Вы находитесь на странице: 1из 14

RFCL - CIVIL WORKS FOR BAGGING & RAILWAY PLATFORM FOR REVIVAL OF RAMAGUNDAM

FERTILIZER COMPLEX
BUILDING WORKS (PART-B)

SCHEDULE OF WORKS

Sl.
No Description START

RFCL - BAGGING BUILDING & RAILWAY PLATFORM


27/01/2017
PROJECT
Mobilization 27/01/2017
Site Clearance 17/2/2017
Site Layout marking 23/02/2017
1 Construction of Bagging Building, Railway Platform&Shed 1/3/2017
Sub-Structure : 1/3/2017
Earth work excavation for footings 1/3/2017
PCC for Foundations 5/3/2017
Footings 10/3/2017
Column (Up to Plinth Level) 15/03/2017
Soil filling and compaction till Ground level 18/04/2017
Plinth Beams 22/04/2017
Soil filling and compaction till Plinth level 25/04/2017
Super-Structure :
First Level Slab @ 104.3 ( Slab Height 4.3m ) ( 738 sqm ) 8/5/2017
GF-Columns upto Beam bottom level 1/5/2017
First Level Slab Concrete 4/5/2017
First Level-Brick Work 6/6/2017
GF-Plumbing & Electrical Ducts 12/6/2017
Internal Plastering 16/6/2017
Heavy duty flooring ( Switch Gear room & AC Pack Room ) 22/6/2017
False Flooring ( Operator Room ) 16/7/2017
Painting GF-Internal 24/7/2017
Toilet wall & floor tile work 9/1/2018
Sanitary fiitings & fixtures in Toilets 22/1/2018
Second Level @ 111.2 ( Slab Height 6.9m ) Slab area = 2404 sqm
FF-Column up to roof beam bottom level 23/05/2017
Slab Concrete For Second level ( Grid 1 -7 ) ( 800 sqm ) 28/05/2017
Slab Concrete For Second level ( Grid 7a -14a ) ( 800 sqm ) 10/6/2017
Slab Concrete For Second level ( Grid 14 -24 ) ( 800 sqm ) 30/06/2017
FF-Brick Work 6/7/2017
FF-Plumbing & Electrical Ducts 15/07/2017
Internal Plastering 28/07/2017

Page 1 of 14
RFCL - CIVIL WORKS FOR BAGGING & RAILWAY PLATFORM FOR REVIVAL OF RAMAGUNDAM
FERTILIZER COMPLEX
BUILDING WORKS (PART-B)

SCHEDULE OF WORKS

Sl.
No Description START
FF-Flooring 15/8/2017
Painting FF-Internal 26/8/2017
Toilet wall & floor tile work 9/1/2018
Sanitary fiitings & fixtures in Toilets 22/1/2018
Expansion joint for slabs 16/08/2017
Third Level @ 116.2 ( Slab Height 5.0m ) area = 3315 sqm
SF-Column up to roof beam bottom level 16/07/2017
Slab Concrete For Third Level ( Grid 1-7) ( 1100 sqm ) 20/7/2017
Slab Concrete For Third Level ( Grid 7a-14a) ( 1100 sqm ) 25/7/2017
Slab Concrete For Third Level ( Grid 14-24) ( 1100 sqm ) 1/9/2017
SF-Brick Work 1/9/2017
SF-Plumbing & Electrical Ducts 15/9/2017
Internal Plastering 10/10/2017
SF-Flooring 22/9/2017
Painting SF-Internal 20/10/2017
Expansion joint for slabs 16/10/2017
Fourth Level @ 119.2 ( Slab Height 3.0m ) area = 942 sqm
Columns up to roof beam bottom level 27/09/2017
Slab Concrete For Fourth Level 1/10/2017
Brick Work 7/11/2017
Plumbing & Electrical Ducts 15/11/2017
Internal Plastering 20/11/2017
Flooring 1/12/2017
Painting SF-Internal 10/12/2017
Fifth Level @ 125.2 ( Slab Height 6.0m ) area = 590 sqm
Columns up to roof beam bottom level for Staircase 23/10/2017
Staircase Slab Casting 1/11/2017
Column Bolts for ISMB Fixting with MS Plate 23/10/2017
Scaffolding ( Cup-lock system ) for ISMB & Truss 24/10/2017
ISMB Erecting 1/11/2017
Truss Fixing with ISMB 12/11/2017
Sixth Level @ 128.7 ( Slab Height 3.5m ) slab area 110 sqm
Columns up to roof beam bottom level for Staircase 17/11/2017
Staircase Slab Casting 23/11/2017
Scaffolding ( Cup-lock system ) for ISMB & Truss 26/11/2017
Column Bolts for ISMB Fixting with MS Plate 29/11/2017

