Академический Документы
Профессиональный Документы
Культура Документы
F (constant)
E=STRESS/STRIAN
E=(F/A) / (ε/L)
L ε/L=(F/A)/E
ε/L=F/(AE)
A
ε=(FL)/(AE)
INTEGRATION ε= ∫ (F/AE) Dl
ε=F/AE * X + C
AT X=0 ε=0→C=0
ε DL
AT X=L ε=(F*L)/(AE)
F
L E=(F/A) / (ε/L)
ε/L=(F/A)/E
A
ε/L=F/(AE)
ε=(FL)/(AE)
When pipe are floated in mud the Bouyance factor should included to find the force
BF=(489.5-MW)/489.5) MW in PCF
F(pipe)= 27,472
Pressure= 5,208 7" OD= 7
F(Area)= 44,007 7" ID= 6.184
7" WEIGHT= 29
A= 8.449
7" LINER
F(liner)= 61,610
Pressure= 7,292
Depth Tension
Total air weight= 311,000 0 263,349
Total bouyd weight= 263,349 14000 -45,075
diff= 47,651
5" elongation due to its weight 5" elongation due to 7" load 7" elongation due to its weight
Tension vs Depth
-100,000 -50,000 0 50,000 100,000 150,000 200,000 250,000 300,000
D 0
e 2,000
p
t 4,000
h 6,000
( 8,000
t 10,000
v 12,000
d
) 14,000
16,000
Tension Load
/ (2 * A * E)
inch
meter
INCH
Meter
MW= 75 Drill pipe
BF= 0.847 L= 2000 0
OD= 5 2000
ID= 4.276
PPF 19.5
A= 5.272
Air Weight= 127,959
Drill collar1
L= 100 F2= 78,567 2000
P2= 3418 OD= 6.5 2100
ID= 2.5
PPF 96
A= 28.260
Air Weight= 31,498
P3= 3589
L= 150 F3= 84,511 Drill collar2
OD= 8.5 2100
ID= 2.5 2250
PPF 176
A= 51.810
P4= 3845 Air Weight= 86,618 F4= -199,205
500
1000
Drill collar1
3,422
-28,076
1500
2000
Drill collar2
-112,587
-199,205
2500
drill collar2