(2018-2021)
Petrochina (Halfaya)
CALCULATION REPORT
FOR
CATHODIC PROTECTION
24/10/2018
CONTENT
1.0 INTRODUCTION 3
1.1 PURPOSE 3
2.0 SCOPE 3
2.2 STANDARD 4
3.0 CALCULATION 4
4.0 CONCLUSION 8
FLOW LINES AND TRUNK LINES
(2018-2021)
Petrochina (Halfaya)
DETAIL DESIGN DOC. NO.: HFY3-3682-01-CP-CAL-0001 REV.: 0 PAGE 3 OF 9
1.0 INTRODUCTION
Halfaya oil field is situated in the southern part of Iraq, in the Missan Governorate, 35 km southeast of
Amara city. The field is a NW-SE trending anticlinal structure about 30 km long, 10 km wide, total area
is about 288 km2.
1.1 PURPOSE
The Calculation Report for Cathodic Protection is the Basis of Cathodic Protection MTO.
This calculation report is about Temporary Cathodic Protection of two underground crude oil pipelines,
namely;
For detailed information HFY3-3575-PPL-DB-001-Design Basis of the project may be referred to.
ITEM VALUE
Altitude 0.5 - 6 m ASL
Atmospheric Pressure 102 kPa
Temperature -2 - 55 °C
Dry Bulb Temp. 42.2 (GPSA 11-3b) °C
Max. Metal temp. by sunshine 80 °C
Max. Speed Wind 40 m/s
Prevailling Direction Wind (winter) NW-SE
Prevailling Direction Wind (summer) NW-SE
Relative Humidity %25 - %80
Rainfall 177.4 mm/a
1-Hour Rainfall 41 mm/h
15 in winter (1.2 -1.6 m)
Temp.
33.6 in summer (1 m)
Seismic Zone 2B
Evaporation Rate 3054.4 mm/a
2.0 SCOPE
2.2 STANDARD
● ISO 15589 Petroleum and natural gas industries cathodic protection of pipeline transportation
systems.
● NACE SP0169 Control of external corrosion on underground and submerged metallic piping system.
2.3 REFERENCE DOCUMENTS
HFY3-3575-PPL-DB-001 Design Basis
HFY-GEN-CP-SPC-0012 Specification for Cathodic Protection of Buried Pipeline
HFY3-3682-01-CP-DST-0001 Cathodic Protection Data Sheet
HFY3-3682-01-CP-MTO-0001 CP Material Take-off
HFY3-3575-02-CP-DWG-001 Test Post Installation Drawing
HFY3-3575-02-CP-DWG-002 Temporary Cathodic Protection Installation Drawing
HFY3-3575-02-CP-DWG-003 Pipeline Road Crossing Cathodic Protection
HFY3-3575-02-CP-DWG-004 Welding Joint Anti-corrosion Drawing
HFY3-3682-01-PPL-LAY-0001 Pipelines Route Layout from OGM726 to CPF2
HFY3-3682-01-PPL-LAY-0002 Pipelines Route Layout from OGM967to CPF2
Soil Resistivity Report
2.4 DESIGN LIFE
The temporary cathodic protection for flowlines and trunklines is no less than 3 years.
3.0 CALCULATION
Length Lp 4.715 km
Dia Dp 508 mm
Area Ap 7,525 m2
Soil Resistivity ρ 2,000 Ω.cm
Design Parameters in Page 7, in
CP Current Density Icp 0.05 mA/m2 HFY-GEN-CP-SPC-0012
Pipe Surface Area Ap 7,525 m2 Ap:𝜋*D*L
376.24 mA
Design Parameters in Page 7, in
Assumed current for 45 C (%37,5) 517.33 mA
HFY-GEN-CP-SPC-0012
Anode Resistance 𝜌 2𝐿
𝑅a,h = ln
2𝜋𝐿 𝑑
Mg Anode Parameters in Page 7, in
Anode Length La 70 cm
HFY-GEN-CP-SPC-0012
Mg Anode Parameters in Page 7, in
Anode Diameter Da 15 cm
HFY-GEN-CP-SPC-0012
Anode Resistance Ra,h 10.16 Ω
Efficiency E 0.5
Mg Anode Parameters in Page 7, in
CP Current Icp 0.51733 A HFY-GEN-CP-SPC-0012
Length Lp 5.266 km
Dia Dp 508 mm
Area Ap 8,404 m2
Soil Resistivity ρ 2,000 Ω.cm
Design Parameters in Page 7, in
CP Current Density Icp 0.05 mA/m2 HFY-GEN-CP-SPC-0012
Pipe Surface Area Ap 8,404 m2 Ap:𝜋*D*L
420.21 mA
Design Parameters in Page 7, in
Assumed current for 45 C (%37,5) 577.79 mA
HFY-GEN-CP-SPC-0012
𝜌 2𝐿
Anode Resistance 𝑅a,h = ln
2𝜋𝐿 𝑑
Mg Anode Parameters in Page 7, in
Anode Length La 70 cm
HFY-GEN-CP-SPC-0012
Mg Anode Parameters in Page 7, in
Anode Diameter Da 15 cm
HFY-GEN-CP-SPC-0012
Anode Resistance Ra,h 10.16 Ω
𝐸𝑝,𝑎−𝐸𝑝,
Anode Current 𝐼a =
𝑅𝑎,ℎ + 𝑅𝑝
Mg Anode Parameters in Page 7, in
Open Circuit Pot. Of Anode Ep,a 1.7 V cse
HFY-GEN-CP-SPC-0012
Cp Criteria in Page 6, in HFY-GEN-
Protection Potential Ep,s 0.85 V cse
CP-SPC-0012
Driving Voltage ∆ 0.85 V
E
Anode Resistance Ra,h 10.16 Ω
Pipeline Resistance Rp Rp
Coating resistance rc' 1.00E+04 Ω.m2 NACE CP3 Course Book
Efficiency E 0.5
Mg Anode Parameters in Page 7, in
HFY-GEN-CP-SPC-0012
CP Current Icp 0.578 A
4.0 CONCLUSION
No. of Mg
Anodes 8 9
Required
No. of Test
6 7
Posts