Page 2 of 14
RFCL - CIVIL WORKS FOR BAGGING & RAILWAY PLATFORM FOR REVIVAL OF RAMAGUNDAM
FERTILIZER COMPLEX
BUILDING WORKS (PART-B)

SCHEDULE OF WORKS

Sl.
No Description START
ISMB & Bracings Erecting 2/12/2017
Truss Fixing with ISMB & Purlins fixing 12/12/2017
Roof Sheeting Fixing 19/12/2017
Seventh Level @ 133.2 ( Floor Height = 4.5m ) Floor area- 30 sqm
Columns up to roof beam bottom level for Staircase 9/12/2017
Staircase Slab Casting 10/12/2017
Scaffolding ( Cup-lock system ) for ISMB & Truss 20/12/2017
Column Bolts for ISMB Fixting with MS Plate 24/12/2017
ISMB & Bracings Erection 27/12/2017
Eight Level @ 139.45 ( Floor Height - 6.25m ) Floor area = 30 sqm
Columns up to roof beam bottom level for Staircase 22/12/2017
Staircase Slab Casting 25/12/2017
Scaffolding ( Cup-lock system ) for ISMB & Truss 8/1/2018
Column Bolts for ISMB Fixting with MS Plate 11/1/2018
ISMB & Bracings Erection 14/1/2018
Ninth Level @ 142.45 ( Floor Height = 3.0m ) floor area - 30 sqm
Columns up to roof beam bottom level for Staircase 7/1/2018
Staircase Slab Casting 9/1/2018
Scaffolding ( Cup-lock system ) for ISMB & Truss 19/1/2018
Column Bolts for ISMB Fixting with MS Plate 22/1/2018
ISMB & Bracings Erection 25/1/2018
Tenth Level @ 146.45 ( Floor Height = 4m ) PEB
Columns up to roof beam bottom level for Staircase 20/1/2018
Staircase Roof Slab Casting 23/1/2018
Scaffolding ( Cup-lock system ) for ISMB & Truss 3/2/2018
Column Bolts for ISMB Fixting with MS Plate 7/2/2018
ISMB & Bracings Erection 10/2/2018
PEB Sheet Cladding & Roof Sheeting
Tenth Level @ 146.45 18/02/2018
Ninth Level @ 142.45 26/02/2018
Eight Level @ 139.45 1/3/2018
Seventh Level @ 133.2 5/3/2018
External Plastering
External Scaffolding 25/10/2017
Third Level @ 116.2 27/10/2017
Second Level @ 111.2 9/11/2017

Page 3 of 14
RFCL - CIVIL WORKS FOR BAGGING & RAILWAY PLATFORM FOR REVIVAL OF RAMAGUNDAM
FERTILIZER COMPLEX
BUILDING WORKS (PART-B)

SCHEDULE OF WORKS

Sl.
No Description START
First Level @ 104.3 23/11/2017
Windows & Ventilators Fixing :
Third Level @ 116.2 11/11/2017
Second Level @ 111.2 24/11/2017
First Level @ 104.3 1/12/2017
Electrical works
All Levels 10/10/2017
External Painting
All Levels 1/12/2017
Handling Over of Bagging Building
All Levels 12/3/2018
Railway Platform
Earth work excavation for foundation 15/03/2017
RCC works 25/03/2017
Back Filling 2/4/2017
Platform Grade Slab 15/4/2017

