Вы находитесь на странице: 1из 823

VOLUME – I

for

BUILDING WORKS
INDEX

SUBJECT PAGE

Foreword (i) – (ii)


Preface (iii) –(iv)
1. General Conditions —— A1 - A4
2. General Specifications
(A) Material —— B1
(B) Execution —— B7
(C) Mode of Measurement B38
(D) Additional Condition of Contract B43
for Departmental Materials
(E) Miscellaneous —— B45

3. Chart for Consumption of Materials —— B48

4. List of frequently used I.S. Codes ____ B59

5. SECTION-1 : BUILDING WORKS


(A) Earth Work, Antitermite Treatment —— 1-6 1

(B) Dismantling, Cutting Chase, Holes etc. —— 7-10 1

(C) Brick Work, Concrete Work etc. —— 11-39

(D) Flooring —— 40-57

47 (E) Roofing and Sheet Walling —— 58-71 6

9 (F) Structural Steel Works, Grills, Gates etc. —— 72-84

85 (G) Carpenter’s Works —— 85-144

10 (H) Band Moulding, Cornice etc. —— 145-150

18(I) Plastering, Pointing etc. —— 151-154192


PWD (W.B.), Schedule of Rates 2014

INDEX

SUBJECT PAGE

(J) White Wash,Colour Wash,Distemper ------ 155-160


__________
(K) Painting, Varnishing etc. —— 161-165
(L) Glazier’s Work — 166-167
(M) Drain, Down Pipes, Chimney Pipes etc. — 168-174
(N) Thatch, Mud and Bamboo Works —— 175-179
(O) Fencing —— 180-187
(P) Soling, Edging and Metalling —— 188-191
(Q) Maintenance of Statues and Monuments etc. —— 192
(R) Aluminium Works —— 193-204
(S) Well for Water Supply —— 205-211
(T) Miscellaneous Works —— 212-229
(U) Additional Items —— 230-264

6. SECTION-2 : Materials and Labour


(A) Materials Delivered & Stacked at Site
(B) Labour Rates per Diem ——
7. ANNEXURE-I
Table-1.1 ——
Format A ——
Format B ——
8. ANNEXURE-II ——
PWD (W.B.), Schedule of Rates 2014

GENERAL CONDITION

1. The Schedule of Rates (Volume – I) is divided into two sections and each section into sub-sections. In
all cases of contracts in respect of Building Works, this entire volume of Schedule will be operative.
Though this entire volume of Schedule is divided for convenience into sections and sub-sections it is to
be taken as a whole. An item under one section will apply equally to work failing under the category of
another section unless a similar item appears in the later section. The same principle applies to items
under different sub-sections..

2. The ‘Engineer-in-Charge’ shall mean the Executive Engineer of the Division concerned. The Sub-
divisional Officer concerned is authorized to carry out on behalf of the ‘Engineer-in-Charge’ general
supervision, day to day instructions with approval of materials and workmanship. In case of dispute,
the decision of the ‘Engineer-in-Charge’ shall be final and binding.

3. Except when specifically mentioned in the description of the item itself, the rate for any item of work
will apply equally to all floors, in any position and up to any height. In respect of concrete work etc.
where the rate is on the basis of volume, the item shall apply to all cases irrespective of the thickness
unless a specific item appear in the Schedule for the particular type of work. The work up to a
particular floor level means all work up to the roof of that floor. All works in basement shall be treated
as work in first floor for payment.

4. Renewal works include dismantling and taking out of old works with mending good damages after
renewal and removal of waste materials. The rate for any item of original nature not provided in this
Schedule may be deduced from the rate of similar item of renewal work by multiplying by a factor
100/105 and conversely the rate of any item of renewal nature not provided in this Schedule may be
deduced from the rate of similar item of original nature by multiplying by a factor 105/100.

5. White washing, painting etc. include preparation of surface (including plugging old nail holes etc.)
prior to the treatment and removal of all marks or stains from walls, floor, glass, panes, chowkats etc.
For repair works, this also includes shifting and/or covering furniture etc.

6. All works shall be carried out with due regard to the convenience of the occupants, if any, and the
arrangement and programme of work must be adjusted accordingly. In case of works within Jails,
Hospitals etc. the Rules & Regulations of Authorities concerned must be strictly obeyed. The rates
given in the Schedule are deemed to be inclusive of all such factors and contingencies.

7. All materials, tools and plants besides those to be supplied by government are to be arranged for the
work. All labours (Skilled & Unskilled) including their housing, sanitation, procurement of food stuff,
medical aids etc. are to be arranged by the contractor. Cost of transport of labour, materials and all
other relevant items shall have to be borne by the contractor.
PWD (W.B.), Schedule of Rates 2014
A-1

8. Arrangement of water for preparation of concrete & mortar as well as for soaking of bricks and other
materials are to be made by the contractor. Construction of platforms and vats including cost thereof
are to be borne by the contractor.

9. Rates of all items are inclusive of labour & material charges with all other relevant cost towards
Sales Tax, Royalty, Octroi, Toll Tax, Ferry Charges, VAT etc. as may have to be incurred by the
contractor for the respective items of works to be executed to proper and complete finish.

To arrive at complete rate of different items in this Schedule, 5% overhead, 10% contractor’s
profit and 1% labour welfare cess have been considered along with the aforesaid material cost,
labour cost and other cost etc.

Unless specifically mentioned otherwise in the description of the item itself, no extra charges will be
paid for scaffolding (including stage scaffolding), centering, shuttering, curing etc. and the rates are
deemed to be inclusive of the same and of the cost of sundries necessary for the satisfactory completion
of the work.

10. All materials brought to site must have approval of Engineer-in-Charge. Rejected materials must be
removed by the contractor from the site within 24 (twenty-four) hours of the issue of orders to that
effect. In case of non-compliance with such orders, the ‘Engineer-in-Charge’ shall have the authority
for removal of those rejected materials at the cost and expenses of contractor and the contractor shall
not be entitled to any loss or damage on that account.

11. Departmental materials (i.e. materials are supposed to be issued by the department) shall be issued to
the contractor to the extent of requirements as assessed and in small installments as decided by the
Engineer-in-Charge. Issue of departmental materials may be of two categories :

(A) Materials for which value are to be recovered from the contractor.

(B) Materials which are issued directly to work (in respect of items the rates of which do not include
the cost of these materials).

For materials under Category (A) the value of materials issued to the contractor on usual hand receipt
shall be recovered from the bill of contractor in one installment or in successive installments as may be
decided by the Engineer-in-Charge.

For materials under Category (B) the contractor will act as custodian of the department, when he shall
take charge of the materials against appropriate receipts signed by him. The contractor shall remain
responsible for the proper storage and safe custody of such materials. The rates of relevant items of
work shall be deemed to be inclusive of reasonable consideration for such duties and responsibilities as
the custodian.
PWD (W.B.), Schedule of Rates 2014
A-2

All materials, whatever be the category thereof, shall be properly stored by the contractor in suitable
godowns within the site of work. Under no circumstances whatsoever shall any materials be removed
from the site of work without prior written permission from the Engineer-in-Charge. The contractor
shall be responsible for any damage or loss of such materials unless he can satisfy the Engineer-in-
Charge that the reasons for such damage or loss are due to circumstances beyond his control. The
contractor shall also have to satisfy the Engineer-in-Charge regarding the proper utilization of such
materials.

The value of any materials which cannot be satisfactorily accounted for, shall be revovered from the
contractor’s bill or other dues as specified in P. W. Department’s Order No. 2809(3)-A Dated
27.04.1971 as mentioned in West Bengal Form No. 2911.

Any materials under Category (A) which may be surplus in few quantities on completion of the work
may at the sole discretion of the Superintending Engineer be taken back provided the same are found of
non-perishable nature and has not been damaged in any way. Surplus materials under Category (B)
shall be returned to the Engineer-in-Charge in good condition.

12. Subject to the aforesaid condition, the following materials under Category (A) shall be issued to the
contractor at issue rates reflected against each. The materials shall be issued from the departmental
godown or godowns and for this purpose a stack-yard shall also be deemed as goodown as may be
specified in the contract stipulations for any particular work. The contractor will have to carry the
materials at his own cost and his quoted rate will be deemed to be inclusive of all such costs including
costs for loading, unloading and stacking.

(i) Cement - Issue Rate and Basic Price of Cement are shown in Table – 1-1 of
Annexure – I. If cement is supplied by the Department, the cost of cement
will be recovered on Issue Rate, when in case of supply of the same by the
contractor, then rates of those cement related items are to be deduced as
per Format – A of Annexure - I.

Except M35 & M40 Grade of design mix concrete, rates of all other
cement related items have been derived considering PSC/PPC Cement. For
M35 & M40 Grade of design mix concrete, OPC (Grade – 43/53) cement
has been considered in deriving the item-rates.

(ii) Reinforcing Steel - Issue Rate and Basic Price of Reinforcing Steel are shown in
Table – 1-1 of Annexure – I. If Steel is supplied by the Department,
the cost of Steel will be recovered on Issue Rate, when in case of
supply of the same by the contractor, then rates of those Steel related
items are to be deduced as per Format – B of Annexure - I.
Cut pieces of reinforcing steel materials left surplus on completion of
work shall not be taken back if the same be considered as unsuitable
for utilization in other works. Item-rates of structural steel and GCI
Sheet have been derived considering said materials to be supplied by
the contractor.
PWD (W.B.), Schedule of Rates 2014
A-3

(iii) Empty Bitumen Drum - Prevailing Schedule of Rates (Volume – III) of PWD is to
be followed.

If in the interest of the work, materials other than those


mentioned above are to be issued under Category (A), the
issue-rate of such materials shall be based on the-then market
rate or the stock issue-rate whichever is higher. Such issue-rate
shall be decided by the Engineer-in-Charge and his decision
shall be binding.

13. Materials obtained by dismantling Government structures or parts thereof shall remain the property of
Government. The contractor shall sort out and stack the serviceable materials within the premises and
also dispose of the unserviceable rubbish etc. as per instruction of the Engineer-in-Charge or his
representative.

The contractor shall remain the custodian of such dismantled materials till the charge of the same is
taken over by the Engineer-in-Charge or his representative.

14. The site must be cleared by the contractor from time to time by removing rubbish, debris etc. as
accumulated during the work and on completion the whole site must be left in a clean and tidy
condition to the satisfaction of Engineer-in-Charge or his representative.

15. Number of full bricks salvaged by dismantling all types of masonry part of the structure must
correspond to at least 20% of the volume dismantled.

16. Carriage of materials (unless specifically considered in the Rate Analysis) is the sole responsibility of
the contractor for which no extra payment should be made (unless in exigency a few of those seem to
be justified by the Engineer-in-Charge, when the same are to be approved by the concerned
Superintending Engineer).

A-4
PWD (W.B.), Schedule of Rates 2014

GENERAL SPECIFICATIONS
(INCLUDING MODES OF MEASUREMENT)
(A) MATERIALS

GENERAL:

All materials to be used in works shall conform to Indian Standards Specification as published by B.I.S from
time to time (and in the absence thereof as approved by the Engineer-in-Charge). Unless specifically mentioned
otherwise the following modes of measurements shall be adopted. In general the mode of measurement of the
civil engineering works shall be guided by I.S.I. Code No.: 1200-1964 (Revised) for Indian Standard Method of
measurement of Building work.

A-1 Bricks

All bricks shall be of approved quality of standard specifications, made of good brick earth, uniform deep red,
cherry or copper colour, thoroughly burnt in kiln (machine made) without being vitrified, regular in shape and
size, sound, hard, homogeneous in texture, true to shape and of standard dimension and shall be free form
cracks, chips, flaws, stones or humps of any kind and shall not show appreciable signs of efflorescence either
dry or subsequent to soaking in water. The size of bricks shall be 93/ ”x 43/ ” x 23/ ” (conventional). 190 x 90 x
4 4 4

90 mm (modular). The Bricks shall emit a clear ringing sound on being struck and have minimum crushing
strength of 105 kg./sq.cm. All the bricks which absorb water more than 20% of their own dry weight after 24
hours immersion in cold water shall be rejected.

A-2 Coarse Aggregates for Cement Concrete Works :


Stone chips or stone ballast for cement concrete (plain or reinforced) shall be hard, of uniform and fine texture.
free form faults or planes of weakness and free from weathered faces. The ballast or chips must be free from
loam, clay or any surface coating, free from organic matter or other impurities and screened, free of dust. Stone
of black and hard variety as is generally available from quarries in Pakur or Chandil areas will be normally
used. Stone aggregates from other sources may also be used provided the same is found suitable in the opinion
of the Engineer-in-Charge. The opinion of Engineer-in-Charge must be recorded in writing. The ballast or chips
shall be obtained by breaking from large blocks and must be more or less cubicle in shape.
Size of Coarse Aggregates : For any of the following nominal sizes of graded coarse aggregates, grading shall
be in conformity with the requirements laid down in the Indian Standards Specification IS : 383-1963 as shown
below in Table 1.

B-1
PWD (W.B.), Schedule of Rates

TABLE - 1
IS. Seive Designation Percentage passing for graded aggregate of nominal size
40mm 20mm 16mm 12.5mm
1 2 3 4 5
80 mm 100
63 mm
40 mm 95-100 100
20 mm 30-70 95-100 100 100
16 mm 90-100
12.5 mm. 90-100
10 mm. 10-35 25-55 30-70 40-85
4.75 mm. 0-5 0-10 0-10 0-10
2.36 mm.

When coarse aggregates brought to the site is ungraded, single size coarse aggregates of different nominal
sizes, conforming to the requirements vide table II given below, shall be mixed at site with the other ingredients
of concrete either directly in the mixture or on the platform in the proportion indicated in Table III below :

TABLE –II
IS. Seive Designation Percentage passing for single sized aggregate of nominal size
63mm 40mm 20mm 16mm 12.5mm 10 mm
1 2 3 4 5 6 7
80 mm 100
63 mm 85-100 100
40 mm 0-30 85- 100 100
20 mm 0-5 0-20 85-100 100
16 mm 85- 100 100
12.5 mm. 85-100 100
10 mm. 0-5 0-5 0-20 0-30 0-45 85-100
4.75 mm. 0-5 0-5 0-10 0-20
2.36 mm. 0-5

B-2
PWD (W.B.), Schedule of Rates

TABLE - III
SI. Cement Nominal Parts of Parts of Parts of Parts of Parts of
No. concrete mix size of aggregate of aggregate of aggregate of aggregate of aggregate of
aggregate size 50 mm. size 40 mm. size 20 mm size 12.5 mm size 10 mm.
1 2 3 4 5 6 7 8
1. C.C1:6: 12 63mm 9 3
2. C.C.1:6:12 40mm 9 3
1
3. C.C.1:5:10 63mm 7 2/ 212/
4. C.C. 1:5:10 40mm 712/ 212/
5. C.C.1:4:8 63mm 6 2
6. C.C.I:4:8 40mm 6 2
1
7. CC. 1:3:6 63mm 4 2/ 112/
8. CC. 1: 3 : 6 40mm 412/ 112/
9. CC. 1:3:6 20mm 412/ 121/
10. C.C.1:2:4 40mm 212/ 1 121/
11. C.C.1:2:4 20 mm 3 1
12. C.C.1:2:4 12.5mm 3 1
13. C.C. 1:1/2:3 20mm 2 1

Notes: The Proportions indicated in table III above are by volume. These proportions may be varied
somewhat by Engineer-in-Charge after making sieve analysis of the aggregates brought to the site, when
considered necessary for obtaining better density and strength of concrete, void ratio in the tune 0-25

All-in-aggregates: If combined aggregates are available, they need not be separated into fine and coarse.
But necessary adjustment may be made in the grading by the addition of single sized aggregates. The grading
of the all-in-aggregate when analysed as described in IS: 2386 (Part I) shall be in accordance with Table IV.

TABLE - IV

I.S.Seive Designation Percentage passing for all-in-aggregate


40mm 20mm
Nominal size Nominal size
1 2 3
80 mm 100
40 mm 95-100 100
20 mm 45-75 95-100
4.75 mm 25-45 30-50
600 micron 8-30 10-35
150 micron 0-6 0-6

B-3
ii) Gravel, for use as coarse aggregates in cement concrete work must be hard, absolutely free from
surface coating and on being broken, the fractured surface must indicate a uniform and fine texture
free from laminations or planes or weakness. It shall be thoroughly washed and free from any
foreign elements.

(iii) Jhama chips for cement concrete work shall be obtained by breaking good quality Jhama bats,
must not be spongy or with any coating of foreign materials and should be homogeneous in texture.
The chips shall be more or less cubicle in shape.

All coarse aggregates for concrete works must be well graded. These shall be screened for removal
of dust and if so necessary in the opinion of the Engineer-in-Charge, shall he washed at the cost
and expenses of the contractor.

A—3 Coarse Aggregates for Lime concrete Works

(i) Brick aggregates for lime concrete in foundation or flooring shall consist of approved, clean, hard
and well-burnt Jhama khoa. The khoa be well graded and unless otherwise specified shall pass
through 32 mm. ring.

(ii) Brick aggregates for Lime Terracing work on roof shall consist of khoa broken from 1st class brick
bats and unless otherwise specified shall pass through 25 mm ring and be suitably graded.

No jhama khoa should be used in lime terracing work.

A—4 Sand

All sand shall be clean sharp and free from clay, loam, organic or any other foreign matter, shall be obtained
from approved source. The contractor shall get the sample of sand to be used in different kinds of works
approved by the Engineer-in-Charge before using the same in work. Sand which in the opinion of the Engineer-
in-Charge or his representative is dirty, must be washed to his satisfaction at the cost and expenses of the
contractor.

(i) In Malda District only BANSLOI Sand should be used in all types of of cement works. In Nadia
and Murshidabad Districts, coarse sand from SAINTHIA only should be used in structural concrete
works.
(ii) Sand for all cement concrete work must be coarse. The sand shall pass through a mesh, 4.75 mm.
square measured in the clear. Sand shall not be used for concrete works if it contains more than
10% of fine grains passing through a 76 mesh sieve as used for cement test, nor should the fineness
modulus be less than 2.00 unless specific permission is obtained from the Engineer-in-Charge.
(iii) Medium sand may be used for cement mortar, for masonry, plaster etc. fineness modulus shall be
between 2 and 1.8.
(iv) Sand filling in plinth or foundation where specified may be done with fine sand or Silver sand.

B-4
A—5 Surki :
Surki shall be made from well burnt 1st class brick bats, ground to pass through a mesh 2 mm, each way, and
shall be perfectly clean and free from any foreign matter.
A-6 Lime:
All lime shall be freshly burnt and slaked and screened before use, the slaking should be done at site of work.
Lime for works including roof terracing shall be Bisra, Satna or other approved stone lime.
The specification covers lime as used in construction of building and other structures as described below (refer
IS. 712-1973).
(a) Quick-lime shall mean a calcined material, the major part of which is calcium oxide in natural
association with a relatively small amount of magnesium oxide and capable of slaking with water.
(b) Fat lime shall mean the lime which has high calcium oxide content (between 95 and 100 percent)
and is dependent for setting and hardening on the absorption of carbon dioxide from the atmosphere.
This is defined as class—C in I.S.: 712-1973 which is used for finishing coat in plastering, white
washing etc. and with addition of pozzolanic materials (surki) for masonry mortar.
(c) Hydraulic lime shall mean the lime which contains small quantities of silica and alumina and I or
iron oxide which are in chemical combination with some of the calcium oxide content, giving a
putty of mortar that has the property of setting and hardening under water.
(d) Hydrated lime shall mean a dry powder resulting from treatment of quick-lime with water enough
to satisfy its chemical affinity for water under the conditions of hydration.
Classification of Lime
Class A: Eminently hydraulic lime (containing 25% to 30% of clay) used for foundations and
other hydraulic structures, shall be supplied as hydrated lime only and should be used particularly
in any masonry work below G.L. It should be noted that no masonry work below G.L. should be
taken up with the use of any lime, other than specified hydraulic lime. In case of doubt if any in
respect of hydraulic lime being used in work below G.L., it is preferable not to use lime mortar at
all below G.L.
Class C: Fat lime is used mainly for lime punning, white washing and with suitable admixture,
such as surki or any other pozzolanic material to produce artificial hydraulic mortar.
A—7 Cement :
No cement except those supplied by the department or approved by Engineer-in-Charge shall be used in work
or brought to site by contractor. Cement bags must be stored in a water-tight shed having wooden floor or
platforms raised at least 50 mm. from ground as approved by the Engineer-in-Charge. Cement which is partially
set or which is lumpy or caked is to be treated as damaged and shall be removed from the site immediately.
A—8 Steel:
All steel shall be clean and free from loose mill scales, dust, loose rust and coats of paints, oil or other coatings.
Any scale or loose rust shall be removed before use, even though the same may have been supplied by the
Department without any claim for extra charge for the same. No steel excepting those supplied by the Department
or approved by the Engineer-in-Charge shall be used in work or brought to site by the contractor.

B-5
A-9 Timber:
All timber shall be of best quality well-seasoned and/or well-treated for preservation and protection against
decay etc. It shall be uniform in substance, straight in fibre, free from large or dead knots, sap, flaws, sun-
cracks, shakes or blemishes of any kind. Any insect damage or splits across the grain shall not be permissible.
The colour of the timber shall be uniform throughout, firm and shining with a silky luster when planed and shall
not emit dull sound when struck.
A-9 Glass:
All glasses shall be of the specified type, colour visibility and sound and shall be free from cracks, flaws. spick
bubbles and blemishes and shall not weigh less than 7.4 kg/sq.m. unless otherwise specified.
A-11 Timber Doors, Windows etc. and their Fittings:
(i) Door and window work shall be carried out as per detailed drawings or as direced by the Engineer-
in-Charge, Specified timber shall be used, and it shall be sawn in the direction of the grains and be
straight and square.
(ii) Fittings shall be of iron, brass, aluminium or as specified. These shall be well made, reasonably
smooth and free from sharp edges, corners, flaws and other defects. Screw holes shall be counter
sunk to suit the head of specified wood screws. Iron fittings shall be finished bright or black
enameled or copper oxidised. Brass fitting shall be finished bright or, (brass) oxidised chromium
plated (etc treated) & aluminium fittings shall be finished bright or anodised or as specified.
Fittings shall be got approved by the Engineer-in-Charge before fixing. In case of renewal works,
the new fitting shall, as far as possible, match with the existing ones. Screws shall be driven home
with screw driver and not hammered in.
A-12 Fibre Reinforced Polymer (FRP) door shutter/frame:
The Polymer shall be either thermoplastic or thermoset resin, such as polyster, Isopolyester, Vinyl ester, epoxy
or Phenolic base. The fibre moulded skins may be of glass or other synthetic (Carbon or aramid) or natural (jute
or Coir) or other reinforcing materials.
The sandwich core to impart monolithic composite strucutres approved by Department of Science & Technology
or similar competent Authority.
Testing : As per IS 4020 door testing performance criteria.
Frame without Core: Frames shall have intermittent stiffness for rigidity and will have provision for hinge
fixing, including anchors.
Frame with Core: Such Composite frames will be filled with inner Core in addition to all the features mentioned
for frame without Core.
A-13 Paint etc.:
All paints shall be delivered in strong containers, marked with the colour of the paint, brand, volume of paint
content in litres and of the best quality of approved make and brand as approved by the Engineer-in-Charge.
Under no circumstances shall the paint be diluted with Linseed oil or otherwise. Any paint or enamel although
of approved brand, which so hardens in the container that it cannot be readily broken up with a stirrer to a
smooth uniform painting consistency, shall be rejected. Any paint or enamel too thick for proper brush
application shall be rejected.

B-6
(B) EXECUTION

GENERAL: All works shall be carried out in proper manner. Items of works not covered by the following.
shall be carried out as per best practice according to directions of the Engineer-in-Charge and to his satisfaction.
Unless otherwise specified in this section or in the description of item, the cost of all stages of works men-
tioned hereunder shall be deemed to have been included in the rates of items provided in the Schedule.
B—1 (a) Excavations of Foundation and Filling up Trenches:
(i) Foundation when excavated to the level shown in the drawing will be shown to the Engineer-in-Charge
and if on account of bad ground or for any reason whatsoever he decides to go deeper with the foundation,
the contractor shall excavate further to the depths required by the Engineer-in-Charge. In no case shall the
foundation soling or concrete be laid prior to receiving orders to that effect from the Engineer-in-Charge
or his authorised representative.
(ii) Excavating shall include throwing the excavated earth at least one metre or half the depth of excavation,
whichever is more, clear of the edge.
(iii) The excavated areas around the foundation of structures are to be filled up properly to the required levels
with earth obtained from excavation or other materials as directed, well rammed with water and consoli-
dated in layers not exceeding 150 mm. at a time. The quantity for this item of work will be measured on
the basis of quantity of excavation paid for less the volume occupied by the strucutre in foundation.
(b) Shoring:
(i) For loose earth and when the depth of excavation exceeds 3 metres, poling boards (vertical mem-
bers) of 50 to 75 mm. in thickness and 175 to 225 mm. in width preferably of sal-wood to be
placed close together and to be driven about 300 mm. in ground below the bottom of the trench
with intermediate sal-bullab piling of dia not less than 100 mm. at the rate of 900 to 1000 mm.
center to center to be placed in between the vertical surface of trench and the poling boards and
double struts of sal-bullah of not less than 100 mm. in dia between two wallings (horizontal
member) of 250 mm. in width and 75 mm. in thickness held horizontally between them.
(ii) For medium clay and when the depth of excavation exceeds 2 metres but not exceeds 3 metres
single struts will be provided and sal-bullah pilling may not be placed. Other requirements are to
be satisfied as (i) above.
(iii) For stiff clay or dry clay and when the excavation is within 2 metres, vertical poling boards will be
placed at the rate of 600 to 1000 mm. apart with or without walling pieces; but single or double
strutting will be provided. Other requirements are to be satisfied as per (i) above.
B-2 Lime Terracing:
Lime terracing on roof shall be composed of brick aggregate of 25 mm. (nominal) size unless otherwise speci-
fied, surki and Bisra or Satna lime in the specified proportion.
Lime concrete shall be laid (and not thrown) in a single layer and spread and rammed, with wooden rammers of
weight not exceeding 2 kg. to the specified average thickness, slopes and levels. The concrete shall be used
when it is quite fresh. Concrete left over from the previous day’s work shall in no circumstances be used.
During this preliminary ramming the surface shall be tested and kept perfectly true to slope, line and level and
even by means of a trowel, straight edge and spirit level. The concrete shall then be further consolidated by two
rows of labourers sitting close and beating the concrete in union with wooden thappies (weight 1 to 2 kg.) across
B-7
the entire width of the roof and thus slowly traversing the length of the roof. Special care shall be taken to
consolidate the concrete properly at its junction with the parapet wall. This beating shall be continued for three
to four days or more until the mortar is almost set and the wooden thappies rebound from the surface readily
when struck on it, causing a ringing sound to emit.
During the operation of mixing, “Kunji” water is to be sprinkled and allowed to soak well in. Lime water must
be continuously sprinkled on the terracing to keep it wet whilst being beaten. The mortar which comes to the
surface of the terracing during the beating shall be rendered smooth and finished off with lime rubbing and
afterwards with oil. Concrete shall be kept wet after each day’s work by spreading straw, and watering very
frequently, so as to ensure thorough setting of the concrete.

Mouths of rain water pipes shall be properly finished as per direction. The slope of the finished terrace shall not
be less than 1in 48. unless a flater slope is desired by the Engineer-in-Charge. The roof surface shall slope from
all sides towards the outlets. The minimum thickness of concrete at junction with parapet shall be 75 mm. and
shall be rounded. The concrete should be leak-proof and free from cracks.

Payment will be made on the basis of average finished thickness after consolidation.

B-3 Cement concrete Works (Plain or Reinforced):

(i) Shuttering and staging: Wherever necessary, shuttering and staging must be provided. Unless oth-
erwise stated no payment will be made for such shuttering or staging and the cost thereof will be
deemed to have been covered by the rate for relevant finished item of work. Where payment for
shuttering has been specified, the rate shall be deemed to cover the cost of the necessary staging as
well. Payment, if any, for shuttering will be on the basis of surtace area of shuttering in actual contact
with concrete.

Shuttering may be of approved dressed timber true to line, not less than 25 mm. thick. Surface to be
in contact with concrete are to be planed smooth except where otherwise stated. As an alternative,
sufficiently rigid steel shuttering may be used. In every case, joints of the shuttering are to be such as
to prevent the loss of liquid from concrete. In timber shuttering the joints must be perfectly closed
and the entire shuttering surface shall be covered with polythene sheets of approved quality. In case
of steel shuttering also the joints are to be similarly lined.

All shuttering and framing must adequately be stayed and braced to the satisfaction of the Engineer-
in-Charge for properly supporting the concrete during the period of hardening. It shall be so con-
structed that it may be removed without shock or vibration to the concrete.

Before the concrete is placed, the shuttering shall, if considered necessary be coated with and ap-
proved preparation for preventing the adhesion of the concrete to the moulds, and it is to be of such a
nature and so applied that the surface of the finished concrete is not stained. Care shall also be taken
that such approved preparation shall be kept out of contact with the reinforcement.

In no circumstances shall forms be struck until the concrete reaches strength of at least twice the
stress of which the concrete may be subjected at the time of striking.

B-8
Interior of all moulds and boxes must be thoroughly washed out with a hosepipe or otherwise so as to be
perfectly clean and free from all extraneous matter prior to the deposition of concrete.

All form works shall be removed without shock or vibration. Before the form work is stripped, the
concrete surface shall be exposed where necessary in order to ascertain that the concrete has hard- ened
sufficiently. In normal weather and with ordinary cement, vertical or side shuttering may be removed
after three days and the bottom shuttering of horizontal members after fourteen days in case of slabs and
twenty one days in case of beams and cantileves etc. from the date of placing the last portion of the
concrete in the structure. The above are the minimum and may be extended if found necessary. Before
stripping the shuttering of structural members the contractor shall take prior per mission of the Engineer-
in-Charge or his representative.

No plugs, bolts, ties, hold fasts or any other appliances whatsoever for the purpose of supporting the
shuttering are to be fixed in the structure or placed in such a way that damage might result to the work in
removing the same when the shuttering is struck.

(ii) Scaffolding: The scaffolding must be strong and rigid stiffened with necessary cross bracers and
always decked and boarded on the sills with close boarded veiling and swings to prevent any injury to
persons or materials. The contractor shall have to allow other traders to make reasonable use of his
scaffolding as and when directed by the Engineer-in-Charge.

If for the interest of the work contractors have to erect scaffolding in other’s properties including local
bodies or corporation, the arrangement for the same including the cost of licensing fees etc. shall have to
be borne by the contractor and the department should be kept free from any liability on this account.

(iii) Mixing, placing and compacting: The proportion specified is by volume in dry rodded condition of the
different constituents.

Boxes of suitable sizes shall be used for measuring sand and aggregate. The unit of measurement for
cement shall be bag of cement weighing 50 Kg. and this shall be taken as 0.035 cubic metre while
measuring the aggregate, shaking, ramming or hammering shall not be done. The proportioning of sand
shall be on the basis of its dry volume and in case of damp sand allowances for bulkage be made. The
aggregate in each batch of concrete are to be proportioned as to contain full bags of cement.

Normally all structural concrete shall be mixed in mixture machine in appropriate proportion, shall have
to be vibrated with suitable vibrator. Mixing shall be continued until there is uniform distribu- tion of the
materials and the mass is uniform in colour and consistency, but in no case mixing shall be be done for less
than two minutes. The rates appearing in the Schedule of Rates against such items are inclusive of hire
and operational charges of such appliances. For a particular job the Engineer-in- Charge may allow hand
mixing and or hand tapping of concrete In case of hand mixing concrete, extra cement up to 10% over the
standard requirement of cement for machine mix of particular mix shall have to be provided by the
contractor at his own cost.
B-9
As the bulking of sand may vary from day to day and at different parts of the day on account of
varying moisture content, frequent tests for bulking shall be carried out with the sand to be used and
amount of bulking allowed for in the field mix so as to keep the actual proportion constant through-
out.

Only such quantities as are required for immediate use are to be mixed at any one time. Sufficient water
is to be added to obtain proper workability so that the mixture may flow readily round the reinforcement
and into every part of the moulds. The workability shall be measured by the amount of slump.

The quantity of water to be used for each mix of 50 kg. cement to give the required consistency shall
not be more than 34 litres for 1:3:6 mix, 32 litres for 1:2:4 mix, 30 litres for 1:11/2:3 mix and 27 litres
for 1:1:2 mix. In the case of vibrated concrete, the limit specified may be suitably reduced to avoid
segregation.

Nominal Mix Concrete may be used for concrete of M20 or lower. The proportions of materials for
nominal mix concrete shall be in accordance with the following table.

Proportions for Nominal Mix Concrete


Grade of Total Q uantity of D ry A ggregates b y Proportion of Fine Q uantity of
Concrete M ass per 50 K g of C em ent, to be Taken A ggregate to C oarse W ater per 50
as the Sum of the Individual M asses of A ggregate (b y M ass) Kg of
fine and C oarse A ggregates. K g. M ax C em ent, K G .,
Max
M5 800 G enerally 1:2 but 60
M 7.5 625 subject to an upper 45
M 10 480 lim it of 1 : 11/2 and 34
M 15 330 low er lim it of 1:21/2 32
M 20 250 30

Note: The proportion of the aggregates should be adjusted from upper limit to lower limit progressively as the
grading of the aggregates becomes finer and the maxirnum size of coarse aggregate become larger. Graded
coarse aggregate shall be used.

Example: For an average of fine aggregate (that is, Zone II). The proportions shall be 1:11/2 , I:.2 and 1:21/2
for maximum size of aggregates 10 mm, 20 mm and 40 mm respectively.

The total water content in each batch of concrete shall always be kept constant as the amount previously
determined by experiments. The quantity of water to be actually added may, therefore, vary depending on
moisture content in the aggregates. In actual job, if the quantities of the ingredients remain constant, the amount
of slump may be taken as a good guide indicating the total water content in the mixture. The consistency and
consequently the water content of the concrete shall therefore be kept constant and checked from time to time
as work proceeds, by means of standard slump test. The slump tests shall be carried out with concrete immedi-
ately after it has been mixed and before any initial set has commenced, the sample being taken preferably at the
point where the concrete is being delivered for placing in the moulds.
B-10
The mould shall then be removed by raising vertically immediately after filling. The moulded concrete shall
then be allowed to subside and the height of the specimen measured after coming to rest

The consistency shall be recorded in terms of millimetres of the subsidence of the specimen during the test,
which is known as slump.

The following slumps shall be adopted for different works.

Sl. Type of SLUMPS


No Work
When vibrator When vibrators
are used are not used
1. Mass concrete in foundation 10 to 25 mm. 50 to 75 mm.
footings, retaining walls and
pavements
2 Mass concrete in RCC foundation, 10 to 25 mm. 80 mm.
footing and retaining walls.
3. Beams, slabs and columns simply 25 to 40 mm. 100 to 125 mm.
reinforced
4. Thin RCC section or section with 40 to 50 mm. 125 to 150 mm
congested steel

I. S. : 456-2000 allows use of nominal mix of concrete upto grade M20 and may be allowed in works at the
discretion of Engineer-in-Charge and will be guided by the provision of IS 456-2000. For grade of concrete
above M20, design mix has to be adopted. For determination of mix proportion for design mix concrete, the
target strength should be higher than the specified characteristic strength to ensure that characteristic strength
is attained at 28 days at site. Accodring to Explanatory Hand Book on IS 456-1978 (S.P. 24—1983):

Target Strength =Characteristic strength + 1.65 x standard deviation.

Standard deviation for different grades of concrete in absence of any test may be taken as per IS : 456 — 2000
as follows :

Grade of Concrete Assumed Standard Deviation


N/mm2
M 10 3.5
M 15 3.5
M 20 4.0
M 25 4.0
M 30 5.0

B-11
Once the target strength of cube moulds with specific mix design is obtained in the laboratory, it may be
inferred that the corresponding characteristic strength of concrete, prepared with the materials used in the test
mould (s) cured under identical condition as that of the test specimen, shall be obtained at site at 28 days.
The Explanatory Hand Book on IS. 456—1978 (S.P.-24-1983) provides an approximate formula for
expressing the strength of concrete at age‘t’ (in days),
t
ft = a +bt
xf28 where f 28 is the strength at 28 days.

ft = strength of concrete at any age ‘t’ (in days), a = 4.7 and b =0.833

ACCEPTANCE CRITERIA:
The concrete shall be deemed to comply with the strength requirements when both the following
conditions are met:
(a) The mean strength determined from any group of four non overlapping consecutive test results com-
plies with the appropriate limits, in Col. 2 of following table.

(b) Any individual test result complies with the appropriate limits in Col. 3 of following table.
Characteristic Compressive Strength Compliance Requirement

Mean of the Group of 4 Non-Overlapping Individual Test


Specified Grade
Consecutive Test Results in N/mm2 Result in N/mm2

M 15 = fck + 0.825 x established standard deviation = fck – 3 N/mm 2


(rounded off to nearest 0.5 N/mm2 )
Or
f ck + 3 N/mm2
Whichever is greater
M 20 or above = fck + 0.825 x established standard deviation = fck – 4 N/mm 2
(rounded off to nearest 0.5 N/mm2 )
Or
f ck + 4 N/mm2
Whichever is greater
Note: In the absence of established value of standard deviation, the values given in relevant Table may be
assumed, and attempt should be made to obtain results of 30 samples as early as possible to establish value of
standard deviation.

Concrete of each grade shall be assessed separately.

Concrete shall be assessed daily for compliance.

B-12
Providing a proper construction joint; (iii) the reinforcement has been displaced beyond the tolerances specified
; or (iv) construction tolerances have not been met. However, the hardened concrete may be accepted after
carrying out suitable remedial measures to the satisfaction of the Engineer-in-Charge.

Frequency of sampling:

Sampling Procedure—a random sampling procedure shall be adopted to ensure that each concrete batch shall
have a reasonable chance of being tested; that is, the sampling should be spread over the entire period of
concreting and cover all mixing units.

Frequency- The minimum frequency of sampling of concrete of each grade shall be in accordance with the
following:

Quantity of concrete in Number of Samples


the Work, Cu.m.

1-5 1
6-15 2
16-30 3
31-50 4
51 and above 4 Plus one additional sample for
each additional 50m 3 or part
thereof

TEST SPECIFICATION—The test specimens shall be made from each sample for testing at 28
days. Additional cubes may be required for various purposes such as to determine the strength of
concrete at 7 days or at the time of striking the form work, or to determine the duration of curing,
or to check the testing error. Additional cubes may also be required for testing cubes cured by
accelerated methods as described in IS: 9013—1978. The specimen shall be tested as described
in IS: 516-1959.

TEST STRENGTH OF SAMPLE—The test strength of the samples shall be the average of the
strength of three specimens. The individual variation should not be more than ± 15 percent of the
average.

Concrete shall be handled from the place of mixing to the place of final deposit as rapidly as
practicable by methods which will prevent the segregation or loss of the ingredients. It shall be
deposited as nearly as practicable in the final position to avoid re-handling or flowing. Unless
specially permitted by the Engineer-in-Charge, concrete shall not be dropped freely from a height
of more than 2 metres.

B-13
rubbish. When placing the concrete the finer materials must be carefully worked against the
moulds so that the faces of concrete shall be left perfectly smooth and free from honey-combing
upon withdrawal of the moulds. Any defect in this respect must be dealt with by the contractor as
directed by the Engineer-in-Charge without any extra charges thereof.

Depositing concrete under water shall not be allowed without specific permission from the
Engineer-in-Charge. The method of concreting to be adopted in such cases shall have to be
previously approved by him.

During placing and also immediately after deposition, the concrete shall be thoroughly compacted
by ramming, spearing etc. until it has been made to penetrate and fill all the spaces between and
around the steel rods, around embedded fixtures, and into the corners of formwork in such a
manner as to ensure a solid mass entirely free from voids. If so directed by the Engineer-in-
Charge, in addition to usual ramming, spearing etc. sufficient number and suitable type of vibrators
may have to be used on important jobs to enable working with homogeneity It is imperative that
the work should be done quickly as well as efficiently and adequate numb of hands must therefore
be employed to ensure this.

Concrete shall be placed and compacted in its final position before setting has commenced and
shall not subsequently be disturbed.
Concreting shall be carried out continuously up to construction joints, the position and arrangement
of which shall be predetermined by the Engineer-in-Charge or his representative. Any rest, pauses,
such as for meal, shall also be subject to his approval. All concreting work should be so
programmed as not to necessitate work at night. If for any reason this becomes imperative, the
contractor shall obtain previous permission of the Engineer-in-Charge or representative and make
proper lighting arrangements, at own cost, to his satisfaction.
(iv) Protection and curing: The contractor shall adequately protect freshly laid concrete, about 1 to
2 hours after its laying from too rapid drying due to sunshine, drying winds etc. and also from
rains or surface water and shocks. About 24 hours after laying of concrete, the surface shall be
cured by flooding with water of minimum 25 mm. depth or by covering with wet absorbent
materials. The curing shall be done for a minimum period of 7 days. Over the foundation concrete
the masonry work may be started after 48 hours of its laying, but the curing of cement concrete
shall be continued along with masonry work for a minimum period of 7 days.

In case of cement concrete used as sub-grade for flooring, the flooring may be commenced with
48 hours of the laying of sub-grade. In case it is not possible to do so due to exigencies of work.
the subgrade shall be roughened with steel wire brush without disturbing the concrete, wetted
with neat cement slurry at the rate of 1.75 kg of cement per square metre applied to the base
before laying floor, and full rate of artificial stone flooring/mosaic will be paid with the specific
orders of the Engineer-in-Charge. The curing to be continued along with top layer of flooring for
a minimum period of 7 days.

B-14
Joints may be made will be indicated by the Engineer-in-Charge or his representative.

In the case of horizontal joint any excess mortar or laitance shall be moved from the surface after the
concrete is deposited and before it has set.

When the work has to be commenced on a surface which has hardened, such surface shall be well
roughened and all laitance removed; the surface shall then be swept clean, thoroughly wetted and covered
with a thin layer of mortar composed of equal volumes of cement and sand. Such works shall be deemed
to be covered by the rates for concrete.

(vi) Minimum crushing strength: For major RCC work, (where concrete is specified by strength) the mix
should not be leaner than 1:11/2:3 so as to give ultimate crushing strength not less than 25 N/Sq. mm. at
28 days cured under field condition. The mix for the concrete is to be so adopted and the slump is to be
so allowed as to give specified strength and proper workability at the existing site conditions. Contractor
shall remain fully responsible for producing concrete of specified strength in the actual job and therefore
cast at his own cost test specimens of 15 cm. Cube as already specified during work and cure the same
in similar way as for laid concrete being tested for strength. Each set of test specimen shall be taken to
cover the quantity of concrete laid on the job during the period from the time of taking the previous set
of specimens and the quantity will be estimated by the Engineer-in-Charge from records maintained by
him.

The interior surface of the mould and base plate shall be lightly oiled before the concrete is placed in the
mould.

(a) Compacting—The test specimens shall be made as soon as practicable after mixing. and in such a way
as to produce full compaction of the concrete with neither segregation nor excessive laitance. The concrete
shall be filled into the mould in layers approximately 5 cm deep. In placing each scoopful of concrete,
the scoop shall be moved around the top edge of the mould as the concrete slides from it, in order to
ensure a symmetrical distribution of the concrete within the mould. Each layer shall be compacted either
by hand or by vibration. After the top layer has been compacted, the surface of the concrete shall be
finished level with the top of the mould, using a trowel, and covered with a glass or metal plate to
prevent evaporation.

Compacting by Hand—When compacting by hand, the standard tamping bar shall be used and the
strokes of the bar shall be distributed in a uniform manner over the cross—section of the mould. The
number of strokes per layer required to produce specified conditions will vary according to the type of
concrete. For cubical specimens, in no case shall the concrete be subjected to less than 35 strokes per
layer for 15 cm cubes or 25 strokes per layer for 10 cm cubes. For cylindrical specimens, the number of
strokes shall not be less than 30 per layer. The strokes shall penetrate into the underlying layer and the
bottom layer shall be rodded throughout its depth. Where voids are left by the tamping bar, the sides of
the mould shall be tapped close the voids.

B-15
(b) When the job concrete is placed by vibration and consistency of the concrete is such that the test specimens
cannot be properly moulded by hand rodding as described under (a) above, the specimens shall be
vibrated to give a compaction corresponding to that of the job concrete. The fresh concrete shall be
placed in the mould in two layers, each approximately half the volume of mould. In placing each scoopfull
of concrete, the scoop shall be moved around the top edge of the mould as the concrete there slides from
it, in order to ensure a symmetrical distribution of concrete within the mould. Either internal or external
vibrator may be used. The vibration of each layer shall not be continued longer than what is necessary to
secure the required density. Internal vibrators shall be of appropriate size and shall penetrate only the
layer to be compacted. In compacting the first layer, the vibrators shall not be allowed to rest on the
bottom of the mould. In placing the concrete for the top layer, the mould shall be filled to the extent that
there will be no mortar loss during vibration. After vibrating the second layer, enough concrete shall be
added to bring the level above the top of the mould. The surface of the concrete shall then be struck off
with a trowel and covered with a class or steel plate as specified under (a) above. The whole process of
moulding shall be carried out in such a manner as to preclude the alternation of water cement ratio of the
concrete by loss of water either by leakage from the bottom or overflow from the top of the mould.

Curing - The test specimens shall be stored on the site at a place free from vibration, under damp
matting, sacks or other similar material for 24 hours +/-1/2 hour from the time of adding the water to the
other ingredients. The temperature of the place of storage shall be within the range of 220 to 320C. After
the period of 24 hours, they shall be marked for later identification. removed from the moulds and,
o
unless required for testing within 24 hours, stored in clean water at a temperature of 24 C to 300C until
they are transported to the testing laboratory. They shall be sent to the testing laboratory well packed in
damp sand, damp sacks, or other suitable material so as to arrive there in a damp condition not less than
24 hours before the time of test. On arrival at the testing laboratory, the specimens shall be stored in
water at a temperature of 270 + /-20C until the time of rest,records of the daily maximum and minimum
temperarure shall be kept during the period of the specimens remain on the site and in the laboratory.

After curing, the specimen suitably marked and properly wrapped shall be made over to the Engineer-
in-Charge or his representative who will arrange to have them tested at 28 days from the date of casting.
If there be any delay for any reason whatsoever the result of the test shall nevertheless be valid and will
be applicable as per rules in each case for all test specimens ns whatsoever. The contractor shall be
responsible for proper packing of the specimens at his own cost, for safe and convenient transport of the
same from the site to the testing laboratory. The cost of testing the test moulds and other charges including
cost of carriage of the test moulds from the work site to the particular laboratory (both ways) and other
incidental charges in this connection will have to be borne by contractor.

In case of concrete showing, on the result of the cube tests, strength less than that specified in (a) and (b)
of the Acceptance Criteria but has a strength greater than (c) & (d) of the said Acceptance Criteria
concrete may, at the discretion of the Engineer-in-Charge, be accepted as being structurally adequate
without further testing.

If the concrete is deemed not to comply pursuant to (c) &. (d) of the Acceptance Criteria, the Structural
adequacy of the parts affected may be investigated as per provision of I.S. 456-latest revision i.e. core
test and / or load test, as the case may be before rejection on the application of the Contractor with the
undertaking to bear the cost of such tests.
B-16
or sub-clause 16.5.3 of I.S. 456-1978, concrete in the member represented by such tests shall be considered
acceptable but the Engineer-in-Charge shall have the full power to fix the rate of deduction @ Rs.200/-
per cubic metre.

In case the test results do not satisfy the relevant requirement of the preceding paragraph, the volume of
concrete so deficient shall be deemed to be un-acceptable and shall be removed from the structure and
replaced by fresh concrete to specified strength and the contractor shall, in that case, have to carry out
the instruction of the Engineer-in-Charge irrespective of the amount of loss, inconvenience and difficulties
involved.

The contractor shall remain liable to act/to carry out instructions under the provision of this clause,
notwithstanding issuing of any certificate or the passing of any bills or accounts by the Engineer-in-
Charge.

(vii) Rehabilitation of Concrete For rehabilitation of Concrete Structures the following essential steps are
to be followed

(a) To remove the loose concrete/plaster until hard and sound surface is exposed.

(b) To remove all rusts by wire brush or sand blasting.

(c) To apply two coats of cement based Polymer modified anti corrosive protective coating to exposed
reinforcement (manufacture’s specification is to be strictly followed).

(d) If diameter of bar is reduced by more than 25%, additional bar equivalent to 50% area of existing bar
is to be added by lapping/welding as deemed fit by Design wing.

(e) (i) The exposed hard concrete surface is to be saturated with clean water and a bond coat of
Cement slurry duly admixed with water resistant bonding agent.

Or

(ii) For concrete beam /column if found necessary by Engineer-in-Charge the surface may be
treated by epoxy based reactive agent for jointing fresh concrete with old surface.

Note: In both cases manufacturer’s specification is to be strictly followed. It is desirable that


representative of the manufacturer supervises the special job and certify that the work is done as per
specification.

(f) (i) For Slab / Chhaja / Weatherboard: To fill up the removed part of Concrete / Plaster with
fresh Concrete / Plaster admixed with the water resistant bonding agent as per
Manufacturer’s specification within the time the bond coat remains fresh or tacky. The
admixed material shall have to be applied within 30 minutes of preparation or as
specified in literature.
B-17
(ii) For Beams / Columns: To fill up the removed part of concrete with fresh concrete with
water proofing plasticising admixture as per manufacturer’s specification.

(g) To cure the concrete surface for 3 days.

B-4 1st Class Brickwork:

Cement mortar shall be prepared by mixing sand and cement in specified proportion. Sand shall be
measured on the basis of its dry volume. In case of damp sand, its quantity shall be increased suitably
to allow for bulkage.

Brick shall be laid in English bond. The brick shall be laid by layering method. A layer of mortar shall
be spread on full width for suitable length of the lower courses. Each brick shall first be laid so as to
project over the one below. Both at the end and at the side, then pressed into the mortar and shoved
into final position so as to embed the brick and to fill its inside face fully with mortar. Cut bricks shall
not be used except where necessary.

The walls shall be taken up true to plumb with plumb bob. The thickness of brick courses shall be
kept uniform and for this purpose, wooden straight edge with graduations giving thickness of each
brick course including joint shall be used. All courses shall be laid truly horizontal and all vertical
joints shall be truly vertical. Vertical joints in alternate course shall come directly one over the other.
A set of tools comprising wooden straight edge, mason’s spirit level, square, half metre rule, line and
pins, string and plumb shall be kept for every 3 masons for frequent checking during progress of
work. Faces of walls found not in plumb shall be dismantled.

Both the faces of walls of thickness greater than 25 cm. shall be kept in proper plane. All the connected
brickwork shall be carried out nearly at one level and no portion of the work shall be left more than 1
metre below the rest of the work. Where this is not possible, the work shall he racked according to
bond (and not left toothed) at an angle not steeper than 45°

Bricks shall be so laid that all joints are quite full of mortar. The thickness of joints shall not exceed
10 mm. Bricks shall be laid with frogs upward except in the top course where frog shall be placed
downward. The face joints shall be racked to a minimum depth of 15 mm. by racking tools daily
during the progress of work when the mortar is still green, so as to provide key for plaster or pointing
to be done. Where plastering or pointing is not required to be done, the joints shall he struck flush and
finished at the time of laying.

The face of brickwork shall be cleaned the very day that brickwork is laid daily and all mortar droppings
removed.

Green work shall be protected from rain by suitable covering. The brickwork shall be kept wet for a
period of at least 7 days. The top of masonry work shall be left flooded at the close of the day.

Scaffolding shall be sound and strong and holes left in masonry work for supporting the scaffolding
shall be filled and made good, before plastering.

B-18
B—5 Damp Proof Courses:

This shall be laid to specified thickness over walls for the full thickness of the super structure walls.
The surface shall be leveled and prepared before laying the cement concrete. Edges of damp proof
course shall be straight, even and vertical. Side shuttering shall consist of wooden form and shall be
strong and properly fixed so that it does not get disturbed during compaction and the mortar does not
leak through. The concrete mix shall be of workable consistency and shall be tamped thoroughly to
make a dense mass. When the sides are removed, the surface should come out smooth without any
honey-combing. The damp proof course shall be laid continuous and the surface shall be double
chequered. Damp proof course shall be cured for at least seven days, after which it shall be allowed to
dry. Water proofing materials of approved quality shall be added to concrete mixture in accordance
with the manufacturer’s specifications starring the quantity for water proofing materials in litres or
kg. per 50 kg. of cement and will be paid for separately. Similarly, polymer based paint used under
damp proof course as per manufacturer’s specification shall also be paid separately.

B-6 Cement plaster:

The proportion of mortar of exterior or interior plaster shall be as specified in the items of work.

The plaster shall be of thickness as specified and the surface shall be similarly cured as for cement
concrete. The moulding shall be carried out as shown in the drawing and shall be separately measured
in overall length unless otherwise specified in the items. Interior corners and edges of openings if so
directed by the Engineer-in-Charge shall be rounded off or chamfered with the same mortar for which
no extra payment will be allowed. All cement concrete surface should be chipped off properly before
taking up the plastering work.

B-7 Artificial stone floorings:

The artificial stone flooring shall be laid in panels of shape and size as directed. The casting ol the
panels will be so programmed as to prevent bonding of the freshly laid panel with adjacent panels.

Unless otherwise specified, the underlay shall be with graded stone chips 12 mm. down, the thickness of
topping shall be of 3mm. thick and colouring pigment as may be required shall only be added with the
topping. The topping and the underlay shall not be laid in one operation. After laying the ‘Underlay’ the
surface shall be left out to dry. The topping shall be laid only alter the underlay has sufficiently dried
and initially set and after thoroughly brushing with hand wire brush and sweeping clean and after
application of slurry. The topping shall be finished with an English trowel and a piece of clean dry
linen. During all the stages. the required level shall be carefully observed and maintained. Suitable
grading, where required shall be provided in the flooring for water drainage as directed by the Engineer-
in-Charge.

The corner between floor and wall shall be rounded off if so directed by the Engineer-in-Charge for
which no separate payment shall be made. All cement concrete surface should be chipped off properly
before taking up the flooring work.

B-19
B-8 Rain Water Pipes :

The rain water pipes shall be of the materials and of the sizes as specified. All rainwater pipes shall have
suitable grating as directed at the inlet opening at roof and shall be fitted and fixed in proper position
with necessary offsets, clamps, shoe, Y-junctions and other accessories as required and as directed by
the Engineer-in- Charge. The pipes are to be fixed to walls in cement mortar (1: 4 with necessary
clamps and nails, suitable teak wood blocks being fixed on the walls to receive the nails. Y- junction
shall be used at the top of the pipe and the vertical leg thereof shall be provided with a cowl. All joints
are to be properly packed. In case the hole is made much larger than the size of the pipe, cement
concrete (1:2:4) shall be used to fill the annular space. The pipes with fittings etc. are to be painted with
2 coats of paints as approved by the Engineer-in-Charge.

B-9 White Washing, Colour Washing :


.
Preparation of surface : All surfaces for white washing, colour washing, painting shall be thoroughly
brushed free from mortar droppings and foreign matter and prepared to the satisfaction of Engineer-
in-Charge, before application of the treatment

Before white washing all the nails etc. have to be removed from the walls and all nail or other holes,
small depressions or damages in plaster of wall surface shall be filled or repaired to original condition
with lime paste.

Old surfaces spoiled by smoke and greasy soots shall be sprinkled with surki and water and rubbed
with brick bats or steel wire brushes or steel scrapers. The surface shall then the broomed to remove
all dust and shall be washed with clean water.

Preparation of white wash : The white washing is to be done with 5 parts of stone lime and one part
of shell lime with necessary gum (2 Kg. per Cu.M. of lime) using indigo as necessary and to be mixed
as per standard practice.

Preparation of colour wash : Colour washing shall have a primer of white wash and shall be of
shade as approved by the Engineer-in-Charge, sufficient quantity of colour wash enough for complete
job shall be prepared in one operation to avoid any difference in shade.

Procedure and preparation of the surface shall be same as in white washing.

Application of white wash and colour wash : The operation for each coat shall consist of four
consecutive strokes of the brush, one horizontally from right to left and the next from left to right and
the third stroke bottom to upward and the fourth from top to down ward before the previous stroke
dries. Each coat shall be allowed to dry before the next coat applied. No portion of the surface shall be
left out initially to be patched up later on. The brush shall be dipped in white wash or colour wash,
pressed lightly against the wall of the container and then applied by lightly pressing against the
surface with full swing of hand.

The white wash on ceiling should be done prior to that on walls.

B-20
Protective Measures : Surfaces of doors, windows, floors, articles of furniture, beams, burghas etc.
and such other parts of the building not to be white or colour washed shall be protected from being
splashed upon. Such surfaces shall be cleaned of white or colour wash splashes, if any

B -10 Dry Distempering :

Dry distemper of approved brand and manufacture shall be used. The shade shall be got approved from
the Engineer-in-Charge before application of the distemper. The dry distemper shall be stirred slowly in
clean water using 6 deciliters of water per kg. of distemper or as specified by the manufacturer. Warm
water shall preferably be used. It shall be allowed to stand for at least 30 minutes (or if practicable over
night) before use. The mixture shall be well stirred before and during use to maintain an even consistency.
Distemper shall not be mixed in larger quantity than is actually required for one day’s work.

Before new work is distempered, the surface shall be thoroughly brushed free from mortar droppings
and other foreign matter and sand papered smooth. New plaster surface shall be allowed to dry for at
least two months, before applying distemper. In the case of old work, all loose pieces and scales shall
be removed by sand papering. The surface shall be cleaned of all grease, dirt etc. Pitting in plaster
shall be made good with plaster of paris mixed with dry distemper of the colour to be used. The
surface shall then be rubbed down again with a fine grade Sand paper and made smooth. A coat of the
distemper shall be applied over the patches. The surface shall be allowed to dry thoroughly before the
regular coat of distemper is applied. The priming coat of whiting shall be applied and no white
washing coat shall be used as a priming coat for distemper.

Whiting (ground white chalk) shall be dissolved in sufficient quantity of warm water and thoroughly
stirred to form a thin slurry which shall then be screened through a clean coarse cloth, Two kg. of gum
and 0.4 kg. of copper sulphate dissolved separately in hot water be added for every Cu.m. of the slurry
which shall then be diluted with water to the consistency of milk so as to make as wash ready for use.
The treated surface shall be allowed to dry before distemper coat is given. In the case of new work,
the treatment shall consist of a priming coat of whiting followed by the application of two or more
coats of distemper till the surface shows an even colour. For old work the surface is to be prepared as
described above and one or more coats of distemper shall be applied till the surface attains an even
colour. The application of each coat shall be as follows: The entire surface shall be coated with the
mixture uniformly, with proper distemper brushes (ordinary white wash brushes shall not be allowed)
in horizontal strokes followed immediately by vertical ones which together shall constitute one coat.
The subsequent coats shall be applied only after the previous coat has dried. The finished surface
shall be even and uniform and shall show no brush marks. Enough distemper shall be mixed to finish
one room at a time. The application of a coat in each room shall be finished in one operation and no
work shall be started in any room, which cannot be completed the same day. After each day’s work,
the brushes shall be washed in hot water and hung down to dry. Old brushes which are dirty or caked
with distemper shall not be used.

B-11 Painting:
All surfaces for painting shall be properly sand papered and cleaned and where necessary good quality
putty shall be used to hide all holes, cracks, open joints etc. The rate for painting includes such work.

B-21
Paint shall be applied with approved brushes and surfaces shall be sand papered after every coat. All work
when completed shall present a smooth, clean solid and uniform surface, to the satisfaction of the Engineer-
in-Charge.
(a) Primer : All surfaces for painting, if they are new, should have a coat of priming before application of the
paint. Old surfaces where existing paints have been completely worn out owing to long use should
also receive a coat of priming before application of fresh painting.
(i) Wood primer : Wood primer of approved brand and manufacture is to be applied on the wooden surface
which would be free from moisture and loose particles.
(ii) Steel Primer : For steel surface red oxide primer, zinc chromate primer of approved brand and
manufacture and as per direction of the Engineer-in-Charge is to be applied on the surface. The surface
should be made free of grease, rust, moisture and loose particles.
(iii) Acrylic Primer Coat (solvent based Primer) : Acrylic primer coat is to be used as base coat on wall
finish of cement, lime or lime cement plaster surface before application of any wall coating e.g.
distemper, oil based paints, synthetic enamel, acrylic emulsion etc. on them. Priming coat shall be
preferably applied by brushing and not by spraying. Hurried priming shall be avoided particularly on
absorbent surface. New plaster patches in old work before applying distemper paints etc. should also
be treated with acrylic primer. The surface shall then be allowed to dry for at least 48 hours. It shall then
be sand papered to give a smooth and even surface. Any unevenness shall be made good by applying
putty, made of plaster of paris mixed with water on the entire surface including filling up the
undulation and then Sand papering the same after it is dry. The cement primer shall be applied with a
brush on the clean dry and smooth surface. Horizontal strokes shall be given first, vertical strokes
shall be applied immediately afterwards. The entire operation will constitute one coat. The surface
shall be finished as uniformly as possible leaving no brush marks. It shall be allowed to dry for at least
48 hours before oil bound distemper or paint is applied.
(b) Synthetic Enamel Paint: Synthetic enamel paint of approved brand and manufacture and of the
required shade shall be used for the top coat and an undercoat of shade to match the coat as
recommended by the manufacturer shall be used. Undercoat of the specified paints of shade suited to
the shade of the top coat shall be applied and allowed to dry overnight. It shall be rubbed next day
with the fine grade of wet abrasive paper to ensure a smooth and even surface free from brush marks
and all loose particles dusted off. Top coats of specified paint of the desired shade shall be applied
after the undercoat is thoroughly dry. Additional finishing coats shall be applied if found necessary to
ensure properly uniform glossy surface.
(C) Aluminium Paint : Aluminium paint of approved brand and manufacture shall be used. The paint
comes in compact dual containers with the paste and the medium separately. The two shall be mixed
together to proper consistency before use. Each coat shall be allowed to dry for 24 hours and lightly
rubbed down with fine grade sand paper and dusted before the next coat is applied. The finished
surface shall present an even and uniform appearance. As aluminium paint is likely to settle in the
container, care shall be taken to frequently stir the paint during use. Also the paint shall be applied
and laid off quickly, as surface is otherwise not easily finished.

B-22
(d) Interior Acrylic Emulsion Paint : Acrylic emulsion paint are not suitable for application on
external surface and surface which are liable to heavy condensation and are be used generally
on internal surface. For plastered surfaces a cement priming coat is required before application
of acrylic emulsion. Acrylic emulsion paint of approved brand and manufacture and of the
required shade shall be used. The paint will be applied in the usual manner with brush or roller.
The paint dries by evaporation of the water content and as soon as the water has evaporated the
film gets hard and the next coat can be applied. The time for drying varies from one hour on
absorbent surfaces to 2 to 3 hours on non-absorbent surfaces. The thinning of emulsion is to be
done with water and not with turpentine. Thinning with water will be particularly required for
the undercoat which is applied on the absorbent surface. The quantity of thinner to be added
shall be as per manufacturer’s instructions. The surface on finishing shall present a flat, velvety,
smooth finish. If necessary more coats will be applied till the surface present a uniform
appearance.

Presautions : (i) Old brushes if they are to be used with emulsion paints should be completely dried of
turpentine or oil paints by washing in warm soap water. Brushes should be quickly
washed in water, immediately after use and kept immersed in water during break periods
to prevent the paint from hardening on the brush.

(ii) In the preparation of walls for Acrylic emulsion painting, an oil base putty shall be used
in filling cracks, holes etc.

(iii) Splashes in floor etc. shall be cleaned out without delay as they will be difficult remove
after hardening.

(iv) Washing of surfaces treated with emulsion paints shall not be done within 3 to 4 weeks
of application.

(e) Varnishing : Varnish for the undercoat shall be a flatting varnish of the same manufacture
as the top coats. New wood work to be varnished shall be finished smooth with a
carpenter’s plane. Knots shall be cut to a slight depth. Cracks and holes shall be cleaned
of dust. The knots, cracks etc. shall then be filled in with woodputty. The varnish shall
be applied liberally with a full brush and spread evenly with short light strokes to avoid
frothing. If the work is vertical the varnish shall be crossed and recrossed and then laid
off, the later being finished on the upstroke so that varnish, as it sets, flows down and
eliminates brush marks. The above process will constitute one coat. If the surface is
horizontal, varnish shall be worked in every direction with light quick strokes and finished
in one definite direction so that it will set without showing brush marks. Rubbing down
and fatting the surface shall be done after each coat except the final coat with fine sand
paper. The work shall be allowed to dry away from draughts and damp air. The finished
surface shall then present a uniform appearance and fine glossy surface free from streaks,
blisters etc. Any varnish left over in the small container shall not be poured back into the
stock tin, as it will render the latter unfit for use. Special fine haired varnishing brush
shall be used and not ordinary paint brushes. Brushes shall be well worn and perfectly
clean.
B-23
(f) Oiling with Raw Linseed Oil : Raw linseed oil shall be lightly viscous but clear and of a
yellowish colour with light brown tinge. Its specific gravity at a temperature of 300 C shall be
between 0.293 and 0.298. The oil shall be mellow and sweet to the taste with very little
smell. The oil shall be of sufficiently matured quality. Oil turbid or thick, with acid and bitter
taste and rancid odour and which remains sticky for a considerable time shall be rejected. The
oil shall be of approved brand and manufacture. The wood work shall be cleaned of all
smoke and water and completely dried. The oil shall be applied freely with brushes (not rags)
and spread evenly and smooth until no more oil is absorbed. Each subsequent coat shall be
applied after the previons coat is thoroughly dried and in any case not before 24 hours of
application of the first coat. Work after completion shall not be patchy and sticky to the touch
and shall present a uniform appearance.

(g) Wax polishing : Wax polishing shall be done with material of approved brand and
manufacture. Preparation of surface will be same as for varnishing. The polish shall be applied
evenly with a clean soft pad of cotton cloth is such a way that the surface is completely and
fully covered. The surface is then rubbed continuously for half an hour. When the surface is
quite dry, a second coat shall be applied in the same manner and rubbed continuously for one
hour or until the surface is dry. The final coat shall then be applied and rubbed for two hours
(more if necessary) until the surface has assumed a uniform gloss and is dry, showing no sign
of stickiness. The final polish depends largely on the amount of rubbing which should be
continuous and with uniform pressure with frequently changes in the direction.

(h) French Polishing : Pure shellac varying from pale orange to lemon yellow colour, free from
resin or dirt shall be dissolved in methylated spirit at the rate of 150 gm. of shellac to a litre of
spirit. Suitable pigment shall be added to get required shade. The surface shall be cleaned.
All unevenness shall be rubbed down smooth with sand paper and well dusted. Knots if
visible shall be covered with a preparation of red lead and glue size laid on while hot. Holes
and indentations on the surface shall be stopped with glaziers putty. The surface shall then be
given a coat of wood filler made by mixing whiting (ground chalk) in methylated spirit at the
rate of 1.4 kg. of whiting per litre of spirit. The surface shall again be rubbed down perfectly
smooth with glass paper and wiped clean. A pad of woolen cloth covered by a fine cloth shall
be used to apply the polish. The pad shall be moistened with the polish and rubbed hard on
the wood in a series of overlapping circles applying the mixture sparingly but uniformly over
the entire area of an even level surface. A trace of linseed oil on the face of the pad facilitates this
operation. The surface shall be allowed to dry and the remaining coats applied in the same
way. To finish off, the pad shall be covered with a fresh piece of clean fine cotton cloth,
slightly damped with methylated spirit and rubbed lightly and quickly with circular motions.
The finished surface shall have a uniform texture and high gloss.

B-24
B-12 Terrazzo Flooring : (Cast in situ) : I.S. 2114-1962

(a) (i) The aggregates used in terrazzo topping shall be marble aggregates of required colour.
Marble powder used in terrazzo shall pass through I.S. Sieve 30

(ii) Aggregates for terrazzo under layer as well as the base concrete shall conform to the
Requirements of ordinary cement concrete.

(b) Cement used for floor finish work shall be ordinary cement or white cement of approved quality.

(c) Pigments incorporated in terrazzo shall be of approved make & brand and of permanent colour

(d) The dividing strips may be copper, brass, aluminium, plastic, glass or similar materials. Metallic
dividing strips shall have a protective coating of bitumen. The thickness of strip shall not be less
than 1.5 mm. and width not less than 20 mm.

(e) (i) The base concrete shall be lean concrete of mix 1:5:10 of lime concrete and thickness shall
be not less than 100 mm.

(ii) The cushioning layer shall preferably be lime concrete and thickness shall be no less than
75 mm.

(iii) The under layer shall be of cement concrete of1: 2: 4, size of coarse aggregates not exceeding
12 mm. The thickness of terrazzo topping shall be not less than the following,depending
upon the grades and size of chips used.

Grade No. Size of chips Minimum thickness of topping


0 1 to 2 mm. 6 mm.
0 2 to 4 mm.
1 4 to 7 mm 9 mm
2 7 to 10 mm 12 mm

(f) The mix for terrazzo topping shall consist of cement with or without pigments, marble powder,
marble aggregates and water. The proportion of cement and marble powder shall be 3 parts of
cement and one part of powder by WEIGHT. For every part of cement marble powder mix, the
proportion of aggregates by VOLUME shall be as follows depending upon the size and grade of
marble aggregates.
Size of aggregates Proportion of aggregates to binder mix

For grades 00,0 and 1 13/4 parts

2 11/3 parts

B-25
(g) The Proportion of cement shall be inclusive of any pigments added to cement. The
proportions pigments die mixed with ordinary cement or white cement to obtain different colour
to the binder, shall be as specified in the following Table :

Colour Pigment to be used Proporti Proportion of Proportion of


on of ordinary white cement
pigment Portland cement
Red Red oxide of iron 1 15 to 20 NIL
Black Carbons black 1 25 to 40 NIL
Pink Red oxide 1 NIL 100 to 400
Cream Yellow oxide of iron I NIL 100 to 400
Yellow Yellow oxide of iron 1 NIL 25 to 75
Light Green Green Chromium oxide 1 NIL 50 to 150

French Grey NIL I to 2 1

(h) (i) Terrazzo topping shall be laid while the under layer is still plastic, but is hardened sufficiently,
normally between 18 and 24 hrs. After the laying of the under layer, terrazzo topping may be laid.
A cement slurry, preferably of the same colour as the topping shall be brushed on the surface
immediately before laying is commenced. The terrazzo topping shall be compacted thoroughly
by tamping or rolling and trowelled smooth. Excessive trowelling or rolling in early stages shall
be avoided. The compaction shall ensure that air is cleared from the mix.

(ii) The surface shall be left dry for air curing for a duration of 12 to 18 hrs. and then be cured by
allowing water to stand in pools over it for a period of not less than 4 days.

(iii) Grinding and polishing may be done either by hand or by machine. The first and second
grinding shall be done with carborundum stone of Grit size 60 and 80 respectively. After each
grinding, the surface shall be washed clean and grouted with neat cement grout of the same colour
(without marble powder) of cream like consistency and then shall be allowed to dry for 24 hours
and wet cured for 4 days. The third grinding shall be done with carborundum stone of Grit
size 120 to 150 and the surface shall then be washed clean and allowed to dry for 11 hours and
wet cured for 4 days. The fourth grinding shall be done with carborundum stone of Grit size 320
to 400 and the surface shall then be washed clean and rubbed hard with felt and slightly moistened
oxalic acid powder (5 gms. of oxalic acid powder per sq.m. of floor area shall be adequate) and
finally the surface shall be washed clean with dilute oxalic acid solution and dried.

B-26
B-13 Door, Window Frames and Shutters:

(a) Wooden Section:

All doors, window frames must have plaster rabbit 12 mm x 12 mm. and rabbit for receiving
shutter at least 15 mm deep. Wood work shall not be painted, oiled or otherwise treated before
it has been approved by the Engineer-in-Charge. All portion of timber abutting against or
embedded in masonry or concrete shall be painted with boiling coal-tar, before being placed in
position. In place of coal-tar, use of approved wood primer shall be permitted. In case of door
frames without sills, the vertical members shall be buried in floor 40 mm. deep. Where sills are
provided, these sills shall be sunk in the floor to 40 mm. depth and shall rest on damp-proof
course. Sills shall be provided, where so directed. The door frames without sills while being
placed in position, shall be provided with temporary wooden bracing or dry bricks well wedged
between the styles at the sill level. These shall be retained to keep the frames from warping
during construction. The frames shall also be protected from damages during construction. The
shutters shall be so fixed that while closing, the left hand leaf of the shutter is closed first and
the right hand leaf of shutter overlaps on the left hand leaf. The overlapping shall be minimum
20 mm. Solid wood panels shall be made out of one or more pieces of timber of not less than
125 mm. in width. In order to avoid warping, splitting and cracking, normally piece not exceeding
200 mm. in width should be used. When made from more than one piece, the pieces shall be
joined with continuous tongued and grooved joints glued together and reinforced with metal
dowels. The grains of the solid panel shall run along the longer dimension of the panel. The
corners and edges of panels shall be finished as shown in drawings and these shall be feather
tongued into styles and rails. Sash bars shall have mittered joints with styles. In measuring
the width and thickness of styles and rails, a tolerance can be allowed up to 1 mm. Styles and
rails shall be properly and accurately mortised and tennoned. Rails which are more than 180
mm. in width shall have two tennons. Styles and end rails of shutters shall be made out of one
piece only. Lock and intermediate rails exceeding 200 mm. in width may be made out of one or
more pieces of timber, but the width of each piece shall not be less than 75 mm. Where more
than one piece of timber are used, they shall be joined with a continuous tongued and grooved
joint glued together and reinforced with metal dowels at regular intervals not exceeding 200
mm. or pinned with not less than three 40 mm. rust proof pins of the lost heads type. Jointed
pieces of timber shall belong to the same pieces. The tennons shall pass clear through styles.
When assembling a leaf, styles shall be left projecting as a horn. The styles and rails shall have
12 mm. grooves in paneled portion for the panel to fit in. The joinery work shall be
assembled and passed the Engineer-in-Charge and then the joints shall be pressed and secured
by bamboo pins of about 6 mm. diameter. The horns of styles shall be sawn off.

Glass panes shall be fixed by wooden beading having mittred joints. A thin layer of putty shall
be applied between glass panes and sash bars and also between glass panes and the beading.
Fixing of glass panes with simple putty’ and beads shall not be permitted. Putty shall be prepared
by mixing one part white lead with three parts of finely powdered chalk and then adding boiled
linseed oil to the mixture to form a stiff paste.

B-27
(b) Aluminium Sections.
Specifications for different component will by as follows.
(INDAL/BECO/or any approved/ISl marked Aluminium extruded sections.)

HINDALCO BECO

(A) Sliding Window :

(i) 2 Track Sliding .


Frame :
Bottom Member 4095 151.155
Top & Side Member 4096 151.154

Shutter :
Bottom &Top. Member 4148 151.161
Style Side 9777 151.152
Inter Lock 9778 151.153

(ii) 3-Track Sliding .


Frame :
Bottom Member 4097 151.157
Top & Side Member 4098 151.156

Shutter :
Bottom & Top. Member 4148 151.161
Style Side 9777 151.152
Inter lock 9778 151.153

(iii) 4 Track Sliding.


Frame :
Bottom Member 4121 151.67
Top & Side Member 4120 151.66

Shutter :
Bottom & Top. Member 4148 151.161
Style Side 9777 151.152
Inter lock 9778 151.153
Accessories: EPDM Gasket, Adhesive, Screw, Cleat Angle
Glass: clear bubble freefloat glass

B-28
(B) Casement Window :
(i) 40 series (40 mm depth).
Outer Frame.
Peripheral members 4133 151.1
Mullion 9149 151.79
Shutter :
Frame members 9148 151.81
Glazing Clip 4135 151.96
Cleat Angle. (Non-Anodized) 2081 151.167
(ii) 34 series (34 mm depth).
Outer Frame
Peripheral Member 2082 151.164
Mullion 9139 151.163
Shutter :
Peripheral Member 2082 151.164
Mullion 9139 151.163
Shutter :
Frame members 4124 151.165
Glazing Clip 4125 151.166
Cleat Angle. (Non-Anodized) 2081 151.167
Accessories: Stainless steel / Aluminium Functional, Hinge, EPDM
Gasket-T & U Type, Adhesive, Screw, Glass

(C) Louvered Window: Outer

Frame.
Top, Bottom & Side member 9835 303.01

Louver
Light – 18 G 1702
Medium – 16 G 1702 Local make
Heavy – 14 G 1702
(D) Fixed glazzing on all tracks with member of fixed glazing flushed on one side only

Frame
Top, Bottom & Side 9210 151.53
Mullion 9207 151.52
Glazing Clip 4660 151.17

Accessories : EPDM Gasket, Glass.

B-29
(E) Fixed Partition -for height of clear opening more than 1.0 metre.

(i) Unsupported length (Vertical member) upto 1.5 m height


Members:
Side, Top & Bottom 9210 151.53
Intermidiates 9207 151.52
Glazing Clip 4660 151.17

(ii) Unsupported length (Vertical Member) above 1.5 m height


Members:
Side, Top & Bottom 9221 151.183
Intermidiates 9220 151.193
Glazing Clip 4660 151.17

(iii) Both ends restrained (with horizontal


members or masonry walls / concrete
members where the horizontal members can
be screwed) for panels within 0.9 Sq.m.

Members:
Side, Top & Bottom 9210 151.53
Intermidiates 9207 151.52
Glazing Clip 4660 151.17

(iv) Both ends restrained (with horizontal


members or masonry walls / concrete
members where the horizontal members can
be screwed) for panels above 0.9 Sq.m

Members:
Side, Top & Bottom 9221 151.183
Intermidiates 9220 151.193
Glazing Clip 4660 151.17

Accessories : EPDM Gasket, Glass / Board

B-30
F) Movable door shutters fully glazed, partly glazed
Partly prelaminated and rimless doors.

(i) Movable door


Door Frame, (Required only when
there is masonry wall/concrete member).
Top Side member 9210 151.183

Shutter :
Top Rail 9201 151.261
Bottom Rail 9200 151.231
Lock Rail 9240 151.218
Door Vertical 9241 151.23
Glazing Clip 4660 151.17
Handle 5140 157.13

(ii) Rimless Door


Top & Bottom Rail 9206 151.51

Accessories:
1. Heavy duty floor spring & top pin assembly
make: Garnish/Nita/Hardyn or any
approved make conforming to IS : 6315
2. EPDM Gasket
3. Wool Pile
4. Lock-Ramson.
5. Handle-Standard/Decorative/Acrylic.
6. Sundries: Adhesive, screw, Cleat Angle

B-14 Door, Window Clamps or holdfasts:

(a) Unless otherwise specified the clamps shall be fixed to outer side of the frame with screws. For
the purpose of receiving clamps a recess of at least 12 mm. deep of suitable size shall be cut into
the frame. After fixing the frame true to plumb with the clamps, the exposed face of the clamps
shall he covered by a thin wooden covering fixed with screws.

(b) The side of the door, window frames which remains in contact with masonry shall invariably be
painted with a protective coat of paint.

B-15 Schedule of Fittings :

(i) Fittings shall be of iron, aluminium or as specified. These shall be well made, reasonably smooth
and free from edges, corners, flaws and other defects. Screw holes shall be counter sunk to suit
the head of specified wood screws. All hinge pins shall be of steel and their riveted heads shall
be well formed.
B-31
bright (brass), oxidised or chromium—plated (electro-plated) and aluminium fittings shall be
finished bright or anodised or as specified. Fittings shall be got approved by the Engineer- in
charge before fixing.
(ii) Screws used for fittings shall be of the same metal and finish as the fittings; however anodised
brass screws or chromium brass screws shall be used for fixing aluminium fittings.
(iii) Fittings shall be fixed in proper position as shown in the drawings or as directed by the Engi-
neer-in-Charge. These shall be truly vertical or horizontal as the case may be. Screws shall be
driven home with screw driver and not hammered in. Recesses shall be cut to exact size and
depth for the counter -sinking of hinge.
B-16 Stone Masonry Block Walling :
(i) Considering ease in handling and other requirements, the nominal length and height of the block
is kept 300 mm. and 150 mm. respectively with the widths as 200, 150 and 100 mm. respec-
tively. The actual block dimensions are short by 10 mm. to accommodate mortar joint thickness.
These blocks weigh from 9 to 18 kg. each. The stone masonry blocks are made from large size
stone pieces bound together with lean cement concrete mix 1:5:8 (cement, sand, stone aggregate
10 mm. down). The stone piece sizes vary from 50 to 260 mm. To impart good workability and
bond, the sand should be well graded and should have tiny particles (15 to 20%) passing I.S.
sieve no. 300 micron and 5 to 15% passing I.S. sieve no 150 micron in area. Where fly ash is
available, this may be used as substitute for the fine particles of sand, provided good workability
and plasticity in such lean concrete is achieved to the desired extent and in such case of using of
fly ash, lesser cost of production of masonry stone block may be achieved at.
(ii) Stone masonry blocks are prepared in the following stages (a) Stone pieces are arranged in
mould (b) concrete (1:5:8) is filled around stone pieces in first layer (c) Second layer of stone
pieces is laid then (d) Concrete (1.5:8) is filled up to top.
Demoulding of such blocks follows soon after 3 to 7 minutes of its casting. The moulded blocks
are cured by frequent sprinkling of water over the stacks for 2 weeks and are cured for another 2
weeks before laying them in wall.
For quality control, testing of two blocks out of every 500 blocks for compressive strength
after providing proper capping as per test procedure laid down in I.S.-2185 of 1967, from
(1:5:8) lean concrete stone masonry block (290 mm x 190 mm.) and thickness 140 mm is
desired. Average ultimate crushing load for such block in tons is to be 38 and its average
compressive strength thus stands at 69 kg/sq. cm.
(iii) The blocks are used both for load bearing and non-load bearing walls. Permissible stresses in the
masonry are taken from the I.S. Code 1969 of 69 “Structural safety of building - masonry
walls”.

As cutting of the these blocks is not recommenced all length of walls, openings, spaces between
openings etc. shall be in multiple of 100 mm. and all height shall be multiple of course height

B-32
wall thickness is decided based on the strength of the blocks and the load coming over it. The
blocks should be dry at the time of laying in the masonry. If the climate is not dry, the blocks may
be wetted on the surface only in order to reduce the suctioning of water from the mortar. For
breaking of vertical joints in alternate course, smaller length blocks (depending upon the wall
length) are used. The external surface is finished with designable pointing; the internal face
may or may not be plastered.

B-17 PRECAUTION AND SEQUENCE OF OPERATION DURING


DEMOLITION / DISMANTILING OF STRUCTURE

PROCEDURE FOR DEMOLITION:

Before beginning the actual demolition work, a careful study shall be made of the structure which is to
be pulled down and also of all its surroundings to ascertain how far the stage by stage demolition will
affect the safety of the adjoining structure. A definite plan of procedure for the demolition work, de-
pending upon the manner in which the loads off the various structural parts are supported, shall be
prepared and approved by the Engineer-in-Charge and this shall be followed as closely as possible, in
actual execution of the demolition work.

It should be ensured that the demolition operations do not, at any stage, endanger the safety of the
adjoining buildings. Moreover, the nuisance effect of the demolishing work on the use of the adjacent
buildings should be kept to the minimum.

No structure or part of the structure or any floor or temporary support or scaffold, side wall or any
device or equipment shall be loaded in excess of the safe carrying capacity, in its then existing condi-
tion.

PRECAUTIONS PRIOR TO DEMOLITION:

1. On every demolition job, danger signs shall be posted all around the structure and all doors and
openings giving access to the structure shall be kept barricaded or manned except during the
actual passage of workmen or equipment. However, provisions shall be made for at least two
independent exists for escape of workmen during any emergency.

During nights, red lights shall be placed on or about all the barricades.

2 All the necessary safety appliances shall be issued to the workers and their use explained. It shall
be ensured that the workers are using all the safety appliances while at work

B-33
3. The power on all electrical service lines shall be shut off and all such lines cut or disconnected at or
outside the property line, before the demolition work is started. Prior to cutting of such lines, the
necessary approval shall be obtained from the electrical authorities concerned. The only exception
will be any power lines required for demolition work itself.
4. Water stream and other service lines shall be shut off and capped or otherwise controlled at or
outside the building line, before demolition work is started.
SPECIAL MEASURES FOR PUBLIC:
1. Safety distances to ensure safety of public shall be clearly marked and prominently sign posted.
Every sidewalk or road adjacent to the work shall be closed or protected. All main roads, which are
open to all, shall be kept open to the public clear and unobstructed at all times. Diversions for
pedestrians shall be constructed, where necessary for safety.
2. If the structure to be demolished is more than two storied or 7.5 m high, measured from the side
walk or street which cannot be closed or safely diverted, and the horizontal distance from the
inside of the sidewalk to the structure is 4.5 m or less, a substantial sidewalk shed shall be con-
structed over the entire length of the sidewalk adjacent to the structure, of sufficient width with a
view to accommodate the pedestrian traffic without causing congestion. The side walk shed shall
be lighted sufficiently to ensure safety at all times.
The roof of sidewalk sheds shall be capable of sustaining a load of 73 N/mm2. Only in exceptional
cases, say due to lack of other space, the storing of material on a sidewalk shed may be permitted
in which case the shed shall be designed for a load of 146 N/mm2. Roof of sidewalk shed shall be
designed taking into account the impact of the falling debris. By frequent removal of loads it shall
be ensured that the maximum load, at any time, on the roof of work shed is not more than 6000 N/
mm2. The height of sidewalk shed shall be such as to give a minimum clearance of 2.4 m.
Sidewalk shed opening. for loading purposes, shall be kept closed at all time except during actual
loading operations.
The deck flooring of the sidewalk shed shall consist of plank of not less than 50 mm in thickness
closely laid and deck made watertight. All members of the shed shall be adequately braced and
connected to resist displacement of members or distortion of framework.
When the horizontal distance from the inside of the sidewalk to the structure is more than 4.5 m
and less than 7.5 m, a sidewalk shed or fence with substantial railing shall be constructed on the
inside of the sidewalk or roadway along the entire length of the demolition side of the property with
movable bars as may be necessary for the proper execution of the work.

SPECIAL PRECAUTIONS DURING DEMOLITON:

Prior to commencement of work, all material of fragile nature like glass shall be removed.
All openings shall be boarded up.
Dust shall be controlled by suitable means to prevent harm to workmen.
B-34
SEQUENCE OF DEMOLITION OPERATIONS:

1. The demolition work shall be proceeded with in such a way that

(a) it causes the least damage and nuisance to the adjoining building and the members of the public, and
(b) it satisfies all safety requirements to avoid any accidents.

2. All existing fixtures required during demolition operation shall be well protected with substantial covering
to the entire satisfaction of the rules and regulations of the undertakings or they shall be temporarily
relocated.

3. Before demolition work is started, glazed sash, glazed doors and windows etc. shall be removed. All
fragile arid loose fixtures shall be removed. The lath and all loose plaster shall he stripped off throughout
the entire building. This is advantageous because it reduces glass breakage and also eliminates a large
amount of dust producing material before more substantial parts of the buildings are removed.

4 The demolition shall always proceed systematically storey by storey, in the descending order. All work in
the upper floor shall be completed and approved by the Engineer-in-Charge prior to disturbance to any
supporting member on the lower floor. Demolition of the structure in sections may be permitted in exceptional
cases if proper precautions are ensured to prevent injuries to persons and damage to property.

DEMOLITION OF WALLS:

1. While walls of sections of masonry are being demolished, it shall be ensured that they are not allowed to
fall as single mass upon the floors of the building that are being demolished so as to exceed the safe
carrying capacity of the floors. Overloading of floors shall be prevented by removing the accumulating
debris through chutes or by other means immediately. The floor shall be inspected by the Engineer-in-
Charge before undertaking demolition work and if the same is found to be incapable to carry the load of the
debris, necessary additional precautions shall be taken so as to prevent any possible unexpected collapse of
the floor.

2. Walls shall be removed part by part. Stages shall be provided for the men to work on if the walls are less
than one and a half brick thick and dangerous to work by standing over them.

DEMOLITION OF FLOOR:

1. Prior to removal of masonry or concrete floor adequate support centering shall be provided.

2. When floors are being removed, no workmen shall be allowed to work in the area, directly underneath and
such area shall be barricaded to prevent access to it.

B-35
DEMOLITION OF CERTAIN SPECIAL TYPES AND ELEMENTS OF STRUCTURES:

1. ROOF TRUSSES:

a) If a building has a pitched roof, the structure should be removed to wall plate level by hand
methods. Sufficient purlins and bracing should be retained to ensure stability of the remaining
roof trusses while each individual truss is removed progressively.

(b) On no account should the bottom tie of roof trusses be cut until the principal rafters are prevented
from making out ward movement.

2. HEAVY FLOOR BEAMS:

Heavy baulks of timber and steel beams should be supported before cutting at the extremities and should
then be lowered gently to a safe working place.

3. BRICK ARCHES:

Expert advice should be obtained and, at all stages of the demolition, the closest supervision should be given
by persons fully experienced and conversant in this type of work to ensure that the structure is stable at all
times.

However, the following points may be kept in view.

(a) On no account should the restraining influence of the abutments be removed before the dead load
of the spandrel fill and the arch rings are removed.

(b) A single span arch can be demolished by hand by cutting narrow segments progressively from each
springing parallel to the span of the earth, until the width of the arch has been reduced to a minimum
which can then be collapsed.

(c) Where deliberate collapse is feasible, the crown may be broken by the demolition ball method
working progressively from edges to the centre.

(d) In multi-span arches, before individual arches are removed, lateral restraint should be provided at
the springing level. Demolition may then proceed as for single span; where explosives are used it is
preferable to ensure the collapse of the whole structure in one operation to avoid the chance of
leaving unstable portion standing.

4. CANTILEVER (NOT PART OF A FRAMED STRUCTURE):

Canopies, cornices, staircases and balconies should be demolished or supported before tailing down load is
removed.

B-36
5. IN-SITU REINFORCED CONCRETE:

Before commencing demolition, the nature and condition of the concrete, the condition and position of
reinforcement and the possibility of lack of continuity of reinforcement should be ascertained.

Demolition should be commenced by removing partition and external non-load bearing cladding.
(a) REINFORCED CONCRETE BEAMS :

A supporting rope should be attached to the beam. Then the concrete should be removed from both ends
by pneumatic drill and the reinforcement exposed. The reinforcement should then be cut in such a way
as to allow the beam to be lowered under control to the floor.

(b) REINFORCED CONCRETE COLUMNS :

The reinforcement should be exposed at the base after restraining wire guy ropes have been placed
round the member at the top. The reinforcement should then be out in such a way as to allow it to be
pulled down to the floor under control.

(c) REINFORCED CONCRETE WALLS :

These should be cut into strips and demolished as for columns.

(d) SUSPENDED FLOORS AND ROOFS :

The slab should be cut into strips parallel to the main reinforcement and demolished strip by strip. Where
ribbed construction has been used, the principle of design and method of construction should be determined
before demolition is commenced. Care should be taken not to cut the ribs inadvertently.

LOWERING, REMOVAL AND DISPOSAL OF MATERIALS:

Dismantled materials may be thrown to the ground only after taking adequate precautions. The material shall
preferably be dumped inside the building. Normally such materials shall be lowered to the ground or to the top
of the sidewalk shed, where provided, by means of ropes of suitable tackles.

B-37
(C) MODES OF MEASUREMENTS
GENERAL: Unless specifically mentioned otherwise, the following modes of measurement shall be
adopted.
C-1 Brick Walls:

(a) With Modular Bricks (190 mm x 90 mm x 90 mm) :

The thickness of brick wall made of Modular Bricks with one brick laid flat (with long side
parallel to the length of the wall) shall be measured as 100 mm. One brick thick walls (with the
length of the brick parallel to the thickness of the wall) shall be measured as 200 mm., one and
half brick as 300 mm, two brick walls measured as 400 mm and so on.

(b) With Conventional Bricks (93/ 4” x 43/ 4” x 23/ 4”) or (248 mm x 120 mm x 70 mm) :

The thickness of brick wall made with one brick laid on edge (with the long side parallel to the
length of the wall) shall be measured as 75 mm. Similarly, a wall made with one brick laid flat
(with the long side parallel to the length of wall) shall be measured as 125 mm. 1 brick thick walls
(with the length of brick parallel to the thickness of the wall) shall be measured as 250 mm., one
and half brick walls (i.e. one brick along the length and one brick along the width) shall be
measured as 375 mm., two brick thick walls measured as 500 mm. and so on.

(c) The width of lintels etc. covering the entire thickness of brick wall shall also be measured as
equal to corresponding wall thickness.

(d) Net measurement of all wall will be taken after deduction of all opening etc. This applies to 125/
100 mm. thick and 75 mm. thick walls also. Parapets (upto 1060 mm. height) will be measured
along with the brick work of the floor just below the roof and will be paid for at the same rate.

(e) No extra payment will be made for curved or chamfered work even though it may necessitate
cutting of bricks. For small curves or chamfers the Engineer-in-Charge may, at his discretion
allow measurement on the square (i.e. without deduction for the quantity removed for forming
the small curve or chamfer).

C-2 Concrete Plain or Reinforced :

Finished net measurement will be taken after deduction of large holes, rebates etc. but without
deduction for the volume of reinforcement, if any, in the concrete.

B-38
C-3 Reinforcement:
The measurement will be on the basis of calculated weight of reinforcement only (i.e. without considering
the weight of tying wires) actually consumed in the finished work as per drawing and design or as per
direction of the Engineer-in-Charge. If the length of any rod be more than that shown in the drawing but
has been allowed to be used, the length will be taken as the length shown in the drawing. Hooks and laps
as per standard practice will be measured and paid for.

C-4 Plaster, Lime punning, Plaster of Paris rendering :


For measurements of plaster (exterior or interior) deduction is to be made for door, window or opening of
similar dimension and allowance is to be made for jambs, sills and soffits. Payment will be made on the
basis of surface measurement of wall deducting one-third the measurement of such opening and without
any separate measurement of jambs, sills and soffits. In case of large openings, exceeding three sq.m.
however, as in the case of verandahs with columns, payment will be on actual measurements.

C-5 White Washing and Colour Washing:

(i) Payment will be made on the basis of surface measurement without any deduction for door,
window or opening or similar dimension and without any separate measurement for jambs. sills
and soffits of such openings.

(ii) For cement paint and oil painting to walls or concrete jellies or similar other works, method of
measurements shall be the same as in plaster.

C-6 Painting:

(a) Measurement for painting work in doors and windows, grills, gratings, collapsible gates, corrugated
roofing etc. shall be on the following basis. In all such cases the “Area” shall be measured flat
(and not girthed). For door and windows, no separate payment shall be made for the frames
(chowkats), the “Area” in such cases represents the area of the wall opening covered by the
frames (including exposed surface of the frames). For grills, gratings etc. the area represents the
area of the opening covered by outer frames.

(a) The area measured as above shall be multiplied by the factor given below and the works of painting
shall be paid on the quantities thus arrived at:

B-39
Multiplying Multiplying
Name of surface painted
factor for factor for
painting one painting
side only both side only

(i) Timber doors, windows etc. 0.80 1.60


Fully glazed (or with glass substitute) 1.30 2.60
Fully panelled or flush or battened Fully 1.80 3.60
venetian or fixed or louvered 1.14 2.28
Two third panelled one third glazed 1.00 2.00
half panelled half glazed 1.20 2.40
Flushing joiner 0.75 1.50
One third panelled two third glazed
One third panelled two third venetian
(or fixed louvered) 1.33 2.66
half panelled half venetian (or fixed-louvered) Netted 1.55 3.10
(without painting to the net with z-battens) Netted (with 0.25 0.50
painting to the net as well with Z-battens) 0.63 1.25
Corrugated (i.e. with leaves of GI. sheets) (ii) 1.25 2.50
(a) Corrugated iron sheet roof 1.05 2.10
(b) Corrugated iron sheet wall including supporting frame 1.14 2.28
(iii) Corrugated asbestos sheet roof or wall 1.20 2.40
(iv) Trafford Asbestos sheet roof or wall 1.10 2.20
(v) Heavy type grating or grated doors (as in jails etc.)
for painting all over 1.50
(vi) Collapsible gate (all over) (vii) 1.50
Steel windows (full glassed) 0.50 1.00
(viii) Ledges & battened or ledged, battened and braced one 1.13 2.25
third glazed two third venetian (or fixed-louvered) two 1.47 2.94
third glazed one third venetian (or fixed-louvered) 1.13 2.25
(ix) Weather boarding (Supporting frame shall not be
Measured separately) 1.20 2.25
(x) Title & slate battening (over all measured without
deduction the open surface) 0.80
(xi) Trellis (or jaffri) work one way or two way (over all members
without deduction the open space & including the supporting
members for painting all over) 2.00
(xii) Grills. gratings & railings (cast iron or wooden)
guards bars, balustrades, expanded metals (supporting
frame work shall not be measured separately for painting all over) (xiii) 1.00
Steel rolling shutters including top casing (jambgurdes. bottom rail s
and locking arrangement etc. shall be deemed to be included in the
item.) 1.10 2.20
(xiv) Curved or enriched work. 2.00 4.00
(xv) Gates and open palisade fencing including standards,
braces, rails, stays etc. (for painting all over) 1.00
(xvi) Partly panelled and partly glazed or glazed steel door. (xvii) 0.80 1.60
Plain sheet steel doors & windows 1.10 2.20
(xviii) Wood shingle roofing 1.10 2.20
(xix) Boarding with cover fillets and match boarding 1.05 2.10

B40
Note as per IS : 1200 (Part XV)-1976/P-8

Note 1 . The Height shall be taken from bottom of lowest rail, if palisades do not go below it or from
lower end of palisades, if they project below lowest rail, upto top of palisades, but not upto
top of standards, if they are higher than palisades.
Note 2 . Where doors, windows etc. are of composite types other than those included in this table,
different portions shall be measured separately with their appropriate coefficients, center line
of common rail being taken as the dividing line between the two portions.
Note 3 . Measurement of painting of doors, windows, collapsible gates, rolling shutters etc as given
in this table shall be deemed to include painting, if required of all iron fittings in the same
shade.
Note 4 When two faces of a door, window etc. are to be treated with different specified finishes,
measurable under separate items, edges of frames and shutters shall be treated with the one
or the other type of finish and measurement thereof shall be deemed to be included in the
measurement of the face treated with that finish.
Note 5 . In case shutters are fixed on both faces of a frame, measurement for the door frame and
shutter on one face shall be taken on the manner already described, while the additional
shutter on the other face shall be measured exclusive of the frame.
Note 6 . Where shutter is provided with clearance exceeding 15 cm. at top and/or at bottom, such
openings shall be deducted from the overall measurement and relevant coefficients applied.

C-7 Metal, Chips, Boulders, Bats, Sand, Lime, Coal, Carried Earth etc. :

(a) Unless specifically mentioned otherwise in the description of the item itself, measurements for
supply and / or carriage shall be taken in stacks and that as soon after the stacks are made as
possible. The height and the shape and size of the stacks shall be as per direction of the Engineer-
in-charge but in no case shall the height of the stacks be less than the minimum as indicated
hereinafter.

Allowance for shrinkage and / or shrinkage shall be made as indicated hereinafter. The net
quantity shall be arrived at after deducting these allowances from the measurement of fresh
stacks and payment for supply or carriage shall be made on the net quantity thus derived.
Quantity of any material shall always indicate such net quantity, unless specifically mentioned
otherwise.

(b) If for any special reasons, as per provisions in any particular contract, final measurements have to
be taken in wagons (before unloading at destination) no deduction for shrinkage and / or
shrinkage shall be made.

For carried earth supplied by the contractor, the earth is to be first stacked at site for measurement
and the earth utilised in the work after such stacks have been measured. The items of earthwork
with such carried earth include the cost of such operation. The net quantity, for the purpose of
payment, shall be derived after deducting allowances for shrinkage and/or shrinkage as specified
below. In special circumstances, the Engineer-in-Charge may, at his sole discretion, take borrow-
pit measurements for such carried earth, in which case no allowance for shrinkage and/or
shrinkage is to be deducted.

Where earth is to be carried from any excavation, the measurement for carriage for excavated
earth will be taken on the basis of earth excavated.
B-41
(c) For conversion of brick materials from one form to another 314 Nos. of bricks (conventional size)
will be taken to produce 1 cu.m. of bats and 1.1 cu.m. of bats to produce 1 cu.m. of khoa or metal.

Unless specifically mentioned otherwise in any particular contract, 1025 kg.. of steam coal shall be
taken as equivalent no 1 cu.m. (When measured in very old and settled stacks or in wagons at
destination or after deducting sinkage and/or shrinkage allowance when measured in fresh stacks).
Similarly 1107 Kg. of slack coal shall be taken as equivalent to 1 cu.m.

(d) For consolidation of stone or jhama metal and similar works involving utilisation of materials already
measured in stacks, the quantity of materials actually consumed in such works will be taken to be same
as the recorded quantities (after due allowance for sinkage and/or shrinkage, where applicable) of the
stack or stacks actually utilised in such works.

(e) Schedule showing minimum height of stacks and allowance to be deducted for sinkage and/or
shrinkage when measured in fresh stacks.

Sl. MATERIALS Minimum Allowance to be


No. height of deduced for sinkage
stacks and/or shrinkage
1
(a) Stone metal, ballast, chips, shingles or gravel 32.5 cm / 13
1
(b) Stone boulders 15 cm. or above sizes 35 cm /7
1
(c) Stone boulders below 15 cm. size 45 cm /9
(d) Jhama bats or bricks bats 53 cm 1/7
(e) Jhama metal, khoa or chips 34 cm 1/9
(f) Sand 61 cm 1/8
(g) Surki 61 cm 1/4
(h) Lime 61 cm 1/4
(i) Moorum 33.5 1/13
(j) Carried earth 34 cm 1/9
(k) Rubbish (building or kiln) 34 cm 1/9
(l) Steam coal or slack coal 61 cm 1/8
(m) Cinder 61 cm 1/9

B-42
C-8 Carriage:

All items involving carriage, loading, unloading & stacking shall be in accordance with the provisions of
the Schedule of Rates of Public Works (Roads) Department applicable at the material time within the
jurisdiction of the circle.

C-9 Glazing:

All glazing shall be measured in square metres. Each pane of glass shall be measured to the nearest 0.5
cm. both width and height. Irregular or circular panes shall be measured as the smallest rectangular area
from which the irregular or circular pane can be cut. Irregular panes shall be measured separately, and
described as irregular shapes measured square.

Govt. order No. 2809 (3) A dt. 27th April, 1971

ADDITIONAL CONDITIONS OF CONTRACT FOR DEPARTMENTAL MATERIALS

(a) The value of materials supplied by the Department for use on the work shown in the schedule on page
II of the contract form (West Bengal Form No. 2911) in respect of items of work for which the contractor’s
rates are inclusive of the cost of such materials, will be debited to him in his accounts at the rates
specified in the schedule.

(b) Regarding materials in respect of items of work for which the contractor’s rates are not inclusive of the
cost of such materials, the contractor shall only act as custodian on behalf of the Govt. and the value of
such materials will not be charged to him except under sub-clause (f) and (g) hereof

(c) When the contract provides for use of certain specified materials to be supplied by the Deptt. the
contractor shall not obtain such materials from other sources unless authorised in writing by the Engineer-
in- Charge of the works.

(d) Materials supplied for a particular work or a part thereof shall not be used elsewhere except with
written permission of the said Engineer-in-Charge.

(e) Materials shall be supplied to the contractor in such installments as may be decided by the Engineer-in-
Charge.

(f) The contractor shall be held responsible for any misuse, loss or damage of the materials issued or
handed over to him by the Engineer-in-Charge. In default, the cost of such materials shall be recovered
from the contractor according to the terms of the provisions made in sub-clause (g) and (h) thereof.
(g) In the following cases, the materials issued or handed over to the contractor shall be deemed to have to
been misused by him.
(i) Materials lost or damaged due to negligence on the part of the contractor and/or defective storage
by him.

B-43
(ii) Materials used in excess of the requirements as shown in consumption chart attached herewith
(iii) Materials used without permission of the Engineer-in-Charge in temporary works (e.g. coffer
dams, embankments, shoring etc.) or in the construction of contractor’s godown, site office, labour
hutments etc.
The value of materials misused as above (in which case the decision of the Engineer-in-Charge shall be
final) shall be recovered at 50 per cent in excess of the highest of the following three rates;
(i) Issue rate as specified in the contract
(ii) Department stock rate at the time of recovery of value
(iii) Market rate at the time recovery of value.
(h) In cases of loss or damage of materials issued or handed over to the contractor other than under the
circumstances mentioned in sub-clause 9(g) the materials so lost or damaged shall be replaced by the
Engineer-in- Charge at the cost of the contractor and the certificate of the Engineer-in-Charge as to the
cost of replacement shall be final and binding on the contractor.
(i) Where so specified and in any case in respect of cement, steel and bituminous materials supplied by the
Deptt. a stock register shall be maintained by the contractor and the daily receipts, issues and balance of
such materials shall be shown therein. This register shall be produced by the contractor to the Engineer-
in-Charge or his representative whenever required for verification of stock.
(j) Whenever asked for by the Engineer-in-Charge during the progress of work and also with the final bill,
the contractor shall submit to the former a statement showing :
(i) The total quantity of materials received by the contractor from the Deptt.
(ii) Consumption thereof item by item in the work ; and
(iii) The balance in hand.
(k) Whenever by computing the consumption of materials of any description in any item or group of items
of work requiring use of such materials.
(i) It is found that the contractor has used less materials than are required by the specification and/or
as shown in consumption chart attached herewith, the value of the quantity of materials less used
shall be recovered from the contractor at 5(five) per cent in excess of the issue rate of such
materials. In such an event the contractor shall not be entitled to claim or receive the materials,
the cost of which has been thus recovered; or
(ii) If it is found that contractor has used any materials in excess of the requirement, the value of the
materials used in excess shall be recovered from the contractor as provided in sub- clause (g)
hereof.
(iii) Provided that recovery of materials used less or in excess as indicated in paragraphs (i) and (ii) of
the sub-clause shall be subjected to the decision of the Engineer-in-Charge who may allow
variation according to para I of consumption chart.

B-44
(D) MISCELLANEOUS
Extra rate for difficult I River line Areas / Difficult nature of work

D-1 The following extra rates will be allowed on the whole schedule of rates mentioned below.

SECTION I - (A) Earth work, Antitermite Treatment (except item 1to 6)


(C) Brick Work, Concrete work etc.
(D) Flooring
(E) Roofing and Sheet Walling
(F) Structural steel work, Grill, Gates etc.
(G) Carpenters works
(H) Band Moulding, Cornics etc.
(I) Plastering, Pointing etc
(J) White Wash etc.
(K) Painting
(L) Glaziers works
(M) Drains etc.
(N) Thatch, Mud and Bamboo Works
(O) Fencing
(P) Soling, Edging and Metalling etc.
(R) Aluminium works
(T) Miscellaneous works (except Items 36 to 38, 41 & 42)
(U) Additional Items

SECTION II - Labour & Materials


Extras : (a) In riverine areas connected by river route and/or ferry crossing under :
Extra Rate
(i) Hasnabad & Bhangore P. S. @ 15%
(ii) Haroa, Canning. Kultali. Namkhana & Kakdwip P. S. @ 15%
(iii) Gosaba, Basanti, Sandeshkhali, Hingalganj & Minakhan P. S. @ 22.5%
(iv) Patharpratima & Sagar P.S. @ 30%
(b) In all other areas under Kakdwip PWD Sub-Division excluding the @ 10%
jurisdiction of Kakdwip P.S. in riverine areas connected by river route
and/or Ferry crossing.

D-2 Extra rate in respect all works on the whole schedule of rates for works

(i)Within the perimeter of Jail including perimeter wall work, where works
are permitted within restricted hours only @ 10%.
B-45
(ii) Rajbhavan, Kolkata @10%

(iii) If repair works required inside running wards / cabins of hospitals are restricted by hospital
authority in writing for duration less than usual working hours an extra rate of 10% will be
allowed.
(iv) If for unavoidable circumstances. works are to be done in emergency cases at night, extra rate
@10% will be applicable to items of night work only strictly under certificate of Engineer- in-
Charge.
(v) For works at Bhutni under Manikchawk P.S. in Malda District Extra 15% (Fifteen per cent) over
and above the rates provided in this schedule is allowed.

D-3 Rates for rehabilitation works in heritage structure / monuments (except buildings in use for Govt. or
similar offices) requiring careful expert quality conscious mistries under guidance of experts, may be
25% higher than the Schedule rate for corresponding items considering wastage of labour and lesser
output, with specific permission from Superintending Engineer of Concerned Circle.

D-4 5% (Five percent) extra in respect of works within Contai-I, Contai-Il, Contai- III, Khejuri-l, Nandigram-
1, Nandigram- II.Sutahata-I, Sutahata-II panchayat samity under East Midnapore District will be
allowed on the whole schedule excepting those under section-I (A) Earth works etc. (B) Dismantling
and cutting chase, holes etc. (N) Thatch, Mud and Bamboo works and whole of Section-II.
Extra in respect of works within following Police station will be allowed on (the whole schedule except-
ing those under section-I (A) Earth works etc. (B) Dismantling and cutting chase, holes etc (N) Thatch,
Mud and Bamboo works and whole of Section-II.
[Additional 5% (Five percent) for Durgachak, Haldia and Digha Police station area.
20% (twenty percent ) extra for Nayachar Island (developed on the midst of Hooghly river under the
Administrative control of D. M. East Midnapore on the whole schedule.

D-5 Rates of the items under-


Section - I Excluding (i) Sub-Section (A) & (B) and (ii) items involving labour only in Sub-Section
(C) to (T) are to be enhanced by

(i) 20% for works in the following places (a) Hill area of Garubathan Block (b) Kalimpong Municipal
Area (c) Dow hill area of Kurseong Sub-Division (d) Miric Block (e) Section from Mane Bhanjan to
Phalut of Simana Sandakphu Phalut Road (f) Section from Peshoke Khola to Lopchu Tea Garden of S.
H. No. 12 (g) within 10 km. from Mongpu under Takda Block (h) Ghoom Tiger Hill Road (i) Section
Pankhabari Bazar to the Starting of Kurseong Municipal Road of Garidhura- Kurseong Road (j) Kalimpong
Block 1/lI and Mongpo & Takda Block. k)Bijanbari Block l) Sukia Pokhri Block.

(ii) 20% of works in the following places:-


(a) Darjeeling Municipal area (b) Kurseong Municipal area (excluding Dow Hill area) (c) Rangit (d)
Health Centers at Singritam, Pokhriabong, Lodhama, Takling, Gitdabling, Samathahar. Saimolbong &
Sittong.

The rates under sections stated above for Jalpaiguri district are to be enhanced by 15% for works in
Boxa Hills .
B-46
The rates for all types of concrete works. masonry works and sand cement plastering in the District of
Uttar Dinajpur and Dakshin Dinajpur have been arrived at with the consideration that Bansloi sand
(Murarai Variety) shall be used in all such works. If any work is done with local sand with the approval
of the Executive Engineer, the rate of the item shall be reduced accordingly on the basis of difference of
cost of Bansloi sand and local sand. All cement concrete works in the District of Uttar Dinajpur and
Dakshin Dinajpur Shall be done with stone chips of Pakur variety when no specific mention is made in
the description of item.

D-6 The Schedule of Rates will be enhanced due to various circumstances as mentioned below:-

(a) By 10% (Ten percent) for works done within the Hills region of Ajodhya in the District of Purulia (a
region will be treated hills if the altitude is more than 200 Meters from the level of any adjoining
area within 10 km.)
(b) By 5 %( Five percent) for works done within the region of Khanakul-I & II Block under the
District of Hooghly.

B-47
CHART FOR CONSUMPTION OF MATERIALS
Consumption of different materials of construction in the corresponding contract items of work shall be
computed on the basis of the quantities shown in this table subject to a variation of plus/minus 5 (Five) per
cent. For steel reinforcement the variation may be permitted upto ±10%

N.B. : The statement is based on the following assumptions :

(i) That dry sand with necessary allowance for bulking is used and (ii) that the size of
bricks used shall be 248 ×120× 70 mm or 93/ "×43/ "×23/ " for conventional bricks and
(190 ×90 × 90 mm) for modular bricks
Sl. Description of Items Unit Name of Materials Quantity of
No. required Materials
required
1. 10 mm. cement plaster 1:2 % sq.m. 1. Cement 0.54 Cu.m.
2. Sand 1.08 Cu.m
2. -Do- 1:3 % sq.m. 1. Cement 0.40 Cu.m.
2. Sand 1.20 Cu.m
3. -Do- 1:4 % sq.m. 1. Cement 0.30 Cu.m.
2. Sand 1.20 Cum.
4. -Do- 1:6 % sq.m. 1. Cement 0.20 Cu.m.
2. Sand 1.20 Cu.m
5. 15 mm cement plaster 1:2 % sq.m. 1. Cement 0.80 Cu.m.
2. Sand 1.60 Cu.m
6. -Do- 1:3 % sq.m. 1. Cement 0.60 Cu.m.
2. Sand 1.80 Cu.m
7. -Do- 1:4 % sq.m. 1. Cement 0.46 Cu.m.
2. Sand 1.84 Cu.m
8. -Do- 1:6 % sq.m. 1. Cement 0.30 Cu.m.
2. Sand 1.80 Cu.m
9. 20 mm. cement plaster 1:3 % sq.m. 1. Cement 0.80 Cu.m.
2. Sand 2.40 Cu.m
10. -Do- 1:4 % sq.m. 1. Cement 0.60 Cu.m.
2. Sand 2.40 Cu.m
11. -Do- 1:6 % sq.m. 1. Cement 0.40 Cu.m.
2. Sand 2.40 Cu.m
12. 25 mm. cement plaster 1:3 % sq.m. 1. Cement 0.884 Cu.m.
2. Sand 2.65 Cu.m
13. -Do- 1:4 % sq.m. 1. Cement 0.71 Cu.m.
2. Sand 2.84 Cu.m

B-48
Sl. Description of Items Unit Name of Materials Quantity of
No. required Materials
required
14. 25 mm. cement plaster 1:6 % sq.m. 1. Cement 0.472 cu.m.
2. Sand 2.84 cu.m
15. Cement flush / rule/ tuck 1:3 % sq.m. 1. Cement 0.119 cu.m.
pointing 2. Sand 0.357 cu.m
16. -Do- 1:4 % sq.m. 1. Cement 0.091 cu.m.
2. Sand 0.366 cu.m

17 Brick work in Cement 1:2 cu.m. 1. Brick 389 Nos.


mortar 2. Cement 0.15 cu.m.
3. Sand 0.30 cu.m.
18 - Do - 1:3 cu.m. 1. Brick 389 nos.
2. Cement 0.107 cu.m.
3. Sand 0.33 cu.m.
19 - Do - 1:4 cu.m. 1. Brick 389 nos.
2. Cement 0.083 cu.m.
3. Sand 0.33 cu.m.
20 - Do - 1:5 cu.m. 1. Brick 389 nos.
2. Cement 0.066 cu.m.
3. Sand 0.33 cu.m.
21 - Do - 1:6 cu.m. 1. Brick 389 nos.
2. Cement 0.055 cu.m.
3. Sand 0.33 cu.m.
22 Brick work in composite 1:1 cu.m. 1. Brick 389 nos.
mortar :6 2. Cement 0.0535 cu.m.
3. Lime 0.0535 cu.m.
4. Sand 0.33 cu.m.
23 Brick work in composite 1:2 cu.m. 1. Brick 389 nos.
mortar :9 2. Cement 0.035 cu.m.
3. Lime 0.071 cu.m.
4. Sand 0.33 cu.m.
24 Brick work in cement 1:4 cu.m. 1. Brick 500 nos.
mortar with modular / fly 2. Cement 0.0805 cu.m.
ash brick 3. Sand 0.322 cu.m.

B-49
Sl. Description of Items Unit Name of materials Quantity of
No. required materials required

25 - Do - 1:6 cu.m. 1. Brick 500 nos.


2. Cement 0.0537 cu.m.
3. Sand 0.322 cu.m.
26 12.5 cm. thick Brick 1:3 % 1. Brick 4951 nos.
work sq.m. 2. Cement 1.22 cu.m.
3. Sand 3.66 cu.m.
27 12.5 cm. thick Brick 1:4 % 1. Brick 4951 nos.
work sq.m. 2. Cement 0.914 cu.m.
3. Sand 3.66 cu.m.
28 100 mm. thick brick 1:4 % sq.m 1. Brick 5065 nos.
work with modular / fly 2. Cement 0.73 cu.m.
ash brick 3. Sand
2.90 cu.m.
29. 75 mm thick brick 1:3 % sq.m 1. Brick 3014 nos.
work 2. Cement 0.762 cu.m.
3. Sand 2.286 cu.m.
30. 75 mm thick brick 1:4 % sq.m 1. Brick 3014 nos.
work 2. Cement 0.572 cu.m.
3. Sand 2.286 cu.m.
31. Cement concrete with 1:2:4 cu.m. 1. Jhama Chips (6 0.90 cu.m.
jhama chips to 19 mm)
2. Sand 0.45 cu.m.
4. Cement 0.225 cu.m.
32. Cement concrete with 1:21/ cu.m. 1. Jhama Chips (6 0.93 cu.m.
jhama chips 2:5 to 19 mm)
Brick
2. Sand 0.465 cu.m.
3. Cement 0.186 cu.m.

B-50
Sl. Description of Items Unit Name of materials Quantity of
No. required materials required

33. Cement concrete with 1:3:6 cu.m. 1. Jhama chips 0.93 Cu.M.
jhama chips (6 to 19
mm.)

2. Sand 0.48 Cu.M.


3. Cement 0.16 Cu.M.
34. - Do - 1:4:8 cu.m. 1. Jhama chips 0.98 Cu.M.
(6 to 19
mm.)

2. Sand 0.49 Cu.M.


3 Cement 0.122 Cu.M.
35. Cement concrete with 1:2:4 cu.m. 1. Stone chips (6 0.88 Cu.M.
stone chips to 20 mm.)

2. Sand 0.44 Cu.M.


3. Cement 0.22 Cu.m.
36. - Do - 1:11/ cu.m. 1. Stone chips (6 0.86 Cu.M.
2:3 to 20 mm.)
2. Sand 0.43 Cu.M.
3. Cement 0.286 Cu.m.

37. - Do - 1: 2 cu.m. 1. Stone chips (6 to 0.92 Cu.M.


½:3 20 mm.)
2. Sand 0.46 Cu.M.
3. Cement 0.18 Cu.m.
38. - Do - 1:3:6 cu.m. 1. Stone chips (6 to 0.94 Cu.M.
20 mm.)
2.Sand 0.47 Cu.M.
4. Cement 0.156 Cu.m.
39. - Do - 1:4:8 cu.m. 1. Stone chips (6 to 0.96 Cu.M.
20 mm.)
2.Sand 0.48 Cu.M.
3.Cement 0.12 Cu.m.

B-51
Sl. Description of Items Unit Name of materials Quantity of
No. required materials required
40 25 mm artificial stone 1:2:4 %sq.m 1.Jhama chips (5to 12 2.268 cu.m.
floor with jhama mm.)
chips(which includes 1.140 cu.m.
3mm thick neat cement 2.Sand
finish)(cement in the 0.872 cu.m.
consumption chart is 3.Cement
exclusive of cement
required for slurry
purpose)
41 20 mm artificial stone 1:2:4 %sq.m 1.Jhama chips (5to 12 1.716 cu.m.
floor with jhama mm.)
chips(which includes 0.858 cu.m.
3mm thick neat cement 2.Sand
finish)(cement in the 0.73 cu.m.
consumption chart is 3.Cement
exclusive of cement
required for slurry
purpose)

42 25 mm artificial stone 1:2:4 %sq.m 1.stone chips (5to 12 2.23 cu.m.


floor with stone mm.)
chips(which includes 1.12 cu.m.
3mm thick neat cement 2.Sand
finish)(cement in the 0.855 cu.m.
consumption chart is 3.Cement
exclusive of cement
required for slurry
purpose)

B-52
Sl. Description of Items Unit Name of materials Quantity of
No. required materials required
43 20 mm artificial stone 1:2:4 %sq.m 1.stone chips (5to 12 1.676 Cu.M.
floor with stone mm.)
chips(which includes 0.838 Cu.M.
3mm thick neat cement 2.Sand
finish)(cement in the 0.70 Cu.M.
consumption chart is 3.Cement
exclusive of cement
required for slurry
purpose)

44 35 mm artificial stone 1:2:4 %sq.m 1.stone chips (5to 12 3.11 cu.m.


floor with stone mm.)
chips(which includes cu.m.
3mm thick neat cement 2.Sand 1.56
finish)(cement in the cu.m.
consumption chart is 3.Cement
exclusive of cement 1.075
required for slurry
purpose)
45 35 mm artificial stone 1:2:4 %sq.m 1.Jhama chips (5to 12 3.43 cu.m.
floor with jhama mm.)
chips(which includes
3mm thick neat cement 2.Sand 1.72 cu.m.
finish)(cement in the
consumption chart is
3.Cement cu.m.
exclusive of cement 1.17
required for slurry
purpose)

46 7.5 cm lime terracing in roof with Sq.m 1.Brick Khoa 0.075 cu.m.
brick khoa,surki,lime(7:2:2) 2.Surki 0.021 cu.m.
Including finishing 3.Lime 0.021 cu.m.

47 10 cm lime terracing in roof with Sq.m 1.Brick Khoa 0.10 cu.m.


brick khoa,surki,lime(7:2:2) 2.Surki 0.029 cu.m.
Including finishing 3.Lime 0.029 cu.m.

B-53
Sl. Description of Items Unit Name of Quantity of
No. materials materials required
required
48 12.5 cm lime terracing in roof with Sq.m 1.Brick Khoa 0.125 cu.m.
brick khoa,surki,lime(7:2:2) 2.Surki 0.036 cu.m.
Including finishing 3.Lime 0.036 cu.m.

49 12.5 cm lime Sq.m 1.Brick Khoa 0.150 cu.m.


terracing in roof with 2.Surki 0.043 cu.m.
brick 3.Lime 0.043 cu.m.
khoa,surki,lime(7:2:2)
Including finishing
50 5cm thick R.C.Slab 1:2:4 %SQ.M 1.stone chips 4.47 cu.m.
with stone chips and (6to 2 mm.)
with 0.8% 2.Sand 2.23 cu.m.
reinforcement 3.Cement 1.12 cu.m.
4.Steel kg
322.60
5.Shuttering 100 sq.m
51 7.5cm thick R.C.Slab 1:2:4 %SQ.M 1.stone chips 6.70 cu.m.
with stone chips and (6to 20 mm.)
with 0.8% 2.Sand 3.35 cu.m.
reinforcement 3.Cement 1.675 cu.m.
4.Steel 482.62
5.Shuttering 100 kg
sq.m
52 10cm thick R.C.Slab 1:2:4 %SQ.M 1.stone chips 8.93 cu.m.
with stone chips and (6to 20mm.)
with 0.8% 2.Sand 4.47 cu.m.
reinforcement 3.Cement 2.23 cu.m.
4.Steel kg
683.54
5.Shuttering 100 sq.m
53 12.5cm thick 1:2:4 %SQ.M 1.stone 11.18 cu.m.
R.C.Slab with stone chips(6to20mm.)
chips and with 0.8% 2.Sand 5.59 cu.m.
reinforcement 3.Cement 2.80 cu.m.
4.Steel kg
787.44
5.Shuttering 100 sq.m

B-54
Sl. Description of Items Unit Name of Quantity of Sl. No. Descript
No. materials materials required ion of
required Items

54 15cm thick R.C.Slab 1:2:4 % sq.m 1.stone 13.4 cu.m.


with stone chips and chips(6to20mm.)
with 0.8% 2.Sand 6.7 cu.m.
reinforcement 3.Cement 3.35 cu.m.
4.Steel kg
955.08
5.Shuttering 100 sq.m
55 Single Brick flat Sq.m 1.Brick 32 Nos
soling(conventional size)
56 Brick on edge soling(conventional sq.m 1.Brick 54 Nos
size)
57 7.5 cm wide Brick-on edge %.m 1.Brick 820 Nos
edging(250 mm depth)
58 7.5 cm wide Brick-on edge %m 1.Brick 410 Nos
edging(125 mm depth)
59 35 mm thick(finished) terrazzo % sq.m 1.Grey cement 1.05 cu.m.
work, cast in situ(using c.c1:2:4 2.Coarse Sand 1.30
backing with stone chips 12mm 3.Stone Chips 2.60 cu.m.
down)floor 9mm thick terrazzo 4.Marble Chips cu.m.
1420
kg
topping, laying and finished to 5.Marble Powder 0.126
6mm thick after final grinding in cu.m.
ordinary grey colour(cement in
consumption chart is exclusive of
cement required for slurry@1.75
kg/sq.m)
60 -DO- % sq.m 1.Grey cement 1.05 cu.m.
In black or red colour 2.Coarse Sand 1.30 cu.m.
3.Stone Chips 2.60 cu.m.
4.Marble Chips kg
1420
5.Marble Powder cu.m.
0.126
6.pigment kg
40
61 -DO- % sq.m 1.Grey cement 0.85 cu.m.
In Silver Grey 2.Coarse Sand 1.30 cu.m.
3.Stone Chips 2.60 cu.m.
4.White Cement cu.m.
0.20
5.Marble Chips 1420 kg
6. Marble Powder 0.126 cu.m.

B-55
Sl. No. Description of Items Unit Name of materials Quantity of
required materials required

62 -DO- % sq.m 1.Grey cement 0.65 cu.m.


In Pink,Green,Yellow, Light 2.Coarse Sand 1.30 cu.m.
Green colour 3.Stone Chips 2.60 cu.m.
4. White Cement cu.m
0.40
5.Marble Chips kg.
1420
6. Marble Powder 0.126 cu.m.
7.pigment
40 kg
63 35 mm thick(finished) % sq.m 1.Grey cement 1.146 cu.m.
terrazzo work, cast in situ 2.Coarse Sand 1.16 cu.m.
(using c.c1:2:4 backing with 3.Stone Chips 2.32 cu.m.
stone chips 12mm down)floor 4.Marble Chips kg
1734
12mm thick terrazzo topping, 5.Marble Powder cu.m
0.170
laying and finished to 9mm
thick after final grinding in
ordinary grey colour(cement
in consumption chart is
exclusive of cement required
for slurry@1.75 kg/sq.m)
64 -DO- % sq.m 1.Grey cement 1.146 cu.m.
In black or red colour 2.Coarse Sand 1.16 cu.m.
3.Stone Chips 2.32 cu.m.
4.Marble Chips Kg
1734
5.Marble Powder Cu.m
0.170
6.pigment kg
57
65 -DO- % sq.m 1.Grey cement 0.863 cu.m.
In Silver colour 2.Coarse Sand 1.16 cu.m.
3.Stone Chips 2.32 cu.m.
4. White Cement 0.283 cu.m
5.Marble Chips 1734 kg
6. Marble Powder 0.170 Cu.m

66 -DO- % sq.m 1.Grey cement 0.58 cu.m.


In Pink,Green,Yellow,Light 2.Coarse Sand 1.16 cu.m.
Green 3.Stone Chips 2.32 cu.m.
4. White Cement 0.566 cu.m
5.Marble Chips 1734 kg.
6. Marble Powder 0.170 cu.m.
Kg
7.Pigment 57

B-56
67. 20 mm thick (finished) terrazzo work in
floor with precast tiles set on 20 mm av.
th. of lime / cement mortar 1:3 and sides
with admixtures of pigment as and when
necessary and white cement / grey
cement in ordinary grey colour (cement
in consumption chart is exclusive of
cement required for slurry @ 1.75
Kg./m2)
(a) When sand cement mortar is used in % sq.m 1.Grey cement 1.422 Cu.m
bed 2.Coarse sand 2.4 Cu.m
3.Pigment 31 kg
(b) When lime mortar is used in bed % sq.m 1.Unslaked Lime 5.65 Quintals
2.Surki 2.67 Cu.m
3.Grey Cement 0.616 Cu.m
4.Pigment 31 kg
68 -Do-
In black and red colour
(a)when sand cement morter is used in % sq.m 1.Grey cement 1.422 Cu.m
bed 2.Coarse sand 2.4 Cu.m
3.Pigment 31 kg
(b) when lime morter is used in bed % sq.m 1.Unslaked Lime 5.65 Quintals
2.Surki 2.67 Cu.m
3.Grey Cement 0.616 Cu.m
4.Pigment 31 kg
69 -DO-
In Silver colour
(a)when sand cement morter is used in % sq.m 1.Grey cement 1.268 Cu.m
bed 2.White cement 0.154 Cu.m
3.Coarse sand 2.4 Cu.m

b) when lime morter is used in bed % sq.m 1.Unslaked Lime 5.65 Quintals
2.Surki 2.67 Cu.m
3.Grey Cement 0.462 Cu.m
4. White cement 0.154 Cu.m

B-57
Sl. No. Description of Items Unit Name of Quantity of
materials materials required
required
70 20 mm thick (finished)
terrazzo work, in floor with
precast tiles set on 20mm
avg. thick of lime/cement
morter 1:3 and sides with
admixtures of pigment as and
when necessary and white
cement / grey cement in Pink,
Green, Yellow, Light Green
colour
(a)when sand cement morter % sq.m 1.Grey Cement 1.114 Cu.m
is used in bed 2.White Cement 0.308 Cu.m
3.Coarse sand 2.4 Cu.m
4.Pigment 31 kg
b) when lime morter is used % sq.m 1.Unslaked Lime 5.65 Quintals
in bed 2.Surki 2.67 Cu.m
3.Grey Cement 0.308 Cu.m
4. White cement 0.308 Cu.m
5 Pigment 31 kg
71(A) Plaster with composite
Morter of cement,lime and
sand with (1:2:9)
(a)35 mm thick % sq.m Cement 0.455 Cu.m
(b)25 mm thick % sq.m Cement 0.325 Cu.m
(c)20 mm thick % sq.m Cement 0.260 Cu.m
(d)15 mm thick % sq.m Cement 0.200 Cu.m
71(B) Plaster with composite
Morter of cement,lime and
sand with (1:1:6)
(a)20 mm thick % sq.m Cement 0.390 Cu.m
(b)15 mm thick % sq.m Cement 0.300 Cu.m
(c)10 mm thick % sq.m Cement 0.198 Cu.m
72 Rubble Masonry in cement
Morter
(a) 1:6 Cu.m 1.Stone 1.25 Cu.m
2.Cement 0.065 Cu.m
3.Sand 0.385 Cu.m
(b) Cu.m 1.Stone 1.25 Cu.m
2.Cement 0.09 Cu.m
3.Sand 0.36 Cu.m
73 250 mm th. Masonary work Cu.m 1.Cement 0.020 Cu.m
with Autoclave aerated 2.Sand 0.120 Cu.m
concrete blocks of size 625 3. Autoclave 1.05 Cu.m
mm x 250 mm x 125 mm aerated concrete
in Cement Mortar (1:6) blocks
74 125 mm thick Autoclave %Sq.m 1.Cement 0.25 Cu.m
aerated concrete blocks work 2.Sand 1.00 Cu.m
with its size 625 mm x 250 3. Autoclave 12.80 Cu.m
mm x 125 mm in Cement aerated concrete
Mortar (1:4). blocks
75 100 mm thick Autoclave %Sq.m 1.Cement 0.19 Cu.m
aerated concrete blocks work 2.Sand 0.78 Cu.m
with its size 625 mm x 250 3. Autoclave 9.86 Cu.m
mm x 125 mm in Cement aerated concrete
Mortar (1:4). blocks
76 Ordinary Cement concrete Cu.m 1. Stone chips 0.88 Cu.m
(mix 1:2:4) with graded stone 2.Cement 0.44 Cu.m
chips (6mm nominal size) 3.Sand 0.22 Cu.m
77 Masonry work with precast Cu.m 1.Cement Cu.m
Hollow Concrete Block of 2.Sand Cu.m
size 300mm X 200mm X 3. precast Hollow Cu.m
150mm with cement mortar Concrete Block
(6:1)
78 100mm thick Masonry work %Sq.m 1.Cement Cu.m
with precast Hollow Concrete 2.Sand Cu.m
Block of size 400mm X 3. precast Hollow Cu.m
100mm X 150mm Concrete Block

B-58
Quantity of Stone Aggregate to be considered for arriving consolidated rate of the
following Cement Concrete related Items:

Sl. Reference Description of Item Qnty. of Stone Aggregate to be Remarks


No. of Item considered per Cu.m. of
Concrete
1) Chapter – C; Ordinary Cement concrete (mix 1:2:4) For arriving
It. No. 5(a) with graded stone chips (20 mm consolidated
nominal size) excluding shuttering rate for all
20 mm Nominal Size – 0.66 Cu.m.
and reinforcement, if any, in ground items use
10 mm Nominal Size – 0.22 Cu.m.
floor as per relevant IS codes. Table- T-1, T-
a) Pakur Variety 2, T-3 and
Annxure – II,
Format - A
2) Chapter – C; Controlled Cement concrete with
It. No. 6(a)(i) well graded stone chips (20 mm
to 6(e)(i) graded nominal size) excluding
shuttering and reinforcement with
complete design of concrete as per IS
: 456 and relevant special
publications, submission of job mix
formula after preliminary mix design
after testing of concrete cubes as per
direction of Engineer-in-charge.
Consumption of cement will not be
less than 300 Kg of cement with
Super plasticiser per cubic meter of
controlled concrete but actual
consumption will be determined on
the basis of preliminary test and job
mix foumula. In ground floor and
foundation.
[using concrete mixture]
(i) Pakur Variety

(a) M 20 Grade 20 mm Nominal Size – 0.54 Cu.m.


10 mm Nominal Size – 0.36 Cu.m.
(b) M 25 Grade 20 mm Nominal Size – 0.54 Cu.m.
10 mm Nominal Size – 0.36 Cu.m.
(c) M 30 Grade 20 mm Nominal Size – 0.54 Cu.m.
10 mm Nominal Size – 0.36 Cu.m.
(d) M 35 Grade 20 mm Nominal Size – 0.54 Cu.m.
10 mm Nominal Size – 0.36 Cu.m.
(e) M 40 Grade 20 mm Nominal Size – 0.54 Cu.m.
10 mm Nominal Size – 0.36 Cu.m.
3) Chapter – C; Ordinary Cement concrete (mix 20 mm Nominal Size – 0.573 Cu.m.
It. No. 7(a) 1:1.5:3) with graded stone chips (20 10 mm Nominal Size – 0.287 Cu.m.
mm nominal size) excluding shuttering
and reinforcement if any, in ground
floor as per relevant IS codes.
(i) Pakur Variety

B-59
Sl. Reference Description of Item Qnty. of Stone Aggregate to be Remarks
No. of Item considered per Cu.m. of Concrete
4) Chapter – C; Batch Mixed concrete of M 20 Grade
It. No. with well Graded stone chips of 20
9(A)(a) to mm nominal size etc. etc.
9(A)(e) [with Batching Plant & transit mixer],
In Ground Floor and Foundation.
20 mm Nominal Size – 0.54 Cu.m.
[Pakur Variety]. 10 mm Nominal Size – 0.36 Cu.m.
(i) Without approved concrete
pump.
(ii) With approved concrete pump.

Batch Mixed concrete of M 25 Grade


with well Graded stone chips of 20
mm nominal size etc. etc.
[with Batching Plant & transit mixer],
In Ground Floor and Foundation. 20 mm Nominal Size – 0.54 Cu.m.
[Pakur Variety]. 10 mm Nominal Size – 0.36 Cu.m.
(i) Without approved concrete
pump.
(ii) With approved concrete pump.

Batch Mixed concrete of M 30 Grade


with well Graded stone chips of 20
mm nominal size etc. etc.
[with Batching Plant & transit mixer],
20 mm Nominal Size – 0.54 Cu.m.
In Ground Floor and Foundation.
[Pakur Variety]. 10 mm Nominal Size – 0.36 Cu.m.
(i) Without approved concrete
pump.
(ii) With approved concrete pump.
Batch Mixed concrete of M 35 Grade
with well Graded stone chips of 20
mm nominal size etc. etc.
[with Batching Plant & transit mixer],
20 mm Nominal Size – 0.54 Cu.m.
In Ground Floor and Foundation.
[Pakur Variety]. 10 mm Nominal Size – 0.36 Cu.m.
(i) Without approved concrete
pump.
(ii) With approved concrete pump.
Batch Mixed concrete of M 40 Grade
with well Graded stone chips of 20
mm nominal size etc. etc.
[with Batching Plant & transit mixer],
20 mm Nominal Size – 0.54 Cu.m.
In Ground Floor and Foundation.
[Pakur Variety]. 10 mm Nominal Size – 0.36 Cu.m.
(i) Without approved concrete
pump.
(ii) With approved concrete pump.

B-60
Sl. Reference Description of Item Qnty. of Stone Aggregate to be Remarks
No. of Item considered per Cu.m. of Concrete
5) Chapter – C; Supplying ready mixed concrete of M20
It. No. Grade with well graded stone chips of
9(B)(a) to 20 mm nominal size etc. etc.
9(B)(e) In Ground Floor and Foundation.
[Pakur Variety].
20 mm Nominal Size – 0.54 Cu.m.
(i) Without approved concrete 10 mm Nominal Size – 0.36 Cu.m.
pump.
(ii) With approved concrete pump.

Supplying ready mixed concrete of M25


Grade with well graded stone chips of
20 mm nominal size etc. etc.
In Ground Floor and Foundation. 20 mm Nominal Size – 0.54 Cu.m.
[Pakur Variety]. 10 mm Nominal Size – 0.36 Cu.m.
(i) Without approved concrete
pump.
(ii) With approved concrete pump.
Supplying ready mixed concrete of M30
Grade with well graded stone chips of
20 mm nominal size etc. etc.
In Ground Floor and Foundation. 20 mm Nominal Size – 0.54 Cu.m.
[Pakur Variety]. 10 mm Nominal Size – 0.36 Cu.m.
(i) Without approved concrete
pump.
(ii) With approved concrete pump.

Supplying ready mixed concrete of M35


Grade with well graded stone chips of
20 mm nominal size etc. etc.
In Ground Floor and Foundation. 20 mm Nominal Size – 0.54 Cu.m.
[Pakur Variety]. 10 mm Nominal Size – 0.36 Cu.m.
(i) Without approved concrete
pump.
(ii) With approved concrete pump.
Supplying ready mixed concrete of M40
Grade with well graded stone chips of
20 mm nominal size etc. etc.
In Ground Floor and Foundation. 20 mm Nominal Size – 0.54 Cu.m.
[Pakur Variety]. 10 mm Nominal Size – 0.36 Cu.m.
(i) Without approved concrete
pump.
(ii) With approved concrete pump.

B-61
INDIAN STANDARDS FOR BUILDING WORKS
BUILDING CONSTRUCTION PRACTICE
Sl. No Specification for Indian Standard
No
1 Design of structural Timber (Fourth revision) 883 : 1994

2 Structural use of un-reinforced masonry (Third Revision) 1905 : 1987

3 Brick Work (First revision) 2212 : 1991

4 Construction of floor roof with joists and filler blocks: Part-I with 6061 (Part 1) :1971
hollow concrete filler block

5 Construction of floor & roof with joists & filler block: Part 2 with 6061 (Part 2) :1981
hollow clay blocks joints and hollow clay filler block

6 Construction of floor and roof with joists & filler blocks: Part 3 6061 (Part 3): 1981
precast hollow clay block joints and hollow clay filler block

7 Construction of floor roof with joists & filler blocks: Part 4 with 6061 (Part 4): 1981
hollow clay block slab panels

8 Anti-termite measures in buildings part I constructional measures 6313 (Part 1): 1981
(First Revision)

9 Anti-termite measures in buildings : Part 2 pre constructional 6313 (Part 2) :1981


chemical
treatment measures (First Revision) (Amendment No.5)
10 Antitermite measures in buildings Part 3 Existing buildings (First 6313 (Part 3): 1981
Revision) (Amendment No. 4)

11 Installation of Joints in concrete pavements (First revision) 6509 : 1985

12 Construction of reinforced brick and R.B.C floor and roofs 10440 :1983

13 Setting out of buildings 11134 :1984

14 No fines cast in situ cement concrete 12727 :1989

15 Sand for masonary mortars (first revision) 2116 :1980

16 Polysulphide base joints sealants : Part 1 General requirements 11433 (Part 1) :


1985
17 Polysulphide base joints sealants : Part 2 General requirements 11433 (Part 2) :
Methods of test 1986
18 Polysulphide based sealants : Part 1. General requirement 12118 (Part 1) :
1987
19 Polysulphide based sealants : Part 2 methods of test 12118 (Part 2) :
1987
B-62
BUILDING LIMES AND LIME PRODUCT

Sl. No Specification for Indian Standard


No
20 Field slaking of building lime & preparation of putty (2nd revision) 1653 : 1992
21 Preparation of use of lime pozzolana mixture concrete in Building & 5817 : 1992
Roads (1st revision)
22 Method of field testing of building lime (1st revision) 1624 : 1986
CEMENT & CONCRETE
23 Plain & reinforced concrete (Fourth revision) 456 : 2000
24 Prestressed Concrete (first revision) (Amendment No 1) 1343 : 1980

25 Concrete structures for the storage of liquids: Part I general 3370 (Part 1) : 1965
requirements (Amendment No 1)
26 Concrete structures for the storage of liquids: Part 2 Reinforced 3370 (Part 2) : 1967
concrete structures (Amendment No-2)
27 Concrete structure for the storage of liquids: Part 3 Prestressed concrete 3370 (Part 3) : 1967
structures (Amendment No I)
28 Concrete structures for the storage of liquids Part 4: Design table 3370 (Part 4) : 1967
(Amendment No. 2)
29 Use of immersion vibrators for consolidating concrete (first revision) 3558 : 1983
30 Extreme Weather concreting : Recommended practice 7861 (Part 1) 1975
for hot weather concreting. (Amendment No. 1)
31 Extreme Weather concreting: Recommended practice for hot weather 7861 (Part 2): 1981
concreting. (Amendment No. 1)

32 Methods of non-destructive testing of concrete : Part 1 13311 (Part 1) :


Ultrasonic pulse velocity 1992
33 Methods of non-destructive testing of concrete: Part 2: Rebound 13311 (Part 2) :
hammer 1992
34 Methods of Sampling & analysis of concrete 1199 : 1959
35 Recommended guidelines for concrete mix design 10262 : 1982
36 Concrete slump test apparatus 7320 : 1974
37 Ready mixed concrete (2nd revision) 4926 : 2003.
38 Artificial lightweight aggregates for concrete masonary units 9142 : 1979

B-63
CEMENT MATRIX PRODUCT

Sl. No Specification for Indian Standard


No
39 Construction of lightweight concrete block masonary 6042 : 1969

40 Concrete masonary units Part I Hollow and Solid concrete blocks 2185 :(Part 1) :
(Second Revision) (Amendment No 1) 1979
41 Concrete masonary units Part 2 Hollow and Solid lightweight 2185 : (Part 2) :
concrete blocks (first revision) 1983
42 Reinforced concrete fence posts (First Revision) 4996 : 1984

43 Precast concrete coping blocks (First Revision) 5751 : 1984

44 Precast concrete kerbs (first revision) 5758 : 1984

45 Precast reinforced concrete door & window frames (first revision) 6523 : 1983

46 Precast reinforced concrete plant guards 9375 :1979

47 Precast concrete septic tanks 9872 :1981

48 Precast concrete blocks for lintels and sills (Amendment No-I) 9893 :1981

49 Precast concrete manhole covers and frames: Part 1 12592 (Part 1) :


Covers (Amendment No 3) 1988
50 Precast concrete manhole covers and frames : Part 2 frames 12592 (Part 2) :
1991

CLAY PRODUCTS FOR BUILDING

Sl. No Specification for Indian Standard


No
51 Common burnt clay building bricks (Fifth Revision) 1077 : 1992
52 Heavy duty burnt clay building bricks ( Third Revision) 2180 : 1988
53 Burnt clay flat terracing tiles : Part 1 Machine made (Second 2690 (Part 1) : 1993
54 Revision) Burnt clay flat terracing tiles : Part 2 Hand Made (Second 2691 (Part II) : 1992
55 Revision) Burnt clay facing bricks (Second Revision) 2691 : 1988
56 Burnt clay paving bricks (Second Revision 3583 : 1988

B-64
CONCRETE REINFORCEMENT

Sl. No Specification for Indian Standard


No
57 Mild steel and medium tensile steel bars and hard drawn steel wire for 432 (Part I) : 1982
concrete reinforcement Part 1 Mild Steel and medium tensile Steel bars
(Third Revision)

58 Mild steel and medium tensile steel bars and hard drawn steel wire for 432 (Part II) : 1982
concrete reinforcement Part 2 Hard Drawn Steel wire (Third Revision)

59 High strength deformed steel bars and wires for concrete reinforcement 1786 : 1985
(Third Revision) Amendment No.1

CONSTRUCTION MANAGEMENT

Sl. No Specification for Indian Standard No

60 Unified nomenclature of workmen for civil engineering 10302 : 1982

DOOR, WINDOWS AND SHUTTERS

Sl. No Specification for Indian Standard


No
61 Aluminium doors, windows and ventilators. 1948 : 1961
62 Aluminium windows for industrial building (Amendment No.1) 1949 : 1961
63 Wooden flush doors shutters (Cellular and hollow core type ) : Part 2191 : (Part 2) :
2Particle board and hard board face panels (Third revision) 1983

64 Wooden flush doors shutters (Solid core type) Part-1 Ply wood face 2202 (Part 1) : 1999
panels (Sixth Revision)
65 Wooden flush doors shutters (Solid core type) Part-2 particle board 2202 (Part 2) : 1983
face panels and hard board (Third Revision)
66 Steel doors frames (Second Revision) (Amendment No.2) 4351 : 2003
67 Wooden side sliding doors 4962 : 1968
68 Collapsible gate 10521 : 1983

B-65
EARTHQUAKE ENGINEERING
Sl. Specification for Indian Standard No.
No.
69 Earthquake resistant design & construction of buildings (Second 4326 : 1993
Revision) (Amendment No. 1)
70 Criteria for earthquake resistant design of structures (Fourth 1893 : 2002
Revision) (Amendment No. 1)
71(a) Improving earthquake resistant low strength masonry buildings – 13828 : 1993
Guidelines (Amendment No. 1)
71(b) Ductile detailing of reinforced concrete structure subjected to 13920 : 1993
seismic forces

FIRE FIGHTING

Sl. No Specification for Indian Standard


No
72 Selection, installation and maintenance of automatic fire detection and 2189 : 1988
alarm system (Second Revision)

73 Selection, installation and maintenance of portable first aid fire 2190 : 1992
extinguishers (Third Revision)

74 Installation and maintenance of internal fire hydrants and hose reels on 3844 : 1989
premises (First Revision)

75 Selection, Operation and maintenance of special fire fighting appliances: 5896 (Part 1) :
Part:1 combined foam and crash tender 1970

FIRE SAFETY

Sl. No Specification for Indian Standard


No
76 Fire Safety of building (General) : General Principles of fire grading & 1641 : 1988
classification (First Revision)

77 Fire Safety of buildings (General) : Details of construction (First Revision) 1642 : 1989

78 Fire safety of buildings (General) : Exposure hazard construction (First 1643 : 1988
Revision)
B-66
FLOORING, WALL FINISHING & ROOFING
Sl. No Specification for Indian Standard
No
79 Chequered Cement concrete tiles specification 13801 : 1993

80 Magnesium oxychloride composition floors (Second Revision) 658 : 1982

81 Laying Bitumen mastic flooring (Second Revision) 1196 : 1978

82 Laying of rubber floors (First Revision) 1197 : 1970

83 Laying, fixing and maintenance of linoleum floor (First Revision) 1198 : 1982

84 Application of cement and cement lime plaster finishes (First Revision) 1661 : 1972

85 Laying in situ terrazzo floor finish (First Revision) 2114 : 1984


86 Application of lime plaster finish (First Revision) 2394 :1984

87 External rendered finishes 2402 :1963


88 Laying in-situ cement concrete flooring (First Revision) 2571 :1970

89 Use of silicate type chemical resistant mortars (First Revision) 4441 1980

90 White washing and colour washing 6278 1971

91 Laying of bitumen mastic flooring for industries handling LPG and 13074 : 1991
other light hydrocarbon products

92 Bitumen mastic for flooring (Second Revision) 1195 : 1978

93 Cement concrete flooring Tiles(First Revision) 1237:1980

94 Sand for plaster(Second Revision) 1542:1992

B-67
FUNCTIONAL RQUIREMENT IN BUILDINGS

SL. Specification for Indian Standard


No. No
95 Sound Insulation of non-industrial buildings(Amendment No. 1) 1950:1962

96 Acoustical design of auditoriums and conference halls (Amendment No. 1) 2526:1963

97 Industrial ventilation of residential buildings(First revision) 3103:1975

98 Noise reduction in industrial buildings 3483:1965

99 Acoustics in buildings 9736:1981

100 Sound Insulation of building and of building elements: part 1 Airborne 11050(Part1):198
sound insulation in buildings and of building elements 4

101 Sound Insulation of building and of building elements: part 2 impact sound 11050(Part2):198
insulation in buildings and of building elements 4

102 Rating of Sound Insulation of building and of building elements: part 3 11050(Part3):198
Airborne sound insulation of facade elements and facades 4

103 Buildings and facilities for the physically handicapped(first revision) 4963:1987

104 Orientation of buildings:Part1 Non-industrial buildings 7662(Part 1):1974

HILL AREA DEVELOPMENT ENGINEERING

105 Retaining wall for hill area : Part 1 Selection type of wall 14458 (Part 1) :
1998
106 Retaining wall for hill area : Part 2 Design of retaining / breast walls 14458 (Part 2) :
1997
107 Retaining wall for hill area : Part 3 construction of dry stone walls 14458 (Part 3) :
1998
108 Land slide controls 14680 : 1999

B-68
Housing
Sl.No Specification for Indian Standard No
109 Design and construction of floors and roofs with precast 13994:1994
reinforced planks and RC joists
110 Design and construction of floors and roofs with 14142:1994
prefabricated brick panel
111 Construction of floor and roof with RC channel units 14215:1994
112 precast reinforced concrete planks and joists for flooring 13990:1994
and roofing
113 prefabricated brick panel and partially precast concrete 14143:1994
joists for flooring and roofing
114 precast reinforced concrete channel unit for construction 14201:1994
of floors and roofs
115 Precast L-panel units for roofing 14241:1994

METHODS OF MEASUREMENT OF WORKS OF CIVIL ENGINEERING

Sl.No Specification for Indian Standard No


116 Measurements of building and civil engineering works: Part 1; 1200(part1):1992
Earthwork(fourth revision)
117 Measurements of building and civil engineering works: Part 2 1200(part2):1974
concrete(third revision)
118 Measurements of building and civil engineering works: Part 3 1200(part3):1976
brickwork(third revision)
119 Measurements of building and civil engineering works: Part 4 Stone 1200(part4):1976
masonry(third revision)
120 Measurements of building and civil engineering works: Part 5 form 1200(part5):1982
work(third revision) (Amendment no-1)
121 Measurements of building and civil engineering works: Part 6 1200(part6):1974
Refractory work(second revision)
122 Measurements of building and civil engineering works: Part 7 1200(part7):1972
Hardware(Second revision) (Amendment no-2)
123 Measurements of building and civil engineering works: Part 8 Steel 1200(part8):1993
Work & Iron Work(fourth revision)
124 Measurements of building and civil engineering works: Part 9 Roof 1200(part9):1973
covering(including cladding)( Second revision) (Amendment no-1)
125 Measurements of building and civil engineering works: Part 10 Ceiling 1200(part10):1973
& Lining(Second revision) (Amendment no-2)
126 Measurements of building and civil engineering works: Part 1200(part11):1977
11Paving,floor finishes, dado & skirting(Third revision) (Amendment
no-1)
127 Measurements of building and civil engineering works: Part 12 1200(part12):1976
Plastering & Pointing (Third revision)
128 Measurements of building and civil engineering works: Part 13 white 1200(part13):1994
washing,colour Washing,distempering & painting of building
surfaces(fifth revision)
B-69
129 Measurements of building and civil engineering works: Part 14 1200(part14):1984
Glazing (Third revision)
130 Measurements of building and civil engineering works: Part 15 1200(part15):1987
painting,polishing,varnishing etc. (fourth revision)
131 Measurements of building and civil engineering works: Part 16 laying 1200(part16):1979
of water & sewer lines including appurtenant items (third revision)
132 Measurements of building and civil engineering works: Part 1200(part18):1974
18demolition & dismantling(third revision)
133 Measurements of building and civil engineering works: Part 19 Water 1200(part19):1981
supply,plumbing & drains (third revision)
134 Measurements of building and civil engineering works: Part 21 Wood 1200(part 21):1973
work & joinery (second revision) (Amendment no-1)
135 Measurements of building and civil engineering works: Part 22 1200(part22):1982
materials
136 Measurements of building and civil engineering works: Part 23 1200(part23):1988
pilling(fourth revision)
137 Measurements of building and civil engineering works: Part 24 Well 1200(part24):1983
foundation (third revision)
138 Measurements of building and civil engineering works: Part 27 Earth 1200(part27):1992
work done by mechanical appliences
139 Measurements of building and civil engineering works: Part 28 Sound 1200(part28):1992
insulation works
140 Measurements of plinth,carpet & rentable area of buildings (first 3861:1975
revision) (Amendment no-3)

PAINTING,VARNISHING AND ALLIED FINISHES


Sl No Specification for Indian Standard No
141 Painting of ferrous metals in buildings:Part 1 1477(part1):1971
Pretreatment(first revision)
142 Painting of ferrous metals in buildings:Part 2 Painting (first 1477(part2):1971
revision)
143 Finishing of wood & wood based materials:Part 1 2338(part1):1967
operations and workmanship
144 Finishing of wood & wood based materials:Part 2 Schedules 2338(part2):1967
145 Painting concrete,masonry and plasterd surfaces :Part 1 2395(part 1):1994
operations and workmanship (first revision)
146 Painting concrete,masonry and plasterd surfaces :Part 2 2395(part 2):1994
Schedules (first revision)

B-70
PUBLIC HEALTH ENGINEERING

Sl No Specification for Indian Standard No


147 Basic requirement for water supply drainage and 1172:1993
sanitation(fourth revision)
148 Building drainage(Second revision) 1742:1983
149 Selection, installation and maintenance of sanitary 2064:1983
appliances(Second revision)
150 Water supply in building(Second revision) 2065:1983
151 Installation of septic tanks: Part 1 design, criteria and 2470(part 1):1985
construction(Second revision)
152 Installation of septic tanks: Part 2 secondary treatment 2470(part 2):1985
and disposal of septic tank effluent (Second revision)
153 Laying of cast iron pipes(Second revision) 3114:1994
154 Ancillary structures in sewerage system: Part 1 4111(Part 1):1986
Manholes(first revision)
155 Ancillary structures in sewerage system: Part 2 flushing 4111(Part 2):1986
tanks(first revision)
156 Laying of glazed stoneware pipes(first revision) 4127:1983
157 Sanitary pipe works above ground for buildings (first 5329:1983
revision)
158 Plumbing in multistoried buildings: Part 1Water supply 12183(part 1):1987
159 Drainage of building’s basement 12251:1987

Safety in construction
Sl No Specification for Indian Standard No
160 Steel tubular scaffolding:Part2 Safety regulations for 4014(part 2):1967
scaffolding
161 Preventive measures against hazards at work places: 13416(part 1):1992
Part 1 falling material hazards prevention
162 Preventive measures against hazards at work places: 13416(part 2):1992
Part 2 fall prevention
163 Preventive measures against hazards at work places: 13416(part 3):1994
Part3 disposal of debris
164 Preventive measures against hazards at work places: 13416(part 4):1994
Part4 timber structures
165 Preventive measures against hazards at work places: 13416(part 5):1994
Part5 timber structures

B-71
STONES
Sl No Specification for Indian Standard No
166 Marble(blocks,slabs and titles) 1130:1969
167 Sandstone(slabs and titles)(first revision) 3622:1977
STRUCTURAL SAFETY
Sl No Specification for Indian Standard No
168 Design loads(other than earthquake) for buildings and 875(part 1):1987
structures Part 1 Dead Load-unit weights of building
169 Design loads(other than earthquake) for buildings and 875(part 2):1987
structures Part 2 Imposed Load (second revision)
STRUCTURAL SECTIONS
Sl No Specification for Indian Standard No
170 Aluminium bulb angles Marine application(first 6449:1987
revision)
171 Aluminium channels(first revision) 3921:1985
172 Aluminium equal leg angles(first revision) 3908:1986
173 Aluminium I-beam(first revision) 5384:1985
174 Aluminium T-bars for Marine application(first revision) 6475:1987
175 Aluminium T sections(first revision) 6445:1985
176 Aluminium unequal leg angles(first revision) 3909:1986
177 Light Gauge structural steel sections(revised) 811:1987
TIMBER AND TIMBER STORES

Sl No Specification for Indian Standard No


178 Door and Window shutters and frames 12896:1990
179 Furniture and cabinets 13662:1993
180 Bamboos for structural purposes 9096:1979
WATER PROOFING AND DAMP PROOFING

Sl No Specification for Indian Standard No


181 Lime concrete for a water proofed roof finish(second 3036:1992
revision)
182 Application of bituminous mastic for water proofing of 4365:1967
roofs
183 Water proofing of underground water reservoirs and 6494:1988
swimming pools(first revision)
184 Damp-proofing using bituminous mastic 7198:1974
185 Bituminous mastic for use in water proofing of 3037:1986
roofs(first revision)
186 Silicon based water repellents 12027:1987

For overall guidance and reference latest edition of National Building Code of India, may
be consulted.
B-72
PWD (WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(A) EARTH WORK,ANTITERMITE TREATMENT
Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

1 Surface Dressing of the ground in any kind of soil


including removing vegetation inequalities not
exceeding 15 cm depth and disposal of the Sq.m 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11
rubbish within a lead upto 75 m as directed.

2 Earth work in excavation of foundation trenches


or drains, in all sorts of soil (including mixed soil
but excluding laterite or sandstone) including
removing, spreading or stacking the spoils within
a lead of 75 m. as directed. The item includes
necessary trimming the sides of trenches,
levelling, dressing and ramming the bottom,
bailing out water as required complete.

(a) Depth of excavation not exceeding 1,500 mm.


%Cum 12047 12047 12047 12047 12047 12047 12047 12047 12047 12047 12047 12047 12047 12047 12047
(b) Depth of excavation for additional depth
beyond 1,500 mm. and upto 3,000 mm. but not %Cum 19430 19430 19430 19430 19430 19430 19430 19430 19430 19430 19430 19430 19430 19430 19430
requiring shoring
(c) Depth of excavation for additional depth
beyond 3000 mm. upto 4000mm. excluding cost %Cum 23704 23704 23704 23704 23704 23704 23704 23704 23704 23704 23704 23704 23704 23704 23704
of shoring as necessary
d) Add extra for excavation in morum soil %Cum - 2290 2290 2290 - 2290 2290 2290 2290 2290 2290 - - - -
e) Add extra for cutting lateriate/sandstone

1) Cutting with chisel %Cum - 19223 19223 19223 - 19223 19223 19223 - - - 19223 - - -
2) by blasting operation
%Cum - 23240 23240 23240 - 23240 23240 23240 - - - 23240 - - -
3 Earth work in filling in foundation trenches or
plinth with good earth, in layers not exceeding
150 mm. including watering and ramming etc.
layer by layer complete. (Payment to be made on
the basis of measurement of finished quantity of
work)
(a) With earth obtained from excavation of
foundation. %Cum 7831 7831 7831 7831 7831 7831 7831 7831 7831 7831 7831 7831 7831 7831 7831

(b) With earth obtained by fresh excavation


(including cost of excavation upto 1,800 mm.
depth) from land arranged by the Deptt. within a %Cum 13855 13855 13855 13855 13855 13855 13855 13855 13855 13855 13855 13855 13855 13855 13855
lead of 100 m.

Page 1
PWD (WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(A) EARTH WORK,ANTITERMITE TREATMENT
Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

(c) (i) With carried earth arranged by the


contractor within a radius of 1 km. including cost %Cum 31584 31584 31584 31584 31584 31584 31584 31584 31584 31584 31584 31584 31584 31584 31584
of carried earth.
(ii) With carried earth arranged by the
contractor within a radius of 3 km. including cost %Cum 35896 35896 35896 35896 35896 35896 35896 35896 35896 35896 35896 35896 35896 35896 35896
of carried earth.

(iii) With carried earth arranged by the


contractor within a radius exceeding 3 km. but
not exceeding 5 km. including the cost of carried %Cum 40300 40300 40300 40300 40300 40300 40300 40300 40300 40300 40300 40300 40300 40300 40300
earth.
(iv) With carried earth arranged by the
contractor within a radius exceeding 5 km. but not
exceeding 10 km. including cost of carried earth. %Cum 49671 49671 49671 49671 49671 49671 49671 49671 49671 49671 49671 49671 49671 49671 49671

4 (A) Filling in foundation or plinth by silver sand in


layers not exceeding 150 mm as directed and
consolidating the same by thorough saturation
with water, ramming complete including the cost %Cum 98524 54495 - - 74726 56872 39029 39029 68771 62827 44973 - 54495 44973 50928
of supply of sand. (payment to be made on
measurement of finished quantity)

(B) Do - by fine sand %Cum 110422 56872 50928 50928 80670 74726 53306 50928 80670 74726 74726 152063 66393 66393 62827
5 Earth work in filling in compound, tank, low land,
ditches etc. with good earth, in layers not
exceeding 150 mm. including breaking clods and
consolidating the same by ramming and dressing
complete. (Payment will be made on profile
measurement before and after the work)

(a) With earth obtained by fresh excavation upto


1800 mm. depth (including the cost of excavation
from land arranged by the Deptt. within a lead of %Cum 17390 17390 17390 17390 17390 17390 17390 17390 17390 17390 17390 17390 17390 17390 17390
100 m.)
(b) (i) With carried earth arranged by the
contractor within a radius of 3 km. including cost
%Cum 38362 38362 38362 38362 38362 38362 38362 38362 38362 38362 38362 38362 38362 38362 38362
of carried earth.

(ii) With carried earth arranged by the


contractor within a radius exceeding 3 km. but
not exceeding 5 km. including the cost of carried %Cum 42378 42378 42378 42378 42378 42378 42378 42378 42378 42378 42378 42378 42378 42378 42378
earth.

Page 2
PWD (WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(A) EARTH WORK,ANTITERMITE TREATMENT
Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

(iii) With carried earth arranged by the


contractor within a radius exceeding 5 km. but not
exceeding 10 km. including cost of carried earth. %Cum 51748 51748 51748 51748 51748 51748 51748 51748 51748 51748 51748 51748 51748 51748 51748

6 Hire and labour charges for shoring work


(including necessary close plank walling, framing,
Eucalyptus/Jhou bulla piling, strutting etc)
complete as per direction of the Engineer-in-
charge for foundation excavation (vertical surface
are in contact with supported earth is to be
measured.) (This item should be executed on
specific direction of the Enginner in charge).

(a) Depth upto 1.5 m.


Sq.M. 431 419 418 419 431 418 409 409 420 420 419 431 419 419 419
(b) For additional depth beyond 1.5 m. and upto
3.00 m Sq.M. 485 473 472 473 485 472 463 463 473 473 473 485 473 473 473
(c) For additional depth beyond 3.00 m.
Sq.M. 546 534 532 533 546 532 523 523 534 534 534 546 534 534 534
(d) (i) For basement work and Depth upto 1.50
m. Sq.m. 581 568 566 568 580 566 557 557 569 569 568 581 568 568 568
(ii) For basement work and Depth beyond 1.50 m
and upto 3.00 m. Sq.m. 639 627 625 627 639 625 616 616 628 628 627 640 627 627 627
(iii) For basement work and Depth beyond 3.00
m. Sq.m. 676 664 662 663 675 662 653 653 664 664 664 676 664 664 664

7 Pre-Constructional Anti-termite measures:


(a) Anti termite treatment to bottom surface ( in
case of masonry foundation and basements) and
the sides ( upto a height of 300 mm. from
bottom) of the excavation trenches with chemical
emulsion by admixing chloropyrofos emulsifiable
concentrates (1% concentration) with water by
Sq.m. 94 94 94 94 94 94 94 94 94 94 94 94 94 94 94
weight at the rate of 5 Litres per sq. m. area. The
work shall be carried out as per specification
described in 6.2.1. of code IS-6313 (part -II)
1981. ( Mode of measurment will be the plan
area of foundation treated.)

Page 3
PWD (WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(A) EARTH WORK,ANTITERMITE TREATMENT
Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

(b) Anti termite treatment to back filling of the


masonry foundation with chemical emulsion by
admixing chloropyrofos emulsifiable concentrates
( 1% concentration) with water by weight at the
rate of 7.5 Litres per sq. m. of the vertical surface
of the substructure for each side of the Sq.m. 131 131 131 131 131 131 131 131 131 131 131 131 131 131 131
foundation.. The work shall be carried out as per
specification described in 6.2.2. of code IS-6313
(part -II) 1981. ( Mode of measurment will be
vertical area treated.)
(c) Anti termite treatment to the top surface of
the consolidated earth within plinth walls with
chemical emulsion by admixing chloropyrofos
emulsifiable concentrates (1% concentration) with
water by weight at the rate of 5 Litres per sq. m.
of the surface before sand bed or sub-grade is
laid. Holes upto 50 mm. to 75 mm. deep at 150
mm. centre to centre both ways shall be made Sq.m. 111 111 111 111 111 111 111 111 111 111 111 111 111 111 111
with 12 mm, diameter mild steel rod on the
surface to facilitate saturation of the soil with the
chemical emulsion. The work shall be carried out
as per specification described in para 6.4 of code
IS-6313 (part -II) 1981. ( Mode of measurment
will be per Sq.m of plan area of plinth treated.)

(d) Treatment to the back filling of R.C.C.


foundation with chemical emulsion by admixing
chloropyrofos emulsifiable concentrate (1%
concentration) with water by weight at the rate of
7.5 ltr. per sq.m. of the vertical surface of the
substructure of each side of the foundation. The Sq.m. 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138
work shall be carried out as per specification as
described in para 6.3.1 of code IS-6313 (part-II)
1981 (Mode of measurement will be per sq.m. of
vertical area of foundation treated).

Page 4
PWD (WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(A) EARTH WORK,ANTITERMITE TREATMENT
Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

8 Post Constructional Measures :

(a) Anti-termite treatment to the outside of


foundations with chemical emulsion by admixing
chloropyrofos emulsifiable concentrates
(1%concentration) with water by weight including
cutting shallow channel by excavating soil along
and close to the wall face ensuring uniform
dispersal of the chemical emulsion to a depth of
300mm. from the ground level by rodding with
12mm. dia. M.S. rod at 150mm.interval in the Mtr 73 73 73 73 73 73 73 73 73 73 73 73 73 73 73
channel. 1.75 litres of chemical emulsion per
metre length shall be used and a balance quantity
of 0.5 litres of the chemical emulsion per running
metre shall then be used to treat the back fill
earth by directing the spray of the imulsion
towards the wall surface. The entire work is to be
carried out as per specification laid down in para
4.3.1.1 of code IS-6313 (Part-III) 1981.

(b) Anti-termite treatment to the outside of


foundation with chemical emulsion by admixing
chloropyrofos emulsifiable concentrate (1%
concentration) with water by weight, drilling
12mm. dia holes in concrete or masonry apron at
an interval of 300mm. to a depth, of 300mm or
more as close to the plinth wall as possible and Mtr 84 84 84 84 84 84 84 84 84 84 84 84 84 84 84
the chemical emulsion pumped into those holes
to soak the soil below at a rate of 2.25 litres per
linear metre complete as per specification laid
down in para 4.3.1.1 of Code I.S.-6313 (Part-III)-
1981.

(c) Anti-termite treatment to the soil under floor


with chemical emulsion by admixing
chloropyrofos emulsifiable concentrate (1%
concentration) with water by weight including
drilling vertically 12mm. dia holes at the junction
of floor and wall at 300mm. interval to reach the
soil below using hand operated pressure pump to
squirt chemical emulsion into the pump to squirt Sq.M. 94 94 94 94 94 94 94 94 94 94 94 94 94 94 94
chemical emulsion into the holes at the rate of
one litre per hole. The holes shall be sealed after
operation to match with the existing floor. The
entire work is to be carried out as per
specification laid down in para 4.3.1.4 of code I.S.-
6313 (Part-III)-1981.

Page 5
PWD (WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(A) EARTH WORK,ANTITERMITE TREATMENT
Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

d) Anti-termite treatment to the junction of wood


work and masonry walls with chemical emulsion
by admixing chloropyrofos emulsifiable
concentrates (1% concentration) with water by
weight including spraying at the points of contact
with the adjoining masonry by drilling 6m. dia
holes at a downward angle of about 45 degree at
the junction of woodwork and masonry and
squirting chemical emulsion into these holes at
the rate of half litre per hole. The entire work is to
be carried out as per specification of Code I.S.- Sq.M. 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62
6313 (Part-III)-1981. The shutters are to be
sprayed with emulsion. on both sides. All wooden
fixtures like almirahs, racks etc. are also to be
throughly sprayed with chemical emulsion.
(Payment will be made on the basis of outside
measurements of doors and windows)

(e) Spot application for insecticides using Aqua


base spray for pest (for bugs, cockroaches,
silverfish, spider, termites, mosquitoes) to walls
and ceiling etc. with chemical emulsion by
admixing chloropyrofos emulsifiable concentrates
(1% concentration) with water by weight including
spraying the emulsified chemical @ 0.5 litres per
sq.m. by a hand operated pressure pump on wall
surfaces, ceiling, electrical fixture,electrical lines
Sq.m. 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49
including drilling holes in-places where source of
termite is detected squirting chemical solution
into the holes and sealing the holes with cement
grout. (Rate is per sq.m. of the floor area while
actual work will be all walls ceiling, rack, partition
and furniture).

Page 6
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(B) DISMANTLING, CUTTING CHASE, HOLES ETC.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

1 Dismantling all types of masonry excepting


cement concrete plain or reinforced, stacking
serviceable materials at site and removing
rubbish as directed within a lead of 75 m.

a) In ground floor including roof. Cu.M. 451 451 451 451 451 451 451 451 451 451 451 451 451 451 451
b) Extra rate for each addl. Floor over the
Cu.M. 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50
rate of ground floor
(c) Extra rate for careful dismantling and
recovering at least 150 no of useable bricks Cu.M. 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58
per cum
2 Dismantling all types of plain cement
concrete works, stacking serviceable
materials at site and removing rubbish as
directed within a lead of 75 m
In ground floor including roof.
(a) upto 150 mm. thick Cu.M. 949 949 949 949 949 949 949 949 949 949 949 949 949 949 949
(b) above 150 mm. thick Cu.M. 1431 1431 1431 1431 1431 1431 1431 1431 1431 1431 1431 1431 1431 1431 1431
(c ) Extra rate for each addl floor over the
rate of ground floor. Cu.M. 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50

3 Dismantling R.C. floor, roof, beams etc.


including cutting rods and removing rubbish
as directed within a lead of 75 m. including
stacking of steel bars.
(a) In ground floor including roof. Cu.M. 1975 1975 1975 1975 1975 1975 1975 1975 1975 1975 1975 1975 1975 1975 1975
(b) Extra rate for each addl floor over the rate
of ground floor Cu.M. 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50

4 Dismantling terraced roof in ground floor


roof (including floor finish, if any.) taking out
carefully tiles with beams, joists, tees or
burgahs covering floor below, sorting and
stacking sevicable materials at site and
removing rubbish as directed within a lead of
75 m.
(a) In Ground Floor including roof. Sq.M. 232 232 232 232 232 232 232 232 232 232 232 232 232 232 232
(b) Extra rate for each addl floor over the rate
of ground floor Sq.M. 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6

Page 7
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(B) DISMANTLING, CUTTING CHASE, HOLES ETC.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

5 Dismantling carefully terraced floor only


(including floor finish if any) or lime terracing
in ground floor roof and removing rubbish as
directed within a lead of 75 m.
(a) In Ground Floor including roof. Cu.M. 747 747 747 747 747 747 747 747 747 747 747 747 747 747 747
(b) Extra rate for each addl floor over the rate
Cu.M. 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50
of ground floor
6 Dismantling artificial stone flooring upto 50
mm. thick by carefully chiselling without
damaging the base and removing rubbish as
directed within a lead of 75 m.
a) In ground floor including roof. Sq.M. 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50
b) Extra for each addl. Floor over the rate of
Sq.M. 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
gournd floor
7 Taking out carefully Ranigunge pattern tiles
from roof stacking seviceable tiles at site and
Sq.M. 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62
removing rubbish as directed within a lead of
75m.
(Payment to be made on the measurement
of portion of roof removed).
8 Taking out carefully G.C.I. or C.I. or asbestos
sheets (including ridges etc.) from roof or
wall after unscrewing bolts, nuts, screws Sq.M. 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42
etc.and stacking the material at site as
directed.
(Payment to be made on measurement of
portion of roof or wall removed.)
9 Dismantling Chunar stone flooring carefully
including removing rubbish to anywhere
Sq.M. 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35
within a lead of 75 m. and stacking the
serviceable materials as directed.
10 Stripping off worn out plaster and raking out
joints of walls, celings etc. upto any height
Sq.M. 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19
and in any floor including removing rubbish
within a lead of 75m as directed.
11 Cutting chase upto 125 x 150 mm. and
subsequent mending of damages.
(a) in brick wall [Cement-3.6 Kg/Mtr] Mtr. 101 94 94 94 98 96 94 94 98 97 98 106 97 97 99
(b) in concrete wall [Cement-3.6 Kg/Mtr] Mtr. 120 114 113 113 117 116 114 113 117 117 117 126 116 116 118
12 Cutting holes and subsequent mending good
damages.

Page 8
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(B) DISMANTLING, CUTTING CHASE, HOLES ETC.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

(a) Diameter upto 150 mm.


(i) In brick work [Cement-4.0 Kg/Mtr] Mtr. 120 113 112 112 117 115 113 112 117 116 116 126 116 116 118
(ii) In concrete work (plain or R.C.)
Mtr. 144 139 138 138 142 140 139 138 142 141 141 149 141 141 143
[Cement- 3.0 Kg/Mtr]
(b) Diameter exceeding 150 mm. but not
exceeding 300 mm.
(i) In brick work [Cement-6.0 Kg/Mtr] Mtr. 176 165 164 164 171 168 165 164 171 170 171 185 170 170 173
(ii) In concrete work (plain or R.C.)
[Cement-4.6 Kg/Mtr] Mtr. 300 292 291 291 297 294 292 291 297 296 296 307 295 295 298

(c) Diameter exceeding 300 mm. but not


exceeding 450 mm.
(i) In brick work [Cement-10.0 Kg/Mtr] Mtr. 272 254 252 252 264 259 254 252 264 262 263 287 261 261 266
(ii) In concrete work (plain or R.C.)
[Cement-7.5 Kg/Mtr] Mtr. 410 395 394 394 403 399 395 394 403 402 402 420 401 401 405

13 Removal of rubbish,earth etc. from the


working site and disposal of the same
beyond the compound, in conformity with the
Municipal / Corporation Rules for such Cu.M. 168 168 168 168 168 168 168 168 168 168 168 168 168 168 168
disposal, loading into truck and cleaning the
site in all respect as per direction of Engineer
in charge
14 Labour for breaking 1/2 Bricks or Full Bricks
(Old / New) into metal / Khoa / chips as per
specific size and stacking the same at site or
stackyard with due allowance of sinkage /
shrinkage as per direction of the Engineer in
charge.
(a) Metal Size 50 mm to 65 mm Cu.M. 252 252 252 252 252 252 252 252 252 252 252 252 252 252 252
(b) Khoa Size 32 mm to 25 mm Cu.M. 291 291 291 291 291 291 291 291 291 291 291 291 291 291 291
(c) Chips Size 20 mm to 10 mm Cu.M. 524 524 524 524 524 524 524 524 524 524 524 524 524 524 524
15 Labour for dismantling the necessary bases
of R.C. or wooden railing post for taking out Each 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61
the damaged posts (scattered job)
16 Dismantling worn out wall or ceiling of Tarja
or Durmamat and removing the dismantled Sq.M. 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14
materials as directed.
17 Dismantling carefully wooden walling,
flooring of ceiling and stacking dismantled Sq.M. 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15
materials as directed.

Page 9
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(B) DISMANTLING, CUTTING CHASE, HOLES ETC.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

18 Labour for scrapping and picking up old


dilapidated mortar / plaster (Cement / Surki /
Lime mortar) from the surface of old Brick
faces including cleaning the frog without
damaging the Brick and stacking the Bricks 1000
960 960 960 960 960 960 960 960 960 960 960 960 960 960 960
at Site / Stacking yard as per direction of Nos
Engineer-in-charge including removing all
debris rubbish from site complete.

19 Dismantling carefully wood work in posts,


postplates, rafters, partition etc., sorting and
stacking serviciable materials at site and Cu.M. 281 281 281 281 281 281 281 281 281 281 281 281 281 281 281
removing rubbish as directed.

Page 10
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( c ) Brickworks,Concrete Works etc.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

1 Single Brick Flat Soling of picked jhama


bricks including ramming and dressing bed
Sq.M. 377 340 278 278 374 365 362 308 343 342 338 460 340 338 339
to proper level and filling joints with local
sand.
2 Labour for laying single brick flat soling
including ramming and dressing bed to
proper level and filling joints with powdered Sq.M. 41 41 41 41 41 41 41 41 41 41 41 41 41 41 41
earth.
3 Supplying and laying brick Khoa of ordinary
bats of size (38 mmx 63 mm)of approved
quality in 100 mm layer (loose) filling in gaps Sq.M. 195 173 173 173 195 195 188 173 180 178 180 332 180 180 180
with small ones rammed and compact as
directed true to level and grade.
4 Cement concrete with graded jhama khoa
(30 mm size) excluding shuttering
In ground floor and foundation.
(a) 1:3:6 proportion Cu.M. 5803 4996 4811 5661 5303 5263 5137 5137 5134 5107 5030 5144
(b) 1:4:8 proportion Cu.M. 5511 4566 4378 5245 4880 4839 4710 4710 4693 4666 4587 4704
5 Ordinary Cement concrete (mix 1:2:4) with
graded stone chips (20 mm nominal size)
excluding shuttering and reinforcement,if
any, in ground floor as per relevant IS codes.

a) Pakur Variety Cu.M. 4603 4271 4213 4134 4427 4306 4352 4219 4393 4415 4324 4939 4431 4478 4583
(b ) River bazree Cu.M. 5930 4644 4712 5038
(c ) RajMahal Cu.M. 5033
(d) With local hard blackstone variety chips
Cu.M. 5131 5024 4881
(crusher broken)

Page 11
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( c ) Brickworks,Concrete Works etc.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

6 (a) Controlled Cement concrete with well


graded stone chips (20 mm graded nominal
size) excluding shuttering and reinforcement
with complete design of concrete as per IS :
456 and relevant special publications,
submission of job mix formula after
preliminary mix design after testing of
concrete cubes as per direction of Engineer-
in charge. Consumption of cement will not be
less than 300 Kg of cement with Super
plasticiser per cubic meter of controlled
concrete but actual consumption will be
determined on the basis of preliminary test
and job mix foumula. In ground floor and
foundation.
[using concrete mixture]
(a) M 20 Grade
(i) Pakur Variety Cu.M. 5402 5062 5003 4923 5222 5098 5145 5010 5187 5210 5126 5755 5235 5283 5390
(ii ) N.B. Variety (Stone Metal) Cu.M. 7152 6074 6074 6239
(iii) RajMahal Cu.M. 5902
(iv) With local hard blackstone variety chips
(crusher broken) Cu.M. 5954 5837 5698

6 (b) Controlled Cement concrete with well


graded stone chips (20 mm nominal size)
excluding shuttering and reinforcement with
complete design of concrete as per IS : 456
and relevant special publications,
submission of job mix formula after
preliminary mix design after testing of
concrete cubes as per direction of Engineer-
in charge. Consumption of cement will not be
less than 300 Kg of cement with Super
plasticiser per cubic meter of controlled
concrete but actual consumption will be
determined on the basis of preliminary test
and job mix foumula. In ground floor and
foundation.
[using concrete mixture]
(b) M 25 Grade
(i) Pakur Variety Cu.M. 5844 5503 5445 5364 5663 5540 5586 5451 5628 5651 5579 6208 5688 5736 5843
(ii ) N.B. Variety (Stone Metal) Cu.M. 7605 6527 6527 6692
(iii) RajMahal Cu.M. 6355
(iv) With local hard blackstone variety chips
Cu.M. 6395 6278 6139
(crusher broken)

Page 12
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( c ) Brickworks,Concrete Works etc.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

6 (c) Controlled Cement concrete with well


graded stone chips (20 mm nominal size)
excluding shuttering and reinforcement with
complete design of concrete as per IS : 456
and relevant special publications,
submission of job mix formula after
preliminary mix design after testing of
concrete cubes as per direction of Engineer-
in charge. Consumption of cement will not be
less than 320 Kg of cement with super
plasticiser per cubic meter of controlled
concrete but actual consumption will be
determined on the basis of preliminary test
and job mix foumula. In ground floor and
foundation.
[using concrete mixture]
(c) M 30 Grade
(i) Pakur Variety Cu.M. 6061 5721 5662 5581 5880 5757 5803 7414 5846 5868 7001 6428 5908 5956 6063
(ii ) N.B. Variety (Stone Metal) Cu.M. 7825 6747 6747 6912
(iii) RajMahal Cu.M. 6575
(iv) With local hard blackstone variety chips
(crusher broken) Cu.M. 6613 6495 6356

6 (d) Controlled Cement concrete grade mix with


well graded stone chips (20 mm nominal
size) including adequate plasticiser &
excluding shuttering and reinforcement with
complete design of concrete as per IS : 456
and relevant special publications,
submission of job mix formula after
preliminary mix design after testing of
concrete cubes as per direction of Engineer-
in charge. Consumption of cement will not be Cu.M 6255 5914 5856 5775 6074 7545 5997 5862 6039 6062 6013 6643 6122 6171 6278
less than 340 Kg of OPC [43/53 grade ]
cement with Super plasticiser per cubic
meter of controlled concrete but actual
consumption will be determined on the basis
of preliminary test and job mix foumula. In
ground floor and foundation.
[using concrete mixture] With Pakur Variety
(d) M 35 Grade of Concrete

Page 13
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( c ) Brickworks,Concrete Works etc.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

6 (e) Controlled Cement concrete grade mix with


well graded stone chips (20 mm nominal
size) including adequate plasticiser &
excluding shuttering and reinforcement with
complete design of concrete as per IS : 456
and relevant special publications,
submission of job mix formula after
preliminary mix design after testing of
concrete cubes as per direction of Engineer-
in charge. Consumption of cement will not be Cu.M 6463 6122 6064 5983 6282 6159 6205 6070 6247 6270 6224 6853 6333 2953 6489
less than 360 Kg of OPC [43/53 grade ]
cement with Super plasticiser per cubic
meter of controlled concrete but actual
consumption will be determined on the basis
of preliminary test and job mix foumula. In
ground floor and foundation.
[using concrete mixture] With Pakur Variety
(I) M 40 Grade of Concrete

7 Ordinary Cement concrete (mix 1:1.5:3) with


graded stone chips (20 mm nominal size)
excluding shuttering and reinforcement if
any, in ground floor as per relevant IS codes.

