERA NACIONAL PARA ENCOF. Y CARPENT. 43 0.11 100.000% 797.1 797.100 862.41 862.410 1.08193
MAQUINARIA Y EQUIPO N 48 45.240% 352.93 159.666 366.60 165.850 1.03873
FM FLETE TERRESTRE 32 0.084 54.760% 469.08 256.868 463.41 253.763 0.98791
416.534 419.613 1.00739
1
INDIC BASE
MON DESCRIPCION IU COEF. INC % INC -MARZO 15 Lo INDIC JUN 17 lr lr/lo
1 2 3 4=3x2 5 6=5x2 7=6/4
MANO DE OBRA INC.
M LEYES SOCIALES 47 0.42 100.000% 523.15 523.150 580.90 580.900 1.11039
PLANCHA ASBESTO-
P CEMENTO 59 0.138 100.000% 205.82 205.820 238.53 238.530 1.15893
CONSTRUCCION
CORRIGADO 3 48.360% 515.52 249.305 448.49 216.890 0.86998
CEMENTO PORTLAND
CA TIPO I 21 0.122 51.640% 389.65 201.215 426.29 220.136 1.09403
450.521 437.026 0.97005
B BLOQUE Y LADRILLO 17 0.053 100.000% 750.04 750.040 690.76 690.760 0.92096
ASFALTO 13 42.470% 1297.19 550.917 1174.50 498.810 0.90542
AA AGREGADO GRUESO 5 0.073 57.530% 400.7 230.523 417.88 240.406 1.04287
781.439 739.217 0.94597
M MADERA NACIONAL PARA ENCOF. Y CARPENT. 43 0.11 100.000% 797.1 797.100 868.81 868.810 1.08996
MAQUINARIA Y EQUIPO N 48 45.240% 352.93 159.666 367.13 166.090 1.04023
FM FLETE TERRESTRE 32 0.084 54.760% 469.08 256.868 467.18 255.828 0.99595
416.534 421.917 1.01292
1
INDIC BASE
MON DESCRIPCION IU COEF. INC % INC -MARZO 15 Lo INDIC JUL 17 lr lr/lo
1 2 3 4=3x2 5 6=5x2 7=6/4
MANO DE OBRA INC.
M LEYES SOCIALES 47 0.42 100.000% 523.15 523.150 580.90 580.900 1.11039
PLANCHA ASBESTO-
P CEMENTO 59 0.138 100.000% 205.82 205.820 238.53 238.530 1.15893
CONSTRUCCION
CORRIGADO 3 48.360% 515.52 249.305 451.95 218.563 0.87669
CEMENTO PORTLAND
CA TIPO I 21 0.122 51.640% 389.65 201.215 426.29 220.136 1.09403
450.521 438.699 0.97376
B BLOQUE Y LADRILLO 17 0.053 100.000% 750.04 750.040 695.81 695.810 0.92770
ASFALTO 13 42.470% 1297.19 550.917 1174.50 498.810 0.90542
AA AGREGADO GRUESO 5 0.073 57.530% 400.7 230.523 416.57 239.653 1.03961
781.439 738.463 0.94500
M MADERA NACIONAL PARA ENCOF. Y CARPENT. 43 0.11 100.000% 797.1 797.100 878.70 878.700 1.10237
MAQUINARIA Y EQUIPO N 48 45.240% 352.93 159.666 366.28 165.705 1.03783
FM FLETE TERRESTRE 32 0.084 54.760% 469.08 256.868 467.18 255.828 0.99595
416.534 421.533 1.01200
1
0.11586 0.11600
0.05184 0.05200
0.07718 0.07700
0.11741 0.11700
0.08472 0.08500
1.03793 1.03800
0.11881 0.11900
0.05175 0.05200
0.07714 0.07700
0.11797 0.11800
0.08502 0.08500
1.04123 1.04200
COEF. REAJ APRO. 3DEC
K=7x1
0.43684 0.43700
0.15372 0.15400
0.11971 0.12000
0.05218 0.05200
0.07026 0.07000
0.11950 0.12000
0.08522 0.08500
1.03742 1.03800