1/5/2017
PEB Columns Erection & Connecting beams @ Level 107.2 & 111.2
Fabrication of Platform Roof Truss 30/5/2017
Roof Truss fixing 30/07/2017
Roof Sheeting 15/08/2017
Painting works 25/08/2017
2 BAGGING CONTROL ROOM
Sub-Structure :
Earth work excavation for footings 30/3/2017
PCC for Foundations 5/4/2017
Footings 9/4/2017
Columns (Up to Plinth Level) 15/04/2017
Soil filling and compaction till Ground level in footings 18/04/2017
Plinth Beams 22/04/2017
Soil filling and compaction till Plinth level 15/05/2017
Super-Structure :
GF-Columns upto Beam bottom level 1/6/2017
Ground Floor Slab Concrete 8/6/2017
Ground Floor-Brick Work 20/7/2017
Grade Slab 20/7/2017

Page 4 of 14
RFCL - CIVIL WORKS FOR BAGGING & RAILWAY PLATFORM FOR REVIVAL OF RAMAGUNDAM
FERTILIZER COMPLEX
BUILDING WORKS (PART-B)

SCHEDULE OF WORKS

Sl.
No Description START
GF-Plumbing & Electrical Ducts 5/8/2017
Internal Plastering 16/8/2017
Heavy duty flooring ( AC Pack Room ) 8/8/2017
Painting GF-Internal 28/8/2017
Flooring with Vitrified Tiles 24/8/2017
Toilet wall & floor tile work 24/8/2017
Sanitary fiitings & fixtures in Toilets 29/8/2017
Kitchen Granite Platform & finishes 30/8/2017
Electrical works 29/8/2017
External Plastering 20/8/2017
Windows & Ventilators 4/9/2017
HVAC 29/8/2017
Under Deck Insulation 5/9/2017
False Ceiling 22/9/2017
False Flooring ( Operator Room ) 16/9/2017
Parapet Wall 15/8/2017
Staircase Head room Columns 5/7/2017
Staircase Head room Slab 8/7/2017
Terrace water Proofing 1/8/2017
3 UREA SILO ( REFURBISHMENT )
Removingexisting waterproof on Silo slab ( External ) 9/3/2017
Waterproofing with Tar based PU elastemeric (Roof ) 15/3/2017
Strengthening of existing Ribs & shell 9/3/2017
Inside Painting of Silo 20/3/2017
Dismantling of Existing RCC Flooring 30/04/2017
Reconstruction of RCC Flooring inside Silo 15/05/2017
Expansion joint in RCC flooring 30/06/2017
Dismantling of Existing Conveyor support 15/3/2017
Reconstruction of Coveyor support system 25/3/2017
4 WARE HOUSE ( REFURBISHMENT )
Dismantling of existing Asbestos cement Sheets 9/3/2017
Fixing new Asbestos cement sheets 25/3/2017
Removing existing Glass ventilators 9/3/2017
Fixing new Glass ventilators 30/3/2017
Epoxy Painting/coating/lining on structural steel 15/05/2017

Page 5 of 14
RFCL - CIVIL WORKS FOR BAGGING & RAILWAY PLATFORM FOR REVIVAL OF RAMAGUNDAM
FERTILIZER COMPLEX
BUILDING WORKS (PART-B)

SCHEDULE OF WORKS

Sl.
No Description START
DISMANTLING OF EXISTING RAILWAY TRACK, BALLAST &
5
REMOVING OF SLEEPERS
Disantling of existing railway track 9/3/2017
Removal of stone ballast under the track 15/3/2017
Removal of wooden track sleepers

6 WEIGH BRIDGE & CABINS


Sub-Structure :
Earth work excavation for footings 9/1/2018
PCC for Foundations 9/1/2018
Footings 12/1/2018
Columns (Up to Plinth Level) 20/1/2018
Soil filling and compaction till Ground level in footings 25/1/2018
Plinth Beams 27/1/2018
Soil filling and compaction till Plinth level 4/2/2018
Super-Structure :
GF-Columns upto Beam bottom level 4/2/2018
Slab Concrete 6/2/2018
Parapet wall 19/2/2018
Brick work 4/2/2018
Electrical ducting 9/2/2018
Internal Plastering 14/2/2018
False Ceiling 20/2/2018
Internal Painting 27/2/2018
External Plastering 20/2/2018
External Painting 25/2/2018
Windows fixing 28/2/2018
Weigh Bridge Mechanical Items Installation 2/3/2018
7 ROADS & FLEXIBLE PAYMENTS
Earth work excavation upto formation level 9/1/2018
Sub-base Course layer ( aggregate size 45mm to 90mm size ) 9/1/2018
Base Course layer ( aggregate size 45mm to 63mm size ) 12/1/2018
RCC concrete pavement 20/1/2018
8 U/G RCC PIPE SEWER LINE
Earth work excavation for RCC Pipe Line 9/1/2018
RCC Pipe 150mm dia ( P1 Class pipes )( Length -- 200m) 9/1/2018