(i) Pakur Variety Cu.M. 5389 5063 5007 4930 5216 5098 5142 5013 5183 5204 5140 5741 5244 5290 5392
(ii ) River Bazree Cu.M. 6792 5535 5600 5920
(iii) RajMahal Cu.M. 5887
(iv) With local hard blackstone variety chips
(crusher broken) Cu.M. 5937 5829 5693

8 Plum concrete work with 40 % cement


concrete with 30 mm down graded stone
metal and 60 % stone boulder of size 150
mm and above, placed in position as
directed excluding shuttering if any.
(i) (1:3:6) proportion Cu.M 3535
(ii) (1:4:8) proportion Cu.M 3378

Page 14
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( c ) Brickworks,Concrete Works etc.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

9 A Batch Mixed concrete of M 20 Grade with


(a) well Graded stone chips of 20 mm nominal
size containing designed quantity of cement
per Cu. M of Wet concrete produced in
computerised batching plant under controlled
condition using approved super plasticizer
designing concrete mix following I.S 10262
and I.S. 456 transporting the mix with
agitation in transit mixer to work site
depositing the mix on a platform erected for
the purpose at required level of concreting
and then placing the mix in its final location
of form work compacting and curing the
same complete as per specification and
direction of the Engineer-in charge including
hire charges of computerised batching plant,
transit mixer with all accessories vibrators
etc. inclusive of all other incidental charges
in this connection complete but excluding
cost of hire charge of platform and its
supporting staging which would be paid
through separate item. Consumption of
cement will not be less than 300 Kg of
cement per cubic meter of controlled
concrete but actual consumption will be
determined on the basis of preliminary test
and job mix foumula. [Cement to be supplied
by Deptt, if Cement is supplied by agency
then item rate to be deduced as per Format
A of Annexure I]
[with Batching Plant & transit mixer], In
(i) Without approved concrete pump. Cu.M 5315 4975 4915 4835 5133 5011 5057 4922 5099 5123 5038 5667 5147 5195 5302
(ii) With approved concrete pump. Cu.M 5469 5129 5070 4990 5289 5166 5211 5077 5253 5277 5193 5823 5303 5350 5457

Page 15
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( c ) Brickworks,Concrete Works etc.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

9 A Batch Mixed concrete of M 25 Grade with


(b) well Graded stone chips of 20 mm nominal
size containing designed quantity of cement
per Cu. M of Wet concrete produced in
computerised batching plant under controlled
condition using approved super plasticizer
designing concrete mix following I.S 10262
and I.S. 456 transporting the mix with
agitation in transit mixer to work site
depositing the mix on a platform erected for
the purpose at required level of concreting
and then placing the mix in its final location
of form work compacting and curing the
same complete as per specification and
direction of the Engineer-in charge including
hire charges of computerised batching plant,
transit mixer with all accessories vibrators
etc. inclusive of all other incidental charges
in this connection complete but excluding
cost of hire charge of platform and its
supporting staging which would be paid
through separate item. Consumption of
cement will not be less than 300 Kg of
cement per cubic meter of controlled
concrete but actual consumption will be
determined on the basis of preliminary test
and job mix foumula. [Cement to be supplied
by Deptt, if Cement is supplied by agency
then item rate to be deduced as per Format
A of Annexure I]
[with Batching Plant & transit mixer]
(i) Without approved concrete pump. Cu.M 5756 5416 5357 5275 5576 5451 5498 5362 5540 5564 5491 6119 5599 5648 5756
(i) With approved concrete pump. Cu.M 5910 5570 5512 5431 5730 5606 5653 5517 5696 5718 5645 6275 5755 5803 5910

Page 16
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( c ) Brickworks,Concrete Works etc.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

9 A Batch Mixed concrete of M 30 Grade with


(c) well Graded stone chips of 20 mm nominal
size containing designed quantity of cement
per Cu. M of Wet concrete produced in
computerised batching plant under controlled
condition using approved super plasticizer
designing concrete mix following I.S 10262
and I.S. 456 transporting the mix with
agitation in transit mixer to work site
depositing the mix on a platform erected for
the purpose at required level of concreting
and then placing the mix in its final location
of form work compacting and curing the
same complete as per specification and
direction of the Engineer-in charge including
hire charges of computerised batching plant,
transit mixer with all accessories vibrators
etc. inclusive of all other incidental charges
in this connection complete but excluding
cost of hire charge of platform and its
supporting staging which would be paid
through separate item. Consumption of
cement will not be less than 320 Kg of
cement per cubic meter of controlled
concrete but actual consumption will be
determined on the basis of preliminary test
and job mix foumula. [Cement to be supplied
by Deptt, if Cement is supplied by agency
then item rate to be deduced as per Format
A of Annexure I]
[with Batching Plant & transit mixer]
(i) Without approved concrete pump. Cu.M 5943 5603 5545 5464 5763 5639 5687 5551 5729 5751 5682 6311 5791 5839 5946
(ii) With approved concrete pump. Cu.M 6099 5758 5699 5618 5918 5795 5841 5707 5883 5906 5836 6466 5946 5993 6100

Page 17
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( c ) Brickworks,Concrete Works etc.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

9A Batch Mixed concrete of M 35 Grade with


(d) well Graded stone chips of 20 mm nominal
size containing designed quantity of cement
per Cu. M of Wet concrete produced in
computerised batching plant under controlled
condition using approved super plasticizer
designing concrete mix following I.S 10262
and I.S. 456 transporting the mix with
agitation in transit mixer to work site
depositing the mix on a platform erected for
the purpose at required level of concreting
and then placing the mix in its final location
of form work compacting and curing the
same complete as per specification and
direction of the Engineer-in charge including
hire charges of computerised batching plant,
transit mixer with all accessories vibrators
etc. inclusive of all other incidental charges
in this connection complete but excluding
cost of hire charge of platform and its
supporting staging which would be paid
through separate item. Consumption of
cement will not be less than 340 Kg of OPC
[43/53 grade] cement per cubic meter of
controlled concrete but actual consumption
will be determined on the basis of preliminary
test and job mix foumula. [Cement to be
supplied by Deptt, if Cement is supplied by
agency then item rate to be deduced as per
Format A of Annexure I]
[with Batching Plant & Transit Mixer]
(i) Without approved concrete pump. Cu.M 6138 5798 5739 5657 5957 5833 5880 5745 5922 5946 5896 6526 6006 6054 6161
(ii) With approved concrete pump. Cu.M 6292 5952 5894 5813 6112 5988 6035 5899 6077 6100 6052 6680 6160 6209 6316

Page 18
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( c ) Brickworks,Concrete Works etc.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

9A Batch Mixed concrete of M 40 Grade with


(e) well Graded stone chips of 20 mm nominal
size containing designed quantity of cement
per Cu. M of Wet concrete produced in
computerised batching plant under controlled
condition using approved super plasticizer
designing concrete mix following I.S 10262
and I.S. 456 transporting the mix with
agitation in transit mixer to work site
depositing the mix on a platform erected for
the purpose at required level of concreting
and then placing the mix in its final location
of form work compacting and curing the
same complete as per specification and
direction of the Engineer-in charge including
hire charges of computerised batching plant,
transit mixer with all accessories vibrators
etc. inclusive of all other incidental charges
in this connection complete but excluding
cost of hire charge of platform and its
supporting staging which would be paid
through separate item. Consumption of
cement will not be less than 360 Kg of OPC
(43/53 grade) cement per cubic meter of
controlled concrete but actual consumption
will be determined on the basis of preliminary
test and job mix foumula. [Cement to be
supplied by Deptt, if Cement is supplied by
agency then item rate to be deduced as per
Format A of Annexure I]
[with Batching Plant & transit mixer]
(i) Without approved concret pump Cu.M 6298 5958 5899 5818 6118 5995 6041 5905 6083 6106 6059 6689 6168 6217 6324
(ii) With approved concret pump Cu.M 6453 6112 6054 5973 6272 6149 6196 6060 6238 6261 6214 6845 6324 6372 6479
[Note:- If Transit Mixer is not used then
Rs 135/-per Cu.m to be deducted from all
items of 9 A]

Page 19
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( c ) Brickworks,Concrete Works etc.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

9B Supplying ready mixed concrete of M 20


(a) Grade with well graded stone chips of 20 mm
nominal size containing designed quantity of
cement per Cu.m of wet concrete produced
in computerised batching plant under
controlled condition using approved super
plastisizer, designing concrete mix following
I.S. 10262 and I.S. 456, transporting the mix
with agitation in transit mixer to work site
depositing the mix on a platform erected for
the purpose at required levels of concreting
and then placing the mix in its final location
of form work, compacting and curing the
same complete as per specification &
direction of the Engineer-in-charge including
computerised batching plant transit mixer
with all accessories vibrators etc. inclusive of
all other incidental charges in this connection
complete but excluding cost of hire charge of
platform and its supporting staging which
would be paid through separate item.
[Cement to be supplied by the Manufacturer
or supplier]
In ground floor and foundation.
(i) Without approved concrete pump. Cu.M 6225 5923
(ii) With approved concrete pump. Cu.M 6411 6106

Page 20
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( c ) Brickworks,Concrete Works etc.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

9B Supplying ready mixed concrete of M 25


(b) Grade with well graded stone chips of 20 mm
nominal size containing designed quantity of
cement per Cu.m of wet concrete produced
in computerised batching plant under
controlled condition using approved super
plastisizer, designing concrete mix following
I.S. 10262 and I.S. 456, transporting the mix
with agitation in transit mixer to work site
depositing the mix on a platform erected for
the purpose at required levels of concreting
and then placing the mix in its final location
of form work compacting and curing the
same complete as per specification &
direction of the Engineer-in-charge including
computerised batching plant transit mixer
with all accessories vibrators etc. inclusive of
all other incidental charges in this connection
complete but excluding cost of hire charge of
platform and its supporting staging which
would be paid through separate item.
[cement to be supplied by the Manufacturer/
supplier]
In Ground Floor and Foundation
(i) Without approved concrete pump Cu.M 6699 6394
(ii) With approved concrete pump Cu.M 6884 6578

Page 21
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( c ) Brickworks,Concrete Works etc.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

9B (c) Supplying ready mixed concrete of M 30


Grade with well graded stone chips of 20 mm
nominal size containing designed quantity of
cement per Cu.m of wet concrete produced
in computerised batching plant under
controlled condition using approved super
plastisizer, designing concrete mix following
I.S. 10262 and I.S. 456, transporting the mix
with agitation in transit mixer to work site
depositing the mix on a platform erected for
the purpose at required levels of concreting
and then placing the mix in its final location
of form work, compacting and curing the
same complete as per specification &
direction of the Engineer-in-charge including
computerised batching plant transit mixer
with all accessories vibrators etc. inclusive of
all other incidental charges in this connection
complete but excluding cost of hire charge of
platform and its supporting staging which
would be paid through separate item.
[cement to be supplied by the Manufacturer/
supplier]
In ground floor and foundation.

(i) Without approved concrete pump Cu.M 6910 6603


(ii) With approved concrete pump Cu.M 7160 6786

Page 22
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( c ) Brickworks,Concrete Works etc.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

9B Supplying ready mixed concrete of M


(d) 35Grade with well graded stone chips of 20
mm nominal size containing designed
quantity of cement per Cu.m of wet concrete
produced in computerised batching plant
under controlled condition using approved
super plastisizer, designing concrete mix
following I.S. 10262 and I.S. 456,
transporting the mix with agitation in transit
mixer to work site depositing the mix on a
platform erected for the purpose at required
levels of concreting and then placing the mix
in its final location of form work, compacting
and curing the same complete as per
specification & direction of the Engineer-in-
charge including computerised batching
plant transit mixer with all accessories
vibrators etc. inclusive of all other incidental
charges in this connection complete but
excluding cost of hire charge of platform and
its supporting staging which would be paid
through separate item. [cement to be
supplied by the Manufacturer/ supplier]
In ground floor and foundation.
(i) Without approved concrete pump Cu.M 7118 6811
(ii) With approved concrete pump Cu.M 7303 6993

Page 23
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( c ) Brickworks,Concrete Works etc.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

9B Supplying ready mixed concrete of M 40


(e) Grade with well graded stone chips of 20 mm
nominal size containing designed quantity of
cement per Cu.m of wet concrete produced
in computerised batching plant under
controlled condition using approved super
plastisizer, designing concrete mix following
I.S. 10262 and I.S. 456, transporting the mix
with agitation in transit mixer to work site
depositing the mix on a platform erected for
the purpose at required levels of concreting
and then placing the mix in its final location
of form work, compacting and curing the
same complete as per specification &
direction of the Engineer-in-charge including
computerised batching plant transit mixer
with all accessories vibrators etc. inclusive of
all other incidental charges in this connection
complete but excluding cost of hire charge of
platform and its supporting staging which
would be paid through separate item.
[cement to be supplied by the Manufacturer/
supplier]
In ground floor and foundation.

(i) Without approved concrete pump Cu.M 7259 6951


(ii) With approved concrete pump Cu.M 7444 7134
[Note:
1. Lifting charge for items of 9 A and 9 B
without approved concrete pump as per
item 11.
2. Lifting charge for items of 9 A and 9 B
with approved concrete pump @ Rs 20/-
per Cu.m per floor.]
10 (I) Cement concrete with graded stone
ballast (40 mm size excluding shuttering)
In ground floor
(A) [Pakur Variety]
(a) 1:3:6 proportion Cu.M 5823 5363 5273 4744 5376 5248 5757 5314 5443 5592 4831 6119
(b) 1:4:8 proportion Cu.M 5436 4967 4875 4335 4981 4849 5369 4917 5049 5201 4410 5726

Page 24
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( c ) Brickworks,Concrete Works etc.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

(B) With N.B. Variety stone metal.


(a) 1:3:6 proportion Cu.M 5411 4167 4167 4398
(b) 1:4:8 proportion Cu.M 5002 3732 3732 3967
(II) Cement concrete with 30 mm down
graded shingles excluding shuttering.
N.B. Variety
In ground floor
(a) 1:3:6 proportion Cu.M 5021 3835 3835 4221
(b) 1:4:8 proportion Cu.M 4604 3393 3393 3787
(III) Cement concrete with 32 mm down
graded gravel excluding shuttering
In ground floor
(a) 1:3:6 proportion Cu.M 4007 3849 3707
(b) 1:4:8 proportion Cu.M 3582 3420 3275
11 Add extra over the rate of ground floor for
basement and each additional floor above
ground floor for items 4 to 10
(i) upto 4 th floor. Cu.M. 96 96 96 96 96 96 96 96 96 96 96 96 96 96 96
(ii) above 4 th floor Cu.M. 117 117 117 117 117 117 117 117 117 117 117 117 117 117 117
Note: 1) For thin concrete members upto
a thickness of 65 mm involving shuttering
and scaffolding rate of concrete
enhanced by 150% of rate by volume
(Cost of shuttering & reinforcement
excluded).
2. For tall structure like overhead
reservoir on R.C. frame, the ground floor
equivalent height shall be taken as 4 m.
Every 4 m or part thereof above 4 m shall
be taken as each additional floor for
purpose of this item.
3. For item nos 5(a), 6(a)(i), 6(b)(i), 6(c)(i),
6(d), 6(e), 7(i), 9A & 9B costruction wing is
to add cost & carriage (including loading
& unloading) of Coarse Aggragate only to
arrive at consolidated rate.

Page 25
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( c ) Brickworks,Concrete Works etc.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

12 Hire and labour charges for shuttering with


centering and necessary staging upto 4 m
using approved stout props and thick hard
wood planks of approved thickness with
required bracing for concrete slabs, beams
and columns, lintels curved or straight
including fitting, fixing and striking out after
completion of works (upto roof of ground
floor)
(When the height of a particular floor is more
than 4 m the equivalent floor height shall be
taken as 4 m and extra for works beyond the
initial 4 m ht. shall be allowed under 12 (e)
for every 4 m or part thereof)
(a) 25 mm to 30 mm thick wooden shuttering
as per decision & direction of Engineer-In- Sq.m 360 351 347 351 359 347 343 343 354 354 351 359 351 351 351
Charge.
(b) Above 30 mm & upto 37 mm thick
wooden shuttering as per decision & Sq.m 375 365 361 365 374 361 357 357 368 368 365 374 365 365 365
direction of Engineer-In-Charge.
(c) Steel shuttering or 9 to 12 mm thick
approved quality ply board shuttering in any Sq.m 403 396 392 396 403 392 389 389 399 399 396 409 396 396 396
concrete work
(d) Extra for works beyond the roof of ground
floor per additional floor

(i) upto 4th (per floor) and in basement. Sq.m 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18

(ii) above 4th floor (per floor). Sq.m 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22


(e) Extra for staging beyond 4 m in any floor
(Mode of measurement: area in plan x mean
Cu.M 66 64 62 63 65 62 62 62 65 65 64 65 64 64 64
height of staging upto soffit of shuttering
above initial 4 m)
(f) 25 mm to 30 mm shuttering without
staging in foundation sq. m 225 221 221 221 225 221 218 218 221 221 221 225 221 221 221

Notes:- For shuttering in shell roof, grid


roof with vertical faces folded plate,
arched roof the rate in 12 (a), 12(b) & 12
(c ) above to be increased by 100 % . For
grid roof with splayed faces, rate is to be
increased by 150%.

Page 26
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( c ) Brickworks,Concrete Works etc.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

13 (a) Hire and labour charges for shuttering for


concrete work in overhead R.C. Reservoir on
separate R.C. frame including fitting, fixing
and striking off after compeltion of work sq. m 781 757 741 750 776 741 729 729 762 762 757 782 757 757 757
including staging upto 4 m using ply board or
steel shuttering.
(Not applicable for resting on roof top)
(b) Extra for Staging beyond 4 m [mode of
measurement: Area of unsupported
horizontal projection (where staging beyond Cu.M 180 172 168 172 179 168 165 165 175 175 172 179 172 172 172
4 m is practically unavoidable) x mean height
of staging] above initial 4 m.

14 Hire and Labour Charges for shuttering with


hard wood for precast R.C. Slab curved, or
stright and striking out the same including
fitting, fixing the precast slab in position with
Sq.m 100 99 99 99 100 99 97 97 99 99 99 100 99 99 99
necessary carriage and haulage, hosting etc,
complete in all respect.
(only the area in contact with concrete to be
measured)
15 Reinforcement for reinforced concrete work
in all sorts of structures including distribution
bars, stirrups, binders etc initial straightening
and removal of loose rust (if necessary),
cutting to requisite length, hooking and
bending to correct shape, placing in proper
position and binding with 16 gauge black
annealed wire at every intersection, complete
as per drawing and direction.

(a) For works in foundation, basement and


upto roof of ground floor/upto 4 m
(i) Tor steel/Mild Steel M.T. 68508 68359 68359 68359 68359 68359 68359 68359 68359 68359 69494 69512 69494 69494 69494
(b)Extra For works beyond the roof of ground
floor/initial 4 m
(i) Upto 4 th floor roof in each addl. floor Qntl 48 44 44 44 44 44 44 44 44 44 44 44 44 44 44
(ii) Above 4 th floor roof per addl. floor/every
Qntl 56 51 51 51 51 51 51 51 51 51 51 51 51 51 51
4m
16 Labour for straightening of coil bars of any
Qntl 155 146 146 146 146 146 146 146 146 146 146 146 146 146 146
dia including stacking

Page 27
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( c ) Brickworks,Concrete Works etc.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

17 Labour for Placing on forms (i.e. shuttering)


I.R.C. or similar welded mesh fabric of
approved sizes.
(Payment to be made on net area used
Sq.m 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27
including cutting straightening, bending,
binding with 16 gauge black annealed wire,
removing rust etc, complete as per direction)

18 Cement concrete (1:1.5:3) with graded stone


chips 5.6 mm size with hexagonal square
mesh wire netting, I.R.C. fabric mesh or X.P.
M. fitted and fixed after tying the existing
reinforcement on concrete without
distributing the same and with proper
scarping and cleaning the reinforcement and
disturbed concrete with wire brush etc. after
applying a coat of cement including the cost
of wire netting I.R.C or X. P. M. & cost of all
handling and scaffolding complete as per
direction of Engineer-in -charge.

a) 20 mm thick Sq.m 551 545 541 531 543 544 550 542 544 545 534 567 550 557 549
b) 25 mm thick Sq.m 586 578 573 561 575 577 584 574 577 579 564 605 584 593 583
c) 37.5mm thick Sq.m 668 656 648 630 652 655 665 650 654 657 635 697 665 678 664
19 Brick work with 1st class bricks in lime and
surki mortar (1:2) ( 1 lime putty/paste: 2
surki) lime to be slaked at site and the mortar
to be prepared with such lime putty and first
class surki made from kiln burnt bricks
having its fineness modulus between 2 and
2.5 and which passes through B.S. sieve No
8 with correspondes to I.S sieve No 200 with
considerable grinding and pugging it
complete.
a) In foundation and plinth Cu.M 6042 5509 4872 4872 6042 5896 5892 5222 5523 5506 5490 7153 5523 5506 5506
b) In Super structure, ground floor. Cu.M 6267 5734 5096 5096 6267 6120 6117 5447 5748 5730 5714 7378 5748 5730 5730

Page 28
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( c ) Brickworks,Concrete Works etc.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

20 Brick work with 1st class bricks in lime and


surki mortar (1:3) ( 1 lime putty/paste: 3
surki) lime to be slaked at site and the mortar
to be prepared with such lime putty and first
class surki made from kiln burnt bricks
having its fineness modulus between 2 and
2.5 and which passes through B.S. sieve No
8 with correspondes to I.S sieve No 200 with
considerable grinding and pugging it
complete.
a) In Foundation and Plinth. Cu.M. 5842 5332 4689 4689 5842 5723 5719 5047 5348 5328 5311 6931 5348 5328 5328
b) In Super structure, Ground Floor. Cu.M. 6067 5557 4914 4914 6067 5948 5944 5272 5573 5553 5536 7156 5573 5553 5553
Notes:-(a) For lime surki brick work in
foundation below G.L. hydraulic lime as per
specification should be used. In other lime-
surki brick work (above G.L.) fat lime as per
specification will be used.
(b) In all items of works viz. brick work,
plastering, lime terracing etc. involving use of
lime, the proportion of lime in all such items
indicating its measurement by volume is of
putty/paste form, which may be obtained
from unslaked lime in the following rate, i.e.
633 kg of unslaked lime form 1.00 Cu.m by
volume of lime putty/paste.

21 Brick work with 1st class bricks in cement


mortar (1:4)
(a) In foundation and plinth Cu.M. 6068 5505 4907 4907 5970 5911 5852 5185 5623 5603 5612 7160 5592 5592 5651
(b) In superstructure, ground floor Cu.M. 6293 5730 5132 5132 6195 6136 6077 5409 5848 5828 5837 7384 5817 5817 5876
22 Brick work with 1st class bricks in cement
mortar (1:6)
(a) In foundation and plinth Cu.M. 5719 5155 4557 4557 5620 5562 5503 4835 5273 5254 5253 6800 5233 5233 5292
(b) In superstructure, ground floor Cu.M. 5943 5380 4782 4782 5845 5786 5728 5060 5498 5479 5478 7025 5458 5458 5517
23 Brick work with 1st class bricks in composite
mortar with cement, lime and sand (1:1:6) (1
cement:1 lime putty/paste:6 sand)

(a) In foundation and plinth Cu.M. 6011 5410 4812 4812 5913 5816 5757 5089 5528 5508 5507 7131 5487 5487 5546
(b) In superstructure, ground floor Cu.M. 6236 5635 5037 5037 6138 6041 5982 5314 5753 5733 5732 7356 5712 5712 5771

Page 29
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( c ) Brickworks,Concrete Works etc.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

NOTE : 633 kg of unslaked lime @1 cu.m.


of lime putty/paste.
24 Brick work with 1st class bricks in composite
mortar with cement, lime and sand (1:2:9) ( 1
cement: 2 lime putty/paste: 9 sand)

(a) In foundation and plinth Cu.M. 5882 5268 4670 4670 5784 5674 5615 4948 5386 5366 5358 7008 5339 5339 5398
(b) In superstructure, ground floor Cu.M. 6107 5493 4895 4895 6009 5899 5840 5172 5611 5591 5584 7233 5564 5564 5623
NOTE : 633 kg of unslaked lime @1 cu.m.
of lime putty/paste.
25 Extra Labour for brick for string course and
set square brick work, brackets and similar
Cu.M. 253 253 253 253 253 253 253 253 253 253 253 253 253 253 253
other projection brick works to be paid in
respective item.
26 Brick work with 1st class modular bricks
(a) With cement mortar (1:4)
(i) In foundation and plinth Cu.M. 5734 5638
(ii) In superstructure, ground floor Cu.M. 5880 5784
(b) With cement mortar (1:6)
(i) In foundation and plinth Cu.M. 5398 5302
(ii) In superstructure,ground floor Cu.M. 5521 5425
27 Add extra for basement and each additional
floor over the rate for ground floor on item
Nos. 19 to 26 except 25
(a) Upto 4th floor Cu.M. 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112
(b) Above 4th floor Cu.M. 134 134 134 134 134 134 134 134 134 134 134 134 134 134 134
28 Extra over rate of corresponding items for
brick works in arches including hire and
labour charges for shuttering, centring etc.
complete.
(a) Clear span not exceeding 1,500 mm. Cu.M. 1044 1044 1044 1044 1044 1044 1044 1044 1044 1044 1044 1044 1044 1044 1044
(b) Clear span exceeding 1,500 mm. but not
Cu.M. 1107 1107 1107 1107 1107 1107 1107 1107 1107 1107 1107 1107 1107 1107 1107
exceeding 2,400 mm.
(c) Clear span exceeding 2,400 mm. but not
Cu.M. 1150 1150 1150 1150 1150 1150 1150 1150 1150 1150 1150 1150 1150 1150 1150
exceeding 3,600 mm.
(d) Clear span exceeding 3,600 mm. but not
Cu.M. 1168 1168 1168 1168 1168 1168 1168 1168 1168 1168 1168 1168 1168 1168 1168
exceeding 4,800 mm.

Page 30
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( c ) Brickworks,Concrete Works etc.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

N.B. : While calculating the volume of brick


work only the thickness of the arch shall be
taken into consideration.
29 125 mm. thick brick work with 1st class
bricks in cement mortar (1:4) in ground floor. Sq.M. 783 714 639 639 772 765 759 674 728 725 726 919 724 724 731

30 125 mm. thick brick work with 1st class


bricks in cement mortar (1:3) in ground floor. Sq.M. 821 753 677 677 810 803 797 712 766 764 766 958 763 763 770

31 Extra for using approved H.B netting in every


third layer in 29 & 30 above in any floor Sq.M. 46 46 46 46 46 46 46 46 46 46 46 48 46 46 46

32 (a) 100 mm. thick brick work with 1st class


Modular bricks set in cement sand mortar
(1:4) including raking out joints, curing, Sq.M. 616 607
scaffolding etc. complete in all respect in
ground floor.
(b) 100 mm. thick brick work with 1st class
Modular bricks set in cement sand mortar
(1:4) including raking out joints, curing,
scaffolding etc. complete in all respect with Sq.M. 642 633
H.B. netting in every third layer in ground
floor.
33 (a) 100 mm. thick brick work with special
class Modular bricks set in cement sand
mortar (1:4) including raking out joints, Sq.M. 649 640
curing, scaffolding etc. complete in all
respect in ground floor
(b) 100 mm. thick brick work with special
class Modular bricks set in sand cement
mortar(1:4) including raking out joints, curing,
scaffolding etc. complete in all respect with Sq.M. 675 666
H.B. netting in every third layer of ground
floor.

Page 31
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( c ) Brickworks,Concrete Works etc.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

34 (a) 75 mm. thick brick work with 1st class


bricks set in cement, sand mortar (1:4) in
ground floor including H.B. netting in every Sq.M. 537 495 449 449 530 526 522 470 503 502 502 621 501 501 505
alternate layers.
(b) 75 mm. thick brick work with 1st class
bricks set in cement, sand mortar (1:3) in
ground floor including H.B. netting in every Sq.M. 593 551 505 505 586 582 578 527 559 558 559 679 558 558 562
alternate layers.
35 Jaffri brick work 125 mm. thick with 1st class
bricks in cement mortar (1:4) including 15
mm. thick cement plaster (1:4) in all faces in Sq.M. 792 734 694 694 776 766 756 712 754 750 752 879 748 748 758
ground floor.
36 200 mm. thick Brick work with Fly Ash Bricks
set in cement sand mortar (1:6) including
raking out joints, curing, scaffolding etc.
complete in all respect.
(a) In ground floor Cu.M. 5277 4992 4949 4949 5277 5153 5092 4949 5211 5092 5056
(b) Add extra for each addl. floor
i) Up to 4th floor Cu.M. 121 121 115 115 121 115 115 115 115 115 121
ii) Above 4th floor Cu.M. 146 146 139 139 146 139 139 139 139 139 146
37 100 mm. thick brick work with Fly Ash Bricks
set in cement sand mortar (1:4) including
raking out joints, curing, scaffolding etc.
complete in all respect.
(a) In ground floor Sq.M. 606 569 555 555 598 574 569 583 579 567 564
(b) Add extra for each addl. floor over
the rate of ground floor
(i) up to 4th floor Sq. M 10 10 10 10
(ii) above 4th floor Sq. M 13 13 13 13
38 Precast pierced concrete jally work as per
design and manufacturer's specification
including moulding etc. with stone chips and
necessary reinforcement shuttering complete
including fitting, fixing in position in all floors.

(a) 50 mm. thick panels Sq. M 405 405 405 405 405 405 405 405 405 405 405 418 405 405 405
(b) 37.5 mm thick panels Sq. M 351 351 351 351 351 351 351 351 351 351 351 364 351 351 351
(Cement and steel required for item no. 38
will not be issued by Deptt.)

Page 32
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( c ) Brickworks,Concrete Works etc.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

39 R.C. weather board (1:1.5:3) with stone chips


and necessary reinforcement upto 1%
(including main and distribution bars),
shuttering and 10 mm. thick cement plaster
(1:4) including all moulding, drip course etc.
complete in ground floor.
50 mm. thick Sq. M 1158 1127 1112 1087 1129 1131 1138 1113 1130 1131 1107 1203 1146 1166 1140
40 R.C. shelves (1:1.5:3) either precast or cast
in situ with stone chips and necessary
reinforcement upto 1% (0.8% main and 0.2%
distribution bars), shuttering etc. and 10 mm.
thick cement plaster (1:4) including neat
cement finishing and cutting chase fitting and
fixing in position, mending good damages as
necessary complete.
In ground floor
(a) 50 mm. Thick panels Sq. M 1207 1176 1161 1136 1179 1180 1188 1163 1179 1180 1157 1253 1196 1216 1190
(b) 37.5 mm. Thick panels Sq. M 1052 1024 1012 993 1028 1028 1033 1013 1028 1029 1011 1090 1040 1056 1037
41 Bonding new brick work with old at every 4th
course including cutting chase and mending Sq. M of
damages in cement mortar (1:4) and curing. bonded 272 264 264 264 269 267 264 264 269 268 268 278 268 268 270
area

42 Add extra for each additional floor over the


rate for ground floor on items from
(i) 29 to 35 except 31
(a) upto 4th floor Sq. M 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12
(b) above 4th floor Sq. M 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13
(ii) 39, 40 & 41
(a) upto 4th floor Sq. M 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9
(b) above 4th floor Sq. M 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10

Page 33
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( c ) Brickworks,Concrete Works etc.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

43 Supplying,hoisting,fitting and fixing R.C.C.


precast thin lintels, 75 mm. thick (1:1.5:3)
conforming to the specification laid down in
C.B.R.I. data sheet No.1 with stone chips,
sand, cement and reinforcement (both main
and distribution) bars upto 1.00 percent as
Cum 13644 13223 13141 12657 13235 13117 13583 13178 13296 13432 12879 14787 13667 13956 14058
per drawing and specification including
placing in situ and supporting arrangement
for taking the load of super-imposed brick
work and striking of the same when directed.

44 1st class brick work of width 200 mm. with


non-modular bricks in cement sand mortar
(1:6) .
(a) In foundation and plinth Cum 5824 5261 4663 4663 5726 5667 5608 4941 5379 5359 5358 6906 5339 5339 5398
(b) In superstructure ground floor Cum 6016 5453 4855 4855 5918 5859 5800 5132 5571 5551 5550 7098 5530 5530 5589
45 1st class brickwork of width 200 mm. with
non-modular bricks in cement and sand
mortar (1:4)
(a) In foundation and plinth Cum 6178 5615 5017 5017 6080 6021 5962 5295 5733 5713 5722 7270 5702 5702 5761
(b) In superstructure ground floor Cum 6370 5807 5209 5209 6272 6213 6154 5486 5925 5905 5914 7461 5894 5894 5953
46 1st class brick work of width 200 mm. with
non-modular bricks in lime and surki mortar
(1:3) (1 lime putty/paste : 3 surki) .
(a) In foundation and plinth Cum 6006 5496 4853 4853 6006 5887 5883 5211 5512 5492 5475 7095 5512 5492 5492
(b) In superstructure and ground floor Cum 6198 5688 5045 5045 6198 6078 6074 5403 5704 5684 5666 7286 5704 5684 5684
NOTES : (a) (i) For item 44 above cement
0.055 cu.m.sand 0.33 cu.m. per cu.m. of
such brick work will be consumed.
(ii)For item 45 above cement 0.083
cu.m. sand 0.33 cu.m. per cu.m. of such
brick work will be consumed.
(b) 633 kg of unslaked lime make 1 cu.m. of
lime putty / paste.
47 Add extra for each additional floor over the
rate for ground floor on items 44, 45,46
above.
(a) upto 4th floor Cum 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112
(b) above 4th floor Cum 134 134 134 134 134 134 134 134 134 134 134 134 134 134 134

Page 34
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( c ) Brickworks,Concrete Works etc.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

48 Manufacturing and supplying (ex-


manufacturers stack yard precast stone
masonary block in 1:5:8 (cement,sand and
stone chips) with average compressive
strength of 70 Kg/Sq.cm as per specification
and drawing laid down in C.B.R.I data sheet
No 8 having the normal size.

(a) 290x190x140 mm each 35


(b) 290x140x140 mm each 29
(c) 290x90x140 mm each 22
Note: For Casting of 100 Nos of Blocks
For (a) cement 1.54 bags, sand 0.27 Cu.m
coarse aggregate (10 mm) 0.43 Cu.m and
stone pieces 0.37 Cu.m
(b) cement 1.14 bags, sand 0.20 Cu.m
coarse aggregate (10 mm) 0.32 Cu.m and
stone pieces 0.27 Cu.m
(c) cement 0.77 bags, sand 0.14 Cu.m
coarse aggregate (10 mm) 0.27 Cu.m and
stone pieces 0.15 Cu.m
49 Dry Rubble Masonry with hard dressed stone
from approved quarries including all carriage Cu.M 2583
of materials
50 Hand Packed rough dressed stone walls by
masons with hard stones from approved
Cu.M 2155
quarries including all carriage of materials to
site
51 Hand Packed rough dressed boulder wall
with boulders from approved quarries
Cu.M 2108
including all carriage of all materials to site.

Page 35
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( c ) Brickworks,Concrete Works etc.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

52 Masonry work with Precast cement concrete


(1:5:8) closed cavity hollow stone blocks
having compressive strength 70 Kg/ Sq. cm
as per C.B.R.I. Specification in cement sand
mortar (1:6) including scaffolding curing etc.
complete.

(a) In foundation & Plinth Cu.M 4702 4204


( Consumption per Cu.m -
Block 400x200x200-57 Nos.
Cement-0.055 Cu.m
Sand-0.33 Cu.m)
(b) In Superstructure ground floor
(i) 200 mm thick wall Sq. M 958 860
( Consumption per Cu.m -
Block 400x200x200-114 Nos.
Cement-0.107 Cu.m
Sand-0.642 Cu.m)
(ii) 150 mm thick wall Sq. M 751 654
( Consumption per Cu.m -
Block 400x200x150-114 Nos.
Cement-0.08 Cu.m
Sand-0.48 Cu.m)
(iii) 100 mm thick wall Sq. M 539 469
( Consumption per Cu.m -
Block 400x200x100-114 Nos.
Cement-0.055 Cu.m
Sand-0.33 Cu.m)
( c ) Add for each addl. Floor
(i) 200 mm thick wall Sq. M 30 30
(ii) 150 mm thick wall Sq. M 24 24
(iii) 100 mm thick wall Sq. M 18 18
53 Rubble masonry in cement (1:6) with hard
dressed stones from approved quarries and
clean, coarse and washed sand including
carriage of all materials to site
(a) In Road and Jhora Work Cu. M 3940 2573 2573
(b) In Fine dressed work in Building
(i) In Ground Floor Cu. M 4015 2648 2648
(ii) In First Floor Cu. M 4127 2761 2761

Page 36
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( c ) Brickworks,Concrete Works etc.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

54 Rubble masonry in cement (1:4) with hard


dressed stones from approved quarries and
clean, coarse and washed sand including
carriage of all materials to site
(a) In Road and Jhora Work Cu. M 4223 2878 2878
(b) In Fine dressed work in Building
(i) In Ground Floor Cu. M 4298 2953 2953
(ii) In First Floor Cu. M 4410 3066 3066
55 Brick work in mud mortar in all thickness of
wall Cu. M 4054 3476 3476 4401 4401 3753 4054 4054 4054

56 Cleaning the concrete surface by removing


dirt and debris, marking defective locations
and removing loose concrete by careful
stripping untill hard surface is exposed,
cutting the concrete to regular shape, wire Sq. M 96 96 96 96 96 96 96 96 96 96 96 96 96 96 96
brushing the exposed surface and removing
debris from site complete as per direction of
the Engineer - in - Charge.
57 Cleaning the exposed reinforcement
preferably upto full diameter by wire brush,
applying two coats of polymer based rust
removing compound left for 24 hours, Sq. M of
removing the coating and then applying two affected 915 915 915 915 915 915 915 915 915 915 915 941 915 915 915
(2) coats of polymer modified anti corrosive reinforce
protective coating formulated to inhibit the d area
corrosion of reinforcement as per
manufacturer's specification]
58 Applying epoxy based reactive joining agent
for joining the old concrete with fresh
concrete to be applied within manufacturer's
Sq. M 356 356 356 356 356 356 356 356 356 356 356 361 356 356 356
specified time as per manufacturers
specification. (0.4 Kg / m² of concrete
surface).
Note: Applicable only when the full
diameter of reinforcement steel is
exposed.

Page 37
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( c ) Brickworks,Concrete Works etc.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

59 (a) Applying 2 coats of bonding agent with


synthetic multi functional rubber emulsion
having adhesive and water proofing
properties by mixing with water in proportion Sq. M 97 97 97 97 97 97 97 97 97 97 97 98 97 97 97
(1 bonding agent : 4 water : 6 cement) as per
Manufacturer's specification [Cement to be
supplied by the Department]

(b) Applying 2 coats of Non-Toxic Acrylic


Polymer modified Paint having adhesive &
waterproofing properties by mixing in
proportion (1 liquid: 4 cementitious material)
or as per manufacturer's specification for Sq. M 299 299 299 299 299 299 299 299 299 299 299 306 299 299 299
water proofing layer in water tank etc. (No
Departmental Cement is required)

60 Extra rate for using water proofing and


plasticising admixture @ 0.2% by weight of
cement (or at manufacturer's specified rate) kg 139 139 139 139 139 139 139 139 139 139 139 139 139 139 139
for concrete of various grades.

61 Polymer concrete made with water resistant


bonding agent of synthetic rubber emulsion
as per manufacturer's specification excluding
the cost of cement concrete (2.75 Kg / bag of Cu.M 5197 5197 5197 5197 5197 5197 5197 5197 5197 5197 5197 5197 5197 5197 3912
cement)
Note : Payment on volume of (1 : 1½ : 3)
Concrete.
62 Removing corroded worn out portion of
reinforcement (when the area of bar is
damaged by more than 25%) by cutting and
replacing the same by a new plain round bar
of requisite diameter by binding with required
lap / welding with old bar, including cost of Kg 102 102 102 102 102 102 102 102 102 102 103 103 103 103 103
reinforcement, complete in all respect
including removing unserviceable materials
from site as per direction of the Engineer - in -
charge. Note : Payment on weight (Kg.) of
new reinforcement.

Page 38
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( c ) Brickworks,Concrete Works etc.


Rate (Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

63 Masonry work with precast stone Masonry


Block having compressive strength 70
kg/Sq.cm as per C.B.R.I. specification and
drawing laid down in C.B.R.I. Data sheet No
08 having the normal size with cement and
sand mortar (1:6) including scaffodding,
curing, supply of materials, stone masory
block etc complete .
(a) 290x190x140 mm Cu.M 6041
Consumption per Cu.M- Block 117
Nos,Cement-0.09 Cu.M, Sand-0.33 Cu.M
(b) 290x140x140 mm Cu.M 6555
Consumption per Cu.M- Block 159
Nos,Cement-0.0.09 Cu.M, Sand-0.33 Cu.M

(c) 290x90x140 mm Cu.M 7525


Consumption per Cu.M- Block 247
Nos,Cement-0.09 Cu.M, Sand-0.33 Cu.M
64 Extra rate for adding Polyester Fibre anti
shrinkage material @ 0.25% by weight of
cement [or as per Manufacturer's
Specification] as secondary reinforcement to Kg 490 490 490 490 490 490 490 490 490 490 490 490 490 490 490
arrest hair crack in concrete including cost of
Fibre .
65 Brick work with Fly Ash Bricks (230 X 110 X
70 size) set in cement sand mortar (1:6)
including raking out joints, curing, scaffolding
etc. complete in all respect.
(a) In ground floor Cu.M 5203 4830 4780 4780 5203 4979 4907 4780 5047 4947 4905
(b) Add extra for each addl. floor
i) Up to 4th floor Cu.M 115 115 115 115 115 115 115 115 115 115 115
ii) Above 4th floor Cu.M 139 139 139 139 139 139 139 139 139 139 139

Note: Construction wing is to add the


carriage cost of moorum material for item
no. 50, to arrive at the consolidated rate
only.

Page 39
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(D) Flooring
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

1) Terraced flooring of lime concrete with


stone lime, surki & 32 mm down Jhama
khoa(1.5:2:7) (1.5 lime putty:2 surki: 7 jhama
khoa)
(a) 75 mm. thick Sq. M 479 422 - 407 479 445 445 - 423 422 421 - 423 416 416
(b) 100 mm. thick Sq. M 630 554 - 534 630 585 584 - 556 554 552 - 556 545 545
NOTE : 633 kg. unslaked lime make @ 1
cu.m. of lime putty / paste.
2 Brick-on-edge floor or pavement with 1st
class brick set close in cement mortar (1:6)
and laid with cushion of sand below
(including cost thereof) including ruled or Sq. M 895 769 680 680 854 841 813 719 806 798 798 1083 787 787 790
flush pointing with cement mortar (1:4) on
top.
3 Artificial stone in floor, dado, staircase etc
with cement concrete (1:2:4) with stone
chips, laid in panels as directed with topping
made with ordinary or white cement (as
necessary) and marble dust in proportion
(1:2) including smooth finishing and rounding
off corners including raking out joints or
roughening of concrete surface and
application of cement slurry before flooring
works using cement @ 1.75 kg/sq.m all
complete including all materials and labour.

In ground floor.
3 mm. thick topping (High polishing grinding
on this item is not permitted with ordinary
cement).
Using grey cement
(i) 20 mm. thick Sq. M 265 260 255 246 257 260 264 256 258 259 249 279 265 272 260
(ii) 25 mm. thick Sq. M 303 296 291 278 292 297 301 292 295 295 282 322 303 313 296
(iii) 35 mm. thick Sq. M 372 362 354 336 357 363 369 355 359 360 341 396 370 384 361
(Add extra @1.5% for each addl. floor upto
4th floor and @1.75% for each additional
floor above 4th floor for item No.1 and 3).

Page 40
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(D) Flooring
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

4 Extra cost of colouring over corresponding


items of artificial stone
(A) For item 3
[with 3 mm thick colour topping]
(i) Colouring black Sq. M 166 166 166 166 166 166 166 166 166 166 166 174 166 166 166
(ii) Colouring red Sq. M 175 175 175 175 175 175 175 175 175 175 175 183 175 175 175
(iii) Colouring pink, cream, yellow, green Sq. M 178 178 178 178 178 178 178 178 178 178 178 189 178 178 178
(These colour items should be done by using
white cement only for 3 mm topping using
white cement @ 3.4 kg/Sq.m, marble dust @
1.7 kg/Sq.m and pigment @ 0.35 kg/ Sq.m.)

[White cement to be supplied by the Agency


including cost thereof and Departmental
Cement @ 5.1 kg/ Sq.m be less issued
corresponding to item 3.]
5 Extra cost of labour over grey artificial stone
for
(i) Chequering Sq. M 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15
(ii) Border (upto 75 mm. width) % Mtr. 1409 1409 1409 1409 1409 1409 1409 1409 1409 1409 1409 1409 1409 1409 1409
(iii) Nosing, bead, moulding etc. % Mtr. 1585 1585 1585 1585 1585 1585 1585 1585 1585 1585 1585 1585 1585 1585 1585
(iv) Moulding hand-rail of verandah,
% Mtr. 2465 2465 2465 2465 2465 2465 2465 2465 2465 2465 2465 2465 2465 2465 2465
staircase
etc.

Page 41
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(D) Flooring
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

6 35 mm. thick (finished) terrazo work, cast in


situ in floor and 20 mm. thick (finished) in
dado, skirting staircase etc. laid in panels or
pattern using cement concrete
(1:2:4)backing with 12 mm stone chips as
directed and necessary terrazo topping with
mosaic chips including rounding off corners
and high polishing etc. complete as per
specification laid down in I.S : 2114-1962
including raking out joints or roughening of
concrete surface & application of cement
slurry before flooring works using cement @
1.75 kg./sq.m. all complete including all
materials & labour.
(Add extra @ 1.5% for each additional floor
upto 4 th floor and @ 1.75 % for each addl.
floor above 4 th floor)
[White cement for item No 6 to be supplied
by the contractor including cost thereof and
grey cement willbe supplied by the Dept at
the isuue rate]
In ground floor.
(A) 9 mm. thick terazo topping, laying and
finished to 6 mm. thick after final grinding
with 0 to 7 mm. size mosaic chips
(i) In ordinary grey colour Sq. M 684 676 669 654 671 676 682 670 673 674 659 717 683 695 676
(ii) In black colour Sq. M 714 706 698 683 701 706 712 699 703 704 688 738 713 724 705
(iii) In red colour Sq. M 758 749 742 727 745 750 755 743 747 747 732 790 756 768 749
(iv) In silver grey (ordinary cement and
white cement to be used in equal proportion Sq. M 770 762 755 740 757 762 768 755 759 760 744 809 768 780 761
in topping)
(v) In pink, green, yellow, light green
colour using white cemeny only and Sq. M 907 899 891 876 894 899 905 892 896 896 880 954 904 916 897
necessary pigment.
(B) 12 mm. thick terrazo topping, laying and
finihsed to 9 mm. thick after final grinding
with 0 to 10 mm. size mosaic chips.

(i) In ordinary grey colour Sq. M 759 751 745 732 747 752 757 746 749 750 737 792 758 769 752
(ii) In black colour Sq. M 848 840 834 821 836 841 846 835 838 839 826 880 847 858 841
(iii) In red colour Sq. M 862 855 848 835 850 855 860 849 852 853 840 895 862 872 855

Page 42
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(D) Flooring
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

(iv) In silver grey (ordinary cement and


white cement to be used in equal proportion Sq. M 844 837 830 817 833 837 842 831 835 835 821 886 843 853 836
in topping)
(v) In pink, green, yellow, light green
colour using white cement only and Sq. M 1039 1032 1025 1012 1028 1032 1037 1026 1029 1030 1015 1093 1037 1047 1030
necessary pigment.
7 20 mm. thick (finished) terrazo work with
precast tiles set on 20 mm avg thick cement
mortar (1:3) and sides with admixture of
pigment and white/grey cement as necessary
in floor, dado, skirting, staircase etc. laid in
panels or in patterns including high polishing,
raking out joints, roughening of concrete
surface & application of cement slurry before
flooring works using cement @ 1.75 kg. per
sq.m. all complete including all materials &
labour.
( Add extra @ 1.5 % for each additional floor
upto 4th floor and @ 1.75 % for each
additional floor above 4th floor).
In ground floor.

(A) 9 mm. thick terrazo topping, laying and


finished to 6 mm. thick after final grinding
with 0 to 7 mm. size mosaic chips.
(i) In ordinary grey colour Sq. M 1011 994 991 991 1004 997 995 991 1001 1001 1003 1039 1002 1002 1007
(ii) In black colour Sq. M 1105 1088 1085 1085 1098 1091 1089 1085 1095 1095 1097 1134 1096 1096 1102
(iii) In red colour Sq. M 1132 1115 1112 1112 1125 1119 1117 1112 1122 1122 1125 1154 1123 1123 1129
(iv) In silver grey (ordinary cement and
white cement to be used in equal proportion Sq. M 1149 1132 1129 1129 1142 1135 1133 1129 1139 1139 1141 1182 1139 1139 1145
in topping).
(v) In pink, green, yellow, light green
colour using white cemeny only and Sq. M 1294 1277 1274 1274 1287 1280 1278 1274 1284 1284 1285 1334 1284 1284 1290
necessary pigment.
(B) 12 mm. thick terrazo topping, laying and
finished to 9 mm. thick after final grinding
with 0 to 10 mm. size mosaic chips.

(i) In ordinary grey colour Sq. M 1056 1039 1037 1037 1049 1043 1041 1037 1047 1047 1049 1079 1047 1047 1053
(ii) In black colour Sq. M 1164 1147 1144 1144 1157 1150 1148 1144 1154 1154 1156 1186 1155 1155 1160
(iii) In red colour Sq. M 1172 1154 1152 1152 1164 1158 1156 1152 1162 1162 1164 1194 1163 1163 1168

Page 43
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(D) Flooring
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

(iv) In silver grey (ordinary cement and


white cement to be used in equal proportion Sq. M 1195 1178 1175 1175 1188 1181 1179 1175 1185 1185 1187 1222 1185 1185 1191
in topping)
(v) In pink, green, yellow, light green
colour using white cement only and Sq. M 1340 1323 1320 1320 1333 1326 1324 1320 1330 1330 1331 1373 1330 1330 1335
necessary pigment.
8 Extra over corresponding item of precast
terrazo work including cost of materials,
labour etc.
(i) For 25 mm. (finished) thick. Sq. M 63 63 63 63 63 63 63 63 63 63 63 57 63 63 63
NOTE : (For item no. 7 & 8, no cement
will be supplied by the Deptt., for
manufacture of precast / tiles).
9 Extra cost of labour over corresponding
items of mosaic work
(a) For borders (upto 75 mm. width) % Mtr. 1353 1353 1353 1353 1353 1353 1353 1353 1353 1353 1353 1353 1353 1353 1353
(b) For nosing, bead moulding etc. % Mtr. 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501
(c) For moulded hand rail of verandah,
% Mtr. 2256 2256 2256 2256 2256 2256 2256 2256 2256 2256 2256 2256 2256 2256 2256
staircase etc.
10 Supplying dividing strip fitted and fixed with
cement mortar (1:3) in mosaic or patent
stone floor, dado etc. complete as per
direction of the Engineer-in-charge.
(i) Glass - 3mm. thick
(a) 20 mm. wide strip Mtr. 18 18 18 18 18 18 18 18 18 18 18 19 18 18 18
(b) 25 mm. wide strip Mtr. 19 19 19 19 19 19 19 19 19 19 19 20 19 19 19
(c) 37 mm. wide strip Mtr. 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21
(ii) Aluminium - 25 mm. wide & 2mm.
Mtr. 48 48 48 48 48 48 48 48 48 48 48 51 48 48 48
thick.

Page 44
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(D) Flooring
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

11 25mm. thick damp proof course with cement


concrete with stone chips (1:1.5:3) [with
graded stone aggregate 10 mm nominal
size] and admixture of water proofing
compound as per manufacturer's
specification followed by two coat of polymer
based paint, (1st coat after 4 to 5 days of
concrete laying and 2 nd coat just before
Sq.m 210 200 209 197 211 208 220 210 213 216 200 248 220 227 230
brick masonry work) as directed (cost of
water proofing compound & polymer based
paint to be paid separately).( Chequering not
required over concrete or painted surface).
[Note: - Waterproofing as per item NO 60,
polymer based paint as per item 59 (a) of
Section (C).

12 25 mm. thick damp proof with cement


concrete (1:1.5:3) (with graded stone
aggregate 10 mm. normal size) and painting
the top surface with a coat of bitumen [VG.40
] using 1.7 kg. per sq.m. including heating Sq.m 297 298 296 284 298 295 307 297 300 303 287 335 307 314 316
the bitumen and cost and carriage of all
materials complete. [Bitument to be supplied
by the Agency]
13 Supplying and laying Polythene Sheet
(150gm / sq.m.) over damp proof course or
below flooring or roof terracing or in Sq. M 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25
foundation or in foundation trenches.

14 40 mm. thick damp proof course with cement


concrete (1:1.5:3) (with graded stone chips
20 mm nominal size) with water proofing
compound of approved brand @ 0.2%
weight of cement including cost of materials
over two coats of non toxic acrylic polymer
modified cementitious waterproofing slurry
Sq. M 329 321 318 299 322 317 336 319 324 330 304 380 335 347 351
coat complete [cost of water proofing
compound and non toxic paint to be paid
seperately) for underground water retaining
structures.
[water proofing as per item no 60 and non
toxic paint as per item NO 59 (b) of Section
'C' ]

Page 45
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(D) Flooring
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

15 (a) Supplying, fitting and fixing 20 mm. to 37.5


mm. thick Chunar / Mirzapur / Dholpur slab in
floor set in 20 mm thick (avg) cement mortar
(1:4) bed and pointing in cement mortar (1:2) [1
cement: 2 marble dust] with admixture of pigment
matching the stone shade, polishing all complete
as per direction of the E-I-C (Using cement slurry
for bedding @ 4.4 kg/Sq.m and jointing @ 2.4
kg/Sq.m).

In ground floor Sq. M 1166 1149 1147 1147 1159 1153 1151 1147 1156 1156 1157 1178 1156 1156 1162
(b) Supplying fitting and fixing in position 8
mm. to 12 mm. thick Dholpur slab in wall,
dado making suitable arrangement to hold
the stone properly with approved
polymerised adhesives (6 mm thick) as per
ISI specification including pointing with
cement mortar (1:2) (1 cement: 2 marble
dust) with admixture of pigment matching the
stone shades all complete as per direction of
Engineer-in-charge including cost of all
materials, labour, scaffolding, staging, curing
complete [using white cement for pointing @
2.4 kg/ Sq.m].
In ground floor Sq. M 1283 1283 1283 1283 1283 1283 1283 1283 1283 1283 1283 1320 1283 1283 1283

Page 46
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(D) Flooring
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

16 Supplying and laying true to line and level


vitrified tiles of approved brand (size not less
than 600 mm X 600 mm X 10 mm thick) in
floor, skirting etc. set in 20 mm sand cement
mortar (1:4) and 2 mm thick cement slurry
back side of tiles using cement @
2.91Kg./sqM or using polymerised adhesive
(6 mm thick layer applied directly over
finished artificial stone floor/Mosaic etc
without any backing course) laid after
application slurry using 1.75 Kg of cement
per sqM below mortar only, joints grouted
with admixture of white cement and colouring
pigment to match with colour of tiles / epoxy
grout materials of approved make as
directed and removal of wax coating of top
surface of tiles with warm water and
polishing the tiles using soft and dry cloth
upto mirror finish complete including the cost
of materials, labour and all other incidental
charges complete true to the manufacturer's
specification and direction of Engineer-in-
Charge.(White cement, synthetic adhesive
and grout material to be supplied by the
contra conc

(I) With application slurry @1.75 kg/


Sq.m, 20 mm sand cement mortar (1:4) & 2
mm thick cement slurry at back side of tiles,
0.2 kg/ Sq.m white cement for joint filling with
pigment.
(A) Deep Colour & White Sq. M 1970 1953 1950 1950 1963 1957 1955 1950 1960 1960 1961 1981 1959 1959 1965
(B) Light Colour Sq. M 1471 1454 1451 1451 1464 1457 1455 1451 1461 1461 1461 1481 1460 1460 1465
(II) With Polymerised Adhesive [6 mm thick]
& epoxy grouting materials for filling joints
including spacer-2 mm
[Applied directly over finished artificial stone
floor/ mosaic etc.]
(A) Deep Colour & White Sq. M 2079 2079 2079 2079 2079 2079 2079 2079 2079 2079 2079 2091 2079 2079 2079
(B) Light Colour Sq. M 1579 1579 1579 1579 1579 1579 1579 1579 1579 1579 1579 1591 1579 1579 1579

Page 47
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(D) Flooring
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

17 Resetting old glazed porcelain tiles in 20 mm


thick cement mortar (1:4) including 4 Nos of
key stone (10 mm) fixed with adhesive of
approved quality & 2 mm thick cement slurry
using cement @ 2.91 kg/Sq.m at the back of
tiles and finishing joints with white cement & Sq. M 427 410 407 407 420 414 412 407 417 417 418 438 416 416 422
colouring oxide [if required] to match the
colour of tiles over application slurry @ 1.75
kg/ Sq.m below cement mortar including
dismantling the old mortar etc.

18 Resetting old Mirzapur stone slabs in 20 mm


thick [avg] cement mortar (1:4) bed including
Sq. M 202 184 182 182 194 188 186 182 192 192 192 212 191 191 197
dismantling old mortar etc.

19 Taking out Mirzapur or glazed porcelain tiles


carefully by chiselling from walls or floor
including stacking serviceable material as Sq. M 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107
directed.
20 Reparing cracks in floor with cement mortar
(1:2) with necessary pigment to match with
existing works, including prior cutting and % M 707 701 700 700 703 702 701 700 703 703 704 712 703 703 705
cleaning the cracks as directed.
21 Filling rat-holes with broken glass and
cement concrete (1:3:6) with jhama chips
each 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56
including shaping holes and mending
damages.
22 Washing and cleaning with oxalic acid
powder using 33 gms./sq.m.
(a) Marble floor/ marble dado % Sq. M 751 751 751 751 751 751 751 751 751 751 751 771 751 751 751
(b) Floor/ dado other than marble % Sq. M 606 606 606 606 606 606 606 606 606 606 606 625 606 606 606
23 Supplying, fitting and fixing Marble Slab/tile
of 15 to 18 mm thickness in floor, lobby,
stair, landing & treads etc. over 20 mm (av.)
thck base of Cement mortar (1:2) laid with
white cement slurry @ 4.4 kg/Sq.m before
placing marble & jointed with white cement
slurry @ 2.0 kg/Sq.m with necessary
pigments including grinding and Granite
polishing as per direction of Engineering -in -
Charge in Ground Floor. {White cement and
Pigment to be supplied by the Agency]

Page 48
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(D) Flooring
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

(a) With Makrana plain pink / Adranga Pink


/ Garbh Gulabi / Udaypur pink / Udaypur
Green / Black Bhaslana
(i) Area of each Slab/tile upto 0.3 sq.m. Sq. M 1662 1648 1645 1645 1656 1651 1649 1645 1654 1654 1655 1701 1654 1654 1658
(ii) Area of each Slab/tile exceeding 0.3
sq.m. but not exceeding 0.6 sq.m. Sq. M 1933 1919 1916 1916 1927 1922 1920 1916 1925 1925 1926 1972 1925 1925 1930

(iii) Area of each Slab/tile exceeding 0.60


sq.m but not exceeding 1.00 sq.m. Sq. M 2207 2192 2190 2190 2201 2195 2194 2190 2199 2199 2200 2245 2198 2198 2203

(iv) Area of each slab/tile exceeding 1.00


sq.m (This item to be executed on specific Sq. M 2481 2466 2464 2464 2475 2469 2467 2464 2472 2472 2473 2519 2472 2472 2477
permission of Superintending Engineer)
(b) With Chawk Dungri
(i) Area of each tile upto 0.3 sq.m. Sq. M 1865 1850 1848 1848 1859 1853 1852 1848 1856 1856 1858 1903 1856 1856 1861
(ii) Area of each tile exceeding 0.3sq.m. but
not exceeding 0.6 sq.m. Sq. M 2139 2124 2122 2122 2133 2127 2125 2122 2130 2130 2131 2177 2130 2130 2135

(iii) Area of each tile exceeding 0.6 sq.m but


not excedding 1 sq.m. Sq. M 3165 3150 3148 3148 3159 3153 3152 3148 3156 3156 3157 3203 3156 3156 3161

(iv) Area of each slab/tile exceeding 1.00


sq.m (This item to be executed on Specific Sq. M 4438 4423 4420 4420 4431 4426 4424 4420 4429 4429 4430 4476 4429 4429 4434
permission of Superintending Engineer)
23 Extra cost of labour for prefinished and
(A) premoulded Nosing to treads of steps, Meter 261 261 261 261 261 261 261 261 261 261 261 261 261 261 261
railing, window sill etc. of Marble Stone.
23 Extra cost of labour for Marble Stone Floor
(B) in treads of Steps. Sq. M 229 229 229 229 229 229 229 229 229 229 229 229 229 229 229

24 Supplying, fitting, fixing marble slab/tiles, 15


mm. to 18 mm. thick in dado / wall in 15 mm
thick [avg] cement mortar (1:2) including
making suitable arrangements to hold the
stones properly by brass / copper hooks
applying white cement slurry @ 4.4 kg/ sq.m
at the back side of marble & pointing in
cement mortar (1:2) (1 cement, 2 marble
dust) with admixture of pigment matching the
stone shades including polishing all
complete as per direction of the Engineer-in-
charge including cost of materials, labours,
scaffolding, staging, curing complete. [White
cement, Pigment to be supplied by the
Agency]

Page 49
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(D) Flooring
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

(a) With Makrana plain pink / Adranga Pink /


Garbh Gulabi / Udaypur Pink / Udaypur
green / Black Bhalsana
(i) Area of each Slab/tile upto 0.3 sq.m.
Sq. M 1777 1766 1764 1764 1772 1768 1767 1764 1770 1770 1771 1814 1770 1770 1774

(ii) Area of each slab/tile exceeding 0.3sq.m.


but not exceeding 0.6 sq.m. Sq. M 2049 2037 2035 2035 2044 2039 2038 2035 2042 2042 2043 2085 2042 2042 2046

(iii) Area of each slab/tile exceeding 0.6 sq.m


but not excedding 1 sq.m. Sq. M 2342 2330 2329 2329 2337 2333 2331 2329 2335 2335 2336 2379 2335 2335 2339

(iv) Area of each slab/tile exceeding 1.00


sq.m (This item to be executed on Specific Sq. M 2596 2584 2583 2583 2591 2587 2585 2583 2589 2589 2590 2633 2589 2589 2593
permission of Superintending Engineer)
(b) With Chawk Doongri
(i) Area of each tile upto 0.3 sq.m. Sq. M 1980 1969 1967 1967 1975 1971 1970 1967 1973 1973 1974 2017 1973 1973 1977
(ii) Area of each tile exceeding 0.3sq.m. but
not exceeding 0.6 sq.m. Sq. M 2254 2242 2240 2240 2249 2245 2243 2240 2247 2247 2248 2291 2247 2247 2251

(iii) Area of each tile exceeding 0.6 sq.m but


not excedding 1 sq.m. Sq. M 3280 3269 3267 3267 3275 3271 3270 3267 3273 3273 3274 3317 3273 3273 3277

(iv) Area of each slab/tile exceeding 1.00


sq.m (This item to be executed on Specific Sq. M 4553 4541 4539 4539 4548 4544 4542 4539 4546 4546 4547 4590 4546 4546 4550
permission of Superintending Engineer)
24 Supplying fitting and fixing 15 to 18 mm thick
(A) Marble slab/Tile in riser of step or skirting (upto
300 mm ht) over 15mm (avg) thick base of
Cement mortar (1:2) laid with white cement
slurry @ 4.4 kg/ Sq.m at back side of marble and
jointed with white cement slurry @ 2.2 kg/ Sq.m
with necessary pigments including grinding and
Granite Polishing. [White cement and Pigment to
be supplied by the Agency]
(a) With Makrana plain pink / Adranga Pink /
Garbh Gulabi / Udaypur Pink / Udaypur
green / Black Bhalsana
(i) Area of each Slab/tile upto 0.3 sq.m. Sq. M 1792 1780 1778 1778 1787 1783 1781 1778 1785 1785 1786 1829 1785 1785 1789
(ii) Area of each tile exceeding 0.3sq.m. but
Sq. M 2065 2054 2052 2052 2061 2056 2055 2052 2059 2059 2060 2103 2059 2059 2062
not exceeding 0.6 sq.m.
(b) With Chawk Doongri
(i) Area of each tile upto 0.3 sq.m. Sq. M 1997 1986 1984 1984 1992 1988 1987 1984 1990 1990 1991 2034 1990 1990 1994
(ii) Area of each tile exceeding 0.3sq.m. but
not exceeding 0.6 sq.m. Sq. M 2271 2259 2257 2257 2266 2262 2260 2257 2264 2264 2265 2308 2264 2264 2268

Page 50
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(D) Flooring
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

Note:- Plain Polish may be accepted with


approval of Engineer-in-charge with
reduction Rs. 50/- per Sq.m for item 23(a),
23 (b), 24 A.
25 Polishing only of old marble or terrazo work
with oxalic acid powder using 33 gms/ sq.m.
Sq. M 39 39 39 39 39 39 39 39 39 39 39 39 39 39 39
by manual labour / machine where
necessary.
26 Supplying and laying chequered tiles of any
shade & of approved quality with (1:1½:3)
cement concrete laid in panels or patterns as
directed in pavement, footpath etc. including
necessary underlay 25 mm thick [avg]
cement mortar (1:3) complete in all respect
with all labour and materials. [Using cement
slurry @ 4.4 kg/Sq.m at back side and @2.4
kg/Sq.m for joint filling]
Red Variety
(i) 25 mm. thick Sq. M 546 528 527 527 538 533 528 527 538 536 539 589 538 538 542
(ii) 30 mm. thick Sq. M 581 563 562 562 573 568 563 562 573 571 574 623 573 573 577
27 18 mm. to 22 mm. thick, kota stone slab set
in 20 mm thick (avg) cement mortar (1:4) in
floor, stair & lobby including pointing in
cement slurry with admixture of pigment
matching the stone shade, including grinding
Sq. M 1151 1135 1134 1134 1144 1139 1135 1134 1144 1142 1144 1167 1143 1143 1147
& polishing as per direction of Engineer - in -
charge to match with the existing work.
[Slurry for bedding @ 4.4 kg/Sq.m and
pointing @2.0 kg/Sq.m]

27 Extra cost of labour for prefinished and


(A) premoulded Nosing to treads of steps, m 226 226 226 226 226 226 226 226 226 226 226 226 226 226 226
railing, window sill etc. of Kota Stone.
27 Extra cost of labour for grinding Kota Stone
(B) Floor in treads and riser of Steps. Sq. M 211 211 211 211 211 211 211 211 211 211 211 211 211 211 211

Page 51
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(D) Flooring
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

28 Supplying, fitting and fixing 18 mm. to 22


mm. thick kota stone slab in wall, dado in 15
mm thick [avg] cement mortar (1:3) including
making suitable arrangement to hold the
stone properly by brass / copper hooks
including pointing in cement mortar (1:2) (1
cement : 2 marble dust) with admixture of
Sq. M 1292 1278 1277 1277 1286 1282 1278 1277 1286 1284 1287 1306 1286 1286 1289
pigments matching the stone shade,
including grinding and polishing all complete
as per direction of Engineer-in-charge
including cost of materials, labour,
scaffolding, staging, curing complete.
[Using cement slurry for bedding @4.4
kg/Sq.m and for jointing @1.8 kg/Sq.m]
29 Grinding to marble / mosaic floor including
remaining stone, if necessary, after cutting
Sq. M 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22
with manual labour / machine, where
necessary
30 Supplying, fitting & fixing 1st quality Ceramic
tiles in walls and floors to match with the
existing work & 4 nos. of key stones (10mm)
fixed with araldite at the back of each tile &
finishing the joints with white cement mixed
with colouring oxide if required to match the
colour of tiles including roughening of
concrete surface, if necessary or by synthetic
adhesive & grout materials etc.

(A) Floor
With Sand Cement Mortar (1:4) 20 mm thick
& 2 mm thick cement slurry at back side of
tiles using cement @ 2.91 Kg/Sq.m & joint
filling using white cement slurry @
0.20kg/Sq.m.
(a) Area of each tile upto 0.09 Sq.m
(i) Coloured decorative Sq. M 844 827 824 824 837 830 828 824 834 834 834 867 833 833 838
(ii) Other than Coloured decorative including
white Sq. M 794 777 774 774 787 780 778 774 784 784 784 817 783 783 788

(b) Area of each tile above 0.09 Sq.m


(i) Coloured decorative Sq. M 1040 1023 1020 1020 1033 1027 1025 1020 1030 1030 1030 1063 1029 1029 1034
(ii) Other than Coloured decorative including
white Sq. M 978 961 958 958 971 964 962 958 968 968 968 1000 966 966 972

(B) Wall

Page 52
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(D) Flooring
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

With Sand Cement Mortar (1:3) 15 mm thick


& 2 mm thick cement slurry at back side of
tiles using cement @ 2.91 Kg/Sq.m & joint
filling using white cement slurry @
0.20kg/Sq.m.
(a) Area of each tile upto 0.09 Sq.m
(i) Coloured decorative Sq. M 851 838 836 836 846 841 840 836 844 844 844 873 843 843 848
(ii) Other than Coloured decorative including
Sq. M 801 788 786 786 796 791 790 786 794 794 794 822 793 793 798
white
(b) Area of each tile above 0.09 Sq.m
(i) Coloured decorative Sq. M 1272 1260 1257 1257 1267 1262 1261 1257 1265 1265 1265 1293 1264 1264 1269
(ii) Other than Coloured decorative including
white Sq. M 1198 1185 1183 1183 1193 1188 1187 1183 1191 1191 1191 1219 1190 1190 1195

(C ) Floor
With Polymerised
With PolymerisedAdhesive
Adhesiveand
& Epoxy
Epoxy grout
pointing including spacer- 2 mm ( When
Tiles are laid over existing hard ready
surface)
(a) Area of each tile upto 0.09 Sq.m [using
adhesive 3 mm thick]
(i) Coloured decorative Sq. M 895 895 895 895 895 895 895 895 895 895 895 916 895 895 895
(ii) Other than Coloured decorative including
Sq. M 845 845 845 845 845 845 845 845 845 845 845 866 845 845 845
white
(b) Area of each tile above 0.09 Sq.m [using
adhesive 4.5 mm thick]

(i) Coloured decorative Sq. M 1083 1083 1083 1083 1083 1083 1083 1083 1083 1083 1083 1105 1083 1083 1083
(ii) Other than Coloured decorative including
Sq. M 1020 1020 1020 1020 1020 1020 1020 1020 1020 1020 1020 1043 1020 1020 1020
white
(D ) Wall
With Polymerised
With PolymerisedAdhesive
Adhesiveand
& Epoxy
Epoxy grout
pointing including spacer- 2 mm ( When
Tiles are laid over existing hard ready
surface)
(a) Area of each tile upto 0.09 Sq.m [using
adhesive 3 mm thick]
(i) Coloured decorative Sq. M 920 920 920 920 920 920 920 920 920 920 920 942 920 920 920
(ii) Other than Coloured decorative including
white Sq. M 870 870 870 870 870 870 870 870 870 870 870 891 870 870 870

(b) Area of each tile above 0.09 Sq.m [using


adhesive 4.5 mm thick]

Page 53
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(D) Flooring
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

(i) Coloured decorative Sq. M 1333 1333 1333 1333 1333 1333 1333 1333 1333 1333 1333 1355 1333 1333 1333
(ii) other than Coloured decorative including
Sq. M 1258 1258 1258 1258 1258 1258 1258 1258 1258 1258 1258 1280 1258 1258 1258
white
Note:-1. If Cement grout is used in place of
epoxy grout then deduct Rs 115/ Sq.m for
item 30 (C) [a] & 30 (D) [a] and Rs 87/ Sq.m
for item 30 (C) [b] & 30 (D) [b]
2. Add extra for each addl, floor over the
rate for item 16 & 30.
(i) upto 4 th floor-Rs 5/ Sq.m
(i) above 4 th floor-Rs 6.25/ Sq.m
31 A Supplying, fitting & fixing granite tiles 10mm
to 12mm. thick in columns, wall, facia etc.
with 15 thick [avg] cement mortar (1:2)
including making suitable arrangements to
hold the stones properly by brass / copper
hooks including pointing in cement mortar
(1:2) (1 white cement : 2 marble dust) with
admixture of pigment matching the stone
shades all complete as per direction of the
Engineer-in-charge including cost of all
materials, labours, scaffolding, staging
,curing and roughening of concrete surface
complete.
[Using cement slurry at back side of tiles@
4.4 kg/sq.m & white cement slurry for joint
filling @ 1.8 kg/sq.m]
Area of each slab upto 0.2 Sq.m Sq. M 2015 2003 2002 2002 2010 2006 2004 2002 2008 2008 2010 2046 2009 2009 2013

Page 54
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(D) Flooring
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

31 B Supplying, fitting & fixing granite slabs 15mm


to 18 mm. thick with uniform texture &
without decorative veins in columns, wall,
facia etc. with 15 mm thick [avg] cement
mortar (1:2) including making suitable
arrangements to hold the stones properly by
brass / copper hooks including pointing in
cement mortar (1:2) (1 white cement : 2
marble dust) with admixture of pigment Sq. M 2685 2674 2672 2672 2680 2676 2675 2672 2678 2678 2680 2770 2679 2679 2683
matching the stone shades all complete as
per direction of the Engineer-in-charge
including cost of all materials, labours,
scaffolding, staging ,curing and roughening
of concrete surface complete.
[Using cement slurry at back side of granite
@ 4.4 kg/sq.m & white cement slurry for joint
filling @ 1.8 kg/sq.m]
32 A) Supplying & laying of approved brand of
scratch proof, semi flexible P.V.C. blended
homogeneous marble Vinyle flooring in tiles
conforming to IS:3461, fixing with synthetic
acrylic adhesive after preparing the floor,
Sq. M 656 656 656 656 656 656 656 656 656 656 656 670 656 656 656
levelling & smothaning when necessary with
suitable putty, as per the design & instruction
of the Engineer-in-charge.
2 mm thick

B) Supplying & laying of approved make and


brand of scratch proof, flexible &
homogeneous P.V.C. Vinyle flooring
conforming to IS:3462 - 1982 in required
finish, fixed with synthetic acrylic adhesive
after preparing the floor, levelling &
smothaning when necessary with suitable
putty, as per the design & instruction of the
Engineer-in-charge.
(i) 2 mm thick (Plain) Sq. M 583 583 583 583 583 583 583 583 583 583 583 591 583 583 583
(ii) 1.5 mm thick (with stud / checkered) Sq. M 557 557 557 557 557 557 557 557 557 557 557 565 557 557 557
33 Renewing burnt clay tiles of tiled flooring to
match with existing work set in cement Sq. M 184 182 181 181 183 182 182 181 183 183 183 186 182 182 183
mortar (1 : 4) complete.
34 Labour for setting tiles in floor / pavement in
cement mortar (1 : 4) joints finished with Sq. M 105 103 102 102 104 103 103 102 104 104 104 108 104 104 104
white cement.

Page 55
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(D) Flooring
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

35 75 mm glazed ceramic tiled border (listel


type)
a) with 15 mm thick cement mortar (1:3) and
2 mm thick cement slurry using cement @ m 209 208 208 208 209 208 208 208 209 208 209 222 209 209 209
2.91 Kg/Sq.m
b) Polymerised adhesive and epoxy grout
jointing m 221 221 221 221 221 221 221 221 221 221 221 234 221 221 209

36 Washing and cleaning with soap water and


rubbing with oil cloth in all types of floor and Sq. M 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
dado.
37 Labour for setting Qota / Dungri stone slabs
in cement mortar (1:2) including necessary Sq. M 235 224 223 223 230 227 224 223 230 229 231 244 230 230 233
underlay of mortar (1:2).
38 Supplying, fitting and fixing Black Stone slab
used in Kitchen slab, alcove, wardrobe etc.
laid and jointed with necessary adhesive
Cement mortar (1:2) including grinding or
polishing as per direction of Engineer-in -
Charge in Ground Floor.
(a) Slab Thickness 20 to 25 mm Sq. M 725 725 725 725 725 725 725 725 725 725 725 739 725 725 725
(b) Slab Thickness above 25 mm and upto
37.5 mm Sq. M 809 809 809 809 809 809 809 809 809 809 809 822 809 809 809

(Add extra for each addl, floor over the rate


for item 23 ,24, 24(A), 27, 28, 31A,31 B & 38
(I) upto 4 th floor- Rs. 12/-per Sq.m
II) above 4th floor -Rs. 16/- per Sq.m

39 Supplying& laying 20 mm designer


chequered tiles of any shade and of
approved quality as per IS: 1237: 1980 laid in
patterns as directed in pavement, footpath
including necessary underlay 25 mm thick
average cement mortar (1:3) complete in all
Sq. M 970 953 951 951 962 958 953 951 962 961 963 998 962 962 966
respect with all labour and materials [using
cement slurry @ 4.4 kg/Sq.m at back side of
tiles. Cement of mortar & slurry will be
supplied by the Department. Border concrete
if necessary to be paid separately].

Page 56
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(D) Flooring
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

40 Supplying & laying interlocking designer


paver block of any shade and of approved
quality as per IS: 1237-1980 laid in pattern
as directed in pavement, footpath, driveway,
etc including necessary underlay complete in
all respect with all labour and material.
[Border concrete if necessary to be paid
separately].
a) 25 mm thick Block (over 25 mm thick
(Avg) Cement mortar (1:3) & Cement Slurry
@ 4.4 kg/Sq.m at back side of Block.
Cement for Mortar & Slurry to be supplied by
Department).
(i) Grey Sq. M 985 968 966 966 977 973 968 966 977 976 978 1013 977 977 981
(ii) Coloured Decorative Sq. M 1023 1005 1004 1004 1015 1010 1005 1004 1015 1013 1016 1050 1014 1014 1019
(b) 40 mm thick block (over 150 mm medium
sand bed including cost of sand but
excluding cost of earthwork in excavation or
dismantling of existing hard surface if
necessary)
(i) Grey Sq. M 1082 935 922 922 1015 975 935 922 1015 1002 989 1188 975 975 1015
(ii) Coloured Decorative Sq. M 1196 1049 1035 1035 1129 1089 1049 1035 1129 1116 1102 1302 1089 1089 1129
(c) 60 mm thick block (over 150 mm medium
sand bed including cost of sand but
excluding cost of earthwork in excavation or
dismantling of existing hard surface if
necessary)
(i) Grey Sq. M 1383 1236 1222 1222 1316 1276 1236 1222 1316 1303 1289 1490 1276 1276 1316
(ii) Coloured Decorative Sq. M 1534 1387 1373 1373 1467 1427 1387 1373 1467 1454 1440 1640 1427 1427 1467

Page 57
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(E)ROOFING & SHEET WALLING


Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

1 Lime terracing on roof with lime


concrete(2:2:7) (2 lime putty / paste : 2 surki
: 7 brick khoa ) laid to proper slope, throughly
beaten and cured including top finishing,
providing ghoondies at junction with parapet
etc., shaping and finishing at mouths of rain
water pipes, complete as per direction.

(For item 1 add extra for each addl. floor over


the rate @ 1.5% upto 4th floor and @ 1.75%
above 4th floor.)
Roof of one storied structure (Payment to be
made on surface area of terracing including
ghoondies.)
(a) 75 mm. thick (average) Sq.M 593 552 532 532 593 570 575 537 553 552 556 723 558 557 557
(b) 100 mm. thick (average) Sq.M 765 709 682 682 765 734 740 689 710 709 714 939 717 716 716
(c) 125 mm. thick (average) Sq.M 900 830 797 797 900 860 869 805 831 829 836 1117 840 838 838
(d) 150 mm. thick (average) Sq.M 1072 988 948 948 1072 1025 1035 959 990 988 996 1332 1001 998 998
NOTE : 633 kg. of unslaked lime = 1
cu.m. of lime putty / paste.
2 Renewing rounding only (100 mm. radius) at Metre 80 73 70 70 80 76 77 71 74 73 74 100 74 74 74
the junction of roof and parapet etc. with
beaten lime concrete (2:2:7) with slaked lime
(2 lime putty / paste : 2 surki : 7 brick khoa )

3 Renewing ceiling tile including pointing in


cement mortar (1:3)

(a) In single layer (Cement 1.7 Kg/ Sq.m) Sq.M 389 387 387 387 388 388 387 387 388 388 388 391 388 388 389

(b) In double layer (Cement 3.4 Kg/ Sq.m) Sq.M 721 716 716 716 719 718 716 716 719 719 719 725 718 718 720

4 Repairs to roof cracks with cement and sand Metre 15 15 15 15 15 15 15 15 15 15 15 16 15 15 16


mortar (1:4) including cutting grooves and
cleaning cracks and grouting the cracks with
neat cement before repairs. (Cement 0.63
Kg/Mtr. )

Page 58
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(E)ROOFING & SHEET WALLING


Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

5 Repair to roof cracks with Bitumen(VG-40) Sq.M 239 235 235 235 237 236 235 235 237 237 237 242 236 236 237
including cutting grooves and cleaning
cracks, heating bitumen as directed and
finished with sand blinding. (Bitumen 1.687
Kg/ Sq.m, Meadium Sand 0.6 Cu.m/100
Sq.m) (Bitumen to be supplied by contractor)

6 Repairs to cracks in terraced roof by cutting Metre 190 168 152 152 190 183 189 152 168 168 173 301 173 173 173
V-grooves 75 mm. to 100 mm. deep and 150
mm. to 200 mm. wide and filling the same
with beaten lime concrete (2:2:7) with lime
putty / paste and finishing complete (2 lime
putty / paste : 2 surki : 7 brick khoa )

7 Labour for painting roof surface with Bitumen Sq.M 27 23 22 22 25 24 23 22 25 25 24 29 24 24 25


(using 135 kg (avg.) per % Sq.m.)including
cleaning roof, heating bitumen as directed
and spreading sand and complete including
cost of sand @ 0.6 cu.m. per % Sq.m. and
cost of carriage of Bitumen from deptt
godown but excluding the cost of bitumen. (If
heating is not reqd. then deduct Rs.3.45/-
per Sq.m)

8 Cow dung (green and not dry hard) and Sq.M 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15


cement wash (3 cow dung: 1 cement by wt.)
not less than 1.5 mm. thick. (Cement
1.08Kg/Sq.m)

9 (i) Examining wooden beam by sounding or Each 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57


boring
(ii) Examining wooden burghas by sounding Each 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

10 Opening out and examining portion of Each 156 156 156 156 156 156 156 156 156 156 156 156 156 156 156
bearing of beam including mending good Bearing
damages as necessary.

Page 59
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(E)ROOFING & SHEET WALLING


Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

11 Replacing wooden beam or R.S. joist by R.S.


joist or by another wooden beam joist and
fixed complete, including hire and labour
charges for necessary sal bullah props,
necessary packing between beams and
burgahs but excluding the cost of joist or
wooden beam and concrete/ Brick works etc
needed for mending damages.

[Mode of payment for wooden beam


(raplacing the old one) will be made against
Item No. 4 of carpanter's work]

(i) Height not exceeding 5m


(a) Clear span not exceeding 3.7m. Each 2735 2735 2735 2735 2735 2735 2735 2735 2735 2735 2735 2735 2735 2735 2735

(b) Clear span exceeding 3.7m but not Each 3214 3214 3214 3214 3214 3214 3214 3214 3214 3214 3214 3214 3214 3214 3214
exceeding 5m.
(c) Clear span exceeding 5m but not Each 3597 3597 3597 3597 3597 3597 3597 3597 3597 3597 3597 3597 3597 3597 3597
exceeding 6m.
(d) Clear span exceeding 6m but not Each 4076 4076 4076 4076 4076 4076 4076 4076 4076 4076 4076 4076 4076 4076 4076
exceeding 7.3m.
(ii) Height exceeding 5m but not
exceeding 7.3m.
(a) Clear span not exceeding 3.7m. Each 3286 3286 3286 3286 3286 3286 3286 3286 3286 3286 3286 3286 3286 3286 3286

(b) Clear span exceeding 3.7m but not Each 3959 3959 3959 3959 3959 3959 3959 3959 3959 3959 3959 3959 3959 3959 3959
exceeding 5m.
(c) Clear span exceeding 5m but not Each 4491 4491 4491 4491 4491 4491 4491 4491 4491 4491 4491 4491 4491 4491 4491
exceeding 6m.
(d) Clear span exceeding 6m but not Each 5164 5164 5164 5164 5164 5164 5164 5164 5164 5164 5164 5164 5164 5164 5164
exceeding 7.3m.
12 Labour for changing burgahs excluding Each 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27
mending damages.
[Payment for the wooden burgahs (replacing
the old ones) will be made against Item 4 of
carpenter's work ]

Page 60
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(E)ROOFING & SHEET WALLING


Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

13 Encasing R.S. joist / beam with 16 to 18 Sq.M 634 605 598 572 607 616 618 600 613 614 583 677 623 641 614
B.W.G. wire netting (13 to 19 mm. mesh)
and cement concrete (1:1..5:3) with stone
chips including finishing with 15 mm. thick
cement plaster (1:4) and 2 coats white
washing complete.( Cement 18.9 Kg/ Sq.m)

(Payment to be made on area of exposed


surface)
14 Cutting shallow channel drain of roof for easy Metre 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19
passage of rain water cement plastered (1:4)
complete.
(Payment for Cement plaster to be paid
separately)
15 Roofing of Ranigunge pattern tiles 1st class
quality (excluding supporting frame work)
including tying eaves tiles with galvanised
wire and pointing all joints with

(a) Valamoid or similar bituminous paste as Sq.M 264 249 220 278 264 264 264 264 220 191 191 - - - -
approved

(b) Cement mortar (1:3) (Cement Sq.M 249 233 204 262 248 248 248 248 205 175 175 - - - -
0.5Kg/Sq.m)
16 Ridging of Ranigunge pattern tiled roof of 1st
class quality fitted and fixed including the
cost of setting and pointing with
(a) Valamoid or similar bituminous paste as Metre 148 148 148 148 148 148 148 148 148 148 148 - - - -
approved

(b) Cement mortar (1:3) (Cement 0.2Kg/Mtr) Metre 147 147 147 147 147 147 147 147 147 147 147 - - - -

17 Renewing (in job work) Ranigunge pattern


tile of 1st class quality including pointing
(a) Valamoid or similar bituminous paste as Each 25 24 21 27 25 25 25 25 21 19 19 - - - -
approved

(b) Cement mortar (1:3) (Cement 5Kg/100 Each 24 22 20 25 24 24 24 24 20 17 17 - - - -


nos)
18 Roofing of Ranigunge pattern tiles (with
dismantled tiles of the Deptt.) excluding the
cost of tile but including the cost of pointing
all joints with

Page 61
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(E)ROOFING & SHEET WALLING


Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

(a) Valamoid or similar bituminous paste as Sq.M 79 79 79 79 79 79 79 79 79 79 79 79 79 79 79


approved
(b) Cement mortar (1:3) (Cement Sq.M 57 57 57 57 57 57 57 57 57 57 57 58 57 57 57
0.5Kg/Sq.m)
19 Ridging of Ranigunge pattern tiled roof (with
dismantled ridge tiles of the Deptt.) excluding
the cost of the ridge tiles but including the
cost of fitting, fixing and of setting and
pointing joints with

(a) Valamoid or similar bituminous paste as Metre 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20


approved

(b) Cement mortar (1:3) (Cement 0.2Kg/Mtr) Metre 23 22 22 22 22 22 22 22 22 22 22 23 22 22 22

20 Resetting old ridging of R.T roof including


fresh pointing with

(a) Valamoid or similar bituminous paste as Metre 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15


approved

(b) Cement mortar (1:3) (Cement 0.2Kg/Mtr) Metre 13 12 12 12 13 12 12 12 13 13 13 13 13 13 13

21 Re-pointing R.T. roof with

(a) Valamoid or similar bituminous paste as Sq.M 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29


approved
(b) Cement mortar (1:3) (Cement Sq.M 12 11 11 11 12 12 11 11 12 12 12 13 12 12 12
0.5Kg/Sq.m)
22 Cleaning thoroughly heavy soots and foreign Sq.M 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21
matters from underneath Ranigunge pattern
tiled roof.
23 Asbestos corrugated (Trafford or similar
approved quality) sheet (6 mm thick) work
(excluding the supporting framework) fitted
and fixed with 9.5mm. dia. J or L hook-bolt
and nuts, limpet and bitumen washers and
putty with 150 mm end lap & one corrugation
minimum side lap complete. (Payment
should be made on area of finished work)

(a) In Roof Sq.M 549 549 549 549 549 549 549 549 549 549 549 569 549 549 549
(b) In Wall Sq.M 539 539 539 539 539 539 539 539 539 539 539 559 539 539 539

Page 62
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(E)ROOFING & SHEET WALLING


Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

24 Galvanised corrugated iron sheet work


(excluding the supporting frame work) fitted
and fixed with 10 mm. dia J or L hook-bolts,
limpet and bitumen washers and putty
complete with 150 mm. end lap and one
corrugation minimum side lap. (Payment to
be made on area of finished work)(GCI sheet
to be supplied by contractor)

(i) In Roof:-
a) With 0.60 mm thick sheet Sq.M 725 725 725 725 725 725 725 725 725 725 725 750 725 725 725

b) With 0.63 mm thick sheet Sq.M 755 755 755 755 755 755 755 755 755 755 755 779 755 755 755

c) With 0.80 mm thick sheet Sq.M 947 947 947 947 947 947 947 947 947 947 947 966 947 947 947

(ii) In wall:-
a) With 0.60 mm thick sheet Sq.M 711 711 711 711 711 711 711 711 711 711 711 735 711 711 711

b) With 0.63 mm thick sheet Sq.M 740 740 740 740 740 740 740 740 740 740 740 765 740 740 740

c) With 0.80 mm thick sheet Sq.M 932 932 932 932 932 932 932 932 932 932 932 951 932 932 932
25 Supplying, fitting and fixing glass reinforced
polyester translucent fiber glass sheet to
match with GCI Corrugation as per IS: 12866
- 1989 in roof fitted and fixed with 10 mm dia
"J" or "L" hook, bolts and nuts, limpet and
bitumen washers and putty with 150mm end
lap and one corrugation minimum side lap
complete.

a) 1.6mm +/- 0.2 mm thick


sheet.(2.6Kg/Sq.m)
i) Natural white or tinted blue colour Sq.M 848 848 848 848 848 848 848 848 848 848 848 928 877 922 848

ii) Fire retardant milky white Sq.M 937 937 937 937 937 937 937 937 937 937 937 1012 952 1005 937
iii) Coloured other than natural white or tinted Sq.M 907 907 907 907 907 907 907 907 907 907 907 1000 934 993 907
blue
iv) Special coloured textured tissue Sq.M 987 987 987 987 987 987 987 987 987 987 987 1083 1032 1077 987

b) 2.0mm +/- 0.2 mm thick


sheet.(3.25Kg/Sq.m)

Page 63
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(E)ROOFING & SHEET WALLING


Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

i) Natural white or tinted blue colour Sq.M 1042 1042 1042 1042 1042 1042 1042 1042 1042 1042 1042 1056 1042 1042 1042
ii) Fire retardant milky white Sq.M 1133 1133 1133 1133 1133 1133 1133 1133 1133 1133 1133 1145 1133 1133 1133
iii) Coloured other than natural white or tinted Sq.M 1133 1133 1133 1133 1133 1133 1133 1133 1133 1133 1133 1145 1133 1133 1133
blue
iv) Special coloured textured tissue Sq.M 1234 1234 1234 1234 1234 1234 1234 1234 1234 1234 1234 1250 1234 1234 1234

26 Supplying, fitting and fixing glass reinforced


polyester translucent ridging 450 mm long
each way as per IS 2866 - 1989 fitted and
fixed with bolts J hooked screws and
bitumen washers complete.

a) 1.6mm +/- 0.2 mm thick sheet.


i) Natural white or tinted blue colour Metre 646 646 646 646 646 646 646 646 646 646 646 656 646 646 646

ii) Fire retardant milkyl white Metre 721 721 721 721 721 721 721 721 721 721 721 731 721 721 721

iii) Coloured other than natural white or tinted Metre 721 721 721 721 721 721 721 721 721 721 721 731 721 721 721
blue
iv) Special coloured textured tissue Metre 840 840 840 840 840 840 840 840 840 840 840 850 840 840 840

(Pro rata increase of rate may be allowed for


arriving at rates of thickness in excess of
1.6mm and up to 2mm)

27 Supplying, fitting and fixing glass reinforced


polyester translucent fiber sheet 300mm
wide in half round gutter in roof as per IS:
12866 - 1989 fitted and fixed with 50 X 6mm
MS Clamp with necessary bolts and nuts,
screws and jointing material complete as per
direction of Engineer - in - Charge.

a) 1.6mm +/- 0.2 mm thick sheet.


i) Natural white or tinted blue colour Metre 921 921 921 921 921 921 921 921 921 921 921 1011 921 921 921

ii) Fire retardant milky white Metre 1011 1011 1011 1011 1011 1011 1011 1011 1011 1011 1011 1095 1011 1011 1011
iii) Coloured other than natural white or tinted Metre 981 981 981 981 981 981 981 981 981 981 981 1083 981 981 981
blue
iv) Special coloured textured tissue Metre 1061 1061 1061 1061 1061 1061 1061 1061 1061 1061 1061 1166 1061 1061 1061

Page 64
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(E)ROOFING & SHEET WALLING


Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

(Pro rata increase of rate may be allowed for


arriving at rates of thickness in excess of
1.6mm and up to 2mm)

28 Galvanised plain sheet works (excluding


supporting framework) fitted and fixed with 6
mm. dia J or L hook-bolts and nuts, sheet-
bolts, limpet and bitumen washers and putty
with 150 mm. end lap & 50 mm minimum
side lap complete.

(a) In roof: with 0.63 mm. sheets. Sq.M 530 530 530 530 530 530 530 530 530 530 530 543 530 530 530

(b) In wall: with 0.63 mm. sheets. Sq.M 513 513 513 513 513 513 513 513 513 513 513 527 513 513 513

29 Asbestos ridging (with standard lap) fitted


and fixed with necessary hook, bolts, nuts,
washers, etc. complete.
(a) Close fitting adjustable type Metre 314 314 314 314 314 314 314 314 314 314 314 321 314 314 314

(b) Serrated adjustable type Metre 260 260 260 260 260 260 260 260 260 260 260 268 260 260 260

30 Galvanised iron sheet ridging fitted with


necessary bolts, screws, washers etc
complete.(225mm end lapping)

(A) 300 mm lapping each way


(a) With 0.60 mm sheet Metre 414 414 414 414 414 414 414 414 414 414 414 425 414 414 414
(b) With 0.63 mm sheet Metre 430 430 430 430 430 430 430 430 430 430 430 441 430 430 430
(c) With 0.80 mm sheet Metre 512 512 512 512 512 512 512 512 512 512 512 523 512 512 512
(B) 450 mm lapping each way
(a) With 0.60 mm sheet Metre 535 535 535 535 535 535 535 535 535 535 535 548 535 535 535
(b) With 0.63 mm sheet Metre 560 560 560 560 560 560 560 560 560 560 560 573 560 560 560
(c) With 0.80 mm sheet Metre 683 683 683 683 683 683 683 683 683 683 683 696 683 683 683
31 Galvanised iron sheet eaves gutter fitted and
fixed with necessary 50 mm X 6 mm M.S flat
bar clamps bent to design, bolts, nuts,
washers etc. complete. Eaves gutter made of
0.63 mm. sheets.(300mm End lapping)

(a) 225 mm. wide gutter Metre 376 376 376 376 376 376 376 376 376 376 376 381 376 376 376

Page 65
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(E)ROOFING & SHEET WALLING


Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

(b) 300 mm. wide gutter Metre 444 444 444 444 444 444 444 444 444 444 444 450 444 444 444
32 Galvanised iron sheets valley gutter with Metre 605 605 605 605 605 605 605 605 605 605 605 613 605 605 605
perimeter not less than 750 mm with 225
mm lap each way fitted and fixed with
necessary bolts, nuts, screws, etc.complete.
Valley gutter made of 0.63 mm. thick sheets.
(300mm End lapping)

33 Fitting and fixing old pieces of asbestos,


G.C.I. or C.I. sheets or plain sheets including
closing old holes with washers and sheet-
bolts and nuts, etc. and including fixing the
same to supporting frame with necessary
hook-bolts, washers, putty etc. (excluding
cost of sheets). (Payment to be made on
area of finished work.)

(i) With about half old and half new


fittings, including the cost of new fittings.

(a) In roof Sq.M 73 73 73 73 73 73 73 73 73 73 73 76 73 73 73


(b) In wall Sq.M 63 63 63 63 63 63 63 63 63 63 63 65 63 63 63
(ii) With all new fittings including the cost
thereof.
(a) In roof Sq.M 113 113 113 113 113 113 113 113 113 113 113 118 113 113 113
(b) In wall Sq.M 96 96 96 96 96 96 96 96 96 96 96 100 96 96 96
34 Fitting and fixing old pieces of asbestos,
G.C.I. or C.I. sheet or plain sheet ridging or
gutter including closing old holes with
washers and sheet-holts and nuts etc. and
including fixing the same to supporting frame
with necessary hookbolts, washers, putty etc.
(excluding the cost of the ridge or gutter
pieces).

(Payment to be made on length of finished


work.)
(a) With about half old and half new fittings, Metre 105 105 105 105 105 105 105 105 105 105 105 106 105 105 105
including the cost of new fittings.

Page 66
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(E)ROOFING & SHEET WALLING


Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

(b) With all new fittings including the cost Metre 125 125 125 125 125 125 125 125 125 125 125 127 125 125 125
thereof.
35 Renewing galvanised J or L hook-bolt with
nut and with necessary limpet and bitumen
washers, putty etc. fitted and fixed complete.
(Total length of bolt upto 225 mm)

(a) 10 mm dia. bolt Each 34 34 34 34 34 34 34 34 34 34 34 37 34 34 34


(b) 8 mm dia. bolt Each 30 30 30 30 30 30 30 30 30 30 30 33 30 30 30
(c) 6 mm dia. bolt Each 24 24 24 24 24 24 24 24 24 24 24 26 24 24 24
(d) 4 mm dia. bolt Each 22 22 22 22 22 22 22 22 22 22 22 24 22 22 22
36 Labour for curving C.I. or G.C.I. sheet for Sq.M 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25
curved roof etc. (Payment to be made on
area of finished works done with the curved
sheets.)
37 Stopping roof leakages in C.I. or G.C.I. or
asbestos roofing.
(i) With putty and paint % Sq.M 1155 1095 1095 1095 1095 1095 1095 1095 1095 1095 1095 1214 1095 1095 1095
(ii) With limpet and bitumen washer and % Sq.M 1446 1446 1446 1446 1446 1446 1446 1446 1446 1446 1446 1565 1446 1446 1446
putty
(iii) Closing holes in C.I. or G.C.I. or asbestos Each 17 17 17 17 17 17 17 17 17 17 17 19 17 17 17
roofing with sheet bolt, limpet and bitumen
washers, putty etc.

38 Filling up joints (both vertical and horizontal) Sq.M 30 30 30 30 30 30 30 30 30 30 30 31 30 30 30


of curved C.I. roofing of Lahore type sheds
by a thick paste made of jute chopping mixed
with bituminous paint and stopping roof
leakages including the leakages through
other weak spots with limpet and bitumen
washers and putty etc.

39 Walling or roofing fitted and fixed complete Sq.M 352 352 352 352 352 352 352 352 352 352 352 375 352 352 352
with cut drum sheets including the cost of
drums, cost of cutting drums and flattening
the sheets and cost of necessary nails and
screws.

(Cost of empty bitumen drums issued by the


Deptt. will be recovered at Rs. 100.00 for
each drum)

Page 67
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(E)ROOFING & SHEET WALLING


Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

40 Galvanised or painted wind-tie made of M.S.


flats, fitted and fixed complete including cost
of necessary fittings.
(a) Made with 40 mm. X 6 mm. flats Metre 138 138 138 138 138 138 138 138 138 138 138 143 138 138 138

(b) Made with 50 mm. X 6 mm. flats Metre 168 168 168 168 168 168 168 168 168 168 168 173 168 168 168

(c) Made with 50 mm. X 10 mm. flats Metre 266 266 266 266 266 266 266 266 266 266 266 275 266 266 266

(Materials will not be supplied by the Deptt.)

41 Taking out wind-tie from roof including Metre 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15


cutting out rusted bolts, nuts etc. and
removing materials to any distance within the
compound and stacking.
42 Fixing old wind-tie with new fittings including Metre 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18
painting.
43 Labour for assembling, hoisting,
placing,fitting & fixing tubular roof trusses.

(a) Above 1.5 m to 3 m span Each 440 440 440 440 440 440 440 440 440 440 440 440 440 440 440
(b) Above 3 m to 6 m span Each 728 728 728 728 728 728 728 728 728 728 728 728 728 728 728
(c) Above 6 m to 9 m span Each 1503 1503 1503 1503 1503 1503 1503 1503 1503 1503 1503 1503 1503 1503 1503
(d) Above 9 m to 12 m span Each 2048 2048 2048 2048 2048 2048 2048 2048 2048 2048 2048 2048 2048 2048 2048
(e) Above 12 m to 15 m span Each 2954 2954 2954 2954 2954 2954 2954 2954 2954 2954 2954 2954 2954 2954 2954

Page 68
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(E)ROOFING & SHEET WALLING


Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

44 Supplying and laying true to line and level 20


mm / 25 mm. thick precast roof tiles made of
cement conc. with stone chips as per
approved strength and density set in 25mm
avg. thick cement morter(1:3) and filling up
joint (3 mm wide) with cement sand mortar
(1:1) applying cement slurry @ 1.75 kg per
Sq.m back of tiles and then settting close
the precast tiles, finishing up the joints with
slurry already laid and finally finishing the top
surface including providing 150 mm. high
skirting with the same tiles flushed with the
inside surface of parapet wall,finishing the
mouth of rain water pipes, curving etc. as
necessary complete as per direction of the
Engineer-in-charge. (Levelling if necessary
may be paid separately)

(a) For 20 mm. thick precast tiles (cement Sq.M 613 596 595 595 606 601 596 595 606 604 606 641 604 604 609
14.6 kg/ Sq.m for underlayer)
(b) For 25 mm. thick precast tiles (cement Sq.M 656 638 637 637 648 643 638 637 648 646 648 683 647 647 651
14.6 kg/ Sq.m for underlayer)
(Add extra @ 1.5% for each additional
floor upto 4th floor and @ 1.75% for each
additional floor above 4th floor)

Page 69
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(E)ROOFING & SHEET WALLING


Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

45 Providing waterproofing treatment over


concrete roof surface (old or new) by the
application of two coats of slurry prepared
with latex of approved brand, water and
cement in the proportion of (LP.W. Cement -
1:4:6) by volume, with brush in a time gap of
minimum 4(four) hours to 14(fourteen) hours
between the two layers, laying 20mm thick
and sand and cement consolidated plaster
(1:4) admixed with Plastocrete Super of
approved brand 0.2% by weight of cement,
laying flat 1st class Brick Bats / Bricks over
the mortar keeping a gap of 10-20 mm
between two bats, filling the vertical joints
with the aforesaid mortar, providing a second
layer of 20 mm thick sand and cement
plaster (1:4) admixed with Plastocrete Super
as above over the brick layer, the top surface
of the treatment should be chequered to
provide the antistrip property.

(Note - the applicator is to be specialised


in such type of work as per specification
and maintain the I.S.I. Marked of the
ingredients of the application. The skilled
worker such as Head Mason, Mason,
Bhistri, Majdoor should be trained from
expert and recognised technical
Personal/Institution having affiliated ISO-
9001)

(a) By Bricks (cement 25.66 kg/ Sq.m) Sq.M 915 838 791 791 891 877 863 811 866 861 863 1021 858 858 872

(b) By 1St Class Brick Bats (cement Sq.M 763 693 688 680 714 725 707 700 714 717 719 790 821 718 733
29.66kg/ Sq.m)

Page 70
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(E)ROOFING & SHEET WALLING


Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

46 Supplying , Fitting and fixing Narriah Sq.M - - 404 404 - - - 404 - - - - - - -


tiles(Khapra) in slope roof over GCI/Plane
Sheet roofing or bamboo frame work with
necessary side restrain attachment by
wooden plank or MS flat ,angle, etc including
cost of tile, labour complete but excluding
cost of GCI/ Plane sheet roofing or bamboo
frame work or side restrain work.

47 Supplying, Fitting and fixing Narriah Sq.M - - 56 56 - - - 56 - - - - - - -


tiles(Khapra) Ridging with necessary lapping
with side slopes of Narriah tiles roofing
including cost of ridging, labour complete but
excluding cost of GCI/ Plane sheet roofing or
bamboo frame work.

48 Labour for taking out and refixing of Narriah Sq.M - - 106 106 - - - 106 - - - - - - -
tiles(Khapra) in slope roof over GCI/Plane
Sheet roofing or bamboo frame work.

49 Labour for taking out and refixing of Narriah Metre - - 5 5 - - - 5 - - - - - - -


tiles(Khapra) ridging in slope roof over
GCI/Plane Sheet roofing or bamboo frame
work.

Page 71
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC.
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

1 M.S. structural works in columns, beams etc.


with simple rolled structural members (e.g.
joists, angle, channel sections conforming to
IS: 226, IS: 808 & SP (6)- 1964 connected to
one another with bracket, gussets, cleats as
per design, direction of Engineer-in- charge
complete including cutting to requisite shape
and length, fabrication with necessary
bolting, metal arc welding conforming to IS:
816- 1956 & IS: 1995 using electrodes of
approved make and brand conforming to
IS:814- 1957, haulage, hoisting and erection
all complete. The rate includes the cost of
rolled steel section, consumables such as
electrodes, gas and hire charge of all tools
and plants and labour required for the work
including all incidental chages such as
electricity charges, labour insurance charges
etc.

Payment to be made on the basis of


calculated weight of structural members only
in finished work as per IS specified weight.
Payment for gusset, bracket, cleat, rivets,
bolts and nuts may be make by adding the
actual weight of such items with the weight of
finished structural members or 7% of weight
for finished structural members weighing not
less than 22.5 Kg. / m. or 15 % of weight for
finished structal members weighing less than
22.5 Kg. / m. may be increased allow for
bracket, cleat, rivet, bolts and nuts etc. and
no seperate payment being made for these
items, as per direction of Engineer In
Charge. The rates are considered for a
height of erection 8m. / 2nd floor level from
the ground. Add 1.5% extra over the rate for
each additional floor or 4m. beyond initiial
8m. or part thereof.

I) For structural members of specified


sections weighing not less than 22.5 Kg./m MT 78989 78989 78989 78989 78989 78989 78989 78989 78989 78989 80327 81653 80327 80327 80327

II) For Structural Works in Roof Trusses etc.


using joists, channels and angles of specified
section weighing not less than 22.5 kg/ m MT 80159 80159 80159 80159 80159 80159 80159 80159 80159 80159 81497 82823 81497 81497 81497

Page72
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC.
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

III) For built up sections / srtuctural members


of specified sections weighing not less than MT 81680 81680 81680 81680 81680 81680 81680 81680 81680 81680 83018 84343 83018 83018 83018
22.5 Kg./m
2 M.S. structural works in roof trusses with
tubular sections conforming to IS: 806-1957
& IS: 1161- 1958 cnnected to one another
with bracket, gusset cleats as per design,
direction of Engineer-in-charge complete
including cutting to requisite size, fabrication
with necessary metal arc welding
conforming to IS: 816- 1956 & IS: 9595 using
electrodes of approved make and brand
conforming to IS:814- 1957, haulage,
hoisting and erection all complete.
The rate includes the cost of rolled steel
section, consumables such as electrodes,
gas and hire charge of all tools and plants
and labour reqired for the work including all
incidental chages such as electricity charges,
labour insurance charges etc.
Payment to be made on the basis of
calculated weight of structural tubular
memebrs as specified in relevent IS code in
finished work. Payment for gusset, bracket,
cleat may be made by adding the actual
weight of such items with weight of finished
structural members. The rates are
considered for a height of erection 8 m. / 2nd
floor level from the ground. Add 1.5 % extra
over the rate for each additional floor or 4m.
beyond the initial 8 m. or part thereof.

i) For trusses spanning up to 12.00 m


MT. 81237 81237 81237 81237 81237 81237 81237 81237 81237 81237 82694 84020 82694 82694 82694

ii) For trusses spanning above 12.00 m and


up to 20 .00 m MT. 83671 83671 83671 83671 83671 83671 83671 83671 83671 83671 85143 86482 85143 85143 85143

iii) for trusses spanning above 20.00 m and


up to 30 .00m MT. 85332 85332 85332 85332 85332 85332 85332 85332 85332 85332 86819 88169 86819 86819 86819

Page73
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC.
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

2A M.S. structural works with hollow sections (


square or rectangular shape) conforming to
IS: 806-1957 & IS:1161-1958) connected to
one another with bracket, gusset, cleat as
per design, drawing & direction of Engineer-
in-Charge complete including cutting to
requisite shape & size, fabrication including
metal arc welding conforming to IS: 816-
1956 & IS: 9595 using electrodes of
approved make and brand conforming to
IS:814- 1957, haulage, hoisting and erection
all complete.
The rate includes the cost of all M.S. Hollow
section, all consumables such as electrodes,
gas and hire charges of all tools and plants
and labour reqired for execution and all
incidental chages (such as electricity, labour
insurance) etc. complete.
Payment to be made on the basis of
calculated weight of structural memebrs of
MS Holow Section as specified in relevent IS
code in finished work. Payment for gusset,
bracket, cleat may be made by adding the
actual weight of such items with weight of
finished structural members. The rates are
considered for a hight of erection 8 m. / 2nd
floor level from the ground. Add 1.5 % extra
over the rate for each additional floor or 4m.
beyond the initial 8 m. or part thereof.

i) For roof truss works


a) Span up to 12 Mtr MT. 78698 78698 78698 78698 78698 78698 78698 78698 78698 78698 80037 81363 80037 80037 80037

b) Span beyond 12 Mtr and up to 20.00 Mtr MT. 81868 81868 81868 81868 81868 81868 81868 81868 81868 81868 83206 84531 83206 83206 83206

c) Span beyond 20 Mtr and up to 30 Mtr MT. 84370 84370 84370 84370 84370 84370 84370 84370 84370 84370 85736 87086 85736 85736 85736
ii) For other Structural works like galleries
etc. MT. 81364 81364 81364 81364 81364 81364 81364 81364 81364 81364 82715 84053 82715 82715 82715

3 Cutting to requisite length or shape


departmental R.S. joists, channels, angles, Sq. cm. 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
tees, plates etc.
( Payment to be made on area of cut
surface)

Page74
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC.
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

4 Drilling holes of requisite diameter in R.S.


joists channels, tees. Plates etc.
(a) (I) Dia. Upto 12mm and depth upto 10
Each 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10
mm.
(ii) Extra for drilling beyond depth of
Each 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10
10mm
(b) (I) Dia.above 12mm and depth upto 10
Each 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15
mm.
(ii) Extra for drilling beyond depth of
Each 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15
10mm
5 Labour for hoisting and placing in proper
position ( up to 1st floor level) departmental
R.S. joists, channels, angles. Tees, plates
Qntl. 416 416 416 416 416 416 416 416 416 416 416 416 416 416 416
etc. including fitting and fixing same with
bolts and nuts, if necessary (but excluding
cost of such bolts and nuts)
(a) Add extra for each additional floor over
Qntl. 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75
1st floor.
6 Labour for lowering and stacking after
dismantling in parts R.S. joists, channels,
angles, tees, plates etc.complete as directed.

(a) From 1st floor level Qntl. 199 199 199 199 199 199 199 199 199 199 199 199 199 199 199
(b) Add extra for each addl. Floor Qntl. 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58
7 Ordinary grating bars made of round or
square M.S. rods fitted and fixed in holes of
window frames etc, complete.
In ground floor. Qntl. 7664 7664 7664 7664 7664 7664 7664 7664 7664 7664 7791 7918 7791 7791 7791
(Steel materials will not be issued by the
Deptt.)
(Add extra @1% for each additional floor
upto 4th floor. @1.25% for each additional
floor above 4th floor).
8 M.S. round or square bar grating of windows
etc. fitted and fixed in holes of window frame
and with intermediate flat bar stiffener( with
necessary holes for the grating bars and with
the ends turned and fixed to timber frame
with necessary screws) complete , as
directed.
In ground floor. Qntl. 7842 7842 7842 7842 7842 7842 7842 7842 7842 7842 7969 8096 7969 7969 7969
(Steel materials will not be issued by the
Deptt.)

Page75
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC.
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

9 M.S. works in framed gratings of window


etc.made of round or square bars and frame
work or M.S. flats (with the bars securely
fixed to the flat bar frame ) with or without
intermediate flat bar stiffener and fixed with
necessary screws etc. complete , as
directed.
In ground floor. Qntl. 8019 8019 8019 8019 8019 8019 8019 8019 8019 8019 8146 8274 8146 8146 8146
10 (a) M.S.or W.I. Ornamental grill of approved
design joints continuously welded with M.S,
W.I. Flats and bars of windows, railing etc.
fitted and fixed with necessary screws and
lugs in ground floor.

(Add extra @ 1% for each addl. floor upto


4th floor and @ 1.25% for each addl. floor
above 4th floor)
(i) Grill weighing above 10 Kg./sq.mtr and up
to 16 Kg./sq. mtr. Qntl 9051 9051 9051 9051 9051 9051 9051 9051 9051 9051 9184 9317 9184 9184 9184

(ii) Grill weighing above 16 Kg./sq.mtr and


Qntl 8857 8857 8857 8857 8857 8857 8857 8857 8857 8857 8989 9124 8989 8989 8989
above
(MODE OF MEASUREMENT):-
The weight of grill per sq.m. will be
determined by taking the physical weight
of fabricated grill and dividing the same
by covered area of the same.
N.B. No shop priming will be allowed to
facilitate inspection of workmanship.
Weight of grill is to be taken after final
grinding and finishing the weld.
(b) Extra for work in grill gate.

(I) For hanging and locking arrangements


including supply of materials and labour
complete.
(15% extra over the corresponding item of
grill )
(ii) For supplying fitting and fixing bottom
rollers including all labour complete.
(5% extra over the corresponding item of
grill )
11 Supplying, fitting, fixing in position rails on
Kg. 78 78 78 78 78 78 78 78 78 78 79 80 79 79 79
any surface.

Page76
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC.
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

12 Supplying 1.5mm thick M.S. sheet fitted and


fixed on one or both faces of M.S./ W.I. gate
etc. with point welding at not more than
Sq.m. 1201 1201 1201 1201 1201 1201 1201 1201 1201 1201 1218 1234 1218 1218 1218
150mm apart complete in all respect as per
design including cost of all labour and
materials .
13 M.S. gate of Jail type as per approved
design made of strong M.S. frame work,
intermediate stiffeners and round / square
bars or angles. M.S. sheet (not less than 14
gauge) gussets, cleats etc. including
necessary riveting, bolting, welding, locking
and hanging arrangements, fitting and fixing
complete as per direction of the Engineer-in -
charge.
In ground floor. Qntl. 9298 9298 9298 9298 9298 9298 9298 9298 9298 9298 9426 9554 9426 9426 9426
(Add extra @ 1% for each addl. floor upto
4th floor and @ 1.25% for each addl. floor
above 4th floor)
(Portion of locking arrangement inside
the wal to be paid separately)

14 Locking arrangement for Jail type doors


including supplying fitting and fixing in Kg. 382 382 382 382 382 382 382 382 382 382 382 382 382 382 382
position complete as per approved design.
(Concrete to be paid extra)
15 Collapsible gate with 40mm x 40mm x 6mm
Tee as top and bottom guide rail, 20mm x
10mm x 2mm vertical channels 100mm apart
in fully stretched position 20mm x 5mm M.S.
flats as collapsible bracings properly rivetted
and washered including 38mm steel rollers
including locking arrangements, fitted and
fixed in position with lugs set in cement
concrete and including cutting necessary
holes, chasing etc. in walls, floors etc. and
making good damages complete.

(Add extra @ 1% for each addl. floor upto


4th floor and @ 1.25% for each addl. floor
above 4th floor)
In ground floor. Sq.m. 4016 4016 4016 4016 4016 4016 4016 4016 4016 4016 4061 4105 4061 4061 4061
(Payment will be made on the area of the
gate covered by two guard rails and two
extreme channels)

Page77
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC.
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

(A) Extra over the corresponding item of


collapsible gate for top hung Sq.m. 149 149 149 149 149 149 149 149 149 149 149 149 149 149 149

16 (a) Supplying, fitting and fixing steel rolling


shutter profile type with 18 B.G . of approved
type steel latche section 75mm wide, fitted
with coil wire spring to necessiate the fitting
of required Nos. of C.I. Pulleys on heavy type
solid drawn seamless steel tube complete
with locking arrangements both inside and Sq.m. 3044 3044 3044 3044 3044 3044 3044 3044 3044 3044 3044 3074 3044 3044 3044
outside specially builtup side guide channels
including providing a hood for the steel
rolling shutter in the room, painting two coats
of approved aluminium paint over a coat of
red lead primer complete.

1. (Measurement will be made on the area


of opening covered by the rolling shutter
corrected upto 2 decimal.)
2. Payment of painting to be separately.

(b) Supplying fitting and fixing steel rolling


grills link type, shutter with 18 B.G .of
approved type steel to the section 75mm
wide, fitted with coil wire spring to necessiate
the fitting of required Nos. of C.I. Pulleys on
heavy type solid drawn seamless steel tube
complete with locking arrangements both Sq.m. 3949 3949 3949 3949 3949 3949 3949 3949 3949 3949 3949 4012 3949 3949 3949
inside and outside specially builtup side
guide channels including providing a hood
for the steel rolling shutter in the room,
painting two coats of approved aluminium
paint over a coat of red lead primer
complete.

(Measurement will be made on the area of


opening covered by the rolling shutter
corrected upto 2 decimal.)
17 Renewing bottom rail or top runners of
collapsible gate including mending good all Kg. 96 96 96 96 96 96 96 96 96 96 97 99 97 97 97
damages.

18 Renewing haskal as per design or direction,


including fitting and fixing same with
Kg. 94 94 94 94 94 94 94 94 94 94 96 97 96 96 96
necessary new bolts and nuts complete.

Page78
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC.
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

(Payment to be made on weight of haskal


and bolts and nuts)
19 Renewing doomney as per design or
direction including cutting hole in masonary
and fixing the doomney with cement concrete Kg. 77 77 77 77 77 77 77 77 77 77 78 79 78 78 78
1:3:6 with jhama chips.
(payment to be made on weight of
doomney, No separate pament wiil be
made for cutting holes or fixing with
concrete. )

20 Holding down bolt with nut including 100 x


100 x 6 mm plate washer at bottom fitted
complete and packing the hole with cement
concrete or cement grout as directed.
(i) 16 mm dia bolt
(a) 300 mm long Each 99 99 99 99 99 99 99 99 99 99 99 102 99 99 99
(b) 450 mm long Each 135 135 135 135 135 135 135 135 135 135 135 136 135 135 135

(ii) 20 mm dia bolt.


(a) 300 mm long Each 164 164 164 164 164 164 164 164 164 164 164 166 164 164 164
(b) 450 mm long Each 188 188 188 188 188 188 188 188 188 188 188 189 188 188 188
(c) 600 mm long Each 224 224 224 224 224 224 224 224 224 224 224 225 224 224 224

(iii) 25 mm dia.
(a) 450 mm long. Each 260 260 260 260 260 260 260 260 260 260 260 262 260 260 260
(b) 500 mm long. Each 295 295 295 295 295 295 295 295 295 295 295 298 295 295 295
(c) 750 mm long Each 402 402 402 402 402 402 402 402 402 402 402 405 402 402 402

(iv) 32 mm dia:
(a) 450 mm long Each 378 378 378 378 378 378 378 378 378 378 378 381 378 378 378
(b) 500 mm long Each 402 402 402 402 402 402 402 402 402 402 402 405 402 402 402
(c) 750 mm long Each 498 498 498 498 498 498 498 498 498 498 498 504 498 498 498

21 Supplying, fitting, fixing bolts with nuts,


washer:
(i) 10 to 16 mm dia:
(a) Length up to 75 mm Kg. 130 130 130 130 130 130 130 130 130 130 130 131 130 130 130
(b) Length above 75 mm and upto 150 mm. Kg. 119 119 119 119 119 119 119 119 119 119 119 120 119 119 119

Page79
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC.
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

(c) Length above 150mm. Kg. 114 114 114 114 114 114 114 114 114 114 114 115 114 114 114

(ii) 20 to 25 mm dia bolt:


(a) Length up to 75 mm dia: Kg. 134 134 134 134 134 134 134 134 134 134 134 135 134 134 134
(b) Length above 75 mm and upto 150 mm. Kg. 127 127 127 127 127 127 127 127 127 127 127 128 127 127 127
(c) Length above 150mm. Kg. 123 123 123 123 123 123 123 123 123 123 123 124 123 123 123
22 Renewing steel plated or oxidised casement
stay or peg stay of steel window frames
including painting two coats with approved Each 82 82 82 82 82 82 82 82 82 82 82 83 82 82 82
paint complete.
23 Repairing steel shutter with new rivets
including taking out and refixing, adjusting,
welding, cleaning cutting holes, mending Sq.M. 405 405 405 405 405 405 405 405 405 405 405 405 405 405 405
good damage to match with the existing one.

24 Renewing M.S. members of steel shutters by


welding including taking out the old,
mending good damages complete, including Mtr. 271 271 271 271 271 271 271 271 271 271 276 280 276 276 276
taking out and refixing the glass panes.

25 Easing, oiling and adjusting the steel


shutters including scraping all members and
fitting so as to make the shutters easily
Pair 43 43 43 43 43 43 43 43 43 43 43 43 43 43 43
operable ( no extra payment will be made for
taking out and fixing glass, if necessary).

(Each means a pair of shutter in a frame)

26 M.S. works in brackets made from flats,


angles, tees etc. to sizes specialy bent,
twisted, forged; making holes drilled and
Qntl. 9148 9148 9148 9148 9148 9148 9148 9148 9148 9148 9282 9415 9282 9282 9282
fitted to rafter of trusses with necessary bolts,
nuts, washer or screws etc. ( length of
straight not less than 230 mm)
(To be used for repair works only)
27 Renewing knobs of steel window frames
including fixing with steel casement by
Each 34 34 34 34 34 34 34 34 34 34 34 34 34 34 34
welding or riveting as directed including
painting complete.
28 Renewing one point steel ( oxidised) handle
of steel door and windows as directed Each 71 71 71 71 71 71 71 71 71 71 71 72 71 71 71
including painting complete.

Page80
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC.
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

29 Renewing two point steel plated or oxidised


handle of steel doors and windows as
Each 77 77 77 77 77 77 77 77 77 77 77 78 77 77 77
directed including painting complete.

30 Renewing hinge of steel shutter including


taking out old one by cutting and fixing new
hinges by welding and mending good Each 217 217 217 217 217 217 217 217 217 217 217 219 217 217 217
damages complete.
31 Welding in M.S. structural work with gas or
electric:
(a) Tack weld point 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9
(b) Continuous weld. cm run 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9
32 Taking out heavy iron grated door or window
(jail pattern or existing) with locking
arrangement after cutting out from walls and
refixing the same including mending all Sq.M. 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230
damages.[Mending charges to be paid
separately]

33 Supplying, fitting and fixing windows and


ventilators with or without integrated grills
conforming to IS 1038-1975 and
manufactured from rolled steel sections
conforming to IS 7452-1974 with non-friction
projecting type, box type hinges, glazing
clips, lugs locking bracket, handle plate etc,
including hoisting in position, straightening if
required, fixing lugs in cement concrete (
1:2:4) with stone chips 20 mm down cutting
holes and mending good damages to match
with existing surface complete in all respect
excluding glazing.

( Add extra @ 1.2 % for each additional


floors upto 4th floor and @ 1.5% for each
addl. Floor above 4th floor.)
In Ground floor
Flash butt welded windows and ventilators
(No shop priming will be allowed to facilitate
inspection of workmanship)
Without integrated grills.

(a) Fixed type steel windows as per IS sizes


Sq. M. 1419 1419 1419 1419 1419 1419 1419 1419 1419 1419 1433 1448 1433 1433 1433
with horizontal glazing bars.

Page81
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC.
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

(b) Openable steel windows as per IS sizes


with side hung shutters and horizotal glazing
bars with/without fixed type ventilators.[The Sq,. M. 2031 2031 2031 2031 2031 2031 2031 2031 2031 2031 2058 2086 2058 2058 2058
extra rate admissible for the openable
portion only]
(c ) Extra over item no. 33 (a) and (b) for,
(I) Fixed type ventilators as per I.S. sizes with
horizontal glazing bars height being limited Sq,. M. 108 108 108 108 108 108 108 108 108 108 108 108 108 108 108
to 580 mm.
(ii) Top hung side hung ventilators as per I.S.
Sq,. M. 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189
sizes 580 mm.
(iii) Centre hung ventilators as per I.S. sizes
580 mm. Sq,. M. 359 359 359 359 359 359 359 359 359 359 359 359 359 359 359

(iv) Two point nose steel handle including


Each 41 41 41 41 41 41 41 41 41 41 41 42 41 41 41
fitting and fixing.
(v) Two point nose aluminium handle
including fitting and fixing. Each 46 46 46 46 46 46 46 46 46 46 46 48 46 46 46

(vi) steel peg stay 300 mm long including


Each 29 29 29 29 29 29 29 29 29 29 29 30 29 29 29
fitting and fixing.
(vii) Aluminium peg stay 300 mm long
including fitting and fixing. Each 46 46 46 46 46 46 46 46 46 46 46 48 46 46 46

(viii) M.S. integrated grill as per approved


design integrated with steel window or
ventilator, joints continuously welded with Kg. 85 85 85 85 85 85 85 85 85 85 87 88 87 87 87
M.S. flats and bars.
Mode of measurement.
(The weight of grill will be determined
(theoritically) from section of the grills
actually used excluding the rolled steel
section of the window / vent. The weight of
the grill should be calculated at 7.85 gm./
cu.cm.)
Note:- For windows and ventilators joints
welded by arc welding, the above rates at (a)
and (b) shall be redused by 10%.

34 Reparing collapsible gate by cutting out all


rivets as necessary re-assambling all
members including welding pieces of
Sq.M. 383 383 383 383 383 383 383 383 383 383 383 383 383 383 383
channels, sraightening bent bars and
rivetting with new rivets and fitting in position
and painting two coats.
35 Easing and oiling, cleaning collapsible gate
and repairing to locking arrangements. Sq.M. 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17

Page82
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC.
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

36 Easing and oiling, cleaning rolling shutters


excluding repair to inside locks. Sq.M. 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12

37 Easing and oiling W.I. Gate or G.I. Gate. Sq.M. 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7


38 Labour for taking out rolling shutter ( only
shutter portion) dismantling by parts for
repair or( replacement of damaged parts
Sq.M. 286 286 286 286 286 286 286 286 286 286 286 286 286 286 286
only), rehanging and refitting the same in
position after necessary repairs (excluding
the cost of supply of new parts).
39 Renewing seam pipe for rolling shutter as
per existing size and shape fitting, fixing Mtr. 213 213 213 213 213 213 213 213 213 213 213 213 213 213 213
complete.
40 Renewing side split pin for seam pipe for
Each 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26
rolling shutter.
41 Oiling and greasing of rolling shutter and
Sq.M. 74 74 74 74 74 74 74 74 74 74 74 74 74 74 74
repair to in side lock.
42 Renewing profile of rolling shutter including
fitting fixing complete as per existing size M. 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55
and shape.
43 Renewing spring of rolling shutter as per
existing size and shape including fitting fixing Each 615 615 615 615 615 615 615 615 615 615 615 615 615 615 615
complete.
44 Taking out M.S. or W.I. Grills from wooden
frame including cutting lugs from masonry
wall and refitting the same and mending Each
good damages after repairs. (Excluding the 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
cost of necessary repair of damages) or
doing any other necessary works.

45 Renewing bottom curved rail of M.S. flat with


necessary clamps under the curved M.S.flats
and fixing them after cutting holes with
cement concrete (1:2:4) with stone chips and
mending good damages to run smooth the
heavy iron gated door or G.C.I. Sheet door or
gate.
(i) 50mm x 6 mm M.S. flat Mtr. 305 305 305 305 305 305 305 305 305 305 308 312 308 308 308

(ii) 40 mm x 6 mm flat Mtr. 265 265 265 265 265 265 265 265 265 265 267 270 267 267 267

46 Renewing W.I. or M.S. wheel or roller of


steel door or gate fitted and fixed with
neceessary clamps and nuts and bolts and
erected complete.

Page83
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC.
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

(i) Above 50 mm. Each 126 126 126 126 126 126 126 126 126 126 126 126 126 126 126
(ii) below 50mm. Each 109 109 109 109 109 109 109 109 109 109 109 109 109 109 109
47 Labour for taking out steel door and window
frame for repairs and re-fixing the same ( or
replacement by new one) including mending
good damages (excluding the cost of repair
of damages) and applying a protective coat
of paint.
Upto one sq.m.area of frame. Each 129 129 129 129 129 129 129 129 129 129 129 129 129 129 129
48 Supplying, fitting and fixing cast iron heavy
type spiral staircase of approved design with
50 mm.dia. Stem and C.I. Steps 150 mm as
per design 900 mm. high C.I, railing including
necessary M.S. tie of suitable section
embedded to wall with cement concrete
(1:2:4) including cost of intermediate C.I.
platform secured with necessary tie to stem
and wall with cement concrete (1:2:4)
including fixing the stem in ground with
cement concrete (1:3:6) complete in all
respect with all labour and materials.

(Payment to be made on vertical height in


between 1st step and top platform.)
(a) With 1200 mm.dia. well Mtr. 4958 4936 4932 4907 4937 4931 4955 4934 4940 4947 4915 5100 4955 4969 4975
(b) With 900 mm.dia. well Mtr. 4567 4545 4540 4516 4546 4540 4563 4543 4549 4556 4523 4713 4563 4578 4583
N.B. : No steel materials will be issued in
this section.

Page84
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

NOTE:
(1) Without the specific permission of the
Superintending Engineer no work
involving 1st class best Indian teak and
Siliguri: Sal wood should be carried out.
(2) In case of of using under specified
timber in frame, shutter etc. penal rate of
reduction to a maximum of 50% will be
made in such under specified timber
work.

1 Wood work in door and window frame fitted


and fixed in position complete including a
protective coat of painting at the contact
surface of the frame exluding cost of
concrete, Iron Butt Hinges and M.S clamps.
(The quantum should be correted upto three
decimals).
(a) 1st class Best Indian teak. Cu.M 173836 157438 151131 151131 173836 151131 149869 149869 149869 149869 149869 157438 149869 149869 149869
(b) Ordinary teak. Cu.M 132209 125902 113288 113288 132209 125902 113288 113288 119596 119596 119596 119596 119596 119596 119596
(c) Sal : Siliguri. Cu.M 113667 100675 100675 100675 113667 100675 100675 100675 100675 98153 98153 94368 94368 94368 98153
(d) Sal : Local. Cu.M 89279 83652 83652 83652 89279 83652 83652 83652 83652 83652 83652 83652 82403 82403 82403
(e) Sal : Malayasian Cu.M 95898 86776 86776 86776 95898 86776 87400 87400 87400 87400 89274 - - - -
(f) Sishu, Gamar, Champ, Badam, Bhola,
Cu.M 87400 81778 81778 81778 87400 81778 81778 81778 81778 81778 84901 84901 81778 81778 81778
Mogra, Hallak.
(g) Kappoor Cu.M 71158 71158 71158 71158 71158 71158 71158 71158 71158 71158 71158 69909 68659 68659 68659
(h) Neem, Jam, Jackfruits Cu.M 63662 61163 61163 61163 63662 59914 59914 59914 59914 59914 59914 61163 57415 57415 57415
(i) Other Local Wood. Cu.M 46171 39924 39924 39924 46171 39924 39924 39924 39924 39924 39924 39924 40549 40549 40549
Note: Extra for Lifting Charges for each
additional floor,
i) Rs. 200/- per Cu.m (upto 4th floor)
ii) Rs.250/-(above 4th floor)

Page 85
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

1 (A) Supplying fitting and fixing door frame


with M.S. angle as per drawing & direction of
required section.The holes for counter sunk
machine screw & nuts will be such as to fit 8
to 10 mm Iron screw. The counter sunk nut
to be welded . The nuts are to be welded
after careful checking with screw.All welding
spots should be properly filed or rounded Kg. 91 91 91 91 91 91 91 91 91 91 91 91 91 91 91
smooth including cost of welding hinges for
hinge cleats , lugs for hasp bolt, socket bolt
etc. and necessary M.S. clamps of 25mm x
6mm flat 225mm long as per direction
welded to the frame fitted and fixed in
position excluding cost of concrete.

Mode of measurement :
Weight of frame shall be calculated for
the M.S. sections of frames. Payment of
butt hinges, clamps, hasp bolt, socket
bolts, screws etc. will be paid separately.
The weight of section should be
calculated at 7.85 gm/Cu.cm
2 Extra rate for Curved wood works in doors
and window frame fitted and fixed complete
over corresponding Items of Item No. 1. (In
measuring such average length and average Cu.M 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10%
breadth to be taken into consideration, depth
remaining constant). (The quantum should
be corrected upto three decimals)
3 (A) Wood work in posts, post plates, rafters,
battens, truss members, purlins etc. fitted
and fixed complete (excluding the cost of
bolts, paints, but including the cost of nails,
screws etc.)
(The quantum should be corrected upto
three decimals)
(i) Sal : Siliguri. Cu.M 113732 100740 100740 100740 113732 100740 100740 100740 100740 98217 98217 94433 94433 94433 98217
(ii) Sal : Local. Cu.M 89345 83717 83717 83717 89345 83717 83717 83717 83717 83717 83717 83717 82468 82468 82468
(iii) Sal : Malayasian Cu.M 95964 86841 86841 86841 95964 86841 87465 87465 87465 87465 89340 - - - -

Page 86
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

(B) Dressed wood work in post , plate ,


battens . etc. fitted & fixed complete
(excluding the cost of bolts only, but
including the cost of nails, screws etc.)
(The quantum should be corrected upto
three decimals)
(i) Sal : Siliguri. Cu.M 118475 105483 105483 105483 118475 105483 105483 105483 105483 102960 102960 99176 99176 99176 102960
(ii) Sal : Local. Cu.M 94087 88460 88460 88460 94087 88460 88460 88460 88460 88460 88460 88460 87211 87211 87211
(iii) Sal : Malayasian Cu.M 95964 86841 86841 86841 95964 86841 87465 87465 87465 87465 89340 - - - -
Note: Extra for Lifting Charges:-
i) upto 4th floor Rs. 200/- per Cu.m
ii) Above 4th floor Rs. 250/- per Cu.m
4 Wood work in beams and burgahs fitted and
fixed in position complete. (Cost for repairing
of Damage to be paid separately)

(i) Sal : Siliguri. Cu.M 103101 90108 90108 90108 103101 90108 90108 90108 90108 87586 87586 83802 83802 83802 87586
(ii) Sal : Malayasian Cu.M 86069 76952 76952 76952 86069 76952 77577 77577 77577 77577 79450 - - - -
(iii) Local Sal. Cu.M 79454 73831 73831 73831 79454 73831 73831 73831 73831 73831 73831 73831 72583 72583 72583
Note: Extra for Lifting Charges:-
i) upto 4th floor Rs. 200/- per Cu.m
ii) Above 4th floor Rs. 250/- per Cu.m
5 Wood work in upper rails of railing, hand rail
of staircase, balcony etc. includig necessary
bend, moulding fitted and fixed complete (for
purpose of payment section will be
measured in the square).
(a) 1st class best Indian teak. Cu.M 191777 174641 168051 168051 191777 168051 166732 166732 166732 166732 166732 174641 166732 166732 166732
(b) Ordinary teak. Cu.M 148278 141687 128507 128507 148278 141687 128507 128507 135097 135097 135097 135097 135097 135097 135097
(c) Sishu, Gamar, Champ, Badam, Bhola,
Cu.M 101454 95579 95579 95579 101454 95579 95579 95579 95579 95579 98843 98843 95579 95579 95579
Morga, Hallak.
(d) Other Local Wood. Cu.M 44896 38352 38352 38352 44896 38352 38352 38352 38352 38352 38352 38352 39007 39007 39007
Note: Extra for Lifting Charges:-
i) upto 4th floor Rs. 200/- per Cu.m
ii) Above 4th floor Rs. 250/- per Cu.m

Page 87
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

6 Labour for wood work in sawing from old


timber to sizes as required for making
(Payment to be made on quantity of finished
work):
(a) Beams of smaller length but of same
section. Cu.M 561 561 561 561 561 561 561 561 561 561 561 561 561 561 561

(b) Beams of smaller section.


Cu.M 2245 2245 2245 2245 2245 2245 2245 2245 2245 2245 2245 2245 2245 2245 2245

(c) Burgahs fitted and fixed complete.


Cu.M 5510 5510 5510 5510 5510 5510 5510 5510 5510 5510 5510 5510 5510 5510 5510

(d) Door and window frames fitted and fixed


complete. Cu.M 4720 4720 4720 4720 4720 4720 4720 4720 4720 4720 4720 4720 4720 4720 4720

(e) Post, post plates, rafters, battens, truss


members, purlins etc. (excluding cost of bolts
only but including cost of nails, screws etc. Cu.M 5184 5184 5184 5184 5184 5184 5184 5184 5184 5184 5184 5184 5184 5184 5184
as directed.
(f) Extra over (a) or (b) for hoisting and fitting,
fixing beam in position. (Damage if any will Cu.M 2790 2790 2790 2790 2790 2790 2790 2790 2790 2790 2790 2790 2790 2790 2790
be repaired separetly)
7 Weather board 12mm. Thick fitted and fixed
with screws complete.
(a) 1st class best Indian Teak. Sq.M 2801 2549 2452 2452 2801 2452 2433 2433 2433 2433 2433 2549 2433 2433 2433
(b) Ordinary Teak Wood. Sq.M 2162 2065 1871 1871 2162 2065 1871 1871 1968 1968 1968 1968 1968 1968 1968
(c) Sishu, Gamar, Champ,Badam,Bhola,
Sq.M 1473 1387 1387 1387 1473 1387 1387 1387 1387 1387 1435 1435 1387 1387 1387
Mogra, Hallak.
(d) Other Local Wood. Sq.M 840 744 744 744 840 744 744 744 744 744 744 744 753 753 753
N.B. : This item is meant for repair works
only.
8 Renewing 25mm. Square wooden gauge of
railing upto 1m ht. fitted and fixed complete.

(a) 1st class best Indian Teak. Metre 145 135 130 130 145 130 130 130 130 130 130 135 130 130 130
(b) Ordinary Teak Wood. Metre 118 114 106 106 118 114 106 106 110 110 110 110 110 110 110
(c) Sal : Siliguri. Metre 106 97 97 97 106 97 97 97 97 96 96 93 93 93 96
(d) Sal : Malayasian Metre 94 88 88 88 94 88 89 89 89 89 90 - - - -
(e) Local Sal. Metre 90 86 86 86 90 86 86 86 86 86 86 86 85 85 85

Page 88
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

9 Wooden sash bar 50mm. X 35mm. Upto


1200 mm length with coach screw and flat
iron clamps (40mm. X 6mm.) fitted and fixed
complete in any position.
(a) 1st class best Indian Teak. Each 412 376 362 362 412 362 359 359 359 359 359 376 359 359 359
(b) Ordinary Teak Wood. Each 317 303 275 275 317 303 275 275 289 289 289 290 289 289 289
(c) Sal : Siliguri. Each 276 247 247 247 276 247 247 247 247 242 242 234 234 234 242
(d) Sal : Malayasian Each 237 217 217 217 237 217 218 218 218 218 222 - - - -
(e) Local Sal. Each 222 210 210 210 222 210 210 210 210 210 210 210 207 207 207
10 Renewing wooden sash bar 50mm. X 35mm.
Upto 1200mm length with new coach screws
and flat iron clamps (40mm. X 6mm.) fitted
and fixed complete in any position.

(a) 1st class best Indian Teak. Each 425 389 375 375 425 375 373 373 373 373 373 390 373 373 373
(b) Ordinary Teak Wood. Each 330 316 289 289 330 316 289 289 303 303 303 303 303 303 303
(c) Sal : Siliguri. Each 289 261 261 261 289 261 261 261 261 255 255 247 247 247 255
(d) Sal : Malayasian Each 250 230 230 230 250 230 232 232 232 232 236 - - - -
(e) Local Sal. Each 236 223 223 223 236 223 223 223 223 223 223 224 221 221 221
11 M.S. sash bar upto 1200mm. Length with
coach screws and flat iron clamps 40mm X
6mm fitted and fixed complete.
(a) With 40mm. X 10mm flat. Each 296 250 250 250 250 250 250 250 250 250 250 253 250 250 250
(b) With 40mm. X 6mm flat. Each 212 182 182 182 182 182 182 182 182 182 182 184 182 182 182
12 Renewing M.S. sash bar upto 1200mm.
Length with coach screws (new) and flat iron
clamps (40mm X 6mm) fitted and fixed
complete.
(a) With 40mm. X 10mm flat. Each 313 267 267 267 267 267 267 267 267 267 267 270 267 267 267
(b) With 40mm. X 6mm flat. Each 229 199 199 199 199 199 199 199 199 199 199 201 199 199 199
13 Renewing M.S. clamps 40mm. X 6mm. Only
for sash bar fitted and fixed complete. Each 31 27 27 27 27 27 27 27 27 27 27 27 27 27 27

14 Refixing sash bar with new coach screws.


Each 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18
15 Refixing M.S. clamps for sash bar with new
Each 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10
screws.

Page 89
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

16 Supplying , fitting and fixing hinge cleat in


position excluding the cost hinge and other
fiffitngs.
a) with 50mm iron Butt-hinge
i) Sal : Siliguri. Each 35 33 33 33 35 33 33 33 33 33 33 32 32 32 33
ii) Sal : Malayasian Each 33 31 31 31 33 31 31 31 31 31 32 - - - -
iii) Local Sal. Each 32 31 31 31 32 31 31 31 31 31 31 31 31 31 31
b) with 75mm iron Butt-hinge
i) Sal : Siliguri. Each 44 41 41 41 44 41 41 41 41 41 41 40 40 40 41
ii) Sal : Malayasian Each 40 38 38 38 40 38 38 38 38 38 39 - - - -
iii) Local Sal. Each 39 38 38 38 39 38 38 38 38 38 38 38 37 37 37
17 Renewing iron chain and staples fitted and
fixed complete.
a) upto 150mm long Each 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24
b) Above 150mm long Each 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26
18 Supplying, fitting and fixing M.S. clamps for
door and window frame made of flat bent
bar, end bifurcated with necessary screws
etc. by cement concrete(1:2:4) as per
direction. (Cost of concrete will be paid
separately)
(a) 40mm X 6mm, 250mm Length Each 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33
(b) 40mm X 6mm, 200mm Length Each 28 28 28 28 28 28 28 28 28 28 28 29 28 28 28
(c) 40mm X 6mm, 125mm Length Each 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22
(The concreting will have to be done for
equivalent thickness of 2 layers of brick
work and for the entire width of the wall.
No deduction on brick work will be made).

Page 90
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

19 Renewing M.S. clamps for door and window


frame made of flat bent bar, end bifurcated
with necessary screws etc. In cement
concrete(1:2:4) including cutting of brick
work/concrete work as per direction.
(Cost of concrete will be paid separately)

(a) 40mm X 6mm, 250mm Length Each 51 51 51 51 51 51 51 51 51 51 51 52 51 51 51


(b) 40mm X 6mm, 200mm Length Each 40 40 40 40 40 40 40 40 40 40 40 41 40 40 40
(c) 40mm X 6mm, 125mm Length Each 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40
20 Iron butt hinges of approved quality fitted and
fixed with steel screws, with ISI mark.

(i) 50mm. X 37mm. X 1.50mm. Each 18 18 18 18 18 18 18 18 18 18 18 19 18 18 18


(ii) 50mm. X 40mm. X 2.5mm. Each 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29
(iii) 75mm. X 40mm. X 1.12mm. Each 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31
(iv) 75mm. X 47mm. X 1.70mm. Each 34 34 34 34 34 34 34 34 34 34 34 35 34 34 34
(v) 75mm. X 60mm. X 3.15mm. Each 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54
(vi) 100mm. X 50mm. X 1.25mm. Each 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48
(vii) 100mm. X 58mm. X 1.90mm. Each 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52
(viii) 100mm. X 75mm. X 3.50mm. Each 75 75 75 75 75 75 75 75 75 75 75 76 75 75 75
(Add Extra 30% for Oxidised Fittings)
21 Iron parliamentary hinges conforming to IS
362-1982 fitted and fixed complete with steel
screws.
(a) 50mm. X 100mm. X 20mm. X 2.24mm. Each 72 72 72 72 72 72 72 72 72 72 72 73 72 72 72
(b) 65mm. X 100mm. X 20mm. X 2.24mm. Each 80 80 80 80 80 80 80 80 80 80 80 81 80 80 80
(c) 75mm. X 100mm. X 20mm. X 2.24mm. Each 90 90 90 90 90 90 90 90 90 90 90 91 90 90 90
(d) 90mm. X 100mm. X 20mm. X 2.24mm. Each 98 98 98 98 98 98 98 98 98 98 98 100 98 98 98
(e) 100mm. X 125mm. X 27mm. X 2.50mm. Each 124 124 124 124 124 124 124 124 124 124 124 125 124 124 124
(f) 125mm. X 125mm. X 27mm. X 2.50mm. Each 140 140 140 140 140 140 140 140 140 140 140 141 140 140 140
(g) 150mm. X 125mm. X 27mm. X 2.50mm. Each 156 156 156 156 156 156 156 156 156 156 156 158 156 156 156
(h) 175mm. X 125mm. X 27mm. X 2.50mm. Each 174 174 174 174 174 174 174 174 174 174 174 175 174 174 174
(i) 200mm. X 125mm. X 27mm. X 2.50mm. Each 196 196 196 196 196 196 196 196 196 196 196 197 196 196 196

Page 91
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

22 Taking out old brass hinges and fitting, fixing


the same with new brass screws.
(a) 50mm. Long butt hinge. Each 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10
(b) 75mm. Long butt hinge. Each 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15
(c) 100mm. Long butt hinge. Each 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22
(d) 125mm. Long but hinge. Each 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22
(e) 150mm. Long butt hinge. Each 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25
(f) 75mm. Long parliamentary hinge. Each 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17
(g) 100mm. Long parliamentary hinge. Each 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22
(h) 125mm. Long parliamentary hinge. Each 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22
(i) 150mm. Long parliamentary hinge. Each 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30
(j) 175mm. Long parliamentary hinge. Each 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30
(k) 200mm. Long parliamentary hinge. Each 39 39 39 39 39 39 39 39 39 39 39 39 39 39 39
23 Taking out old iron higes and fitting, fixing
the same with new steel screws.
(a) 50mm. Long butt hinge. Each 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
(b) 65mm. Long butt hinge. Each 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
(c) 75mm. Long butt hinge. Each 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10
(d) 90mm. Long butt hinge. Each 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10
(e) 100mm. Long butt hinge. Each 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16
(f) 125mm. Long butt hinge. Each 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16
(g) 150mm. Long butt hinge. Each 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18
(h) 50mm. Long parliamentary hinge. Each 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13
(i) 65mm. Long parliamentary hinge. Each 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13
(j) 75mm. Long parliamentary hinge. Each 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15
(k) 100mm. Long parliamentary hinge. Each 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18
(l) 125mm. Long parliamentary hinge. Each 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18
(m) 150mm. Long parliamentary hinge. Each 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21
(n) 175mm. Long parliamentary hinge. Each 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21
(o) 200mm. Long parliamentary hinge. Each 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Page 92
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

24 Iron catch hook of approved quality fitted and


fixed to shutter and chowkat.

(a) 6mm dia x 100mm long. Each 40 40 40 40 40 40 40 40 40 40 40 41 40 40 40


(b) 6mm dia x 225mm long. Each 73 73 73 73 73 73 73 73 73 73 73 74 73 73 73
(c) 10mm dia x 300mm long. Each 95 95 95 95 95 95 95 95 95 95 95 96 95 95 95
(d) 10mm dia x 375mm long. Each 115 115 115 115 115 115 115 115 115 115 115 116 115 115 115
(e) 10mm dia x 450mm long. Each 135 135 135 135 135 135 135 135 135 135 135 136 135 135 135
(f) 12mm dia x 600mm long. Each 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150
(g) 12mm dia x 750mm long. Each 217 217 217 217 217 217 217 217 217 217 217 217 217 217 217
25 Iron socket bolt of approved quality fitted and
fixed complete.

(a) 75mm long x 10mm dia bolt. Each 38 38 38 38 38 38 38 38 38 38 38 39 38 38 38


(b) 100mm long x 10mm dia bolt. Each 45 45 45 45 45 45 45 45 45 45 45 46 45 45 45
(c) 150mm long x 10mm dia bolt. Each 71 71 71 71 71 71 71 71 71 71 71 72 71 71 71
(d) 225mm long x 10mm dia bolt. Each 87 87 87 87 87 87 87 87 87 87 87 88 87 87 87
(e) 300mm long x 10mm dia bolt. Each 109 109 109 109 109 109 109 109 109 109 109 110 109 109 109
26 Iron skeleton bolt of approved quality fitted
and fixed complete.
(a) 375mm long x 10mm dia rod. Each 105 105 105 105 105 105 105 105 105 105 105 106 105 105 105
(b) 450mm long x 10mm dia rod. Each 119 119 119 119 119 119 119 119 119 119 119 120 119 119 119
27 i) Iron hasp bolt of approved quality fitted and
fixed complete (oxidised) with 16mm dia rod
with centre bolt and round fitting.

(a) 200mm long Each 155 155 155 155 155 155 155 155 155 155 155 160 155 155 155
(b) 250mm long. Each 184 184 184 184 184 184 184 184 184 184 184 189 184 184 184
(c) 300mm long. Each 193 193 193 193 193 193 193 193 193 193 193 201 193 193 193
ii) Brass hasp bolt of approved quality fitted
and fixed complete (oxidised) with 16mm dia
rod with centre bolt and round fitting.

(a) 200mm long Each 528 528 528 528 528 528 528 528 528 528 528 534 528 528 528
(b) 250mm long. Each 707 707 707 707 707 707 707 707 707 707 707 713 707 707 707
(c) 300mm long. Each 778 778 778 778 778 778 778 778 778 778 778 784 778 778 778

Page 93
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

28 Iron pad bolt (lock) of approved quality rod


and handle single cast:
(i) 115mm x 10mm dia rod 65mm x 3mm
plate. Each 103 103 103 103 103 103 103 103 103 103 103 104 103 103 103

(ii) 200mm x 16mm dia rod 105mm x 3mm


plate. Each 131 131 131 131 131 131 131 131 131 131 131 133 131 131 131

29 Double acting Iron Spring Hinges of


approved quality fitted and fixed complete:-

(a) 100mm size Each 211 211 211 211 211 211 211 211 211 211 211 213 211 211 211
(b) 125mm size Each 270 270 270 270 270 270 270 270 270 270 270 276 270 270 270
(c) 150mm size Each 370 370 370 370 370 370 370 370 370 370 370 375 370 370 370
30 Iron Gravity Hinge (block patent best quality)
fitted and fixed complete. Each 132 132 132 132 132 132 132 132 132 132 132 135 132 132 132

31 Iron Tee Hinges of approved quality fitted


and fixed complete:
(a) 75 x 65 x 20mm size Each 46 46 46 46 46 46 46 46 46 46 46 48 46 46 46
(b) 100 x 75 x 20mm size. Each 60 60 60 60 60 60 60 60 60 60 60 61 60 60 60
(c) 125 x 75 x 25mm size. Each 72 72 72 72 72 72 72 72 72 72 72 73 72 72 72
(d) 150 x 75 x 25mm size. Each 98 98 98 98 98 98 98 98 98 98 98 99 98 98 98
(e) 200 x 90 x 25mm size. Each 118 118 118 118 118 118 118 118 118 118 118 119 118 118 118
(f) 250 x 100 x 30mm size. Each 124 124 124 124 124 124 124 124 124 124 124 126 124 124 124
(g) 300 x 115 x 30mm size. Each 148 148 148 148 148 148 148 148 148 148 148 150 148 148 148
32 Helical door spring hinge of approed quality
fitted and fixed complete.
(a) Iron (Heavy type)
(i) 100mm long. Each 123 123 123 123 123 123 123 123 123 123 123 125 123 123 123
(ii) 125mm long. Each 135 135 135 135 135 135 135 135 135 135 135 137 135 135 135
(iii) 150mm long. Each 173 173 173 173 173 173 173 173 173 173 173 175 173 173 173
33 Renewing iron mortice lock (local best
approved quality) 6 lever with handle,
connected rods and keys consisting a
complete set:
(a) With chromium plated handle. Each 1033 1033 1033 1033 1033 1033 1033 1033 1033 1033 1033 1039 1033 1033 1033
(b) With oxidised handle. Each 836 836 836 836 836 836 836 836 836 836 836 854 836 836 836
(c) With anodised aluminium white handle. Each 1134 1134 1134 1134 1134 1134 1134 1134 1134 1134 1134 1146 1134 1134 1134

Page 94
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

(d) With anodised aluminium decorative Each 1193 1193 1193 1193 1193 1193 1193 1193 1193 1193 1193 1199 1193 1193 1193
handle.
34 Renewing rebeated iron mortice lock (local
best approved quality) with handle,
connected rods and keys consisting a
complete set with I.S.I.
(a) With chromium mark.
plated handle. Each 1033 1033 1033 1033 1033 1033 1033 1033 1033 1033 1033 1051 1033 1033 1033
(b) With oxidised handle. Each 836 836 836 836 836 836 836 836 836 836 836 854 836 836 836
(c) With anodised aluminium white handle. Each 1146 1146 1146 1146 1146 1146 1146 1146 1146 1146 1146 1165 1146 1146 1146
(d) With anodised aluminium decorative Each 1223 1223 1223 1223 1223 1223 1223 1223 1223 1223 1223 1241 1223 1223 1223
handle.
35 Renewing mortice lock handle with
connected rod:
(a) With chromium plated. Pair 490 490 490 490 490 490 490 490 490 490 490 496 490 490 490
(b) Oxidised. Pair 431 431 431 431 431 431 431 431 431 431 431 443 431 431 431
(c) Anodised aluminium (white). Pair 550 550 550 550 550 550 550 550 550 550 550 562 550 550 550
(d) Anodised aluminium (decorative). Pair 758 758 758 758 758 758 758 758 758 758 758 776 758 758 758

36 (a) Supplying 'Godrej' mortice lock chromium Each 1223 1223 1223 1223 1223 1223 1223 1223 1223 1223 1223 1223 1223 1223 1223
plated with latch and keys 4 levers, including
fitting and fixing complete.

(b) Supplying 'Godrej' mortice lock Each 2264 2264 2264 2264 2264 2264 2264 2264 2264 2264 2264 2264 2264 2264 2264
chromium plated with keys 6levers including
fitting & fixing complete.
(c) Supplying 6levers 'Godrej' Crystal Satine Each 2199 2199 2199 2199 2199 2199 2199 2199 2199 2199 2199 2199 2199 2199 2199
Mortice Lock with keys including fitting &
fixing complete.

37 Cord for fan light fitted & fixed complete. Each 26 26 26 26 26 26 26 26 26 26 26 29 26 26 26

38 Cord for clerestory window fitted and fixed Each 29 29 29 29 29 29 29 29 29 29 29 31 29 29 29


complete.

39 (i) Brass floor door stopper. Each 134 134 134 134 134 134 134 134 134 134 134 140 134 134 134
(ii) Anodised aluminium floor door stopper Each 78 78 78 78 78 78 78 78 78 78 78 84 78 78 78
(iii) Steel body foot-door holder. Each 75 75 75 75 75 75 75 75 75 75 75 80 75 75 75
40 Renewing iron catch hook of approved Each 26 26 26 26 26 26 26 26 26 26 26 27 26 26 26
quality for fan light or clerestory window
41 50mm size hinges
Renewing with 6mm
for rod.
fan light or clerestory Each 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18
window (iron).

Page 95
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

42 Renewing iron eye of hasp bolt. Each 26 26 26 26 26 26 26 26 26 26 26 28 26 26 26

43 i) Hydraulic door closer of approved quality


as per I.S.I. standard fitted and fixed
complete.
(a) Heavy type (I.S.I. size 3) Each 1919 1919 1919 1919 1919 1919 1919 1919 1919 1919 1919 1919 1919 1919 1919
(b) Medium (I.S.I. size 2) Each 1562 1562 1562 1562 1562 1562 1562 1562 1562 1562 1562 1562 1562 1562 1562
(c) Light (I.S.I. size 4) Each 1443 1443 1443 1443 1443 1443 1443 1443 1443 1443 1443 1443 1443 1443 1443
ii) Godrej Hydraulic door closer fitted and
fixed complete.
(a) Heavy type Each 2395 2395 2395 2395 2395 2395 2395 2395 2395 2395 2395 2395 2395 2395 2395
(b) Medium type Each 1919 1919 1919 1919 1919 1919 1919 1919 1919 1919 1919 1919 1919 1919 1919
(c) Light type Each 1681 1681 1681 1681 1681 1681 1681 1681 1681 1681 1681 1681 1681 1681 1681
44 Renewing 125mm long wooden buffer block
i) With Sal : Siliguri. Each 69 63 63 63 69 63 63 63 63 62 62 60 60 60 62
ii) With Sal : Malayasian Each 61 57 57 57 61 57 57 57 57 57 58 - - - -

45 Renewing hinged cleat with old hinge and


new screws.
i) Sal : Siliguri. Each 48 45 45 45 48 45 45 45 45 45 45 44 44 44 45
ii) Sal : Malayasian Each 44 42 42 42 44 42 43 43 43 43 43 - - - -
iii) Local Sal. Each 43 42 42 42 43 42 42 42 42 42 42 42 42 42 42
46 Renewing brass eye of hasp bolt. Each 59 59 59 59 59 59 59 59 59 59 59 62 59 59 59

47 Renewing 14 SWG woven wire netting only


as per existing design including taking out
old batten etc. (As necessary and fixing the
same with new stapples and hooks)
(a) 75mm x 75 mm mesh Each 582 582 582 582 582 582 582 582 582 582 582 587 582 582 582
(b) 125mm x 125 mm mesh Each 515 515 515 515 515 515 515 515 515 515 515 524 515 515 515
48 Renewing twisted clamp 225mm long and Each 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70
37.5mm x 6mm flat bar fitted and fixed to
post plate and rafter with coach screws
including drilling hole.
49 Refixing ceiling battens with new screws Metre 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13
including fixing ceiling to position with new
screws (excluding cost of ceiling).

Page 96
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

50 Labour for fitting and fixing different type of Each 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61


automatic door closer with necessary
screws.
51 Renewing wood moulding (50mm x 37.5m)
of panel partition or panel door.
(a) With 1st class Best Indian teak. Metre 340 310 298 298 340 298 295 295 295 295 295 310 295 295 295
(b) With Ordinary teak. Metre 262 250 227 227 262 250 227 227 239 239 239 239 239 239 239
(c) With Gamari wood. Metre 178 168 168 168 178 168 168 168 168 168 174 174 168 168 168
52 Extra for Teak wood corner moulding (50mm Each 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67
x 12mm) of panel partition or panel door.
53 Renewing X.P.M. including taking out and
refixing with old battens but with new screws
etc. complete.
(a) 25mm x 75mm strand 3.25mm x 1.6mm. Sq.M 503 503 503 503 503 503 503 503 503 503 503 514 503 503 503
(b) 25mm x 75mm strand 3.25mm x Sq.M 545 545 545 545 545 545 545 545 545 545 545 558 545 545 545
3.15mm.
(c) 20mm x 50mm strand 2.5mm x 1.25mm. Sq.M 514 514 514 514 514 514 514 514 514 514 514 527 514 514 514
(d) 40mm x 115mm mesh 3mm x 3mm. Sq.M 608 608 608 608 608 608 608 608 608 608 608 626 608 608 608
(e) 12mm x 50mm mesh 6mm x 1.5mm. Sq.M 695 695 695 695 695 695 695 695 695 695 695 714 695 695 695
54 Renewing X.P.M. including taking out and
refixing with new battens made of local wood
of size 50mmx25mm and new screws etc.
complete.
(a) 25mm x 75mm strand 3.25mm x 1.6mm. Sq.M 1067 1038 1038 1038 1067 1038 1038 1038 1038 1038 1038 1049 1032 1032 1032
(b) 25mm x 75mm strand 3.25mm x Sq.M 1109 1081 1081 1081 1109 1081 1081 1081 1081 1081 1081 1093 1074 1074 1074
3.15mm.
(c) 20mm x 50mm strand 2.5mm x 1.25mm. Sq.M 1068 1039 1039 1039 1068 1039 1039 1039 1039 1039 1039 1051 1032 1032 1032
(d) 40mm x 115mm mesh 3mm x 3mm. Sq.M 1161 1132 1132 1132 1161 1132 1132 1132 1132 1132 1132 1151 1126 1126 1126
(e) 12mm x 50mm mesh 6mm x 1.5mm. Sq.M 1047 1018 1018 1018 1047 1018 1018 1018 1018 1018 1018 1037 1011 1011 1011
55 Taking out and refixing wire netted frames or Sq.M 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33
shutters including providing new screws.

Page 97
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

56 (a) Supplying fitting and fixing door made Sq.M 2850 2850 2850 2850 2850 2850 2850 2850 2850 2850 2850 2860 2850 2850 2850
with IRC febric mesh of 75mm x
50mmx4.5mmx2.7mm on 50mm x 50mm x
6mm angle iron frames all round and one
37.5mm x 6mm M.S. flat bar over the netting
all round welded to angle iron frame and
providing locking arrangements if necessary
and with two coats of synthetic enamel
paint(Other than Hi-gloss) fitted and fixed
with clamps or haskal doomney etc.
complete including flat stiffeners on every 1.0
(b) Renewing IRC febric mesh of 75mm x Sq.M 1707 1707 1707 1707 1707 1707 1707 1707 1707 1707 1707 1718 1707 1707 1707
50mmx4.5mmx2.7mm on 50mm x 50mm x
6mm old angle iron frames all round and
one 37.5mm x 6mm M.S. flat bar over the
netting all round welded to angle iron frame
and providing locking arrangements if
necessary and with two coats of synthetic
enamel paint(Other than Hi-gloss) fitted and
fixed with clamps or haskal doomney etc.
complete including flat stiffeners on every 1.0
57 m apart both
Renewing ways.
brass Cost
hasp andof staple
Concrete
for for
locking Each 56 56 56 56 56 56 56 56 56 56 56 57 56 56 56
arrangement 100mm long with brass screws
complete.

58 Repairs to automatic door closer including Each 367 367 367 367 367 367 367 367 367 367 367 379 367 367 367
replacement of damaged main spring, oiling
and adjusting as necessary including taking
out and refitting the same.
59 (A) Iron door ring of approved quality
fitted and fixed with nut and washer
complete.
(i) 50mm dia. Each 19 19 19 19 19 19 19 19 19 19 19 20 19 19 19
(ii) 75mm dia. Each 32 32 32 32 32 32 32 32 32 32 32 33 32 32 32
(B) Split shank iron door ring fitted and
fixed complete
(i) 50mm dia. Each 32 32 32 32 32 32 32 32 32 32 32 35 32 32 32
(ii) 75mm dia. Each 47 47 47 47 47 47 47 47 47 47 47 50 47 47 47
60 Supplying anodised aluminium catch hook
with eye fitted and fixed to shutter and
chowkat complete of best quality:
(i) 150mm long. Each 42 42 42 42 42 42 42 42 42 42 42 43 42 42 42
(ii) 225mm long. Each 49 49 49 49 49 49 49 49 49 49 49 50 49 49 49

Page 98
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

61 Anodised aluminium barrel / tower / socket


bolt (full covered) of approved manufactured
from extruded section conforming to I.S.
204/74 fitted and fixed with cadmium plated
screws:
(i) 50mm long x 10mm dia. bolt. Each 50 50 50 50 50 50 50 50 50 50 50 51 50 50 50
(ii) 75mm long x 10mm dia. bolt. Each 55 55 55 55 55 55 55 55 55 55 55 56 55 55 55
(iii) 100mm long x 10mm dia. bolt. Each 61 61 61 61 61 61 61 61 61 61 61 63 61 61 61
(iv) 150mm long x 10mm dia. bolt. Each 73 73 73 73 73 73 73 73 73 73 73 75 73 73 73
(v) 150mm long x 12mm dia. bolt. Each 103 103 103 103 103 103 103 103 103 103 103 104 103 103 103
(vi) 200mm long x 10mm dia. bolt. Each 91 91 91 91 91 91 91 91 91 91 91 92 91 91 91
(vii) 225mm long x 10mm dia. bolt. Each 98 98 98 98 98 98 98 98 98 98 98 99 98 98 98
(viii) 225mm long x 12mm dia. bolt. Each 134 134 134 134 134 134 134 134 134 134 134 135 134 134 134
(ix) 300mm long x 10mm dia. bolt. Each 116 116 116 116 116 116 116 116 116 116 116 117 116 116 116
(x) 300mm long x 12mm dia. bolt. Each 178 178 178 178 178 178 178 178 178 178 178 179 178 178 178
62 Anodised aluminium skeleton bolt of
approved quality manufactured from
extruded section conforming to I.S:
specification (I.S: 204/74) fitted and fixed
(i) 225mm long x 10mm dia. bolt. Each 95 95 95 95 95 95 95 95 95 95 95 97 95 95 95
(ii) 225mm long x 12mm dia. bolt. Each 129 129 129 129 129 129 129 129 129 129 129 130 129 129 129
(iii) 300mm long x 10mm dia. bolt. Each 125 125 125 125 125 125 125 125 125 125 125 126 125 125 125
(iv) 300mm long x 12mm dia. bolt. Each 174 174 174 174 174 174 174 174 174 174 174 176 174 174 174
(v) 450mm long x 10mm dia. bolt. Each 165 165 165 165 165 165 165 165 165 165 165 169 165 165 165
(vi) 450mm long x 12mm dia. bolt. Each 224 224 224 224 224 224 224 224 224 224 224 227 224 224 224
(vii) 600mm long x 10mm dia. bolt. Each 199 199 199 199 199 199 199 199 199 199 199 201 199 199 199
(viii) 600mm long x 12mm dia. bolt. Each 267 267 267 267 267 267 267 267 267 267 267 268 267 267 267
63 Anodised aluminium Aldrop / Sliding bolts of
approved quality manufactured from
extruded section conforming to I.S.
specification (I.S. 2681/66) fitted and fixed
(i) 250mm x 16mm dia bolt. Each 270 270 270 270 270 270 270 270 270 270 270 272 270 270 270
(ii) 250mm x 19mm dia. bolt. Each 336 336 336 336 336 336 336 336 336 336 336 342 336 336 336
(iii) 300mm x 16mm dia. bolt. Each 269 269 269 269 269 269 269 269 269 269 269 282 269 269 269
(iv) 300mm x 19mm dia. bolt. Each 347 347 347 347 347 347 347 347 347 347 347 353 347 347 347

Page 99
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

64 Anodised aluminium butt hinges of approved


quality manufactured from extruded section
conforming to I.S. specification (I.S. 205/66)
and fitted and fixed with cadmium plated
screws:
(i) 50 x 45 x 2.5mm. Each 43 43 43 43 43 43 43 43 43 43 43 44 43 43 43
(ii) 65 x 45 x 2.5mm. Each 49 49 49 49 49 49 49 49 49 49 49 50 49 49 49
(iii) 75 x 45 x 2.5mm. Each 60 60 60 60 60 60 60 60 60 60 60 61 60 60 60
(iv) 75 x 63 x 3.2mm. Each 72 72 72 72 72 72 72 72 72 72 72 73 72 72 72
(v) 100 x 63 x 3.2mm. Each 84 84 84 84 84 84 84 84 84 84 84 85 84 84 84
(vi) 125 x 63 x 3.2mm. Each 90 90 90 90 90 90 90 90 90 90 90 91 90 90 90
(vii) 100 x 75 x 4.0mm. Each 107 107 107 107 107 107 107 107 107 107 107 108 107 107 107
(viii) 125 x 63 x 4.0mm. Each 125 125 125 125 125 125 125 125 125 125 125 126 125 125 125
(ix) 125 x 75 x 4.0mm. Each 131 131 131 131 131 131 131 131 131 131 131 132 131 131 131
(x) 150 x 75 x 4.0mm. Each 155 155 155 155 155 155 155 155 155 155 155 157 155 155 155
65 Anodised aliminium D-type handle of
approved quality manufactured from
extruded section conforming to I.S.
specification (I.S. 230/72) fitted and fixed
(a) With continuous plate base
(Hexagonal / Round rod)
(i) 75 mm grip x 10 mm dia rod. Each 70 70 70 70 70 70 70 70 70 70 70 76 70 70 70
(ii) 100 mm grip x 10 mm dia rod. Each 79 79 79 79 79 79 79 79 79 79 79 85 79 79 79
(iii) 100 mm grip x 12 mm dia rod. Each 98 98 98 98 98 98 98 98 98 98 98 104 98 98 98
(iv) 125 mm grip x 10 mm dia rod. Each 108 108 108 108 108 108 108 108 108 108 108 112 108 108 108
(v) 125 mm grip x 12 mm dia rod. Each 118 118 118 118 118 118 118 118 118 118 118 126 118 118 118
(vi) 150 mm grip x 10 mm dia rod. Each 111 111 111 111 111 111 111 111 111 111 111 117 111 111 111
(vii) 150 mm grip x 12 mm dia rod. Each 127 127 127 127 127 127 127 127 127 127 127 133 127 127 127

(b) With round base:


(i) 75 mm grip x 10 mm dia rod. Each 56 56 56 56 56 56 56 56 56 56 56 62 56 56 56
(ii) 100 mm grip x 10 mm dia rod. Each 62 62 62 62 62 62 62 62 62 62 62 68 62 62 62
(iii) 100 mm grip x 12 mm dia rod. Each 70 70 70 70 70 70 70 70 70 70 70 76 70 70 70
(iv) 150 mm grip x 10 mm dia rod. Each 98 98 98 98 98 98 98 98 98 98 98 104 98 98 98

Page 100
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

(v) 150 mm grip x 12 mm dia rod. Each 104 104 104 104 104 104 104 104 104 104 104 110 104 104 104
66 Anodised aluminium decorative handle
(hexagonal / fluted) of approed quality fitted
and fixed complete.
(i) 150mm plate x 10mm dia rod x 12mm Each 99 99 99 99 99 99 99 99 99 99 99 110 99 99 99
hexagonal/fluted.
(ii) 175mm plate x 12mm dia rod x 60mm Each 114 114 114 114 114 114 114 114 114 114 114 120 114 114 114
hexagonal / fluted.
67 (a) Metallic magic eye of approved quality Each 61 61 61 61 61 61 61 61 61 61 61 73 61 61 61
fitted and fixed complete.
(b) Plastic magic eye of approved quality Each 43 43 43 43 43 43 43 43 43 43 43 49 43 43 43
fitted and fixed complete.
68 Anodised aluminium grip handle with base
plate of approved quality fitted and fixed
complete.
(a) With base plate.
(i) 165mm grip x 12mm dia rod x 42mm plate Each 167 167 167 167 167 167 167 167 167 167 167 179 167 167 167
x 3.2mm thick.
(ii) 225mm grip x 16mm dia rod x 38mm Each 202 202 202 202 202 202 202 202 202 202 202 208 202 202 202
plate x 3.2mm thick.
(iii) 300mm grip x 20mm dia rod x 50mm Each 239 239 239 239 239 239 239 239 239 239 239 245 239 239 239
plate x 3.2mm thick.
69 Supplying fitting and fixing 4mm thick acrylic Sq.M 706 706 706 706 706 706 706 706 706 706 706 712 706 706 706
ornamental finger plate made of transparent
acrylic sheet including providing holes of
knobs and keys as per existing shutter and
chamfering the edges of the acrylic sheet.
70 Iron door handle of approved quality fitted
and fixed complete:
(i) 100mm x 5mm. Each 45 45 45 45 45 45 45 45 45 45 45 46 45 45 45
(ii) 150mm x 5.5mm. Each 57 57 57 57 57 57 57 57 57 57 57 58 57 57 57
71 Supplying , fitting and fixing Godrej ultra Each 1937 1937 1937 1937 1937 1937 1937 1937 1937 1937 1937 1967 1937 1937 1937
vertibold brass rim lock.
72 Labour for taking out door and window frame
including shutter for repair or replacement of
different parts of the frame & refixing the
same including mending good all damaes
complete. (Concrete and brick work for
mending
(a) damage
Upto area 2.5 will
Sq.mbe paid separately) Sq.M 121 121 121 121 121 121 121 121 121 121 121 121 121 121 121
(b) Above area 2.5 Sq.m Sq.M 148 148 148 148 148 148 148 148 148 148 148 148 148 148 148

Page 101
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

73 Taking out shutter of door and window, Sq.M 128 128 128 128 128 128 128 128 128 128 128 128 128 128 128
dismantling by parts (for repair or
replacement of damaged parts),
reassembling and refitting and rehanging
same with old fittings but with new screws as
necessary. (Where different parts of same
shutter are renewed under different item,
74 payment
Taking outunder
dooritemand73window
will be shutters
made onceand
rehanging the same with old fittings.
(a) With new iron screws. Sq.M 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78
(b) With old screws. Sq.M 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67

75 Easing door and windows. Each 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17

76 Wooden venetian/ Louvered valves, fitted


and fixed with plated hooks complete:
(i) 19mm thick valves.
(a) 1st class best Indian teak. Sq.M 2759 2575 2504 2504 2759 2504 2490 2490 2490 2490 2490 2575 2490 2490 2490
(b) Ordinary teak. Sq.M 2291 2220 2078 2078 2291 2220 2078 2078 2149 2149 2149 2149 2149 2149 2149
(ii) 12mm thick valves.(Size 360x100mm)

(a) 1st class best Indian Teak. Sq.M 2143 2024 1978 1978 2143 1978 1969 1969 1969 1969 1969 2024 1969 1969 1969
(b) Ordinary Teak Wood. Sq.M 1841 1795 1703 1703 1841 1795 1703 1703 1749 1749 1749 1749 1749 1749 1749
(c) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 1515 1474 1474 1474 1515 1474 1474 1474 1474 1474 1474 1496 1474 1474 1474
Mogra, Hallak.
(c) Other Local Wood. Sq.M 1215 1169 1169 1169 1215 1169 1169 1169 1169 1169 1169 1169 1174 1174 1174
(This is a repair item. Item No. 73 or 74
will be admissible in addition).
77 Renewing plated hook of Venetian Valve Each 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16
with screws.
78 Renewing valve rod of size 37.5mmx
37.5mm for Venetian Shutters fitted and
fixed with old plated screw
(a) Sishu, Gamar, Champ,Badam,Bhola, Metre 328 313 313 313 328 313 313 313 313 313 313 321 313 313 313
Mogra, Hallak.
(b) Other Local Wood. Metre 213 195 195 195 213 195 195 195 195 195 195 195 197 197 197
79 Strengthening corners of shutters with M.S.
corner plate fitted with screws:
(a) With 4.5mm thick plate. Each 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29

Page 102
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

(b) With 3.0mm thick plate. Each 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25


(c) With 1.5mm thick plate. Each 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21
80 Renewing gauge bar(40x40mm) of glazed
shutter to match with the existing one .
(a) Sishu, Gamar, Champ,Badam,Bhola, Metre 254 244 244 244 254 244 244 244 244 244 244 249 244 244 244
Mogra, Hallak.
(c) Other Local Wood. Metre 183 172 172 172 183 172 172 172 172 172 172 172 173 173 173

81 Renewing 12mm. Thick louver of fixed


lauvered shutter to match with the existing
one including necessary railing pieces:
(a) Ordinary Teak Wood. Sq.M 1999 1953 1861 1861 1999 1953 1861 1861 1907 1907 1907 1907 1907 1907 1907
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 1673 1632 1632 1632 1673 1632 1632 1632 1632 1632 1632 1655 1632 1632 1632
Mogra, Hallak.
(c) Other Local Wood. Sq.M 1373 1327 1327 1327 1373 1327 1327 1327 1327 1327 1327 1327 1332 1332 1332
82 Styles and rails of wooden shutters fitted and
fixed complete. (Payment to be made on
area of new work only). In Ground Floor:

(i) For 25mm. Thick shutter.


(a) Ordinary Teak Wood. Sq.M 2736 2626 2408 2408 2736 2626 2408 2408 2517 2517 2517 2517 2517 2517 2517
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 1956 1858 1858 1858 1956 1858 1858 1858 1858 1858 1858 1912 1858 1858 1858
Mogra, Hallak.
(c) Other Local Wood. Sq.M 1240 1132 1132 1132 1240 1132 1132 1132 1132 1132 1132 1132 1143 1143 1143
(ii) 35mm Thick shutter.
(a) Ordinary Teak Wood. Sq.M 3650 3498 3194 3194 3650 3498 3194 3194 3346 3346 3346 3346 3346 3346 3346
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 2569 2433 2433 2433 2569 2433 2433 2433 2433 2433 2433 2509 2433 2433 2433
Mogra, Hallak.
(c) Other Local Wood. Sq.M 1574 1424 1424 1424 1574 1424 1424 1424 1424 1424 1424 1424 1439 1439 1439

(iii) 37.5mm. Thick shutter.


