Академический Документы
Профессиональный Документы
Культура Документы
Cell: 0092-3456278469
Skype ID: engrabbasali49
Email: engrabbasali49@gmail.com Linkedin: www.linkedin.com/in/abbas-ali-27259310a/
OBJECTIVE:
Eager to progress as a professional in the fields of Mechanical Engineering with a world class organization.
EDUCATION:
WORK EXPERIENCE:
4-5 Year Professional Experience in Hub Power Company Limited and Sui Southern Gas Company Limited
August 2016- Present
a) HUBCO THERMAL POWER PLANT – 1292 MW
Working as Mechanical Maintenance & Project Engineer (Rotary & Stationary Equipment’s)
Major responsibilities include:
1. Transfer of Boiler Soot Blower controls from PLC to DCS with ABB team: Ensured on-time completion of project with
quality and safety
2. Refurbishment of Forced Draft Fan outlet to Steam Air Heater inlet air duct: Ensured on-time completion of project
through coordination with other teams like Corrosion Protection team.
3. Replacement of Corroded Demin Water pipeline
4. Installation of On-Line Turbine Lube Oil Duplex Filter
5. Boiler Retrofit Tube Replacement Project
6. RFO Tank API 653 inspection and repair work project.
7. Condensate Polishing Plant Project (Lead Engineer) With GE (WBG)
1
Turbine Auxiliaries Overhauling & Maintenance mainly overhauling of Condensate Extraction Pumps, Boiler Feed
Water Main Pump & Hydraulic Coupling, Vacuum Pump, Mechanical seals, Lube Oil Pumps, Feed Water Heaters and
other Heat exchangers.
RCA: Have a good experience of RCA, participated in RCA of business loss and safety incident of the plant. RCA
successfully increased plant safety and reliability.
Improving and Maintaining Reliability of Plant Equipment’s through preventive maintenance, predictive
maintenance, corrective maintenance, troubleshooting, condition based monitoring (Micro log CMVA-65) and Root
Cause Failure Analyses and improving the preventive maintenance procedures and schedules for operational equipment.
Major Overhauling of IHI Boiler (Capacity 1030 ton) and its Auxiliaries specifically overhauling of Force Draft
Fans, Gas Recirculation Fans, Gas Air Heater, Boiler Steam Drum and Safety Valves.
Major Overhauling of Balance of Plant Systems which includes Sea Water Intake CW Submersible Pump, Fuel Oil
Tanks and turbine hall 15/60 ton over head crane.
Major overhauling of Desalination Plants multi effect type (Capacity 1200 m 3/day) Different checks during
overhauling which are these: tube coating inspection, tubes inspection & replacement, main Ejector inspection,
Condenser inspection, valves complete overhauling.
RFO Tank: Led as project Engineer of Tank sludge disposal, cleaning, Inspection and repair works as per API 653.
Major Overhauling & Maintenance of Multistage Compressor Different checks during overhauling which are these
Bearing, float check, Gears measure& inspections, flow path measurements, cooler hydro-testing, compressor rotor
inspection(NDT), seals inspection, lubrication pumps inspection. etc
Plant modification has a good experience of plant temporary & permanent modification Through Management of
Change (MOC)
HAZOP Techniques: Participated in process safety analysis of different maintenance task.
DuPont/ PSM Safety System: Have good experience of process safety management system and ensure plants
compliance with process safety standard
Lead, manage and coordinate multi-discipline projects from initiation to close out according project handling
procedures and best practices.
Plant Operation: Excellent knowledge about Steam turbine, Boiler and their auxiliaries operation.
Excellent hand on experience with Maximo (Version 7.6) in procurement or inventory ordering system.
2
10. Have excellent interpersonal and communication skills