Page 6 of 14
RFCL - CIVIL WORKS FOR BAGGING & RAILWAY PLATFORM FOR REVIVAL OF RAMAGUNDAM
FERTILIZER COMPLEX
BUILDING WORKS (PART-B)

SCHEDULE OF WORKS

Sl.
No Description START

Page 7 of 14
L OF RAMAGUNDAM

FINISH

26/03/2018

16/2/2017
25/02/2017
28/02/2017
16/10/2017
8/5/2017
10/3/2017
15/03/2017
31/03/2017
10/4/2017
12/4/2017
5/5/2017
8/5/2017

8/5/2017
10/5/2017
22/5/2017
16/6/2017
22/6/2017
26/6/2017
27/6/2017
26/7/2017
30/7/2017
15/1/2018
29/1/2018

5/6/2017
20/6/2017
30/6/2017
15/7/2017
15/08/2017
30/07/2017
20/8/2017

Page 8 of 14
L OF RAMAGUNDAM

FINISH
30/8/2017
15/09/2017
15/1/2018
29/1/2018
25/08/2017

26/7/2017
15/08/2017
20/8/2017
26/9/2017
15/10/2017
25/10/2017
7/10/2017
25/10/2017
15/11/2017
25/10/2017

6/10/2017
22/10/2017
22/11/2017
27/11/2017
5/12/2017
15/12/2017
20/12/2017

3/11/2017
15/11/2017
25/10/2017
30/10/2017
15/11/2017
25/11/2017

26/11/2017
7/12/2017
30/11/2017
4/12/2017

Page 9 of 14
L OF RAMAGUNDAM

FINISH
15/12/2017
19/12/2017
26/12/2017

12/12/2017
20/12/2017
24/12/2017
27/12/2017
7/1/2018

26/12/2017
5/1/2018
11/1/2018
13/1/2018
24/1/2018

10/1/2018
18/1/2018
22/1/2018
24/1/2018
2/2/2018

23/1/2018
3/2/2018
7/2/2018
10/2/2018
17/02/2018

25/02/2018
2/3/2018
6/3/2018
12/3/2018

30/10/2017
9/11/2017
22/11/2017

Page 10 of 14
L OF RAMAGUNDAM

FINISH
30/11/2017

16/11/2017
30/11/2017
5/12/2017

10/1/2018

30/12/2017

26/03/2018

15/04/2017
30/4/2017
5/5/2017
20/5/2017

20/5/2017

15/7/2017
30/8/2017
15/09/2017
25/09/2017

7/4/2017
10/4/2017
25/04/2017
30/4/2017
5/5/2017
15/5/2017
30/5/2017

10/6/2017
29/6/2017
10/8/2017
10/8/2017

Page 11 of 14
L OF RAMAGUNDAM

FINISH
15/8/2017
30/8/2017
10/8/2017
12/9/2017
4/9/2017
29/8/2017
4/9/2017
4/9/2017
15/9/2017
29/8/2017
12/9/2017
20/9/2017
22/9/2017
22/10/2017
23/9/2017
20/8/2017
10/7/2017
22/7/2017
10/8/2017

9/4/2017
19/5/2017
9/4/2017
30/04/2017
30/05/2017
30/06/2017
30/07/2017
25/3/2017
30/04/2017

9/4/2017
15/5/2017
20/3/2017
10/4/2017
20/06/2017

Page 12 of 14
L OF RAMAGUNDAM

FINISH

9/4/2017
19/5/2017

16/1/2018
18/1/2018
22/1/2018
26/1/2018
28/1/2018
5/2/2018
7/2/2018

9/2/2018
17/2/2018
24/2/2018
7/2/2018
15/2/2018
20/2/2018
27/2/2018
2/3/2018
27/2/2018
28/2/2018
28/2/2018
15/3/2018

16/1/2018
18/1/2018
22/1/2018
26/1/2018

16/1/2018
18/1/2018

Page 13 of 14
L OF RAMAGUNDAM

FINISH

Page 14 of 14