(a) Ordinary Teak Wood. Sq.M 3794 3634 3314 3314 3794 3634 3314 3314 3474 3474 3474 3474 3474 3474 3474
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 2656 2514 2514 2514 2656 2514 2514 2514 2514 2514 2514 2593 2514 2514 2514
Mogra, Hallak.
(c) Other Local Wood. Sq.M 1609 1451 1451 1451 1609 1451 1451 1451 1451 1451 1451 1451 1466 1466 1466
(iv) 40mm. Thick shutter.
(a) Ordinary Teak Wood. Sq.M 4035 3861 3514 3514 4035 3861 3514 3514 3688 3688 3688 3688 3688 3688 3688

Page 103
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 2802 2647 2647 2647 2802 2647 2647 2647 2647 2647 2647 2733 2647 2647 2647
Mogra, Hallak.
(c) Other Local Wood. Sq.M 1667 1496 1496 1496 1667 1496 1496 1496 1496 1496 1496 1496 1513 1513 1513
(v) 45mm. Thick shutter.
(a) Ordinary Teak Wood. Sq.M 4470 4272 3877 3877 4470 4272 3877 3877 4075 4075 4075 4075 4075 4075 4075
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 3066 2890 2890 2890 3066 2890 2890 2890 2890 2890 2890 2988 2890 2890 2890
Mogra, Hallak.
(c) Other Local Wood. Sq.M 1775 1579 1579 1579 1775 1579 1579 1579 1579 1579 1579 1579 1599 1599 1599
(vi) 50mm. Thick shutter.
(a) 1st class best Indian teak. Sq.M 6308 5746 5530 5530 6308 5530 5486 5486 5486 5486 5486 5746 5486 5486 5486
(b) Ordinary Teak Wood. Sq.M 4881 4665 4232 4232 4881 4665 4232 4232 4448 4448 4448 4448 4448 4448 4448

(This is a repair Item Item No. 73 will be


admissible in addition). Lifting Charges
for upper floors refer item 86.
83 Panel (made of single plank) of door and
window shutters to design as directed: In
Ground Floor
(Payment to be made on area of exposed
new work). (In case of non-supply of single
plank penal rate of reduction to a maximum
of 30% will be made).
(i) 12mm Thick panel of 30cm to 45cm
width
(a) Ordinary Teak Wood. Sq.M 1282 1245 1170 1170 1282 1245 1170 1170 1207 1207 1207 1207 1207 1207 1207
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 1016 983 983 983 1016 983 983 983 983 983 983 1002 983 983 983
Mogra, Hallak.
(c) Other Local Wood. Sq.M 1470 1274 1274 1274 1470 1274 1274 1274 1274 1274 1274 1274 1294 1294 1294
(ii) 19mm thick panel of 30cm to 45cm
width
(a) Ordinary Teak Wood. Sq.M 1714 1653 1530 1530 1714 1653 1530 1530 1592 1592 1592 1592 1592 1592 1592
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 1278 1223 1223 1223 1278 1223 1223 1223 1223 1223 1223 1254 1223 1223 1223
Mogra, Hallak.
(c) Other Local Wood. Sq.M 877 816 816 816 877 816 816 816 816 816 816 816 822 822 822

(iii) 25mm thick panel of 30cm to 45cm


width
(a) 1st class best Indian teak. Sq.M 2645 2430 2347 2347 2645 2347 2331 2331 2331 2331 2331 2430 2331 2331 2331

Page 104
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

(b) Ordinary Teak Wood. Sq.M 2099 2016 1851 1851 2099 2016 1851 1851 1933 1933 1933 1933 1933 1933 1933
(c) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 1511 1437 1437 1437 1511 1437 1437 1437 1437 1437 1437 1478 1437 1437 1437
Mogra, Hallak.
(c) Other Local Wood. Sq.M 877 816 816 816 877 816 816 816 816 816 816 816 822 822 822
(This is a repair item, Item No. 73 will be
admissible in addition). Lifting Charges
for upper floors refer item 86.
84 Panel shutters of door and window, as per
design (each panel consisting of single plank
without joint), including fitting and fixing the
same in position but excluding the cost of
hinge and other fittings.
In ground floor.
(In case of non-supply of single plank,
penal rate of reduction of 20% will be
made)
(i) 50mm thick shutters with 25mm thick
panel of size 30to 45 Cm.
(a) 1st class best Indian teak. Sq.M 8442 7664 7365 7365 8442 7365 7305 7305 7305 7305 7305 7664 7305 7305 7305
(b) Ordinary teak wood. Sq.M 6468 6169 5571 5571 6468 6169 5571 5571 5870 5870 5870 5870 5870 5870 5870
(ii) 40mm thick shutters with 19mm thick
panel of size 30to 45 Cm.
(a) Ordinary Teak Wood. Sq.M 5237 5002 4532 4532 5237 5002 4532 4532 4767 4767 4767 4767 4767 4767 4767
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 3568 3358 3358 3358 3568 3358 3358 3358 3358 3358 3358 3474 3358 3358 3358
Mogra, Hallak.
(c) Other Local Wood. Sq.M 2032 1799 1799 1799 2032 1799 1799 1799 1799 1799 1799 1799 1822 1822 1822
(iii) 35mm thick shutters with 19mm thick
panel of size 30to 45 Cm.
(a) Ordinary Teak Wood. Sq.M 4852 4639 4211 4211 4852 4639 4211 4211 4425 4425 4425 4425 4425 4425 4425
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 3335 3144 3144 3144 3335 3144 3144 3144 3144 3144 3144 3250 3144 3144 3144
Mogra, Hallak.
(c) Other Local Wood. Sq.M 1939 1727 1727 1727 1939 1727 1727 1727 1727 1727 1727 1727 1748 1748 1748
(iv) 25mm thick shutters with 12mm thick
panel of size 30to 45 Cm.
(a) Ordinary Teak Wood. Sq.M 3570 3423 3129 3129 3570 3423 3129 3129 3276 3276 3276 3276 3276 3276 3276
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 2527 2396 2396 2396 2527 2396 2396 2396 2396 2396 2396 2469 2396 2396 2396
Mogra, Hallak.
(c) Other Local Wood. Sq.M 1567 1422 1422 1422 1567 1422 1422 1422 1422 1422 1422 1422 1436 1436 1436

Page 105
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

Note: i) Lifting Charges for upper floors


refer item 86.
(ii) In case of panel with Rly. Type batton
the rates will be reduced by Rs.20.00
/Sq.m.)
85 Venetian shutters of doors and windows as
per design with valves fixed to valve and rod
with plated hooks including cost of plated
hooks and fitting, fixing shutters in position
but excluding the cost of hinges and other
fittings.
(i) 50mm thick shutters with 19mm thick
panel.
(a) 1st class best Indian teak. Sq.M 9323 8575 8287 8287 9323 8287 8229 8229 8229 8229 8229 8575 8229 8229 8229
(b) Ordinary teak. Sq.M 7639 7351 6776 6776 7639 7351 6776 6776 7063 7063 7063 7063 7063 7063 7063
(ii) 35mm thick shutters with 12mm thick
panel.
(a) Ordinary Teak Wood. Sq.M 5987 5791 5399 5399 5987 5791 5399 5399 5595 5595 5595 5595 5595 5595 5595
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 4594 4419 4419 4419 4594 4419 4419 4419 4419 4419 4419 4517 4419 4419 4419
Mogra, Hallak.
(c) Other Local Wood. Sq.M 3313 3118 3118 3118 3313 3118 3118 3118 3118 3118 3118 3118 3138 3138 3138
Note: Lifting Charges for upper floors
refer item 86.
86 Add extra over the rate of ground floor for
each addl. Floor.
(i) Upto 4th floor. Sq.M 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29
(ii) Above 4th floor. Sq.M 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36
87 Fixed louver shutters of doors and windows
as per design, including fitting & fixing same
in position but excluding the cost of hinges
and other fittings in ground floor.
(i) 50mm thick shutters with 19mm thick
valve.
(a) 1st class best Indian teak. Sq.M 8714 7999 7723 7723 8714 7723 7668 7668 7668 7668 7668 7999 7668 7668 7668
(b) Ordinary teak. Sq.M 6897 6622 6071 6071 6897 6622 6071 6071 6347 6347 6347 6347 6347 6347 6347
(ii) 40mm thick shutters with 12mm thick
valve.
(a) Ordinary Teak Wood. Sq.M 5696 5487 5070 5070 5696 5487 5070 5070 5279 5279 5279 5279 5279 5279 5279

Page 106
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 4214 4028 4028 4028 4214 4028 4028 4028 4028 4028 4028 4132 4028 4028 4028
Mogra, Hallak.
(c) Other Local Wood. Sq.M 2851 2644 2644 2644 2851 2644 2644 2644 2644 2644 2644 2644 2665 2665 2665
(iii) 35mm thick shutters with 12mm thick
valve.
(a) Ordinary Teak Wood. Sq.M 5245 5062 4695 4695 5245 5062 4695 4695 4878 4878 4878 4878 4878 4878 4878
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 3941 3778 3778 3778 3941 3778 3778 3778 3778 3778 3778 3869 3778 3778 3778
Mogra, Hallak.
(c) Other Local Wood. Sq.M 2742 2560 2560 2560 2742 2560 2560 2560 2560 2560 2560 2560 2578 2578 2578
(iv) 25mm thick shutters with 12mm thick
valve.
(a) Ordinary Teak Wood. Sq.M 4250 4108 3825 3825 4250 4108 3825 3825 3966 3966 3966 3966 3966 3966 3966
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 3242 3116 3116 3116 3242 3116 3116 3116 3116 3116 3116 3186 3116 3116 3116
Mogra, Hallak.
(c) Other Local Wood. Sq.M 2315 2175 2175 2175 2315 2175 2175 2175 2175 2175 2175 2175 2189 2189 2189

Note: Lifting Charges for upper floors


refer item 86.
88 Glazed shutters of doors, windows, fan light,
clerestory windows etc. as per design (with
ordinary glass of 7.4kg./sq.m. 3mm. Thick)
fitted with putty bed and teak wood bead and
nails including fitting and fixing shutter in
position but excluding the cost of hinges and
other fittings. cost of glass, putty, wooded
beads etc.will be paid separately.
(i) 40mm thick shutters.
(a) Ordinary Teak Wood. Sq.M 4342 4179 3854 3854 4342 4179 3854 3854 4017 4017 4017 4017 4017 4017 4017
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 3187 3042 3042 3042 3187 3042 3042 3042 3042 3042 3042 3123 3042 3042 3042
Mogra, Hallak.
(c) Other Local Wood. Sq.M 2125 1964 1964 1964 2125 1964 1964 1964 1964 1964 1964 1964 1980 1980 1980
(ii) 35mm thick shutters.
(a) Ordinary Teak Wood. Sq.M 4076 3928 3633 3633 4076 3928 3633 3633 3780 3780 3780 3780 3780 3780 3780
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 3026 2895 2895 2895 3026 2895 2895 2895 2895 2895 2895 2968 2895 2895 2895
Mogra, Hallak.
(c) Other Local Wood. Sq.M 2061 1915 1915 1915 2061 1915 1915 1915 1915 1915 1915 1915 1929 1929 1929
(iii) 25mm thick shutters.

Page 107
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

(a) Ordinary Teak Wood. Sq.M 3278 3175 2968 2968 3278 3175 2968 2968 3071 3071 3071 3071 3071 3071 3071
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 2544 2451 2451 2451 2544 2451 2451 2451 2451 2451 2451 2503 2451 2451 2451
Mogra, Hallak.
(c) Other Local Wood. Sq.M 1868 1765 1765 1765 1868 1765 1765 1765 1765 1765 1765 1765 1776 1776 1776
Note: i) Lifting Charges for upper floors
refer item 86.

89 Glazed shutters of doors, as per design with


sheet glass of 5.0mm thick beded in putty
and fitted with teak bead and nails (the styles
150mm wide, top & bottm rail 200mm wide if
not otherwise mentioned) including fitting
and fixing shutters in position but excluding
the cost of glass , putty , teak bead, nails,
hinges etc. and other fittings, in ground floor.

50mm Thick shutters


(a) 1st class best Indian teak. Sq.M 5181 4717 4538 4538 5181 4538 4503 4503 4503 4503 4503 4717 4503 4503 4503
(b) Ordinary Teak Wood. Sq.M 3999 3821 3464 3464 3999 3821 3464 3464 3642 3642 3642 3642 3642 3642 3642

Note: i) Lifting Charges for upper floors


refer item 86.
ii) In case of panel with Rly. Type battens
the rate will be reduced by Rs. 10.00 per
sq.m.)
90 Shutter of 1/3rd panel, 2/3 glazed of doors
and windows, as per design (each panel
consisting of a single plank without joint and
with ordinary glass of 7.4 kg per Sq.m/3mm
Thick) fitted with putty bed, teak wood bead
and nails including fitting and fixing shutters
in position but excluding the cost of glass ,
putty , teak bead, nails, hinges etc. and other
(i) 50mm thick shutters with 25mm thick
panel.
(a) 1st class best Indian teak. Sq.M 7590 6926 6671 6671 7590 6671 6620 6620 6620 6620 6620 6926 6620 6620 6620
(b) Ordinary teak. Sq.M 5905 5650 5139 5139 5905 5650 5139 5139 5395 5395 5395 5395 5395 5395 5395
(ii) 40mm thick shutters with 19mm thick
panel.
(a) Ordinary Teak Wood. Sq.M 4878 4680 4283 4283 4878 4680 4283 4283 4482 4482 4482 4482 4482 4482 4482

Page 108
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 3470 3293 3293 3293 3470 3293 3293 3293 3293 3293 3293 3391 3293 3293 3293
Mogra, Hallak.
(c) Other Local Wood. Sq.M 2174 1978 1978 1978 2174 1978 1978 1978 1978 1978 1978 1978 1997 1997 1997
(iii) 35mm thick shutters with 19mm thick
panel.
(a) Ordinary Teak Wood. Sq.M 4446 4271 3923 3923 4446 4271 3923 3923 4097 4097 4097 4097 4097 4097 4097
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 3208 3053 3053 3053 3208 3053 3053 3053 3053 3053 3053 3139 3053 3053 3053
Mogra, Hallak.
(c) Other Local Wood. Sq.M 2069 1897 1897 1897 2069 1897 1897 1897 1897 1897 1897 1897 1914 1914 1914
(iv) 25mm thick shutters with 12mm thick
panel.
(a) Ordinary Teak Wood. Sq.M 3409 3283 3031 3031 3409 3283 3031 3031 3157 3157 3157 3157 3157 3157 3157
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 2513 2401 2401 2401 2513 2401 2401 2401 2401 2401 2401 2463 2401 2401 2401
Mogra, Hallak.
(c) Other Local Wood. Sq.M 1688 1564 1564 1564 1688 1564 1564 1564 1564 1564 1564 1564 1576 1576 1576
Note: i) Lifting Charges for upper floors refer
item 86.
91 Shutters of 2/3rd panel and 1/3rd glazed of
doors and windows as per design (each
panel consisting of a single plank without
joint and with ordinary glass of 7.4kg. Per
sq.m./3mm thick) fitted with putty bed and
teak wood beads and nails including fitting
and fixing shutters in position but excluding
the cost of glass , putty , teak bead, nails,
hinges etc. and other fittings, in ground floor.

(i) 50mm. Thick shutters with 25mm thick


panel.
(a) 1st class best Indian teak. Sq.M 8269 7543 7264 7264 8269 7264 7208 7208 7208 7208 7208 7543 7208 7208 7208
(b) Ordinary teak. Sq.M 6423 6143 5585 5585 6423 6143 5585 5585 5864 5864 5864 5864 5864 5864 5864
(ii) 40mm thick shutters with 19mm thick
panel.
(a) Ordinary Teak Wood. Sq.M 5396 5173 4729 4729 5396 5173 4729 4729 4951 4951 4951 4951 4951 4951 4951
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 3820 3621 3621 3621 3820 3621 3621 3621 3621 3621 3621 3731 3621 3621 3621
Mogra, Hallak.
(c) Other Local Wood. Sq.M 2367 2147 2147 2147 2367 2147 2147 2147 2147 2147 2147 2147 2169 2169 2169
(iii) 35mm thick shutters with 19mm thick
panel.

Page 109
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

(a) Ordinary Teak Wood. Sq.M 4966 4768 4371 4371 4966 4768 4371 4371 4570 4570 4570 4570 4570 4570 4570
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 3558 3381 3381 3381 3558 3381 3381 3381 3381 3381 3381 3479 3381 3381 3381
Mogra, Hallak.
(c) Other Local Wood. Sq.M 2259 2063 2063 2063 2259 2063 2063 2063 2063 2063 2063 2063 2082 2082 2082
(iv) 25mm thick shutters with 12mm thick
panel.
(a) Ordinary Teak Wood. Sq.M 3797 3659 3382 3382 3797 3659 3382 3382 3520 3520 3520 3520 3520 3520 3520
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 2815 2692 2692 2692 2815 2692 2692 2692 2692 2692 2692 2761 2692 2692 2692
Mogra, Hallak.
(c) Other Local Wood. Sq.M 1909 1772 1772 1772 1909 1772 1772 1772 1772 1772 1772 1772 1786 1786 1786
Note: i) Lifting Charges for upper floors
refer item 86.
(ii) In case of panel with Rly. Type battens
the rate will be reduced by Rs. 12.00 per
Sq.m]
92 Shutter of 1/3rd fixed louvered, 2/3rd glazed
of doors as per design (with ordinary glass of
7.4kg per sq.m./3mm. Thick) fixed with putty
bed, teak wood beads and nails including
fitting and fixing shutters in position but
excluding the cost of glass , putty , teak
bead, nails, hinges etc. and other fittings, in
ground floor.
(i) 50mm thick shutters with 19mm thick
valve.
(a) 1st class best Indian teak. Sq.M 6820 6246 6026 6026 6820 6026 5982 5982 5982 5982 5982 6246 5982 5982 5982
(b) Ordinary teak. Sq.M 5364 5143 4701 4701 5364 5143 4701 4701 4922 4922 4922 4922 4922 4922 4922
(ii) 40mm thick shutters with 12mm thick
valve.
(a) Ordinary Teak Wood. Sq.M 4509 4335 3989 3989 4509 4335 3989 3989 4162 4162 4162 4162 4162 4162 4162
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 3278 3124 3124 3124 3278 3124 3124 3124 3124 3124 3124 3209 3124 3124 3124
Mogra, Hallak.
(c) Other Local Wood. Sq.M 2143 1971 1971 1971 2143 1971 1971 1971 1971 1971 1971 1971 1988 1988 1988
(iii) 35mm thick shutters with 12mm thick
valve.
(a) Ordinary Teak Wood. Sq.M 3966 3818 3522 3522 3966 3818 3522 3522 3670 3670 3670 3670 3670 3670 3670
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 2914 2782 2782 2782 2914 2782 2782 2782 2782 2782 2782 2855 2782 2782 2782
Mogra, Hallak.
(c) Other Local Wood. Sq.M 1943 1796 1796 1796 1943 1796 1796 1796 1796 1796 1796 1796 1811 1811 1811

Page 110
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

(iv) 25mm thick shutters with 12mm thick


valve.
(a) Ordinary Teak Wood. Sq.M 3235 3123 2899 2899 3235 3123 2899 2899 3011 3011 3011 3011 3011 3011 3011
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 2441 2341 2341 2341 2441 2341 2341 2341 2341 2341 2341 2396 2341 2341 2341
Mogra, Hallak.
(c) Other Local Wood. Sq.M 1710 1599 1599 1599 1710 1599 1599 1599 1599 1599 1599 1599 1610 1610 1610
Note: i) Lifting Charges for upper floors
refer item 86.
93 Shutters 2/3 fixed louvered, 1/3rd glazed of
doors and windows as per design (with
ordinary glass of 7.4kg. Per sq.m./3mm.
Thick) fitted with putty beds, teak wood
beads and nails including fitting and fixing
shutters in position but excluding the cost of
glass , putty , teak bead, nails, hinges etc.
and other fittings, in ground floor.
(i) 50mm thick shutters with 19mm thick
valve.
(a) 1st class best Indian teak. Sq.M 7534 6902 6659 6659 7534 6659 6610 6610 6610 6610 6610 6902 6610 6610 6610
(b) Ordinary Teak. Sq.M 5930 5687 5200 5200 5930 5687 5200 5200 5444 5444 5444 5444 5444 5444 5444
(ii) 40mm thick shutters with 12mm thick
valve.
(a) Ordinary Teak Wood. Sq.M 4924 4737 4362 4362 4924 4737 4362 4362 4550 4550 4550 4550 4550 4550 4550
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 3594 3427 3427 3427 3594 3427 3427 3427 3427 3427 3427 3520 3427 3427 3427
Mogra, Hallak.
(c) Other Local Wood. Sq.M 2370 2185 2185 2185 2370 2185 2185 2185 2185 2185 2185 2185 2204 2204 2204
(iii) 35mm thick shutters with 12mm thick
valve.
(a) Ordinary Teak Wood. Sq.M 4522 4357 4027 4027 4522 4357 4027 4027 4192 4192 4192 4192 4192 4192 4192
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 3350 3204 3204 3204 3350 3204 3204 3204 3204 3204 3204 3285 3204 3204 3204
Mogra, Hallak.
(c) Other Local Wood. Sq.M 2273 2110 2110 2110 2273 2110 2110 2110 2110 2110 2110 2110 2126 2126 2126
(iv) 25mm thick shutters with 12mm thick
valve.
(a) Ordinary Teak Wood. Sq.M 3561 3435 3184 3184 3561 3435 3184 3184 3309 3309 3309 3309 3309 3309 3309
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 2668 2555 2555 2555 2668 2555 2555 2555 2555 2555 2555 2618 2555 2555 2555
Mogra, Hallak.

Page 111
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

(c) Other Local Wood. Sq.M 1846 1721 1721 1721 1846 1721 1721 1721 1721 1721 1721 1721 1734 1734 1734
Note: i) Lifting Charges for upper floors
refer item 86.

94 Z-batten shutters of door and window as per


design havings tongued and groove-half lap
jointed as per direction of the Engineer-in-
Charge including fitting and fixing shutter in
position, but excluding the cost of hinges and
other fittings in ground floor.

(A) Shutter with 25mm thick planks,


19mm thick battens.
(i) Sal : Local. Sq.M 3611 3413 3413 3413 3611 3413 3413 3413 3413 3413 3413 3413 3369 3369 3369
(ii) Sal : Malayasian Sq.M 3844 3523 3523 3523 3844 3523 3545 3545 3545 3545 3611 - - - -
(iii) Sishu, Gamar, Champ, Badam, Bhola, Sq.M 3077 2918 2918 2918 3077 2918 2918 2918 2918 2918 2918 3006 2918 2918 2918
Morga, Hallak.
(iv) Other Local Wood Sq.M 2092 1871 1871 1871 2092 1871 1871 1871 1871 1871 1871 1871 1893 1893 1893
(B) Shutter with 19mm thick planks,
19mm thick battens.
(i) Sal : Local. Sq.M 3131 2971 2971 2971 3131 2971 2971 2971 2971 2971 2971 2971 2935 2935 2935
(ii) Sal : Malayasian Sq.M 3319 3060 3060 3060 3319 3060 3077 3077 3077 3077 3131 - - - -
(iii) Sishu, Gamar, Champ, Badam, Bhola, Sq.M 3077 2918 2918 2918 3077 2918 2918 2918 2918 2918 2918 3006 2918 2918 2918
Morga, Hallak.
(iv) Other Local Wood Sq.M 1905 1727 1727 1727 1905 1727 1727 1727 1727 1727 1727 1727 1745 1745 1745
Note: i) Lifting Charges for upper floors
refer item 86.

Page 112
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

95 Providing and fixing of false ceiling with


powder coated exposed G.I. grid suspension
system (E-Grid T 2430/1510 or equivalent
load carrying capacity with mid span
deflection not exceeding 1/360 span with
hanger spacing of 1200mm c/c ) consisting
of Main Runner 3600 mm long, Cross Tee
1200 mm / 600 mm long and Wall Angle.
The Wall Angle shall be fixed on PVC Dash
Fasteners on the perimeter of the wall by
steel screws with distance 300mm c/c. The
Main Runners to be placed @ 1200 mm. The
Cross Tee 1200mm will be inserted in the
pre-cut slots of Main Runner at regular
interval of 600 mm to form a modular grid of
1200mm X 600mm. Additional Cross Tees of
600 mm shall be placed perpendicular to the
Cross Tee 1200 mm long to finally form a
grid of 600 mm X 600 mm. Grid of module
size 600 mm X 600 mm shall be supported
by 6 mm dia G.I. wire from purlins / soffit. 4
mm thick High Pressure Steam Cured Non
Asbestos Fibre Cement Standard Ceiling
Board (Density > 1300 Kg/m3) of size 595
mm X 595 mm, conforming IS 14862 & Type
B Category III of ISO 8336, tested as per AS-
a) False Ceiling (with 4mm thick Fibre Sq.M 596 596 596 596 596 596 596 596 596 596 596 609 596 596 596
Cement Standard Ceiling Board and E-Grid
T-2430/1510).

Page 113
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

96 (A) Providing and fixing of false ceiling with


powder coated exposed G.I. grid suspension
system (E-Grid T 2430 or equivalent load
carrying capacity with mid span deflection
not exceeding 1/360 span with hanger
spacing of 1200mm c/c ) consisting of Main
Runner 3600 mm long, Cross Tee 1200 mm
/ 600 mm long and Wall Angle. The Wall
Angle shall be fixed on PVC Dash Fasteners
on the perimeter of the wall by steel screws
with distance 300mm c/c. The Main Runners
to be placed @ 1200 mm. The Cross Tee
1200mm will be inserted in the pre-cut slots
of Main Runner at regular interval of 600 mm
to form a modular grid of 1200mm X 600mm.
Additional Cross Tees of 600 mm shall be
placed perpendicular to the Cross Tee 1200
mm long to finally form a grid of 600 mm X
600 mm. Grid of module size 600 mm X 600
mm shall be supported by 6 mm dia G.I. wire
from purlins / soffit. 6 mm thick High
Pressure Steam Cured Non Asbestos Fibre
Cement Standard Ceiling Board (Density >
1300 Kg/m3) of size 595 mm X 595 mm,
conforming IS 14862 & Type B Category III
of ISO 8336, tested as per AS-1530 part 3 &
False Ceiling (with 6mm thick Fibre Cement Sq.M 680 680 680 680 680 680 680 680 680 680 680 695 680 680 680
Standard Ceiling Board and E-Grid T-2430).

Page 114
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

(B) False Ceiling with concealed metal


(G.I.) Framework :-
Providing and fixing in position 6 mm. thick
High Pressure Steam cured non-asbestos
Fiber Cement Ceiling Board (Density > 1250
Kg/M3) Confirming IS 14862 & Type - B
Category - III of ISO 8336, Tested as per AS-
1530 Part - 3 & BS-476 Part - 4,5,6,7 & 8
fixed to G.I. Section (perimeter channels
having one flange of 20 mm. and another
flange of 30 mm. with thickness of 0.55 mm.
and web of length 27 mm., along the
perimeter of the ceiling, screws fixed to the
wall with help of nylon sleeves or PVC dash
fastners @ 610 mm c/c. then suspend G.I.
intermidiate 'C' section with web 45 mm. and
flanges of 15 mm. each from soffit @ 1200
mm c/c with ceiling angle of size 25 mm. X
10 mm. X 0.55 mm. fixed to soffit G.I. Cleat
and Steel expansion fasteners. Ceiling
section of 0.55 mm. thickness having web of
51.5 mm. and two flanges of 26 mm. each
with lips of 10.55 mm., are then fixed on to
the intermediate channel with the help of
connecting clips in the direction
perpendicular to the intermidiate channel @
610 mm c/c) with fully threaded fiber cement
screws @ 300 mm c/c. All complete as per
the drawing and direction of Engineer-in-
Charge. Jointing should be done by Elasto
jointing compound and top finish with putty
False Ceiling (with 6mm thick Fibre Cement Sq.M 595 595 595 595 595 595 595 595 595 595 595 605 595 595 595
Standard Ceiling Board and E-Grid T-2430).

Page 115
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

97 Providing and fixing of false ceiling with


powder coated exposed G.I. grid suspension
system (E-Grid T 2430/1510 or equivalent
load carrying capacity with mid span
deflection not exceeding 1/360 span with
hanger spacing of 1200mm c/c ) consisting
of Main Runner 3600 mm long, Cross Tee
1200 mm / 600 mm long and Wall Angle.
The Wall Angle shall be fixed on PVC Dash
Fasteners on the perimeter of the wall by
steel screws with distance 300mm c/c. The
Main Runners to be placed @ 1200 mm. The
Cross Tee 1200mm will be inserted in the
pre-cut slots of Main Runner at a regular
interval of 600 mm to form a modular grid of
1200mm X 600mm. Additional Cross Tees of
600 mm shall be placed perpendicular to the
Cross Tee 1200 mm long to finally form a
grid of 600 mm X 600 mm. Grid of module
size 600 mm X 600 mm shall be supported
by 6 mm dia G.I. wire from purlins / soffit. 4
mm thick High Pressure Steam Cured Non
Asbestos pearl designer Fibre Cement
Standard Ceiling Board (Density > 1500
Kg/m3) of size 595 mm X 595 mm,
conforming IS 14862
a) False Ceiling (with & Type
4mm A Category
thick Pearl IV Sq.M 816 816 816 816 816 816 816 816 816 816 816 831 816 816 816
Designer Fibre Cement Board and E-Grid T-
2430/1510).

Page 116
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

98 Providing and fixing of false ceiling with


powder coated exposed G.I. grid suspension
system (E-Grid T 2430/1510 or equivalent
load carrying capacity with mid span
deflection not exceeding 1/360 span with
hanger spacing of 1200mm c/c ) consisting
of Main Runner 3600 mm long, Cross Tee
1200 mm / 600 mm long and Wall Angle.
The Wall Angle shall be fixed on PVC Dash
Fasteners on the perimeter of the wall by
steel screws with distance 300mm c/c. The
Main Runners to be placed @ 1200 mm. The
Cross Tee 1200mm will be inserted in the
pre-cut slots of Main Runner at a regular
interval of 600 mm to form a modular grid of
1200mm X 600mm. Additional Cross Tees of
600 mm shall be placed perpendicular to the
Cross Tee 1200 mm long to finally form a
grid of 600 mm X 600 mm. Grid of module
size 600 mm X 600 mm shall be supported
by 6 mm dia G.I. wire from purlins / soffit. 4
mm thick High Pressure Steam Cured Non
Asbestos Fibre Cement designer Ceiling
Board (Density > 1300 Kg/m3) of size 595
mm X 595 mm, conforming IS 14862 & Type
B Category III of ISO 8336, tested as per AS-
a) False Ceiling (with 4mm thick Fibre Sq.M 669 669 669 669 669 669 669 669 669 669 669 689 669 669 669
Cement Designer Board and E-Grid T-
2430/1510).

Page 117
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

99 (A) Providing and fixing of false ceiling with


powder coated exposed G.I. grid suspension
system (E-Grid T 2430 or equivalent load
carrying capacity with mid span deflection
not exceeding 1/360 span with hanger
spacing of 1200mm c/c ) consisting of Main
Runner 3600 mm long, Cross Tee 1200 mm
/ 600 mm long and Wall Angle. The Wall
Angle shall be fixed on PVC Dash Fasteners
on the perimeter of the wall by steel screws
with distance 300mm c/c. The Main Runners
to be placed @ 1200 mm. The Cross Tee
1200mm will be inserted in the pre-cut slots
of Main Runner at a regular interval of 600
mm to form a modular grid of 1200mm X
600mm. Additional Cross Tees of 600 mm
shall be placed perpendicular to the Cross
Tee 1200 mm long to finally form a grid of
600 mm X 600 mm. Grid of module size 600
mm X 600 mm shall be supported by 6 mm
dia G.I. wire from purlins / soffit. 6 mm thick
High Pressure Steam Cured Non Asbestos
Fibre Cement Standard Ceiling Board
(Density > 1300 Kg/m3) of size 595 mm X
595 mm, conforming IS 14862 & Type B
Category III of ISO 8336, tested as per AS-
a) False Ceiling (with 6mm thick Fibre Sq.M 794 794 794 794 794 794 794 794 794 794 794 812 794 794 794
Cement Designer Board and E-Grid T-2430).

Page 118
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

100 Providing and fixing of false ceiling with


powder coated exposed G.I. grid suspension
system (E-Grid U-1520 or equivalent load
carrying capacity with mid span deflection
not exceeding 1/360 span with hanger
spacing of 1200mm c/c ) consisting of Main
Runner 3600 mm long, Cross Tee 1200 mm
/ 600 mm long and Wall Angle. The Wall
Angle shall be fixed on PVC Dash Fasteners
on the perimeter of the wall by steel screws
with distance 300mm c/c. The Main Runners
to be placed @ 1200 mm. The Cross Tee
1200mm will be inserted in the pre-cut slots
of Main Runner at a regular interval of 600
mm to form a modular grid of 1200mm X
600mm. Additional Cross Tees of 600 mm
shall be placed perpendicular to the Cross
Tee 1200 mm long to finally form a grid of
600 mm X 600 mm. Grid of module size 600
mm X 600 mm shall be supported by 6 mm
dia G.I. wire from purlins / soffit. 15mm thick
OW Acoustic Board (Mineral Fiber Acoustic
Ceiling Tiles) of approved patern and size
595mm X 595mm with NRC value > 0.65
a) Acoustic False Ceiling (with 15mm thick Sq.M 1371 1371 1371 1371 1371 1371 1371 1371 1371 1371 1371 1389 1371 1371 1371
OW Acoustic Board and E-Grid U-1520).

101 Supplying solid flush type doors of


commercial quality, the timber frame
consisting of top and bottom rails and side
styles of well seasoned timber 65mm wide
each and the entire frame fitted with 37.5mm
wide battens places both ways in order to
make the door of solid core and internal
lipping with Garjan or similar wood veneers
using phenol formaldehyde as glue etc.
complete, including fitting, fixing shutters in
position but excluding the cost of hinges and
other fittings in ground floor.
(a) 35 mm thick shutters (single leaf) Sq.M. 3142 3142 3142 3142 3142 3142 3142 3142 3142 3142 3142 3439 3142 3142 3142

(b) 32 mm thick shutters (single leaf) Sq.M. 2785 2785 2785 2785 2785 2785 2785 2785 2785 2785 2785 3047 2785 2785 2785

(For upper floors refer to item 128 also)

Page 119
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

102 Supplying solid flush type doors of deluxe


decorative (both side) quality, conforming to
I:S 2202 timber frame consisting of top and
bottom rail and side styles of well seasoned
timber 65mm wide each and the entire frame
fitted with 27.5mm wide battens places both
ways in order to made the door of solid core
and internal lipping with teak, mahogony or
rose wood approved decorative veneers
using phenol formaldehyde as glue etc.
complete, including fitting, fixing the shutters
in position but excluding the cost of hinges
and other fittings in ground floor:

(a) 35mm thick shutters (single leaf) Sq.M. 4689 4689 4689 4689 4689 4689 4689 4689 4689 4689 4689 5141 4689 4689 4689

(b) 25mm thick shutters (single leaf) Sq.M. 4483 4483 4483 4483 4483 4483 4483 4483 4483 4483 4483 4914 4483 4483 4483

(For upper floors refer to item 128 also)

103 Extra over item No. 101 and 102 for


providing:
(a) Vision aperture (round or retangular in Each 34 34 34 34 34 34 34 34 34 34 34 34 34 34 34
shape) with 7.4kg. Per sq.m./ 3mm thick
glass pane with wooden beads. ( Cost of
glass panes and wooden beads will be paid
separately).

(b) Rabbet cutting in shutters Sq.M. of 45 45 45 45 45 45 45 45 45 45 45 45 45 45 45


Shutters
(c) Double leaf shutters Sq.M. of 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30
Shutters
(For upper floors refer to item 128 also)
104 Supplying, fitting, Fixing Fly/Mosquito proof Sq.M. 973 973 973 973 973 973 973 973 973 973 973 1016 973 973 973
nylon net on any type of window , door
shutter frame with necessary fixing
arrangements complete.

105 Ceiling with 12mm thick wooden planks fitted


and fixed complete (excluding the supporting
framework) as per direction of the Engineer-
in-charge.
In Ground Floor
(a) Ordinary Teak Sq.M. 1680 1605 1454 1454 1680 1605 1454 1454 1529 1529 1529 1529 1529 1529 1529

Page 120
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

(b) Sq.M. 1143 1076 1076 1076 1143 1076 1076 1076 1076 1076 1076 1114 1076 1076 1076
Sishu/Champ/Badam/Gamar/Bhola/Mogra/H
allak
(For upper floors refer to item 128 )
106 Wall panelling / partition with Melamine
faced 3 layered flat pressed wood particle
board of approved make and brand as per
direction of Engineer - in - Charge of
requisite grade bonded with phenol
formaldehyde synthetic resin conforming to
IS: 848 - 1974 (excluding the cost of
supporting frame work and teak wood
battens / lipping)
In Ground Floor
(A) Plain : Conforming to IS: 3087 - 1985

i) Plain : Exterior grade.

a) 9 mm thick Sq.M. 746 746 746 746 746 746 746 746 746 746 746 773 746 746 746

b) 12 mm thick. Sq.M. 914 914 914 914 914 914 914 914 914 914 914 950 914 914 914

c) 18 mm thick. Sq.M. 1212 1212 1212 1212 1212 1212 1212 1212 1212 1212 1212 1263 1212 1212 1212

(B) Prelaminated particle board conforming


to IS: 3087 - 1985 and IS 12823 - 1990.

i) One side decorative laminated

a) Exterior grade

9mm thick Sq.M. 1189 1189 1189 1189 1189 1189 1189 1189 1189 1189 1189 1244 1189 1189 1189

12mm thick Sq.M. 1242 1242 1242 1242 1242 1242 1242 1242 1242 1242 1242 1257 1242 1242 1242

(b) Interior Grade

9mm thick Sq.M. 983 983 983 983 983 983 983 983 983 983 983 1007 983 983 983

12mm thick Sq.M. 1203 1203 1203 1203 1203 1203 1203 1203 1203 1203 1203 1257 1203 1203 1203

(ii) Both side decorative laminate

(a) Exterior grade

Page 121
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

9mm thick Sq.M. 1292 1292 1292 1292 1292 1292 1292 1292 1292 1292 1292 1319 1292 1292 1292

12mm thick Sq.M. 1507 1507 1507 1507 1507 1507 1507 1507 1507 1507 1507 1569 1507 1507 1507

(b) Interior Grade

9mm thick Sq.M. 1007 1007 1007 1007 1007 1007 1007 1007 1007 1007 1007 1069 1007 1007 1007

12mm thick Sq.M. 1257 1257 1257 1257 1257 1257 1257 1257 1257 1257 1257 1319 1257 1257 1257

(c ) Extra for Ceiling Work Sq.M. 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22


107 Supplying, fitting and fixing boiling water
proof ply conforming to IS: 710-1977 bonded
with phenol formaldehyde synthetic resin
conforming to IS: 848-1974 of approved
make and brand fitted and fixed as per
design as per approval and direction of
Engineer-in-Charge.[excluding the cost of
supporting frame work and teak wood
batten/Lipping]
(i) 4mm Sq.M. 1067 1067 1067 1067 1067 1067 1067 1067 1067 1067 1067 1173 1067 1067 1067
(ii) 6mm Sq.M. 1304 1304 1304 1304 1304 1304 1304 1304 1304 1304 1304 1360 1304 1304 1304
(iii) 9mm Sq.M. 1504 1504 1504 1504 1504 1504 1504 1504 1504 1504 1504 1569 1504 1504 1504
(iv) 12mm Sq.M. 2004 2004 2004 2004 2004 2004 2004 2004 2004 2004 2004 2094 2004 2004 2004
(v) 16mm Sq.M. 2369 2369 2369 2369 2369 2369 2369 2369 2369 2369 2369 2474 2369 2369 2369
(vi) 19mm Sq.M. 2838 2838 2838 2838 2838 2838 2838 2838 2838 2838 2838 2965 2838 2838 2838
108 Supplying, fitting and fixing boiling water
resistant ply conforming to IS: 303-1989
bonded with phenol formaldehyde synthetic
resin of approved make and brand fitted and
fixed as per design as per approval and
direction of Engineer-in-Charge.[excluding
the cost of supporting frame work and teak
wood batten/Lipping]
In Ground Floor
(i) 4mm Sq.M. 848 848 848 848 848 848 848 848 848 848 848 942 848 848 848
(ii) 6mm Sq.M. 1067 1067 1067 1067 1067 1067 1067 1067 1067 1067 1067 1129 1067 1067 1067
(iii) 9mm Sq.M. 1192 1192 1192 1192 1192 1192 1192 1192 1192 1192 1192 1304 1192 1192 1192
(iv) 12mm Sq.M. 1504 1504 1504 1504 1504 1504 1504 1504 1504 1504 1504 1629 1504 1504 1504
(v) 16mm Sq.M. 1838 1838 1838 1838 1838 1838 1838 1838 1838 1838 1838 1963 1838 1838 1838
(vi) 19mm Sq.M. 2182 2182 2182 2182 2182 2182 2182 2182 2182 2182 2182 2338 2182 2182 2182

Page 122
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

109 Supplying, fitting and fixing boiling water


proof block board conforming to IS:1659-
1990 conforming to IS:848-1974 of approved
make and brand, fitted and fixed as per
design as per direction of Engineer-in-
charge.[excluding the cost of supporting
frame work and teak wood batten/Lipping]
In Ground Floor
(i) 16mm Sq.M. 1910 1910 1910 1910 1910 1910 1910 1910 1910 1910 1910 1987 1910 1910 1910

(ii) 19mm Sq.M. 2113 2113 2113 2113 2113 2113 2113 2113 2113 2113 2113 2200 2113 2113 2113

(iii) 25mm Sq.M. 2863 2863 2863 2863 2863 2863 2863 2863 2863 2863 2863 2988 2863 2863 2863

(Note: For Boiling Water Resistant Block


Boards reduce the above rates by 5%).

For upper floor refer Item 128 for item


106,107,108,109
110 Hessian ceiling as per design fitted and fixed
complete (excluding supporting framework
but including necessary timber
battens).[excluding the cost of supporting
frame work and teak wood batten/Lipping but
including necessary wood battens of size 25
mmx25 mm).
(a) malayasian Sal Sq.M. 226 215 215 215 226 215 216 216 216 216 218

(b) Local Sal Sq.M. 218 211 211 211 218 211 211 211 211 211 211 217 209 209 209

(c) Sq.M. 215 209 209 209 215 209 209 209 209 209 209 219 209 209 209
Sishu/Champ/Badam/Gamar/Bhola/Mogra/H
allak
111 Hessian partition as per design fitted and
fixed complete (excluding supporting
framework but including necessary wood
battens of size 25 mmx25 mm).

(a) malayasian Sal Sq.M. 193 182 182 182 193 182 184 184 184 184 185

(b) Local Sal Sq.M. 185 179 179 179 185 179 179 179 179 179 179 185 177 177 177

(c) Sq.M. 183 176 176 176 183 176 176 176 176 176 176 187 176 176 176
Sishu/Champ/Badam/Gamar/Bhola/Mogra/H
allak

Page 123
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

112 Renewing hessian only of ceiling including Sq.M. 88 88 88 88 88 88 88 88 88 88 88 94 88 88 88


taking out old battens etc. (as necessary)
and refixing same with new screws.

113 Canvas partition as per design fitted and


fixed complete (excluding the supporting
framework but including necessary wood
battens of size 25 mmx25mm).
(a) Sal Malayasian Sq.M. 230 219 219 219 230 219 220 220 220 220 222
(b) Sal : Local Sq.M. 222 215 215 215 222 215 215 215 215 215 215 220 213 213 213
(c) Sq.M. 219 213 213 213 219 213 213 213 213 213 213 222 213 213 213
Sishu/Gamar/Champ/Badam/Bhola/Mogra/H
allak
114 Canvas ceiling as per design fitted and fixed
complete (excluding the supporting
framework but including necessary wood
battens of size 25 mmx25mm).
(a) Malayasian Sal Sq.M. 262 251 251 251 262 251 252 252 252 252 254
(b ) Sal : Local Sq.M. 254 247 247 247 254 247 247 247 247 247 247 252 246 246 246

(c) Sq.M. 252 245 245 245 252 245 245 245 245 245 245 254 245 245 245
Sishu/Gamar/Champ/Badam/Bhola/Mogra/H
allak
115 Renewing canvas only of ceiling including Sq.M. 124 124 124 124 124 124 124 124 124 124 124 129 124 124 124
taking out old battens etc. and refixing the
same with new screws.

116 Ceiling of soft-insulation boards (12mm


thick) as per design fitted and fixed complete
(excluding the support framework but
including necessary wood battens of size 40
mmx25 mm).
In ground floor.
(a) Ordinary Teak Sq.m. 640 627 602 602 640 627 602 602 615 615 615 627 615 615 615
(b) Sal : Local Sq.m. 555 544 544 544 555 544 544 544 544 544 544 556 542 542 542

117 Ceiling of masonite board as per design


fitted and fixed complete (excluding the
supporting framework but including
necessary wood battens of size 40 mmx25
mm).
In ground floor

Page 124
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

(i) 4.5mm thick


(a) Ordinary Teak Sq.M. 610 598 573 573 610 598 573 573 586 586 586 598 586 586 586
(b) Sal Local Sq.M. 526 515 515 515 526 515 515 515 515 515 515 528 512 512 512

(ii) 6.0mm thick


(a) Ordinary Teak Sq.M. 652 640 615 615 652 640 615 615 627 627 627 642 627 627 627
(b) Sal Local Sq.M. 568 557 557 557 568 557 557 557 557 557 557 571 554 554 554
118 Ceiling of commercial ply as per design fitted
and fixed complete (excluding the supporting
framework but including necessary wood
battens of size 40mmx20mm ).
In ground floor

(i) 4mm thick


(a) Sal Local Sq.M. 649 638 638 638 649 638 638 638 638 638 638 725 635 635 635

(ii) 6mm thick


(a) Sal Local Sq.M. 836 825 825 825 836 825 825 825 825 825 825 931 823 823 823

(iii) 12mm thick


(a) Ordinary Teak Sq.M. 1233 1221 1196 1196 1233 1221 1196 1196 1208 1208 1208 1271 1208 1208 1208

119 Partition with soft insulation board (of 12mm


thick) as per design fitted and fixed complete
(excluding the supporting framework but
including necessary teak wood battens of
size 40 mm & 25 mm).

In Ground Floor
(a) Ordinary Teak Sq.M. 630 618 593 593 630 618 593 593 605 605 605 618 605 605 605
(b) Sal Local Sq.M. 546 535 535 535 546 535 535 535 535 535 535 547 532 532 532

120 Providing, fitting and fixing in position,


medium density fibre board conforming to IS:
12406-1988 for plain and IS: 14587-1998 for
prelaminated made of wood fibre bonded
with Urea formaldehyde for interior grade
and Phenol Formaldehyde for exterior grade
conforming to per IS:848-1974 as per
approved make and brand as per direction of
Engineer-in-Charge.
(A)Plain :
(a) Exterior grade.
(i) 6mm Sq.M. 715 715 715 715 715 715 715 715 715 715 715 744 715 715 715
(ii) 8mm Sq.M. 855 855 855 855 855 855 855 855 855 855 855 892 855 855 855
(iii) 12mm Sq.M. 953 953 953 953 953 953 953 953 953 953 953 994 953 953 953

Page 125
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

(b) Interior grade.


(i) 6mm Sq.M. 785 785 785 785 785 785 785 785 785 785 785 818 785 785 785
(ii) 8mm Sq.M. 925 925 925 925 925 925 925 925 925 925 925 965 925 925 925
(iii) 12mm Sq.M. 1135 1135 1135 1135 1135 1135 1135 1135 1135 1135 1135 1185 1135 1135 1135

(B) One side decorative lamination

(I) Exterior Grade


(i) 8mm Sq.M. 877 877 877 877 877 877 877 877 877 877 877 940 877 877 877
(ii) 12mm Sq.M. 1008 1008 1008 1008 1008 1008 1008 1008 1008 1008 1008 1065 1008 1008 1008

(II) Interior Grade


(i) 8mm Sq.M. 877 877 877 877 877 877 877 877 877 877 877 877 877 877 877
(ii) 12mm Sq.M. 977 977 977 977 977 977 977 977 977 977 977 977 977 977 977

(C) Both side decorative lamination

(I) Exterior Grade


(i) 8mm Sq.M. 946 946 946 946 946 946 946 946 946 946 946 987 946 946 946
(ii) 12mm Sq.M. 1077 1077 1077 1077 1077 1077 1077 1077 1077 1077 1077 1125 1077 1077 1077

(II) Interior Grade


(i) 8mm Sq.M. 908 908 908 908 908 908 908 908 908 908 908 947 908 908 908
(ii) 12mm Sq.M. 1027 1027 1027 1027 1027 1027 1027 1027 1027 1027 1027 1072 1027 1027 1027

121 Supplying fitting, fixing decorative lamination


conforming to IS: 2046 : 1995 as per
approved make, brand, finish and thickness
with fitting, fixing the same on Particle/MDF /
Ply Boards with recommended / approved
adhesive with proper clipping the sides for
better attachment as per direction of
Engineer-in-charge.The rate includes the
cost of labour, adhesive and all incidental
charges thereof.
In ground floor
Glossy/Matt/Suede excluding surface texture
or metallic lustre.
(i) Thickness of laminate 1.5mm Sq.M. 924 924 924 924 924 924 924 924 924 924 924 961 924 924 924
(ii) Thickness of laminate 1 mm Sq.M. 787 787 787 787 787 787 787 787 787 787 787 817 787 787 787

Page 126
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

122 (A) Partition of commercial ply as per design


fitted and fixed complete (excluding the
supporting framework but including
necessary teak wood battens of size 40mmx
25 mm):

In Ground Floor

(i) 4mm thick Sq.M. 718 706 681 681 718 706 681 681 693 693 693 781 693 693 693

(ii) 6mm thick Sq.M. 906 893 868 868 906 893 868 868 881 881 881 987 881 881 881

(iii) 12mm thick Sq.M. 1218 1206 1181 1181 1218 1206 1181 1181 1193 1193 1193 1256 1193 1193 1193

123 Partition of masonite board as per design


fitted and fixed complete (excluding the
supporting framework but including
necessary wood battens of size 40 mmx25
mm):
In ground floor.
(a) Teak Wood
(i) 4.5mm thick Sq.M. 594 582 557 557 594 582 557 557 569 569 569 582 569 569 569
(ii) 6.0mm thick Sq.M. 636 623 599 599 636 623 599 599 611 611 611 626 611 611 611

(b) Sal Local


(i) 4.5mm thick Sq.M. 510 499 499 499 510 499 499 499 499 499 499 511 496 496 496
(ii) 6.0mm thick Sq.M. 551 540 540 540 551 540 540 540 540 540 540 555 538 538 538

124 Partition of teak veneer [1 mm] as per design


fitted and fixed complete (excluding the
supporting frame work & necessary teak
wood battens):
In ground floor
(i) 4mm thick commercial quality Sq.M. 537 537 537 537 537 537 537 537 537 537 537 559 537 537 537

125 Scantling upto 50mm wide and 12mm thick


(chamfering or rounding) for ceiling/partion
battens including fitting, fixing in position with
washers, coach screws etc. complete.:

(a) Ordinary teak Mtr. 116 112 104 104 116 112 104 104 108 108 108 108 108 108 108
(b) Mtr. 87 83 83 83 87 83 83 83 83 83 83 85 83 83 83
Sishu/Champ/Badam/Gamar/Bhola/Mogra/H
allak

Page 127
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

126 Taking out existing partition/ceiling of particle Sq.M. 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55


board, masonite board, ply board, soft board
etc. of any thickness and refixing same in
new position with necessary clamps making
holes in walls, floor, roof and mending
damages if any.[concrete plaster will be paid
separately]

127 Plain and finished timber planks in partition,


shelves etc. fitted and fixed complete as per
design (butt joints) in ground floor.

(i) 12mm thick planks


(a) Sal Malayasian Sq.M. 1064 955 955 955 1064 955 970 970 970 970 985
(b) Sq.M. 962 895 895 895 962 895 895 895 895 895 895 932 895 895 895
Sishu/Champ/Badam/Gamar/Bhola/Mogra/H
allak
© other Local wood Sq.M. 468 393 393 393 393 393 393 393 393 393 393 393 400 400 400

(ii) 19mm thick planks


(a) Sal Malayasian Sq.M. 1609 1435 1435 1435 1609 1435 1459 1459 1459 1459 1483
(b) Sq.M. 1447 1340 1340 1340 1447 1340 1340 1340 1340 1340 1340 1399 1340 1340 1340
Sishu/Champ/Badam/Gamar/Bhola/Mogra/H
allak
(c) other Local wood Sq.M. 661 542 542 542 542 542 542 542 542 542 542 542 554 554 554

(iii) 25mm thick planks


(a) Sal Malayasian Sq.M. 2061 1835 1835 1835 2061 1835 1866 1866 1866 1866 1897
(b) Sq.M. 1850 1710 1710 1710 1850 1710 1710 1710 1710 1710 1710 1788 1710 1710 1710
Sishu/Champ/Badam/Gamar/Bhola/Mogra/H
allak
(c) other Local wood Sq.M. 825 669 669 669 669 669 669 669 669 669 669 669 685 685 685

(iv) 32mm thick planks


(a) Sal Malayasian Sq.M. 2654 2361 2361 2361 2654 2361 2401 2401 2401 2401 2442
(b) Sq.M. 2381 2201 2201 2201 2381 2201 2201 2201 2201 2201 2201 2301 2201 2201 2201
Sishu/Champ/Badam/Gamar/Bhola/Mogra/H
allak
(c) other Local wood Sq.M. 1058 857 857 857 857 857 857 857 857 857 857 857 878 878 878

(v) 35mm thick planks


(a) Sal Malayasian Sq.M. 2872 2554 2554 2554 2872 2554 2597 2597 2597 2597 2641
(b) Sq.M. 2575 2379 2379 2379 2575 2379 2379 2379 2379 2379 2379 2488 2379 2379 2379
Sishu/Champ/Badam/Gamar/Bhola/Mogra/H
allak

Page 128
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

(c) other Local wood Sq.M. 1136 917 917 917 917 917 917 917 917 917 917 917 939 939 939

128 Add extra over rate of ground floor for


each addl. Storey for items -95 to 100, 116
to 124, 127,130,135,136,139,143, 145 to
148 ,151,152,155 to 159
(i) Upto 4th floor Sq.M. 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15
(ii) Above 4th floor Sq.M. 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18
(For upper floors refer to Item No.128 for
items 119,120,122,127)
129 Add extra over correspnding item 127 and
130:
(i) Half lap joint Sq.M. 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25
(ii) Tongued and grooved joint Sq.M. 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48

130 Rough dressed timber planks fitted and


fixed with nut bolts excluding framework
complete :
In ground floor
(i) 25mm thick planks
(a) Sal Malayasian Sq.M. 2074 1845 1845 1845 2074 1845 1877 1877 1877 1877 1908
(b) Sal Local Sq.M. 1908 1767 1767 1767 1908 1767 1767 1767 1767 1767 1767 1767 1736 1736 1736

(ii) 35mm thick planks


(a) Sal Malayasian Sq.M. 2872 2554 2554 2554 2872 2554 2597 2597 2597 2597 2641
(b) Sal Local Sq.M. 2641 2444 2444 2444 2641 2444 2444 2444 2444 2444 2444 2444 2401 2401 2401

(iii) 50mm thick planks


(a) Sal Malayasian Sq.M. 4079 3622 3622 3622 4079 3622 3684 3684 3684 3684 3747
(b) Sal Local Sq.M. 3747 3465 3465 3465 3747 3465 3465 3465 3465 3465 3465 3465 3403 3403 3403

(iv) Above 50mm thick planks


(a) Sal Malayasian Cu.M. 80519 71402 71402 71402 80519 71402 72650 72650 72650 72650 73899
(b) Sal Local Cu.M. 73904 68280 68280 68280 73904 68280 68280 68280 68280 68280 68280 68280 67031 67031 67031

131 Easing drawers of laboratory tables of any Each 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26


size (labour only)

132 Easing tower wrench, barrel, skeleton, Each 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4


socket bolt etc. by scraping and oiling.

133 Taking Out and Refixing wooden moulded Each 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18


knobs of drawers fitted and fixed complete.

Page 129
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

134 Taking out and refixing after oiling and Each 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66


cleaning including adjusting spring of
different type of automatic door closer with
necessary screw complete.

135 wooden eaves board as per design, fitted


and fixed complete:
In ground floor

(i) Plain eaves board (Local Sal)


(a) 19mm thick Sq.M. 1784 1672 1672 1672 1784 1672 1672 1672 1672 1672 1672 1672 1647 1647 1647
(b) 25mm thick Sq.M. 2233 2086 2086 2086 2233 2086 2086 2086 2086 2086 2086 2086 2053 2053 2053

(ii) Ornamental eaves board (Ordinary Teak)


(a) 19mm thick Sq.M. 2828 2702 2450 2450 2828 2702 2450 2450 2576 2576 2576 2576 2576 2576 2576
(b) 25mm thick Sq.M. 3543 3377 3047 3047 3543 3377 3047 3047 3212 3212 3212 3212 3212 3212 3212

(iii) Ornamental eaves board


(Badam/Gamar/Champ/Hallak)
(a) 19mm thick Sq.M. 1944 1831 1831 1831 1944 1831 1831 1831 1831 1831 1831 1894 1831 1831 1831
(b) 25mm thick Sq.M. 2369 2222 2222 2222 2369 2222 2222 2222 2222 2222 2222 2304 2222 2222 2222

136 Square or hexagonal mesh netting made


with 18 B.W.G. galvanised wire, fitted and
fixed complete as per design (excluding the
supporting framework but including local sal
wood battens of size 37.5mmx25mm).
In ground floor.

(a) 19mm mesh. Sq.M. 471 455 455 455 471 455 455 455 455 455 455 462 452 452 452
(b) 25mm mesh Sq.M. 442 426 426 426 442 426 426 426 426 426 426 431 422 422 422
(c) 37.5mm mesh Sq.M. 421 405 405 405 421 405 405 405 405 405 405 409 401 401 401

137 Renewing square or hexagonal mesh netting


only (made with 18 B.W.G. galvanised wire)
as per existing design including taking out
old battens etc. (as necessary) and refixing
with new screws:

(a) 19mm mesh. Sq.M. 240 240 240 240 240 240 240 240 240 240 240 247 240 240 240
(b) 25mm mesh Sq.M. 210 210 210 210 210 210 210 210 210 210 210 216 210 210 210
(c) 37.5mm mesh Sq.M. 189 189 189 189 189 189 189 189 189 189 189 193 189 189 189

Page 130
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

138 Extra for providing hand hole (upto 150mm x


150mm size) including necessary timber
frame [ size of batten 37.5 mmx25mm].

(a) Sal Malayasian Each 70 65 65 65 70 65 65 65 65 65 66


(b) Sal Local Each 66 63 63 63 66 63 63 63 63 63 63 63 62 62 62

139 Supplying fitting and fixing I.R.C. fabric mesh


with covering battens including cost of
screws etc complete (excluding the cost of
battens).
In ground floor.

(a) 50mm x 25mm x 2.7mm x 2.7mm. Sq.M. 263 263 263 263 263 263 263 263 263 263 263 271 263 263 263
(b) 75mm x 25mm x 2.7mm x 2.7mm. Sq.M. 257 257 257 257 257 257 257 257 257 257 257 264 257 257 257
(c) 75mm x 25mm x 4.5mm x 2.7mm. Sq.M. 303 303 303 303 303 303 303 303 303 303 303 313 303 303 303
(d) 75mm x 50mm x 4.5mm x 3.0mm. Sq.M. 259 259 259 259 259 259 259 259 259 259 259 267 259 259 259
(e) 75mm x 50mm x 2.7mm x 2.7mm. Sq.M. 256 256 256 256 256 256 256 256 256 256 256 263 256 256 256
(f) 75mm x75mm x 4.5mm x 4.5mm. Sq.M. 308 308 308 308 308 308 308 308 308 308 308 318 308 308 308
(g) 75mm x 75mm x 2.7mm x 2.7mm. Sq.M. 227 227 227 227 227 227 227 227 227 227 227 232 227 227 227
(h) 100mm x 100mm x 2.7mm x 2.7mm. Sq.M. 206 206 206 206 206 206 206 206 206 206 206 211 206 206 206
(i) 25mm x 25mm x 2.7mm x 2.7mm. Sq.M. 350 350 350 350 350 350 350 350 350 350 350 361 350 350 350
(j) 25mm x 25mm x 2.2mm x 2.2mm. Sq.M. 223 223 223 223 223 223 223 223 223 223 223 228 223 223 223

140 Renewing G.I. sheet door with old sheet but Sq.M. 1941 1842 1842 1842 1941 1842 1842 1842 1842 1842 1842 1842 1820 1820 1820
with new local sal wood frame (styles, rails
and diagonal braces 100mm x 35mm)
including fitting, fixing with proper screws and
rehanging shutter with haskal and doomney
(excluding the cost of haskal and doomney).

141 Renewing G.I. sheet door with new sheet Sq.M. 820 820 820 820 820 820 820 820 820 820 820 820 820 820 820
0.63mm th. but with old local sal wood frame
(styles, rails and diagonal braces 100mm x
35mm) including fitting, fixing with proper
screws and rehanging shutter with haskal
and doomney (excluding the cost of haskal
and doomney).

Page 131
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

142 (a) Supplying, fitting fixing I.S.I. approved Set 2427 2427 2427 2427 2427 2427 2427 2427 2427 2427 2427 2534 2427 2427 2427
quality and brand hydraulic (oil check) floor
door spring, heavy duty double action with
brass shoe, brass top centre aluminium top
cover etc. complete set as per direction of
Engineer-in-charge.

(b) Supplying, fitting fixing Godrej type Set 4212 4212 4212 4212 4212 4212 4212 4212 4212 4212 4212 4408 4212 4212 4212
hydraulic (oil check) floor door spring, heavy
duty double action with brass shoe, brass top
centre aluminium top cover etc. complete set
as per direction of Engineer-in-charge.

143 Supplying, fitting & fixing fibre reinforced


polymer (FRP) Composite door shutters as
per approved design with glass fibre
reinforced plastic moulded skins and a
special sandwich core, so as to impart
monolitaheic composite structure as per
approved technology of Department of
Science and Technology (DST) to satisfy
IS:4020 door testing performance criteria.
In ground
(i) 32 mm floor.
thick Sq.m 3263 3263 3263 3263 3263 3263 3263 3263 3263 3263 3263 3417 3263 3263 3263
(ii) 25 mm thick Sq.m 3046 3046 3046 3046 3046 3046 3046 3046 3046 3046 3046 3188 3046 3046 3046

144 Supplying, fitting and fixing fibre reinforced


polymer (FRP) Composite door frame as per
approved section with glass fibre reinforced
plastic moulded skins and a special
sandwich core, so as to impart monolitaheic
composite structure as per approved
technology of Department of Science and
Technology (DST) to safisfy IS: 4020 door
testing performance criteria..
(ii) 66mm x 90mm Mtr. 586 586 586 586 586 586 586 586 586 586 586 613 586 586 586

(ii) 66mm x 70mm Mtr. 525 525 525 525 525 525 525 525 525 525 525 549 525 525 525

Page 132
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

145 Supplying, Fitting & Fixing 30 mm thick Sq.m 2277 2277 2277 2277 2277 2277 2277 2277 2277 2277 2277 2380 2277 2277 2277
Factory made solid Panel PVC Door Shutter
consisting of outer frame made out of M.S.
tubes of 19 gauge thickness and size 19
mmx19 mm for styles, top and bottom rails,
M.S. frame shall have cost of steel primers of
approved make and manufacture, M.S.
frame covered with 5 mm th. heat moulded
PVC “C” channel of size 30 mm th, 70 mm
width out of which 50 mm shall be flat and 20
mm shall be tapered in 45 degree angle on
either sides forming styles; and 5 mm th. 95
mm wide PVC sheet out of which 75 mm
shall be flat and 20 mm tapered in 45 degree
on the inner side to form top & bottom rail
and 115 mm wide PVC sheet out of which
75mm shall be flat and 20 mm shall be
tapered on both sides to form lock rail. Top,
bottom and lock rails shall be provided either
side of the panel with 10 mm (5 mmx2) th.,20
mm wide cross PVC sheet as gap insert for
top rail and bottom rail. Paneling of 5 mm th.
both side PVC sheet to be fitted in the M.S.
frame welded/sealed to the styles &rails with
7 mm (5 mm+2 mm) th.x15 mm wide PVC
sheet beading on inner side and joined
together with solvent cement adhesive. An
additional 5 mm th. PVC strip of 20 mm

Page 133
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

146 Supplying, Fitting & Fixing 30 mm thick both Sq.m 2868 2868 2868 2868 2868 2868 2868 2868 2868 2868 2868 3000 2868 2868 2868
side prelaminated Factory made solid Panel
PVC Door Shutter consisting of outer frame
made out of M.S. tubes of 19 gauge
thickness and size 19 mmx19 mm for styles,
top and bottom rails, M.S. frame shall have
cost of steel primers of approved make and
manufacture, M.S. frame covered with 5 mm
th. heat moulded PVC “C” channel of size 30
mm th, 70 mm width out of which 50 mm
shall be flat and 20 mm shall be tapered in
45 degree angle on either sides forming
styles; and 5 mm th. 95 mm wide PVC sheet
out of which 75 mm shall be flat and 20 mm
tapered in 45 degree on the inner side to
form top & bottom rail and 115 mm wide
PVC sheet out of which 75mm shall be flat
and 20 mm shall be tapered on both sides to
form lock rail. Top, bottom and lock rails
shall be provided either side of the panel with
10 mm (5 mmx2) th.,20 mm wide cross PVC
sheet as gap insert for top rail and bottom
rail sheet to be fitted in the M.S. frame
welded/sealed to the styles &rails with 7 mm
(5 mm+2 mm) th.x15 mm wide PVC sheet
beading on inner side and joined together
with solvent cement adhesive. An additional
5 mm th. PVC strip of 20 mm which is to be

Page 134
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

147 Supplying, Fitting & Fixing 30 mm thick Sq.m 2677 2677 2677 2677 2677 2677 2677 2677 2677 2677 2677 2800 2677 2677 2677
Double Leaf Factory made solid Panel PVC
Door Shutter consisting of outer frame made
out of M.S. tubes of 19 gauge thickness and
size 19 mmx19 mm for styles, top and
bottom rails, M.S. frame shall have cost of
steel primers of approved make and
manufacture, M.S. frame covered with 5 mm
th. heat moulded PVC “C” channel of size 30
mm th, 70 mm width out of which 50 mm
shall be flat and 20 mm shall be tapered in
45 degree angle on either sides forming
styles; and 5 mm th. 95 mm wide PVC sheet
out of which 75 mm shall be flat and 20 mm
tapered in 45 degree on the inner side to
form top & bottom rail and 115 mm wide
PVC sheet out of which 75mm shall be flat
and 20 mm shall be tapered on both sides to
form lock rail. Top, bottom and lock rails
shall be provided either side of the panel with
10 mm (5 mmx2) th.,20 mm wide cross PVC
sheet as gap insert for top rail and bottom
rail. Paneling of 5 mm th. both side PVC
sheet to be fitted in the M.S. frame
welded/sealed to the styles &rails with 7 mm
(5 mm+2 mm) th.x15 mm wide PVC sheet
beading on inner side and joined together
with solvent cement adhesive. An additional
5 mm th. PVC strip of 20 mm which is to be

Page 135
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

148 Supplying, Fitting & Fixing 30 mm thick thick Sq.m 3197 3197 3197 3197 3197 3197 3197 3197 3197 3197 3197 3346 3197 3197 3197
both side prelaminated Double Leaf Factory
made solid Panel PVC Door Shutter
consisting of outer frame made out of M.S.
tubes of 19 gauge thickness and size 19
mmx19 mm for styles, top and bottom rails,
M.S. frame shall have cost of steel primers of
approved make and manufacture, M.S.
frame covered with 5 mm th. heat moulded
PVC “C” channel of size 30 mm th, 70 mm
width out of which 50 mm shall be flat and 20
mm shall be tapered in 45 degree angle on
either sides forming styles; and 5 mm th. 95
mm wide PVC sheet out of which 75 mm
shall be flat and 20 mm tapered in 45 degree
on the inner side to form top & bottom rail
and 115 mm wide PVC sheet out of which
75mm shall be flat and 20 mm shall be
tapered on both sides to form lock rail. Top,
bottom and lock rails shall be provided either
side of the panel with 10 mm (5 mmx2) th.,20
mm wide cross PVC sheet as gap insert for
top rail and bottom rail. Paneling of 5 mm th.
both side PVC sheet to be fitted in the M.S.
frame welded/sealed to the styles &rails with
7 mm (5 mm+2 mm) th.x15 mm wide PVC
sheet beading on inner side and joined
together with solvent cement adhesive. An
149 Supplying, Fitting & Fixing Factory made Mtr. 352 352 352 352 352 352 352 352 352 352 352 366 352 352 352
P.V.C. door frame of size 50 mmx47 mm
with a wall thickness of 5 mm, made out of
extruded 5 mm, PVC sheet miter cut at two
corners and joined with two nos of 1.5 mm
long brackets of 15 mm x15 mm M.S. square
tube. The two vertical door profiles are to be
reinforced with 19 mmx 19 mm M.S. Square
tube of 19 gauge, weather seal to be
provided through out the frame. The door
frame shall be fixed with the wall using
65/100 mm long M.S. Screws through the
frame by using P.V.C fasteners. A minimum
of 4 Nos of screws to be provided for each
vertical member and minimum 2 Nos for

Page 136
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

150 Supplying, Fitting & Fixing Factory made Mtr. 447 447 447 447 447 447 447 447 447 447 447 466 447 447 447
prelaminated P.V.C. door frame of size 50
mmx47 mm with a wall thickness of 5 mm,
made out of extruded 5 mm Prelaminated
PVC sheet miter cut at two corners and
joined with two nos of 1.5 mm long brackets
of 15 mm x15 mm M.S. square tube. The two
vertical door profiles are to be reinforced with
19 mmx 19 mm M.S. Square tube of 19
gauge, weather seal to be provided through
out the frame. The door frame shall be fixed
with the wall using 65/100 mm M.S. Screws
through the frame by using P.V.C fasteners.
A minimum of 4 Nos of screws to be
provided for each vertical member and
minimum 2 Nos for horizontal member etc.

151 Supplying, Fitting & Fixing 30 mm thick


Factory made moulded Door shutter, wood
free consisting of frame made out of 25 mm,
M.S. tube, M.S. frame shall have a coat of
steel primer. The inner panel shall consist of
25 mm thick High Density EPS. With 2 mm
thick termite proof, water proof and fire
resistant moulded PVC sheet with raised
panel design in different plain and /or prelam
colours after routing the moulded design on
one side & 2 mm plain and/ or prelam PVC
sheet on other side of the EPS. The edge of
Panel to be sealed with lipping of 10 mm
wide P.V.C. sheet batten made by sticking 2
Nos P.V.C. rigid foam sheet of 5 mm
thickness using P.V.C. solvent cement and
style sides 25 mm [5x5 mm] th. and 30 mm
with PVC sheet fitted along M.S. tube for
lock provision and for lock height 5 mm thick
PVC sheet [150 mmx100 mm] fixed with
upper and lower face of inner side of EPS
Panel etc. complete excluding hardwares as
necessary as per direction of Engineer-in-
Charge and Manufacturer’s Specification.
In ground floor.
(a) Moulded door using 2 mm moulded PVC Sq.M. 3127 3127 3127 3127 3127 3127 3127 3127 3127 3127 3127 3272 3127 3127 3127
sheet or 2 mm etched moulded PVC sheet
on one side & 2 mm PVC sheet on other
side.
Page 137
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

(b) Moulded door using 2 mm Prelam Sq.M. 3560 3560 3560 3560 3560 3560 3560 3560 3560 3560 3560 3727 3560 3560 3560
moulded PVC sheet on both side.

152 Supplying, Fitting & Fixing 30 mm thick


Factory made moulded Door shutter,
consisting of solid core single leaf flash door
of 30 mm thickness lipped with 15 mm
[5mmx3] thick x 30 mm wide on one style
and top rail and 10 mm [5mmx2] thick x 30
mm wide of the other style and bottom rail.
The inner panel laminated with 2 mm thick
termite proof water proof and fire resistant
moulded PVC sheet with raised panel
designed in different plain/ or Prelam colour
on one side after routing the moulded design
on flash door and 2mm plain and or Prelam
PVC sheet on other side using rubber
adhesive on flash door and solvent cement
adhesive on the PVC lipping etc. complete
excluding hardwares as necessary as per
direction of Engineer-in
(a) Moulded door using Charge,
2 mm moulded PVC Sq..M 3863 3863 3863 3863 3863 3863 3863 3863 3863 3863 3863 4045 3863 3863 3863
sheet or 2 mm etched moulded PVC sheet
on one side & 2 mm PVC sheet on other
side.

(b) Moulded door using 2 mm Prelam Sq..M 4296 4296 4296 4296 4296 4296 4296 4296 4296 4296 4296 4500 4296 4296 4296
moulded PVC sheet on both side.

153 Taking out door shutter and rehanging the Sq..M 609 609 609 609 609 609 609 609 609 609 609 629 609 609 609
same by fixing aluminium sheet [0.457 mm]
with proper nail etc.

Page 138
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

154 Supplying fitting and fixing in position Mtr. 282 282 282 282 282 282 282 282 282 282 282 288 282 282 282
approved P.V.C. door frame (Matt finish)
made of extruded P.V.C. multichamber
hollow section having dimensions 60mm x
50mm x 2mm (+/-0.2mm), horizontal section
will be joined with vertical section by
galvanised steel screws after inserting two
number steel brackets as reinforcement
making suitable space for placing hinges,
one steel tube 40mm x 20mm x 1.20 mm will
be inserted on one full vertical side of the
frame (hinge side) as reinforcement, the
frame will then be fixed in the opening with
the help of P.V.C. expandable
fastner/wooden gutties and galvanised steel
screws including cost of all materials and
labour, hire charges of tools and appliances,
carriage of all materials, taxes and all other
incidental charges complete.
155 PVC Door Shutter-37 mm thick:
(A)

Page 139
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

Supplying fitting and fixing P.V.C. door Sq.M. 2310 2310 2310 2310 2310 2310 2310 2310 2310 2310 2310 2413 2310 2310 2310
shutter of approved quality & shade in
position, the style & rail of the P.V.C. door
shutter will be made of rigid P.V.C.
multicavity hollow chamber of suitable size
and section with 2.0 mm (+/-0.2 mm) wall
thickness, the section will have 2nos. built in
beads, horizontal & vertical section shall be
fixed to each other by self tapping screws
and 2 nos. of solid plastic or M.S. tubular
galvanised brackets of length 200mm x
80mm and other 100mm x 100mm both 1.20
mm in each corner of the shutter frame for
placing hinges. Polymer based multicavity
hollow section of 105 mm x37mm with 2.0
mm (+/- 0.2 mm) wall thickness will be fitted
in the middle as lock rail reinforced by solid
polymer bar of 200 mm long at both ends
abd screws from both sides. The section
frame will then be fitted in by PVC panels of
size 100 mmx20 mm with wall thickness of
1.2 mm (+/- 0.2 mm) and 2 nos. of 6 mm dia
and screws from both sides 6mm dia bright
rod will be inserted horizontally with both side
check and nut system and stretches where
fixing of hinges / hasp bolt / tower bolt / door
ring are required to be strong enough to with
stand wear and tear. The rate is inclusive of

155 PVC Door Shutter-30 mm thick:


(B)

Page 140
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

Supplying fitting and fixing P.V.C. door Sq.M. 2149 2149 2149 2149 2149 2149 2149 2149 2149 2149 2149 2244 2149 2149 2149
shutter of approved quality & shade in
position, the style & rail of the P.V.C. door
shutter will be made of rigid P.V.C.
multicavity hollow chamber of 59 mm x30
mm section with 2.0 mm (+/-0.2 mm) wall
thickness.Horizontal & vertical section shall
be fixed to each other by self tapping screws
and 1 solid polymeric or M.S. galvanised
tubular 'L' shaped bracket 100mm x 200mm
in each corner of the shutter frame for
placing hinges. Polymer based multicavity
hollow section of 120 mm x30mm with 2.0
mm (+/- 0.2 mm) wall thickness will be fitted
in the middle, reinforced by solid polymer bar
of 200 mm long at both ends and screws
from both sides as lock rail. The section
frame will then be fitted in by PVC panels of
size 100 mmx25 mm with wall thickness of
1.2 mm (+/- 0.2 mm) and 2 nos. of 6 mm dia
bright rod will be inserted horizontally with
both side check and nut system and
stretches where fixing of hinges / hasp bolt /
tower bolt / door ring are required to be
strong enough to with stand wear and tear.
The rate is inclusive of cost of all materials,
labour, and hire of tools and plants and
156 Wall paneling with Gypsum Plaster Board of Sq.M. 1007 1006 1006 1006 1007 1006 1006 1006 1006 1006 1006 1020 1005 1005 1005
12.5 mm thick fitted to G.I. channel of 55
mmx50 mm placed at 300 mm c/c in
horizontal direction and metal stand 55
mmx48 mm placed @900 mm c/c in vertical
direction connected with G.I. connecting
clips. 12.5 mm thick Gypsum plaster based
are to be fixed with G.I. channel by machine
screws. The boards are to be joined with
jointing compound and fibre tape and
finished with top coat etc the rate includes
the cost of all materials, labour charges
including scaffolding etc. complete as per
direction of the Engineer-in-charge.
In ground floor

Page 141
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

157 M.F. suspended ceiling made with 12.5 mm Sq.M. 1257 1257 1257 1257 1257 1257 1257 1257 1257 1257 1257 1273 1257 1257 1257
thick Gypsum plaster board including G.I.
perimeter channel of 0.55 mm flush (having
two flanges 20 mm and 30 mm respectively
and web 27 mm ) along with perimeter of
ceiling with G.I. intermediate channel of 0.9
mm thick size 45 mmx15mm placed at 750
mm c/c with G.I. ceiling angle of size 25
mmx10mmx0.55 mm thick fixed to the ceiling
with G.I. Cleat and steel expansion fastener
ceiling section 0.55 mm thick of size 51.50
mmx26mm fixed to the intermediate
channels with the help of connecting clip and
in the direction of perpendicular to the
intermediate channel of 300 mm c/c 12.5
mm thick Gypsum plastered board are to be
fixed under ceiling section as above by
machine screws. The boards are to be joined
and finished with jointing compound, paper
tape and application of top coat etc. as per
the direction of Engineer-in-charge. (The rate
includes of cost of all materials including

Page 142
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

158 P.V.C Partition: Sq.M 2221 2221 2221 2221 2221 2221 2221 2221 2221 2221 2221 2333 2221 2221 2221
Supplying,fitting and fixing the partition,frame
will be made with rectangular steel tube of
size 50mmx25mm with wall thickness not
less than 1.00mm. The vertical members
duly welded to the horizontal members shall
be placed between 1000mm to 1200mm
apart the entire partition frame will be
securedly fixed to the wall, ceiling and floor
using rawlplug or wooden gutties and screws
etc.the frame will be painted with synthetic
paint, the section of the partition frame will
then fitted with PRINTED LAMINATED
P.V.C extruded hollow section of size
100mmx25mm. panel with approved quality
fixed in the place by means of P.V.C
extruded beading on both sides or P.V.C
extruded angles (20mmx18mm) on one side
and P.V.C extruded beading (9mmx9mm) on
other side ,angle/beading will be fixed to the
steel frame by 19mm (nos.6) self tapping
steel screw placed at an interval of 450mm
and complete in all respect as per direction
of Engineer-in-Charge with all labour and
materials

Page 143
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(G) CARPENTAR'S WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

159 P.V.C- False Ceiling : Sq.M 1542 1542 1542 1542 1542 1542 1542 1542 1542 1542 1542 1615 1542 1542 1542
Providing False Ceiling made with
framework of steel tube of 40mm x 20mm of
not less than 18 gauge,the long and cross
section will be welded with each other
1000mm to 1200mm apart the entire
framework will be fixed in wall using rawlplug
or gutties or screws etc. and suspended from
ceiling with M.S flat 19mmx3mm as
necessary,the entire frame will be painted
with red oxide. PRINTED LAMINATED
P.V.C Section 150mm x 12mmx 1.00mm (+/-
0.01mm) of approved quality and colour will
be fixed on the frame so that the entire
framework will not be visible from below
P.V.C Section will be fixed with the frame
with the help of self tapping steel screws
including all materials and labour charges
including fitting,fixing the same and hoisting
including mending the damages in all
respect and cost of paint as required as per
direction of Engineer-in-Charge .
In ground floor.

Page 144
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(H)BAND MOULDING, CORNICE ETC.
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

1 Band moulding (horizontal or vertical)


rectangular section,made with cement
plaster (1:4) complete.
In ground floor.
(i) Projection upto 25 mm.
(a) Depth or width (75 mm to 100 mm)
(Cement 1.25Kg/Mtr.) Metre 40 38 38 38 39 39 38 38 39 39 39 42 39 39 39

(b) Depth or width (125 mm to 150 mm)


(Cement 1.65Kg/Mtr.) Metre 52 49 48 48 50 49 49 48 50 50 50 54 50 50 51

(ii) Projection 40 mm.


(a) Depth or width (75 mm to 100 mm)
Metre 58 54 54 54 56 55 54 54 56 56 56 61 55 55 56
(Cement 2.0 Kg/Mtr.)
(b) Depth or width (125 mm to 150 mm)
(Cement 2.6Kg/Mtr.) Metre 68 64 63 63 66 65 64 63 66 66 66 72 66 66 67

2 Multiple-band moulding (horizontal or


vertical) made with 15mm cement plaster
(1:4) complete :
In ground floor.
(i) Projection upto 25 mm
(a) Depth or width (75 mm to 100 mm)
(Cement 2.5Kg/Mtr.) Metre 57 51 51 51 54 53 51 51 54 54 54 61 53 53 55

(b) Depth or width (125 mm to 150 mm)


(Cement 3.5Kg/Mtr.) Metre 75 68 67 67 72 70 68 67 72 71 71 80 71 71 72

(ii) Projection 40 mm
(a) Depth or width (75 mm to 100 mm)
(Cement 3.5Kg/Mtr.) Metre 76 70 69 69 73 72 70 69 73 73 73 81 72 72 74

(b) Depth or width (125 mm to 150 mm)


Metre 84 76 75 75 80 78 76 75 80 79 80 89 79 79 81
(Cement 3.74Kg/Mtr.)
3 Band moulding (horizontal or vertical) of
rectangular section made with 15 mm thick
cement plaster (1:4) on brick projection or
concrete projection (excluding the cost of
such brick or concrete projection).
In ground floor.
(i) Projection upto 75 mm.
(a) Depth or width (75 mm to 150 mm)
Metre 67 62 62 62 65 64 62 62 65 65 65 71 64 64 66
(Cement 2.46Kg/Mtr.)

Page 145
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(H)BAND MOULDING, CORNICE ETC.
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

(ii) Projection above (75 mm. and upto 150


mm)
(a) Depth or width (75 mm to 150 mm)
(Cement 3.3Kg/Mtr.) Metre 83 77 76 76 80 79 77 76 80 80 80 88 79 79 81

4 Masonry curb or sill in floor of rectangular


section finished with 15 mm. thick cement
plaster (1:4) and neat cement punning
complete (including cost of masonary made
with 1st class bricks and 1:4 cement morter)
:
In ground floor.
(a) 125 mm. x 75 mm. section (Cement
3.24Kg/Mtr.) Metre 101 92 86 86 99 97 96 89 96 95 95 115 95 95 96

(b) 125 mm. x 150 mm. section


(Cement 6.48Kg/Mtr.) Metre 185 167 155 155 179 176 173 160 173 172 172 211 171 171 175

(c) 100 mm. x 100 mm. section


(Cement 3.12Kg/Mtr.) Metre 115 105 97 97 112 110 109 100 108 107 107 131 107 107 108

5 Concrete chowkat with rabbet (in sill of door


or window) made with cement concrete
(1:2:4) and finished with 15 mm. thick
cement plaster (1:4) and neat cement
punning complete.
In ground floor.
(i) With rabbet on one side
(a) 75 mm. x 50 mm. or 75 mm. x 75 mm.
Metre 79 75 73 70 76 75 76 73 76 76 72 85 77 79 76
sec (Cement 3.7Kg/Mtr.)
(b)100 mm. x 50 mm. or 100 mm. x 75 mm.
Metre 97 91 89 85 92 92 93 89 92 92 88 103 94 97 92
sec (Cement 4.6Kg/Mtr.)
(c) 125 mm. x 50 mm. or 125 mm. x 75 mm.
sec (Cement 5.4Kg/Mtr.) Metre 118 112 109 104 112 112 114 109 112 112 107 126 114 118 112

(d) 150 mm. x 50 mm. or 150 mm. x 75 mm.


Metre 132 125 121 116 125 126 127 122 125 125 119 141 128 132 125
sec (Cement 6.1Kg/Mtr.)
(ii) With rabbet on both sides
(a) 100 mm. x 50 mm. or 100 mm. x 75 mm.
Metre 106 101 99 95 102 102 103 99 102 102 98 113 103 106 102
sec (Cement 4.6Kg/Mtr.)
(b) 125 mm. x 50 mm. or 125 mm. x 75 mm.
Metre 121 115 112 108 116 116 117 113 116 116 111 129 118 122 116
sec (Cement 5.4Kg/Mtr.)
(c) 150 mm. x 50 mm. or 150 mm. x 75 mm.
Metre 136 128 125 119 129 129 131 125 129 129 123 145 132 136 129
sec (Cement 6.1Kg/Mtr.)

Page 146
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(H)BAND MOULDING, CORNICE ETC.
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

6 Renewing throating,nosing or drip course


moulding with 15 mm. thick cement plaster
(1:4) complete. (Cement 0.7Kg/Mtr.) Metre 20 19 18 18 19 19 19 18 19 19 19 21 19 19 19
In ground floor.

7 Making ornamental R.C. hand rail upto 160


sq.cm. cross sectional area excluding cost of
reinforcement and including cost of
shuttering with (1:1.5:3) cement concrete in
stone chips, plastered 15 mm. thick (1:4), Metre 260 247 244 236 250 251 253 245 250 251 242 274 254 260 251
neat cement finishing and polishing complete
as per direction of Engineer-in-charge.
(Cement 10.0 Kg/Mtr.)
In ground floor.
8 Finishing of 75 mm. or 125 mm. thick wall
with 15 mm. thick cement plaster (1:4) and
moulding (30 mm deep and 6 mm. or 10
mm. projection) on side, including neat
cement punning complete. (Payment to be
made on length of wall)
(a) With moulding on one side only
(Cement 1.5Kg/Mtr.) Metre 44 42 42 42 43 43 42 42 43 43 43 46 43 43 44

(b) With moulding on both sides (Cement


2.0Kg/Mtr.) Metre 51 49 49 49 50 49 49 49 50 50 50 53 50 50 50

9 Renewing coping of compound wall with


brick work and 15 mm. thick cement plaster
(1:4) complete (Payment to be made on
length of wall) :
(a) 125 mm. wide coping (Cement
3.8Kg/Mtr.) Metre 137 127 120 120 134 132 130 123 130 130 130 151 129 129 131

(b) 250 mm. wide coping (Cement


Metre 201 186 174 174 197 195 193 179 191 190 190 226 190 190 192
5.0Kg/Mtr.)
(c) 375 mm. wide coping (Cement
7.7Kg/Mtr.) Metre 277 257 239 239 272 269 267 247 262 261 262 312 261 261 264

(d) 500 mm. wide coping (Cement


9.7Kg/Mtr.) Metre 355 326 302 302 348 343 339 312 334 333 334 403 332 332 337

Page 147
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(H)BAND MOULDING, CORNICE ETC.
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

10 Renewing plaster and coping of compound


wall (including petty repairs to brick work)
with 15 mm. thick cement plaster (1:4).
(Payment to be made on length of wall) :
(a) 125 mm. wide coping (Cement
1.5Kg/Mtr.) Metre 53 49 48 48 51 50 49 48 51 50 50 56 50 50 51

(b) 250 mm. wide coping (Cement


2.4Kg/Mtr.) Metre 76 70 69 69 74 73 71 69 73 72 73 82 72 72 73

(c) 375 mm. wide coping (Cement


Metre 95 88 86 86 93 91 90 87 91 91 91 103 91 91 92
3.1Kg/Mtr.)
(d) 500 mm. wide coping (Cement
3.8Kg/Mtr.) Metre 115 106 103 103 112 110 108 104 110 109 109 124 109 109 111

11 Renewing cornice(with mouldings but without


floral or similar intricate patterns) including
necessary masonry work and 15 mm. thick
cement plaster(1:4) complete :
In ground floor.
(i) Projection (75 to 150) mm.
(a) Depth (100 to 150) mm (Cement
4.3Kg/Mtr.) Metre 215 202 192 192 212 209 207 196 206 205 206 236 205 205 207

(b) Depth (150 to 200) mm (Cement


Metre 253 236 222 222 249 246 244 228 241 240 241 281 240 240 243
5.5Kg/Mtr.)

(ii) Projection (175 to 225) mm.


(a) Depth (100 to 150) mm (Cement
6.6Kg/Mtr.) Metre 278 258 243 243 273 270 267 249 265 263 264 311 263 263 266

(b) Depth (150 to 200) mm (Cement


Metre 335 308 287 287 328 324 320 296 316 315 315 378 314 314 318
8.0Kg/Mtr.)
(c) Depth (225 to 300) mm (Cement
Metre 442 403 371 371 433 427 422 386 414 412 413 507 411 411 417
11.0Kg/Mtr.)

(iii) Projection (250 to 300) mm.

(a) Depth (100 to 125) mm (Cement


8.5Kg/Mtr.) Metre 339 312 290 290 332 328 324 300 320 319 319 383 318 318 322

(b) Depth (150 to 200) mm (Cement


10.6Kg/Mtr.) Metre 417 381 352 352 408 403 398 365 392 390 391 476 389 389 394

(c) Depth (225 to 300) mm (Cement


Metre 482 439 406 406 471 464 457 421 452 450 451 551 449 449 456
13.0Kg/Mtr.)

(iv) Projection (325 to 375) mm.

Page 148
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(H)BAND MOULDING, CORNICE ETC.
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

(a) Depth (150 to 200) mm (Cement


13.0Kg/Mtr.) Metre 497 452 414 414 486 479 473 431 465 462 463 571 461 461 468

(b) Depth (225 to 300) mm (Cement


17.0Kg/Mtr.) Metre 665 603 547 547 651 642 635 572 620 617 618 774 615 615 624

(c) Depth (325 to 400) mm (Cement


22.0Kg/Mtr.) Metre 892 809 733 733 874 862 853 768 831 827 829 1039 825 825 836

(v) Projection (400 to 450) mm.


(a) Depth (150 to 200) mm (Cement
Metre 593 540 494 494 581 572 565 515 555 552 553 683 551 551 559
15.0Kg/Mtr.)
(b) Depth (225 to 300) mm (Cement
20.0Kg/Mtr.) Metre 819 744 677 677 803 792 783 708 764 761 762 950 759 759 769

(c) Depth (325 to 400) mm (Cement


26.0Kg/Mtr.) Metre 1076 977 886 886 1055 1041 1030 928 1003 999 1001 1252 996 996 1009

12 Renewing plaster of cornice (with moulding


but without floral or similar intricate
patterns)including petty repairs to masonry
with 15 mm thick cement plaster (1:4)
(Payment to be made on length of cornice):
In ground floor.
(i) Projection (75 to 125) mm
(a) Depth (100 to 125) mm (Cement
2.5Kg/Mtr.) Metre 96 90 87 87 94 92 91 88 92 92 92 103 92 92 93

(b) Depth (150 to 200) mm (Cement


3.0Kg/Mtr.) Metre 106 99 96 96 104 102 101 97 102 102 102 115 101 101 103

(ii) Projection (175 to 225) mm


(a) Depth (100 to 125) mm (Cement
Metre 127 119 115 115 124 122 120 116 122 122 122 137 121 121 123
4.0Kg/Mtr.)
(b) Depth (150 to 200) mm (Cement
Metre 154 144 139 139 151 149 147 141 148 148 148 167 147 147 149
4.0Kg/Mtr.)
(c) Depth (225 to 300) mm (Cement
5.0Kg/Mtr.) Metre 178 164 157 157 173 170 168 160 170 169 169 195 168 168 171

(iii) Projection (250 to 300) mm


(a) Depth (100 to 125) mm (Cement
4.4Kg/Mtr.) Metre 175 163 157 157 171 168 166 160 168 167 167 190 167 167 169

(b) Depth (150 to 200) mm (Cement


5.0Kg/Mtr.) Metre 186 174 167 167 182 179 177 170 178 178 178 203 177 177 180

(c) Depth (225 to 300) mm (Cement


Metre 231 217 208 208 227 224 221 212 222 221 222 251 221 221 224
6.0Kg/Mtr.)
(iv) Projection (325 to 375) mm

Page 149
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(H)BAND MOULDING, CORNICE ETC.
Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

(a) Depth (150 to 200) mm (Cement


Metre 228 212 205 205 223 219 216 208 218 217 218 247 217 217 220
6.0Kg/Mtr.)
(b) Depth (225 to 300) mm (Cement
7.0Kg/Mtr.) Metre 253 235 225 225 247 244 241 230 242 241 241 276 240 240 244

(c) Depth (325 to 400) mm (Cement


8.0Kg/Mtr.) Metre 284 264 251 251 278 274 271 256 271 270 270 313 269 269 273

(v) Projection (400 to 450) mm

(a) Depth (150 to 200) mm (Cement


7.0Kg/Mtr.) Metre 244 227 218 218 238 234 231 222 234 232 233 265 232 232 235

(b) Depth (225 to 300) mm (Cement


8.0Kg/Mtr.) Metre 285 264 251 251 279 275 271 257 272 270 271 315 270 270 274

(c) Depth (325 to 400) mm (Cement


9.0Kg/Mtr.) Metre 330 304 287 287 323 318 314 295 313 312 312 368 311 311 315

13 String course up to 75 mm projection and


upto 150 mm depth 15 mm thick plasterd
(1:4) (including stripping off old surface
Metre 137 127 120 120 134 132 131 123 130 130 131 153 130 130 132
where necessary) complete. (Cement
6.6Kg/Mtr.)
In ground floor.
Note:- Add extra @1.5% for each
additional floor upto 4th floor and 1.75%
for each additional floor above 4th floor
on all items except items 8, 9 and 10.

Page 150
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(I)PLASTERING, POINTING ETC.


Rate (Rs.)

the area of Haldibari PS


Darjeeling except plains

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub


of Siliguri Sub Divn.
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Bankura
Birbhum
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
Div
S)
No.

1 Labour for Chipping of concrete surface


before taking up Plastering work. Sq.M 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21

2 Plaster (to wall, floor, ceiling etc.) with sand


and cement mortar including rounding off or
chamfering corners as directed and raking
out joints including throating, nosing and drip
course, scaffolding/staging where necessary
(Ground floor).[Excluding cost of chipping
over concrete surface]
(i) With 1:6 cement mortar
(a) 25 mm thick plaster Sq.M 212 193 192 192 204 199 193 192 204 202 202 225 200 200 205
(b) 20 mm thick plaster Sq.M 181 166 164 164 174 170 166 164 174 173 173 193 171 171 176
(c) 15 mm thick plaster Sq.M 156 144 143 143 151 147 144 143 151 150 150 165 148 148 152
(ii) With 1:4 cement mortar
(a) 20 mm thick plaster Sq.M 206 191 189 189 199 195 191 189 199 198 198 218 197 197 201
(b) 15 mm thick plaster Sq.M 176 164 163 163 171 168 164 163 171 170 170 186 169 169 173
(c) 10 mm thick plaster Sq.M 140 132 131 131 136 134 132 131 136 135 136 146 135 135 137
(iii) With 1:3 cement mortar
(a) 20 mm thick plaster Sq.M 231 216 214 214 224 220 216 214 224 223 224 244 223 223 227
(b) 15 mm thick plaster Sq.M 193 182 181 181 188 185 182 181 188 187 188 203 187 187 190
(c) 10 mm thick plaster Sq.M 148 141 140 140 145 143 141 140 145 144 145 155 144 144 146
(iv) 1:2 cement mortar (to be used in
floors and for special works)
(a) 15 mm. thick plaster Sq.M 220 210 209 209 216 213 210 209 216 215 216 230 216 216 218
(b) 10 mm. thick plaster Sq.M 177 170 169 169 174 172 170 169 174 173 174 183 174 174 175
3 Plaster (to wall, floor, ceiling etc.) with
composite mortar of sand, lime and cement
including round off or chamfering corners as
directed and raking out joints and
roughening of concrete surface including
throating, nosing and drip course where
necessary (Ground floor).
(i) With (1:2:9) composite mortar with 1
cement : 2 lime paste/putty : 9 sand
(a) 35 mm. thick plaster Sq.M 263 229 227 227 250 237 229 227 244 241 241 288 238 238 245
(b) 25 mm. thick plaster Sq.M 214 190 188 188 205 195 190 188 200 199 198 232 196 196 202
(c) 20 mm. thick plaster Sq.M 180 161 160 160 173 165 161 160 169 168 167 194 166 166 170
(d) 15 mm. thick plaster Sq.M 159 145 144 144 154 148 145 144 151 150 150 170 149 149 152
(ii) With (1:1:6) composite mortar with 1
cement : 1 lime paste/putty : 6 sand
(a) 20 mm. thick plaster Sq.M 189 171 169 169 182 175 171 169 179 178 178 203 176 176 181
(b) 15 mm. thick plaster Sq.M 166 152 151 151 161 155 152 151 159 157 157 177 156 156 160

Page 151
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(I)PLASTERING, POINTING ETC.


Rate (Rs.)

the area of Haldibari PS


Darjeeling except plains

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub


of Siliguri Sub Divn.
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Bankura
Birbhum
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
Div
S)
No.

(c) 10 mm. thick plaster Sq.M 131 122 121 121 127 124 122 121 126 125 125 138 124 124 126
4 Plaster with lime and surki mortar including
rounding off or chamfering corners as
directed and raking out joints (Ground floor).

(i) With lime & surki morter (1:2)


(a) 20 mm. thick plaster Sq.M 183 170 166 166 183 173 172 171 171 170 168 197 171 170 170
(b) 15 mm. thick plaster Sq.M 157 147 144 144 157 149 149 148 148 147 146 167 148 147 147
(ii) With lime & surki morter (1:3)
(a) 25 mm thick plaster Sq.M 186 173 168 168 186 177 176 174 174 173 171 200 174 173 173
(b) 19 mm thick plaster Sq.M 167 155 151 151 167 158 158 156 156 155 154 178 156 155 155
(c) 12.5 mm thick plaster Sq.M 128 121 118 118 128 123 123 122 122 121 120 136 122 121 121
(iii) With lime & surki morter (1:4)
(a) 25 mm thick plaster Sq.M 179 167 161 161 179 171 170 168 168 166 165 192 168 166 166
(b) 19 mm thick plaster Sq.M 149 140 136 136 149 142 142 141 141 140 138 158 141 140 140
(c) 12.5 mm thick plaster Sq.M 119 112 110 110 119 114 114 113 113 112 111 125 113 112 112
5 Extra for each additional floor over the rate
for ground floor items 2 to 4 :
(i) External plaster
(a) Upto 4th floor Sq.M 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
(b) Above 4th floor Sq.M 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
(ii) Internal plaster
(a) Upto 4th floor Sq.M 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
(b) Above 4th floor Sq.M 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
6 Extra for Rusticated plaster (over rate of
corresponding item of plaster)
(a) With sand plus cement (Cement 0.053
Sq.M 15 14 14 14 15 14 14 14 15 15 15 16 15 15 15
Cu.m/100Sq.m)
(b) With stone chips (Cement 0.086
Sq.M 59 57 57 52 56 60 62 58 57 58 51 64 60 64 57
Cu.m/100Sq.m)
7 Extra for fluted, corrugated or ribbed plaster
(over rate of corresponding rate of plaster). Sq.M 45 43 43 43 44 43 43 43 44 44 44 46 44 44 44
(Cement 0.135 Cu.m/100Sq.m)
8 Neat cement punning about 1.5mm thick in
wall,dado,window sill,floor etc. Sq.M 38 38 38 38 38 38 38 38 38 38 39 39 39 39 39
NOTE:Cement 0.152 cu.m per100 sq.m.
9 Lime punning about 3 mm. thick with stone
Sq.M 87 87 87 87 87 87 87 87 87 87 87 88 87 87 87
lime and shell lime (1:2)
10 Sand rubbing including preparing and
smoothening surface with admixture of
pigment if necessary as directed :

Page 152
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(I)PLASTERING, POINTING ETC.


Rate (Rs.)

the area of Haldibari PS


Darjeeling except plains

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub


of Siliguri Sub Divn.
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Bankura
Birbhum
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
Div
S)
No.

(a) Ground floor Sq.M 57 57 57 57 57 57 57 57 57 57 57 58 57 57 57


(b) Extra for each additional floor Sq.M 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
11 Making V-groove line ( 6 mm. wide, 6 mm.
deep) in plastered surface. %Metre 498 498 498 498 498 498 498 498 498 498 498 498 498 498 498

12 Making V-groove line ( 12 mm wide,12 mm


deep) in plastered surface. %Metre 586 586 586 586 586 586 586 586 586 586 586 586 586 586 586

13 Closing gap between door and window frame


and jambs with cement mortar (1:3)
including removing old mortar (throughout
%Metre 1149 1123 1121 1121 1137 1130 1123 1121 1137 1135 1137 1170 1134 1134 1142
entire surface of contact) and cleaning the
joint. (Cement 0.012 Cu.m/100 Mtr.)
(This item is not payable for new works).
14 Flush pointing to brick work in cement mortar
(1:4) including raking out joints. Sq.M 81 79 78 78 80 79 79 78 80 80 80 83 80 80 80

15 Flush pointing to ceiling tiles in cement


mortar including raking out joints (1:4) Sq.M 80 77 77 77 79 78 77 77 79 78 79 82 78 78 79

16 Flush pointing to arched ceiling in cement


mortar (1:4) & top finishing including raking Sq.M 86 84 84 84 85 84 84 84 85 85 85 88 85 85 85
out joints.
17 Flush pointing to tiled floor in cement mortar
(1:4) with admixture of pigment to match
Sq.M 83 81 80 80 82 81 81 80 82 82 82 85 81 81 82
with colour of tiles including raking out joints.

18 Rule pointing to brick work in cement mortar


(1:4) including raking out joints & top Sq.M 84 82 82 82 83 83 82 82 83 83 83 86 83 83 83
finishing.
19 Rule pointing to brick work in cement mortar
(1:4) with admixture of pigment to match
Sq.M 87 84 84 84 86 85 84 84 86 85 85 88 85 85 86
with colour of brick including raking out
joints.
NOTE : For items 14 to 19 cement 0.091
Cu.m. sand 0.366 Cu.m per 100 Sq.m.
20 Rule pointing to brick work with ruled joints
in lime and surki 1:2 mortar including raking
Sq.M 57 55 54 54 57 56 55 55 55 55 55 59 55 55 55
out joints and top finishing (1 lime paste/
putty : 2 surki ).
21 Tuck pointing to brick work in cement mortar
(1:3) including raking out joints. (Cement Sq.M 115 112 112 112 114 113 112 112 114 113 114 117 113 113 114
0.119 Cu.m/100 Sq.m)
22 Sand and lime plaster including rounding off
or chamfering corners as directed and raking
out joints where necessary.
(i) (1:2) with Lime & Sand mortar
(a) 19 mm thick plaster Sq.M 154 133 132 132 148 137 133 132 141 140 138 170 137 137 141

Page 153
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(I)PLASTERING, POINTING ETC.


Rate (Rs.)

the area of Haldibari PS


Darjeeling except plains

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub


of Siliguri Sub Divn.
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Bankura
Birbhum
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
Div
S)
No.

(b) 12 mm thick plaster Sq.M 114 101 100 100 110 103 101 100 105 105 104 124 103 103 105
(ii) (1:3) with Lime & Sand mortar
(a) 25 mm thick plaster Sq.M 160 134 133 133 151 139 134 133 145 143 141 178 139 139 145
(b) 19 mm thick plaster Sq.M 133 113 112 112 126 117 113 112 121 120 119 147 117 117 121
(c) 12.5 mm thick plaster Sq.M 109 96 95 95 105 99 96 95 101 100 100 118 99 99 101
(iii) (1:4) with Lime & Sand mortar
(a) 25 mm thick plaster Sq.M 145 122 121 121 137 127 122 121 132 130 129 161 127 127 132
(b) 19 mm thick plaster Sq.M 119 101 100 100 113 105 101 100 109 108 106 131 105 105 109
(c) 12.5 mm thick plaster Sq.M 97 86 85 85 93 88 86 85 91 90 89 105 88 88 91
23 Surki beaten plaster (1:2) including rounding
off or chamfering corners, as directed and
raking out joints or roughening surface

(a) 19 mm thick plaster Sq.M 172 160 156 156 172 162 162 161 161 159 158 185 161 159 159
(b) 12.5 mm thick plaster Sq.M 128 119 117 117 128 121 121 120 120 119 118 136 120 119 119
24 Flush pointing to stone masonry wall in
cement morter (1:3) including racking out Sq.M 45 43 43 43 44 43 43 43 44 44 44 47 44 44 44
joints (Cement 0.119 Cu.m/100 Sq.m)

Page 154
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(J)WHITE WASH, COLOUR WASH, DISTEMPER


Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

1 Scraping of moss, blisters etc.thoroughly


from exterior surface of walls necessitating
the use of scraper, wire brush etc.(Payment
Sq.M 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
against this item will be made only when this
has been done on the specific direction of
the Engineer-in-charge)
2 Scraping and removing greasy soot from
walls or ceiling of kitchen or similar smoke Sq.M 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11
affected rooms and preparing the surface.
3 White washing including cleaning and
smoothening surface thoroughly.
All floors :
(a) One coat %Sq.M 1358 1358 1358 1358 1358 1358 1358 1358 1358 1358 1358 1383 1358 1358 1358
(b) Two coats (to be done on specific
instruction). %Sq.M 1887 1887 1887 1887 1887 1887 1887 1887 1887 1887 1887 1922 1887 1887 1887

(c) Three coats (on new works only). %Sq.M 2081 2081 2081 2081 2081 2081 2081 2081 2081 2081 2081 2120 2081 2081 2081
4 Colour washing with "ELLA" with a coat of
white wash priming including cleaning and
smoothening surface thoroughly :
(i) Internal (all floors)
(a) One coat %Sq.M 1496 1496 1496 1496 1496 1496 1496 1496 1496 1496 1496 1522 1496 1496 1496
(b) Two coats %Sq.M 2240 2240 2240 2240 2240 2240 2240 2240 2240 2240 2240 2281 2240 2240 2240
(ii) External surface (ground floor)
(a) One coat %Sq.M 1514 1514 1514 1514 1514 1514 1514 1514 1514 1514 1514 1540 1514 1514 1514
(b) Two coats %Sq.M 2264 2264 2264 2264 2264 2264 2264 2264 2264 2264 2264 2305 2264 2264 2264
N.B. : Extra for each additional floor in
external walls refer item 20
5 Colour washing with any shade with
Stainers, as required including cleaning and
smoothening surface thoroughly :
(i) Internal surface (All floors)
(a) One coat of colour wash
(i) Other than yellow, pink. %Sq.M 1525 1525 1525 1525 1525 1525 1525 1525 1525 1525 1525 1551 1525 1525 1525
(ii) Yellow, pink. %Sq.M 1537 1537 1537 1537 1537 1537 1537 1537 1537 1537 1537 1563 1537 1537 1537
(b) Two coats (on new works only).
(i) Other than yellow, pink. %Sq.M 2139 2139 2139 2139 2139 2139 2139 2139 2139 2139 2139 2179 2139 2139 2139
(ii) Yellow, pink. %Sq.M 2157 2157 2157 2157 2157 2157 2157 2157 2157 2157 2157 2197 2157 2157 2157
(ii) External surface (Ground floor)

Page 155
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(J)WHITE WASH, COLOUR WASH, DISTEMPER


Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

(a) One coat


(i) Other than yellow, pink. %Sq.M 1579 1579 1579 1579 1579 1579 1579 1579 1579 1579 1579 1605 1579 1579 1579
(ii) Yellow, pink. %Sq.M 1591 1591 1591 1591 1591 1591 1591 1591 1591 1591 1591 1617 1591 1591 1591
(b) Two coats (on new works only).
(i) Other than yellow, pink. %Sq.M 2229 2229 2229 2229 2229 2229 2229 2229 2229 2229 2229 2267 2229 2229 2229
(ii) Yellow, pink. %Sq.M 2246 2246 2246 2246 2246 2246 2246 2246 2246 2246 2246 2286 2246 2246 2246
N.B. : Extra for each additional floor in
external walls refer item 20
6 Cement washing including cleaning and
smoothening surface thoroughly (cement to
be used @15 kg./100 sq.m. of surface for
one coat and @25 kg./100 sq.m of surface
for two coats):
External surface (Ground floor)
(a) One coat %Sq.M 953 953 953 953 953 953 953 953 953 953 957 957 957 957 957
(b) Two coats (on new works only). %Sq.M 1487 1487 1487 1487 1487 1487 1487 1487 1487 1487 1493 1493 1493 1493 1493
N.B. : Extra for each additional floor in
external walls refer item 20
7 Red oxide wash of approved shade including
cleaning and smoothening surface
thoroughly (without specific permission from
the Engineer-in-charge this item of work
must not be done on an old painted surface
which has not received such red oxide wash
before) :
External surface (Ground floor)
(a) One coat %Sq.M 2597 2597 2597 2597 2597 2597 2597 2597 2597 2597 2597 2629 2597 2597 2597
(b) Two coats (on new works only). %Sq.M 3576 3576 3576 3576 3576 3576 3576 3576 3576 3576 3576 3627 3576 3576 3576
N.B. : Extra for each additional floor in
external walls refer item 20
8 Rounding corners with cement mortar (1:3)
for crack repairs. Metre 15 14 14 14 14 14 14 14 14 14 14 15 14 14 15

Page 156
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(J)WHITE WASH, COLOUR WASH, DISTEMPER


Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

9 Removing old scales, blisters etc. of interior


surface of walls,ceiling by scraping etc. and
preparing smooth and even surface with
rendering or cement mortar (1:2) (as
necessary), to make the surface suitable for %Sq.M 1047 1039 1038 1038 1043 1041 1039 1038 1043 1043 1044 1055 1043 1043 1046
receiving distemper. (Payment against this
item will be made only when this has been
done on the specific direction of the Engineer-
in-charge).
10 Acrylic Distemper to interior wall, ceiling with
a coat of solvent based interior grade acrylic
primer (as per manufacturer's specification)
including cleaning and smoothning of Sq.M 76 76 76 76 76 76 76 76 76 76 76 78 76 76 76
surface.
Two Coats
11 Synthetic Distemper to interior wall, ceiling
with a coat of solvent based interior grade
acrylic primer (as per manufacturer's
specification) including cleaning and Sq.M 73 73 73 73 73 73 73 73 73 73 73 75 73 73 73
smoothning of surface.
Two Coats
12 Bordering (upto 75 mm. width) in distemper
including cost of materials by two coats
acrylic distemper and one coat solvent based %Metre 752 752 752 752 752 752 752 752 752 752 752 766 752 752 752
acrylic primer.

13 Bordering (upto 75 mm. width) in distemper


including cost of materials by two coats
Synthetic distemper and one coat solvent %Metre 732 732 732 732 732 732 732 732 732 732 732 745 732 732 732
based acrylic primer.

14 Applying Interior grade Acrylic Primer of


approved quality and brand on plastered or
cencrete surface old or new surface to
receive Distemper/ Acrylic emulsion paint
including scraping and preparing the surface
throughly, complete as per manufacturer's
specification and as per direction of the EIC.
(In Ground Floor)
(a) One Coat
i) Water based interior grade Acrylic Primer %Sq.M 3333 3333 3333 3333 3333 3333 3333 3333 3333 3333 3333 3404 3333 3333 3333
ii) Solvent based interior grade Acrylic
%Sq.M 3676 3676 3676 3676 3676 3676 3676 3676 3676 3676 3676 3757 3676 3676 3676
Primer

(b) Two Coats

Page 157
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(J)WHITE WASH, COLOUR WASH, DISTEMPER


Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

i) Water based interior grade Acrylic Primer %Sq.M 4798 4798 4798 4798 4798 4798 4798 4798 4798 4798 4798 4899 4798 4798 4798
ii) Solvent based interior grade Acrylic
Primer %Sq.M 5303 5303 5303 5303 5303 5303 5303 5303 5303 5303 5303 5434 5303 5303 5303

[This item to be done under specific


instruction of the Superintending Engineer]

15 Applying Exterior grade Acrylic primer of


approved quality and brand on plastered or
cencrete surface old or new surface to
receive decorative textured(matt finish) or
smooth finish acrylic exterior emulsion paint
including scraping and preparing the surface
throughly, complete as per manufacturer's
specification and as per direction of the EIC.

In Ground Floor:
(a) One Coat %Sq.M 3404 3404 3404 3404 3404 3404 3404 3404 3404 3404 3404 3474 3404 3404 3404
(b) Two Coats %Sq.M 4899 4899 4899 4899 4899 4899 4899 4899 4899 4899 4899 5010 4899 4899 4899
[This item to be done under specific
instruction of the Superintending Engineer]

N.B.:-Extra for each additional floor in


external walls refer item 20
16 Applying decorative cement based paint of
approved quality after preparing the surface
including scraping the same thoroughly
(plastered or concrete surface) as per
manufacturer's specification.
In Ground floor:
(i) One coat on old surface. Sq.M 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33
(ii) One coat on new surface. Sq.M 37 37 37 37 37 37 37 37 37 37 37 37 37 37 37
(iii) Two coats. Sq.M 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53
17 Chalk washing (one coat) - any height.
Sq.M 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9

Page 158
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(J)WHITE WASH, COLOUR WASH, DISTEMPER


Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

18 Protective and Decorative Textured exterior


high class matt finish paint of approved
quality, composed of special Tharmoplastic
Resin containing fine crystalline additives
derive from Granite as per manufacturer's
specification and as per direction of EIC to
be applied over acrylic primer as required.
The rate includes cost of material, labour,
scaffolding and all incidental charges but
excluding the cost of primer.
In Ground floor
Two Coat Sq.M 113 113 113 113 113 113 113 113 113 113 113 117 113 113 113
N.B. This item is to be selected only with
written permission of Superintending
Engineer for very resticted and small
areas of a building.
19 Protective and Decorative Acrylic exterior
emulsion paint of approved quality, as per
manufacturer's specification and as per
direction of EIC to be applied over acrylic
primer as required. The rate includes cost of
material, labour, scaffolding and all incidental
charges but excluding the cost of primer.

In Ground floor (Two Coat)


a) Normal Acrylic Emulsion Sq.M 73 73 73 73 73 73 73 73 73 73 73 74 73 73 73
b) Premium 100% Acrylic Emulsion Sq.M 92 92 92 92 92 92 92 92 92 92 92 94 92 92 92
c) Super Protective 100% Acrylic Emulsion.
Sq.M 108 108 108 108 108 108 108 108 108 108 108 109 108 108 108

N.B. The items 19(b) & 19(c) are to be


selected only with written permission of
Superintending Engineer for very
resticted and small areas of a building.
20 Add extra for each additional floor over the
rate for ground floor on items 4 to 7 and item
15, 16,18 & 19
External surface

(i) Upto 4th floor %Sq.M 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72


(ii) Above 4th floor %Sq.M 83 83 83 83 83 83 83 83 83 83 83 83 83 83 83

Page 159
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(J)WHITE WASH, COLOUR WASH, DISTEMPER


Rate (Rs.)

Uttar/ Dakshin Dinajpur


Coochbehar excluding
Kolkata / 24 Pgs (N &

Jalpaiguri,Alipurduar,
/Area of Kalyani Sub

plains of Siliguri Sub

plains of Siliguri Sub

the area of Haldibari


Darjeeling except
excluding area of
Howrah/ Hoogly

Kalyani Sub Div

Divn. & Area of

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia

Divn.
Description of Items Unit

Dist.
Div

PS
S)
No.

NOTE: For all structures the ground floor


equivalent height shall be taken as 4
meters. Every 4 meters or part thereof
above 4 meters shall be taken as each
additional floor for purpose of item 4, 5, 6,
7 and 15, 16, 18 &19.
21 Dry Distemparing to interior walls or ceiling
including cleaning, washing, smoothening
surface
(a) One Coat Sq.M 34 34 34 34 34 34 34 34 34 34 34 34 34 34 34
(b) Two coat Sq.M 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51
22 Bordering (upto 7.5 cm. width) with dry
distemper Sq.M 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6

Page 160
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(K) PAINTING, VERNISHING ETC.


Rate (Rs.)

Darjeeling except plains of

Coochbehar excluding the


plains of Siliguri Sub Divn.
excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

1 Removing loose scales, blisters etc. from old


painted surface and thoroughly smoothening
the surface to make the same suitable for Sq.M 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22
receiving fresh coat of paint.

2 Removing old paint from blistered painted


surface with application of soda, sajimati or
any approved chemical paint remover and
exposing the original surface including
Sq.M 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40
cleaning and thorough washing to remove all
traces of the removing agent including taking
out shutters and refixing the same where
necessary.
3 Removing old paint from blistered painted
surface of steel or other metal by chipping
including scraping and cleaning and Sq.M 48 48 48 48 48 48 48 48 48 48 48 49 48 48 48
exposing the original surface.
4 Removing thick layers of paint from heavily
cracked and blistered painted surface of
timber by careful burning with blow lamp
including smoothening exposed surface of Sq.M 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53
timber with pumice stone or glass and
preparing the same for fresh treatment.

N.B.:
(Payment against item 1, 2, 3, 4 will be
made only when done at specific
direction of the Engineer- in-charge. Cost
of taking out shutter etc.for this item and
rehanging the same or changing glass
panes cracked or broken in the operation
will be deemed to be covered by the rate
of this item and no seperate payment
therefor shall be made.)

5 (a) Rendering the surface of walls and ceiling


with plaster of paris (thickness not less than Sq.M 69 64 64 64 64 64 64 64 64 64 64 64 64 64 64
1.5 mm.)
(b) Rendering the surface of walls and ceiling
with white cement based wall putty of Sq.M 122 122 122 122 122 122 122 122 122 122 122 123 122 122 122
approved make and brand(1.5mm thick)

Page161
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(K) PAINTING, VERNISHING ETC.


Rate (Rs.)

Darjeeling except plains of

Coochbehar excluding the


plains of Siliguri Sub Divn.
excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

6 (a)Cleaning the walls and ceiling by scraping,


sand papering and smoothening down the Sq.M 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18
surface including putting.
(b) Washing & cleaning the wall surface &
ceiling by soft detergent powder & soft water
& render the surface free of dust, stain etc. Sq.M 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8

7 (a) Priming one coat on timber or plastered


surface with synthetic oil bound primer of
approved quality including smoothening Sq.M 41 41 41 41 41 41 41 41 41 41 41 42 41 41 41
surfaces by sand papering etc.
(b) Priming one coat on steel or other metal
surface with synthetic oil bound primer of
approved quality including smoothening Sq.M 31 31 31 31 31 31 31 31 31 31 31 32 31 31 31
surfaces by sand papering etc.

(This item is applicable to new work or


old work when the original surface has
been exposed by removal of old paint.)
8 (A) Painting with best quality synthetic
enamel paint of approved make and brand
including smoothening surface by sand
papering etc. including using of approved
putty etc. on the surface, if necessary :
(a) On timber or plastered surface :
With super gloss (hi-gloss) -
(i) One coat (white in shade) Sq.M 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57
(ii) Two coats (white in shade) Sq.M 85 85 85 85 85 85 85 85 85 85 85 86 85 85 85
(iii) One coat (with any shade except white) Sq.M 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59
(iv) Two coats (with any shade except white)
Sq.M 89 89 89 89 89 89 89 89 89 89 89 89 89 89 89

With other than hi-gloss of approved


quality-
(i) One coat (white in shade) Sq.M 50 50 50 50 50 50 50 50 50 50 50 51 50 50 50
(ii) Two coats (white in shade) Sq.M 76 76 76 76 76 76 76 76 76 76 76 76 76 76 76
(iii) One coat (with any shade except white) Sq.M 51 51 51 51 51 51 51 51 51 51 51 52 51 51 51
(iv) Two coats (with any shade except white)
Sq.M 80 80 80 80 80 80 80 80 80 80 80 81 80 80 80

(b) On steel or other metal surface :

Page162
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(K) PAINTING, VERNISHING ETC.


Rate (Rs.)

Darjeeling except plains of

Coochbehar excluding the


plains of Siliguri Sub Divn.
excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

With super gloss (hi-gloss) -


(i) One coat (white in shade) Sq.M 53 53 53 53 53 53 53 53 53 53 53 54 53 53 53
(ii) Two coats (white in shade) Sq.M 83 83 83 83 83 83 83 83 83 83 83 84 83 83 83
(iii) One coat (with any shade except white) Sq.M 55 55 55 55 55 55 55 55 55 55 55 56 55 55 55
(iv) Two coats (with any shade except white)
Sq.M 86 86 86 86 86 86 86 86 86 86 86 87 86 86 86

With other than hi-gloss of approved


quality-
(i) One coat (white in shade) Sq.M 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48
(ii) Two coats (white in shade) Sq.M 75 75 75 75 75 75 75 75 75 75 75 76 75 75 75
(iii) One coat (with any shade except white) Sq.M 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49
(iv) Two coats (with any shade except white)
Sq.M 77 77 77 77 77 77 77 77 77 77 77 77 77 77 77

8 (B) Painting with superior quality aluminium


paint of approved make and brand including
smoothening surface by sand papering etc.
on steel surface :
(a) One coat Sq.M 37 37 37 37 37 37 37 37 37 37 37 38 37 37 37
(b) Two coats Sq.M 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62
9 Applying Acrylic Emulsion Paint of approved
make and brand on walls and ceiling
including sand papering in intermediate
coats including putty (to be done under
specific instruction of Superintending
Engineer) :
(Two coats)
i) Standard Quality Sq.M 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67
ii) Luxury Quality Sq.M 76 76 76 76 76 76 76 76 76 76 76 77 76 76 76
10 Painting with ready mixed red lead paint of
approved make and brand :
(a) One coat Sq.M 34 34 34 34 34 34 34 34 34 34 34 34 34 34 34
(b) Two coats Sq.M 59 59 59 59 59 59 59 59 59 59 59 60 59 59 59
11 Painting with ready mixed Black Japan of
approved make and brand including
smoothening surface
(a) One coat Sq.M 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35
(b) Two coats Sq.M 60 60 60 60 60 60 60 60 60 60 60 61 60 60 60
12 Borders (up to 150 mm. width) with two coats
of Black Japan Paint. Metre 8 8 8 8 8 8 8 8 8 8 8 9 8 8 8

Page163
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(K) PAINTING, VERNISHING ETC.


Rate (Rs.)

Darjeeling except plains of

Coochbehar excluding the


plains of Siliguri Sub Divn.
excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

13 Washing and cleaning old painted surface


and oiling with linseed oil. Sq.M 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7

14 Cleaning old painted surface and oiling with


linseed oil with admixture of paint (25% of
Sq.M 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11
linseed oil by volume.)

15 Coal tarring :

(a) One coat Sq.M 22 22 22 22 22 22 22 22 22 22 22 23 22 22 22


(b) Two coats Sq.M 36 36 36 36 36 36 36 36 36 36 36 38 36 36 36
16 Painting with oil type wood preservative of
approved brand & make.
(a) One coat Sq.M 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29
(b) Two coats Sq.M 43 43 43 43 43 43 43 43 43 43 43 43 43 43 43
17 Copal varnish of approved quality including
preparing surface :
(i) On new wood work :
(a) One coat Sq.M 125 125 125 125 125 125 125 125 125 125 125 126 125 125 125
(b) Two coats Sq.M 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189
(ii) On old varnish surface including removing
old varnish and exposing original surface :

(a) One coat Sq.M 175 175 175 175 175 175 175 175 175 175 175 175 175 175 175
(b) Two coats Sq.M 257 257 257 257 257 257 257 257 257 257 257 258 257 257 257
18 French polishing to wood work including
preparing surface (ordinary gloss)
(a) On new wood work Sq.M 492 492 492 492 492 492 492 492 492 492 492 500 492 492 492
(b) On old French polished surface including
complete removal of the old polish. Sq.M 563 563 563 563 563 563 563 563 563 563 563 571 563 563 563

NOTE : For high gloss polish the rate


shall be increased by 50% over the rate
for ordinary gloss. This work should not
be executed without specific permission
of Superintending Engineer.

19 Ready mix Wax polishing to wood work


including preparing surface.

(a) On new wood work.


Sq.M 79 79 79 79 79 79 79 79 79 79 79 79 79 79 79

Page164
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(K) PAINTING, VERNISHING ETC.


Rate (Rs.)

Darjeeling except plains of

Coochbehar excluding the


plains of Siliguri Sub Divn.
excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit

Dist.
No.

(b) On old wax polished surface including


removal of old polish. Sq.M 118 118 118 118 118 118 118 118 118 118 118 118 118 118 118

20 Frosting glass panes by dabbing white paint


Sq.M 41 41 41 41 41 41 41 41 41 41 41 41 41 41 41

21 Painting black board with approved paint


after scraping and polishing surface etc. Sq.M 83 83 83 83 83 83 83 83 83 83 83 84 83 83 83

Page165
PWD(WB) Schedule of Rates;
SECTION 1. ------------BUILDING WORKS

(L)GLARZIER'S WORK
Rate (Rs.)

excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


Kolkata / 24 Pgs (N & S)
/Area of Kalyani Sub Div

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Bankura
Birbhum
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

1 Supplying best Indian sheet glass panes set


in putty and fitted and fixed with nails and
putty complete. (In all floors for internal wall
& upto 6 m height for external wall)
(i) 3 mm thick (weighing 7.4 kg/Sq.m) Sq.M 544 544 544 544 544 544 544 544 544 544 544 560 544 544 544
(ii) 4 mm thick Sq.M 615 615 615 615 615 615 615 615 615 615 615 623 615 615 615
2 Supplying best Indian sheet glass panes set
in putty (as per I.S specification) and fitted
and fixed with teak wood beads and nails
complete. (In all floors for internal wall & upto
6 m height for external wall)
(i) 3 mm thick (weighing 7.4 kg/Sq.m) Sq.M 1042 1042 1042 1042 1042 1042 1042 1042 1042 1042 1042 1066 1042 1042 1042
(ii) 4 mm thick Sq.M 972 972 972 972 972 972 972 972 972 972 972 996 972 972 972
3 Supplying best Indian Reinforced wire safety
glass 6 mm thick including cutting to
required sizes, setting on putty bases and
fitted and fixed with teak glazing bead
Sq.M 3233 3233 3233 3233 3233 3233 3233 3233 3233 3233 3233 3278 3233 3233 3233
(19mm x 12mm) including putty and nails as
necessary complete. (In all floors for internal
wall & upto 6 m height for external wall)

4 Supplying best Indian Sheet glass 5 mm


thick including cutting to required
sizes,setting on putty bases and fitted and
fixed with teak glazing beads (19 mm x 12 Sq.M 1094 1094 1094 1094 1094 1094 1094 1094 1094 1094 1094 1118 1094 1094 1094
mm) including putty and nails as necessary
complete. (In all floors for internal wall & upto
6 m height for external wall)
5 Supplying best Indian figured glass viz.
hammered, fluted, ribbed, pinhead etc. type
including cutting to required sizes, setting on
putty bases and fitted and fixed with nails
and putty complete.(In all floors for internal
wall & upto 6 m height for external wall)

(i) 3 mm thick(White) Sq.M 479 479 479 479 479 479 479 479 479 479 479 488 479 479 479
(ii) 3 mm thick(Coloured) Sq.M 550 550 550 550 550 550 550 550 550 550 550 558 550 550 550
6 Supplying best Indian laminated safety glass
5 mm. thick including cutting to required
sizes, setting on putty bases and fitted and
fixed with teak glazing beads (19 mm x 12 Sq.M 2405 2405 2405 2405 2405 2405 2405 2405 2405 2405 2405 2436 2405 2405 2405
mm) including putty and nails as necessary
complete.(In all floors for internal wall & upto
6 m height for external wall)

Page 166
PWD(WB) Schedule of Rates;
SECTION 1. ------------BUILDING WORKS

(L)GLARZIER'S WORK
Rate (Rs.)

excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


Kolkata / 24 Pgs (N & S)
/Area of Kalyani Sub Div

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Bankura
Birbhum
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

7 Extra for fixing glass panes in steel window.


Sq.M 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67
8 Renewing worn out putty of glass panes :
(a) Panes not exceeding 0.2 Sq.m Each 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35

(b) Panes exceeding 0.2 Sq.m but not


Each 53 53 53 53 53 53 53 53 53 53 53 54 53 53 53
exceeding 0.5 Sq.m
9 Renewing teak wood beads of glass panes
(each pane not exceeding 0.2 Sq.m) Each 56 56 56 56 56 56 56 56 56 56 56 58 56 56 56

10 Cleaning and removing paint mark from


glass pane with spirit and removing strains Sq.M 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17
etc.

11 Supplying, fitting and fixing in position fibre


glass panes of approved quality with resin,
nail, clip etc. as per IS:12866-1989. (In all
floors for internal wall & upto 6 m height for
external wall)
(a) 1.2 mm thick (1.85 Kg/Sq.m) Sq.M 617 617 617 617 617 617 617 617 617 617 617 624 617 617 617
(b) 1.6 mm thick (2.5 Kg/Sq.m) Sq.M 815 815 815 815 815 815 815 815 815 815 815 822 815 815 815
(c) 2.0 mm thick (3.36 Kg/Sq.m) Sq.M 1101 1101 1101 1101 1101 1101 1101 1101 1101 1101 1101 1111 1101 1101 1101
(d) 3.0 mm thick (5.10 Kg/Sq.m) Sq.M 1625 1625 1625 1625 1625 1625 1625 1625 1625 1625 1625 1633 1625 1625 1625
(e) 4.0 mm thick (6.72 Kg/Sq.m) Sq.M 2029 2029 2029 2029 2029 2029 2029 2029 2029 2029 2029 2043 2029 2029 2029
(f) 6.0 mm thick (10.0 Kg/Sq.m) Sq.M 3055 3055 3055 3055 3055 3055 3055 3055 3055 3055 3055 3062 3055 3055 3055
12 Taking out carefully from shutter existing
broken glass panes, cutting the same to
smaller and utilising the same, small pane
including cost of fitting and fixing.
(a) Putty and Nails Each 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19
(b) With Teak wood Beads and Nails Each 37 37 37 37 37 37 37 37 37 37 37 38 37 37 37

Note:- Add 5% extra for each 6 Mtr. height


or part thereof beyond the initial height of
6 Mtr. for item 1 to 5 & 10 only. This extra
rates is applicable for external works. For
maintenance work, 20% extra on the rate
of corresponding item to be added.

Page 167
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(M)DRAIN, DOWN PIPES, CHIMNEY ETC.


Rate (Rs.)

Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of

Coochbehar excluding the


/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

1 Filling up cracks with cement morar (1:3) at


the junction of the out side wall and drain. %Metre 268 251 250 250 261 257 251 250 261 260 261 281 259 259 264
(Cement 11.4 Kg/100 Mtr.)

2 Cutting shallow drain on roof for easy


passage of rain water finised with cement
plaster (1:4) complete. (Cement 153.0 %Metre 2997 2801 2783 2783 2908 2854 2801 2783 2908 2890 2908 3158 2891 2891 2944
Kg/100 Mtr.)
3 Saucer drain upto 150 mm. width in floor and
upto 75 mm. Depth including cement plaster
(1:3) and neat cement finishing. (Cement %Metre 3672 3436 3415 3415 3565 3501 3436 3415 3565 3543 3575 3875 3554 3554 3618
224.0 Kg/100 Mtr.)
4 Regrading mouth of down pipe for easy out
let of rain water including cement plaster
(1:3) including cutting slope and mending Each 20 19 19 19 19 19 19 19 19 19 19 20 19 19 19
damages. (Cement 57.0 Kg/100 Nos)

5 Khasia drain of 150 mm. To 225 mm. width


in ceement morter (1:4) finished with neat
cement and including adges 35 mm. raised Metre 54 50 50 50 52 51 50 50 52 52 52 57 52 52 53
complete. (Cement 270.0 Kg/100 Mtr.)
6 Making kutcha drain upto 450 mm. deep and
upto 750 mm width to grade including
trimming sides and beds, removing spoils to Metre 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33
any distance and speading.
7 Resectioning kutcha drain by mathor labour
after removing sludge, filth, night soil etc.
and bailing out water from source, making
earthen bundh where necessary and
removing afterwards, trimming the sides and
regrading bottom including necessary
Sq.M 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25
chilchalling involving earth work upto 150
mm average thickness and disposal of spoils
as directed and fine dressing. ( Payment to
be made on area trimmed and dressed i.e.
the length measured along the profile
length).

Page 168
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(M)DRAIN, DOWN PIPES, CHIMNEY ETC.


Rate (Rs.)

Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of

Coochbehar excluding the


/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

8 Supply fitting, fixing cast iron down pipes


conforming to IS:3989-1970 and IS:1729-
1964 in position with necessary clamps, nails
including making hole in wall, floor etc. and
cutting trenches in any soil through masonry
concrete structures etc. if necessary and
mending good damages including joining
with jointing materials complete.[ Payment
will be made on centre line measurement of
the total pipe line including specials.
Payment for specials will however be paid
separately ].
(i) 75 mm. Dia. (Internal) Metre 585 585 585 585 585 585 585 585 585 585 585 600 585 585 585
(ii) 100 mm. Dia. (Internal) Metre 669 669 669 669 669 669 669 669 669 669 669 688 669 669 669
(iii) 150 mm. Dia. (Internal) Metre 1139 1139 1139 1139 1139 1139 1139 1139 1139 1139 1139 1163 1139 1139 1139
9 Supplying fitting fixing C.I. Specials of down
pipes in position with clamps nails etc. with
jointing materials including cutting holes in
masonry or concrete, mending good
damages complete.
(A) (1) C. I Head or 'Y' or 'T' junction
(single) of down pipe.
(i) 75 mm. Dia. Each 619 619 619 619 619 619 619 619 619 619 619 646 619 619 619
(ii) 100 mm. Dia. Each 811 811 811 811 811 811 811 811 811 811 811 822 811 811 811
(iii) 150 mm. Dia. Each 2049 2049 2049 2049 2049 2049 2049 2049 2049 2049 2049 2085 2049 2049 2049
(A) (2) C. I Head or 'Y' or 'T' junction
(single) of down pipe.
(With door)
(i) 75 mm. Dia. Each 705 705 705 705 705 705 705 705 705 705 705 721 705 705 705
(ii) 100 mm. Dia. Each 896 896 896 896 896 896 896 896 896 896 896 907 896 896 896
(iii) 150 mm. Dia. Each 2145 2145 2145 2145 2145 2145 2145 2145 2145 2145 2145 2157 2145 2145 2145
(B) (1) C. I Head or 'Y' or 'T' junction
(double) of down pipe.
(Without door)
(i) 75 mm. Dia. Each 816 816 816 816 816 816 816 816 816 816 816 851 816 816 816
(ii) 100 mm. Dia. Each 1157 1157 1157 1157 1157 1157 1157 1157 1157 1157 1157 1169 1157 1157 1157
(iii) 150 mm. Dia. Each 2347 2347 2347 2347 2347 2347 2347 2347 2347 2347 2347 2377 2347 2347 2347

Page 169
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(M)DRAIN, DOWN PIPES, CHIMNEY ETC.


Rate (Rs.)

Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of

Coochbehar excluding the


/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

(B) (2) C. I Head or 'Y' or 'T' junction


(double) of down pipe.
(With door)
(i) 75 mm. Dia. Each 869 869 869 869 869 869 869 869 869 869 869 879 869 869 869
(ii) 100 mm. Dia. Each 1204 1204 1204 1204 1204 1204 1204 1204 1204 1204 1204 1219 1204 1204 1204
(iii) 150 mm. Dia. Each 2532 2532 2532 2532 2532 2532 2532 2532 2532 2532 2532 2561 2532 2532 2532
(C) C. I Offset of down pipe

(i) 75 mm. Dia projection 75 mm. Each 465 465 465 465 465 465 465 465 465 465 465 477 465 465 465
(ii) 75 mm. Dia projection 150 mm. Each 562 562 562 562 562 562 562 562 562 562 562 574 562 562 562
(iii) 100 mm. Dia projection 75 mm. Each 610 610 610 610 610 610 610 610 610 610 610 628 610 610 610
(iv) 100 mm. Dia projection 150 mm. Each 682 682 682 682 682 682 682 682 682 682 682 694 682 682 682
(v) 150 mm. Dia projection 75 mm. Each 891 891 891 891 891 891 891 891 891 891 891 903 891 891 891
(vi) 150 mm. Dia projection 150 mm. Each 1140 1140 1140 1140 1140 1140 1140 1140 1140 1140 1140 1153 1140 1140 1140
(D)(1) C. I Bend of down pipe (Without
door)
(i) 75 mm. Dia. Each 430 430 430 430 430 430 430 430 430 430 430 441 430 430 430
(ii) 100 mm. Dia. Each 533 533 533 533 533 533 533 533 533 533 533 543 533 533 533
(iii) 150 mm. Dia. Each 942 942 942 942 942 942 942 942 942 942 942 955 942 942 942
(D)(2) C. I Bend of down pipe. (With door)

(i) 75 mm. Dia. Each 506 506 506 506 506 506 506 506 506 506 506 518 506 506 506
(ii) 100 mm. Dia. Each 609 609 609 609 609 609 609 609 609 609 609 621 609 609 609
(iii) 150 mm. Dia. Each 1050 1050 1050 1050 1050 1050 1050 1050 1050 1050 1050 1062 1050 1050 1050
(E) C. I shoe of down pipe.

(i) 75 mm. Dia. Each 411 411 411 411 411 411 411 411 411 411 411 423 411 411 411
(ii) 100 mm. Dia. Each 454 454 454 454 454 454 454 454 454 454 454 466 454 454 454
(iii) 150 mm. Dia. Each 592 592 592 592 592 592 592 592 592 592 592 604 592 592 592
10 Supplying, fitting, fixing C.I Grating (Heavy
type).
(a) Up to 100 mm Square or 100 mm Dia. Each 80 80 80 80 80 80 80 80 80 80 80 86 80 80 80
(b) Above 100 mm and upto 150 mm
Square or round. Each 128 128 128 128 128 128 128 128 128 128 128 134 128 128 128

Page 170
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(M)DRAIN, DOWN PIPES, CHIMNEY ETC.


Rate (Rs.)

Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of

Coochbehar excluding the


/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

11 Supplying, fitting, fixing approved quality


asbestos cement quality down pipe in positin
with necessary clamps, nails including
making holes in wall, floor etc. and cutting
trenches in any soil or through masonry,
concrete structures etc. if necessary and
mending good damages including jointing
materials complete.
(i) 76.2 mm Dia. Metre 114 114 114 114 114 114 114 114 114 114 114 120 114 114 114
(ii) 101.6 mm Dia. Metre 133 133 133 133 133 133 133 133 133 133 133 140 133 133 133
(iii) 152.4 mm Dia. Metre 204 204 204 204 204 204 204 204 204 204 204 210 204 204 204
12 Supplying, fitting, fixing approved quality
asbestos cement specials of down pipe in
position with clamps, nails etc. with jointing
materials including cutting holes in masonry
or concrete, mending good damages
complete.
(a) Asbestos cement plain bend shoe of
down pipe.
(i) 76.2 mm Dia. Each 123 123 123 123 123 123 123 123 123 123 123 128 123 123 123
(ii) 101.6 mm Dia. Each 136 136 136 136 136 136 136 136 136 136 136 142 136 136 136
(iii) 152.4 mm Dia. Each 191 191 191 191 191 191 191 191 191 191 191 197 191 191 191
(b) Asbestos cement slotted vent/ cowl of
down pipe.
(i) 76.2 mm Dia. Each 80 80 80 80 80 80 80 80 80 80 80 86 80 80 80
(ii) 101.6 mm Dia. Each 106 106 106 106 106 106 106 106 106 106 106 112 106 106 106
(iii) 152.4 mm Dia. Each 142 142 142 142 142 142 142 142 142 142 142 148 142 142 142
(c) Asbestos cement cone cap / cowl of
down pipe.
(i) 76.2 mm Dia. Each 86 86 86 86 86 86 86 86 86 86 86 92 86 86 86
(ii) 101.6 mm Dia. Each 124 124 124 124 124 124 124 124 124 124 124 130 124 124 124
(iii) 152.4 mm Dia. Each 159 159 159 159 159 159 159 159 159 159 159 163 159 159 159

Page 171
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(M)DRAIN, DOWN PIPES, CHIMNEY ETC.


Rate (Rs.)

Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of

Coochbehar excluding the


/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

13 Taking out rain water down pipes, removing


chokages and refixing the same in position
including mending good damages (of taking Metre 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12
out and refixing)
14 Taking out rain water down pipe.
%Metre 904 904 904 904 904 904 904 904 904 904 904 904 904 904 904

15 Removing chokage of rain water pipes with


split bamboo. %Metre 759 759 759 759 759 759 759 759 759 759 759 759 759 759 759

16 Renewing cemented joint of down pipe. Each


15 15 15 15 15 15 15 15 15 15 15 15 15 15 15
joint
17 Taking out and refixing C. I. Grating of down
pipe after cleaning the mouth including Each
mending good damages in cement mortar 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16
joint
(1:3).
18 G.I. Rain water spout 75 mm. Dia. And 600
to 750 mm. Long supplied fitted and fixed
complete with two coats of paint to both Each 143 143 143 143 143 143 143 143 143 143 143 148 143 143 143
exposed portion.

19 Galvanised Iron pipe outlet for water with


bevelled end at outlet, supplied fitted and
fixed complete including painting two coats
to the exposed portion.
(a) 25 mm. Dia. Metre 237 237 237 237 237 237 237 237 237 237 237 243 237 237 237
(b) 32 mm. Dia. Metre 270 270 270 270 270 270 270 270 270 270 270 276 270 270 270
(c) 40 mm. Dia. Metre 338 338 338 338 338 338 338 338 338 338 338 344 338 338 338
(d) 50 mm. Dia. Metre 407 407 407 407 407 407 407 407 407 407 407 414 407 407 407
20 Steel chimney supplied, fitted and fixed with
necessary cowl complete with necessary
stiffeners, guy rope etc. as directed complete
with two coats of anticorrosive paint (internal
surface to be painted with bituminous paint).

(i) Made of 2.54mm steel sheets.


(a) 150 mm. Dia. Metre 1328 1328 1328 1328 1328 1328 1328 1328 1328 1328 1328 1333 1328 1328 1328
(b) 175 mm. Dia. Metre 1449 1449 1449 1449 1449 1449 1449 1449 1449 1449 1449 1454 1449 1449 1449
(c) 200 mm. Dia. Metre 1630 1630 1630 1630 1630 1630 1630 1630 1630 1630 1630 1636 1630 1630 1630

Page 172
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(M)DRAIN, DOWN PIPES, CHIMNEY ETC.


Rate (Rs.)

Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of

Coochbehar excluding the


/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

(ii) Made of 3.17mm steel sheets.


(a) 200 mm. Dia. Metre 1920 1920 1920 1920 1920 1920 1920 1920 1920 1920 1920 1928 1920 1920 1920
(b) 225 mm. Dia. Metre 2100 2100 2100 2100 2100 2100 2100 2100 2100 2100 2100 2109 2100 2100 2100
(c) 250 mm. Dia. Metre 2331 2331 2331 2331 2331 2331 2331 2331 2331 2331 2331 2341 2331 2331 2331
(d) 275 mm. Dia. Metre 2490 2490 2490 2490 2490 2490 2490 2490 2490 2490 2490 2501 2490 2490 2490
(e) 300 mm. Dia. Metre 2664 2664 2664 2664 2664 2664 2664 2664 2664 2664 2664 2676 2664 2664 2664
21 Supplying, fitting & fixing UPVC pipes A-
Type and fittings conforming to IS:13592-
1992 with all necessary clamps nails,
including making holes in walls, floor etc.
cutting trenches in any soil through masonry
concrete structures etc if necessary and
mending good damages including joining
with jointing materails (Spun Yarn,
Valamoid/Bitumen/M-Seal etc) complete.

A) UPVC Pipes:
(i) 75 mm. Dia. Metre 216 216 216 216 216 216 216 216 216 216 216 228 216 216 216
(ii) 110 mm. Dia. Metre 291 291 291 291 291 291 291 291 291 291 291 303 291 291 291
(iii) 160 mm. Dia. Metre 570 570 570 570 570 570 570 570 570 570 570 584 570 570 570

B) UPVC Fittings:
a) Plain Tee
(i) 75 mm. Dia. Nos 117 117 117 117 117 117 117 117 117 117 117 120 117 117 117
(ii) 110 mm. Dia. Nos 200 200 200 200 200 200 200 200 200 200 200 206 200 200 200
(iii) 160 mm. Dia. Nos 600 600 600 600 600 600 600 600 600 600 600 611 600 600 600
b) Plain Y
(i) 75 mm. Dia. Nos 144 144 144 144 144 144 144 144 144 144 144 153 144 144 144
(ii) 110 mm. Dia. Nos 261 261 261 261 261 261 261 261 261 261 261 271 261 261 261
(iii) 160 mm. Dia. Nos 686 686 686 686 686 686 686 686 686 686 686 700 686 686 686

Page 173
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(M)DRAIN, DOWN PIPES, CHIMNEY ETC.


Rate (Rs.)

Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of

Coochbehar excluding the


/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

c) Bend 87.5 degree


(i) 75 mm. Dia. Nos 96 96 96 96 96 96 96 96 96 96 96 101 96 96 96
(ii) 110 mm. Dia. Nos 162 162 162 162 162 162 162 162 162 162 162 170 162 162 162
(iii) 160 mm. Dia. Nos 408 408 408 408 408 408 408 408 408 408 408 420 408 408 408
d) Shoe
(i) 75 mm. Dia. Nos 88 88 88 88 88 88 88 88 88 88 88 93 88 88 88
(ii) 110 mm. Dia. Nos 128 128 128 128 128 128 128 128 128 128 128 141 128 128 128
(iii) 160 mm. Dia. Nos 358 358 358 358 358 358 358 358 358 358 358 367 358 358 358

Page 174
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(N)THATCH, MUD AND BAMBOO WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

1 Fixing of bamboo posts by digging hole in all


sorts of soil and subsequent thorough
repacking the same with spoils including the
cost of one coat of coal-tarring the
embedded portion of the bamboo :
(a) Depth 450 mm. Each 18 18 18 18 18 18 18 18 18 18 18 - 18 18 18
(b) Depth 600 mm. Each 23 23 23 23 23 23 23 23 23 23 23 - 23 23 23
(c) Depth 750 mm. Each 26 26 26 26 26 26 26 26 26 26 26 - 26 26 26
2 Strong bamboo posts, posts plates, rafters,
ties etc. fitted and fixed complete with coir
rope or nails as directed. (Embedded portion
of posts shall also be paid for against this
item cost of digging hole and repacking
being paid for seperately) :
(a) 75 mm. dia bamboo Metre 50 46 46 46 50 46 46 46 46 46 46 - 46 46 46
(b) 100 mm. dia bamboo Metre 67 61 61 61 67 61 61 61 61 61 61 - 61 61 61
3 Strong bamboo frame work (for thatched
roofing) with 75 mm. dia full bamboo rafters
spaced at 350 mm. centres and tied with
transverse bracings at 380 mm. spacing
Sq.M 242 225 225 225 242 225 225 225 225 225 225 - 225 225 225
(each bracing consisting of a pair of quarter
bamboo, one at top and the other at the
bottom of the rafters) fitted and fixed in
position complete.
4 Renewing with part old and part new
materials bamboo frame works (of thatched
roof) consisting of 75 mm. dia, full bamboo
rafters spaced at 350 mm. centres and tied
with tranverse bracing at 380 mm. spacing
(each bracing consisting of pair of quarter
bamboo,one at top and the other at bottom
of the rafters) fitted and fixed in position.
(a) With half old and half new materials Sq.M 173 164 164 164 173 164 164 164 164 164 164 - 164 164 164
(b) With one fourth old and three-fourth new
Sq.M 197 184 184 184 197 184 184 184 184 184 184 - 184 184 184
materials
5 Repairs to bamboo frame work (of thatched
roof consisting of 75mm dia. Bamboo) by
retying with new rope and with old pieces of Sq.M 41 39 39 39 41 39 39 39 39 39 39 - 39 39 39
quarter bamboo (including cost of new
materials as required).

Page 175
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(N)THATCH, MUD AND BAMBOO WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

6 Single durma mat lining (over bamboo roof


frame) fitted and fixed complete. Sq.M 60 60 60 60 60 60 60 60 60 60 60 - 60 60 60

7 Renewing single durma mat lining (over


bamboo roof frame) with half old and half Sq.M 39 39 39 39 39 39 39 39 39 39 39 - 39 39 39
new material fitted and fixed complete.
8 Rice straw thatching in roof including ridges
and hips.
(a) 150 mm. (pressed) thick Sq.M 259 231 231 231 259 231 231 231 231 231 231 - 231 231 231
(b) 225 mm. (pressed) thick Sq.M 306 263 263 263 306 263 263 263 263 263 263 - 263 263 263
9 Renewing rice straw thatching in roof with
half old and half new material including
ridges and hip with entirely new materials :
(a) 150 mm. (pressed) thick Sq.M 111 97 97 97 111 97 97 97 97 97 97 - 97 97 97
(b) 225 mm. (pressed) thick Sq.M 166 145 145 145 166 145 145 145 145 145 145 - 145 145 145
10 Renewing ridges or hips of thatched roof :

(a) Excluding jaffry Metre 56 56 56 56 56 56 56 56 56 56 56 - 56 56 56


(b) Including new jaffry Metre 94 94 94 94 94 94 94 94 94 94 94 - 94 94 94
11 Renewing jaffry of ridges or hips of thatched
roof fitted and fixed in position :
(Payment to be made on length of ridges or
hips)
(a) With half old and half new materials Metre 56 56 56 56 56 56 56 56 56 56 56 - 56 56 56
(b) With entirely new materials Metre 70 70 70 70 70 70 70 70 70 70 70 - 70 70 70
12 Split bamboo jaffry in thatched roof, fitted
and fixed in position:
(a) Coarse jaffry Sq.M 41 41 41 41 41 41 41 41 41 41 41 - 41 41 41
(b) Fine jaffry Sq.M 47 47 47 47 47 47 47 47 47 47 47 - 47 47 47
13 Renewing split bamboo jaffry in thatched roof
with half old and half new materials fitted and
fixed in position :
(a) Coarse jaffry Sq.M 30 30 30 30 30 30 30 30 30 30 30 - 30 30 30
(b) Fine jaffry Sq.M 33 33 33 33 33 33 33 33 33 33 33 - 33 33 33
14 Oloo thatching 150 mm. (pressed) thick in
roof including ridges and hips and including Sq.M 94 94 94 94 94 94 94 94 94 94 94 - 94 94 94
tying as necessary.

Page 176
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(N)THATCH, MUD AND BAMBOO WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

15 Renewing oloo thatching 150 mm. (pressed)


thick in roof with half old and half new
materials including ridges and hips with Sq.M 83 83 83 83 83 83 83 83 83 83 83 - 83 83 83
entirely new materials.
16 75 mm.(pressed) thick oloo thatching over
existing thatching including new ridges and Sq.M 74 74 74 74 74 74 74 74 74 74 74 - 74 74 74
hips and including tying as necessary.
17 Repairing thatching of roof with straw kuchi
to stop roof leaking and including tying as Sq.M 38 38 38 38 38 38 38 38 38 38 38 - 38 38 38
necessary
18 Diagonally woven crushed bamboo mat
including durma mat lining and both
longitudinal and transverse intermediate
stiffners (about 300 mm. centre each way)
and tied with 18 B.W.G. galvanised wire
fitted and fixed in position complete but
excluding costof supporting frame work.
(a) In wall fencing etc. Sq.M 103 103 103 103 103 103 103 103 103 103 103 - 103 103 103
(b) In ceiling Sq.M 113 113 113 113 113 113 113 113 113 113 113 - 113 113 113
19 Renewing with half old and half new
materials diagonally woven crushed bamboo
mat including durma mat lining and both
longitudinal and tranverse intermediate
stffiners (about 300 mm centre each way)
made on each face and tied with entirely new
18 B.W.G.galvanised wire fitted and fixed in
position complete(but excluding the cost of
supporting frame work) :
(a) In wall fencing etc. Sq.M 72 72 72 72 72 72 72 72 72 72 72 - 72 72 72
(b) In ceiling Sq.M 81 81 81 81 81 81 81 81 81 81 81 - 81 81 81
20 Bamboo walling made of crushed bamboo or
split bamboo or bamboo twigs(kanchis) as
directed and tied with necessary stiffners of
split bamboo (in pairs) made of 100mm dia. Sq.M 128 109 109 109 128 109 109 109 109 109 109 - 109 109 109
Bamboo fitted and fixed complete (but
excluding the cost of supporting frame work)

Page 177
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(N)THATCH, MUD AND BAMBOO WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

21 Renewing with half old and half new


materials bamboo walling made of crushed
bamboo or split bamboo or bamboo twigs
(kanchis) as directed and tied with necessary
Sq.M 81 71 71 71 81 71 71 71 71 71 71 - 71 71 71
stiffners of split bamboo (in pairs) fitted and
fixed complete (but excluding the cost of
supporting frame work)

22 100 mm. thick dab wall made of bamboo


walling (with crushed bamboo or split
bamboo twigs) mud plastered both sides and
finished with lipping of cowdung and earth Sq.M 91 91 91 91 91 91 91 91 91 91 91 - 91 91 91
(1:4) mixture complete but excluding the cost
of supporting frame work)

23 Thick mud walling made with prepared and


weathered earth and admixture of straw
chopping etc. (land where from earth may
be obtained will be made available by the Cum 258 258 258 258 258 258 258 258 258 258 258 - 258 258 258
dept. within 100 metre).

24 Ceiling made of bamboo mat of crushed


bamboo,split bamboo or bamboo twigs (as
directed) fitted and fixed in position with mud
plaster on underside finished smooth with Sq.M 111 111 111 111 111 111 111 111 111 111 111 - 111 111 111
lipping of cowdung and earth (1:4) mixture
complete (but excluding the coast of
supporting framework).
25 Mud pluster (25 to 37.5) mm. thick with
prepared mixture of earth and cowdung
(10:1) with admixture of straw chopping and
finishing smooth with lipping of cowwdung
and earth (1:4):
(a) In walls or floors Sq.M 25 25 25 25 25 25 25 25 25 25 25 - 25 25 25
(b) In ceilings Sq.M 25 25 25 25 25 25 25 25 25 25 25 - 25 25 25
26 Mud lipping with of cowdung and earth
mixture (1:4) :
(a) In walls or floors Sq.M 37 37 37 37 37 37 37 37 37 37 37 - 37 37 37
(b) In ceilings Sq.M 61 61 61 61 61 61 61 61 61 61 61 - 61 61 61

Page 178
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(N)THATCH, MUD AND BAMBOO WORKS


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

27 Durma mat works strengthened with split


bamboo placed both ways (225 mm. apart)
both sides and tied together fitted and fixed
complete (but excluding the cost of
supporting framework) :
(i) Single durma mat works
(a) In walls or floors Sq.M 66 66 66 66 66 66 66 66 66 66 66 - 66 66 66
(b) In ceilings Sq.M 72 72 72 72 72 72 72 72 72 72 72 - 72 72 72
(ii) Double durma mat works
(a) In walls or floors Sq.M 81 81 81 81 81 81 81 81 81 81 81 - 81 81 81
(b) In ceilings Sq.M 105 105 105 105 105 105 105 105 105 105 105 - 105 105 105
28 Renewing with half old half new materials
durma mat works strengthened with split
bamboo placed both ways (225 mm. apart)
on both sides and tied together fitted and
fixed complete (but excluding the cost of
supporting frameworks) :
(i) Single durma mat works
(a) In walls or floors Sq.M 43 43 43 43 43 43 43 43 43 43 43 - 43 43 43
(b) In ceilings Sq.M 54 54 54 54 54 54 54 54 54 54 54 - 54 54 54
(ii) Double durma mat works
(a) In walls or floors Sq.M 68 68 68 68 68 68 68 68 68 68 68 - 68 68 68
(b) In ceilings Sq.M 69 69 69 69 69 69 69 69 69 69 69 - 69 69 69
29 Double durma mat door or window
strengthened with necessary split bamboo
with strong outer frame and diagonals of Sq.M 132 132 132 132 132 132 132 132 132 132 132 - 132 132 132
bamboos and half bamboo complete,
including tying and handling the same.
30 Restoring scoured surface of mud walls by
dabbing with prepared and weathered earth
(with mixture of straw choppings etc.)
(Payment to be made on area restored.)

(a) Thickness restored 50 to 75 mm. Sq.M 12 12 12 12 12 12 12 12 12 12 12 - 12 12 12


(b) Thickness restored exceeding 75 mm.
but not exceeding 100 mm. Sq.M 18 18 18 18 18 18 18 18 18 18 18 - 18 18 18

(c) Thickness restored exceeding 100 mm.


Sq.M 22 22 22 22 22 22 22 22 22 22 22 - 22 22 22
but not exceeding 125 mm.
(d) Thickness restored exceeding 125 mm.
but not exceeding 150 mm. Sq.M 23 23 23 23 23 23 23 23 23 23 23 - 23 23 23

Page 179
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(O) FENCING
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

1 Fixing post of iron or precast concrete by


digging hole in the ground (in all sorts of soil)
and embedding the same by packing the
hole with cement concrete (1:3:6) (with
jhama khoa. For Purulia, Bankura and
Darjeeling Hill by Pakur Variety, Local Black
Hard Stone & Bazree respectively) and
finishing the top surface to regular shape (as
directed) with 15 cm cement plaster (1:6)
complete, including the cost of concrete,
plaster etc.but excluding the cost of the post
:
(i) Average dia. of the hole 200 mm. to
300 mm.

(a) Depth 450 mm. to 500 mm.


[cement 8 kg/No] Each 210 183 209 178 205 194 191 156 189 188 189 196 188 185 188

(b) Depth exceeding 500 mm. but not


exceeding 600 mm. Each 254 222 253 215 248 235 232 189 229 227 229 237 227 224 228
(Cement -9.65 kg/No)
(c) Depth exceeding 600 mm. but not
exceeding 675 mm. Each 288 252 287 244 282 267 263 215 260 258 259 269 258 255 259
(Cement-10.9 Kg/NO)
(d) Depth exceeding 675 mm. but not
exceeding 750 mm. Each 317 277 315 269 310 293 289 236 285 284 285 296 284 280 284
(Cement-12.1 KG/No)
(ii) Average dia. of the hole 300 mm. to
400 mm.

(a) Depth 450 mm. to 500 mm.


(Cement- 14..35 Kg/No.) Each 377 328 375 318 368 348 343 280 339 337 339 351 337 332 338

(b) Depth exceeding 500 mm. but not


exceeding 600 mm. Each 451 392 448 381 440 417 410 335 405 403 405 420 403 397 404
[Cement-17.2 Kg/No.]
(c) Depth exceeding 600 mm. but not
exceeding 675 mm. Each 509 443 506 430 497 470 463 378 457 455 457 474 455 449 456
[Cement-19.35 Kg/No.]
(d) Depth exceeding 675 mm. but not
exceeding 750 mm. Each 563 490 560 475 550 520 512 418 506 503 506 525 503 496 504
[Cement-21.5 Kg/No.]

Page 180
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(O) FENCING
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

2 Petty repairs to top of concrete embedment


of fencing post including replastering with 15
mm thick cement mortar (1:6) and finishing Each 23 22 22 22 23 22 22 22 23 23 23 24 22 22 23
to shape. [Cement-0.5 Kg/No.]
3 Straightening deformed iron post of fencing
carefully without damaging or loosening the Each 45 45 45 45 45 45 45 45 45 45 45 45 45 45 45
base.
4 Straightening deformed iron railing of fencing
carefully by dismantling and repairing and Each 47 47 47 47 47 47 47 47 47 47 47 47 47 47 47
refixing the same.

5 Labour for fitting line of wire through holes in


fencing post (already made in the body of the
posts or formed by staples already fixed
thereto) and tightening and fixing the wire in
taut condition with straining bolts (including
the cost of making holes, cost of staples and
cost of cutting and lappping joints in wire as
necessary but excluding the cost of straining
bolts ) :
(Payment to be made on the length of the
individual lines of wire.)

(a) Galvanised wire of 9 to 12 B.W.G. %Mtr. 337 337 337 337 337 337 337 337 337 337 337 337 337 337 337
(b) Strand wire (3 to 7 ply) upto 6 mm. dia. %Mtr. 501 501 501 501 501 501 501 501 501 501 501 501 501 501 501
(c) Standard wire (3 to 7 ply) above 6 mm.
%Mtr. 589 589 589 589 589 589 589 589 589 589 589 589 589 589 589
dia
(d) Barbed wire %Mtr. 662 662 662 662 662 662 662 662 662 662 662 662 662 662 662
6 (a) Supplying, fitting galvanised 3 ply 12
gauge / 4 points line of barbed wire in
fencing (holes already made in the body of
the post) or fixed by staples tightening and
fixing the wires in taut condition with straining %Mtr. 2795 2795 2795 2795 2795 2795 2795 2795 2795 2795 2795 2920 2795 2795 2795
bolts including the cost of cutting and of
lapping joints in the wire as necessary but
excluding the cost of galvanised
staples,straining bolt and binding wire where
necessary.
(Payment to be made on the length of
individual lines of wire.)

Page 181
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(O) FENCING
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

(b) Supplying, fitting galvanised 2 ply 12


gauge / 2 points line of barbed wire in
fencing (holes already made in the body of
the post) or fixed by staples tightening and
fixing the wires in taut condition with straining
bolts including the cost of cutting and of %Mtr. 2508 2508 2508 2508 2508 2508 2508 2508 2508 2508 2508 2619 2508 2508 2508
lapping joints in the wire as necessary but
excluding the cost of galvanised
staples,straining bolt and binding wire as
necessary 2 ply 12 gauge/ 2 points.

(Payment to be made on the length of


individual lines of wire.)
7 Labour for fitting wove wire or similar fencing
net tightening and fixing the same to post
with staples at every bar (including the cost
of cutting and lapping joints in the net, the
cost of staples, binding wire etc. and of
labour for fixing such staples as necessary).

(Payment to be made on the length of net in


finished work.)
(a) Net upto 1350 mm. height %Mtr. 997 997 997 997 997 997 997 997 997 997 997 997 997 997 997
(b) Net above 1350 mm. height %Mtr. 1254 1254 1254 1254 1254 1254 1254 1254 1254 1254 1254 1254 1254 1254 1254
8 Labour for repairs to snapped line of wire by
jointing snapped ends with links of new wire
as necessary, stretching and refixing the line
in taut condition (excluding the cost of new
materials)
(Payment to be made on the length of the
portion of wire which had become loose due
to snapping.)
(a) Galvanised wire of 9 to 12 B.W.G. %Mtr. 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97
(b) Strand wire (3 to 7 ply) upto 6 mm. dia. %Mtr. 111 111 111 111 111 111 111 111 111 111 111 111 111 111 111
(c) Standard wire (3 to 7 ply) above 6 mm.
dia %Mtr. 129 129 129 129 129 129 129 129 129 129 129 129 129 129 129

(d) Barbed wire %Mtr. 147 147 147 147 147 147 147 147 147 147 147 147 147 147 147

Page 182
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(O) FENCING
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

9 Labour for replacement of damaged or


broken portion of wove wire or similar net in
fencing including cutting and removing the
net of the affected bay and restoring the gap
with new net and fitting fixing the same in
taut condition and also tightening and
securing the adjacent affected bays
(including the cost of new staples and of
labour for fixing such new staples)
(Payment to be made on the length of the
replaced bay.)

(a) Net upto 1350 mm. height %Mtr. 1424 1424 1424 1424 1424 1424 1424 1424 1424 1424 1424 1424 1424 1424 1424
(b) Net above 1350 mm. height %Mtr. 1770 1770 1770 1770 1770 1770 1770 1770 1770 1770 1770 1770 1770 1770 1770
10 Labour for taking out (from fencing) line of
wire (galvanised, strand or barbed) by
drawing the same out through holes in the %Mtr. 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97
body of the post or through holes formed by
fixed staples.
(Payment to be made on the length of the
wire taken out.)
11 Labour for taking out (from fencing) line of
wire (galvanised, strand or barbed) including
%Mtr. 129 129 129 129 129 129 129 129 129 129 129 129 129 129 129
the cost of taking out staples (by cutting or
otherwise, as necessary).
(Payment to be made on the length of the
wire taken out.)
12 Labour for taking out wove wire or similar net
(from fencing) including the cost of taking out
staples (by cutting or otherwise,as
necessary).
(a) Net upto 1350 mm. height %Mtr. 468 468 468 468 468 468 468 468 468 468 468 468 468 468 468
(b) Net above 1350 mm. height %Mtr. 541 541 541 541 541 541 541 541 541 541 541 541 541 541 541
13 Supplying galvanised straining bolts (with
eye at one end with double nuts and
washers) fitted and fixed complete.
(i) 10 mm. dia.
(a) 150 mm. Each 50 50 50 50 50 50 50 50 50 50 50 52 50 50 50
(b) 200 mm. Each 58 58 58 58 58 58 58 58 58 58 58 61 58 58 58

Page 183
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(O) FENCING
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

(ii) 12 mm. dia.


(a) 200 mm. Each 80 80 80 80 80 80 80 80 80 80 80 84 80 80 80
(b) 250 mm. Each 87 87 87 87 87 87 87 87 87 87 87 91 87 87 87
(c) 300 mm. Each 94 94 94 94 94 94 94 94 94 94 94 99 94 94 94
(iii) 16 mm. dia.
(a) 250 mm. Each 116 116 116 116 116 116 116 116 116 116 116 122 116 116 116
(b) 300 mm. Each 124 124 124 124 124 124 124 124 124 124 124 130 124 124 124
14 Supplying galvanised staples fitted and fixed
complete.
(a) 19 mm. to 25 mm. size % Nos 224 224 224 224 224 224 224 224 224 224 224 230 224 224 224
(b) 32.5 mm. to 37.5 mm. size % Nos 283 283 283 283 283 283 283 283 283 283 283 295 283 283 283
(c) 44 mm. to 50 mm. size % Nos 355 355 355 355 355 355 355 355 355 355 355 367 355 355 355
15 Supplying 7 ply galvanised strand wire 19
gauge fitted and fixed complete with
Mtr. 40 40 40 40 40 40 40 40 40 40 40 42 40 40 40
necessary eyes, hooks and straining bolts
(excluding the cost of straining bolts.)
16 Supplying 6 ply galvanised strand wire 19
gauge fitted and fixed complete with
Mtr. 34 34 34 34 34 34 34 34 34 34 34 36 34 34 34
necessary eyes, hook and straining bolts
(excluding the cost of straining bolts.)
17 Taking out bulged out wire netting fitted and
fixed in window frames with nails and refixing
the same after straightening with new
galvanised staples and lapping with new (50 Sq. M 32 32 32 32 32 32 32 32 32 32 32 32 32 32 32
x 13) mm. Badam/ Gamari batten fitted and
fixed with iron screws including hire and
labour of scaffolding complete.
18 Double knotted wove wire 1.2 m. height (11
bars), vertical 300 mm. apart,horizontal
spacing starting from 88 mm. ending 200
mm. top and bottom wire 10g and all other
intermediate and upright wire 9g. with
finished border 2 ply twisted fencing Mtr. 411 411 411 411 411 411 411 411 411 411 411 431 411 411 411
including tightening and fixing the same to
posts with staples at every bar including cost
of cutting and of lapping joints in the net as
necessary including cost of staples and wove
wire.
(payment to be made on the length of the
finished netting work)

Page 184
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(O) FENCING
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

19 Double kontted wove wire 2.1 m height (17


bars) vertical 300 mm apart horizontal
spacing starting from 88 mm ending 200 mm
top and bottom wire 10g and all other
intermediate and upright wire 9g with
finished border 2 ply twisted fencing Mtr. 713 713 713 713 713 713 713 713 713 713 713 748 713 713 713
complete including tightening and fixing the
same to posts with staples at every bar
including cost of cutting and of lapping joints
in net as necessary including cost of staples
and wove wire.
(payment to be made on the length of the
finished netting work)
20 Supplying, fitting, fixing G.I chain link fencing
75 mm x 75 mm mesh 12 g wire to the
R.C.C or wooden posts with galvanised Sq. M 192 192 192 192 192 192 192 192 192 192 192 199 192 192 192
hooks or staples etc. complete as per
direction.
21 Supplying, fitting, fixing, Chain link fencing of
approved quality with R.C.C posts wooden
posts or iron posts by means of galvanised
"C" clips to grid of horizontal strands of
galvanised high tensile spring steel wire of
12 S.W.G which have to be tensioned and
fixed to the vertical posts by means of
galvanised special clips, bolts and nuts etc.

(The rate is exclusive of the cost of posts)


(I) 50 mm. x 50 mm. x 8 g. Sq. M 487 487 487 487 487 487 487 487 487 487 487 506 487 487 487
(II) 65 mm. x 65 mm. x 8 g. Sq. M 443 443 443 443 443 443 443 443 443 443 443 456 443 443 443
(III) 75 mm. x 75 mm. x 8 g. Sq. M 393 393 393 393 393 393 393 393 393 393 393 412 393 393 354
(IV) 75 mm. x 75 mm. x 6 g. Sq. M 499 499 499 499 499 499 499 499 499 499 499 524 499 499 499
(V) 100 mm. x 100 mm. x 6 g. Sq. M 462 462 462 462 462 462 462 462 462 462 462 487 462 462 462
(VI) 25 mm. x 25 mm. x 12 g. Sq. M 431 431 431 431 431 431 431 431 431 431 431 449 431 431 431
(VII) 12.5 mm. x 12.5m. x 12 g. Sq. M 646 646 646 646 646 646 646 646 646 646 646 665 646 646 646

Page 185
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(O) FENCING
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

22 Supplying, fitting, fixing in position netting


with PVC Coated Crinkle mesh of approved
colour with wooden or steel or concrete
frame work including cost of galvanised
bolts, nuts, screws, nails, spacers, shape
welding etc complete but excluding the cost
of supporting frame works, battens etc.

(a) 25 mm. x 25 mm. x 8 g. Sq. M 833 833 833 833 833 833 833 833 833 833 833 846 833 833 833
(b) 25 mm. x 50 mm. x 8 g. Sq. M 646 646 646 646 646 646 646 646 646 646 646 658 646 646 646
(c) 50 mm. x 50 mm. x 8 g. Sq. M 533 533 533 533 533 533 533 533 533 533 533 546 533 533 533
(d) 75 mm. x 75 mm. x 8 g. Sq. M 465 465 465 465 465 465 465 465 465 465 465 477 465 465 465
(e) 75 mm. x 25 mm. x 8 g. Sq. M 615 615 615 615 615 615 615 615 615 615 615 627 615 615 615
23 Supplying fitting and fixing 600 mm (+/- 30
mm) diametre R.B.T (Reinforced Barbed
Tape) Concertina fencing on wall top using
concertina coils stretched to approx.6 meters
length at site clipped with two nos. of
Mtr. 481 481 481 481 481 481 481 481 481 481 481 494 481 481 481
horizontal R.B.T strands which will be
tensioned and fixed with the vertical M.S
angle iron posts by means of security
fasteners (such as 'C' clips, R.B.T clips etc.)

(The rate is exclusive of the cost of posts)


24 Labour for fitting line of wire to posts,
tightening by straining bolts and fixing the
wire ( in taut condition) to the post with
staples (including the cost of cutting and
lapping joints in the wire, as necessary and
including the cost of staples and straining
bolts and also the labour for fixing the
staples but excluding the cost of straining
bolts)
(Payment to be made on length of the
individual line of wire)
(a) Galvanised wire 9 to 12 BWG %Mtr. 202 202 202 202 202 202 202 202 202 202 202 202 202 202 202
(b) Strand wire (3 to 7 ply) upto 6 mm dia %Mtr. 256 256 256 256 256 256 256 256 256 256 256 256 256 256 256
(c) Strand wire (3 to 7 ply) above 6 mm dia %Mtr. 306 306 306 306 306 306 306 306 306 306 306 306 306 306 306
(d) Barbed wire %Mtr. 311 311 311 311 311 311 311 311 311 311 311 311 311 311 311

Page 186
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(O) FENCING
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

25 Supplying at site or stackyard or as directed


PCC (1 : 2 :4) Fencing Post 215 cm 150 mm
X 150 mm section at bottom, 100 mm X 100
mm section at top with T-Base 300 mm X
Each 517 506 496 476 500 507 514 497 503 503 482 545 515 531 505
150 mm X 100 mm, having 4 nos 6 mm dia
vertical M.S. reinforcement and 6 mm dia
binders @ 200 mm centres, finished smooth
etc., complete.

Page 187
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(P)SOLING, EDGING AND METALLING


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

1 Brick soling with picked jhama bricks


including preparation of bed as necessary
with brick joints properly filled in and packed
with powdered earth and including necessary
cushion of similar material below the soling
(and in between layers when more than one
layer is used) completes as per direction.

(a) Single brick flat soling (thickness 75 mm.)


Sq.M 358 329 268 268 360 354 354 301 329 329 329 430 329 329 329

(b) Double brick flat soling (thickness 150


mm.) Sq.M 695 638 516 516 699 687 687 581 638 638 638 840 638 638 638

(c) Soling or dry pavement with one brick-on-


edge on a layer of brick flat (thicknass 125 Sq.M 928 851 688 688 933 918 918 775 851 851 851 1123 851 851 851
mm. plus 75 mm.)
(d) Soling or dry pavement with one brick-on-
edge laid in herring bone pattern over a layer
of brick flat (thickness 125 mm plus 75 mm) Sq.M 941 865 701 701 946 931 931 788 865 865 865 1136 865 865 865

(e) Soling or dry pavement with one brick-on-


edge (thickness 125 mm.) Sq.M 595 547 444 444 598 589 589 499 547 547 547 717 547 547 547

(f) Soling or dry pavement with one brick-on-


edge laid in herring bone pattern (thickness Sq.M 601 553 450 450 604 595 595 505 553 553 553 723 553 553 553
125 mm.)
(g) Extra rate for using local sand inlieu of
powered earth in Single layer soling. Sq.M 11 5 4 4 7 7 4 4 7 7 7 15 6 6 5

(h) Extra rate for using local sand inlieu of


powered earth in Double layer soling. Sq.M 21 9 8 8 15 13 9 8 15 13 13 31 12 12 11

2 Labour for laying soiling with departmental


bricks including carriage of departmental
bricks within a lead of 150 metres
preparation of bed as necessary with brick
joints properly filled in and packed with brick
joints properly filled in and packed with local
sand or powdered earth and including
necessary cushion of similar materials below
the soling (and in between layers when more
than one layer is used)
(The item included the cost of obtaining
local sand or powdered earth)

Page 188
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(P)SOLING, EDGING AND METALLING


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

(a) Single brick flat soling (thickness 75 mm)


%Sq.M 3620 3620 3620 3620 3620 3620 3620 3620 3620 3620 3620 3620 3620 3620 3620

(b) Double brick flat soling (thickness 75 mm.


plus 75 mm) %Sq.M 5430 5430 5430 5430 5430 5430 5430 5430 5430 5430 5430 5430 5430 5430 5430

(c) Soling with one brick-on-edge on a layer


of brick flat (thickness 75 mm plus 125 mm) %Sq.M 6365 6365 6365 6365 6365 6365 6365 6365 6365 6365 6365 6365 6365 6365 6365

(d) Soling or dry pavement with one brick-on-


edge laid in herring bone pattern on a layer
of brick flat (thickness 75 mm. plus 125 mm) %Sq.M 7404 7404 7404 7404 7404 7404 7404 7404 7404 7404 7404 7404 7404 7404 7404

(e) Soling or dry pavement with one brick


thickness (125 mm.) (laid in herring bone %Sq.M 5430 5430 5430 5430 5430 5430 5430 5430 5430 5430 5430 5430 5430 5430 5430
pattern)
(f) Soling (125 mm thick) or dry pavement
with one brick-on-edge. %Sq.M 6134 6134 6134 6134 6134 6134 6134 6134 6134 6134 6134 6134 6134 6134 6134

3 Brick edging 75 mm wide with picked jhama


bricks, laid true to line and level including
cutting necessary trench in soil or in hard
metalled surface, laying the bricks and
repacking the trench (on both side of the
edging) with spoils and ramming the same
thoroughly complete as per direction.
(a) Brick-on-edge edging (125 mm) depth.
%Metre 4857 4491 3711 3711 4881 4809 4809 4125 4491 4491 4491 5784 4491 4491 4491
(b) Brick-on-end edging (250 mm) depth.
%Metre 9392 8661 7099 7099 9441 9295 9295 7929 8661 8661 8661 11246 8661 8661 8661

4 Labour for laying brick edging (75 mm wide)


with departmental brick laid true to line and
level including carriage of departmental
bricks within a lead of 150 metres cutting
necessary trench in soil or in hard metalled
surface laying the bricks and repacking the
trench (on both sides of the edging) with
spoils and ramming the same thoroughly.

(a) Brick-on-edge edging (125 mm) depth. %Metre 760 760 760 760 760 760 760 760 760 760 760 760 760 760 760

(b) Brick-on-end edging (250 mm) depth. %Metre 1197 1197 1197 1197 1197 1197 1197 1197 1197 1197 1197 1197 1197 1197 1197

Page 189
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(P)SOLING, EDGING AND METALLING


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

5 Labour for taking out old brick-on-edge


edging including removing debris to flank or
berm sorting out serviceable materials and %Sq.M 641 641 641 641 641 641 641 641 641 641 641 641 641 641 641
stacking.
6 Labour for taking out old soling edging
including removing debris

(a) Single flat soling %Sq.M 991 991 991 991 991 991 991 991 991 991 991 991 991 991 991

(b) Double flat soling %Sq.M 1457 1457 1457 1457 1457 1457 1457 1457 1457 1457 1457 1457 1457 1457 1457
7 Labour for taking out brick-on-end edging
including removing debris to flank or berm
sorting out serviceable materials and %Metre 671 671 671 671 671 671 671 671 671 671 671 671 671 671 671
stacking.
8 Labour for taking out brick-on-edge of
herring bone bond including removing debris
to flank or berm sorting out serviceable %Sq.M 1749 1749 1749 1749 1749 1749 1749 1749 1749 1749 1749 1749 1749 1749 1749
materials and stacking.
9 Labour for taking out brick-on-edge of
herring bone bond set in cement mortar
including removing debris to flank or berm %Sq.M 3499 3499 3499 3499 3499 3499 3499 3499 3499 3499 3499 3499 3499 3499 3499
sorting out serviceable materials and
stacking.
10 Supplying cinder including throwing
spreading rough leavlling and dressing. Cum 302 285 285 285 285 285 285 285 285 285 285 289 285 285 285

(Measurement will be taken on the basis of


profile, before and after the work with
deduction of 1/9 th of the volume for sinkage
and / shrinkage).
11 Ornamental brick edging (75 mm wide) in
compound roads, gardens etc. with 1st class
or picked jhama bricks laid diagonally on end
and with a corner slightly raised from the
adjoining surface thus giving saw tooth %Metre 7653 7104 5934 5934 7690 7580 7580 6556 7104 7104 7104 9044 7104 7104 7104
appearance including cutting trench laying
bricks and repacking the trench thoroughly
on both sides of the edging complete as per
direction.

Page 190
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(P)SOLING, EDGING AND METALLING


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

12 Labour for laying stone edging with


departmental stone materials laid to correct
line and level including carriage of
departmental stone materials within a lead of
150 metres cutting necessary trench in soil
or in hard metalled surface, laying the stones
and repacking the trench on both sides of the
edging with spoils and ramming the same
thoroughly.
(a) 100 mm wide and 125 mm deep edging
with stone sets laid-on-edge. %Metre 1401 1401 1401 1401 1401 1401 1401 1401 1401 1401 1401 1401 1401 1401 1401

(b) 100 mm wide and 250 mm deep edging


%Metre 1986 1986 1986 1986 1986 1986 1986 1986 1986 1986 1986 1986 1986 1986 1986
with stone sets laid-on-edge.
13 Labour for taking out carefully existing stone
edging, relaying edging in the same trench
after rectifying line and level as required with
all old materials or with partly old and partly
new departmental materials (including
carriage of new materials within a lead of
120m) and repacking the trench thoroughly
on both sides of the edging.
(a) 100 mm. wide and 125 mm. deep edging
with stone sets laid-on-edge. %Metre 1895 1895 1895 1895 1895 1895 1895 1895 1895 1895 1895 1895 1895 1895 1895

(b) 100 mm. wide and 250 mm. deep edging


with stone sets laid-on-edge. %Metre 2806 2806 2806 2806 2806 2806 2806 2806 2806 2806 2806 2806 2806 2806 2806

14 Relaying disturbed kerb stone on new lime


concrete (18 : 36 : 100) bed up to 75 mm Metre 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50
thick.
15 Relaying disturbed channel stone on new
lime concrete (18 : 36 : 100) bed up to 75 Metre 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
mm thick.
16 Labour for taking out soling from road and
stacking the serviceable materials at site.

150 mm boulder soling Sq.M 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22

Page 191
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(Q)MAINTANANCE OF STATUES AND MONUMENTS ETC


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

1 Filling up the joints of marble or granite stone


etc. of statues after chiselling out joints
including grouting with cement mortar (1:3)
with white cement carefully (with cement Metre 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31
gun) and matching colour with necessary
pigment.
2 Cleaning and removing stains as far as
possible from pedestals and bases below
statues of granite and syenite stone including
cleaning ornamental cornice, base moulding
curvings, sunk panel surface with Sq.M 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23
carborandum block No. 1 of coarse and
medium grains of grades 60 and 40
respectively by skilled labour and washing
them with soap and soda water
3 Cleaning and removing stains as far as
possible from pedestals and bases below
statues of sand stone including cleaning
ornamental cornice, base moulding curvings
sunk panel surface with carborandum block Sq.M 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18
No. 1 of coarse and medium grains of grades
60 and 40 respectively by skilled labour and
washing them with soap and soda water

4 Cleaning and removing stains as far as


possible from pedestals and below starues of
marble or artificial cast white stone including
plasters and ornamental cap and moulding Sq.M 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11
and flowes with No. 1 No. 2 and No. 3 stone
as necessary.
5 Hire and labour charges for high scaffolding L.S. 29632 - - - - - - - - - - - - - -
all round (outside) body domes and finials
etc. of Saheed Minar.
6 Hire and labour charges for high scaffolding L.S. 8939 - - - - - - - - - - - - - -
all round (outside) body domes and finials
etc. of Luscar Memorial.

