General .............................................................................. 2
Design layout..................................................................... 3
Function............................................................................. 4
The reproduction, transmission or use of this document or its
Welded assembly............................................................... 5 - 6
Bolt assembly .................................................................... 7
Tightening torque
- General............................................................................ 8 - 9
design, are reserved.
Tightening torque
- Tables.............................................................................. 10 - 12
Tightening torque
- Partitioned bolted connections ........................................ 13
Class: RESTRICTED
Siemens AG 3.2-0273-0005/1
Power Generation 02.02E
Gas Turbine Assembly Instructions for Piping
Field Assembly
Assembly - Instructions
Pipe Unions
Siemens AG 3.2-0273-0005/2
Power Generation 02.02E
Gas Turbine Assembly Instructions for Piping
Field Assembly
Design Layout
1)Welding cone
DIN 3865 res.
DIN/ISO 8434-4
2a)Welding connection
DIN 3902 among others
DIN/ISO 8434-1S
2b)Bolted connection
DIN 3900/1 res.
DIN/ISO 8434-1SDS
3) Cap nut
DIN 3870-A2 res.
DIN/ISO 8434-1 N
4) O-ring
DIN 3771 res. ISO 3601
Siemens AG 3.2-0273-0005/3
Power Generation 02.02E
Gas Turbine Assembly Instructions for Piping
Field Assembly
Function
After completion of the welding assembly, the components together with the
steel pipes make up a homogenous unit. By way of the bolted assembly, the
piping is centered and connected, so that it is axially sealed.
Sealing principle:
Joining principle:
Siemens AG 3.2-0273-0005/4
Power Generation 02.02E
Gas Turbine Assembly Instructions for Piping
Field Assembly
Welded assembly
Welding the piping components, welded connections and conical seal with
the cap nut to the corresponding steel pipe ends should be carried out
according to the general rules of DIN 8563 together with DIN 2359.
State of the art welded assembly calls for manual or mechanical inert gas
welding in accordance with the "Wurzel-WIG procedure". This requires a
welder with the qualification of the F III/IV permit.
Siemens AG 3.2-0273-0005/5
Power Generation 02.02E
Gas Turbine Assembly Instructions for Piping
Field Assembly
Welded Assembly
The following working steps are required for achieving the welded assembly:
1 A right angle butt joint at the steel pipe while observing the assembly
dimension and the required axial clearances here.
2 Chamfer the pipe end at an angle of 30' (DIN 2559) and deburr the
inside and outside of the pipe edge.
5 Welding of the root pass under protective and inert gas, then all filler
and final passes of the connection are applied.
Welding joints on precision steel pipes (DIN 2391) or stainless steel pipes
made under these conditions have metallically bright and clean surfaces. As a
result, there is no need to acid clean the piping. Flushing the lines suffices.
Siemens AG 3.2-0273-0005/6
Power Generation 02.02E
Gas Turbine Assembly Instructions for Piping
Field Assembly
Bolt assembly
The high reliability of this pipe joint requires careful bolt assembly. To reach
this goal the following working steps are necessary:
1. First the O-ring is inserted in the cleaned groove of the conical seal.
2. Then the conical seal shall be placed into the 24° cone of the welded
or bolted connection.
3. Now the cap nut is manually stressed, so that it is hand-tight.
4. Finally, the cap nut is stressed with the corresponding torque
moment. (see table on Sheet 10)
Important!
For safety reasons the union shall be held with an open ended wrench to
keep it in position. This also applies for the disassembly of the pipe
union.
Siemens AG 3.2-0273-0005/7
Power Generation 02.02E
Gas Turbine Assembly Instructions for Piping
Field Assembly
Tightening torque
The decisive criterion for the safety quality of a bolted joint is the pre-
stressing force. It is realized by means of the tightening torque in the form of
binding force. A bolted joint should never be fully relaxed, so as to prevent
relative movement. For this reason, high pre-stressing force should always be
chosen.
With a pipe union the pre-stressing force can only be evaluated by way of the
tightening torque, whereby approximately 90% of the torque moment is
transferred to the head and threading friction and only about 10% results in
the pre-stressing force.
For reasons stemming from the design, the joining and positioning behavior
of the 24°-conical seal bolted joint calls for tightening torque-dependent
installation. With the installation dependent on travel of turning, the
assembly components are plastically set or, to a certain extent, cold-
strengthened at the same angle of rotation. This is especially the case with
renewed assembly. For this reason, piping seals over longer periods can only
be guaranteed when the tightening torque moments achieved during bolted
assembly, which are listed in the tables, are observed.
Siemens AG 3.2-0273-0005/8
Power Generation 02.02E
Gas Turbine Assembly Instructions for Piping
Field Assembly
Tightening torque
Bolted joints made out of stainless steel tend to seize the threads as well as
the head faces as a result of their high cohesive properties. To prevent this
tendency the cap nuts of the AVIT conical seal pipe unions are equipped
with an electrolytically applied silver plating.
This prevents the so-called seizing res. cold-welding of the pipe union even
after multiple disassembly and reassembly operation also at temperature
influence of approximately 700°C.
Since the AVIT conical seal bolted joints of standard steel have been
phosphatized and treated with lubricant before delivery, it is not necessary to
additionally treat these bolted joints of standard or stainless steel with more
lubricant. Assemble these with the corresponding tightening torque moments
(MA) contained in the tables.
Siemens AG 3.2-0273-0005/9
Power Generation 02.02E
Gas Turbine Assembly Instructions for Piping
Field Assembly
DN cap nut SW MA
C-steel stainl. steel
- mm mm Nm Nm
4 M 18 x 1.5 22 50 70
6 M 20 x 1.5 24 58 80
8 M 24 x 1.5 30 63 120
10 M 30 x 2.0 36 95 150
15 M 36 x 2.0 46 145 250
20 M 42 x 2.0 50 200 320
25 M 52 x 2.0 60 240 500
40 M 68 x 2.0 80 300 650
Siemens AG 3.2-0273-0005/10
Power Generation 02.02E
Gas Turbine Assembly Instructions for Piping
Field Assembly
profiled ring
Siemens AG 3.2-0273-0005/11
Power Generation 02.02E
Gas Turbine Assembly Instructions for Piping
Field Assembly
DN threads SW MA
(A) C-steel stainless steel
- G....A mm Nm Nm
4/8 1/4 19 60 75
8 3/8 27 100 135
10 1/2 32 140 205
15 3/4 41 300 385
20 1 46 380 460
25 1 1/4 55 600 720
40 1 1/2 70 800 960
Siemens AG 3.2-0273-0005/12
Power Generation 02.02E
Gas Turbine Assembly Instructions for Piping