Вы находитесь на странице: 1из 2
‘iste the Konrad mine the Morseben ‘epostang andthe Ase mine to gather Information about the state ofthe ar Indrlling technology ad the seating of boreal. Building materials for ‘sealing and injection measures at the Asse Mine for more than a dacade, SCE and BCE TECANOLOCY Gmbl Rave gained ex fon of dit seats [Row bares) at the Ase mine In der to quaantee long-term chemical stablity and cor at re made of mapnerum onyclo ‘magnesium oxide [MGO) and crushed SIC med with magnesium charge Selution Due tos high reataty the Sserlabity timecf the concrete ether athe transporabity getance ofthe ction hee to\be done underground ‘nth sence plat. To ens that the concrete is produced ommpenents and on the production process The deer notes ofthe con Ponente are etecied routinely Inthe ‘the chemical composton of the ming olution are investigated. During the prodecton process, the dent, the i ‘oidcontent the termperatre adem erature evn, the electri tonic Setting times of the canrete The i= {al temperature of the mur core Spends tothe temperature of the aw freon ring natal anspor ‘more than 100 year, large numa of boreoler hve tobe eel in oro to taller han dif ameter, concretes “opie for borehole seating reasres Thus, 8 fre-grined and hy Nowe wae developed, which is based on the Same components s the moghesum ‘wears canerete in order to ensure ompatbty of the bung mater Sis To optimise the mater propertis fiperte of OGE TECHNOLOGY Gmbi ‘moathe the proportions ofthe mortar components. Moreoit, the diferent production and processing conditions tf conerte and mortar were taken ito Sccount. in the cate of borehole cel ing i has to be considered thatthe fd the reuting ncreas in tempers ture cols tet borehole sang fhe Bevehols chat campramisee De dit tle cdot ie aang that equ Special mesures. By no several hun ‘rods of breoies have ben sealea. based bling materials During mate Fal evelopment, partf the MgO was replaced mth magnesium hygronge [bruce sn roar to ensure soften ouragate «weed ex langeterm stable wen tgcL-reh brine. thie way. the injection materia compatible th Ng0-conemte and mortar The grain ‘tera sand the mare ui the requ of very fe Binders AS 3 result the materia eae ny facture, hoe 2 low permeability, and 2 pot fe lowes appcston under peak Sse mine» tof practi knomledge hasbeen snedinapluing MgO. eed busing matali order to achive Sealing of Exploratory Boreholes in the Gorleben and Asse Salt Mines fer competion of the Coleen se boreholes rmained open inthe min Ovetothernghvolumes great ents, Sand the high reauirements on their 5 For reasons of long-term stabi, wae decided to use magnesia binder essing material an fr reasane of ‘opie to the needs Neverthe, thie recipe could not beured tof the rset new recipe had tobe Gevelopes ord tested, biperts of BCE TECHNOLOGY ‘Gb prolanged the wertaty time (sot Ue] oF thi materal sgneanty ‘ork fociad on acepting the mater Se of cooled magnesia inde in orer {organ the pte and to oa croetng dung [AL tats and the seating ofthe bore (ted quaty assurance pros frder to guarantee smooth ‘he werkand to cemonstate tht the measurement resus clearly showed be succssul seat Ove to the very ing of positive experince gained in Gorteben ‘wae deed to ule this mitre for ‘sling the borholes in the Aa et The second par of the rin. For» fst seating rnesure the ruhe (PTKA assigned the RED proct ‘material was mixed above round and UVERSTOFF ta analyse the impact of ftoneparted in tanks to the ob ste on high temperatures an concrete cone the 70O-m-avel Tis procedure which structions na epostony to AGE TECH required an oxvenely ong pot if, was _ NOLOGY CnbH. 5 fin for bigh-quaty magnesia in= Ista a florence mater forthe every repositary concept in all Rost falng of further boreholes that are recs, Some elements of the sealing Planned for explong the postion of Systems ae made of ferent yoes of Eoneret. Tress eements ar often ct gored at mass concrete structures ew mine she many inveigation have been cared tion phase of mass concrete struc Concrete seating fooeeecees (on behalf of the Federal Minty fr are miarng The serch work cried Economic Affas and Energy (EMU, out within the scope of RAD project the Project Management Agency Kare” UVERSTOFFIe to clare the gop Far further infomation, vit wevrbpe-tchnology. san the QR code belo tery TEC BGE TECHNOLOGY GmbH sane a8

Вам также может понравиться