Page 192
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( R) ALUMINIUN WORKS
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

1 Supplying profiles of required section made


of Aluminium Alloy Extrusions conforming to
IS: 732-1983 and IS: 1285- 1975; Annodized
(with required film thickness and specified
colour / natural) matt finished conforming to
IS: 1868-1983 for fabrication of composit
door, sliding & casement windows, partitions,
formed of basic sections of any ISI
embossed / certified make and brand as per
direction of Engineer - In- Charge. (Payment
will be made on finished length of the work).

(A) In 10-12 Micron thickness Annodizing


film
I) Natural white
a) 2- track sliding window
i) Bottom frame Metre 257 257 257 257 257 257 257 257 257 257 257 267 257 257 257
ii) Top and side frame. Metre 229 229 229 229 229 229 229 229 229 229 229 237 229 229 229
b) 3- track sliding window
i) Bottom frame Metre 366 366 366 366 366 366 366 366 366 366 366 380 366 366 366
ii) Top and side frame. Metre 317 317 317 317 317 317 317 317 317 317 317 329 317 317 317
c) 4- track sliding window
i) Bottom frame Metre 441 441 441 441 441 441 441 441 441 441 441 459 441 441 441
ii) Top and side frame. Metre 381 381 381 381 381 381 381 381 381 381 381 396 381 381 381
d) Shutter for all track sliding window.

i) Bottom & Top member. Metre 138 138 138 138 138 138 138 138 138 138 138 143 138 138 138
ii) Style side member. Metre 140 140 140 140 140 140 140 140 140 140 140 146 140 140 140
iii) Interlock member. Metre 176 176 176 176 176 176 176 176 176 176 176 183 176 176 176
e) Casement window ( 40 mm Depth
series)
i) Outer frame. Metre 185 185 185 185 185 185 185 185 185 185 185 192 185 185 185
ii) Mullion. Metre 264 264 264 264 264 264 264 264 264 264 264 274 264 264 264
iii) Shutter. Metre 182 182 182 182 182 182 182 182 182 182 182 190 182 182 182
iv) Glazing clip. Metre 49 49 49 49 49 49 49 49 49 49 49 52 49 49 49
v) Cleat angle. (Non-annodized) Metre 314 314 314 314 314 314 314 314 314 314 314 327 314 314 314
f) Casement window ( 34 mm Depth
series)
i) Outer frame. Metre 157 157 157 157 157 157 157 157 157 157 157 163 157 157 157

Page 193
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( R) ALUMINIUN WORKS
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

ii) Mullion. Metre 228 228 228 228 228 228 228 228 228 228 228 237 228 228 228
iii) Shutter. Metre 134 134 134 134 134 134 134 134 134 134 134 140 134 134 134
iv) Glazing clip. Metre 52 52 52 52 52 52 52 52 52 52 52 54 52 52 52
v) Cleat angle. (Non-annodized) Metr. 314 314 314 314 314 314 314 314 314 314 314 327 314 314 314
g) Fixed glazing.
i) Top and bottom & side member. Metre 382 382 382 382 382 382 382 382 382 382 382 397 382 382 382
ii) Mullion. Metre 403 403 403 403 403 403 403 403 403 403 403 419 403 403 403
iii) Glazing clip. Metre 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50
h) Louvered window.
i) Top, bottom and side member. Metre 218 218 218 218 218 218 218 218 218 218 218 226 218 218 218
ii) Louvered Section. Metre 780 780 780 780 780 780 780 780 780 780 780 811 780 780 780
iii) Cleat angle ( Non-annodized). Metre 314 314 314 314 314 314 314 314 314 314 314 327 314 314 314
i) Fixed partitions.
(Unsupported length of vertical member upto
1.5 mtr. Height of both ends of vertical
member restrained but panels within 0.9
sq.m.)
i) Top , bottom & side member. Metre 382 382 382 382 382 382 382 382 382 382 382 397 382 382 382
ii) Intermediate member. Metre 403 403 403 403 403 403 403 403 403 403 403 419 403 403 403
iii) Glazing clip. Metre 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50
j) Fixed partitions.
(Unsupported length of vertical member upto
1.5 mtr. Height of both ends of vertical
member restrained but panels within 0.9
sq.m.)
i) Top , bottom & side member. Metre 548 548 548 548 548 548 548 548 548 548 548 571 548 548 548
ii) Intermediate member. Metre 571 571 571 571 571 571 571 571 571 571 571 594 571 571 571
iii) Glazing clip. Metre 46 46 46 46 46 46 46 46 46 46 46 47 46 46 46
k) Movable door shutter.
i) Door frame. (Top & sides). Metre 376 376 376 376 376 376 376 376 376 376 376 391 376 376 376
ii) Shutter :
Top rail. Metre 361 361 361 361 361 361 361 361 361 361 361 376 361 361 361
Bottom rail. Metre 534 534 534 534 534 534 534 534 534 534 534 557 534 534 534
Lock rail Metre 446 446 446 446 446 446 446 446 446 446 446 465 446 446 446
Door vertical. Metre 395 395 395 395 395 395 395 395 395 395 395 410 395 395 395
Glazing cleap. Metre 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50

Page 194
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( R) ALUMINIUN WORKS
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

l) Rimless door.
i) Top & bottom rail. Metre 964 964 964 964 964 964 964 964 964 964 964 1003 964 964 964
II) Coloured
a) 2- track sliding window
i) Bottom frame Metre 283 283 283 283 283 283 283 283 283 283 283 292 283 283 283
ii) Top and side frame. Metre 253 253 253 253 253 253 253 253 253 253 253 262 253 253 253
b) 3- track sliding window
i) Bottom frame Metre 406 406 406 406 406 406 406 406 406 406 406 420 406 406 406
ii) Top and side frame. Metre 354 354 354 354 354 354 354 354 354 354 354 366 354 354 354
c) 4- track sliding window
i) Bottom frame Metre 478 478 478 478 478 478 478 478 478 478 478 495 478 478 478
ii) Top and side frame. Metre 421 421 421 421 421 421 421 421 421 421 421 436 421 421 421
d) Shutter for all track sliding window.

i) Bottom & Top member. Metre 153 153 153 153 153 153 153 153 153 153 153 158 153 153 153
ii) Style side member. Metre 149 149 149 149 149 149 149 149 149 149 149 156 149 149 149
iii) Interlock member. Metre 188 188 188 188 188 188 188 188 188 188 188 195 188 188 188
e) Casement window ( 40 mm Depth
series)
i) Outer frame. Metre 201 201 201 201 201 201 201 201 201 201 201 208 201 201 201
ii) Mullion. Metre 278 278 278 278 278 278 278 278 278 278 278 289 278 278 278
iii) Shutter. Metre 196 196 196 196 196 196 196 196 196 196 196 203 196 196 196
iv) Glazing clip. Metre 56 56 56 56 56 56 56 56 56 56 56 58 56 56 56
v) Cleat angle. (Non-annodized) Metre 314 314 314 314 314 314 314 314 314 314 314 327 314 314 314
f) Casement window ( 34 mm Depth
series)
i) Outer frame. Metre 172 172 172 172 172 172 172 172 172 172 172 178 172 172 172
ii) Mullion. Metre 245 245 245 245 245 245 245 245 245 245 245 255 245 245 245
iii) Shutter. Metre 169 169 169 169 169 169 169 169 169 169 169 175 169 169 169
iv) Glazing clip. Metre 59 59 59 59 59 59 59 59 59 59 59 61 59 59 59
v) Cleat angle. (Non-annodized) Metre 314 314 314 314 314 314 314 314 314 314 314 327 314 314 314
g) Fixed Glazing.
i) Top, bottom and side member. Metre 395 395 395 395 395 395 395 395 395 395 395 410 395 395 395
ii) Mullion. Metre 419 419 419 419 419 419 419 419 419 419 419 436 419 419 419

Page 195
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( R) ALUMINIUN WORKS
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

iii) Glazing clip. Metre 56 56 56 56 56 56 56 56 56 56 56 58 56 56 56


h) Louvered window.
i) Top, bottom and side member. Metre 227 227 227 227 227 227 227 227 227 227 227 236 227 227 227
ii) Louvered Section. Metre 794 794 794 794 794 794 794 794 794 794 794 826 794 794 794
iii) Cleat angle ( Non-annodized). Metre 314 314 314 314 314 314 314 314 314 314 314 327 314 314 314
i) Fixed partitions.
(Unsupported length of vertical member upto
1.5 mtr. Height of both ends of vertical
member restrained but panels within 0.9
Sq.m)
i) Top , bottom & side member. Metre 395 395 395 395 395 395 395 395 395 395 395 410 395 395 395
ii) Intermediate member. Metre 419 419 419 419 419 419 419 419 419 419 419 436 419 419 419
iii) Glazing clip. Metre 56 56 56 56 56 56 56 56 56 56 56 58 56 56 56
j) Fixed partitions.
(Unsupported length of vertical member
more than 1.5 mtr.or both ends of vertical
member restrained but panels more than 0.9
Sq.m)
i) Top , bottom & side member. Metre 568 568 568 568 568 568 568 568 568 568 568 590 568 568 568
ii) Intermediate member. Metre 591 591 591 591 591 591 591 591 591 591 591 614 591 591 591
iii) Glazing clip. Metre 56 56 56 56 56 56 56 56 56 56 56 58 56 56 56
k) Movable door shutter.
i) Door frame. (Top & sides). Metre 376 376 376 376 376 376 376 376 376 376 376 391 376 376 376
ii) Shutter :
Top rail. Metre 375 375 375 375 375 375 375 375 375 375 375 390 375 375 375
Bottom rail. Metre 574 574 574 574 574 574 574 574 574 574 574 597 574 574 574
Lock rail Metre 471 471 471 471 471 471 471 471 471 471 471 489 471 471 471
Door vertical. Metre 412 412 412 412 412 412 412 412 412 412 412 428 412 412 412
Glazing clip. Metre 56 56 56 56 56 56 56 56 56 56 56 58 56 56 56
l) Rimless door.
i) Top & bottom rail. Metre 986 986 986 986 986 986 986 986 986 986 986 1026 986 986 986
(B) 15 Micron colour annodizing.
a) 2- track sliding window
i) Bottom frame Metre 293 293 293 293 293 293 293 293 293 293 293 303 293 293 293
ii) Top and side frame. Metre 263 263 263 263 263 263 263 263 263 263 263 271 263 263 263
b) 3- track sliding window

Page 196
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( R) ALUMINIUN WORKS
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

i) Bottom frame Metre 422 422 422 422 422 422 422 422 422 422 422 436 422 422 422
ii) Top and side frame. Metre 368 368 368 368 368 368 368 368 368 368 368 380 368 368 368
c) 4- track sliding window
i) Bottom frame Metre 507 507 507 507 507 507 507 507 507 507 507 524 507 507 507
ii) Top and side frame. Metre 437 437 437 437 437 437 437 437 437 437 437 452 437 437 437

d) Shutter for all track sliding window.

i) Bottom & Top member. Metre 158 158 158 158 158 158 158 158 158 158 158 163 158 158 158
ii) Style side member. Metre 154 154 154 154 154 154 154 154 154 154 154 159 154 154 154
iii) Interlock member. Metre 193 193 193 193 193 193 193 193 193 193 193 200 193 193 193
e) Casement window ( 40 mm Depth
series)
i) Outer frame. Metre 207 207 207 207 207 207 207 207 207 207 207 214 207 207 207
ii) Mullion. Metre 284 284 284 284 284 284 284 284 284 284 284 295 284 284 284
iii) Shutter. Metre 201 201 201 201 201 201 201 201 201 201 201 208 201 201 201
iv) Glazing clip. Metre 58 58 58 58 58 58 58 58 58 58 58 60 58 58 58
v) Cleat angle. (Non-annodized) Metre 314 314 314 314 314 314 314 314 314 314 314 327 314 314 314
f) Casement window ( 34 mm Depth
series)
i) Outer frame. Metre 179 179 179 179 179 179 179 179 179 179 179 185 179 179 179
ii) Mullion. Metre 253 253 253 253 253 253 253 253 253 253 253 262 253 253 253
iii) Shutter. Metre 175 175 175 175 175 175 175 175 175 175 175 181 175 175 175
iv) Glazing clip. Metre 62 62 62 62 62 62 62 62 62 62 62 64 62 62 62
v) Cleat angle. (Non-annodized) Metre 314 314 314 314 314 314 314 314 314 314 314 327 314 314 314
g) Fixed glazing.
i) Top, bottom and side member. Metre 400 400 400 400 400 400 400 400 400 400 400 415 400 400 400
ii) Mullion. Metre 426 426 426 426 426 426 426 426 426 426 426 442 426 426 426
iii) Glazing clip. Metre 58 58 58 58 58 58 58 58 58 58 58 60 58 58 58
h) Louvered window.
i) Top, bottom and side member. Metre 230 230 230 230 230 230 230 230 230 230 230 239 230 230 230
ii) Louvered Section. Metre 803 803 803 803 803 803 803 803 803 803 803 835 803 803 803
iii) Cleat angle ( Non-annodized). Metre 314 314 314 314 314 314 314 314 314 314 314 327 314 314 314

Page 197
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( R) ALUMINIUN WORKS
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

i) Fixed partitions.
(Unsupported length of vertical member upto
1.5 mtr. Height of both ends of vertical
member restrained but panels within 0.9
sq.m.)
i) Top , bottom & side member. Metre 400 400 400 400 400 400 400 400 400 400 400 415 400 400 400
ii) Intermediate member. Metre 426 426 426 426 426 426 426 426 426 426 426 442 426 426 426
iii) Glazing clip. Metre 58 58 58 58 58 58 58 58 58 58 58 60 58 58 58
j) Fixed partitions.
(Unsupported length of vertical member
more than 1.5 mtr.or both ends of vertical
member restrained but panels more than 0.9
sq.m.)
i) Top , bottom & side member. Metre 576 576 576 576 576 576 576 576 576 576 576 598 576 576 576
ii) Intermediate member. Metre 599 599 599 599 599 599 599 599 599 599 599 622 599 599 599
iii) Glazing clip. Metre 58 58 58 58 58 58 58 58 58 58 58 60 58 58 58
k) Movable door shutter.
i) Door frame. (Top & sides). Metre 376 376 376 376 376 376 376 376 376 376 376 391 376 376 376
ii) Shutter :
Top rail. Metre 381 381 381 381 381 381 381 381 381 381 381 395 381 381 381
Bottom rail. Metre 581 581 581 581 581 581 581 581 581 581 581 603 581 581 581
Lock rail Metre 478 478 478 478 478 478 478 478 478 478 478 495 478 478 478
Door vertical. Metre 419 419 419 419 419 419 419 419 419 419 419 434 419 419 419
Glazing clip. Metre 58 58 58 58 58 58 58 58 58 58 58 60 58 58 58
l) Rimless door.
i) Top & bottom rail. Metre 995 995 995 995 995 995 995 995 995 995 995 1035 995 995 995
2 Labour charge for fabrication and installation
of composite door, window , partitions made
from annodized extruded alloy aluminium
sections for the following units:-

Page 198
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( R) ALUMINIUN WORKS
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

(A) Glazed aluminium sliding windows made


of extruded and annodized alloy aluminium
sectios, fabrications, including cutting to
proper shape and size, drilling and aligning
of window shutter frame fitted with in built
locking arrangements, sliding rollers and
other necessary fittings, fixture, adhesives
and joineries along with extruded neoprine or
EPDM gasketing in between window frame
and masonry work (walls, column,
beam.lintels etc.) as well as between glass
and shutter frame for fixing glass and Poly
Shulphate sealant and in between shutter
and window frame where necessary
including cutting to requisite size and fixing
glass as per drawing, specification and
direction of EIC.
The rate includes the hire charge of all tools
and plants, including all incidental charges,
adhesive, joineries such as screw, cleate
angle etc. but excluded the cost of extruded
aluminium sections, glass, neoprene / EPDM
gasketing, locking arrangement and rollers.

i) 2 track sliding window. Sq.M 703 703 703 703 703 703 703 703 703 703 703 703 703 703 703
ii ) 3 /4 track sliding window. Sq.M 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950

iii ) Openable / Casement window. Sq.M 1128 1128 1128 1128 1128 1128 1128 1128 1128 1128 1128 1128 1128 1128 1128
iv ) Fixed glazzing. Sq.M 776 776 776 776 776 776 776 776 776 776 776 776 776 776 776
v ) Louvered window. Sq.M 737 737 737 737 737 737 737 737 737 737 737 737 737 737 737
vi) Add for special architectural feature,
where members / sections are required to be R.M. 261 261 261 261 261 261 261 261 261 261 261 261 261 261 261
bent as per requirement.

Page 199
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( R) ALUMINIUN WORKS
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

(B) Partly glazed partly panelled or fully


glazed single leaf alunminium swing door
made of extruded and annodized alloy
aluminium sections, fabrication including
cutting to proper shape and size, drilling and
aligning, fitted with heavy duty hydraulic
action floor sping placed in the floor with
mending damages,with top pin assembly of
approve make and brand, fitted with in built
locking arrangement, flush bolt, glazing clips Sq.M 1294 1294 1294 1294 1294 1294 1294 1294 1294 1294 1294 1294 1294 1294 1294
and all other necessary fittings, fixtures,
adhesives and joineries, cutting glass of
approved make to requisite shape and size
fitting with dry set neoprene or EPDM
gasketing, cutting to requisite shape and size
panel board (prelaminated particle block)
fixing them with glazing clips as per drawing,
specification and direction of Engineer in
charge.

The rate includes the hire charge of all tools


and plants, adhesive, joineries such as
screw, cleate angle etc. but excluded the
cost of extruded alumium sections,
glass,panel boards neoprene / EPDM
gasketing, locking arrangement, weather
gasketing / wool pile, floor spring, top pin,
handle, tower bolt, glazing clips etc. (10%
rate reduction has to be made for swing
doors or partitions where floor sping is not
used. 10% enhancement of rate is to be
made where door frame of extruded
aluminium sections has to be fitted and fixed
to masonry wall. 5% rate enhencement may
be allowed for double leaf swing door.
Payment shall be made for the shutter area
only exept where door frame is fixed the
entire opening shall be taken to
consideration.Payment for door frame
sections are to be paid seperately).

Page 200
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( R) ALUMINIUN WORKS
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

(C) Fully glazed single leaf reamless swing


door made of anodized aluminium alloy
extrusions fabrication after cutting to proper
shape and size, drilling and aligning fitted
with heavy duty hydrolic action floor spring
with top pin assembly and fitted with inbuilt
Sq.M 1516 1516 1516 1516 1516 1516 1516 1516 1516 1516 1516 1516 1516 1516 1516
locking arrangement and all other necessary
fittings, fixture, adhesives and joineries,
cutting the glass to requisite shape and size
mounting the edges for fitting the same with
dry set neoprine/EPDM gasket.

The rate includes the hire charge of all tools


and plants, adhesive, joineries but excludes
the cost of extruded aluminium sections,
glass, panel boards EPDM gasket, locking
arrangement, weather gasketing / wool pile,
floor spring, top pin, handle, tower bolt etc.

(D) Partly glazed and partly panelled


partition or fixed glazing made of extruded
and anodised alloy aluminium sections,
fabrications after cutting to proper shape and
size, drilling and aligning fitted with inbuilt
locking arrangement cutting the glass / board
(prelaminated / particle / block) to requisite
shape and size moulding the edges fitted
and fixed glazing clips and dry set neoprine
/EPDM gasket, along with all other
necessary arrangements for fixing the
partition to walls, floors, beams, columns
polysulphide sealant for water proofing if
necessary complete in all respect as per
drawing and specifications and direction of
the Engineer in charge.
The rate includes the hire charge of all tools
and plants, adhesive, joineries such as
screw, fastener but excludes the cost of
extruded aluminium sections, EPDM
gasket, glass, board, glazing clips, locking
arrangement, etc.
I) For partitions using section of size:
a) 63.50 mm x 38.10 mm Sq.M 736 736 736 736 736 736 736 736 736 736 736 736 736 736 736
b) 101.50mm x 44.45 mm Sq.M 899 899 899 899 899 899 899 899 899 899 899 899 899 899 899

Page 201
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( R) ALUMINIUN WORKS
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

Note: Add extra for each Addl. Floor over


the rate of item 2A, 2B, 2C and 2D except
2A(vi)
i) Upto 4th Floor Rs.12.00 per Sq.m
ii) Above 4th Floor Rs.16.00 per Sq.m
3 Supplying heavy duty hydraulic double action
floor spring along with top pin/set of pivots
conforming to IS: 6315 or any approved Each Set 2062 2062 2062 2062 2062 2062 2062 2062 2062 2062 2062 2062 2067 2062 2062
make as per direction of Engineer in charge.

4 Supplying heavy duty top pin/set of pivots of


local make and approved by the Engineer-in-
charge. (This item to be provided where floor Pair. 355 355 355 355 355 355 355 355 355 355 355 361 355 355 355
spring not used).
5 Supplying concealed type heavy duty PVC
headed aluminium tower bolt for double leaf
doors as per approved make and brand as
per direction of Engineer-in-Charge.
(a) 200 mm long Each 73 73 73 73 73 73 73 73 73 73 73 73 73 73 73
(b) 250 mm long Each 79 79 79 79 79 79 79 79 79 79 79 79 79 79 79
(c) 300 mm long Each 88 88 88 88 88 88 88 88 88 88 88 89 88 88 88
(d) 450 mm long Each 196 196 196 196 196 196 196 196 196 196 196 197 196 196 196
6 Supplying PVC rollers for sliding windows as
per direction of Engineer in charge. Each 15 15 15 15 15 15 15 15 15 15 15 17 15 15 15

7 Supplying maruti lock (100mm)


Pair 56 56 56 56 56 56 56 56 56 56 56 59 56 56 56
8 Supplying EPDM gusket of approved make
and brand as per direction of Engineer in
charge.
i) For sliding windows
a) ' T' shaped EPDM gasket for frames. Metre 13 13 13 13 13 13 13 13 13 13 13 15 13 13 13
b) 'U' shaped EPDM gasket for frames. Metre 15 15 15 15 15 15 15 15 15 15 15 18 15 15 15
ii) For openable / Casement windows
a) EPDM / weather gasket for outer frame
Metre 15 15 15 15 15 15 15 15 15 15 15 18 15 15 15
and mullion.
iii) weather gasket / wool pile for door
Metre 19 19 19 19 19 19 19 19 19 19 19 21 19 19 19
vertical.
9 Supplying bubble free float glass of approved
make and brand conforming to IS: 2835-
1987.

Page 202
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( R) ALUMINIUN WORKS
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

i) 4mm thick clear glass. Sq.M 475 475 475 475 475 475 475 475 475 475 475 482 475 475 475
ii) 4mm thick coloured / tinted / smoke
Sq.M 558 558 558 558 558 558 558 558 558 558 558 572 558 558 558
glass.
iii) 5mm thick clear glass. Sq.M 628 628 628 628 628 628 628 628 628 628 628 628 628 628 628
iv) 5mm thick coloured / tinted / smoke
Sq.M 698 698 698 698 698 698 698 698 698 698 698 698 698 698 698
glass.
v) 6mm thick clear glass. Sq.M 726 726 726 726 726 726 726 726 726 726 726 726 726 726 726
vi) 6mm thick coloured / tinted / smoke
Sq.M 789 789 789 789 789 789 789 789 789 789 789 803 789 789 789
glass.
vii) 8mm thick clear glass. Sq.M 1012 1012 1012 1012 1012 1012 1012 1012 1012 1012 1012 1026 1012 1012 1012
viii) 8mm thick coloured / tinted / smoke
Sq.M 1082 1082 1082 1082 1082 1082 1082 1082 1082 1082 1082 1096 1082 1082 1082
glass.
ix) 10mm thick clear glass. Sq.M 1291 1291 1291 1291 1291 1291 1291 1291 1291 1291 1291 1291 1291 1291 1291
x) 10 mm thick coloured / tinted / smoke
Sq.M 1361 1361 1361 1361 1361 1361 1361 1361 1361 1361 1361 1382 1361 1361 1361
glass.
xi) 12mm thick clear glass. Sq.M 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500
xii) 12mm thick coloured / tinted / smoke
Sq.M 2212 2212 2212 2212 2212 2212 2212 2212 2212 2212 2212 2212 2212 2212 2212
glass.
xiii) 12mm thick cleared toughened glass
Sq.M 3859 3859 3859 3859 3859 3859 3859 3859 3859 3859 3859 3859 3859 3859 3859
coforming to IS: 2553-1992 (Part-II)
xiv) 12mm thick coloured / tinted /
toughened glass coforming to IS: 2553-1992 Sq.M 4913 4913 4913 4913 4913 4913 4913 4913 4913 4913 4913 4913 4913 4913 4913
(Part-II)
10 Supplying stainless steel functional hinge for
casement window as per approved brand as
directed by Engineer- in -charge. (Natural
White)
(a) 250 mm long Each 361 361 361 361 361 361 361 361 361 361 361 229 361 361 361
(b) 300 mm long Each 397 397 397 397 397 397 397 397 397 397 397 265 397 397 397
11 Supplying annodized aluminium extruded
section box hinge for casement windows as
per approved brand and make directed by Each 44 44 44 44 44 44 44 44 44 44 44 46 44 44 44
Engineer- in -Charge.(Natural White)
12 Supplying 4 lever mortice lock or any
approved make and brand as per direction of
the Engineer- in -Charge.

i) 150 mm. Each 451 451 451 451 451 451 451 451 451 451 451 457 451 451 451
ii) 100 mm. Each 252 252 252 252 252 252 252 252 252 252 252 235 252 252 252

Page 203
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

( R) ALUMINIUN WORKS
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

iii) 75 mm. Each 157 157 157 157 157 157 157 157 157 157 157 163 157 157 157
13 (A) Supplying Aluminium casted body
hydraulic door closer as per I.S.I. Each 757 757 757 757 757 757 757 757 757 757 757 763 757 757 757

(B) Supplying 125 mm. Dia acrylic handle for


aluminium door as per approved make &
brand.
(a) Natural Colour Each Set 216 216 216 216 216 216 216 216 216 216 216 175 216 216 216
(b) Colour Each Set 228 228 228 228 228 228 228 228 228 228 228 193 228 228 228
(C) Supplying Heavy Duty Aluminium Handle
(EBCO Type) Each 114 114 114 114 114 114 114 114 114 114 114 73 114 114 114
(Natural White)
(D) Supplying Aluminium casted body Butt
Hinge (KOBRA type). Each set 68 68 68 68 68 68 68 68 68 68 68 70 68 68 68
(Natural white)
(E) Supplying 250mm long Heavy Type
Aluminium window Peg Stay Each 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66
(Natural White)

(F) Supplying Zinc powered coated star lock


Each 49 49 49 49 49 49 49 49 49 49 49 51 49 49 49
(Natural White)

Note:- For Colour anodizing rate of item


no. 10, 11, 13A, 13C, 13D, 13E to be
enhanced by 10%..

Page 204
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(S) WELL FOR WATER SUPPLY


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

1 Digging earth in any soil including mixed soil


but excluding moorum, laterite sand stone or
any other hard stone including spreading or
stacking the spoils within a lead of 75 metres
as directed bailing out water upto 1 metre
depth, shoring etc., when and if required and
back filling with fine sand ( including cost of
sand) on completion of steining works.

A) R.C.C. Ring Well


i) 1.2 metre diameter of digging for 0.9 metre
internal diameter of well ring.

a) Upto 3 metre below G.L. Mtr. 712 553 535 535 623 605 542 535 623 605 605 581 581 570

b) Beyond 3 metre upto 6 metre below G.L. Mtr. 761 601 583 583 672 654 590 583 672 654 654 629 629 619

c) Beyond 6 metre upto 9 metre below G.L. Mtr. 829 670 652 652 740 723 659 652 740 723 723 698 698 687

d) Beyond 9 metre upto 12 metre below G.L. Mtr. 946 787 769 769 857 840 776 769 857 840 840 815 815 804

e) Beyond 12 metre upto 15 metre below


Mtr. 1014 855 837 837 926 908 844 837 926 908 908 883 883 873
G.L.

f) Beyond 15 metre upto 18 metre below G.L. Mtr. 1151 992 974 974 1062 1045 981 974 1062 1045 1045 1020 1020 1010

ii) 1.5 metre diameter of digging for 1.2 metre


internal diameter of well ring.

a) Upto 3 metre below G.L. Mtr. 905 703 680 680 793 770 689 680 793 770 770 739 739 725

b) Beyond 3 metre upto 6 metre below G.L. Mtr. 954 751 729 729 841 819 738 729 841 819 819 787 787 774

c) Beyond 6 metre upto 9 metre below G.L. Mtr. 1022 820 797 797 910 887 806 797 910 887 887 856 856 842

d) Beyond 9 metre upto 12 metre below G.L. Mtr. 1091 888 866 866 978 956 875 866 978 956 956 924 924 911

e) Beyond 12 metre upto 15 metre below


Mtr. 1208 1005 983 983 1095 1073 992 983 1095 1073 1073 1041 1041 1028
G.L.

f) Beyond 15 metre upto 18 metre below G.L. Mtr. 1325 1122 1100 1100 1212 1190 1109 1100 1212 1190 1190 1158 1158 1145

iii) 1.8 metre diameter of digging for 1.5


metre internal diameter of well ring.

Page 205
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(S) WELL FOR WATER SUPPLY


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

a) Upto 3 metre below G.L. Mtr. 1420 1202 1178 1178 1299 1275 1188 1178 1299 1275 1275 1241 1241 1227

b) Beyond 3 metre upto 6 metre below G.L. Mtr. 1469 1251 1227 1227 1348 1324 1237 1227 1348 1324 1324 1290 1290 1275

c) Beyond 6 metre upto 9 metre below G.L. Mtr. 1537 1319 1295 1295 1416 1392 1305 1295 1416 1392 1392 1358 1358 1344

d) Beyond 9 metre upto 12 metre below G.L. Mtr. 1654 1437 1412 1412 1533 1509 1422 1412 1533 1509 1509 1475 1475 1461

e) Beyond 12 metre upto 15 metre below


Mtr. 1771 1554 1529 1529 1650 1626 1539 1529 1650 1626 1626 1592 1592 1578
G.L.

f) Beyond 15 metre upto 18 metre below G.L. Mtr. 1811 1593 1569 1569 1690 1666 1579 1569 1690 1666 1666 1632 1632 1617

B) Masonry Steining Well

i) 2.1 metre diameter of digging for 1.2 metre


internal diameter of well.

a) Upto 3 metre below G.L. Mtr. 1145 890 861 861 1004 975 873 861 1004 975 975 935 935 918

b) Beyond 3 metre upto 6 metre below G.L. Mtr. 1194 938 910 910 1052 1024 921 910 1052 1024 1024 984 984 967

c) Beyond 6 metre upto 9 metre below G.L. Mtr. 1331 1075 1047 1047 1189 1161 1058 1047 1189 1161 1161 1121 1121 1104

d) Beyond 9 metre upto 12 metre below G.L. Mtr. 1448 1192 1164 1164 1306 1278 1175 1164 1306 1278 1278 1238 1238 1221

e) Beyond 12 metre upto 15 metre below


Mtr. 1585 1329 1301 1301 1443 1414 1312 1301 1443 1414 1414 1375 1375 1358
G.L.

f) Beyond 15 metre upto 18 metre below G.L. Mtr. 1702 1446 1418 1418 1560 1531 1429 1418 1560 1531 1531 1492 1492 1475

ii) 2.4 metre diameter of digging for 1.5 metre


internal diameter of well.

a) Upto 3 metre below G.L. Mtr. 1310 1017 984 984 1147 1114 997 984 1147 1114 1114 1069 1069 1049

b) Beyond 3 metre upto 6 metre below G.L. Mtr. 1427 1134 1101 1101 1264 1231 1114 1101 1264 1231 1231 1186 1186 1166

c) Beyond 6 metre upto 9 metre below G.L. Mtr. 1564 1270 1238 1238 1401 1368 1251 1238 1401 1368 1368 1322 1322 1303

d) Beyond 9 metre upto 12 metre below G.L. Mtr. 1701 1407 1375 1375 1538 1505 1388 1375 1538 1505 1505 1459 1459 1440

e) Beyond 12 metre upto 15 metre below


Mtr. 1818 1524 1492 1492 1655 1622 1505 1492 1655 1622 1622 1577 1577 1557
G.L.

Page 206
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(S) WELL FOR WATER SUPPLY


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

f) Beyond 15 metre upto 18 metre below G.L. Mtr. 1935 1641 1609 1609 1772 1739 1622 1609 1772 1739 1739 1694 1694 1674

iii) 2.7 metre diameter of digging for 1.8


metre internal diameter of well.

a) Upto 3 metre below G.L. Mtr. 1426 1095 1058 1058 1242 1205 1072 1058 1242 1205 1205 1154 1154 1131

b) Beyond 3 metre upto 6 metre below G.L. Mtr. 1474 1143 1106 1106 1290 1254 1121 1106 1290 1254 1254 1202 1202 1180

c) Beyond 6 metre upto 9 metre below G.L. Mtr. 1591 1260 1223 1223 1407 1371 1238 1223 1407 1371 1371 1319 1319 1297

d) Beyond 9 metre upto 12 metre below G.L. Mtr. 1708 1377 1340 1340 1524 1488 1355 1340 1524 1488 1488 1436 1436 1414

e) Beyond 12 metre upto 15 metre below


Mtr. 1845 1514 1477 1477 1661 1624 1492 1477 1661 1624 1624 1573 1573 1551
G.L.

f) Beyond 15 metre upto 18 metre below G.L. Mtr. 1962 1631 1594 1594 1778 1741 1609 1594 1778 1741 1741 1690 1690 1668

iv) 3.0 metre diameter of digging for 2.1


metre internal diameter of well.

a) Upto 3 metre below G.L. Mtr. 1590 1221 1180 1180 1385 1344 1197 1180 1385 1344 1344 1287 1287 1262

b) Beyond 3 metre upto 6 metre below G.L. Mtr. 1639 1270 1229 1229 1434 1393 1245 1229 1434 1393 1393 1335 1335 1311

c) Beyond 6 metre upto 9 metre below G.L. Mtr. 1756 1387 1346 1346 1551 1510 1362 1346 1551 1510 1510 1452 1452 1428

d) Beyond 9 metre upto 12 metre below G.L. Mtr. 1873 1504 1463 1463 1668 1627 1479 1463 1668 1627 1627 1569 1569 1545

e) Beyond 12 metre upto 15 metre below


Mtr. 2010 1641 1599 1599 1805 1764 1616 1599 1805 1764 1764 1706 1706 1682
G.L.

f) Beyond 15 metre upto 18 metre below G.L. Mtr. 2127 1758 1716 1716 1922 1881 1733 1716 1922 1881 1881 1823 1823 1799

v) 3.6 metre diameter of digging for 2.4


metre internal diameter of well.

a) Upto 3 metre below G.L. Mtr. 2030 1441 1375 1375 1702 1637 1401 1375 1702 1637 1637 1545 1545 1506

b) Beyond 3 metre upto 6 metre below G.L. Mtr. 2078 1489 1424 1424 1751 1686 1450 1424 1751 1686 1686 1594 1594 1555

c) Beyond 6 metre upto 9 metre below G.L. Mtr. 2195 1607 1541 1541 1868 1803 1567 1541 1868 1803 1803 1711 1711 1672

Page 207
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(S) WELL FOR WATER SUPPLY


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

d) Beyond 9 metre upto 12 metre below G.L. Mtr. 2312 1724 1658 1658 1985 1920 1684 1658 1985 1920 1920 1828 1828 1789

e) Beyond 12 metre upto 15 metre below


Mtr. 2449 1860 1795 1795 2122 2056 1821 1795 2122 2056 2056 1965 1965 1926
G.L.

f) Beyond 15 metre upto 18 metre below G.L. Mtr. 2566 1977 1912 1912 2239 2173 1938 1912 2239 2173 2173 2082 2082 2043

vi) 4.2 metre diameter of digging for 3.0


metre internal diameter of well.

a) Upto 3 metre below G.L. Mtr. 2278 1588 1511 1511 1894 1818 1542 1511 1894 1818 1818 1710 1710 1664

b) Beyond 3 metre upto 6 metre below G.L. Mtr. 2375 1685 1608 1608 1992 1915 1639 1608 1992 1915 1915 1808 1808 1762

c) Beyond 6 metre upto 9 metre below G.L. Mtr. 2512 1822 1745 1745 2128 2052 1776 1745 2128 2052 2052 1944 1944 1898

d) Beyond 9 metre upto 12 metre below G.L. Mtr. 2629 1939 1862 1862 2245 2169 1893 1862 2245 2169 2169 2061 2061 2015

e) Beyond 12 metre upto 15 metre below


Mtr. 2766 2076 1999 1999 2382 2306 2029 1999 2382 2306 2306 2198 2198 2152
G.L.

f) Beyond 15 metre upto 18 metre below G.L. Mtr. 2883 2192 2116 2116 2499 2423 2146 2116 2499 2423 2423 2315 2315 2269

vii) 4.8 metre diameter of digging for 3.6


metre internal diameter of well.

a) Upto 3 metre below G.L. Mtr. 2506 1715 1627 1627 2066 1978 1662 1627 2066 1978 1978 1855 1855 1803

b) Beyond 3 metre upto 6 metre below G.L. Mtr. 2603 1812 1724 1724 2163 2076 1759 1724 2163 2076 2076 1953 1953 1900

c) Beyond 6 metre upto 9 metre below G.L. Mtr. 2740 1949 1861 1861 2301 2212 1896 1861 2301 2212 2212 2089 2089 2037

d) Beyond 9 metre upto 12 metre below G.L. Mtr. 2857 2066 1978 1978 2418 2329 2013 1978 2418 2329 2329 2206 2206 2154

e) Beyond 12 metre upto 15 metre below


Mtr. 2974 2183 2095 2095 2534 2446 2130 2095 2534 2446 2446 2323 2323 2271
G.L.

f) Beyond 15 metre upto 18 metre below G.L. Mtr. 3091 2300 2212 2212 2651 2563 2247 2212 2651 2563 2563 2440 2440 2388

N.B.
a) Extra 10% per meter for work beyond
the initial depth of 18 metre will be paid.

Page 208
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(S) WELL FOR WATER SUPPLY


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

b) For well done by sinking process 30%


extra over the corresponding rate for digging
the respective internal dia of the well will be
allowed on the different stages of depth.
(c) Extra rock cutting over the corresponding
rate for digging for the respective internal
diameter of the well will be allowed on the
different stage of depth.
i) 5% extra for cutting moorum.
ii) 100 % extra in Laterite rock or sand stone
cutting with chisel and jumpers, but not
requiring blasting.
iii) 200 % extra in hard rock requiring blasting
including cost of explosive etc. and done with
permission from the Engineer-in-Charge.

iv) 300 % extra in hard rock in built up areas


using chisel, jumper and manual labour.

2 R.C.C. well ring made with cement concrete


1:1.5:3 with stone chips and 0.80%
reinforcement (including the cost of
shuttering and reinforcement) cast at site
fitted and fixed in position after proper curing
true to plumb in the well including jointing
with cement mortar 1:2 complete as per
direction.
a) 65 mm thick and 0.9 metre internal dia. Mtr. 1543 1532 1532 1532 1542 1533 1526 1526 1535 1533 1547 1547 1547 1546
cement for joint filling-4 kg/meter
b) 65 mm thick and 1.2 metre internal dia. Mtr. 1932 1917 1917 1917 1929 1918 1909 1909 1920 1918 1936 1936 1936 1935
Cement for joint filling-6 Kg/m
c) 75 mm thick and 1.5 metre internal dia. Mtr. 2560 2541 2540 2540 2556 2542 2529 2529 2543 2542 2567 2566 2566 2566
Cement for joint filling-8Kg/m
3 Supplying and fitting fixing in position 15 cm
Dia. C.I. Pully (extra payment will be made
Each 557 557 557 557 557 557 557 557 557 557 557 557 557 557
for pully bar and other allied item in
respective item)
4 1st class brick work for steining wall of well in
cement morter 1 :4 below G.L. including
cuttng bricks if required.
a) 0 metre to 6 metre depth. Cum 6420 5823 5150 5150 6327 6272 6216 5464 5934 5916 5924 5905 5905 5961
b) above 6 metre to 9 metre depth. Cum 6530 5933 5260 5260 6437 6382 6326 5574 6044 6026 6034 6015 6015 6071

Page 209
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(S) WELL FOR WATER SUPPLY


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

c) above 9 metre to 12 metre depth. Cum 6557 5961 5287 5287 6464 6409 6353 5602 6072 6053 6061 6043 6043 6098
d) above 12 metre to 15 metre depth. Cum 6585 5988 5315 5315 6492 6436 6381 5629 6099 6081 6089 6070 6070 6126
e) above 15 metre to 18 metre depth. Cum 6645 6049 5375 5375 6553 6497 6442 5690 6160 6141 6150 6131 6131 6187
f) above 18 metre up to any depth. Cum 6673 6076 5403 5403 6580 6525 6469 5717 6187 6169 6177 6159 6159 6214
5 Taking out and removing silt from the bottom
of well after bailing out water, removing moss
and weed from the well surface (by wire
brush) and disinfecting the well complete.

(i) Well depth 9 metre to 12 metre


(a) Dia of well 0.9 m to 1.2 m Each 496 496 496 496 496 496 496 496 496 496 496 496 496 496
(b) Dia of well 1.3 m to 1.5 m Each 663 663 663 663 663 663 663 663 663 663 663 663 663 663
(c) Dia of well 1.6 m to 1.8 m Each 937 937 937 937 937 937 937 937 937 937 937 937 937 937
(d) Dia of well 1.9 m to 2.1 m Each 1213 1213 1213 1213 1213 1213 1213 1213 1213 1213 1213 1213 1213 1213
(e) Dia of well 2.2 m to 2.4 m Each 1487 1487 1487 1487 1487 1487 1487 1487 1487 1487 1487 1487 1487 1487
(f) Dia of well 2.5 m to 2.75 m Each 1298 1298 1298 1298 1298 1298 1298 1298 1298 1298 1298 1298 1298 1298
(g) Dia of well 2.85 m to 3 m Each 1635 1635 1635 1635 1635 1635 1635 1635 1635 1635 1635 1635 1635 1635
(h) Dia of well 3.6 m Each 1909 1909 1909 1909 1909 1909 1909 1909 1909 1909 1909 1909 1909 1909
(ii) Wells of depth above 12 metre but not
exceeding 18 metre
(a) Dia of well 0.9 m to 1.2 m Each 542 542 542 542 542 542 542 542 542 542 542 542 542 542
(b) Dia of well 1.3 m to 1.5 m Each 707 707 707 707 707 707 707 707 707 707 707 707 707 707
(c) Dia of well 1.6 m to 1.8 m Each 1257 1257 1257 1257 1257 1257 1257 1257 1257 1257 1257 1257 1257 1257
(d) Dia of well 1.9 m to 2.1 m Each 1533 1533 1533 1533 1533 1533 1533 1533 1533 1533 1533 1533 1533 1533
(e) Dia of well 2.2 m to 2.4 m Each 1807 1807 1807 1807 1807 1807 1807 1807 1807 1807 1807 1807 1807 1807
(f) Dia of well 2.5 m to 2.75 m Each 1594 1594 1594 1594 1594 1594 1594 1594 1594 1594 1594 1594 1594 1594
(g) Dia of well 2.85 m to 3 m Each 1931 1931 1931 1931 1931 1931 1931 1931 1931 1931 1931 1931 1931 1931
(h) Dia of well 3.6 m Each 2207 2207 2207 2207 2207 2207 2207 2207 2207 2207 2207 2207 2207 2207
6 Removing and cleaning hard scum and silt
from the bottom of the masonry well from
45cm below the ordinary silt level the kerb
level.
(a) Dia of well 0.9 m to 1.2 m Mtr. 509 509 509 509 509 509 509 509 509 509 509 509 509 509
(b) Dia of well 1.3 m to 1.5 m Mtr. 783 783 783 783 783 783 783 783 783 783 783 783 783 783
(c) Dia of well 1.6 m to 1.8 m Mtr. 1087 1087 1087 1087 1087 1087 1087 1087 1087 1087 1087 1087 1087 1087
(Mode of measurement:- Payment to be
made per metre depth of scum removed)

Page 210
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS

(S) WELL FOR WATER SUPPLY


Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

7 Sinking Precast R.C. well ring made with


cement concrete 1:2:4 with stone chips and
necessary reinforcement fitted and fixed in
position true to plumb including all labour
and hire charges of tools and Plant complete
as directed and jointing rings with cement
mortar (1:2)
(a) 90 cm dia (internal) Mtr. 219 219 219 219 219 219 219 219 219 219 219 219 219 219
cement for joint filling-4 kg/meter
(b) 120 cm dia (internal) Mtr. 288 288 288 288 288 288 288 288 288 288 288 288 288 288
Cement for joint filling-6 Kg/m
(c) 150 cm dia (internal) Mtr. 426 426 426 426 426 426 426 426 426 426 426 426 426 426
Cement for joint filling-8Kg/m

Page 211
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

1 Number plaque of building (plaque size up to


225 mm x 225 mm) made of sand cement
plaster (1 : 2) on face of wall or plinth with 50
mm size letters P.W.D and the number of
the structure formed thereon (in sunk type) Each 119 108 107 107 114 111 108 107 114 113 112 126 111 111 114
including painting the letters and the number
complete as per direction.
(Cement - 1 kg/No.)
2 Petty repairs to number-plaque of building
including repainting the letters and the Each 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42
number.
3 Repainting the letters and the number of
number plaque of buildings. Each 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26

4 Repairing crack in wall by cement grouting (1


: 2) including widening the crack on the
surface (into V section) cleaning and packing
the same with cement mortar (1 : 2) and %Mtr. 1513 1450 1444 1444 1484 1468 1450 1444 1484 1479 1490 1570 1483 1483 1501
finishing off to match with adjacent surface.
(cement-69 Kg/100 m)

5 (A) Stitching crack in brick wall by carefully


cutting out face brick 125 mm. deep into the
wall, cleaning the gap and filling up the same
with precast cement concrete block carefully
set in cement mortar (1:3) including mending
good damages and finishing the surface to
match with adjacent areas complete as per
direction.
(i) With plain cement concrete
blocks(1:1½:3) with stone chips.
(a) Block size 250 x 125 x 75 mm.
Block 91 89 89 87 89 89 90 89 90 90 88 95 90 91 92
thick
(Cement-1.85 Kg/No.)
(b) Block size 250 x 125 x 150 mm.
Block 107 104 103 101 104 104 105 104 105 105 102 113 106 107 108
thick
(Cement-2.5 Kg/No.)
(ii) With reinforced cement concrete
blocks (1:1½:3) with stone chips and nominal
reinforcement.
(a) Block size 250 x 125 x 75 mm.
Block 116 114 113 112 114 114 114 113 115 115 114 120 115 116 117
thick
(Cement-1.85 Kg/No.)
(b) Block size 250 x 125 x 150 mm.
Block 140 137 137 135 138 137 139 137 138 139 137 147 140 141 142
thick

Page 212
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

(Cement-2.5 Kg/No.)
(B) Stitching crack in brick wall by carefully
cutting out face brick 250 mm. long, 75 mm.
thick and 125 mm deep into the wall,cleaning
the gap and filling up the same with sound
new brick, carefully set in cement mortar Brick 45 42 40 40 44 43 43 41 43 43 43 50 43 43 43
(1:3) including mending good damages and
finishing the surface to match with adjacent
areas complete as per direction.

(Cement-1 Kg/No.)
(C) Renewing weathered face brick including
taking out the old brick completely and
setting the head brick carefully in cement
mortar (1:3) complete,including making good
all damages.

(i) In stretcher course. ( Cement-0.75


Kg/No.) Brick 39 35 33 33 38 37 36 34 37 37 36 43 36 36 37

(ii) In header course- (Cement-1.0


Kg/No.) Brick 41 37 36 36 40 39 38 36 39 39 39 46 38 38 39

(iii) In header course with the new brick


projecting 62 mm. to 225 mm. from the wall
surface Brick 35 32 30 30 34 33 33 31 33 33 33 38 33 33 33
(Cement-0.5Kg/No.)
6 Renewing ornamental baluster (Balustrade)
as per design including mending good all
damages complete.
(a) With baluster of burnt clay (floral or
intricate pattern of height not exceeding 1200 Each 278 278 278 278 278 278 278 278 278 278 278 288 278 278 278
mm.)
(b) With baluster of plain cement concrete
with (1:1½:3) with stone chips(floral or
intricate pattern of height not exceeding 1200 Each 342 342 342 342 342 342 342 342 342 342 342 355 342 342 342
mm.)
(c) With baluster of plain cement concrete
with jhama chips (1:3:6) (floral or intricate Each 297 297 297 297 297 297 297 297 297 297 297 308 297 297 297
pattern of height not exceeding 1200 mm.)
(d) With baluster of cement concrete
(1:1½:3) with stone chips and with nominal
Each 407 407 407 407 407 407 407 407 407 407 407 423 407 407 407
reinforcement (floral or intricate pattern
height not exceeding 1200 mm.)

Page 213
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

7 Vertical sleeve joint in wall etc. or horizontal


joint in floor roof etc. Including shaping and
finishing adjacent surface and caulking the
joint with hemp rope thoroughly soaked in
bituminous material and fixing rope in
position by staples or other suitable devices
complete as per direction (including cost of
all materials)
(Payment to be made on length of rope
caulking)
(a) With 10 mm. dia rope Mtr. 46 46 46 46 46 46 46 46 46 46 46 47 46 46 46
(b) With 12 mm. dia rope Mtr. 50 50 50 50 50 50 50 50 50 50 50 52 50 50 50
(c) With 16 mm. dia rope Mtr. 55 55 55 55 55 55 55 55 55 55 55 56 55 55 55
(d) With 19 mm. dia rope Mtr. 61 61 61 61 61 61 61 61 61 61 61 62 61 61 61
8 Expansion joint in floor roof etc. formed with
V strips made of 22.5 cm wide strips of 24
gauge aluminium sheets with anchor arm
projecting on each side (and end turned )
embedded in adjacent cement concrete, Mtr. 383 383 383 383 383 383 383 383 383 383 383 401 383 383 383
including shaping and finishing the edges on
either side of the joint (including the cost of
bituminous filler if any) complete as per
direction.
9 Bituminous filler of approved type in
expansion joints of dummy joints including Cum 54737 54737 54737 54737 54737 54737 54737 54737 54737 54737 54737 57235 54737 54737 54737
finishing the top surface as directed.
(The quantam should be corrected upto
three decimals)
10 Uprooting and removing plants from the
surface of walls parapet etc and making
good damages. Repairing of damages to be
paid separately.
(a) Small plant of girth of exposed stem upto
75 mm. lift upto 6 mtr. Each 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51

(b) Medium size plant of girth of exposed


stem above 75 mm. but not exceeding 150 Each 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61
mm. lift upto 6 mtr.
(c) Large plant of girth of exposed stem
above 150 mm. but not exceeding 225 mm. Each 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189
lift upto 6 mtr.
Note : For lift beyond initial 6 mtr. the rate
will be increased @ 20% for each
additional lift if 6 mtr. or part thereof

Page 214
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

11 Removing scum form the bottom floor of


service latrine washing the floor thoroughly
and treating the same with liberal sprinkling Sq. M 32 32 32 32 32 32 32 32 32 32 32 32 32 32 32
of bleaching powder (including cost of
bleaching power)
(Payment to be made on area of floor)
12 Constructing brick chulla with 1st class brick
in lime mortar (1:2) and 20 mm thick (1:2)
surki beaten plaster and necessary C.I Each 6290 5738 5148 5148 6290 6097 6093 5489 5757 5734 5713 7363 5757 5734 5734
grating and cheeks (overall measurements
not less than 1 cu m)
13 Constructing brick chulla with 1st class brick
in lime mortar (1 : 2) and 20 mm thick (1 : 2)
surki beaten plaster and necessary C.I Each 4084 3742 3375 3375 4084 3966 3963 3589 3754 3740 3726 4751 3754 3740 3740
grating and cheeks (overall measurements
not less than ½ cu.m.)
14 Constructing brick chulla with 1st class brick
in lime mortar (1:2) and 20 mm thick (1:2)
surki beaten plaster and necessary C.I Each 2703 2500 2245 2245 2710 2611 2609 2403 2508 2498 2489 3072 2508 2498 2498
grating and cheeks (overall measurements
not less than 0.3 cu.m.)
15 Reconstructing brick chulla with ½ old and ½
new 1st class bricks in lime mortar (1:2) and
20 mm thick (1:2) surki beaten plaster and Each 4773 4373 3967 3967 4783 4558 4554 4237 4392 4368 4347 5414 4392 4368 4368
renewal of grating and cheeks (overall
measurement not less than 1 cu.m.)
16 Reconstructing brick chulla with ½ old and ½
new 1st class bricks in lime mortar (1:2) and
20 mm thick (1:2) surki beaten plaster and Each 3247 3001 2748 2748 3254 3116 3113 2917 3013 2997 2984 3646 3013 2997 2997
renewal of grating and cheeks (overall
measurement not less than 0.5 cu m)
17 Renewing iron grating with 19 mm M.S rod
@ 5 cm centers of chulla including fixing in Sq. M of
position in lime mortar (1 : 3) and plaster to grating 2766 2615 2565 2565 2766 2648 2644 2626 2626 2612 2599 2976 2626 2612 2612
match with the existing
18 Renewing C.I boxes of chulla 375 x 375 x
300 mm including fixing in position and
Each 718 718 718 718 718 718 718 718 718 718 718 718 718 718 718
mending damages to match with the existing

Page 215
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

19 Lifting up bodily (1.5 x 0.9 x 0.9) meters


wooden work bench table with drawers or
reagent racks along with sink and waste pipe
and removing the same outside the room
Each 146 146 146 146 146 146 146 146 146 146 146 146 146 146 146
carefully without disturbing or damaging
other working table and resetting again after
completion of channel drain construction.

20 Extra for high scaffolding in water tank for


repairing painting etc. Each 5884 5884 5884 5884 5884 5884 5884 5884 5884 5884 5884 5884 5884 5884 5884

NOTE : Height of the bottom of the tank


not less than 15 mtrs.
21 Labour for propping up overhead members
as a precautionary measure against falling
as directed with necessary planks,
Eucalyptus props, packing nails, wire ropes,
Cum 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56
iron wires etc. including hire charges of all
materials fitting, fixing dismantling and
removing the props etc and all ancillary
works in this connection complete.
(Payment to be made on volume
measurement considering the hight and
contact area)
22 Supplying fitting approved type ventilator in
position after cutting holes in walls setting in
cement mortar mending damages to wall
and plaster and two coats of paint of
approved brand sand shade. Payment of
mending two damages of wall & plaster and
painting to be made separately.
(a) C.I. ventilator of 5 mm. thick
(i) Upto 0.10 sq.m. area Each 91 91 91 91 91 91 91 91 91 91 91 92 91 91 91
(ii) Above 0.10 sq.m. area Each 102 102 102 102 102 102 102 102 102 102 102 104 102 102 102
(b) R.C.C ventilator of 20 mm. thick
(i) Upto 0.10 sq.m. area Each 117 117 117 117 117 117 117 117 117 117 117 119 117 117 117
(ii) Above 0.10 sq.m. area Each 142 142 142 142 142 142 142 142 142 142 142 145 142 142 142
23 Bailing or pumping out water from foundation
trenches. %Cum 2109 2109 2109 2109 2109 2109 2109 2109 2109 2109 2109 2146 2109 2109 2109

Page 216
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

This item should be executed on the


specific direction of the Engineer-in-
charges when he is satisfied in his
absolute discretion, that this has not been
necessitated due to any fault on the part
of the contractor
(Payment, if permitted, will be made on
the quantity of water calculated on the
basis of initial and final water calculated
on the basis of initial and final water level
measured before starting and completion
of each days work which necessitates a
bailing / pumping of water from the
trench. The final level of water to be
measured, will depend on the level at
which the day's work will be taken up. The
rate includes any seepage water that may
percolate in the trench during pumping)

24 Pumping out water from ponds or tanks %Cum 1054 1054 1054 1054 1054 1054 1054 1054 1054 1054 1054 1073 1054 1054 1054
(Payment if permitted will be made on the
quantity of water calculated on the basis of
initial water level and final level on
consideration being made for any water that
may have been made for any water that may
have been added through percolation or
otherwise)

25 Extra over the corresponding item of earth


work for removing semi liquid mud or slushy %Cum 2684 2684 2684 2684 2684 2684 2684 2684 2684 2684 2684 2684 2684 2684 2684
earth by iron pans, buckets etc.
(This item is to be done with express
approval of Engineer-in-charge)
26 Bamboo pile walling made of 65 mm to 75
mm dia. Bamboo (in single line) driven about
half length into the ground at very close
spacing side by side including necessary
bamboo stays ties runners etc and lining the
exposed portion with sheets made form cut-
drums fitted and fixed complete as per
direction.
(Payment to be made on length of wall)

Page 217
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

(a) With bamboos of length between 1.20


Mtr. 897 852 852 852 897 852 852 852 852 852 852 901 852 852 852
m. and 1.80 m. each.
(b) With bamboos of length above 1.80 m.
Mtr. 1050 993 993 993 1050 993 993 993 993 993 993 1055 993 993 993
and up to 2.40 m. each
(c) With bamboos of length above 2.40 m.
Mtr. 1285 1216 1216 1216 1285 1216 1216 1216 1216 1216 1216 1291 1216 1216 1216
and up to 3.00 m. each
27 Renewing bamboo piles 75 mm dia including
driving upto 1.50 m Mtr. 49 45 45 45 49 45 45 45 45 45 45 49 45 45 45

28 Half bamboo runners (made from 75 mm dia


stout bamboo) and fitting fixing in positions
with country made rose headed nails. Mtr. 35 33 33 33 35 33 33 33 33 33 33 35 33 33 33

29 (a) Brick gabion 1.50 m.internal diameter


and 1.20m. high with 150 mm. deep solid
brick band (in 1:6 cement mortar) at
base,125 mm.thick body of jaffry brick work
set in cement mortar (1:4) and 150 mm.
deep solid brick band at top in cement
Each 4194 3820 3556 3556 4091 4028 3965 3673 3945 3924 3929 4753 3907 3907 3970
mortar 1:6 and cement plaster (1:6) (all
faces) including colour wash (all surfaces) to
the top band and redoxide or similar
approved wash (all surfaces) to the
remaining portion, complete as per direction.

(Cement- 105 Kg/No)


(b) Mending good damages to brick gabions
(with old materials as available and with new
materials as necessary) including fresh
colour wash and oxide wash to the entire
gabion.
(i) When less than half gabion has to be
restored. Each 925 851 809 809 902 888 873 827 880 874 875 1024 871 871 885

(Cement- 25 Kg/No)
(ii) When more than half the gabion has to
be restored. Each 1268 1140 1093 1093 1220 1191 1162 1111 1198 1188 1190 1405 1181 1181 1209

(Cement- 50 Kg/No)

Page 218
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

30 Making gabions from old tar or bitumen


drums after cutting strips 75 mm wide x 300
mm long including fitting and fixing in Each 442 442 442 442 442 442 442 442 442 442 442 442 442 442 442
position using 1½ No of drums for each
gabion including cost of drums.
31 Making gabions from old tar or bitumen
drums after cutting strips 75 mm wide x 300
mm long including fitting and fixing in Each 317 317 317 317 317 317 317 317 317 317 317 317 317 317 317
position using one number of drums for each
gabion including cost of drums.
32 Brick pavement with 1st class or picked
jhama bricks as directed with joints set close
in cement mortar (1 :6) and rule\flush
pointing with cement mortar (1 : 4)

(i) When laid with a cushion of sand below


(including cost thereof).
(a) One brick flat pavement. Sq. M 446 374 310 310 427 406 391 336 393 388 378 560 381 376 385
(Cement- 1.4 Kg/Sq.M)
(b) One brick-on-edge pavement. Sq. M 760 661 554 554 738 712 695 603 684 678 669 930 672 667 678
(Cement- 10.7 Kg/Sq.M)
(c) One brick-on-edge pavement in
herring bone pattern. Sq. M 772 673 566 566 750 724 707 614 696 690 681 942 683 679 689

(Cement- 10.7 Kg/Sq.M)


(ii) When laid with cement mortar (1:6) on
the under side as well (including cost
thereof)
(a) One brick flat pavement. Sq. M 527 443 377 377 502 478 460 403 468 462 452 649 453 449 461
(Cement- 6.4 Kg/Sq.M)
(b) One brick-on-edge pavement. Sq. M 834 724 615 615 807 778 758 664 753 746 737 1013 738 733 747
(Cement- 15 Kg/Sq.M)
(c) One brick-on-edge pavement in
Sq. M 850 740 631 631 823 794 774 680 769 762 753 1029 754 750 764
herring bone pattern.
(Cement- 15 Kg/Sq.M)
33 Taking out stone slabs of flat V-shaped drain
of road side and resetting the same to
correct line and level with cement mortar (1 :
4) including cement pointing (1 :2)
(a) Vertical kerb stone. Mtr. 34 32 32 32 33 33 32 32 33 33 33 36 33 33 33
(Cement- 1.25 Kg/M)
(b) Flat channel stone. Mtr. 53 50 50 50 52 51 50 50 52 51 52 55 51 51 52

Page 219
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

(Cement- 1.75 Kg/M)


34 Renewing cement pointing (1 :2) in joints of
flat V-shaped road side drain made of kerb
stone and channel stone including opening %Mtr. 562 537 534 534 550 543 537 534 550 548 552 584 550 550 557
up and cleaning the joints preperly.
Cement- (26 Kg/100 M)
(Payment to be made on length of drain
pointed i.e. kerb stone and channel stone
taken together.)
35 Hire and labour charges for 75 mm dia
bamboo railing on Jhau/Eucalyptus or other
approved timber\bamboo posts 1.4 m above
G.L and 0.60 m below G.L including tying
strongly with coir ropes and boring holes for
posts in any soil/ concrete
surface/Bituminious surface packing the
sides etc including cost of carriage of all
materials and labour complete including cost
of restoration to the damages of the ground
to its original condition as per direction of
Engineer in charge after removing the
barricade.(Cost of restoration would be paid
separately).
(a) 75mm. dia bamboo railing & 125mm. dia
Jhau/Eucalyptus/other approved timber
posts @ 1.60m apart

(i) Railing with 4 rows. Mtr. 64 62 61 62 63 61 61 61 62 62 62 63 62 62 62


(ii) Railing with 3 rows. Mtr. 56 54 53 54 55 53 53 53 54 54 54 55 54 54 54
(b) 75mm. dia bamboo railing & 100mm. dia
bamboo posts @ 1.40m. apart.
(i) Railing with 4 rows. Mtr. 59 57 57 57 59 57 57 57 57 57 57 59 57 57 57
(ii) Railing with 3 rows. Mtr. 50 49 49 49 50 49 49 49 49 49 49 50 49 49 49

Page 220
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

36 Hire and labour charges for 100 mm dia


bamboo railing on Jhau/Eucalyptus post 1.40
m above G.L and 0.60 m below G.L tied
strongly with bamboo railing with coir rope,
digging holes for posts in any sort of soil or
concrete surface packing the sides etc
including cost of carriage of all materials and
labour complete including cost of restoration
to the damages of the ground to its original
condition as per direction of Engineer- in-
charge after removing the barricade. (Cost of
restoration to be paid separately. )

(a) 100 mm. dia bamboo railing and 150


mm. dia. Jhaubullah/Eucalyptus posts @
1.80 m. apart.
(i) Railing with 4 rows. Mtr. 85 83 82 82 84 82 82 82 83 83 83 84 83 83 83
(ii) Railing with 3 rows. Mtr. 71 70 68 69 71 68 68 68 70 70 70 71 70 70 70
37 Hire and labour charges for coir rope fencing
25 mm dia rope single on 120 m dia bamboo
posts 1.40 m above G.L and 600 mm below Mtr. 18 17 17 17 18 17 17 17 17 17 17 18 17 17 17
G.L 1.50 m apart including digging holes
complete
38 Hire and labour charges for coloured and
twisted cloth rope fencing as per design
approved by Engineer-in-charge one line
with 100 mm dia Eucalyptus or bamboo
posts 0.60 m above G.L and 300 mm below Mtr. 21 21 20 21 21 20 20 20 21 21 21 21 21 21 21
G.L 1.50 m apart fitted and fixed complete
including painting with white zinc painting (2
coat) complete.Payment of Painting to be
made separately.
39 Labour for fitting and fixing special type M.S
calmp with necessary wooden packing to
Elec. Lamp post upto 7.60 m height with
necessary scaffolding and tightening the
Each 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56
bolts and nuts and one coat of white painting
complete including dismantling the clamps
and depositing the same to P.W.D office
after the foundation.

Page 221
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

40 Labour charges for fitting and fixing flag up to


1.80 m x 1.20 m size in the special type
clamp including sticking the flag as
necessary with scaffolding upto 7.6 m and
bringing down the flag immediately after the Each 156 156 156 156 156 156 156 156 156 156 156 156 156 156 156
function and depositing the same to P.W.D
office (Bringing down of the flag to be
completed in the afternoon on the date
specified by Engineer in charge)
41 Hire and labour charges for erecting
temporary latrine and urinals with thick
canvas (new) walling fitted and fixed with
strong bamboo frames and posts including
cutting drain, making seats with porcelain
pans and urinals as directed with hire Sq. M 276 276 276 276 276 276 276 276 276 276 276 276 276 276 276
charges completed. (Payment to be made on
the covered ground area between temporary
wallings. One basin or pan or urinal to be
fixed for every 3 sq m covered area or part.)

42 Hire and labour for erecting new thick canvas


shade 6.10 m x 3.70 m with roof covering
with strong bamboo frame for 2 nos ladies
cloak room with canvas on all sides as per
direction of Engineer- in -charges including Set 5908 5908 5908 5908 5908 5908 5908 5908 5908 5908 5908 5908 5908 5908 5908
maintaining the shades as required including
fitting and fixing white squatting urinals and
one pan complete with drainage as directed.

43 Supplying on hire "Garden" chairs during


function and arranging those properly on
ground as per direction of Engineer- in-
charge including carriage of chairs to site,
Each 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12
their retention till the end of the function and
their removal after conclusion of function
including cost of all labour and material
complete.
44 Supplying on hire basis cushioned chairs for
VIPs arranging properly on the dias as per
direction of engineer- in -charge including Each 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40
carriage of chairs etc complete.

Page 222
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

45 Hire and labour charges for providing "Drop


Gate" with 15 cm dia salbullah of length not
less than 8 meter including hoisting and
fitting fixing with bolts and nuts to vertical
posts (100 mm dia : 2 nos on each flank
embedded 750 mm below G.L) and providing
counter load of concrete or stone or iron Each 632 632 632 632 632 632 632 632 632 632 632 632 632 632 632
block at the fulcrum end including painting
two coats in alternate band providing 'STOP'
plate, jute rope of necessary length etc
complete including dismantling and removing
as per direction of the Engineer in charge.

46 Labour charge for hoisting and fitting fixing


drop gate including carriage of the gate by
parts from the departmental godown / stack
Each 620 620 620 620 620 620 620 620 620 620 620 620 620 620 620
yard and dismantling and returning the gate
to the place of supply as per direction of the
Engineer in charge

47 Supplying sign-board made of 25 mm thick


sal plank and frame on all side of sal batten
50mm x 32 mm and 3.15mx100mmx100mm
fitting fixing such with digging holes of dia
300 mm and depth 750 mm in all sorts of soil
and repacking and consolidating the gap
around the post with cement concrete (1 : 3 :
6) painting 2 coats including cost of nails,
bolts and nuts etc. complete in all respect as
per direction of the Engineer- in-
charge.Payment of concrete and painting to
be made separately.

(i) 600 mm. x 450 mm. size of board. Each 535 535 535 535 535 535 535 535 535 535 535 560 535 535 535

(ii) 900 mm. x 600 mm. size of board. Each 986 927 981 925 977 953 948 905 938 937 958 1046 957 957 962
48 Projection of individual brick 12.5 cm x 7.5
cm x 6.5 cm to 12.5 cm projection from wall
surface. (The rate covers the projection only,
Each 13 13 11 11 14 13 13 12 13 13 13 16 13 13 13
the embedded portion being including in the
measurement of the wall against appropriate
item)

Page 223
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

49 Cleaning and removing cnservancy garbage


mixed with rubbish & other filthy materials
from the road side flank, drain and
compound including sutting, loading, %Cum 5718 5718 5718 5718 5718 5718 5718 5718 5718 5718 5718 5718 5718 5718 5718
unloading to and from truck or cart by Mathor
labour & removing the same to any distance.

50 7.5 cm. thick compacted lime concrete with


moorum and best quality slaked stone lime (
5% by volume) properly mixed, laid and
rammed on bed of foundation including cost
Sq. M 58 54 54 54 58 54 54 54 54 54 54 62 54 54 54
of all materials, labour and curing etc.
complete in all respect as per direction of
Engineer-in-Charge (10 cm. loose
consolidated to 7.5 cm. thick)
51 Making one set of scaffolding only for
replacing glass panels, painting, uprooting
plant and another repairing works of building
and S&P works for external works only with
10 cm. dia bamboo as main posts at the rate
of 1 metre centre to centre and 7.5 cm. dia
bamboo ties @ 0.75 metre apart fitting and
fixing with necessary coir, nails etc. as per
direction of the Engineer-in-charge.

(This item should be executed only after prior


approval of the Engineer-in-charge). Firstly,
one number to be paid and then labour rate
for shifting up to further nineteenth (19) times
@ 10% each time to be considered. If
necessary further after twenty times of total
use, another one number new and labour
rate for shifting to be considered accordingly.

a) 3.90 metre height Each 386 386 386 386 386 386 386 386 386 386 386 386 386 386 386

b) Extra for additional 3.6 height or part


Each 349 349 349 349 349 349 349 349 349 349 349 349 349 349 349
thereof

Page 224
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

52 Supplying (in bulk) at depots as directed


boundary pillars 0.9m. high 27 cm. dia at
base and 22.5m. dia at top with chamfered
flat face in the top with sunk inscription
thereon complete with top 45cm length
finished smooth with cement rendering or
thin plaster (1:3) but without any wash or
painting.
(No Departmental cement will be issued)

a) Made of cement concrete 1:3:6 with jhama


chips Each 288 252 252 252 252 252 252 252 252 252 252 265 252 252 252

b) Made of cement concrete 1:3:6 with stone


chips or gravel Each 338 296 296 296 296 296 296 296 296 296 296 311 296 296 296

53 Fitting and fixing boundary pillar in correct


position as directed with embedment of 60
cm. into the ground including making hole in
ground and repacking the same thoroughly
and carriage of the boundary pillar to site.

a) With carriage upto 150 metre Each 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50

(When the pillar are delivered near the


area by departmental carriage)
b) With carriage beyond 150 metre and upto
Each 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53
3.00 Km
c) With carriage beyond 3.00 Km and upto
8.00 Km Each 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55

54 White wash or colour wash to boundary pillar


and painting as directed. Each 32 32 32 32 32 32 32 32 32 32 32 32 32 32 32

55 Supplying (in bulk), at depots as instructed


R.C.guard posts (with cement concrete 1:2:4
with stone chips and normal reinforcement),
1.35m. long and of octagonal section
measuring 20 cm. accross opposite flat
surfaces at the base tapering to
Each 301 316 316 316 316 316 316 316 316 316 316 316 316 316 316
corresponding dimension of 15 cm. at the top
and with top and face level finished complete
as per direction, including smooth finishing to
the top 90 cm. length with cement rendering
of thin plaster 1:3 but excluding painting.

Page 225
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

(No Departmental cement will be issued)

56 Fitting and fixing guard post in correct


position as directed, true to line and level
with embedment of 53 cm. to 68 cm. (as
directed) into the ground including making
hole, repacking the same thoroughly and
including carriage of the guard post of the
site.
a) With carriage upto 150 metre Each 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50
(When the pillar are delivered near the area
by departmental carriage)

b) With carriage beyond 150 metre and upto


3.00 Km Each 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53

c) With carriage beyond 3.00 Km and upto


8.00 Km Each 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55

57 Painting guard post with horizontal alternate


bands in different colours as directed with
approved oil-bound paint.

a) One coat Each 44 44 44 44 44 44 44 44 44 44 44 44 44 44 44

b) Two coats Each 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53


58 Painting the vertical end faces and the inside
face of pillar or railing or parapet (1.05 m. to
1.75 m. high) with horizontal alternate bands
in different colours, as directed with
approved oil-bound paint.
(Length of each band ranging between
0.75 m. and 1.2 m.)
a) One coat Each 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52
b) Two coats Each 73 73 73 73 73 73 73 73 73 73 73 73 73 73 73
59 Painting block letters or digits in Black Japan
or any approved paint as per direction.

a) Size 2 cm. to 2.5 cm. Each 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6


b) Size above 2.5 cm. and upto 4 cm. Each 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
c) Size above 4 cm. and upto 5 cm. Each 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10
d) Size above 5 cm. and upto 7.5 cm. Each 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11
e) Size above 7.5 cm. and upto 10 cm. Each 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13

Page 226
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

f) Size above 10 cm. and upto 12.5 cm. Each 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14


g) Size above 12.5 cm. and upto 15 cm. Each 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15
h) Size above 15 cm. and upto 20 cm. Each 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16
NB.:
(a) The above rates will be enhanced by
100% if the letters are engraved and
painted.
(b) 25% extra for painting the letters of
K.M. Post and M Post etc.
60 Supplying Surki, shifting and spreading the
same as directed. Cu.M. 2185 1858 1613 1613 2185 2022 2007 1917 1917 1843 1776 2512 1917 1843 1843

(Payment to be made on prior measurement


with the allowance for sinkage or shrinkage)

61 Labour for laying 150 mm to 200 mm boulder


soling including rough dressing hand packing
and ramming down small pieces in the
interstics including rolling and preparing the Sq.m. 64 64 64 64
bed to proper level and filling up all joints
with sandy clay or earth.
NB. -- This rate only for Northern Circle,
NBCC-I & NBCC-II
62 `-- Do -- -- Do - without rolling but including
Sq.m. 51 51 51 51
ramming.
NB. -- This rate only for Northern Circle,
NBCC-I & NBCC-II
63 Taking out carefully existing (75 mm. wide)
brick edging and relaying the edging in the
same trench after rectifying line and level as
required and repacking the trench throughly
on both sides of the edging.
NB. -- This rate only for Northern Circle,
NBCC-I & NBCC-II
(i) Relaying with all old bricks or with partly
old and partly new departmental bricks
(including carriage of such bricks within a
lead of 150m.)

a) Brick on edge edging (125 mm. depth) Mtr. 7 7 7 7

b) Brick on edge edging (250 mm. depth) Mtr. 11 11 11 11

Page 227
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

64 Taking out carefully existing (75 mm. wide)


ornamental brick edging of Saw-tooth type
(with bricks laid diagonally on end) and
relaying the edging in the same trench after Mtr. 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
rectifying line and level as required and
repacking the trench throughly on both sides
of the edging.
65 Labour for taking out carefully existing stone
edging and relaying the edging on the same
trench rectifying line and level as required
with all old materials or with partly old and
Mtr.
partly new departmental materials (including
carriage of new materials within a lead of
150 m.) and repacking the trench throughly
on both sides of the edging.
(a) 125 mm to 150 mm width and 225 mm to
250 mm deep edging with stone boulders Mtr. 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11
with the top portion rough dressed.
(b) 100 mm wide and 125 mm deep edging
with stone sets laid on edge. Mtr. 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7

(c) 100 mm wide and 250mm deep edging


with stone sets laid on edge. Mtr. 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7

66 Stone set pavement with the joints set close


in cement mortar (1:6) excluding the cost of
stone sets but including the cost of carriage
thereof within a lead of 150 m.
(i) When laid with a cushion of sand below
(including cost thereof).
(a) 100 mm thick pavement Sq.m. 62 40 38 38 50 41 32 32 47 44 35 89 40 35 38
(b) 125 mm thick pavement. Sq.m. 69 47 45 45 57 48 39 39 54 51 42 95 47 42 45
(ii) When laid with cement mortar (1:6) on
the underside as well (including cost
thereof).

(a) 100 mm thick pavement Sq.m. 46 46 46 46 46 46 46 46 46 46 46 46 46 46 46


(b) 125 mm thick pavement. Sq.m. 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52
67 Supplying, fitting and fixing Fan Hook for
ceiling with 1 metre long 16mm. dia rod
complete including mending damages. Each 105 105 105 105 105 105 105 105 105 105 107 107 107 107 107
Payment for damage and repair to be made
separately.

Page 228
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)

Uttar/ Dakshin Dinajpur Dist.


Jalpaiguri,Alipurduar, plains
of Siliguri Sub Divn. & Area
Darjeeling except plains of

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Item

Purulia

Malda
Nadia
Description of Items Unit
No.

68 Clearing compound premises of shurbs,


plants, jungles etc. by cutting and removing
as directed (Specific permission of Engineer-
Sq.m. 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11
in-Charge prior to execution will be
necessary).
(Payment to be made on area cleared)

Page 229
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

1) 250 mm th. Masonary work with Autoclave


aerated concrete blocks of size 625 mm x
250 mm x 125 mm made of fly ash, lime
cement conforming to IS: 2185 ( Part-3)-
1984 in Cement Mortar (1:6) complete in all
respect.
In Super Structure, Ground Floor. Cu.M. 5175 5094 5087 5087 5138 5116 5094 5087 5138 5131 5130 5233 5123 5123 5120
2) 125 mm thick Autoclave aerated concrete
blocks work with its size 625 mm x 250 mm
x 125 mm made of fly ash, lime & cement
conforming to IS: 2185 ( Part-3)-1984 in
Cement Mortar (1:4) complete in all respect.

In Super Structure, Ground Floor. Sq.M. 694 573 573 573 577 575 573 573 577 576 577 585 576 576 578
3) 100 mm thick Autoclave aerated concrete
blocks work with its size 625 mm x 250 mm
x 100 mm made of fly ash, lime & cement
conforming to IS: 2185 ( Part-3)-1984 in
Cement Mortar (1:4) complete in all respect.

In Super Structure, Ground Floor. Sq.M. 563 558 557 557 560 559 558 557 560 560 560 567 560 560 561
4) Ordinary Cement concrete (mix 1:2:4) with
graded stone chips (6mm nominal size)
excluding shuttering and reinforcement,if
any, in gound floor as per relevant IS codes.

Pakur variety Cu.M. 6313 5822 5789 5281 5872 6106 6235 5872 5944 6068 5381 6937 6205 6501 6016

Page 230
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

5) Supplying, fitting & fixing granite slabs 15mm


to 18 mm. thick with uniform texture &
without decorative veins in columns, wall,
facia,rise etc. with 15 mm thick [avg] cement
mortar (1:2) including making suitable
arrangements to hold the stones properly by
brass / copper hooks including pointing in
cement mortar (1:2) (1 white cement : 2
marble dust) with admixture of pigment
matching the stone shades all complete as
per direction of the Engineer-in-charge
including cost of all materials, labours,
scaffolding, staging, curing and roughening
of concrete surface complete.
[Using cement slurry at back side of granite
@ 4.4 kg/sq.m & white cement slurry for joint
filling @ 1.8 kg/sq.m]
In ground floor
(a) Area of each Granite slab 0.6 to 1.0 Sq,M. 3399 3387 3386 3386 3394 3390 3388 3386 3392 3392 3394 3753 3630 3630 3634
Square meter.
(b) Area of each Granite slab above 1.00 Sq,M. 3693 3682 3680 3680 3689 3684 3683 3680 3687 3687 3689 3813 3688 3688 3691
Square meter.
6) supplying,fitting & fixing granite slab 15mm
to 18mm thick in floor, lobby, stair, landing
and treads etc. over 20mm (avg) thick base
of cement morter (1:2) laid with white cement
slurry @ 4.40Kg per Square meter before
placing of granite and jointed with white
cement slurry @ 2.0 Kg per square meter
with necessary pigments and complete as
per direction of Engineer-in-charge including
cost of all materials, labours, curing and
roughening of concrete surface complete.
In ground floor
(a) Area of each Granite slab upto 0.60 Sq.M. 2522 2469 2466 2466 2477 2472 2470 2466 2475 2475 2476 2564 2475 2475 2480
Square meter.
(b) Area of each Granite slab 0.6 to 1.0 Sq.M. 3232 3217 3215 3215 3226 3220 3218 3215 3223 3223 3224 3593 3460 3460 3465
Square meter.
(c) Area of each Granite slab above 1.00 Sq.M. 3526 3512 3509 3509 3520 3515 3513 3509 3518 3518 3519 3652 3518 3518 3522
Square meter.

Page 231
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

7) Supplying, fitting and fixing Stainless Steel


railing consist of 38mm dia and 900mm
height vertical balustrade at every two
alternative steps, 50mm dia top rail, 3 (three
) nos 19mm dia horizontal Strainless steel
pipe and base/cover plate with Strainless
Steel GRADE 304 containing 7.5% nickle
(Interior Grade) Brushed/Mat finish, complete
as per direction of the Engineer-in-charge.
Weight of Strainless Steel railing per metre
6.5 Kg (approx)
Mtr. 7754 7754 7754 7754 7754 7754 7754 7754 7754 7754 7754 8984 7754 7754 7754
8) Supplying , fitting & fixing Zn -Al alloy coated
( followed by colour coated ) steel sheet work
having minimum yield strength of 550 Mpa of
trapizoidal profile of approved make
(excluding the supporting frame work) fitted
and fixed with 10 mm. dia J or L hook-bolts,
limpet and bitumen washers and putty
complete with 150 mm. end lap and one
corrugation minimum side lap. (Payment to
be made on area of finished work)

(i) In Roof:-
a) With 0.90 mm thick sheet Sq.M. 905 905 905 905 905 905 905 905 905 905 905 915 905 905 905
9) Supplying, fitting & fixing circular corrugated
Aluminium sheet (excluding the supporting
frame work) of approved make & brand in
alloy 3105 conforming to IS: 1254-1991 fitted
and fixed with 55 mm & 25 mm Self tapping
screw , EPDM Washer 16 mm dia & 3 mm th
washer etc complete with 150 mm. end lap
and one corrugation minimum side lap.
(Payment to be made on area of finished
work) (Aluminium sheet to be supplied by
contractor).

(i) In Roof:-
a) With 0.65 mm thick sheet Sq.M. 781 781 781 781 781 781 781 781 781 781 781 791 781 781 781
b) With 0.71 mm thick sheet Sq.M. 831 831 831 831 831 831 831 831 831 831 831 841 831 831 831
c) With 0.91 mm thick sheet Sq.M. 903 903 903 903 903 903 903 903 903 903 903 915 903 903 903

Page 232
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

10) Supplying, fitting & fixing Industrial Troughed


Aluminium sheet (excluding the supporting
frame work) of approved make & brand in
alloy 3105 conforming to IS: 1254-1991 fitted
and fixed with 75 mm & 25 mm Self tapping
screw , EPDM Washer 16 mm dia & 3 mm th
washer etc complete with 150 mm. end lap
and one corrugation minimum side lap.
(Payment to be made on area of finished
work) (Aluminium sheet to be supplied by
contractor).
(i) In Roof:-
a) With 0.65 mm thick sheet Sq.M. 968 968 968 968 968 968 968 968 968 968 968 980 968 968 968
b) With 0.71 mm thick sheet Sq.M. 968 968 968 968 968 968 968 968 968 968 968 980 968 968 968
c) With 0.91 mm thick sheet Sq.M. 1195 1195 1195 1195 1195 1195 1195 1195 1195 1195 1195 1207 1195 1195 1195
11) Aluminium sheet ridging fitted with self
tapping screws, EPDM washers etc
complete.(Minimum 225mm end lapping).

(A) 300 mm lapping each way


(a) With 0.71 mm sheet Mtr. 460 460 460 460 460 460 460 460 460 460 460 467 460 460 460
(b) With 0.91 mm sheet Mtr. 557 557 557 557 557 557 557 557 557 557 557 563 557 557 557
12) Supplying, fitting & fixing 1.5mm thick Plain
Corrugation Polycarbonate clear sheet made
of national brand, excluding the supporting
frame work, fitted and fixed with 10mm dia x
55mm Self-driving screws, EPDM washers
and putty complete with 150mm end lap and
one corrugation minimum side lap complete
as per specification & direction of Engineer -
in - charge including materials, labour, taxes
and all other incidental charges.
(Payment to be made on area of finished
work ).

In Roof Sq.M. 2357 2357 2357 2357 2357 2357 2357 2357 2357 2357 2357 2366 2357 2357 2357

Page 233
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

13) Supplying, fitting & fixing 1.5mm thick


Trapezoidal profile corrugation
Polycarbonate clear sheet made of national
brand, excluding the supporting frame work,
fitted and fixed with 10mm dia x 55mm Self-
driving screws, EPDM washers and putty
complete with 150mm end lap and one
corrugation minimum side lap complete as
per specification & direction of Engineer-in-
charge including materials, labour, taxes and
all other incidental charges (Payment to be
made on area of finished work )

In Roof Sq.M. 2766 2766 2766 2766 2766 2766 2766 2766 2766 2766 2766 2776 2766 2766 2766
14) supplying wooden moulding slanting beat of
size 37mm X 18mm (finished) of approved
design to finish the joint between wooden
frame of door/window with masonary in true
line and level fitted & fixed with adhesive and
head less pins complete as per direction of
Engineer -in-charge.

a) Teak wood beat Mtr. 127 127 127 127 127 127 127 127 127 127 127 138 127 127 127
b) Kappoor wood beat Mtr. 87 87 87 87 87 87 87 87 87 87 87 93 87 87 87
15) Polishing with melamine finish to wooden
surface after preparing the surface as per
decision and direction of Engineer-in-
Charge.
Sq.M. 78 78 78 78 78 78 78 78 78 78 78 83 78 78 78
16) Supplying, fitting and fixing Godrej Multi Lock
or equivallent .
Each 150 150 150 150 150 150 150 150 150 150 150 159 150 150 150

Page 234
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

17) Supplying, fitting and fixing of false ceiling


framework with powder coated exposed G.I.
grid suspension system (E-Grid T 2430/1510
or equivalent load carrying capacity with mid
span deflection not exceeding 1/360 span
with hanger spacing of 1200mm c/c )
consisting of Main Runner 3600 mm long,
Cross Tee 1200 mm / 600 mm long and Wall
Angle. The Wall Angle shall be fixed on PVC
Dash Fasteners on the perimeter of the wall
by steel screws with distance 300mm c/c.
The Main Runners to be placed @ 1200 mm.
The Cross Tee 1200mm will be inserted in
the pre-cut slots of Main Runner at regular
interval of 600 mm to form a modular grid of
1200mm X 600mm. Additional Cross Tees of
600 mm shall be placed perpendicular to the
Cross Tee 1200 mm long to finally form a
grid of 600 mm X 600 mm. Grid of module
size 600 mm X 600 mm shall be supported
by 6 mm dia G.I. wire from purlins / soffit. all
complete as per drawing & directions of
Engineer-in-charge.

Sq.M. 388 388 388 388 388 388 388 388 388 388 388 348 388 388 388

Page 235
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

18) Supplying, fitting and fixing of false ceiling


framework with powder coated exposed G.I.
grid suspension system (E-Grid U-1520 or
equivalent load carrying capacity with mid
span deflection not exceeding 1/360 span
with hanger spacing of 1200mm c/c )
consisting of Main Runner 3600 mm long,
Cross Tee 1200 mm / 600 mm long and Wall
Angle. The Wall Angle shall be fixed on PVC
Dash Fasteners on the perimeter of the wall
by steel screws with distance 300mm c/c.
The Main Runners to be placed @ 1200 mm.
The Cross Tee 1200mm will be inserted in
the pre-cut slots of Main Runner at a regular
interval of 600 mm to form a modular grid of
1200mm X 600mm. Additional Cross Tees of
600 mm shall be placed perpendicular to the
Cross Tee 1200 mm long to finally form a
grid of 600 mm X 600 mm. Grid of module
size 600 mm X 600 mm shall be supported
by 6 mm dia G.I. wire from purlins / soffit. All
complete as per the drawing & directions of
Engineer-in-charge.

Sq.M. 573 573 573 573 573 573 573 573 573 573 573 584 573 573 573

Page 236
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

19) Supplying fitting & fixing concealed of False


ceiling Framework with G.I. Section
(perimeter channels having one flange of 20
mm. and another flange of 30 mm. with
thickness of 0.55 mm. and web of length 27
mm., along the perimeter of the ceiling,
screws fixed to the wall with help of nylon
sleeves or PVC dash fastners @ 610 mm
c/c. then suspend G.I. intermidiate 'C' section
with web 90 mm. and flanges of 15 mm.
each from soffit @ 1200 mm c/c with ceiling
angle of size 25 mm. X 10 mm. X 0.55 mm.
fixed to soffit G.I. Cleat and Steel expansion
fasteners. Ceiling section of 0.55 mm.
thickness having web of 51.5 mm. and two
flanges of 26 mm. each with lips of 10.55
mm., are then fixed on to the intermediate
channel with the help of connecting clips in
the direction perpendicular to the intermidiate
channel @ 610 mm c/c) with fully threaded
fiber cement screws @ 300 mm c/c. All
complete as per the drawing and direction of
Engineer-in-Charge.
Section specification :- Perimeter Channel :-
30 mm X 20 mm X 27 mm, thickness 0.55
mm (min), Intermidiate Channel :- 15 mm X
90 mm, thickness 0.90 mm (min), Ceiling
Section :- 51.5 mm X 26 mm X 10.55 mm,
thickness 0.55 mm (min), Ceiling Angle :- 25
mm X 10 mm, thickness 0.55 mm (min).

Sq.M. 400 400 400 400 400 400 400 400 400 400 400 409 400 400 400

Page 237
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

20) Supplying,fitting & fixing in position


suspended false ceiling with frame work of
aluminium hollow section of size 50mm X
25mm (2.0mm thickness) combined with
aluminium corners of size 38mm X 25mm,
suspended by aluminium hollow tube section
of size 38mm X 25mm having size of 600mm
X 600mm ceiling with aluminium composit
panels (ACP) - Interior grade of thickness
3.0mm comprising of proctective film,
polyester coating, primer, aluminium coil,
adhesive film, polyethylene core again with
one layer adhesive film, aluminium bottom
coating and finally service coating as per
manufacturer's specification finished with
aluminium screw and silicon sealent
complete in all respect including all incidental
charges etc. as per direction of Engineer-in-
charge.

Sq.M. 2689 2689 2689 2689 2689 2689 2689 2689 2689 2689 2689 2936 2689 2689 2689
21) A. Exposed False-ceiling Work --
(a) Supplying, fitting & fixing High Pressure
steam Cured Non Asbestos fibre cement
standard ceiling board (Density > 1300Kg
per Cu.M. ) of size595mm X595mm
conforming IS 14862 and type B, catagory III
of ISO 8336, tested as per AS-1530 Part 3
and BS-476 Part 4,5,6,7 & 8, should be
placed in the Grid module to form a false
ceiling. All complete as per drawing &
direction of Engineer - in- Charge.

False ceiling with


(i) 4mm thick Fibre Cement Standard ceiling Sq.M. 255 255 255 255 255 255 255 255 255 255 255 263 255 255 255
board.
(ii) 6mm thick Fibre Cement Standard ceiling Sq.M. 340 340 340 340 340 340 340 340 340 340 340 351 340 340 340
board.

Page 238
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

(b) Supplying, fitting & fixing High Pressure


steam Cured Non Asbestos Pearl designer
fibre cement standard ceiling board (Density
> 1500Kg per Cu.M. ) of size595mm
X595mm conforming IS 14862 and type A,
catagory IV of ISO 8336, tested as per AS-
1530 Part 3 and BS-476 Part 4,5,6,7 & 8,
should be placed in the Grid module to form
a false ceiling. All complete as per drawing &
direction of Engineer - in- Charge.

False ceiling with


(i) 4mm thick Pearl Designer Fibre Cement Sq.M. 479 479 479 479 479 479 479 479 479 479 479 495 479 479 479
Standard ceiling board.
(c) Supplying, fitting & fixing High Pressure
steam Cured Non Asbestos fibre cement
designer ceiling board (Density > 1300Kg per
Cu.M. ) of size595mm X595mm conforming
IS 14862 and type B, catagory III of ISO
8336, tested as per AS-1530 Part 3 and BS-
476 Part 4,5,6,7 & 8, should be placed in the
Grid module to form a false ceiling. All
complete as per drawing & direction of
Engineer - in- Charge.

False ceiling with


(i) 4mm thick Fibre Cement Designer ceiling Sq.M. 329 329 329 329 329 329 329 329 329 329 329 345 329 329 329
board.
(ii) 6mm thick Fibre Cement Designer ceiling Sq.M. 456 456 456 456 456 456 456 456 456 456 456 470 456 456 456
board.
(d) Supplying, fitting & fixing OW Acoustic
Board (mineral Fibre Acoustic Ceiling Tiles)
of approved patern and size595mm X595mm
with NRC value > 0.65 should be placed in
the Grid module to form a false ceiling. All
complete as per drawing & direction of
Engineer - in- Charge.

False ceiling with


(i)15mm thick OW Acoustic Board/Tiles. Sq.M. 854 854 854 854 854 854 854 854 854 854 854 863 854 854 854

Page 239
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

(e) Supplying ,fitting & fixing Eco-friendly,


Water Resistance and Incombustable
Calcium Silicate board/tiles (Density >900 Kg
per Cu.M.) of approved design and brand
placed in the grid module to form a false
ceiling. All complete as per drawing &
direction of Engineer - in- Charge.

False ceiling with


(i) 6mm thick square edged Calcium Silicate Sq.M. 406 406 406 406 406 406 406 406 406 406 406 422 406 406 406
tiles (size 595mm X 595mm)
f) Supplying ,fitting & fixing Eco-
friendly,Humidity Resistance and
Incombustable Light Weight Calcium Silicate
board/tiles (Density < 900 Kg per Cu.M.&
Sound absorption NRC - 0.1 to
0.75)Conforming to BS 476 (Part IV, VI &
VII) of approved design and brand placed in
the grid module of size 600mm X 600mm to
form a false ceiling, all complete as per
drawing & direction of Engineer - in- Charge.

False ceiling with


15mm X 10mm Densified tegular edged
Light weight Calcium Silicate tiles Sq.M. 1010 1010 1010 1010 1010 1010 1010 1010 1010 1010 1010 1061 1010 1010 1010
(g) Supplying ,fitting & fixing Eco-
friendly,Moisture Resistance and
Incombustable Gypsum plaster board/tiles (
Density > 700Kg per Cu.M.) conforming to IS
2095- Part 1, 2011 of size 595mm X595mm
of approved design and brand placed in the
Grid module to form a false ceiling. All
complete as per drawing & direction of
Engineer - in- Charge.

False ceiling with


(i) 9.5mm thick Square edged Gypsum Sq.M. 434 434 434 434 434 434 434 434 434 434 434 452 434 434 434
Plaster Board / tiles.
(ii) 12.5mm thick Square edged Gypsum Sq.M. 464 464 464 464 464 464 464 464 464 464 464 484 464 464 464
Plaster Board / tiles

Page 240
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

(h) Supplying ,fitting & fixing Eco-friendly,


Heat Resistance and Incombustable
Gypsum plaster board/tiles ( Density >
700Kg per Cu.M.) confirming to IS 2095-
Part 1, 2011 of size 595mm X595mm of
approved design & brand placed in the Grid
module to form a false ceiling, all complete
as per drawing & direction of Engineer - in-
Charge.
False ceiling with
(i) 12.5mm thick Square edged heat Sq.M. 494 494 494 494 494 494 494 494 494 494 494 515 494 494 494
resistance Gypsum Plaster Board/tiles with
vapour control film
21) B. Concealed False-ceiling Work --
(a) Supplying, fitting & fixing High Pressure
steam Cured Non Asbestos fibre cement
standard ceiling board (Density > 1300Kg
per Cu.M. ) of size595mm X595mm
conforming IS 14862 and type B, catagory III
of ISO 8336, tested as per AS-1530 Part 3
and BS-476 Part 4,5,6,7 & 8, should be
placed in the Grid module to form a false
ceiling. All complete as per drawing &
direction of Engineer - in- Charge. (Jointing
should be done by Elasto jointing compound
and top finished with putty as specified by
manufacturer.)

False ceiling with


(i) 4mm thick Fibre Cement Standard ceiling Sq.M. 347 278 278 278 278 278 278 278 278 278 278 278 278 278 278
board.
(ii) 6mm thick Fibre Cement Standard ceiling Sq.M. 431 431 431 431 431 431 431 431 431 431 431 445 431 431 431
board.

Page 241
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

(b) Supplying, fitting & fixing High Pressure


steam Cured Non Asbestos Pearl designer
fibre cement standard ceiling board (Density
> 1500Kg per Cu.M. ) of size595mm
X595mm conforming IS 14862 and type A,
catagory IV of ISO 8336, tested as per AS-
1530 Part 3 and BS-476 Part 4,5,6,7 & 8,
should be placed in the Grid module to form
a false ceiling. All complete as per drawing &
direction of Engineer - in- Charge. (Jointing
should be done by Elasto jointing compound
and top finished with putty as specified by
manufacturer.)

False ceiling with


(i) 4mm thick Pearl Designer Fibre Cement Sq.M. 479 479 479 479 479 479 479 479 479 479 479 495 479 479 479
Standard ceiling board.
(c) Supplying, fitting & fixing High Pressure
steam Cured Non Asbestos fibre cement
designer ceiling board (Density > 1300Kg per
Cu.M. ) of size595mm X595mm conforming
IS 14862 and type B, catagory III of ISO
8336, tested as per AS-1530 Part 3 and BS-
476 Part 4,5,6,7 & 8, should be placed in the
Grid module to form a false ceiling. All
complete as per drawing & direction of
Engineer - in- Charge. (Jointing should be
done by Elasto jointing compound and top
finished with putty as specified by
manufacturer.)

False ceiling with


(i) 4mm thick Fibre Cement Designer ceiling
board. Sq.M. 420 420 420 420 420 420 420 420 420 420 420 439 420 420 420
(ii) 6mm thick Fibre Cement Designer ceiling
board. Sq.M. 548 548 548 548 548 548 548 548 548 548 548 564 548 548 548
(d) Supplying, fitting & fixing OW Acoustic
Board (mineral Fibre Acoustic Ceiling Tiles)
of approved patern and size595mm X595mm
with NRC value > 0.65 should be placed in
the Grid module to form a false ceiling. All
complete as per drawing & direction of
Engineer - in- Charge.

False ceiling with

Page 242
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

(i) 15mm thick OW Acoustic Board/Tiles. Sq.M. 945 945 945 945 945 945 945 945 945 945 945 957 945 945 945
(e) Supplying ,fitting & fixing Eco-friendly,
Water Resistance and Incombustable
Calcium Silicate board/tiles (Density >900 Kg
per Cu.M.) of approved design and brand
finished with calcium silicate jointing
compound to form a joint less false ceiling.
All complete as per drawing & direction of
Engineer - in- Charge.
False ceiling with
(i) 6mm thick square edged Calcium Silicate Sq.M. 439 439 439 439 439 439 439 439 439 439 439 455 439 439 439
Board
(ii) 8mm thick square edged Calcium Silicate Sq.M. 533 533 533 533 533 533 533 533 533 533 533 554 533 533 533
Board
(f) Supplying ,fitting & fixing Eco-
friendly,Moisture Resistance and
Incombustable Gypsum plaster board (
Density > 700Kg per Cu.M.) confirming to IS
2095- Part 1, 2011 of approved design and
brand finished with gypsum jointing
compound to form a joint less false ceiling.
All complete as per drawing & direction of
Engineer - in- Charge.
False ceiling with
(i) 9.5mm thick tapered edged Gypsum Sq.M. 460 460 460 460 460 460 460 460 460 460 460 486 460 460 460
Plaster Board
(ii) 12.5mm thick tapered edged Gypsum Sq.M. 475 475 475 475 475 475 475 475 475 475 475 502 475 475 475
Plaster Board
(g) Supplying ,fitting & fixing Eco-friendly,
Heat Resistance and Incombustable
Gypsum plaster board ( Density > 700Kg per
Cu.M.) confirming to IS 2095- Part 1, 2011
of approved design and brand finished with
gypsum jointing compound to form a joint
less false ceiling. All complete as per
drawing & direction of Engineer - in- Charge.

False ceiling with


(i) 12.5mm thick tapered edged Heat Sq.M. 519 519 519 519 519 519 519 519 519 519 519 549 519 519 519
resistance Gypsum Plaster Board with
vapour control film

Page 243
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

22) Supplying and fitting in all places of wall


panelling to all heights and fixing on pre-
framed existing frame work grid with glass
wool of 50mm thick having density of 48 Kg
per cum. to be inserted into the pre -
fabricated slot covered the glass wool by
marking cloths treated with Naptha @ 0.07
Ltr.per Sq.M. of cloths. Finally 12.5mm thick
gypsum Fulton board having size
595mmX595mm fitted & fixed into the pre-
fabricated grid and covered the all perifirial
gaps of fulton board by self additive fibre
tape with necessary filler if required,
complete in all respect as per direction of the
Engineer-in-charge.
Sq.M. 1381 1381 1381 1381 1381 1381 1381 1381 1381 1381 1381 1419 1381 1381 1381
23) Providing and fixing exterior quality
Aluminium Composit Panel (ACP) wall
cladding on existing Al. /MS frame work with
GI brackets, ACP fixed on the existing frame
work by folding the edges of ACP panel (
Engraving the rear surface of ACP sheet)
with CP angles, cleats and strainless Steel
screws forming groves at the periphery of
ACP panel. Such grooves filled with foam
and silicon sealant etc. complete with all
materials ( but excluding the cost of silicon
sealant), labour, scaffolding and all other
incidental charges e.g. VAT, Labour cess etc
complete in all respect as per specification
and direction of Engineer-in-charge. ( Mode
of payment is on finished surface area of
ACP)
(a) 3mm thick (0.25mm Al.+2.5mm LDPE Sq.M. 2219 2219 2219 2219 2219 2219 2219 2219 2219 2219 2219 2287 2219 2219 2219
+0.25mm Al. PVDF coating )
(b) 4mm thick (0.50mm Al.+3.0mm LDPE Sq.M. 1133 1133 1133 1133 1133 1133 1133 1133 1133 1133 1133 1147 1133 1133 1133
+0.50mm Al. PVDF coating )

Page 244
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

24) Supplying,fitting & fixing of 2-Track / 3-Track


Aluminium sliding Window of all Aluminium
sections viz. window frame (top,bottom &
side frame), shutter (top, bottom, side &
interlock member) made of aluminium alloy
extrusions conforming to IS 733-1983 & IS
1285-1975, annodised conforming to IS 1868-
1983, fitted with all other accessories viz.
PVC roller, EPDM gasket, maruti lock,
screws etc. including labour charges for
fitting & fixing of aluminium 2-track/3-track
sliding window with fixing of glass (excluding
cost of glass) all complete as per
architectural drawings and direction of
Engineer-in-charge.
10-12 Micron thickness Annodizing film
Natural white
Kg. 494 494 494 494 494 494 494 494 494 494 494 505 494 494 494

For 2-Track window : Members for Bottom


frame @ 0.875 Kg per Mtr. and for Top and
Side frame @ 0.778 Kg per Mtr. and for
shutter Bottom and Top member @ 0.472 Kg
per Mtr., Style side member @ 0.493 Kg per
Mtr. and Interlock member @ 0.612 Kg per
Mtr.
For 3-Track window : Members for Bottom
frame @ 1.233 Kg per Mtr. and for Top and
Side frame @ 1.067 Kg per Mtr. and for
shutter Bottom and Top member @ 0.472 Kg
per Mtr., Style side member @ 0.493 Kg per
Mtr. and Interlock member @ 0.612 Kg per
Mtr.
[Note : for estimate purpose construction
wing may consider weight of 2-track
Aluminium window @ 5.5 Kg per
Sq.M.and 3-track Aluminium window @
6.5 Kg per Sq.M]

Page 245
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

25) Supplying, fitting & fixing of partly glazed


partly panelled or fully glazed single leaf
Aluminium swing door of all aluminium
sections viz door frame ( top and side
frame), shutter( top rail, bottom rail, lock rail,
door vertical) , glazing clip made of
Aluminium Alloy Extrusions conforming to IS:
733-1983 and IS: 1285-1975, annodized
conforming to IS:1868-1983, fitted with all
other accessories viz. EPDM gusket,cleat,
angle screws etc. including labour charges
for fitting and fixing of aluminium door with
door spring,/aluminium hinges, glass / Panel
board all complete as per architectural
drawings and direction of Engineer-in-
charge.
( Excluding cost of glass/ panel board, door
spring/ Al hinges, door closer, door stoper,
handle, tower bolt and locking arrangment
etc)
10-12 Micron thickness Annodizing film
Natural white
Kg. 430 430 430 430 430 430 430 430 430 430 430 441 430 430 430

(unit wt of to Top & side frame @1.366 kg/m


; top rail @ 1.296 kg/m; bottom rail @ 1.974
kg/m; lock rail @ 1.590 kg/m; door vertical @
1.412 kg/m; glazing clip @ 0.167 kg/m. )

[Note : for estimate purpose construction


wing may consider weight of Aluminium
door @ 9.0 Kg per Sq.M]

Page 246
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

26) Supplying, fitting & fixing of Aluminium fixed


partion wall of all aluminium sections viz top,
bottom and side member, intermediate
member , glazing clip made of Aluminium
Alloy Extrusions conforming to IS: 733-1983
and IS: 1285-1975, annodized conforming to
IS:1868-1983, fitted with all other
accessories viz. EPDM gusket,cleat, angle
screws etc. including labour charges for
fitting and fixing of aluminium fixed partition
wall with glass / panel board all complete as
per architectural drawings and direction of
Engineer-in-charge.
( Excluding cost of glass/ panel board,
10-12 Micron thickness Annodizing film.
Natural white.
a) for unsupported length of vertical member Kg. 436 436 436 436 436 436 436 436 436 436 436 448 436 436 436
upto 1.50m. height of both ends of vertical
member restrained but panel with in 0.90
sqm
(unit wt of Top, bottom & side member
@1.366 kg/m ; intermediate member @
1.443 kg/m; glazing clip: 0.167 kg/m
respectively)
[Note : for estimate purpose construction
wing may consider weight of Al-Sections
for Partition wall @ 5.7 Kg per Sq.M]

b) For unsupported length of vertical member Kg. 432 432 432 432 432 432 432 432 432 432 432 444 432 432 432
above 1.50m. height of both ends of vertical
member restrained but panel above 0.90
sqm
(unit wt of Top, bottom & side member @
1.978; intermediate member @ 2.055;
glazing clip @ 0.167 kg/m respectively)
[Note : for estimate purpose construction
wing may consider weight of Al-Sections
for Partition wall @ 5.0 Kg per Sq.M]

[Mode of Measurement:
for SL No. 24 to 26
Payment will be made on the basis of
actual weight of Aluminium Composit
section based on relevant specification]

Page 247
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

27) Supplying, Aluminium Grill with F channel


frame of approved make and brand having
ultimate tensile strength of 19 Kg/Sq.m. and
modulus of elasticity 7000 kg/ sq.m., with 15
micron anodising fitted & fixed with
necessary screws etc. complete as per
direction of Engineer-in-charge.

Grill made with 10 mm wide and 5.2 mm Sq.M. 1859 1859 1859 1859 1859 1859 1859 1859 1859 1859 1859 1948 1859 1859 1859
thick aluminium sheet having expansion
width of 66.00 mm and weight not less than
3.26 Kg/Sq.m.
28) Supplying profiles of required section made
of Aluminium Alloy Extrusion conforming to
IS: 732-1983 and IS: 1285-1975; Annodised
with required film thickness and specified
colour/natural matt finished conforming to IS:
1868-1983 for fabrication of Structural
Glazing, Curtain Wall formed of basic
sections of any ISI embossed/certified make
and brand as per direction of Engineer-in-
charge. ( Payment will be made on finished
length of the work).
15 micron colour annodizing
Structural glazing /Cartain Wall
i) Mulion & Transom (Weight @1.819 Kg per Sq.M. 552 552 552 552 552 552 552 552 552 552 552 573 552 552 552
Meter)
ii) Sub frame for fixing Glass (Weight @0.31 Sq.M. 97 97 97 97 97 97 97 97 97 97 97 100 97 97 97
Kg per Meter)
29) Supplying Glazing Silicon of approved make
and brand for fixing of Glass on Sub-frame
as per direction of Engineer-in-charge for

Structural Glazing/Curtain wall etc.


Glazing Silicon for fixing Glass on Sub frame Mtr. 133 133 133 133 133 133 133 133 133 133 133 133 133 133 133

30) Supplying Weather Silicon of approved make


and brand for fixing of grove line between the
Glasses as per direction of Engineer-in-
charge. for Structural Glazing/Curtain wall

Weather Silicon for filling the Grove line


between Glasses or any other material for
facial work

Page 248
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

Glazing Silicon for fixing Glass on Sub frame Mtr. 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68

31) Supplying profiles of required sections made


of aluminium alloy extrusion confirming to IS
732-1983 and IS 1285-1975 annodised with
required film thickness and specified colour /
natural mat finished conforming to IS 1868-
1983 for fabrication of structural glazing,
curtain wall formed of basic section of any ISI
embossed / certified make and brand as per
direction of Engineer-in-Charge. (Payement
will be made on finished length of the work).
for Structural glazing / curtain wall with 15
Micron Coloured Annodizing

(i) Fixing Plate (Wt. @ 0.515 Kg per Mtr.) Mtr. 139 139 139 139 139 139 139 139 139 139 139 144 139 139 139
(ii) Fixing cap (Wt. @ 0.342 Kg per Mtr.) Mtr. 92 92 92 92 92 92 92 92 92 92 92 96 92 92 92
32) Labour charge for fabrication and installation
of structural Glazing/Curtain Wall made from
annodized extruded allooy aluminium
sections for the following units:-

Structural Glazing made of extruded and


annodized alloy aluminium sections,
fabrications including cutting to proper shape
and size, drilling including cost of brackets,
fastener bolt, mullion bolt, nuts & washers,
maskin tape, double side adhesieve
crosslink foam (used for guard of glazed
silicon on sub-frame), tissue paper foam
(used as filler between sub-frame and under
backing of weather silicon), screws and other
necessary hardwares, fixing of glass as per
drawing, specification and direction of
Engineer-in-Charge. (The rate includes hire
charges of all tools and plants, including all
incidental charges, adhesieve, joiners such
as screw,cleate angle,etc. but excluded the
cost of extruded aluminium sections, glass,
glazed silicon, weather silicon etc.)

Sq.M. 881 881 881 881 881 881 881 881 881 881 881 881 881 881 881

Page 249
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

33) Supplying bubble free float glass of approved


make and brand conforming to IS: 2835-
1987;
(A) clear, toughened glass conforming to IS:
2553-1992 (part-II)
(i) 6mm thick Sq.M. 1142 1142 1142 1142 1142 1142 1142 1142 1142 1142 1142 1142 1142 1142 1142
(ii) 8mm thick Sq.M. 1779 1779 1779 1779 1779 1779 1779 1779 1779 1779 1779 1779 1779 1779 1779
(iii) 10mm thick Sq.M. 2224 2224 2224 2224 2224 2224 2224 2224 2224 2224 2224 2224 2224 2224 2224
(B) coloured, toughened glass conforming to
IS: 2553-1992 (part-II)
(i) 6mm thick Sq.M. 1281 1281 1281 1281 1281 1281 1281 1281 1281 1281 1281 1281 1281 1281 1281
(ii) 8mm thick Sq.M. 2064 2064 2064 2064 2064 2064 2064 2064 2064 2064 2064 2167 2064 2064 2064
(iii) 10mm thick Sq.M. 2580 2580 2580 2580 2580 2580 2580 2580 2580 2580 2580 2709 2580 2580 2580
34) Supplying, fitting & fixing Step edging made
of anodised Aluminium Alloy Extrusion
(weight @ 0.494 Kg per Mtr.) Conforming to
IS: 732-1983 and IS: 1285-1975, fixed to the
steps by strainless steel screws driven by
electric drill as per specification & direction of
Engineer-in-charge.

Mtr. 270 270 270 270 270 270 270 270 270 270 270 270 270 270 270
35) Taking out old damaged tarfelt from the roof,
parapet etc. preparing the roof surfaces by
removing all spoils, blisters, moss etc. from
the working site and disposal of the same
beyond the compound and cleaning the site
in all respect as per direction of Engineer-in-
Charge.

All floor Sq.M. 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13

Page 250
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

36) Preparation of drainage spout on roof for


bituminous waterproofing treatment after
required grading and shaping of the under
bed with Cement Concrete (1:2:4) or Cement
Mortar (1:4) as directed, Chamfering and
moulding the parapet wall to form a bell
mouth entry, if required and providing full
course treatment with bituminous felt to
facilitate quick and smooth drainage of watwr
into the down pipes complete including cost
of all materials and labour according to
satisfaction of the Engineer - in - Charge.
(This item shall be done for reparing
works only and shall not be used when
original/renewal of tarfelting work is
proposed to be undertaken)
All floor Each 114 114 114 114 114 114 114 114 114 114 114 114 114 114 114
37) Application of priming coat for standard
bituminous waterproofing treatment over flat
roof with Bitumen primer of approved brand
fufilling the provision of I.S. 1346 - 1991 &
3384 - 1986 applied @ 0.27 Liters /Sq.m.
over clean and prepared roof surface
complete as per satisfaction of the Engineer -
in - Charge.
All Floor - Sq.M. 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26
(This item shall not be applied over C.I. or
Asbestos roof)

Page 251
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

38) Supplying and laying standard four course


bituminous water proofing treatment as per
specification laid down in I.S. 1346 - 1991 to
be finished with pea size gravel including
necessary preparatory works such as
shaping mouth of outlets, cutting as and
where necessary and refilling with sand and
Cement mortar (4:1) or Cement Concrete
(1:2:4) with graded stone chips before
undertaking the treatment including cutting
grooves in parapet and inserting edge of felt
and mending good damage complete in all
respect as per direction of Engineer - in -
Charge including cost of all materials and
labours and incidental charges but excluding
the cost of Cement Mortar or concrete
required for levelling and grading. (In sloped
roof Course sand of approved varieties is to
be used in place of Pea size gravels as
fourth and final course.)

i) 1st and 3rd Course with bonding


materials of hot applied industrial blown type
bitumen of grade 85/25 or 90/15 conforming
to I.S.702 - 1988 @ 12Kg/10Sqm on each
layer.
ii) 2nd course with Hessian base self
finished bitumen type-3 Gr.-I conforming to
I.S. 1322-1993 (weighing 23kg/10Sqm gross
with bitumen content 12.10kg/10Sqm )
tested under the provision of I.S. 13826 -
1993 part VII
iii) 4th course with washed and clean pea
sized gravel or grit @ 0.006 cum/Sqm.

A. Over Flat Roof. Sq.M. 367 367 367 367 367 367 367 367 367 367 367 367 367 367 367
B. Over Sloped Roof. Sq.M. 364 353 352 352 355 354 353 352 354 354 354 359 353 353 355

Page 252
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

39) Supplying and laying standard six course


bituminous water proofing treatment as per
specification laid down in I.S. 1346 - 1991 to
be finished with pea size gravel including
necessary preparatory works such as
shaping mouth of outlets, cutting chase as
and where necessary and refilling with sand
and Cement mortar (4:1) or Cement
Concrete (4:2:1) with graded stone chips
before undertaking the treatment including
cutting grooves in parapet and inserting edge
of felt and mending good damage complete
in all respect as per direction of Engineer - in
- Charge including cost of all materials and
labours and incidental charges but excluding
the cost of Cement Mortar or concrete
required for levelling and grading. (In sloped
roof Course sand of approved varieties is to
be used in place of Pea size gravels as sixth
and final course.)

i) 1st, 3rd and 5th Course with bonding


materials of hot applied industrial blown type
bitumen of grade 85/25 or 90/15 conforming
to I.S.702 - 1988 @ 12Kg/10Sqm on each
course.
ii) 2nd and 4th course with Hessian base
self finished bitumen type-3 Gr.-I conforming
to I.S. 1322-1993 (weighing 23kg/10Sqm
gross with bitumen content 12.10kg/10Sqm )
tested under the provision of I.S. 13826 -
1993 part VII
iii) 6th course with washed and clean pea
sized gravel or grit @ 0.006 cum/Sqm.

A. Over Flat Roof. Sq.M. 574 574 574 574 574 574 574 574 574 574 574 574 574 574 574
B. Over Sloped Roof. Sq.M. 571 567 566 566 569 568 567 566 569 569 568 573 568 568 569
40) Supplying and stacking of good earth
(adequate for horticulture work) at site
including royalty (earth measured in stack
will be reduced by 20% for payment)

Cu.M. 309 309 309 309 309 309 309 309 309 309 309 309 309 309 309

Page 253
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

41) Supplying and stacking sludge (adequate for


Horticulture work) at site in dry cake form
from approved disposal work site including
royalty, all lead and lift etc. (Sludge
measured in stack will be reduced by 8%).

Cu.M. 462 462 462 462 462 462 462 462 462 462 462 462 462 462 462
42) Spreading of sludge, dump manure,/farm
yard manure/animel dung manure and good
earth in required thickness. This includes
supply of labour, tools & plants excluding
materials.
% Sq.M. 177 177 177 177 177 177 177 177 177 177 177 177 177 177 177
43) Supplying and fixing grasses tiles of grass
Maxican Carpet/Selection No. 1 Healthy &
fresh grasses (size 1'x1' or bigger) including
watering and maintenance of the lawn for 30
days or more till the grass forms a thick lawn
free from wees and fit for mowing including
supplying good earth as required by
Engineer-in-charge. (Rate includes supply of
labour, tools & plants including materials)

% Sq.M. 20343 20343 20343 20343 20343 20343 20343 20343 20343 20343 20343 20343 20343 20343 20343

44) Preparation of beds for hedging and


shrubbery by excavating 60cm deep and
trenching the excavated base to a further
depth of 30cm, refilling the excavated earth
after breaking clods and mixing with sludge
or manure in the ratio of 8:1 ( 8 parts of
stacked volume of earth after reduction by
20%, one part of stacked volume of sludge
or manure after reduction by 8%), flooding
with water, filling with earth if necessary
watering and finally fine dressing, levelling
etc., including stacking and disposal of
materials declared unserviceable and
surplus earth by spreading and levelling as
directed, within a lead of 50m lift upto 1.5m
complete. This includes supply of labour,
tools & plants including materials.

Planting hedge plants in two rows at 30cm % Sq.M. 3565 3565 3565 3565 3565 3565 3565 3565 3565 3565 3565 3565 3565 3565 3565
apart

Page 254
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

45) Maintenance of hedge for one year including


application of necessary presticide, farm yard
manure, replacement of damaged hedge
plant by new one complete in all respect as
per instruction of Engineer-in-charge. This
includes supply of labour, tools & plants
including materials.

% Sq.M. 11888 11888 11888 11888 11888 11888 11888 11888 11888 11888 11888 11888 11888 11888 11888
46) Planting of trees ( Avenue plants) in 0.60m
dia holea, 1m deep dug in the ground, mixing
the soil with decayed farm yard/sludge
manure. This includes supply of labour, tools
& plants including materials but excluding
cost of tree.
Each 118 118 118 118 118 118 118 118 118 118 118 118 118 118 118
47) Maintanance of trees for one year (Avenue
Plants) including watering, trimming,
manuring, spraying insecticide and guarding
as required. This includes supply of labour,
tools & plants including materials.

Each Per 482 482 482 482 482 482 482 482 482 482 482 482 482 482 482
Year
48) Supplying and Planting of different plant /
trees ( Supplying well grown plants bushy
and healthy, minimum height as specified i.e.
exposed height including all leads & lift,
carriage, handling, manuring, applying
presticide and fertilizer etc.
i) Furcaria veriegated 10-12 leaves in height Each 162 162 162 162 162 162 162 162 162 162 162 162 162 162 162
20-30cm in earthen pots of size 25cm.

ii) Rangon chineese of size not less than Each 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12


20cm
iii) Rangon chineese polythene pack Each 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
iv) Rangon hi-breed healthy plant. Each 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23

v) Duranta goldianna of size not less than Each 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15


20cm
vi) Duranta healthy plant of big size Each 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25

vii) Duranta poly pack Each 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6

Page 255
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

viii) China palm of leaves 4-5 in earthen pots Each 1893 1893 1893 1893 1893 1893 1893 1893 1893 1893 1893 1893 1893 1893 1893
size 25cm
ix) Ficus bengalensis (variegated) of height Each 185 185 185 185 185 185 185 185 185 185 185 185 185 185 185
60-75cm in earthen pots size 30cm

x) Ficus blakii ( F. Vivicon ) well branched ( Each 187 187 187 187 187 187 187 187 187 187 187 187 187 187 187
Bushy ) of height 120cm - 135 cm in earthen
pot of size 30cm.
xi) Ficus elastica Decora ( Rubber plant ) of Each 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69
height 90cm-60cm in each earthen pot of
size 25cm.
xii) Ficus infectoria (Pilikhan) of height Each 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61
135cm-150cm in big polybag of size 25cm-
30cm
xiii) Ficus regnold well branched (bushy) of Each 142 142 142 142 142 142 142 142 142 142 142 142 142 142 142
height 120cm-135cm in cement pots of size
35cm.

xiv) Acalypha species ( Red/Green) of height Each 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78


30cm-90cm in earthen pots of size 25cm.

xv) Acalypha species (Red/Green) of height Each 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52


30cm-90cm in earthen pots of size 20 cm.

xvi) Adenium obesum of height 90cm-60cm Each 207 207 207 207 207 207 207 207 207 207 207 207 207 207 207
in earthen pots of size 25cm.

xvii) Bougainvillea (mix variety) of height Each 39 39 39 39 39 39 39 39 39 39 39 39 39 39 39


30cm-90cm in polybag of size 10cm-15cm.

xviii) Bougainvillea (mix variety) of height Each 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8


30cm-90cm in earthen pots of size 20cm.

xix) Bougainvillea (name variety, bushy Each 103 103 103 103 103 103 103 103 103 103 103 103 103 103 103
plants, full bloom) of height 90cm-60cm in
cement pots of size 30cm.
xx) Croton (broad leaves) 3-5 branches of Each 148 148 148 148 148 148 148 148 148 148 148 148 148 148 148
height 90cm-120cm in cement pots of size
30cm.
xxi) Croton different varieties of height 30 cm Each 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110
to 90 cm in earthen pots of size 25cm.

Page 256
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

xxii) Croton different varieties of height 30 Each 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64


cm to 90 cm in earthen pots of size 20 cm.

xxiii) Hibiscus Rosa Sinensis of height 90 Each 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40


cm to 60 cm in earthen pots of size 20 cm.

xxiv) Hibiscus Rosa Sinensis of height 60 Each 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53


cm to 75 cm in earthen pots of size 35 cm.

xxv) Hibiscus Variegated of height 60 cm to Each 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65


75 cm in earthen pots of size 25 cm.

xxvi) Areca Palm 4 - 5 suckers of height 90 Each 127 127 127 127 127 127 127 127 127 127 127 127 127 127 127
cm to 105 cm in earthen pots of size 25 cm.

xxvii) Areca Palm 4 - 5 suckers of height Each 163 163 163 163 163 163 163 163 163 163 163 163 163 163 163
120 cm to 135 cm in earthen pots of size 25
cm.
xxviii) Dracaena (Mahatma) of height 30 cm Each 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51
to 90 cm in earthen pots of size 20 cm.

xxix) Dracaena (Song of India) of height 30 Each 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51


cm to 90 cm in earthen pots of size 20 cm.

xxx) Dracaena Fragrance of height 90 cm to Each 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75


60 cm in earthen pots of size 35 cm.
xxxi) Dracaena Green of height 30 cm to 90 Each 34 34 34 34 34 34 34 34 34 34 34 34 34 34 34
cm in earthen pots of size 20 cm.
xxxii) Dracaena Marginata of height 30 cm Each 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49
to 90 cm in earthen pots of size 20 cm.

xxxiii) Dracaena Reflexa of height 30 cm to Each 44 44 44 44 44 44 44 44 44 44 44 44 44 44 44


90 cm in earthen pots of size 20 cm.
xxxiv) Dracaena Rosea of height 30 cm to Each 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64
90 cm in earthen pots of size 20 cm.

xxxv) Dracaena Victoria of height 30 cm to Each 83 83 83 83 83 83 83 83 83 83 83 83 83 83 83


90 cm in earthen pots of size 25 cm.
xxxvi) Dracaena Wameckal of height 30 cm Each 46 46 46 46 46 46 46 46 46 46 46 46 46 46 46
to 90 cm in earthen pots of size 20 cm.

Page 257
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

xxxvii) Eranphemum Species of height 30 Each 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51


cm to 90 cm in earthen pots of size 20 cm.

xxxviii) Hibiscus Rosa sinensis of height 90 Each 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42


cm to 60 cm in earthen pots of size 20 cm.

49) Removal of mud/sludge/slurry/liquid earth


obtained during piling work from the working
site and disposal of the same beyond the
KMC/Municipal or any suitable area with
conformity of Municipal Corporation Rules
using tanker including loading and unloading
the same with pump, clearing the site
complete in all respect as per direction of the
Engineer-in-charge.
(a) For 900mm Pile Mtr. 25 25 25 25 25 25 25 25 25 25 25 25 25 25
(b) For 500mm Pile Mtr. 31 31 31 31 31 31 31 31 31 31 31 31 31 31
(c) For 600mm Pile Mtr. 44 44 44 44 44 44 44 44 44 44 44 44 44 44
50) Masonry work with precast Hollow Concrete
Block of size 300mm X 200mm X 150mm
and shell thickness 60mm (as per
specification of I S 2185 - Part I) with cement
mortar (6:1) complete in all respect as per
direction of Engineer-in-charge.

In Superstructure, Ground Floor. Cum. 5100 5060 - - 5100 - - - - - - - - - -


51) 100mm thick Masonry work with precast
Hollow Concrete Block of size 400mm X
100mm X 150mm and shell thickness 30mm
(as per specification of I S 2185 - Part I) with
cement mortar (4:1) complete in all respect
as per direction of Engineer-in-charge.

In Superstructure, Ground Floor. Sqm. 548 509 - - 548 - - - - - - - - - -

Page 258
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

52) supplying, fitting & fixing factory made foam


PVC (density shall not be less than 600
kg/cum) door frame (finished weight of 2.73
kg/mtr.) of size 100mm X 90mm made off
with 5mm thick extruded foam PVC sheet,
mitre cut at junction of horizontal and vertical
member and joined them by heat welding.
Entire door frame profiles to be reinforced
with steel primer coated 19 SWG 40mm X
20mm M.S. tube. An additional 5mm thick
PVC sheet with desire colour/shade to be
provided at the exposed surface and three
nos 5mm thick PVC sheet to be provided as
gap insert. The door frame to be fixed with
wall by using 8mm dia. and 100mm long
strainless steel screws and PVC fasteners. A
minimum of 4 nos. screws to be provided for
each vertical member & 2 nos. for horizontal
member. All complete as per direction of
Engineer-in-Charge.

(a) Plain Colour. Mtr. 606 606 606 606 606 606 606 606 606 606 606 606 606 606 606
(b) Pre-laminated Colour. Mtr. 661 661 661 661 661 661 661 661 661 661 661 661 661 661 661

Page 259
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

53) supplying, fitting & fixing factory made solid


panel foam PVC (density shall not be less
than 600 kg/cum) door shutter consisting of
19 SWG thick M.S. tube of size 40mm X
20mm for stiles and top, lock & bottom rail
and welded together to form outer framework
including a coat of approved make steel
primer. M.S. frame shall be covered with
5mm thick heat moulded PVC channel to
form 30mm X 100mm stiles and 5mm thick
PVC sheet on either side of panel to form
30mm X 125mm top, lock & bottom rail
where 15mm (5mm X 3) thick and 20mm
wide PVC sheet to be provide as gap insert
for top & bottom rail. For panel 10mm PVC
sheet to be fitted with stiles & rails with
30mm X 5mm PVC sheet beading on either
side of panel and additional 30mm PVC
beading as gap insert below top & bottom rail
on either side of panel joined together using
solvent cement adhesive. An additional 5mm
thick and 20mm wide PVC strip to be stuck
on the interior side of the PVC channel using
using solvent cement adhesive etc. complete
excluding all necessary hardwares as per
direction of Engineer-in-Charge. In Ground
floor.
30mm thick single leaf shutter with 10mm
thick panel.
(a) Plain Colour. Mtr. 3429 3429 3429 3429 3429 3429 3429 3429 3429 3429 3429 3429 3429 3429 3429
(b) Pre-laminated Colour. Mtr. 3698 3698 3698 3698 3698 3698 3698 3698 3698 3698 3698 3698 3698 3698 3698

Page 260
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

54 Providing Bored Cast-in-situ____________


grade R.C.C. pile in position as per
specifications in all kinds of soil including
cost of boring using drilling mud to stabilize
the bore and flushing the bore of excess mud
with freshly prepared drilling fluid by using
pumps prior to placing concrete by tremie
pipe in one continuous operation and
including the cost of all materials and labour
for placing of concrete and also including the
cost of mobilization and hire charges of all
equipment necessary for boring, welding of
reinforcement cage as necessary and
lowering of reinforcement cage, preparation
and placing of concrete, including the cost of
concrete but excluding the cost of
reinforcement and labour for bending binding
etc. complete as per Drawing and Technical
Specifications and removal of excavated
earth with all lifts and lead upto 1000 m.
Work to be executed as per IS: 2911 (Part II
Sec 2).

(a) Using hydraulic piling rig


i) Pile diameter - 300 mm. Mtr. 1708 1708 1708 1708 1708 1708 1708 1708 1708 1708 1708 1789 1708 1708 1708
ii) Pile diameter - 350 mm. Mtr. 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 1865 1781 1781 1781
iii) Pile diameter - 400 mm. Mtr. 1860 1860 1860 1860 1860 1860 1860 1860 1860 1860 1860 1948 1860 1860 1860
iv) Pile diameter - 450 mm. Mtr. 1946 1946 1946 1946 1946 1946 1946 1946 1946 1946 1946 2038 1946 1946 1946
v) Pile diameter - 500 mm. Mtr. 2040 2040 2040 2040 2040 2040 2040 2040 2040 2040 2040 2137 2040 2040 2040
vi) Pile diameter - 550 mm. Mtr. 2144 2144 2144 2144 2144 2144 2144 2144 2144 2144 2144 2245 2144 2144 2144
vii) Pile diameter - 600 mm. Mtr. 2259 2259 2259 2259 2259 2259 2259 2259 2259 2259 2259 2365 2259 2259 2259
viii) Pile diameter - 650 mm. Mtr. 2386 2386 2386 2386 2386 2386 2386 2386 2386 2386 2386 2499 2386 2386 2386
ix) Pile diameter - 700 mm. Mtr. 2529 2529 2529 2529 2529 2529 2529 2529 2529 2529 2529 2648 2529 2529 2529
(b) Using tripod, winches
i) Pile diameter - 300 mm. Mtr. 1708 1708 1708 1708 1708 1708 1708 1708 1708 1708 1708 1789 1708 1708 1708
ii) Pile diameter - 350 mm. Mtr. 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 1865 1781 1781 1781
iii) Pile diameter - 400 mm. Mtr. 1860 1860 1860 1860 1860 1860 1860 1860 1860 1860 1860 1948 1860 1860 1860
iv) Pile diameter - 450 mm. Mtr. 1946 1946 1946 1946 1946 1946 1946 1946 1946 1946 1946 2038 1946 1946 1946

Page 261
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

v) Pile diameter - 500 mm. Mtr. 2040 2040 2040 2040 2040 2040 2040 2040 2040 2040 2040 2137 2040 2040 2040
vi) Pile diameter - 550 mm. Mtr. 2144 2144 2144 2144 2144 2144 2144 2144 2144 2144 2144 2245 2144 2144 2144
vii) Pile diameter - 600 mm. Mtr. 2259 2259 2259 2259 2259 2259 2259 2259 2259 2259 2259 2365 2259 2259 2259
viii) Pile diameter - 650 mm. Mtr. 2386 2386 2386 2386 2386 2386 2386 2386 2386 2386 2386 2499 2386 2386 2386
ix) Pile diameter - 700 mm. Mtr. 2529 2529 2529 2529 2529 2529 2529 2529 2529 2529 2529 2648 2529 2529 2529
Note:
1. The rate provided is exclusive of cost of
concrete. Construction wing is to add cost of
concrete of desired grade for volume
corresponding to 1.0m length of pile length,
to arrive at the complete rate. Also the
desired crushing strength is to be mentioned
in the space provided in the description of
item. The Rate of providing the temporary
steel casing upto 3m depth is included.
2.To obtain the complete rate the
construction wing have to add cost of
concrete volume for 1m length of pile,
multiplied by a factor:[1+ { dummy length of
pile( max=1.5m) / Individual pile length}]
3. The cost of dismantling the length of the
pile above cut off level is to be paid
separately.

55 Driven Cast-in-place__________ grade


vertical R.C.C. pile of required diameter and
required length (length to be measured from
the bottom of raft / Pile Cap to the bottom of
shoe) including cost of all materials and
labour for casting, hoisting, driving etc. and
also including cost of dummy lengths of pile
and of hire charges of all instruments as
necessary but excluding reinforcement
complete as per drawing and & Technical
Specification.
i) Pile diameter - 450 mm. Mtr. 1177 1177 1177 1177 1177 1177 1177 1177 1177 1177 1177 1219 1177 1219 1177
ii) Pile diameter - 500 mm. Mtr. 1202 1202 1202 1202 1202 1202 1202 1202 1202 1202 1202 1245 1202 1245 1202
iii) Pile diameter - 550 mm. Mtr. 1229 1229 1229 1229 1229 1229 1229 1229 1229 1229 1229 1273 1229 1273 1229
iv) Pile diameter - 600 mm. Mtr. 1257 1257 1257 1257 1257 1257 1257 1257 1257 1257 1257 1302 1257 1302 1257
v) Pile diameter - 650 mm. Mtr. 1317 1317 1317 1317 1317 1317 1317 1317 1317 1317 1317 1364 1317 1364 1317
vi) Pile diameter - 700 mm. Mtr. 1348 1348 1348 1348 1348 1348 1348 1348 1348 1348 1348 1397 1348 1397 1348

Page 262
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

Note:
1. The rate provided is exclusive of cost of
concrete. Construction wing is to add cost of
concrete of desired grade for volume
corresponding to 1.0m length of pile length,
to arrive at the complete rate. Also the
desired crushing strength is to be mentioned
in the space provided in the description of
item. The Rate of providing the temporary
steel casing upto 3m depth is included.

2.To obtain the complete rate the Note:


1.The rate provided is exclusive of cost of
concrete. Construction wing is to add cost of
concrete of desired grade for volume
corresponding to 1.0m length of pile length,
to arrive at the complete rate. Also the
desired crushing strength is to be mentioned
in the space provided in the description of
item.
2. In case steel lining is included in the
design for driven cast in situ pile and is
planned to be retained, the same is to be
included in the rate analysis. In case the
temporary steel casing used during casting is
planned to be removed an additional cost of
0.5% of the cost of concrete is to be provided
to cover in usage.
3. The quantity of concrete required to be
removed above the designed top level of the
concrete, if any, is to be added in the rate
analysis.
4. The cost of dismantling the length of the
pile above cut off level is to be paid
separately.

Page 263
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)

Coochbehar excluding the area


Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub

Uttar/ Dakshin Dinajpur Dist.


Siliguri Sub Divn. & Area of
Darjeeling except plains of
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Siliguri Sub Divn.


Howrah/ Hoogly

of Haldibari PS

REMARKS
Medinipur (W)
Medinipur (E)

Murshidabad

Haldibari PS
Bardhaman

Birbhum

Bankura
Item

Purulia

Malda
Nadia
Description of Items Unit

Div
No.

Note:
1. Add extra over the rate of ground floor for
basement and each additional floor above
ground floor for item 4
(i) upto 4 th floor. = Rs.96/Cum
(ii) above 4 th floor =Rs. 117/cum

2.Add extra for basement and each


additional floor over the rate for ground floor
on item Nos. 1 & 50
(i) upto 4 th floor. = Rs.112/Cum
(ii) above 4 th floor =Rs. 134/cum

3.Add extra for each additional floor over the


rate for ground floor on items 2,3 &51.
(i) upto 4 th floor. = Rs.12/Sqm
(ii) above 4 th floor =Rs. 13/Sqm

4. (Add extra for each addl, floor over the


rate for item 5 & 6
(I) upto 4 th floor- Rs. 12/-per Sq.m
II) above 4th floor -Rs. 16/- per Sq.m

Page 264
SECTION II ---- MATERIALS AND LABOUR
1. Building ---- (A) Materials delivered and stacked at site
RATE(Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS

REMARKS
Siliguri Sub Divn.
Howrah/ Hoogly

Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Description of

Purulia

Malda
Nadia

Dist.
Sl. No.
Items Unit

1st Class Bricks (kiln


1. (a) 1000 Nos. 8500 7750 6500 6500 8500 8500 8500 7100 7750 7750 7750 10500 7750 7750 7750
burnt)
2nd Class Bricks
1. (b) 1000 Nos. 6050 5400 4250 4250 6050 5750 5750 4800 5600 5600 5500 7550 5400 5500 5600
(kiln burnt)
1st Class Picked
2. (a) 1000 Nos. 8400 7650 6050 6050 8450 8300 8300 6900 7650 7650 7650 10300 7650 7650 7650
Jhama Bricks
Flyash
(b) 1000 Nos. 5800 5500 5500 5500 5800 5700 5700 5500 5700 5500 5500
Bricks(Modular)
1 st Class Modular
(c) 1000 Nos. 5950 5950
Bricks
special class
(d) 1000 Nos. 6500 6500
modular bricks
3. (a) Jhama Bats 1 M3 1430 1060 960 1430 1250 1250 1060 1060 1060 1060 1000 1000
Jhama metal (kiln
(b) burnt) 50mm. to 1 M3 1750 1220 1220 1750 1500 1500 1220 1220 1500 1500 1500 1500
65mm.
4. 1st Class Bats 1 M3 1220 1000 900 900 1220 1170 1150 900 1000 1000 1050 2330 1050 1050 1050
5. Ordinary Bats 1 M3 850 700 700 700 850 850 800 700 750 730 750 1800 750 750 750
Sand coarse
6. (a) (Finenses moduls 1 M3 1150 550 450 450 900 670 600 450 800 800 700 1390 650 650 850
not less than 2)
Medium Sand
(b) (Finenses moduls 1 M3 950 400 350 350 700 550 400 350 700 650 600 1300 550 550 700
1.8 to 2)
(c) Fine Sand 1 M3 800 350 300 300 550 500 320 300 550 500 500 1150 430 430 400
(d) Silver Sand 1 M3 700 330 500 350 200 200 450 400 250 330 250 300
1st Class Raniganj
7. 1 Each 14 13 11 15 14 14 14 14 11 9 9 17 9 9 9
Pattern Tiles
8. Surki 1 M3 1430 1210 1045 1045 1430 1320 1310 1250 1250 1200 1155 1650 1250 1200 1200
9. Lime 1 M3 4900 4300 4300 4300 4900 4300 4300 4300 4300 4300 4300 5500 4300 4300 4300
Trap stone
10
Rajmahal
(a) Boulder 1 M3
(b) 40 mm. Size 1 M3 874
(c) 25 mm. Size 1 M3 928
(d) 20 mm. Size 1 M3 980
(e) 12 mm. Size 1 M3 928
(f) 10 mm. Size 1 M3 874
(g) 6 mm. Size 1 M3 848
Trap stone
11
Panchami Variety
(a) Boulder 1 M3
(b) 40 mm. Size 1 M3 1425
(c) 25 mm. Size 1 M3 1378
(d) 20 mm. Size 1 M3 1456
(e) 12 mm. Size 1 M3 1085
(f) 10 mm. Size 1 M3 1122
(g) 6 mm. Size 1 M3 999
SECTION II ---- MATERIALS AND LABOUR
1. Building ---- (A) Materials delivered and stacked at site
RATE(Rs.)

Darjeeling except plains of

plains of Siliguri Sub Divn.

Coochbehar excluding the


excluding area of Kalyani
/Area of Kalyani Sub Div
Kolkata / 24 Pgs (N & S)

Uttar/ Dakshin Dinajpur


& Area of Haldibari PS
Jalpaiguri,Alipurduar,

area of Haldibari PS

REMARKS
Siliguri Sub Divn.
Howrah/ Hoogly

Medinipur (W)
Medinipur (E)

Murshidabad
Bardhaman

Birbhum

Bankura

Sub Div
Description of

Purulia

Malda
Nadia

Dist.
Sl. No.
Items Unit

Trap stone Chandil


12
Variety
(a) Boulder 1 M3
(b) 40 mm. Size 1 M3
(c) 25 mm. Size 1 M3
(d) 20 mm. Size 1 M3
(e) 12 mm. Size 1 M3
(f) 10 mm. Size 1 M3
(g) 6 mm. Size 1 M3
Local Hard Black
Stone (Crusher
13 Broken) Midnapore
E, Midnapore W,
Bankura)
(a) 40 mm. Size 1 M3 1060 1008 933
(b) 25 mm. Size 1 M3 1114 1060 1008
(c) 20 mm. Size 1 M3 1220 1166 1092
(d) 12 mm. Size 1 M3 1086 1034 954
(e) 10 mm. Size 1 M3 874 768 742
(f) 6 mm. Size 1 M3 689 636 546
32 mm down graded
gravel (Midnapore E,
14 742 636 584
Midnapore W,
Bankura)
Damodarpur Gravel
15 1 M3
(Bankura)
Stone Metal 30 mm
16 down of N. Bengal 1 M3 1644 902 902 1008
variety
Stone Ballast 40 mm
17 down of N. Bengal 1 M3 1590 848 848 954
variety
Stone Boulder 150
18 mm of N. Bengal 1 M3 1272 584 584 848
variety
30 mm down graded
19 Shingles of N. 1 M3 1241 551 551 796
Bengal variety
Bazree (N. Bengal
20 1 M3 1484 626 690 902
variety)
Grit (N. Bengal
21 1326 530 530 742
variety)
Fly Ash
22 1000 Nos 6500 6000 6000 6000 6000 6000 6000 6500 6500 6000 6000
Bricks(Traditional)
PWD(WB)'s Modified Schedule of Rates;w.e.f 01.07.2014
SECTION II ---- MATERIALS AND LABOUR
(B) Labour Rates Per Diem
Sl. Description of Items Unit R A T E (Rs.)
No.

except plains

Jalpaiguri,Ali

Divn. & Area


Murshidabad

Haldibari PS
Coochbehar
Kalyani Sub

Kalyani Sub
Kolkata / 24
Pgs (N & S)

Siliguri Sub
Bardhaman

REMARKS
the area of
Darjeeling
Medinipur

Medinipur

Sub Divn.
excluding

excluding
of Siliguri

purduar,
plains of
Howrah/

Bankura

Dinajpur
Birbhum

Dakshin
/Area of

Hoogly

area of
Purulia

Malda
Nadia

Uttar/

Dist.
(W)
Div

Div
(E)
ZONE (A) (A) (B) (B) (A) (A) (A) (B) (B) (B) (B) (A) (A) (B) (B)

1) Mason (Head) Each 326 326 326 326 326 326 326 326 326 326 326 326 326 326 326
2) Mason (Ordinary) Each 296 296 296 296 296 296 296 296 296 296 296 296 296 296 296
3) Mazdoor (Male) Each 245 245 245 245 245 245 245 245 245 245 245 245 245 245 245
4) Mazdoor (Female) Each 245 245 245 245 245 245 245 245 245 245 245 245 245 245 245
5) Carpenter (Head) Each 326 326 326 326 326 326 326 326 326 326 326 326 326 326 326
6) Carpenter (Ordinary) Each 296 296 296 296 296 296 296 296 296 296 296 296 296 296 296
7) Carpenter (Helper) Each 270 270 270 270 270 270 270 270 270 270 270 270 270 270 270
8) Beater Women Each 270 270 270 270 270 270 270 270 270 270 270 270 270 270 270
9) Gharamee (Head) Each 326 326 326 326 326 326 326 326 326 326 326 326 326 326 326
10) Gharamee (Ordinary) Each 296 296 296 296 296 296 296 296 296 296 296 296 296 296 296
11) Bhistee Each 270 270 270 270 270 270 270 270 270 270 270 270 270 270 270
12) Stone Cutter Each 326 326 326 326 326 326 326 326 326 326 326 326 326 326 326
13) Santras Each 326 326 326 326 326 326 326 326 326 326 326 326 326 326 326
14) Blacksmith (Head) Each 326 326 326 326 326 326 326 326 326 326 326 326 326 326 326
15) Blacksmith (Ordinary) Each 296 296 296 296 296 296 296 296 296 296 296 296 296 296 296
16) Blacksmith (Helper) Each 270 270 270 270 270 270 270 270 270 270 270 270 270 270 270
17) Fitter Mechanic Each 326 326 326 326 326 326 326 326 326 326 326 326 326 326 326
18) Fitter Mechanic (Helper) Each 270 270 270 270 270 270 270 270 270 270 270 270 270 270 270

19) Hammer Man Each 270 270 270 270 270 270 270 270 270 270 270 270 270 270 270
20) Khalasi Each 245 245 245 245 245 245 245 245 245 245 245 245 245 245 245
21) Tarman Each 296 296 296 296 296 296 296 296 296 296 296 296 296 296 296
22) Painter Each 326 326 326 326 326 326 326 326 326 326 326 326 326 326 326
23) Spray Painter Each 326 326 326 326 326 326 326 326 326 326 326 326 326 326 326
24) Welder Each 326 326 326 326 326 326 326 326 326 326 326 326 326 326 326
25) Welder (Helper) Each 296 296 296 296 296 296 296 296 296 296 296 296 296 296 296
26) Rod Binder (Head) Each 326 326 326 326 326 326 326 326 326 326 326 326 326 326 326
27) Rod Binder (Ordinary) Each 296 296 296 296 296 296 296 296 296 296 296 296 296 296 296
28) Rod Binder (Helper) Each 270 245 245 245 245 245 245 245 245 245 245 245 245 245 245
29) Mosaic Mistry Each 326 326 326 326 326 326 326 326 326 326 326 326 326 326 326
Note :- (I)The above rates of labour are exclusive of 10% profit which would be admissible to the Contractors, but contractual percentage will not be applicable on the above rates.
(II) The workers employed on High Rise Building or any structure over 30 ft in height and also workers engaged in Tunnel workers shall be paid 20% as extra wages.
ANNEXURE-I
Table-1-1- ISSUE RATE OF CEMENT & STEEL MATERIALS

Item Descriptions of Issue Rate(Rs) (Supplied by Basic Price(Rs)


Unit Remarks
No. Items Department) (Supplied by Contractor)

1 2 3 South Bengal North Bengal South Bengal North Bengal 6

Cement:
PPC/PSC/ MT 8100 8320 7360 7560
OPC(33 Grade)
Cement:
8100 8320 7360 7560
OPC(43 Grade)

Cement: 1) Rates furnished in column-4 of item 1 &


1) MT 8320 8580 7560 7800 2 are the issue rates of materials at
OPC(53 Grade) Departmental Stackyard/Godown.

Steel Materials 2) For sub Items of Item 2 ,The Basic


i)Mild Steel Rods MT 53900 54900 49150 50240 Prices exclusive of Contractors Profit but
(Fe 250) inclusive of all Taxes & duties,are given in
2) Column-5.To arrive at complete rate in
case of Steel supplied by
ii) Tor Steel Contractor.Format B of Annexure -I is
Rods/HYSD/Fe MT 53900 54900 49150 50240 reffered.
415/Fe 500/Fe 500 D

3)The rate of items involving use of cement


3) Structural Steel MT 47000 supplied by the Contractor shall be
evaluated as per Format -A of Annexure-I

G.C.I Sheet(0.6 mm-


5.15 kg/sq.m; 0.63
4) mm - 5.34 kg/sq.m; MT 61360
0.8 mm - 6.69 kg/
sq.m)
ANNEXURE - I

FORMAT - A
(Format for analysis of rate of items involving use of Cement supplied by Contractor)

Step - 1 Rate of item as per relevant section of this Schedule Rs. A

Step - 2 Deduct cost of cement = (Quantity of cement) X (Issue rate of cement Rs. B
vide Item No. 1, Column - 4, Table - 1 - 1 of Annexure - I)

Note: The quantity of cement shall be as per Chart for Consumption of


Materials.

Step - 3 Add cost of cement supplied by Contractor including 10% Profit = Rs. C
1.1 X (Quantity of cement) X (Basic price of cement vide Item No. 1,
Column - 5, Table - 1 - 1 of Annexure-I)
Note: The quantity of cement shall be same as Step - 2.

Final Rate of Item = Rs. A - Rs.B + Rs. C = Rs. D


ANNEXURE - I

FORMAT - B

(Format for Analysis of Rate of reinforcing Steel supplied by Contractor)

Step - 1 Rate of item as per relevant section of this Schedule Rs. A

Step - 2 Deduct Issue Rate (Per MT) of respective Quality Steel X 1.05 Rs. B

Step - 3 Add Basic Price at outlet of Steel of respective quality X 1.05 Rs. C

Step - 4 Add Contractor's Profit @ 10% on cost of Steel only (Sl. No. 3) Rs. D

Step - 5 Add cost of Carriage from outlet to site with necessary loading, Rs. E
unloading and stacking charges for 1.05 MT Steel

Final Rate of Item = [Rs. A - Rs.B + Rs.C + Rs.D + Rs.E] = Rs.


ANNEXURE - II
FORMAT - A
(Format for Rate Analysis of Cement Concrete items)

Step - 1 Rate of item as per relevant section of this Schedule Rs. A

Step - 2 Add cost of stone aggregate of different grading as per consumption required for one cum of concrete.
( As per table:T-1)

20mm Nominal Size: Rs. B


10mm Nominal Size:

Step - 3 Add cost of carriage of stone aggregate as per consumption required for one cum of concrete.
( As per table:T-2)

20mm Nominal Size: Rs. C


10mm Nominal Size:

Step - 4 Add cost for loading and unloading of stone aggregate Rs. D
( As per table:T-3)

Final Rate of Item = [Rs. A - Rs.B + Rs.C + Rs.D] = Rs.

Note:
1. Cost of stone aggregate of different grading to be obtained from Table T-1 by considering rate of the nearest railway stack
yard.
2. Cost of carriage of stone aggregate to be obtained from Table: T-2 by considering the actual distance from the nearest
railway stack yard to the working site.
3. Cost for loading and unloading of stone aggregate to be obtained from Table:T-3

4. ANNEXURE – II is applicable for It. No. 5(a), 6(a)(i) to 6(e)(i), 7(a), 9(A)(a) to 9(A)(e) & 9(B)(a) to 9(B)(e) of Chapter –
C only.
P.W.D(WB) Schedule of Rates 2014 Vol-I

(TABLE :T-1)
RATES OF PAKUR VARIETY STONE AGGREGATES AT DIFFERENT RAILWAY YARDS

Aggregat
Boulder

Stone
Hand broken

es
Machine made Stone Chips Stone Screening Graded Aggregates
Aggregates

aggregates

aggregates

Stone dust
Grade - II

Stone grit
Grade - I

37.5 mm

40 mm

20 mm

10 mm
Name of
30 / 45 kg

Railway Unit

26.5 mm

22.4 mm

13.2 mm

11.2 mm

Type - A

Type - B
5.6 mm
Yards

(53 - 22.4

Nominal

Nominal

Nominal
45mm)

mm)
(63 -

size

size

size
Adrajn. Cum 1193 1401 1424 1419 1482 1497 1521 1376 1110 1013 989 1196 992 1473 1463 1296

Andal Cum 966 1174 1197 1192 1255 1270 1294 1149 883 786 762 969 765 1246 1236 1069

Asansol Cum 1024 1232 1255 1250 1313 1328 1352 1207 941 844 820 1027 823 1304 1294 1127

Ballyganj Cum 1250 1458 1481 1476 1539 1554 1578 1433 1167 1070 1046 1253 1049 1530 1520 1353

Bankura Jn. Cum 1304 1512 1535 1530 1593 1608 1632 1487 1221 1124 1100 1307 1103 1584 1574 1407

Bandel Jn. Cum 1135 1343 1366 1361 1424 1439 1463 1318 1052 955 931 1138 934 1415 1405 1238

Barasat Cum 1250 1458 1481 1476 1539 1554 1578 1433 1167 1070 1046 1253 1049 1530 1520 1353

Barrackpur Cum 1193 1401 1424 1419 1482 1497 1521 1376 1110 1013 989 1196 992 1473 1463 1296

Baripurjn. Cum 1304 1512 1535 1530 1593 1608 1632 1487 1221 1124 1100 1307 1103 1584 1574 1407

Berhampur
Cum 1473 1681 1704 1699 1762 1777 1801 1656 1390 1293 1269 1476 1272 1753 1743 1576
Court

Bishnupur Cum 1360 1568 1591 1586 1649 1664 1688 1543 1277 1180 1156 1363 1159 1640 1630 1463

Bongaon Cum 1304 1512 1535 1530 1593 1608 1632 1487 1221 1124 1100 1307 1103 1584 1574 1407

Burdwan In. Cum 966 1174 1197 1192 1255 1270 1294 1149 883 786 762 969 765 1246 1236 1069

Page 1
P.W.D(WB) Schedule of Rates 2014 Vol-I

Aggregat
Boulder

Stone
Hand broken

es
Machine made Stone Chips Stone Screening Graded Aggregates
Aggregates

aggregates

aggregates

Stone dust
Grade - II

Stone grit
Grade - I

37.5 mm

40 mm

20 mm

10 mm
Name of

30 / 45 kg
Railway Unit

26.5 mm

22.4 mm

13.2 mm

11.2 mm

Type - A

Type - B
5.6 mm
Yards

(53 - 22.4

Nominal

Nominal

Nominal
45mm)

mm)
(63 -

size

size

size
Chandrakona
Cum 1587 1795 1818 1813 1876 1891 1915 1770 1504 1407 1383 1590 1386 1867 1857 1690
Road

Contai roads Cum 1587 1795 1818 1813 1876 1891 1915 1770 1504 1407 1383 1590 1386 1867 1857 1690

Dalkhola Cum 1024 1232 1255 1250 1313 1328 1352 1207 941 844 820 1027 823 1304 1294 1127

Dankuni Cum 1135 1343 1366 1361 1424 1439 1463 1318 1052 955 931 1138 934 1415 1405 1238

Dhupguri Cum 1416 1624 1647 1642 1705 1720 1744 1599 1333 1236 1212 1419 1215 1696 1686 1519

Durgapur Cum 966 1174 1197 1192 1255 1270 1294 1149 883 786 762 969 765 1246 1236 1069

Falakata Cum 1473 1681 1704 1699 1762 1777 1801 1656 1390 1293 1269 1476 1272 1753 1743 1576

Haldia Cum 1530 1738 1761 1756 1819 1834 1858 1713 1447 1350 1326 1533 1329 1810 1800 1633

Jhargram Cum 1587 1795 1818 1813 1876 1891 1915 1770 1504 1407 1383 1590 1386 1867 1857 1690

Kalyani Cum 1193 1401 1424 1419 1482 1497 1521 1376 1110 1013 989 1196 992 1473 1463 1296

Kharagpur Jn. Cum 1473 1681 1704 1699 1762 1777 1801 1656 1390 1293 1269 1476 1272 1753 1743 1576

Krishnanagar
Cum 1304 1512 1535 1530 1593 1608 1632 1487 1221 1124 1100 1307 1103 1584 1574 1407
City

Maldah Town Cum 795 1003 1026 1021 1084 1099 1123 978 712 615 591 798 594 1075 1065 898

Midnapore Cum 1530 1738 1761 1756 1819 1834 1858 1713 1447 1350 1326 1533 1329 1810 1800 1633

New Farakka Cum 795 1003 1026 1021 1084 1099 1123 978 712 615 591 798 594 1075 1065 898

Page 2
P.W.D(WB) Schedule of Rates 2014 Vol-I

Aggregat
Boulder

Stone
Hand broken

es
Machine made Stone Chips Stone Screening Graded Aggregates
Aggregates

aggregates

aggregates

Stone dust
Grade - II

Stone grit
Grade - I

37.5 mm

40 mm

20 mm

10 mm
Name of

30 / 45 kg
Railway Unit

26.5 mm

22.4 mm

13.2 mm

11.2 mm

Type - A

Type - B
5.6 mm
Yards

(53 - 22.4

Nominal

Nominal

Nominal
45mm)

mm)
(63 -

size

size

size
New Alipore Cum 1250 1458 1481 1476 1539 1554 1578 1433 1167 1070 1046 1253 1049 1530 1520 1353

New
Cum 1587 1795 1818 1813 1876 1891 1915 1770 1504 1407 1383 1590 1386 1867 1857 1690
Alipurduar
New
Cum 1587 1795 1818 1813 1876 1891 1915 1770 1504 1407 1383 1590 1386 1867 1857 1690
Coochbehar

New Jalpaiguri Cum 1304 1512 1535 1530 1593 1608 1632 1487 1221 1124 1100 1307 1103 1584 1574 1407

Panskura Cum 1360 1568 1591 1586 1649 1664 1688 1543 1277 1180 1156 1363 1159 1640 1630 1463

Purulia Cum 1078 1286 1309 1304 1367 1382 1406 1261 995 898 874 1081 877 1358 1348 1181

Raniganj Cum 966 1174 1197 1192 1255 1270 1294 1149 883 786 762 969 765 1246 1236 1069

Sainthia Cum 795 1003 1026 1021 1084 1099 1123 978 712 615 591 798 594 1075 1065 898

Salimar Cum 1250 1458 1481 1476 1539 1554 1578 1433 1167 1070 1046 1253 1049 1530 1520 1353

Sealdah Cum 1250 1458 1481 1476 1539 1554 1578 1433 1167 1070 1046 1253 1049 1530 1520 1353

Serampore Cum 1193 1401 1424 1419 1482 1497 1521 1376 1110 1013 989 1196 992 1473 1463 1296

Suri Cum 795 1003 1026 1021 1084 1099 1123 978 712 615 591 798 594 1075 1065 898

Tarakeswar Cum 1416 1624 1647 1642 1705 1720 1744 1599 1333 1236 1212 1419 1215 1696 1686 1519

Tamluk Cum 1135 1343 1366 1361 1424 1439 1463 1318 1052 955 931 1138 934 1415 1405 1238

Page 3
(TABLE :T-3)
Rate for loading & unloading of Stone Aggregate

All districts of
West Bengal and
Item Darjeeling
Description of Items Unit Unit Darjeeling Plain of Remarks
No. Hill Area
Siliguri Sub-
Division

Loading & unloading by manual


means

Loading into trucks at the lifting point,


unloading at destination, stacking
1
properly in go downs or yard etc. as
directed including carriage by head
load up to a lead of 50.00 m at each of
the two points.

Stone Aggregate below 40 mm


a) nominal size Cum 58.00 58.00

Stone Aggregate above 40 mm


b) nominal size Cum 62.00 62.00
(TABLE :T-2)
Road Transportation & Carriage Works
Any distance Up to 5 km Above Above Above Above Above
5 km 10 km 20 km 50 km 100 km
Description of

Zone
Item No. Unit up to up to up to up to
Items
10 km 20 km 50 km 100 km
(per km) (per km) (per km) (per km) (per km)

1.
All district except hill
124.00 10.90 10.10 9.50 8.40 7.90
area of Darjeeling
Carriage of Stone
Cum
Aggregate
Hill area of
185.00 16.40 15.20 14.30 12.60 11.90
Darjeeling
VOLUME – II
for
SANITARY & PLUMBING WORKS
INDEX
SUBJECT PAGE

GENERAL CONDITIONS ---- i-iv

GENERAL SPECIFICATIOS v-vii

(A) Execution ----

(B) Mode of Measurement ----

(C) Suggested Brand Names ----

SECTION (A) : Plumbing Works

I. Ferrule and Ferrule Connection (Original & Repair Works) ---- 1---1

II. G. I. Pipe Works and Its Fittings (Original & Repair Works) ---- 1--22

III. Cisterns, G. I. Tanks with Parts (Original & Repair Works) ---- 1--5

IV. Basins and sinks with Parts (Original & Repair Works) ---- 1--8

V. Tube-well (Original & Repair Works) ---- 1--9

SECTION (B) : Sanitary and Drainage Works

I. Hydrants and Allied Works (Original & Repair Works) ---- 1--2

II. Soil-pipe and Fittings (Original & Repair Works) ---- 1--17

III. Water Closets and Urinals (Original & Repair Works) ---- 1--6

IV. Inspection Pit, Septic Tank, Soak Pit etc. (Original & Repair Works) ----

A Inspection Pit-Part-I ---- 1--2

B Inspection Pit-Part-II ---- 1--4

SECTION (C) : Materials and Labour etc.

I. Miscellaneous ---- 1--5


II. Cost of Materials ---- 1--11
III. Wages to Various Labourers ----
IV. Selection of pipe diameter ----
V. Drawing of Septic Tank ----

ANNEXURE-I
I. Table - 1.1 ----

II. FORMAT - A ----

III. FORMAT - B ----

IV. Useful Table ----


GENERAL CONDITIONS

1. If in connection with Sanitary & Plumbing Works etc. any item or items of work relating
to Building works, Road works and Carriage crop up, the contactor shall if so directed,
have to execute such items. In respect of such items the Schedule of Rates for Building
Works, Road Works and Carriage for the Current year including general conditions,
general specifications etc. operative in the area will be applicable and the contractual
percentage will be applicable in respect of such works as well.

2. If not specifically indicated in the items themselves, the rates appearing in this schedule
are inclusive of cost of all supply, carriage, handling, fitting, fixing sales tax, royalty,
VAT, toll taxes, ferry charges etc. and all other incidental works involved in any floor, at
any level including all necessary jointing materials, scaffolding to any height, hire
charges of tools and plants, and all helping materials.

3. To arrive at complete rate of different items in this Schedule, 5% Overhead, 10%


Contractors Profit and 1% Labour Welfare Cess has been considered besides Material
cost, Labour Cost and other cost involved to execute the item. All cutting holes, chases,
trenches etc. at any place necessary in connection with works as per items in this
schedule and subsequent mending damage as per original specification and as directed
are included in the rates and shall not be paid extra unless otherwise expressly specified.

4. The issue of Departmental materials, if any required for the work will be at the rates and
under the terms and conditions as stipulated in the General Conditions and General
Specifications embodied in the Schedule of Rates for Building works, Materials and
Labour for the current year operative in the area.

(i) Cement: -

Issue Rate and Basic Price of Cement are shown in Table – 1.1 of Annexure – I.
All cement related item rates depicted in this Schedule are derived considering
the fact that Cement will be supplied by the Department at Issue Rate.

If Cement is supplied by the Contractor, then item rates are to be deduced as per
Format – A of Annexure – I.

PPC / PSC Cement is considered for Cement related items.

(ii) Reinforcing Steel:-

Issue rate and Basic Price of Reinforcing Steel is shown in Table – 1.1 of
Annexure – I. All item rates related to Reinforcing Steel are derived considering
the fact that Reinforcing Steel will be supplied by the Department. If Reinforcing
steel is supplied by the Contractor, then item rates are to be deduced as per
Format – B of Annexure – I.

Cut pieces of Reinforcing Steel materials left surplus on completion of work shall
not be taken back if the same be considered as unsuitable for utilization in other
works.

i
5. The contractor shall be responsible for the safe custody and proper maintenance in
original condition of all sanitary and plumbing works till all works are completed and
formally handed over to the Department.

6. Renewal works include dismantling and taking out old work, mending good damage
after renewal and removal of the waste materials. The rate for any item of original nature
not provided in this Schedule may be deduced from the rate of similar item of renewal
work by multiplying by a factor 100/105 and conversely the rate of any items of renewal
nature not provided in this schedule may be deduced from the rate of similar item of
original nature by multiplying by a factor 105/100.

7. Where renewals are involved, indigenous materials shall be used without exception even
if this means changing the type. In cases of exceptional areas viz. operation theaters,
chemical laboratories etc., prior approval of the Engineer-in-Charge for using non-
indigenous materials is to be obtained. In such case, due care and scrutiny should be
exercised for selection of type before acceptance and payment.

8. Before application of rate, quantities of all items with metric unit must be calculated with
correction 2 places of decimal when the rate is up to Rs. 100.00 and 3 places of decimal
when the rate is above Rs. 100.00.

9. If not mentioned otherwise in the items themselves, all materials including fitting shall
conform to standard laid down by the Bureau of Indian Standards and bear I.S.I. mark
where such standardization has been made. All other materials must be of best quality
conforming to the standard laid down by the I.S.I. and being approved by the Engineer-
in-Charge. Under very special circumstances materials standardized by B.I.S. with I.S.I.
mark but not bearing I.S.I. mark may be accepted with prior approval of Engineer-in-
Charge with reduction by 20%.

10. Unless otherwise specifically mentioned in the items of this Schedule, all G.I. Pipes are
to be normally of TATA make, all sanitary wares should be of Parry ware, Hindware,
Neycer, C.E.R.A. (1st Quality) or should bear I.S.I. certification marks.

11. For works within the perimeter of Jail where works are permitted within the restricted
hours only, extra rate @ 10% in respect of all items of the schedule will be allowed.

12. Extra rates for difficult / reverine areas in respect of all items of this schedule will be
allowed as follows :

(a) In riverine areas connected by the river route and / or ferry crossing under:

(i) 15% Extra for Hsnabd, Bhangore P.S.

(ii) 15% Extra for Haroa, Canning Kultali, Namkhana & Kakdwip P.S.

(iii) 22.5% Extra for Gosaba, Basanti, Manakhan Sandeskhali & Hingalganj P.S.

(iv) 30% Extra for Pathar Pratima & Sagar P.S.

ii
(b) 10% Extra for all areas under Kakdwip PWD Sub-Division excluding the
jurisdiction of Kakdwaip P.S. in reverine areas connected by River Route and or
ferry crossing.

(c) For N.C.N.B.C.C.-I/II :


The rates of items that include supply of bricks/brick materials are to be enhanced
for works within Mathabhanga Civil Sub-Division and Mekhliganj Civil Sub-
Division as under:

1. Item requiring bricks @ Rs. 200.00 per 1000 bricks required.

2. Item requiring brick materials @ Rs. 100.00 per m3 of brick materials


required.

The Rates of items of work that include supply of stone materials in the “Cooch
Behar District exdcluding the area under Haldibari Police Station” are to be
enhanced by (i) 10% for works within Mathabhanga (Civil) Sub-Division and (ii)
5% for works within Dinhata (Civil) Sub Division. The said rates in the
Jalpaiguri Dist. are to be enhanced by 10% for works within area of Haldibari
Police Station.

(d) i) Rates of items except Section (B)(iv) ( Item 1 to 6) and items involving labour
only in Section (A) to (C) are to be enhanced by 10% for Darjeeling except
plains of Siliguri Sub Division.

In addition to above extra rate following enhancement will be applicable for all
items except items involving labour only:

ii) 20% for works in the following places : (a) Hill area of Garubathan Block
(b) Kalimpong Municipal area (c) Dow Hill area of Kurseong Sub Division (d)
Miric P.S. (e) Section from Mane Bhanjan to Phalut of Simana Sandakphu Phalut
road (f) Section from Peshoke Khola to Lopchu Tea Garden of S.H.No. 12(g)
Within 10 Km from Mongpu under Takda Block (h) Ghoom Tiger Hill Road (i)
Section Pankhabari Bazar to the starting of Kurseong Municipal Road of
Garidhura-Kurseong Road (j) Kalimpong Block I/II and Mongpo & Tagda
Block.

iii) 20% for works in the following places : Darjeeling Municipal area (b) Kurseong
Municipal area (excluding Dow Hill area) (c) Rangit (d) Health Centers at
Singritam, Pokhriabong, Lodhama, Takling, Gitdabling, Samathahar, Samolbong
& Stittong.

(e) The rates under sections stated above are to be enhanced by 15% for works in
Buxa Hills.

(f) The rates for all types of concrete works, Masonry works (except Dry Rubble
Masonry and allied works) and plastering etc. in the Hills of Darjeeling District
have been arrived at with cost of Balas on variety of stone aggregates and sand.
If any work is done with local approved stone aggregates/sand the rate of the item

iii
will be reduced by 15% such reduction will however, be 5% if Teesta variety
materials are used.

(g) The rates for all types of concrete works, Masonry works and sand cement
plastering in the District of Uttar Dinajpur and Dakshin Dinajpur have been
arrived at with the consideration that Bansloi sand (Murarai variety) shall be used
in all such works. If any work is done with local sand with the approved of the
Executive Engineer, the rate of the item shall be reduced accordingly on the basis
of difference of cost of Bansloi sand and local sand. All cement works in the
District of Uttar Dinajpur and Dakshin Dinajpur shall be done with stone chips of
Pakur variety when no specific mention is made in the description of item.

(h) For W.C.-I

The Schedule of Rates will be enhanced due to various circumstances is


mentioned below :

1. By 5% (five) for works carried out with civil Sub-Divisional Jurisdiction of


Kalna, Durgapur and Bolepur Sub ivision.

2. By 10% (Ten) for works done within the Hills region of Ajodhya in the District
of Purulia (a region will be treated hills in the altitude is more than 200 Meters
from the level of any adjoining area within 10 Km.

3. All the rates appearing in the schedule excepting those which are specifically
mentioned in the schedule are rates valid for Burdwan Division. Extra over
ratres for other division will be added by percentage as mentioned below from the
basic rates.
(a) Asansole Division - 2% (Two)
(b) Birbhum Division- 5% (Five)
(c) Purulia Division- 7% (Seven)

(i) (For W.C. II :

Extra rates will be allowed as follows:

Khanakul block No. I & II)- 5% extra.

(j) In case of any ambiguity or dispute in any matter arising out of this schedule,
Superintending Engineer’s decision will be final.

iv
GENERAL SPECIFICATION
(Including Mode of Measurement)

A. EXECUTION

General - All works shall be carried out in proper manner. Items of works not covered by the
following shall be carried out as per direction of the Engineer-in-Charge and to his
satisfaction. Unless otherwise specified in this Section or in the description of item
the cost of all stages of works mentioned hereunder shall be deemed to have been
included in the rates of items provided in the Schedule.

1. G.I. Tank :

Before acceptance of any G.I. Tank, proper scrutiny as to the thickness of the
sheets should be made. Due check should also be made on each face of the tank by
punching holes to be subsequently mended and hermetically sealed by the
contractor without any extra charge being paid on this account by Department.
Thickness of M.S. Sheet is exclusive of galvanizing.

2. Flushing Cistern :

Flushing Cistern of I.P.W.C. & E.P.W.C. will be 10 litre pull and let low down
cistern types as specified. Flush pipes for urinals shall be made of G.I. Pipes of
Polythene pipes with fittings or lead pipes as may be directed by the Engineer-in-
Charge. Flushing cistern of urinals shall be of approve type. All flush pipes and
cisterns shall have to be painted with 2 coats of paint of approved shade and brand
over a coat of approved primer. The inlets of sanitary fittings and equipments to be
connected with the adjacent distribution line (water supply) with requisite lengths
and size of P.V.C. connection pipe is to be provided with necessary unions at both
ends within the quoted rates of respective items. Cost of these P.V.C. connection
pipe will be paid separately.

3. Fittings for G.I. Pipes :

All G.I. Fittings will be of approved make. For installation of G.I. pipe line all
fittings and specials as may be necessary shall have to be fitted and fixed to the
line.

4. Joints :

The joints of pipes, fitting & accessories shall be made as specified and unless
otherwise specified, no separate payment shall be allowed.

(i) G.I. Pipes fitting, valves and cocks with jute and white lead paint.

(ii) C.I. Soil pipes & fittings: The jointing shall have to be done by either of
the two methods as specified :
v
(a) The half of the depth of the annular space between spigot and socket shall be
packed with spun yarn and the remaining half to be filled up with molten lead well
caulked with caulking tools.

(b) The half of the depth of the annular space between spigot and socket shall be
packed with tarred gasket and the remaining half will be filled up three quarters
with valamoid and the top quarter with cement mortar (4:1) and shall shall be
finished beveled at 45o.

(i) Stone Ware Pipes & Fittings : The half of the depth of the annular space
between socket and spigot shall be packed with tarred gasket and the
remaining half shall be filled up with Cement mortar (3:1) & shall be
finished beveled at 45o.

(ii) C.I.. Water mainline: The jointing shall have to be done with Tyton joints
as per manufacture’s specifications.

5. Test of pipe lines valves and cocks :


The pipe lines, valves and cocks shall be tested at the contractor’s expenses for which no
extra payment shall be allowed. The available water supply sources may however be
allowed to be utilized for testing but in absence of any such arrangement the contractor
shall have to conduct the following tests.

(i) C.I. Water main pipe line : The pipe shall have to be tested at least for
designed working pressure.

(ii) C.I. soil pipe line : Smoke test.

(iii) S.W. Pipe line : All sections between two inspection pits shall have to be
tested separately. The funnel shall be at least 1.3 meter above the soffit of
the S.W. pipe at the upper inspection pit.

Any defect or defects detected during testing shall be rectified at the contractor’s
expenses.

6. Septic Tank :

Construction of septic tank shall be done as per approved design. After completion of
the tank, the tank shall have to be filled up with clear water after removing any foreign
materials from the inside of the tank, if any. No separate payment shall be allowed on
this account.

7. Painting :

All pipes (G.I., C.I. water main and soil) and fittings shall have to be painted outside
with two coats of paint of approved brand and shade.

vi
B. MODE OF MEASUREMENT

1. G.I., C.I. Water main & Soil, S.W. Pipe line:

All the pipe lines shall be measured in fitted condition along the central line of the
exposed surface.

2. Strainer:
The strainer as used in the Tube-Well shall be measured in fitted condition along the
central line of the exposed surface.

3. Boring of Tube-Well:
Boring for tube-wells always shall have to be done by the contractor’s pipe. In no case Deptt.
pipes or the pipes which will be actually lowered shall be used for the purpose of boring.
Labour rate of boring is inclusive of hire charge of boring pipes. Generally measurement of the
boring will be taken on the basis of the finished length of the tubewell from the ground line. If
for some special reasons, boring depth is required to be more than the finished length of the
tube-well, previous permission of Engineer-ion-Charge is to be taken to get the payment of extra
boring in excess of the finished length.

vii
SECTION (A) - PLUMBING WORKS PWD SOR Vol-II wef-01.07.2014
(A)-(I) FERRULE AND FERRULE CONNECTION

Item No. Description of Item Unit All Districts of


West Bengal

(a) Original Works

1 Supplying,fitting and fixing brass ferrule including connection with G.I.


pipes of TATA make of following dia. and upto 450 mm long with
screw,jamnut,sockets etc.,complete in all respect, including cutting
trenches in all sorts of soil and filling up the trenches as per direction of
the Engineer - in - Charge.

(i) 25 mm dia. Each 2185.00

(ii) 20 mm dia. Each 1494.00

(iii) 15 mm dia. Each 1102.00

(iv) 10 mm dia. Each 1076.00

2 Supplying, fitting and fixing brass ferrule including connection with P.V.C.
pipe of approved make upto 450 mm long with plumbing joint,brass over
C.P. coupling at both ends, with cap and lining complete in all respect,
including cutting trenches in all sorts of soil and filling up trenches as per
direction of the Engineer-in-charge.

(i) 25 mm dia. Each 2105.00

(ii) 20 mm dia. Each 1438.00

(iii) 15 mm dia. Each 1051.00

(iv) 10 mm dia. Each 1025.00

(b) REPAIR WORKS


1 Renewing brass ferrule for connecting mains.

(i) 25 mm dia. Each 1939.00

(ii) 20 mm dia. Each 1314.00

(iii) 15 mm dia. Each 949.00

(iv) 10 mm dia. Each 918.00

2 Dismantling ferrule with all pipe connections. Each Set 174.00

3 Dismantling existing ferrule with fittings and refixing same after cleaning. Each Set 193.00
PWD SOR Vol-II wef-01.07.2014
SECTION (A) - PLUMBING WORKS
All Districts of West
(A)-(II) G.I. PIPE WORKS AND FITTINGS Bengal
Item No. Description of Item Unit (Rs)
(a) Original Works
1 Supplying, fitting and fixing G.I. pipes of TATA make with all necessary
accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple,
longscrew, reducing socket, reducing tee, short piece etc. fitted with
holder bats clamps, including cutting pipes, making threads, fitting, fixing
etc. complete in all respect including cost of all necessary fittings as
required,jointing materials and two coats of painting with approved paint
in any position above ground. (Payment will be made on the centre line
measurements of total pipe line including all specials. No separate
payment will be made for accesories, specials. Payment for painting will
be made seperately)

(A) For Exposed Work


(a) (i) 15 mm dia. light quality Mtr 202.00

(ii) 15 mm dia. medium quality Mtr 220.00

(b) (i) 20 mm dia. light quality Mtr 230.00

(ii) 20 mm dia. medium quality Mtr 260.00

(c) (i) 25 mm dia. light quality Mtr 308.00

(ii) 25 mm dia. medium quality Mtr 354.00

(d) (i) 32 mm dia. light quality Mtr 349.00

(ii) 32 mm dia. medium quality Mtr 408.00

(e) (i) 40 mm dia. light quality Mtr 400.00

(ii) 40 mm dia. medium quality Mtr 476.00

(f) (i) 50 mm dia. light quality Mtr 526.00

(ii) 50 mm dia. medium quality Mtr 624.00

(g) (i) 65 mm dia. light quality Mtr 656.00

(ii) 65 mm dia. medium quality Mtr 773.00

(h) (i) 80 mm dia. light quality Mtr 821.00

(ii) 80 mm dia. medium quality Mtr 955.00

(i) (i) 100 mm dia. medium quality Mtr 1206.00

(ii) 100 mm dia. heavy quality Mtr 1402.00

(j) (i) 125 mm dia. medium quality Mtr 1555.00

(ii) 125 mm dia. heavy quality Mtr 1703.00

(k) (i) 150 mm dia. medium quality Mtr 1813.00

(ii) 150 mm dia. heavy quality Mtr 1966.00

(B) For Concealed Work


(a) 15 mm dia. medium quality Mtr 265.00

(b) 20 mm dia. medium quality Mtr 299.00

(c) 25 mm dia. medium quality Mtr 412.00

2 Supplying, fitting and fixing in position G.I.pipes of TATA make for


underground works with all necessary accessories,specials viz.socket,
bend, tee, union, cross, elbow, nipple, short piece etc.including cost of
all materials,jointing materials ,cutting pipes,making threads,cutting
trenches upto 1.5 metre below surface in all sorts of soil and refilling the
same as directed with two coats of painting on G.I. pipes and specials
with bituminous paint complete in all respect. (Payment will be made on
the centre line measurement of the total pipe line including all specials
No separate payment will be made for accessories, specials.Payment for
painting will be made seperately)

(i) 15 mm dia. medium quality metre 234.00

(ii) 20 mm dia. medium quality metre 274.00


PWD SOR Vol-II wef-01.07.2014
SECTION (A) - PLUMBING WORKS
All Districts of West
(A)-(II) G.I. PIPE WORKS AND FITTINGS Bengal
Item No. Description of Item Unit (Rs)
(iii) 25 mm dia. medium quality metre 368.00

(iv) 32 mm dia. medium quality metre 407.00

(v) 40 mm dia. medium quality metre 461.00

(vi) 50 mm dia. medium quality metre 604.00

(vii) 65 mm dia. medium quality metre 753.00

(viii) 80 mm dia. medium quality metre 936.00

(ix) 100 mm dia. medium quality metre 1179.00

(x) 125 mm dia. medium quality metre 1528.00

(xi) 150 mm dia. medium quality metre 1780.00

3 Supplying, fitting and fixing shower of approved brand and make.


(a) (i) Chromium plated round shower with revolving joint 100 mm dia each 576.00
with rubid cleaning system (Equivalent to Code No. 542(N) & Model -
Tropical / Sumthing Special of ESSCO or similar brand).

(ii) Chromium plated round shower with revolving joint (Equivalent to each 457.00
Code No. 541(N) & Model - Tropical / Sumthing Special of ESSCO or
similar brand).

(iii) Chromium plated shower arm 240 mm long (Equivalent to Code No. each 391.00
536(A) & Model - Tropical / Sumthing Special of ESSCO or similar brand).

(b) Chromium plated Rose shower with revolving joint and 150 mm long each 1819.00
shower arm (Equivalent to Code No. 5489 & Model - Florentine of Jaquar
or similar brand).

(c) Chromium plated Hand shower 70mm dia Round Shape Single flow each 1581.00
with Flexible Tube & fittings(Equivalent to Code No. ESH-5512 & Model -
Tropical / Sumthing Special of ESSCO or similar).

(d) Chromium plated Hand shower with Flexible Tube & each 2414.00
fittings(Equivalent to Code No. Hsh-1937 & (Equivalent to Code No. 5037
& Model - Florentine of Jaquar or similar).).

(e) Chromium plated double coat Hook(Equivalent to Code No. 35761 & each 659.00
Model - KUBIX of Jaquar or similar).