0.11510 0.11500
0.05097 0.05100
0.06797 0.06800
0.11918 0.11900
0.08441 0.08400
1.02818 1.02800
COEF. REAJ APRO. 3DEC
K=7x1
0.43684 0.43700
0.15372 0.15400
0.11744 0.11700
0.05068 0.05100
0.06823 0.06800
0.11901 0.11900
0.08462 0.08500
1.03053 1.03100
0.11754 0.11800
0.05103 0.05100
0.06805 0.06800
0.11986 0.12000
0.08463 0.08500
1.04621 1.04700
COEF. REAJ APRO. 3DEC
K=7x1
0.45138 0.45100
0.15981 0.16000
0.11848 0.11800
0.05058 0.05100
0.06886 0.06900
0.11863 0.11900
0.08482 0.08500
1.05257 1.05300
0.11835 0.11800
0.04881 0.04900
0.06906 0.06900
0.11990 0.12000
0.08509 0.08500
1.06749 1.06700
COEF. REAJ APRO. 3DEC
K=7x1
0.46636 0.46600
0.15993 0.16000
0.11880 0.11900
0.04917 0.04900
0.06899 0.06900
0.12126 0.12100
0.08501 0.08500
1.06952 1.06900
0.11990 0.12000
0.04939 0.04900
0.06901 0.06900
0.12289 0.12300
0.08498 0.08500
1.07247 1.07200
COSTO FINAL DE
CONCEPTO OBRA (S/.)
6 OTROS 0.00
MAYORES GASTOS GENERALES AMPL. DE PLAZO 0.00
INTERES POR MORA EN PAGOS 0.00
OTROS CONCEPTOS 0.00
7 MONTO NETO FACTURABLE SIN IGV (4+6) S/ 1,851,122.44
13 MONTO A CANCELAR(11+12)
14 COSTO FINAL DE OBRA S/ 2,184,324.48
COSTO DE OBRA SIN IGV (4+6) S/ 1,851,122.44
IGV (18%) 333,202.04
A CARGO DEL
ITEM CONCEPTO CONTRATISTA
1.00 MONTO CONTRACTUAL S/ 2,121,113.60
2.00 ADELANTOS 0.00
3.00 REINTEGRO POR MAYORES GASTOS GENERALES 0.00
4.00 REINTEGROS POR REAJUSTE (FORMULA POLINOMICA) 0.00
5.00 MULTAS Y/O PENALIDADES 0.00
6.00 VALORIZACION PENDIENTE DE PAGO 0.00
7.00 RETENCION POR CARTA FIANZA
8.00 GASTO POR LIQUIDACION
9.00 OTROS DOCUMENTOS
10.00 TOTAL DE SALDOS A FAVOR DEL CONTRATISTA
MONTOS SALDOS POR
PAGADOS PAGAR
(S/.) (S/)
1757621.25 39,932.65
1757621.25 39,932.65
0 53,568.54
0 53,568.54
S/ 1,757,621.25 S/ 93,501.19
S/ 1,757,621.25 S/ 93,501.19
-1078532.34 0.00
-359510.78 0.00
-719021.56 0.00
0.00 0.00
0.000 0.00
0.00 0.00
0.00 0.00
S/ 1,757,621.25 S/ 93,501.19
0 0.00
0 0.00
0 0.00
0.00 0.00
0.000 0.00
0.00 0.00
0.00 0.00
S/ 1,757,621.25 S/ 93,501.19
S/ 316,371.83 16,830.21
S/ 316,371.83 16,830.21
2,073,993.0750 110,331.4042
110,331.40
A FAVOR DEL
CONTRATISTA
0
63210.88
0
47120.53
110331.41
PENALIDAD CONFORME
Por falta de permanencia del Residente de Contrato N° 134-
Obra 2015/MDP/GM
Ley Contrataciones de
Incumplimiento del plazo Contractual Estado
DESCRIPCION FECHAS
12
17
CONSORCIO
Culminacion de obra (consideradando las
PICHANAQUI no concluye
02 ampliaciones) el 14 de noviembre de
la obra en la fecha
2016
establecida
LA OBRA PARALIZADA ACTA SUPERVISION
2,121,113.60
S/ 2,121,113.60