(f) hand Shower(Health Faucet) with 1mtr Fexible Tube with Wall each 1611.00
Hook(Equivalent to Code No.573 & Model -ALLIED of Jaquar or similar).

(g) PTMT overhead shower ( Prayag or equivalent)


(i) 75 mm round each 208.00
(ii) 150 mm round each 400.00
PWD SOR Vol-II wef-01.07.2014
SECTION (A) - PLUMBING WORKS
All Districts of West
(A)-(II) G.I. PIPE WORKS AND FITTINGS Bengal
Item No. Description of Item Unit (Rs)
(h) Polythene overhead shower of approved make
15 mm X 125 mm each 177.00
(Note: Item 3(b, d, e & f) to be done as per specific direction of the
Superintending Engineer)

4 Supplying, fitting and fixing Peet's valve fullway gunmetal standard


pattern best quality of approved brand bearing I.S.I. marking with fittings
(tested to 21 kg per sq. cm.).

(i) 100 mm dia each 14085.00

(ii) 80 mm dia each 7112.00

(iii) 65 mm dia each 5070.00

(iv) 50 mm dia each 3015.00

(v) 40 mm dia each 2088.00

(vi) 32 mm dia each 1585.00

(vii) 25 mm dia each 1137.00

(viii) 20 mm dia each 807.00

(ix) 15 mm dia each 631.00

5 Supplying, fitting and fixing gunmetal wheel valve of approved brand and
make tested to 21 kg per sq. cm. (for water lines only).
(i) 100 mm dia each 12398.00

(ii) 80 mm dia each 7196.00

(iii) 65 mm dia each 5043.00

(iv) 50 mm dia each 2905.00

(v) 40 mm dia each 2014.00

(vi) 32 mm dia each 1458.00

(vii) 25 mm dia each 963.00

(viii) 20 mm dia each 738.00

(ix) 15 mm dia each 523.00

6 Supplying, fitting and fixing gunmetal wheel valve of approved brand and
make tested to 35 kg per sq. cm. (for gas line only).
(i) 100 mm dia each 16056.00

(ii) 80 mm dia each 8223.00

(iii) 65 mm dia each 6451.00


PWD SOR Vol-II wef-01.07.2014
SECTION (A) - PLUMBING WORKS
All Districts of West
(A)-(II) G.I. PIPE WORKS AND FITTINGS Bengal
Item No. Description of Item Unit (Rs)
(iv) 50 mm dia each 3863.00

(v) 40 mm dia each 2741.00

(vi) 32 mm dia each 2055.00

(vii) 25 mm dia each 1429.00

(viii) 20 mm dia each 978.00

(ix) 15 mm dia each 709.00

7 Supplying, fitting and fixing bib cock or stop cock.


(a) (i) Chromium plated Bib Cock short body (Equivalent to Code No. 511 each 689.00
& Model - Tropical / Sumthing Special of ESSCO or similar brand).

(ii) Chromium plated Bib Cock long body with wall flange with aerator each 843.00
(Equivalent to Code No. 512 & Model - Tropical / Sumthing Special of
ESSCO or similar brand)

(b) (i) Chromium plated Stop Cock (Equivalent to Code No. 513(A) & each 629.00
513(B) & Model - Tropical / Sumthing Special of ESSCO or similar brand).

(ii) Chromium plated Concealed Stop Cock (Equivalent to Code No. each 855.00
514(A) & Model - Tropical / Sumthing Special of ESSCO or similar brand).

(c) (i) Chromium plated Bib Cock (angular shape with wall flange) each 1105.00
(Equivalent to Code No. 5037 & Model - Florentine of Jaquar or similar
brand).

(ii) Chromium plated Bib Cock with wall flange (Equivalent to Code No. each 1105.00
5047 & Model - Florentine of Jaquar or similar brand).

(d) (i) Chromium plated angular Stop Cock with wall flange (Equivalent to each 1046.00
Code No. 5053 & Model - Florentine of Jaquar or similar brand).

(ii) Chromium plated concealed Stop Cock heavy duty (Equivalent to each 1224.00
Code No. 5083 & Model - Florentine of Jaquar or similar brand).

(e) PTMT (Polytetra Bib Cock / Stop Cock ( Prayag or equivalent)


15 mm each 177.00

(f) (i) Polythene Bib Cock / Stop Cock (HD) with metal inlet (EMCO /
ATLAS or equivalent)
15 mm each 100.00

(ii) Polythene Bib Cock / Stop Cock with plastic inlet (EMCO / ATLAS or
equivalent)
15 mm each 100.00
PWD SOR Vol-II wef-01.07.2014
SECTION (A) - PLUMBING WORKS
All Districts of West
(A)-(II) G.I. PIPE WORKS AND FITTINGS Bengal
Item No. Description of Item Unit (Rs)
(g) Supplying, fitting and fixing alloy iron with brass spindle bib cock/ stop
cock of approved brand and make, spray painted and tested to 21 kg per
sq. cm.
(i) 15 mm each 195.00

(ii) 20 mm each 352.00

(iii) 25 mm each 576.00

(Note: Item 7c(i),(ii) & 7d (i) ,(ii) to be done as per specific direction of
the Superintending Engineer.)

8 Supplying, fitting and fixing push cock of heavy quality and of approved
make and brand.
(a) Cast iron

(i) 15 mm each 234.00

(ii) 20 mm each 259.00

(b) Cast iron with brass spindle

(i) 15 mm each 242.00

(ii) 20 mm each 290.00

(c) (i) PTMT Push Cock (20 mm F/T) with spout ( Prayag or equivalent) each 177.00

(ii) PTMT Push Cock with reducer 15x20 mm ( Prayag or equivalent) each 215.00

(iii) PTMT Push Cock 15 mm (Female thread) ( Prayag or equivalent) each 156.00

(iv) PTMT Push Cock 15 mm with spout ( Prayag or equivalent) each 165.00

(d) Polythene

(i) 15 mm each 94.00

(ii) 20 mm each 108.00

9 C.I. sluice valve with flanged ends drilled to as per I.S. 1358/62 and
having all cast iron components as per I.S. 780/71 solid forged bronze
inside screw spindle having ultimate tensile strength not less than 4.72
MT per sq. cm. Spindle nut valve and seat faces of hard wear resisting,
manufactured from best quality gunmetal conforming to I.S. 780/71,
painted black all over with asphalt base paint tested to 21 kg (hydraulic
pressure) per sq. cm., valve opening to anticlockwise direction, fitted and
fixed complete.
(i) 50 mm each 3245.00

(ii) 80 mm each 4557.00

(iii) 100mm each 6000.00


PWD SOR Vol-II wef-01.07.2014
SECTION (A) - PLUMBING WORKS
All Districts of West
(A)-(II) G.I. PIPE WORKS AND FITTINGS Bengal
Item No. Description of Item Unit (Rs)

(iv) 125mm each 7442.00

(v) 150 mm each 8885.00

(vi) 200 mm each 17562.00

(vii) 250 mm each 24314.00

(viii) 300 mm each 28818.00

10
Sluice valve chamber with C.I. heavy cover with locking arrangement,
(weight not less than 25 kg) (size of chamber 450 mm X 600 mm inside
upto 900 mm depth) 250 mm thick cement brick walls (6:1), 150 mm
thick cement concrete (6:3:1) bed with stone chips, 20 mm thick cement
plaster (6:1) for inside wall and 15 mm thick cement plaster (4:1) for
outer walls including rounding corners.
each set 11354.00

11 Supplying, fitting and fixing C.I. tail pieces in pair conforming to I.S.
specifications.
(i) 100 mm each pair 2319.00

(ii) 80 mm each pair 1762.00

12 Supplying, fitting and fixing cast iron spun pipe conforming to I.S.
1536/1976 with all necessary specials including cutting trenches in any
soil or through masonry, concrete etc., if necessary,and mending good all
damages including jointing pipes with Tyton joints as per manufacturer's
specifications and filling up the trenches all complete but excluding the
cost of masonry or concrete work, if required.

(a) Class A:

(i) 80 mm nominal dia. metre 1447.00

(ii) 100 mm nominal dia. metre 1662.00

(iii) 125 mm nominal dia. metre 2305.00

(iv) 150 mm nominal dia. metre 2591.00

(v) 200 mm nominal dia. metre 3824.00

(vi) 250 mm nominal dia. metre 4969.00

(vii) 300 mm nominal dia. metre 6402.00

(b) Class B:

(i) 80 mm nominal dia. metre 1571.00

(ii) 100 mm nominal dia. metre 1805.00

(iii) 125 mm nominal dia. metre 2506.00


PWD SOR Vol-II wef-01.07.2014
SECTION (A) - PLUMBING WORKS
All Districts of West
(A)-(II) G.I. PIPE WORKS AND FITTINGS Bengal
Item No. Description of Item Unit (Rs)

(iv) 150 mm nominal dia. metre 2819.00

(v) 200 mm nominal dia. metre 4162.00

(vi) 250 mm nominal dia. metre 5411.00

(vii) 300 mm nominal dia. metre 6974.00

(c) Class LA:

(i) 80 mm nominal dia. metre 1324.00

(ii) 100 mm nominal dia. metre 1519.00

(iii) 125 mm nominal dia. metre 2103.00

(iv) 150 mm nominal dia. metre 2363.00

(v) 200 mm nominal dia. metre 3486.00

(vi) 250 mm nominal dia. metre 4528.00

(vii) 300 mm nominal dia. metre 5827.00

13 Renewing specials only of cast iron spun pipe conforming to I.S. Kg 102.00

1536/1976 including cutting trenches in any soil or through masonry,


concrete etc., if necessary and mending good damages including jointing
with Tyton joints as per manufacturer's specifications excluding the cost
of concrete or masonry work, if required, but including the cost of filling
up trenches (for all dia. specials, payment will be made on the basis of
actual weight of the specials).

14 Supplying, fitting and fixing C.I. holder bat clamp including cutting holes
in wall etc. and mending good all damages in cement concrete with
jhama chips (4:2:1) and cement plaster (6:1) to match and curing
complete in all respect.
(i) 15 mm each 28.00

(ii) 20 mm each 33.00

(iii) 25mm each 35.00

(iv) 32mm each 53.00

(v) 40 mm each 55.00

(vi) 50 mm each 66.00

(vii) 65 mm each 142.00

(viii) 80 mm each 172.00

(ix) 100 mm each 196.00


PWD SOR Vol-II wef-01.07.2014
SECTION (A) - PLUMBING WORKS
All Districts of West
(A)-(II) G.I. PIPE WORKS AND FITTINGS Bengal
Item No. Description of Item Unit (Rs)
15 Supplying, fitting and fixing self closing C.P. water tap of approved brand each 372.00
and make - 15 mm dia.
16 Supplying, fitting and fixing G.I. gravity operated water tap for public use
with pilfer proof arrangement of approved brand and make.

(i) 15 mm dia. each 350.00

(ii) 20 mm dia. each 403.00

17 Supplying,fitting and fixing steel reducing bush.


(i) 20 mm X 15 mm and below each 26.00

(ii) 25 mm X 20 mm and below each 32.00

(iii) 15 mm X 10 mm and below each 26.00

(iv) 32 mm X 25 mm each 54.00

(v) 40 mm X 32 mm each 69.00

(vi) 50 mm X 40 mm each 108.00

18 Labour for fitting and fixing high density poly-ethylene pipes or P.V.C.
pipes for above ground work including cost of jointing materials paints
etc. fitting and fixing all necessary specials, cutting pipes, making threads,
cutting holes in walls or R.C. floor where necessary and mending good all
damages excluding the cost of masonry or concrete work, if necessary,
but including the cost and fitting and fixing holder bat clamps(any floor)
or for underground work including cutting trenches upto 1.5 metre and
refilling the same complete as per direction of the Engineer-in-charge.
(Payment will be made on centre line measurement of the total pipeline
including specials. )

(A)Above Ground
(i) 15 mm dia. metre 27.00

(ii) 20mm dia. metre 27.00

(iii) 25 mm dia. metre 28.00

(iv) 32 mm dia. metre 28.00

(v) 40 mm dia. metre 38.00

(vi) 50 mm dia. metre 40.00

(vii) 65 mm dia. metre 47.00

(viii) 75 mm dia. / 80 mm dia. metre 57.00

(ix) 100 mm dia. / 110 mm dia. metre 59.00

(x) 140 mm dia. metre 74.00

(xi) 160 mm dia. metre 75.00


PWD SOR Vol-II wef-01.07.2014
SECTION (A) - PLUMBING WORKS
All Districts of West
(A)-(II) G.I. PIPE WORKS AND FITTINGS Bengal
Item No. Description of Item Unit (Rs)

(B)Under Ground
(i) 15 mm dia. metre 42.00

(ii) 20mm dia. metre 43.00

(iii) 25 mm dia. metre 42.00

(iv) 32 mm dia. metre 43.00

(v) 40 mm dia. metre 47.00

(vi) 50 mm dia. metre 61.00

(vii) 65 mm dia. metre 72.00

(viii) 75 mm dia. / 80 mm dia. metre 86.00

(ix) 100 mm dia. / 110 mm dia. metre 88.00

(x) 140 mm dia. metre 89.00

(xi) 160 mm dia. metre 96.00


19(I) Supplying, fitting and fixing PVC pipes of approved makeof (medium
duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes
as per IS : 1239 (Part - I). with all necessary accessories, specials viz.
socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket,
reducing tee, short piece etc. fitted with holder bats clamps, including
cutting pipes, making threads,fitting, fixing etc. complete in all respect
including cost of all necessary fittings as required,jointing materials and
two coats of painting with approved paint in any position above ground.
(Payment will be made on the centre line measurements of total pipe
line including all specials. No separate payment will be made for
accesories, specials. Payment for painting will be made seperately)

(a) For Exposed Work


PVC Pipes
(Dia)
15 mm metre 106.00

20 mm metre 136.00

25 mm metre 186.00

32 mm metre 249.00

40 mm metre 308.00

50 mm metre 406.00

65 mm metre 634.00

80 mm metre 811.00

100 mm metre 1200.00

125 mm metre 1592.00

150 mm metre 1930.00

200 mm metre 2863.00

250 mm metre 3933.00

300 mm metre 5394.00

(b) For Concealed Work


PWD SOR Vol-II wef-01.07.2014
SECTION (A) - PLUMBING WORKS
All Districts of West
(A)-(II) G.I. PIPE WORKS AND FITTINGS Bengal
Item No. Description of Item Unit (Rs)
(Dia)
15 mm metre 141.00

20 mm metre 164.00

25 mm metre 214.00

19(II) Supplying, fitting and fixing PVC pipes for underground work of
approved make (medium duty) conforming to ASTMD - 1785 and
threaded to match with GI Pipes as per IS : 1239 (Part - I). with all
necessary accessories, specials viz. socket, bend, tee, union, cross, elbo,
nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted
including cost of all materials ,jointing materials, cutting pipes, making
threads ,cutting trenches upto 1.5 metre below surface in all sorts of soil
and refilling the same as directed complete in all respect. (Payment will
be made on the centre line measurement of the total pipe line including
all specials No separate payment will be made for accessories, specials.)

PVC Pipes
(Dia)
15 mm metre 122.00

20 mm metre 150.00

25 mm metre 200.00

32 mm metre 263.00

40 mm metre 327.00

50 mm metre 424.00

65 mm metre 652.00

80 mm metre 839.00

100 mm metre 1228.00

125 mm metre 1620.00

150 mm metre 1943.00

200 mm metre 2876.00

250 mm metre 3938.00

300 mm metre 5406.00

19(III) Supply of PVC pipes & fittings (medium duty) conforming to ASTMD -
1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I).

(A) PVC Pipes


(Dia)
15 mm metre 65.00
20 mm metre 88.00
25 mm metre 128.00
32 mm metre 179.00
40 mm metre 219.00
50 mm metre 298.00
65 mm metre 482.00
80 mm metre 610.00
100 mm metre 922.00
125 mm metre 1239.00
150 mm metre 1498.00
200 mm metre 2252.00
250 mm metre 3110.00
300 mm metre 4297.00

(B) Socket
PWD SOR Vol-II wef-01.07.2014
SECTION (A) - PLUMBING WORKS
All Districts of West
(A)-(II) G.I. PIPE WORKS AND FITTINGS Bengal
Item No. Description of Item Unit (Rs)
(Dia)
15 mm Each 11.00
20 mm Each 14.00
25 mm Each 24.00
32 mm Each 35.00
40 mm Each 45.00
50 mm Each 56.00
65 mm Each 117.00
80 mm Each 190.00
100 mm Each 255.00
125 mm Each 269.00
150 mm Each 320.00
200 mm Each 552.00
250 mm Each 697.00
300 mm Each 929.00

(C) Elbow
(Dia)
15 mm Each 14.00
20 mm Each 19.00
25 mm Each 29.00
32 mm Each 43.00
40 mm Each 73.00
50 mm Each 119.00
65 mm Each 174.00
80 mm Each 280.00
100 mm Each 506.00
125 mm Each 634.00
150 mm Each 1331.00
200 mm Each 1684.00
250 mm Each 2206.00
300 mm Each 2671.00

(D) Long Bend (90 Degree)


(Dia)
15 mm Each 27.00
20 mm Each 35.00
25 mm Each 60.00
32 mm Each 96.00
40 mm Each 145.00
50 mm Each 203.00
65 mm Each 420.00
80 mm Each 625.00
100 mm Each 871.00
125 mm Each 1074.00
150 mm Each 1208.00
200 mm Each 3356.00
250 mm Each 4180.00
300 mm Each 5051.00

(E) Tee
(Dia)
15 mm Each 15.00
20 mm Each 25.00
25 mm Each 38.00

32 mm Each 60.00
PWD SOR Vol-II wef-01.07.2014
SECTION (A) - PLUMBING WORKS
All Districts of West
(A)-(II) G.I. PIPE WORKS AND FITTINGS Bengal
Item No. Description of Item Unit (Rs)
40 mm Each 105.00
50 mm Each 132.00
65 mm Each 255.00
80 mm Each 368.00
100 mm Each 677.00
125 mm Each 911.00
150 mm Each 2380.00
200 mm Each 3541.00
250 mm Each 4586.00
300 mm Each 5457.00

(F) (i) Nipple (75 mm long)


(Dia)
15 mm Each 12.00
20 mm Each 16.00
25 mm Each 20.00
32 mm Each 30.00
40 mm Each 36.00
50 mm Each 38.00
65 mm Each 59.00
80 mm Each 87.00
100 mm Each 100.00

(ii) Nipple (100 mm long)


(Dia)
15 mm Each 18.00
20 mm Each 24.00
25 mm Each 28.00
32 mm Each 37.00
40 mm Each 42.00
50 mm Each 45.00

(iii) Nipple (150 mm long)


(Dia)
15 mm Each 20.00
20 mm Each 27.00
25 mm Each 30.00
32 mm Each 38.00
40 mm Each 47.00
50 mm Each 55.00
65 mm Each 100.00
80 mm Each 130.00
100 mm Each 145.00

(iv) Nipple (200 mm long)


(Dia)
15 mm Each 27.00
20 mm Each 37.00
25 mm Each 50.00
32 mm Each 60.00
40 mm Each 73.00
50 mm Each 133.00
65 mm Each 173.00
80 mm Each 231.00
100 mm Each 277.00

(v) Nipple (300 mm long)


PWD SOR Vol-II wef-01.07.2014
SECTION (A) - PLUMBING WORKS
All Districts of West
(A)-(II) G.I. PIPE WORKS AND FITTINGS Bengal
Item No. Description of Item Unit (Rs)
(Dia)
15 mm Each 30.00
20 mm Each 40.00
25 mm Each 56.00
32 mm Each 68.00
40 mm Each 89.00
50 mm Each 109.00
65 mm Each 178.00
80 mm Each 240.00
100 mm Each 396.00
125 mm Each 347.00
150 mm Each 475.00
200 mm Each 719.00
250 mm Each 1089.00
300 mm Each 1655.00

(G) Flange
(Dia)
15 mm Pair 50.00
20 mm Pair 69.00
25 mm Pair 89.00
32 mm Pair 109.00
40 mm Pair 139.00
50 mm Pair 168.00
65 mm Pair 267.00
80 mm Pair 327.00
100 mm Pair 383.00
125 mm Pair 495.00
150 mm Pair 624.00
200 mm Pair 940.00
250 mm Pair 1089.00
300 mm Pair 1386.00

(H) Threaded Adopter


(Dia)
15 mm Each 12.00
20 mm Each 16.00
25 mm Each 20.00
32 mm Each 40.00
40 mm Each 71.00
50 mm Each 99.00
65 mm Each 119.00
80 mm Each 139.00
100 mm Each 188.00
125 mm Each 248.00
150 mm Each 287.00
200 mm Each 0.00

(I) Union
(Dia)
15 mm Each 30.00
20 mm Each 44.00
25 mm Each 60.00
32 mm Each 89.00
40 mm Each 129.00

50 mm Each 159.00
PWD SOR Vol-II wef-01.07.2014
SECTION (A) - PLUMBING WORKS
All Districts of West
(A)-(II) G.I. PIPE WORKS AND FITTINGS Bengal
Item No. Description of Item Unit (Rs)
(J) Threaded End Cap
(Dia)
15 mm Each 10.00
20 mm Each 15.00
25 mm Each 19.00
32 mm Each 25.00
40 mm Each 35.00
50 mm Each 48.00
65 mm Each 73.00
80 mm Each 90.00
100 mm Each 129.00
125 mm Each 310.00
150 mm Each 318.00
200 mm Each 769.00
250 mm Each 1003.00
300 mm Each 1212.00

(K) End Plug


(Dia)
100 mm Each 232.00
125 mm Each 645.00
150 mm Each 957.00
200 mm Each 1131.00
250 mm Each 1533.00

(L) Reducing Socket (mm X mm)


20 X 15 Each 16.00
25 X 15 Each 28.00
25 X 20 Each 24.00
32 X 25 Each 32.00
40 X 25 Each 74.00
40 X 32 Each 46.00
50 X 25 Each 145.00
50 X40 Each 70.00
65 X 40 Each 120.00
65 X 50 Each 123.00
80 X 40 Each 143.00
80 X 50 Each 149.00
80 X 65 Each 159.00
100 X 40 Each 213.00
100 X 50 Each 181.00
100 X 80 Each 150.00
125 X 50 Each 228.00
125 X 80 Each 852.00
125 X 100 Each 684.00
150 X 50 Each 693.00
150 X 80 Each 480.00
150 X 100 Each 468.00
150 X 125 Each 496.00

(M) Reducing Tee (mm X mm)


20 X 15 Each 39.00
25 X 15 Each 46.00
25 X 20 Each 50.00
40 X 15 Each 106.00

40 X 20 Each 108.00
PWD SOR Vol-II wef-01.07.2014
SECTION (A) - PLUMBING WORKS
All Districts of West
(A)-(II) G.I. PIPE WORKS AND FITTINGS Bengal
Item No. Description of Item Unit (Rs)
40 X 25 Each 79.00
40 X 32 Each 162.00
50 X 15 Each 248.00
50 X 25 Each 221.00
50 X 32 Each 191.00
65 X 25 Each 230.00
65 X 40 Each 319.00
65 X 50 Each 311.00
80 X 25 Each 494.00
100 X 32 Each 763.00
100 X 65 Each 800.00

(N) Reducing Elbow (mm X mm)


25 X 15 Each 70.00
25 X 20 Each 67.00
80 X 50 Each 248.00

(O) Solvent Cement


250 Gm. 250 gm. 137.00

20 Supply of High Density Poly-ethylene Pipe conforming to IS - 4984 - 1985


(Dia) [PE - 63]
A. 6 Kg / Sq.Cm. (Working Pressure)
(Dia)
40 mm m 76.00
50 mm m 117.00
63 mm m 184.00
75 mm m 262.00
110 mm m 575.00

B. 10 Kg / Sq.Cm. (Working Pressure)


(Dia)
15 mm m 23.00
20 mm m 29.00
25 mm m 46.00
32 mm m 74.00

21 Supply ,Fitting & Fixing 3 layer PP-R (Poly-propylene Random Copolymer)


U.V STABILISED and anti-microbial fusion welded pipes conforming to
IS:15801-2008.for hot & cold water supply including necessary fittings
and joining materials as required complete as per direction of Engineer-in-
charge. (Payment will be made on the centre line measurement of the
total pipe line including all specials. No seperate payment will be made
for accessories, specials etc.)

A. For Exposed Work


I)SDR 7.4/PN-16 Pipes
20 mm (outer dia ) m 148.00
25 mm ( outer dia ) m 189.00
32 mm ( outer dia ) m 245.00
40 mm ( outer dia ) m 362.00
II)SDR 11/PN-10 Pipes
50 mm ( outer dia ) m 386.00
63 mm ( outer dia ) m 473.00
75 mm ( outer dia ) m 618.00

90 mm ( outer dia ) m 879.00


PWD SOR Vol-II wef-01.07.2014
SECTION (A) - PLUMBING WORKS
All Districts of West
(A)-(II) G.I. PIPE WORKS AND FITTINGS Bengal
Item No. Description of Item Unit (Rs)
110 mm ( outer dia ) m 1262.00
B. For Concealed Work
I)SDR 7.4/PN-16 Pipes
20 mm (outer dia ) m 180.00
25 mm ( outer dia ) m 236.00
32 mm ( outer dia ) m 274.00
22 Supply ,Fitting & Fixing of PVC Bottle waste tap
i) 32 mm Each 181.00
ii) 40 mm Each 189.00

23 Supply ,Fitting & Fixing of 32 mm PVC Waste Nozzle with jamnut, full Each 55.00
thread or half thread complete.

24 Supply ,Fitting & Fixing of 40 mm PVC Waste Nozzle with jamnut, full Each 62.00
thread or half thread complete.

25 Supply ,Fitting & Fixing of Plug with chain for waste with jamnut, full Each 37.00
thread or half thread complete.

26 Supply ,Fitting & Fixing of Polythene Coupling - (Nipple & Nut) 15 mm Each 31.00
size

27 Supply ,Fitting & Fixing of Polythene Coupling - (Nipple & Nut) 20 mm Each 30.00
size

28 Supply ,Fitting & Fixing of Polythene Coupling - (Nipple & Nut) 25 mm Each 32.00
size

29 Supply ,Fitting & Fixing of Polythene Coupling - (Nipple & Nut) 32 mm Each 32.00
size

30 Supply ,Fitting & Fixing of Polythene Coupling - (Nipple & Nut) 40 mm Each 45.00
size

31 Supply ,Fitting & Fixing of Polythene Coupling - (Nipple & Nut) 50 mm Each 51.00
size

32 Supply ,Fitting & Fixing of Polythene flange.


i) 15 mm dia Each 47.00

ii) 20 mm dia Each 69.00

iii) 25 mm dia Each 78.00

iv) 40 mm dia Each 133.00

v) 50 mm dia Each 158.00

33 (A) Labour for fitting and fixing G.I. pipes above ground (exposed) in
structures with holder bat clamps including cost of jointing materials,
holder bat clamps etc.,as necessary, including cutting pipe, making
threads etc. complete in all respect with two coats of painting with
approved paint any height. (Payment will be made on the centre line
measurement of the total pipeline including specials. Payment of
painting will be paid seperately)
PWD SOR Vol-II wef-01.07.2014
SECTION (A) - PLUMBING WORKS
All Districts of West
(A)-(II) G.I. PIPE WORKS AND FITTINGS Bengal
Item No. Description of Item Unit (Rs)
(i) 15 mm dia. metre 47.00

(ii) 20 mm dia. metre 54.00

(iii) 25 mm dia. metre 54.00

(iv) 32 mm dia. metre 80.00

(v) 40 mm dia. metre 93.00

(vi) 50 mm dia. metre 94.00

(vii) 65 mm dia. metre 95.00

(viii) 80 mm dia. metre 95.00

(ix) 100 mm dia. metre 126.00

(x) 125 mm dia. metre 127.00

(xi) 150 mm dia. metre 129.00

(B) Labour for fitting and fixing G.I. pipes above ground (concealed) in
structures with holder bat clamps including cost of jointing materials,
holder bat clamps etc.,as necessary, including cutting pipe, making
threads etc. complete in all respect with two coats of painting with
approved paint any height. (Payment will be made on the centre line
measurement of the total pipeline including specials. Payment of
painting will be paid seperately.)

(i) 15 mm dia. metre 93.00

(ii) 20 mm dia. metre 93.00

(iii) 25 mm dia. metre 93.00

34 Labour for fitting and fixing G.I. pipes for under ground work including
cost of jointing materials, cutting pipes,making threads etc. complete in
all respect including cutting trenches upto 1.5 metre below surface in all
sorts of soil and refilling the same as directed with two coats of painting
to G.I. pipes and specials with bituminous paint. (Payment will be made
on the centre line measurement of the total pipeline including specials.
Payment of painting to be paid seperately.)

(i) 15 mm dia. metre 61.00

(ii) 20 mm dia. metre 68.00

(iii) 25 mm dia. metre 69.00

(iv) 32 mm dia. metre 80.00

(v) 40 mm dia. metre 88.00

(vi) 50 mm dia. metre 90.00

(vii) 65 mm dia. metre 90.00


PWD SOR Vol-II wef-01.07.2014
SECTION (A) - PLUMBING WORKS
All Districts of West
(A)-(II) G.I. PIPE WORKS AND FITTINGS Bengal
Item No. Description of Item Unit (Rs)
(viii) 80 mm dia. metre 91.00

(ix) 100 mm dia. metre 114.00

(x) 125 mm dia. metre 116.00

(xi) 150 mm dia. metre 117.00

35 Labour for fitting and fixing G.I. specials including cost of jointing
materials.
(a) Plug.

(i) Upto 25 mm dia. each 8.00

(ii) Above 25 mm upto 50 mm dia. each 10.00

(iii) Above 50 mm upto 80 mm dia. each 12.00

(iv) Above 80 mm upto 150 mm dia. each 14.00

(b) Socket, Reducing socket, Bend, Plain equal elbow, Reducing elbow,
Nipple, Short piece.
(i) Upto 25 mm dia. each 8.00

(ii) Above 25 mm upto 50 mm dia. each 10.00

(iii) Above 50 mm upto 80 mm dia. each 12.00

(iv) Above 80 mm upto 150 mm dia. each 14.00

(c) Plain tee, Reducing tee, Pendent tee, Jamnut, Socket and Nipple.

(i) Upto 25 mm dia. each 8.00

(ii) Above 25 mm upto 50 mm dia. each 10.00

(iii) Above 50 mm upto 80 mm dia. each 12.00

(iv) Above 80 mm upto 150 mm dia. each 14.00

(d) Cross, Union, Long screw.


(i) Upto 25 mm dia. each 8.00

(ii) Above 25 mm upto 50 mm dia. each 10.00

(iii) Above 50 mm upto 80 mm dia. each 12.00

(iv) Above 80 mm upto 150 mm dia. each 14.00

36 Supplying & laying Double Wall Corrugated (with external annular


corrugation and smooth internal walls) High Density Polyethelene Pipes
conforming to IS 16098 (Part-II):2013 having Stiffness Class of SN 8 with
Ring Stiffness not less than 8.00 KN/Sqm. and Impact Resistance TIR
value not more than 10% including necessary jointing materials for non-
pressure underground Drainage, Sewerage & Cross drainage application.

(i) 250mm internal dia. metre 999.00


PWD SOR Vol-II wef-01.07.2014
SECTION (A) - PLUMBING WORKS
All Districts of West
(A)-(II) G.I. PIPE WORKS AND FITTINGS Bengal
Item No. Description of Item Unit (Rs)

(ii) 300mm internal dia. metre 1323.00

(iii) 400mm internal dia. metre 1909.00

(iv) 600mm internal dia. metre 4478.00

(b) Repair Works

1 Labour for dismantling G.I. pipe with fittings.


(i) 15 mm metre 6.00

(ii) 20 mm metre 6.00

(iii) 25 mm metre 6.00

(iv) 32 mm metre 6.00

(v) 40 mm metre 8.00

(vi) 50 mm metre 8.00

(vii) 65 mm metre 8.00

(viii) 80 mm metre 11.00

(ix) 100 mm metre 11.00

2 Refixing G.I. pipe with fittings after cleaning where necessary.


(i) 15 mm metre 6.00

(ii) 20 mm metre 7.00

(iii) 25 mm metre 7.00

(iv) 32 mm metre 8.00

(v) 40 mm metre 9.00

(vi) 50 mm metre 9.00

(vii) 65 mm metre 15.00

(viii) 80 mm metre 16.00

(ix) 100 mm metre 16.00

3 Removing chokage in G.I. pipe including cleaning pipe.


(i) 15 mm metre 7.00

(ii) 20 mm metre 7.00

(iii) 25 mm metre 7.00

(iv) 32 mm metre 9.00


PWD SOR Vol-II wef-01.07.2014
SECTION (A) - PLUMBING WORKS
All Districts of West
(A)-(II) G.I. PIPE WORKS AND FITTINGS Bengal
Item No. Description of Item Unit (Rs)
(v) 40 mm metre 9.00

(vi) 50 mm metre 9.00

(vii) 65 mm metre 11.00

(viii) 80 mm metre 11.00

(ix) 100 mm metre 11.00

4 Renewing C.I. clamp for pipe including cutting hole in wall etc. and
mending good all damages with cement concrete(4:2:1) with jhama chips
and cement plaster (6:1) to match with and curing.
(i) 15 mm each 28.00

(ii) 20 mm each 33.00

(iii) 25 mm each 36.00

(iv) 32 mm each 52.00

(v) 40 mm each 53.00

(vi) 50 mm each 67.00

(vii) 65 mm each 140.00

(viii) 80 mm each 148.00

(ix) 100 mm each 168.00

5 Renewing P.V.C. clip with necessary screws.


(i) 15 mm each 10.00

(ii) 20 mm each 12.00

(iii) 25 mm each 18.00

(iv) 32 mm each 21.00

(v) 40 mm each 25.00

(vi) 50 mm each 28.00

(vii) 65 mm each 38.00

6 Opening out leaky water supply pipe and making the joints water tight
including cutting threads where necessary.
(i) Upto 40 mm dia. each 60.00

(ii) 50 mm dia. each 70.00

(iii) 65 mm to 100 mm dia. each 114.00

7 Renewing iron jamnut with washer.


(i) 15 mm each 13.00
PWD SOR Vol-II wef-01.07.2014
SECTION (A) - PLUMBING WORKS
All Districts of West
(A)-(II) G.I. PIPE WORKS AND FITTINGS Bengal
Item No. Description of Item Unit (Rs)
(ii) 20 mm each 15.00

(iii) 25 mm each 17.00

8 Cutting out pipe and making threads.


(i) Upto 20 mm dia. each 9.00

(ii) Above 20 mm upto 32 mm dia. each 13.00

(iii) Above 32 mm upto 50 mm dia. each 25.00

(iv) Above 50 mm upto 80 mm dia. each 33.00

(v) Above 80 mm upto 150 mm dia. each 45.00

9 Perforating G.I. pipe of all diameters by drilling including taking G.I. pipes Dozzen 68.00
to workshop and back if required.

10 Making bend/offset in G.I. pipe by heat.


(i) Upto 50 mm dia. each 36.00

(ii) Above 50 mm upto 80 mm dia. each 55.00

(iii) Above 80 mm upto 150 mm dia. each 153.00

11 Cutting out section of G.I. water main pipe upto 100 mm. each 40.00

12 Dismantling and refixing bib cock or stop cock.


(i) 15 mm each 13.00

(ii) 20 mm each 16.00

13 Rewashering stop cock/ bib cock/ push cock/ pillar cock including gland
packing if necessary.
(i) 15 mm each 14.00

(ii) 20 mm each 18.00

(iii) 25 mm each 19.00

(iv) 40 mm each 27.00

14 Renewing brass spindle and valve of stop cock/bib cock/push cock/pillar


cock.
(i) 15 mm each 84.00

(ii) 20 mm each 107.00

15 Dismantling and refixing shower rose after cleaning. each 12.00

16 Renewing cromium plating of

(a) bib cock/ stop cock/ pillar cock/ waste fittings. each 55.00
PWD SOR Vol-II wef-01.07.2014
SECTION (A) - PLUMBING WORKS
All Districts of West
(A)-(II) G.I. PIPE WORKS AND FITTINGS Bengal
Item No. Description of Item Unit (Rs)
(b) Elbow action bib/ pillar tap. each 75.00

17 Cutting out existing G.I.F.W. or U.F.W. or gas pipeline to required size


and making threads including taking out and refixing.
(i) 15 mm to 20 mm set 62.00

(ii) 25 mm to 32 mm set 62.00

(iii) 40 mm to 50 mm set 89.00

(iv) 65 mm to 80 mm set 109.00

(v) 100 mm set 115.00

18 Drilling and tapping C.I. main.


(i) Upto 15 mm set 162.00

(ii) Above 15 mm upto 25 mm set 202.00

(iii) Above 25 mm set 242.00

19 Plugging up C.I. main with necessary materials & Labour Complete set 209.00

20 Renewing copper plated gas cock C.P. or oxidised (approved brand, wall/
bench type).
6 mm/ 10 mm/ 15 mm

(i) One way each 186.00

(ii) Two way each 198.00

(iii) Three way each 251.00

(iv) Four way each 309.00

21 Renewing special make up piece of pipe having threads on both sides.

(i) 15 mm each 57.00

(ii) 20 mm each 63.00

(iii) 25 mm each 68.00

(iv) 32 mm each 73.00

(v) 40 mm each 84.00

(vi) 50 mm each 86.00

22 Dismantling upto 100 mm sluice valve by parts and cutting out worn out Each Set 472.00
bolts and reassembling the same after regrinding valve,rewashering
flanges, asbestos diamond packing including studs,bolts, nuts and
necessary repairs.
SECTION (A) - PLUMBING WORKS PWD SOR Vol-II wef-01.07.2014
(A)-(III) CISTERN, G.I. TANKS WITH PARTS

Item No. Description of Item Unit All Districts of


West Bengal
(a) Original Works

1 Supplying, fitting and fixing 10 litre porcelain low-down cistern of


approved make with either side or bottom inlet, side overflow, brackets
complete with all internnal PVC fittings.

White each 2567.00

2 Supplying, fitting and fixing 10 litre P.V.C. low-down cistern conforming to each 1181.00
I.S. specification with P.V.C. fittings complete,C.I. brackets including two
coats of painting to bracket etc.

3 Supplying, fitting and fixing 10 litre porcelain low-down cistern of


approved make without fittings and brackets.

White each 1740.00

For item 1 & 3 above for using coloured Porcelain :-


N.B. Cisterns the rate will enhanced over the corresponding item of white
Porcelain cistern as follows.

(a) Sky blue, Venetian, Min. green, Turquoise, Citrus yellow , Champage,
Saphire - By 50%

(b) Roman brown, Fern green, Misty lilac, Orange, Sienna gold, Silver grey,
Sepia, Alpine, Cornil sorvinto blue - 100%

(c) Burgandy, Emerald green coloured - 200%

4 Supplying, fitting and fixing concealed cistern of approved make with flash
plate Cute/Loop/Shell/Nova (Code No. concealo-H(80mm Body sap code
508179 of Hindware or equivalent).
Matt/Gloss Nos 9641.00

5 Supplying G.I. tank with Galvanised iron sheet with 450 mm dia C.I. raised
approved type locking cover and 50 mm cleaning flange and plug.

(a) With 2 mm thick G.I. sheet

(i) 1812 litre capacity each 19157.00

(ii) 1364 litre capacity each 17348.00

(b) With 1.6 mm thick G.I. sheet

(i) 908 litre capacity each 10727.00

(ii) 540 litre capacity each 10336.00


SECTION (A) - PLUMBING WORKS PWD SOR Vol-II wef-01.07.2014
(A)-(III) CISTERN, G.I. TANKS WITH PARTS

Item No. Description of Item Unit All Districts of


West Bengal
6 Supplying P.V.C. water storage tank of approved quality with closed top
with lid (Black) - Multilayer

(a) 500 litre capacity each 3076.00

(b) 1000 litre capacity each 6110.00

(c) 1500 litre capacity each 9343.00

(d) 2000 litre capacity each 12437.00

(e) 2500 litre capacity each 15530.00

(f) 3000 litre capacity each 18639.00

(g) 4000 litre capacity each 24827.00

(h) 5000 litre capacity each 32246.00

7 Supplying, fitting and fixing cast iron raised rain proof tank cover 450mm. each 1198.00

8 Supplying, fitting and fixing cast iron raised rain proof tank cover 500 mm each 1495.00
dia. with locking arrangements (weighing not less than 12 kg).

9 Hoisting G.I. tank (upto and including 1812 litre capacity).

(a) 1st story from G.L. each 442.00

(b) Extra for each additional story each 146.00

10 Labour for hoisting plastic water storage tank.

(i) Upto 1500 litre capacity.

(a) Upto 1st story from G.L. each 97.00

(b) Extra for each additional story each 44.00

(ii) Above 1500 litre upto 5000 litre capacity.

(a) Upto 1st story from G.L. each 155.00

(b) Extra for each additional story each 73.00


SECTION (A) - PLUMBING WORKS PWD SOR Vol-II wef-01.07.2014
(A)-(III) CISTERN, G.I. TANKS WITH PARTS

Item No. Description of Item Unit All Districts of


West Bengal
11 Lowering G.I. tank (upto and including 1812 litre capacity).

(a) From 1st story to G.L. each 316.00

(b) Extra for each additional story each 96.00

12 Labour for lowering plastic water storage tank and stacking in places as
directed.

(i) Upto 1500 litre capacity

(a) From 1st floor to G.L. each 58.00

(b) Extra for each additional story each 29.00

(ii) Above 1500 litre upto 5000 litre capacity

(a) From 1st story to G.L. each 96.00

(b) Extra for each additional story each 44.00

13 Labour for punching hole in plastic water storage tank upto 50 mm dia. each 19.00

(b) Repair Works

1 Supplying, fitting and fixing low-down cistern parts.

(i) Internal fittings for cistern complete of approved make. Each Set 326.00

(ii) Outlet Assembly each 320.00

(iii) Intlet Assembly each 72.00

(iv) Rubber Kid each 349.00

(v) Knob each 349.00

(vi) Brackets (pair) each 349.00

(vii) CP Flush Bend (local) best quality


a) Orrisa & Indian Pattern WC Each 351.00
b) E. W.C. & Anglo-Indian W.C. Each 332.00

2 Renewing bolts and nuts for cistern. Each Set 41.00

3 Renewing brass screws in auto cistern. Each Set 32.00


SECTION (A) - PLUMBING WORKS PWD SOR Vol-II wef-01.07.2014
(A)-(III) CISTERN, G.I. TANKS WITH PARTS

Item No. Description of Item Unit All Districts of


West Bengal
4 Changing the lather only of syphon of automatic cistern including taking Each Set 39.00
out and refixing necessary parts.

5 Renewing high pressure polythene ball cock of approved quality with


polythene ball and aluminium lever complete for pipe of dia.:

(i) 32 mm each 195.00

(ii) 25 mm each 142.00

(iii) 20 mm each 100.00

(iv) 15 mm each 82.00

6 Renewing polythene ball of approved quality for pipe of dia.:


(i) 32 mm each 154.00

(ii) 25 mm each 112.00

(iii) 20 mm each 88.00

(iv) 15 mm each 48.00

7 Dismantling G.I. tank including disconnecting pipe connection. each 116.00

8 Fixing G.I. tank in position including refitting pipe connection. each 116.00

9 Dewatering and repairing G.I. tank above 1000 litre and upto 2000 litre each 280.00
capacity with G.I. washer, bolts, nuts and cement concrete at bottom as
necessary.

10 Dewatering and repairing G.I. tank upto 1000 litre capacity with G.I. each 210.00
washer, bolts and nuts and washer.

11 Punching holes in tank(G.I.). each 39.00

12 Cleaning and removing mud upto 2000 litre Water Tank including masonry each 111.00
reservoir.

13 Cleaning and removing mud above 2000 litre Water Tank including Cum 68.00
masonry reservoir.

14 Cleaning and disinfecting upto 2000 litre Water Tank including masonry each 157.00
reservoir.

15 Cleaning and disinfecting above 2000 litre Water Tank including masonry Cum 89.00
reservoir.
SECTION (A) - PLUMBING WORKS PWD SOR Vol-II wef-01.07.2014
(A)-(III) CISTERN, G.I. TANKS WITH PARTS

Item No. Description of Item Unit All Districts of


West Bengal
16 Repairing damaged G.I. tank of any capacity after lowering on roof by sq. m. 1998.00
replacing with new 2 mm thick G.I. sheet by rivetting with necessary
packing, painting new portions, refixing the existing C.I. tank cover by
rivetting in new position, if necessary, after taking out old cover very
carefully etc. complete (excluding the cost of dismantling and refixing tank
but including the cost of cutting out worn out portion by suitable means to
regular shape). (Payment will be made on the basis of area of damaged
portion replaced.)
SECTION (A) - PLUMBING WORKS PWD SOR Vol-II wef-01.07.2014
(A)-(IV) BASIN AND SINKS WITH PARTS

Item No. Description of Item Unit All Districts of


West Bengal

(a) Original Works

1 Wash basin vitreous china of approved make (without fittings)


supplied,fitted and fixed in position on 75mm X 75 mm X 75 mm wood
blocks and C.I. brackets including two coats of painting of C.I. brackets.

(i) 450 mm X 300 mm size each 1374.00

(ii) 550 mm X 400 mm size each 1671.00

(iii) 630 mm X 450 mm size each 3040.00

(iv) Angle back wash basin 400 mm X 400 mm each 1445.00

(v) Surgeon's wash basin 650 mm X 450 mm each 4896.00

(vi) Spitton for Dental Surgeon each 3302.00

2 Supplying, fitting and fixing white vitreous china best quality approved
make wash basin with C.I. brackets on 75 mm X 75 mm wooden blocks,
C.P. waste fittings of 32 mm dia., one approved quality brass C.P. pillar
cock of 15 mm dia., C.P. chain with rubber plug of 30 mm dia., approved
quality P.V.C. waste pipe with C.P. nut 32 mm dia., 900 mm long approved
quality P.V.C. connection pipe with heavy brass C.P. nut including mending
good all damages and painting the brackets with two coats of approved
paint.

(i) 450 mm X 300 mm size each 2207.00

(ii) 550 mm X 400 mm size each 2504.00

(iii) 630 mm X 450 mm size each 3873.00

(iv) Angle back wash basin 400 mm X 400 mm size each 2278.00

3 Supplying, fitting and fixing pedestal of approved make for wash basin each 1911.00
(white)

4 Best quality sink in mosaic in silver grey colourwith C.P. waste and other
fittings, rubber plug and chain, C.I. heavy brackets with two coats of
approved paint.

(i) 600 mm X 450 mm X 200 mm each 901.00

(ii) 600 mm X 450 mm X 250 mm each 925.00


SECTION (A) - PLUMBING WORKS PWD SOR Vol-II wef-01.07.2014
(A)-(IV) BASIN AND SINKS WITH PARTS

Item No. Description of Item Unit All Districts of


West Bengal

(iii) 750 mm X 450 mm X 250 mm each 1139.00

5 Supplying, fitting and fixing White Vitreous China Sink in position on C.I.
brackets including two coats of painting of brackets.

(a) Plain edge sink with overflow

(i) 610 mm X 450 mm X 200 mm each 6297.00

(ii) 610 mm X 450 mm X 250 mm each 6963.00

(b) Laboratory sink with rim and overflow

(i) 450 mm X 300 mm X 150 mm each 2977.00

(ii) 500 mm X 300 mm X 150 mm each 4358.00

(c) Laboratory table sink including cutting of laboratory table as required. each 2812.00
450 mm X 300 mm X 150 mm

N.B. For using coloured Basin, Sink, Pedestal etc. th rates of the
corresponding rates of white viterous porcelain colour will be enhanced by
as followes:

(a) Sky blue, Venetian, Min. green, Turquoise, Citrus yellow , Champage,
Saphire - By 50%

(b) Roman brown, Fern green, Misty lilac, Orange, Sienna gold, Silver grey,
Sepia, Alpine, Cornil sorvinto blue - 100%

(c) Burgandy, Emerald green coloured - 200%

6 Supplying, fitting and fixing stainless steel sink complete with waste
fittings and two coats of painting of C.I. brackets.

(a) Sink only

(i) 530 mm X 430 mm x 180 mm each 4143.00

(ii) 630 mm X 550 mm X 180 mm each 4798.00

(b) Sink with drain board 1050 mm X 450 mm X 180 mm each 6381.00

7 Supplying, fitting and fixing of Fire clay Kitchen Sink with overflow
conforming to IS: 771 with waste fittings and C.I. Brackets.(White Colour)

(i) 750 mm X 450 m X 250 mm each 6404.00


SECTION (A) - PLUMBING WORKS PWD SOR Vol-II wef-01.07.2014
(A)-(IV) BASIN AND SINKS WITH PARTS

Item No. Description of Item Unit All Districts of


West Bengal

(ii) 600mm X 400 mm X 250 mm each 4712.00

(iii) 600 mm X 450 mm X 200 mm each 4606.00

8 Supplying, fitting and fixing Drain boards for sinks with brackets in
position.

(a) Porcelain fluted drain board of approved make

(i) 530 mm X 450 mm each 2147.00

9 Supplying,fitting and fixing approved brand P.V.C. CONNECTOR white


flexible, with both ends coupling with heavy brass C.P. nut, 15 mm dia.

(i) 300 mm long each 67.00

(ii) 450 mm long each 96.00

(iii) 600 mm long each 126.00

(iv) 750 mm long each 138.00

(v) 900 mm long each 174.00

10 Supplying,fitting and fixing approved brand 32 mm dia.P.V.C. waste pipe,


with PVC coupling at one end fitted with necessary clamps.

(i) 600 mm long each 55.00

(ii) 750 mm long each 69.00

(iii) 900 mm long each 89.00

(iv) 1050 mm long each 107.00

11 Supplying, fitting and fixing C.P. chain and stay with rubber plug.
(i) 25 mm dia. of plug Each Set 56.00

(ii) 32 mm dia. of plug Each Set 63.00

(iii) 40 mm dia. of plug Each Set 69.00

(iv) 45 mm dia. of plug Each Set 79.00

(v) 50 mm dia. of plug Each Set 82.00


SECTION (A) - PLUMBING WORKS PWD SOR Vol-II wef-01.07.2014
(A)-(IV) BASIN AND SINKS WITH PARTS

Item No. Description of Item Unit All Districts of


West Bengal

12 Supplying, fitting and fixing C.P. chain 1200 mm long with rubber plug 65 Each Set 200.00
mm dia.

13 Supplying, fitting and fixing C.P. chain or stay for wash basin each 13.00

14 Supplying,fitting and fixing rubber plug.


(i) 25 mm dia. each 10.00

(ii) 32 mm dia. each 12.00

(iii) 40 mm dia. each 16.00

(iv) 45 mm dia. each 17.00

(v) 50 mm dia. each 22.00

15 Supplying, fitting and fixing complete Bottle waste trap (Heavy Quality)

(a) Chromium plated Bottle trap 32 mm with 190 mm long connecting pipe Each 808.00
and wall flange (Equivalent to Code No. 545 & Model - Tropical / Sumthing
Special of ESSCO or similar brand).

(b) PTMT Bottle trap 32 mm with connecting pipe ( Each 522.00


Prayag or equivalent).

16 Supplying, fitting and fixing 15 mm swan neck tap with left & right hand Each 1046.00
operating nob with aerator (Equivalent to Code No. 510, 510(A) and
Model - TROPICAL / SUMTHING SPECIAL of ESSCO or similar brand).

17 Supplying, fitting and fixing Waste fittings complete.


(a) C.P. over brass

(i) 25 mm each 194.00

(ii) 32 mm each 245.00

(iii) 40 mm each 307.00

(b) Polythene

(i) 32 mm each 51.00

(ii) 40 mm each 69.00

(iii) 50 mm each 76.00


SECTION (A) - PLUMBING WORKS PWD SOR Vol-II wef-01.07.2014
(A)-(IV) BASIN AND SINKS WITH PARTS

Item No. Description of Item Unit All Districts of


West Bengal

18 Supplying, fitting and fixing C.I. bracket including two coats of painting.

(a) Wash basin, Dental spitton each 167.00

(b) Sink, Drain board each 185.00

(c) Surgeon's basin each 179.00

(d) Cistern each 114.00

(e) Aluminium brackets each 91.00

19 Supplying, fitting and fixing pillar cock of approved make.

a) (i) CP Pillar Cock - 15 mm. (Equivalent to Code No. 507 & Model - Each 713.00
Tropical / Sumthing Special of ESSCO or similar brand).

a) (ii) CP Pillar Cock Super Deluxe with Aerator - 15 mm. (Equivalent to Each 760.00
Code No. 508 & Model No. Tropical / Sumthing Special of ESSCO or similar
brand).

b) PTMT Pillar Cock - 15 mm. (Prayag or equivalent). Each 278.00

c) CP Pillar Cock - 15 mm. (Code No. 5011 & Model - FLORENTINE of Each 1105.00
JAQUAR or equivalent).

d) Polythene Piller Cock (EMCO / ATLAS or equivalent)


(i) 15 mm each 118.00

e) (i) CP Centre hole Basin mixture with regular spout without popup Each 3188.00
waste system with 450 mm long braided hoses. (Equivalent to Code No.
5167(B) & Model - FLORENTINE of JAQUAR or similar brand).

e) (ii) CP Wall Mixture without spout but with provision for connnection to Each 3188.00
Telephone Shower and exposed pipe for Overhead shower (Equivalent to
Code No. 5215 & Model - FLORENTINE of JAQUAR or similar brand).

f) CP Pillar Cock with 200 mm extended Lever Handle (Equivalent to Code Each 1641.00
No. 5031 & Model - FLORENTINE of JAQUAR or similar brand).

(Note: Item 19(c),e(i),(ii) & f to be done as per specific direction of the


Superintending Engineer.)
SECTION (A) - PLUMBING WORKS PWD SOR Vol-II wef-01.07.2014
(A)-(IV) BASIN AND SINKS WITH PARTS

Item No. Description of Item Unit All Districts of


West Bengal

20 Supplying, fitting and fixing C.P. Extension Pipe Each 133.00

21 Supplying, fitting and fixing C.P. Offset Each 382.00

22 Supplying, fitting and fixing C.P. Wall Flange Each 81.00

23 Supplying, fitting and fixing dome shaped C.P. waste grating for urinals.

(i) 32 mm each 231.00

(ii) 50 mm each 327.00

(b) Repair Works

1 Dismantling wash basin with brackets with or without waste fittings. each 35.00

2 Refixing wash basin with brackets with or without waste fittings. each 71.00

3 Dismantling Surgeon's wash/ Dental spitton with brackets with or without each 35.00
waste fittings.

4 Refixing Surgeon's wash/ Dental spitton with brackets with or without each 79.00
waste fittings.

5 Dismantling sink with brackets with or without waste fittings.

(i) Upto 450 mm length each 41.00

(ii) Above 450 mm and upto 600 mm length each 53.00

(iii) Above 600 mm and upto 750 mm length each 59.00

(iv) Above 750 mm length each 76.00

6 Refixing sink with brackets with or without waste fittings.

(i) Upto 450 mm length each 76.00

(ii) Above 450 mm and upto 600 mm length each 76.00

(iii) Above 600 mm and upto 750 mm length each 76.00

(iv) Above 750 mm length each 118.00


SECTION (A) - PLUMBING WORKS PWD SOR Vol-II wef-01.07.2014
(A)-(IV) BASIN AND SINKS WITH PARTS

Item No. Description of Item Unit All Districts of


West Bengal

7 Renewing wooden block of approved variety of size 150 mm X 100 mm X each 54.00
75 mm with nails and screws for fixing brackets for sinks/ basins.

8 Renewing wooden scantling 450 mm X 25 mm X 12 mm under the table each 35.00


for fixing laboratory sink in proper position with nails and screws
complete.

9 Cutting table for sink. each 49.00

10 Dismantling pillar cock of wash basin. each 9.00

11 Refixing pillar cock of wash basin. each 9.00

12 Dismantling drain board. each 16.00

13 Refixing drain board. each 18.00

14 Fixing brackets for wash basin/ sink/ drain board/ cistern. each 25.00

15 Renewing China stopper for wash basin. each 103.00

16 Dismantling bath tub. each 100.00

17 Refixing bath tub each 147.00

18 Cleaning wash basin/ sink with acid. each 16.00

19 Cleaning sink with soda and soap. each 12.00

20 Cleaning bath tub with acid. each 40.00

21 Renewing cap and lining of heavy quality C.P. over brass.

(i) 15 mm each 34.00

(ii) 20 mm each 64.00

(iii) 25 mm each 81.00

(iv) 32 mm each 90.00

(v) 40 mm each 100.00

(vi) 45 mm each 117.00

(vii) 50 mm each 126.00


SECTION (A) - PLUMBING WORKS PWD SOR Vol-II wef-01.07.2014
(A)-(IV) BASIN AND SINKS WITH PARTS

Item No. Description of Item Unit All Districts of


West Bengal

22 Renewing 32 mm N.P. waste fittings for wash basin including coupling C.P. each 128.00
chain and rubber plug.

23 Renewing simla cap and lining brass union, heavy type best Indian make.

(i) 15 mm each 52.00

(ii) 20 mm each 58.00

24 Rectifying leakage of bed pan sink, renewing rubber washer fully complete each 86.00
with G.I. nuts and bolts.

25 Renewing brass neck only of swan neck cock. each 126.00

26 Renewing bottle jet of bed pan sink. each 458.00

27 Dismantling and refixing Surgeon's mixing valve after repairs. each 296.00

28 Dismantling and taking out lead / polythene waste pipe and refixing the each 34.00
same after removing chokage including necessary bendings/ offsets and
straightening and replacement of damaged parts, if any.

29 Cleaning and refixing displaced laboratory sink in proper position and each 51.00
making the edges of sinks perfectly water tight by renewing packing and
putty joints and setting with rubber sheeting.

30 Dismantling and re-fixing Swan Neck Piller Cock after necessary repairing, each 68.00
packing, washering complete.

31 Dismantling and removing heavy porcelain / enamelled bath tub for each 226.00
repairing the same or for repairing the floor underneath and placing the
same in its original position.
SECTION (A) - PLUMBING WORKS PWD SOR Vol-II wef-01.07.2014
(A)-(V) TUBE WELL
Item No. Description of Item Unit All Districts of
West Bengal

(a) Original Works

1 Labour for boring tube well of required dia. by water jet system through
any type of soil strata including hire and labour charges for boring pipes,
scaffolding, tools and plants as necessary and taking out them and
lowering pipes, strainers, blind pipe etc. and fitting and fixing the same
complete including bucket washing and other incidental works in the
connection. The tube well should have a minimum 50 mm gap in between
the outside of the tubewell pipe and the bore.

(a) For depth upto 150 metre.

(i) 40 mm dia. boring etc. metre 91.00

(ii) 50 mm dia. boring etc. metre 150.00

(iii) 80 mm dia. boring etc. metre 199.00

(b) For depth more than 150 metre.

(i) 40 mm dia. boring etc. beyond 150 metre metre 112.00

(ii) 50 mm dia. boring etc. beyond 150 metre metre 186.00

(iii) 80 mm dia. boring etc. beyond 150 metre metre 218.00

(c) For depth upto 150 metre for 40 mm dia. Tube well with top
enlargement of 80 mm dia.

(i) 40 mm dia. boring etc. metre 149.00

(ii) 80 mm dia. boring etc. top enlargement metre 290.00

(d) For depth upto 150 metre for 50 mm dia. tube well with top
enlargement of 100 mm dia.

(i) 50 mm dia. boring etc. metre 290.00

(ii) 100 mm dia. boring etc. top enlargement metre 430.00


SECTION (A) - PLUMBING WORKS PWD SOR Vol-II wef-01.07.2014
(A)-(V) TUBE WELL
Item No. Description of Item Unit All Districts of
West Bengal

(e) For depth upto 150 metre for 80 mm dia. tube well wuth top
enlargement of 150 mm dia.

(i) 80 mm dia. boring etc. metre 290.00

(ii) 150 mm dia. boring etc. top enlargement metre 692.00

(f) For depth more than 150 metre for 50 mm dia. tube well with top
enlargement of 100 mm dia.

(i) 50 mm dia. boring etc. beyond 150 metre metre 218.00

(ii) 100 mm dia. boring etc. top enlargement metre 430.00

Note - To arrive at labour cost for boring, lowering of a tube well of 50 mm


dia. with top enlargement of 100 mm dia. of depth 30 metre having a total
depth of boring say 200 metre from G.L.: (i) 30 m X f(ii) + 120 m X d(i) + 50
m X f(i) = Rs.10320.00 + Rs.27720.00 + Rs. 8700.00 = Rs.46740.00

2 Labour for boring through any type of soil for sinking tube well of required
dia. with top enlargement by rig boring system (either by reserve
circulation or by direct rotary method) including hire charges and labour
for rig machine, tools and plants, staging, force pumping set and making
arrangement for water required for boring etc. complete and lowering of
pipes, strainers, blind pipes etc. complete.

(a) For depth upto 250 metre for 100 mm dia. Tube well with top
enlargement of 200 mm dia.(upto 50 metre).

(i) First 50 metre metre 1026.00

(ii) Next 50 metre metre 894.00

(iii) Next 50 metre metre 1067.00

(iv) Rest 100 metre metre 1104.00

(b) For depth upto 250 metre for 150 mm dia. Tube well with top
enlargement of 250 mm dia.(upto 50 metre).

(i) First 50 metre metre 1078.00

(ii) Next 50 metre metre 1060.00


SECTION (A) - PLUMBING WORKS PWD SOR Vol-II wef-01.07.2014
(A)-(V) TUBE WELL
Item No. Description of Item Unit All Districts of
West Bengal

(iii) Next 50 metre metre 1261.00

(iv) Rest 100 metre metre 1307.00

(c) For depth upto 250 metre for 150 mm dia. Tube well with top
enlargement of 300 mm dia.(upto 50 metre.)

(i) First 50 metre metre 1090.00

(ii) Next 50 metre metre 1078.00

(iii) Next 50 metre metre 1286.00

(iv) Rest 100 metre metre 1464.00

Note: (i) For item no. 2, measurement will be taken below G.L. taking G.L.
as zero for payment. (ii) For item no. 1 & 2 for bored depth where no
lowering of pipe is involved the corresponding rates would be reduced by
30%.

3 Supplying brass-strainer with brass socket of approved make. (Heavy


type)

(i) 40 mm dia. metre 994.00

(ii) 50 mm dia. metre 1423.00

(iii) 75 mm dia. metre 1886.00

(iv) 100 mm dia. metre 2150.00

4 Supplying G.I. pipe strainer with brass net & jacketted of approved quality.
(Heavy Type)

(i) 40 mm dia. metre 1162.00

(ii) 50 mm dia. metre 1721.00

(iii) 80 mm dia. metre 2236.00


SECTION (A) - PLUMBING WORKS PWD SOR Vol-II wef-01.07.2014
(A)-(V) TUBE WELL
Item No. Description of Item Unit All Districts of
West Bengal

5 Supplying high density polythene strainer of approved make with adapter


conforming to I.S. specifications.

(i) 40 mm dia. metre 448.00

(ii) 50 mm dia. metre 634.00

(iii) 80 mm dia. metre 978.00

(iv) 100 mm dia. metre 1573.00

6 Supplying PVC strainer of approved make with adapter conforming to


I.S.12818specifications.
(i) 40 mm dia. metre 349.00
(ii) 50 mm dia. metre 437.00
(iii) 80 mm dia. metre 587.00
(iv) 100 mm dia. metre 809.00
(v) 150mm dia metre 916.00

7 Supplying, fibre glass reinforced Epoxy resin slotted of 1 mm slot width in


6.1m length of approved make and as per direction of the Engineer - in -
Charge

(a) 100 mm nominal dia


(i) 6.00 mm wall thickness metre 1953.00

(b) 150 mm nominal dia


(i) 6.0 mm wall thickness metre 2921.00
(ii) 7.00 mm wall thickness metre 3390.00

(c) 200 mm nominal dia


(i) 6.0 mm wall thickness metre 3846.00
(ii) 7.00 mm wall thickness metre 4486.00

8 Supplying M.S. male / female adopter of approved make and brand for
coupling of M.S. pipe and fibre glass strainers, as per direction of the
Engineer - in - Charge.

(i) 100 mm metre 3134.00

(ii) 150 mm metre 3815.00

(iii) 200 mm metre 4087.00


SECTION (A) - PLUMBING WORKS PWD SOR Vol-II wef-01.07.2014
(A)-(V) TUBE WELL
Item No. Description of Item Unit All Districts of
West Bengal

9 Supplying, fitting and fixing steel cutter piece upto 450 mm long with
sockets.

(i) 40 mm dia. each 147.00

(ii) 50 mm dia. each 225.00

(iii) 75 mm dia. each 480.00

10 Supplying, fitting and fixing plug of approved make conforming to I.S.


specifications.

(i) 40 mm each 61.00

(ii) 50 mm each 84.00

(iii) 75 mm each 155.00

11 Supplying, fitting and fixing chech valve (vertical) G.M. tested to 21 kg per
sq. cm.

(i) 15 mm each 293.00

(ii) 20 mm each 356.00

(iii) 25 mm each 487.00

(iv) 32 mm each 819.00

(v) 40 mm each 1011.00

(vi) 50 mm each 1725.00

12 Supplying,fitting and fixing check valve (horizontal) G.M. tested to 21 kg


per sq. cm.

(i) 15 mm each 351.00

(ii) 20 mm each 556.00

(iii) 25 mm each 771.00

(iv) 32 mm each 1214.00

(v) 40 mm each 1765.00

(vi) 50 mm each 2627.00


SECTION (A) - PLUMBING WORKS PWD SOR Vol-II wef-01.07.2014
(A)-(V) TUBE WELL
Item No. Description of Item Unit All Districts of
West Bengal

13 Supplying, fitting and fixing special hand pump no. 6 of approved make each 4429.00
(for 50 mm or 40 mm dia. tube well).

14 Supplying, fitting and fixing popular Maya pump no-6 or similar.

(i) For 40 mm dia. tube well each 1878.00

(ii) Domestic Pump of approved make of 40/50 mm dia. each 1454.00

15 Supplying, fitting and fixing 65 mm dia. deep well brass cylinder with each 2287.00
necessary fittings and accessories.

16 Supplying, fitting and fixing 15 mm dia. galv. M.S. connecting rod with metre 84.00
sockets.

17 Supplying, fitting and fixing heavy type bell mouth reducing socket.

(i) 50 mm X 100 mm each 540.00

(ii) 75 mm X 150 mm each 732.00

(iii) 100 mm X 150 mm each 732.00

(iv) 100 mm X 200 mm each 1029.00

(v) 200 mm X 250 mm each 1797.00

18 Supplying, fitting and fixing G.I. cap at top

(i) 100 mm each 163.00

(ii) 150 mm each 598.00

(iii) 200 mm each 669.00

(iv) 300 mm each 859.00

19 Supplying, fitting and fixing M.S socket ring


(i) 100 mm each 126.00
(ii) 150 mm each 240.00
(iii) 200 mm each 310.00
(iv) 300 mm each 584.00
SECTION (A) - PLUMBING WORKS PWD SOR Vol-II wef-01.07.2014
(A)-(V) TUBE WELL
Item No. Description of Item Unit All Districts of
West Bengal

20 Washing and developing tube well with air compressor pump and engine day 7613.00
for 8 (eight) hours continuous pumping per day with necessary
arrangements for testing the yield in gallons per hour with 'V' notch
including hire and labour charges for all tools and plants and scaffolding as
required.

21 Surging of existing tube well with chemical treatment and bucket wash
(prior to use of compressor machine) and developing the tube well with
compressor machine at least 3 (three) days at 8 (eight) hours per day till
the yield is obtained at least by 75% of the total specified yield of the tube
well (measured by 'V' notch tank) and draw down is within the permissible
limit of 10% variation and water so obtained after such washing and
developing will be free from sand and bacteria for which test report from
the Public Analyst is to be obtained. (The rate is inclusive of all labour and
materials including hire charges of tools and plants and cost of materials.)

(a) For tube well from 40 mm to 100mm top enlarged to have yield from each 17188.00
1500 to 3000 gallons per hour as per size and yield.

(b) For tube well of size bigger than 100mm dia. with top enlargement to each 28140.00
have yield of 6000 gallons per hour.

(c) For additional period Per Day 5258.00

N.B. This item is to be executed with the special approval of the Engineer-
in-charge.

22 Labour for making arrangement for showing verticality test including the L.S. 926.00
cost for hire charges of tools and plants, scafolding, labour etc. all
complete.

23 Collecting sample of water for bacteriological and chemical test from any L.S. 1243.00
depth at any time during execution of work including hire and labour
charges for tools and plants and sterilising the equipments, paying all
charges and fees, testing etc. complete in all respect as per direction.

24 Packing the annular space between the outside of the tube well pipes & cu. m. 2050.00
strainers and the bore with pea size washed gravel of approved quality
having size from 2 mm to 5 mm or the size approved by the Engineer-in-
charge including cost of all materials labour and equipment complete.

Note: Initial 6 m. of Annular space between the housing pipe and the bore
should not be shrouded with Pea size gravel to avoid contamination with
surface water.
SECTION (A) - PLUMBING WORKS PWD SOR Vol-II wef-01.07.2014
(A)-(V) TUBE WELL
Item No. Description of Item Unit All Districts of
West Bengal

25 Packing annular space between the outside of the housing pipe and the cu. m. 421.00
bore with puddled clay balls of approved size as per direction of the
Engineer-in-charge with cost of all materials and labour complete.

26 Providing and fixing bell plug as required upto 250 mm (internal) dia. each 508.00
ERWMS pipe including cost of materials and labour complete.

27 Supplying, fitting and fixing 300 mm M.S. housing clamp of approved Per Set 2660.00
quality.

28 Providing 200 mm centre guide.


i) With Clamp Per Set 151.00
ii) With Flat Per Set 83.00

29 Geophysical investigation of the acquifer by electrologging system with all Each Test 8329.00
tools and plants as necessary including supply of necessary report.

(b) Repair Works

1 Taking out pipes of existing tube well including strainer etc. complete for
portion
(a) Uptoof
20length:
metre below G.L.
(i) 40 mm dia. metre 29.00
(ii) 50 mm dia. metre 46.00
(iii) 80 mm dia. metre 54.00
(iv) 100 mm dia. metre 81.00
(v) 150 mm dia. metre 98.00
(vi) 200 mm dia. metre 130.00
(vii) 250 mm dia. metre 143.00
(viii) 300 mm dia. metre 162.00
(ix) 350 mm dia. metre 175.00
SECTION (A) - PLUMBING WORKS PWD SOR Vol-II wef-01.07.2014
(A)-(V) TUBE WELL
Item No. Description of Item Unit All Districts of
West Bengal

(b) Beyond 20 metre below G.L.


(i) 40 mm dia. metre 46.00
(ii) 50 mm dia. metre 54.00
(iii) 80 mm dia. metre 81.00
(iv) 100 mm dia. metre 98.00
(v) 150 mm dia. metre 130.00
(vi) 200 mm dia. metre 143.00
(vii) 250 mm dia. metre 162.00
(viii) 300 mm dia. metre 175.00
(ix) 350 mm dia. metre 194.00

2 Repairing chocked up tube well by cleaning and washing with chemical


including
(i) 40 mmpumping with
to 50 mm dia.powerful
tube wellpump.
upto 100 metre deep Each Set 2370.00
(ii) Above 50 mm to 100 mm dia. tube well upto 100 metre deep Each Set 4712.00

3 Supplying, fitting and fixing brass cylinder parts.

(i) Brass plunger complete each 466.00


(ii) Brass plunger complete without G.I. rod each 411.00
(iii) C.I. top socket each 92.00
(iv) C.I. bottom socket each 101.00
(v) 65 mm brass tube (both ends threaded) each 1314.00
SECTION (B) - SANITARY AND DRAINAGE WORKS PWD SOR Vol-II wef-01.07.2014
(B)-(I) HYDRANT AND ALLIED WORKS

Item No. Description of Item Unit All Districts of


West Bengal

(a) Original Works

1 Supplying, fitting and fixing ground hydrant of approved make.

(i) 20 mm each 1128.00


(ii) 25 mm each 1640.00
(iii) 32 mm each 3288.00
(iv) 40 mm each 4552.00

2 Supplying, fitting and fixing street pattern hydrant 65 mm with guaranteed each 4759.00
spindles and C.I.cover complete.

3 Supplying, fitting and fixing C.I. cover for street pattern hydrant. each 960.00

4 Supplying, fitting and fixing fire hydrant of approved make.


(i) 20 mm each 1117.00
(ii) 25 mm each 1604.00
(iii) 32 mm each 3349.00
(iv) 40 mm each 4659.00

(b) Repair Works

1 Dismantling and refixing 65 mm street hydrant. each 65.00

2 Renewing C.I. square head of street hydrant. each 140.00

3 Renewing leather washer of street hydrant.


(i) 50 mm each 66.00
(ii) 45 mm each 62.00

4 Renewing 150 mm X 150 mm grey rubber washer for flange of street each 49.00
hydrant.

5 Supplying, fitting and fixing spindle (G.M.) nipple for hydrants to make each 269.00
house union 25 mm to 40 mm size.

6 Regrinding valve seat of street hydrant. each 115.00

7 Renewing brass jumper of street hydrant. each 125.00

8 Dismantling garden hydrant and refixing the same after repair including each 146.00
regrinding seat 40 mm and above.

9 Dismantling fire hydrant after plugging off the supply for repairs and each 341.00
refixing the same including taking to workshop and back.

10 Renewing bolt and nut for hydrant. each 13.00


SECTION (B) - SANITARY AND DRAINAGE WORKS PWD SOR Vol-II wef-01.07.2014
(B)-(I) HYDRANT AND ALLIED WORKS

Item No. Description of Item Unit All Districts of


West Bengal

11 Renewing spindle of hydrant.


(i) 15 mm each 78.00
(ii) 20 mm each 89.00
(iii) 25 mm each 102.00
(iv) 32 mm each 148.00
(v) 50 mm each 279.00
(vi) 75 mm each 549.00

12 Renewing pin for hydrant. each 29.00

13 Renewing 65 mm bridge guage. each 308.00

14 Renewing cap for 65 mm bridge guage. each 148.00

15 Renewing brickets for hydrant. each 136.00

16 Renewing English rubber seat.


(i) 80 mm dia. 10 mm thick each 35.00
(ii) 125 mm dia. 6 mm thick each 36.00
SECTION (B) - SANITARY AND DRAINAGE WORKS PWD SOR Vol-II wef-01.07.2014
(B)-(II) SOIL PIPE AND FITTINGS

Item No. Description of Item Unit All Districts of


West Bengal

(a) Original Works

1 Supplying, fitting & fixing Cast iron soil pipe only conforming to I.S. 3989 /
1970 and I.S. 1729/1964 with bobbins, nails etc. including making holes in
the wall, floor etc. and cutting trenches etc. in any floor through masonry
concrete, if necessary, and mending good damages with necessary jointing
materials and painting two coats to the exposed surface with approved
paint complete. (Measurement will be made along the center line of the
total pipe line in fitted condition including specials,payment for specials &
Painting will however be paid seperately).

(a) With valamoid joints including sealing with sand cement morter (4:1)
upto quarter depth.

(i) 150 mm dia. (internal) metre 1613.00

(ii) 100 mm dia. (internal) metre 795.00

(iii) 75 mm dia. (internal) metre 659.00

(iv) 50 mm dia. (internal) metre 511.00

(b) With lead caulked joints.

(i) 150 mm dia. (internal) metre 1710.00

(ii) 100 mm dia. (internal) metre 858.00

(iii) 75 mm dia. (internal) metre 705.00

(iv) 50 mm dia. (internal) metre 554.00

2 Supplying, fitting & fixing Cast iron single branch equal with door
conforming to I.S. 1729/1970 including joining and painting two coats to
the exposed surface with approved paint complete. (Payment of Painting
will however be paid seperately).
(a) With valamoid joints including sealing the top with cement mortar (4:1)

(i) 150 mm dia. each 1811.00

(ii) 100 mm dia. each 923.00

(iii) 75 mm dia. each 624.00

(iv) 50 mm dia. each 544.00


SECTION (B) - SANITARY AND DRAINAGE WORKS PWD SOR Vol-II wef-01.07.2014
(B)-(II) SOIL PIPE AND FITTINGS

Item No. Description of Item Unit All Districts of


West Bengal
(b) With lead caulked joints

(i) 150 mm dia. each 2002.00

(ii) 100 mm dia. each 1035.00

(iii) 75 mm dia. each 703.00

(iv) 50 mm dia. each 578.00

3 Supplying, fitting & fixing Cast iron double branch equal with door
conforming to I.S. 1729/1970 including jointing and painting two coats to
the exposed surface with approved paint complete. (Payment of Painting
will however be paid seperately).
(a) With valamoid joints including sealing the top with cement mortar (4:1)

(i) 150 mm dia. each 2127.00

(ii) 100 mm dia. each 1069.00

(iii) 75 mm dia. each 826.00

(iv) 50 mm dia. each 737.00

(b) With lead caulked joints

(i) 150 mm dia. each 2400.00

(ii) 100 mm dia. each 1223.00

(iii) 75 mm dia. each 936.00

(iv) 50 mm dia. each 802.00

N.B. For single or double junction without door, the rates for items 2 & 3
will be reduced by Rs. 50.00.

4 Supplying, fitting & fixing H.C.I. bend with door conforming to I.S.S.
including jointing complete and painting two coats to the exposed surface
with approved paint complete. (Payment of Painting will however be paid
seperately).
(a) With valamoid joints including sealing the top with cement mortar (4:1)

(i) 150 mm dia. each 1005.00

(ii) 100 mm dia. each 624.00


SECTION (B) - SANITARY AND DRAINAGE WORKS PWD SOR Vol-II wef-01.07.2014
(B)-(II) SOIL PIPE AND FITTINGS

Item No. Description of Item Unit All Districts of


West Bengal
(iii) 75 mm dia. each 482.00

(iv) 50 mm dia. each 424.00

(b) With lead caulked joints

(i) 150 mm dia. each 1184.00

(ii) 100 mm dia. each 728.00

(iii) 75 mm dia. each 567.00

(iv) 50 mm dia. each 473.00

5 Supplying, fitting & fixing H.C.I. bend without door conforming to I.S.S.
including jointing complete and painting two coats to the exposed surface
with approved paint complete. (Payment of Painting will however be paid
seperately).
(a) With valamoid joints including sealing the top with cement mortar (4:1)

(i) 150 mm dia. each 1038.00

(ii) 100 mm dia. each 568.00

(iii) 75 mm dia. each 469.00

(iv) 50 mm dia. each 362.00

(b) With lead caulked joints

(i) 150 mm dia. each 1217.00

(ii) 100 mm dia. each 672.00

(iii) 75 mm dia. each 554.00

(iv) 50 mm dia. each 411.00

6 Supplying, fitting & fixing H.C.I. heel rest bend conforming to I.S.S.
including jointing complete and painting two coats to the exposed surface
with approved paint complete. (Payment of Painting will however be paid
seperately).
(a) With valamoid joints including sealing the topwith cement mortar (4:1)

(i) 150 mm dia. each 1164.00


SECTION (B) - SANITARY AND DRAINAGE WORKS PWD SOR Vol-II wef-01.07.2014
(B)-(II) SOIL PIPE AND FITTINGS

Item No. Description of Item Unit All Districts of


West Bengal
(ii) 100 mm dia. each 632.00

(iii) 75 mm dia. each 499.00

(iv) 50 mm dia. each 451.00

(b) With lead caulked joints

(i) 150 mm dia. each 1336.00

(ii) 100 mm dia. each 732.00

(iii) 75 mm dia. each 613.00

(iv) 50 mm dia. each 514.00

7 (A) Supplying, fitting & fixing H.C.I. offset conforming to I.S.S. including
jointing complete with or without ear (75 mm projection) and painting
two coats to the exposed surface with approved paint complete. (Payment
of Painting will however be paid seperately).

(a) With valamoid joints including sealing the top with cement mortar (4:1)

(i) 150 mm dia. each 985.00

(ii) 100 mm dia. each 714.00

(iii) 75 mm dia. each 508.00

(iv) 50 mm dia. each 398.00

(b) With lead caulked joints

(i) 150 mm dia. each 1164.00

(ii) 100 mm dia. each 819.00

(iii) 75 mm dia. each 593.00

(iv) 50 mm dia. each 446.00

(B) Supplying, fitting & fixing H.C.I. offset conforming to I.S.S. including
jointing complete with or without ear (150 mm projection) and painting
two coats to the exposed surface with approved paint complete. (Payment
of Painting will however be paid seperately).
SECTION (B) - SANITARY AND DRAINAGE WORKS PWD SOR Vol-II wef-01.07.2014
(B)-(II) SOIL PIPE AND FITTINGS

Item No. Description of Item Unit All Districts of


West Bengal

(a) With valamoid joints including sealing the top with cement mortar (4:1)

(i) 150 mm dia. each 1234.00

(ii) 100 mm dia. each 747.00

(iii) 75 mm dia. each 619.00

(iv) 50 mm dia. each 508.00

(b) With lead caulked joints

(i) 150 mm dia. each 1413.00

(ii) 100 mm dia. each 851.00

(iii) 75 mm dia. each 704.00

(iv) 50 mm dia. each 557.00

8 (a) H.C.I. bell mouth plain trap supplied, fitted and fixed with lead jointing each 965.00
complete 100 mm dia and painting two coats to the exposed surface with
approved paint complete. (Payment of Painting will however be paid
seperately).

(b) H.C.I. bell mouth plain trap supplied, fitted and fixed with valamoid each 861.00
joint complete 100 mm dia and painting two coats to the exposed surface
with approved paint complete. (Payment of Painting will however be paid
seperately).

9 Supplying, fitting & fixing approved patent vent cowl I.C.I. conforming to
I.S.S and painting two coats to the exposed surface with approved paint
complete. (Payment of Painting will however be paid seperately).

(i) 100 mm dia. each 427.00

(ii) 75 mm dia. each 315.00

(iii) 50 mm dia. each 277.00

10 Supplying, fitting & fixing Aluminium domical grating.

(i) 150 mm each 87.00


SECTION (B) - SANITARY AND DRAINAGE WORKS PWD SOR Vol-II wef-01.07.2014
(B)-(II) SOIL PIPE AND FITTINGS

Item No. Description of Item Unit All Districts of


West Bengal
(ii) 125 mm each 65.00

(iii) 100 mm each 57.00

(iv) 87.5 mm each 49.00

(v) 75 mm each 48.00

(vi) 50 mm each 44.00

11 Supplying, fitting & fixing Cast Iron Fresh air inlet valve 100 mm and each 200.00
painting two coats to the exposed surface with approved paint complete.
(Payment of Painting will however be paid seperately).

12 Supplying, fitting & fixing Cast iron inverted single junction or antisyphon
all degrees conforming to I.S. 3989/1970 and 1729/ 1964 including jointing
and painting two coats to the exposed surface.(Painting will however be
paid seperately).

(a) With valamoid joints including sealing the top with cement mortar (4:1)
upto quarter depth.

(i) 50 mm X 50 mm each 650.00

(ii) 100 mm X 50 mm each 834.00

13 Supplying, fitting & fixing Cast iron inverted double junction or antisyphon
all degrees conforming to I.S. 3989/1970 and 1729 / 1964 including
jointing and painting two coats to the exposed surface with approved
paint complete. (Measurement of Painting will however be paid
(a) With valamoid joints including sealing the top with cement mortar (4:1)
upto quarter depth.

(i) 100 mm X 50 mm X 50 mm each 1037.00

(b) with lead caulked joints.

(i) 100 mm X 50 mm X 50 mm each 1235.00

14 Supplying,fitting and fixing cast iron 'P' or 'S' trap conformimg to I.S. 3989 /
1970 and 1729 / 1964 including lead caulked joints and painting two coats
to the exposed surface. (Painting to be paid seperately).

(A) 'P' Trap


(i) 50 mm each 573.00
SECTION (B) - SANITARY AND DRAINAGE WORKS PWD SOR Vol-II wef-01.07.2014
(B)-(II) SOIL PIPE AND FITTINGS

Item No. Description of Item Unit All Districts of


West Bengal

(ii) 75 mm each 684.00

(iii) 100 mm each 1094.00

(iv) 150 mm each 1959.00

(B) 'S' Trap


(i) 50 mm each 748.00

(ii) 75 mm each 740.00

(iii) 100 mm each 923.00

(iv) 150 mm each 1722.00

15 Supplying, fitting and fixing cast iron extension pipes for using in Traps only
(connector) conforming to I.S.3989/1970 and 1729/1964 including lead
caulked joints complete and painting two coats to the exposed surface
with approved paint complete. (Payment of Painting will however be paid
seperately).

(a) (i) 100 mm X 150 mm each 495.00

(ii) 100 mm X 225 mm each 554.00

(iii) 100 mm X 300 mm each 607.00

(iv) 100 mm X 375 mm each 644.00

(v) 100 mm X 450 mm each 679.00

(vi) 100 mm X 525 mm each 763.00

(vii) 100 mm X 600 mm each 792.00

(b) Extension 50 mm one way


(i) 100 mm X 375 mm each 696.00

(c) Extension 50 mm two way


(i) 100 mm X 375 mm each 845.00

16 Supplying, fitting and fixing with cement jointing (3:1) salt glazed
stoneware pipe including excavation of earth upto 1.50 metre depth in all
sorts of soil both mixed or unmixed and refilling (but excluding concreting
at bottom and sides).

(i) 300 mm Mtr. 1079.00

(ii) 225 mm Mtr. 604.00


SECTION (B) - SANITARY AND DRAINAGE WORKS PWD SOR Vol-II wef-01.07.2014
(B)-(II) SOIL PIPE AND FITTINGS

Item No. Description of Item Unit All Districts of


West Bengal

(iii) 150 mm Mtr. 378.00

(iv) 100 mm Mtr. 330.00

17 Supplying, fitting and fixing with cement jointing (3:1) with jute gasket
soaked in cement mortar.
(a) Stoneware bend

(i) 300 mm each 613.00

(ii) 225 mm each 512.00

(iii) 150 mm each 406.00

(iv) 100 mm each 343.00

(b) Stoneware single T or Y junction

(i) 225 mm each 581.00

(ii) 150 mm each 512.00

(iii) 100 mm each 324.00

(c) Stoneware double T or Y junction

(i) 150 mm each 557.00

(ii) 100 mm each 497.00

18 Supplying, fitting and fixing C.I. round grating.

(i) 100 mm each 73.00

(ii) 150 mm each 100.00

(iii) 225 mm each 141.00

19 Supplying, fitting and fixing C.I. square jalli.

(i) 100 mm each 86.00

(ii) 150 mm each 120.00

(iii) 225 mm each 168.00


SECTION (B) - SANITARY AND DRAINAGE WORKS PWD SOR Vol-II wef-01.07.2014
(B)-(II) SOIL PIPE AND FITTINGS

Item No. Description of Item Unit All Districts of


West Bengal
(iv) 300 mm each 219.00

(v) 450 mm each 364.00

20 Supplying, fitting and fixing yard gully with approved H.C.I. grating
complete.

(i) 225 mm X 150 mm with 230 mm gratings each 588.00

(ii) 150 mm X 100 mm with 150 mm gratings each 353.00

21 Supplying, fitting and fixing S.W. master trap.

(i) 150 mm X 150 mm each 1112.00

(ii) 225 mm X 225 mm each 6799.00

22 Cast Iron fittings for soil pipe line conforming to I.S. 1729/1970 including
jointing and fitting and fixing in position and painting two coats to the
exposed surface complete including cost of all materials &
labour.(Payment of paiting will be paid seperatly.)

(a) Single junction of 150 mm.X 100 mm. dia with door

(i) With valamoid joint including sealing the top with cement mortar (4:1) each 1670.00

(ii) With lead caulked joints each 1661.00

(b) Double junction of 150 mm.dia X 100 mm.dia X 100 mm. with door

(i) With valamoid joints including sealing the top with cement mortar (4:1) each 1698.00

(ii) With lead caulked joints each 1889.00

(c) Double 'Y' junction of 150 mm.dia X 100 mm.dia X 100 mm.dia with
door

(i) With valamoid joints including sealing the top with cement mortar (4:1) each 1620.00
SECTION (B) - SANITARY AND DRAINAGE WORKS PWD SOR Vol-II wef-01.07.2014
(B)-(II) SOIL PIPE AND FITTINGS

Item No. Description of Item Unit All Districts of


West Bengal
(ii) With lead caulked joints each 1810.00

N.B. For any junction without door the rate for above items will be
reduced by Rs. 50.00

23 Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992

(A) (i) Single Socketed 3 Meter Length

(a) 75 mm metre 234.00

(b) 110 mm metre 348.00

(c) 160 mm metre 651.00

(ii) Double Socketed 3 Meter Length

(a) 75 mm metre 251.00

(b) 110 mm metre 375.00

(c) 160 mm metre 713.00

(iii) Single Socketed 1.8 Meter Length

(a) 75 mm metre 243.00

(b) 110 mm metre 350.00

(iv) Double Socketed 1.8 Meter Length

(a) 75 mm metre 251.00

(b) 110 mm metre 378.00


SECTION (B) - SANITARY AND DRAINAGE WORKS PWD SOR Vol-II wef-01.07.2014
(B)-(II) SOIL PIPE AND FITTINGS

Item No. Description of Item Unit All Districts of


West Bengal

(v) Double Socketed 1.2 Meter Length

(a) 75 mm metre 262.00

(b) 110 mm metre 384.00

(vi) Double Socketed 0.9 Meter Length

(a) 75 mm metre 270.00

(b) 110 mm metre 387.00

(vii) Double Socketed 0.60 Meter Length

(a) 75 mm metre 281.00

(b) 110 mm metre 402.00

(B) Fittings
(i) Coupler
(a) 75 mm Each 55.00
(b) 110 mm Each 101.00
(c)160 mm Each 312.00
(ii) Plain Tee
(a) 75 mm Each 95.00
(b) 110 mm Each 182.00
(c) 160 mm Each 604.00

(iii) Door Tee


(a) 75 mm Each 120.00
(b) 110 mm Each 233.00
(c) 160 mm Each 613.00
iv) Door Tee(LH) & (RH)
SECTION (B) - SANITARY AND DRAINAGE WORKS PWD SOR Vol-II wef-01.07.2014
(B)-(II) SOIL PIPE AND FITTINGS

Item No. Description of Item Unit All Districts of


West Bengal
(a) 75 mm Each 212.00
(b) 110 mm Each 372.00
v) Plain Y
(a) 75 mm Each 122.00
(b) 110 mm Each 246.00
(c) 160 mm Each 695.00
vi) Door Y (LH) & (RH)
(a) 75 mm Each 167.00
(b) 110 mm Each 329.00
vii) Double Y
(a) 75 mm Each 179.00
(b) 110 mm Each 327.00
viii) Double Y with Door
(a) 75 mm Each 256.00
(b) 110 mm Each 411.00
ix) Bend 45º
(a) 75 mm Each 64.00
(b) 110 mm Each 106.00
(c) 160 mm Each 349.00
x) Bend 87.5º
(a) 75 mm Each 73.00
(b) 110 mm Each 143.00
(c) 160 mm Each 403.00
xi) Door Bend (T.S.)
(a) 75 mm Each 99.00
(b) 110 mm Each 176.00
(c) 160 mm Each 441.00
xii) Door Bend (LH) & (RH)
(a) 75 mm Each 149.00
(b) 110 mm Each 339.00

xiii) Cross Tee


(a) 75 mm Each 173.00
(b) 110 mm Each 222.00
xiv) Cross Tee with Door
(a) 75 mm Each 257.00
(b) 110 mm Each 285.00
SECTION (B) - SANITARY AND DRAINAGE WORKS PWD SOR Vol-II wef-01.07.2014
(B)-(II) SOIL PIPE AND FITTINGS

Item No. Description of Item Unit All Districts of


West Bengal
xv) Vent Cowl
(a) 75 mm Each 30.00
(b) 110 mm Each 39.00
(c) 160 mm Each 68.00
xvi) Pipe Clip
(a) 75 mm Each 19.00
(b) 110 mm Each 25.00
(c) 160 mm Each 52.00
xvii) W.C. Connector (150 mm long) 125 X 110(W/WC Ring)
75 mm Each 169.00
xviii) W.C. Connector (450 mm long) W / lipring
75 mm Each 330.00
xix) W.C. Connector Bend W / lipring
75 mm Each 190.00
xx) 125/110 P Trap with W.C. Ring
75 mm Each 406.00
xxi) 110 X 110 P Trap
75 mm Each 335.00
xxii) 125/110 S Trap with W.C. Ring
75 mm Each 658.00
xxiii) 110/110 S Trap
75 mm Each 518.00
xxiv) 125/110 Q Trap with W.C. Ring
75 mm Each 563.00
xxv) 110/110 Q Trap
75 mm Each 411.00
xxvi) Reducer 110 X 75 mm
75 mm Each 95.00
xxvii) Reducing Tee (110 X 75 mm)
75 mm Each 170.00
xxviii) Reducing Tee (160 X 110 mm)
75 mm Each 483.00
xxix) Passover
(a) 75 mm Each 340.00
(b) 110 mm Each 486.00
xxx) Cleaning Pipe
(a) 75 mm Each 111.00
(b) 110 mm Each 217.00
SECTION (B) - SANITARY AND DRAINAGE WORKS PWD SOR Vol-II wef-01.07.2014
(B)-(II) SOIL PIPE AND FITTINGS

Item No. Description of Item Unit All Districts of


West Bengal
(c) 160 mm Each 548.00
xxxi) Plain Floor Trap with Top tile & Strainer
75 mm Each 171.00
xxxii) Plain Floor Trap without Top tile & Strainer
75 mm Each 171.00
xxxiii) Multi Floor Trap with Top tile & Strainer
75 mm Each 204.00
xxxiv) Multi Floor Trap without Top tile & Strainer
75 mm Each 209.00
xxxv) Socket Plug
75 mm Each 50.00
110 mm Each 64.00
xxxvi) Reducing Door Tee 160 X 110 mm
75 mm Each 473.00
xxxvii) Reducing Door Tee 160 X 75 mm
75 mm Each 189.00
xxxviii) Reducing Tee 160 X 75 mm
75 mm Each 434.00
xxxix) Reducing Y 110 X 75 mm
75 mm Each 173.00
xI) Branch Saddle 110 X 75 mm
75 mm Each 95.00
xIi) Branch Saddle 110 X 50 mm
75 mm Each 89.00
xIii) Branch Saddle 110 X 40 mm
75 mm Each 78.00
xIiii) Branch Saddle 75 X 50 mm
75 mm Each 23.00
xIiv) Branch Saddle 75 X 40 mm
75 mm Each 23.00

xIv) Round Jali


75 mm Each 28.00
xIvi) Door Cap
(a) 75 mm Each 44.00
(b) 110 mm Each 61.00
xIvii) W.C. Ring
SECTION (B) - SANITARY AND DRAINAGE WORKS PWD SOR Vol-II wef-01.07.2014
(B)-(II) SOIL PIPE AND FITTINGS

Item No. Description of Item Unit All Districts of


West Bengal
110 mm Each 148.00
xIviii) Lip Ring
110 mm Each 72.00
xIix) Door Gasket
(a) 75 mm Each 7.00
(b) 110 mm Each 9.00
L) Rubber Ring

(a) 75 mm Each 16.00

(b) 110 mm Each 21.00

( c ) 160 mm Each 36.00

Li) Nahani Trap


90 mm Each 125.00

C) Rubber Lubricant 500 ML 500 ML 223.00

D) Solvent Cement 250 ML 250 ML 123.00

24 Labour for fitting and fixing U.P.V.C. pipes for above ground work including
cost of jointing materials etc. fitting and fixing all necessary specials,
cutting pipes, cutting holes in walls or R.C. floor where necessary and
mending good all damages excluding the cost of masonry or concrete
work, if necessary, but including the cost and fitting and fixing holder bat
clamps (any floor) or for underground work including cutting trenches
upto 1.5 metre and refilling the same complete as per direction of the
Engineer-in-charge. (Payment will be made on centre line measurement of
the total pipeline including specials.

(A)Above ground
(i) 75 mm dia. metre 45.00
(ii) 110 mm dia. metre 57.00
(iii) 160 mm dia. metre 66.00

(B)Under ground
(i) 75 mm dia. metre 73.00
(ii) 110 mm dia. metre 85.00
(iii) 160 mm dia. metre 94.00

(b) Repair Works


SECTION (B) - SANITARY AND DRAINAGE WORKS PWD SOR Vol-II wef-01.07.2014
(B)-(II) SOIL PIPE AND FITTINGS

Item No. Description of Item Unit All Districts of


West Bengal
1 Dismantling H.C.I. pipe with fittings including melting lead caulked joints.

(i) 50 mm metre 51.00

(ii) 75 mm metre 58.00

(iii) 100 mm metre 65.00

(iv) 150 mm metre 72.00


2 Refixing H.C.I. pipe with fittings including lead caulked joints (with the old
molten lead).

(i) 50 mm metre 37.00

(ii) 75 mm metre 54.00

(iii) 100 mm metre 72.00

(iv) 150 mm metre 90.00


3 Melting out lead caulked joint.
(i) 50 mm metre 15.00
(ii) 75 mm metre 22.00
(iii) 100 mm metre 26.00
(iv) 150 mm metre 37.00

4 Renewing lead caulked joints for H.C.I. pipe with new gaskets.

(i) 150 mm (2.07 kg of lead) each 480.00

(ii) 100 mm (1.25 kg of lead) each 305.00

(iii) 75 mm (0.87 kg of lead) each 213.00

(iv) 50 mm (0.56 kg of lead) each 146.00

5 Renewing cast iron inspection door with bolts and nuts complete for each 98.00
fittings of 50 mm dia. to 150 mm dia. H.C.I. pipe.

6 Dismantling door of H.C.I. bend or junction and taking out broken nuts by each 30.00
drilling and refixing the same with new nuts including putty joints
complete.
SECTION (B) - SANITARY AND DRAINAGE WORKS PWD SOR Vol-II wef-01.07.2014
(B)-(II) SOIL PIPE AND FITTINGS

Item No. Description of Item Unit All Districts of


West Bengal
7 Cutting out patent stone / mosaic floor for embedding pipe and mending metre 97.00
good all damages including concreting (4:2:1) and bringing the floor to
original nature.

8 Renewing door of H.C.I. bend or junction with new bolts and nuts including set 84.00
taking out.

9 Dismantling yard gully with gratings.


(i) 100 mm each 35.00

(ii) 150 mm each 35.00

(iii) 225 mm each 53.00

(iv) 300 mm each 53.00

10 Refixing yard gully including necessary cement brick work (4:1) and 13 mm
thick cement plaster (2:1) etc. complete including mending good all
damages. (Cement work will be paid seperately).

(i) 100 mm each 21.00

(ii) 150 mm each 21.00

(iii) 225 mm each 35.00

(iv) 300 mm each 35.00

11 Removing chokage of yard gully. each 25.00

12 Removing chokage of H.C.I. or S.W. pipe with split bamboo.


(a) Underground metre 11.00

(b) Over ground metre 9.00

13 Scraping the hard scum of 'S' trap carefully to render the flushing flow easy each 88.00
after soaking with strong acid through W.C. pan on floor and also cleaning
through flanged junction door underneath the ceiling including necessary
scafolding and resetting the flanged door watertight by putty joints by
methor labour.
SECTION (B) - SANITARY AND DRAINAGE WORKS PWD SOR Vol-II wef-01.07.2014
(B)-(III) WATER CLOSETS AND URINALS

Item No. Description of Item Unit All Districts of


West Bengal

(a) Original Works

1 Supplying, fitting and fixing Shallow water closet Indian pattern (I.P.W.C.)
of approved make in white vitreous chinaware in position (excluding cost
of concrete for fixing).

(i) 580 mm long each 1193.00

(ii) 510 mm long each 1098.00

(iii) 450 mm long each 1062.00

2 Supplying, fitting and fixing E.W.C. in white glazed vitreous chinaware of


approved make complete in position with necessary bolts, nuts etc.

(a) With 'P' trap each 1776.00

(b) With 'S' trap each 1895.00

3 Supplying, fitting and fixing Anglo-Indian W.C. in white glazed vitreous


china ware of approved make complete in position with necessary bolts,
nuts etc.

(a) With 'P' trap (with vent) each 3965.00

(b) With 'S' trap (with vent) each 4203.00

N.B. For W.C. with trap without vent the rate will be reduced by Rs.25.00

4 Supplying, fitting and fixing Orissa pattern water closet in white glazed
vitreous chinaware of approved make in position complete excluding 'P' or
'S' trap (excluding cost of concrete for fixing).

(i) 580 mm X 440 mm each 2026.00

(ii) 530 mm X 410 mm each 1907.00

5 Suppling, fitting and fixing Wall mounted water closet of white glazed each 5057.00
vitreous chinaware of approved make and brand in position complete with
necessary nut and boalts (Equivalent to Code No. 20061 or 92065 &
Model Studio or Rubbic of Hidware or equivalent.)
(This item to be executed on specific permission of Superintending
Engineer)
SECTION (B) - SANITARY AND DRAINAGE WORKS PWD SOR Vol-II wef-01.07.2014
(B)-(III) WATER CLOSETS AND URINALS

Item No. Description of Item Unit All Districts of


West Bengal

6 Supplying, fitting and fixing Flat back urinal (half stall urinal) in white
vitreous chinaware of approved make in position with brass screws on 75
mm X 75 mm X 75 mm wooden blocks complete.

(i) 590 mm X 390 mm X 380 mm each 2990.00

(ii) 465 mm X 355 mm X 265 mm each 820.00

(iii) Corner urinal 430 mm X 340 mm X 260 mm each 1115.00

7 Supplying, fitting and fixing Squating plate with integral flushing in white
vitreous chinaware of approved make in cement concrete (6:3:1) with
jhama chips complete. (Payment of concrete will be paid seperately).

(i) 450 mm X 350 mm each 1103.00

8 Supplying, fitting and fixing Half round channel with or without outlet as
required set in cement concrete (6:3:1) with jhama chips complete.
(Payment of concrete will be paid seperately).

(i) 600 mm X 100 mm

(a) Salt glazed stone ware metre 150.00

(b) White vitreous chinaware metre 595.00

(ii) 600 mm X 150 mm

(a) Salt glazed stone ware metre 169.00

(b) White vitreous chinaware metre 743.00

(A) Extra for item 8(i)(b) & 8(ii)(b)

(i) Channel with outlet, stop end metre 49.00

(ii) Channel with 'L' or 'T' metre 250.00

9 Supplying, fitting and fixing Foot rest for water closet of size 275 mm X 125
mm with

(a) Artificial stone (4:2:1) with 6 mm stone chips and chequered including Each Pair 70.00
adding colour as necessary.

(b) Porcelain of approved make. Each Pair 257.00


SECTION (B) - SANITARY AND DRAINAGE WORKS PWD SOR Vol-II wef-01.07.2014
(B)-(III) WATER CLOSETS AND URINALS

Item No. Description of Item Unit All Districts of


West Bengal

10 Supplying, fitting and fixing Closet seat of approved make with lid and C.P.
hinges, rubber buffer and brass screws complete.

(a) E.W.C.
(i) Plastic (hallow type) black each 353.00
(ii) Plastic (hallow type) white each 446.00
(iii) Bestolite (solid type) black each 632.00
(iv) Bestolite (solid type) white each 846.00

(b) Anglo Indian


(i) Plastic (hallow type) black each 436.00
(ii) Plastic (hallow type) white each 572.00

11 Supplying,fitting and fixing 32 mm dia. Flush Pipe of approved make with


necessary fixing materials and clamps complete.
i) Polythene Flush Pipe each 181.00
ii) C. P. Flush Pipe each 378.00

12 Supplying, fitting and fixing urinal flush pipe fittings of approved brand.

(a) C.P. urinal flush pipe fittings range of one each 525.00

(b) C.P. urinal flush pipe fittings range of two each 1179.00

(c) C.P. urinal flush pipe fittings range of three each 1609.00

13 Supplying, fitting and fixing 18 mm thick marble partition slab with chawk sq. m. 1710.00
doongri marbel square cut, both sides polished with two front corners
rounded and edges polished.

14 Supplying, fitting and fixing porcelain partition wall of approved make of each 1459.00
size 618 mm X 310 mm complete in all respect.

15 Supplying, fitting and fixing bevelled edged mirror 5.5 mm thick silver red
as per I.S. 3438 / 1965 together with brass C.P. hinges.

(i) 450 mm X 300 mm each 467.00

(ii) 600 mm X 450 mm each 619.00

16 Supplying, fitting and fixing glass shelf with aluminium guard rails.
(a) Ordinary type with 5.5 mm sheet glass

(i) 450 mm X 125 mm each 432.00

(ii) 600 mm X 125 mm each 485.00


SECTION (B) - SANITARY AND DRAINAGE WORKS PWD SOR Vol-II wef-01.07.2014
(B)-(III) WATER CLOSETS AND URINALS

Item No. Description of Item Unit All Districts of


West Bengal

17 Supplying, fitting and fixing liquid soap container.

(a) Cromium plated. each 506.00

(b) PTMT(Prayag or equivalent) each 268.00

(c) Fibre glass each 240.00

(d) Polythene each 114.00

18 Supplying, fitting and fixing soap holder.

(a) PTMT(Prayag or equivalent) each 171.00

(b) Fibre glass each 71.00

(c) Polythene each 56.00

19 Supplying, fitting and fixing best quality Indian make mirror 5.5 mm thick each 792.00
with silvering as per I.S.I. specifications supported on fibre glass frame of
any colour, frame size 550 mm X 400 mm

20 Supplying, fitting and fixing Tooth brush and Tumbler holder of approved each 465.00
make of size 140 mm X 65 mm (porcelain).

21 Supplying, fitting and fixing PTMT Smart Shelf of approved make of size each 285.00
300 mm.

22 Supplying, fitting and fixing towel rail with two brackets.

(a) C.P. over brass

(i) 25 mm dia. and 450 mm long each 494.00

(ii) 25 mm dia. and 600 mm long each 554.00

(iii) 25 mm dia. and 750 mm long each 613.00

(b) Aluminium

(i) 25 mm dia. and 450 mm long each 179.00

(ii) 25 mm dia. and 600 mm long each 209.00

(iii) 25 mm dia. and 750 mm long each 238.00


SECTION (B) - SANITARY AND DRAINAGE WORKS PWD SOR Vol-II wef-01.07.2014
(B)-(III) WATER CLOSETS AND URINALS

Item No. Description of Item Unit All Districts of


West Bengal

23 Supplying, fitting and fixing porcelain toilet paper holder of approved


make with wooden spindle as necessary.

(i) Roll type size 250 mm X 125 mm each 375.00

(ii) Box type size 175 mm X 150 mm each 435.00

(iii) Recess roll type size 150 mm X 150 mm each 494.00

24 Supplying, fitting and fixing porcelain soap tray of approved make.

(i) Recessed soap tray of size 150 mm X 150 mm each 435.00

25 Supplying, fitting and fixing bathroom shelf of approved make of size 580 each 792.00
mm X 150 mm (porcelain).

N.B. For coloured sanitary wares rates will be enhanced over the rates of
corresponding items of white glazed sanitary wares as follows:

(a) Sky blue, Venetian pink, Min. green, Turquoise, Citrus yellow,
Champange, Saphire - by 50 %

(b) Roman brown, Fern green, Misty lilac, Orange, Sienna gold, Sepia,
Silver grey, Alpine, Cornil, Sorvinto Blue - by 100%

(c) Burgandy, Emerald green - by 200%

(b) Repair Works

1 Foot rest for Indian pattern water closet.


(a) Dismantling No 18.00

(b) Refixing No 20.00

2 Dismantling Indian W.C. including taking out base concrete as necessary. each 45.00

3 Refixing Indian W.C. excluding cost of base concrete if necessary complete. each 71.00

4 Dismantling E.P. or Anglo-Indian W.C. each 45.00

5 Refixing E.P. or Anglo-Indian W.C. each 89.00

6 Dismantling Orissa pattern W.C. including taking out of base concrete, if each 45.00
necessary, complete.
SECTION (B) - SANITARY AND DRAINAGE WORKS PWD SOR Vol-II wef-01.07.2014
(B)-(III) WATER CLOSETS AND URINALS

Item No. Description of Item Unit All Districts of


West Bengal

7 Refixing Orissa pattern W.C. Including cost of base concrete, if necessary, each 89.00
complete.Payment of concrete to be paid seperatly.

8 Dismantling urinal. each 33.00

9 Refixing urinal. each 35.00

10 Dismantling flush pipe of water closet. each 18.00

11 Refixing flush pipe of water closet. each 22.00

12 Refixing flush pipe/ M.S. bend/ C.P. flush pipe with I.R. adapter. each 35.00

13 Cleaning I.P.W.C. with acid. each 20.00

14 Cleaning E.P. or Anglo-Indian W.C. with acid. each 27.00

15 Cleaning urinal with channel with acid. Each Set 20.00

16 Cleaning glazed tiles with acid. sq. m. 10.00

17 Cleaning white glazed channels with acid. metre 10.00

18 Cleaning and polishing marble or mosaic partition including removing sqm 10.00
stains.

19 Dismantling and refixing marble or mosaic partition. each 101.00

20 Removing chokage of water closet. each 26.00

21 Removing chokage of urinal and waste trap. each 26.00

22 Repairing C.P. hinges of W.C. seat. each 83.00

23 Repairing W.C. seat with brass plate and screws. set 83.00

24 Polishing W.C. seat. set 39.00

25 Rectifying leakage of W.C. by new joints by methor mistry. each 39.00

27 Renewing best quality C.P. hinges for mirror. set 83.00

28 Renewing rubber buffer with brass screws. each 18.00


PWD SOR Vol-II wef-01.07.2014
SECTION (B) - SANITARY AND DRAINAGE WORKS
(B)-(IV) INSPECTION PIT, SEPTIC TANK, SOAK PIT ETC.
Item Description of Item Unit Rate (in Rs.)
No. Kolkata / 24 Bardhaman Purulia Birbhum Howrah Medinipur Medinipur Bankura Nadia Murshidabad Malda Darjeeling Jalpaiguri Coochbehar Uttar/ REMARKS
Pgs / (E) (W) excluding except ,Alipurduar,pl excluding the Dakshin
(N & S) Hoogly area of plains of ains of Siliguri area of Dinajpur
/Area of Kalyani Sub Siliguri Sub Sub Divn. & Haldibari PS Dist.
Kalyani Sub Div Divn. Area of
Div Haldibari PS
(a) Original Works
1 Constructing Inspection pit of inside measurement 600mm X 600mm X upto 600mm (depth)
with 250 mm thick 1st. class brick work in cement mortar (1:4) on all sides, bottom of the pit
consisting of 100 mm thick cement concrete (1:3:6) with stone chips over a layer of jhama brick
flat soling,15 mm thick (1:4) cement plaster to inside walls and out-side walls upto G.L. and 20
mm.thick (1:4) plaster to bottom of the pit, providing necessary invert with cement concrete
(1:3:6) with stone chips as per direction, neat cement finishing to entire internal surfaces, top of
the pit covered with 100 mm thick R.C.C. slab (1:1.5:3) with stone chips and necessary
reinforcements upto 1% and shuttering including 6 mm thick cement plaster (1:4) in all external
surfaces of the slab and one 560 mm dia. R.C.C. manhole cover of approved make supplied,
fitted and fixed in the slab with necessary fittings, necessary earthwork in excavation in all sorts
of soil, filling sides of the pit with earth and removing spoils after work complete in all respect
with all costs of labour and materials.

i) With Pakur variety. Each 7980.00 7406.00 6991.00 6835.00 7749.00 7652.00 7743.00 7180.00 7548.00 7572.00 7373.00 - - - -
ii) With Bazree (N.B Varity) Each - - - - - - - - - - - 8620.00 7108.00 7129.00 7291.00
iii) Extra for each additional depth of 150 mm or part thereof beyond initial 600 mm depth. Each 1631.00 1187.00 1076.00 1076.00 1449.00 1340.00 1231.00 1112.00 1405.00 1368.00 1337.00 2009.00 1301.00 1301.00 1410.00

2 Constructing Inspection pit to a depth of 1.5 metre (inside), 250 mm thick 1st class brick work
(1:4) in all sides over a layer of jhama brick soling and 150 mm thick cement concrete with stone
chips (1:3:6) including necessary earth work, fitting and fixing approved type S.W. master trap,
constructing masonry invert with cement concrete (1:1.5:3) with stone chips, plastering inside
and outside (outside upto 300 mm below G.L.) with 20 mm thick cement plastering (1:4) and
neat cement punning, including supplying,fitting and fixing one 560 mm. dia R.C.C. manhole
cover of approved make with R.C.C. slab of 100 mm thick with cement concrete (1:1.5:3) with
stone chips including necessary reinforcement (upto 1%) and shuttering and necessary
corbelling brick work (1:4) so that the R.C.C. cover slab rests 150 mm above adjucent G.L.,
cement plaster (1:4) 10 mm thick on all external surfaces of the top slab as directed complete in
all respect and removal of surplus earth with all costs of labour and materials (excluding the cost
of master trap only).

(i) 900 mm X 750 mm (inside) chamber including fitting and fixing S.W. master trap of 150 mm
dia. of approved make
A) With Pakur variety. Each 13017.00 12195.00 11639.00 11370.00 12664.00 12502.00 12676.00 11881.00 12386.00 12437.00 12085.00 - - - -
B) With Bazree(N.B Varity) Each - - - - - - - - - - - 13440.00 11482.00 11503.00 11706.00
(ii) 900 mm X 750 mm (inside) chamber including fitting and fixing S.W. master trap of 100 mm
dia. of approved make
A) With Pakur variety. Each 12483.00 11661.00 11105.00 10836.00 12130.00 11969.00 12142.00 11348.00 11852.00 11903.00 11552.00 - - - -
B) With Bazree(N.B Varity) Each - - - - - - - - - - - 12810.00 10851.00 10872.00 11075.00
(iii) 1050 mm X 750 mm (inside) chamber including fitting and fixing S.W. master trap of 225
mm dia. of approved make
A) With Pakur variety. Each 13396.00 12497.00 11895.00 11581.00 12998.00 12821.00 13032.00 12158.00 12703.00 12765.00 12352.00 - - - -
B) With Bazree(N.B Varity) Each - - - - - - - - - - - 14212.00 11828.00 11870.00 12157.00
(iv) 1050 mm X 750 mm (inside) chamber including fitting and fixing S.W. master trap of 300
mm dia. of approved make
A) With Pakur variety. Each 13929.00 13030.00 12429.00 12115.00 13532.00 13355.00 13566.00 12692.00 13237.00 13299.00 12885.00 - - - -
B) With Bazree(N.B Varity) Each - - - - - - - - - - - 14746.00 12362.00 12404.00 12691.00
(v) Extra for additional depth beyond 1.5 metre.
(a) For (i) and (ii) Per Mtr. 3675.00 3373.00 3052.00 3052.00 3623.00 3591.00 3560.00 3201.00 3436.00 3426.00 3430.00 4261.00 3420.00 3420.00 3451.00
Depth
(b) For (iii) and (iv) Per Mtr. 3886.00 3562.00 3218.00 3218.00 3830.00 3796.00 3762.00 3377.00 3630.00 3619.00 3624.00 4515.00 3612.00 3612.00 3646.00
Depth
PWD SOR Vol-II wef-01.07.2014
SECTION (B) - SANITARY AND DRAINAGE WORKS
(B)-(IV) INSPECTION PIT, SEPTIC TANK, SOAK PIT ETC.
Item Description of Item Unit Rate (in Rs.)
No. Kolkata / 24 Bardhaman Purulia Birbhum Howrah Medinipur Medinipur Bankura Nadia Murshidabad Malda Darjeeling Jalpaiguri Coochbehar Uttar/ REMARKS
Pgs / (E) (W) excluding except ,Alipurduar,pl excluding the Dakshin
(N & S) Hoogly area of plains of ains of Siliguri area of Dinajpur
/Area of Kalyani Sub Siliguri Sub Sub Divn. & Haldibari PS Dist.
Kalyani Sub Div Divn. Area of
Div Haldibari PS
3 Construction of septic tank of different capacities as per approved drawing with 1st class brick
work in cement mortar (1:4) including two 560 mm dia. R.C.C. manhole cover(heavy type)of
approved make supplied, fitted and fixed in the 100mm thick R.C.C (1:1.5:3) top slab with
necessary fittings, 20mm thick cement plaster (4 : 1) with neat cement finish to the internal
surfaces and 15 mm thick cement plaster (4 : 1) to outside wall upto 200 mm below G.L floor
finished with 25 mm thick grey artificial stone over 100 mm thick R.C.C(1:1.5:3) bottom slab
including supplying, fitting and fixing all necessry specials, fittings, S.W. tees, C.I. foot rest etc.
including excavation earth in all sorts of soil, shoring, bailing out and pumping out water as
necessary, ramming, dressing the bed and fefilling the sides of the tanks with earth, removing
spoils, filling up the chamber with clear water, removing foreign materials from the chamber
and including constructing attached inspection pit as per approved drawing and connecting all
necessary pipes, joints etc. with internal plaster work and artificial stone flooring is to be done
with admixture of water proofing compound @ 0.5% by weight of cement with all costs of
labour and materials.
(i) For 10 users
A) With Pakur variety. Each 39964.00 37783.00 36005.00 35435.00 39177.00 38816.00 39158.00 36805.00 38237.00 38336.00 37741.00 - - - -
B) With Bazree(N.B Varity) - - - - - - - - - - - 42789.00 36783.00 36860.00 37419.00
(ii) For 20 users
A) With Pakur variety. Each 53147.00 50218.00 47784.00 47068.00 52125.00 51651.00 52062.00 48882.00 50829.00 50946.00 50209.00 - - - -
B) With Bazree(N.B Varity) - - - - - - - - - - - 57071.00 49000.00 49097.00 49819.00
(iii) For 30 users
A) With Pakur variety. Each 68982.00 64949.00 61740.00 60651.00 67487.00 66803.00 67465.00 63180.00 65805.00 65996.00 64747.00 - - - -
B) With Bazree(N.B Varity) - - - - - - - - - - - 73943.00 62908.00 63055.00 64119.00
(iv) For 50 users
A) With Pakur variety. Each 100021.00 94129.00 89549.00 87768.00 97721.00 96692.00 97863.00 91599.00 95357.00 95698.00 93636.00 - - - -
B) With Bazree(N.B Varity) - - - - - - - - - - - 106670.00 90464.00 90705.00 92357.00
(v) For 100 users
A) With Pakur variety. Each 126688.00 119354.00 113855.00 111373.00 123648.00 122315.00 124047.00 116304.00 120866.00 121375.00 118483.00 - - - -
B) With Bazree(N.B Varity) Each - - - - - - - - - - - 134581.00 114366.00 114702.00 116906.00
(vi) For 200 users
A) With Pakur variety. Each 198367.00 186151.00 177241.00 172648.00 193026.00 190734.00 194112.00 181194.00 188607.00 189605.00 183923.00 - - - -
B) With Bazree(N.B Varity) Each - - - - - - - - - - - 207110.00 173221.00 173843.00 177749.00
4 Construction of circular soak well 2.5 metre deep in all types of sandy soils with dry brick work Each 17982.00 16621.00 15177.00 15099.00 17723.00 17523.00 17515.00 15827.00 16837.00 16848.00 16749.00 20615.00 16835.00 16881.00 16911.00
upto 1.6 metre from the bottom having 150 mm intermediate cement brick work (1:4) band all
round and cement brick work (1:4) upto 0.90 metre from top with 20mm thick cement
plastering (1:4) to inside face upto the depth of cement brick work, 15mm thick cement plaster
(1:4) on outer face from top of the well upto G.L. and 6 mm thick cement plaster (1:4) on top of
the R.C.C. cover slab including filling bottom 1.00 metre of inside of the well with brick metal (50
mm to 63 mm size) including R.C.C. cover slab of 100 mm thick with cement conc (1:1.5:3) with
stone chips with necessary reinforcement and shuttering including one 560 mm dia. R.C.C.
manhole cover (heavy type)of approved make supplied, fitted and fixed in the cover slab with
necessary fittings, making nacessary arrangements for pipe connections, excavation of well
including shoring, dewatering and removing the exess earth from the premises as per direction
complete in all respect with all costs of labour and materials.
With 250 mm thick dry brick work and 250 mm thick cement brick work (1:6) and 1.00m inside
dia.

5 Open jointed stone ware pipe 100 mm dia. supplied, laid and fitted in position duly Each 273.00 273.00 273.00 273.00 273.00 273.00 273.00 273.00 273.00 273.00 273.00 313.00 273.00 273.00 273.00
encircled all round by 150 mm thick layer jhama metal (38 mm to 50 mm size) including
excavation of earth in any soil upto required depth including refilling trench,watering
and ramming complete. (Cost of Jhama Metal to be paid seperately).

6 Construction of soak gallery (600 mm X 450 mm) with two layers of jhama metal/Brick Each 1059.00 895.00 741.00 810.00 1060.00 1007.00 1007.00 782.00 895.00 895.00 955.00 1321.00 955.00 955.00 955.00
bats (38 mm to 50 mm size) 150 mm thick and 3 layers of dry brick flats in between the
layers of jhama metal leaving an opening of 100 mm X 150 mm in section along the G.L.
as per sketch including cutting trenches in required grade,back filling and compacting
to its original G.L. etc. complete including costs of labour and materials.
(This item is suitable for moorum and sandy area and predominantly sandy soils @ 1.50
metre length per head of user.)
SECTION (B) - SANITARY AND DRAINAGE WORKS PWD SOR Vol-II wef-01.07.2014
(B)-(IV) INSPECTION PIT, SEPTIC TANK, SOAK PIT ETC.

Item No. Description of Item Unit All Districts of


West Bengal

7 Supplying, fitting and fixing in position R.C.C. Manhole/ pit cover of


approved make with rim of approved make (Heavy type)

(i) 450 mm dia. each 303.00

(ii) 560 mm dia. each 384.00

8 Supplying, fitting and fixing in position reinforced cement polymer


concrete manhole /gully pit cover with matching frame.As per I.S-
12592(M.D)

(i) 35 MT load bearing capacity round manhole cover provided with two each 4744.00
lifter hooks fitted with matching frame of size
Cover: 700 mm X 100 mm
Frame: 910 mm X 185 mm
opening: 560mm
Weight: 245 kg (approx)

(ii) 25 MT load bearing capacity round manhole cover provided with two each 3966.00
lifter hooks fitted with matching frame of size
Cover: 680 mm X 90 mm
Frame: 800 mm X 165 mm
opening: 500mm
Weight: 196 kg (approx)

(iii) 20 MT load bearing capacity round manhole cover provided with two each 3808.00
lifter hooks fitted with matching frame of size
Cover: 600 mm X 75 mm
Frame: 750 mm X 150 mm
opening: 525mm
Weight: 170 kg (approx)

(iv) 15 MT load bearing capacity round manhole cover provided with two each 2956.00
lifter hooks fitted with matching frame of size
Cover: 460 mm X 75 mm
Frame: 620 mm X 150 mm
opening: 360mm
Weight: 100 kg (approx)
SECTION (B) - SANITARY AND DRAINAGE WORKS PWD SOR Vol-II wef-01.07.2014
(B)-(IV) INSPECTION PIT, SEPTIC TANK, SOAK PIT ETC.

Item No. Description of Item Unit All Districts of


West Bengal

(v) 12 MT load bearing capacity round manhole cover provided with two each 3450.00
lifter hooks fitted with matching frame of size
Cover: 550 mm X 75 mm
Frame: 650mm X 135 mm
opening: 475mm
Weight: 100 kg (approx)

(Vi) 5 MT load bearing capacity round manhole cover provided with two each 3013.00
lifter hooks fitted with matching frame of size
Cover: 565 mm X 65 mm
Frame: 665 mm X 125 mm
opening: 470mm
Weight: 90 kg (approx)

(vii) 3 MT load bearing capacity round manhole cover provided with two each 1528.00
lifter hooks fitted with matching frame of size
Cover: 450 mm X 50 mm
Frame: 540 mm X 100 mm
opening: 370mm
Weight: 46 kg (approx)

(vii) 1 MT load bearing capacity round manhole cover provided with two each 1125.00
lifter hook with matching frame of size
Cover: 450 mm X 40 mm
Frame: 540 mm X 80 mm
opening: 360mm
Weight: 34 Kg. (approx)

(viii) 5 MT load bearing capacity gully pit cover with frame and hinge each 2344.00
arrangement for opening of size
Cover: 470 mm X 420 mm X 80 mm
Frame: 590 mm X 550 mm X 170 mm
opening: 380mm x 305mm
Weight: 100 kg (approx)

(ix) Light duty gully pit cover (yard gully) with with frame and hinge each 1451.00
arrangement for opening of size
Cover: 300 mm X 275 mm X 30 mm
Frame: 450 mm X 375 mm X 75 mm
opening: 300mm x 225mm
Weight: 43 kg (approx)
SECTION (B) - SANITARY AND DRAINAGE WORKS PWD SOR Vol-II wef-01.07.2014
(B)-(IV) INSPECTION PIT, SEPTIC TANK, SOAK PIT ETC.

Item No. Description of Item Unit All Districts of


West Bengal

9 Supplying, fitting and fixing in position C.I. manhole/ pit cover with rim.

(a) Round
(i) 450 mm X 100 mm X 21 kg (approx.) each 1972.00

(ii) 450 mm X 100 mm X 25 kg (approx.) each 2364.00

(iii) 450 mm X 100 mm X 50 kg (approx.) each 4130.00

(iv) 450 mm X 100 mm X 75 kg (approx.) each 6272.00

(b) Square
(i) 450 mm X 450 mm X 16 kg (approx.) each 1599.00

(ii) 450 mm X 450 mm X 50 kg (approx.) each 4130.00

(iii) 600 mm X 600 mm X 32 kg (approx.) each 3030.00

(iv) 600 mm X 600 mm X 50 kg (approx.) each 4130.00

(c) Rectangular
(i) 600 mm X 450 mm X 25 kg (approx.) each 2358.00

(ii) 600 mm X 450 mm X 32 kg (approx.) each 2831.00

(iii) 600 mm X 450 mm X 50 kg (approx.) each 4347.00

(b) Repair Works

1 Dismantling & Refixing pit cover each 35.00

2 Cleaning silt of inspection pit. each 155.00


SECTION (B) - SANITARY AND DRAINAGE WORKS PWD SOR Vol-II wef-01.07.2014
(B)-(IV) INSPECTION PIT, SEPTIC TANK, SOAK PIT ETC.

Item No. Description of Item Unit All Districts of


West Bengal

3 Removing sludge from septic tank, soak well etc. by methor labour
including disposal of the same outside the compound as directed.

(a) Upto 20 users:-


(i) Within a lead of 150 metre Each 1940.00
(ii) Beyond a lead of 150 metre and outside the Municipal limit Each 2181.00

(b) Upto 30 users:-


(i) Within a lead of 150 metre Each 2133.00
(ii) Beyond a lead of 150 metre and outside the Municipal limit Each 2979.00

(c) Upto 50 users:-


(i) Within a lead of 150 metre Each 2327.00
(ii) Beyond a lead of 150 metre and outside the Municipal limit Each 3336.00

(d) Upto 100 users:-


(i) Within a lead of 150 metre Each 2715.00
(ii) Beyond a lead of 150 metre and outside the Municipal limit Each 3962.00

(e) Upto 200 users:-


(i) Within a lead of 150 metre Each 3491.00
(ii) Beyond a lead of 150 metre and outside the Municipal limit Each 5752.00

4 Cleaning soak pit by removing the top slab and replacing inner filling with each 1361.00
jhama bats and repairing the pit as necessary including fitting the slab.

5 Cleaning silt of master trap pit. each 1164.00

6 Making connection with the existing pit. each 89.00


SECTION (C) - MATERIALS AND LABOUR ETC. PWD SOR Vol-II wef-01.07.2014
(C)-(I) MISCELLANEOUS

Item No. Description of Item Unit All Districts of


West Bengal

(C)-(I) MISCELLANEOUS

1 Cutting trench thorugh passage upto 40 mm wide including refilling, metre 29.00
watering and ramming.

2 Cutting out asphaltum road and restoring the same with spoils including metre 29.00
guarding and barricading

3 Cutting trench upto 1.00 metre deep through masonry foundation. metre 78.00

4 Opening out mud holes of boiler, grinding the same to proper size and Each Set 870.00
refixing including supplying, packing washer to watertight (hot water
installation) including carriage to workshop and back.

5 Decarbonising and cleaning gas pipe including necessary scaffolding,


pumping and testing complete including dismantling and refixing pipe
where necessary.

(i) Upto 25 mm dia. pipe metre 17.00

(ii) Above 25 mm dia. and upto 40 mm dia. pipe metre 20.00

(iii) Above 40 mm dia. and upto 80 mm dia. pipe metre 25.00

6 Renewing gas tubing upto 1.00 metre. each 56.00

7 Renewing 50 mm gas syphon. each 286.00

8 Tracing out underground pipe or pit by opening out test trench including each 39.00
filling it up.

9 Cutting hole through wall, roof or cornice and mending good all damages. each 69.00

10 Renewing 15 mm C.P. over brass spreader. each 298.00

11 Renewing 15 mm G.I. spreader. each 66.00

12 Dismantling and refixing 15 mm brass spreader. each 25.00


SECTION (C) - MATERIALS AND LABOUR ETC. PWD SOR Vol-II wef-01.07.2014
(C)-(I) MISCELLANEOUS

Item No. Description of Item Unit All Districts of


West Bengal

13 Dismantling and refixing water distiller. each 71.00

14 Dismantling large distilling or cooking gas burner cock, refixing after repair, each 129.00
greasing and cleaning 50 mm dia.

15 Labour for jointing and lowering G.I. or E.R.W. M.S. pipes including strainer
within the tube well bore vertically with necessary sockets, special fittings
and welding as required including cost of all jointing materials, hire
charges of tools and plants, cutting pipes to required sizes, making
threads, welding pieces together etc. as necessary as per direction of the
Engineer-in-charge.

(i) Upto 100 mm dia. pipe metre 60.00

(ii) Above 100 mm dia. and upto 200 mm dia. pipe metre 79.00

(iii) Above 200 mm dia. and upto 300 mm dia. pipe metre 117.00

(iv) Above 300 mm dia pipe metre 186.00

16 Labour charges for making slots in E.R.W.M.S. pipe as per direction of the
Engineer-in-charge for the purpose of using the slotted pipe as strainer
including cost of labour and hire charges of tools and plants,all complete.

(i) 100 mm dia. pipe metre 346.00

(ii) 150 mm dia. pipe metre 489.00

(iii) 200 mm dia. pipe metre 608.00

17 Dismantling ball cock and refixing the same after repair including
straightening lever and renewing split pin.

(i) 15 mm each 28.00

(ii) 20 mm each 34.00

(iii) 25 mm each 36.00


SECTION (C) - MATERIALS AND LABOUR ETC. PWD SOR Vol-II wef-01.07.2014
(C)-(I) MISCELLANEOUS

Item No. Description of Item Unit All Districts of


West Bengal

(iv) 32 mm each 45.00

(v) 40 mm each 49.00

(vi) 50 mm each 52.00

(vii) 65 mm each 56.00

18 Cleaning and removing silt from choked up gully pit including painting C.I. each 34.00
grating with bituminous paint.

19 Cleaning, scraping and removing sediment etc. from masonry urinal or each 25.00
through latrine seat including cleaning with acid by methor labour.

20 Renewing rose headed nails 100mm. Each Set 14.00

21 Repairing 25 mm to 40 mm pit valve including renewing packing to gland each 38.00


etc.

22 Renewing spindle valve and wheel of fire hydrant including taking out and
refixing the same.

(i) 25 mm size Each Set 195.00

(ii) 32 mm size Each Set 204.00

(iii) 40 mm size Each Set 218.00

(iv) 50 mm size Each Set 228.00

23 Dismantling and refixing drain pipe including cutting trench and refilling
the same.

(i) Upto 100 mm metre 71.00

(ii) 150 mm metre 19.00

(iii) 225 mm metre 71.00


SECTION (C) - MATERIALS AND LABOUR ETC. PWD SOR Vol-II wef-01.07.2014
(C)-(I) MISCELLANEOUS

Item No. Description of Item Unit All Districts of


West Bengal

(iv) 300 mm metre 71.00

24 Renewing hinged gully grating with frame.

(i) 100 mm X 100 mm each 32.00

(ii) 150 mm X 150 mm each 41.00

(iii) 225 mm X 225 mm each 52.00

(iv) 300 mm X 300 mm each 136.00

25 Renewing gully grating.

(i) 375 mm X 300 mm X 40 mm X 18 kg each 1539.00

(ii) 375 mm X 300 mm X 75 mm X 25 kg each 2063.00

(iii) 450 mm X 375 mm X 150mm X 40 kg each 3188.00

(iv) 500 mm x 400 mm X 150 mm X 75 kg each 5722.00

(v) 600 mm x 450 mm X 100 mm X 80 kg each 6091.00

26 Renewing 75 mm rubber washer. each 25.00

27 Renewing fly or spindle. each 37.00


SECTION (C) - MATERIALS AND LABOUR ETC. PWD SOR Vol-II wef-01.07.2014
(C)-(I) MISCELLANEOUS

Item No. Description of Item Unit All Districts of


West Bengal

28 Cleaning rubbish, sludge, weeds scum, liquid earth, mud etc.etc.from road cum 292.00
side masonary drain/ hume pipe drain/ culvert etc. by mathor labour after
removing concrete.Slab/manhole cover etc.without damaging the same
and refixing the same properly after cleaning as necessary and removing
the sludge etc.etc.by using iron pans,buckets including all labour, tools &
plants including removing the spoils in dry condition and disposing the
same by truck beyond the road side in conformity with
municipal/corporation rules for such disposal including loading into truck
and cleaning the road side in all respects as per direction of the Engineer-
in-Charge.

(Payment will be made on the basis of actual stack measurment of spoils


in dry condition at roadside)

29 Repairing damaged lead caulked joint by cutting trench through any type
of surface including taking out lead from the joint,recasting and
hammering the same with additional lead and lead wool,refilling the
trench and mending good damages of the surface complete in all respect
including cost of lead and lead wool.

(i) 100 mm dia. each 232.00

(ii) 150 mm dia. each 275.00


SECTION (C) - MATERIALS AND LABOUR ETC. PWD SOR Vol-II wef-01.07.2014
(C)-(II) COST OF MATERIALS

Item No. Description of Item Unit All Districts of


West Bengal

1 Supply of G.I. pipes of TATA make including necessary sockets.


(a) 15 mm dia.
(i) Light quality metre 144.00
(ii) Medium quality metre 161.00

(b) 20 mm dia.
(i) Light quality metre 164.00
(ii) Medium quality metre 192.00

(c) 25 mm dia.
(i) Light quality metre 236.00
(ii) Medium quality metre 278.00

(d) 32 mm dia.
(i) Light quality metre 249.00
(ii) Medium quality metre 305.00

(e) 40 mm dia.
(i) Light quality metre 277.00
(ii) Medium quality metre 347.00

(f) 50 mm dia.
(i) Light quality metre 388.00
(ii) Medium quality metre 479.00

(g) 65 mm dia.
(i) Light quality metre 508.00
(ii) Medium quality metre 617.00

(h) 80 mm dia.
(i) Light quality metre 661.00
(ii) Medium quality metre 785.00

(i) 100 mm dia.


(i) Medium quality metre 990.00
(ii) Heavy quality metre 1172.00
SECTION (C) - MATERIALS AND LABOUR ETC. PWD SOR Vol-II wef-01.07.2014
(C)-(II) COST OF MATERIALS

Item No. Description of Item Unit All Districts of


West Bengal

(j) 125 mm dia.


(i) Medium quality metre 1313.00
(ii) Heavy quality metre 1451.00

(k) 150 mm dia.


(i) Medium quality metre 1545.00
(ii) Heavy quality metre 1688.00

2 Supply of galvanised iron socket with I.S.I. mark.


(i) 15 mm dia each 18.00

(ii) 20 mm dia. each 27.00

(iii) 25 mm dia. each 38.00

(iv) 32 mm dia. each 54.00

(v) 40 mm dia. each 71.00

(vi) 50 mm dia. each 110.00

(vii) 65 mm dia. each 192.00

(viii) 80 mm dia. each 269.00

(ix) 100 mm dia. each 466.00

(ix)125mm dia each 1148.00

(ix)150mm dia each 1603.00

3 Supply of galvanised iron jamnut.


(i) 15 mm each 12.00

(ii) 20 mm each 15.00

(iii) 25 mm each 23.00


SECTION (C) - MATERIALS AND LABOUR ETC. PWD SOR Vol-II wef-01.07.2014
(C)-(II) COST OF MATERIALS

Item No. Description of Item Unit All Districts of


West Bengal

(iv) 32 mm each 38.00

(v) 40 mm each 42.00

(vi) 50 mm each 72.00

(vii) 65 mm each 100.00

(viii) 80 mm each 154.00

(ix) 100 mm each 290.00

4 Supply of G.I. plug


(i) 15 mm each 12.00

(ii) 20 mm each 22.00

(iii) 25 mm each 32.00

(iv) 32 mm each 51.00

(v) 40 mm each 65.00

(vi) 50 mm each 103.00

(vii) 65 mm each 128.00

(viii) 80 mm each 188.00

(ix) 100 mm each 375.00

5 Supply of G.I. reducing socket with I.S.I. mark.

(i) 20 mm each 29.00

(ii) 25 mm each 41.00

(iii) 32 mm each 60.00

(iv) 40 mm each 79.00


SECTION (C) - MATERIALS AND LABOUR ETC. PWD SOR Vol-II wef-01.07.2014
(C)-(II) COST OF MATERIALS

Item No. Description of Item Unit All Districts of


West Bengal

(v) 50 mm each 121.00

(vi) 65 mm each 211.00

(vii) 80 mm each 296.00

(vii) 100 mm each 512.00

(ix)125mm dia each 1263.00

(ix)150mm dia each 1763.00

6 Supply of G.I. bend.


(i) 15 mm each 41.00

(ii) 20 mm each 62.00

(iii) 25 mm each 99.00

(iv) 32 mm each 184.00

(v) 40 mm each 255.00

(vi) 50 mm each 429.00

(vii) 65 mm each 996.00

(viii) 80 mm each 1745.00

(ix) 100 mm each 2872.00

7 Supply of G.I. plain equal elbow of approved brand and make.


(i) 15 mm each 20.00

(ii) 20 mm each 31.00

(iii) 25 mm each 53.00

(iv) 32 mm each 79.00

(v) 40 mm each 106.00


SECTION (C) - MATERIALS AND LABOUR ETC. PWD SOR Vol-II wef-01.07.2014
(C)-(II) COST OF MATERIALS

Item No. Description of Item Unit All Districts of


West Bengal

(vi) 50 mm each 165.00

(vii) 65 mm each 282.00

(viii) 80 mm each 435.00

(ix) 100 mm each 742.00

(ix)125mm dia each 1782.00

(ix)150mm dia each 2387.00

8 Supply of G.I. plain tee of approved brand and make


(i) 15 mm each 30.00

(ii) 20 mm each 49.00

(iii) 25 mm each 73.00

(iv) 32 mm each 104.00

(v) 40 mm each 142.00

(vi) 50 mm each 226.00

(vii) 65 mm each 360.00

(viii) 80 mm each 500.00

(ix) 100 mm each 883.00

(ix)125mm dia each 2385.00

(ix)150mm dia each 3008.00

9 Supply of pendent tee with I.S.I. mark.


SECTION (C) - MATERIALS AND LABOUR ETC. PWD SOR Vol-II wef-01.07.2014
(C)-(II) COST OF MATERIALS

Item No. Description of Item Unit All Districts of


West Bengal

(i) 15 mm X 15 mm X 20 mm each 38.00

(ii) 15 mm X 15 mm X 25 mm each 61.00

(iii) 20 mm X 20 mm X 25 mm each 90.00

(iv) 25 mm X 25 mm X 32 mm each 129.00

(v) 25 mm X 25 mm X 50 mm each 161.00

(vi) 32 mm X 32 mm X 40 mm each 145.00

(vii) 40 mm X 40 mm X 50 mm each 154.00

10 Supply of G.I. reducing tee of approved brand and make


(i) 20 mm X 15 mm each 53.00

(ii) 25 mm X 15 mm each 79.00

(iii) 25 mm X 20 mm each 79.00

(iv) 32 mm X 15 mm each 114.00

(v) 32 mm X 20 mm each 114.00

(vi) 32 mm X 25 mm each 114.00

(vii) 40 mm X 15 mm each 156.00

(viii) 40 mm X 20 mm each 156.00

(ix) 40 mm X 25 mm each 156.00

(x) 40 mm X 32 mm each 156.00

(xi) 50 mm X 15 mm each 248.00

(xii) 50 mm X 20 mm each 248.00

(xiii) 50 mm X 25 mm each 248.00

(xiv) 50 mm X 32 mm each 248.00


SECTION (C) - MATERIALS AND LABOUR ETC. PWD SOR Vol-II wef-01.07.2014
(C)-(II) COST OF MATERIALS

Item No. Description of Item Unit All Districts of


West Bengal

(xv) 50 mm X 40 mm each 248.00

(xvi) 65 mm X 50 mm each 396.00

(xvii) 80 mm X 50 mm each 550.00

(xviii) 100 mm X 80 mm each 971.00

(xix) 100 mm X 65 mm each 971.00

11 Supply of G.I. nipple standard 50 mm long.


(i) 15 mm each 20.00

(ii) 20 mm each 31.00

(iii) 25 mm each 51.00

(iv) 32 mm each 77.00

(v) 40 mm each 98.00

(vi) 50 mm each 139.00

(vii) 65 mm each 253.00

(viii) 80 mm each 364.00

(ix)100mm dia each 502.00

12 Supply of long screw (150 mm long) of TATA make with sockets (TATA
make) and jamnut.
(i) 15 mm each 38.00

(ii) 20 mm each 54.00

(iii) 25 mm each 70.00

(iv) 32 mm each 88.00


SECTION (C) - MATERIALS AND LABOUR ETC. PWD SOR Vol-II wef-01.07.2014
(C)-(II) COST OF MATERIALS

Item No. Description of Item Unit All Districts of


West Bengal

(v) 40 mm each 117.00

(vi) 50 mm each 167.00

(vii) 65 mm each 339.00

(viii) 80 mm each 380.00

(ix) 100 mm each 531.00

13 Supply of G.I. union.


(i) 15 mm each 53.00

(ii) 20 mm each 82.00

(iii) 25 mm each 115.00

(iv) 32 mm each 167.00

(v) 40 mm each 205.00

(vi) 50 mm each 314.00

(vii) 65 mm each 616.00

(viii) 80 mm each 869.00

(ix) 100 mm each 1171.00

(x)125mm dia each 2876.00

(xi)150mm dia each 3596.00

14 Supply of G.I. cross.


(i) 15 mm each 49.00

(ii) 20 mm each 71.00

(iii) 25 mm each 112.00

(iv) 32 mm each 178.00


SECTION (C) - MATERIALS AND LABOUR ETC. PWD SOR Vol-II wef-01.07.2014
(C)-(II) COST OF MATERIALS

Item No. Description of Item Unit All Districts of


West Bengal

(v) 40 mm each 236.00

(vi) 50 mm each 359.00

(vii)65mm dia each 642.00

(viii)80mm dia each 934.00

(ix)100mm dia each 1273.00

15 Supply of G.I. short piece of TATA make (Above 50mm & upto150 mm
long)
(i) 15 mm each 55.00

(ii) 20 mm each 72.00

(iii) 25 mm each 87.00

(iv) 32 mm each 90.00

(v) 40 mm each 122.00

(vi) 50 mm each 150.00

(vii) 65 mm each 208.00

(viii) 80 mm each 254.00

(ix) 100 mm each 387.00

16 Supply of G.I. reducing elbow.


(i) 20 mm X 15 mm each 34.00

(ii) 25 mm X 15 mm each 58.00

(iii) 25 mm X 20 mm each 58.00

(iv) 32 mm X 15 mm each 88.00

(v) 32 mm X 20 mm each 88.00


SECTION (C) - MATERIALS AND LABOUR ETC. PWD SOR Vol-II wef-01.07.2014
(C)-(II) COST OF MATERIALS

Item No. Description of Item Unit All Districts of


West Bengal

(vi) 32 mm X 25 mm each 88.00

(vii) 40 mm X 15 mm each 118.00

(viii) 40 mm X 20 mm each 118.00

(ix) 40 mm X 25 mm each 118.00

(x) 40 mm X 32 mm each 118.00

(xi) 50 mm X 15 mm each 182.00

(xii) 50 mm X 20 mm each 182.00

(xiii) 50 mm X 25 mm each 182.00

(xiv) 50 mm X 32 mm each 182.00

(xv) 50 mm X 40 mm each 182.00

(xvi) 65 mm X 50 mm each 310.00

(xvii) 80 mm X 50 mm each 477.00

(xviii) 100 mm X 80 mm each 815.00

(xix) 100 mm X 65 mm each 815.00

17 (A) Sypply of E.R.W.M.S.(Electrical Resistant Welded M.S.) black pipe of


of TATA make(heavy quality) as per standard specification, 5 mm thick.

(i) 100 mm dia. (internal) metre 1246.00

(ii) 150 mm dia. (internal) metre 1814.00

(iii) 200 mm dia. (internal) metre 2168.00

(iv) 250 mm dia. (internal) metre 2974.00

(v) 300 mm dia. (internal) metre 3988.00


SECTION (C) - MATERIALS AND LABOUR ETC. PWD SOR Vol-II wef-01.07.2014
(C)-(II) COST OF MATERIALS

Item No. Description of Item Unit All Districts of


West Bengal

(B) Supply of E.R.W.M.S. black pipe of approved make(heavy quality) as


per standard specification having wall thickness not less than 8 mm.

(i) 200 mm dia. (internal) metre 2884.00

(ii) 300 mm dia. (internal) metre 4344.00

N.B. The rates for supply of non TATA but I.S.I. marked G.I. pipes and
fittings will be arrived at by reducing the corresponding rates for TATA
pipes and fittings by 20%.
Section (C ) Materials and Labour Rate for Sanitary and Plumbing

Sl NO. Description of Items unit Rate (Rs.)


All Districts of West Bengal

1
Plumbing Mistry Each 326

2 Mazdoor Each 245


3 Methor Mistry Each 326

4 Methor Mazdoor Each 296


5 Plumbing Helper Each 270

Note: The above rates of labour are exclusive of 10% profit & 1% Labour welfare cess, which would be
admissible to the contractors, but contractual percentage will not be applicable on the above rates.
RECOMMENDATION ON SELECTION OF DIAMETER
OF PIPE IN DISTRIBUTION SYSTEM

Diamet Diameter of Branch Pipe


er of 2 inch 1½ inch 11/4 inch 1 inch 3/4 inch ½ inch
Delivery
2 inch 1 2 3 6 12 32
1½ inch --- 1 2 3 6 16
1/4
1 inch --- --- 1 2 4 10
1 inch --- --- --- 1 2 6
3/4
inch --- --- --- --- 1 3
½ inch --- --- --- --- --- 1
ANNEXURE-I
Table-1-1- ISSUE RATE OF CEMENT & STEEL MATERIALS

Item Descriptions of Issue Rate(Rs) (Supplied by Basic Price(Rs)


Unit Remarks
No. Items Department) (Supplied by Contractor)

1 2 3 South Bengal North Bengal South Bengal North Bengal 6

Cement:
PPC/PSC/ MT 8100 8320 7360 7560
OPC(33 Grade)
Cement:
8100 8320 7360 7560
OPC(43 Grade)

Cement: 1) Rates furnished in column-4 of item 1 &


1) MT 8320 8580 7560 7800 2 are the issue rates of materials at
OPC(53 Grade) Departmental Stackyard/Godown.

Steel Materials 2) For sub Items of Item 2 ,The Basic


i)Mild Steel Rods MT 53900 54900 49150 50240 Prices exclusive of Contractors Profit but
(Fe 250) inclusive of all Taxes & duties,are given in
2) Column-5.To arrive at complete rate in
case of Steel supplied by
ii) Tor Steel Contractor.Format B of Annexure -I is
Rods/HYSD/Fe MT 53900 54900 49150 50240 reffered.
415/Fe 500/Fe 500 D

3)The rate of items involving use of


3) Structural Steel MT 47000 cement supplied by the Contractor shall be
evaluated as per Format -A of Annexure-I

G.C.I Sheet(0.6 mm-


5.15 kg/sq.m; 0.63
4) mm - 5.34 kg/sq.m; MT 61360
0.8 mm - 6.69 kg/
sq.m)
1
ANNEXURE - I

FORMAT - A
(Format for analysis of rate of items involving use of Cement supplied by Contractor)

Step - 1 Rate of item as per relevant section of this Schedule Rs. A

Step - 2 Deduct cost of cement = (Quantity of cement) X (Issue rate of cement Rs. B
vide Item No. 1, Column - 4, Table - 1 - 1 of Annexure - I)

Note: The quantity of cement shall be as per Chart for Consumption of


Materials.

Step - 3 Add cost of cement supplied by Contractor including 10% Profit = Rs. C
1.1 X (Quantity of cement) X (Basic price of cement vide Item No. 1,
Column - 5, Table - 1 - 1 of Annexure-I)
Note: The quantity of cement shall be same as Step - 2.

Final Rate of Item = Rs. A - Rs.B + Rs. C = Rs. D


ANNEXURE - I

FORMAT - B

(Format for Analysis of Rate of reinforcing Steel supplied by Contractor)

Step - 1 Rate of item as per relevant section of this Schedule Rs. A

Step - 2 Deduct Issue Rate (Per MT) of respective Quality Steel X 1.05 Rs. B

Step - 3 Add Basic Price at outlet of Steel of respective quality X 1.05 Rs. C

Step - 4 Add Contractor's Profit @ 10% on cost of Steel only (Sl. No. 3) Rs. D

Step - 5 Add cost of Carriage from outlet to site with necessary loading, Rs. E
unloading and stacking charges for 1.05 MT Steel

Final Rate of Item = [Rs. A - Rs.B + Rs.C + Rs.D + Rs.E] = Rs.


ANNEXURE - I
USEFUL TABLE

Table - 1.2 Area & linear weights of common reinformcment bars :


Diameter of bar Cross Sectional Area Weight per meter length
(mm) (mm2) (kg / m)

M. S. Bars H.Y.S.D. Bars M. S. Bars H.Y.S.D. Bars


6 28.27 28.30 0.222 0.222
8 50.26 50.30 0.390 0.395
10 78.54 78.50 0.616 0.617
12 113.10 113.10 0.888 0.888
16 201.06 201.10 1.578 1.579
20 314.16 314.20 2.466 2.467
22 380.13 380.10 2.984 2.985
25 490.87 490.90 3.853 3.855
28 615.75 615.70 4.834 4.836
32 804.24 804.20 6.313 6.316
36 1017.88 1017.90 7.990 7.994
40 1257.64 1256.60 9.865 9.869

Table - 1.3 Conversion factors for Linear Measurements:


To Convert To Conversion To Convert To Conversion
factor factor
milimeter inch 0.03937 mile kilometer 1.60934
inch milimeter 25.4000 kilometer mile 0.62137
meter foot 3.28084 centimeter inch 0.39370
foot meter 0.30480 meter yard 1.09361
yard meter 0.91440 mile yard 1760.00

Table - 1.4 Conversion factors for weight.


To Convert To Conversion To Convert To Conversion
factor factor
kilogram pound 2.20459 ton metric ton 1.01606
pound kilogram 0.45360 metric ton ton 0.98419
Metric ton(tonne) kip(kilo pound) 2.20459 ton pound 2240.00
kip Metric ton 0.45360 ton kilogram 1016.06

Table - 1.5 Conversion factors for Area:


To Convert To Conversion To Convert To Conversion
factor factor
sq. centimeter sq. inch 0.15500 acre hectare 0.40467
sq. inch sq. centimeter 6.45160 hectare acre 2.47113
sq. meter sq. foot 10.76391 sq. meter hectare 0.00010
sq. foot sq. meter 0.09290 sq. mile sq. kilometer 2.58998

Table - 1.6 Conversion factors for Volume:


To Convert To Conversion To Convert To Conversion
factor factor
imperial gallon litre 4.54610 cu. Inch cu. centimeter 16.38706
US gallon litre 3.76902 cu. foot (cft) cu. meter 0.02832
cu. foot (cft) litre 28.31685
ANNEXURE - I
USEFUL TABLE
Table - 1.7 Conversion factors for Density:
To Convert To Conversion To Convert To Conversion
factor factor
gram / cu.
pound / cft ton / cu. Meter 0.01602 pound / cft 62.42691
Centimeter
gram / cu. kilogram / cu.
pound / cu. Inch 27.68040 pound / cft 0.06243
Centimeter Meter

Table - 1.8
Standard Wire MM Standard Wire MM
Gauge Gauge

30 Gauge 0.315 mm 10 Gauge 3.251 mm

28 Gauge 0.3759 mm 8 Gauge 4.064 mm

26 Gauge 0.4570 mm 6 Gauge 4.877 mm

24 Gauge 0.5590 mm 4 Gauge 5.893 mm

22 Gauge 0.7110 mm 2 Gauge 7.010 mm

20 Gauge 0.9140 mm 1 Gauge 7.620 mm

18 Gauge 1.219 mm 0 Gauge 8.230 mm

16 Gauge 1.626 mm 00 Gauge 8.839 mm

14 Gauge 2.032 mm 000 Gauge 9.045 mm

12 Gauge 2.642 mm 0000 Gauge 10.160 mm

Table - 1.9
Bermingham MM Bermingham MM
Wire Gauge Wire Gauge

30 Gauge 0.312 mm 10 Gauge 3.175 mm

28 Gauge 0.397 mm 8 Gauge 3.988 mm

26 Gauge 0.498 mm 6 Gauge 5.032 mm

24 Gauge 0.629 mm 4 Gauge 6.350 mm

22 Gauge 0.794 mm 2 Gauge 7.993 mm

20 Gauge 0.996 mm 1 Gauge 8.971 mm

18 Gauge 1.257 mm 0 Gauge 10.070 mm

16 Gauge 1.588 mm 00 Gauge 11.310 mm

14 Gauge 1.994 mm 000 Gauge 12.700 mm

12 Gauge 2.517 mm 0000 Gauge 13.760 mm


PREAMBLE

1. The items in the Schedule of rates for Road and Bridge works are framed mostly in accordance
with the specifications laid down in the “Specifications for Road and Bridge Works (5th
Revision)” by The Ministry of Road Transport and Highways (MORT&H) and “Specifications
for Rural Road” by Ministry of Rural Development (MORD).

In This Volume, here in after, Specification of MORT&H means “Specifications for Road and Bridge
Works (5th Revision)” and Specification of MORD means “Specifications for Rural Roads”.

2. The rates of the items have been derived mostly from “ Standard Data Book for analysis of
rates” by MORT&H and Standard data book for analysis of rates for Rural Roads” by MORD.
Though rates of few items have also been derived following CPWD’s Analysis of rates. Where
the above documents are found to be inadequate to analyse the rate of an item, method of
analysis, generated in house based on feedback from construction sites, has been adopted.

3. Contractors profit has been considered as 10% and Overhead Charges have been considered as
5%, 15% and 20% for road works, Bridge works and Repair of Bridge works respectively.
Overhead charge is inclusive of all the items as stated in serial no. 3, in basic approach of
“standard data book of analysis of rates” by MORT&H.

4. The rates of steel materials have been taken from SAIL and RINL of Govt. of India, Department
of steel as on 1st, May 2014. The rates of Cements have been obtained from ECSC, Govt. of West
Bengal as on 2nd week of December’2013.

5. Price of Bitumen (VG grade), Emulsion and CRMB has been obtained from IOCL as on 16 th
June, 2014.

6. Prices of major construction materials like Stone materials, Bricks, Sand, etc. have been mostly
obtained from market or supplied by different Construction Divisions of this Department.

7. Prices of Bearings, Expansion joints, etc. have obtained from Original producer or enlisted
/registered supplier of MORT&H and Govt. of India.

8. Rates of some minor construction materials have been taken from SOR of PWD of other states.

9. Machinery usages rates have been taken from Standard Data Books of MORT&H, MORD,
CPWD and Other State PWDs as has been found appropriate.

10. For construction and maintenance of major roads having high traffic volume, items have been
selected and analysed according to STANDARD DATA BOOK for analysis of road and bridge
works by MORT&H.

For medium trafficked roads, items have been analysed following Standard data book for
analysis of rates for Rural Road by MORD and for roads having low traffic conventional items
involving traditional machineries have been retained as usual so as to provide the user wide
variety of items to select according to site conditions.

11. As the utility shifting and environment have become vital issues in present day two chapters
namely 'Site clearance' and 'Horticulture' have been dedicated in the SOR as per Standard Data
Book.
12. Since, now a day, concrete pavement and geo-synthetic are gaining more and more
importance, two separate chapters have been provided for 'Concrete-pavement' and 'Geo-
synthetic, in this volume of SOR.

13. For construction of good road, good embankment and sub grade and good drainage are very
essential, therefore, greater emphasis has been given to frame the chapter - II, i.e. 'Earthwork,
Erosion control and drainage’.

14. Since Traffic sign and road furniture’s are very important for the safety of road traffic a new
chapter namely, 'Traffic sign, road safety and appliances' has been introduced in this volume of
the SOR for Road and Bridge works.

15. Another new chapter called 'River training works and erosion control’ has been included in
this volume of SOR of PWD.

16. Some conventional maintenance items and common items for Road works, Culverts and
Bridges works (including maintenance of Wooden and Steel bridges) and for construction and
maintenance of ancillary structures including road side amenities, have been grouped under
the head 'Miscellaneous'

17. In most of the items, construction wing is required to add the cost of required cement, steel
stone chips or bitumen as per design and specification to arrive at the complete rate.

18. In some items, rates are inclusive of cost of cement and steel materials. In such cases
departmental issue rates have considered in the analysis of rates of items.

19. The rates of major construction materials used in the items have been duly taken into account
in the Analysis of Rate and need not be considered further.

20. Finally, The Rates of the items provided in this volume of SOR of PWD are tentative and for
estimation purpose only.

__________
CONTENTS

SECTION TITLE PAGE NO.

1 General Conditions 1–8


2 General Specifications & Quality Control Test 9 - 207
3 Approximate requirement of materials for different items of Works 208 - 214

SCHEDULE OF RATES

Basic Cost of Materials and Issue Rates 215 - 224

ROAD WORKS
Chapter - 1 Carriage of Materials 225 - 229
Chapter - 2 Site Clearance 230 - 234
Chapter - 3 Earth Work, Erosion Control and Drainage 235 - 240
Chapter - 4 Sub-Bases, Bases (Non- Bituminous) and Shoulders 241 - 246
Chapter - 5 Bases and Surface Courses (Bituminous) 247 - 257
Chapter - 6 Cement Concrete Pavements 258 - 259
Chapter - 7 Geosynthetics and Reinforced Earth 260 – 261
Chapter - 8 Traffic Signs, Markings & Other Road Appurtenances 262 - 266
Chapter - 9 Horticulture 267 – 268
Chapter - 10 Maintenance of Roads 269 - 273

BRIDGE AND CULVERT WORKS


Chapter - 11 Pipe Culverts 274 – 275
Chapter - 12 Foundations 276 – 289
Chapter - 13 Sub-Structure 290 – 293
Chapter - 14 Super-Structure 294 – 301
Chapter - 15 River Training and Protection Works 302 – 304
Chapter - 16 Repair and Rehabilitation 305 – 306
Chapter - 17 Soil Boring and Testing Works 207 – 314

MISCELLANEOUS WORKS
Chapter - 18 Miscellaneous Works 315 – 322

APPENDICES
Appendix - I Distance From Refineries and Plant for Bituminous Products. 323 – 325
Appendix - II Distances From Quarries of Stone Aggregates and River Bed 326
Locations for River Bed Materials.
Appendix - III Sign of Distress, Probable Causes and Suggested Measure in 327 - 328
Bituminous Pavement.
Appendix - IV Specification for Anti-stripping Compound 329
Appendix - V Grouting Record 330
Appendix - VI History of Sinking of Well 331
Appendix - VII Tilt and Shift in Well 332
Appendix - VIII Pre-stressing Report 333
Appendix - IX Useful Tables 334
Appendix - X List of Some Indian and Foreign Standards referred in the 335 - 336
Specification.

DRAWINGS Details of KM Post, RC Guard Post & Terms Used in the 337 - 339
Specifications to Describe Road Cross-Section.
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

GENERAL CONDITIONS
1.1. The Schedule of Rates (Vol. III) is divided into different Sub-sections, according to the nature of the works involved.
For contracts made specifically for Carriage works, the Sub-section dealing with carriage items will be operative. In
all other cases for contracts in respect of Road works, Bridge and Culvert works etc. the entire Schedule (including
the Sub-section dealing with carriage items) will be operative.
For contracts made specifically for Building works, P.W.D. Schedule, Volume I & II will only be operative.
1.2. The Engineer-in-Charge shall mean the Executive Engineer of the Division concerned. The Sub Divisional Officers
concerned is authorised to carry out general supervision, issue of day to day instructions and to approve materials
and workmanship on behalf of the Engineer - in - Charge.
1.3. All materials, tools and plants besides those to be supplied by the Govt. for the work, all labour (skilled and
unskilled) including their housing, sanitation, procurement of food stuff, medical aid, drinking water, etc. are to be
arranged by the Contractor. Cost for transportation of labour, materials and all items aforesaid shall have to be
borne by the Contractor unless otherwise specified in the contract. The expenditure deemed to be covered under
Overhead charges.
1.4. Arrangement for water for mixing concrete and mortar and for soaking and curing concrete, bricks, bats and other
materials, construction of platforms and vats including cost thereof are to be borne by the Contractor.
1.5. All rates quoted will be inclusive of labour, materials and profit except specifically mentioned otherwise, will include
all charges like Octroi, Toll, Ferry charges, Local charge, Income Tax, VAT/Sales Tax. Royalties etc. as may have to
be incurred by the Contractor for getting the respective items of works executed to proper order and complete and
finish. Unless specifically mentioned otherwise in the description of the item itself no extra charg e will be paid for
scaffolding (including stage, scaffolding) centering, shuttering, curing etc. Rates are to be deemed to be inclusive of
the same and also of the cost of any helping materials necessary for satisfactory completion of the work.
1.6. Renewal works include dismantling and taking out of old work and mending good damages after renewal and
clearing the worksite of all spoils and dismantled materials, as per direction of the Engineer-in-Charge.
1.7. Tools & Plants:
(a) The Contractor is to make his own arrangements for necessary tools and plants. If possible, the tools and
plants as stated in Table: 1-1, belonging to the State may however be rented out to the Contractor depending
on availability and on payment of hire charges as mentioned against each. No extension of time will be granted
due to non-availability of departmental tools & plants.
Table: 1 -1: List of Tools & Plants
(i) Power Roller (8 Ton or above) ` 750.00 per day plus ` 400.00 per day ( As wages
of operating staff )
(ii) Tar boiler (upto 400 gallons) ` 100.00 per day
N.B.: Per day shall mean a day of eight working hours. Hire charges shall be payable for the full period from the
date of issue to the date of return (both days inclusive).
(b) All stores, fuels, lubricants etc. for running the tools and plants lent out by the Department are to be supplied
by the Contractor; quality of which however, must be approved by the Engineer-in-Charge.
(c) Tools and plants should be taken delivery of and returned at Departmental godown in consultation with E.I.C.
The expenditure on carriage of such plants/equipments from the departmental custody to the place of work
and its return to the place as directed by Department should be borne by the Contractor. In case the Contractor
does not return the machinery by the due date, hire charges at double the issue rate will be recovered from the
party for the number of days such machineries are detained. In case the machineries have to be carried and
taken back to the godown by the Department engaging his own agency due to fault on the part of the
Contractor, the expenditure incurred on this account will be recovered from the Contractor.
(d) The machinery is to be handed over to the Contractor in running condition and should also be received back in
the same condition from the Contractor.

1
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

(e) The Contractor will be solely responsible for the safe custody and guarding of the machine during the period
the machine remains with the Contractor. During this period the Contractor will be held responsible for any
pilferage, theft or loss to the machine.
The roller will be driven by the Departmental driver as long as it remains in the custody of the Contractor. The
Contractor must not give any direction to the roller driver which is detrimental to the life of the roller. If any
damage occurs to the roller due to such direction, the Contractor will be held solely responsible for it.
(f) The machine must be well protected from storm and rain.
(g) All kinds of repairs, maintenance will be done by the Department However, in case of emergency minor or
running repairs within ` 500/- on each occasion can be done by the Contractor after taking prior approval of
the Department and also getting the materials approved by the Department In such cases the cost will be
reimbursable to the Contractor.
(h) The inspection of the machinery will be open to the Department at any time even if the machinery remains in
the custody of the Contractor.
(i) Hire charges will be realised per day of 8 hours. The hire charges for the machinery working for a part of a day
i.e. less than 8 hours will also be charged for the full day.
(j) All risks on account of carriage of machineries etc. by railway, road transport or ferry lies with the Contractor
and charges for loss or damages to the same will have to be borne by the Contractor.
(k) When the machine is given to parties other that Govt. body like Municipality, Corporation, Club etc. 50% of
the hire charges will be levied extra.
1.8. All materials shall be brought to the site after due approval of the Engineer-in-Charge. Rejected materials must be
removed by the Contractor from the site within 24 hours of the issue of orders to that effect. In case of non-
compliance with such orders the Engineer-in-Charge shall have the authority to remove the same at the cost and
expense of the Contractor and the Contractor shall not be entitled to any loss or damage on that account.
Departmental materials shall be issued to the Contractor to the extent of requirements as assessed and in small
instalments as decided by the Engineer-in-Charge. Issue of departmental materials may be of two categories :-
(A) Materials for which value is to be recovered from the Contractor.
(B) Materials which are issued direct to work (in respect of items the rates of which do not include the cost of
these materials).
For materials under Category (A) the value of the materials is issued to the Contractor on usual hand receipts,
shall be recovered from the bills of the Contractor in one installment, or in successive instalments as may be
decided by the Engineer-in-Charge.
For materials under Category (B), the Contractor will act as the custodian of the Department and he shall take
charge of the materials against appropriate receipts signed by him. The Contractor shall remain responsible for
the proper storage and safe custody of such materials. The rates for relevant items of work shall deemed to be
inclusive of reasonable consideration for such duties and responsibilities as the custodian.
Necessary carriage from the nearest Departmental godown to the site of work including loading, unloading and
stacking will have to be done by the Contractor at his own cost in case of cement.
All materials whatever be the category thereof shall be properly stored by the Contractor in suitable godown near
the site of work. Under no circumstances, whatsoever, shall any materials be removed from the site of work
without prior permission of the Engineer-in-Charge. The Contractor shall be responsible for any damage or loss of
such materials unless he can satisfy the Engineer-in-Charge that the reasons for such damage or loss are due to
circumstances beyond his control.
The Contractor shall also have to satisfy the Engineer-in-Charge regarding the proper utilization of such materials.
The value of any materials, which cannot be satisfactorily accounted for, shall be recovered from the Contractor‟s
bills or other dues as specified in P.W. Deptt‟s Order No. 2809 (3) A dt. 27.4.71 as reproduced below. The
quantities of materials for which such value is to be recovered shall be decided by the Engineer-in-Charge. In case
of dispute, the decision of Superintending Engineer of the Circle concerned shall be final and binding. Any
materials under category (A) which may be surplus on completion of the work may at sole direction of the
concerned Superintending Engineer be taken back provided the same be of non-perishable nature and has not
been damaged in any way. Surplus materials under category (B) shall be returned to the Engineer-in-Charge in
good condition.

2
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

EXCERPT FROM GOVT ORDER NO 2809 (3) A. dt. 27 th April, 1971


Additional Conditions of Contract for Departmental Materials:

(a) The Value of materials supplied by the Department for use on the work shown in the schedule on page II of
the contract form (West Bengal Form No. 2911) in respect of items of work for which the Contractor‟s rates
are inclusive of the cost of such materials will be debited to him in his accounts at the rates specified in the
schedule.
(b) Regarding materials in respect of items of work for which the Contractor‟s rates are not inclusive of the cost
of such materials, the Contractor shall only act as custodian on behalf of the Govt. and the value of such
materials will not be charged to him except under sub-clause (f) and (g) hereof.
(c) When the contract provides for use of certain specified materials to be supplied by the Department the
Contractor shall not obtain such materials from other sources unless authorised in writing by the Engineer-
in-Charge of the works.
(d) Materials supplied for a particular work or a part thereof shall not be used elsewhere except with the written
permission of the Engineer-in- Charge.
(e) Materials shall be supplied to the Contractor in such instalments as may be decided by the said Engineer-in-
Charge.
(f) The Contractor shall be held responsible for any misuse, loss or damage of the materials issued or handed
over to him by the Engineer-in-Charge. In default, the cost of such materials shall be recovered from the
Contractor according to the terms of the provisions made in sub-clause (g) and (h) hereof.
(g) In the following cases, the materials issued or handed over to the Contractor shall be deemed to have been
misused by him.
(i) Materials lost or damaged due to negligence on the part of the Contractor and / or defective storage
by him.
(ii) Materials used in excess of the requirements as shown in Table 3.1-1.
(iii) Materials used without permission of the Engineer-in-Charge in temporary works (e.g. Coffer dams,
embankments, shoring etc.) or in the construction on Contractor‟s godown, site office, labour
hutments etc.
The value of materials misused as above (in which case the decision of the Engineer-in-Charge shall be final
and binding) shall be recovered at 50 per cent in excess of the highest of the following three rates:

(i) Issue rate as specified in the contract.


(ii) Department stock rate at the time of recovery of value.
(iii) Market Rate at the time of recovery of value.

(h) In cases of loss or damage of materials issued or handed over to the Contractor other than under the
circumstances mentioned in sub-clause (g), the materials so lost or damaged shall be replaced by the
Engineer-in-Charge at the cost of the Contractor and the certificate of the Engineer-in-Charge as to the cost
of replacement shall be final and binding on the Contractor.
(i) Where so specified and in any case in respect of cement, steel and bituminous materials supplied by the
Department a stock register shall be maintained by the Contractor and the daily receipts, issues and balance
of such materials shall be shown therein. This register shall be produced by the Contractor to the Engineer-
in-Charge or his representative whenever required for verification of stock.
(j) Whenever asked for by the Engineer-in-Charge during the progress of work and also with the final bill, the
Contractor shall submit to the former a statement showing.
(i) The total quantity of materials received by the Contractor from the Department..
(ii) Consumption thereof item by item in the work; and
(iii) The balance in hand.
(k) Whenever by computing the consumption of materials of any description in any item or group of items of
work requiring use of such materials.

3
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

(i) It is found that the Contractor has used less materials than are required by the specification and /
or are shown in Table 3.1-1, the value of the quantity of materials less used shall be recovered from
the Contractor at 50 (fifty) per cent in excess of the issue rate of such materials. In such an event the
Contractor shall not be entitled to claim or receive the materials, the cost of which has been thus
recovered ; or

(ii) If it is found that the Contractor has used any materials in excess of the requirement the value of the
material used in excess shall be recovered from the Contractor as provided in sub-clause (g) hereof;

(iii) Provided that recovery of materials used less or in excess as indicated in paragraphs (i) and (ii) of
the sub-clause shall be subjected to the decision of the Engineer-in-Charge who may allow variation
according to para 1 of consumption chart.

1.9. Subject to condition as aforesaid, the following materials, if available under category (A) shall be issued to the
Contractor at issue rate noted in Table I-1 in „Basic Cost of Materials‟ of this Schedule. The materials shall be
issued from any Sub-Divisional godown or godowns where such materials may be available and for this purpose a
stacking yard shall also be deemed as a godown. The Contractor shall be responsible for carriage of the materials
except bitumen and bitumen emulsion from the place of issue to the site of work including loading, unloading and
stacking at his own cost and the rate quoted will be deemed to be inclusive of carriage cost.
Steel materials of all categories and in sections and sizes as available in stock as stated below to be consumed
actually in the finished work. Cut pieces of steel material left surplus on completion of work shall not be taken
back if the same be considered as unsuitable for utilisation in other works.
If in the interest of the work, any material other than those mentioned above be issued under category (A), the
issue rate of such materials shall be based on the then market rate or the stock issue rate, whichever is higher.
Such issue rates shall be decided by the Engineer-in-Charge and his decision shall be binding.
1.10. Value of departmental stones issued to Contractor at site of work in hills will be recovered from the Contractor‟s
bills as follows :
(a) Rough dressed stones received from dismantled work.
(b) Undressed stones received from hard rocks blasting, re-cutting. To be determined by the
(c) Dressed stones received from old D.R.M. or C.R.M. work. (in case of Superintending Engineer
C.R.M. work stripping of old mortar will not be paid extra) concerned.

(d) Boulders.
1.11. Materials obtained by digging at site or dismantling of Govt. structures or part thereof shall remain the property of
Govt. The Contractor shall sort out and stack materials at site as per direction except in case of maintenance work
of road and building in which case the materials obtained after dismantling should be carried and stacked in the
Department godown. He shall also dispose of the unserviceable rubbish etc. as per instructions of the Engineer-in-
Charge or his representative. The Contractor shall remain the custodian of such dismantled materials till the
charge of the same is taken over by the Engineer-in-Charge or his representative. Consideration for assumption of
such responsibilities shall be deemed to have been included in the rates for the relevant items of work.
1.12. In case of collection of road metals etc. from quarry, the Contractor will have to pay royalty and other incidental
charges for quarry and blasting to the respective authorities as may be required. As and when demanded they
shall have to produce evidence in support of payment of such Royalties. The Sub-Divisional Officer, P.W. (Roads)
Department in-Charge will write to respective Divisional Forest Officer and Tea Garden Managers, if necessary,
giving the quantities of stone, stone chips and sand required to be collected for different Government works from
the forest or teagarden areas concerned mentioning the name of the quarries. In all cases stone, stone chips, and
sand must be of the best variety and obtained from the quarry as specified by the Engineer-in-Charge as available.
No quarrying of stone or sand should be done in any Jhora or road side land within a length as directed by the
Engineer-in-Charge.
1.13. Contractor‟s rate for steel reinforcements (or reinforced concrete work) and for other M.S. work should include
cost of straightening the coils of rods, kinks in flats and angles etc. and for this no extra payment will be made.

4
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

1.14. All works are to be carried out with due regard to the convenience of the occupants, if any, of premises or of road
users, and in close co-operation with other Contractors who may be working in the area. All arrangement and
programme of work must be adjusted accordingly. All precautions must be taken to guard against chances of
injury or accident to the occupants, users and workers. The Contractor must see that all damages to any property
which in the opinion of the Engineer-in-Charge are due to the work of the Contractor are promptly rectified as per
his direction and to his satisfaction.
In case of roads or in such portion of roads which are open to traffic, replacement of existing culvert, bridge, the
construction of work must be done in such a way as not to dislocate the traffic. Whenever the Engineer-in-Charge
feels that the traffic cannot be run during construction over the existing road, necessary diversion road has to be
made and maintained for all kinds of traffic. Land required for providing diversion will have to be arranged by
Contractor where departmental land is not available. Provision in the schedule of items of the tender is to be kept
for such diversion road and its maintenance.
During construction works on roads open to traffic, suitable barriers are to be kept to segregate, the area of work.
Red lights are to be provided at such barriers at night during poor visibility on account of fog or otherwise. Night
Chowkiders are also to be maintained. All these will be considered to be included in the rates quoted by
Contractor for construction works.
Prominent signs (in boards measuring nearly 100 cm. x 60 cm.) indicating in black letters on a primrose yellow
background “Road-up, use at your own risk / works undergoing” on the side facing vehicles approaching the
disturbed area and the sign “clear” on the reverse side of the board, are to set up at about 100 m. distance on
either side of the area so disturbed. Similar board with the sign “You have been warned” shall be similarly fixed at
about 10m.distance at either end of the said disturbed area. In addition, other suitable direction or guiding
boards are to be fixed in proper positions to guide traffic to diversions etc. Unless specifically stipulated
otherwise, all the above shall be done at the cost and expense of the Contractor. It must be clearly understood
that the Government is indemnified by the Contractor against payment of any compensation or award on account
of any accident injuries and if any such payment has to be made by the Government under orders of appropriate
authorities the same shall be recovered from the Contractor.
1.15. Except when specifically mentioned in the description of the item itself, the rate for any item of work will apply
equally to all floors in any position and upto any height. In respect of concrete work etc. where the rate is on the
basis of volume the item shall apply to all cases, irrespective of the thickness, unless a specific item appears in
the schedule for the particular type of work.
1.16. The rates for items of works in Chapter 4,5,6,10 and items in Chapter 11 to 18 as provided in this Schedule are to
be enhanced excluding the cost of Government material issued as below:
All the islands situated under North and South 24 Parganas, which are not connected by major bridges from the
main land, the Schedule rates shall be enhanced by 20%. The carriage cost involved for the execution of works
shall be based on shortest distance.
1.17. The site must be cleared by the Contractor of rubbish etc. from time to time as these accumulate. On completion
of work all temporary diversion, barrier board and other structures of obstruction (including sunk pile or similar
underground work, if any) must be removed. All scars of construction shall be obliterated and the whole site left in
a clean workmanlike manner to the satisfaction of the Engineer-in-Charge. No separate payment shall be made
for these, the cost thereof being deemed to have been included in the rates of various items of works.

5
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014
ADDITIONAL INFORMATION
1.18. Public Utilities:
1.18.1 Drawings scheduling the affected services like water pipes, sewers, oil pipelines, cables, gas ducts etc.
owned by various authorities including Public Undertakings and Local Authorities included in the
Contract Documents shall be verified by the Contractor for the accuracy of the information prior to the
commencement of any work.
The Contractor shall notify all utility agencies who may have installation in the work area and secure
their assistance in locating and identifying all utilities before starting any work that may cause any
damage to such utilities.
The Contractor shall schedule work in such a manner as to protect existing utility facilities until they are
relocated, abandoned or replaced.
The Contractor shall ensure that all utilities encountered within the Right of Way i.e. OFC Cable,
telephone, power, water supply, sewerage or any others, remain operational at all times. Any utility, if
damaged, due to construction operation, shall be promptly repaired by the Contractor at his cost.
1.18.2 Notwithstanding the fact that the information on affected services may not be exhaustive, the final
position of these services within the works shall be supposed to have been indicated based on the
information furnished by different bodies and to the extent the bodies are familiar with the final
proposals. The intermediate stages of the works are, however, unknown at the design stage, these being
dictated by the Contractor's methods of working. Accordingly, the Contractor's programme must take
into account the period of notice and duration of diversionary works of each body as given on the
Drawings and the Contractor must also allow for any effect of these services and alterations upon the
Works and for arranging regular meetings with the various bodies at the commencement of the Contract
and throughout the period of the Works, the Contractor shall have no objection if the public utility
bodies vary their decisions in the execution of their proposals in terms of programme and construction,
provided that, in the opinion of the Engineer, the Contractor has received reasonable notice thereof
before the relevant alterations are put in hand.
1.18.3 No removal of or alterations to the utility shall be carried out unless written instructions are issued by
the Engineer.
1.18.4 Any services affected by the Works must be temporarily supported by, the Contractor who must also
take all measures reasonably required by the various bodies to protect their services and property
during the progress of the Works.
1.18.5 The Contractor may be required to carry out certain works for and on behalf of various bodies, which he
shall provide, with the prior approval of the Engineer.
1.18.6 The work of temporarily supporting and protecting the public utility services during execution of the
Works shall be deemed to be part of the Contract and no extra payment shall be made for the same.
1.18.7 The Contractor shall be responsible to co-ordinate with the service providers for cutting of trees, shifting
of utilities, removal of encroachments etc. to make site unencumbered for completion of work. This will
include frequent follow-up meetings. Co¬ ordination for making project site unencumbered shall be
deemed to be part of the Contract and no extra payment shall be made for the same.
1.18.8 In some cases, the Contractor may be required to carry out the removal or shifting of certain
services/utilities on specific orders from the Engineer for which payment shall be made to him. Such
works, however, shall be taken up by the Contractor only after obtaining clearance from the Engineer
and ensuring adequate safety measures.
1.19. Precautions for safeguarding the Environment:
1.19.1 General
The Contractor shall take all precautions for safeguarding the environment during the course of the
construction of the works. He shall abide by all laws, rules and regulations in force governing pollution
and environmental protection that are applicable in the area where the works are situated.
1.19.2 Borrow pits for Embankment Construction
Borrow pits shall be selected only after testing the suitability of materials for use in construction and
shall not normally be dug in the right-of-way of the road. The stipulations in Section 305.2.2 shall
govern. The borrow pits shall not be left in a condition likely to cause hazard to human and animal life.
The Contractor shall seek prior approval from the concerned authorities for operating the borrow pits.

6
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

1.19.3 Pollution from Plants and Batching Plants


Stone crushing and screening plants, bituminous hot-mix plants, concrete batching plants etc. shall be
located sufficiently away from habitation, agricultural operations or industrial establishments. The
locations shall be as permissible under the laws governed by local bodies/ administration of the area.
The Contractor shall take every precaution to reduce the levels of noise, vibration, dust and emissions
from his plants and shall be fully responsible for any claims or damages caused to the owners of
property, fields and residences in the vicinity and violation of pollution control norms, if any.
1.19.4 Substances Hazardous to Health
The Contractor shall not use or generate any materials in the works which are hazardous to the health of
persons, animals or vegetation. Where it is necessary to use some substances which can cause injury to
the health of workers, the Contractor shall provide protective clothing or appliances to his workers.
1.19.5 Use of Nuclear Gauges
Nuclear gauges shall be used only where permitted by the Engineer. The Contractor shall provide the
Engineer with a copy of the regulations governing the safe use of nuclear gauges he intends to employ
and shall abide by such regulations.
1.19.6 Occupational Health and Safety of the Workforce
The Contractor shall prepare and submit to the Engineer the Occupational Health & Safety Procedures/
Practices for the workforce in all quarry sites, plant sites, work sites, camp sites, etc., in accordance
with the applicable laws.
1.20. Arrangement of Traffic during construction:
1.20.1 General
The Contractor shall at all times, carry out work on the highway in a manner creating least interference
to the flow of traffic while consistent with the satisfactory execution of the same. For all works involving
improvements to the existing highway, the Contractor shall, in accordance with the directives of the
Engineer, provide and maintain, during execution of the work, a passage for traffic either along a part of
the existing carriageway under improvement or along a temporary diversion constructed close to the
highway. Before taking up any construction or maintenance operation, the Contractor shall prepare a
Traffic Management Plan for each work zone and submit it to the Engineer for prior approval. This plan
should include inter alia:
i) Provision of a qualified safety officer with support staff to serve as a site safety team
ii) Provision of traffic safety devices and road signs in construction zones as per IRC:SP:55 and other
relevant IRC Codes and para 112.4.
iii) Safety measures for the workers engaged including personal protection equipment
iv) First aid and emergency response arrangements
v) Details and drawings of arrangements in compliance with other sub Sections of this Section.
1.20.2 Passage of Traffic along a Part of the Existing Carriageway under Improvement
For widening/strengthening existing carriageway where part width of the existing carriageway is
proposed to be used for passage of traffic, treated shoulders shall be provided on the side on which
work is not in progress. The treatment to the shoulder shall consist of providing at least 150 mm thick
granular (Wet Mix Macadam/Water Bound Macadam) base course covered with bituminous surface
dressing in a width of at least 1.5 m and the treated shoulder shall be maintained throughout the period
during which traffic uses the same to the satisfaction of the Engineer. The continuous length, in which
such work shall be carried out, would be limited normally to 500 m at a place. However, where work is
allowed by the Engineer in longer stretches passing places at least 20 m long with additional paved
width of 2.5 m shall be provided at every 0.5 km interval.
In case of eccentric widening of existing two-lane to four-lane, the additional two-lanes would be
constructed first and the traffic diverted to it and only thereafter the required treatment to the existing
carriageway would be carried out. In case of concentric widening, stipulations as in paragraph above
shall apply.

7
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

After the works are completed, with the approval of the Engineer, the treated shoulder shall be
dismantled, the debris disposed of and the area cleared as per the direction of the Engineer.
1.20.3 Passage of Traffic along a Temporary Diversion
In stretches where it is not possible to pass the traffic on part width of the carriageway, a temporary
diversion shall be constructed with 7 m carriageway and 2.5 m earthen shoulders on each side (total
width of roadway 12 m) with the following provision for road crust in the 7 m width:
i) Earthwork
ii) 200 mm (compacted) Granular sub-base
iii) 225 mm (compacted) Granular base course
iv) Priming and Tack Coat and
v) Premix carpet with Seal Coat/Mix Seal Surfacing
The location of such stretch, alignment and longitudinal section of diversion including junctions and
temporary cross drainage provision shall be as approved by the Engineer.
1.20.4 Traffic Safety and Control
The Contractor shall take all necessary measures for the safety of traffic during construction and provide,
erect and maintain such barricades, including signs, marking, flags, lights and flagmen as per the traffic
management plan submitted by the Contractor and approved by the Engineer, referred to in Sub-Section
112.1. Before taking up any construction, an agreed phased programme for the diversion of traffic on the
highway shall be drawn up in consultation with the Engineer.
All construction equipment working or parked on or within the traffic lanes or shoulders under "Traffic
maintained" conditions shall be equipped with flashing yellow beacons.
The Contractor shall conduct all operations to minimize any drop-offs (abrupt changes in roadway)
exposed to traffic. Drop-offs in the travelled way shall be protected by a wedge of compacted stable
material capable of carrying traffic (the wedge being 1 vertical to 4 horizontal or flatter).
The Engineer shall authorize other methods, to protect drop-offs when conditions do not allow a wedge of
compacted, stable material.
Warning signs, barricades, warning lights, and all other traffic control devices shall not be removed if the
hazard has not been eliminated. Only upon receipt of specific written authorization from the Engineer, the
Contractor may remove or cease to maintain warning signs, barricades, warning lights, and all other
traffic control devices.
The barricades erected on either side of the carriageway/portion of the carriageway closed to traffic,
shall be of strong design to resist violation, and painted with alternate black and white stripes. Red
lanterns or warning lights of similar type shall be mounted on the barricades at night and kept lit
throughout from sunset to sunrise.
At the points where traffic is to deviate from its normal path (whether on temporary diversion or part width
of the carriageway) the channel for traffic shall be clearly marked with the aid of pavement markings,
painted drums or a similar device to the directions of the Engineer. At night, the passage shall be
delineated with lanterns or other suitable light source including solar energy bulbs.
One-way traffic operation shall be established whenever the traffic is to be passed over part of the
carriageway inadequate for two-lane traffic. This shall be done with the help of temporary traffic signals
or flagmen kept positioned on opposite sides during all hours. For regulation of traffic, the flagmen shall
be equipped with red and green flags and lanterns/lights.
On both sides, suitable regulatory/warning signs as approved by the Engineer shall be installed for the
guidance of road users. On each approach, at least two signs shall be put up, one close to the point
where transition of carriageway begins and the other 120 m away. The signs shall be of approved design
and of reflective type, as directed by the Engineer.
1.20.5 Maintenance of Diversions and Traffic Control Devices
Signs, lights, barriers and other traffic control devices, adequate lighting and other arrangements, as well
as the riding surface of diversions and treated shoulders shall be maintained in a satisfactory condition
till such time they are required and as directed by the Engineer. The temporary travelled way shall be kept
free of dust by frequent applications of water, if necessary.

8
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

GENERAL SPECIFICATION
2.1 MATERIALS
All materials used in the works shall be of the best kind and to the approval of the Engineer-in-Charge. All materials shall
comply with the relevant Bureau of Indian Standard Specification.

2.1.1 BRICKS (cl .1003 of MORT&H)


Burnt clay bricks shall conform to the requirements of IS:1077, except that the minimum compressive strength when tested
flat, shall not be less than 8.4 MPa for individual bricks and mean strength not less than 10.5 MPa for a group of 5
specimens. They shall be free from cracks and flaws and nodules of free lime. The brick shall have smooth rectangular faces
with sharp corners and emit a clear ringing sound when struck. The size may be according to local practice with a tolerance
of ± 5 percent.

2.1.2 STONES AND BLOCKS (cl. 1004 of MORT&H)


2.1.2.1 Stones
Stones shall be of the type specified. They shall be hard, sound, free from cracks, decay and weathering and shall be freshly
quarried from an approved quarry. Stones with round surface shall not be used.
The stones, when immersed in water for 24 hours, shall not absorb water of more than 5 percent of their dry weight when
tested in accordance with IS:1124.
The length of stone shall not exceed three times its height and the width on the base shall not be greater than three-fourth of
the thickness of the wall nor less than 150 mm.

2.1.2. 2 Concrete Blocks


Solid concrete blocks made of cement and suitable aggregates shall conform to relevant provisions of IS:2185 Part 1 in
respect of dimension, mix, manufacturing, curing, drying and physical requirements. The minimum compressive strength of
solid concrete blocks when tested as per IS:2185 Part 1 shall not be less than 10.5 MPa. Hollow light weight concrete
blocks shall not be used in works.
The thickness of concrete block shall not be less than 200 mm and the width shall not be less than 200 mm. The density of
concrete block shall not be less than 2.2 ton/cu.m.

2.1.3 CAST IRON (cl. 1005 of MORT&H)


Cast iron shall conform to IS:210. The grade number of the material shall not be less than 14.

2.1.4 CEMENT (cl. 1006 of MORT&H)


Cement to be used shall be any of the following types with the prior approval of the Engineer.
a) Ordinary Portland cement, 33 Grade, conforming to IS: 269.
b) Ordinary Portland cement, 43 Grade, conforming to IS: 8112.
c) Ordinary Portland cement, 53 Grade, conforming to IS: 12269.
d) Sulphate resisting Portland cement, conforming to IS: 12330.
e) Portland Pozzolana cement (fly ash based) conforming to IS:1489 (Part I)
f) Portland slag cement conforming to IS:455
g) Rapid Hardening Portland cement, conforming to IS: 8041.
h) Low heat Portland cement conforming to IS: 12600
Cement of 33 grade conforming to IS:269 shall be used only after ensuring that the minimum required design strength can be
achieved without exceeding the maximum permissible cement content of 450 Kg/cum of concrete (excluding any mineral
admixture).
Cements of 43 and 53 grades conforming to IS:8112 and IS: 12269 respectively may be used provided the minimum cement
content mentioned elsewhere from durability considerations, is not reduced.

9
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

Sulphate resisting cement conforming to IS: 12330 shall be used when sodium sulphate and magnesium sulphate are present
in large enough concentration to be aggressive to concrete. The recommended threshold values as per IS: 456 are: sulphate
concentration in excess of 0.2 percent in surrounding soil or 300 ppm (0.03 percent) in ground water. Cement conforming to IS:
12330 shall be carefully selected from strength considerations to ensure that the minimum required design strength can be
achieved without exceeding the maximum permissible cement content of 450 kg/cum (excluding any mineral admixture).
Alternatively, Portland slag cement conforming to IS:455 with slag content more than 50 percent can be used instead of
sulphate resisting cement when the sulphate content in the surrounding soil is less than 1 percent or the sulphate content in
the ground water is less than 2500 ppm.
Cement conforming to IS: 8041 shall be used only for precast concrete products after specific approval of the Engineer.
Total chloride content shall be 0.1 percent by mass of cement for the cement to be used in structures other than prestressed
concrete structures and 0.05% by mass of cement in prestressed concrete structures. Also, total sulphur content calculated as
sulphuric anhydride (S03) shall in no case exceed 3.5 percent.-
Where chloride is encountered along with sulphates in soil or ground water, ordinary Portland cement with C3A content from 5
to 8 percent shall be preferably used in concrete, instead of sulphate resisting cement.
Manufacturer's test certificate shall be submitted to the Engineer by the contractor for every consignment of cement. The
certificate shall cover all the tests for chemical requirements, physical requirements and chloride content as per relevant codes
as applicable.
Independent tests of samples drawn from the consignment shall be carried out at the site laboratory or in an independent
laboratory approved by the Engineer, immediately after delivery. The following properties shall be tested:
i) Compressive strength.
ii) Setting time.
The cost of the tests shall be borne by the Contractor.
Cement in bags in local storage for more than 3 months after completion of tests, may be re-tested for compressive strength
and setting times (initial and final) before use and may be rejected if it fails to conform to any of the requirements.
Lot size for independent testing of cement at site shall be the quantity received at site on any day, subject to a maximum of 500
tonnes.

2.1.5 COARSE AGGREGATES FOR CONCRETE WORK (cl. 1007 of MORT&H)


For plain and reinforced cement concrete (PCC and RCC) or prestressed concrete (PSC) works, coarse aggregates shall consist
of clean, hard, strong, dense, non-porous and durable pieces of crushed stone, crushed gravel, natural gravel or a suitable
combination thereof or other approved inert material. They shall not contain pieces of disintegrated stones, soft, flaky,
elongated particles, salt, alkali, vegetable matter or other deleterious materials in such quantities as to reduce the strength and
durability of the concrete, or to attack the steel reinforcement. Coarse aggregates having positive alkali-silica reaction shall not
be used. All coarse aggregates shall conform to IS: 383 and tests for conformity shall be carried out as perlS:2386, Parts I to
VIII.
The contractor shall submit for the approval of the Engineer, the entire information indicated in Appendix A of iS:383.
Maximum nominal size of coarse aggregate for various structural components in PCC, RCC or PSC, shall conform to Section
1700 of these Specifications. The maximum value for flakiness index for coarse aggregate shall not exceed 35 percent. The
coarse aggregate shall satisfy the requirements of grading as given in Table 1000-1 of MoRT&H:

Table 1 : Grading Requirements of Coarse Aggregate (Table 1000-1of MORT&H)

Per cent age Passing for Gr aded Aggr egat e of Nominal S ize
IS S iev e S ize
4 0 mm 2 0 mm 1 2 .5 mm
63 mm — — —
40 mm 95-100 100 —
20 mm 30-70 95-100 100
12.5 mm — — 90-100
10 mm 10-35 25-55 40-85
4.75 mm 0-5 0- 10 0-10

10
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.1.6 FINE AGGREGATES FOR CONCRETE WORKS (cl. 1008 of MORT&H)


For masonry work, sand shall conform to the requirements of IS: 2116.
Natural sand, crushed stone sand or crushed gravel sand or a suitable combination of natural sand, crushed stone or
gravel, shall be used as fine aggregates in plain, reinforced and pre stressed concrete works. The fine aggregates shall be
dense, durable, clean and free from veins and adherent coating and other deleterious substances. They shall not contain
dust, lumps, soft or flaky materials, mica or other deleterious materials in such quantities as to reduce the strength and
durability of the concrete, or to attack the embedded steel. Mechanised sand washing machines should be used to remove
impurities from sand. Fine aggregates having positive alkali-silica reaction shall not be used. All fine aggregates shall
conform to IS:383 and tests for conformity shall be carried out as per IS:2386, (Parts I to VIII). The Contractor shall submit
to the Engineer the entire information indicated in Appendix A of IS: 383. The fineness modulus of fine aggregate shall
neither be less than 2.0 nor greater than 3.5.
Fine aggregate for structural concrete shall conform to the following grading requirements:

Table 2 : Grading Requirements of Fine Aggregates (Table 1000-2 of MORT&H)


Per cent Passing for
IS S iev e S ize
Gr ading Z one I Gr ading Z one II Gr ading Z one III
10 mm 100 100 100
4.75 mm 90-100 90-100 90-100
2.36 mm 60-95 75-100 85-100
1.18 mm 30-70 55-90 75-100
600 micron 15-34 35-59 60-79
300 micron 5-20 8-30 12-40
150 micron 0-10 0-10 0-10

Not e : When the grading falls outside the limits of any particular grading zone of sieves other than 600-micron IS Sieve by a
total amount not exceeding 5 percent, it shall be regarded as falling within that grading zone. However for crushed stone
sand, the permissible limit on 150-micron IS Sieve is increased to 20 percent. Reference shall be made to Clause: 4.3
of IS: 383.

2.1.7 STEEL (CL. 1009 of MORT&H)

2.1.7.1 Cast Steel


The use of cast steel shall be limited to bearings and other similar parts. Steel for castings shall conform to Grade 280 -
520N of IS: 1030. In case where subsequent welding is unavoidable in the relevant cast stee l components, the letter N at
the end of the grade designation of the steel casting shall be replaced by letter W. To increase the corrosion resistance
properties, 0.3% to 0.5% copper may be added.

2.1.7.2 Steel for Pre stressing


a) The pre stressing steel shall conform to any one of the following standards:
b) Plain hard drawn steel wire conforming to IS: 1785 (Part I) and IS:1785 (Part II)
c) Cold drawn indented wire conforming to IS:6003
d) High tensile steel bar conforming to IS:2090
e) Uncoated stress relieved strands conforming to IS:6006
f) Uncoated stress relieved low relaxation seven ply strand conforming to IS:14268
Data in respect of modulus of elasticity, relaxation loss at 1000 hours, minimum ultimate tensile strength, stress strain
curve etc. shall be obtained from the manufacturer. Pre-stressing steel shall be subjected to acceptance tests prior to
actual use in the works.

2.1.7.3 Reinforcement/Un tensioned Steel


2.1.7.3.1 Reinforcing Bars
For plain and reinforced cement concrete (PCC and RCC) or pre stressed concrete (PSC) works, the reinforcement/un
tensioned steel as the case may be, shall consist of the following grades of reinforcing bars.

11
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.1.7.3.2 Hot Dipped Galvanized Bars


Hot dipped galvanized reinforcing steel shall be provided wherever specified. The coating shall conform to IS:12594-
1988.
2.1.7.4 Steel Forgings
Forged steel pins shall comply with clause 3, 3A or 4 of IS: 1875 and steel forgings shall comply with clause 3, 3A or 4 of
IS:2004. Raw materials of the forging shall be as per IS: 1875 with minimum reduction ratio of 1.8:1. Alternatively, if
forging is made from ingot, the minimum reduction ratio shall be 4:1. Forging shall be normalized.
2.1.7.5 Structural Steel
Unless otherwise permitted, all structural steel shall, before fabrication, comply with the requirements of the following
Indian Standards:
IS: 226 : Structural Steel (Standard Quality)
IS: 961 : Structural Steel (High Tensile)
IS: 2062 : Weldable Structural Steel
IS: 8500 : Weldable Structural Steel (medium and high strength qualities)
IS: 1148 : Hot rolled rivet bars (upto 40 mm dia) for structural purposes
IS: 1149 : High tensile rivet bars for structural purposes
IS: 1161 : Steel tubes for structural purposes
IS: 4923 : Hollow Steel sections for structural use
IS: 11587 : Structural weather resistant steel
IS: 808 : Specifications for Rolled Steel Beam, Channel and Angle Sections
IS: 1239 : Mild Steel Tubes
IS: 1730 : Dimension for Steel Plate, sheet and strip for structural and general Engineering
purposes.
IS: 1731 : Dimension for Steel flats for structural and general engineering purposes
IS: 1732 : Dimension for round and square steel bars for structural and general
engineering purposes.
IS: 1852 : Rolling and cutting tolerances for hot rolled steel products

The use of structural steel not covered by the above standards may be permitted with the specific approval of the Engineer.
Refer to Section 1900 of these Specifications for further details.

2.1.8 WATER (CL. 1010 of MORT&H)


Water used for mixing and curing shall be clean and free from oils, acids, alkalis, salts, sugar, organic materials or other
substances that may be deleterious to concrete or steel.
In case of doubt regarding development of strength, the suitability of water proposed to be used for the production of
concrete shall be ascertained by carrying out tests for the compressive strength of concrete and initial setting time of
cement using the same water.
The sample of water taken for testing shall represent the water proposed to be used for concreting, taking into account
seasonal variations, if any. The sample shall not receive any treatment before testing other than that being given to the
regular supply of water proposed for use in concrete. The sample shall be stored in a clean container previously rinsed out
with similar water.
Average 28 days compressive strength of at least three 150 mm concrete cubes prepared with water proposed to be used
shall not be less than 90 percent of the average strength of three similar concrete cubes prepared with distilled water. The
cubes shall be prepared, cured and tested in accordance with the requirements of IS: 516.
The initial setting time of test block made with the appropriate cement and the water proposed to be used shall not be less
than 30 minutes and shall not be more than 30 minutes from the initial setting time of control test block prepared with the
same cement and distilled water. The test blocks shall be prepared and tested in accordance with the requirements of IS :
4031 (Part 5).

12
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

pH value of water shall not be less than 6. Potable water is generally considered satisfactory for mixing concrete. Mixing
and curing with sea water shall not be permitted.
As a guide, the following concentrations represent the maximum permissible values:
a) To neutralize 100 ml sample of water, using phenolphthalein as an indicator, it should not require more than 5 ml
of 0.02 normal NaOH. For details of test refer IS:3025(Part 22).
b) To neutralize 100 ml sample of water, using mixed indicator, it should not require more than 25 ml of 0.02
normal. H2S04. For details of test refer IS: 3025(Part 23).
c) The Permissible limit's for solids shall be as follows :
Tested as per Permissible Limit max.
Organic : IS: 3025 (Pt. 18) 200 mg per liter
Inorganic : IS: 3025 (Pt. 18) 3000 mg per liter
Sulphates (SO4) : IS: 3025 (Pt. 28) 400 mg per liter
Chloride (Cl) : IS: 3025 (Pt. 32) 2000 mg per liter for concrete work not containing
embedded steel and 500 mg/lit for prestressed /
reinforced concrete work
Suspended matters : IS: 3025 (Pt. 17) 2000 mg per liter
All samples of water (including potable water) shall be tested and suitable measures taken, where necessary, to ensure
conformity of the water to the requirements stated herein.
2.1.9 TIMBER (cl. 1011 of MORT&H)
The timber used for structural purposes shall conform to IS: 883.

2.1.10 CONCRETE ADMIXTURES (cl. 1012 of MORT&H)


2.1.10.1 Mineral Admixtures
Any of the following mineral admixtures may be used as part replacement of Portland Cement with the approval of the Engineer.
Fly ash : conforming to of IS: 3812-3
Granulated slag: Ground granulated slag obtained by grinding granulated slag conforming tolS:12089.
Silica fume: Silica fume is very fine, non- crystalline Si0 2, obtained as a by-product of Silicon and Ferro - Silicon alloy
industries and shall conform to IS: 15388
2.1.10.2 Chemical Admixtures
2.1.10.2.1 Information Required from the Manufacturer
Chemical admixtures are proprietary items of manufacture and shall be obtained only from established manufacturers with
proven track record, quality assurance and full-fledged laboratory facilities for the manufacture and testing of concrete.
The contractor shall provide the following information concerning each admixture, after obtaining the same from the
manufacturer:
a) Normal dosage and detrimental effects, if any, of under dosage and over dosage.
b) The chemical names of the main ingredients.
c) The chloride content, if any, expressed as a percentage by weight of the admixture.
d) Values of dry material content, ash content and relative density which can be used for Uniformity
Tests.
e) Whether it leads to the entrapment of air when used as per the manufacturer's recommended dosage,
and if so to what extent,
f) Confirmation regarding its compatibility with type of cement.
g) Whether it increases the risk of corrosion of reinforcement or other embedments.
h) Whether it affects the durability of concrete adversely.

13
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.1.10.2.2 Physical and Chemical Requirements


Admixtures shall conform to the requirements of IS:9103. In addition, the following conditions shall be satisfied.
a) "Plasticisers" and "Super-Plasticisers" shall meet the requirements indicated for "Water reducing
Admixture".
b) Except where resistance to freezing and thawing and to disruptive action of deicing salts is required, the air
content of freshly mixed concrete in accordance with the pressure method given in IS:1199, shall not
be more than 2 percent higher than that of the corresponding control mix and in any case not more
than 3 percent of the test mix.
c) The chloride content of the admixtures shall not exceed 0.2 percent when tested in accordance with
IS: 6925. In addition, the maximum permissible limit of chloride content of all the constituents as
indicated in Section 1700 of these Specifications shall also not be exceeded.
d) Uniformity tests on the admixtures are essential to compare qualitatively the composition of different
samples taken from batch to batch or from the same batch at different times.
The tests that shall be performed along with permissible variations are as follows:
i) Dry Material Content: within 3 percent and 5 percent of liquid and solid
ii) Ash content : within 1 percent of the value stated by the manufacturer.
iii) Relative Density (for liquid admixtures) : within 2 percent of the value stated by the
manufacturer.
e) All tests relating to concrete admixtures shall be conducted periodically at an independent laboratory
and the results compared with the data given by the manufacturer.

2.1.11 REINFORCED AND PRESTRESSED CONCRETE PIPES (cl. 1013 of MORT&H)


Reinforced concrete pipes for highway structures shall be of NP4 type conforming to the requirements of IS:458.
Prestressed concrete pipes (NP4) conforming to IS: 784 can also be used depending on the requirement.

2.1.12 Prestressing Materials (cl. 1014.6 of MORT&H)


All prestressing steel, sheathing, anchorages and sleeves or couplers shall be protected during transportation, handling
and storage. The prestressing steel, sheathing and other accessories shall be stored under cover from rain or damp ground
and protected from the ambient atmosphere if it is likely to be aggressive. Period of storage at site must be kept to the
absolute minimum.
a) Tendons : Wires, strands and bars from which tendons are to be fabricated shall be stored about 300 mm
above the ground in a suitably covered and closed space so as to avoid direct climatic influences and to protect
them from splashes from any other materials and from the cutting operation of an oxy-acetylene torch or arc
welding process in the vicinity. Under no circumstances shall tendon material be subjected to any welding
operation or on site heat treatment or metallic coating such as galvanizing. Storage facilities and the
procedures for transporting material into or out of the store, shall be such that the material does not become
kinked or notched. Wires or strands shall be stored in large diameter coils which enable the tendons to be laid
out straight. As a guide, for wires above 5 mm dia, coils of about 3 m dia without breaks or joints shall be
obtained from manufacturer. Protective wrapping for tendons shall be chemically neutral. All prestressing
steel must be provided with temporary protection during storage.
b) Anchorage Components : The handling and storing procedures shall maintain the anchorage components in a
condition in which they can subsequently perform their function to an adequate degree. Components shall be
handled and stored so that mechanical damage and detrimental corrosion are prevented. The corrosion of the
gripping and securing system shall be prevented. The use of correctly formulated oils and greases or of other
corrosion preventing material, shall be guaranteed by the producer to be non-aggressive and non-degrading.
Prestressing steel which shall be absolutely clean and without any signs of rust, shall be stored in a closed
store having single door with double locking arrangements and no windows. The air inside the store shall be kept
dry as far as possible by using various means to the satisfaction of the Engineer, so as to eliminate the
possibility of initial rusting of prestressing steel during storage. Instrument measuring the air humidity shall be
installed inside the store. The prestressing steel shall be coated with water-soluble grease.
14
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All prestressing steel shall be stored at least 300 mm above ground level and shall be invariably wrapped with
a protective covering of tar paper or polythene or any other approved material.
The Contractor should ensure that prestressing steel is used within 3 months of its manufacture. He should
chalk out his prestressing programme in such a manner as to avoid the possibility of initial corrosion before
placing in position.

2.1.13 SUPPLY OF STONE AGGREGATES FOR PAVEMENT COURSES (cl. 520 of MORT&H)
2.1.13.1 Scope
This Clause shall apply to the supply of stone aggregates only. The work shall consist only of collection, transportation and
stacking the stone aggregates and stone filler for subsequent use in pavement courses. The actual work of laying the
pavement courses shall, however, be governed by the individual Specification Clause for the actual work, given elsewhere in
these Specifications. The size and quantities of the aggregates to be supplied shall be so selected by the Engineer that the
grading requirements set forth in the individual Specification Clauses for the pavement courses, for which the supply is
intended, are satisfied.
All the materials shall be procured from approved sources and shall conform to the physical requirements, specified in the
respective Specification Clauses for the individual items given elsewhere in these Specifications.
2.1.13.2 Sizes of Stone Aggregates
The stone aggregates shall be designated by their standard sizes in the Contract and shall conform to the requirements
shown in Table 500-49.
2.1.13.3 Stacking
2.1.13.4 Coarse Aggregates
Only the aggregates satisfying the Specifications requirements shall be conveyed to the roadside and stacked. Each size of
aggregate shall be stacked separately. Likewise, materials obtained from different quarry sources shall be stacked separately
and in such a manner that there is no contamination of one source with another.
Table 3 : Size Requirements for Coarse Stone Aggregates (Table 500-49 of MORT&H)
Designat ion of S iev e Designat ion of
S. Thr ough which t he S iev e on which t he
Nominal S ize of Aggr egat e
No. Aggr egat es shall Aggr egat es shall be
Wholly Pass Wholly Ret ained
1) 75 mm 106 mm 63 mm
2) 63 mm 90 mm 53 mm
3) 45 mm 53 mm 26.5 mm
4) 26.5 mm 45 mm 22.4 mm
5) 22.4 mm 26.5 mm 13.2 mm
6) 13.2 mm 22.4 mm 11.2 mm
7) 11.2mm 13.2 mm 6.7 mm
8) 6.7 mm 11.2 mm 2.8 mm

2.1.13.5 Fine Aggregate


As stated in the individual relevant Specification Clauses.
The aggregates shall be stacked clear of the roadway on even clear hard ground, or on a platform prepared in advance for
the purpose by the Contractor at his own cost and in a manner that allows correct and ready measurement. If the stockpile
is placed on ground where the scraping action of the loader can contaminate the material with underlying soil, then the
stockpile shall be rejected by the Engineer. Materials shall not be stacked in locations liable to inundation or flooding.
The dimensions of the stockpiles and their locations shall be approved by the Engineer. Where the material is improperly
stacked, the Engineer shall direct complete re-stacking of the materials in an approved manner at the Contractor's cost.
Stone filler shall be supplied in a dry state in bags or other suitable containers approved by the Engineer and shall be
protected from the environment, so as to prevent deterioration in quality.

15
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

Table 4 : Percent Reduction In Volume of Aggregates (Table 500-50 of MORT&H)


S l. S t andar d S ize of Aggr egat es Percentage Reduction in Volume Computed by Stack Measurements
No. t o Ar r iv e at t he Volume t o be Paid for
1) 75 mm and 63 mm 12.5
2) 45 mm and 26.5 mm 10.0
3) 22.4 mm, 13.2 mm, 11.2 mm and 6.7 mm 5.0
4) Fine aggregate 5.0
Unless otherwise directed by the Engineer, measurements shall not be taken until sufficient materials for use on the road have
been collected and stacked. Immediately after measurement, the stacks shall be marked by white wash or other means as
directed by the Engineer.
Stone filler as delivered to the site shall be measured in tonnes.
2.1.14 Bitumen
The Bureau of Indian Standards (BIS) introduced paving grade bitumen specifications (IS: 73-1950) for the first time in the
year 1950 and classified it on penetration. The specifications were revised in the years 1962 and 1992. To improve the
quality of Bitumen, BIS revised IS-73-1992 specifications based on Viscosity (Viscosity at 60 oC) in July 2006. As per these
specifications, there are four grades VG-10, VG-20, VG-30 & VG-40. A few qualification tests like specific gravity, water
content, ductility, loss on heating & Farass breaking point were removed from IS: 73-1992 specifications as these tests do
not have any relationship either with the quality or performance of the product.
According to viscosity (degree of fluidity) grading, higher the grade, stiffer the Bitumen. Tests are conducted at 60 o C and
135o C, which represent the temperature of road surface during summer (hot climate, similar to northern parts of India) and
mixing temperature respectively. The penetration at 25 o C, which is annual average pavement temperature, is also retained.
2.1.14.1 Different Grades of Bitumen marketed by Indian Oil :
VG-10 Bitumen : VG-10 is widely used in spraying applications such as surface-dressing and paving in very cold
climate in lieu of old 80/100 Penetration grade. It is also used to manufacture Bitumen Emulsion and Modified Bitumen
products.
VG-20 Bitumen : VG-20 is used for paving in cold climate & high altitude regions
VG-30 Bitumen : VG-30 is primarily used to construct extra heavy duty Bitumen pavements that need to endure
substantial traffic loads. It can be used in lieu of 60/70 Penetration grade.
VG-40 Bitumen : VG-40 is used in highly stressed areas such as intersections, near toll booths and truck parking lots
in lieu of old 30/40 Penetration grade. Due to its higher viscosity, stiffer Bitumen mixes can be produced to improve
resistance to shoving and other problems associated with higher temperature and heavy traffic loads.
Table 5 : Viscosit y Gr ade (V G) Bit umen S pecificat ion As Per I S 7 3 :2 0 0 6
Char act er ist ics VG-1 0 VG-2 0 VG-3 0 VG-4 0
Absolute Viscosity, 60 oC, poises, min 800 1600 2400 3200
Kinematic Viscosity, 135oC, CST, min 250 300 350 400
Flash point, C, min 220 220 220 220
Solubility in trichloroethylene, %, min 99.0 99.0 99.0 99.0
Penetration at 25 oC 80-100 60-80 50-70 40-60
Softening point, C, min 40 45 47 50
Tests on residue from thin film over test / RTFOT:
i. Viscosity ratio at 60oC, max 4.0 4.0 4.0 4.0
ii. Ductility at 25oC, cm, min, after thin film over test 75 50 40 25

Table 6 : Use of Viscosity Grade Bitumen as per IS: 7 3-2006 in replacement of Penetration Grade Bitumen as per IS : 7 3 -1 9 9 2
(As amended in 2 0 0 2 )
Bitumen Grade as per
Use Refer ence
IS :7 3 -2 0 0 6
May be used in spraying application in very cold climate in lieu of old 80/100
VG-10
penetration grade. Memo No KDO/C/Bit
VG-20 May be used for paving in cold climate in high altitude regions. dated 17.06.2009 of
May be used for construction of heavy duty bitumen pavements that need to Senior Divisional
VG-30 Consumer Sales
endure substantial traffic load. It can be used in lieu of 60/70 penetration grade.
Manager, Kolkata
May be used in highly stressed area such as intersection, near toll booth, truck Divisional Office, Indian
VG-40
parking lots in lieu of old 30/40 penetration grade. Oil Corporation Limited.

16
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.1.14.2 MODIFIED BINDER


2.1.14.2.1 Scope
Modified binders comprise a base binder, to which is added either natural rubber, crumb rubber or a polymer such as
Styrene-Butadiene-Styrene (SBS), Ethylene-Vinyl-Acetate (EVA) or Low Density Polyethylene (LDPE). The purpose is to
achieve a high performance binder with improved properties, particularly at extremes of temperature.
(a) Modifier
The modifier shall be a natural rubber, crumb rubber or any other polymer which is compatible with the base binder and
which allows the properties as given in following Table to be achieved. For further details, IRC: SP-53 may be referred to.
The modifier, in the required quantity shall be blended at the refinery or at the site plant capable of producing modif ied
binder.
Table 7 : Bitumen – CRMB, IS 15462: 2004
Gr ade and Requir ement s Met hod of Test , Ref. To
Char act er ist ics
CRMB 5 0 CRMB 5 5 CRMB 6 0 IS No. Annex
Penetration at 25 Deg. C, 0.1 mm, 100g, 5s <70 <60 <50 1203 -
Softening Point, (R&B), Deg. C Min. 50 55 60 1205 -
Flash Point, COC, Deg. C. Min. 220 220 220 1209 -
Elastic recovery of half thread in ductilometer at 15 50 50 50 - A
Deg. C, percent Min. or
Separation, difference in softening point (R&B) Deg. C 4 4 4 B
Max.
Viscosity at 150 Deg. C, Poise 1-3 2-6 3-9 1206 (Part 1) -
Thin film oven tests and test -
on residue :
a. Loss in mass, percent 1.0 1.0 1.0 9382
b. Increase in softening point, Deg. C. Max. 7 6 5 1205 -
c. Reduction in penetration of residue, at 25 Deg. C, 40 40 40 1203 -
percent Max.
d. Elastic recovery of half thread in ductilometer at 25 35 35 35 - A
Deg. C, percent Min.

Table 8 : Bitumen Emulsion ( Cationic Type) – IS 8887: 2004 (Second Revision)


Gr ades of Emulsion Met hod of Test , Ref t o
Char act er ist ics Annex of
RS -1 RS -2 MS S S -1 S S -2 1 :No.
This st andar d
Residue on 600 micron IS Sieve, percent 0.05 0.05 0.05 0.05 0.05 - B
by mass, Max
Viscosity by saybolt furol viscometer, 3117 -
seconds:
1) At 25 Deg. C - - - 20-100 30-150
2) At 50 Deg. C 20-100 100-300 50-300 - -
Coagulation of emulsion at low Nil Nil Nil Nil Nil - C
temperature C
Storage stability after 24 h, percent, Max 2 1 1 2 2 - D
Particle charge Positive Positive Positive Weak Positive - E
Positive
Coating ability and water resistance:
1. Coating, dry aggregate - - Good - - - F
2. Coating, after spraying - - Fair - -
3. Coating, wet aggregate - - Fair - -
4. Coating, after spraying - - Fair - -
Stability to mixing with cement - - - 2 2 - G
(percentage coagulation), Max
No No No - No H
Miscibility with water
coagulation coagulation coagulation coagulation

17
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

Gr ades of Emulsion Met hod of Test , Ref t o


Char act er ist ics Annex of
RS -1 RS -2 MS S S -1 S S -2 1 :No.
This st andar d
Tests on residue:
1. Residue by evaporation, percent, 60 67 65 50 60 - -
Min.
2. Penetration 25 Deg. C/100g/5 sec 80-150 80-150 60-150 60-350 60-120 1203 -
3. Ductility 27 Deg. C/cm, Min. 50 50 50 50 50 1208 -
4. Solubility : In trichloro-ethylene, -
Percent by mass, Min. 98 98 98 98 98 1216
Distillation in percent, by volume at
1. 190 Deg. C - - - 20-55 - - -
2. 225 Deg. C - - - 30-75 - - -
3. 260 Deg. C - - - 40-90 - - -
4. 315 Deg. C - - - 60-100 - - -
Water content, percent by mass, Max. - - - 20 - - -

2.1.15.1 Testing and Approval of Material


The Contractor shall furnish test certificates from the manufacturer/supplier of materials along with each batch of material(s)
delivered to site.
The Contractor shall set up a field laboratory with necessary equipment for testing of all materials, finished products used
in the construction as per requirements of conditions of contract and the relevant specifications. The testing of all the
materials shall be carried out by the Engineer for which shall make all the necessary arrangements and bear the entire cost.
Test which cannot be carried out in the field laboratory have to be got done at the Contractor's cost at any recognized
laboratory/testing establishments approved by the Engineer.
2.1.15.2 Sampling of Materials
Samples provided to the Engineer for inspection are to be in labelled boxes suitable for storage.
Samples required for testing and approval must be supplied well in advance by at least 48 hours or before the minimum
period required for carrying out the relevant tests. Delay to works arising from the late submission of samples, will not be
acceptable as a reason for delay in completion of the works.
If materials are brought from abroad, the cost of sampling/testing whether in India or abroad shall be borne by the
Contractor.
2.1.15.3 Rejection of Materials not conforming to the Specifications.
Any stack or batch of material(s) of which sample(s) does (do) not conform to the prescribed tests and quality shall be rejected
by the Engineer and such materials shall be removed from site by the Contractor at his own cost. Such rejected materials shall
not be made acceptable by any rectifications.
2.1.15.4 Testing and Approval of Plant and Equipment
All plants and equipment used for preparing, testing and production of materials for incorporation into the permanent
works, shall be in accordance with manufacturer's specifications and shall be got approved by the Engineer before use.

2.2 GENERAL RULES FOR THE MEASUREMENT OF WORKS FOR PAYMENT (cl. 113 of MORT&H)
2.2.1 General
All measurements shall be made in the metric system. Different items of work shall be measured in accordance with the
procedures set forth in the relevant Sections read in conjunction with the General Conditions of Contract. The same shall
not, however, apply in the case of lump sum contracts.
2.2.2 Measurement of Pavement Thickness for Payment on Volume Basis
The finished thickness of sub-bases, base and bituminous layers and concrete courses to be paid on volume basis shall be
computed in the following manner:

18
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

Levels shall be taken before and after construction, at the grid of points 10m centre-to-centre longitudinally in straight
reaches and 5 m centre-to-centre at curves. Normally, on two-lane roads, the levels shall be taken at four positions
transversely, at 0.75 m and 2.75 m from either edge of the carriageway and on single-lane roads, these shall be taken at
two positions transversely, being at 1.25 m from either edge of the carriageway. For multi-lane roads, levels shall be taken
at two positions transversely for each lane. The transverse position for levels shall be 0.75 m from either edge of the
carriageway and the remaining locations shall be at equi-distance in the balance portion of carriageway. For paved
shoulder an additional level shall be taken at the centre of the shoulder.
Suitable references for the transverse grid lines should be left in the form of embedded bricks on both ends or by other
means so that it is possible to locate the grid points for level measurements after each successive course is laid.
For pavement courses laid only over widening portions, at least one line of levels shall be taken on each strip of widening,
or more depending on the width of widening as decided by the Engineer.
Notwithstanding the above, the measurements may be taken at closer intervals also, if so desired by the Engineer, the need
for which may arise particularly in the case of estimation of the volume of the material for profile corrective course (levelling
course). The average thickness of the pavement course in any area shall be the arithmetic mean of the difference of levels
before and after construction at all the grid points falling in that area, provided that the thickness of finished work shall be
limited to those shown on the drawings or approved by the engineer in writing.
As supplement to level measurements, the Engineer shall have the option to take cores/ make holes to check the depth of
construction. The holes made and the portions cut for taking cores shall be made good by the Contractor by laying fres h
mix/material including compacting as required at his-own cost immediately after the measurements are recorded.
2.2.3 Checking of Pavement Thickness for Payment on Area Basis
Where payment for any bituminous course in Section 500 is allowed to be made on the area basis, the Engineer may have
its thickness checked with the help of a suitable penetration gauge at regular intervals or other means as he may decide.

2.3 FIELD LABORATORY (cl. 120 of MORT&H)

2.3.1 Scope
The work covers the provision and maintenance of an adequately equipped field laboratory as required for site control on the
quality of materials and the works.

2.3.2 Description
The Contractor shall arrange to provide fully furnished and adequately equipped field laboratory. The field laboratory shall
preferably be located adjacent to the site office of the Engineer and provided with amenities like water supply, electric
supply etc. as for the site office of the Engineer as described in this Section.
The layout and size of the field laboratory shall be as indicated in the drawings. In case no drawings is furnished, the laboratory
shall include space for the storage of samples, equipment, laboratory tables and cupboards, working space for carrying out
various laboratory tests, a wash basin, toilet facility and a curing tank for the curing of samples, around 4 m x 2 m x 1 m in size
and a fume chamber. Wooden/concrete working table with a working platform area of about 1 m x 10 m shall be provided
against the walls. Wooden cupboards above and below the working tables shall be provided to store accessories such as,
sample moulds etc. At least 4 racks of slotted angles and M.S. sheets the size 1800 mm x 900 mm x 375 mm and at least
6 stools for laboratory test operators shall also be provided.
The items of laboratory equipment shall be provided in the field laboratory depending upon the items to be executed as per
Table 100-2.

2.3.3 Ownership
The field laboratory building and equipment shall be the property of the Contractor. The Employer and the Engineer shall
have free access to the laboratory.
2.3.4 Maintenance
The Contractor shall arrange to maintain the field laboratory in a satisfactory manner until the issue of Taking over Certificate
for the completed work. Maintenance includes all activities described in Section 120.4.

19
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

Table 9 : List of Laboratory Equipment (Table 100-2 of MORT&H)


S I. No Name of t he Pr oject Number
A) GENERAL
1) Weigh Balances
a) 5 - 20 kg capacity Electronic type -Accuracy 1 gm 1 No.
b) 500 gm capacity-Electronic Type Accuracy 0.01 gm 1 No.
c) Electronic 5 kg capacity Accuracy 0.5 gm 1 No.
d) Platform Balance scale-300 kg capacity 1 No.
e) Chemical Balance 100 gm capacity-accuracy 0,001 gm -
2) Oven-electrically operated, thermostatically controlled (including thermometer), stainless steel interior
From 0°C to 220°C Sensitivity 1°C 1 No
3) Sieves : as per IS:460-1962
a) I.S. sieves 450 mm internal dia of sieve sets as per BIS of required sieve sizes complete with lid and pan 1 set
b) IS sieve 200 mm internal dia (brass frame and steel/or brass wire cloth mesh) consisting of sieve sets of 2 sets
required sieve sizes complete with ltd
4) Sieve shaker capable of taking 200 mm and 450 mm dia sieves-electrically operated with time switch 1 No
5) 200 tonnes compression testing machine 1 No
6) Stop watches 1/5 sec. accuracy 1 No
7) Glassware comprising beakers, pipettes, dishes, measuring cylinders (100 to 1000 cc capacity) glass rods 2 No. each
and funnels, glass thermometers range 0°C to 100 aC and metallic thermometers range upto 300°C.
8) Hot plates 200 mm dia (1500 watt.) 1 No
9) Enamel trays
a) 600 mm x 450 mm x 50 mm 2Nos
b) 450 mm x 300 mm x 40 mm 2 Nos
c) 300 mm x 250 mm x 40 mm 2 Nos
d) Circular plates of 250 mm dia 2 Nos
10) Water Testing Kit 1 No
B) F OR S OILS
1) Water still -
2) Liquid limit device with ASTM grooving tools as per IS:2720 1 No
3) Sampling pipettes fitted with pressure and suction inlets, 10 ml. Capacity 1 set
4) Compaction apparatus (Proctor) as per IS:2720 (Part 7) complete with collar, base plate and hammer and all 1 No
other accessories
5) Modified AASHTO Compaction apparatus as per IS:2720 (Part 8) 1974 or Heavy Compaction Apparatus as per 1 No
IS complete with collar, base plate hammer and all other accessories
6) Sand pouring cylinder with conical funnel and tap and complete as per IS: 2720 {Part 28) 1974 including 2Nos
modern equipment.
7) Ennore Standard Sand As required
8) Sampling tins with lids 100 mm dia x 75 mm ht. ½ kg capacity and miscellaneous items like moisture tins with 4 Nos
lid 50 grams etc.
9) Lab CBR testing equipment for conducting CBR testing, load frame with 5 Tonne capacity, electrically operated 1 Set
with speed control as per IS:2720 (Part 16) and consisting of following:
a) CBR moulds 150 mm dia- 175 mm ht. 6 No
b) Tripod stands for holding dial gauge holder 4 Nos
c) CBR plunger with settlement dial gauge holder 1 No
d) Surcharge weight 147 mm dia 2.5 kg wt. 6 Nos
e) Spacers disc 148 mm dia 47.7 mm ht. with handle 2 Nos
f) Perforated plate (Brass) 2 Nos
g) Soaking tank for accommodating 6 CBR moulds 2 Nos
h) Proving rings of 1000 kg, 2500 kg capacity 1 No each
i) Dial gauges 25 mm travel - 0.01 mm/division 2 No
10) Standard penetration test equipment 1 No
11) Nuclear moisture Density meter or equivalent -
12) Speedy moisture meter complete with chemicals 1 No
13) Unconfined Compression Test Apparatus 1 No

20
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

S I. No Name of t he Pr oject Number


C) F OR BITUMEN AND BITUMINOUS MIXES
1) Constant temperature bath for accommodating bitumen test specimen, electrically operated, and thermostatically 1 No
controlled (to accommodate minimum six Specimens)
2) Penetrometer automatic type, including adjustable weight arrangement and needles as per IS:1203-1958 1 No
3) Soxhlet extraction or centrifuge type apparatus complete with extraction thimbles with solvent and filter paper 1 No
4) Bitumen laboratory mixer including required accessories (20 Itrs.) 1 No
5) Marshall compaction apparatus automatically operated as per ASTM 1559-62 T complete with accessories (with 1 set
180 N Marshall Moulds)
6) Furol viscometer 1 No
7) Ductility meter 1 No
8) Softening point (Ring and ball app) 1 No
9) Distant reading thermometer -
10) Rifle box -1 No
11) Automatic Asphlat content Meter -1 No
12) Thin film over test apparatus for modified binder either with PMB or CRMB —
13) Mastic Asphalt Hardness testing equipment -
14) Sand Equivalent test apparatus 1 set
15) Core cutting machine suitable for upto 150 mm dia core 1 set
16) Thermometers 4 Nos
D) F OR CEMENT, CEMENT CONCRETE AND MATERIALS
1) Water still 1 No
2) Vicat needle apparatus for setting time with plungers as per IS:269-1967 1 No
3) Moulds
a) 150 mm x 300 mm ht. Cylinder with capping component along with the capping set and compound as per IS As reqd.
b) Cube 150 mm, and 100 mm (each size) As reqd.
4) Concrete permeability apparatus -
5) High frequency mortar cube vibrator for cement testing -
6) Concrete mixer power driven, 1 cu.ft. capacity -
7) Variable frequency and amplitude vibrating table size 1 m x 1 m as per the relevant British Standard -
8) Flakiness index test apparatus 1 No
9) Aggregate impact test apparatus as per IS:2386 (Part 4) 1963 1 No
10) Los-angeles abrasion test apparatus as per IS:2386 (Part 4) 1963 1 No
11) Flow table as per IS:712-1973 -
12) Equipment for slump test 1 No
13) Equipment for determination of specific gravity or fine and coarse aggregate as per IS:2386 (Part 3) 1963 1 No
14) Compression and Flexural strength testing machine of 200 T capacity with additional dial for flexural testing 1 No
15) Core cutting machine with 10 cm dia diamond cutting edge 1 no
16) Needle vibrator 2 Nos
17) Air entrainment meter -
18) 0.5 Cft, 1 Cft cylinder for checking bulk density of aggregate with tamping rod As reqd.
19) Soundness testing apparatus for cement (Lee chattlier) 1 set
E) F OR CONTROL OF PROF ILE AND S URF ACE EVENNES S
1) Total Station 1 No
2) Precision automatic level with micrometer attachment 1 set
3) Distomat or equivalent 1 set
4) Theodolite - Electronically operated with computerised output attachment 1 set
5) Precision staff 2 sets
6) 3 meter straight edge and measuring wedge 1 set
7) Camber template 2 Lane
a) Crown type cross-section 1 set
b) Straight run cross-section 2 sets
8) Steel tape
a) 5 m long 2Nos
b) 10 m long 2Nos
c) 20 m long 2 Nos
d) 30 m long 2Nos
e) 50 m long 1 No
9) Roughometer (Bump Integrator) 1 No.
(when reqd.)

21
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

Not e : The items and their numbers listed above in this Section are indicative and shall be decided by the Engineer as per
requirements of the Project and modified accordingly.

2.4 SUPPLY OF PROJECT RECORD (cl. 121 of MORT&H)


2.4.1 Scope
The work covers the supply digital record of project events in digital format (DVD/Flash Drive) including coloured
photographs both in digital format as well as mounted on albums to serve as a permanent record of the work needed for an
authentic documentation, as approved by the Engineer.

2.5 SITE CLEARANCE

2.5.1 CLEARING AND GRUBBING (cl. 201 of MORT&H)


2.5.1.1 Description
This work shall consist of cutting, removing and disposing of all materials such as trees, bushes, shrubs, stumps, roots,
grass, weeds, rubbish, top organic soil, etc. to an average depth of 150 mm in thickness, which in the opinion of the
Engineer-in-Charge are unsuitable for incorporation in the works, from the area of road land containing road embankment,
drains, cross-drainage structures and such other areas as may be specified on the drawings or by the Engineer-in-Charge.
It shall include necessary excavation, backfilling of pits resulting from uprooting of trees and stumps to required
compaction, handling, salvaging, and disposal of cleared materials with all leads and lifts. Clearing and grubbing shall be
performed in advance of earthwork operations and in accordance with the requirements of Specifications for Road &
Bridge Works of MoRT&H (5th Revision).
2.5.1.2 Preservation of Property/Amenities
Roadside trees, shrubs, any other plants, pole lines, fences, signs, monuments, buildings, pipelines, sewers and all
highway facilities within or adjacent to the highway which are not to be disturbed shall be protected from injury or damage.
During clearing and grubbing, the Contractor shall take all adequate precautions against soil erosion, water pollution, etc.,
and where required, undertake additional works to that effect vide Clause 306. Before start of operations, the Contractor
shall submit to the Engineer-in-Charge for approval, his work plan including the procedure to be followed for disposal of
waste materials, etc., and the schedules for carrying out temporary and permanent erosion control works as stipulated in
Clause 306.3 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
2.5.1.3 Methods, Tools and Equipment
Only such methods, tools and equipment as are approved by the Engineer-in-Charge and which will not affect any property
to be preserved shall be adopted for the Work. If the area has thick vegetation/roots/trees, a crawler or pneumatic tyred
dozer of adequate capacity may be used for clearance purposes. The dozer shall have ripper attachments for removal of
tree stumps. All trees, stumps, etc., falling within excavation and fill lines shall be cut to such depth below ground level that
in no case these fall within 500 mm of the bottom of the subgrade. Also, all vegetation such as roots, under-growth, grass
and other deleterious matter unsuitable for incorporation in the embankment/ subgrade shall be removed between fill
lines to the satisfaction of the Engineer-in-Charge. All branches of trees extending above the roadway shall be trimmed as
directed by the Engineer-in-Charge.
All excavations below the general ground level arising out of the removal of trees, stumps, etc., shall be filled with suitable
material and compacted thoroughly so as to make the surface at these points conform to the surrounding area.
For the purpose of cutting of trees and removal of roots and stumps, the girth shall be measured at a height of 1 m above
ground or at the top of the stump if the height of the stump is less than one metre from the ground.
2.5.1.4 Disposal of Materials
All materials arising from clearing and grubbing operations shall be taken over and shall be disposed of by the Contractor
at suitable disposal sites with all leads and lifts. The disposal shall be in accordance with local, State and Central
regulations.
Ground levels shall be taken prior to and after clearing and grubbing. Levels taken prior to clearing and grubbing shall be
the base level and will be accordingly used for assessing the depth of clearing and grubbing and computation of quantity of
any unsuitable material which is required to be removed. The levels taken subsequent to clearing and grubbing shall be the
base level for computation of earthwork for embankment.

22
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.5.2 DISMANTLING CULVERTS, BRIDGES AND OTHER STRUCTURES / PAVEMENTS (cl. 202 of MORT&H)

2.5.2.1 Scope
This work shall consist of dismantling and removing existing culverts, bridges, pavements, kerbs and other structures like
guard-rails, fences, utility services, manholes, catch basins, inlets, etc., from the right of way which in the opinion of the
Engineer interfere with the construction of road or are not suitable to remain in place, disposing of the surplus/unsuitable
materials and backfilling to after the required compaction as directed by the Engineer.
Existing culverts, bridges, pavements and other structures which are within the highway and which are designated for removal,
shall be removed upto the limit and extent specified in the drawings or as indicated by the Engineer.
Dismantling and removal operations shall be carried out with such equipment and in such a manner as to leave undisturbed,
adjacent pavement, structures and any other work to be left in place.
All operations necessary for the removal of any existing structure which might endanger new construction shall be completed
prior to the start of new work.
2.5.2.2 Dismantling Culverts and Bridges
The structures shall be dismantled carefully and the resulting materials so removed as not to cause any damage to the part
of the structure to be retained and any other properties or structures nearby.
Unless otherwise specified, the superstructure portion of culverts/bridges shall be entirely removed and other parts removed
up to at least 600 mm below the sub-grade, slope face or original ground level whichever is the lowest or as necessary
depending upon the interference they cause to the new construction. Removal of overlying or adjacent material, if required in
connection with the dismantling of the structures, shall be incidental to this item.
Where existing culverts/bridges are to be extended or otherwise incorporated in the new work, only such part or parts of the
existing structure shall be removed as are necessary and directed by the Engineer to provide a proper connection with the new
work. The connecting edges shall be cut, chipped and trimmed to the required lines and grades without weakening or
damaging any part of the structure to be retained. Due care should be taken to ensure that reinforcing bars which are to be left
in place so as to project into the new work as dowels or ties are not injured during removal of concrete.
Pipe culverts shall be carefully removed in such a manner as to avoid damage to the pipes.
Steel structures shall, unless otherwise provided, be carefully dismantled in such a manner as to avoid damage to members
thereof. If specified in the drawings or directed by the Engineer that the structure is to be removed in a condition suitable for
re-erection, all members shall be match-marked by the Contractor with white lead paint before dismantling; end pins, nuts,
loose plates, etc, shall be similarly marked to indicate their proper location; all pins, pin holes and machined surfaces shall
be painted with a mixture of white lead and tallow and all loose parts shall be securely wired to adjacent members or packed
in boxes.
Timber structures shall be removed in such a manner as to avoid damage to such timber or lumber having salvage value as is
designated by the Engineer.
2.5.2.3 Dismantling Pavements and Other Structures
In removing pavements, kerbs, gutters, and other structures like guard-rails, fences, manholes, catch basins, inlets, etc.,
where portions of the existing construction are to be left in the finished work, the same shall be removed to an existing joint or
cut and chipped to a true line with a face perpendicular to the surface of the existing structure. Sufficient removal shall be
made to provide for proper grades and connections with the new work as directed by the Engineer.
All concrete pavements, base courses in carriageway and shoulders etc., designated for removal shall be broken to pieces
whose volume shall not exceed 0.02 cu.m and used with the approval of the Engineer or disposed of.
2.5.2.4 Back-filling
Holes and depressions caused by dismantling operations shall be backfilled with excavated or other approved materials and
compacted to required density as directed by the Engineer.
2.5.2.5 Disposal of Materials
Ad surplus materials shall be taken over by the Contractor which may either be re-used with the approval of the Engineer or
disposed of with all leads and lifts.

23
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.6 EMBANKMENT CONSTRUCTION (cl. 305 of MORT&H)


2.6.1 Description
These Specifications shall apply to the construction of embankments including sub-grades, earthen shoulders and
miscellaneous backfills with approved material obtained from approved source, including material from roadway and drain
excavation, borrow pits or other sources. All embankments sub-grades, earthen shoulders and miscellaneous backfills shall
be constructed in accordance with the requirements of these Specifications and in conformity with the lines, grades, and
cross-sections shown on the drawings or as directed by the Engineer.
2.6.2 Materials and General Requirements
2.6.2.1 Physical Requirements
2.6.2.1.1 The materials used in embankments, subgrades, earthen shoulders and miscellaneous backfills shall be soil,
moorum, gravel, reclaimed material from pavement, fly ash, pond ash, a mixture of these or any other material as approved
by the Engineer. Such materials shall be free of logs, stumps, roots, rubbish or any other ingredient likely to deteriorate or
affect the stability of the embankment.
The following types of material shall be considered unsuitable for embankment:
a) Materials from swamps, marshes and bogs;
b) Peat, log, stump and perishable material; any soil that classifies as OL, Ol, OH or Pt in
accordance with IS: 1498;
c) Materials susceptible to spontaneous combustion;
d) Materials in a frozen condition;
e) Clay having liquid limit exceeding 50 and plasticity index exceeding 25; and
f) Materials with salts resulting in leaching in the embankment.
2.6.2.1.2 Expansive clay exhibiting marked swell and shrinkage properties ("free swelling index" exceeding 50
percent when tested as per IS: 2720 - Part 40) shall not be used as a fill material. Where expansive clay having "free
swelling index" value less than 50 percent is used as a fill material, subgrade and top 500 mm portion of the embankment
just below sub-grade shall be non-expansive in nature.
2.6.2.1.3 Any fill material with a soluble sulphate content exceeding 1.9 grams of sulphate (expressed as S0 3) per litre
when tested in accordance with BS: 1377, Part 3, but using a 2:1 water-soil ratio shall not be deposited within 500 mm
distance (or any other distance described in the Contract), of permanent works constructed out of concrete, cement bound
materials or other cementitious material.
Materials with a total sulphate content (expressed as S0 3) exceeding 0.5 percent by mass, when tested in accordance with
BS: 1377, Part 3 shall not be deposited within 500 mm, or other distances described in the Contract, of metallic items
forming part of the Permanent Works.
2.6.2.1.4 The size of the coarse material in the mixture of earth shall ordinarily not exceed 75 mm when placed in the
embankment and 50 mm when placed in the sub-grade. However, the Engineer may at his discretion permit the use of
material coarser than this also if he is satisfied that the same will not present any difficulty as regards the placement of fill
material and its compaction to the requirements of these Specifications. The maximum particle size in such cases, however,
shall not be more than two-thirds of the compacted layer thickness.
2.6.2.1.5 Ordinarily, only the materials satisfying the density requirements given in Table 300-1 shall be employed for
the construction of the embankment and the sub-grade
Table 10 : Density Requirements of Embankment and Sub -grade Materials (Table 300-1of MORT&H)

S l. Max imum labor at or y dr y unit weight when t est ed


Ty pe of Wor k
No. as per IS :2 7 2 0 (Par t 8 )
Embankments up to 3 m height, not subjected to
1) Not less than 15.2 kN/cu.m
extensive flooding
Embankments exceeding 3 m height or embankments of
2) Not less than 16 kN/ cu.m
any height subject to long periods of inundation
3) Subgrade and earthen shoulders/verges/ backfill Not less than 17.5 kN/cu.m

24
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

Notes : 1) This Table is not applicable for lightweight fill material, e.g., cinder, fly ash, etc.
2) The material to be used in subgrade shall be non-expansive and shall satisfy design CBR at the
specified dry density and moisture content. In case the available materials fail to meet the requirement of
CBR, use of stabilization methods in accordance with Clauses 403 and 404 or by any stabilization
method approved by the Engineer shall be followed.
2.6.2.2 General Requirements
2.6.2.2.1 Borrow Materials
The arrangement for the source of supply of the material for embankment and sub-grade and compliance with the guidelines,
and environmental requirements, in respect of excavation and borrow areas as stipulated, from time to time by the Ministry of
Environment and Forests, Government of India and the local bodies, as applicable shall be the sole responsibility of the
Contractor.
Borrow pits along the road shall be discouraged. If permitted by the Engineer, these shall not be dug continuously. Ridges
of not less than 8 m width should be left at intervals not exceeding 300 m. Small drains shall be cut through the ridges to
facilitate drainage. The depth of the pits shall be so regulated that their bottom does not cut an imaginary line having a slope
of 1 vertical to 4 horizontal projected from the edge of the final section of the bank, the maximum depth in any case being limited
to 1.5 m. Also, no pit shall be dug within the offset width of a minimum of 10 m.
Haulage of material to embankments or other areas of fill shall proceed only when sufficient spreading and compaction plant
is operating at the place of deposition.
Where the excavation reveals a combination of acceptable and unacceptable materials, the Contractor shall, unless
otherwise agreed by the Engineer, carry out the excavation in such a manner that the acceptable materials are excavated
separately for use in the permanent works without contamination by the unacceptable materials. The acceptable materials
shall be stockpiled separately.
The Contractor shall ensure that he does not adversely affect the stability of excavation or fills by the methods of stockpiling
materials, use of plants or siting of temporary buildings or structures.
2.6.2.2.2 Fly-Ash
Use of fly-ash shall conform to the Ministry of Environment and Forest guidelines. Where fly-ash is used the embankment
construction shall conform to the physical and chemical properties and requirements of IRC: SP: 38-2001, "Guidelines
for Use of Flyash in Road Construction". The term fly-ash shall cover all types of coal ash such as pond ash, bottom ash or
mound ash.
Embankment constructed out of fly ash shall be properly designed to ensure stability and protection against erosion in
accordance with IRC guidelines. A suitable thick cover may preferably be provided at intervening layers of pond ash for this
purpose. A thick soil cover shall bind the edge of the embankment to protect it against erosion. Minimum thickness of
such soil cover shall be 500 mm.
2.6.2.2.3 Compaction Requirements
The Contractor shall obtain representative samples from each of the identified borrow areas and have these tested at the
site laboratory following a testing programme approved by the Engineer. It shall be ensured that the subgrade material
when compacted to the density requirements as in Table 300-2 shall yield the specified design CBR value of the sub-
grade.
Table 11: Compaction Requirements for Embankment and Sub -grade (Table 300-2 of MORT&H)

S. Relative compaction as percentage of max. laborat or y


Ty pe of wor k /mat er ial
No. dr y densit y as per lS :2 7 2 0 (Par t 8 )

1) Subgrade and earthen shoulders Not less than 97%


2) Embankment, Not less than 95%
3) Expansive Clays
a) Subgrade and 500 mm portion just below the subgrade Not allowed 90-95%
b) Remaining portion of embankment

The Contractor shall at least 7 working days before commencement of compaction submit the following to the Engineer for
approval:
25
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

i) The values of maximum dry density and optimum moisture content obtained in accordance
with IS: 2720 (Part 8), appropriate for each of the fill materials he intends to use.
ii) A graph of dry density plotted against moisture content from which each of the values in (i)
above of maximum dry density and optimum moisture content were determined.
The maximum dry density and optimum moisture content approved by the Engineer shall form the basis for compaction.
2.6.3 Construction Operations
2.6.3.1 Setting Out
After the site has been cleared to Clause 201, the work shall be set out to Clause 301.3.1 . The limits of embankment/sub-
grade shall be marked by fixing batter pegs on both sides at regular intervals as guides before commencing the earthwork.
The embankment/sub-grade shall be built sufficiently wider than the design dimension so that surplus material may be
trimmed, ensuring that the remaining material is to the desired density and in position specified and conforms to the
specified side slopes.
2.6.3.2 Dewatering
If the foundation of the embankment is in an area with stagnant water, and in the opinion of the Engineer it is feasible to
remove it, the same shall be removed by bailing out or pumping, as directed by the Engineer and the area of the
embankment foundation shall be kept dry. Care shall be taken to discharge the drained water so as not to cause damage
to the works, crops or any other property. Due to any negligence on the part of the Contractor, if any such damage is
caused, it shall be the sole responsibility of the Contractor to repair/restore it to original condition or compensate for th e
damage at his own cost.
If the embankment is to be constructed under water, Clause 305.4.6 shall apply.
2.6.3.3 Stripping and Storing Topsoil
When so directed by the Engineer, the topsoil from all areas of cutting and from all areas to be covered by embankment
foundation shall be stripped to specified depths not exceeding 150 mm and stored in stockpiles of height not exceeding 2
m for covering embankment slopes, cut slopes and other disturbed areas where re-vegetation is desired. Topsoil shall not
be unnecessarily subjected to traffic either before stripping or when in a stockpile. Stockpiles shall not be surcharged or
otherwise loaded and multiple handling shall be kept to a minimum.
2.6.3.4 Compacting Ground Supporting Embankment/Sub-Grade
Where necessary, the original ground shall be levelled to facilitate placement of first layer of embankment, scarified, mixed
with water and then compacted by rolling in accordance with Clauses 305.3.5 and 305.3.6 so as to achieve minimum dry
density as given in Table 300-2.
In case where the difference between the sub-grade level (top of the sub-grade on which pavement rests) and ground level
is less than 0.5 m and the ground does not have 97 percent relative compaction with respect to the dry density (as given in
Table 300-2), the ground shall be loosened upto a level 0.5 m below the sub-grade level, watered and compacted in layers
in accordance with Clauses 305.3.5 and 305.3.6 to achieve dry density not less than 97 percent relative compaction as
given in Table 300-2.
Where so directed by the Engineer, any unsuitable material occurring in the embankment foundation (500 mm portion just
below the sub-grade) shall be removed, suitably disposed and replaced by approved materials laid in layers to the required
degree of compaction.
Any foundation treatment specified for embankments especially high embankments, resting on suspect foundations as
revealed by borehole logs shall be carried out in a manner and to the depth as desired by the Engineer. Where the ground
on which an embankment is to be built has any of such material types (a) to (f) in Clause 305.2.1.1 at least 500 mm of
such material must be removed and replaced by acceptable fill material before embankment construction commences.
2.6.3.5 Spreading Material in Layers and Bringing to Appropriate Moisture Content
2.6.3.6 Compaction
Only the compaction equipment approved by the Engineer shall be employed to compact the different material types
encountered during construction. Static three-wheeled roller, self-propelled single drum vibratory roller, tandem vibratory
roller, pneumatic tyre roller, pad foot roller, etc., of suitable size and capacity as approved by the Engineer shall be used for
the different types and grades of materials required to be compacted either individually or in suitable combinations.
26
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

The compaction shall be done with the help of self-propelled single drum vibratory roller or pad foot vibratory roller of 80 to
100 kN static weight or heavy pneumatic tyre roller of adequate capacity capable of achieving the re quired compaction.
The Contractor shall demonstrate the efficacy of the equipment he intends to use by carrying out compaction trials. The
procedure to be adopted for the site trials shall be submitted to the Engineer for approval.
Earthmoving plant shall not be accepted as compaction equipment nor shall the use of a lighter category of plant to
provide any preliminary compaction to assist the use of heavier plant be taken into account.
Each layer of the material shall be thoroughly compacted to the densities specified in Table 300-2. Subsequent layers
shall be placed only after the finished layer has been tested according to Clause 903.2.2 and accepted by the Engineer.
The Engineer may permit measurement of field dry density by a nuclear moisture/density gauge used in accordance with
agreed procedure and provided the gauge is calibrated to give results identical to that obtained from tests in accordance
with IS:2720 (Part 28). A record of the same shall be maintained by the Contractor.
When density measurements reveal any soft areas in the embankment/sub-grade/earthen shoulders, further compaction
shall be carried out as directed by the Engineer. If in spite of that the specified compaction is not achieved, the material in
the soft areas shall be removed and replaced by approved material, compacted using appropriate mechanical means such
as light weight vibratory roller, double drum walk behind roller, vibratory plate compactor, trench compactor or vibratory
tamper to the density requirements and satisfaction of the Engineer.

2.6.3.7 Repairing of Damages Caused by Rain/Spillage of Water


The soil in the affected portion shall be removed in such areas as directed by the Engineer before next layer is laid and
refilled in layers and compacted using appropriate mechanical means such as small vibratory roller, plate compactor or
power rammer to achieve the required density in accordance with Clause 305.3.6. If the cut is not sufficiently wide for use
of required mechanical means for compaction, the same shall be widened suitably to permit their use for proper
compaction. Tests shall be carried out as directed by the Engineer to ascertain the density requirements of the repaired
area. The work of repairing the damages including widening of the cut, if any, shall be carried out by the Contractor at his own
cost, including the arranging of machinery/equipment for the purpose.
2.6.3.8 Finishing Operations
Finishing operations shall include the work of shaping and dressing the shoulders/verge/ roadbed and side slopes to
conform to the alignment, levels, cross-sections and dimensions shown on the drawings or as directed by the Engineer
subject to the surface tolerance described in Clause 902. Both the upper and lower ends of the side slopes shall be rounded
off to improve appearance and to merge the embankment with the adjacent terrain.
The topsoil, removed and conserved earlier (Clauses 301.3.2 and 305.3.3) shall be spread over the fill slopes as per
directions of the Engineer to facilitate the growth of vegetation. Slopes shall be roughened and moistened slightly prior to
the application of the topsoil in order to provide satisfactory bond. The depth of the topsoil shall be sufficient to sustain plant
growth, the usual thickness being from 75 mm to 150 mm.
Where directed, the slopes shall be turfed with sods in accordance with Clause 307. If seeding and mulching of slopes is
prescribed, this shall be done to the requirements of Clause 308.
When earthwork operations have been substantially completed, the road area shall be cleared of all debris, and ugly scars
in the construction area responsible for objectionable appearance eliminated.
2.6.3.9 Earthwork for Widening Existing Road Embankment
When an existing embankment and/or sub-grade is to be widened and its slopes are steeper than 1 vertical on 4 horizontal,
continuous horizontal benches, each at least 300 mm wide, shall be cut into the old slope for ensuring adequate bond with
the fresh embankment/sub-grade material to be added. The material obtained from cutting of benches could be utilized in
the widening of the embankment/subgrade. However, when the existing slope against which the fresh material is to be
placed is flatter than 1 vertical on 4 horizontal, the slope surface may only be ploughed or scarified instead of resorting to
benching.
Where the width of the widened portions is insufficient to permit the use of conventional rollers, compaction shall be
carried out with the help of light weight vibratory roller, double drum walk behind roller, vibratory plate compactor or vibratory
tamper or any other appropriate equipment approved by the Engineer. End dumping of material from trucks for widening
operations shall be avoided except in difficult circumstances when the extra width is too narrow to permit the movement of
any other types of hauling equipment.

27
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.6.3.10 Earthwork for Embankment and Sub-Grade to be Placed against Sloping Ground

Where an embankment/subgrade is to be placed against sloping ground, the latter shall be appropriately benched or
ploughed/scarified as required in Clause 305.4.1 before placing the embankment/sub-grade material. Extra earthwork
involved in benching or due to ploughing/ scarifying etc. shall be considered incidental to the work.
For wet conditions, benches with slightly inward fall and subsoil drains at the lowest point shall be provided as per the
drawings, before the fill is placed against sloping ground.
Where the Contract requires construction of transverse subsurface drain at the cut-fill interface, work on the same shall be
carried out to Clause 309 in proper sequence with the embankment and sub-grade work as approved by the Engineer.

2.6.3.11 Earthwork over Existing Road Surface


Where the embankment is to be placed over an existing road surface, the work shall be carried out as indicated below:
i) If the existing road surface is of granular type and lies within 1 m of the new formation levels, it
shall be scarified to a depth of 50 mm or as directed so as to provide ample bond between the old
and new material ensuring that at least 500 mm portion below the top of new sub-grade level is
compacted to the desired density;
i) If the existing road surface is of bituminous type or cement concrete and lies within 1 m of the
new formation level, the bituminous or cement concrete layer shall be removed completely;
iii) If the level difference between the existing road surface and the new formation level is more than
1 m, the existing surface shall be roughened after ensuring that the minimum thickness of 500
mm of subgrade is available.

2.6.3.12 Embankment and Sub-Grade around Structures


To avoid interference with the construction of abutments, wing walls or return walls of culvert/bridge structures, the
Contractor shall, at points, to be determined by the Engineer suspend work on embankment forming approaches to such
structures, until such time as the construction of the latter is sufficiently advanced to permit the completion of approaches
without the risk of damage to the structure.
Unless directed otherwise, the filling around culverts, bridges and other structures upto a distance of twice the height of the
road from the back of the abutment shall be carried out independent of the work on the main embankment. The fill
material shall not be placed against any abutment or wing wall, unless permission has been given by the Engineer but in
any case not until the concrete or masonry has been in position for 14 days. The embankment and sub-grade shall be
brought up simultaneously in equal layers on each side of the structure to avoid displacement and unequal pressure. The
sequence of work in this regard shall be got approved from the Engineer.
The material used for backfill shall not be an organic soil or highly plastic clay having plasticity index and liquid limit more
than 20 and 40 respectively when tested according to !S:2720 (Part 5). Filling behind abutments and wing walls for all
structures shall conform to the general guidelines given in IRC:78. The fill material shall be deposited in horizontal layers
in loose thickness and compacted thoroughly to the requirements of Table 300-2.
Where the provision of any filter medium is specified behind the abutment, the same shall be laid in layers simultaneously
with the laying of fill material. The material used for filter shall conform to the require ments for filter medium spelt out in
Clause 2504 unless otherwise specified in the Contract.
Where it may be impracticable to use conventional rollers, the compaction shall be carried out by appropriate mechanical
means such as small vibratory roller, plate compactor or power rammer. Care shall be taken to see that the compaction
equipment does not hit or come too close to any structural member so as to cause any damage to them or excessive
pressure against the structure.

2.6.3.13 Construction of Embankment over Ground Incapable of Supporting Construction Equipment


Where embankment is to be constructed across ground which will not support the weight of repeated heavy loads of
construction equipment, the first layer of the fill may be constructed by placing successive loads of material in a uniformly
distributed layer of a minimum thickness required to support the construction equipment as permitted by the Engineer. The
Contractor, if so desired by him, may also use suitable geosynthetic material to increase the bearing capacity of the
foundation. This exception to normal procedure will not be permitted where, in the opinion of the Engineer, the
28
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

embankments could be constructed in the approved manner over such ground by the use of lighter or modified equipment
after proper ditching and drainage have been provided. Where this exception is permitted, the selection of the material and
the construction procedure to obtain an acceptable layer shall be the responsibility of the Contractor. The cost of providing
suitable traffic conditions for construction equipment over any area of the Contract will be the responsibility of the
Contractor and no extra payment will be made to him. The remainder of the embankment shall be constructed as specified
in Clause 305.3.

2.6.3.14 Embankment Construction under Water and Waterlogged Areas

2.6.3.14.1 Embankment Construction under Water

Where filling or backfilling is to be placed under water, only acceptable granular material or rock shall be used unless
otherwise approved by the Engineer. Acceptable granular material shall be of GW, SW, GP, SP as per IS: 1498 and consist
of graded, hard durable particles with maximum particle size not exceeding 75 mm. The material should be non-plastic
having uniformity coefficient of not less than 10. The material placed in open water shall be deposited by end tipping
without compaction.

2.6.3.14.2 Embankment Construction in Waterlogged and Marshy Areas

The work shall be done as per IRC: 34.

2.6.3.15 Earthwork for High Embankment


The material for high embankment construction shall conform to Clause 305.2.1.7. In the case of high embankments
(more than 6 m), the Contractor shall normally use fly ash in conformity with Clause 305.2.1.1 or the material from the
approved borrow area.
Where provided, stage construction of embankment and controlled rates of filling shall be carried out in accordance with
the Contract including installation of instruments and its monitoring.
Where required, the Contractor shall surcharge embankments or other areas of fill with approved material for the periods
specified in the Contract. If settlement of surcharged fill results the Contractor shall bring the resultant level up to
formation level with acceptable material for use in fill.

2.6.4 Sub-grade Strength

2.6.4.1 It shall be ensured prior to actual execution that the material to be used in the sub-grade satisfies the
requirements of design CBR.
2.6.4.2 Sub-grade shall be compacted and finished to the design strength consistent with other physical
requirements. The actual laboratory CBR values of constructed sub-grade shall be determined on remoulded samples,
compacted to the field density at the field moisture content and tested for soaked/unsoaked condition as specified in the
Contract.

2.7 TURFING WITH SODS (cl. 307 of MORT&H)

2.7.1 Scope
This work shall consist of furnishing and laying of the live sod of perennial turf forming grass on embankment slopes, verges
(earthen shoulders) or other locations shown on the drawings or as directed by the Engineer. Unless otherwise specified, the
work shall be taken up as soon as possible following construction of the embankment, provided the season is favourable for
establishment of the sod.

2.7.2 Materials
The sod shall consist of dense, well-rooted growth of permanent and desirable grasses, indigenous to the locality where it is
to be used, and shall be practically free from weeds or other undesirable matter. At the time the sod is cut, the grass on the
sod shall have a length of approximately 50 mm and the sod shall have been freed of debris.

29
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

Thickness of the sod shall be as uniform as possible, with some 50-80 mm or so of soil covering the grass roots depending
on the nature of the sod, so that practically all the dense root system of the grasses is retained in the sod strip. The sods shall
be cut in rectangular strips of uniform width, not less than about 250 mm x 300 mm in size but not so large that it is
inconvenient to handle and transport these without damage. During wet weather, the sod shall be allowed to dry sufficiently to
prevent tearing during handling and during dry weather shall be watered before lifting to ensure its vitality and prevent the
dropping of the soil in handling.

2.7.3 Construction Operations

2.7.3.1 Preparation of the Earth Bed


The area to be sodded shall have been previously constructed to the required slope and cross-section. Soil on the area shall
be loosened, freed of all stones larger than 50 mm size, sticks, stumps and any undesirable foreign matter, and brought to a
reasonably fine granular texture to a depth of not less than 25 mm for receiving the sod.
Where required, topsoil shall be spread over the slopes. Prior to placing the topsoil, the slopes shall be scarified to a depth
which, after settlement, will provide the required nominal depth shown on the drawings. Spreading shall not be done when the
ground is excessively wet.
Following soil preparation and top soiling, where required, fertilizer and ground limestone when specified shall be spread
uniformly at the rate indicated on the drawings. After spreading, the materials shall be incorporated in the soil by using disc
harrow or other means to the depths shown on the drawings.

2.7.3.2 Placing the Sods


The prepared sod bed shall be moistened to the loosened depth, if not already sufficiently moist, and the sod shall be
placed thereon within approximately 24 hours after the same had been cut. Each sod strip shall be laid edge to edge and
such that the joints caused by abutting ends are staggered. Every strip, after it is snugly placed against the strips already in
position, shall be lightly tamped with suitable wooden or metal tampers so as to eliminate air pockets and to press it into
the underlying soil.
On side slopes steeper than 2 (horizontal) to 1 (vertical), the laying of sods shall be started from bottom upwards. At points
where water may flow over a sodded area, the upper edges of the sod strips shall be turned into the soil below the adjacent
area and a layer of earth placed over this followed by its thorough compaction.

2.7.3.3 Staking the Sods


Where the side slope is 2 (horizontal) to 1 (vertical) or steeper and the distance along the slope is more than 2 m, the sods
shall be staked with pegs or nails spaced approximately 500 to 1000 mm along the longitudinal axis of the sods strips.
Stakes shall be driven approximately plumb through the sods to be almost flush with them.

2.7.3.4 Top Dressing


After the sods have been laid in position, the surface shall be cleaned of loose sod, excess soil and other foreign material.
Thereafter, a thin layer of topsoil shall be scattered over the surface of top dressing and the area thoroughly moistened by
sprinkling with water.
2.7.3.5 Watering and Maintenance
The sods shall be watered by the Contractor for a period of at least four weeks after laying. Watering shall be so done as to
avoid erosion and prevent damage to sodded areas by wheels of water tanks.
The Contractor shall erect necessary warning signs and barriers, repair or replace sodded areas failing to show uniform
growth of grass or damaged by his operations and shall otherwise maintain the sod at his cost until final acceptance.

2.8 SEEDING AND MULCHING (cl. 308 of MORT&H)


2.8.1 Scope
This shall consist of preparing slopes, placing topsoil, furnishing all seeds, commercial or organic fertilizers and mulching
materials, providing jute netting, coir netting, or polymer netting and placing and incorporating the same on embankment
slopes or other locations designated by the Engineer or shown in the Contract documents.

30
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.8.2 Materials

2.8.2.1 Seeds
The seeds shall be of approved quality and type suitable for the soil on which these are to be applied, and shall give
acceptable purity and germination to requirements set down by the Engineer.
Fertilizers shall consist of standard commercial materials and conform to the grade specified. Organic manure shall be
fully putrified organic matter such as cow dung.
Mulching materials shall consist of straw, hay, wood shavings, or sawdust and shall be delivered in dry condition suitable
for placing with a mulch blower. They shall be reasonably free of weed seed and such foreign materials as may detract from
their effectiveness as mulch or be injurious to the plant growth.

2.8.2.2 Topsoil

Topsoil shall not be obtained from an area known to have noxious weeds growing in it. If treated with herbicide or
sterilents, it shall be got tested by appropriate agricultural authority to determine the residual in the soil. Topsoil shall not
contain less than 2 percent and more than 12 percent organic matter.

2.8.2.3 Bituminous Emulsion

A suitable grade of bituminous emulsion used as a tie down for mulch shall be as described in the Contract document or as
desired by the Engineer. Emulsified bitumen shall not contain any solvent or diluting agent toxic to plant life

2.8.2.4 Netting

Jute netting shall be undyed jute yarn woven into a uniform open weave with approximate 25 mm square openings.
Geonetting shall be made of uniformly extruded rectangular mesh having mesh opening of 20 mm x 20 mm. The colour
may be black or green. It shall weigh not less than 3.8 kg per 1000 sqm.

2.8.3 Seeding Operations

2.8.3.1 Seed-Bed Preparation


The area to be seeded shall be brought to the required slope and cross-section by filling, reshaping eroded areas and
refinishing slopes, medians etc. Topsoil shall be evenly spread over the specified areas to the depth shown on the
drawings, unless otherwise approved by the Engineer. The seed-bed preparation shall consist of eliminating all live plants
by suitable means using agricultural implements. All stones 150 mm and larger shall be removed. The soil shall be
excavated on the contour to a depth of 100 mm. All clods larger than 25 mm in diameter shall be crushed and packed.
Where necessary, water shall then be applied. All topsoil shall be compacted unless otherwise specified or approved by the
Engineer. Compaction shall be by slope compactor, cleated tractor or similar equipment approved by the Engineer.
Equipment shall be so designed and constructed as to produce a uniform rough textured surface ready for seeding and
mulching and which will bond the topsoil to the underlying material. The entire area shall be covered by a minimum of 4
passes of the roller or approved equipment.

2.8.3.2 Fertilizer Application

Fertilizer to the required quantities shall be spread and thoroughly incorporated into the soil surface as a part of the seed-
bed preparation.

2.8.3.3 Planting of Seeds

All seeds shall be planted uniformly at the approved rate. Immediately after sowing, the area shall be raked, dragged or
otherwise treated so as to cover the seeds to a depth of 6 mm.
The operation of seed sowing shall not be performed when the ground is muddy or when the soil or weather conditions
would otherwise prevent proper soil preparation and subsequent operations.

31
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.8.4 Mulching, Applying Bituminous Emulsion and Jute Netting / Geonetting / Netting of Coir
Within 24 hours of seeding, mulching material mixed with organic manure shall be placed so as to form a continuous,
unbroken cover of approximate uniform thickness of 25 mm using an acceptable mechanical blower. Mulching material shall
be held in place and made resistant to being blown away by suitable means approved by the Engineer. When called for in the
Contract documents, mulch material shall be anchored in place with bituminous emulsion applied at the rate of 2300 litres
per hectare. Any mulch disturbed or displaced following application shall be removed, reseeded and remulched as specified.
Jute netting/geonetting or netting of coir shall be unrolled and placed parallel to the flow of water immediately following the
bringing, to finished grade, the area specified on the drawings or the placing of seed and fertilizer. Where more than one strip
is required to cover the given areas, they shall overlap a minimum of 100 mm. Jute netting/Geonetting /coir netting shall be
held in place by approved wire staples, pins, spikes or wooden stakes driven vertically into the soil.

2.9 Sub-Surface Drains (cl. 309.3 of MORT&H)

2.9.1 Scope
Sub-surface drains shall be of close-jointed perforated pipes, open-jointed unperforated pipes, surrounded by granular
material laid in a trench or aggregate drains to drain the pavement courses. Sub-surface drains designed using
Geosynthetics and approved by the Engineer can also be used.

2.9.2 Materials

2.9.2.1 Pipe
Perforated pipes for the drains may be metal/asbestos cement/cement concrete/Poly Vinyl Chloride (PVC)/Poly Propylene
(PP)/Poly Ethylene (PE) and unperforated pipes of metal vitrified clay/cement concrete/asbestos cement PVC/PP/PE. The
type, size and grade of the pipe to be used shall be as specified in the Contract. In no case, however, shall the internal
diameter of the pipe be less than 100 mm. Holes for perforated pipes shall be on one half of the circumference only and
conform to the spacing indicated on the drawings. Size of the holes shall not ordinarily be greater than half of D85 size of the
material surrounding the pipe, subject to being minimum 3 mm and maximum 6 mm. D85 stands for the size of the sieve that
allows 85 percent of the material to pass through it.

2.9.2.2 Backfill Material


Backfill material shall consist of sound, tough, hard, durable particles of free draining sand-gravel material or crushed stone
and shall be free of organic material, clay balls or other deleterious matter. Unless the Contract specifies any particular
grading’s for the backfill material or requires these to be designed on inverted filter criteria for filtration and permeability to the
approval of the Engineer, the backfill material shall be provided on the following lines:
i) Where the soil met with in the trench is of fine grained type (e.g., silt, clay or a mixture thereof),
the backfill material shall conform to Class I grading set out in-Table 300-3;
ii) Where the soil met with in the trench is of coarse silt to medium sand or sandy type, the backfill material shall
correspond to Class II grading of Table 300-3; and
iii) Where soil met with in the trench is gravelly sand, the backfill material shall correspond to Class III grading of Table
300-3.
Geosynthetics for use with subsurface drain shall conform to the requirements as per Section 700.

2.9.3 Trench Excavation


Trench for sub-surface drain shall be excavated to the specified lines, grades and dimensions shown in the drawings provided
that width of trench at pipe level shall not be less than 450 mm. The excavation shall begin at the outlet end of the drain and
proceed towards the upper end. Where unsuitable material is met with at the trench bed, the same shall be removed to such
depth as directed by the Engineer and backfilled with approved material which shall be thoroughly compacted to the
specified degree.

2.9.4 Laying of Pipe and Backfilling


Laying of pipe in the trench shall be started at the outlet end and proceed towards the upper end, true to the lines and grades
specified.

32
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

Table 12 : Grading Requirements for Filter Material Percent Passing by Weight (Table 300-3 of MORT&H)
S iev e Designat ion Class I Class II Class III
53 mm - - 100
45 mm - - 97-100
26.5 mm - 100 -
22.4 mm - 95-100 58-100
11.2 mm 100 48-100 20-60
5.6 mm 92-100 28-54 4-32
2.8 mm 83-100 20-35 0-10
1.4 mm 59-96 - 0-5
710 micron 35-80 6-18 -
355 micron 14-40 2-9 -
180 micron 3-15 - -
90 micron 0-5 0-4 0-3
Before placing the pipe, backfill material of the required grading(s) shall be laid for full width of the trench bed and
compacted to a minimum thickness of 150 mm or as shown on the drawings. The thickness of the backfill material on the
sides of the pipe shall be as shown on the drawings subject to a minimum of 150 mm. The pipe shall then be embedded
firmly on the bed.
Perforated pipes, unless otherwise specified, shall be placed with their perforations down to minimize clogging. The pipe
sections shall be joined securely with appropriate coupling fittings or bands.
Non-perforated pipes shall be laid with joints as close as possible with the open joints wrapped with suitable pervious material
(like suitable Geosynthetics of not less than 150 mm width) to permit entry of water but prevent fines entering the pipes. In the
case of non-perforated pipes with bell end, the bell shall face upgrade.
Upgrade end sections of the pipe installation shall be tightly closed by means of concrete plugs or plugs fabricated from
the same material as the pipe and securely held in place to prevent entry of soil materials.
After the pipe installation has been completed and approved, backfill material of the required grading (s) (see Clause
309.3.2.2) shall be placed over the pipe to the required level in horizontal layers not exceeding 150 mm in thickness and
thoroughly compacted. The minimum thickness of material above the top of the pipe shall be 300 mm.
Unless otherwise provided, sub-surface drains not located below the road pavement shall be sealed at the top by means of
150 mm thick layer of compacted clay so as to prevent percolation of surface water.
2.9.5 Use of Geosynthetics in Laying of Pipe and Backfilling
After excavating the trench for subsurface drain, the filter fabric shall be placed, the pipe installed and the trench
backfilled with permeable material according to dimensions and details shown on the drawings. Surfaces to receive filter
fabric prior to placing shall be free of loose or extraneous material and sharp objects that may damage the filter fabric
during installation. Adjacent rolls of the fabric shall be overlapped a minimum of 450 mm. The preceding roll shall overlap
the following roll in the direction the material is being spread.
Damage to the fabric resulting from Contractor's vehicles, equipment or operations shall be replaced or repaired by the
Contractor at his Cost.
2.9.6 Drain Outlet
The outlet for a sub-surface drain shall not be under water or plugged with debris but should be a free outlet discharging
into a stream, culvert or open ditch. The bottom of the pipe shall be kept above high water level in the ditch and the end
protected with a grate or screen. For a length of 500 mm from the outlet end, the trench for pipe shall not be provided with
granular material but backfilled with excavated soil and thoroughly compacted so as to stop water directly percolating from
the backfill material around the pipe. The pipe in this section shall not have any perforations.
2.9.7 Aggregate Drains
Aggregate drains shall be placed within the verge/shoulders after completion of the pavement. Depth, thickness and
spacing of the aggregate drains shall be as shown on the drawings.
Trenches for aggregate drains shall be excavated to a minimum width of 300 mm and to the depth shown on the drawings
or ordered by the Engineer. The bottom of the trench shall be sloped to drain and shall be free from loose particles of soil.
The trench shall be excavated so as to expose clearly the granular pavement courses to be drained.

33
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

Aggregate for the drains shall be durable gravel, stone or slag and shall be free from vegetable matter and other
deleterious substances. The grading requirements are given in Table 300-4. Grading to be adopted shall be indicated in
the drawings.
Table 13 : Grading Requirements for Aggregate Drains (Table 300-4 of MORT&H)
Per cent Passing by Weight
S iev e Designat ion Ty pe A Ty pe B
63 mm - 100
37.5 mm 100 85- 100
19 mm - 0-20
9.5 mm 45-100 0-5
3.35 mm 25-80 -
600 micron 8-45 -
150 micron 0-10 -
75 micron 0-5 -

2.10 PREPARATION AND SURFACE TREATMENT OF FORMATION (cl. 310 of MORT&H)


Preparation and surface treatment of the formation shall be carried out only after completion of any specified sub-grade
drainage and unless otherwise agreed by the Engineer, immediately prior to laying the sub-base or the road base where no
sub-base is required. The sequence of operations shall be as follows:
a) Full formation, after reinstatement of any soft areas to the required Specifications shall be well
cleaned and freed of all mud and slurry.
b) The surface shall be compacted to the required density by a smooth wheeled roller of 80 to 100
kN weight after spraying requisite amount of water, if required.
c) the formation shall be finished to the requirements of Clause 305.3.9.
The entire work of surface treatment of formation shall be deemed as incidental to the work of sub-base/base course to be
provided for the same.
2.11 GRANULAR SUB-BASE (cl. 401 of MORT&H)
2.11.1 Scope
This work shall consist of laying and compacting well-graded material on prepared subgrade in accordance with the
requirements of these Specifications. The material shall be laid in one or more layers as sub-base or lower sub-base and
upper sub-base (termed as sub-base hereinafter) as necessary according to lines, grades and cross-sections shown on the
drawings or as directed by the Engineer.
2.11.2 Materials
2.11.2.1 The material to be used for the work shall be natural sand, crushed gravel, crushed stone, crushed slag, or
combination thereof depending upon the grading required. Use of materials like brick metal, Kankar and crushed concrete
shall be permitted in the lower sub-base. The material shall be free from organic or other deleterious constituents and shall
conform to the gradings given in Table 400-1 and physical requirements given in Table 400-2. Gradings III and IV shall
preferably be used in lower sub-base. Gradings V and VI shall be used as a sub-base-cum-drainage layer. The grading to be
adopted for a project shall be as specified in the Contract. Where the sub-base is laid in two layers as upper sub-base and
lower sub-base, the thickness of each layer shall not be less than 150 mm.
2.11.2.2 If the water absorption of the aggregates determined as per IS: 2386 (Part 3) is greater than 2 percent, the
aggregates shall be tested for Wet Aggregate Impact Value (AlV) (IS: 5640). Soft aggregates like Kankar, brick ballast and
laterite shall also be tested for Wet AlV (IS: 5640).
401.2.1 Table 14 : Grading for Granular Sub-base Materials (Table 400-1 of MORT&H)
IS S iev e Per cent by Weight Passing t he IS S iev e
Designat ion Gr ading l Gr ading II Gr ading III Gr ading IV Gr ading V Gr ading VI
75.0 mm 100 - - - 100 -
53.0 mm 80-100 100 100 100 80-100 100
26.5 mm 55-90 70-100 55-75 50-80 55-90 75-100
9.50 mm 35-65 50-80 - - 35-65 55-75
4.75 mm 25 - 55 40-65 10-30 15-35 25-50 30-55
2.36 mm 20-40 30-50 - - 10-20 10-25
0.85 mm - - - - 2-10 -
0.425 mm 10-15 1 0 -1 5 - - 0-5 0-8
0.075 mm <5 <5 <5 <5 - 0-3

34
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

Table 15 : Physical Requirements for Materials for Granular Sub-base (Table 400-2 of MORT&H)
Aggregate Impact Value (AIV) IS:2386(Part4) or lS:5640 40 maximum
Liquid Limit IS:2720 (Part 5) Maximum 25
Plasticity Index IS:2720 (Part 5) Maximum 6
CBR at 98% dry density (at IS:2720-Part 8) IS:2720(Part5) Minimum 30 unless otherwise specified in the Contract

2.11.3 Construction Operations


2.11.3.1 Preparation of Sub-grade
Immediately prior to the laying of sub-base, the subgrade already finished to Clause 301 or 305 as applicable shall be
prepared by removing all vegetation and other extraneous matter, lightly sprinkled with water, if necessary and rolled with two
passes of 80-100 kN smooth wheeled roller.
2.11.3.2 Spreading and Compacting
The sub-base material of the grading specified in the Contract and water shall be mixed mechanically by a suitable mixer
equipped with provision for controlled addition of water and mechanical mixing. So as to ensure homogenous and uniform
mix. The required water content shall be determined in accordance with IS: 2720 (Part 8). The mix shall be spread on the
prepared subgrade with the help of a motor grader of adequate capacity, its blade having hydraulic controls suitable for initial
adjustment and for maintaining the required slope and grade during the operation, or other means as approved by the
Engineer.
Moisture content of the mix shall be checked in accordance with IS: 2720 (Part 2) and suitably adjusted so that, at the time of
compaction, it is from 1 to 2 percent below the optimum moisture content.
Immediately after spreading the mix, rolling shall be done by an approved roller. If the thickness of the compacted layer
does not exceed 100 mm, a smooth wheeled roller of 80 to 100 kN weight may be used. For a compacted single layer up to 200
mm the compaction shall be done with the help of a vibratory roller of minimum 80 to 100 kN static weight capable of
achieving the required compaction. Rolling shall commence at the lower edge and proceed towards the upper edge
longitudinally for portions having unidirectional cross fall or on super elevation. For carriageway having cross fall on both
sides, rolling shall commence at the edges and progress towards the crown.
Each pass of the roller shall uniformly overlap not less than one-third of the track made in the preceding pass. During
rolling, the grade and cross fall (camber) shall be checked and any high spots or depressions which become apparent,
corrected by removing or adding fresh material. The speed of the roller shall not exceed 5 km per hour.
Rolling shall be continued till the density achieved is at least 98 percent of the maximum dry density for the material
determined as per IS: 2720 (Part 8). The surface of any layer of material on completion of compaction shall be well closed,
free from movement under compaction equipment and from compaction planes, ridges, cracks or loose material. All loose,
segregated or otherwise defective areas shall be made good to the full thickness of layer and re -compacted.

2.12 LIME TREATED SOIL FOR IMPROVED SUB-GRADE/SUB-BASE (cl. 402 of MORT&H)
2.12.1 Scope
This work shall consist of laying and compacting an improved sub-grade/lower sub-base of soil treated with lime on
prepared sub-grade in accordance with the requirements of these Specifications and in conformity with the tines, grades
and cross-sections shown on the drawings or as directed by the Engineer. Lime treatment is generally effective for soils which
contain a relatively high percentage of clay and silty clay.
2.12.2 Materials
2.12.2.1 Soil
Except when otherwise specified, the soil used for stabilization shall be the local clayey soil having a plasticity index greater
than 8.
2.12.2.2 Lime
Lime for lime-soil stabilization work shall be commercial dry lime slaked at site or pre-slaked lime delivered to the site in
suitable packing. Unless otherwise permitted by the Engineer, the lime shall have purity of not less than 70 percent by weight
of Quick-lime (CaO) when tested in accordance with IS: 1514. Lime shall be properly stored to avoid prolonged exposure to the
atmosphere and consequent carbonation which would reduce its binding properties.

35
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.12.2.3 Quantity of Lime in Stabilized Mix


Quantity of lime to be added as percentage by weight of the dry soil shall be as specified in the Contract. The quantity of
lime used shall be related to its calcium oxide content which shall be specified. Where the lime of different calcium oxide
content is to be used, its quantity shall be suitably adjusted with the approval of the Engineer so that equivalent calcium
oxide is incorporated in the work. The mix design shall be done to arrive at the appropriate quantity of lime to be added, having
due regard to the purity of lime, the type of soil, the moisture-density relationship, and the design CBR/Unconfined
Compressive Strength (UCS) value specified in the Contract. The laboratory CBR/UCS value shall be at least 1.5 times the
minimum field value of CBR/UCS stipulated in the Contract.
2.12.3 Construction Operations
2.12.3.1 Weather Limitations
Lime-soil stabilisation shall not be done when the air temperature in the shade is less than 10°C.
2.12.3.2 Degree of Pulverisation
For lime-soil stabilisation, the soil before addition of stabilizer shall be pulverized using agricultural implements like disc
harrows (only for low volume roads) and rotavators to the extent that it passes the requirements set out in Table 400 -3
when tested in accordance with the method described in Appendix-3.
Table 16 : Soil Pulverisation Requirements for Lime Stabilisation (Table 400-3 of MORT&H)
IS S iev e designat ion Minimum percent by weight passing the IS S ieve
26.5 mm 100
5.6 mm 80

2.12.3.3 Equipment for Construction


Stabilised soil sub-bases shall be constructed by mix-in-place method of construction or as otherwise approved by the
Engineer. Manual mixing shalt be permitted only where the width of laying is not adequate for mechanical operations, as
in small-sized jobs.
The equipment used for mix-in-place construction shall be a rotavator or similar approved equipment capable of
pulverizing and mixing the soil with additive and water to specified degree to the full thickness of the layer being
processed, and of achieving the desired degree of mixing and uniformity of the stabilized material. If so desired by the
Engineer, trial runs with the equipment shall be carried out to establish its suitability for work.
The thickness of any layer to be stabilized shall be not less than 100 mm when compacted. The maximum thickness can
be 200 mm, provided the plant used is accepted by the Engineer.
2.12.3.4 Mix-in-place Method of Construction
Before deploying the equipment, the soil after it is made free of undesirable vegetation or other deleterious matter shall be
spread uniformly on the prepared subgrade in a quantity sufficient to achieve the desired compacted thickness of the
stabilised layer. Where single-pass equipment is to be employed, the soil shall be lightly rolled as directed by the Engineer
The equipment used shall either be of single-pass or multiple pass type. The mixers shall be equipped with an appropriate
device for controlling the depth of processing and the mixing blades shall be maintained or reset periodically so that the
correct depth of mixing is obtained at all times.
With single-pass equipment the forward speed of the machine shall be so selected in relation to the rotor speed that the
required degree of mixing, pulverisation and depth of processing is obtained. In multiple-pass processing, the prepared
sub-grade shall be pulverised to the required depth with successive passes of the equipment and the moisture content
adjusted to be within prescribed limits mentioned hereinafter. The lime shall then be spread uniformly and mixing
continued with successive passes until the required depth and uniformity of processing have been obtained.
The mixing equipment shall be so set that it cuts slightly into the edge of the adjoining lane processed previously so as to
ensure that all the material forming a layer has been properly processed for the full width.
2.12.3.5 Construction with Manual Means
Where manual mixing is permitted, the soil from borrow areas shall first be freed of all vegetation and other deleterious
mater and placed on the prepared subgrade. The soil shall then be pulverized by means of crow-bars, pick axes or other
means approved by the Engineer.

36
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

Water in requisite quantities may be sprinkled on the soil for aiding pulverisation. On the pulverized soil, the lime in
requisite quantities shall be spread uniformly and mixed thoroughly by working with spades or other similar implements till
the whole mass is uniform. After adjusting the moisture content to be within the limits mentioned later, the mixed material
shall be levelled up to the required thickness so that it is ready to be rolled.

2.12.3.6 Addition of Lime


Lime may be mixed with the prepared material either in slurry form or dry state at the option of the Contractor with the
approval of the Engineer.
Dry lime shall be prevented from blowing by adding water to the lime or other suitable means selected by the Contractor,
with the approval of the Engineer.
The tops of windrowed material may be flattened or slightly trenched to receive the lime.
The distance to which lime may be spread upon the prepared material ahead of the mixing operation shall be determined
by the Engineer.
No traffic other than the mixing equipment shall be allowed to pass over the spread lime until after completion of mixing.
Mixing or remixing operations, regardless of equipment used, shall continue until the material is free of any white streaks or
pockets of lime and the mixture is uniform.
Non-uniformity of colour reaction, when the treated material is tested with the standard phenolphthalein alcohol indicator,
will be considered evidence of inadequate mixing.

2.12.3.7 Moisture Content for Compaction


The moisture content at compaction checked vide IS: 2720 (Part 2) shall neither be less than the optimum moisture content
corresponding to IS: 2720 (Part 8) nor more than 2 percent above it.

2.12.3.8 Rolling
Immediately after spreading, grading and levelling of the mixed material, compaction shall be carried out with approved
equipment preceded by a few passes of lighter rollers if necessary. Rolling shall commence at edges and progress towards the
centre, except at super elevated portions or for carriageway with unidirectional cross-fall where it shall commence at the inner
edge and progress towards the outer edge. During rolling, the surface shall be frequently checked for grade and crossfall
(camber) and any irregularities corrected by loosening the material and removing/adding fresh material. Compaction shall
continue until the density achieved is at least 98 percent of the maximum dry density for the material determined in
accordance with IS: 2720 (Part 8).
Care shall be taken to see that the compaction of lime stabilised material is completed within three hours of its mixing or such
shorter period as may be found necessary in dry weather.
During rolling it shall be ensured that roller does not bear directly on hardened or partially hardened treated material
previously laid other than what may be necessary for achieving the specified compaction at the joint. The final surface shall be
well closed, free from movement under compaction planes, ridges, cracks or loose material. All loose or segregated or otherwise
defective areas shall be made good to the full thickness of the layer and recompacted.

2.12.3.9 Curing

The sub-base course shall be suitably cured for a minimum period of 7 days after which subsequent pavement courses
shall be laid to prevent the surface from drying out and becoming friable. No traffic of any kind shall ply over the completed sub-
base unless permitted by the Engineer.

2.12.4 Strength

When lime is used for improving the subgrade, the soil-lime mix shall be tested for its CBR value. When lime stabilized soil is
used in a sub-base, it shall be tested for unconfined compressive strength (UCS) at 7 days. In case of variation from the design
CBR/UCS, in situ value being lower, the pavement design shall be reviewed based on the actual CBR/UCS values. The extra
pavement thickness needed on account of lower CBR/UCS value shall be constructed by the Contractor at his own cost.

37
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.13 CEMENT TREATED SOIL AND CEMENT -FLYASH TREATED SUB-BASE/BASE (cl. 403 of MORT&H)
2.13.1 Scope
This work shall consist of laying and compacting a sub-base/base course of soil treated with cement or cement-flyash on
prepared subgrade/sub-base, in accordance with the requirements of these
Specifications and in conformity with the lines, grades and cross-sections shown on the drawings or as directed by the
Engineer.
2.13.2 Materials
2.13.2.1 Material to be Treated
The material used for cement or cement-flyash treatment shall be soil including sand and gravel, laterite, kankar, brick
aggregate, crushed rock or slag or any combination of these. For use in a sub-base course, the material shall have a
grading shown in Table 400-4. It shall have a uniformity coefficient not less than 5, capable of producing a well-closed surface
finish. For use in a base course, the material shall be sufficiently well graded to ensure a well-closed surface finish and have a
grading within the range given in Table 400-4. If the material passing 425 micron sieve is plastic, it shall have a liquid limit not
greater than 45 percent and a plasticity index not greater than 20 percent determined in accordance with IS:2720 (Part 5). The
physical requirements for the material to be treated with cement for use in a base course shall be same as for Grading I
Granular Sub-base, Clause 401.2.2.
2.13.2.2 Cement
Cement for stabilization shall either be ordinary Portland Cement, Portland Slag Cement or Portland Puzzolana Cement and
shall comply with the requirements of IS: 269, 455 or 1489 respectively.
Table 17 : Grading Limits of Material for Stabilisation with Cement (Table 400-4 of MORT&H)
IS siev e size Per cent age by mass passing S ub-Base/Base wit hin t he r ange
53.00 mm 100
37.5 mm 9 5 -1 0 0
19.0 mm 4 5 -1 0 0
9.5 mm 3 5 -1 0 0
4.75 mm 2 5 -1 0 0
600 micron 8-65
300 micron 5-40
75 micron 0-10
2.13.2.3 Flyash
Flyash may be from anthracitic coal or lignite coal. Flyash to be used for cement-flyash treatment shall conform to the
requirement given in Tables 400-5 and 400-6.
Table 18 : Chemical Requirements for Fly Ash as Pozzolana (Table 400-5 of MORT&H)
S I. Char act er ist ics Requir ement s for F ly Ash
Met hod of Test
No. Ant hr acit ic F ly ash Lignit e F ly ash
1) Si0 2 +Al2 03 +Fe2 03 in percent by mass, Min 70 50 IS:1727
2) Si0 2 in percent by mass, Min 35 25 IS:1727
3) MgO in percent by mass, Max 25 5.0 IS:1727
4) S0 3 in percent by mass, Max 2.75 3.5 IS:1727
5) Available alkalies as Na2 0/K 2 0 in percent by mass, Max, 1.5 1.5 IS:4032
6) Total chlorides in percent by mass, Max 0.05 0.05 IS:1727
7) Loss on ignition in percent by mass, Max 5.0 5.0 IS:1727

Table 19 : Physical Requirement for Fly Ash as a Pozzolona (Table 400-6 of MORT&H)
S I. No. Char act er ist ics Requir ement
1) Fineness-specific surface in m2 /Kg by Blaine's permeability test, Min 250
2) Particles retained on 45 micron IS sieve, Max 40
3) Lime reactivity in N/mm2 , Min 3.5
4) Soundness by autoclave test expansion of specimen in percent, Max 0.8
5) Soundness by Lechatelier method-expansion in mm, Max 10

38
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

Pond ash or bottom ashes, which do not meet the requirements of Tables 400-5 and 400-6 can also be used for cement-flyash
treatment. However, in all cases of cement stabilised fly-ash/ bottom ash/ pond ash, mix should develop adequate
strength.
2.13.2.4 Quantity of Cement in Cement-Soil Stabilised Mix
The quantity of cement to be added as percent by weight of the dry soil shall be specified in the Contract. Also if lime is
used as pre-treatment for highly clayey soils, the quantity as percent by weight of dry soil shall be specified in the Contract.
The mix design shall be done on the basis of 7 day unconfined compressive strength (UCS) and/or durability test under 12
cycles of wet-dry conditions. The laboratory strength values shall be at least 1.5 times the minimum field UCS value
stipulated in the Contract.
2.13.2.5 Quantity of Cement in Cement/Fly Ash Treated Sub-base/Base
The quantity of cement shall be more than 2 percent by weight of cement/ fly-ash mix. The mix design shall be done to
achieve a strength of 1.75 MPa when tested on cylindrical specimens compacted to the density at optimum moisture
content, tested in accordance with IS: 2720 (Part 8 as specified in the contract) after 7 days moist curing. The design mix
shall indicate the proportions of cement and fly ash and the quantity of water to be mixed.
2.13.2.6 Weather Limitations
Stabilisation shall not be done when the air temperature in the shade is less than 10°C.
2.13.2.7 Degree of Pulverisation
For stabilisation, the soil before addition of cement shall be pulverised, where necessary, to the extent that it passes the
requirements as set out in Table 400-7 when tested in accordance with the method described in Appendix-3.
2.13.2.8 Moisture Content for Compaction
The moisture content at compaction checked vide IS: 2720 (Part 2) shall not be less than the optimum moisture content
corresponding to IS: 2720 (Part 8) nor more than 2 percent above it.
2.13.2.9 Rolling
Clause 402.3.8 shall apply except that care shall be taken to see that the compaction of cement stabilised material is
completed within two hours of its mixing or such shorter period as may be found necessary in dry weather.
2.13.2.10 Curing
The sub-base/base course shall be suitably cured for 7 days. Subsequent pavement course shall be laid soon after to prevent
the surface from drying out and becoming friable. No traffic of any kind shall ply over the completed sub-base unless
permitted by the Engineer.
2.13.2.11 Surface Finish
The surface finish of construction shall conform to the requirements of Clause 902.

2.14 WATER BOUND MACADAM SUB-BASE/BASE (cl. 404 of MORT&H)


2.14.1 Scope
This work shall consist of clean crushed aggregates mechanically interlocked by rolling and bonding together with
screening, binding material where necessary and water laid on a properly prepared subgrade/sub-base/base or existing
pavement, as the case may be and finished in accordance with the requirements of these Specifications and in close
conformity with the lines, grades, cross-sections and thickness as per approved plans or as directed by the Engineer.
2.14.2 Materials
2.14.2.1 Coarse Aggregates
Coarse aggregates shall be either crushed or broken stone, crushed slag, over burnt (Jhama) brick aggregates or any other
naturally occurring aggregates such as kankar and laterite of suitable quality. Materials other than crushed or broken stone
and crushed slag shall be used in sub-base courses only. If crushed gravel /shingle is used, not less than 90 percent by
weight of the gravel/shingle pieces retained on 4.75 mm sieve shall have at least two fractured faces. The aggregates shall
conform to the physical requirements set forth in Table 400-8. The type and size range of the aggregate shall be specified
in the Contract or shall be as specified by the Engineer. If the water absorption value of the coarse aggregate is greater
than 2 percent, the soundness test shall be carried out on the material delivered to site as per IS : 2386 (Part 5).
39
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

Table 20 : Physical Requirements of Coarse Aggregates for Water Bound Macadam for Sub -base/Base Courses
(Table 400-8 of MORT&H)
S.No. Test Test Met hod Requir ement s
1) Los Angeles Abrasion value IS:2386(Part4) 40 percent (Max)
or Aggregate Impact value IS: 2386 (Part-4) or 30 percent (Max)
IS:5640*
2) Combined Flakiness and Elongation Indices (Total) ** IS;2386(Part-1) 35 percent (Max)
* Aggregates which get softened in presence of water shall be tested for Impact value under wet conditions in accordance
with IS: 5640.
** The requirement of flakiness index and elongation index shall be enforced only in the case of crushed broken stone and
crushed slag.
In case water bound macadam is used for sub-base, the requirements in respect of Los Angeles Value and Aggregate
Impact Value shall be relaxed to 50 percent and 40 percent maximum respectively.

2.14.2.2 Crushed Slag


Crushed slag shall be made from air-cooled blast furnace slag. It shall be of angular shape, reasonably uniform in quality
and density and generally free from thin, elongated and soft pieces, dirt or other deleterious materials. The weight of
crushed slag shall not be less than 11.2 kN per m3 and the percentage of glossy material shall not be more than 20. It
should also comply with the following requirements:
i) Chemical stability : To comply with requirements of appendix of BS: 1047
ii) Sulphur content Maximum 2 percent
iii) Water absorption Maximum 10 percent

2.14.2.3 Over burnt (Jhama) Brick Aggregates


Jhama brick aggregates shall be made from over burnt bricks or brick bats and be free from dust and other objectionable
and deleterious materials. This shall be used only for road stretch when traffic is low.
The coarse aggregates shall conform to one of the Gradings given in Table 400 -9 as specified.

2.14.2.4 Screenings
Screenings to fill voids in the coarse aggregate shall generally consist of the same material as the coarse aggregate.
However, where permitted, predominantly non-plastic material such as moorum or gravel (other than rounded river borne
material) may be used for this purpose provided liquid limit and plasticity index of such material are below 20 and 6
respectively and fraction passing 75 micron sieve does not exceed 10 percent.

Table 21 : Grading Requirements of Coarse Aggregates (Table 400-9 of MORT&H)


Gr ading No. S ize Range IS S iev e Designat ion Per cent by weight Passing
1) 63 mm to 45 mm 75 mm 100
63 mm 90-100
53 mm 25-75
45 mm 0-15
22.4 mm 0-5
2) 53 mm to 22.4 mm 63 mm 100
53 mm 95-100
45 mm 65-90
22.4 mm 0-10
11.2 mm 0-5

Not e : The compacted thickness for a layer shall be 75 mm.


Screenings shall conform to the grading set forth in Table 400-10. The quantity of screenings required for various grades of
stone aggregates are given in Table 400-11. The Table also gives the quantities of materials (loose) required for 10 m2 for
sub-base/base compacted thickness of 75 mm.
The use of screenings shall be omitted in the case of soft aggregates such as brick metal, kankar, laterites, etc. as they are
likely to get crushed to a certain extent under rollers.

40
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.14.2.5 Binding Material


Binding material to be used for water bound macadam as a filler material meant for preventing ravelling shall comprise of a
suitable material approved by the Engineer having a Plasticity Index (PI) value of less than 6 as determined in accordance
with IS:2720 (Part-5).
The quantity of binding material where it is to be used, will depend on the type of screenings. Generally, the quantity required
for 75 mm compacted thickness of water bound macadam will be 0.06-0.09 m3 per 10 m2.
Table 2 2 : Gr ading F or S cr eenings (Table 400-10 of MORT&H)
Gr ading S ize of S cr eenings IS S iev e Designat ion Per cent by Weight Passing
Classificat ion t he S iev e
A 13.2 mm 13.2 mm 100
11.2 mm 95-100
5.6 mm 15-35
180 micron 0-10
B 11.2 mm 11.2 mm 100
9.5 mm 80-100
5.6 mm 50-70
180 micron 5-25
Table 2 3 : Appr oximate Quantities of Coarse Aggregates and Screenings Required for 75 mm Compacted Thickness of Wat er
Bound Macadam (WBM) S ub-Base/Base Cou r se for 1 0 m 2 Ar ea (Table 400-11 of MORT&H)
S cr eenings
Cr ushable Type Such as
S ize Compact ed S t one S cr eening
Classificat ion Loose Qty. Moor um or Gr av el
Range Thick ness Gr ading F or WBM Gr ading Loose
Classificat ion S ub-base/Base Cour se Classificat ion Qt y .
& S ize (Loose Quant it y ) & S ize
Grading 1 63 mm to 75 mm 0.91 to Type A 13.2 mm 0.12 to 0.15 m3 Not uniform 0.22 to
45 mm 1.07 m3 0.24 m3
-do- -do- -do- -do- Type B 11.2 mm 0.20 to 0.22 m3 -do- -do-
Grading 2 53 mm to 75 mm -do- -do- 0.18 to 0.21 m3 -do- -do-
22.4 mm
 The above mentioned quantities should be taken as a guide only, for estimation of quantities for construction etc.
 Application of binding materials may not be necessary when the screenings used are of crushable type such as moorum or
gravel.
2.14.3 Construction Operations
2.14.3.1 Preparation of Base
The surface of the sub-grade/sub-base/base to receive the water bound macadam course shall be prepared to the
specified grade and camber and cleaned of dust, dirt and other extraneous material. Any ruts or soft yielding places shall be
corrected in an approved manner and rolled until firm surface is obtained.
Where the WBM is to be laid on an existing metalled road, damaged area including depressions and potholes shall be
repaired and made good with the suitable material. The existing surface shall be scarified and re-shaped to the required
grade and camber before spreading the coarse aggregate for WBM.
As far as possible, laying water bound macadam course over existing bituminous layer may be avoided since it will cause
problems of internal drainage of the pavement at the interface of two courses. It is desirable to completely pick out the
existing thin bituminous wearing course where water bound macadam is proposed to be laid over it.
2.14.3.2 Inverted Choke / Sub-surface Drainage Layer
If water bound macadam is to be laid directly over the sub-grade, without any other intervening pavement course, a 25 mm course
of screenings (Grading B) or coarse sand shall be spread on the prepared sub-grade before application of the aggregates is
taken up. In case of a fine sand or silty or clayey sub-grade, it is advisable to lay 100 mm insulating layer of screening or
coarse sand on top of fine grained soil, the gradation of which will depend upon whether it is intended to act as a drainage
layer as well. As a preferred alternative to inverted choke, appropriate geosynthetics performing functions of separation and
drainage may be used over the prepared sub-grade as directed by the Engineer. Section 700 shall be applicable for use of
geosynthetics.
41
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.14.3.3 Lateral Confinement of Aggregates


For construction of WBM, arrangement shall be made for the lateral confinement of aggregates. This shall be done by building
adjoining shoulders along with WBM layers. The practice of constructing WBM in a trench section excavated in the finished
formation must be completely avoided.
Where the WBM course is to be constructed in narrow widths for widening of an existing pavement, the existing shoulders
should be excavated to their full depth and width up to the sub-grade level except where widening specifications envisages
laying of a stablised sub-base using in-situ operations in which case the same should be removed only up to the sub-base
level.
2.14.3.4 Spreading Coarse Aggregates
The coarse aggregates shall be spread uniformly and evenly upon the prepared sub-grade/ sub-base in the required
quantities from the stockpiles to proper profile by using templates placed across the road about 6 m apart, in such
quantities that the thickness of each compacted layer is not more than 75 mm. In no case shall these be dumped in heaps
directly on the area where these are to be laid nor shall their hauling over a partly completed base be permitted. Wherever
possible, approved mechanical devices such as aggregate spreader shall be used to spread the aggregates uniformly so as
to minimize the need for manual rectification afterwards.
No segregation of coarse aggregates shall be allowed and the coarse aggregates, as spread shall be of uniform gradation with
no pockets of fine material.
The surface of the aggregates spread shall be carefully checked with templates and all high or low spots remedied by
removing or adding aggregates as may be required. The surface shall be checked frequently with a straight edge while
spreading and rolling so as to ensure a finished surface as per approved drawings.
The coarse aggregates shall not normally be spread more than 3 days in advance of the subsequent construction
operations.
2.14.3.5 Rolling
Immediately following the spreading of the coarse aggregates, rolling shall be started with three wheeled power rollers of 80
to 100 kN capacity or tandem or vibratory rollers of 80 to 100 kN static weight. The type of roller to be used shall be approved
by the Engineer based on trial run.
Except on superelevated portions and carriageway with unidirectional cross-fall, where the rolling shall proceed from inner
edge to the outer, rolling shall begin from the edges gradually progressing towards the center. First the edge/edges shall be
compacted with roller running forward and backward. The roller shall then move inward parallel to the center line of the road, in
successive passes uniformly overlapping preceding tracks by at least one-half width.
Rolling shall be carried out on courses where coarse aggregates of crushed/ broken stone are used, till the road metal is
partially compacted. This will be followed by application of screenings and binding material where required in Clauses
404.3.6 and 404.3.7.
However, where screenings are not to be applied as in the case of aggregates like brick metal, laterite and Kankarfor sub-
base construction, the compaction shall be continued until the aggregates are thoroughly keyed. Rolling shall be continued
and light sprinkling of water shall be done till the surface is well compacted.. Rolling shall not be done when the sub- grade
is soft or yielding or when it causes a wave-like motion in the sub-grade or sub-base course.
The rolled surface shall be checked transversely with templates and longitudinally with 3 m straight edge. Any irregularities,
exceeding 12 mm, shall be corrected by loosening the surface, adding or removing necessary amount of aggregates and re-
rolling until the entire surface conforms to the desired camber and grade. In no case shall the use of screenings be permitted
to make up depressions.
Material, which gets crushed excessively during compaction or becomes segregated, shall be removed and replaced with
suitable aggregates.
2.14.3.6 Application of Screenings
After the coarse aggregates have been rolled to Clause 404.3.5, screenings to completely fill the interstices shall be
applied gradually over the surface. These shall not be damp or wet at the time of application. Dry roiling shall be done while
the screenings are being spread so that vibrations of the roller cause them to settle into the voids of the coarse aggregates.
The screenings shall not be dumped in piles but be spread uniformly in successive thin layers either by the spreading
motions of hand shovels or by mechanical spreaders, or directly from tipper with suitable grit spreading arrangement.
Tipper operating for spreading the screenings shall be equipped with pneumatic tyres and operated so as not to disturb the
coarse aggregates.

42
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

The screenings shall be applied at a slow and uniform rate (in three or more applications) so as to ensure filling of all voids.
This shall be accompanied by dry rolling and brooming with mechanical brooms, hand brooms or both. In no case shall the
screenings be applied so fast and thick as to form cakes or ridges on the surface in such a manner as would prevent filling of
voids or prevent the direct bearing of the roller on the coarse aggregates. These operations shall continue until no more
screenings can be forced into voids of the coarse aggregates. The spreading, rolling, and brooming of screenings shall be
carried out in only such lengths of the road which could be completed within one day's operation.
2.14.3.7 Sprinkling of Water and Grouting
After application of screenings, the surface shall be copiously sprinkled with water, swept and rolled. Hand brooms shall be
used to sweep the wet screenings into voids and to distribute them evenly. The sprinkling, sweeping and rolling operation shall
be continued, with additional screenings applied as necessary until the coarse aggregates have been thoroughly keyed, well-
bonded and firmly set in its full depth and a grout has been formed of screenings. Care shall be taken to see that the sub-
base or sub-grade does not get damaged due to the addition of excessive quantities of water during construction.
In case of lime treated soil sub-base, construction of water bound macadam on top of it shall be taken up after curing as per
Clause 402.3.9 and as directed by the Engineer.
Application of binding material : After the application of screenings in accordance with Clauses 404.3.6 and 404.3.7, the
binding material where it is required to be used (Clause 404.2.7) shall be applied successively in two or more thin layers at a
slow and uniform rate. After each application, the surface shall be copiously sprinkled with water, the resulting slurry swept in
with hand brooms, or mechanical brooms to fill the voids properly, and rolled during which water shall be applied to the wheels
of the rollers if necessary to wash down the binding material sticking to them. These operations shall continue until the
resulting slurry after filling of voids, forms a wave ahead of the wheels of the moving roller.
2.14.3.8 Setting and Drying
After the final compaction of water bound macadam course, the pavement shall be allowed to dry overnight. Next morning
hungry spots shall be filled with screenings or binding material as directed, lightly sprinkled with water if necessary and roiled.
No traffic shall be allowed on the road until the macadam has set. The Engineer shall have the discretion to stop hauling
traffic from using the completed water bound macadam course, if in his opinion it would cause excessive damage to the
surface.
The compacted water bound macadam course shall be allowed to completely dry and set before the next pavement course
is laid over it.
2.14.3.9 Reconstruction of Defective Macadam
The finished surface of water bound macadam shall conform to the tolerances of surface regularity as prescribed in Clause
902. However, where the surface irregularity of the course exceeds the tolerances or where the course is otherwise defective due
to sub-grade soil mixing with the aggregates, the course to its full thickness shall be scarified over the affected area, reshaped
with added material or removed and replaced with fresh material as applicable and re-compacted. The area treated shall not
be less than 10 sq.m. In no case shall depressions be filled up with screenings or binding material.

2.15 WET MIX MACADAM SUB-BASE/BASE (cl. 406 of MORT&H)


2.15.1 Scope
This work shall consist of laying and compacting clean, crushed, graded aggregate and granular material, premixed with
water, to a dense mass on a prepared sub-grade/sub- base/ base or existing pavement as the case may be in accordance with
the requirements of these Specifications. The material shall be laid in one or more layers as necessary to lines, grades and
cross-sections shown on the approved drawings or as directed by the Engineer.
The thickness of a single compacted Wet Mix Macadam layer shall not be less than 75 mm. When vibrating or other approved
types of compacting equipment are used, the compacted depth of a single layer of the sub-base course may be upto 200 mm
with the approval of the Engineer.
2.15.2 Materials
2.15.2.1 Aggregates
2.15.2.1.1 Physical Requirements
Coarse aggregates shall be crushed stone. If crushed gravel/shingle is used, not less than 90 percent by weight of the
gravel/shingle pieces retained on 4.75 mm sieve shall have at least two fractured faces. The aggregates shall conform to
the physical requirements set forth in Table 400-12.
43
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

If the water absorption value of the coarse aggregate is greater than 2 percent, the soundness test shall be carried out on
the material delivered to site as per IS:2386 (Part-5).
Table 24 : Physical Requirements of Coarse Aggregates for Wet Mix Macadam for Sub-base/Base Courses
(Table 400-12 of MORT&H)
S . No. Test Test Met hod Requir ement s
1) Los Angeles Abrasion value IS:2386 (Part-4) 40 percent (Max.)
or Aggregate Impact value IS:2386 (Part-4) or IS:5640 30 percent (Max.)
2) Combined Flakiness and Elongation indices (Total) IS:2386(Part-1) 35 percent (Max.)*
* To determine this combined proportion, the flaky stone from a representative sample
** should first be separated out. Flakiness index is weight of flaky stone metal divided by weight of stone sample. Only the
elongated particles be separated out from the remaining (non-flaky) stone metal. Elongation index is weight of elongated
particles divided by total non-flaky particles. The values of flakiness index and elongation index so found are added up.
2.15.2.1.2 Grading Requirements
The aggregates shall conform to the grading given in Table 400-13 of MORT&H.
Table 25 : Grading Requirements of Aggregates for Wet Mix Macadam (Table 400-13 of MORT&H)
IS S iev e Designat ion Per cent by weight passing t he IS S iev e
53.00 mm 100
45.00 mm 95-100
26.50 mm -
22.40 mm 60-80
11.20 mm 40-60
4.75 mm 25^0
2.36 mm 15-30
600.00 micron 8-22
75.00 micron 0-5

Material finer than 425 micron shall have Plasticity Index (PI) not exceeding 6.
The final gradation approved within these limits shall be graded from coarse to fine and shall not vary from the low limit on
one sieve to the high limit on the adjacent sieve or vice versa.

2.15.3 Construction Operations


2.15.3.1 Provision of Lateral Confinement of Aggregates
While constructing wet mix macadam, arrangement shall be made for the lateral confinement of wet mix. This shall be done by
laying materials in adjoining shoulders along with that of wet mix macadam layer and following the sequence of operations
described in Clause 404.3.3.

2.15.3.2 Preparation of Mix


Wet Mix Macadam shall be prepared in an approved mixing plant of suitable capacity having provision for controlled addition
of water and forced/ positive mixing arrangement like pugmill or pan type mixer of concrete batching plant. The plant shall
have following features:
i) For feeding aggregates- three/ four bin feeders with variable speed motor
ii) Vibrating screen for removal of oversize aggregates
iii) Conveyor Belt
iv) Controlled system for addition of water
v) Forced/positive mixing arrangement like pug-mill or pan type mixer
vi) Centralized control panel for sequential operation of various devices and precise process control
vii) Safety devices
Optimum moisture for mixing shall be determined in accordance with IS: 2720 (Part-8) after replacing the aggregate
fraction retained on 22.4 mm sieve with material of 4.75 mm to 22.4 mm size. While adding water, due allowance should
be made for evaporation losses. However, at the time of compaction, water in the wet mix should not vary from the optimum
value by more than agreed limits. The mixed material should be uniformly wet and no segregation should be permitted.

44
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.15.3.3 Spreading of Mix


Immediately after mixing, the aggregates shall be spread uniformly and evenly upon the prepared sub-grade/sub-
base/base in required quantities. In no case shall these be dumped in heaps directly on the area where these are to be
laid nor shall their hauling over a partly completed stretch be permitted.
The mix may be spread by a paver finisher. The paver finisher shall be self-propelled of adequate capacity with following
features:
i) Loading hoppers and suitable distribution system, so as to provide a smooth uninterrupted
material flow for different layer thicknesses from the tipper to the screed.
ii) Hydraulically operated telescopic screed for paving width upto to 8.5 m and fixed screed
beyond this. The screed shall have tamping and vibrating arrangement for initial compaction
of the layer.
iii) Automatic levelling control system with electronic sensing device to maintain mat thickness
and cross slope of mat during laying procedure.
In exceptional cases where it is not possible for the paver to be utilized, mechanical means like motor grader may be used
with the prior approval of the Engineer. The motor grader shall be capable of spreading the material uniformly all over the
surface.
The surface of the aggregate shall be carefully checked with templates and all high or low spots remedied by removing or
adding aggregate as may be required. The layer may be tested by depth blocks during construction. No segregation of
larger and fine particles should be allowed. The aggregates as spread should be of uniform gradation with no pockets of
fine materials.
The Engineer may permit manual mixing and /or laying of wet mix macadam where small quantity of wet mix macadam is
to be executed. Manual mixing/laying in inaccessible/ remote locations and in situations where use of machinery is not
feasible can also be permitted. Where manual mixing/laying is intended to be used, the same shall be done with the
approval of the Engineer.
2.15.3.4 Compaction
After the mix has been laid to the required thickness, grade and cross fall/camber the same shall be uniformly compacted
to the full depth with suitable roller. If the thickness of single compacted layer does not exceed 100 mm, a smooth wheel
roller of 80 to 100kN weight may be used. For a compacted single layer upto 200 mm, the compaction shall be done with
the help of vibratory roller of minimum static weight of 80 to 100 kN with an arrangement for adjusting the frequency and
amplitude. An appropriate frequency and amplitude may be selected. The speed of the roller shall not exceed 5 km/h.
In portions having unidirectional cross fall/super elevation, rolling shall commence from the lower edge and progress
gradually towards the upper edge. Thereafter, roller should progress parallel to the center line of the road, uniformly over-
lapping each preceding track by at least one-third width until the entire surface has been rolled. Alternate trips of the roller
shall be terminated in stops at least 1 m away from any preceding stop
In portions in camber, rolling should begin at the edge with the roller running forward and backward until the edges have been
firmly compacted. The roller shall then progress gradually towards the center parallel to the center line of the road uniformly
overlapping each of the preceding tracks by at least one-third width until the entire surface has been rolled.
Any displacement occurring as a result of reversing of the direction of a roller or from any other cause shall be corrected at
once as specified and/or removed and made good.
Along forms, kerbs, walls or other places not accessible to the roller, the mixture shall be thoroughly compacted with
mechanical tampers or a plate compactor. Skin patching of an area without scarifying the surface to permit proper bonding
of the added material shall not be permitted.
Rolling should not be done when the sub-grade is soft or yielding or when it causes a wavelike motion in the sub-base/base
course or sub-grade. If irregularities develop during rolling which exceeds 12 mm when tested with a 3 m straight edge, the
surface should be loosened and premixed material added or removed as required before rolling again so as to achieve a
uniform surface conforming to the desired grade and cross fall. In no case shall the use of unmixed material be permitted to
make up the depressions.
Rolling shall be continued till the density achieved is at least 98 percent of the maximum dry density for the material as
determined by the method outlined in IS: 2720 (Part-8).

45
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

After completion, the surface of any finished layer shall be well-closed, free from movement under compaction equipment or
any compaction planes, ridges, cracks and loose material. All loose, segregated or otherwise defective areas shall be made
good to the full thickness of the layer and recompacted.
2.15.3.5 Setting and Drying
After final compaction of wet mix macadam course, the road shall be allowed to dry for 24 hours.
2.15.4 Opening to Traffic
No vehicular traffic shall be allowed on the finished wet mix macadam surface. Construction equipment may be allowed
with the approval of the Engineer.

2.15.5 Rectification of Surface Irregularity


Where the surface irregularity of the wet mix macadam course exceeds the permissible tolerances or where the course is
otherwise defective due to sub-grade soil getting mixed with the aggregates, the full thickness of the layer shall be
scarified over the affected area, re-shaped with added premixed material or removed and replaced with fresh premixed
material as applicable and re-compacted in accordance with Clause 406.3. The area treated in the aforesaid manner shall
not be less than 5 m long and 2 m wide. In no case shall depressions be filled up with unmixed and ungraded material or
fines.

2.16 SHOULDERS, ISLANDS AND MEDIANS (cl. 408 of MORT&H)


2.16.1 Scope
The work shall consist of constructing shoulder (hard/paved/earthen with brick or stone block edging) on either side of the
pavement, median in the road dividing the carriageway into separate lanes and islands for channe lising the traffic at
junctions in accordance with the requirements of these Specifications and in conformity with the lines, grades and cross -
sections shown on the drawings or as directed by the Engineer.
2.16.2 Materials
Shoulder on either side of the road may be of selected earth/granular material/paved conforming to the requirements of
Clause 305/401 and the median may be of selected earth conforming to the requirements of Clause 305.
Median/Traffic islands shall be raised and kerbed at the perimeter and the enclosed area filled with earth and suitably
covered with grass turf/shrubs as per Clause 307 and/or paved as per Clauses 410.3.4 or 410.3.5.
Paved shoulders shall consist of sub-base, base and surfacing courses, as shown in the drawings and materials for the
same shall conform to relevant Specifications of the corresponding items. Where paved or hard shoulders are not provided,
the pavement shall be provided with brick/stone block edgings as shown in the drawings. The brick shall conform to Clause
1003 of these Specifications. Stone blocks shall conform to Clause 1004 of these Specifications and shall be of size 225
mm x 110 mm x 75 mm
2.16.3 Size of Shoulders/Medians/Islands
Shoulder (earthen/hard/paved)/median/traffic island dimensions shall be as shown on the drawings or as directed by the
Engineer.
2.16.4 Construction Operations
2.16.4.1 Shoulders
The sequence of operations shall be such that the construction of paved shoulder is done in layers each matching the
thickness of adjoining pavement layer. Only after a layer of pavement and corresponding layers in paved and earth shoulder
portion have been laid and compacted, the construction of next layer of pavement and shoulder shall be taken up.
Where the materials in adjacent layers are different, these shall be laid together and the pavement layer shall be compacted
first. The corresponding layer in paved shoulder portion shall be compacted thereafter, which shall be followed by compaction
of each shoulder layer. The adjacent layers having same material shall be laid and compacted together.
In all cases where paved shoulders have to be provided alongside of existing carriageway, the existing shoulders shall be
excavated in full width and to the required depth as per Clause 301.3.7. Under no circumstances, box cutting shall be done
for construction of shoulders.

46
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

Compaction requirement of earthen shoulder shall be as per Table 300-3. In the case of bituminous courses and concrete
pavement, work on shoulder shall start only after the pavement course has been laid and compacted.
During all stages of shoulder construction, the required cross fall shall be maintained to drain off surface water.
Regardless of the method of laying, all shoulder construction material shall be placed directly on the shoulder. Any spilled
material dragged on to the pavement surface shall be immediately removed, without damage to the pavement, and the
area so affected thoroughly cleaned.
2.16.4.2 Median and Islands
Median and islands shall be constructed in a manner similar to shoulder up to the road level. Thereafter, the median and
islands, if raised, shall be raised at least 300 mm by using kerb stones of approved material and dimensions and suitably
finished and painted as directed by the Engineer. If not raised, the median and islands shall be differentiated from the
shoulder/ pavement as the case may be, as directed by the Engineer. The confined area of the median and islands shall be
filled with local earth or granular material or any other approved material and compacted by plate compactor/power
rammer. The confined area after filling with earth shall be turfed with grass or planted with shrubs, or finished with
tiles/slabs as provided in the drawings.
2.16.4.3 Brick/Stone Block Edging
The brick/stone blocks shall be laid on edge, with the length parallel to the transverse direction of the road. They shall be
laid on a bed of 25 mm sand, set carefully rolled into position by a light roller and made flush with the finished level of the
pavement
2.16.5 Surface Finish and Quality Control of Works
The surface finish of construction shall conform to the requirements of Clause 902. Control on the quality of materials and
works shall be exercised by the Engineer in accordance with Section 900.

2.17 CEMENT CONCRETE KERB AND KERB WITH CHANNEL (cl. 409 of MORT&H)
2.17.1 Scope
This work shall consist of constructing cement concrete kerbs and kerbs with channel in the central median and/or along the
footpaths or separators in conformity with the lines, levels and dimensions as specified in the drawings or as directed by the
Engineer.
2.17.2 Materials
Kerbs and kerb with channel shall be provided in cement concrete of Grade M 20 in accordance with Section 1700 of these
Specifications.
2.17.3 Type of Construction
These shall be cast-in-situ construction with suitable kerb casting machine in all situations except at locations where
continuous casting with equipment is not practicable. In those locations precast concrete blocks shall be used.
2.17.4 Equipment
A continuous kerb casting equipment of adequate capacity and controls, capable of laying the kerbs in required cross-
sections and producing a well-compacted mass of concrete free of voids and honeycombs, shall be used.
2.17.5 Construction Operations
Kerb shall be laid on firm foundation of minimum 150 mm thickness of cement concrete of M 15 grade cast in-situ or on
extended width of pavement. The foundation shall have a projection of 50 mm beyond the kerb stone. Before laying the
foundation of lean concrete, the base shall be levelled and slightly watered to make it damp.

2.18 GENERAL REQUIREMENTS FOR BITUMINOUS PAVEMENT LAYERS (cl. 501 of MORT&H)
2.18.1 General
Bituminous pavement courses shall be made using the materials described in the Specifications.
The use of machinery and equipment mentioned in various Clauses of these Specifications is mandatory. Details of the
machinery and equipment are available in the Manual for Construction and Supervision of Bituminous Works. The
equipment mandatory for any particular project shall be in accordance with the Contract Specifications for that project.
47
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.18.2 Materials
2.18.2.1 Binder
The binder shall be an appropriate type of bituminous material complying with the relevant Indian Standard, as defined in
the appropriate Clauses of these Specifications, or as otherwise specified herein. The choice of binder shall be stipulated
in the Contract or by the Engineer. Where viscosity grades of bitumen are specified, they are referred to by a designation in
accordance with IS: 73. Where modified bitumen is specified, it shall conform to the requirements of IRC: SP: 53 and IS:
15462; and the following provision of this Specification shall apply.
i) Modified bitumen from refinery sources or blended at approved central plant or at site using appropriate
industrial process and plant with high shear mill, and testing facilities to achieve stable and homogenous
mix shall be used. The use of high shear mixer or any other device capable of producing a homogeneous
blend is essential when the modifier is in powder form.
ii) Transportation tanks and storage tanks shall be insulated and equipped with effective heating system and
circulation/agitating device to maintain the specified temperature, homogeneity and viscosity of the
bitumen during transit and storage.
iii) Separation, difference in softening point (R&B), shall not be more than 3°C for any type of specified
modified bitumen when tested as per Annex B of IS: 15462.
Table 26: Selection of Binder for Bituminous Mixes (Table VII-1 of IRC: 37-2012)
Max imum Av er age air
Tr affic (CVD) Bit uminous Cour se Gr ade of Bitumen t o be used
Temper at ur e ° C
≤ 30°C ≤ 1500 commercial vehicles per day BM, DBM and BC VG 10/VG20
< 40°C For all types of traffic BM, DBM, SDBC and BC VG 30
≥ 40°C Heavy Loads, Expressways DBM, SDBC, BC VG 40 bitumen for wearing
msa>30msa course as well as binder course,
Modified bitumen may be used
for the wearing course.
Selection criteria for viscosity grade bitumen, based on highest and lowest daily mean temperatures at a particular site, are
given in Table 500-1 of MoRT&H.
Selection criteria for modified bitumen shall be in accordance with IRC: SP: 53.
Table 27: Selection Criteria for Viscosity-Graded (VG) Paving Bitumen’s Based on Climatic Conditions
(Table 500-1 of MORT&H)
Lowest Daily Mean Air Highest Daily Mean Air Temper at ur e, ° C
Temperature, °C Less than 20°C 20 to 30°C More than 30°C
More than -10°C VG-10 VG-20 VG-30
-10°C or lower VG-10 VG-10 VG-20
Both the highest daily mean air temperature and the lowest daily mean air temperatures mentioned in Tables 500-5 and
500-6 can be obtained for the weather station nearest to the project site crom the Indian Meteorological Organization
(IMO). This daily mean high temperature on a specific day is the same as daily 'normal" high temperature for that day as
usually reported in some newspapers. The highest of the 365 daily mean high air temperatures (which usually occurs on
some day in May or June) is used in Tables 500-5 and 500-6. Likewise, the lowest daily mean air temperature (which
usually occurs on some day in January) can also be obtained from the IMO. Since these are mean temperatures based on
the average of 30-40 years data, these temperatures are significantly lower than the absolute maximum temperatures,
which may have occurred in a specific year.
2.18.2.2 Coarse Aggregates
The coarse aggregates shall consist of crushed rock, crushed gravel or other hard material retained on the 2.36 mm sieve.
They shall be clean, hard, durable, of cubical shape, free from dust and soft or friable matter, organic or other deleterious
matter. Where the Contractor's selected source of aggregates has poor affinity for bitumen, the Contractor shall
demonstrate through test results that with the use of anti-stripping agents, the stripping value is improved to satisfy the
specification requirements. The Engineer may approve such a source and, as a condition for the approval of that source,
the bitumen shall be treated with approved anti-stripping agents, as per the manufacturer's recommendations, at the cost
of the Contractor.

48
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

Where crushed gravel is proposed for use as aggregate not less than 90 percent by weight of the crushed material retained
on the 4.75 mm sieve shall have at least two fractured faces, except that in the case of bituminous concrete the
requirement in this regard shall be 95 percent. .
The aggregates shall satisfy the physical requirements set forth in the individual relevant clause for the material.
2.18.2.3 Fine Aggregates
Fine aggregates shall consist of crushed or naturally occurring material, or a combination of the two, passing 2.36 mm
sieve and retained on the 75 micron sieve. They shall be clean, hard, durable, dry and free from dust, and soft or friable
matter, organic or other deleterious matter. Natural sand shall not be allowed in binder and wearing courses.
However, natural sand upto 50 percent of the fine aggregates may be allowed in base courses. Fine aggregates shall have a
sand equivalent value of not less than 50 when tested in accordance with the requirement of IS: 2720 (Part 37). The
plasticity index of the fraction passing 0.425 mm shall not exceed 4 when tested in accordance with IS: 2720 (Part 5). The
fine aggregates shall satisfy the physical requirements set forth in the individual relevant-clause for the material in question.
2.18.2.4 Sources of Material
The sources of materials proposed to be used by the Contractor shall be tested to the satisfaction of the Engineer who shall
give the necessary approval. The Engineer may from time to time withdraw approval of a specific source, or attach
conditions to the existing approval. Any change in aggregate source for bituminous mixes shall require a new mix design,
and laying trials, where the mix is based on a job mix design. Stockpiles from different sources approved or otherwise, shall be
kept separate, such that there is no contamination between one material and another. Each source submitted for approval
shall contain material sufficient for at least 5 days' work.
2.18.3 Mixing
Pre-mixed bituminous materials shall be prepared in a hot mix plant of adequate capacity and capable of yielding a mix of
proper and uniform quality with thoroughly coated aggregates. Appropriate mixing temperatures are given in Table 500-2
of these Specifications, the difference in temperature between the binder and aggregate shall at no time exceed 14°C. In
order to ensure uniform quality of the mix and better coating of aggregates, the hot mix plant shall be calibrated from time to
time. The essential features of the hot mix plants are given in Annex A of IRC: 27.
Table 28 : Mixing, Laying and Rolling Temperatures for Bituminous Mixes (Degree Celcius) (Table 500-2 of MORT&H)
Bit umen Viscosit y Bit umen Aggr egat e Mix ed Mat er ial * Rolling
Lay ing Temperat ur e
Gr ade Temper at ur e Temper at ur e Temper at ur e Temper at ur e
VG-40 160-170 160-175 160-170 150 Min 100 Min
VG-30 150-165 150-170 150-165 140 Min 90 Min
VG-20 145-165 145-170 145-165 135 Min 85 Min
VG-10 140-160 140-165 140-160 130 Min 80 Min
 Rolling must be completed before the mat cools to these minimum temperatures.
If a continuous type mixing plant is used, the Contractor must demonstrate by laboratory analysis that the cold feed
combined grading is within the grading limits specified for that bituminous bound material. In the case of a designed job mix,
the bitumen and filler content shall be derived using this combined grading.
2.18.4 Transporting
Bituminous materials shall be transported in clean insulated and covered vehicles. An asphalt release agent, such as soap or
lime water, may be applied to the interior of the vehicle to prevent sticking and to facilitate discharge of the material.
2.18.5 Laying
2.18.5.1 Weather and Seasonal Limitations
Laying shall be suspended:
i) In presence of standing water on the surface;
ii) When rain is imminent, and during rains, fog or dust storm
iii) When the base/binder course is damp;
iv) When the air temperature on the surface on which it is to be laid is less than 10°C for mixes with
conventional bitumen and is less than 15°C for mixes with modified bitumen;
v) When the wind speed at any temperature exceeds the 40 km per hour at 2 m height.
49
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.18.5.2 Cleaning of Surface


The surface on which the bituminous work is to be laid shall be cleaned of all loose and extraneous matter by means of a
mechanical broom and air jet. The equipment for applying a high pressure air jet from a compressor to remove dust or loose
matter shall be available full time at the site.
2.18.5.3 Spreading
Prior to spreading the mix, the base shall be prepared by carrying out the required operations as per Clause 501.8 depending
upon the site conditions. Except in areas where paver cannot get access, bituminous materials shall be spread, levelled and
tamped by an approved self-propelled paving machine equipped with an electronic sensing device. The essential features of
the paver finisher shall conform to Annex A of IRC: 27. As soon as possible after arrival at site, the materials shall be
supplied continuously to the paver and laid without delay. The rate of delivery of material to the paver shall be regulated to
enable the paver to operate continuously. The travel rate of the paver, and its method of operations, shall be adjusted to
ensure an even and uniform flow of bituminous material across the screed, free from dragging, tearing and segregation of
the material. In areas with restricted space (such as confined space, foot ways, of irregular shape and varying thickness,
approaches to expansion joints, etc.) where paver cannot be used, the material shall be spread, raked and levelled with
suitable hand tools by trained staff.
The minimum thickness of material laid in each paver pass shall be in accordance with the minimum values given in the
relevant parts of these Specifications. When laying binder course or wearing course approaching an expansion joint of a
structure, machine laying shall stop 300 mm short of the joint. The remainder of the pavement up to the joint, and the
corresponding area beyond it, shall be laid by hand, and the joint or joint cavity shall be kept clear of surfacing material.
Bituminous material, with a temperature greater than 145aC, shall not be laid or deposited on bridge deck water-proofing
systems, unless precautions against heat damage have been approved by the Engineer.
2.18.5.4 Cleanliness and Overlaying
Bituminous material shall be kept clean and uncontaminated. The only traffic permitted to run on bituminous material to
be overlaid shall be that engaged in laying and compacting the next course or, where a binder course is to be sealed or
surface dressed, that engaged on such surface treatment. Should any bituminous material become contaminated, the
Contractor shall make it good to the satisfaction of the Engineer, in compliance with Clause 501.8.
Binder course material shall be covered by either the wearing course or surface treatment, whichever is specified in the
Contract.
2.18.6 Compaction
Bituminous materials shall be laid and compacted in layers, which enable the specified thickness, surface level, regularity
requirements and compaction to be achieved.
Compaction of bituminous materials shall commence as soon as possible after laying. Compaction shall be substantially
completed before the temperature falls below the minimum rolling temperatures stated in the relevant part of these
Specifications. Rolling of the longitudinal joints shall be done immediately behind the paving operation. After this, rolling
shall commence at the edges and progress towards the centre longitudinally except that on super-elevated and
unidirectionally cambered portions, it shall progress from the lower to the upper edge parallel to the centre line of the
pavement. Rolling shall continue until all roller marks have been removed from the surface. All deficiencies in the surface
after laying shall be made good by the attendants behind the paver, before initial rolling is commenced. The initial or
breakdown rolling shall be done with 8-10 tonne static weight smooth-wheel rollers. The intermediate rolling shall be done
with 8-10 tonne static weight or vibratory roller or with a pneumatic tyre roller of 12 to 15 tonne weight, with a tyre pressure
of at least 0.56 MPa. The Contractor shall demonstrate the efficiency of the equipment proposed to be used by carrying
compaction trials. The procedure for site trials shall be submitted to the Engineer for approval. The finish rolling shall be
done with 6 to 8 tonne smooth wheel tandem rollers. Rolling shall continue until the specified compaction is achieved.
Where compaction is to be determined by density of cores, the requirements to prove the performance of rollers shall apply
in order to demonstrate that the specified density can be achieved. In such cases the Contractor shall specify the plant, and
the method by which he intends to achieve the specified level of compaction and finish at temperatures above the minimum
specified rolling temperature. Laying trials shall then demonstrate the acceptability of the plant and method used.
Bituminous materials shall be rolled in a longitudinal direction, with the driven rolls nearest the paver. The roller shall first
compact material adjacent to joints and then work from the lower to the upper side of the layer, overlapping on successive
passes by at least one-third of the width of the rear roll or, in the case of a pneumatic-tyred roller, at least the nominal width of
300 mm.
50
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

In portions with super-elevated and unidirectional camber, after the edge has been rolled, the roller shall progress from the
lower to the upper edge.
Rollers should move at a speed of not more than 5 km per hour. The roller shall not be permitted to stand on pavement
which has not been fully compacted, and necessary precautions shall be taken to prevent dropping of oil, grease, petrol/
diesel or other foreign matter on the pavement either when the rollers are operating or standing. The wheels of roller
machine shall be in good working order, to prevent the mix from adhering to the wheels. Only sufficient moisture to prevent
adhesion between the wheels of rollers and the mix should be used. Surplus water shall not be allowed to stand on the
partially compacted pavement.

2.18.7 Joints

2.18.7.1 Where joints are made, the material shall be fully compacted and the joint made flush in one of the
following ways:
a) All joints shall be cut vertical to the full thickness of the previously laid mix. All loosened material
shall be discarded and the vertical face coated with suitable viscosity grade hot bitumen, or cold
applied emulsified bitumen. While spreading the material along the joint the material spread shall
overlap 25 mm to 50 mm on the previously laid mix beyond the vertical face of the joint. The
thickness of the loose overlap material should be approximately a quarter more than the final
compacted thickness. The overlapped mix shall be dragged back to the hot lane so that the roller
can press the small excess into the hot side of the joint to obtain a high joint density.
b) By using two or more pavers operating in echelon, where this is practicable and in sufficient
proximity for adjacent widths to be fully compacted by continuous rolling.
2.18.7.2 All longitudinal joints shall be offset at least 300 mm from parallel joints in the layer beneath or as directed,
and in a layout approved by the Engineer. Joints in the wearing course shall coincide with either the lane edge or the lane
marking, whichever is appropriate. Longitudinal joints shall not be situated in wheel track zones.
2.18.7.3 For transverse joints method a) above shall apply. Transverse joints in the successive and adjoining layers
shall have a minimum offset of 2 m.

2.18.8 Preparation of Surface

2.18.8.1 Scope
This work shall consist of preparing an existing granular or black-topped surface for laying bituminous course. The work
shall be performed on such widths and lengths as shown on the drawings or as instructed by the Engineer. The existing
surface shall be firm and clean, and treated with Prime or Tack coat where specified in the Contract.

2.18.8.2 Materials

2.18.8.2.1 For Scarifying and Re-laying the Granular Surface


The material used shall be coarse aggregates salvaged from the scarification of the existing granular base course
supplemented by fresh coarse aggregates and screenings so that aggregates and screenings thus supplemented
correspond to Clauses 404 or 406.

2.18.8.2.2 For Patching Potholes and Sealing Cracks


Where the existing surface to be overlaid is bituminous, material required for patching and sealing cracks shall be in
accordance with Clauses 3004.2 and 3004.3, or as directed by the Engineer.

2.18.8.2.3 For Profile Corrective Course


The type of material for use as profile corrective course shall be as shown on the drawings or as directed by the Engineer.
Where it is to be laid as part of the overlay/ strengthening course, the profile corrective course material shall be of the same
specification as that of the overlay/ strengthening course. However, if provided as a separate layer, it shall be of the
specification and details given in the Contract.

2.18.8.3 Construction Operations

51
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.18.8.3.1 Preparing Existing Granular Surface


Where the existing surface is granular, all loose materials shall be removed, and the surface lightly watered where the profile
corrective course to be provided as a separate layer is also granular. Where the profile corrective course of bituminous
material is to be laid over the existing granular surface, the latter shall, after removal of all loose material, be primed in
accordance with Clause 502 and a tack coat applied in accordance with Clause 503.
The surface of all granular layers on which bituminous works are to be placed, shall be free from dust. All such layers must
be capable of being swept, after the removal of any non-integral loose material, by means of a mechanical broom, without
shedding significant quantities of material and dust removed by air jet, washing, or other means approved by the Engineer.
After cleaning, the surface shall be correct to line and level within the tolerances specified for base course.
2.18.8.3.2 Scarifying Existing Bituminous Surface
Where specified or shown on the drawings, the existing bituminous layer in the specified width shall be removed with care and
without causing undue disturbance to the underlying layer, by a suitable method approved by the Engineer. After removal of
all loose and disintegrated material, the underlying layers which might have been disturbed shall be suitably reworked
supplementing the base material as necessary with suitable fresh stone aggregates and compacted to line and level. The
compacted finished surface shall be primed in accordance with Clause 502. Reusable materials shall be stacked as directed
by the Engineer with all leads and lifts.
2.18.8.3.3 Patching of Potholes and Sealing of Cracks
Where the existing surface to be overlaid is bituminous, any existing potholes and cracks shall be repaired and sealed in
accordance with Clauses 3004.2 and 3004.3, or as directed by the Engineer.
2.18.8.3.4 Profile Corrective Course
a) Application of Profile Corrective Course
i) A profile corrective course for correcting the existing pavement profile shall be laid to varying
thickness as shown on the Drawings.
ii) Any high spots in the existing black-topped surface shall be removed by a milling machine or
other approved method, and all loose material shall be removed to the satisfaction of the
Engineer
iii) Where the maximum thickness of profile corrective course will be not more than 40 mm, the
profile corrective course shall be constructed as an integral part of the overlay course. In other
cases, the profile corrective course shall be constructed as a separate layer, adopting such
construction procedures and using such equipment as approved by the Engineer, to lay the
specified type of material, to thickness and tolerance as specified for the course to be provided.
iv) The profile corrective course shall be laid to tolerances and densities as specified for wearing
course if it is laid integral with the wearing course. The profile corrective course shall be laid to
tolerances and densities as specified for base course, if it is to be covered with a wearing course
layer.
b) Laying on Granular Base : After preparing the granular surface in accordance with Clauses
501.8.3.1 and 501.8.3.2, the profile corrective course shall be laid using material as described in
Clauses 501.8.2.3 and 501.8.3.4 (a), or as otherwise described in the Contract, and compacted to
the requirements of the particular Specification.
c) Laying on Existing Bituminous Surface : The existing bituminous surface shall be prepared in
accordance with Clause 501.8.3.3, and after applying a tack coat conforming to Clause 503. the
bituminous profile corrective course shall be laid using material as described in Clauses 501.8.2.3
and 501.8.3.4(a) and compacted to the requirements of the Specification.
d) Correction of Local Depressions, Camber and Super-Elevation : Where local sags or depressions
occur in the existing pavement, a specific filling operation shall be instructed by the Engineer, which
should be laid in accordance with Fig. 500-1. Normally, the maximum layer thickness at any point
should not exceed 100 mm. In placing multiple lifts, they should be arranged according to the
correct method as illustrated.

52
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.19 PRIME COAT OVER GRANULAR BASE (cl. 502 of MORT&H)


2.19.1 Scope
This work shall consist of the application of a single coat of low viscosity liquid bituminous material to a porous granular
surface preparatory to the superimposition of bituminous treatment or mix. The work shall be carried out on a previously
prepared granular/ stabilized surface to Clause 501.8.
2.19.2 Materials
2.19.2.1 The primer shall be cationic bitumen emulsion SS1 grade conforming to IS: 8887 or medium curing
cutback bitumen conforming to IS:217 or as specified in the Contract.
2.19.2.2 Quantity of SS1 grade bitumen emulsion for various types of granular surface shall be as g iven in Table
500-3.
Table 29 : Quantity of Bitumen Emulsion for Various Types of Granular Surfaces (Table 500-3 of MORT&H)
502.2.1

Ty pe of S ur face Rat e of S pr ay (k g/sq.m)


WMM/WBM 0.7-1.0
Stabilized soil bases/Crusher Run Macadam 0.9-1.2

2.19.2.3 Cutback for primer shall not be prepared at the site. Type and quantity of cutback bitumen for various types
of granular surface shall be as given in Table 500-4.
Table 30 : Type and Quantity of Cutback Bitumen for Various Types of Granular Surface (Table 500 -4 of MORT &H)
Rat e of S pr ay
Ty pe of S ur face Ty pe of Cut back
(k g/sq.m)
WMM/WBM MC30 0.6-0.9
Stabilized soil bases/ Crusher Run Macadam MC70 0.9-1.2

2.19.2.4 The correct quantity of primer shall be decided by the Engineer and shall be such that it can be absorbed by
the surface without causing run-off of excessive primer and to achieve desired penetration of about 8-10 mm.
2.19.3 Weather and Seasonal Limitations
Primer shall not be applied during a dust storm or when the weather is foggy, rainy or windy or when the temperature in the
shade is less than 100C. Cutback bitumen as primer shall not be applied to a wet surface. Surfaces which are to receive
emulsion primer should be damp, but no free or standing water shall be present. Surface can be just wet by very light sprinkling
of water.
2.19.4 Construction
2.19.4.1 Equipment
The primer shall be applied by a self-propelled or towed bitumen pressure sprayer equipped for spraying the material
uniformly at specified rates and temperatures. Hand spraying shall not be allowed except in small areas, inaccessible to the
distributor, or in narrow strips where primer shall be sprayed with a pressure hand sprayer, or as directed by the Engineer.
2.19.4.2 Preparation of Road Surface
The granular surface to be primed shall be swept clean by power brooms or mechanical sweepers and made free from dust.
All loose material and other foreign material shall be removed completely. If soil/ moorum binder has been used in the
WBM surface, part of this should be brushed and removed to a depth of about 2 mm so as to achieve good penetration.
2.19.4.3 Application of Bituminous Primer
After preparation of the road surface as per Clause 502.4.2, the primer shall be sprayed uniformly at the specified rate. The
method for application of the primer will depend on the type of equipment to be used, size of nozzles, pressure at the spray bar
and speed of forward movement. The Contractor shall demonstrate at a spraying trial, that the equipment and method to be
used is capable of producing a uniform spray, within the tolerances specified.
No heating or dilution of SS1 bitumen emulsion and shall be permitted at site. Temperature of cutback bitumen shall be high
enough to permit the primer to be sprayed effectively though the jets of the spray and to cover the surface uniformly.

53
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.19.4.4 Curing of Primer and Opening to Traffic


A primed surface shall be allowed to cure for at least 24 hours or such other higher period as is found to be necessary to allow all
the moisture/volatiies to evaporate before any subsequent surface treatment or mix is laid, Any unabsorbed primer shall first
be blotted with a light application of sand, using the minimum quantity possible. A primed surface shall not be opened to
traffic other than that necessary to lay the next course.

2.20 TACK COAT (cl. 503 of MORT&H)


2.20.1 Scope
The work shall consist of the application of a single coat of low viscosity liquid bituminous material to existing bituminous ,
cement concrete or primed granular surface preparatory to the superimposition of a bituminous mix, when specified in the
Contract or as instructed by the Engineer. The work shall be carried out on a previously prepared surface in accordance with
Clause 501.8.
2.20.2 Materials
The binder used for tack coat shall be either Cationic bitumen emulsion (RS 1) complying with IS:8887 or suitable low
viscosity paving bitumen of VG 10 grade conforming to IS:73 . The use of cutback bitumen RC:70 as per IS:217 shall be
restricted only for sites at sub-zero temperatures or for emergency applications as directed by the Engineer. The type and
grade of binder for tack coat shall be as specified in the Contract or as directed by the Engineer.

2.20.3 Weather and Seasonal Limitations


Bituminous material shall not be applied during a dust storm or when the weather is foggy, rainy or windy or when the
temperature in the shade is less than 10°C. Where the tack coat consists of emulsion, the surface shall be slightly damp,
but not wet. Where the tack coat is of cutback bitumen, the surface shall be dry.

2.20.4 Construction

2.20.4.1 Equipment
The tack coat shall be applied by a self-propelled or towed bitumen pressure sprayer, equipped for spraying the material uniformly
at a specified rate. Hand spraying shall not be permitted except in small areas, inaccessible to the distributor, or narrow
strips, shall be sprayed with a pressure hand sprayer, or as directed by the Engineer.

2.20.4.2 Preparation of Base


The surface on which the tack coat is to be applied shall be clean and free from dust, dirt, and any extraneous material, and be
otherwise prepared in accordance with the requirements of Clauses 501.8. The granular or stabilized surfaces shall be
primed as per Clause 502. Immediately before the application of the tack coat, the surface shall be swept clean with a
mechanical broom, and high pressure air jet, or by other means as directed by the Engineer

2.20.4.3 Application of Tack Coat


The application of tack coat shall be at the rate specified in Table 500-5, and it shall be applied uniformly. If rate of application of
Tack Coat is not specified in the contract, then it shall be the rate specified in Table 500-5. No dilution or heating at site of RS1
bitumen emulsion shall be permitted. Paving bitumen if used for tack coat shall be heated to appropriate temperature in
bitumen boilers to achieve viscosity less than 2 poise. The normal range of spraying temperature for a bituminous emulsion
shall be 20°C to 70°C and for cutback, 50°C to 80°C The method of application of tack coat will depend on the type of
equipment to be used, size of nozzles, pressure at the spray bar, and speed or forward movement. The Contractor shall
demonstrate at a spraying trial, that the equipment and method to be used is capable of producing a uniform spray, within
the tolerances specified.
Table 31 : Rate of Application of Tack Coat (Table 500-5 of MORT&H)
Ty pe of S ur face Rat e of Spray of Binder in Kg per sq. m
Bituminous surfaces 0 .2 0 -0 .3 0
Granular surfaces treated with primer 0 .2 5 -0 .3 0
Cement concrete pavement 0.30-0.35

54
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.20.4.4 Curing of Tack Coat


The tack coat shall be left to cure until all the volatiles have evaporated before any subsequent construction is started. No
plant or vehicles shall be allowed on the tack coat other than those essential for the construction.

2.21 BITUMINOUS MACADAM (cl. 504 of MORT&H)

2.21.1 Scope
This work shall consist of construction in a single course having 50 mm to 100 mm thickness or in multiple courses of
compacted crushed aggregates premixed with a bituminous binder on a previously prepared base to the requirements of
these Specifications. Since the bituminous macadam is an open-graded mix, there is a potential that it may trap water or
moisture vapour within the pavement system. Therefore, adjacent layer (shoulders) should have proper drainage quality to
prevent moisture-induced damage to the BM.

2.21.2 Materials
2.21.2.1 Bitumen
The bitumen shall be viscosity graded paving bitumen complying with Indian Standard Specification for paving bitumen,
IS:73 or as specified in the Contract. The type and grade of bitumen to be used would depend upon the climatic conditions
and the traffic. Guidelines for selection of bitumen are given in Table 500-1.
2.21.2.2 Coarse Aggregates
The coarse aggregates shall consist of crushed rock, crushed gravel or other hard material retained on 2.36 mm sieve. It
shall be clean, hard, durable and cubical shape, free from dust and soft organic and other deleterious substances. The
aggregate shall satisfy the physical requirements specified in Table 500-6. Where crushed gravel is proposed for use as
aggregate, not less than 90 percent by weight of the crushed material retained on 4.75 mm sieve shall have at least two
fractured faces resulting from crushing operation. Before approval of the source, the aggregates shall be teste d for
stripping. Where the Contractor's selected source of aggregates have poor affinity for bitumen, as a condition for the
approval of that source, the bitumen shall be treated with approved anti-stripping agents, as per the manufacturer's
recommendations, without additional payment.
2.21.2.3 Fine Aggregates
Fine aggregates shall consist of crushed or naturally occurring mineral material, or a combination of two, passing 2.36
mm sieve and retained on 75 micron sieve. It shall be clean, hard, durable, free from dust and soft organic and other
deleterious substances. Natural sand shall not be used in the binder course.
Table 32 : Physical Properties of Coarse Aggregate (Table 500-6 of MORT&H)
Pr oper t y Test Requir ement Test met hod
Cleanliness Grain size analysis Max. 5% passing 0.075 micron IS:2386 Part I
Particle shape Combined Flakiness and Elongation Indices Max. 35% IS:2386Part I
Strength Los Angeles Abrasion Value or Max 40% IS:2386Part IV IS:2386Part IV
Aggregate Impact Value Max. 30%
Durability Soundness (Sodium or Magnesium) 5 cycles IS:2386 Part V IS:2386PartV
Sodium Sulphate Max. 12%
Magnesium Sulphate Max. 18%
Water absorption Water absorption Max. 2% IS:2386 Part III
Stripping Coating and Stripping of Bitumen Aggregate Min. Retained Coating 95% IS;6241
Water sensitivity Retained Tensile strength* Min. 80% AASHTO 283

 If the minimum retained tensile strength falls below 80 percent, use of anti stripping agent is recommended to meet the
minimum requirements.
2.21.2.4 Aggregate Grading and Binder Content
The combined grading of the coarse aggregates and fine aggregates, when tested in accordance with IS:2386 Part 1, wet
sieving method, shall conform to limits given in Table 500-8. The type and quantity of bitumen and appropriate thickness
is also given in Table 500-7.

55
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.21.2.5 Proportioning of Material


The combined aggregate grading shall not vary from the lower limit on one sieve to the higher limit on the adjacent sieve to
avoid gap grading. The aggregate may be proportioned and blended to produce a uniform mix complying with the
requirements in Table 500-7. The binder content shall be within a tolerance of ± 0.3 percent by weight of total mix when
individual specimens are taken for quality control tests in accordance with the provisions of Section 900.

2.21.3 Construction Operation

2.21.3.1 Weather and Seasonal Limitations


The provisions of Clause 501.5.1 shall apply.

Table 33 : Aggregate Grading and Bitumen Content (Table 500-7 of MORT&H)


Gr ading 1 2
Nominal maximum aggregate size* 40 mm 19 mm
Layer thickness 80 -100 mm 50 -75 mm
IS Sieve size (mm) Cumulative % by weight of total aggregate passing
45 100
37.5 90-100
26.5 75-100 100
19 - 90-100
13.2 35-61 56-88
4.75 1 3 -2 2 16-36
2.36 4-19 4-19
0.3 2-10 2-10
0.075 0-8 0-8
Bitumen content ** percent by mass of total mix 3.3** 3.4**

* Nominal maximum aggregate size is the largest specified sieve size upon which any of the aggregate material is
retained.
** Corresponds to specific gravity of the Aggregate being 2.7. In case aggregates have specific gravity more than 2.7,
bitumen content can be reduced proportionately. Further, for regions where highest daily mean air temperature is 30°C
or lower and lowest daily mean air temperature is -10°C or lower, the bitumen content may be increased by 0.5 percent.

2.21.3.2 Preparation of the Base


The base on which bituminous macadam is to be laid shall be prepared, shaped and compacted to the required profile in
accordance with Clauses 501.8 and 902.3 as appropriate, and a prime coat, shall be applied in accordance with Clause
502 where specified, or as directed by the Engineer. The surface shall be thoroughly swept clean by a mechanical broom,
and the dust removed by compressed air. In locations where mechanical broom cannot get access, other appro ved
methods shall be used as directed by the Engineer.

2.21.3.3 Tack Coat

A tack coat in accordance with Clause 503 shall be applied as required under the Contract or as directed by the Engineer.

2.21.3.4 Preparation and Transportation of the Mix


The provisions of Clauses 501.3 and 501.4 shall apply.

2.21.3.5 Spreading
The provisions of Clause 501.5.3 shall apply.

2.21.3.6 Rolling
Compaction shall be carried out in accordance with the provisions of Clauses 501.6 and 501.7.
Rolling shall be continued until the specified density is achieved, or where no density is specified, until there is no further
movement under the roller. The required frequency of testing is defined in Clause 903.

56
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.22 DENSE BITUMINOUS MACADAM (cl. 505 of MORT&H)

2.22.1 Scope
The specification describes the design and construction procedure for Dense Bituminous Macadam, (DBM), for use mainly,
but not exclusively, in base/binder and profile corrective courses. The work shall consist of construction in a single or
multiple layers of DBM on a previously prepared base or sub-base. The thickness of a single layer shall be 50 mm to 100
mm.

2.22.2 Materials

2.22.2.1 Bitumen

The bitumen shall be viscosity grade paving bitumen complying with the Indian Standard Specification IS:73, modified
bitumen complying with Clause 501.2.1 or as otherwise specified in the Contract.

The type and grade of bitumen to be used shall be specified in the Contract.

2.22.2.2 Coarse Aggregates

The coarse aggregates shall consist of crushed rock, crushed gravel or other hard material retained on 2.36 mm sieve. They
shall be clean, hard, durable, of cubical shape, free from dust and soft or friable matter, organic or other deleterious
substances. Where the Contractor's selected source of aggregates has poor affinity for bitumen, the Contractor shsil produce
test result that with the use of anti-stripping agents, the stripping value is improved to satisfy the specflcation requirements.
The Engineer may approve such a source and as a condition for the approval of that source, the bitumen shall be treated with
an approved anti-stripping agent, as per the manufacturer's recommendations, at the cost of the Contractor. The aggregates
shall satisfy the requirements specified in Table 500-8.

Where crushed gravel is proposed for use as aggregate, not less than 90 percent by weight of the crushed material retained on
the 4.75 mm sieve shall have at least two fractured faces.

2.22.2.3 Fine Aggregates

Fine aggregates shall consist of crushed or naturally occurring mineral material, or a combination of the two, passing the
2.36 mm sieve and retained on the 75 micron sieve. These shall be clean, hard, durable, dry and free from dust, and soft or
friable matter, organic or other deleterious matter. Natural sand shall not be allowed in binder courses. However, natural
sand upto 50 percent of the fine aggregate may be allowed in base courses. The fine aggregate shall have a sand equivalent
value of not less than 50 when tested in accordance with the requirement of IS:2720 (Part 37). The plasticity index of the
fraction passing the 0.425 mm sieve shall not exceed 4, when tested in accordance with IS:2720 (Part 5).

2.22.2.4 Filler

Filter shall consist of finely divided mineral matter such as rock dust, hydrated lime or cement approved by the Enginee r.
The filler shall be graded within the limits indicated in Table 500-9.

The filler shall be free from organic impurities and have a plasticity Index not greater than 4. The Plasticity Index
requirement shall not apply if filler is cement or lime. Where the aggregates fail to meet the requirements of the water
sensitivity test in Table 500-8, then 2 percent by total weight of aggregate, of hydrated lime shall be used and percentage of
fine aggregate reduced accordingly.

2.22.2.5 Aggregate Grading and Binder Content

2.22.2.5.1 When tested in accordance with IS:2386 Part 1 (wet sieving method), the combined grading of the coarse
and fine aggregates and filler for the particular mixture shall fall within the limits given in Table 500-10 for grading 1 or 2 as
specified in the Contract. To avoid gap grading, the combined aggregate gradation shall not vary from the lower limit on one
sieve to higher limit on the adjacent sieve.

57
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

Table 34: Physical Requirements for Coarse Aggregate for Dense Bituminous Macadam (Table 500-8 of MORT&H)
Pr oper t y Test S pecificat ion Met hod of Test
Cleanliness (dust) Grain size analysis Max 5% passing IS:2386Partl
0.075 mm sieve
Particle shape Combined Flakiness and Elongation Max 35% IS:2386 Parti
Indices*
Strength Los Angeles Abrasion Value Max 35% IS:2386 Part IV
or
Aggregate Impact Value Max 27%
Durability Soundness either : IS:2386PartV
Sodium Sulphate or Max 12%
Magnesium Sulphate Max 18%
Water Absorption Water Absorption Max 2% IS:2386 Part III
Stripping Coating and Stripping of Bitumen Minimum retained coating IS:6241
Aggregate Mix 95%
Water Sensitivity Retained Tensile Strength** Min. 80% AASHTO 283

 To determine this combined proportion, the flaky stone from a representative sample should first be separated out.
Flakiness index is weight of flaky stone metal divided by weight of stone sample. Only the elongated particles be
separated out from the remaining (non-flaky) stone metal. Elongation index is weight of elongated particles divided by
total non-flaky particles. The values of flakiness index and elongation index so found are added up.
** If the minimum retained tensile test strength falls below 80 percent, use of anti-stripping agent is recommended to
meet the requirement.

Table 35 : Grading Requirements for Mineral Filler (Table 500-9 of MORT&H)


IS siev e (mm) Cumulat iv e Per cent Passing by Weight of Tot al Aggr egat e
0.6 100
0.3 9 5 -1 0 0
0.075 8 5 -1 0 0

Table 36 : Composition of Dense Graded Bituminous Macadam (Table 500-10 of MORT&H)


Gr ading 1 2
Nominal aggr egat e size * 3 7 .5 mm 2 6 .5 mm
Lay er t hick ness 7 5 - 1 0 0 mm 5 0 - 7 5 mm
IS S iev e (mm) Cumulat iv e % by weight of t ot al aggr egat e passing
45 100
37.5 95-100 100
26.5 63-93 90-100
19 - 71-95
13.2 55-75 56-80
9.5 - -
4.75 38-54 38-54
2.36 28-42 28-42
1.18 - -
0.6 - -
0.3 7-21 7-21
0.15 - -
0.075 2-8 2-8
Bitumen content % by mass of total mix Min 4.0** Min 4.5**

* The nominal maximum particle size is the largest specified sieve size upon which any of the aggregate is retained.
** Corresponds to specific gravity of aggregates being 2.7. In case aggregate have specific gravity more than 2.7, the
minimum bitumen content can be reduced proportionately. Further the region where highest daily mean air temperature is
30°C or lower and lowest daily air temperature is - 10°C or lower, the bitumen content may be increased by 0.5 percent,

58
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.22.2.5.2 Bitumen content indicated in Table 500-10 is the minimum quantity. The quantity shall be determined in
accordance with Clause 505.3.

2.22.3 Mix Design


The bitumen content required shall be determined following the Marshall mix design procedure contained in Asphalt
Institute Manual MS-2.
The Fines to Bitumen (F/B) ratio by weight of total mix shall range from 0.6 to 1.2.

2.22.3.1 Requirements for the Mix


Apart from conformity with the grading and quality requirements for individual ingredients, the mixture shall meet the
requirements set out in Table 500-11.
Table 37 : Requirements for Dense Graded Bituminous Macadam (Table 500-11 of MORT&H)
Viscosit y Gr ade Modified bit umen
Pr oper t ies Pav ing Bit umen Test Met hod
Hot climat e Cold climat e
Compaction level 75 blows on each face of the specimen
Minimum stability (kN at 600C) 9.0 12.0 10.0 AASHTO T 245
Marshall flow (mm) 2-4 2.5-4 3.5-5 AASHTO T 245
Marshall Quotient 2-5 2.5-5 MS-2 and
ASTM D 2041

% air voids 3-5


% Voids Filled with Bitumen (VFB) 65-75
Coating of aggregate particle 95% minimum IS:6241
Tensile Strength ratio 80% Minimum AASHTO T 283
% Voids in Mineral Aggregate (VMA) Minimum percent voids in mineral aggregate (VMA) are set out in Table 500-13

2.22.3.2 Binder Content


The binder content shall be optimized to achieve the requirements of the mix set out in Table 500 -11. The binder content
shall be selected to obtain 4 percent air voids in the mix design. The Marshall method for determining the optimum binder
content shall be adopted as described in the Asphalt Institute Manual MS-2.
Where maximum size of the aggregate is more than 26.5 mm, the modified Marshall method using 150 mm diametre
specimen described in MS-2 and ASTM D 5581 shall be used. This method requires modified equipment and procedures.
When the modified Marshall test is used, the specified minimum stability values in Table 500 -12 shall be multiplied by
2.25, and the minimum flow shall be 3 mm.
Table 38 : Minimum Percent Voids In Mineral Aggregate (VMA) (Table 500-12 of MORT&H)
Nominal Max imum Par t icle S ize 1 (mm) Minimum VMA Per cent Relat ed t o Design Per cent age Air v oids
3.0 4.0 5.0
26.5 11.0 12.0 13.0
37.5 10.0 11.0 12.0

Note : Interpolate minimum voids in the mineral aggregate (VMA) for designed percentage air voids values between those listed.
2.22.3.3 Job Mix Formula
The Contractor shall submit to the Engineer for approval at least 21 days before the start the work, the job mix formula
proposed for use in the works, together with the following details:
i) Source and location of all materials;
ii) Proportions of all materials expressed as follows:
(a) Binder type, and percentage by weight of total mix;
(b) Coarse aggregate/Fine aggregate/Mineral filler as percentage by weight of total aggregate
including mineral filler;
iii) A single definite percentage passing each sieve for the mixed aggregate;
iv) The individual gradings of the individual aggregate fraction, and the proportion of each in the
combined grading;
59
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

v) The results of mix design such as maximum specific gravity of loose mix (Gmm), compacted specimen
densities, Marshall stability,flow, air voids, VMA, VFB and related graphs and test results of AASHTO T
283 Moisture susceptibility test;
vi) Where the mixer is a batch mixer, the individual weights of each type of aggregate, and binder per
batch;
vii) Test results of physical characteristics of aggregates to be used;
viii) Mixing temperature and compacting temperature
While establishing the job mix formula, the Contractor shall ensure that it is based on a correct and truly representative
sample of the materials that will actually be used in the work and that the mix and its different ingredients satisfy the
physical and strength requirements of these Specifications.
Approval of the job mix formula shall be based on independent testing by the Engineer for which samples of all ingredients
of the mix shall be furnished by the Contractor as required by the Engineer.
The approved job mix formula shall remain effective unless and until a revised Job Mix Formula is approved. Should a
change in the source of materials be proposed, a new job mix formula shall be forwarded by the Contractor to the Engineer for
approval before the placing of the material.

2.22.3.4 Plant Trials - Permissible Variation in Job Mix Formula


Once the laboratory job mix formula is approved, the Contractor shall carry out plant trials to establish that the plant can
produce a uniform mix conforming to the approved job mix formula. The permissible variations of the individual
percentages of the various ngredients in the actual mix from the job mix formula to be used shall be within the limits as
specified in Table 500-13 and shall remain within the gradation band. These variations are intended to apply to individual
specimens taken for quality control tests in accordance with Section 900.

Table 39 : Permissible Variations in the Actual Mix from the Job Mix Formula (Table 500-13 of MORT&H)
Descr ipt ion Base/binder Cour se
Aggregate passing 19 mm sieve or larger ±8%
Aggregate passing 13.2 mm, 9.5 mm ±7%
Aggregate passing 4.75 mm ±6%
Aggregate passing 2.36 mm, 1.18 mm, 0.6 mm ±5%
Aggregate passing 0.3 mm, 0.15 mm ±4%
Aggregate passing 0.075 mm ±2%
Binder content ± 0.3%
Mixing temperature ±10°C

2.22.3.5 Laying Trials


Once the plant trials have been successfully completed and approved, the Contractor shall carry out laying trials, to
demonstrate that the proposed mix can be successfully laid and compacted all in accordance with Clause 501. The laying
trial shall be carried out on a suitable area which is not to form part of the works. The area of the laying trials shall be a
minimum of 100 sq.m of construction similar to that of the project road, and it shall be in all respects, particularly
compaction, the same as the project construction, on which the bituminous material is to be laid.
The Contractor shall previously inform the Engineer of the proposed method for laying and compacting the material. The
plant trials shall then establish if the proposed laying plant, compaction plant, and methodology is capable of producing
satisfactory results. The density of the finished paving layer shall be determined by taking cores, no sooner than 24 hours
after laying, or by other approved method. The compacted layers of Dense Graded Bituminous Macadam (DBM) shall have
a minimum field density equal to or more than 92% of the density based on theoretical maximum specific gravity (G mm)
obtained on the day of compaction in accordance with ASTM D 2041.
Once the laying trials have been approved, the same plant and methodology shall be applied to the laying of the material
on the project, and no variation of either shall be acceptable, unless approved in writing by the Engineer, who may at his
discretion require further laying trials.
2.22.4 Construction Operations
2.22.4.1 Weather and Seasonal Limitations
The provisions of Clause 501.5.1 shall apply.
60
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.22.4.2 Preparation of Base


The base on which Dense Graded Bituminous Material is to be laid shall be prepared in accordance with Clauses 501 and
902 as appropriate, or as directed by the Engineer.
2.22.4.3 Geosynthetics
Where Geosynthetics are specified in the Contract, this shall be in accordance with the requirements stated in Clause 703.
2.22.4.4 Stress Absorbing Layer
Where a stress absorbing layer is specified in the Contract, this shall be applied in accordance with the requirements of
Clause 517.
2.22.4.5 Prime Coat
Where the material on which the dense bituminous macadam is to be laid is other than a bitumen bound layer, a prime
coat shall be applied, as specified, in accordance with the provisions of Clause 502, or as directed by the Engineer.
2.22.4.6 Tack Coat
Where the material on which the dense bituminous macadam is to be laid is either bitumen bound layer or primed granular
layer, tack coat shall be applied, as specified, in accordance with the provisions of Clause 503, or as directed by the
Engineer.
2.22.4.7 Mixing and Transportation of the Mix
The provisions as specified in Clauses 501.3 and 501.4 shall apply. Table 500-2 gives the mixing, laying and rolling
temperature for dense mixes using viscosity grade bitumen. In case of modified bitumen, the temperature of mixing and
compaction shall be higher than the mix with viscosity grade bitumen. The exact temperature depends upon the type and
amount of modifier used and shall be adopted as per the recommendations of the manufacturer. In order to have uniform
quality, the plant shall be calibrated from time to time.
2.22.4.8 Spreading
The provisions of Clauses 501.5.3 and 501.5.4 shall apply.
2.22.4.9 Rolling
The general provisions of Clauses 501.6 and 501.7 shall apply, as modified by the approved laying trials. The compaction
process shall be carried out by the same plant, and using the same method, as approved in the laying trials, which may be
varied only with the express approval of the Engineer in writing
2.22.5 Opening to Traffic
It shall be ensured that the traffic is not allowed without the approval of the Engineer in writing, on the surface until the
dense bituminous layer has cooled to the ambient temperature.

2.23 SAND ASPHALT BASE COURSE (cl. 506 of MORT&H)


2.23.1 Scope
This work shall consist of a base course composed of a mixture of sand, mineral filler where required and bituminous binder,
placed and compacted upon a prepared and accepted sub-base in accordance with these Specifications and the lines, levels,
grades, dimensions and cross sections shown on the Drawings or as directed by the Engineer.
Note: Sand Asphalt Base course is used in special situations like quality coarse aggregates not being available within
economical leads and/or water needed for conventional base course not being readily available, as in desert areas.
2.23.2 Materials
2.23.2.1 Bitumen
The bitumen shall be paving bitumen of viscosity grade VG 30 or VG 20, as specified in the Contract, conforming to IS : 73.
2.23.2.2 Sand
The sand shall be clean, naturally occurring or blended material free from any deleterious substances, dry and well graded
within the limits given in Table 500-14 and with other physical properties conforming to the requirements of this Table.

61
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

Table 40 : Sand Grading and Physical Requirements (Table 500-14 of MORT&H)


S iev e S ize (mm) Cumulative Percentage by Weight of Tot al Aggr egat e Passing
9.5 100
4.75 85-100
2.36 80-100
1.18 70-98
0.60 55-95
0.30 30-75
0.15 10-40
0.075 4-10
Plasticity Index (%) 6 max.
Sand equivalent (IS:2720 Part 37) 30 min.
Los Angeles Abrasion Value (IS:2386, Part 4) 40 max.
Not e : Maximum thickness for sand asphalt is 80 mm.
2.23.2.3 Filler
When required, filler shall consist of finely divided mineral matter such as rock dust, hydrated lime or cement as approved by
the Engineer. The filler shall conform to Clause 505.2.4.
2.23.3 Mix Design
2.23.3.1 Requirements for the Mix
Apart from conformity with the grading and quality requirements for individual ingredients, the mixture shall meet the
requirements set out in Table 500-15.
2.23.3.2 Binder Content
The binder content shall be optimized to achieve the requirements of the mix set out in Table 500-15. The Marshall method
for determining the optimum binder content shall be adopted as described in the Asphalt Institute Manual MS-2.
Table 41: Requirements fo r Sand Asphalt Base Course (Table 500-15 of MORT&H)
Par amet er Requir ement
Minimum stability (kN at 60°C) 2.0
Minimum flow (mm) 2
Compaction level (Number of blows) 2 x 75
Per cent air voids 3-5
Percent voids in mineral aggregate (VMA) 16 min.
Percent voids filled with bitumen (VFB) 65-75

2.23.3.3 Job Mix Formula


The Contractor shall develop the job mix formula proposed for use in the works and submit it to the Engineer for approval
together with the following details :
i) Source and location of all materials;
ii) Proportions of all materials expressed as follows where each is applicable:
a) Binder, as percentage by weight of total mixture;
b) Sand/Mineral filler as percentage by weight of total aggregate including mineral filler;
iii) A single definite percentage passing each sieve for the mixed aggregate;
iv) The results of tests enumerated in Table 500-15 as obtained by the Contractor;
v) Test results of physical characteristics of aggregates to be used;
vi) Mixing temperature and compacting temperature.
While working out the job mix formula, the Contractor shall ensure that it is based on a correct and truly representative
sample of the materials that will actually be used in the work and that the mixture and its different ingredients satisfy the
physical and strength requirements of these Specifications.
Approval of the job mix formula shall be based on independent testing by the Engineer for which joint samples of all
ingredients of the mix shall be furnished by the Contractor as required by the former.
62
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

The approved job mix formula shall remain effective unless and until modified by the Engineer. Should a change in the
source of materials be proposed, a new job mix formula shall be established by the Contractor and approved by the
Engineer before actually using the materials.
2.23.4 Permissible Variation from Job Mix Formula
The Contractor shall produce a uniform mix conforming to the approved job mix formula, subject to the permissible
variations of the individual percentages of the various ingredients in the actual mix from the job mix formula to be used,
within the limits as specified in Table 500-12, with the condition that the gradation after the variation remains within the
gradation envelop. These variations are intended to apply to individual specimens taken for quality control tests in
accordance with Section 900 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).

2.23.4 Construction Operations


2.23.4.1 Weather and Seasonal Limitations
Clause 501.5.1 of Specifications for Road & Bridge Works of MoRT&H (5th Revision shall apply.
2.23.4.2 Preparation of Base
The surface on which Sand Asphalt Base course Material is to be laid shall be prepared, shaped and graded in the profile
required for the particular layer in accordance with Clauses 501 and 902 as appropriate or as directed by the Engineer. The
surface shall be thoroughly swept clean free from dust and foreign matter using a mechanical brush, and the dust blown off
by compressed air. In confined locations where mechanical plant cannot get access, other methods shall be used as
approved by the Engineer. A prime coat, where specified, shall be applied in accordance with Clause 502 of Specifications
for Road & Bridge Works of MoRT&H (5th Revision) or as directed by the Engineer-in-Charge.
2.23.4.3 Tack Coat
A tack coat over the base shall be applied in accordance with Clause 503, or otherwise as directed by the Engineer.
2.23.4.4 Preparation and Transportation of the Mixture
The provisions of Clauses 501.3 and 501.4 shall apply.
2.23.4.5 Spreading
The provisions of Clauses 501.5.2 to 501.5.4 shall apply. Laying must be accomplished at a suitable temperature to
ensure proper compaction. Guidance for mixing and compaction temperature for the particular bitumen may be taken from
Table 500-3 and shall correspond to a viscosity of 2 Poise (0.2 Pa.s) and 3 poise (0.3 Pa.s) respectively, based on the
original (unaged) bitumen properties.
2.23.4.6 Rolling
Clause 501.6 shall apply. Generally the initial or breakdown rolling shall be done with 8-10 tonne static weight smooth-
wheeled rollers. The intermediate rolling shall be done with 8-10 tonne static weight or vibratory rollers or with a pneumatic
tyred roller of 12-15 tonne weight having a tyre pressure of at least 0.56 MPa. The finish rolling shall be done with 8-10
tonne deadweight smooth wheeled tandem rollers. The exact pattern of rolling shall be established at the laying trials.
2.23.5 Opening to Traffic
It shall be ensured that the traffic is not allowed without the express approval of the Engineer in writing, on the surface until
the paved mat has cooled below 60°C in its entire depth.

2.24 SEMI-DENSE BITUMINOUS CONCRETE


2.24.1 Scope
This work shall consist of construction in single or multiple layers of semi-dense bituminous concrete on a previously prepared
bituminous base. A single layer shall be 25 mm to 40 mm in thickness.
2.24.2 Materials
2.24.2.1 Bitumen
The bitumen shall be paving bitumen of penetration grade complying with IS: 73 and of the penetration indicated in Table 42,
or modified bitumen as specified in the Contract.

63
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.24.2.2 Coarse Aggregates


The coarse aggregates shall be generally as specified in Clause 2.22.2.2, except that the aggregates shall satisfy the physical
requirements of Table 43.
Table 42 : Physical Requirements for Coarse Aggregate for Semi-Dense Bituminous Concrete
Pr oper t y Test S pecificat ion Met hod of Test
Cleanliness (dust) Grain size analysis Max 5% passing IS.2386 Part I
0.075 mm sieve
Particle shape Combined Flakiness and Elongation Indices Max 30% IS:2386 Part I
Strength Los Angeles Abrasion Value or Max 35% lS:2386Part IV
Aggregate Impact Value Max 27%
Durability Soundness either-
Sodium Sulphate or Max 12% IS:2386 Part V
Magnesium Sulphate Max 18%
Polishing Polished Stone Value Min 55 BS:812-114
Water Absorption Water Absorption Max 2% IS:2386 Part III
Stripping Coating and Stripping of Bitumen Aggregate Mix Minimum retained coating 95% IS:6241
Water Sensitivity Retained Tensile Strength* Min 80% AASHTO 283
2.24.2.3 Fine Aggregates
The fine aggregates shall be as specified in Clause 2.22.2.2.
2.24.2.4 Filler
Filler shall be generally as specified in Clause 2.22.2.2. Where the aggregates fail to meet the requirements of the water
sensitivity test in Table 42, 2% by total weight of aggregate of hydrated lime shall be added without additional cost.
2.24.2. 5 Aggregate gradation
The mineral aggregate, including mineral filler, shall be so graded or combined so as to conform to grading set forth in Table
43.
Table 43 : Composition of Semi-Dense Bituminous Concrete Pavement Layers
Gr ading 1 2
Nominal aggr egat e size 1 3 mm 1 0 mm
Lay er t hick ness 3 5 -4 0 mm 2 5 -3 0 mm
IS S iev e 1 (mm) Cumulat iv e % by weight of t ot al aggr egat e passing
19 100 -
13.2 90-100 100
9.5 70-90 90-100
4.75 35-51 35-51
2.36 24-39 24-39
1.18 15-30 15-30
0.6 - -
0.3 9-19 9-19
0.15 - -
0.075 3-8 3-8
Bitumen content % by mass of total mix 2 Min 4.5 Min 5.0
Bitumen Grade (pen) 65* 65*

Not es: 1. The combined aggregate grading shall not vary from the low limit on one sieve to the high limit on the adjacent sieve.
2. Determined by the Marshall method.
* Only in exceptional circumstances, 80/100 penetration grade may be used, as approved by the Engineer -in-Charge.
2.24.3 Mixture Design
2.24.3.1 Requirement of mixture
Apart from conformity with the grading and quality requirements for indivual ingredients the mixture shall meet the requireme nts set
out in Table 44.

64
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

Table 44 : Requirements of Semi-Dense Bituminous Concrete Pavement Layers


Minimum stability (kN at 60°C) 8.2
Minimum flow (mm) 2
Maximum flow (mm) 4
Compaction level (Number of blows) 75 blows on each of the two faces of the specimen
Percent air voids
Percent voids in mineral aggregate (VMA) See Table 38
Percent voids filled with bitumen (VFB) 65-78
The requirements for minimum per cent voids in mineral aggregates (VMA) are set out in Table 38. [Minimum Per Cent Voids in
Mineral Aggregate (VMA)]
2.24.3.2 Binder Content
The binder content shall be optimized to achieve the requirements or the mixture set forth in Table 43 and the traffic volume
as specified in the Contract. The Marshall method for determining the optimum binder content shall be adopted.
2.24.4 Job Mix Formula
The procedure for formulating the job mix formula shall be generally specified in Clause 2.22.3.3 and the results of tests
enumerated in Table 44 as obtained by the Contractor.
2.24.5 Permissible variation from Job mix formula
The contractor shall have the responsibility of ensuring proper proportions of materials in accordance with the approved job
mix formula and producing a uniform mix. The permissible variations of the individual percentage of the various ingredients in
the actual mix from the job mix formula may be within the limits as specified in Table 39 (Permissible variation from Job Mix
Formula).
2.24.6 Construction operations
2.24.6.1 Weather and seasonal limitations
Relevant guidelines as per Clause 501.5.1, shall apply.
2.24.6.2 Preparation of base
The base on which semi-dense bituminous concrete is to be laid shall be prepared, shaped and conditioned to the specified
lines, grade and cross-sections as directed by the Engineer-in-Charge. The surface shall be thoroughly swept and scrapped
clean and free of dust and foreign matter.
2.24.6.3 Tack coat
Where specified in the Contract, a tack coat complying with Clause 503 shall be applied over the base. Application of tack
coat shall, however not be necessary when laying follows soon after the provision of a bituminous base, without opening to
traffic.
2.24.6.4 Preparation of mix
Semi-Dense Bituminous Concrete Mix shall be prepared in a Hot Mix Plant of adequate capacity and specification as laid
down in Clauses 501.3 and 501.4 shall apply. The temperature of binder at the time of mixing shall be in the range of 150ºC-
177ºC and of aggregates in the range 155ºC-163ºC. At no time the difference in temperature between the aggregates and the
binder shall exceed 14ºC.
Mixing shall be thorough to ensure that a homogeneous mixture is obtained in which all the particles of the mineral
aggregates are coated uniformly. The mix shall be transported from the mixing plant to the point of use in suitable vehicles.
The vehicles employed for transport shall be clean and the covered over in transit if so directed by the Engineer-in-Charge.
2.24.6.5 Spreading
Refer specification as per Clause 501.5.3.
2.24.6.6 Rolling
Refer specification as per Clause 501.6 and 501.7.
2.24.7 Opening to traffic
Traffic may be allowed immediately after completion of the final rolling when the mix has cooled down to the surrounding
temperature.

65
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.25 BITUMINOUS CONCRETE (cl. 507 of MORT&H)


2.25.1 Scope
This work shall consist of construction of Bituminous Concrete, for use in wearing and profile corrective courses. This work
shall consist of construction in a single layer of bituminous concrete on a previously prepared bituminous bound surface. A
single layer shall be 30 mm/40 mm/50 mm thick.
2.25.2 Materials
2.25.2.1 Bitumen
The bitumen shall conform to Clause 504.2.1 of MoRT&H.
2.25.2.2 Coarse Aggregates
The coarse aggregates shall be generally as specified in Clause 504.2.2, except that the aggregates shall satisfy the
physical requirements of Table 500-16 and where crushed gravel is proposed for use as aggregate, not less than 95
percent by weight of the crushed material retained on the 4.75 mm sieve shall have at least two fractured faces.
Table 45 : Physical Requirements for Coarse Aggregate for Bituminous Concrete (Table 500-16 of MORT&H)
Pr oper t y Test S pecificat ion Met hod of Test
Cleanliness (dust) Grain size analysis Max 5% passing 0.075 mm sieve IS.2386 Part I
Particle shape Combined Flakiness and Elongation Indices Max 35% IS:2386 Part I
Strength Los Angeles Abrasion Value or Max 30% lS:2386Part IV
Aggregate Impact Value Max 24%
Durability Soundness either-
Sodium Sulphate or Max 12% IS:2386 PartV
Magnesium Sulphate Max 18%
Polishing Polished Stone Value Min 55 BS:812-114
Water Absorption Water Absorption Max 2% IS:2386 Part III
Stripping Coating and Stripping of Bitumen Aggregate Mix Minimum retained coating 95% 1S:6241
Water Sensitivity Retained Tensile Strength* Min 80% AASHTO 283
 If the minimum retained tensile test strength falls below 80 percent, use of anti-stripping agent is recommended to meet the
requirement.
2.25.2.3 Fine Aggregates
The fine aggregates shall be all as specified in Clause 505.2.3.
2.25.2.4 Filler
Filler shall be as specified in Clause 505.2.4.
2.25.2.5 Aggregate Grading and Binder Content
When tested in accordance with IS:2386 Part 1 (Wet grading method), the combined grading of the coarse and fine
aggregates and filler shall fall within the limits shown in Table 500-17. The grading shall be as specified in the Contract.
Table 46 : Composition of Bituminous Concrete Pavement Layers (Table 500-17 of MORT&H)
Gr ading 1 2
Nominal aggr egat e size* 1 9 mm 1 3 .2 mm
Lay er t hick ness 5 0 mm 3 0 -4 0 mm
IS S iev e 1 (mm) Cumulat iv e % by weight of t ot al aggr egat e passing
45 - -
37.5 - -
26.5 100 -
19 90-100 100
13.2 59-79 90-100
9.5 52-72 70-88
4.75 35-55 53-71
2.36 28-44 42-58
1.18 20-34 34-48
0.6 15-27 26-38
0.3 10-20 18-28
0.15 5-13 12-20
0.075 2-8 4-10
Bitumen content % by mass of total mix Min 5.2* Min 5.4**

66
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

 The nominal maximum particle size is the largest specified sieve size up on which any of the aggregate is retained.
** Corresponds to specific gravity of aggregate being 2.7. In case aggregate have specific gravity more than 2.7, the
minimum bitumen content can be reduced proportionately. Further the region where highest daily mean air
temperature is 30°C or lower and lowest daily air temperature is - 10°C or lower, the bitumen content may be
increased by 0.5 percent.

2.25.3 Mix Design

2.25.3.1 Requirements for the Mix


Clause 505.3.1 shall apply.

2.25.3.2 Binder Content


Clause 505.3,2 shall apply.

2.25.3.3 Job Mix Formula


Clause 505.3.3 shall apply.

2.25.3.4 Plant Trials - Permissible Variation in Job Mix Formula


The requirements for plant trials shall be as specified in Clause 505.3.4, and permissible limits for variation as given in
Table 500-18.

Table 47: Permissible Variations in Plant Mix from the Job Mix Formula (Table 500-18 of MORT&H)
Descr ipt ion Per missible Var iat ion
Aggregate passing 19 mm sieve or larger ±7%
Aggregate passing 13.2 mm, 9.5 mm ±6%
Aggregate passing 4.75 mm ±5%
Aggregate passing 2.36 mm, 1.18 mm, 0.6 mm ±4%
Aggregate passing 0.3 mm, 0.15 mm ±3%
Aggregate passing 0.075 mm ± 1.5%
Binder content ± 0.3%
Mixing temperature ± 10%

2.25.3.5 Laying Trials


The requirements for laying trials shall be as specified in Clause 505.3.5. The compacted layers of bituminous concrete
(BC) shall have a minimum field density equal to or more than 92 percent of the average theoretical maximum specific
gravity (Gmm) obtained on the day of compaction in accordance with ASTM D2041.

2.25.4 Construction Operations

2.25.4.1 Weather and Seasonal Limitations


The provisions of Clause 501.5.1 shall apply.

2.25.4.2 Preparation of Base


The surface on which the bituminous concrete is to be laid shall be prepared in accordance with Clauses 501 and 902 as
appropriate, or as directed by the Engineer. The surface shall be thoroughly swept clean by mechanical broom and dust
removed by compressed air. In locations where a mechanical broom cannot get access, other approved methods shall be
used as directed by the Engineer.

2.25.4.3 Geosynthetics
Where Geosynthetics are specified in the Contract, this shall be in accordance with the requirements stated in Clause 703.

67
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.25.4.4 Stress Absorbing Layer


Where a stress absorbing layer is specified in the Contract, this shall be applied in accordance with the requirements of Clause
517.
2.25.4.5 Tack Coat
The provisions as specified in Clause 504.4.6 shall apply.
2.25.4.6 Mixing and Transportation of the Mix
The provisions as specified in Clauses 501.3, 501.4 and 504.4.7 shall apply.
2.25.4.7 Spreading
The general provisions of Clauses 501.6 and 501.7 shall apply, as modified by the approved laying trials.
2.25.4.8 Rolling
The general provisions of Clauses 501.6 and 501.7 shall apply, as modified by the approved laying trials.
2.25.5 Opening to Traffic
Provisions in Clause 504.5 shall apply.

2.26 SURFACE DRESSING (cl. 509 of MORT&H)

2.26.1 Scope
This work shall consist of the application of one coat or two coats of surface dressing, each coat consisting of a layer of
bituminous binder sprayed on a previously prepared, base, followed by a cover of stone chips rolled in to form a wearing
course to the requirements of these Specifications.
2.26.2 Materials
2.26.2.1 Binder
The binder shall either be bitumen conforming to IS:73 or rapid setting cationic bitumen emulsion (RS -2) conforming to
IS:8887. Grade of bitumen shall depend upon the climatic condition. For selection of grade of bitumen guidance may be
taken from Table 500-1. The type of binder to be used shall be stated in the Contract, or as directed by the Engineer.
2.26.2.2 Aggregates
The stone chips (cover aggregate) shall conform to the requirements of Clause 505.2.2., except that their water absorption
shall be restricted to a maximum of 1 percent and they shall have a Polished Stone Value of minimum 60. [in BS:812
(Part-114)], of not less than 60. The size of the aggregate shall depend upon the type of surface on which it is laid and the
traffic intensity. The chips shall be single sized, clean, hard, durable, of cubical shape; and free from dust and soft or friable
matter, organic or other deleterious matter and conform to one of the gradings given in Table 500-21. The size of the
aggregate shall depend upon the type of surface on which it is laid and the traffic intensity. Table 500 -20 may be used as
guidance.
Pre-coated Chips : As an alternative to the use of an adhesion agent or wherever specified in the Contract, the chips may be
pre-coated before they are spread except when the sprayed binder film is a bitumen emulsion. Pre-coating the chips may
be carried out by mixing aggregates with 0.75 to 1.0 percent of bitumen by weight of chips in a suitable mixer. The chips
shall be heated to 160°C and mixed with the binder heated to its application temperature. The pre-coated chips shall be
allowed to cure for at least one week or until they become non sticky and can be spread easily.
Table 48 : Recommended Nominal Size of Aggregates (mm) (Table 500-20 of MORT&H)

Tr affic Intensity in Terms of Number of Vehicles Per Day in the Lane Under Consideration
Ty pe of S ur face
1 0 0 0 -2 0 0 0 2 0 0 -1 0 0 0 2 0 -2 0 0
Very hard 10 6 6
Hard 13 10 6
Normal 13 10 6
Soft 19 13 13
Very soft 19 13

68
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

Table 49 : Grading requirements for Aggregates used for Surface Dressing (Table 500-21 of MORT&H)

IS S ieve Designation (mm) Cumulative Percent by Weight of Total Aggregates Passing for t he F ollowing Nominal S izes (mm)
19 13 10 6
26.5 100 - - -
19 85-100 100 - -
13 0-40 85-100 100 -
9.5 0-7 0-40 85-100 100
6.3 - 0-7 0-35 85-100
4.75 - - 0-10 -
3.35 - - - 0-35
2.36 0-2 0-2 0-2 0-10
0.60 - - - 0-2
0.075 0-1.5 0-1.5 0-1.5 0-1.5
Minimum 65% by weight of Passing 19 and Passing 13.2 and Passing 9.5 and retained Passing 6.3 and retained
aggregate retained on 13.2 retained on 9.5 on 6.3 on 3.35

2.26.2.3 Rates of Spread of Binder and Chips

The rate of spread of binder and chips will depend upon the nominal size of the aggregate and the extent of its embedment
into the surface. The rate shall be determined as per the procedure given in Manual for Construction and Supervision of
Bituminous Construction. Approximate rate of application of aggregates, and binder under average conditions are given in
Table 500-22.
Table 50 : Approximate Rate of Application of Binder and Aggregates (Table 500-22 of MORT&H)
Binder (K g/m 2 )
Aggr egat es
Nominal Aggregate Size mm Uncoat ed Aggr egat es Coat ed Aggr egat es
Cu.m/m 2
Bit umen Emulsion Bit umen
19 1.2 1.8 1.0 0.014-0.015
13 1.0 1.5 0.8 0.009-0.011
10 0.9 1.3 0.7 0.007-0.009
6 0.75 1.1 0.6 0.003-0.005
Note : Bitumen for coated aggregates excludes quantity of bitumen required for coating.

2.26.2.4 Anti-Stripping Agent


Where the proposed aggregate fails to pass the stripping test then an approved anti-stripping agent (Appendix V for
details) may be added to the binder in accordance with the manufacturer's instructions. The effectiveness of the proposed
anti-stripping agent must be demonstrated by the Contractor, before approval by the Engineer.

2.26.3 Construction Operations

2.26.3.1 Weather and Seasonal Limitations

Clause 501.5.1 shall apply.

2.26.3.2 Preparation of Base


The base on which the surface dressing is to be laid shall be prepared, shaped and conditioned to the specified lines, grade and
cross section in accordance with Clause 501 or as directed by the Engineer. Prime coat, where needed, shall be provided as per
Clause 502 or as directed by the Engineer. Where the existing surface shows signs of fatting up, the excess bitumen shall be
removed as directed by the Engineer. The bituminous surface to be dressed shall be thoroughly cleaned either by using a
mechanical broom and/or compressed air, or any other approved equipment/method as specified in the Contract or
directed by the Engineer. The prepared surface shall be dust free, clean and dry, (except in the case of cationic emulsion
where the surface shall be slightly damp).

69
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.26.3.3 Application of Binder


After preparation of base, paving grade binder heated to an appropriate temperature or bitumen emulsion shall be
sprayed uniformly using mechanical sprayers. During the operation the ratio between truck speed and pump revolution
shall be maintained constant with the help of automatic control. When work resumes, the binder shall not be sprayed on the
earlier completed surface. This can be done by covering the completed work with bitumen impregnated paper. Excessive deposit
of bituminous material shall be immediately removed. The equipment described in IRC:SP:34 with synchronized spraying and
compaction shall be preferred for better control and uniformity in construction.
The spraying temperatures for binder are given below:
Whir ling S pr ay Jet s S lot Jet s
Binder Gr ade
Min° C Max ° C Min° C Max ° C
VG 1 0 180 200 165 175
2.26.3.4 Application of Stone Chips
Immediately after application of the binder, clean, dry chips (in the case of emulsion the chippings may be slightly damp)
shall be spread uniformly by means of a mechanical chip spreader on the surface so as to cover the surface completely with
a single layer of chips.
2.26.3.5 Rolling
Rolling of the chips should preferably be carried out by a pneumatic tyre roller in accordance with Clauses 501.6 and 501.7.
Rolling shall commence at the edges and progress towards the centre except in super-elevated and uni-directional
cambered portions where it shall proceed from the lower edge to the higher edge. Each pass of the roller sh all uniformly
overlap not less than one-third of the track made in the preceding pass. While rolling is in progress, additional chips shall
be spread by hand in necessary quantities required to make up irregularities. Rolling shall continue until all aggregate
particles are firmly embedded in the binder and present a uniform closed surface.
2.26.3.6 Application of Second Coat of Surface Dressing
Where surface dressing in two coats is specified, the second coat should not be applied until the first coat has been open to
traffic for two weeks. The surface on which the second coat is laid must be clean and free of dust. The construction operations
for the second coat shall be the same as described in Clauses 510.3.3 to 510.3.5.
2.26.4 Opening to Traffic
Traffic shall not be permitted to run on any newly surface dressed area until the following day. In special circumstances,
however, the Engineer may allow the road to be opened to traffic immediately after rolling, but in such cases traffic speed
shall be limited to 20 km per hour until the following day.

2.27 OPEN-GRADED PREMIX SURFACING (cl. 510 of MORT&H)

2.27.1 Open-Graded Premix Surfacing using Viscosity Grade Paving Bitumen


2.27.1.1 Scope
This work shall consist of preparation, laying and compaction of an open-graded premix surfacing material of 20 mm
thickness composed of small-sized aggregate premixed with bituminous binder on a previously prepared base, in
accordance with the requirements of these Specifications to serve as a wearing course.
2.27.1.2 Materials
2.27.1.2.1 Binder
The binder shall be viscosity grade bitumen of a suitable grade as specified in the Contract, or as directed by the Engineer,
and satisfying the requirements of IS:73. For selection of grade of bitumen guidance may be taken from Table 500-1.
2.27.1.2.2 Aggregates
The aggregates shall conform to Clause 504.2.2 except that the water absorption shall be limited to a maximum of 1
percent. The Polished Stone Value, shall not be less than 55, when tested as per BS:812-114.
2.27.1.2.3 Proportioning of Material
The materials shall be proportioned in accordance with Table 500-23.

70
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

Table 51: Quantities of Materials Required for 10 m2 of Road Surface for 20 mm Thick Open-graded Premix
Surfacing (Table 500-23 of MORT&H)
Mat er ials Quant it y
Aggregates
a) Nominal Stone size 13.2 mm (passing 22.4 mm sieve and retained on 11.2 mm sieve) 0.18 m3
b) Nominal Stone size 11.2 mm (passing 13.2 mm sieve and retained on 5.6 mm sieve) 0.09 m3
Total 0 .2 7 m3
Binder
a) For 0.18 m3 of 13.2 mm nominal size stone of 52 kg bitumen per m3 9.5 kg
b) For 0.09 m3 of 11.2 mm nominal size stone of 56 kg bitumen per m 3 5.1 kg
Total 1 4 .6 kg

2.27.1.3 Construction Operations


2.27.1.3.1 Weather and Seasonal Limitations
Clause 501.5.1 shall apply.
2.27.1.3.2 Preparation of Surface
The underlying surface on which the bituminous surfacing is to be laid shall be prepared, shaped and conditioned to the
specified lines, grade and cross-section in accordance with Clause 501. A prime coat where needed shall be applied in
accordance with Clause 502 as directed by the Engineer.
2.27.1.3.3 Tack Coat
A tack coat complying with Clause 503, shall be applied over the base preparatory to laying of the surfacing.
2.27.1.3.4 Preparation of Premix
Hot mix plant of appropriate capacity and type shall be used for the preparation of the mix material. The hot mix plant shall
have separate dryer arrangement for heating aggregate.
The temperature of the binder and aggregate at the time of mixing, laying and compaction shall be in conformity with the
temperature given in Table 500-3. The difference in temperature between the binder and aggregate shall at no time exceed
14°C. Mixing shall be thorough to ensure that a homogeneous mix is obtained in which all particles of the aggregates are
coated uniformly.
The mix shall be immediately transported from the mixer to the point of use in suitable vehicles or hand barrows. The
vehicles employed for transport shall be clean and the mix being transported covered in transit if so directed by the
Engineer.
2.27.1.3.5 Spreading and Roiling
The pre mixed material shall be spread on a previously prepared base to Clause 501 by a paver unless specified otherwise in
the Contract to the desired thickness, grades and crossfall (camber). The cross-fall should be checked by means of camber
boards and irregularities levelled out. Excessive use of blades or rakes should be avoided. As soon as sufficient length of
bituminous material has been laid, rolling shall commence with 8-10 tonne rollers, smooth wheel tandem type or other
approved equipment. Rolling shall begin at the edge and progress towards the centre longitudinally, except that on
superelevated and uni-directional cambered portions, it shall progress from the lower to upper edge parallel to the centre
line of the pavement.
When the roller has passed over the whole area once, any high spots or depressions, which become apparent, shall be
corrected by removing or adding premixed materials. Rolling shall then be continued until the entire surface has been rolled
and all the roller marks eliminated. In each pass of the roller the preceding track shall be overlapped uniformly by at least
one-third width. The roller wheels shall be kept damp to prevent the premix from adhering to the wheels. In no case shall
fuel/lubricating oil be used for this purpose. Excess use of water for this purpose shall also be avoided.
Rollers shall not stand on newly laid material. Rolling operations shall be completed in every respect before the temperature
of the mix falls below the rolling temperature indicated in Table 500-3.
2.27.1.3.6 Seal Coat
A seal coat conforming to Clause 511 of the type specified in the Contract shall be applied to the surface immediately after
laying the surfacing.

71
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.27.1.4 Opening to Traffic


No traffic shall be allowed on the road until the seal coat has been laid. After the seal coat is laid, the road may be opened to
traffic according to Clause 511.4.

2.27.2 Open Graded Premix Surfacing Using Cationic Bitumen Emulsion


2.27.2.1 Scope
This work shall consist of the preparation, laying and compaction of an open graded premix surfacing of 20 mm thickness
composed of small-sized aggregate premixed with a cationic bitumen emulsion on a previously prepared surface, in
accordance with the requirements of these Specifications to serve as a wearing course.
2.27.2.2 Materials
2.27.2.2.1 Binder
The binder for Premix wearing course shall be Cationic Bitumen emulsion of Medium Setting (MS) grade complying with
IS:8887 or as specified in the Contract.
2.27.2.2.2 Aggregate
The requirements of Clause 511.1.2.2 shall apply.
2.27.2.3 Proportioning of Materials
The materials shall be proportioned as per quantities given in Tables 500-24.
Table 52 : Quantities of Aggregate for 10 m2 Area (Table 500-24 of MORT&H)
Aggr egat es
a) Coarse aggregate nominal 13.2 mm size, passing IS 22.4 mm sieve and retained on IS 11.2 mm sieve 0.18 m3
b) Coarse aggregate nominal 11.2 mm size; passing IS 13.2 mm sieve and retained on IS 5.6 mm sieve 0.09 m3
Binder 20 to 23 kg

2.27.2.4 Construction Operations


2.27.2.4.1 Weather and Seasonal Limitations
Clause 501.5.1 shall apply except that the minimum air temperature for laying shall be 10°C. Cationic bitumen emulsions
shall not normally be stored below 0°C.
2.27.2.4.2 Preparation of Surface
The underlying surface on which the premix surfacing is to be laid shall be prepared, in accordance with the requirements
of Clause 504.3.2 for a newly primed surface, and in accordance with Clause 505.4.2 where an existing bituminous surface
is to be overlaid.
2.27.2.4.3 Preparation of Binder
Before opening, the cationic bitumen emulsion drums shall be rolled at a slow speed, to and fro at least 5 times, for a distance of
about 10 metres, to distribute any storage sedimentation.
2.27.2.4.4 Tack Coat
A tack coat complying with Clause 503, shall be applied over the surface preparatory to laying of the surfacing where
specified in the Contract, as directed by the Engineer.
2.27.2.4.5 Preparation of Premix
Premixing of cationic bitumen emulsion and aggregates can be carried out in a suitable mixer such as cold mixing plant as
per IS:5435 (Revised) or concrete mixer or by pay loaders in exceptional cases where approved by the Engineer. Where
specified in the Contract, continuous mixing operation shall be done either in batch or continuous hot mix plant suitable for
emulsion mixes.
When using concrete mixer for preparing the premix, 0.135 cu.m (0.09 cu.m of 13.2 mm size and 0.045 cu.m of 11.2 mm
size) of aggregates per batch shall be used. This quantity will be for 5 sq.m of road surface with 20 mm average thickness.
The aggregates required for one batch shall be prepared adjacent to the mixer.

72
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

The coarse aggregate of 13.2 mm size shall be placed into the mixer followed by 5 to 6.5 kg of Cationic bitumen e mulsion and
then the 11.2 mm size aggregate shall be added, followed by 5 to 6.5 kg of Cationic bitumen emulsion. After the materials
have been mixed thoroughly, the mix shall be immediately transported to the laying site in suitable vehicles. Too much
mixing shall be avoided.
2.27.2.4.6 Spreading and Rolling
The premixed cationic bitumen emulsion and aggregates shall be spread uniformly by a paver within 10 minutes of applying the
tack coat. All levelling, raking etc. should be completed within 20 minutes of the time of mixing.
The mix shall be spread uniformly to the desired thickness, grades and crossfall (camber). The crossfall shall be checked by
means of camber boards and irregularities levelled out. Too much raking is to be avoided.
The rolling shall start immediately after laying the premix. A smooth wheeled tandem roller of 8-10 tonnes shall be used,
unless other compaction methods are approved by the Engineer, based on the results of laying trials, if necessary. While
rolling, wheels of roller should be clean and kept moist to prevent the premix from adhering to the wheels. In no case shall
fuel/ lubricating oil be used for this purpose. Use of water for this purpose shall be strictly limited to an absolute minimum.
Rolling shall commence at the edges and progress towards the centre longitudinally except in the case of superelevated
and uni-directionaly cambered sections where rolling shall be carried out from the lower edge towards the higher edge
parallel to the centre line of the road.
After one pass of roller over the whole area, depressions or uncovered spots should be corrected by adding premix
material. Rolling shall be continued until the entire surface has been rolled, to maximum compaction and all the roller marks
eliminated. In each pass of the roller, the preceding track shall be overlapped uniformly by at least one-third width. Roller(s)
shall not stand on newly laid material. Joints, both longitudinal and transverse to the road sections laid and compacted
earlier, shall be cut vertically to their full depth so as to expose fresh surface which shall be painted with a thin coat of binder
before the new mix is laid.
2.27.2.5 Seal Coat
A seal coat, conforming to Clause 511, as specified in the Contract, shall be applied immediately after laying the premix
carpet.
2.27.2.6 Opening to Traffic
Traffic should not be allowed over the premix surface till seal coat is laid. After the seal coat is laid, traffic may be allowed in
accordance with Clause 511.4.
2.27.2.7 Surface Finish and Quality Control
The surface finish of construction shall conform to the requirements of Clause 902. For control of the quality of materials
and work carried out, relevant provision of Section 900 shall apply.
2.27.2.8 Arrangements for Traffic
During the period of construction, arrangements for traffic shall be made in accordance with the provisions of Clause 112.

2.28 SEAL COAT (cl. 511 of MORT&H)

2.28.1 Scope
This work shall consist of the application of a seal coat for sealing the voids in a bituminous surface laid to the specified
levels, grade and cross fall (camber).
Seal coat shall be of either of the two types specified below:
A. Liquid seal coat comprising of an application of a layer of bituminous binder followed by a cover of stone chips.
B. Premixed seal coat comprising of a thin application of fine aggregate premixed with bituminous binder.
2.28.2 Materials
2.28.2.1 Binder
The requirements of Clauses 510.1.2.1 and 510.2.2.1 shall apply.
The quantity of bitumen per 10 square metres, shall be 9.8 kg for Type A, and 6, 8 kg for Type B seal coat. Where bituminous
emulsion is used as a binder, the quantities for Type A and Type B seal coats shall be 15 kg and 10.5 kg respectively.

73
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.28.2.2 Stone Chips for Type A Seal Coat


The stone chips shall consist of angular fragments of clean, hard, tough and durable rock of uniform quality throughout. They
shall be free of soft or disintegrated stone, organic or other deleterious matter. Stone chips shall be of 6.7 mm size defined as
100 percent passing through 11.2 mm sieve and retained on 2.36 mm sieve. The quantity used for spreading shall be 0.09
cubic metre per 10 square metre area. The chips shall satisfy the quality requirements given in Table 500-8 except that the
upper limit for water absorption value shall be 1 percent.
2.28.2.3 Aggregate for Type B Seal Coat
The aggregate shall be sand or grit and shall consist of clean, hard, durable, uncoated dry particles, and shall be free from
dust, soft or flaky/elongated material, organic matter or other deleterious substances. The aggregate shall pass 2.36 mm
sieve and be retained on 180 micron sieve. The quantity used for premixing shall be 0.06 cum per 10 sqm area.
2.28.3 Construction Operations
2.28.3.1 Weather and Seasonal Limitations
The requirements of Clause 501.5.1 shall apply.
2.28.3.2 Preparation of Surface
The seal coat shall be applied immediately after laying the bituminous course which is required to be sealed. Before application
of seal coat materials, the surface shall be cleaned free of any dust or other extraneous matter.
2.28.3.3 Construction of Type A Seal Coat
The construction operations shall be the same as described in Clause 509.3.3 to 509.3.5.
2.28.3.4 Construction Type B Seal Coat
2.28.3.4.1 Using Paving Bitumen
The construction operations shall be the same as in Clause 510.1.3.
2.28.3.4.2 Using Emulsion
The construction operations shall be the same as in Clause 510.2.4.
2.28.4 Opening to Traffic
In the case of Type B seal coat, traffic may be allowed soon after final rolling when the premixed material has cooled do wn
to the surrounding temperature. In the case of Type A seal coat, traffic shall not be permitted to run on any newly sealed area
until the following day. In special circumstances, however, the Engineer may open the road to traffic immediately after
rolling, but in such cases traffic shall be rigorously limited to 20 km per hour until the following day.

2.29 SLURRY SEAL (cl. 512 of MORT&H)


2.29.1 Scope
The work consists of design and laying a mixture of mineral aggregate, slow setting cationic bitumen emulsion, water and
additives, if. needed, proportioned, mixed and uniformly spread over a previously prepared surface. The finally laid slurry seal
shall have a homogenous mat, adhere firmly to the prepared surface and provide friction resistant surface texture throughout its
surface life.
2.29.2 Type of Slurry Seals and Applications
Different types of slurry seal and their applications are given in Table 500-25. The type and application of the slurry seal
shall be specified in the Contract.
Table 53 : Different Types of Slurry Seals (Table 500-25 of MORT&H)
It ems Ty pe 1 (2 - 3 mm) Ty pe II (4 - 6 mm) Ty pe III ( 6 -8 mm)* *
Application Filling of hair cracks Filling of surface cracks 1 - 3 mm Filling of surface cracks 3-6 mm
And preventive/ renewal and preventive/renewal
treatment (upto 450 CVPD)*** treatment (upto 1500 CVPD)***
Quantity* of slurry (kg/m2 ) 4.3 to 6.5 8.4 to 9.8 10.1 to 12
Residual binder (% by weight of 10 to 16 7.5 to 13.5 6.5 to 12
dry aggregate)
 In terms by weight of dry aggregate Indicative only
** CVPD : Commercial Vehicles per day
74
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.29.3 Materials
The materials for slurry seal shall conform to the following requirements.
2.29.3.1 Bitumen Emulsion
The bitumen emulsion shall be a cationic slow setting type SS 2, conforming to the requirements oflS:8887.
2.29.3.2 Aggregates
The mineral aggregates shall be crushed stone dust, clean, sharp, hard, durable and uncoated dry particles and shall be free from
soft pieces and organic and other deleterious substances. The aggregate shall satisfy the requirement given in Table 500-26.
The target grading shall conform to one of the three types given in Table 500-27.
Table 54 : Properties of Aggregates (Table 500-26 of MORT&H)
Pr oper t ies Test Met hod S pecificat ion
Sand Equivalent Value IS:2720 (Part 37) Min 50 percent
Water absorption* IS:2386 (Part 3) Max 2 percent
Soundness with- IS:2386 (Part 5)
Sodium sulphate Max 12 percent
Magnesium sulphate Max 18 percent

 In case water absorption exceeds 2% but is less than 4%, same may be permitted subject t o conformity of soundness
test and wet stripping test
Table 55 : Aggregate Grading (Table 500-27 of MORT&H)
Per cent age by Mass Passing (Minimum Lay er Thick ness)
S iev e S ize (mm)
Ty pe I (2 -3 mm) Ty pe II (4 -6 mm) Ty pe III (6 -8 mm)
9.5 - - 100
6.3 - 100 90-100
4.75 100 90-100 70-90
2.36 90-100 65-90 45-70
1.18 65-90 45-70 28-50
0.600 40-65 30-50 19-34
0.300 25-42 18-30 12-25
0.150 15-30 10-21 7-18
0.075 10-20 5-15 5-15

Tolerances : Percent passing each sieve shall not vary by more than the tolerance limit indicated in Table 500-28 and shall
remain within the gradation band.
Table 56 : Tolerances for Slurry Seal (Table 500-28 of MORT&H)
Descr ipt ion Toler ance
Aggregate passing 4.75 mm ±5%
Aggregate passing 2.36 mm, 1.18 mm, 0.6 mm ±5%
Aggregate passing 0.3 mm ±4%
Aggregate passing 0.15 mm ±3%
Aggregate passing 0.075 mm ±2%

If more than one nominal size aggregate is used to produce the required grading, the correct amount of each type of
aggregate used shall be proportioned separately to meet the requirements of grading as per Table 500-27, prior to adding
other materials in the mixture. After target gradation has been submitted, the percent passing each sieve shall not vary by
more than the tolerance limits given in Table 500-29, and shall remain within the gradation band. The aggregate will be
acceptable based on average of five gradation tests at the job location.
2.29.3.3 Filler
Mineral filler shall be Ordinary Portland Cement. The quantity of filler shall be in the range of 0.5 to 2 percent by weight of dry
aggregate.
2.29.3.4 Water
Water shall be potable, free from harmful salt and contaminants. The pH of the water shall be in the range of 6 to 7.

75
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.29.3.5 Additives
Chemical additives may be used to accelerate or retard the break-set time of the slurry or to improve the resulting surface
finish. The quantity of additive, if used, shall be decided by mix design and to be adjusted as per the site/climate
conditions. The specifications for additive shall be supplied by the supplier of the emulsion. The additive and emulsion shall
be compatible with each other.
2.29.4 Mix Design
The compatibility of aggregate, emulsion, filler and additive(if needed) shall be verified by mix design for a selected type
and grading of aggregate as specified in Tables 500-27 and 500-28. the design criteria for slurry seal mixture is specified in
Table 500-29. The proposed slurry seal mix shall conform to the specified requirements, when tested in accordance with
tests specified in Table 500-30. The mix design report shall clearly show the proportions of aggregate, filler, water and
residual bitumen content based on the dry weight of the aggregates, additive usage (if any).
Table 57 : Mix Design Criteria for Slurry Seal Mix (Table 500-29 of MORT&H)
Requir ement S pecificat ions Test Met hod
Mix Time, minimum 180 seconds Appendix 1 IRC:SP:81
Consistency, maximum 3 cm Appendix 3 IRC:SP:81
Wet cohesion, pass % minimum 20 kg.cm Appendix 4 IRC:SP:81
Wet striping, Pass %, minimum 90 Appendix 5 IRC:SP:81
Wet Track abrasion loss, (one hour soak), maximum 800 g/m2 Appendix 6 IRC:SP:81

Aggregate, bitumen emulsion, water and additive including set control additive (if needed), shall be proportioned by
weight utilizing the mix design approved by the Engineer. The final mixture, after addition of water and additive (if used) shall
be such that the slurry seal mixture has proper workability and permit traffic within four hours (without leading to ravelling
after placement). Trial mix shall be prepared and laid at site for the designed mix and observed for breaking and setting
time. Indicative limits of various ingredients for job mix of slurry seal shall be as given in Table 500-30.
Table 58 : Indicative Quantity of Ingredients (Table 500-30 of MORT&H)
Ingr edient s Limits (Percent by Weight of Dry Aggregates)
Cationic Bitumen Emulsion 10 to 16 for type I 7.5 to 13.5 for Type II 6.5 to 12 for Type III
Water 6 to 12
Filler 1.0 to 2.0
Additive 0.5 to 2.0

2.29.5 Construction
2.29.5.1 Weather and Seasonal Limitations
Laying of slurry seal shall not be undertaken, if either the pavement temperature or air temperature is below 10°C.
However during a dry spell, slurry seal may be laid in rainy season also, even if the surface is wet but there is no stagnant
water on the pavement surface.
2.29.5.2 Surface Preparation
The underlying surface on which the slurry seal is to be applied shall be cleaned of all loose material, mud spots, vegetation
and extraneous matter and shall be prepared and shaped to the needed profile. It is essential to pre-treat cracks on the
pavement surface with an appropriate crack sealing material prior to application of slurry seal, if it is used for preventive/
renewal treatment. The surface should be swept clean by removing caked earth and other foreign matter with wire brushes,
sweeping with mechanical brooms and finally dusting with air jet or other means approved by the Engineer
2.29.5.3 Application of Tack Coat
Tack coat is not required normally for flexible pavements, unless surface is extremely hungry and dry. In case it is needed,
Clause 503 shall apply.
2.29.5.4 Machine
The machine shall be specially designed and manufactured to lay slurry seal. It shall be self propelled equipment, truck
mounted, consisting of following sub-assemblies used to manufacture and simultaneously spread these mixes on the
surface:

76
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

i) Aggregate bin.
ii) Filler bin.
iii) Water and Emulsion Tanks.
iv) Additive Tanks.
v) Aggregates and filler conveyors to supply the mixer box.
vi) Pump or compressed air system to supply the emulsion/water.
vii) Mixer Box.
viii) Spreader box to place the mixed slurry on the job.

2.29.5.5 Calibration of Machine


Slurry seal laying machine shall be calibrated for flow of all the constituents as per the job mix in presence of En gineer. No
machine shall be allowed to work on the project until the calibration has been completed and accepted by the engineer. 2
kg samples of slurry seal mix will be taken and verified for proportioning and mix consistency. The verification for
application rate shall also be carried out in presence of the Engineer. The procedure for calibration and verification is as
given in Appendix 7 of IRC:SP:81.
2.29.5.6 Application of Slurry Seal
A calibrated slurry seal machine, as per requirements of job mix, shall be used to spread the material. The surface shall be
pre-wetted by fogging ahead of the spreader box (if required under hot weather conditions). The rate of application shall be
adjusted during the day to suit temperature, surface texture and humidity. The mixture shall be agitated and mixed uniformly in
the spreader box by means of twin shafted paddles or spiral augurs fixed in spreader box. A front seal shall be provided to
ensure no loss of the mixture at the road contact point. The rear seal shall act as final strike off and shall be adjustable. The
spreader box and real strike off shall be so designed and operated that a uniform consistency is achieved to produce free flow
of material to the rear strike off, A secondary strike off shall have the same adjustment as the spreader box. The spreader box
shall have the suitable means provided to side shift the box to compensate for variation in pavement geometry. Sufficient
amount of material shall be carried in all parts of spreader box at all times so that a complete coverage is obtained.
Overloading of the spreader box shall be avoided. No lumping, balling and unmixed aggregates shall be permitted. No streak,
caused by oversized aggregates shall be left on the finished surface. Longitudinal joints shall correspond with the edges of
existing traffic lanes. Other patterns of longitudinal joints may be permitted, if pattern will not adversely affect the quality of
finished surface, In case streak is formed, it shall be corrected immediately by fresh material and with use of squeeze.
Longitudinal joints, common to two traffic lanes shall be butt joints with overlap not exceeding an average of 60-100 mm. The
mixture shall be uniform and homogeneous after spreading on existing surfaces and shall not show separation of the emulsion
and aggregates after setting.
2.29.5.7 Rate of Application
The rate of application shall be as per Table 500-26 (by weight of dry aggregates).
2.29.5.8 Rolling
Generally rolling is not required. Where rolling is felt necessary due to inadequate cohesion, a pneumatic tyred roller having
individual wheel load between 0.75 to 1.5 tonne shall be used. Rolling shall commence as soon as the slurry has set.
2.29.6 Opening to Traffic
Surface shall be opened to traffic after slurry is in a completely set condition. The maximum setting time shall be 4 hours.
Speed of traffic shall be restricted to 20 km per hour for next 12 hours.

2.30 FOG SPRAY (cl. 513 of MORT&H)


2.30.1 Scope
The work covers a very light application of low viscosity bitumen emulsion for purposes of sealing cracks less than 3 mm
wide or incipient fretting or disintegration in an existing bituminous surfacing, and to help reduce loosening of chips by
traffic on newly finished surface dressing.
2.30.2 Material
The bitumen emulsion shall be as specified in the Contract or as instructed by the Engineer. The emulsion shall be SS-1
complying with the requirements of IS:8887.

77
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.30.3 Weather and Seasonal Limitations


Spraying shall not take place when the temperature is below 10°C, nor in windy or dusty conditions, nor when it is raining
or the surface to be sprayed is wet ( a damp surface is acceptable but refer to Clause 513.4.2.).
2.30.4 Construction Operations
2.30.4.1 Equipment

The fog spray shall be applied by means of a self-propelled or towed bitumen pressure sprayer complying with the
requirements of the Manual for Construction and Supervision of Bituminous Works. The spray bar should be protected from
gusts of wind by means of a hood.
2.300.4.2 Preparation of Surface

The surface on which the fog spray is to be applied shall be thoroughly cleaned with compressed air, scrubbers etc. The
cracks shall be cleaned with a pressure air jet to remove all dirt, dust etc.
2.30.4.3 Application
The fog seal shall be applied at a rate of 0.5-1.0 litres/m2, using equipment such as pressure tank, flexible hose and spray bar
or lance.
2.30.5 Blinding
If specified in the Contract or ordered by the Engineer, the fog spray shall be blinded with graded grit of 3 mm size and
under, coated with about 2 percent of the emulsion by weight. The pre coated grit shall be allowed to be cured for at least
one week or until they become non-sticky and can be spread easily.
2.30.6 Arrangements for Traffic
During the spraying operations, arrangements for traffic shall be made in accordance with the provisions of Clause 112.
The surface should not be opened to traffic for 24 hours after spraying. If pick-up does occur a light blinding of crusher dust
or sand should be applied,

2.31 MASTIC ASPHALT (cl. 516 of MORT&H)


2.31.1 Scope
This work shall consist of constructing a single layer of mastic asphalt wearing course for road pavements and bridge
decks.
Mastic asphalt is an intimate homogenous mixture of selected well-graded aggregates, filler and bitumen in such
proportions as to yield a plastic and void less mass, which when applied hot can be trowelled and floated to form a very dense
impermeable surfacing.
2.31.2 Materials
2.31.2.1 Binder
Subject to the approval of the Engineer, the binder shall be a paving/ Industrial grade bitumen meeting the requirements given
in Table 500 -39.

Table 59 : Requirements for Physical Properties of Binder (Table 500-39 of MORT&H)


Property Test Method Requirements
Penetration at 25°C IS:1203 15 ±5*
Softening point, °C IS:1205 65 ± 10
Loss on heating for 5h at 163°C, % by mass Max. IS:1212 2.0
Solubility in trichloroethylene, % by mass Min. IS:1216 95
Ash (mineral matter), % by mass Max. IS:1217 1.0

 In cold climatic regions (temperature less than 10°C), VG 40 grade bitumen may be used.

78
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.31.2.2 Coarse Aggregates


The coarse aggregates shall consist of crushed stone, crushed gravel/shingle or other stones. They shall be clean, hard,
durable, of fairly cubical shape, uncoated and free from soft, organic or other deleterious substances. They shall satisfy the
physical requirements given in Table 500-6.
The percentage and grading of the coarse aggregates to be incorporated in the mastic asphalt depending upon the
thickness of the finished course should be as specified in Table 500-40.
Table 60 : Grade and Thickness of Mastic Asphalt Paving and Grading of Coarse Aggregates (Table 500-40 of MORT&H)
Thick ness Nominal Size of Coar se Coar se Aggr egat e Cont ent ,
Applicat ion
Range (mm) Aggr egat e (mm) % by Mass of Tot al Mix
Roads and bridge decks 25-50 13 40±10
Heavily stressed areas i.e. Junctions and toll plazas 40-50 13 45±10
Nominal size of coarse aggregate IS Sieve (mm) 13 mm Cumulative % passing by weight
19 100
13.2 88-96
2.36 0-5
Fine Aggregates: The fine aggregates shall be the fraction passing the 2.36 mm and retained on the 0.075 mm sieve consisting
of crusher run screening, natural sand or a mixture of both. These shall be clean, hard, durable, uncoated, dry, and free from
soft or flaky pieces and organic or other deleterious substances.
Filler : The filler shall be limestone powder passing the 0.075 mm sieve and shall have a calcium carbonate content of not
less than 80 percent by weight when determined in accordance with IS:1514.
The grading of the fine aggregate inclusive of filler shall be as given in Table 500-41.
Table 61 : Grading of Fine Aggregate (Inclusive of Filler) (Table 500-41 of MORT&H)
IS S iev e Per cent age by weight of aggr egat e
Passing 2.36 mm but retained on 0.600 mm 0-25
Passing 0.600 mm but retained on 0.212 mm 10-30
Passing 0.212 mm but retained on 0.075 mm 10-30
Passing 0.075 mm 30-55

2.31.3 Mix Design


2.31.3.1 Hardness Number
The mastic asphalt shall have a hardness number at the time of manufacture of 50 to 70 at 25DC prior to the addition of
coarse aggregate and 10 to 20 at 25°C at the time of laying after the addition of coarse aggregate.
The hardness number shall be determined in accordance with the method specified in ISM195 -1978.
2.31.3.2 Binder Content
The binder content shall be so fixed as to achieve the requirements of the mix specified in Clause 516.3.1 and shall be in
the range of 14 to 17 percent by weight of total mix as indicated in Table 500-42 of MoRT&H.
Table 62 : Composition of Mastic Asphalt Blocks without Coarse Aggregate (Table 500-42 of MORT&H)
IS S iev e Per cent age by Weight of Mast ic Asphalt
Minimum Max imum
Passing 2.36 mm but retained on 0.600 mm 0 22
Passing 0.600 mm but retained on 0.212 mm 4 30
Passing 0.212 mm but retained on 0.075 mm 8 18
Passing 0.075 mm 25 45
Bitumen Content % by mass 14 17

2.31.3.3 Job Mix Formula


The Contractor shall submit to the Engineer for approval at least one month before the start of the work the job mix formula
proposed to be used by him for the work, indicating the source and location of all materials, proportions of all materials such
as binder and aggregates, single definite percentage passing each sieve for the mixed aggregate and results of the tests
recommended in the various Tables and Clauses of this Specification.

79
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.31.4 Construction Operations


2.31.4.1 Weather and Seasonal Limitations
The provisions of Clause 501.5.1 shall apply, except that laying shall not be carried out when the air temperature at the
surface on which the Mastic Asphalt is to be laid is below 10°C.
2.31.4.2 Preparation of the Base
The base on which mastic asphalt is to be laid shall be prepared, shaped and conditioned to the profile required, in
accordance with Clause 501 or 902 as appropriate or as directed by the Engineer. In the case of a cement concrete base,
the surface shall be thoroughly power brushed clean and free of dust and other deleterious matter. Under no circumstances
shall mastic asphalt be spread on a base containing a binder which might soften under high application temperatures. If
such material exists, the same shall be cut out and repaired before the mastic asphalt is laid.
2.31.4.3 Tack Coat
A tack coat in accordance with Clause 503 shall be applied on the base or as directed by the Engineer.
2.31.4.4 Preparation of Mastic Asphalt
Preparation of mastic asphalt consists of two stages. The first stage shall be mixing of filler and fine aggregates and then heating
the mixture to a temperature of 170°C to 210°C. Required quantity of bitumen shall be heated to 170°C to 180°C and
added to the heated aggregated. They shall be mixed and cooked in an approved type of mechanically agitated mastic cooker
for some time till the materials are thoroughly mixed. Initially the filler alone is to be heated in the cooker for an hour a nd
then half the quantity of binder is added. After heating and mixing for some time, the fine aggregates and the balance of
binder are to be added and further cooked for about one hour. The second stage is incorporation of coarse aggregates and
cooking the mixtures for a total period of 3 hours. During cooking and mixing care shall be taken to ensure that the contents
in the cooker are at no time heated to a temperature exceeding 210°C.
Where the material is not required for immediate use it shall be cast into blocks consisting of filler, fine aggregates and
binder, but without the addition of coarse aggregate, weighing about 25 kg each. Before use, these blocks shall be
reheated to a temperature of not less than 175°C and not more than 210°C, thoroughly incorporated with the requisite
quantity of coarse aggregates and mixed continuously. Mixing shall be continued until laying operations are completed so as
to maintain the coarse aggregates in suspension. At no stage during the process of mixing shall the temperature exceed
210°C,
The mastic asphalt blocks (without coarse aggregate) shall show on analysis a composition within the limits as given in
Table 500-42 of MoRT&H.
The mix shall be transported to the laying site in a towed mixer transporter having arrangements for stirring and keeping the mix
hot during transportation.
2.31.4.5 Spreading
The mastic asphalt shall be laid, normally in one coat, at a temperature between 175°C and 210°C and spread uniformly
by hand using wooden floats or by machine on the prepared surface. The thickness of the mastic asphalt and the percentage
of added coarse aggregate shall be in accordance with Table 500-40 or as specified by the Engineer. Where necessary,
battens of the requisite dimensions should be employed. Any blow holes that appear in the surface shall be punctured while
the material is hot, and the surface made good by further floating.
Laying surface over existing bridge deck : Before laying bitumen over existing bridge deck, the existing cross fall/camber,
expansion joint members and water drainage spouts shall be carefully examined for their proper functioning in the bridge
deck structure and any deficiency found shall be removed. Loose elements in the expansion joint shall be firmly secured.
The existing wearing coat shall be removed, as per Clause 2809. The cracks in the concrete surface, if any, shall be repaired
and filled up properly or replaced by new concrete of specified grade before laying the bitumen mastic over bridge deck.
Laying over new bridge deck : New concrete bridge deck which is not in camber/cross fall shall first be provided with required
camber and cross fall by suitable concrete or bituminous treatment.
Treatment where mastic asphalt Is laid over a concrete surface : In case of laying over concrete surface, following measures
shall be taken :
a) For proper bond with new concrete deck, .surface shall be roughened by means of stiff broom or wire brush and it
shall be free from ridges -and troughs.

80
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

b) A thin bituminous tack coat (with bitumen of grade VG 30) shall be applied on the concrete deck before pouring
mastic. The deck shall be dry. The quantity of bitumen for tack coat shall be as per Table 500-6 of MoRT&H.
c) After applying tack coat, chicken-mesh reinforcement of 1.5 mm dia steel wire with hexagonal or rectangular
openings of 20-25 mm shall be placed and held properly in position on the concrete surface before pouring
mastic.
2.31.4.6 Joints
All construction joints shall be properly and truly made. These joints shall be made by warming existing mastic asphalt by the
application of an excess quantity of the hot mastic asphalt mix which afterwards shall be trimmed to leave it flush with the
surfaces on either side.
2.31.4.7 Surface Finish
The mastic asphalt surface can have poor skid resistance after floating, in order to provide resistance to skidding, the
mastic asphalt after spreading, while still hot and in a plastic condition, shall be covered with a layer of stone aggregate.
This aggregate shall be 13.2 mm size (passing the 19.0 mm sieve and retained on the 6.7 mm sieve) or 9.5 mm siz e
(passing the 13.2 mm sieve and retained on the 6,7 mm sieve) subject to the approval of the Engineer. Hard stone chips,
complying with the quality requirements of Table 500-16, shall be precoated with bitumen at the rate of 2 ± 0.4 percent of
VG 30 grade. The addition of 2 percent of filler complying with Table 500-9 may be required to enable this quantity of binder
to be held without draining. The chips shall then be applied at the rate of 0.005 cu.m per 10 sq.m and rolled or otherwise
pressed into the surface of the mastic layer when the temperature of the mastic asphalt is not less than 100°C.
2.31.5 Opening of Traffic
Traffic may be allowed after completion of the work when the mastic asphalt temperature of the completed layer has cooled
to the daytime maximum ambient temperature.

2.32 CRACK PREVENTION COURSES (cl. 517 of MORT&H)


2.32.1 Scope
The work shall consist of providing one or two coats of an elastomeric rubber membrane known as Stress Absorbing
Membrane (SAM) over a cracked surface, followed by a covering of aggregate chips, and a Stress Absorbing Membrane
Interlayer (SAMI), which is a material similar to SAM or which consists of a bitumen impregnated geotextile, as specified in
the Contract.
2.32.2 Materials
2.32.2.1 Binder
Binder shall be a modified binder complying with the requirements of IS: 15462 and IRC:SP:53, according to the
requirements of the Contract, except that viscosity grade VG 10 complying with the requirements of IS:73 shall be used in the
case of a bitumen impregnated geotextile.

2.32.2.2 Aggregate
The requirements of Clause 510.2.2 apply except that the Polished Stone Value requirement does not apply in the case of
SAMI. Where required by the contract, aggregates shall be pre-coated by mixing them with 0.75 to 1.0 percent of paving
bitumen by weight of chips in a suitable mixer, the chips being heated to 160°C and the bitumen to its application temperature.
The pre-coated chips shall be allowed to cure for at least one week or until they become non-sticky and can be spread easily.

2.32.2.3 Rates of Spread of Binder and Aggregate


The rate of spread of binder and aggregate shall be as given in Table 500-43, as required by the Contract.

2.32.2.4 Geo-textile
The geotextile as prescribed shall conform to the requirements of Clause 703.3 of MoRT&H.

2.32.3 Construction Operations

2.32.3.1 Weather and Seasonal Limitations


Clause 501.5.1 shall apply.
81
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.32.3.2 Preparation of Base


The base on which the SAM, SAMI or bitumen impregnated geotextile is to be laid shall be prepared, in accordance with
Clause 501 and as directed by the Engineer. The surface shall be thoroughly cleaned either by using a mechanical brush or
any other equipment/method approved by the Engineer. Dust removed in the process shall be blown off with compressed air.

2.32.3.3 Application of Binder


2.32.3.3.1 The equipment and general procedures shall all be in accordance with the Manual for Construction and
Supervision of Bituminous Works. The application temperature for modified binder shall be 160o-170°C. Binder for bitumen
impregnated geotextile shall be applied according to Clause 703.4.4. The surface on which the binder is to be applied shall
be dry.

Table 63 : Quantity of Materials Required for 10 sq.m of Road Surface for Stress Absorbing Membrane
Table 500-43 of MORT&H)
S pecification of S AM t o be Quant it y of
S . No. Ty pe and Widt h of Cr ack Quant it y of Chipping
Applied Binder Kg/10m2
Hair cracks and map cracks Single coat SAM
1) 8 -1 0 0.10 m3 of 5.6 mm chips
upto 3 mm width or 2nd coat of two coat SAM
2) Map cracks or alligator cracks Single coat SAM 10-12 0.11m3 of 5.6 mm chips
3 mm to 6 mm width
Map cracks or alligator cracks Two coat SAM 0.12 m3 of 5.6 mm and 11.2 mm
3) 1st coat 12 -14 chips in 1:1 ratio
6 mm to 9 mm width
2nd coat 8 -1 0 0.10 m3 of 5.6 mm chips
Two coat SAM
Cracks above 9 mm width and
4) 1st coat 14-16 0.12 m3 of 11.2 mm chips
cracked area above 50 percent
2nd coat 8 -1 0 0.10 m3 of 5.6 mm chips
All types of cracks with crack width
5) Single coat SAM I 8 -1 0 0.10 m3 of 5.6 mm chips
below 6 mm
All types of cracks with crack width
6) Single coat SAM I 10-12 0.10 m3 of 11.2 mm chips
above 6 mm

2.32.3.3.2 Binder quantity for bitumen impregnated geotextile shall be in the range 0.9 to 1.2 litres/m2. Binder
quantity outside this range is permitted according to the geotextile manufacturer's instructions and subject to the
agreement of the Engineer.

2.32.3.4 Application of Aggregates


The equipment and general procedures shall all be in accordance with the Manual for Construction and Supervision o f
Bituminous Works. Immediately after application of the modified binder, clean, dry aggregate shall be spread uniformly on
the surface.
2.32.3.5 Sweeping
The surface of SAMs and SAM Is shall be swept to ensure uniform spread of aggregate and that there are no loose chips on
the surface.
2.32.3.6 Two Coat SAM or SAM I

Where a two coat SAM or SAMI is required by the Contract, the second coat shall be applied within 90 days of the first coat.

2.32.3.7 Geotextiie Placement


For bitumen impregnated geotextiie, the requirements of Clause 703.4.4 shall apply.

2.32.4 Opening to Traffic


Traffic may be permitted over a SAM or SAMI 2 hours after rolling, but the speed shall be limited to 20 km/h, until the
following day. Speed control measures are to be approved by the Engineer, prior to laying. Traffic shall not be allowed on the
bitumen impregnated geotextiie layer unless it is overlaid.

82
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.33 BITUMINOUS COLD MIX (INCLUDING GRAVEL EMULSION) (cl. 518 of MORT&H)

2.33.1 The Design Mix


The work shall consist of providing a bituminous cold mix consisting of a mixture of unheated mineral aggregate and emulsified
or cutback bitumen, laid in a single layer of 25-75 mm. The mix shall either be a design mix or a recipe mix.

2.33.2 Materials

2.33.2.1 Binder
The binder shall be a slow/ medium setting bitumen emulsion conforming to IS:8887 or a medium curing cut-back
conforming to IS:217.
The final selection of the binder shall be made only after laboratory evaluation with the aggregates to be used. A general
guide for the selection of the binder is given in the Manual for Construction and Supervision of Bituminous Works.
The binder with the highest residual viscosity at ambient temperatures that can reasonably be handled by the mixing and
laying equipment proposed shall be used.

2.33.2.1.1 Aggregates
The aggregates shall comply with the requirements of Clauses 505.2.2. and 505.2.3. If the aggregates are not properly
coated with the binder, a small amount of hydrated lime on an approved antistripping agent (see Appendix 4) shall be
proposed by the Contractor, for the approval of the Engineer.

2.33.2.1.2 Aggregate Grading and Binder Content


The combined aggregate grading for the particular mixture, when tested in accordance with IS:2386 Part I, (wet sieving
method), shall fall within the limits shown in Table 500-44 of MoRT&H.

2.33.2.2 Mix Design

2.33.2.2.1 Requirements for the Mixture


Apart from conformity with the grading and quality requirements for individual ingredients, the mix shall meet the
requirements set out in Table 500-45 of MoRT&H.

Table 64 : Aggregate Grading and Bitumen Content (Table 500-44 of MORT&H)


Nominal Max imum S ize (mm) 9 .5 1 3 .2 1 9 .0
Allowable Thick ness (mm) 2 5 -3 5 3 6 -5 0 5 1 -7 5
IS S iev e (mm) Cumulat iv e % by weight of t ot al aggr egat e passing
37.5 - - -
26.5 - - 100
19.0 - 100 90-100
13.2 100 90-100 —
9.5 90-100 - 60-80
4.75 60-80 45-70 35-65
2.36 35-65 25-55 20-50
0.30 6-25 5-20 3-20
0.075 2-10 2-9 2-8
Cutback Emulsion Binder content, percent by weight of total mix
4-6
7-10

The binder content shall be determined by the modified Marshall Test.

83
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

Table 65 : Mix Requirements for Designed Cold Mix (Table 500-45 of MORT&H)
Par amet er Emulsion 1 Cut back 2
2.2 kN at 25°C for maintenance 3.3 kN
Minimum Stability 2.2 kN at 22.2°C for paving
at 25°C for paving
Percent maximum stability loss on soaking 50 3 25 4
Minimum flow (mm) 2 2
Compaction level (number of blows) 50 75
Per cent air voids 3-55 3-5
Per cent voids in mineral aggregate (VMA) See Table 500-46
Per cent minimum coating 6 50

Not es: 1 Using Marshall method for emulsified asphalt-aggregate cold mix design". Appendix F, MS-14

2 Using "Marshall method for cut-back asphalt-aggregate cold mix design:, Appendix H, MS-14
³ With vacuum saturation and immersion
4 Four days soak at 25°C.

5 Refers to total voids in the mix occupied by air and water

6 Coating Test, Appendix F, MS-14.

Table 66 : Minimum Percent Voids in Mineral Aggregate (VMA) (Table 500-46 of MORT&H)

Nominal Max imum Par t icle S ize IS S iev e (mm) Minimum VMA (Per cent )
9.5 16.0
12.5 15.0
19.0 14.0
25.0 13.0
37.5 12.0

2.33.2.2.2 Binder Content


The binder content shall be optimized by the Modified Marshall Test to achieve the requirements of the mix set out in Table
500-45. The method adopted shall be that described in Appendix F and H of Asphalt Institute's Manual, MS-14.
2.33.2.2.3 Job Mix Formula
The Contractor shall submit to the Engineer for approval at least one month before the start of the work, the job mix formula
proposed for use in the works together with the following details:
i) Source and location of all materials;
ii) Proportions of all materials expressed as follows where each is applicable:
a) Binder, as percentage by weight of total mix;
b) Coarse aggregate/fine aggregate as percentage by weight of total aggregate;
iii) A single definite percentage passing each sieve for the mixed aggregate;
iv) The results of tests enumerated in Table 500-46 as obtained by the Contractor;
v) Test results of the physical characteristics of the aggregates to be used;
vi) Spraying temperature of binder if appropriate.
While working out the job mix formula, the Contractor shall ensure that it is based on a correct and truly representative
sample of the materials that will actually be used in the work and that the mix and its different ingredients satisfy the
physical and strength requirements of these Specifications.
Approval of the job mix formula shall be based on independent testing by the Engineer for which samples selected jointly
with the Engineer of all ingredients of the mix shall be furnished by the Contractor as required by the former.
The approved job mix formula shall remain effective unless and until modified by the Engineer. Should a change in the
source of materials be proposed, a new job mix formula shall be established by the Contractor and approved by the Engineer
before actually using the materials.

84
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.33.2.2.4 Permissible Variation from the Job Mix Formula


It shall be the responsibility of the Contractor to produce a uniform mix conforming to the approved job mix formula, subject
to the permissible variations of the individual percentages of the various ingredients in the actual mix from the job mix
formula to be used, within the limits as specified in Tables 500-13 and 500-18. These variations are intended to apply to
individual specimens taken for quality control tests in accordance with Section 900 of MoRT&H Specifications.

2.33.2.3 Construction operations

2.33.2.3.1 Weather and Seasonal Limitations


Construction with cold mix must not be undertaken when ambient temperatures below 10°C are expected, during rain, in
standing water, or generally when poor weather is predicted. Bitumen emulsions and cutbacks depend on the evaporation
of water and/or solvent for the development of their curing and adhesion characteristics. Cold weather, rain and high
humidity slow down the rate of curing. Extra manipulation may be required to remove volatiles in cool and humid conditions.
Wind increases the rate of evaporation.

2.33.2.3.2 Preparation of the Base


The base on which cold mix is to be laid shall be prepared, shaped and levelled to the required profile in accordance with
Clauses 501 and 902 as appropriate, and a prime coat, where specified, shall be applied in accordance with Clause 502 or
as directed by the Engineer.
2.33.2.3.3 Tack Coat
A tack coat in accordance with Clause 503 shall be applied over the base on which the cold mix is to be laid where specified
in the Contract.

2.33.2.3.4 Preparation and Transportation of the Mix


Mixing can be carried out using one of the following types of mixer, which is provided with equipment for spraying the binder
at a controlled rate and, if necessary, for heating the binder to a temperature at which it can be applied uniformly to the
aggregate:
a) rotary drum type concrete mixer for small jobs or asphalt cold mix plant;
b) batch or continuous type mixer without dryer
A sufficient number of haul trucks with smooth, clean beds should be available to ensure continuous operation of the mixing
plant. The type of truck used for transporting the mixture from the mixer to the road site shall suit to the Contractor's
proposed laying procedure methodology.
2.33.2.3.5 Spreading
Designed cold mix shall be placed by a paver or grader as specified in the Contract. The mix shall not be placed on any wet
surface or when weather conditions will otherwise prevent its proper handling or finishing.
If spreading by motor grader, the grader shall have a blade that is straight and sharp and long enough to ensure finishing to
close, straight, transverse tolerances and all joints and linkages must be in good condition. The grader must be heavy enough
to hold the blade firmly and uniformly on the surface while spreading the mix.
If climatic conditions and aggregate grading do not permit evaporation of moisture or volatiles without aeration by
manipulation, a grader shall be used to place designed cold mix.
Other methods of spreading may be used as approved by the Engineer.
2.33.2.3.6 Compaction
Initial compaction of the laid material shall preferably be carried out using a pneumatic-tyred roller of a weight appropriate
to the layer thickness to be compacted with single layer thickness being 25-100 mm and all compaction being in accordance
with Clauses 501.6 and 501.7. Smooth tyres shall be used. Final rolling and smoothening of the surface should be
completed using steel wheel rollers. The Contractor shall demonstrate at laying trials that his proposed laying and
compaction methods can achieve a satisfactory result.
2.33.2.4 Opening to Traffic
Traffic shall not be allowed to run on new work until all the water or volatiles in the mix have evaporated, as determined by the
Engineer. The rate of evaporation will be influenced by the temperature, humidity and wind conditions.

85
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.34 DRY LEAN CEMENT CONCRETE SUB-BASE (cl. 601 of MORT&H)


2.34.1 Scope
2.34.1.1 The work shall consist of construction of (zero slump) dry lean concrete sub-base for cement concrete
pavement in accordance with the requirements of these Specifications and in conformity with the lines, grades and cross-
sections shown on the drawings or as directed by the Engineer. The work shall include furnishing of all plant and equipment,
materials and labour and performing all operations, in connection with the work, as approved by the Engineer.
2.34.1.2 The design parameters of dry lean concrete sub-base, viz., width, thickness, grade of concrete, details of
joints, if any, etc. shall be as stipulated in the drawings.
2.34.2 Materials
2.34.2.1 Sources of Materials
The Contractor shall indicate to the Engineer the source of all materials with relevant test data to be used in the dry lean
concrete work sufficiently in advance and the approval of the Engineer for the same shall be obtained at least 45 days before the
scheduled commencement of the work in trial length. If the Contractor later proposes to obtain the materials from a different
source during the execution of main work, he shall notify the Engineer with relevant test data for his approval at least 45 days
before such materials are to be used.
2.34.2.2 Cement
Any of the following types of cement may be used with prior approval of the Engineer:
S . No. Ty pe Confor ming t o
i) Ordinary Portland Cement 43 Grade IS:8112
ii) Portland Slag Cement IS:455
iii) Portland Pozzolana Cement IS:1489-Part I
If the subgrade soil contains soluble sulphates in a concentration more than 0.5 percent, sulphate resistant cement
conforming to IS:6909 shall be used.
Cement to be used may preferably be obtained in bulk form. It shall be stored in accordance with stipulations contained in
Clause 1014 and shall be subjected to acceptance test prior to its immediate use.
2.34.2.3 Fly-ash
Fly-ash upto 20 percent by weight of cementitious material (cement+flyash) may be used along with 43/53 grade cement
may be used to replace OPC cement grade 43 upto 30 percent by weight of cement. Fly-ash shall conform to IS:3812 (Part
1) and its use shall be permitted only after ensuring that facilities exist for uniform blending through a proper mechanical
facility with automated process control like batch mix plant conforming to IS:4925 and IS:4926.
2.34.2.4 Aggregates
2.34.2.4.1 Coarse Aggregates
Coarse aggregates shall comply with Clause 602.2.6.2, except that the maximum size of the coarse aggregate shall be
26.5 mm, and aggregate gradation shall comply with Table 600-1 of MoRT&H.
2.34.2.4.2 Fine Aggregates
The fine aggregate shall comply with Clause 602.2.6.3 of MoRT&H.
2.34.2.4.3 The material after blending shall conform to the grading as indicated in Table 600-1 of MoRT&H.
Table 67 : Aggregate Gradation for Dry Lean Concrete (Table 600-1 of MORT&H)
S iev e Designat ion Per cent age by Weight Passing t he S iev e
26.50 mm 100
19.0 mm 75-95
9.50 mm 50-70
4.75 mm 30-55
2.36 mm 17-42
600 micron 8-22
300 micron 7-17
150 micron 2-12
75 micron 0-10

86
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.34.3 Proportioning of Materials for the Mix


2.38.3.1 The mix shall be proportioned with a maximum aggregate cementitious material ratio of 15:1. The water
content shall be adjusted to the optimum as per Clause 601.3.2 for facilitating compaction by rolling. The strength and
density requirements of concrete shall be determined in accordance with Clauses 601.7 and 601.8 by making trial mixes.
Care should be taken to prevent one size of aggregate falling into the other size of the hopper of the feeding bin while loading
the individual size of aggregates into the bins.
2.34.3.2 Moisture Content
The optimum water content shall be determined and demonstrated by rolling during trial length construction and the
optimum moisture content and degree of compaction shall be got approved from Engineer. While laying in the main work,
the lean concrete shall have a moisture content between the optimum and optimum +2 percent, keeping in view the
effectiveness of compaction achieved and to compensate for evaporation losses.
2.34.3.3 Cement Content
The cement content in the dry lean concrete shall be such that the strength specified in Clause 601.3.4 is achieved. The
minimum cement content shall be 150 kg/cu.m of concrete. In case flyash is blended at site as part replacement of
cement, the quantity of flyash shall not be more than 20 percent by weight of cementitious material and the content of OPC
shall not be less than 120 kg/cu.m.
If this minimum is not sufficient to produce dry lean concrete of the specified strength, it shall be increased as necessary by
the Contractor at his own cost.
2.34.3.4 Concrete Strength
The average compressive strength of each consecutive group of 5 cubes made in accordance with Clause 903.5.1.1 shall not
be less than 10 MPa at 7 days. In addition, the minimum compressive strength of any individual cube shall not be less than
7.5 MPa at 7 days. The design mix complying with the above Clauses shall be got approved from the Engineer and
demonstrated in the trial length construction.
2.34.4 Sub-grade
The sub-grade shall conform to the grades and cross-sections shown on the drawings and shall be laid and compacted in
accordance with Clause 305. The subgrade strength shall correspond to the design strength specified in the Contract. As
far as possible, the construction traffic shall be avoided on the prepared sub-grade.
2.34.5 Drainage Layer
A drainage layer conforming to Clause 401 shall be laid above the subgrade before laying the Dry Lean Concrete sub-base,
as specified in the drawings and the Contract.
2.34.6 Construction
2.34.6.1 General
The Dry Lean Concrete shall be laid on the prepared granular drainage layer. The pace and programme of the Dry Lean
Concrete sub-base construction shall be matching suitably with the programme of construction of the cement concrete
pavement over it. The Dry Lean Concrete sub-base shall be overlaid with concrete pavement only after 7 days of sub-base
construction.
2.34.6.2 Batching and Mixing
The batching plant shall be capable of proportioning the materials by weight, each type of material being weighed
separately in accordance with Clauses 602.9.2, 602.9.3.1 and 602.9.3.2 of MoRT&H.
The design features of Batching Plant should be such that the plant can be shifted quickly.
2.34.6.3 Transporting
Plant mix lean concrete shall be discharged immediately from the mixer, transported directly to the point where it is to be
laid and protected from the weather by covering the tipping trucks with tarpaulin during transit. The concrete shall be
transported by tipping trucks, sufficient in number to ensure a continuous supply of material to feed the laying equipment
to work at a uniform speed and in an uninterrupted manner. The lead of the batching plant to paving site shall be such that
the travel time available from mixing to paving as specified in Clause 601.6.5.2 will be adhered to. Tipping truck shall not
have old concrete sticking to it. Each tipping truck shall be washed with water jet before next loading as and when required
after inspection.

87
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.34.6.4 Placing
Lean concrete shall be placed by a paver with electronic sensor on the drainage layer or as specified in the Contract. The
equipment shall be capable of laying the material in one layer in an even manner without segregation, so that after
compaction the total thickness is as specified. The paving machine shall have high amplitude tamping bars to give good
initial compaction to the sub-base. One day before placing of the dry lean cement concrete sub-base, the surface of the
granular sub-base/drainage layer shall be given a fine spray of water and rolled with a smooth wheeled roller.
Preferably the lean concrete shall be placed and compacted across the full width of the two lane carriageway, by
constructing it in one go. In roads with carriageway more than 2 lanes a longitudinal joint shall be provided. Transverse butt
type joint shall be provided at the end of the construction in a day. Transverse joints in the concrete pavement shall not be
coterminous with the transverse construction joint of the Dry Lean Concrete.
The Dry Lean Concrete shall be laid in such a way that it is atleast 750 mm wider on each side than the proposed width
including paved shoulders of the concrete pavement. The actual widening shall be decided based on the specifications of
the paver, such that the crawler moves on the Dry Lean Concrete, and the cost of extra width shall be borne by the
Contractor.
2.34.6.5 Compaction
2.34.6.5.1 The compaction shall be carried out immediately after the material is laid and levelled. In order to ensure
thorough compaction, rolling shall be continued on the full width till there is no further visible movement under the roller and
the surface is well closed. The minimum dry density obtained shall not be less than 98 percent of that achieved during the trial
length construction in accordance with Clause 601.7. The densities achieved at the edges i.e. 0.5 m from the edge shall not
be less than 96 percent of that achieved during the trial construction.
2.34.6.5.2 The spreading, compacting and finishing of the lean concrete shall be carried out as rapidly as possible and
the operation shall be so arranged as to ensure that the time between the mixing of the first batch of concrete in any transverse
section of the layer and the final finishing of the same shall not exceed 90 minutes when the temperature of concrete is
between 25°C and 30°C, and 120 minutes if less than 25°C. This period may be reviewed by the Engineer in the light of the
results of the trial run but in no case shall it exceed 120 minutes. Work shall not proceed when the temperature of the concrete
exceeds 30°C. If necessary, chilled water or addition of ice may be resorted to for bringing down the temperature. It is
desirable to stop concreting when the ambient temperature is above 35°C. After compaction has been completed, roller shall
not stand on the compacted surface for the duration of the curing period except during commencement of next day's work
near the location where work was terminated the previous day.
2.34.6.5.3 Double drum smooth-wheeled vibratory rollers of minimum 80 to 100 kN static weight are suitable for
rolling dry lean concrete. In case any other roller is proposed, the same shall be got approved from the Engineer, after
demonstrating its performance. The number of passes required to obtain maximum compaction depends on the thickness
of the dry lean concrete, the compatibility of the mix and the weight and type of the roller and the same as well as the tota l
requirement of rollers for the jobs shall be determined during trial run by measuring in-situ density and the scale of the
work to be undertaken.
Except on super elevated portions where rolling shall proceed from the inner edge to the outer, rolling shall begin from the
edges gradually progressing towards the centre. First, the edge/edges shall be compacted with a roller running forward
and backward. The roller shall then move inward parallel to the centreline of the road, in successive passes uniformly
lapping preceding tracks by at least one half width.
2.34.6.5.4 A preliminary pass without vibration to bed the Dry Lean Concrete down shall be given followed by the
required number of passes to achieve the desired density and, a final pass without vibration to remove roller with vibration
marks and to smoothen the surface.
Special care and attention shall be exercised during compaction near joints, kerbs, channels, side forms and around
gullies and manholes. In case adequate compaction is not achieved by the roller at these locations, use of plate vibrators
shall be made, if so directed by the Engineer.
2.34.6.5.5 The final lean concrete surface on completion of compaction shall be well closed, free from movement
under roller and free from ridges, low spots, cracks, loose material, pot holes, ruts or other defects. The final surface shall
be inspected immediately on completion and all loose, segregated or defective areas shall be corrected by using fresh lean
concrete material, laid and compacted. For repairing honeycombed/hungry surface, concrete with aggregates of size 10
mm and below shall be spread and compacted as per Specifications. It is necessary to check the level of the rolled surface
for compliance. Any level/thickness deficiency shall be corrected after applying concrete with aggregates of size 10 mm
and below after roughening the surface. Surface regularity also shall be checked with 3 m straight edge. Strength tests
shall be carried out, and if deficiency in strength is noticed, at least three (evenly spread) cores of minimum 100 mm dia

88
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

per km shall be cut to check deficiency in strength. The holes resulting from cores shall be restored by filling with concrete
of the specified strength and compacted by adequate rodding.
2.34.6.5.6 Segregation of concrete in the tipping trucks shall be controlled by moving the dumper back and forth
while discharging the mix into the same or by any appropriate means. Paving operation shall be such that the mix does not
segregate.

2.34.6.6 Joints
Construction and longitudinal joints shall be provided as per the drawings.
Transverse butt type joint shall be provided at the end of the construction in a day. Longitudinal construction joint shall be
provided only when full width paving is not possible. Transverse joints in Dry Lean concrete shall be staggered from the
construction butt type joint in Concrete pavement by 800-1000 mm.
Longitudinal joint in Dry Lean Concrete shall be staggered by 300-400 mm from the longitudinal joint of concrete
pavement.
At longitudinal or transverse construction joints, unless vertical forms are used, the edge of compacted material shall be cut
back to a vertical plane where the correct thickness of the properly compacted material has been obtained.

2.34.6.7 Curing
As soon as the lean concrete surface is compacted, curing shall commence. One of the following methods shall be
adopted:

a) Curing may be done by covering the surface by gunny bags/hessian, which shall be kept wet
continuously for 7 days by sprinkling water.
b) The curing shall be done by spraying with approved resin based aluminized reflective curing compound
conforming to ASTM-C 309-81 in accordance with Clause 602.9.12. As soon as the curing compound
has lost its tackiness, the surface shall be covered with wet hessian for three days. The rate of application
shall be as recommended by the supplier.
c) Wax-based white pigmented curing compound with water retention index of not less than 90 percent shall be
used to cure the dry lean concrete. The curing compound shall conform to BS: 7542. The compound shall
be applied uniformly with a mechanical sprayer and with a hood to protect the spray from the wind. The
curing compound shall be applied over the entire exposed surface of the Dry Lean Concrete, including
sides and edges, at the rate of 0.2 litres/sq.m, or as recommended by the supplier.
The first application, referred to as curing application shall be applied immediately after the final rolling of Dry Lean
Concrete is completed. As soon as the curing compound loses tackiness, the surface shall be covered with wet hessian for
three days. The second application of curing compound also referred to as the debonding application, shall be applied 24 to 48
hours prior to the placement of the concrete pavement. Any damaged Dry Lean Concrete shall be corrected prior to the second
application. Normally, the manufacturer's instructions shall be followed for its application.

2.34.7 Trial Mixes


The Contractor shall make trial mixes of dry lean concrete with moisture contents like 5.0, 5.5, 6.0, 6.5 and 7.0 percent
using specified cement content, specified aggregate grading and aggregate-cement ratio specified in Clause 601.3.1.
Optimum moisture and density shall be established by preparing cubes with varying moisture contents. Compaction of the
mix shall be done in three layers with vibratory hammer fitted with a square or rectangular foot as described in Clause
903.5.1.1. After establishing the optimum moisture, a set of six cubes shall be cast at optimum moisture for the
determination of compressive strength on the third and the seventh day. Trial mixes shall be repeated if the strength is not
satisfactory by increasing cement content. After the mix design is approved, the Contractor shall construct a trial section in
accordance with Clause 601.8.
If during the construction of the trial length, the optimum moisture content determined as above is found to be
unsatisfactory, the Contractor may make suitable changes in the moisture content to achieve the satisfactory mix. The cube
specimens prepared with the changed mix content should satisfy the strength requirement. Before production of the mix,
natural moisture content of the aggregate should be determined on a day-to-day basis so that the moisture content could
be adjusted. The mix finally designed should neither stick to the rollers nor become too dry resulting in ravelling of surface.

89
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.34.8 Trial Length


2.34.8.1 The trial length shall be constructed at least 14 days in advance of the proposed date of commencement of
work. At least 30 days prior to the construction of the trial length, the Contractor shall submit for the Engineer's approval a
"Method Statement" giving detailed description of the proposed materials, plant, equipment, mix proportions, and
procedure for batching, mixing, laying, compaction and other construction procedures. The Engineer shall also approve the
location and length of trial construction which shall be a minimum of 100 m length laid in two days and for full width of the
pavement. The trial length shall be outside the main works. The trial length shall contain the construction of at least one
transverse construction joint involving hardened concrete and freshly laid Dry Lean Concrete sub-base. The construction of
trial length shall be repeated till the Contractor proves his ability to satisfactorily construct the Dry Lean Concrete sub-
base.
2.34.8.2 After the construction of the trial length, the in-situ density of the freshly laid material shall be determined by
sand replacement method. Three density holes shall be made at locations equally spaced along a diagonal that bisects the
trial length and average of these densities shall be determined. The density holes shall not be made in the strip 500 mm from
the edges. The average density obtained from the three samples collected shall be the reference density and is considered as
100 percent. The field density of regular work will be compared with this reference density in accordance with Clauses
601.6.5.1 and 903.5, 1.2.
2.34.8.3 The hardened concrete shall be cut over 3 m width and reversed to inspect the bottom surface for any
segregation taking place. The trial length shall be constructed after making necessary changes in the gradation of the mix to
eliminate segregation of the mix. The lower surface shall not have honey-combing and the aggregates shall not be held
loosely at the edges.
2.34.8.4 The main work shall not start until the trial length has been approved by the Engineer. After approval has been
given, the materials, mix proportions, moisture content, mixing, laying, compaction plant and construction procedures shall
not be changed without the approval of the Engineer.

2.34.9 Traffic
No heavy commercial vehicles like trucks and buses shall be permitted on the dry lean concrete sub-base. Construction
vehicles at slow speed may be permitted after 7 days of its construction with the prior approval of the Engineer.

2.35 CEMENT CONCRETE PAVEMENT (cl. 602 of MORT&H)


2.35.1 Scope
2.35.1.1 The work shall consist of construction of un-reinforced, dowel jointed, plain cement concrete pavement in
accordance with the requirements of these Specifications and in conformity with the lines, grades and cross sections shown
on the drawings. The work shall include furnishing of all plant and equipment, materials and labour and performing all
operations in connection with the work, as approved by the Engineer.
2.35.1.2 The design parameters, viz., thickness of pavement slab, grade of concrete, joint details etc. shall be as
stipulated in the drawings.
2.35.2 Materials
2.35.2.1 Cement
Any of the following types of cement capable of achieving the design strength may be used with prior approval of the
Engineer, but preference shall be to use at least the 43 grade or higher.
S .No. Ty pe Confor ming t o
i) Ordinary Portland Cement 43 Grade 1S:8112
ii) Ordinary Portland Cement 53 Grade 1S:12269
iii) Portlant slag cement IS:455
iv) Portland Pozzolana Cement IS:1489-Part I
If the soil around concrete pavement has soluble salts like sulphates in excess of 0.5 percent, the cement used shall be
sulphate resistant and shall conform to IS: 12330.
Cement to be used may preferably be obtained in bulk form. If cement in paper bags is proposed to be used, there shall be
bag-splitters with the facility to separate pieces of paper bags and dispose them off suitably. No paper pieces shall enter
the concrete mix. Bulk cement shall be stored in accordance with Clause 1014. The cement shall be subjected to
acceptance test.

90
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

Fly-ash upto 20 percent by weight of cementitious material may be used in Ordinary Portland

Cement 43 and 53 Grade as part replacement of cement provided uniform blending with cement is ensured. The fly ash
shall conform to IS:3812 (Part I).

Site mixing of fly ash shall be permitted only after ensuring availability of the equipments at site for uniform blending
through a specific mechanised facility with automated process control like batch mix plants conforming to IS:4925 and
IS:4926. Site mixing will not be allowed otherwise.

The Portland Pozzolana Cement produced in factory as per IS:1489-Part I shall not have fly-ash content more than 20
percent by weight of cementitious material. Certificate from the manufacturer to this effect shall be produced before use.

2.35.2.2 Chemical Admixtures

Admixtures conforming to IS:9103 and IS:6925 shall be permitted to improve workability of the concrete and/or extension
of setting time, on satisfactory evidence that they will not have any adverse effect on the properties of concrete with respect
to strength, volume change, durability and have no deleterious effect on steel bars. The particulars of the admixture and
the quantity to be used, must be furnished to the Engineer in advance to obtain his approval before use. Satisfactory
performance of the admixtures should be proved both on the laboratory concrete trial mixes and in the trial length paving, (f
air entraining admixture is used, the total quantity of air shall be 5±1.5 percent for 31.5 mm maximum nominal size
aggregate (in air-entrained concrete as a percentage of the volume of the mix).

2.35.2.3 Silica Fumes

Silica fume conforming to a standard approved by the Engineer may be used as an admixture in the proportion of 3 to 10
percent of cement. Silica fume shall comply with the requirements given in IS:15388-2003, IS:456-2000, IRC:SP:76 and
!RC:44-2008.

2.35.2.4 Fibres

Fibres may be used subject to the provision in the design/approval by the Engineer to reduce the shrinkage cracking and post-
cracking. The fibres may be steel fibre as per IRC:SP:46 or polymeric Synthetic fibres within the following range of
specifications:
Effective Diameter 10 micron - 100 micron
Length 6-48 mm
Specific gravity more than 1.0
Suggested dosage 0.6-2.0 kg/cu.m (0.2 - 0.6% by weight of cement in mix)
Usage will be regulated as stipulated in IRC:44/IS:456
Water absorption less than 0.45 percent
Melting point of this fibre shall not be less than 160°C.
The aspect ratio generally varies from 200 to 2000.
These synthetic fibres will have good alkali and UV light resistance.

When fibres are used, the mix shall be so designed that the slump of concrete at paving site is 25±15 mm.

2.35.2.5 Aggregates

2.35.2.5.1 Aggregates for pavement concrete shall be natural material complying with

IS:383 but with a Los Angeles Abrasion Test value not exceeding 35 percent. The limits of deleterious materials shall not
exceed the requirements set out in Table 600-2 of MoRT&H.

91
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

Table 68 : Permissible Limits of Deleterious Substances in Fine and Coarse Aggregates (Table 600-2 of MORT&H)
F ine Aggregate Per cent age by Coarse Aggregate Percentage by
S. Weight , (Max ) Weight (Max )
Delet er ious S ubst ance Method of Test
No.
Uncr ushed Cr ushed* Uncr ushed Cr ushed*
(1) (2) (3) (4) (5) (6) (7)
i) Coal and lignite IS:2386 (Part 11)- 1.0 1.0 1.0 1.0
1963
ii) Clay lumps do 1.0 1.0 1.0 1.0
iii) Materials finer than 75 u IS Sieve IS:2386 (Part l)- 3.0 8.0 3.0 3.0
1963
iv) Soft fragments IS:2386 (Part ll)- — — 3.0 -
1963
v) Shale IS:2386 (Part ll)- 1.0 — — —
1963
vi) Total of percentages of all deleterious 5.0 2.0 5.0 5.0
materials (except mica) including SI No.
(i) to (v) for col 4, 6 and 7 and SI No. (i)
and (ii) for col 5 only

* Crushed aggregate at least one face fractured


Not e: The presence of mica in the fine aggregate has been found to reduce considerably the durability and compressive strength
of concrete and further investigations are underway to determine the extent of the deleterious effect of mica. It is advisable,
therefore, to investigate the mica content of fine aggregate and make suitable allowances for the possible reduction in the
strength of concrete or mortar; in cases where the stretch of the project road passes through micacious belt.

The aggregates shall be free from chert, flint, chalcedony or other silica in a form that can react with the alkalies in the
cement. In addition, the total chlorides content expressed as chloride ion content shall not exceed 0.06 percent by weight
and the total sulphate content expressed as sulphuric anhydride (S03) shall not exceed 0.25 percent by weight. In case the
Engineer considers that the aggregates are not free from dirt, the same may be washed and drained for atleast 72 hours
before batching, as directed by the Engineer.

2.35.2.5.2 Coarse Aggregates


Coarse aggregates shall consist of clean, hard, strong, dense, non-porous and durable pieces of crushed stone or crushed gravel
and shall be devoid of pieces of disintegrated stone, soft, flaky, elongated, very angular or splintery pieces. The maximum
size of coarse aggregate shall not exceed 31.5 mm for pavement concrete. No aggregate which has water absorption more
than 2 percent shall be used in the concrete mix. The aggregates shall be tested for soundness in accordance with IS:2386
(Part-5). After 5 cycles of testing, the loss shall not be more than 12 percent if sodium sulphate solution is used or 18
percent if magnesium sulphate solution is used. The Los Angeles Abrasion value shall not exceed 35. The combined flakiness
and elongation index of aggregate shall not be more than 35 percent.

2.35.2.5.3 Fine Aggregates


The fine aggregates shall consist of clean natural sand or crushed stone sand or a combination of the two and shall conform to
IS:383. Fine aggregate shall be free from soft particles, clay, shale, loam, cemented particles, mica and organic and other
foreign matter. The fine aggregates shall have a sand equivalent value of not less than 50 when tested in accordance with the
requirement of IS:2720 (Part 37).

2.35.2.5.4 Combined Gradation of Fine and Coarse Aggregates


The combined gradation of fine and coarse aggregates shall be as per Table 600-3 of MoRT&H.

2.39.2.6 Steel for Dowels and Tie Bars


Steel shall conform to the requirements of IS:432 and IS:1786 as relevant. The dowel bars shall conform to !S:432 of Grade
I. Tie bars shall be either High yield Strength Deformed bars conforming to IS: 1786 and grade of Fe 500 or plain bars
conforming to IS:432 of Grade I. The steel shall be coated with epoxy paint for protection against corrosion.

92
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.35.2.7 Joint Filler Board


Synthetic Joint filler board for expansion joints shall be used only at abutting structures like bridges and shall be of 20-25
mm thickness within a tolerance of ± 1.5 mm and of a firm compressible material and complying with the requirements of IS:
1838, with a compressibility more than 25 percent. It shall be 25 mm less in depth than the thickness of the slab within a
tolerance of ± 3 mm and provided to the full width between the side forms. It shall be in suitable lengths which shall not be
less than one lane width. If two pieces are joined to make up full width, the joint shall be taped such that no slurry escapes
through the joint. Holes to accommodate dowel bars shall be accurately bored or punched out to give a sliding fit on the dowel
bars.

2.35.2.8 Joint Sealing Compound


The joint sealing compound shall be of hot poured, elastomeric type or cold polysulphide/ polyurethene/silicone type having
flexibility, resistance to age hardening and durability as per IRC:57. Manufacturer's certificate shall be produced by the
Contractor for establishing that the sealant is not more than six months old and stating that the sealant complies with the
relevant standard mentioned below. The samples shall meet the requirements as mentioned in IRC:57.
If sealant is of hot poured type, it shall conform to Hot applied sealant: IS:1834 or ASTM : 3406-95, as applicable Cold
poured sealants shall be one of the following :
i) polysulphide IS:11433 (Part I), BS:5212 (Part II)
ii) polyurethene BS:5212
iii) silicone ASTM 5893-04

2.35.2.9 Preformed Seals


The pre-formed joint sealing material shall be a vulcanized elastomeric compound using polychloroprene (Neoprene) as
the base polymer.
The joint seal shall conform to requirements of ASTM D 2628 as given in Table 600-4 of MoRT&H.

Table 69: Requirement of Preformed Seals as per ASTM D 2628(Table 600-4 of MORT&H)
S . No. Descr ipt ion Requir ement s AS TM Test Met hods
1) Tensile strength, min 13.8 MPa D412
2) Elongation at break Min. 250% D412
3) Hardness, Type A durometer 55 +/-5 points D2240
4) Oven aging, 70 h at 100°C Tensile strength loss 20% max D573
5) Elongation loss 20% max
6) Hardness Change Type A durometer 0 t o+ 1 0 points D471
7) Oil Swell, ASTM Oil 3, 70 h at 100°C Weight Change 45% max D 1149
8) Ozone resistance 20 percent strain, 300 pphm in air, 70h at 40°C No cracks D2240
Low temperature stiffening, 7 days at -10°C Hardness Change type
9) 0 to +15 points
A durometer
10) Low temperature recovery, 22h at -10°C, 50% deflection 88% min D2628
11) Low temperature recovery, 22h at -29°C, 50% deflection 83% min D2628
12) Low temperature recovery, 70h at -100°C, 50% deflection 85% min D2628
13) Compression, deflection, at 80% of normal width (min) 613 N/m D2628

2.35.3 Proportioning of Concrete

2.35.3.1 After approval by the Engineer of all the materials to be used in the concrete, the Contractor shall submit the
mix design based on weighed proportions of all ingredients for the approval of the Engineer vide Clause 602.3.4. The mix
design shall be submitted at least 30 days prior to the paving of trial length and the design shall be based on laboratory trial
mixes using the approved materials and methods as per IRC:44 or IS: 10262. The target mean strength for the design mix shall
be determined as indicated in Clause 602.3.3.1. The mix design shall be based on the flexural strength of concrete.

93
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.35.3.2 Cement Content


When Ordinary Portland Cement (OPC) is used the quantity of cement shall not be less than 360 kg/cu.m. In case fly ash grade
I (as per IS:3812) is blended at site as part replacement of cement, the quantity of fly ash shall be upto 20 percent by weight
of cementitious material and the quantity of OPC in such a blend shall not be less than 310 kg/cu.m. The minimum of OPC
content, in case ground granulated blast furnace slag cement blended, shall also not be less than 310 kg/m3. If this minimum
cement content is not sufficient to produce concrete of the specified strength, it shall be increased as necessary by the
contractor at his own cost.

2.35.3.3 Concrete Strength


2.35.3.3.1 The characteristic flexural strength of concrete shall not be less than 4.5 MPa unless specified otherwise. Target
mean flexural strength for mix design shall be more than 4.5 MPa + 1.65s, where s is standard deviation of flexural strength
derived by conducting test on minimum 30 beams. While designing the mix in the laboratory, correlation between flexural
and compressive strengths of concrete shall be established on the basis of at least thirty tests on specimens. However,
quality control in the field shall be exercised on the basis of flexural strength. It may, however, be ensured that the materials
and mix proportions remain substantially unaltered during the daily concrete production. The water content shall be the
minimum required to provide the agreed workability for full compaction of the concrete to the required density as determined
by the trial mixes or as approved by the Engineer and the maximum free water cement ratio shall be 0.45 when only OPC is
used and 0.50 when blended cement (Portland Pozzolana Cement or Portland Slag Cement or OPC blended with fly ash or
Ground Granulated Blast Furnace Slag, at site) is used.
2.35.3.3.2 The ratio between the 7 and 28 day strength shall be established for the mix to be used in the slab in advance,
by testing pairs of beams and cubes at each stage on at least six batches of trial mix. The average strength of the 7 day cured
specimens shall be divided by the average strength of the 28 day specimens for each batch, and the ratio "R' shall be
determined. The ratio 'R' shall be expressed to three decimal places.
If during the construction of the trial length or during some normal working, the average value of any four consecutive 7 day
test results falls below the required 7 day strength as derived from the value of 'R' then the cement content of the concrete
shall, without extra payment, be increased by 5 percent by weight or by an amount agreed by the Engineer. The increased
cement content shall be maintained at least until the four corresponding 28 day strengths have been assessed for in
conformity with the requirements as per Clause 602.3,3.1. Whenever the cement content is increased, the concrete mix
shall be adjusted to maintain the required workability.

2.35.3.4 Workability
2.35.3.4.1 The workability of the concrete at the point of placing shall be adequate for the concrete to be fully
compacted and finished without undue flow. The optimum workability for the mix to suit the paving plant being used shall
be determined by the Contractor and approved by the Engineer. The control of workability in the field shall be exercised by
the slump test as per IS: 1199.
The workability requirement at the batching and mixing plant and paving site shall be established by slump tests carried
during trial paving. These requirements shall be established from season to season and also when the lead from batching
and mixing plant site to the paving site changes. The workability shall be established for the type of paving equipment
available. A slump value in the range of 25 ± 15 mm is reasonable for paving works but this may be modified depending
upon the site requirement and got approved by the Engineer. These tests shall be carried out on every tipping
truck/dumper at batching and mixing plant site and paving site initially when the work commences but subsequently the
frequency can be reduced to alternate tipping trucks or as per the instructions of the Engineer.
2.35.3.5 Design Mix
2.35.3.5.1 The Contractor shall carry out laboratory trials of design mix with the materials from the approved sources to
be used as per IRC:44. Trial mixes shall be made in presence of the Engineer or his representative and the design mix shall
be subject to the approval of the Engineer. They shall be repeated, if necessary, until the proportions, that will produce a
concrete which complies in all respects with these Specifications, and conform to the requirements of the
design/drawings.
2.35.3.5.2 The proportions determined as a result of the laboratory trial mixes may be adjusted, if necessary, during the
construction of the trial length. Thereafter, neither the materials nor the mix proportions shall be varied in any way except
with the written approval of the Engineer.

94
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.35.3.5.3 Any change in the source of materials or mix proportions proposed by the Contractor during the course of
work shall be assessed by making laboratory trial mixes and the construction of a further trial length of length not less than
50 m unless approval is given by the Engineer for minor adjustments like compensation for moisture content in aggregates
or minor fluctuations in the grading of aggregate.

2.35.4 Sub-base
The cement concrete pavement shall be laid over the sub-base constructed in accordance with the relevant drawings and
Specifications. It shall be ensured that the sub-base is not damaged before laying the concrete pavement. If the dry lean
concrete sub-base is found damaged at some places or it has cracks wider than 10 mm, it shall be repaired with fine
cement concrete (aggregate size 10 mm and down) or bituminous concrete before laying separation membrane layer.

2.35.5 Separation Membrane


A separation membrane shall be used between the concrete slab and the sub-base. Separation membrane shall be
impermeable PVC sheet 125 micron thick transparent or white in colour laid flat with minimum creases. Before placing the
separation membrane, the sub-base shall be swept clean of all the extraneous materials using air compressor. Wherever
overlap of plastic sheets is necessary, the same shall be at least 300 mm and any damaged sheathing shall be replaced at
the Contractor's cost. The separation membrane may be nailed to the lower layer with concrete nails. The separation
membrane shall be omitted when two layers of wax-based curing compound is used.

2.35.6 Joints

2.35.6.1 Transverse Joints

2.35.6.1.1 Transverse joints shall be contraction, construction and expansion joints constructed at the spacing
described in the drawings. Transverse joints shall be straight within the following tolerances along the intended line of
joints.

i) Deviations of the performed filler board (IS: 1838) in the case of expansion joints from the intende d line of
the joint shall not be greater than ±10 mm.
ii) The best fit straight line through the joint grooves as constructed shall be not more than 25 mm from the
intended line of the joint.
iii) Deviations of the joint groove from the best fit straight line of the joint shall not be greater than 10 mm.
iv) Transverse joints on each side of the longitudinal joint shall be in line with each other and of the same type
and width. Transverse joints shall have a sealing groove which shall be sealed in compliance with Clause
602.10 of MoRT&H.

2.35.6.1.2 Contraction Joints


The contraction joints shall be placed transversely at pre-specified locations as per drawings/ design using dowel bars.
These joints shall be cut as soon as the concrete has undergone initial hardening and is hard enough to take the load of
joint sawing machine without causing damage to the slab.
Contraction joints shall consist of a mechanical sawn joint groove, 3 to 5 mm wide and one -fourth to one-third depth of the
slab ± 5 mm or as stipulated in the drawings and dowel bars complying with Clause 602.6.5 of MoRT&H.
Contraction joint shall be widened subsequently to accommodate the sealant as per Clause 602.10, to dimensions shown
on drawings or as per IRC: 57.

2.35.6.1.3 Expansion Joints


The expansion joint shall consist of a joint filler board complying with Clause 602.2.9 and dowel bars complying with
Clause 602.6.5 and as detailed in the drawings. The filler board shall be positioned vertically with the prefabricated joint
assemblies along the line of the joint within the tolerances given in Clause 602.6.2.1. The adjacent slabs shall be completely
separated from each other by the joint filler board.

95
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.35.6.2 Transverse Construction Joint


Transverse construction joint shall be placed whenever concreting is completed after a day's work or is suspended for more
than 30 minutes. These joints shall be provided at location of contraction joints using dowel bars. If sufficient concrete has
not been mixed to form a slab extending upto a contraction joint, and if an interruption occurs, the concrete placed shall be
removed upto the last preceding joint and disposed of. At all construction joints, steel bulk heads shall be used to retain the
concrete. The surface of the concrete laid subsequently shall conform to the grade and cross sections of the previously laid
pavement. When positioning of bulk head/stop-end is not possible, concreting to an additional 1 or 2 m length may be carried
out to enable the movement of joint cutting machine so that joint grooves may be cut and the extra 1 or 2 m length is cut out
and removed subsequently after concrete has hardened.
After minimum 14 days of curing, in case OPC cement is used and 16 days of curing when flyash or blended cement is used,
the construction joint shall be widened to accommodate the sealant as per Clause 602.10 to dimensions shown on
drawing or as per IRC.57.
2.35.6.3 Longitudinal Joint
2.35.6.3.1 Tie Bars
Tie bars shall be provided at the longitudinal joints as per dimensions and spacing shown in the drawing and in accordance
with Clause 602.6.6. The direction of the tie bars at curves shall be radial in the direction of the radius.
2.35.6.4 Dowel Bars
2.35.6.4.1 Dowel bars shall be mild steel rounds in accordance with Clause 602.2.8 with details/dimensions as
indicated in the drawings and free from oil, dirt, loose rust or scale. They shall be straight, free of irregularities and burring
restricting slippage in the concrete. The sliding ends shall be sawn or cropped cleanly with no protrusions outside the
normal diameter of the bar. Any protrusions shall be removed by grinding the ends of the dowel bars. The dowel bar shall be
supported on cradles/dowel chairs in pre-fabricated joint assemblies positioned prior to the construction of the slabs or
mechanically inserted with vibration into the plastic concrete by a method which ensures correct placement of the bars
besides full re-compaction of the concrete around the dowel bars.
2.35.6.4.2 Unless shown otherwise on the drawings, dowel bars shall be positioned at mid depth of the slab within a
tolerance of ±20 mm, and centered equally about intended lines of the joint within a tolerance of ±25 mm. They shall be aligned
parallel to the finished surface of the slab and to the centre line of the carriageway and to each other within tolerances given
here-in-under, the compliance of which shall be checked as per Clause 602.11.7 of MoRT&H.
i) For bars supported on cradles prior to the laying of the slab:
a) All bars in a joint shall be within ±2 mm per 300 mm length of bar
b) 2/3rd of the number of bars shall be within ±3 mm per 500 mm length of bar
c) No bar shall differ in alignment from an adjoining bar by more than 3 mm per 300 mm length of bar
in either the horizontal or vertical plane
d) Cradles supporting dowel bar shall not extend across the line of joint i.e. no steel bar of the cradle
assembly shall be continuous across the joint.
ii) For all bars inserted after laying of the slab except those inserted by a Dowel Bar Inserter the tolerance
for alignment may be twice as indicated in (i) above.
iii) The transverse joints at curves shall be radial in the direction of the radius.
2.35.6.4.3 Dowel bars, supported on cradles in assemblies, when subject to a load of 110 N applied at either end and
in either the vertical or horizontal direction (upwards and downwards and in both directions horizontally) shall conform to be
within the limits given in Clause 602.6.5.2 of MoRT&H.
2.35.6.4.4 The assembly of dowel bars and supporting cradles, including the joint filler board in the case of expansion
joints, shall have the following degree of rigidity when fixed in position:-
i) For expansion joints, the deflection of the top edge of the filler board shall be not greater than 13
mm, when a load of 1.3 kN is applied perpendicular to the vertical face of the joint filler board and
distributed over a length of 600 mm by means of a bar or timber packing, at mid depth and midway
between individual fixings, or 300 mm from either end of any length of filler board, if a continuous
fixing is used. The residual deflection after load shall be not more than 3 mm.
ii) The fixings for joint assembly shall not fail under 1.3 kN load and shall fail before the load reaches
2.6 kN when applied over a length of 600 mm by means of a bar or timber packing placed as near to
the level of the line of fixings as practicable.

96
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

iii) Fixings shall be deemed to fail when there is displacement of the assemblies by more than 3 mm
with any form of fixing, under the test load. The displacement shall be measured at the nearest part
of the assembly to the centre of the bar or timber packing.
2.35.6.4.5 Dowel bars in the contraction joints, construction joints and expansion joints shall be covered by a thin
plastic sheath. The thickness of the sheath shall not exceed 0.5 mm and shall be tightly fitted on the bar for at least two-
thirds of the length from one end for dowel bars in contraction/construction joints and half the length plus 50 mm for
expansion joints. The sheathed bar shall comply with the following pull-out tests:
Four bars shall be taken at random from stock and without any special preparation shall be covered by sheaths as required
in this Clause, The ends of the dowel bars which have been sheathed shall be cast centrally into concrete specimens 1 50
mm x 150 mm x 600 mm, made of the same mix proportions to be used in the pavement, but with a maximum nominal
aggregate size of 20 mm and cured in accordance with IS:516. At 7 days a tensile load shall be applied to achieve a
movement of the bar of at least 0.25 mm. The average bond stress to achieve this movement shall not be greater than
0.14 MPa.
2.35.6.4.6 For expansion joints, a closely fitting cap 100 mm long consisting of waterproofed cardboard or an
approved synthetic material like PVC or Gl pipe shall be placed over the sheathed end of each dowel bar. An expansion
space (about 25 mm) at least equal in length to the thickness of the joint filler board shall be formed between the end of
the cap and the end of the dowel bar by using compressible sponge. To block the entry of cement slurry into the annular
space between the sheathing and dowel bar shall be taped around its mouth,
2.35.6.5 Tie Bars
2.35.6.5.1 Tie bars in longitudinal joints shall be deformed steel bars of strength 500 MPa complying with IS: 1786
and in accordance with the requirements given in this Clause. The bars shall be free from oil, dirt, loose rust and scale.
2.35.6.5.2 Tie bars projecting across the longitudinal joint shall be protected from corrosion for 75 mm on each side
of the joint by a protective coating of bituminous paint with the approval of the Engineer. The coating shall be dry when the
tie bars are used. In the case of coastal region and high rainfall areas, tie bars shall be epoxy coated in their full length as
per IS: 13620.
2.35.6.5.3 Tie bars in longitudinal joints shall be made up into rigid assemblies with adequate supports and fixings
to remain firmly in position during the construction of the slab. Alternatively, tie bars at longitudinal joints may be
mechanically or manually inserted into the plastic concrete from above by vibration using a method which ensures correct
placements of the bars and recompaction of the concrete around the tie bars.
2.35.6.5.4 Tie bars shall be positioned to remain in the middle from the top or within the upper middle third of the
slab depth as indicated in the drawings and approximately parallel to the surface and approximately perpendicular to the
line of the joint, with the centre of each bar on the intended line of the joints within a tolerance of ±50 mm, and with a
minimum cover of 30 mm below the joint groove. Spacing of tie bars on curves of radius less than 360 m shall not be less
than 350 mm.
2.35.6.5.5 To check the position of the tie bars, one metre length, 0.5 m on either side of the longitudinal joint shall
be opened when the concrete is green (within 20 to 30 minutes). The pit shall be refilled with the fresh concrete of same
mix after checking.
2.35.6.5.6 Concreting during Monsoon Months
Concreting should be avoided during rainy season. However, when concrete is being placed during monsoon months and
when it may be expected to rain, sufficient supply of tarpaulin or other waterproof cloth shall be provided along the line of
the work. Any time when it rains, ail freshly laid concrete which had not been covered for curing purposes shall be
adequately protected. Any concrete damaged by rain shall be removed and replaced. If the damage is limited to texture, it
shall be retextured in accordance with the directions of the Engineer.
2.35.7 Construction
2.35.7.1 General
A systems approach may be adopted for construction of the pavement, and the Method Statement for carrying out the work,
detailing all the activities, indication of time-cycle, equipment, personnel etc., shall be got approved from the Engineer before
the commencement of the work. This shall include the type, capacity and make of the batching and mixing plant besides the
hauling arrangement and paving equipment. The capacity of paving equipment, batching plant as well as all the ancillary
equipment shall be adequate for a paving rate of atleast 500 m in one day. The paving speed of slip-form paver shall not be
less than 1.0 m per minute. The concreting should proceed continuously without stops and starts.

97
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.35.7.2 Batching and Mixing


Batching and mixing of the concrete shall be done at a central batching and mixing plant with automatic controls, located
at a suitable place which takes into account sufficient space for stockpiling of cement, aggregates and stationary water
tanks. This shall be located at an approved distance, duly considering the properties of the mix and the transporting
arrangements available with the Contractor.
2.35.7.2.1 Batching Plant and Equipment:
1) General: The batching plant shall include minimum four bins, weighing hoppers, and scales for the fine
aggregates and for each size of coarse aggregate. If cement is used in bulk, a separate scale for cement
shall be included. There shall be a separate bin for flyash, if this additive is specified. The weighing
hoppers shall be properly sealed and vented to preclude dust during operation. Approved safety devices
shall be provided and maintained for the protection of all personnel engaged in plant operation,
inspection and testing. The batch plant shall be equipped with a suitable non-resettable batch counter
which will correctly indicate the number of batches proportioned. A continuous type of mixing plant can
also be used provided the ingredients are weighed through electronic sensors before feeding.
2) Automatic weighing devices : Batching plant shall be equipped to proportion aggregates and bulk cement
by means of automatic weighing devices using load cells. The weighing devices shall have an accuracy
within ±1 % in respect of quantity of cement, admixtures and water and ±2% in respect of aggregates and
the accuracy shall be checked at least once a month.
3) Mixer : Mixers shall be pan type, reversible type or any other mixer capable of combining the aggregates,
cement, and water into a thoroughly mixed and uniform mass within the specified mixing period, and of
discharging the mix, without segregation. Each stationary mixer shall be equipped with an approved timing
device which will automatically lock the discharge lever when the drum has been charged and release it at
the end of the mixing period. The device shall be equipped with a bell or other suitable warning device
adjusted to give a clearly audible signal each time the lock is released. In case of failure of the timing
device, the mixer may be used for the balance of the day while it is being repaired, provided that each batch is
mixed in 90 seconds or as per the manufacturer's recommendation. The mixer shall be equipped with a
suitable non-resettable batch counter which shall correctly indicate the number of batches mixed.
The mixer shall be cleaned at suitable intervals. The pick-up and throw-over blades in the drum or
drums shall be repaired or replaced when they are worn down 20 mm or more. The Contractor shall (1)
have available at the job site a copy of the manufacturer's design, showing dimensions and
arrangements of blades in reference to original height and depth, or (2) provide permanent marks on
blade to show points of 20 mm wear from new conditions. Drilled holes of 5 mm diameter near each
end and at midpoint of each blade are recommended. Batching Plant shall be calibrated in the
beginning and thereafter at suitable interval not exceeding 1 month.
4) Control cabin : An air-conditioned centralized computer control cabin shall be provided for automatic
operation of the equipment.
The design features of the batching plant should be such that it can be shifted quickly.

2.35.7.2.2 Paving Equipment


The concrete shall be placed with an approved fixed form or slip form paver with independent units designed to (i) spread,
(ii) consolidate, screed and float-finish, (iii) texture and cure the freshly placed concrete in one complete pass of the
machine in such a manner that a minimum of hand finishing will be necessary and so as to provide a dense and
homogeneous pavement in conformity with the plans and Specifications. The paver shall be equipped with electronic
sensor controls to control the line and grade from either one side or both sides of the machine.
Vibrators shall operate at a frequency of 8000-10000 impulses per minute under load at a maximum spacing of 600 mm.
The variable vibration setting shall be provided in the machine.
2.35.7.3 Hauling and Placing of Concrete
2.35.7.3.1 Placing of Concrete
The total time taken from the addition of the water to the mix, until the completion of the surface finishing and texturing
shall not exceed 120 minutes when concrete temperature is less than 25°C and 90 minutes when the concrete
temperature is between 25°C and 30°C. When the time between mixing and laying exceed these values, the concrete shall
be rejected and removed from the site. Tipping trucks delivering concrete shall normally not run on plastic sheathing nor shall
they run on completed slabs until after 28 days of placing the concrete.
98
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

The placing of concrete in front of the PQC paver should preferably be from the side placer to avoid damage to DLC by
concrete tipping trucks. In case of unavoidable situation, truck supplying concrete to the paver may be allowed to ply on the
DLC with the approval of the Engineer. The paver shall be capable of paving the carriageway as shown in the drawings, in a
single pass and lift.

2.35.7.4 Construction by Slip Form Paver


2.35.7.4.1 Tube Floating
Upon the instructions of the Engineer, Contractor shad scrape the concrete surface when in plastic state with a 3 m long tube
float fixed with a long and stable handle before texturing. Tube float shall be of an alloy steel tube of 50 to 60 mm diameter
with a long and stable handle. The length of tube float shall preferably be longer than half the length of slab i.e., half the
distance between two transverse contraction joints. This operation shall be done to minimise surface irregularity caused due
to varied causes like frequent stoppages of work, surface deformation due to plastic flow etc. The tube float shall be placed
at the centre of the slab parallel to longitudinal joint and pulled slowly and uniformly towards the edges. After the use of float
tube, it shall be frequently cleaned before further use. The slurry removed shall be discarded. This activity shall be
advanced laterally by providing an overlap of half the length of tube float. The removal of the cement slurry from the surface
shall be sufficient enough such that the texture is formed on a firm surface and is more durable. This operation, however, shall
be carried out after removing bleeding water.

2.35.7.5 Construction by Fixed Form Paver


2.35.7.5.1 The fixed form paving train shall consist of separate powered machines which spread, compact and finish
the concrete in a continuous operation.
2.35.7.5.2 The concrete shall be discharged without segregation into a hopper spreader which is equipped with
means for controlling its rate of deposition on to the sub-base. The spreader shall be operated to strike off concrete upto a
level requiring a small amount of cutting down by the distributor of the spreader. The distributor of spreader shall strike off
the concrete to the surcharge adequate to ensure that the vibratory compactor thoroughly compacts the layer. If necessary,
poker vibrators shall be used adjacent to the side forms and edges of the previously constructed slab. The vibratory
compactor shall be set to strike off the surface slightly high so that it is cut down to the required level by the oscillatin g
beam. The machine shall be capable of being rapidly adjusted for changes in average and differential surcharge
necessitated by changes in slab thickness or crossfall. The final finisher shall be able to finish the surface to the require d
level and smoothness as specified, care being taken to avoid bringing up of excessive mortar to the surface by over
working.

2.35.7.6 Semi-mechanised Construction


Areas in which hand-guided methods of construction become indispensable shall be got approved by the Engineer in
writing in advance. Such work may be permitted only in restricted areas in small lengths. Work shall be carried out by
skilled personnel as per methods approved by the Engineer. The acceptance criteria regarding level, thickness, surface
regularity, texture, finish, strength, of concrete and all other quality control measures shall be the same as in the case of
machine laid work. Guidelines on the use of plants, equipment, tools, hauling of mix, compaction floating, straight edging,
texturing, edging etc. shall be as per IRC:15.

2.35.7.7 Surface Texture


2.35.7.7.1 Tining
After final floating and finishing of the slab and before application of the liquid curing membrane, the surface of concrete
slabs shall be textured either in the transverse direction (i.e., at right angles to the longitudinal axis of the road) or in
longitudinal direction (i.e., parallel to the centreline of the roadway). The texturing shall be done by tining the finished
concrete surface by using rectangular steel tines. A beam or a bridge mounted with steel tines shall be equipped and
operated with automatic sensing and control devices from main paver or auxiliary unit. The tining unit shall have facility fo r
adjustment of the download pressure on the tines as necessary to produce the desired finish. The tining rakes shall be
cleaned often to remove snots of slurry. The tines shall be inspected daily and all the damaged and bent tines shall be
replaced before commencing texturing. Tined grooves shall be 3 mm wide and 3 to 4 mm deep. Before commencing
texturing, the bleeding water, if any, shall be removed and texturing shall be done on a firm surface. The measurement of
texture depth shall be done as per Clause 602.12 of MoRT&H.

99
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

a) Transverse tining : When the texturing is specified in transverse direction, a beam of at least 3 m
length mounted with tines shall be moved in transverse direction to produce the texture. The
grooves produced shall be at random spacing of grooves but uniform in width and depth. The
spacing shall conform to a pattern shown below;
Random spacing in mm
10 14 16 11 10 13 15 16 11 10 21 13 10
b) The above pattern shall be repeated. Texturing shall be done at the right time such that the
grooves after forming shall not close and they shall not get roughened. Swerving of groove
patterns will not be permitted. The completed textured surface shall be uniform in appearance.
2.35.7.7.2 Brush Texturing
Alternatively on the instructions of the Engineer, the brush texturing shall be applied. The brushed surface texture shall be
applied evenly across the slab in one direction by the use of a wire brush not less than 450 mm wide but wider brushes
normally of 3 m length are preferred. The brush shall be made of 32 gauge tape wires grouped together in tufts placed at 10
mm centres. The tufts shall contain an average of 14 wires and initially be 100 mm long. The brush shall have two rows of tufts.
The rows shall be 20 mm apart and the tufts in one row shall be opposite the centre of the gap between tufts in the other row.
The brush shall be replaced when the shortest tuft wears down to 90 mm long.
The texture depth shall be determined by the Sand Patch Test as described in the Clause 602.12. This test shall be
performed at least once for each day's paving and wherever the Engineer considers it necessary at times after construction as
under:
Five individual measurements of the texture depth shall be taken at least 2 m apart anywhere along a diagonal line across a
lane width between points 50 m apart along the pavement. No measurement shall be taken within 300 mm of the
longitudinal edges of a concrete slab constructed in one pass.
Texture depths shall not be less than the minimum required depth when measurements are taken as given in Table 600-5 nor
greater than an average of 1.25 mm.
Table 70 : Texture Depth (Table 600-5 of MORT&H)
Number of Requir ed Tex t ur e Dept h (mm)
Time of Test
Measur ement s S pecified Value Toler ance
1) Between 24 hours and 7 days after the construction of the An average of 5 1.00 ±0.25
slab or until the slab is first used by vehicles measurements
2) Not later than 6 weeks before the road is opened to traffic An average of 5 1.00 +0.25 - 0.35
measurements
After the application of the brushed texture, the surface of the slab shall have a uniform appearance.
Where the texture depth requirements are found to be deficient, the Contractor shall make good the texture across the full
lane width over the length directed by the Engineer, by retexturing the hardened concrete surface in an approved manner.

2.35.7.8 Curing
2.35.7.8.1 Immediately after the surface texturing, the surface and sides of the slab shall be cured by the application of
approved resin-based aluminized reflective curing compound which hardens into an impervious film or membrane with the
help of mechanical sprayer.
2.35.7.8.2 The curing compound shall not react chemically with the concrete and the film or membrane shall not
crack, peel or disintegrate within three weeks of application. Immediately prior to use, the curing compound shall be
thoroughly agitated in its containers. The rate of spread shall be in accordance with the manufacturer's instructions
checked during the construction of the trial length and subsequently whenever required by the Engineer. The mechanical
sprayer shall incorporate an efficient mechanical device for continuous agitation and mixing of the compound during
spraying. The curing compound shall be sprayed in two applications to ensure uniform spread.
Curing compounds shall contain sufficient flake aluminium in finely divided dispersion to produce a complete coverage of
the sprayed surface with a metallic finish. The compound shall become stable and impervious to evaporation of water from
the surface of the concrete within 60 minutes of application and shall be of approved type. The curing compounds s hall
have a water retention efficiency index not less than 90 percent in accordance with BS Specification No. 7542 or as per
ASTM C-309-81 Type 2.

100
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.35.7.8.3 In addition to spraying of curing compound, the fresh concrete surface shall be protected for at least 3
hours by covering the finished concrete pavement with tents mounted on mobile trusses as described in Clause 602.7.2,
during adverse weather conditions as directed by the Engineer. After three hours, the pavement shall be covered by moist
hessian laid in two layers and the same shall then be kept damp for a minimum period of 14 days after which time the
hessian may be removed. The hessian shall be kept continuously moist. All damaged/torn hessian shall be removed and
replaced by new hessian on a regular basis.
2.35.7.8.4 The Contractor shall be liable at his cost to replace any concrete damaged as a result of incomplete curing
or cracked on a line other than that of a joint as per procedure in IRC:SP:83.

2.36 GEOSYNTHETICS FOR ROAD AND BRIDGE WORKS (cl. 701 of MORT&H)
2.36.1 Application and General Requirements
The specification covers the various applications of geosynthetic materials for use in road and bridge works including
supplying and laying as per contract specifications.
Geosynthetic is a general classification for all synthetic materials used in geotechnical engineering application. It includes
geotextiles, geogrids, geostrips, geomembranes, geonets, geocomposites, geocells, geosynthetic mats, paving fabric and
glass grid etc. Geo fabrics made from natural fibres such as jute, and coir referred to herein under natural geotextites may
also be used in different geotechnical engineering applications.
i) Geotextiles : Any permeable synthetic textile used with foundation, soil, rock, earth, or any other
geotechnical engineering-related material as an integral part of a human-made project, structure, or
system.
The geotextile fabric shall be a woven, non-woven or knitted fabric consisting of long-chain polymeric
filaments or yarns such as polypropylene, polyethylene or polyester or any combination thereof
formed into a stable network such that the filaments or yarns retain their relative position to each
other.
There are several application areas for geotextiles requiring specific functions namely separation,
filtration, drainage, reinforcement or a combination thereof.
ii) Geogrids : A deformed or non-deformed netlike polymeric material used with foundation, soil, rock,
earth, or any other geotechnical engineering-related material as an integral part of human-made
project, structure, or system.
Geogrids have relatively high strength, high modulus, and low-creep-sensitive polymers with apertures
varying from 10 to 100 mm in size or more. The openings/holes in geogrids are either elongated ellipse,
near squares with rounded corners, squares or rectangles. Geogrids can be of uni-axial grid, bi-axial
grid or three dimensional grids. Geostrip is another form of geogrid, which is used in reinforced soil
structures. It is primarily made of synthetic material in strips and is made from high tenacity
polyester yarn and contained in a suitable polymer sheath.
These are used as reinforcement in pavements and reinforced soil slopes.
iii) Geomembranes : An essentially impermeable membrane (liner or barrier) used with foundation,
soil, rock, earth, or in any other geotechnicai application as an integral part of human-made project,
structure, or system, used to control fluid migration.
Geomembranes are made from PVC or polyethylene sheets, which are duly protected from
ultraviolet exposure by carbon black or any antioxidants and thermal stabilizers.
These are used as capillary cut off in roads in water logged areas.
iv) Geonets : Geonets are used in combination with other types of geosynthetics. These are usually
formed by continuous polymeric ribs at acute angle to one another. When the ribs are opened
relatively large size apertures are formed in a net like configuration.
These are used in combination with other geosynthetic materials to form a composite material.
v) Geocomposite : A manufactured material, which could be a combination of any two or more
synthetic materials like geotextiles, geogrids, geonets and geomembranes etc., in laminated or
composite form. One of the popular forms of geocomposite is Drainage Composite. Drainage
Composites are formed by combining geotextile or geomembrane with a core of geonet or
seratted/corrugated polymeric materials.

101
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

Prefabricated Vertical Drains (PVD)/Band Drains and Fin Drains come under the category of
geocomposites.
vi) Geocell : It is a three dimensional structure with interconnected cells. The geocells are made of
polyester/polypropylene/high density polyethylene stabilized with carbon black.
Geocells may be used in erosion control of slopes.
vii) Geosynthetic Mats : These are two dimensional or three dimensional mats with specified thickness,
made of multi-filaments, with apertures to allow vegetation growth for erosion control application.
Geosynthetic mat consists of UV stabilized non-degradable polypropylene/polyethylene or similar
polymer fibres that are extruded or heat bonded to provide a dimensionally stable matrix. A tension
element like steel wire mesh or geogrid shall be included in these mats as reinforcement, where these
mats are required to possess more strength against erosive forces, like in steep slopes or in heavy
rainfall areas.
These are used for erosion protection of slopes.
viii) Natural Geotextiles : These geotextiles are made of natural fibres like jute or coir. The
blankets/mats/mesh made of these fibres are sometimes further reinforced with polymeric nettings
to enhance its tensile strength and for holding the fibres intact. The polymer netting is securely
stitched on both sides of the fabric to form a strong quilted mat. These fabrics have excellent
drapability and aid in quick growth of vegetation and are used for erosion control applications.
ix) Paving Fabric and Glass Grids : The paving fabrics are non-woven heat set material, consisting of at
least 85% by weight of polyolefin, polyester or polyamides. They are heat bonded only on one side
Glass grids are either a composite glass fibre reinforced geogrid with continuous filament nonwoven
geotextile chemically /mechanically bonded to the grid, or bituminous coated glass fibre geogrids
with or without adhesive on one side of the grid.
The paving fabric, glass grids and composite of fabric and glass grids are used in bituminous
pavements to act as stress relieving membrane and crack retarding layer within the pavement
structure. The paving fabric also serves the function of water barrier.

2.36.2 Testing, Certification and Acceptance


2.36.2.1 Geosynthetic Materials Shall be Tested and Certified in the Following Manner.
a) The manufacturer shall have ISO or CE certification for manufacturing process and quality control.
b) The manufacturer shall provide manufacturer's test certificate for every lot supplied from the factory.
c) The supplier shall provide third party test reports from an independent laboratory with valid accreditation
for all the test values in Manufacturer's test certificate.
2.36.2.2 Geosynthetics shall be tested in accordance with tests prescribed by BIS. In absence of IS codes, tests
prescribed either by ASTM, EN, BS or ISO shall be conducted.

2.37.1 Scope
The work covers the use of geotextile materials for drainage, separation/filtration and erosion control works including
supplying and laying as per design, drawing and these specifications.
For drainage/filtration function, geotextile shall be able to convey water across the plane of the fabric throughout its
design life.
For separation function the geotextile shall prevent intermixing of two layers of dissimilar materials, throughout the design
life of the structure.
The geotextile as a filter material below erosion control measures like stone pitching or stone filled mattresses over the
slopes, shall allow the water to flow out and at the same time prevent the loss of soil under the protective measures.

2.37.2 Material
2.37.2.1 Strength Requirement
The minimum strength of geotextile in terms of MARV under different installation conditions shall be as specified in Table
700-1 of MoRT&H.

102
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

Table 71 : Minimum Geotextile Strength Property Requirements (Table 700-1 of MORT&H)


S t r engt h Pr oper t y Requir ement (MARV)
Gr ab S t r engt h in Tear S t r engt h in Puncture Str engt h Bur st Str engt h in
Newt on (N) as per Newt on (N) as per In Newt on (N) Newt on (N) as per
Inst allat ion Condit ion Ty pe AS TM D 4 6 3 2 / AS TM D 4 5 3 3 / as per IS :1 3 1 6 2 AS TM D 3 7 8 6 /
IS :1 3 1 6 2 Par t 5 IS :1 4 2 9 3 Par t 4 IS :1 9 6 6
Elongat ion at F ailur e
<50 % >50 % <50 % >50 % <50 % >50 % <50 % >50 %
Harsh installation condition Type I 1400 900 500 350 500 350 3500 1700
Moderate Installation condition Type II 1100 700 400 250 400 250 2700 1300
Less Severe Installation condition Type III 800 500 300 180 300 180 2100 950
Note:
a) All numeric values in the above table represent Minimum Average Roll Value (MARV) in weaker principal direction. The MARV is
derived statistically as the average value minus two standard deviations.
b) When the geotextiles are joined together by field sewing, the seam strength shall be at least 60 percent of the material's
tensile strength. All field seams shall be sewn with thread as strong as the material in the fabric.
c) The puncture strength if determined in accordance with ASTM D 6241, the minimum requirement in terms of "Newton (N)"
shall be as follows:

S t r engt h pr oper t y r equir ement (MARV)


Puncture Strength in Newt on (N) as per AS TM D6 2 4 1 .
Inst allat ion condit ion
Elongat ion at F ailur e
< 50 % > 50 %
Harsh installation condition 2800 2000
Moderate Installation condition 2250 1400
Less Severe Installation condition 1700 1000

2.37.2.2 Ultraviolet Stability Requirements


The material shall satisfy the ultraviolet stability requirements specified in Table: 700-2 of MoRT&H.
Table 72 : Requirements for Ultra Violet Stability (Table 700-2 of MORT&H)
S .No Pr oper t ies of F abr ic Requir ement s (Ret ained S t r engt h)
1) Grab Strength Not less than 70% after 500 hours of exposure
2) Tear Strength
3) Puncture Strength
4) Burst Strength

2.37.2.3 Hydraulic Requirements for Various Applications

2.37.2.3.1 Subsurface Drainage


The geotextile shall conform to the physical requirements specified in Table 700-3 of MoRT&H.
Table 73 : Geotextile Requirements for Separation (Subgrades Soaked CBR >3) (Table 700-4 of MORT&H)
S .No. Geot ex t ile Pr oper t y Requir ement
1) Permittivity as per ASTM D 4491 0.02 sec1 (per sec)
2) Maximum Apparent Opening Size as per ASTM D 4751 0.60 mm

Table 74 : Geotextile Requirements for Separation (Subgrades Soaked CBR <3) (Table 700-5 of MORT&H)
S .No. Geot ex t ile Pr oper t y Requir ement
1) Permittivity as per ASTM D 4491 0.05 sec1 (per sec)
2) Maximum Apparent Opening Size as per ASTM D 4751 0.43

2.37.2.3.2 Erosion Control


The geotextile for erosion control shall conform to requirements given in Table 700-6 of MoRT&H.

103
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

Table 75 : Geotextile Requirements for Erosion Control (Table 700-6 of MORT&H)


In-situ S oil Passing 0 .0 7 5 mm Per mitt iv it y , per sec AS TM D Max imum Apparent Opening Size, mm AS TM
S iev e (%) 4491 D 4751
<15 0.7 0.43
15 to 50 0.2 0.25
>50 0.1 0.22

2.37.3 Construction

2.37.3.1 General
Exposure of geotextiles to the elements between lay down and cover shall be a maximum of 14 days to minimize damage
potential.
In trenches, after placing the backfill material, the geotextile shall be folded over the top of the filter material to produce a
minimum overlap of 300 mm for trenches greater than 300 mm wide. In trenches less than 300 mm wide, the overlap shall
be equal to the width of the trench. The geotextile shall then be covered with the subsequent course.
Overlap at roll ends and at adjacent sheets shall be a minimum of 450 mm, except when placed underwater. In such
instances, the overlap shall be a minimum of 1 m. Where seams are required in the longitudinal trench direction, they shall
be joined by either sewing or overlapping. All seams and overlaps shall be subject to the approval of the Engineer.
Care shall be taken during installation so as to avoid any damage to the geotextile. Damages, if any, during installation shall
be repaired by placing a geotextile patch over the damaged area and extending it 1 m beyond the perimeter of the tear or
damage, or as approved by the Engineer.

2.37.3.2 Subsurface Drainage


Construction shall conform to Clause 309.3 of MoRT&H specifications.

2.37.3.3 Separation
After preparation of subgrade as per the specifications along the road alignment, geotextile shall be rolled out as indicated in
the drawings. The entire roll shall be placed on the subgrade and unrolled as smoothly as possible. Wrinkles and folds in the
fabric shall be removed by stretching as required.
Adjacent rolls of geotextiles shall be overlapped, sewn, or joined as required. For curves, the geotextile shall be folded or cut
and overlapped in the direction of construction. Folds in the geotextile shall be stapled or pinned approximately 0.6 m
centre-to-centre. Before covering, the condition of the geotextile shall be checked for damage (i.e., holes, nips, tears, etc)
by the Engineer.
Before placing the, first lift of granular sub-base on the geotextile, a trial stretch of 100 m shall be laid as per roll width to
establish a proper construction methodology of placing and compacting the sub-base in a manner that no damages are
caused to the separation layer of geotextile.

2.37.3.4 Filter Layer under Stone Pitching for Erosion Control


The geotextile shall be placed in intimate contact of soil ensuring slight tension, to avoid wrinkles or folds and shall be
anchored on a properly shaped surface as indicated in drawings and approved by the Engineer. It shall be ensured that the
placement of the overlying material be placed in such a manner that it does not tear/puncture the geotextile. Anchoring of the
terminal ends of the geotextile shall be accomplished as per drawings through the use of key trenches or aprons at the crest
and toe of slope.
The geotextile shall be placed with the machine direction parallel to the direction of water flow. Adjacent geotextile sheets
shall be joined by either sewing or overlapping.
The pitching shall begin at the toe and proceed up the slope. Big sized boulders shall not be allowed to roll down the slope.
Any geotextile damaged shall be either replaced or repaired with a patch, as directed by the Engineer, at the cost of the
contractor.

104
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.38 GEOGRID (cl. 703 of MORT&H)

2.38.1 Scope
The work covers the use of geogrids in sub-base of pavement, erosion control of slopes, reinforced soil slopes and
reinforced soil walls including supplying and laying as per design, drawing and these specifications.
The use of geogrids as a component for reinforced soil slopes and walls shall be as per Section 3100 of MoRT&H.

2.38.2 Materials
2.38.2.1 General
Geogrids shall be either made from high tenacity polyester yarn jointed at cross points by weaving, knitting or bonding
process with appropriate coating or from polypropylene or polyethylene or any other suitable polymeric material by an
appropriate process. Geogrids manufactured by extrusion process are integrally jointed, mono or bi-directionally oriented
or stretched meshes, in square, rectangular, hexagonal or oval mesh form. The geogrids manufactured by
weaving/knitting/bonding process shall be formed into a stable network such that ribs, filaments or yarns retain their
dimensional stability relative to each other including selvages.

2.38.2.2 Sub-base Reinforcement


Geogrid for use as reinforcement of sub-base layers of flexible pavements shall meet the requirement as per the design
subject to the minimum requirements as given in Table 700-7 of MoRT&H.

2.38.2.3 Erosion Control


The geogrid for erosion control application shall have the minimum tensile strength of 4 kN/m, when tested as per ASTM D
5035 (Minimum Average Roll Value in Machine Direction). The aperture opening size shall be minimum 20 mm x 20 mm
and average grid thickness shall be minimum 1.0 mm. Geogrid for erosion control application shall be UV stabilized. The
geogrid shall have ultraviolet stability of 70 percent after 500 hrs exposure as per ASTM D 4355.

Table 76 : Minimum Requirements for Geogrid for Sub-Base of Flexible Pavement (Table 700-7 of MORT&H)

Pr oper t y Test Met hod Unit Requir ement


Stiffness at 0.5% strain ISO-10319 kN/m >350; both in machine and cross-machine direction

Tensile strength @2% strain ASTM D6637 kN/m >15% of T; both in machine and cross-machine direction

Tensile strength @5% strain ASTM D6637 kN/m >20% of T; both in machine and cross-machine direction

Junction Efficiency for


GRI-GG2-87or ASTM-WK 14256 - 90% of rib ultimate tensile strength
extruded geogrids
Ultraviolet stability ASTM D4355 - 70% after 500 hrs exposure

Note :
1) All numerical values in the Table represent MARV in the specified direction.
2) All geogrids shall be placed along machine direction parallel to the centre line of roadway alignment.

2.38.2.4 Reinforced Soil Slopes and Walls


The strength and other requirements shall be as per Section 3100.

2.38.2.5 Sub-base Reinforcement


Prior to laying of geogrid, the surface shall be properly prepared, cleaned and dressed to the specified lines and levels as
shown on the drawings.
The geogrid shall be laid within the pavement structure as shown on the drawings.
Geogrid reinforcement shall be placed flat, pulled tight and held in position by pins or suitable means until the subsequent
pavement layer is placed.
No vehicle shall be allowed on geogrid unless it is covered by at least 150 mm thick sub-base material.
105
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.38.2.6 Reinforced Slopes and Walls


The geogrid for reinforced slopes and walls shall be installed in accordance with the manufacturer's recommendation and
as per Section 3100.

2.39 PAVING FABRICS/GLASS GRIDS (cl. 708 of MORT&H)

2.39.1 Scope
This work shall consist of laying geosynthetic materials either non-woven paving fabric or fibre glass coated grid over
existing bituminous surface, including preparation of surface and joining, stitching or overlapping of geosynthetic fabric
etc., as part of highway pavement strengthening in layers as shown on drawings or as directed by the Engineer.

2.39.2 Material Requirements

2.39.2.1 Paving Fabrics


The paving fabric will be a non-woven heat set material consisting of at least 85 percent by weight of polyolefins,
polyesters or polyamides. The paving fabric shall be resistant to chemical attack, rot and mildew and shall have no tears or
defects which will adversely alter its physical properties. The fabric shall be specifically designed for pavement
applications and be heat bonded only on one side to reduce bleed-through of tack coat during installation. The fabric shall
meet the physical requirements given in Table 700-16.

2.39.2.2 Glass Grids


These will be either a composite glass fibre reinforced geogrid with continuous filament non-woven Geotextile chemically
or mechanically bonded to the grid; or bituminous coated glass fiber geogrid with or without adhesive on one s ide of the
grid. The physical and mechanical properties of glass grid fabric shall conform to the requirements given in Table 700 -17.

Table 77 : Properties of Glass Fibre Grids (Table 700-17 of MORT&H)


Pr oper t y Unit s Requir ement
Tensile S t r engt h in Bo t h Median and Cr oss -Machine Dir ect ion
Tensile Strength kN/m ASTM D 6637 50 1000 200
% Elongation at break % >4 >4 >4
Minimum Mesh Size mm 25x25 1 2 .5 x 1 2 .5 12.5x 12.5
Melting Point °C ASTM D 276 >250 >250 >250

2.39.2.3 Asphalt Reinforcing Geogrids


These shall be made of high modulus polyester yarns with low creep properties. The grid shall be connected to low weight
non-woven polypropylene fabric. The composite shall have a bitumen finish. The properties shall conform to the
requirements given in Table 700-18.
Table 78 : Properties of Asphalt Reinforcement Geogrids (Table 700-18 of MORT&H)
Requir ement
Pr oper t y Unit s Test Met hod
Tensile strength in both MD and CD, Not less than
Tensile strength kN/m ISO-10319 25 50 100
% Elongation at break % ISO-10319 12.5% 12.5% 12.5%
Mesh Size 3 5 x 3 5 20x20 3 5 x 3 5 20x20 35x35 20x20
Melting Point °C > 190 > 190 > 190

2.39.2.4 Paving Fabric Placement


The paving fabric shall be placed onto the tack coat using mechanical or manual lay down equipment capable of providing a
smooth installation with a minimum amount of wrinkling or folding. The paving fabric shall be placed before to the tack coat
cools and loses tackiness. After laying the paving fabric, some loose bituminous premix material shall be sprinkled on it in
the wheel path of the paver and the tipper to ensure that the fabric is not picked up between the wheels. Paving fabric shall not
be installed in areas where the bituminous overlay tapers to a thickness of less than 40 mm. Excess paving fabric which
extends beyond the edge of existing pavement or areas of tack coat application shall be trimmed and removed. When
106
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

bitumen emulsions are used, the emulsion shall be allowed to cure properly such that no water/moisture remains prior to
placing the paving fabric. Wrinkles or folds in excess of 25 mm shall be single-lapped in the direction of the paving
operation. Brooming and/ or pneumatic rolling will be required to maximize paving fabric contact with the pavement
surface. Additional hand-placed tack coat may be required at laps and repairs as determined by the Engineer to satisfy
bitumen retention of the lapped paving fabric. All areas where paving fabrics have been placed shall be paved the same
day. No traffic except necessary construction equipment will be allowed to drive on the paving fabric. Turning of the paver
and other vehicles shall be done gradually and kept to a minimum to avoid movement and damage to the paving fabric.
Abrupt starts and stops shall also be avoided. Damaged fabric shall be removed and replaced with the same type of fabric.
Overlaps shall be shingle-lapped in the direction of paving. Additional tack coat shall be placed between the overlap to
satisfy saturation requirements of the fabric. Overlap shall be sufficient to ensure full closure of the joint but not exceed 150
mm. Transverse joints shall be overlapped in the direction of the pavement by 100 to 150 mm or as per the manufacturer's
recommendations or as directed by the Engineer. Longitudinal joints shall be overlapped by 20-30 mm or as per the
manufacturer's recommendations or as directed by the engineer. The overlay operations shall be completed at the earliest
after laying the fabric.
2.39.2.5 Glass Grid Placement
The glass grid shall be placed on the surface provided by the tack coat using mechanical or manual lay down equipment
capable of providing a smooth installation with a minimum amount of wrinkling or folding. On curves, the Glass grid must be
cut and realigned to match the curvature.
Glass grid shall not be installed in areas where the bituminous overlay tapers to a compacted thickness of less than 40 mm.
When emulsions are used, the emulsion shall be allowed to cure properly such that no water/moisture remains prior to
placing the glass grid. Wrinkles severe enough to cause folds shall be slit and laid flat. Brooming and/or rubber-tire rolling will
be required to maximize glass grid contact with the pavement surface. Additional hand-placed tack coat may be required at
overlaps and repairs as required by the Engineer. Turning and braking of the paver and other vehicles shall be done gradually
and kept to a minimum to avoid movement and damage to the glass grid. Damaged composite shall be removed and
replaced with the same type of composite and a tack coat.
All areas where glass grid has been placed shall be paved the same day. No traffic except necessary construction traffic
shall be allowed to drive on the glass grid.
Overlaps shall be shingle - lapped in the direction of paving. Additional tack coat shall be placed between the overlap to
satisfy saturation requirements of the fabric. Overlap shall be sufficient to ensure full closure of the joint but not exceeding
150 mm.
2.39.2.6 Overlay Placement
Bituminous overlay construction shall closely follow the placement of paving fabric or glass-grid. Excess tack coat that bleeds
through the paving fabric or glass grid shall be removed by broadcasting hot mix or sand on the glass grid. Excess sand or hot mix
shall be removed before beginning the paving operation. In the event of rainfall prior to the placement of the asphalt overlay,
the fabric must be allowed to dry completely before the overlay is placed. Overlay asphalt thickness shall meet the
requirements of the contract drawings and documents. The minimum compacted thickness of the first lift of overlay asphalt
concrete shall not be less than 40 mm.

2.40 TRAFFIC SIGNS (cl. 801 of MORT&H)


2.40.1 Scope
The work shall consist of the fabrication, supply and installation of ground mounted traffic signs on roads. The details of
the signs shall be as shown in the drawings and in conformity with the Code of Practice for Road Signs, IRC:67 -2010.
2.40.2 Materials
The various materials and fabrication of the traffic signs shall conform to the following requirements:
2.40.2.1 Concrete
Concrete for foundation shall be of M 15 Grade as per Section 1700 of MoRT&H Specifications or the grade shown on the
drawings or otherwise as directed by the Engineer.
2.40.2.2 Reinforcing Steel
Reinforcing steel shall conform to the requirement of IS: 1786 unless otherwise shown on the drawing.

107
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.40.2.3 Plates and Supports


Plates and support sections for the sign posts shall conform to IS:226 and IS:2062 or any other relevant IS Specifications.

2.40.2.4 Substrate
Sign panels shall be fabricated on aluminium sheet, aluminium site panel, fibre glass sheeting, or sheet moulding
compound. Aluminium sheets use. Sign boards shall be of smooth, hard and corrosion resistant aluminium alloy
conforming to IS: 736-Matehal Designation 24345 or 1900. Aluminium Composite Material (ACM) sheets shall be
sandwiched construction with a thermoplastic core of Low Density Polyethylene (LDPE) between two thick skins/sheets of
aluminium with overall thickness and 3 mm or 4 mm (as specified in the Contract), and aluminium skin of thickness 0.5
mm and 0.3 mm respectively on both sides.
The mechanical proportion of ACM and that of aluminium skin shall conform to the requirements given in Table 800-1, when
tested in accordance with the test methods mentioned against each of them.

Table 79 : Specifications for Aluminium Composite Material (ACM) (Table 800-1 of MORT&H)
S pecificat ion
S . No. Descr ipt ion S t andar d Test Accept able Value
A Mechanical Properties of ACM
1) Peel off strength with retro reflective sheeting (Drum Peel Test) ASTM D903 Min. 4 N/mm
2) Tensile strength ASTM E8 Min. 40 N/mm2
3) 0.2% Proof Stress ASTM E8 Min. 34 N/mm2
4) Elongation ASTM E8 Min. 6%
5) Flexural strength ASTM 393 Min. 130 N/mm2
6) Flexural modulus ASTM 393 Min. 44.00 N/mm2
7) Shear strength with Punch shear test ASTM 732 Min. 30 N/mm2
B Pr operties of Aluminium Skin
1) Tensile strength (Rm) ASTM E8 Min. 65 N/mm2
2) Modulus of elasticity ASTM E8 Min. 70,000 N/mm2
3) Elongation ASTM E8 A50 Min. 2%
4) 0.2% Proof Stress ASTM E8 Min. 10 N/mm2

2.40.2.5 Plate Thickness


Shoulder mounted ground sings with a maximum side dimension not exceeding 600 mm shall not be less than 1.5 mm thick
with Aluminium and 3 mm thick with Aluminium Composite Material. All other signs be at least 2 mm thick with Aluminium and 4
mm thick with Aluminium Composite Material. The thickness of the sheet shall be related to the size of the sign and its
support and shall be such that it does not bend or deform under prevailing wind and other loads.

2.40.3 Traffic Signs having Retro-Reflective Sheeting


2.40.3.1 General Requirements
The retro-reflective sheeting used on the sign shall consist of the white or coloured sheeting having a smooth outer surface
which has the property of retro-reflection over its entire surface. It shall be weather-resistant and show colour fastness. It shall
be new and unused and shall show no evidence of cracking, scaling, pitting, blistering, edge lifting or curling and shall
have negligible shrinkage or expansion. A certificate of having tested the sheeting for co-efficient of retro-reflection,
day/night time colour luminous, shrinkage, flexibility, linear removal, adhesion, impact resistance, specular gloss and
fungus resistance and its having passed these tests shall be obtained from a Government Laboratory/Institute, by the
manufacturer of the sheeting. The retro-reflective sheeting shall be either of Engineering Grade material with enclosed
lens, High Intensity Grade with encapsulated lens or Micro-prismatic Grade retro-reflective element material as given in
Clauses 801.3.2 to 801.3.7. Guidance on the recommended application of each class of sheeting may be taken from
IRC:67.
2.40.3.2 High Intensity Grade Sheeting
2.40.3.2.1 High Intensity Grade (Type III)

108
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

This high intensity retro reflective sheeting shall be of encapsulated lens type consisting of spherical glass lens, elements
adhered to a synthetic resin and encapsulated by a flexible, transparent waterproof plastic having a smooth surface or as
an unmetallised micro prismatic reflective material element. The retro-reflective surface after cleaning with soap and
water and in dry condition shall have the minimum co-efficient of retro-reflection (determined in accordance with ASTM
D:4956-09) as indicated in Table 800-2 of MoRT&H.
Table 80 : Acceptable Minimum Co-efficient of Retro-Reflection for High Intensity Grade Sheeting (Type III)
(Encapsulated Lens Type) (Candelas Per Lux Per Square Metre) (Table 800-2 of MORT&H)
Observation Angle in Ent rance Angle in Whit e Yellow Or ange Gr een Red Blue Br own
Degrees Degrees
0.10B -4° 300 200 120 54 54 24 14
0.10B +30° 180 120 72 32 32 14 10
0.2° -4° 250 170 100 45 45 20 12
0.2° +30° 150 100 60 25 25 11 8.5
0.5° -4° 95 62 30 15 15 7.5 5.0
0.5° +30° 65 45 25 10 10 5.0 3.5
A minimum of Coefficient of Retro-reflection (RA) cd/fc/ft 2 (cd-lx-1 m2 ).
B Values for 0.1° observation angles are supplementary requirements that shall apply only when specified by the purchaser in
the Contract or order. When totally wet, the sheeting shall show not less than 90 percent, of the values of retro reflectance
indicated in above Table. At the end of 7 years, the sheeting shall retain at least 80 percent of its original retro-reflectance.
2.40.3.3 High Intensity Micro-Prismatic Grade Sheeting (HIP) (Type IV)
This sheeting shall be of high intensity retro-reflective sheeting made of micro-prismatic retro-reflective element material
coated with pressure sensitive adhesive. The retro-reflective surface after cleaning with soap and water and in dry
condition shall have the minimum coefficient of retro-reflection (determined in accordance with ASTM D:4956-09) as
indicated in Table 800-3 of MoRT&H.

2.40.3.4 Prismatic Grade Sheeting


2.40.3.4.1 Prismatic Grade Sheeting (Type VIM)
The reflective sheeting shall be retro reflective sheeting made of micro prismatic retro reflective material. The retro
reflective surface, after cleaning with soap and water and in dry condition shall have the minimum co-efficient of retro
reflection (determined in accordance with ASTM E 810) as indicated in Table 800-4 of MoRT&H.

2.40.3.4.2 Prismatic Grade Sheeting (Type IX)


The reflective sheeting shall be retro-reflective sheeting made of micro prismatic retro-reflective material. The retro-
reflective surface, after cleaning with soap and water and in dry condition shall have the minimum co-efficient of retro-
reflection (determined in accordance with ASTM E 810) as indicated in Table 800-5 of MoRT&H.
Table 81 : Acceptable Minimum Co-efficient of Retro-Reflection for Prismatic Grade Sheeting (Type VIII)
(Candelas Per Lux per Square Metre) (Table 800-4 of MORT&H)
F luor- F luor- F luor-
Observation Ent rance
Whit e Yellow Or ange Gr een Red Blue Br own escent escent escent
Angle Angle Yellow/ Yellow Or ange
Gr een
0.1 OB -4° 1000 750 375 100 150 45 30 800 600 300
0.1 OB +30° 460 345 175 46 69 21 14 370 280 135
0.2° -4° 700 525 265 70 105 32 21 560 420 210
0.2° +30° 325 245 120 33 49 15 10 260 200 95
0.5° -4° 250 190 94 25 38 11 7.5 200 150 75
0.5° +30° 115 86 43 12 17 5 3.5 92 69 35

A Minimum Coefficient of Retro reflection (RA) cd/fc/ft 2 (cd-lx-1m2 ).


B Values for 0.1° observation angles are supplementary requirements that shall apply only when specified by the purchaser in
the contract or order. When totally wet, the sheeting shall show not less than 90 percent of the values of retro reflection
indicated in above Table. At the end of 10 years, the sheeting shall retain at least 80 percent of its original retro-reflectance.

109
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

Table 82 : Acceptable Minimum Co-efficient of Retro-Reflection for Prismatic Grade Sheeting (Type IX)
(Candelas Per Lux per Square Metre) (Table 800-5 of MORT &H)
F luor e - F luor e -
Obser - F luor escent
Ent r ance Whit e Yellow Or ange Gr een Red Blue scent scent
v at ion Yellow / Gr een
Yellow Or ange
0.1 0B -4° 600 500 250 66 130 130 530 400 200
0.1 0B +30° 370 280 140 37 74 17 300 220 110
0.2° -4° 380 285 145 38 76 17 300 230 115
0.2° +30° 215 162 82 22 43 10 170 130 65
0.5° -4° 240 180 90 24 48 11 190 145 72
0.5° +30° 135 100 50 14 27 6.0 110 81 41
1.0° -4° 80 60 30 8.0 16 3.6 64 48 24
1.0° +30° 45 34 17 4.5 9.0 2.0 36 27 14

A Minimum Coefficient of Retro reflection (RA) cd/fc/ft 2 (cd-lx-1m2 ).


B Values for 0.1° observation angles are supplementary requirements that shall apply only when specified by the purchaser in
the contract or order. When totally wet, the sheeting shall show not less than 90 percent of the values of retro reflection
indicated in above Table. At the end of 10 years, the sheeting shall retain at least 80 percent of its original retro-reflectance.

2.40.3.4.3 Prismatic Grade Sheeting (Type XI)


Retro-reflective sheeting typically manufactured as a cube corner. The reflective sheeting shall be retro-reflective sheeting
made of micro prismatic retro-reflective material. The retro- reflective surface, after cleaning with soap and water and in
dry condition shall have the minimum co-efficient of retro-reflection (determined in accordance with ASTM E 810) as
indicated in Table 800-6 of MoRT&H.

Table 83 : Acceptable Minimum Co-efficient of Retro-Reflection for Prismatic Grade Sheeting Type A (Type XI)
(Candelas Per Lux per Square Metre) (Table 800-6 of MORT&H)
F luor e -
F luor e - F luor e -
Obser - Ent r ance scent
Whit e Yellow Or ange Gr een Red Blue Br own scent scent
v at ion Angle Yellow/ Yellow Or ange
Gr een
0.1 OB -4° 830 620 290 83 125 37 25 660 500 250
0.1 0B +30° 325 245 115 33 50 15 10 260 200 100
0.2° -4° 580 435 200 58 87 26 17 460 350 175
0.2° +30° 220 165 77 22 33 10 7.0 180 130 66
0.5° -4° 420 315 150 42 63 19 13 340 250 125
0.5° +30° 150 110 53 15 23 7.0 5.0 120 90 45
1.0° -4° 120 90 42 12 18 5.0 4.0 96 72 36
1.0° +30° 45 34 16 5.0 7.0 2.0 1.0 36 27 14
A Minimum Coefficient of Retro-reflection (RA) cd/fc/ft 2 (cd-lx-1m2 ).
B Values for 0.1° observation angles are supplementary requirements that shall apply only when specified by the purchaser in
the contract or order. When totally wet, the sheeting shall show not less than 90 percent of the values of retro reflection
indicated in above Table. At the end of 10 years, the sheeting shall retain at least 80 percent of its original retro-reflectance.

2.40.3.5 Adhesives

The sheeting shall have a pressure-sensitive adhesive of the aggressive-tack type requiring no heat, solvent other
preparation for adhesion to a smooth clean surface, in a manner recommended by the sheeting manufacturer. The
adhesive shall be protected by an easily removable liner (removable by peeling without soaking in water or other solvent)
and shall be suitable for the type of material of the base plate used for the sign. The adhesive shall form a durable bond to
smooth, corrosion and weather resistant surface of the base plate such that it shall not be possible to remove the sheeting
from the sign base in one piece by use of sharp instrument. The sheeting shall be applied in accordance with the
manufacturer's specifications.

110
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.40.3.6 Fabrication
Surface to be reflectorised shall be effectively prepared to receive the retro-reflective sheeting. The aluminium sheeting
shall be de-greased either by acid or hot alkaline etching and all scale/dust removed to obtain a smooth plain surface
before the application of retro-reflective sheeting. If the surface is rough, approved surface primer may be used. After cleaning,
metal shall not be handled, except by suitable device or clean canvas gloves, between all cleaning and preparation operation
and application of reflective sheeting/primer. There shall be no opportunity for metal to come in contact with grease, oil or
other contaminants prior to the application of retro-reflective sheeting. Complete sheets of the material shall be used on the
signs except where it is unavoidable. At splices, sheeting with pressure-sensitive adhesives shall be overlapped not less than
5 mm. Where screen printing with transparent colours is proposed, only butt joint 'shall be used. The material shall cover the
sign surface evenly and shall be free from twists, cracks and folds. Cut-outs to produce legends and borders shall be bonded
with the sheeting in the manner specified by the manufacturer.
2.40.3.7 Messages/Borders
The messages (legends, letters, numerals etc.) and borders shall either be screen-printed or of cut out from durable
transparent overlay or cut out from the same type of reflective sheeting for the cautionary/mandatory sign boards. Screen
printing shall be processed and finished with materials and in a manner specified by the sheeting manufacturer. For the
informatory and other sign boards, the messages (legends, letters, numerals etc.) and borders shall be cut out from durable
transparent overlay film or cut-out from the same reflective sheeting only. Cut-outs shall be from durable transparent
overlay materials as specified by the sheeting manufacturer and shall be bonded with the sheeting in the manner specified
by the manufacturer. For screen-printed transparent coloured areas on white sheeting, the coefficient of retro-reflection
shall not be less than 50 percent of the values of corresponding colour in Tables 800 -2 to 800-8 as applicable. Cut-out
messages and borders, wherever used, shall be either made out of retro-reflective sheeting or made out of durable
transparent overlay except those in black which shall be of non-reflective sheeting or opaque in case of durable transparent
overlay.
2.40.3.8 Colour for Signs
Table 84 : Colour Specified Limits (Daytime) (Table 800-7 of MORT&H)
Day t ime Luminance
Colour 1 2 3 4
F act or (Y%)
x y x y x y x y Min. Max .
White 0.303 0.300 0.368 0.366 0.340 0.393 0.274 0.329 15 -
Yellow 0.498 0.412 0.557 0.442 0.479 0.520 0.438 0.472 24 45
Green 0.026 0.399 0.166 0.364 0.286 0.446 0.207 0.771 2.5 11
Red 0.648 0.351 0.735 0.265 0.629 0.281 0.565 0.346 2.5 11
Blue 0.140 0.035 0.244 0.210 0.190 0.255 0.065 0.216 1 10
Orange 0.558 0.352 0.636 0.364 0.570 0.429 0.506 0.404 12 30
Brown 0.430 0.340 0.610 0.390 0.550 0.450 0.430 0.390 1 6
Fluorescent Yellow-Green 0.387 0.610 0.369 0.546 0.428 0.496 0.460 0.540 60 -
Fluorescent Yellow 0.479 0.520 0.446 0.483 0.512 0.421 0.557 0.442 45 -
Fluorescent Orange 0.583 0.416 0.535 0.400 0.595 0.351 0.645 0.355 25 -
Not e : The colours shall be durable and uniform in acceptable hue when viewed in day light or under normal headlights at night.

2.40.3.9 Sizes of Letters


Table 85: Acceptable Limits for Sizes of Letters (Table 800-8 of MORT&H)
Design Minimum V Height Minimum S ight Dist ance/ Max imum Dist ance
S peed of t he Let t er s Clear Visibilit y Dist ance fr om Cent r e Line
(K m./hr .) (mm) (m) (m)
40 100 45 12
50 125 50 14
65 150 60 16
80 250 80 21
100 300 90 24
120 400 115 32
Not e : The thickness of the letters and their relation to the x-height, the width, the heights are indicated in Table IV (a) of the
Annexure-4 of IRC:67 to facilitate the design of the informatory signs and definition plates.

111
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.41 ROAD MARKINGS (cl. 803 of MORT&H)


2.41.1 Scope
The work shall consist of providing road markings of specified width, layout and design using paint of the required
specifications as given in the Contract and as per guidelines contained in from IRC:35-1997.
2.41.2 Materials
Road markings shall be of ordinary road marking paint hot applied thermoplastic compound, reflectorised paint or cold
applied reflective paint as specified in the item and the material shall meet the requirements as specified in these
Specifications.
2.41.3 Ordinary Road Marking Paint
2.41.3.1 Ordinary paint used for road marking shall conform to Grade I as per IS:164.
2.41.3.2 The road marking shall preferably be laid with appropriate road marking machinery.
2.41.4 Hot Applied Thermoplastic Road Marking
2.41.4.1 Thermoplastic Material
2.41.4.1.1 General
The thermoplastic material shall be homogeneously composed of aggregate, pigment, resins and glass refiectorizing beads.
The colour of the compound shall be white or yellow (IS colour No. 356) as specified in the drawings or as directed by the
Engineer.
2.41.4.1.2 Requirements :
Table 86 : Proportions of Constituents of Marking Material (Percentage by Weight) (Table 800-9 as MORT&H)
Component Whit e Yellow
Binder 18.0 min. 18.0 min.
Glass Beads 30-30 30-30
Titanium Dioxide 10.0 min.
Calcium Carbonate and Inert Fillers 42.0 max. See Note below
Yellow Pigments See Note below

Not e : Amount of yellow pigment, calcium carbonate and inert fillers shall be at the option of the manufacturer, provided all
other requirements of this Specification are met.
2.41.4.2 Reflectorizing Glass Beads
2.41.4.2.1 General
This Specification covers two types of glass beads to be used for the production of reflectorised pavement markings.
Type 1 beads are those which are a constituent of the basic thermoplastic compound vide Table 800-9 and Type 2 beads
are those which are to be sprayed on the surface vide Clause 803.6.4.
2.41.4.2.2 Specific Requirements
a) Gradation : The glass beads shall meet the gradation requirements for the two types as given in
Table 800-10.
Table 8 7 : Gradation Requirements for Glass Beads (Table 800-10 of MORT&H)
Per cent Ret ained
S iev e S ize
Ty pe 1 Ty pe 2
1.18 mm 0to3
850 micron 5 to 20 0 to 5
600 micron 5 to 20
425 micron 65 to 95
300 micron 30 to 75
180 micron 0-10 10 to 30
Below 180 micron O to 15

112
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.41.4.2.3 Test Methods


The specific requirements shall be tested with the following methods:
i) Free-flow test: Spread 100 grams of beads evenly in a 100 mm diameter glass dish. Place the dish in a
250 mm inside diameter dessicator which is filled within 25 mm of the top of a dessicator plate with
sulphuric acid water solution (specific gravity 1.10). Cover the dessicator and let it stand for 4 hours at
20°C to 29°C. Remove sample from dessicator, transfer beads to a pan and inspect for lumps or
clusters. Then pour beads into a clean, dry glass funnel having a 100 mm stem and 6 mm orifice. If
necessary, initiate flow by lightly tapping the funnel. The glass spheres shall be free of lumps and
clusters and shall flow freely through the funnel.
ii) The requirements of gradation, roundness and refractive index of glass beads and the amount of glass
beads in the compound shall be tested as per BS:6088 and BS:3262 (Part I).
iii) The Contractor shall furnish to the Engineer a copy of certified test reports from the manufacturer of
glass beads obtained from a reputed laboratory showing results of all tests specified herein and shall
certify that the material meets all requirements of these Specifications. However, if so required, these
tests may be carried out as directed by the Engineer.

2.41.4.3 Application Properties of Thermoplastic Material


2.41.4.3.1 The thermoplastic material shall readily get screeded/extruded at temperatures specified by the
manufacturers for respective method of application to produce a line of specified thickness which shall be continuous and
uniform in shape having clear and sharp edges.
2.41.4.3.2 The material upon heating to application temperatures shall not exude fumes, which are toxic, obnoxious or
injurious to persons or property.
2.41.4.4 Preparation
i) The material shall be melted in accordance with the manufacturer's instructions in a heater with a
mechanical stirrer to give a smooth consistency to the thermoplastic material to avoid local overheating.
The temperature of the mass shall be within the range specified by the manufacturer, and shall on no
account be allowed to exceed the maximum temperature stated by the manufacturer. The molten material
should be used as expeditiously as possible and for thermoplastic material which has natural binders or is
otherwise sensitive to prolonged heating, the material shall not be maintained in a molten condition for
more than 4 hours.
ii) After transfer to the laying equipment, the material shall be maintained within the temperature range
specified by the manufacturer for achieving the desired consistency for laying.
2.41.5 Reflectorised Paint
Reflectorised paint, if used, shall conform to the Specification by the manufacturers and approved by the Engineer.
Reflectorising glass beads for reflectorising paints where used shall conform to the requirements of Clause 803.4.2.
2.41.6 Application
2.41.6.1 Properties of Finished Road Markings
a) The finished lines shall be free from ruggedness on sides and ends and be parallel to the general
alignment of the carriageway. The upper surface of the lines shall be level, uniform and free from
streaks.
b) The stripe shall not be slippery when wet.
c) The marking shall not lift from the pavement in freezing weather.
d) After application and proper drying, the stripe shall show no appreciable deformation or
discoloration under traffic and under road temperatures upto 60°C.
e) The marking shall not deteriorate by contact with sodium chloride, calcium chloride or oil
dripping from traffic.
f) The stripe or marking shall maintain its original dimensions and position. Cold ductility of the material
shall be such as to permit normal movement with the road surface without chopping or cracking.
g) The colour of yellow marking shall conform to IS Colour No. 356 as given in IS:164

113
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.41.7 Cold Applied Reflective Paint


2.41.7.1 Material
2.41.7.1.1 The cold applied paint material shall be homogeneously composed or binder, pigment, extenders and other
additives as required for the formulation.
2.41.7.1.2 Composition
The pigments and extenders shall be uniformly dispersed in the binder medium dissolved in organic solvents. The material
shall be free from skin, dirt and foreign objects and shall comply with requirements indicated in Table 800-11 of MoRT&H.
Table 88: Proportions of Constituents or Paints (Percentage by Weight) (Table 800-11 as MORT&H)
Component Whit e Yellow
Binder 25.0 min. 18.0 min.
Titanium Dioxide 20.0 min.
Calcium Carbonate and Inert Fillers 16.0 min. 29.0 min.
Yellow Pigments 14.0 min.

2.41.7.1.3 Properties
Non-Volatile Matter content by weight shall be a minimum of 65 percent as determined in accordance with test method
ASTM D1644. The liquid paint shall have a density of 1.3 g/cc minimum as determined in accordance with test method
ASTM D1475.
2.41.7.1.4 Appearance
Drying Time of the paint as determined by the test method ASTM D711 shall be a maximum of 20 minutes at a wet film
thickness of 350 micron. The paint shall set to bear traffic after 40 minutes when the ambient temperature is higher than
24°C. The paint shall not be applied when the surface temperature of the road is higher than 40°C.
2.41.7.1.5 Properties of the Dried Paint Film
When tested using a sand abrasion tester as described in ASTM D968, the quantity of sand required for removal of a 75
micron thick unbeaded dry film shall be greater than 65 litres.
2.41.7.1.6 Minimum Thickness of the Unbeaded Cold Applied Paint Coat
The minimum thickness of the wet unbeaded coat of paint shall not be less than 400 micron, and the minimum thickness of
the dry unbeaded coat of paint shall not be less than 200 microns.
2.41.7.1.7 Retro-reflective Properties
The co-efficient of retro-reflection as per British Standards BS EN 1436:1998 shall be as under:
For white paint (Beaded) -300 mcd/m2 /lux on application
-100 mcd/m2 /lux after defect liability period of one year
For yellow paint (Beaded) -200 mcd/m2 /lux on application
-100 mcd/m2 /lux after defect liability period of one year
The luminous Co-efficient as per British Standards BS EN 1436:1998 shall be as under:
For white paint (Un-beaded) 100 mcd/m2 /lux on application
For yellow paint (Un-beaded) 80 mcd/m2 /lux on application
2.41.7.3 Reflectorising Glass Beads
2.41.7.3.1 Specific Requirements
i) Gradation: The glass beads shall meet the gradation requirements as per No. 4 of BS:6088
as given in Table 800-12.
Table 89 : Gradation Requirements for Glass Beads (Table 800-12 of MORT&H)
S iev e S ize Per cent age Ret ained
250 micron 0-10
150 micron 80-100
Below 150 micron 0-20

114
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

ii) Roundness: The glass beads shall have a minimum of 70 percent true Spheres.
iii) Refractive Index: The glass beads shall have a minimum refractive Index of 1.50.
iv) Free Flowing Properties: The glass beads shall be free of hard lumps, clusters and shall dispense
readily under any conditions suitable for paint striping. They shall pass the free flow-test as given in
Clause 803.6.5.4 of MoRT&H.
2.42 ROAD DELINEATORS (cl. 806 of MORT&H)
2.42.1 Scope
The work shall cover supplying and fixing roadway indicators, hazard markers and object markers. Roadway indicators shall be
properly installed to indicate the horizontal alignment and vertical profile of the roadway so as to outline the vehicle path for
safe driving. Hazard markers shall be installed immediately ahead of obstruction of vehicular path such as just before a narrow
bridge. Object markers shall be erected where obstruction within the roadway starts such as channelising island in
approaches to intersections.
2.42.2 The design, materials to be used and the location of the road delineators (roadway indicators, hazard markers
and object markers) shall conform to Recommended Practice for Road Delineators, IRC.79, and to relevant drawings or as
otherwise directed by the Engineer. The steel drums such as empty bitumen drums shall not be used as they could pose safety
hazards, The delineators shall be retro-reflectorised as shown on the drawings or as directed by the Engineer. The reflectors on
the delineators shall be of retro-reflective sheeting with encapsulated lens and with the visibility of 300 m under clear weather
conditions, when illuminated by the upper beam of the car headlights.
2.42.3 Installation
The delineators shall be so installed that their posts do not change their orientation and the reflectorised faces are always
perpendicular to the direction of travel.
2.43 CRASH BARRIERS (cl. 811 of MORT&H)

2.43.1 Concrete Crash Barrier


2.43.1.1 Materials
All materials shall conform to Section 1000 Materials for Structures as applicable, and relevant Clauses in Section 1600
of MoRT&H Specifications shall govern the steel reinforcement.
2.43.1.2 The minimum grade of concrete shall be M25.
2.43.2 Construction Operations
2.43.2.1 The concrete barriers shall be either (i) precast or (ii) constructed by the "cast-in-place with fixed forms"
method or the "extrusion or slip form" method or a combination thereof at the Contractor's option with the approval of the
Engineer. Where "extrusion or slip form" method is adopted full details of the method and literature shall be furnished.
2.431.2.2 The concrete barrier may be precast in lengths upto 6 m depending upon the feasibility of transport and lifting
arrangements. Longitudinal roadside concrete barrier shall be placed on adequate bedding as detailed in the drawing. The
top and exposed faces of the barriers shall conform to the specified tolerances, as defined in Clause 810.2.2.3, when tested
with 3 m straight edge, laid on the surface.
An expansion joint with pre-moulded asphalt filler board shall be provided at the junctions of crash barrier on structure and
crash barrier on the fill. The crash barrier on the fill shall be constructed in pieces of length not exceeding 20 m, with pre-
moulded asphalt filler board joints.
Backfilling to the concrete barriers shall be compacted in layers to the compaction of the surrounding earthwork.
2.43.3 Tolerance
The overall horizontal alignment of rails shall not depart from the road alignment by more than ± 30 mm, nor deviate in any
two successive lengths from straight by more than 6 mm and the faces shall not vary more than 12 mm from the edge of a 3
m straight edge. Barriers shall be at the specified height as shown in the plans above the edge of the nearest adjacent
carriageway or shoulder, within a tolerance of ± 30 mm.

2.43.4 Metal Beam Crash Barrier

115
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.43.4.1 Materials
2.43.4.1.1 Metal beam rail shall be corrugated sheet steel beams of the class, type, section and thickness indicated
on the drawings. Railing posts shall be made of steel of the section, weight and length as shown on the drawings. All
complete steel rail elements, terminal sections, posts, bolts, nuts, hardware and other steel fittings shall be galvanized. All
elements of the railing shall be free from abrasions, rough or sharp edges and shall not be kinked, twisted or bent.
2.43.4.1.2 The "W" beam type safety barrier shall consist of a steel post and a 3 mm thick "W" beam rail element. The
steel post and the blocking out spacer shall both be channel section of 75 mm x150 mm & size 5 mm thick. The rail shall be
70 cm above the ground level and posts shall be spaced 2 m centre-to-centre. Double "W" beam barrier shall be as
indicated in IRC:5-1998.
The thrie beam safety barrier shall have posts and spacers similar to the ones mentioned above for "W" beam type. The rail
shall be placed at 85 cm above the ground level.
The "W" beam, the thrie beam, the posts, spacers and fasteners for steel barriers shall be galvanized by hot dip process
(zinc coated, 0.55 kg per square metre; minimum single spot) unless otherwise specified. The galvanizing on all other steel
parts shall conform to the relevant IS Specifications. All fittings (bolts, nuts, washers) shall conform to the IS: 1367 and
IS:1364. All galvanizing shall be done after fabrication.
2.43.4.1.3 Concrete for bedding and anchor assembly shall conform to Section 1700 of these Specifications.
2.43.4.2 Construction Operations
2.43.4.2.1 The line and grade of railing shall be true to that shown on the plans. The railing shall be carefully adjusted
prior to fixing in place, to ensure proper matching at abutting joints and correct alignment and camber throughout their length.
Holes for field connections shall be drilled with the railing in place in the structure at proper grade and alignment.
2.43.4.2.2 Unless otherwise specified on the drawing, railing steel posts shall be given one shop coat of paint (primer)
and three coats of paint on structural steel after erection, if the sections are not galvanized. Any part of assembly below
ground shall be painted with three coats of red lead paint.
2.43.4.2.3 Splices and end connections shall be of the type and designs specified or shown on the plans and shall be of
such strength as to develop full design strength of the rail elements.
2.43.4.3 Installation of Posts
2.43.4.3.1 Holes shall be dug or drilled to the depth indicated on the plans or posts may be driven by approved
methods and equipment, provided these are erected in proper position and are free from distortion and burring or any other
damage.
2.43.4.3.2 All post holes that are dug or drilled shall of such size as will permit proper setting of the posts and allow
sufficient room for backfilling and tapping.
2.43.4.3.3 Holes shall be backfilled with selected earth or stable materials in layers not exceeding 100 mm thickness
and each layer shall be thoroughly tamped and rammed. When backfilling and tamping are completed, the posts or anchors
shall be held securely in place.
2.43.4.3.4 Post holes that are drilled in rock and holes for anchor posts shall be backfilled with concrete.
2.43.4.3.5 Posts for metal beam guardrail on bridges shall be bolted to the structure as detailed on the plans. The
anchor bolts shall be set to proper location and elevation with templates and carefully checked.
2.43.4.4 Erection
2.43.4.4.1 Ail guard rail anchors shall be set and attachments made and placed as indicated on the plans or as
directed by the Engineer.
2.43.4.4.2 All bolts or clips used for fastening the guardrail or fittings to the posts shall be drawn up tightly. Each bolt
shall have sufficient length to extend at least 6 mm through and beyond the full nut, except where such extensions might
interfere with or endanger traffic in which case the bolts shall be cut off flush with the nut.
2.43.4.4.3 All railings shall be erected, drawn and adjusted so that the longitudinal tension will be uniform
throughout the entire length of the rail.

2.43.4.5 End Treatment for Steel Barrier


2.43.4.5.1 End treatments shall from an integral part of safety barriers which should not spear, vault or roll a vehicle
for head-on or angled impacts. The two end treatments recommended for steel barriers are "Turned-down-guardrail" and
"Anchored in back slope", as shown on the drawings or as directed by the Engineer.

116
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

SPECIFICATION FOR BRIDGE AND CULVERT WORKS


2.44 PILE FOUNDATIONS
2.44.1 Concrete in Piles (cl. 1104 of MoRT&H)
For both precast and cast in in-situ piles, the grade of concrete, minimum cement content, water cement ratio and slump
at the time of placement shall be as per Table 1100-1 :

Table 90 : Requirements for Concrete in Piles (Table 1100-1 of MoRT&H)


Cast in-situ Concrete by Tremie Precast Concrete
Grade of concrete M35 M35
Minimum cement content 400 kg/m³ 400 kg/m³
Minimum water cement ratio 0.4 0.40
Slump (mm) as measured at the time of placement 150-200 50-75

The terms 'minimum cement content' and 'minimum water cement' ratio mentioned Table 1100-1, are to be based on
total cementitious material (inclusive of all mineral admixtures called additives) mentioned in Clause 1007 of these
Specifications. Maximum limits for such additives shall be as specified in Clause 1716.2 of these Specifications.
High alumina cements (i.e. quick setting cement) shall not be used in marine conditions. When both chlorides and
sulphates are present, in soil or ground water, sulphate resistant cement shall not be used. For improving resistance
against the penetration of chlorides and sulphates from surrounding soils or water, mineral admixtures such as fly ash,
silica fumes, GGBS conforming to respective BIS/lnternational Standards and as per IRC: 112, may be u sed.

2.44.1 TEST PILES (cl. 1106 of MoRT&H)


Test piles which are shown on the drawings or specified in the contract or installed by the Contractor on his own to
determine the lengths of piles to be furnished, shall conform to the requirements for piling as indicated in these
Specifications. Test piles which are used to arrive at the load carrying capacity shall not be incorporated in the structure.
All test piles shall be installed with the same type of equipment that is proposed to be used for piling in the actual
structure.
Test piles which are not to be incorporated in the completed structure shall be removed to at least 600 mm below the
proposed soffit level of pile cap and the remaining hole so formed shall be backfilled with earth or other suitable material.
The piles shall be load tested in accordance with provisions laid down in this Section.

2.44.2 CAST IN-SITU CONCRETE PILES (cl. 1107 of MoRT&H)


2.44.2.1 General
Cast in-situ concrete piles may be either installed by drilling a bore into the ground and removing the material or by driving
a metal casing with a shoe at the tip and displacing the material laterally. The two types of piles are termed as "bored
piles" and "driven piles" respectively. Cast in-situ concrete piles may be cast in metal shells which may remain
permanently in place. However, other types of reinforced concrete cast in-situ piles, cased or uncased, may be used if in
the opinion of the Engineer the soil conditions permit their use and if their design and the methods of placing are
satisfactory.
Certain specific requirements regarding driving of cast in-situ driven piles shall be as per Clauses 1110 and 1111.
Any liner or borehole which is improperly located or shows partial collapses that would affect the load carrying capacity of
the pile, shall be rejected or repaired as directed by the Engineer at the cost of the Contractor.
Boring shall be carried out using rotary equipment. Percussion type of equipment shall be used only if approved by the
Engineer.
The diameter of the finished pile shall not be less than that specified. A continuous record shall be kept by the Engineer as
to the volume of concrete placed in relation to the length of pile that is cast.
Defective piles shall be removed or left in place as judged convenient without affecting the performance of adjacent piles
or pile cap. Additional piles shall be provided to replace the defective piles.

117
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.44.2.2 Concreting
Wherever practicable, concrete should be placed in a clean dry hole. Prior to the placing of the reinforcement cage, the pile
shaft shall be cleaned of all loose materials. Before concreting of the pile is commenced, it is essential to ensure that no
debris remains at the bottom of the shaft, as inadequate cleaning of the base can lead to formation of a soft base or soft
toe which may result in reduction of load bearing capacity of the pile.
Reinforcement for the pile as shown on the drawing shall be tied in place to form a cage which is lowered into the pile
shaft. Suitable spacers shall be provided to maintain the required cover to reinforcing steel. Reinforcements at the bottom
should not be provided with L-bends as these may interfere with cleaning of the pile base.
Where concrete is placed in dry and a casing is present, the top 3 m of the pile shall be compacted using internal vibrators.
Where the casing is withdrawn from cohesive soils for the formation of cast in-situ pile, the concreting should be done with
necessary precautions to minimize the softening of the soil by excess water. Where mud flow conditions exist, the casing of
cast in-situ piles shall not be allowed to be withdrawn.
Care shall be taken during concreting to prevent the segregation of the ingredients. The displacement or distortion of
reinforcement during concreting and while extracting the casing, shall also be avoided.
If the concrete is placed inside precast concrete tubes or consists of precast sections, these shall be free from cracks or
other damage before being installed.
The concrete shall be properly graded, shall be self-compacting and shall not get mixed with soil, excess water, or other
extraneous matter. Special care shall be taken in silty clays and other soils which have the tendency to squeeze into the
newly deposited concrete and cause necking. Sufficient head of green concrete shall be maintained to prevent inflow of
soil or water into the concrete.
The placing of concrete shall be a continuous process from the toe level to the top of the pile. To ensure compaction by
hydraulic static heads, rate of placing concrete in the pile shaft shall not be less than 6 m (length of pile) per hour.
2.44.2.3 Casing
When concreting is carried out for a pile, a temporary casing should be installed to sufficient depth so as to ensure that
fragments of soil from the sides of the hole do not drop into the concrete as it is placed. When the bore hole is stabilized
using drilling mud, the temporary casing is not required except near the top.
The metal casing shall be of sufficient thickness and strength to hold its original form and show no harmful distortion while
driving or when adjacent casings are driven.
Cast in-situ concrete driven piles shall be installed using a properly designed detachable shoe at the bottom of the casing.
Bored cast in-situ piles in soils which are stable, may often be installed with only a small casing length at the top. A
minimum of 2 m length of top of bore shall invariably be provided with casing to ensure against loose soil falling into the
bore. In cases in which the side soil can fall into the hole, it is necessary to stabilize the side of the bore hole with drilling
mud, or a suitable steel casing. Permanent steel liner shall be provided at least up to maximum scour level. The minimum
thickness of steel liner shall be 6 mm.
Permanent steel liner shall be provided for the full depth of the pile in the following situations where:
i) The surrounding soil is marine clay
ii) Soft soil is present
iii) Surrounding soil has sulphate content equal to or more than 1%
iv) Surrounding water has sulphate content equal to or more than 2500 ppm
v) Leakage of sewage is expected
For bored cast in-situ piles, casing/liner shall be driven open ended with a pile driving hammer capable of achieving
penetration of the liner to the depth shown on the drawing or as approved by the Engineer. Materials inside the casing shall
be removed progressively by air lift, grab or percussion equipment or other approved means.
Where bored cast in-situ piles are used in soils liable to ffow, the bottom of the casing shall be kept sufficiently in advance
of the boring tool to prevent the entry of soil into the casing, leading to formation of cavities and settlements in the
adjoining ground. The water level in the casing should generally be maintained at the natural ground water level for the
same reasons. The joints of the casing shall be made as leak-tight as possible to minimize inflow of water or leakage of
slurry during concreting.
118
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

The diameter of the boreholes shall not be more than the inside diameter of the liner when the liners are installed before
boring. When the liners are installed after boring, the diameter of the boreholes shall not be more than the outside
diameter of liner + 2 mm, unless otherwise approved by Engineer.
2.44.2.4 Use of Tremie
The concrete should invariably be poured through a tremie with a funnel, so that the concrete can be properly deposited in
the hole without segregation. For concreting done by tremie, the following requirements which are particularly applicable
shall be ensured:
a) The hopper and tremie should be a leak proof system.
b) Diameter of tremie shall be not less than 200 mm for use with 20 mm diameter down aggregate.
c) The first charge of concrete should be placed with a sliding plug pushed down the tube ahead of it or with
a steel plate with adequate charge to prevent mixing of concrete and water. However, the plug should not
be left in the concrete as a lump.
d) The tremie pipe should always penetrate well into the concrete with an adequate margin of safety against
accidental withdrawal of the pipe. The tremie should be always full of concrete.
e) The pile should be concreted wholly by tremie and the method of deposition should not be changed part
way up the pile, to prevent laitance from being entrapped within the pile.
f) All tremie tubes shall be thoroughly cleaned after use.
g) For concrete placed through tremie, there is no need to add 10 percent extra cement.
h) Concreting of piles shall be carried out continuously. In exceptional cases of interruption of concreting
the tremie shall not be taken out of the concrete under any circumstances. The tremie pipe shall be
raised and lowered slowly from time to time to prevent it from getting stuck in the concrete while ensuring
its lower and does not come out of concrete. The concreting shall be resumed before final setting time of
concrete, which shall be established before the start of the piling operation. For achieving longer setting
time of the concrete, super plasticizers having retarding properties/retarders can be used. If any of these
requirements are not met, the pile shall be rejected.
2.44.2.5 Removal of Concrete above Cut-off Level
It is desirable that the concrete above cut-off level, is removed before the concrete is set. This may be done manually or by
specially made bailer or other device. Such removal of concrete helps in preventing the damage of the good concrete below
the cut-off level, which results from chipping by percussion method.
The removal of concrete shall be within ± 25 mm from the specified cut off level, preferably on the minus side . After
removal of such concrete, the concrete shall be compacted with rammer with spikes or vibrated.
In case the concrete is not removed before setting, a groove shall be made on outer perimeter by rotary equipment before
chipping by percussion method.
The minimum embedment of cast in-situ concrete piles into pile cap shall not be less than 50 mm. Any defective concrete
at the head of the completed pile shall be cut away and made good with new concrete. The clear cover between the bottom
reinforcement in pile cap from the top of the pile shall be not less than 25 mm. The reinforcement in the pile shall be
exposed for full anchorage length to permit it to be adequately bonded into the pile cap. Exposing such length shall be
done carefully to avoid damaging the rest of the pile.

2.44.3 STEEL PILES (cl. 1108 of MoRT&H)


Steel piles shall be of "H" or "I" sections as shown on the drawings and shall be of structural steel conforming to Section
1000 of these Specifications.
Steel piles shall be protected by suitable anti-corrosive painting as specified on the drawing or as directed by the Engineer.
Piles shall be stored above the ground having protective packing to minimize damage to surface coating. Each pile shall be
supplied preferably in one piece without splices.
At the option of the Contractor, steel piles consisting of structural steel plates welded together may be substituted for the
rolled sections specified, provided the depth, width and average thicknesses are at least equal to those of the rolled
sections, the steel plates conform to Section 1000 of these Specifications. The flanges shall be welded to the web with
continuous fillet welds on either side of the web, and the welding shall conform to Clause 1904.8 of MoRT&H
Specifications.
119
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

The length of the steel pile may be built up in sections either before or during driving operations. The sections shall be of
identical cross-section. Pile splices shall be made with full penetration butt welds over the whole cross-section. Pile splices
shall develop at least the yield strength of pile.
The connections shall be made by butt welding the entire cross-section in accordance with the provisions in Clause 1904.8
of these Specifications. Care shall be taken to properly align the sections connected so that the axis of the pile will be
straight. The number of welded connections in the length of pile shall be as few as possible.

2.44.4 PILE TESTS (cl. 1113 of MoRT&H)


2.44.4.1 Initial Load Test
a) The number of initial tests shall be determined by the Engineer taking into consideration the bore log and
soil profile, design length, pile diameter and design pile capacity. However, it shall not be less than two
for each category.
b) Initial load test for axial load capacity, including uplift capacity if required, on trial piles of the same
diameter as of the design pile, shall be carried out after 28 days design strength is achieved. The testing
shall be done as per the procedure laid down in IS:2911, Part-IV. The load test shall be conducted for not
less than 21/2 times the design load. The initial load test shall be cyclic load test for piles deriving
strength from end bearing and side friction. The maintained load test can be performed for end bearing
piles which do not rely on friction and for piles socketed in rock; as initial load test value. The number of
initial tests shall be determined by the Engineer taking into consideration the bore log and soil profile.
c) Lateral load tests shall be carried out for estimating the lateral load capacity of the piles. The test
procedure shall be carried out as per IS 2911 Part IV. However the permissible deflection shall be as per
IRC:78.
d) In particular cases where upper part of pile is likely to be exposed later due to scour, then the capacity
contributed by that portion of the pile during load test, shall be accounted for.
e) If the initial load test gives a capacity greater than 25 percent of the capacity calculated by static formula
and if it is desired to take benefit of the higher capacity, another two load tests shall be carried out to
confirm the earlier value and minimum of the three shall be considered
2.44.4.2 Routine Load Tests
Routine load test shall be carried out at actual locations of foundations of bridges to re -confirm or modify the allowable
loads. The lateral load test may be conducted on two adjacent piles. However, results of routine load tests shall not be
used for upward revision of design capacity of piles. The minimum number of tests to be conducted for confirming the
capacity shall be as per Table 1100-3.
2.44.4.3 Permissible Overload
While conducting routine test on one of the piles belonging to a pile group, if the pile capacity is found to be deficient
(based on the settlement criteria of 12 mm for piles of diameter up to and including 600 mm and 2 percent of the pile
diameter for piles of diameter more than 600 mm at 1.5 times the design load) an overload up to 10 percent of the
capacity may be allowed.
2.44.4.4 For a quick assessment of pile capacity, strain dynamic tests may be conducted after establishing co-
relation using the results of load tests. However, results of strain dynamic tests shall not be used for upward revision of
design capacity of pile. Detailed guidelines and references are given in IRC:78. These methods can be followed.
To have a fairly good idea about the quality of concrete and construction defects like voids, discontinuities etc., pile
integrity tests are extensively conducted. Detailed guidelines in this connection are given in IRC:78.
2.44.5 PILE CAP (cl. 1114 of MoRT&H)
Casting of pile cap should be at a level higher than low water level unless functionally required to be below low water level.
In such cases dewatering shall be resorted to allow concreting in dry conditions. Pile caps shall be of reinforced concrete. A
minimum offset of 150 mm shall be provided beyond the outer faces of the outermost piles in the group. If the pile cap is in
contact with earth at the bottom, a leveling course of minimum 80 mm thickness of M 15 nominal mix concrete shall be
provided. In marine conditions or areas exposed to the action of harmful chemicals, the pile cap shall be protected with a
coating such as bituminous based coal tar epoxy or epoxy based coating or with suitable anti corrosive paint. Concrete with
high alumina cement, shall not be used in marine environment.

120
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

The attachment of the pile head to the cap shall be adequate for the transmission of loads and forces. A portion of pile top
may be stripped of concrete and the reinforcement anchored into the cap. Manual chipping may be permitted thre e days
after casting of pile, while pneumatic tools for chipping shall be permitted only seven days after casting of pile. The top o f
pile after stripping shall project at least 50 mm into the pile cap.
The top of concrete in a pile shall be brought above cut-off level to permit removal of all laitance and weak concrete before
pile cap is laid. This will ensure good concrete at the cutoff level.

2.44.6 IMPORTANT CONSIDERATIONS, INSPECTION / PRECAUTIONS FOR DIFFERENT TYPES OF PILES


(cl. 1115 of MoRT&H)
2.44.6.1 Driven Cast In-Situ Piles
2.44.6.1.1 Specialist literature and the guidelines from the pile construction industry shall be consulted regarding the
method of installation, equipment and accessories for pile driving and recording of data.
2.44.6.1.2 During installation of piles, the final "set" of penetration of pile per blow of hammer shall be checked taking
an average of last 10 blows.
The pile shoes which may be of either cast iron conical type or mild steel flat type shall have double reams for proper
seating of the removable casing tube inside the space between the reams.
2.44.6.1.3 Before commencement of pouring of concrete, it shall be ensured that there is no ingress of water in the
casing tube from the bottom. Further, adequate control during withdrawal of the casing tube is essential so as to maintain
sufficient head of concrete inside the casing tube at all stages of withdrawal.
2.44.6.1.4 Concrete in piles shall be cast up to a minimum height of 600 mm above the designed top level of pile,
which shall be stripped off at the time of construction of pile cap.
2.44.6.2 Bored Cast In-Situ Piles.
2.44.6.2.1 While concreting uncased piles, voids in concrete shall be avoided and sufficient head of concrete is to be
maintained to prevent inflow of soil or water into the concrete. It is also necessary to take precautions during concreting to
minimize the softening of the soil by excess water. Uncased cast in-situ piles shall not be allowed where mudflow
conditions exist.
2.44.6.2.2 The drilling mud such as bentonite suspension shall be maintained at a level sufficiently above the
surrounding ground water level throughout the boring process, to ensure the stability of the strata which is being
penetrated until the pile has been concreted.
2.44.6.2.3 Where bentonite suspension is used to maintain the stability of the borehole, it is essential that the
properties of the material be carefully controlled at stages of mixing, supply to the borehole and immediately before
concrete is placed. It is usual to limit:
i) The density of bentonite suspension to 1.05 g/cc
ii) The marsh cone viscosity between 30 and 40
iii) The pH value between 9.5 and 12
iv) The silt content less than 1 percent
v) The liquid limit of bentonite not less than 400 percent
These aspects shall act as controlling factors for preventing contamination of bentonite slurry for clay and silt.
2.44.6.2.4 The bores shall be washed by bentonite flushing to ensure clean bottom at two stages viz. after completion
of boring and prior to concreting after placing of reinforcement cage. Flushing of bentonite shall be done continuously with
fresh bentonite slurry till the consistency of inflowing and outflowing slurry is similar.
2.44.6.2.5 For concreting of piles using tremie, Clause 1107 of MoRT&H Specifications may be referred.
For very long or large diameter piles, use of retarding plasticizer in concrete is desirable.
2.44.6.2.6 For large diameter piles, it may be essential to conduct non-destructive pile integrity tests to evaluate
integrity of the pile.
2.44.6.2.7 Where possible, it may be desirable to grout the base of pile with cement slurry under suitable pressure after
concrete in the pile attains the desired strength. For this purpose, conduit pipes with easily removable plugs at the bottom
end, should be placed in the bore along with reinforcement cage before concreting.

121
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.44.7 TOLERANCES (cl. 1116 of MoRT&H)


2.44.7.1 Permissible Tolerances for Piles
(A) Pre-cast Concrete Piles:
o Variation in cross-sectional dimensions : ± 5 mm
o Variation in length : ± 25 mm
o Surface irregularities measured with 3 m straight edge : 5 mm
o Bow for total length in mm : 1 mm/m length of pile limited
to 20 mm
(B) Driven Piles:
o Variation in cross-sectional dimensions : + 50 mm, -10 mm
o Variation from vertical for vertical piles : 1 in 150
o Variation in the final position of the head in plan : 75 mm
o Variation of level of lop of piles : ± 25 mm
(C) Bored Piles:
o Variation in cross-sectional dimensions : + 50 mm, -10 mm
o Variation from vertical for vertical piles : 1 in 150
o Variation in the final position of the head in plan : 75 mm
o Variation of level of lop of piles : ± 25 mm
(D) For raker piles from specified rake : 1 in 25
2.44.7.2 Permissible Tolerances for Pile Caps
o Variation in dimension : +50 mm -10 mm
o Misplacements from specified position in plan : 15 mm
o Surface irregularities measured with 3 m straight edge : 5 mm with 3 m straight edge
o Variation of levels at the top of piles : ± 25 mm

2.45 WELL FOUNDATIONS


2.45.1 GENERAL
2.45.1.1 Wells may have a circular, rectangular or D-shape in plan and may consist of one, two or more
compartments in plan.
2.45.1.2 In case of well foundations of size larger than 12 m diameter, supplemental construction specifications will
be necessary.
2.45.1.3 The subsurface geotechnical investigations to be carried out before commencement of work of well
foundations shall be in accordance with relevant clauses of Section 1900 of MoRT&H Specifications.
2.45.1.4 In case blasting is anticipated for facilitating sinking through difficult strata such as boulders and rock,
special protective/strengthening measures for the curb and steining of the well will be required.
2.45.1.5 Pneumatic sinking may have to be resorted to in cases where the well has to be sunk through rock/hard
strata or where there are obstacles such as tree trunks, large sized boulders etc., which cannot be removed by open
dredging. In such cases, the decision regarding adoption of pneumatic sinking shall be taken on the basis of results of
confirmatory bores and as directed by the Engineer.
2.45.2 SETTING OUT AND PREPARATIONS FOR SINKING (cl. 1203 of MoRT&H)
2.45.2.1 Necessary reference points shall be accurately fixed to mark x-x axis along the direction of traffic and y-y axis
normal to direction of traffic. Such reference points shall be away from the zone of blow-ups or possible settlements which
may result from well sinking operations and shall be connected to the permanent stations with the base line on the banks.
The centre of the individual wells shall be marked with reference to these stations. The distances between the wells shall
be checked with the help of precision instruments.

122
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.45.2.2 A temporary benchmark shall be established near the well foundation, away from the zone of blow-ups or
possible settlement. The bench mark shall be checked regularly with respect to the permanent bench mark established at
the bridge site.
2.45.2.3 For wells located on the banks of the river or in dry area, the bed may be prepared by excavating the soil up to
1.5 m, followed by levelling and dressing before placing the cutting edge.
2.45.2.4 For wells which are to be located in water, a sand island shall be constructed for laying the cutting edge and
well curb. Sand islands are practicable for water depths of up to 5 m under stable bed soil conditions. Where the depth of
water is greater than 5 m or in fast flowing rivers or for locations where soil is too weak to sustain sand island, floating
caissons may have to be adopted.
The plan dimensions of sand islands shall be such as to have a working space of at least 2 m all around the steining of the
well. Sand islands shall be maintained to perform their functions, until the well is sunk to a depth below the original bed
level at least equal to the depth of water at that location.
The sand island shall be held in position and protected against scour by means of wooden bailies properly braced or sheet
piles. The top level of the sand island to be decided by the Engineer, shall be sufficiently above the prevailing water level so
that it is not affected by wave action.
2.45.2.5 Equipment shall be deployed for construction of well foundation as required and as directed by the Engineer.
Generally, the following equipment may be required for the work:
a) crane with grab buckets - capacity 0.5 cum to 2.0 cum
b) submersible pumps
c) air compressors, air locks and other accessories where pneumatic sinking of well is anticipated
d) chisels of appropriate sizes
e) aqua-header for cutting rocky strata
f) diving helmets and accessories
g) batching plants for concrete production
h) equipment for transportation, placing and compaction of concrete

2.45.3 CUTTING EDGE (cl. 1204 of MoRT&H)


2.45.3.1 The cutting edge shall be made from structural steel sections conforming to
2.45.3.2 Section 1900 of these Specifications and shall be strong enough to facilitate sinking of the well through the
type of strata expected to be encountered. The weight of the cutting edge shall not be less than 40 kg per metre length. It
shall be properly anchored into the well curb as shown on the drawing.
2.45.3.3 When there are two or more compartments in a well, the bottom of the cutting edge of the inne r walls shall
be kept at about 300 mm above that of outer walls.
2.45.3.4 In V shaped cutting edge, the inclined plate should meet the vertical plate in such a way that full strength
connection by welding is feasible.
2.45.3.5 The parts of cutting edge shall be erected on level firm ground about 300 mm above prevalent water level.
Temporary supports shall be provided to facilitate fabrication and for maintaining the assembly in true shape. The
fabrication may be carried out in the shop or at site. Steel sections shall not be heated and forced into shape. However,
"V" cuts may be made in the horizontal portion, uniformly throughout the length, to facilitate cold bending. After bending,
such "V" cuts should be closed by welding. Joints in the lengths of structural sections, unless otherwise specified, shall be
fillet welded using single cover plate to ensure the requisite strength of the original section.

2.45.4 WELL CURB (cl. 1205 of MoRT&H)


2.45.4.1 The well curb shall be such that it will offer minimum resistance while sinking but will be strong enough to
be able to transmit superimposed loads from the steining to the bottom plug. The shape and outline dimensions of the
curb shall be as shown in IRC:78. The internal angle of the curb shall be about 30° to 37 ° depending upon geotechnical
data of the strata through which the well is to be sunk.

123
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.45.4.2 The well curb shall be in reinforced concrete having concrete mix in accordance with Table 1700 -2 and
Table 1700-3 and with minimum reinforcement of 72 kg/cum excluding bond rods. The steel shall be suitably detailed to
prevent spreading and splitting of curb during sinking. The outer face of the curb shall be vertical. The bottom ends of
vertical bond rods of steining shall be fixed securely to the cutting edge with check nuts or by welds. Concreting of the well
curb shall be done in one continuous operation.
2.45.4.3 Steel formwork for well curb shall be fabricated strictly in conformity with the drawing. The formwork on
outer face of curb may be removed within 24 hours after concreting while that on inner face shall be removed only after 72
hours.
In case blasting is anticipated, the inner face of the well curb shall be protected with steel plates of thickness not less than
10 mm up to the top of the well curb. If considered necessary, the inner face of steining may also be protected with steel
plates of 6 mm thickness up to a height of 3 m above the top of the well curb or as specified by the Engineer. The curb as
well as 3 m height of steining above the curb, shall be provided with additional hoop reinforcement of 10 mm diameter
bars at 150 mm spacing. Additional hoop reinforcement shall be provided in the steining for a further height of up to two
times the thickness of steining above the plates, so as to avoid cracking which may arise on account of sudden change in
the effective section due to curtailment of plate.
2.45.5 FLOATING CAISSONS (cl. 1206 of MoRT&H)
2.45.5.1 Floating caissons are generally fabricated at or near the banks on dry land or in dry docks and then towed
into position. For floating caissons, a detailed method statement covering fabrication, floating and sinking operations,
shall be prepared and furnished to the Engineer. Such statement shall include the total tonnage of steel involved,
fabrication and welding specifications, list of materials and plant and a description of operations and manpower required
for the work.
2.45.5.2 Floating caissons shall be of structural steel conforming to Section 1900 of these Specifications. The joints
of the fabricated structure shall be absolutely leak-tight and shall be checked against leakage before floating and being
towed to site. The reinforcement of the curb and steining of the well shall be fixed inside the shell by welding before the
caisson is floated. Stability of floating caissons shall be ensured against overturning and capsizing under the action of
water current, wave pressure and wind while being towed and kept in position. To maintain the stability of the shell while
being floated, it may be provided with ballast in the form of water filling up to required level or filling with small amount of
concrete. It shall be ensured that the draught of the floating caisson is always less than the depth of water available, so a s
to facilitate its smooth hindrance-free movement while being towed.
2.45.5.3 Height of caisson shall be planned to ensure that at any given time, at least one metre of the shell shall be
above water level. In case the location is affected by the action of waves, the height shall be suitably increased to avoid
water spilling into the caisson. In case the bed has soft soil, the caisson shall be provided with 3 to 5 metres of additiona l
height, as it may sink by itself after grounding in bed. Simultaneous sinking and concreting is required to prevent caisson
from tilting. In sandy stratum especially with strong water current, appropriate additional height of caisson is necessary fo r
accommodating local scour.
2.45.5.4 The floating caisson shall be held in position against untoward movement by wire ropes/chains, using
winches mounted on stationary suitable platforms/buoys or similar anchoring systems. Anchoring in minimum three
directions, shall be provided to prevent unacceptable longitudinal and lateral movement. The anchoring system s hall
permit small movements in order to facilitate correct positioning of the caisson at the exact location of the well and until
the stage when it is just getting grounded. Special care is necessary where variation in water level is frequent, e.g. in tidal
zones.
2.45.5.5 After being held in correct position, concreting of the floating caisson shall be commenced. The concrete
mixed in batching plants, shall be carried to the floating caisson on barges and placed in position through concrete pumps
or tremie. When large volumes of concreting are involved, the batching plant concrete pump, crane etc, may all be mounted
on a barge kept in the vicinity of the caisson. As no vibration is possible inside the shell, it shall be ensured that the
concrete has a slump of 150 to 200; alternatively, self-compacting concrete can be used. The concrete shall be carefully
placed uniformly all around the caisson so that it settles vertically without any tendency to tilt.
2.45.6 WELL STEINING (cl. 1207 of MoRT&H)

2.45.6.1 The dimensions, shape, concrete strength and reinforcements of the well steining shall strictly conform to
those shown on the drawings. The formwork shall preferably be of M.S. sheets shaped and stiffened suitably. In case
timber forms are used, they shall be lined with plywood or M.S. sheets.

124
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.45.6.2 The height of the first lift of steining to be cast above the well curb shall not be more than 2 m and
subsequent lifts shall not exceed the diameter of the well or the depth of well to be sunk below the bed level at any time.
For stability, the first lift of steining shall be cast only after sinking the curb at least partially. Concreting of steinin g may be
carried out in subsequent lifts of about 2 to 2.5 m. Attempts should be made to minimize the number of construction
joints. The concreting layers shall be limited to 450 mm restricting the free fall of concrete to not more than 1.5 m.
Laitance formed at the top surface of a lift shall be removed to expose coarse aggregates before setting of concrete at the
proposed construction joint. As far as possible, construction joints shall not be kept at the location of laps in the vertical
steining bars.
2.45.6.3 The steining of the well shall be built in one straight line from bottom to top such that if the well is titled, the
next lift of steining will be aligned in the direction of the tilt. The work will be checked carefully with the aid of straig ht
edges of lengths approved by the Engineer. Plumb bob or spirit level shall not be used for alignment. After sinking of a
stage is complete, damaged portions if any, of steining at top of the previous stage shall be properly repaired before
constructing the next stage.
2.45.6.4 For measuring the height of steining, it shall be marked with at least 4 gauges, two in traffic direction and
two normal to traffic direction, distributed equally on the outer face of the well. The marking shall be in the form of a 100
mm wide strip painted on the steining, with every metre marked in black paint. Marking of the gauges shall be done
carefully and accurately with a steel tape, starting with zero at the bottom of the cutting edge. The marking shall be
continued upwards as each lift of steining is added.
2.45.6.5 After reaching the founding level, the well steining shall be inspected to check for any damage or cracks.
The Engineer will direct and the Contractor shall execute the remedial measures, if required, before acceptance of the well
steining. In case the well is found to be unacceptable even after remedial measures are carried out, then it shall stand
rejected.

2.45.7 WELL SINKING (cl. 1208 of MoRT&H)

2.45.7.1 General
The well shall be sunk true and vertical through all types of strata. No well shall be permitted to be placed in a pre -dredged
hole.
Sinking or loading of the well with kentledge shall be commenced only after the steining has been cured for at least 48
hours or as specified in the drawings.
The well shall be sunk by excavating the material uniformly from inside the dredge hole using cranes with grab buckets of
appropriate capacity. Use of water jetting, explosives and divers may be adopted for sinking of wells through difficult
strata, with prior approval of the Engineer. Well sinking can also be carried out by jack down method.
Normally dewatering of well should not be permitted as a means for sinking the well. It shall never be resorted to if there is
any danger of sand blowing under the well. Dewatering shall however be done when well is to be founded in rock.
Pneumatic sinking may have to be resorted to where obstacles such as tree trunks, large sized boulders etc. are met or
when there is hard strata which cannot be removed by open dredging. The necessity for adopting pneumatic sinking shall
be decided by the Engineer.
Complete history of sinking of each well giving details of concreting, sinking and problems met, if any, shall be maintained
in the format given in Appendix VII.
2.45.7.2 Sand Blows in Wells
Dewatering of the well shall not be carried out if sand blows are expected. Any equipment or men working inside the well,
shall be brought outside the well as soon as there are any indications of sand blow occurring. Sand blow can often be
minimized by keeping the level of water inside the well higher than the water table and also by adding heavy kentledge.
2.45.7.3 Use of Kentledge for Sinking of Well
Kentledge shall be placed in an orderly and safe manner on the loading platform and in such a way that it does not
interfere with the excavation of the material from inside the dredge hole and also does not in any way damage the steining
of the well.
Where tilt has occurred or there is a danger of well developing a tilt, the position of the load shall be regulated in such a
manner as to provide greater sinking effort on the higher side of the well.

125
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.45.7.4 Use of Water Jetting


Water jetting can be used to facilitate sinking of wells through clay/hard strata. The decision regarding use of water jettin g
shall be taken at the design stage itself, based on geotechnical investigations which may be indicating presence of hard,
clayey strata. For carrying out water jetting, the required number of steel pipes of 40 to 50 mm diameter shall be
embedded in the steining of the well, spaced evenly around its periphery. The bottom of the steel pipe shall taper down to a
nozzle exiting in the sloping face of the well curb. The diameter of the nozzle shall be 6 mm. The steel pipe shall be kept
about 1 m above the top of each lift of steining, so that it can be extended by means of suitable couplers before the next lift
of steining is cast. When the well reaches the hard strata and the need for water jetting arises, the tops of the embedded
pipes shall be connected to pumps of required capacity for pumping in water at high pressure. The water jet issuing from
the nozzle of the pipe under high pressure, cuts through the hard material and loosens it, permitting the well to sink at a
faster rate than would otherwise have been possible. When water jetting is to be adopted, the Contractor shall furnish a
method statement for approval of the Engineer covering all aspects of the work including the number, capacity and
location of the high pressure pumps and other ancillaries required for executing the work.

2.45.7.5 Use of Jack Down Method


The jack down method of sinking shall be adopted as per requirement or as directed by the Engineer. The first step shall be
to install ground anchors outside the periphery of the well. The number, location and depth of ground anchors are decided
based on the properties of the surrounding soil to develop the necessary resisting force through skin friction. The drill holes
of about 150 mm diameter along with casings shall be taken down to a depth of about 20 m or more below the founding
level of the well, depending on requirements of design. After the holes have been drilled to the required depth, prestressing
strands of adequate diameter and capacity are cut to the desired length and lowered into the holes. The holes shall then be
grouted with cement slurry with non-shrink additive. Once the grouting is completed till the ground level, the casing is
removed. The removal of the casing shall be done before the grout sets. In case rock is met with, the anchors shall be
socketed into rock.
Heavy duty pressurization girders fabricated of steel, shall be placed over stools resting on the steining of the well, against
which the hydraulic jacks connected to the ground anchors, can exert pressure to push the well down. The hydraulic jacks
shall be of capacity 500 T or more as per requirement. Before applying pressure from the jacks, 1 m deep sump is created
inside the well by dredging. Pressure on different jacks is exerted in such a manner as to neutralize any tendency of the well
to tilt. With the use of the jacks and controlled dredging, high rates of sinking can be achieved and the chances of sand
blowing can also be reduced.
For use of jack down method of sinking, the Contractor shall furnish a method statement for approval of the Engineer,
giving full details of construction of ground anchors, fabrication of pressurizing girder, type, number and capacity of jacks
to be used, method of dredging and application of jack down force and all other relevant aspects for proper execution of
the work.

2.45.7.6 Use of Explosives


Mild explosive charges may be used as an aid for sinking of the well. All prevalent laws concerning handling, storing and
using of explosives shall be strictly followed. All safety precautions shall be taken as per IS:4081 "Safety Code for Blasting
and related Drilling Operations", to the extent applicable, whenever blasting is resorted to.
When the likelihood of resorting to blasting is predicted in advance, protection of the bottom portion of the well shall be
done as per Clause 1205.4.
Blasting of any sort shall be done only with prior permission and in the presence of the Engineer. Blasting shall not be done
before the concrete in the steining has hardened sufficiently and is more than 7 days old.
After blasting operations are completed, the well curb and steining should be examined for any cracks and remedial
measures taken if required.
If blasting has been done after the well has reached the design foundation level, normally 24 hours shall be allowed to
lapse before the bottom plug is laid.
The charges shall be exploded well below the cutting edge by making a sump so as to avoid chances of any damage to the
curb or to the steining of the well. A minimum sump of 1 m depth should be made before resorting to blasting. Use of large
charges, 0.7 kg or above, may not be allowed, except under expert direction and with the permission of the Engineer. The
pattern of charges may be suitably arranged with delay detonators so as to reduce the number of charges fired at a time.
The burden of the charge may be limited to 1 m and the spacing of holes may normally be kept as 0.5 m to 0.6 m.

126
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

There should be no equipment inside the well nor shall there be any worker in the close vicinity of the well at the time of
exploding the charges.
If rock blasting is to be done for seating of the well, the damage caused by flying debris should be minimised by covering
blasting holes with rubber mats before detonating the charge.
2.45.7.7 Use of Divers
Divers may be used for removal of obstructions during sinking, carrying out rock blasting and for inspection. All safety
precautions shall be taken as per any acceptable safety code or any statutory regulations in force, when divers carry out
work under water in the well.
Only persons trained in diving operations shall be employed after being certified fit for diving by an approved doctor. They
shall work under expert supervision. The raising of the diver from the bottom of wells shall be controlled so that
decompression rate conforms to the rate as laid down in relevant regulations.
The diving and other equipment shall be of acceptable standard and certified to this effect by an approved independent
agency. They shall be well maintained as per requirements for safe use.
Arrangement for ample supply of low pressure clean cool air shall be ensured through an armoured flexible hose pipe.
Standby compressor shall be provided to cover the contingency of breakdown of the compressor.
Separate high pressure connection shall be made for use of pneumatic tools. Electric lights where provided shall be at 50
volts (maximum).
2.45.7.8 Use of Pneumatic Sinking
2.45.7.8.1 General
The Engineer shall familiarize himself with particular reference to 'caisson diseases' and working of the medical air-lock. A
doctor competent to deal with cases of 'caisson diseases' or other complications arising as a result of working under high
pressure, shall be stationed at the construction site when pneumatic sinking is under progress.
The Contractor shall provide complete facilities and ensure strict enforcement of the requirements outlined in these
specifications.
Safely provisions as contained in IS:4138 and in these specifications shall be strictly followed.
Pneumatic sinking shall be limited to a depth of 30 m below ground level.
2.45.7.8.2 Man Locks and Shafts
Locks, reducers, and shaft used in connection with caissons shall be of riveted construction throughout. The material used
in their manufacture shall be steel plate with thickness not less than 6 mm.
Shafts shall be subjected to hydrostatic or air pressure test so as to ensure leak-tightness at a pressure of at least 0.5 MPa.
The pressure at which testing has been done shall be clearly and visibly displayed.
The shaft shall be provided with safe, proper and suitable staircase for its entire length including landing platforms which
shall be not more than 6 m apart. Where this is impracticable due to space constraints, suitable ladders along with landing
platforms shall be installed. These shall be kept clear and in good condition at all times and shall be constructed,
inspected and maintained to the entire satisfaction of the Engineer.
A 1 m wide platform with 1 m high railing shall be provided all round the caisson air locks.
Where 15 or more men are employed, caissons shall have two locks, one of which shall be used as a man -lock.
Locks shall be located so that the lowest part of the bottom door shall not be less than 1 m above the highest water level in
the well.
The supply of fresh air to the working chamber shall at all times be sufficient to permit work to be done without any danger
or excessive discomfort. All air supply lines shall be fitted with check valves.
A man lock shall be used solely for the compression or decompression of workers and not for the passage of plant and
material and shall be maintained in a reasonably clean and sufficiently warm state. However, any hand tool or hand
instruments used for the purpose of the work may be carried into the man lock,
Where it is not reasonably practicable to provide a separate man lock for use by workers only, the lock when it is in actual
use for compression or decompression of a person, shall be in a reasonably clean and sufficiently warm state and shall not
be put simultaneously to any other use.
127
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.45.7.8.3 Valves
Exhaust valves shall be provided, having risers extending to the upper part of the chamber. These shall be opera ted,
whenever necessary specially after a blast. Precautions shall be taken that men are not allowed to resume work after a
blast, until the gas and smoke have cleared.

2.45.7.8.4 Medical Supervision and Certification


Every employee absent from work for 10 or more consecutive days due to illness or any other disability, shall be required to
pass the regular physical examination by the doctor before being permitted to return to work.
After a person has been employed continuously in compressed air for a period of 2 months, he shall be re-examined by the
doctor and shall not be permitted to work until such re-examination has been made and the report is satisfactory.
No person known to be addicted to the excessive use of intoxicants shall be permitted to work in compressed air.
The doctor shall, at all times, keep a complete and full record of examination made by him, which shall contain dates of
examinations, a clear and full description of the persons examined, his age and physical condition at the time of
examination and a statement as to the period for which he has been engaged in such work. Records shall be kept at the
place where the work is in progress and shall be subject to inspection by authorized officers.
Every man lock shall always have a doctor or a responsible person in attendance. In case the person in charge is not a
doctor, he must have positive means of promptly communicating with and securing the services of a competent doctor in
case of emergency. Such arrangements shall invariably be subject to the approval of the Engineer.
All cases of compressed-air illness shall be reported and copies of all such reports shall be kept in file at the place of work.

2.45.7.8.5 Lighting
All lighting in compressed air chambers shall be operated only by electricity. Two independent electric lighting systems
with independent sources of supply shall be used. These shall be so arranged that the emergency source shall become
automatically operative in case of failure of the regularly used source.
The minimum intensity of light on any walkway ladder, stairway, or lower working level shall be one-quarter (1/4)
candlepower. In all work places, the lighting shall always be such as to enable workmen to see their way about clearly. All
external parts of lighting fixtures and electrical equipment lying within 2.5 m above the floor shall be constructed of non-
combustible, non-absorbing insulating materials. If metal is used, it must be effectively earthed. Portable lamp shall have
non-combustible, non-absorbing insulating sockets, approved handles, basket guards and approved cables. The use of
worn out or defective portable and pendant conductors is prohibited.

2.45.7.8.6 Safety Against Fire Hazard


No oil, gasoline, or other combustible material shall be stored within 30 m of any shaft, caisson or tunnel opening. It shall
be positively ensured that leaking flammable liquids do not flow into such areas. Oil may be stored in suitable tanks in
isolated fireproof buildings, which are not less than 15m away from any shaft, caisson, or tunnel opening or any building
directly connected thereto.
Where feasible, a fire hose connected to a suitable source of water shall be provided at the top of every caisson. Where fire
mains are not accessible, water shall be stored in tanks near the top of every caisson, provided fire pails or suitable pumps
are kept available. Approved fire extinguishers shall also be provided.

2.45.7.8.7 Sanitation
Properly heated, lighted and ventilated dressing rooms shall be provided for all employees engaged in compressed air
work. Such rooms shall contain lockers and benches and be open and accessible to person during intermissions between
shifts. Adequate toilet accommodation of one for every twenty five employees shall be provided.
Care shall be taken to keep all parts of the caissons and other working compartments, including locker rooms, dry rooms,
rest rooms and other equipment in good sanitary condition and free from refuse, decaying or other objectionable matter.
Smoking shall be strictly prohibited and matches and smoking materials shall not be allowed to be brought into the locker
rooms.
A separate dry room shall be provided where working clothes may be dried in a reasonable time.

128
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.45.7.8.8 Protection Against Gases


In all cases where release of gas is expected as in the case of sinking through alluvium impregnated with decayed
vegetable matter, the use of Davy Safety Lamp shall be compulsory.

2.45.7.8.9 Additional Safety Provisions


a) The weight of the pneumatic platform and that of steining and kentlege, if any, shall be sufficient to
resist the uplift from air inside, skin friction being neglected in this case. If at any section, the total
weight acting downwards is less than the uplift pressure of air inside, additional kentledge shall be
placed on the well.
If it is not possible to make the well heavy enough during excavation, "blowing down" may be used.
The men should be withdrawn and air pressure reduced. The well should then begin to move with small
reduction in air pressure. "Blowing down" should only be used when the ground is such that it will not
heave up inside the chamber when the pressure is reduced. When the well does not move with the
reduction in air pressure, kentledge should be added. "Blowing down" should be in short stages and
the drop should not exceed, 0.5 m at any stage. To control sinking during blowing down, use of
packing is recommended.
b) The pneumatic sinking plant and other allied machinery shall not only be of proper design and make,
but also shall be operated by competent and well trained personnel. Every part of the machinery and
its fixtures shall be minutely examined before installation and use. Availability of appropriate spares,
standbys, safety of personnel as recommended in IS:4138 for working in compressed air must be
ensured at site. Codes for safety and for working in compressed air and other labour laws and
practices prevalent in the country, as specified to provide safe, efficient and expeditious sinking shall
be followed.
c) Inflammable materials shall not be taken into air locks and smoking shall be prohibited. Wherever
gases are suspected to be issuing out of dredge hole, the same shall be analysed by trained personnel
and necessary precautions adopted to avoid hazard to life and equipment.
d) Where blasting is resorted to, it shall be carefully controlled and all required precautions shall be
observed. Workers shall be allowed inside after blasting only when a competent and qualified person
has examined the chamber and steining thoroughly and found the same to be safe.

2.45.7.9 Precautions During Sinking

a) When wells have to be sunk close to each other and clear distance between them is less than the
diameter of wells, sinking shall be taken up on all wells and they shall be sunk alternately so that the
sinking proceeds uniformly. Simultaneous and even dredging shall be carried out in the wells in such a
manner that the difference in the levels of the sump and cutting edge in the adjacent wells does not
exceed half the clear gap between them. Plugging of all the wells shall be done together.
b) During sinking of double D-shaped wells, the excavation in both the dredge holes should be carried
out simultaneously and equally.
c) Bore chart shall be referred to constantly during sinking for taking adequate care while piercing
different types of strata. The type of soil as obtained during the well sinking should be compared with
bore chart so as to take prompt decisions.
d) Before seasonal floods, all wells on which sinking is in progress shall be sunk to sufficient depths
below the designed scour level. Further, they shall be temporarily filled and plugged so that they do not
suffer any tilt or shift during the floods.
e) All necessary precautions shall be taken against any possible damage to the foundations of existing
structures in the vicinity of the wells, prior to commencement of dredging from inside the well.
f) The dredged material shall not be allowed to accumulate around the well. It shall be dumped and
spread, as far away as possible, and then continuously and simultaneously removed, as directed by
the Engineer. In case the river stream flows along one edge of the well being sunk, the dredged
material shall not be dumped on the dry side of the bank but on the side on which the river current
flows.

129
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

g) Very deep sump shall not be made below the well curb, as it entails risk of jumping (sudden sinking) of
the well. The depth of sump shall be generally limited to one-sixth of the outer diameter/least lateral
dimension of the well in plan. Normally the depth of sump shall not exceed 3.0 m below the level of the
cutting edge unless otherwise specially permitted by the Engineer.
h) In case a well sinks suddenly with a jerk, the steining of the well shall be examined to the satisfaction
of the Engineer to see that no damage has occurred to it.
i) In pneumatic sinking, the well shall not, at any time, be dropped to a depth greater than 500 mm by
the method of "blowing down".
j) Dewatering shall be avoided if sand blows are expected. Any equipment and men working inside the
well shall be brought out of the well as soon as there are any indications of a sand-blow.
k) Sand blowing in wells can often be minimized by keeping the level of water inside the well higher than
the water table and also by adding heavy kentledge.
l) In soft strata prone to settlement/creep, the construction of the abutment wells shall be taken up only
after the approach embankment for a sufficient distance near the abutment, has been completed.

2.45.7.10 Tilts and Shifts


Unless otherwise specified, the tilt of any well i.e. its inclination from the vertical, shall not exceed 1 (horizontal) in 80
(vertical). The shift of the well i.e. the horizontal displacement of the centre of the well at the founding level from its
theoretical position, shall not be more than 150 mm in any resultant direction.
Tilts and shifts shall be carefully checked and recorded regularly during sinking operations in the format given in Appendix
- VIII. For the purpose of measuring the tilts along the two axes of the bridge, reduced level of the marks painted on the
surface of the steining of the well shall be taken. For determination of shift, locations of the ends of the two diameters shall
be precisely measured along the two axes, with reference to fixed reference points.
Whenever any tilt is noticed, adequate corrective measures like placing eccentric kentledge, pulling, strutting, anchoring or
depositing more dredged material outside the tilted face, water/air jetting, shall be adopted before any further sinking.
After correction, the dredged material shall be removed and disposed of sufficiently away from the affected well. In case of
sinking by jack down method tilt can be controlled by suitably adjusting jack down pressure on one side.
A pair of wells close to each other have a tendency to come closer while sinking. Timber struts may be introduced in
between the steining of these wells to prevent such movement.
Tilts occurring in a well during sinking in dipping rocky strata can be controlled by suitably supporting the curb.
In the event of a well developing tilt or shift beyond the specified permissible values, the Contractor shall have to carry out,
at his own cost, suitable remedial measures to the satisfaction of the Engineer, to bring the tilt and shift within permissible
values.
If the resultant tilt and shift of any well exceeds 1 in 80 or 150 mm respectively the well so sunk shall be regarded as not
conforming to specification and classified as substandard work. The Engineer in his sole discretion, may consider
accepting such a well, provided:

i) Calculations for foundation pressures and steining stresses, accounting for the actual tilt and shift
furnished by the Contractor show that the well is safe, remedial measures required to bring the
stresses within permissible values (such as increase in the dimension of the well cap, provision of
dummy weights on the well cap etc.), shall be carried out by the Contractor at his own cost.
ii) The Contractor shall be subjected to reduction in rates as a penalty in accordance with Clause
1215(g).
In case the Engineer, in his discretion, rejects the well, the Contractor shall dismantle the rejected well to the extent
directed by the Engineer and remove the debris. Further, the Contractor shall at his own risk and cost, complete the bridge
with modified span arrangement acceptable to the Engineer.

130
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.45.7.11 Seating of Wells


The well shall be uniformly seated on the founding strata. It shall be ensured by test borings that the properties of the soil
encountered at the founding level and up to a depth of one and a half times the well diameter, is identical to that adopted
in the design. The procedure for test boring shall be in accordance with the provisions of these Specifications. In case the
soil encountered is inferior to that adopted in design, the well shall be re-designed by the Engineer adopting the soil
properties actually encountered and the founding level intimated to the Contractor, who shall carry out the work
accordingly.
In case of seating of wells in hard rocky strata, where the rock profile is steeply sloping, pneumatic methods of sinking may
be adopted to seat the well evenly as directed by the Engineer. The decision of adopting pneumatic sinking shall be taken
by the Engineer. The cutting edge may also be embedded for a suitable depth in the rocky strata, as decide d by the
Engineer keeping in view the quality of rock. A sump of depth 300 mm in hard rock or 600 mm in ordinary rock shall be
made inside the well by chiselling or blasting as approved by Engineer. Diameter of sump shall be 1.5 m to 2 m less than
that of the dredge hole. After the well has been evenly seated on good hard rock, arrangements shall be made to facilitate
proper inspection in dry and visible conditions before the bottom plug is laid.

2.45.8 BOTTOM PLUG (cl. 1209 of MoRT&H)


A bottom plug of concrete shall be provided in all wells, the top level of which shall be kept a minimum of 300 mm above
the top of the curb, as shown in IRC78. A suitable sump shall be made below the level of the cutting edge. Before
concreting the bottom plug, it shall be ensured that the inside faces of curb and steining have been cleaned thoroughly.
The concrete mix used in bottom plug shall have a minimum cement content of 330 kg per cu.m with a slump about 150
mm, to permit easy flow of concrete through tremie to fill up all cavities. Concrete shall be laid in one continuous operation
till the dredge hole is filled to the required height. For under water concreting, the concrete shall be placed by tremie under
still water condition and the minimum cement content shall not be less than 330 kg/m3 inclusive of all mineral
admixtures, if added.
In case of grouted concrete, the grout mix shall not be leaner than 1:2. It shall be ensured that the grout fills up all
interstices upto the top of the bottom plug by suitable means such as, controlling the rate of pumping etc.
Any dewatering required, shall only be done 7 days after casting of bottom plug.
The concrete production and placement equipment should be sufficient to enable under water concreting within stipulated
time. Necessary standby equipment should be available for emergency situation.
Before commencing plugging, all loose material from the bottom of the well shall be removed. Concreting shall be done in
one continuous operation till the dredge hole is filled up to the required height and thereafter soundings shall be taken to
ensure that the concrete has been laid to the required height. Least disturbance shall be caused to the water inside the
well while laying concrete in the bottom plug. The concrete after placing, shall not be disturbed in any way for at least 7
days.
In order to check whether there is any rise in the level of the bottom plug, soundings should be taken at the close of
concreting and once every day for the next 3 days.
The soundness of the bottom plug may be tested by dewatering the well to a level 5 m below the surrounding water level
and checking the rise of water. For foundation subjected to artesian pressure, the depth of dewatering by 5 m shall be
measured form the still water level created inside the well by the construction of false steining. The rate of rise shall
preferably be less than 10 cm per hour. In case the rate is higher, suitable remedial measures as directed by the Engineer,
shall be taken by the Contractor at his own cost.
2.45.9 SAND FILLING (cl. 1210 of MoRT&H)
Sand filling shall commence 7 days after laying of bottom plug. The level of the top of the bottom plug shall be verified
before starting sand filling.
The sand shall be clean and free from earth, clay clods, roots, boulders, shingles, etc. and shall be compacted as directed.
Sand filling shall be carried out up to the level shown on the drawing or as directed by the Engineer.
2.45.10 TOP PLUG (cl. 1211 of MoRT&H)
After filling sand up to the required level, a top plug of 300 mm thick concrete of grade M 15, shall be provided over it as
shown on the drawing or as directed by the Engineer.

131
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.45.11 WELL CAP (cl. 1212 of MoRT&H)


A reinforced cement concrete well cap will be provided over the top of the steining in accordance with the drawing.
Formwork will be prepared conforming to the shape of well cap. In case sand filling has been carried out up to the top of
the well, the concrete of the well cap may be laid directly on it after it has been suitably levelled. Otherwise, suitable
shuttering supported on the inside of the steining, shall be provided for carrying the weight of the green concrete of the we ll
cap.
Concreting shall be carried out in dry condition. A properly designed false steining may be provided where required, to
ensure that the well cap is laid in dry condition.
The bottom of the well cap shall be laid preferably as low as possible but above the LWL in the active channel. Where the
bed level is higher than the LWL, the top of the well cap may be suitably raised and kept 1m below existing ground level.
Bond rods of steining shall be anchored into the well cap.

2.45.12 TOLERANCES (cl. 1213 of MoRT&H)


The permissible tilt and shift shall not exceed 1 (horizontal) in 80 (vertical) and the shift at the well base shall n ot be more
than 150 mm in any resultant direction.
For the well steining and well cap, the permissible tolerances shall be as follows:
a) Variation in dimension : +50 mm, -10 mm
b) Misplacement from specified : 15 mm position in plan
c) Surface unevenness measured with : 5 mm 3 m straight edge
d) Variation of level at the top : ± 25 mm

2.46 FORMWORK

2.46.1 MATERIALS (cl. 1502 of MoRT&H)


AH materials shall comply with the requirements of IRC:87. Materials and components used for formwork shall be
examined for damage or excessive, deterioration before use/re-use and shall be used only if found suitable after necessary
repairs. In case of timber formwork, the inspection shall not only cover physical damages but also signs of attacks by
decay, rot or insect attack or the development of splits.
Forms shall be constructed with metal or timber. The metal used for forms shall be of such thickness that the forms remain
true to shape. All bolts should be countersunk. The use of approved internal steel ties or steel or plas tic spacers shall be
permitted. Structural steel tubes used as support for forms shall have a minimum wall thickness of 4 mm. Other materials
conforming to the requirements of IRC:87 may also be used if approved by the Engineer.

2.46.2 DESIGN OF FORMWORK (cl. 1503 of MoRT&H)

a) The design, erection and removal of formwork shall conform to IRC:87 "Guidelines for Formwork, False
work and Temporary Structures" and these specifications. The forms shall be such as to ensure that
they can be conveniently removed without disturbing the concrete. The design shall facilitate proper and
safe access to all parts of formwork for inspection.
b) The Contractor shall furnish the design and drawing of complete formwork (i.e. the forms as well as their
supports) for approval of the Engineer before any erection is taken up. If proprietary system of formwork
is used, the Contractor shall furnish detailed information as per Appendix 1500/1, to the Engineer for
approval.
c) Notwithstanding any approval or review of drawing and design by the Engineer, the Contractor shall be
entirely responsible for the adequacy and safety of formwork.
d) 1503.3 In the case of prestressed concrete superstructure, careful consideration shall be given to
redistribution of loads on props due to prestressing.

132
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.46.3 WORKMANSHIP (cl. 1504 of MoRT&H)


2.46.3.1 The formwork shall be robust and strong and the joints shall be leak-proof. Ballies shall not be used as
staging. Staging must have cross bracings and diagonal bracings in both directions. Staging shall be provided with an
appropriately designed base plate resting on firm strata.
2.46.3.2 The number of joints in the formwork shall be kept to a minimum by using large sized panels. The design
shall provide for proper "soldiers" to facilitate alignment. All joints shall be leak proof and must be properly sealed. Use of
PVC joint sealing tapes, foam rubber or PVC T-section, is essential to prevent leakage of grout.
2.46.3.3 As far as practicable, clamps shall be used to hold the forms together. Where use of nails is unavoidable,
minimum number of nails shall be used and these shall be of the double-headed type. Alternatively, if the nails are of the
normal type, they shall be left partially projecting without being driven to their full length, so that they can be withdrawn
easily.
2.46.3.4 Use of ties shall be restricted, as far as practicable. Wherever ties are used they shall be used with HDPE
sheathing so that they can easily be removed. No parts prone to corrosion shall be left projecting or near the surface. The
sheathing shall be grouted with cement mortar of the same strength as that of the structure.
2.46.3.5 Unless otherwise specified, or directed, chamfers or fillets of size 25 mm x 25 mm shall be provided at all
angles of the formwork to avoid sharp corners. The chamfers, beveled edges and mouldings shall be made in the formwork
itself. Opening for fixtures and other fittings shall be provided in the shuttering as directed by the Engineer.
2.46.3.6 Shuttering for walls, sloping members and thin sections of considerable height shall be provided with
temporary openings to permit inspection and cleaning out before placing of concrete.
2.46.3.7 The formwork shall be constructed with pre-camber to the soffit to allow for deflection of the formwork. This
shall be in addition to the pre-camber for the permanent structure as shown on the drawings.
2.46.3.8 Where centering trusses or launching trusses are adopted for casting of superstructure, the joints of the
centering trusses, whether welded, riveted or bolted shall be thoroughly checked periodically. Also, various members of the
centering trusses should be periodically examined for proper alignment and unintended deformation before proceeding
with the concreting. They shall also be periodically checked for any deterioration in quality due to steel corrosion.
Launching truss, casting truss of span more than 40 m and travelling forms, shall be load tested before they are put to use.
2.46.3.9 The formwork shall be so made as to produce a finished concrete true to shape, line and levels and
dimensions as shown on the drawings, subject to the tolerances specified in respective Sections of these specifications, or
as directed by the Engineer.
2.46.3.10 Where metal forms are used, all bolts and rivets shall be countersunk and well ground to provide a smooth,
plane surface. Where timber is used it shall be well seasoned, free from loose knots, projecting nails, splits or other defects
that may mar the surface of concrete.
2.46.3.11 Forms shall be made sufficiently rigid by the use of ties and bracings to prevent any displacement or sagging
between supports. They shall be strong enough to withstand all pressure, ramming and vibration during and after placing
the concrete. Screw jacks or hard wood wedges where required shall be provided to make up any settlement in the
formwork either before or during the placing of concrete.
2.46.3.12 The formwork shall ensure the correct final shape of the structure, with the calculated amount of positive or
negative camber. The deformation of false work, scaffolding or propping and the instantaneous or deferred deformation
due to various causes arising in prestressed structures shall be properly accounted for.
2.46.3.13 Suitable camber shall be provided to horizontal members of structure, specially in long spans, to counteract
the effects of deflection. The formwork shall be so fixed as to provide for such camber.
2.46.3.14 The formwork shall be coated with an approved release agent that will effectively prevent sticking and will
not stain the concrete surface. Lubricating oils (machine oils) shall be prohibited for use as coating.
2.46.4 LINING OF FORMWORK (cl. 1505of MoRT&H)
The formwork shall be lined with material approved by the Engineer so as to provide a smooth finish of uniform texture and
appearance. This material shall leave no stain on the concrete and shall be so fixed to its backing as not to impart any
blemishes. It shall be of the same type and obtained from only one source throughout for the construction of any one
structure. The contractor shall make good any imperfections in the resulting finish as required by the Engineer. Internal ties
and embedded metal parts shall be carefully detailed and their use shall be subject to the approval of the Engineer.

133
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.46.5 PRECAUTIONS (cl. 1506 of MoRT&H)


The following precautions shall be observed:
i) It shall be ensured that any cut-outs or openings provided in any structural member to facilitate
erection of formwork, are closed with the same grade of concrete as that of the structure, after
formwork is removed.
ii) Provision for safe access to the formwork shall be made at all levels as required.
iii) Close watch shall be maintained to check for settlement of formwork during concreting and any
settlement shall be promptly rectified.
iv) Natural ground shall be checked for bearing capacity and likely settlement before erection of the
staging.
v) It shall be ensured that water used for curing or rain water does not stagnate near the base plate of
the staging.
vi) For shutters used for deep and narrow member, temporary openings in the sides shall be provided to
facilitate pouring and compaction of concrete.
2.46.6 PREPARATION OF FORMWORK BEFORE CONCRETING (cl. 1507 of MoRT&H)
The inside surfaces of forms shall, except in the case of permanent formwork or where otherwise agreed to by the Engineer,
be coated with a release agent supplied by approved manufacturer or of an approved material to prevent adhesion of
concrete to the formwork. Release agents shall be applied strictly in accordance with the manufacturer's instructions and
shall not be allowed to come in contact with any reinforcement or prestressing tendons and anchorages. Different release
agents shall not be used in formwork for exposed concrete.
Before re-use of forms, the following actions shall be taken :
a) The contact surfaces of the forms shall be cleaned carefully and dried before applying a release agent.
b) It should be ensured that the release agent is appropriate to the surface to be coated. The same type
and make of release agent shall be used throughout on similar formwork materials and different types
should not be mixed.
c) The form surfaces shall be evenly and thinly coated with release agent. The vertical surface shall be
treated before horizontal surface and any excess wiped out.
d) It shall be ensured that the reinforcement or the surface of the hardened concrete shall not come in
contact with the release agent.
All forms shall be thoroughly cleaned immediately before concreting.
The Contractor shall give the Engineer due notice before placing any concrete in the forms to permit him to inspect and
approve the formwork. However, such inspection shall not relieve the contractor of his responsibility for safety of formwork,
men, machinery, materials and finish or tolerances of concrete.
2.46.7 REMOVAL OF FORMWORK (cl. 1508of MoRT&H)
The scheme for removal of formwork (i.e. de-shuttering and de-centering) shall be planned in advance and furnished to the
Engineer for scrutiny and approval. No formwork or any part thereof shall be remove d without prior approval of the
Engineer.
The formwork shall be so removed as not to cause any damage to concrete. Centering shall be gradually and uniformly
lowered in such a manner as to permit the concrete to take stresses due to its own weight uniformly and gradually to avoid
any shock or vibration.
Form work shall not be released unless the concrete has achieved strength of at least twice the stress the concrete may be
subjected at the time of the removal of formwork. When no test is conducted for determination of strength of concrete and
where the time of removal of formwork is not specified, the same shall be as under:
a) Walls, piers, abutments, columns and vertical faces of structural members 12 to 48 hours as may be decided by the Engineer
b) Soffits of Slabs (with props left under) 3 days
c) Props left under slabs 14 days
d) Soffits of Girders (with props left under) 7 days
e) Props (left under girders) 21 days

134
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

The above time schedule is applicable when ordinary Portland Cement is used without any admixtures at an ambient
temperature exceeding 10°C.
For concrete made with Portland pozzolona cement, Portland slag cement or mineral admixtures, additional cube samples
shall be taken for verifying the strength of concrete to decide the time of deshuttering.
Where there are re-entrant angles in the concrete sections, the formwork should be removed at these sections as soon as
possible after the concrete has set, in order to avoid cracking due to shrinkage of concrete.
Additional precautions as given in Clause 8.17 of IRC: 87, shall also be followed.

2.46.8 RE-USE OF FORMWORK (cl. 1509 of MoRT&H)


When the formwork is dismantled, its individual components shall be examined for damage and damaged pieces shall be
removed for rectification. Such examination shall always be carried out before their use again. Before re-use all
components shall be cleaned of deposits of soil, concrete or other unwanted materials. Threaded parts shall be oiled after
cleaning.
All bent steel props shall be straightened before re-use. The maximum permissible deviation from straightness is 1/600 of
the length. The maximum permissible axial loads in used props shall be suitably reduced depending upon their condition.
The condition of the timber components, plywood and steel shuttering plates shall be examined closely for distortion and
defects before re-use.

2.46.9 SPECIALISED FORMWORK (cl. 1510 of MoRT&H)


Specialised formwork such as slip form, floating caisson and travelling form, wherever used shall be designed and detailed
by competent agencies and a set of complete working drawings and installation instructions supplied to the Engineer. In
case proprietary equipment is used, the supplier shall furnish drawings, details, installation instructions etc, in the form of
manuals along with the formwork.
For slip form, the rate of climb of the formwork shall be designed for each individual case taking into account various
parameters including the grade of concrete, concrete strength, concrete temperature, ambient temperature and concrete
admixtures.
For floating caisson, the details of fabrication, floating to site and placing in position shall be as given in Clause 1203.5 of
MoRT&H Specifications.
In order to verify the time and sequence of striking/removal of specialised formwork, routine field tests for the consistency
and strength development of concrete are mandatory.
For specialised formwork, the form lining material may be either plywood or steel sheet of appropriate thickness.

2.47 STEEL REINFORCEMENT


2.47.1 GENERAL
Steel for reinforcement shall meet the requirements of Section 1000 of MoRT&H Specifications.
Reinforcements may be either mild steel or high strength deformed bars. They may be uncoated or coated with epoxy.
2.47.2 PROTECTION OF REINFORCEMENT (cl. 1603 of MoRT&H)
Uncoated reinforcing steel shall be protected from rusting or chloride contamination. Reinforcements shall be free from
rust, mortar, loose mill scale, grease, oil or paints. This may be ensured either by using reinforcement fresh from the facto ry
or by thoroughly cleaning it using any suitable method such as sand blasting, mechanical wire brushing etc., as directed by
the Engineer. Reinforcements shall be stored above the ground in a clean and dry condition, on blocks, racks or platforms
and shall be suitably marked to facilitate inspection and identification.
Portions of uncoated reinforcing steel and dowels projecting from concrete, shall be protected within one week after initial
placing of concrete, with a brush coat of neat cement mixed with water to a consistency of thick paint. This coating shall be
removed by lightly tapping with a hammer or other tool not more than one week before placing of the adjacent pour of
concrete. Coated reinforcing steel shall be protected against damage to the coating. If the coating on the bars is damaged
during transportation or handling and cannot be repaired, the same shall be rejected.
In case of fusion bonded epoxy coated reinforcement or hot dipped galvanized bars used, reference shall be made Clause
1010.3.2 of Section 1000 of these specifications.
135
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.47.3 BENDING OF REINFORCEMENT (cl. 1604 of MoRT&H)

Bar bending schedule shall be furnished by the Contractor and got approved by the Engineer before start of work.
Reinforcing steel shall conform to the dimensions and shapes given in the approved Bar Bending Schedules.
Bars shall be bent cold to the specified shape and dimensions or as directed by the Engineer using a proper bar bender,
operated by hand or power to obtain the correct shape and radii of bends.
Bars shall not be bent or straightened in a manner that will damage the parent material or the coating.
Bars bent during transport or handling shall be straightened before being used on work. They shall not be heated to
facilitate straightening.

2.47.4 PLACING OF REINFORCEMENT (cl. 1605 of MoRT&H)

a) The reinforcement cage should generally be fabricated in the yard at ground level and then shifted and
placed in position. The reinforcement shall be placed strictly in accordance with the drawings and shall
be assembled in position only when the structure is otherwise ready for placing of concrete. Prolonged
time gap between assembling of reinforcement and casting of concrete, which may result in rust
formation on the surface of the bars, shall not be permitted.

b) Reinforcement bars shall be placed accurately in position as shown on the drawings. The bars, crossing
one another shall be tied together at every intersection with binding wire (annealed), conforming to
IS:280 to make the skeleton of the reinforcement rigid such that the reinforcement does not get
displaced during placing of concrete, or any other operation. The diameter of binding wire shall not be
less than 1 mm.

c) Bars shall be kept in position usually by the following methods:

i) In case of beam and slab construction, industrially produced polymer cover blocks of thickness
equal to the specified cover, shall be placed between the bars and formwork, subject to satisfactory
evidence that the polymer composition is not harmful to concrete and reinforcement. Cover blocks
made of concrete may be permitted by the Engineer, provided they have the same strength and
specification as those of the member.
ii) In case of dowels for columns and walls, the vertical reinforcement shall be kept in position by
means of timber templates with slots cut in them accurately, or with cover blocks tied to the
reinforcement. Timber templates shall be removed after the concreting has progressed upto a level
just below their location.
iii) Layers of reinforcements shall be separated by spacer bars at approximately one metre intervals.
The minimum diameter of spacer bars shall be 12 mm or equal to maximum size of main
reinforcement or maximum size of coarse aggregate, whichever is greater. Horizontal reinforcement
shall not be allowed to sag between supports.
iv) Necessary stays, blocks, metal chairs, spacers, metal hangers, supporting wires etc. or other
subsidiary reinforcement shall be provided to fix the reinforcement firmly in its correct position.
v) Use of pebbles, broken stone, metal pipe, brick, mortar or wooden blocks etc., as devices for
positioning reinforcement shall not be permitted.

d) Bars coated with epoxy shall be placed on supports that do not damage the coating. Supports shall be
installed in a manner such that planes of weakness are not created in hardened concrete. The coated
reinforcing steel shall be held in place by use of plastic or plastic coated binding wires especially
manufactured for the purpose. Refer Section 1000 of these Specifications for other requirements.

e) Placing and fixing of reinforcement shall be inspected and approved by the Engineer before concreting
is commenced.

136
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.47.5 BAR SPLICES (cl. 1606 of MoRT&H)


2.47.5.1 Lapping
All reinforcement shall be furnished in full lengths as indicated on the drawing. No splicing of bars, except where shown on
the drawing, shall be permitted without approval of the Engineer. The lengths of the splice shall be as indicated on drawing
or as approved by the Engineer. Where practicable, overlapping bars shall not touch each other, and shall be kept apart by
25 mm or 1.25 times the maximum size of coarse aggregate, whichever is greater. If this is not feasible, overlapping bars
shall be bound with annealed steel binding wire not less than 1 mm diameter and twisted tight in such a manner as to
maintain minimum clear cover to the reinforcement from the concrete surface. Lapped splices shall be staggered or
located at points along the span where stresses are low.
2.47.5.2 Welding
2.47.5.2.1 Splicing by welding of reinforcement will be permitted only if detailed on the drawing or approved by the
Engineer. Weld shall develop an ultimate strength equal to or greater than that of the bars connected.
2.47.5.2.2 While welding may be permitted for mild steel reinforcing bars conforming to IS:432, welding of deformed
bars conforming to IS: 1786 shall in general be prohibited. Welding may be permitted in case of bars of other than Fe 240
grade including special welding grade of Fe 415 grade bars conforming to IS: 1786, for which necessary chemical analysis
has been secured and the carbon equivalent (CE) calculated from "the chemical composition using the formula :
Mn Cr+Mg+V Ni+Cu
CE = C + + +
6 5 15
is 0.4 or less.
2.47.5.2.3 The method of welding shall conform to IS:2751 and IS:9417, any supplemental specifications and
Clause 1904.8 of these Specifications to the satisfaction of the Engineer.
Welding may be carried out by metal arc welding process. Oxy-acetelene welding shall not be permissible. Any other
process may be used subject to the approval of the Engineer and necessary additional requirements to ensure satisfactory
joint performance. Precautions on overheating, choice of electrode, selection of correct current in arc welding etc., should
be strictly observed.
All bars shall be butt welded except for smaller diameter bars (diameter of less than 20 mm) which may be lap welded.
Single-V or Double-V butt joints may generally be used. For vertical bars single bevel or double bevel joints may be used.
Welded joints shall be located well away from bends and shall be not less than twice the bar diameter away from a bend.
Generally, shop welding in controlled conditions is to be preferred, where feasible. Site welding where necessary shall,
however, be permitted when the facilities, equipment, process, consumables, operators and welding procedure, are
adequate to produce and maintain uniform quality at par with that attainable in shop welding, to the satisfaction of the
Engineer.
Joint welding procedures which are to be employed shall invariably be established by a procedure specification. All welders
and welding operators to be employed shall be qualified by tests prescribed in IS:2751. Inspection of welds shall conform
to IS:822 and destructive or non-destructive testing may be undertaken when deemed necessary. Joints with weld defects
detected by visual inspection or dimensional check inspection, shall not be accepted.
Suitable means shall be provided for holding the bars securely in position during welding. It must be ensured that no voids
are left in welding. When welding is done in two or three stages, the surface shall be cleaned properly after each stage.
Bars shall be cleaned of all loose scale, rust, grease, paint and other foreign matter before carrying out welding. Only
competent and experienced welders shall be employed on the work with the approval of the Engineer. No welding shall be
done on coated bars.
M.S. electrodes used for welding shall conform to IS:814.
2.47.5.2.4 Welded joints shall preferably be located at points where steel will not be subject to more than 75 percent of
the maximum permissible stresses and welds so staggered that at any one section, not more than 20 percent of the bars
are welded.
2.47.5.2.5 Specimens of welded pieces of reinforcement taken from the site, shall be tested. The number and
frequency of tests shall be as directed by the Engineer.

137
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.47.5.3 Mechanical Couplers and Anchorages

2.47.5.3.1 Mechanical Couplers


Bars may be joined with approved patented mechanical devices as indicated on the drawing or as approved by the
Engineer e.g. by special grade steel sleeves swaged on to bars in end to end contact or by screwed couplers. In case such
devices are permitted by the Engineer, they shall develop at least 125 percent of the characteristic strength of the
reinforcement bar.

2.47.5.3.2 Anchorages
Bars may be anchored with approved patented mechanical anchorages as indicated on the drawing or as approved by the
Engineer. The anchorages shall be connected to the reinforcing bar by the use of taper thread system. The anchorage shall
be capable of developing the characteristic strength of reinforcement without damage to concrete and shall have sufficient
diameter and width to develop adequate shear cone strength. The connection shall develop 12 5% of the characteristic
strength of reinforcement bar.

2.48 STRUCTURAL CONCRETE

2.48.1 GRADES OF CONCRETE (cl. 1703 of MoRT&H)

2.48.1.1 The grades of concrete shall be designated by the characteristic strength as given in Table 1700-1, where
the characteristic strength is defined as the strength of concrete below which not more than 5 percent of the test results are
expected to fall.
Table 91 : Grades of Concrete (Table 1700-1 of MoRT&H)
Ty pe of Concr et e/Gr ade Designat ion
Char act er ist ic S t r engt h in MPa
Nominal Mix Concrete S t andard Concr et e High Per for mance Concr et e
M15 M15 15
M20 M20 20
M25 25
M30 M30 30
M40 M35 35
M45 M40 40
M50 M45 45
M50 50
M55 55
M60 60
M65 65
M70 70
M75 75
M80 80
M85 85
M90 90

1) Normal Mix Concrete is made on the basis of nominal mix proportioned by weight of its main ingredients - cement, coarse
and fine aggregates and water.
2) Standard concrete is made on the basis of design mix proportioned by weight of its ingredients, which in addition to cement,
aggregates and water, may contain chemical admixtures to achieve certain target values of various properties in fresh
condition, achievement of which is monitored and controlled during production by suitable tests. Generally, concrete of
grades up to M50 are included in this type.
3) High Performance Concrete is similar to standard concrete but contains additional one or more mineral admixtures providing
binding characteristics and partly acting as inert filler material which increases its strengt h, reduces its porosity and modifies
its other properties in fresh as well as hardened condition. Concrete of grades upto M90 are included in this type.
4) For concrete of grades higher than M90, the design parameters may be obtained from specialized literature and
experimental results.
2.48.1.2 The minimum grades of concrete and corresponding minimum cement content and maximum water/cement
ratios for different exposure conditions shall be as indicated in Table 1700-2 of MoRT&H.

138
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.48.1.3 For concrete subjected to sulphate attack the minimum grades of concrete, minimum cement content and
maximum water/cement ratios and types of cement for different concentration of sulphate content shall be as indicated in
Table 1700-3.

Table 92 : Requirement of Concrete for Different Exposure Condition using 20 mm Aggregate (Table 1700-2 of MoRT&H)
Max imum Wat er Cement Minimum Cement Cont ent ,
Ex posure Condit ion Minimum Gr ade of Concr et e
Rat io k g/m³
Moderate 0.45 340 M25
Severe 0.45 360 M30
Very Severe 0.40 380 M40
Not e :
1) All three provisions given in the above table for a particular exposure condition shall be satisfied.
2) The term cement for maximum w/c ratio and minimum cement content shown in Table includes all cementitious
materials mentioned in Clause 1715.2. The maximum limit of flyash and ground granulated blast furnace slag in the
blended cement shall be as specified in IS: 1489 (Part 1) and IS: 455 respectively.
3) For plain cement concrete, with or without surface reinforcement, the minimum grade of concrete can be lowered by 5
MPa and maximum water/cement ratio exceeded by 0.05.
Cement content shown in the above table shall be increased by 40 kg/m3 for use of 12.50 mm nominal size aggregates
and decreased by 30 kg/m3 for use of 40 mm nominal size aggregates.
The maximum cement content excluding any mineral admixtures (Portland cement component alone) shall not exceed 450
kg/cu.m.
2.48.2 Requirements of Consistency
The mix shall have the consistency which will allow proper placement and compaction in the required position. Every
attempt shall be made to obtain uniform consistency. Slump test shall be used to measure consistency of the concrete.
The optimum consistency for various types of structures shall be as indicated in Table 1700 -4, or as directed by the
Engineer. The slump of concrete shall be checked as per IS: 516.

Table 93 : Requirements of Consistency (Table 1700-4 of MoRT&H)


S lump (mm)
Ty pe
(at the Time of Placing of Concr et e)
1) a) Structure with exposed inclined surface requiring low slump concrete to allow 25
proper compaction
b) Plain cement concrete 25
2) RCC structure with widely spaced reinforcements; e.g. solid columns, piers, 40-50
abutments, footings, well steining
3) RCC structure with fair degree of congestion of reinforcement; e.g. pier 50-75
and abutment caps, box culverts, well curb, well cap, walls with thickness greater
than 300 mm
4) RCC and PSC structure with highly congested reinforcements e.g. deck 75-125
slab girders, box girders, walls with thickness less than 300 mm
5) Underwater concreting through tremie e.g. bottom plug, cast in-situ piling 150-200

Notwithstanding the optimum consistency indicated against SI. No. 1 to 3, the situation should be property assessed to
arrive at the desired workability with the adjustment of admixture in each case, where the concrete is to be transported
through transit mixer and placed using concrete pump. Under these circumstances, the optimum consistency during
placement for the items of work of SI. No. 1 to 3, can be considered ranging from 75 mm to 150 mm. This is, however,
subject to satisfying the other essential criteria of strength, durability etc. and approval of the Engineer.

2.48.3 Requirements for Design Mixes

2.48.3.1 Target Mean Strength

The target mean strength of specimen shall exceed the specified characteristic compressive strength by at least the current
margin.

139
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

i) The current margin for a concrete mix shall be determined by the Contractor and shall be taken as 1.64
times the standard deviation of sample test results taken from at least 40 separate batches of concrete of
nominally similar proportions produced at site by the same plant under similar supervision, over a period
exceeding 5 days, but not exceeding 6 months.
ii) Where there is insufficient data to satisfy the above, the current margin for the initial design mix shall be
taken as given in Table 1700-5 of MoRT&H

The initial current margin given in Table 1700-5 shall be used till sufficient data is available to determine the current
margin as per Sub-Clause 1704.2.1 (i).

2.48.3.2 Trial Mixes


The Contractor shall give notice to the Engineer to enable him to be present at the time of carrying out trial mixes and
preliminary testing of the cubes. Prior to commencement of trial mix design, all materials forming constituents of proposed
design mix should have been tested and approval obtained in writing from the Engineer. Based on test results of material,
draft mix design calculation for all grades of concrete to be used in the works, shall be prepared after taking into account
the provisions in the Contract Technical Specifications, Guidelines of IS:10262, IS:SP:23 and IRC:112 and submitted to
the Engineer for approval. Prior to commencement of concreting, trial mix design shall be performe d for all grades of
concrete and trial mix which has been found successful, shall be submitted by the Contractor and approval obtained.
During concreting with the approved trial mix design, if source of any constituents is changed, the mix design shall be
revised and tested for satisfying the strength requirements.
The initial trial mixes shall be carried out in a laboratory approved by the Engineer. However, Engineer may permit the initial
trial mixes to be prepared at the site laboratory of the Contractor, if a full-fledged concrete laboratory has been established
well before the start of construction, to his entire satisfaction, Sampling and testing procedures shall be in accordance
with these Specifications.
When the site laboratory is utilized for preparing initial mix design, the concrete production plant and means of transport
employed to make the trial mixes shall be similar to those proposed to be used in the works.
For each trial mix, a set of six cubes shall be made from each of three consecutive batches for purposes of testing. Three
cubes from each set of six shall be tested at an age of 28 days and three at an earlier age approved by the Engineer. The
cubes shall be made, cured, stored, transported and tested in accordance with these Specifications. The mean strength of
the nine cubes at 28 days shall exceed the specified characteristic strength by the current margin minus 3.5 MPa.

2.48.3.3 Control of Strength of Design Mixes

a) Adjustment to Mix Proportions


Adjustment to mix proportions arrived at in the trial mixes, shall be made subject to the Engineer's
approval, in order to minimize the variability of strength and to maintain the target mean strength.
Such adjustments shall not be taken to imply any change in the current margin.
b) Change of Current Margin
When required by the Engineer, the Contractor shall recalculate the current margin in accordance with
Clause 1704.2.1. The recalculated value shall be adopted as directed by the Engineer, and it shall
become the current margin for concrete produced thereafter.
c) Additional Trial Mixes
In case any changes are observed in the properties of fresh concrete and/or strength of hardened
concrete on the basis of early age tests, additional mixes and tests shall be carried out during
production, so as to control and bring the quality of concrete within acceptable limits. In case of any
change in the source or properties of materials, the design of mix shall be established afresh.

2.48.4 Requirements of Nominal Mix Concrete


Requirements for nominal mix concrete unless otherwise specified shall be as given in Table 1700-6 of MoRT&H.

140
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

Table 94 : Requirements for Nominal Mix Concrete (Table 1700-6 of MoRT&H)


Tot al Quantity of Dry Aggregate by Mass per 5 0 k g Max imum Quantit y of Wat er
Pr oportion of F ine to Coarse for 50 kg of Cement (Lit r es)
Concrete Grade of Cement to be taken as t he S um of Indiv idual
Aggr egat e (by Mass)
Masses of F ine and Coar se Aggr egat es (k g) PCC RCC
M 15 350 Generally 1:2, subject to 25
upper limit 1:1.5 and lower
M20 250 limit of 1:2.5 25 22

2.48.5 Grading of Aggregates for Pumped Concrete


Materials for pumped concrete shall be batched consistently and uniformly. Maximum size of aggregate shall not exceed
one-third of the internal diameter of the pipe.
The grading of aggregates shall be continuous and shall have sufficient ultra-fine materials (material finer than 0.25 mm).
Proportion of fine aggregates passing through 0.25 mm shall be between 15 and 30 percent and that passing through
0.125 mm sieve shall not be less than 5 percent of the total volume of aggregate. Admixtures to increase workability can
be added. When pumping long distances and in hot weather, set-retarding admixtures can be used. Fluid mixes can be
pumped satisfactorily after adding plasticisers and super plaslicisers. Suitability of concrete shall be verified by trial mixes
and by performing pumping test.
2.48.6 ADMIXTURES (cl. 1705 of MoRT&H)
2.48.6.1 Chemical Admixtures
Chemical admixtures such as superplasticisers, or air entraining, water reducing, accelerating and retarding agents for
concrete, may be used with the approval of the Engineer.
As the selection of an appropriate concrete admixture is an integral part of the mix design, the manufacturers shall
recommend the use of any one of their products only after obtaining complete information of all the actual constituents of
concrete as well as methodologies of manufacture, transportation and compaction of concrete proposed to be used in the
work. Admixtures/additives conforming to IS:9103 may be used subject to approval of the Engineer. However,
admixtures/additives generating hydrogen or nitrogen and containing chlorides, nitrates, sulphides, sulphates or any other
material likely to adversely affect the steel or concrete, shall not be permitted.
The general requirements for admixtures are given in Clause 1007 of these Specifications.
Compatibility of the admixtures with the cement and any other pozzolona or hydraulic addition shall be ensured by for
avoiding the following problems
i) Requirement of large dosage of superplasticiser for achieving the desired workability,
ii) Excessive retardation of setting,
iii) Excessive entrainment of large air bubbles,
iv) Unusually rapid stiffening of concrete,
v) Rapid loss of slump
vi) Excessive segregation and bleeding.
2.48.6.2 Mineral Admixtures
For use of mineral admixtures, refer Clauses 1714.1 and 1715.2.
2.48.7 SIZE OF COARSE AGGREGATES (cl. 1706 of MoRT&H)
The size (maximum nominal) of coarse aggregates for concrete to be used in various components shall be as given in Table
1700-7.
Table 95 : Maximum Nominal Size of Coarse Aggregates (Table 1700-7 of MoRT&H)
Max imum Nominal S ize of Coar se Aggr egat e
Component s
(mm)
I) RCC well curb 20
ii) RCC/PCC well steining 40
iii) Well cap or Pile Cap Solid type piers and abutments 40
iv) RCC work in girder, slabs wearing coat, kerb, approach slab, hollow piers 20
and abutments, pier/abutment caps, piles
v) PSC Work 20
vi) Any other item As specified by the Engineer
141
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

Maximum nominal size of aggregates shall also be restricted to the smaller of the following values :
a) 10 mm less than the minimum lateral clear distance between individual reinforcements
b) 10 mm less than the minimum clear cover to the reinforcement
c) One quarter of minimum thickness of member
The proportions of the various individual sizes of aggregates shall be so adjusted that the grading produces the densest
mix and the grading curve corresponds to the maximum nominal size adopted for the concrete mix.
2.48.8 EQUIPMENT (cl. 1707 of MoRT&H)
Unless specified otherwise, equipment for production, transportation and compaction of concrete shall be as under:
a) Production of Concrete :
i) For overall bridge length of less than 200 m - batch type concrete mixer, diesel or electric
operated, with a minimum size of 200 litres automatic water measuring system and integral
weigher (hydraulic/pneumatic type).
ii) For overall bridge length of 200 m or more - concrete batching and mixing plant fully automatic,
with minimum capacity of 15 cum per hour.
All measuring devices of the equipment shall be maintained in a clean and serviceable condition. Their accuracy shall be
checked over the range in use, when set up at each site and thereafter, periodically as directed by the En gineer.
The accuracy of the measuring devices shall fail within the following limits :
Measurement of Cement ± 3 percent of the quantity of cement in each batch
Measurement of Water ± 3 percent of the quantity of water in each batch
Measurement of Aggregate ±3 percent of the quantity of aggregate in each batch
Measurement of Admixture ± 3 percent of the quantity of admixture in each batch
b) Transportation of Concrete:
i) Concrete dumpers minimum 2 tonnes capacity
ii) Powered hoists minimum 0.5 tonne capacity
iii) Chutes
iv) Buckets handled by cranes
v) Transit truck mixer
vi) Concrete pump
vii) Concrete distributor booms
viii) Belt conveyor
ix) Cranes with skips
x) Tremies
c) For Compaction of Concrete :
i) Internal vibrators size 25 mm to 70 mm
ii) Form vibrators minimum 500 watts
iii) Screed vibrators full width of carriageway (upto two lanes)

2.48.9 BATCHING, MIXING, TRANSPORTING, PLACING AND COMPACTION (cl. 1708 of MoRT&H)
2.48.9.1 General
Prior to start of concreting, the Contractor shall submit for approval of the Engineer, his programme along with list of
equipment proposed to be used by him for batching, mixing, transporting and placing concrete.
2.48.9.2 Batching of Concrete
In batching concrete:
• The quantity of cement, aggregate and mineral admixtures, if used, shall be determined by mass.
• Chemical admixtures, if solid, shall be determined by mass.
• Liquid admixtures may be measured in volume or mass, and
• Water shall be weighed or measured by volume in a calibrated tank.

142
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

The concrete shall be sourced from on-site or off-site batching and mixing plants, or from approved Ready Mixed Concrete
plants, preferably having quality certification.
Except where supply of properly graded aggregate of uniform quality can be maintained over a period of work, the grading
of aggregate should be controlled by obtaining the coarse aggregate in different sizes and blending them in the right
proportions when required, the different sizes being stocked in separate stock piles. The materials should be stock piled
several hours, preferably a day before use. The grading of coarse and fine aggregate should be checked as frequently as
possible to ensure that the specified grading is maintained.
The water/cement ratio shall always be maintained constant at its correct value. To this end, determination of moisture
content in both fine and coarse aggregates shall be made as frequently as possible, depending on weather conditions. The
amount of added water shall be adjusted to compensate for any observed variations in the moisture content. To allow for
the variation in mass of aggregate due to variation in moisture content, suitable adjustment in the mass of aggregate, shall
also be made. Accurate control shall be kept on the quantity of mixing water, which when specified, shall not be changed
without approval.
2.48.9.3 Mixing Concrete
2.48.9.3.1 Mixing at Site
All concrete shall be machine mixed. In order to ensure uniformity and good quality of concrete the ingredients shall be
mixed in a power driven batch mixer with hopper and suitable weigh batching arrangement or in a central mix plant. Hand
mixing shall not be permitted. The mixer or the plant shall be at an approved location considering the properties of the
mixes and the transportation arrangements available with the Contractor. The mixer or the plant shall be approved by the
Engineer.
Mixing shall be continued till materials are uniformly distributed, a uniform colour of the entire mass is obtained and each
individual particle of the coarse aggregate shows complete coating of mortar containing its proportionate amount of
cement. In no case shall mixing be done for less than 2 minutes. It shall be ensured that the mixers are not loaded above
their rated capacities and are operated at a speed recommended by the manufacturer. When mineral admixtures are
added at the mixing stage, their thorough and uniform blending with cement shall be ensured, if necessary by longer mixing
time. The addition of water after the completion of the initial mixing operation, shall not be permitted.
Mixers which have been out of use for more than 30 minutes shall be thoroughly cleaned before putting in a new batch and
also before changing from one type of cement to another.
2.48.9.3.2 Ready Mix Concrete
Use of ready mix concrete proportioned and mixed off the project site and delivered to site in a freshly mixed and
unhardened state conforming to IS:4926, shall be allowed with the approval of the Engineer.
2.48.9.4 Transporting Concrete
Mixed concrete shall be transported from the place of mixing to the place of final deposit as rapidly as possible by
methods which will prevent the segregation or loss of the ingredients. The method of transporting or placing of concrete
shall be approved by the Engineer. Concrete shall be transported and placed as near as practicable to its final position so
that no contamination, segregation or loss of its constituents materials take place.
Concrete may be transported by transit mixers or properly designed buckets or by pumping. Transit mixers or othe r hauling
equipment when used should be equipped with the means of discharge of concrete without segregation. During hot or cold
weather, concrete shall be transported in deep containers. Other suitable methods to be reduce the loss of water by
evaporation in hot weather and heat loss in cold weather may also be adopted.
When concrete is conveyed by chute, the plant shall be of such size and design as to ensure practically continuous flow.
Slope of the chute shall be so adjusted that the concrete flows without excessive quantity of water and without any
segregation of its ingredients. The delivery end of the chute shall be as close as possible to the point of deposit. The chut e
shall be thoroughly flushed with water before and after each working period and the water used for this purpose shall be
discharged outside the formwork.
In case concrete is to be transported by pumping, the fresh concrete should have adequate fluidity and cohesiveness to be
pumpable. Proper concrete mix proportioning and initial trials should ensure this. The conduit shall be primed by pumping
a batch of mortar through the line to lubricate it. Once the pumping is started, it shall not be interrupted, as concrete
standing idle in the line is liable to cause plug. The operator shall ensure that some concrete is always there in the pump's
receiving hopper during operation. The lines shall always be maintained clean and free of dents.

143
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

Pipelines from the pump to the placing area shall be laid with minimum bends. For large quantity placements, standby
pumps shall be available. Suitable air release valves, shutoff valves etc. shall be provided as per site requirements. The
pumping of priming mix i.e. rich mix of creamy consistency, to lubricate the concrete pump and pipelines, shall precede the
pumping of concrete. Continuous pumping shall be done to the extent possible. After concreting, the pipelines and
accessories shall be cleaned immediately. The pipes for pumping shall not be made of material which has adverse effect
on concrete. Aluminium alloy pipelines shall not be used.
2.48.9.5 Placing of Concrete
All formwork and reinforcement contained in it shall be cleaned and made free from standing water, dust, snow or ice
immediately before placing of concrete.
No concrete shall be placed in any part of the structure until the approval of the Engineer has been obtained. If concreting
is not started within 24 hours of the approval being given, the approval shall have to be obtained again from the Engineer.
Concreting shall proceed continuously over the area between the construction joints. Fresh concrete shall not be placed
against concrete which has been in position for more than 30 minutes, unless a proper construction joint is formed.
The concrete shall be deposited as nearly as practicable in its original position to avoid re-handling. Methods of placing
should be such as to preclude segregation. Care should be taken to avoid displacement of reinforcement or movement of
formwork. To achieve this, concrete should be lowered vertically in the form and horizontal movement of concrete inside
the forms should, as far as practicable, be minimised.
The concrete shall be placed and compacted before its initial setting so that it is amenable to compaction by vibration. The
workability of concrete at the time of placement shall be adequate for the compaction equipment to be used. If there is
considerable time gap between mixing and placing of concrete, as in the case of ready mixed concrete plants or off -site
batching and mixing plants, concrete mix shall be designed to have appropriately higher workability at the time of
discharge from the mixer, in order to compensate the loss of workability during transit. This is generally achieved by
suitable chemical admixtures. Keeping these considerations in view, the general requirement for ready mixed concrete
plants or off-site batching and mixing plants, is that concrete shall be discharged from the truck mixer within two hours of
the time of loading. A longer period may be permitted if suitable retarding admixtures are used.
In wall forms, drop chutes attached to hoppers at the top should preferably be used to lower concrete to the bottom of the
form. As a general guidance, the permissible free fall of concrete may not exceed 1.5 metres and under no circumstance s
shall it be more than 2 metres. When free fall of larger height is involved, self-compacting concrete having adequate
fluidity, cohesiveness and viscosity and which uniformly and completely fills every corner of the formwork by its own weight
without segregation, shall be used.
Except where otherwise agreed to by the Engineer, concrete shall be deposited in horizontal layers to a compacted depth
of not more than 450 mm when internal vibrators are used and not more than 300 mm in all other cases.
Concrete when deposited shall have temperature of not less than 5°C and preferably not more than 30°C and in no case
more than 40°C. In case of site mixing, fresh concrete shall be placed and compacted in its final position within 30
minutes of its discharge from the mixer. When the concrete is carried in properly designed agitator operating continuously,
the concrete shall be placed and compacted within 1 hour of the addition of cement to the mix and within 30 minutes of its
discharge from the agitator. It may be necessary to add retarding admixtures to concrete, if trials show that the periods
indicated above are unacceptable. In all such matters, the Engineer's decision shall be final.
2.48.9.6 Compaction of Concrete
Concrete shall be thoroughly compacted by vibration or other means during placing and worked around the reinforcement,
tendons or duct formers, embedded fixtures and into corners of the formwork to produce a dense homogeneous void-free
mass having the required surface finish. When vibrators are used, vibration shall be done continuously during the placing
of each batch of concrete until the expulsion of air has practically ceased and in a manner that does not promote
segregation. Over-vibration shall be avoided to minimize the risk of forming a weak surface layer. When external vibrators
are used, the design of formwork and disposition of vibrator shall be such as to ensure efficient compaction and to avoid
surface blemishes. Vibrations shall not be applied through reinforcement and where vibrators of immersion type are used,
contact with reinforcement and all inserts like ducts etc., shall be avoided.
When internal vibrators are used, they shall be inserted vertically to the full depth of the layer being placed and ordinarily
shall penetrate the layer below for a few centimetres. The vibrator should be kept in place until air bubbles cease escaping
from the surface and then withdrawn slowly to ensure that no hole is left in the concrete, care being taken to see that it
remains in continued operation while being withdrawn. The internal vibrators shall be inserted in an orderly manner and the
distance between insertions should be about one and half times the radius of the area visibly affected by vibration.
144
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

Additional vibrators in serviceable condition shall be kept at site so that they can be used in the event of breakdown.
Mechanical vibrators used shall comply with IS:2502, !S:2506, IS:2514 and IS:4656.

2.48.10 CONSTRUCTION JOINTS (cl. 1709 of MoRT&H)


Construction joints shall be avoided as far as possible. In no case shall the locations of such joints be changed or
increased from those shown on the drawings except with the express approval of the Engineer.
Joints should be positioned where they are readily accessible for preparation and concreting. Construction joints should be
positioned to minimize the effects of the discontinuity of the durability, structural integrity and appearance of the structure.
As far as possible, joints should be provided in non-aggressive zones, but if joints in aggressive zones cannot be avoided,
they should be sealed. Joints should be located away from the regions of maximum stress caused by loading; particularly
where shear and bond stresses are high.
In beams and slabs joints should not be near the supports. Construction joints between slabs and ribs in composite
beams, shall be avoided. For box girders, there shall be no construction joint between the soffit and webs.
Joints should be either vertical or horizontal. For a vertical construction joint, the lifts of concrete shall finish level or at right
angles to the axis of the member. Concreting shall be continued right up to the joint.
Before resuming work at a construction joint when concrete has not yet fully hardened, all laitance shall be removed
thoroughly. The surface shall be roughened, taking care to avoid dislodgement of coarse aggregates. Concrete shall be
brushed with a stiff brush soon after casting, while the concrete has only slightly stiffened. If the concrete has partially
hardened, it may be treated by wire brushing or with a high pressure water jet, followed by drying with an air jet,
immediately before the new concrete is placed. Fully hardened concrete shall be treated with mechanical hand tools or grit
blasting, taking care not to split or crack aggregate particles. The practice of first placing a layer of mortar or grout when
concreting joints, shall be avoided. The old surface shall be soaked with water, without leaving puddles, immediately
before starting concreting. The new concrete shall be thoroughly compacted against it.
Where there is likely to be a delay before placing the next concrete lift, protruding reinforcement shall be protected. In all
cases, where construction joints are made, the joint surface shall not be contaminated with release agents, dust, or
sprayed curing membrane and reinforcement shall be firmly fixed in position at the correct cover.
The sequence of concreting, striking of forms and positioning of construction joints for every individual structure, shall be
decided well in advance of the commencement of work.

2.48.11 CONCRETING UNDER WATER (cl. 1710 of MoRT&H)


When it is necessary to deposit concrete under water, the methods, equipment, materials and proportions of mix to be
used, shall be got approved from the Engineer before any work is started.
Concrete shall not be placed in water having a temperature below 5°C. The temperature of the concrete, when deposited,
shall not be less than 16°C, nor more than 30°C.
Coffer dams or forms shall be sufficiently tight to ensure still water conditions, if practicable, and in any case to reduce the
flow of water to less than 3 m per minute through the space into which concrete is to be deposited. Coffer dams or forms in
still water shall be sufficiently tight to prevent loss of mortar through the joints in the walls. Pumping shall not be done
while concrete is being placed, or until 24 hours thereafter. To minimise the formation of laitance, care shall be exercised
not to disturb the concrete as far as possible while it is being deposited.
All under water concreting shall be carried out by tremie method only. The number and spacing of the tremies should be
worked out to ensure proper concreting. However, it is necessary to have a minimum number of 2 tremies for any
concreting operation, so that even if one of the tremies goes out of commission during concreting, the other one can be
used to complete the work. The tremie concreting when started, should continue without interruption for the full height of
the member being concreted. The capacity of the concrete production and placement equipment should be sufficient to
enable the underwater concreting to be completed uninterrupted within the stipulated time.
The top section of the tremie shall have a hopper large enough to hold one full batch of the mix or the entire contents of the
transporting bucket, as the case may be. The tremie pipe shall not be less than 200 mm in diameter and shall be large
enough to allow a free flow of concrete and strong enough to withstand the external pressure of the wa ter in which it is
suspended, even if a partial vacuum develops inside the pipe. Preferably, flanged steel pipe of adequate strength shall be
used. A separate lifting device shall be provided for each tremie pipe with its hopper at the upper end. Unless the lower end
of the pipe is equipped with an approved automatic check valve, the upper end of the pipe shall be plugged with a wadding

145
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

of gunny sacking or other approved material before delivering the concrete to the tremie pipe through the hopper, so that
when the concrete is forced down from the hopper to the pipe, it will force the plug (and along with it any water in the pipe )
down the pipe and out of the bottom end, thus establishing a continuous stream of concrete. It will be necessary to raise
the tremie slowly in order to allow a uniform flow of concrete. At all times after placing of concrete is started and until a ll
the required quantity has been placed, the lower end of the tremie pipe shall be kept below the surface of the plastic
concrete and shall not be taken out of concrete. This will cause the concrete to build up from below instead of flowing out
over the surface and thus avoid formation of layers of laitance. It is advisable to use retarders or suitable superplasticize rs
to retard the setting time of concrete, which shall be established before the commencement of work.

2.48.12 Concreting in Cold Weather


Where concrete is to be deposited at or near freezing temperature, precautions shall be taken to ensure that at the time of
placing, it has a temperature of not less than 5°C and that the temperature shall be maintained above 4°C until the
concrete has hardened. When necessary, concrete ingredients shall be heated before mixing but cement shall not be
heated artificially other than by the heat transmitted to it from other ingredients of the concrete. Stockpiled aggregate may
be heated by the use of dry heat or steam. Aggregates shall not be heated directly by gas or on sheet metal over fire. In
general, the temperature of aggregates or water shall not exceed 65°C. Salt or other chemicals shall not be used for the
prevention of freezing. No frozen material or materials containing ice shall be used. All concrete damaged by frost shall be
removed. Concrete exposed to freezing weather shall have entrained air and the water content of the mix shall not exceed
30 litres per 50 kg of cement. To counter slower setting of concrete, accelerators can be used with the approval of the
Engineer. However, accelerators containing chloride shall not be used.

2.48.13 Concreting in Hot Weather


When depositing concrete in hot weather, precautions shall be taken so that the temperature of wet concrete does not
exceed 30°C while placing. This shall be achieved by using chilled mixing water, using crushed ice as a part of mixing
water, shading stock piles of aggregates from direct rays of the sun, sprinkling the stock piles of coarse aggregate with
water to keep them moist, limiting temperature of cement below 30°C at the time of use, starting curing before concrete
dries out and restricting time of concreting as far as possible to early mornings and late evenings. When ice is used to cool
mixing water, it will be considered as part of the water in design mix. Under no circumstances shall the mixing operation be
considered complete until all ice in the mixing drum has melted. The Contractor will be required to state his methodology
for the Engineer's approval when temperatures of concrete are likely to exceed 30°C during the work.

2.48.14 PROTECTION AND CURING (cl. 1712 of MoRT&H)


2.48.14.1 General
Concreting operations shall not commence until adequate arrangements for concrete curing have been made by the
Contractor. Curing and protection of concrete shall start immediately after compaction of the concrete.
The concrete shall be protected from:
a) Premature drying out particularly by solar radiation and wind
b) High internal thermal gradients
c) Leaching out by rain and flowing water
d) Rapid cooling during the first few days after placing
e) Low temperature or frost
f) Vibration and impact which may disrupt the concrete and interfere with its bond to the reinforcement.
g) Vibration caused by traffic including construction traffic.
Concrete shall be protected, without allowing ingress of external water, by means of wet (not dripping) gunny bag s, hessian
etc. Once the concrete has attained some degree of hardening (approximate 12 hrs after mixing), moist curing shall
commence and be continued through the requisite period. Where members are of considerable size and length, with high
cement content, accelerated curing methods may be applied, as approved by the Engineer.

2.48.14.2 Water Curing


Water for curing shall be as specified in Section 1000 of these specifications.
Sea water shall not be used for curing. Sea water shall not come into contact with concrete members before they have
attained adequate strength.

146
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

The concrete should be kept constantly wet by ponding or covering or use of sprinklers/ perforated pipes for a minimum
period of 14 days after concreting, except in the case of concrete with rapid hardening cement, where it can be reduced to
5 days. Water should be applied on surfaces after the final set. Curing through watering shall not be done on green
concrete. On formed surfaces, curing shall start immediately after the forms are stripped. The concrete shall be kept
constantly wet with a layer of sacking, canvas, hessian or similar absorbent material.

2.48.14.3 Steam Curing


Where steam curing is adopted, it shall be ensured that it is done in suitable enclosure to contain the live steam in order to
minimize moisture and heat losses. The initial application of the steam shall be after about four hours of placement of
concrete to allow the initial set of the concrete to take place.
Where retarders are used, the waiting period before application of the steam shall be increased to about six hours.
The steam shall be at 100 percent relative humidity to prevent loss of moisture and to provide excess moisture for proper
hydration of the cement. The application of steam shall not be directly on the concrete. Steam curing is applied in
enclosures or tunnels through which concrete members are transported on a conveying system. Alternatively, portable
enclosures or plastic covers are placed over precast members and steam is supplied to the enclosures. The rate of increase
or decrease of temperature should not be more than 10°C to 20°C per hour and the maximum temperature shall be about
70°C. The maximum temperature shall be maintained until the concrete has attained the desired strength required at the
end of steam curing period and shall be decided by prior trials. When steam curing is discontinued, the air temperature
shall not drop at a rate exceeding 10°C per hour, until a temperature of about 10°C above the ambient temperature
outside has been reached. Steam curing of concrete shall be followed by water curing for at least 7 days. The concrete shall
not be exposed to temperatures below freezing for at least six days after curing.

2.48.14.4 Curing Compound


Membrane forming curing compounds consisting of waxes, resins, chlorinated rubbers etc. may be permitted by the
Engineer in special circumstances. Curing compounds shall not be used on any surface which requires further finishing to
be applied. All construction joints shall be moist cured and no curing compound shall be permitted in locations where
concrete surfaces are required to be bonded together.
Liquid membrane forming compounds shall conform to ASTMC 309 and the curing efficiency shall be as per ASTMC 156.
Curing compounds shall be continuously agitated during use. All concrete cured by this method shall receive two
applications of the curing compound. The first coat shall be applied immediately after acceptance of concrete finish. If the
surface is dry, the concrete shall be saturated with water and curing compound applied as soon as the surface film of water
disappears. The second application shall be made after the first application has set. Placement in more than two coats
may be required to prevent streaking. The membrane formed shall be stripped off after 14 days, when curing is complete.
Impermeable membranes, such as sheet materials for curing concrete conforming to ASTM C 171 or polyethylene sheeting
covering closely the concrete surface, may also be used to provide effective barrier against evaporation.

2.48.15 FINISHING (cl. 1713 of MoRT&H)


Immediately after the removal of forms, exposed bars or bolts, if any, shall be cut inside the concrete member to a depth of
at least 50 mm below the surface of the concrete and the resulting holes filled with cement mortar. All fins caused by form
joints, all cavities produced by the removal of form ties and ail other holes and depressions, honeycomb spots, broken
edges or corners, and other defects, shall be thoroughly cleaned, saturated with water and carefully pointed and rendered
true with mortar. The mortar shall be of cement and fine aggregate mixed in the proportions used in the grade of concrete
that is being finished and of as dry a consistency as possible. Considerable pressure shall be applied in filling and pointing
to ensure thorough filling in all voids. Surfaces which have been pointed shall be kept moist for a period of twenty four
hours. Special pre-packaged proprietary mortars shall be used where appropriate or where specified in the drawing.
All construction and expansion joints in the completed work shad be left carefully tooled and free from any mortar and
concrete. Expansion joint filler shall be left exposed for its full length with clean and true edges.
Immediately on removal of forms, the concrete work shall be examined by the Engineer before any defects are made good.
The work that has sagged or contains honeycombing to an extent detrimental to structural safety or architectural
appearance of the member, shall be rejected. Surface defects of a minor nature may be accepted. On acceptance of such
work, the same shall be rectified as directed by the Engineer.

147
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.48.16 CONCRETE WITH BLENDED CEMENTS OR MINERAL ADMIXTURES (cl. 1714 of MoRT&H)
2.48.16.1 Production of Concrete
In order to improve the durability of the concrete, use of blended cement or blending of mineral admixtures, is permitted.
The maximum limit of flyash and ground granulated blast furnace slag in concrete, shall be as specified in Clause 1715.2.
Blending at site shall be permitted only through a specific facility with complete automated process control to achieve the
specified design quality or through RMC plants with similar facility.
2.48.16.2 Modified Properties
For concrete made with Portland Pozzolona Cement, Portland Blast furnace slag cement or mineral admixtures, the setting
time and rate of gain of strength are different from those of concrete made with OPC alone. Cognizance of such modified
properties shall be taken in deciding de-shuttering time, initial time of prestressing, curing period and for early age
loading.
2.48.16.3 Compatibility of Chemical Admixtures
Compatibility of chemical admixtures and superplasticizers with Portland Pozzolona cement, Portland blast furnace slag
cement and mineral admixtures shall be ensured by trials outlined in Clause 1705 of MoRT&H.

2.48.17 HIGH PERFORMANCE CONCRETE (cl. 1715 of MoRT&H)


2.48.17.1 General
High Performance Concrete shall be used where special performance requirements of high strength, high early strength ,
high workability, low permeability and high durability for severe service environments, are required. Production and use of
such concrete in the field shall be carried out with high degree of uniformity between batches and very stringent quality
control.
2.48.17.2 Materials
Cement, mineral admixtures, chemical admixtures, aggregates and water shall conform to Section 1000 of MoRT&H
Specifications and this Section, Flyash when used, shall neither be less than 20 percent nor shall be greater than 35
percent of the total by mass of ordinary Portland cement and flyash and shall conform to grade -1 of IS:3812.
Ground granulated blast furnace (GGBS) slag when used, shall neither be less than 50 percent nor greater than 70 percent
of the total mass of ordinary Portland cement and GGBS and shall conform to IS:12089.
Silica fume conforming to IS:15388 shall be used.
The cement content of concrete inclusive of any mineral admixtures shall not be less than 380 kg/m3. The cement content
excluding any mineral admixtures (Portland cement content alone) shall not exceed 450 kg/m3. The water/cement
(cement plus all cementitious materials) ratio should generally not exceed 0.33 but in no case shall be more than 0.40.
2.48.17.3 Compatibility of Admixtures
Compatibility of the superplasticiser and admixtures with the cement and any other Pozzoianic or hydraulic dilutes shall be
ensured by trials as outlined under Clause 1705 of MoRT&H.
2.48.17.4 Characteristic Strength and Target Mean Strength
Characteristic strength and the initial target mean strength of concrete, shall be as given in Table 1700-8 of MoRT&H.
The target mean strength shall be calculated as per Clause 1704.2 after obtaining data on standard deviation from
sufficient samples.

2.48.18 TESTS AND STANDARDS OF ACCEPTANCE (cl. 1717 of MoRT&H)


2.48.18.1 Concrete shall conform to the surface finish and tolerance as prescribed in these Specifications for
respective components.
2.48.18.2 Random sampling and lot by lot acceptance inspection, shall be made for the 28 days cube strength of
concrete.
2.48.18.3 Concrete under acceptance, shall be notionally divided into lots for the purpose of sampling before
commencement of work. The basis of delimitation of lots shall be as follows:

148
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

i) No individual lot shall be more than 30 cu.m in volume


ii) Different grades of mixes of concrete shall be divided into separate lots.
iii) Concrete of a lot shall be used in the same identifiable component of the bridge.
2.48.18.4 Sampling and Testing
Concrete for preparing 3 test cubes shall be taken from a batch of concrete at point of delivery for construction, according
to procedure laid down in IS:1199.
A random sampling procedure shall be adopted which ensures that each of the concrete batches forming the lot under
acceptance inspection has equal chance of being chosen for taking cubes.
150 mm cubes shall be made, cured and tested at the age of 28 days for compressive strength in accordance with IS:516.
The 28 day test strength result for each cube shall form an item of the sample. Tests at other age shall also be performed, if
specified.
Where automated batching plant/Ready Mixed Concrete Plant is located away from the place of use and the time gap
between production and placement is more than the initial setting time or where any ingredients are added subsequent to
mixing, separate sets of samples shall be collected and tested at batching plant and at location of placement. The results
shall be compared and used to make suitable adjustment at batching plants so that properties of concrete at placement
are as per the requirements.
2.48.18.5 Test Specimen and Sample Strength
Three test specimens shall be made from each sample for testing at 28 days. Additional cubes may be required for various
purposes such as to determine the strength of concrete at 7 days or for any other purpose.
The test strength of the sample shall be the average of the strength of 3 cubes. The individual variation should not be more
than ±15 percent of the average. If variation is more, the test results of the sample are invalid.
2.48.18.6 Frequency
The minimum frequency of sampling of concrete of each grade shall be in accordance with Table 1700 -9 of MoRT&H.
2.48.18.7 Acceptance criteria
2.48.18.7.1Compressive Strength
1) Cubes
The concrete shall be taken as having the specified compressive strength when both the following
conditions are met:
a) The mean strength determined from any group of four consecutive non-overlapping samples
exceeds the specified characteristic compressive strength by 3 MPa.
b) Strength of any sample is not less than the specified characteristic compressive strength
minus 3 MPa.
The quantity of concrete represented by the test results include the batches from which the first and
last samples were taken, together with all intervening batches.
2) Cores
When the concrete does not satisfy both the conditions given in (1) above, representative cores shall
be extracted from the hardened concrete for compression test in accordance with the method
described in IS:1199 and tested to establish whether the concrete satisfies the requirement of
compressive strength.
Evaluation of compressive strength by taking cores may also be done in case of doubt regarding the
grade of concrete used either due to poor workmanship or based on results of cube strength tests.
The locations from which core samples are to be taken and their number shall be decided so as to be
representative of the whole of the concrete under consideration. However, in no case shall fewer than
three cores be tested. Cores shall be prepared and tested as described in IS: 516. Concrete in the
member represented by a core test shall be considered acceptable if the average equivalent cube
strength of the cores is equal to at least 85 percent of the cube strength of the grade of concrete
specified for the corresponding age and no individual core has strength less than 75 percent of the
specified strength.
149
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.48.18.7.2Chloride and Sulphate Content


The total chloride and sulphuric anhydride (S03) content of all the constituents of concrete as a percentag e of mass of
cement in the mix, shall not exceed the values given in this Section.
2.48.18.7.3Density of Fresh Concrete
Where minimum density of fresh concrete is specified, the mean of any four consecutive non-overlapping samples shall
not be less than the specified value and any individual sample result shall not be less than 97.5 percent of the specified
value.
2.48.18.7.4Density of Hardened Concrete
Where minimum density of hardened concrete is specified, the mean of any four consecutive non-overlapping samples
shall not be less than the specified value and any individual sample result shall not be less than 97.5 percent of the
specified value.

2.48.18.7.5Permeability Test
Water permeability test as per DIN: 1048 Part 5-1991 shall be carried out as described below:
i) A cylindrical test specimen 150 mm dia and 160 mm high shall be prepared.
ii) After 28 days of curing, the test will be conducted between 28 and 35 days. The test specimen shall be
fitted in a machine such that specimen can be subjected to a water pressure of up to 7 bars. Atypical
machine is shown in Appendix-1700/1.
iii) The concrete specimen shall be subjected to a water pressure of 0.5 N/mm2 from the top for a period
of 3 days. The pressure shall be maintained constant throughout the test period. If the water
penetrates through to the underside of the specimen, the test may be terminated and the specimen
rejected as failed.
iv) After 3 days, the pressure shall be released and the sample shall be taken out. The specimen shall be
split in the middle by compression applied on two round bars on opposite sides above and below.
v) When the split faces show signs of drying (after 5 to 10 minutes), the maximum depth of penetration in
the direction of height shall be measured with the scale and extent of water penetration established.
vi) The mean of maximum depth of penetration obtained from three specimens thus tested, shall be taken
as the test result and it shall not exceed 25 mm.
2.48.18.7.6If the concrete is not able to meet any of the standards of acceptance as prescribed, the effect of such
deficiency on the structure shall be investigated by the Contractor as directed by the Engineer. The Engineer may accept the
concrete as sub-standard work. Any additional work required by the Engineer for such acceptance, shall be carried out by
the Contractor at his cost. In case the concrete is not found to be acceptable even after investigation, the Contractor shall
remove the rejected concrete forthwith.

2.48.18.7.7When durability of concrete is desired the rapid chloride ion permeability test as stated under Clause
1714.3.1 shall also be performed in addition to above tests.

2.49 PRE STRESSING

2.49.1 GENERAL (cl. 1802 of MoRT&H)


The work shall be carried out in accordance with the drawings and these Specifications or as approved by the Engineer.
Structural concrete and untensioned steel for the production of prestressed concrete members shall conform to the
requirements of Section 1700 and Section 1600 respectively, of these Specifications, unless specifically modified by
requirements set forth in this Section.

2.49.2 MATERIALS (cl. 1803 of MoRT&H)


2.49.2.1 All materials shall conform to Section 1000 of MoRT&H Specifications.

2.49.3 Sheathing

150
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.49.3.1 General
The sheathing ducts shall be of the spiral corrugated type either in mild steel or HDPE or in PP for internal tendons. They
shall be in as long lengths as practicable from considerations of handling and transportation without getting damaged.
External tendons shall be housed in either High Density Poly-Ethylene (HDPE) sheaths or metallic steel sheaths (plain or
with protective coatings), which have smooth internal surfaces.
2.49.3.2 M.S. Sheathing Ducts
The material shall be Cold Rolled Cold Annealed (CRCA) Mild Steel conforming to IS : 513 intended for mechanical
treatment and surface refining but not for quench hardening or tempering.
The material shall be clean and free from rust and normally be bright finished. However, where specified, as in case of use
in aggressive environment, galvanized or lead-coated mild steel strips shall be used.
The sheathing shall conform to the requirements specified in Table 94 and Appendix IX. All the joints of sheathing shall be
water tight and conform to provisions contained in Clause 1804.6 of MoRT&H.
Table 96 : Details of Ducts (Table 1800-1 of MoRT&H)
No. of Strands/ Dia in Diamet er of Duct in mm Thickness of MS Sheathing in Thickness of HDPE Duct in mm
mm Met allic HDPE mm
6/13 50 50 0.3 2.0
12/13 75 75 0.4 2.5
19/13 85 85 0.4 2.5
27/13 100 100 0.5 3.0
12/15 85 85 0.4 2.5
19/15 100 100 0.5 3.0
27/15 125 130 0.5 4.0

2.49.3.3 Corrugated HDPE Sheathing Ducts


The material for the ducts shall be high density polyethylene or polypropylene with more than 2 percent carbon black to
provide resistance to ultraviolet degradation. The ducts shall be corrugated on both sides. All tests on raw materials and
tests to be conducted on the finished product, shall be in accordance with fib Technical Report Bulletin 7 "Corrugated
plastic ducts for internal bonded post tensioning".
Each batch of the HDPE ducts supplied to the site shall be accompanied by the supplier's certificate for properties of the
raw materials which shall comply with the Technical report Bulletin 7. In addition the shore hardness for D-3 sec value
shall be 60±5. For the approval of the finished product, the tests mentioned in the Appendix A1 to A9 of fib Technical
Report Bulletin 7, shall be conducted at the reputed institutions or at the manufacturer's laboratories. Results shall
comply with the provisions of the fib Technical report Bulletin 7, except for the wear resistance, minimum bending radius
and bond length test which are modified as follows:
a) Wear resistance test: The wear resistance of the duct i.e. the minimum residual wall thickness after
loss, shall not be less than 1.5 mm for ducts up to 85 mm in diameter and not less than 2 mm for
ducts greater than 85 mm in diameter.
b) Minimum bending resistance: The test apparatus shall be identical to the wear test apparatus with the
same clamping force. However sample shall not be moved but shall be as held in position for a period
of 7 days. The residual wall thickness shall be as mentioned in (a) above.
c) Bond length test: The ducts shall transmit full tendon strength from the tendon to the surrounding
concrete over a length of not grater then 40 times duct diameter.
Each supply of the ducts shall be accompanied by test report of the finished product also. The test certificates issued by
the institutes will be valid for a period of two years.
2.49.3.4 Diameter and Thickness of Sheathing Ducts
The internal diameter and thickness of sheathing shall be as shown in the drawing or as indicated in Table 1800-1,
whichever is greater:
Where prestressing tendons are required to be threaded after concreting, the internal diameter of sheathing shall be about
5 mm larger than required above for spans more than 30 m. In severe environment, cables shall be threaded after
concreting. In such cases a temporary tendon shall be inserted in the sheathing or the sheathing shall be stiffened by other
suitable method during concreting.
151
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.49.4 Anchorages
2.49.4.1 Prestressing accessories like jacks, anchorages, wedges, block plates, etc. shall be procured from
authorized manufacturers only. Anchorages shall conform to "Recommendations for acceptance and application of
prestressing systems" published by FIB. The prestressing accessories shall be subjected to an acceptance test prior to
their actual use on the work. Test certificates from a laboratory fully equipped to carry out the tests shall be furnished to the
Engineer. Such test certificates shall not be more than 12 months old at the time of making the proposal for adoption of a
particular system for the project.
No damaged anchorages shall be used. Steel parts shall be protected from corrosion at all times. Threaded parts shall be
protected by greased wrappings and tapped holes shall be protected by suitable plugs until used. The anchorage
components shall be kept free from mortar and loose rust and any other deleterious coating.
2.49.4.2 Swages of prestressing strand and button-heads of prestressing wire, where provided shall develop a
strength of at least 95 percent of the specified breaking load of the strand or wire as the case may be. Where
swaging/button-heading is envisaged, the Contractor shall furnish details of his methodology and obtain approval of the
Engineer, prior to taking up the work.
2.49.4.3 Untensioned steel reinforcements, around anchorages shall conform to the details of prestressing system
and as shown on the drawing.
2.49.4.5 Couplers
Couplers or other similar fixtures used in conjunction with the prestressing strands or bars, shall have an ultimate tensile
strength of not less than the strengths of the individual strands or bars being joined and shall also meet the requirements
of individual anchorages.

2.49.5 TESTING OF PRESTRESSING STEEL AND ANCHORAGES (cl. 1804 of MoRT&H)


All materials specified for testing shall be furnished free of cost by the Contractor and shall be delivered in time for tests to
be made, well in advance of anticipated time of use.
All wires, strands or bars to be shipped to the site, shall be assigned a lot number and tagged for identification purposes.
Anchorage assemblies to be shipped shall also be similarly identified.
All samples submitted shall be representative of the lot to be furnished and in the case of wire or strand, shall be taken
from the same master roll. The Contractor shall furnish samples of at least 5 m length selected from each lot for testing.
Also, two anchorage assemblies, complete with distribution plates of each size or type to be used, shall be furnished along
with short lengths of strands as required.
2.49.5.1 Post Tensioning
Prestressing tendons shall be accurately located and maintained in position, both vertically and horizontally, as per
drawings.
Tendons shall be so arranged that they have a smooth profile without sudden bends or kinks.
The location of prestressed cables shall be such as to facilitate easy placement and vibration of concrete in between the
tendons. High capacity tendons shall be used to reduce the number of cables thereby eliminating the necessity of
grouping. The selected profiles of the tendons shall be such that their anchorages are not located in the top deck surface .
Where two or more rows of cables have to be used, the cables shall be vertically in line to enable easy flow of concrete. The
clear vertical and horizontal distance between any two cable ducts shall in no case be less than 50 mm or diameter of duct,
whichever is greater, when grouping of cable is not involved. Where precast segments are used, the clear distance between
cables shall be at least 150 mm.
Sheathing shall be placed in correct position and profile by providing suitable ladders and spacers. Such ladders may be
provided at intervals of approximately 1.0 m. Sheathing shall be tied rigidly with such ladders/spacer bars, so that they do
not get disturbed during concreting.
The method of supporting and fixing shall be such that profile of cables is not disturbed during vibrations, by pressure of
wet concrete, by workmen or by construction traffic.
Sheathing in which the permanent tendon will not be in place during concreting shall have a temporary tendon inserted or
shall be stiffened by some other method to the approval of the Engineer. The temporary tendon shall be pulled out by a
special threading machine or other contrivance, before threading the permanent tendon.
152
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

Where possible, tendons shall be placed prior to stressing. Tendons shall be handled with care to avoid damage or
contamination, to either the tendon or the sheathing. Any tendons which are damaged or contaminated shall be cleaned or
replaced.
2.49.5.2 Pre-tensioning
Prestressing steel shall be accurately located and maintained in position, both vertically and horizontally, as per drawings.
2.49.5.3 Each anchorage device shall be set square to the line of action of the corresponding prestressing tendon and
shall be positioned securely to prevent movement during concreting.
The anchorage devices shall be cleaned to the satisfaction of the Engineer, prior to the placing of concrete. After
concreting, any mortar or concrete which adheres to bearing or wedging surfaces, shall be removed immediately.
2.49.5.4 Cutting
Cutting and trimming of wires or strands shall be done by suitable mechanical or flame cutters. When a flame cutter is
used, care shall be taken to ensure that the flame does not come in contact with other stressed steel. The flame cutting of
wire or strand shall be carried out at least 75 mm beyond the point where the tendon will be gripped by the anchorage or
jacks.
In post tensioned members, the ends of prestressing steel projecting beyond the anchorages, shall be cut after the grout
has set.
2.49.5.5 Coupling of MS Sheathing Ducts
For major projects, the sheathing duct should preferably be manufactured at the project site utilizing appropriate
machines. With such an arrangement, long lengths of sheathing ducts may be used with consequent reduction in the
number of joints and couplers.
Where sheathing duct joints are unavoidable, they shall be made cement slurry tight by the use of corrugated threaded
sleeve couplers, which can be tightly screwed on to the outer side of the sheathing ducts.
The length of the coupler should not be less than 150 mm but should be increased upto 200 mm wherever practicable. The
joints between the end of coupler and duct shall be sealed with tape to prevent penetration of slurry during concreting. The
couplers of adjacent ducts shall be staggered wherever practicable. As far as possible, couplers should not be located in
curved zones. The corrugated sleeve couplers can be conveniently manufactured using the sheath making machine with
the next higher size of die set.
For typical details of coupling refer Appendix 1800/1 of MoRT&H Specifications.
2.49.5.6 Coupling of HDPE Sheathing Ducts
The HDPE sheathing can be joined by any one of the following three methods.
a) Use of threaded sleeve couplers in the same manner as given for metallic sheathing.
b) Welding of two ends of HDPE sheathing using appropriate machine such as Roaster Machine or Mirror
Machine.
c) Use of heat shrink couplers made of HDPE sleeves. The sleeves are integrated with the parent
sheathing by hot process by using heating torch.
For typical details of coupling, refer Appendix 1800/1 of MoRT&H Specifications.
2.49.5.7 Grout Vents
Grout vents of at least 20 mm diameter shall be provided at both ends of the sheathing and at all valleys and crests along
its length. For cables longer than 50 m grout vents or drains may be provided at or near the lowest points. Additional vents
shall also be provided along the length of sheathing such that the spacing of consecutive vents do not exceed 20 m. Each
of the grout vents shall be provided with a plug or similar device capable of withstanding a pressure of 1.0 MPa without
leakage of water, air pressure or grout.
2.49.5.8 Anchorages
All bearing surfaces of the anchorages shall be cleaned prior to concreting and tensioning.
Anchor cones, blocks and plates shall be securely positioned and maintained during concreting such that the centre line of
the duct passes axially through the anchorage assembly.

153
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

The anchorages shall be recessed from the concrete surface by a minimum of 100 mm.
After the prestressing operations are completed and prestressing wires/strands are cut, the surface shall be painted with
two coats of epoxy of suitable formulation having a dry film thickness of 80 micron per coat and entire recess shall be fille d
with concrete or non-shirk/ pre-packaged mortar of epoxy concrete.

2.49.6 TENSIONING EQUIPMENT (cl. 1807 of MoRT&H)


All tensioning equipment shall be procured from authorized manufacturers only and be approved by the Engineer prior to
use. Where hydraulic jacks are used, they shall be power-driven unless otherwise approved by the Engineer. The tensioning
equipment shall satisfy the following requirements :
i) The means of attachments of the prestressing steel to the jack or any other tensioning apparatus shall
be safe and secure.
ii) Where two or more wires/strands constitute a tendon, a single multi-pull stressing jack shall be used,
which is capable of tensioning simultaneously all the wires/strands of the tendon. Suitable facilities
for handling and attaching the multi-pull jack to the tendons shall be provided.
iii) The tensioning equipment shall be such that it can apply controlled total force gradually on the
concrete without inducing dangerous secondary stresses in steel, anchorage or concrete.
iv) Means shall be provided for direct measurement of the force by use of dynamometers or pressure
gauges fitted in the hydraulic system itself to determine the pressure in the jacks. Facilities shall also
be provided for the liner measurement of the extension of prestressing steel to the nearest mm and of
any slip of the gripping devices at transfer.
All dynamometers and pressure gauges including a master gauge shall be calibrated by an approved laboratory
immediately prior to use and then at intervals not exceeding 3 months and the true force determined from the calibration
curve.
Pressure gauges shall be concentric scale type gauges accurate to within two percent of their full capacity. The minimum
nominal size of gauge shall be 100 mm. The gauge shall be so selected that when the tendon is stressed to 7 5 percent of
its breaking load, the gauge is reading between 50 percent and 80 percent of its full capacity. Suitable safety devices shall
be fitted to protect pressure gauges against sudden release of pressure.
Provision shall be made for the attachment of the master gauge to be used as a check, whenever requested for by the
Engineer.
Jack and pump shall be calibrated from an approved laboratory prior to use and then at intervals not exceeding three
months.

2.49.7 POST TENSIONING (cl. 1808 of MoRT&H)


Tensioning force shall be applied in gradual and steady steps, in such a manner that the applied tensions and elongations
can be measured at all times. The sequence of stressing, applied tensions and elongations shall be in accordance with the
approved drawing or as directed by the Engineer.
It shall be ensured that in no case, the load is applied to the concrete before it attains the strength specified on the
drawing or as stipulated by the prestressing system supplier, whichever is more.
After prestressing steel has been anchored, the force exerted by the tensioning equipment shall be decreased gradually
and steadily so as to avoid shock to the prestressing steel or anchorage.
The tensioning force applied to any tendon shall be determined by direct reading of the pressure gauges or dynamo-meters
and by comparison of the measured elongation with the calculated elongation. The calculated elongation shall be
invariably adjusted with respect to the modulus of elasticity of steel for the particular lot as given by the manufacturer.
The difference between calculated and observed tension and elongation during prestressing operations shall be regulated
as follows :
a) If the calculated elongation is reached before the specified gauge pressure, continue tensioning till the
specified gauge pressure is attained, provided the elongation does not exceed 1.05 times the calculated
elongation. If 1.05 times the calculated elongation is reached before the specified gauge pressure is
attained, stop stressing and inform the Engineer.

154
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

b) If the calculated elongation has not been reached at the specified gauge pressure, continue tensioning
by intervals of 5 kg/sq. cm until the calculated elongation is reached, provided the gauge pressure does
not exceed 1.05 times the specified gauge pressure.
c) If the elongation at 1.05 times the specified gauge pressure is less than 0.95 times the calculated
elongation, the following measures must be taken, in succession, to determine the cause of this
discrepancy:

i) Check the correct functioning of the jack, pump and leads.


ii) De-tension the cable. Slide it in its duct to check that it is not blocked by mortar which has entered
through holes in the sheath. Re-tension the cable, if free.
iii) Re-establish the modulus of elasticity of steel for the particular lot from an approved laboratory.
iv) If the required elongation is still not obtained, further finishing operations such as cutting or
sealing, should not be undertaken without the approval of the Engineer.
d) When stressing from one end only, the slip at the end remote from the jack, shall be accurately measured
and an appropriate allowance made in the measured extension at the jacking end.

A complete record of prestressing operations along with elongation and jack pressure data shall be maintaine d in the
format given in Appendix 1800/11.
The number of stages of prestressing and grouting shall be kept to a minimum, preferably two in the case of simply
supported girders.

2.49.8 GROUTING OF PRESTRESSED TENDONS (cl. 1809 of MoRT&H)

Grouting of prestressed tendons shall be carried out in accordance with provisions given in Appendix 1800/III of MoRT&H
Specification. A record of grouting operations shall be maintained in the format given in Appendix VI.

2.49.9 TRANSPORTATION STORAGE AND HANDLING OF PREC AST GIRDERS (cl. 1814 of MoRT&H)

Precast girders shall be transported in an upright position. Points of support and the direction of the reactions with respect
to the girder shall approximately be the same during transportation, and storage as when the girder is placed in final
position.
Method of transportation should be planned in such a way that the vehicle employed to transport the long girders can
successfully negotiate the available road geometry. Adequate care shall be taken to ensure that the girder being
transported does not topple due to unstable arrangement. For this purpose, height of the vehicle shall be kept as low as
possible. This will also help in accommodating greater height of the system during transportation below existing bridges or
through any other constraints. Girders should be transported only after 28 day concrete strength is achieved.
When members are to be stacked, they shall be firmly supported at such bearing positions as will ensure the stresses
induced in them are always less than the permissible design stresses. Further, inclined side supports shall be provided at
the ends and along the length of a precast girder to prevent lateral movements or instability.
Care shall be taken during storage, hoisting and handling of precast units to prevent them from being cracked or
damaged. Units cracked or damaged by improper storing or handling, shall be replaced by the Contractor at his cost.
Handling of precast girders from precasting location to the bridge site requires careful operation. Lifting location shall be
strictly as indicated on the construction drawings.
Lifting devices generally consist of loops of prestressing strand or mild steel bars or any other suitable arrangement. If it is
anticipated that embedded material for lifting devices will be cast into the face of the member that will be exposed to view
or to corrosive materials in the completed structure, the depth of removal of the embedded material and the method of
filling the resulting cavities, shall be as shown on the construction drawings. The depth of removal shall not be less than
the clear cover required to the reinforcing steel. The cavity so formed shall be suitably grouted for protecting the embedded
metal. Also, the projecting reinforcement shall be suitably protected against corrosion.

155
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.50 STRUCTURAL STEEL

2.50.1 GENERAL (cl. 1902 of MoRT&H)


General requirements relating to the supply of material shall conform to the Specifications of IS: 1387, for the purpose of
which the supplier shall be the Contractor and the purchaser shall be the Engineer.
Unless otherwise specified, high tensile steel rivets conforming to IS: 1149 shall be used only for members of high tensile
steel conforming to IS:961 and shall not be used for members of mild steel.
Unless otherwise specified, bolted connection of structural joints using high tensile friction grip bolts shall comply with
requirements of IS:4000.

2.50.2 MATERIALS (cl. 1903 of MoRT&H)


2.50.2.1 All materials shall conform to Section 1000 of these Specifications. Special requirements are given below:
Mild steel for bolts and nuts shall conform to IS:226 but have a minimum tensile strength of 44 kg/sq.mm and minimum
percentage elongation of 14.
High tensile steel for bolts and nuts shall conform to IS:961 but with a minimum tensile strength of 58 kg/sq.mm.
Use of high strength friction grip bolts shall be permitted only on satisfactory evidence of performance to the requirements
(not covered by these Specifications) specified by the Engineer or as laid down in special provisions.

2.50.2.2 Castings and Forgings


Steel castings and forgings shall comply with the requirements of the following Indian Standards, as appropriate:
IS: 1030, IS: 1875, IS: 2004, IS: 2644, IS: 2708, IS: 4367
2.50.2.3 Fasteners
Bolts, nuts washers and rivets shall comply with the following or relevant Indian Standards as appropriate:
IS: 1148, IS: 1149, IS: 1363, IS: 1364, IS: 3640 , IS: 3757, IS: 4000, IS: 5369, IS: 5370, IS: 5372, IS:
5374, IS: 5624, IS: 6610, IS: 6623, IS: 6639, IS: 6649, IS: 7002

2.50.2.4 Welding Consumables


Welding consumables shall comply with the following Indian Standards as appropriate :
IS: 814, IS: 1395, IS: 3613, IS: 6419, IS: 6560

2.50.2.5 Welding
IS: 816, IS: 822, IS: 1024, IS: 1182, IS: 4853, IS: 5334, IS: 7307, IS: 7310, IS: 7318, IS: 9595

2.50.2.6 Paints
All materials for paints and enamels shall conform to the requirements specified on the drawings or other special
provisions laid down by the Engineer.
The type of paints which can be used shall be as follows :
a) Ordinary i.e. paints based on drying oils, alkyd resin, modified alkyd resin, phenolic varnish epoxy
b) Chemical Resistant - one pack type (ready for use) or two pack type (mixed before use).
c) Vinyl
d) Chlorinated rubber
e) Bituminous - (IS:9862)
f) Epoxy -(IS:14925)
g) Polyurethane - (IS:13759)
h) Zinc rich -(IS:14589
Unless otherwise specified, paints shall conform to the relevant Indian Standards. Paints shall be tested for the following
qualities as per Specifications given in the relevant IS codes:

156
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

Weight (for 10 litres of paint, thoroughly mixed)


Drying time
Consistency
Dry thickness and rate of consumption

2.50.3 FABRICATION (cl. 1904 of MoRT&H)


2.50.3.1 General
All work shall be in accordance with the drawings and as per these Specifications. Fabrication work shall be taken up only
after receipt of approved fabrication/working drawings. It shall be ensured that all parts of an assembly fit accurately
together. All members shall carry mark number and item number and, if required, serial number. Method of marking shall
be commensurate with the process of manufacture and such as to ensure retention of identity at all stages.
Unless specifically required under the contract, corresponding parts need not be interchangeable, but the parts shall be
match marked as required under Clause 1904.9 of MoRT&H.
Templates, jigs and other appliances used for ensuring the accuracy of the work shall be of mild steel; where specially
required, these shall be bushed with hard steel. All measurements shall be made by means of steel tape or other device
properly calibrated. Where bridge materials have been used as templates for drilling, these shall be inspected and passed
by the Engineer before they are used in the finished structure.
All structural steel members and parts shall have straight edges and plane surfaces. They shall also be free from twist. If
necessary, they shall be straightened or flattened by pressure unless they are required to be of curvilinear forms. Adjacent
surfaces or edges shall be in close contact or at uniform distance throughout.
The Contractor shall submit his programme of work to the Engineer for his approval at least 15 days before the
commencement of fabrication, which shall include the proposed system of identification and erection marks together with
complete details of fabrication and welding procedures. He shall also submit for approval of Engineer, a Quality Assurance
Plan according to the nature of fabrication work (whether welded or riveted) which should clearly define the points of
checking and inspection during the stages of fabrication as well as supply of materials.
The Contractor shall prepare shop drawings for fabrication of any member and obtain approval of the Engineer before the
start of work. Complete information regarding the location, type, size and extent of all welds shall be clearly shown on the
shop drawings. These drawings shall distinguish between shop and field welds.
2.50.3.2 Preparation of Holes
2.50.3.2.1 Drilling and Punching
Holes for rivets, black bolts, high strength bolts and countersunk bolts/rivets (excluding close tolerance and turn fitted
bolts) shall be either punched or drilled. For bolts/rivets less than 25 mm dia, the diameter of holes shall be 1.5 mm larger
while for those of 25 mm dia or more, the diameter of holes shall be 2 mm larger than the diameter of the bolt/rivet.
All holes shall be drilled except those for secondary members such as floor plates, hand rails etc. Members which do not
carry the main load can be punched subject to the thickness of member not exceeding 12 mm for material conforming to
IS:2062 up to Grade E250 (Fe 410w).
Holes through material of more than one thickness or through main material thickness exceeding 20 mm for steel
conforming to IS:2062 up to Grade E250 (Fe 41Ow) or 16 mm for steel conforming to IS:2062 up to Grade E300 (Fe
440w) and above, shall either be sub-drilled or sub-punched to a diameter of 3 mm less than the required size and then
reamed to the required size. The reaming of material more than one thickness shall be done after assembly.
Where several plates or sections form a compound member, they shall, where practicable, be firmly connected together by
clamps or tacking bolts and the holes shall be drilled through the group in one operation. Alternatively, and in the case of
repetition work, the plates and sections may be drilled separately from jigs and templates. Jigs and templates shall be
checked at least once after every 25 operations. All burrs shall be removed.
In the case of repetition of spans, the erection of every span shall not be insisted upon, except where close tolerance or
turned bolts are used, provided that methods are adopted to ensure strict interchange ability. In such cases, one span in
ten or any number less than ten of each type shall be erected from pieces selected at random by the Engineer and should
there be any failure of the pieces to fit, all similar spans shall be erected complete. In the event of spans being proved
completely interchangeable, all corresponding parts shall carry the same mark so that sorting of the materials at site is
facilitated.
157
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.50.3.3 Size of Holes


The diameters of rivet holes in millimetres are given in Table 1900-1 of MoRT&H.

2.50.3.4 Close Tolerance Bolts and Barrel Bolts


For close tolerance or turn fitted bolts, the diameter of the holes shall be equal to the nominal diameter of the bolt shank +
0.15 mm to - 0.0 mm.

2.50.3.5 Holes for High Strength Friction Grip Bolts


All holes shall be drilled after removal of burrs. Where the number of plies in the grip does not exceed three, the diameters
of holes shall be 1.5 mm larger than those of bolts. Where the number of plies in the grip exceeds three, the diameters of
holes shall be as follows, unless otherwise specified by the Engineer:
In outer plies 1.5 mm larger than diameter of bolts
In inner plies not less than 1.5 mm and not more than 3.0 mm larger than diameter of bolts

2.50.3.6 Rivets and Riveting


2.50.3.6.1 The riveting shall be done by hydraulic or pneumatic machine unless otherwise specified by Engineer. The
driving pressure shall be maintained on the rivets for a short time after the upsetting is completed.
2.50.3.6.2 The diameter of rivets shown on the drawings shall be the size before heating. Each rivet shall be of sufficient
length to form a head of the standard dimensions as given in IS handbook on Steel Sections, Part-I. The underside of the
head shall be free from burrs.
2.50.3.6.3 The tolerance on the diameter of rivets shall be in accordance with IS: 1148 for mild steel rivets and IS:
1149 for high tensile steel rivets. Unless otherwise specified, the tolerance shall be minus.
2.50.3.6.4 When countersunk head is required, the head shall fill the countersunk hole and projection after
countersinking shall be ground off wherever necessary. The included angle of the head shall be as follows:
a) For plates over 14 mm thickness 90 degree
b) For plates upto and including 14 mm thickness 120 degree
2.50.3.6.5 Mild steel rivets shall be heated uniformly to a light cherry red colour between 650°C to 700°C for hydraulic
riveting and orange colour for pneumatic riveting. High tensile steel rivets shall be heated up to 1100°C. The rivets shall be
red hot from head to the point when inserted and shall be upset in its entire length so as to fill the hole as completely as
possible when hot. After being heated and before being inserted in the hole, the rivet shall be made free from scale by
striking it on a hard surface. Any rivet whose point is heated more than the prescribed limit, shall not be driven.
Where flush surface is required, any projecting metal shall be chipped or ground off.
2.50.3.6.6 Before riveting is commenced, the parts/members to be riveted shall be firmly drawn together with bolts,
clamps or tack welds so that the various sections and plates are in close contact throughout. Every third hole of the joint
shall have assembly bolts till riveted. Drifts shall only be used for drawing the work into position and shall not be used to
such an extent as to distort the holes. Drifts of a larger size than the nominal diameter of the hole shall not be used.
2.50.3.6.7 Driven rivets, when struck sharply on the head by a quarter pound rivet testing hammer, shall be free from
movement and vibrations. Assembled riveted joint surfaces, including those adjacent to the rivet heads, shall be free from,
dirt, loose scale, burrs, other foreign materials and defects that would prevent solid seating of parts.
2.50.3.6.8 All loose or burnt rivets, rivets with cracked or badly formed defective heads or rivets with heads which are
unduly eccentric with the shanks, shall be removed and replaced. In removing rivets, the head shall be sheared off and the
rivet punched out so as not to damage the adjacent metal. If necessary, the rivets shall be drilled out. Re -cupping or re-
caulking shall not be permitted. The parts not completely riveted in the shop shall be secured by bolts to prevent damage
during transport and handling.

2.50.3.7 High Strength Friction Bolts and Bolted Connections


The general requirement shall be as per relevant IS Specifications mentioned in Clause 1903.2.2. Unless otherwise
specified by the Engineer, bolted connections of structural joints using high tensile friction grip bolts shall comply with
requirements mentioned in IS:4000.

158
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.50.4 Welding
2.50.4.1 All welding shall be done with the prior approval of the Engineer and the workmanship shall conform to the
specifications of the relevant Indian Standards as appropriate.
When material thickness is 20 mm or more, special precautions like pre-heating shall be taken as laid down in IS:9595.
Surfaces and edges to be welded shall be smooth, uniform and free from fins, tears, cracks and other discontinuities.
Surface shall also be free from loose or thick scale, slag rust, moisture, oil and other foreign materials. Surfaces within 5 0
mm of any weld location shall be free from any paint or other material that may prevent proper welding or cause
objectionable fumes during welding.
The general welding procedures including particulars of the preparation of fusion faces for metal arc welding, shall be
carried out in accordance with IS:9595.
The welding procedures for shop and site welds including edge preparation of fusion faces shall be as per details shown on
the drawings and shall be submitted in writing for the approval of the Engineer, in accordance with Clause 22 of IS:9595,
before commencing fabrication.
Any deviation from this procedure has to be approved by the Engineer. Preparation of edges shall, wherever practicable, be
done by machine methods.
Machine flame cut edges shall be substantially as smooth and regular as those produced by edge planing and shall be left
free of slag. Manual flame cutting shall be permitted by the Engineer only where machine cutting is not practicable.
Electrodes to be used for metal arc welding shall comply with relevant Indian Standards mentioned in Clause 1903.2.3.
Procedure test shall be carried out as per IS:3613 to find out suitable wire-flux combination for welded joint.
Assembly of parts for welding shall be in accordance with provisions of Clauses 14 to 16 of IS:9595.
Welded temporary attachment should be avoided as far as possible. If unavoidable, the method of making any temporary
attachment shall be as approved by the Engineer. Any scars from temporary attachment shall be removed by cutting and
chipping and surface shall be finished smooth by grinding to the satisfaction of the Engineer.
Welding shall not be carried out when the air temperature is less than 10°C, when the surfaces are wet, during periods of
strong winds and in snowy weather, unless the work and the welding operators are adequately protected.
2.50.4.2 For welding of any particular type of joint, welders shall undergo the appropriate welders qualification test
as prescribed in any of the relevant Indian Standards IS:817, IS:1966, IS: 1393, IS:7307 (Part I), IS:7310 (Part I) and
IS:7318 (Part I) to the satisfaction of the Engineer.
2.50.4.3 In assembling and joining parts of a structure or of built-up members, the procedure and sequence of
welding shall be such as to avoid distortion and minimize shrinkage stress.
All requirements regarding pre-heating of parent material and interpass temperature shall be in accordance with
provisions of IS:9595.
2.50.4.4 Peening of weld shall be carried out wherever specified by the Engineer:
a) If specified, peening may be employed to be effective on each weld layer except the first filling layer.
b) After weld has cooled, the peening should be carried out by light blows from a power hammer using a
round nosed tool. Care shall be taken to prevent scaling or flaking of weld and base metal from over
peening.
2.50.5 Tolerances
Tolerances in dimensions of components of fabricated structural steel work shall be specified on the drawings and shall be
subject to the approval of the Engineer before fabrication. Unless otherwise specified, all parts of an assembly shall fit
together accurately within tolerances specified in Table 1900-2 of MoRT&H.
2.50.6 Non-Destructive Testing of Welds
One or more of the following methods may be applied for inspection or testing of weld :
a) Visual Inspection
b) Magnetic Particle and Radiographic Inspection
c) Ultrasonic inspection
d) Liquid Penetration Inspection

159
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.50.7 PAINTING (cl. 1906 of MoRT&H)

2.50.7.1 General
Unless otherwise specified, all metal work shall be given approved shop coats as well as field coats of painting. The item of
work shall include preparation of metal surfaces, application of protective covering and drying of the paint coatings along
with all tools, scaffolding, labour and materials necessary.
Coatings shall be applied only to dry surfaces and the coated surfaces shall not be exposed to rain or frost before they are
dry. The coatings shall be applied to all surfaces excluding shear connectors and inner surfaces of fully sealed hollow
sections. While coating adjacent surfaces, care shall be taken to ensure that primer is not applied on the shear connectors.
2.50.7.2 Types of Paints
i) Ordinary Paints
These include paints based on drying oils, alkyd resin, modified alkyd resin, phenolic varnish epoxy, etc.
Ordinary painting can generally be sub-divided into two types:
a) Primary Coats :
This shall be applied immediately after the surface preparation and should have the properties of
adhesion, corrosion inhibition and imperviousness to water and air.

b) Finishing Coats :
This shall be applied over the primary coat and should have the properties of durability, abrasion
resistance, aesthetic appearance and smooth finish.
ii) Chemical Resistant Paints
The more highly corrosion resistant paints can be divided into two main groups :
a) One pack paints (ready for use)
b) Two pack paints (mixed before use)
The two pack paints shall be mixed together just before use since they remain workable thereafter only
for a restricted period of time.
iii) Other types of paints as mentioned in Clause 1903.4 of MoRT&H Specifications may also be used,
subject to approval by the Engineer.
All paints shall conform to relevant IS Standards as appropriate.
2.50.7.3 Surfaces which are inaccessible for cleaning and painting after fabrication shall be painted as specified
before being assembled for riveting.
All rivets, bolts, nuts, washers etc., are to be thoroughly cleaned and dipped into boiling linseed oil conforming to IS:77.
All machined surfaces are to be well coated with a mixture of white lead conforming to IS: 34 and mutton tallow
conforming to IS: 887.
In site painting, the whole of the steel work shall be given the second cover coat after final passing and after touching up
the primer and cover coats, if damaged in transit.
2.50.7.4 Quality of Paint
Only paints which have been tested for the following qualities as per the specifications given in the relevant IS codes,
should be used :
 Weight test (weight per 10 litre of paint thoroughly mixed)
 Drying time
 Flexibility and adhesion
 Consistency
 Dry thickness and rate of consumption
2.50.7.5 Unless otherwise specified, all painting and protective coating work shall be done in accordance with
IS:1477 (Part I).
160
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.50.7.6 Surface Preparation


Steel surface to be painted either at the fabricating shop or at the site of work shall be prepared in a thorough manner with
a view to ensuring complete removal of mill scale by one of the following processes as agreed to between the fabricator
and the Engineer:
a) Dry or wet grit/sand blasting
b) Pickling which should be restricted to single plates, bars and sections
c) Flame cleaning
Primary coat shall be applied as soon as practicable after cleaning and in case of flame cleaning, while the metal is still
warm.
All slag from welds shall be removed before painting. Surfaces shall be maintained dry and free from dirt and oil. Work out
of doors in frosty or humid weather shall be avoided.
2.50.7.7 Coatings
Prime coat to be used shall conform to the specification of primers approved by the Engineer. Metal coatings shall be
considered as prime coats. Primer shall be applied to the blast cleaned surface before any deterioration of the surface is
visible. In any case, the surface shall receive one coat of primer within 4 hours of abrasive blast cleaning.
a) Epoxy Based Painting
i) Surface preparation : Remove oil/grease by use of petroleum hydrocarbon solution (IS:1745) and
grit blasting to near white metal surface.
ii) Paint system : 2 coats of epoxy zinc phosphate primer = 60 micron: Total 5 coats = 20 0 micron
b) Conventional Painting System for areas where corrosion is not severe Priming Coat:
One coat of ready mixed, red lead primer conforming to IS: 102
or
One coat of ready mixed zinc chrome primer conforming to IS: 104 followed by one coat of ready mixed
red oxide zinc chrome primer conforming to IS:2074
or
Two coats of red oxide zinc chrome primer conforming to IS:2074. Finishing Coats:
Two cover coats of red oxide paint conforming to IS: 123 or any other approved paint shall be applied
over the primer coat. One coat shall be applied before the fabricated steel work leaves the shop. After
the steel work is erected at site, the second coat shall be given after touching up the primer and the
cover coats, if damaged in transit.
c) Conventional Painting System for areas where corrosion is severe Priming Coat:
Two coats of ready mixed red lead primer conforming to IS: 102
or
One coat of ready mixed zinc chrome primer conforming to IS: 104 followed by one coat of ready mixed
zinc chrome primer conforming to IS:2074.
Finishing Coats :
Two coats of aluminium paint conforming to IS:2339 shall be applied over the primer coat. One coat
shall be applied before the fabricated steel work leaves the shop. After the steel work is erected at site,
the second coat shall be given after touching up the primer and the cover coats, if damaged in transit.
2.50.7.8 Painting in the Shop
All fabricated steel shall be painted in the shop after inspection and acceptance with at least one priming coat, unless the
exposed surfaces are subsequently to be cleaned at site or are metal coated. No primer shall be applied to galvanised
surfaces.
Shop contact surfaces, if specifically required to be painted, shall be brought together while the paint is still wet.
Field contact surfaces and surfaces to be in contact with cement, shall be painted with primer only. No paint shall be
applied within 50 mm of design location of field welds. Paint shall be completely dry before loading and transporting of the
fabricated steel work to site.
Surfaces not in contact but inaccessible after shop assembly shall receive the full specified protective treatment before
161
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

assembly.
Where surfaces are to be welded, the steel shall not be painted or metal coated within a suitable distance from any edges
to be welded, if the specified paint or metal coating would be harmful to welders or is likely to impair the quality of site
welds.
Exposed machined surfaces shall be adequately protected.

2.50.7.9 Painting at Site


Surfaces which will be inaccessible after site assembly shall receive the full specified protective treatment before
assembly.
Surfaces which will be in contact after site assembly shall receive a coat of paint (in addition to any shop priming) and sha ll
be brought together while the paint is still wet.
Damaged or deteriorated paint surfaces shall be first made good with the same type of coat as the shop coat.
Where steel has received a metal coating in the shop, this coating shall be completed on site so as to be continuous over
any welds, bolts and site rivets.
Specified protective treatment shall be completed after erection.

2.50.7.10 Methods of Application


The methods of application of all paint coatings shall be in accordance with the manufacturer's written recommendation
and shall be as approved by the Engineer. Spray painting may be permitted provided it will not cause inconvenience to the
public and is appropriate to the type of structure being coated. Areas inaccessible for painting and areas shaded for spray
application shall be coated first by brushing.

2.50.7.11 Protective Coatings in Different Environments


Table 1900-3 gives guidelines for various types of coatings to be used in various environmental conditions. Approximate
life to first maintenance is also indicated.

Table 97 : Guidelines for Selection of Types of Protective Coatings (Table 1900-3 of MoRT&H)

Ty pe of Coat ing Ex posur e Condit ion


i) Wire brush to remove all loose rust and scale; 2 coats drying oil type primer, and 1 under coat Moderate
alkyd type paint; 1 finishing coat alkyd type. Total dry thickness = 150 urn
ii) Wire brush to remove all loose rust and scale; 2 coats drying oil type primer; 2 under coats Polluted inland environment
micaceous iron oxide (MXO) pigmented phenolic modified drying oil. Total dry film thickness =
170 µm (life up to 5 years)
iii) Blast clean the surface; 2 coats of quick drying primer; undercoat alkyd type paint; 1 finishing Moderate
coat alkyd type. Total dry film thickness : 130-150 urn
iv) Blast clean the surface; 2 coats of drying type oil primer; 1 under coat micaceous iron oxide Polluted inland
pigmented drying oil type paint. Total dry film thickness : 165-190 urn environments
v) Blast clean the surface; 2 coats of metallic lead pigmented chlorinated rubber primer, 1 Severe coastal and non-
undercoat of high build chlorinated rubber primer, 1 under coat of high build chlorinated coastal interior situations
rubber; 1 finishing coat of chlorinated rubber. Total dry film thickness : 200 um
vi) Blast clean the surface; 350 - 450 um thickness coal tar epoxy. Severe
vii) Pickle; hot dip galvanised (Zinc). Moderate
Total thickness : 85 um (life up to 15-20 years)
viii) Grit blast, hot dip galvanised. (Zinc). Moderate
Total thickness = 140 um (life more than 20 years)
ix) Grit blast; 1 coat of sprayed zinc/aluminum followed by suitable sealer Total thickness = 150 Severe
um (life up to 15-20 years)

162
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.51 BEARINGS
2.51.1 GENERAL (cl. 2002 of MoRT&H)
a) Bearing plates, bars, rockers, assemblies and other expansion or fixed devices shall be in accordance
with the details shown on the drawings.
b) The bearings may either be supplied directly to the Engineer by the manufacturer to be installed by the
Contractor or supplied and installed by the Contractor as part of the contract. In the former case, the
manufacturer shall be associated with the installation of the bearings to the full satisfaction of the
Engineer, whereas in the latter case, the Contractor shall be solely responsible for the satisfactory supply
and installation of the bearing. In the detailed description of the specification, a general reference shall
be made to the Contractor or manufacturer and the interpretation shall be as per terms of contract.
c) The Contractor shall exercise the utmost care in setting and fixing all bearings in their correct positions
and ensuring that uniformity is obtained on all bearing surfaces.
d) Bearings shall be handled with care and stored under cover.
e) When bearing assemblies or plates are shown on the drawings to be placed (not embedded) directly on
concrete, the concrete bearing area shall be constructed slightly above grade (not exceeding 12 mm) and
shall be finished by grinding.
f) It shall be ensured that the bearings are set truly level and in exact position as indicated on the drawings
so as to have full and even bearing on the seats. Thin mortar pads (not exceeding 12 mm thickness) may
be provided for this purpose.
g) It shall be ensured that the bottoms of girders to be seated on the bearings are plane at the locations of
the bearings and that the bearings are not displaced while placing the girders.
h) M.S bearings sliding on M.S. plates shall not be permitted. For sliding plate bearings, stainless steel
surface sliding on stainless steel plate with mild steel matrix shall be used. The other option shall be to
provide PTFE surface sliding on stainless steel.
i) Segmental rollers are not permitted; only full cylindrical rollers shall be used. Adequate width of base
plate shall be provided to cater for anticipated movements of the supporting structure.
j) For seismic Zones IV and V, roller and rocker bearing components shall have guides to prevent them from
being displaced during earthquakes.
k) For bridges with skew angle less than 20°, the bearings shall be placed at right angles to the
longitudinal axis of the bridge. For bridges with skew angle greater than 20°, very wide bridges and
curved bridges, the location of bearings shall be ensured as shown on the drawings.
l) Easy access to the bearing shall be made available for purposes of inspection and maintenance.
Provision shall also be made for jacking up of the superstructure so as to allow repair/replacement of
bearings.
m) For types of bearings not covered in this Section, required specifications shall be as laid down in the
contract.

2.51.2 STEEL BEARINGS (cl. 2003 of MoRT&H)


2.51.2.1 Mild Steel
Mild steel to be used for components of bearings shall comply with IS: 2062, Steel for General Structural Purposes.
2.51.2.2 Forged Steel
Forged steel to be used in components of bearings shall be in accordance with Clause 1009.5 of MoRT&H Specifications.
2.51.2.3 High Tensile Steel
High tensile steel shall comply with IS: 961.
2.51.2.4 Cast Steel
Cast steel shall be in accordance with Clause 1009.1 of MoRT&H Specifications.
For the purpose of checking the soundness, castings shall be ultrasonically examined following procedures as per
IS:7666, with acceptance standard as per IS:9565. The castings may also be checked by any other accepted method of
non-destructive testing as specified in IS:1030.
2.51.2.5 Stainless Steel
Stainless steel shall be in accordance with Clause 1009.7 of MoRT&H Specifications.

163
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.51.3 ELASTOMERIC BEARINGS (cl. 2005 of MoRT&H)


Elastomeric bearings shall cater for translation and/or rotation of the superstructure by elastic deformation.

2.51.3.1 Materials
i) Chloroprene Rubber (CR) only shall be used.
ii) Grades of raw elastomer of proven use in elastomeric bearings, with low crystallization rates and
adequate shelf life viz. Neoprene WRT, Neoprene W, Bayprene 110, Bayprene 210, Skyprene B-5,
Skyprene B-30, Denka S-40V and Denka M-40, shall be used.
iii) No reclaimed rubber or vulcanized wastes or natural rubber shall be used.
iv) The polychloropene content of the compound shall not be lower than 60 per cent. The ash content
shall not exceed 5 per cent of its weight. Polychloropene content shall be determined in accordance
with ASTM-D297 and ash content as per IS:3400-Part XXII.
v) Use of synthetic rubber-like materials such as Ethyl Propylene Dimonomer (EPDM), Isobutane
Isoprene Copolymer (IIR) and Chloro-Isoprene Copolymer (CIIR) shall not be permitted.

2.51.3.2 Properties of Elastomer


The elastomer shall conform to the properties specified in Table 2000-1.
Laminates of mild steel conforming to IS:2062/IS:1079 or equivalent international grade, shall only be permitted. The
yield stress of the material shall not be less than 250 MPa. Use of any other material like fibre glass or similar fabric as
laminates, shall not be permitted.
The manufacturers of elastomeric bearings shall satisfy the Engineer that they have in-house facilities for carrying out the
following tests on elastomer in accordance with the relevant provisions of ASTM D-297.

2.51.3.3 Manufacturing Tolerances


The bearings shall be fabricated/manufactured with the tolerances specified in Table 2000-3. Tolerances of thickness of
individual layer of elastomer, dimension of laminates, and flatness of laminates are primarily meant for quality control
during production. In order to measure thickness of individual layer of elastomer, dimension of laminates and flatness of
laminates of a finished bearing, it is essential to cut the bearing, which may be done if agreed upon between the
manufacturer and the buyer.

2.51.3.4 Acceptance Specifications


The manufacturer shall have all the test facilities required for the process and acceptance control tests installed at his
plant to the complete satisfaction of the Engineer. The test facilities and their operation shall be open to inspection by th e
Engineer on demand.
All acceptance and process control tests shall be conducted at the manufacturer's plant. Cost of all materials, equipment
and labour shall be borne by the manufacturer unless otherwise specified or specially agreed to between the manufacturer
and Engineer.
A testing programme shall be submitted by the manufacturer to the Engineer and his approval obtained before
commencement of acceptance testing.
Any acceptance testing delayed 180 days beyond the date of production shall require special approval of the Engineer and
modified acceptance specification, if deemed necessary by him.
All acceptance testing shall be conducted by the Inspector with the aid of the manufacturer's personnel having adequate
expertise and experience in rubber testing, working under the supervision of the Inspector and to his complete satisfaction.
Inspection and acceptance shall be carried out lot by lot.

2.51.4 POT BEARINGS (cl. 2006 of MoRT&H)


2.51.4.1 General
Pot bearings shall consist of a metal piston supported by a disc of unreinforced elastomer confined within a metal cylinder
to take care of rotation. Horizontal movement, if required, shall be provided by sliding surfaces of PTFE pads sliding against
stainless steel mating surfaces, with a system of sealing rings. Pot bearings shall consist of cast steel assemblies or
fabricated structural steel assemblies.

164
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.51.4.2 Materials
2.51.4.2.1 Structural steel, mild steel, high tensile steel and steel for forging shall conform to the requirements of
Section 1009 of MoRT&H Specifications.
2.51.4.2.2 Cast steel shall comply with Grade 280-520W or 340-570W of IS:1030.
2.51.4.2.3 Stainless steel shall conform to AISI 316 L or 02Cr17Ni12M02 of IS:6911.

2.51.4.2.4 PTFE
The raw material for PTFE used in bearings shall be pure polytetrafluoroethylene, free sintered without regenera ted
materials or fillers. The mechanical and physical properties of unfilled PTFE shall comply with Grade A of BS:3784 or
equivalent. PTFE shall be either in the form of solid rectangular modules or large sheets with dimples formed by hot
pressing or moulding. Sheet with dimples formed by machining or drilling from a solid PTFE sheet, shall not be permitted.
The surface of PTFE sheets/modules which are to be in contact with metal backing plates shall be provided with suitable
chemical treatment for proper bonding. Adhesives used for bonding PTFE to backing plates, shall produce a bond with
minimum peel strength of 4 N/mm width when tested in accordance with BS:5350 (Part C9).

2.51.4.2.5 Elastomer
The elastomer to be used for the components of bearings shall comply with provisions of Table 2000-1 of MoRT&H.
The confined elastomer inside the pot shall have the properties as given in Table 2000 -4 of MoRT&H.
2.51.4.2.4 Certification and Marking
i) Bearings should be transported to bridge site after final acceptance by the Inspector/inspection agency
appointed by the concerned authority, along with an authenticated copy of the certificate of
acceptance. An information card listing the required bearing characteristics, duly certified by the
manufacturer should also be appended with the certificate.
ii) All bearings shall have suitable index markings in indelible ink or flexible paint, which if practicable,
shall be visible even after installation, giving the following information:
Name of manufacturer
Month and year of manufacture
Bearing designation
Type of bearing
Load and movement capacity
Centre line markings to facilitate installation
Direction of major and minor movement, if any
Preset, if any

2.51.4.3 Installation
2.51.4.3.1 General
a) Bearings shall be so located as to avoid the accumulation of dirt and debris on or around them.
Detailing of the structure shall be such that water is prevented from reaching the bearings.
b) In order to avoid contamination of moving surfaces, bearings should not normally be dismantled after
leaving the manufacturer's workshop. However, if for any reason, a bearing is required to be
dismantled, it shall be done only under expert supervision for which the manufacturer's help may be
sought.
c) Transfer of load from the superstructure to the bearings should not be allowed until the bedding
material has developed sufficient strength. Temporary clamping devices should be removed at the
appropriate time before the bearings are required to accommodate movement. The holes exposed on
removal of temporary transit clamps should be filled with selected material. Where re-use of these
fixing holes may be required, the material used for filling the holes should be capable of being easily
removed without damaging the threads.

165
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

d) Suitable temporary supporting arrangements under bearing base plates should be made to
accommodate thermal movement and elastic deformation of the incomplete superstructure. Such
temporary supports, if provided, should be removed once the bedding material has reached its required
strength. Any voids left as a consequence of their removal should be made good using the same
bedding material. Steel folding wedges and rubber pads are suitable for use as temporary supports
under bearing plates.

2.51.4.3.2 Bedding
i) The bedding material shall be selected keeping in view a number of factors such as the type and size of
bearing, construction sequence, load on the bearing, required setting time, friction requirements,
access around bearings, design and condition of surface in the bearing area and thickness, strength
and shrinkage of bedding material.
ii) Commonly used bedding materials are cementitious or chemical resin mortar and grout. In some
cases, it may be necessary to carry out trials to ascertain the most suitable material.
iii) The bedding material, whether above or below the bearing, should extend over the whole area of the
bearing in order to ensure even loading. After installation, there shall be no voids or hard spots. The
top surface of any extension of the bedding beyond the bearing shall have a downward slope away
from the bearing.
iv) The bedding material shall be capable of transmitting the applied load to the structure without being
damaged. Surfaces to receive bedding mortar shall be suitably prepared so as to be compatible with
the mortar chosen.

2.51.4.3.3 Fixing of Bearings


i) Bearings should be anchored in order to counter vibration and accidental impact. Anchorage should
be accurately set into recesses cast into the structure using templates. The remaining space in the
recesses should be filled with material capable of withstanding the loads.
ii) Bearings that are to be installed on temporary supports should be firmly fixed to the substructure by
anchorage or other means to prevent disturbance during subsequent operations. Voids beneath the
bearings should be completely filled with bedding material using the appropriate method.
iii) Bearings may be fixed directly to metal bedding plates that may be cast in or bedded on top of the
supporting structure to the correct level and location.
iv) If the structure is of steel, the bearings may be bolted directly onto it. Care shall be taken to ensure
that there is no mismatch between the bolt holes of the structure and those of the bearing.
v) Threaded fasteners shall be tightened uniformly to avoid overstressing of any part of the bearing.

2.51.4.3.4 Bearings Supporting In -situ Concrete Deck


i) Where bearings are installed prior to casting of an in-situ concrete deck, formwork around bearings
should be properly sealed to prevent grout leakage. It is essential that the bearings and particularly
the working surfaces are protected during concreting operations. Sliding plates should be fully
supported and care taken to prevent tilting, displacement or distortion of the bearings under the
weight of green concrete. Any mortar contaminating the bearings should be completely removed
before it sets.
ii) For bearings supporting precast concrete or steel beams, a thin layer of synthetic resin mortar should
be used between bearings and the beams. Bearings shall be bolted to anchor plates or sleeves
embedded in precast concrete elements or to machined sole plates on steel elements.

2.51.4.3.5 Installation Tolerances


Bearings shall be located so that their centre lines are within ± 3 mm of their correct position. The level of a bearing or the
mean levels of more than 1 bearing at any support, shall be within a tolerance of ± 0.0001 times the sum of the adjacent
spans of a continuous girder, but not exceeding ± 5 mm. Bearings shall be placed in a horizontal plane within a tolerance
of 1 in 200 in any direction, even under superstructure in gradient.

166
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.52 SURFACE AND SUBSURFACE GEOTECHNICAL INVESTIGATION


2.52.1 The field work shall consist of excavation, drilling of boreholes for the purpose of collection of undisturbed
and disturbed samples, standard penetration tests, in-situ vane tests, static and dynamic cone penetration tests, other
field tests, as specified by the Engineer and preparation of bore logs. It will also include collection, preservation and
testing of disturbed and undisturbed samples from boreholes, borrow pits, etc. as specified by the Engineer. All in-situ
tests shall be supplemented by laboratory investigations. Relevant Indian Standards such as IS:1498, IS:1 888, IS:1892,
IS:2131, IS:2132, IS:2720, IS:4434 and IS:4968 and Annex 2 of IRC:78 shall be followed for guidance.
2.52.2 The soundings by dynamic method, where required shall be carried out in bore holes using a standard
sampler as specified in IS: 2131.

2.52.3 EXTENT AND NUMBER OF BORES (cl. 2402 of MoRT&H)

2.52.3.1 Investigations shall cover the entire length of the bridge and also extend on either side for a distance about
twice the depth below bed of the last main foundation. Bores shall be taken at the location of each pier and abutment of
the bridge. A minimum of two bores shall be taken in the approaches on either side, along the centre line of the alignment,
at a distance of 50 m and 120 m behind the abutment positions. In case of viaducts in the approaches on either side of
the bridge, bores shall be taken at the location of each foundation of the viaduct spans.

2.52.3.2 Where detailed investigation indicates appreciable variation or where variations in a particular foundation
are likely to appreciably affect the construction (specially in case of bridge foundations resting on rock), it will be necessary
to take additional bores in the transverse direction also, to establish complete profile of the underlying strata. The number
of additional bores shall be decided depending upon the extent of variation in local geology at a particular foundation
location and should cover the entire area of that foundation.

2.52.4 DEPTH OF BORES (cl. 2403 of MoRT&H)


2.52.4.1 The bores shall be taken below the proposed founding level to a depth of at least VA times the width of
foundation. In case the soil at that level is found to be unsuitable or of doubtful bearing capacity, the depth of investigation
below the proposed founding level, shall be extended to 4 times the width of foundation or til! firm and stable soil or rock
is met with. If rock is met with, the depth of drilling into rock having RQD more than 75, may be limited to 3 metres.
2.521.4.2 For embankments and guide bunds, the depth of bore should cover all strata likely to cause undesirable
settlement affecting their stability. The depth of bore holes below the ground level may ordinarily be 2.5 times the
maximum height of the embankment/ guide bund, subject to a minimum of 20 m. However, borings can be terminated at
shallower depths when firm strata or bed rock is encountered. Where highly compressible strata are encountered, the
boring may have to be taken deeper. In order to ensure that firm strata is sufficiently thick, the boring should extend 3
metres into the firm strata.

2.52.5 DETAILED INVESTIGATION (cl. 2404 of MoRT&H)


2.52.5.1 The subsurface investigation for bridges shall be carried out in the following three zones:
i) between bed level and up to anticipated maximum scour depth (below H.F.L.)
ii) from the maximum scour depth to the founding level
iii) from founding level to a depth of about VA times the width of the foundation
The data required to be obtained from each zone will cover soil classification, particle size distribution, shearing strength
characteristics, compressibility and permeability as detailed in Table 1 of Annex 2 of IRC:78.ln all cases, samples of soils
shall be collected at every 1 m to 1.5 m depth or at change of strata.
2.52.5.2 For bridge works, the investigations shall be comprehensive enough to give the following information to the
designer:
i) the engineering properties of the soil/rock,
ii) the location and extent of soft layers, cavities and gas pockets, if any under the hard founding strata,
iii) the geological condition like type of rock, faults, fissures or subsidence due to mining, cavities,
hollows, porosity etc.,
iv) ground water level,
v) artesian conditions, if any,

167
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

vi) quality of water in contact with the foundation,


vii) the depth and extent of scour,
viii) suitable depth of foundation,
ix) bearing capacity of the stratum
x) probable settlement and differential settlement of the foundations,
xi) likely sinking or driving effort, and
xii) likely construction difficulties.

2.52.6 DETAILED INVESTIGATION FOR BRIDGE FOUNDATIONS RESTING ON ROCK (cl. 2405of MoRT&H)
2.52.6.1 Identification and classification of rock types for engineering purposes may in general be limited to broad,
basic geological classes in accordance with accepted practice. Strength of parent rock alone is of limited value because
overall characteristics depend to a large extent on character, spacing and distribution of discontinuities such as joints,
bedding planes, faults and weathered seams in the rock mass. An important factor affecting the behaviour of the rock is
the weathered zone at top.
2.52.6.2 Basic Information Required from Investigations
i) Geological system
ii) Depth of rock strata and its variation over the length of the bridge
iii) Whether bed consists of isolated boulders or continuous rock formation
iv) Extent and character of weathered zone
v) Structure of rock - including bedding planes, faults, fissures, solution cavities etc.
vi) Properties of rock material - strength, geological formation, etc.
vii) Colour, quality and quantity of water coming out of drill holes
viii) Erodability of rock to the extent possible, where relevant

2.52.6.3 Core Recovery and Rock Quality Designation


The quality of rock cores shall be classified according to Rock Quality Designation as given in Table 2400-1 of MoRT&H.
Table 98 : Classification According To RQD (Table 2400-1 of MoRT&H)
RQD Per cent Cor e Qualit y
90-100 Excellent
75-90 Good
50-75 Fair
25-50 Poor
25 Very Poor

2.52.7 BORING (cl. 2406 of MoRT&H)


Boring shall be done by any of the following methods depending on the soil type and types of samples required for the
investigation.
i) Auger Boring
ii) Shell and Auger Boring
iii) Percussion Boring
iv) Wash Boring
v) Rotary Boring
For detailed subsurface investigation, only rotary drills shall be used. Casing shall also be invariably provided with
diameters not less than 150 mm up to the level of rock, if any. Use of percussion or wash boring equipment shall be
permitted only to penetrate through bouldery or gravelly strata for progressing the boring but not for the collection of
samples. While conducting detailed borings, the resistance to the speed of drilling i.e. rate of penetration, core loss, etc. ,
as specified in Annex-2 of IRC:78 shall be carefully recorded to evaluate the different types of strata and specially to
distinguish sand from sandstone, clay from shale, etc.

2.52.8 METHODS OF SAMPLING (cl. 2408 of MoRT&H)


There are two types of samples viz. (a) Disturbed sample (b) Undisturbed sample. The usual methods for sampling
conforming to IS:1892 and IS:2132 are given below ;

168
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

Nature of Ground Type of Sample Method of Sampling


Soil Disturbed Hand Samples
Auger Samples
Shell Samples
Undisturbed Hand Samples
Tube Samples
Rock Disturbed Wash samples from
Percussion or rotary drilling
Undisturbed Cores
2.52.9 PROCEDURE FOR TAKING SAMPLES (cl. 2409 of MoRT&H)
2.52.9.1 For proper identification of subsurface material, sample should be recovered containing all the constituents
of the materials in their proper proportion. In clayey deposits, such samples could be collected by split spoon samplers. In
sandy deposits, sampling spoons shall be fitted with suitable devices for retaining samples. All data required for soil
identification (Appendix-2.1 of IRC:75) should be collected from the samples so extracted when undisturbed samples, are
not available. Penetration test should be carried out with the standard split spoon sampler or penetrometers if the soil is
coarse grained. If the soil profile is known to be fairly regular, preliminary and detailed investigation may be combined.
Tube samplers can be used in place of split spoon samplers for collecting samples in clayey strata.
2.52.9.2 Disturbed Soil Samples
2.52.9.2.1 Disturbed samples of soil shall be obtained in the course of excavation and boring. For procuring samples
from below the ground water level, where possible, special type of sampler shall be used. Where Standard Penetration Test
is conducted, representative samples shall be obtained from the split spoon. While collecting disturbed samples from
borrow areas it shall be ensured that the samples collected represent all types of borrow materials to be used in the
construction of embankment and subgrade.
2.52.9.2.2 The size of sample generally required shall be as given in Table 2400-2 of MoRT&H.
Table 99 : Size of Soil Sample Required (Table 2400-2 of MoRT&H)
S.No. Purpose of Sample Soil Type Weight of Sample Required Kg
1) Soil identification, natural moisture content cohesive soils sands & 1
tests, mechanical analysis and index gravels 3
properties, chemical tests
2) Compression tests cohesive soils and sand 12.5
3) Comprehensive examination of construction cohesive soils sands 25-50
material and borrow area soil including soil gravelly soil 50-100
stabilization
2.52.9.2.3 While taking out disturbed soil samples, Standard Penetration Test may also be conducted to find out the
bearing capacity of the subsoils at specified levels.
2.52.9.3 Undisturbed Soil Samples
2.52.9.3.1 The location of the bore-hole shall be as indicated on the drawing or given by the Engineer. The depth of the
bore-hole shall be as indicated on the drawing or shall be governed by the criteria given therein or as directed by the
Engineer.
2.52.9.3.2 Samples shall be obtained in such a manner that their moisture content and structure do not get altered.
This may be ensured by use of correctly designed sampler and by careful preservation and packing.
2.52.9.3.3 Standard Penetration Test may have to be conducted in each case to obtain additional data as directed by
the Engineer, in soft clay, in-situ vane shear test as per IS:4434 may have to be conducted. Where all the three operations
have to be carried out in one layer, the sequence shall be as follows: undisturbed soil sampling, in-situ vane shear test,
Standard Penetration Test.
2.52.9.3.4 For compression test samples, a core of 40 mm diameter and about 150 to 200 mm length may be
sufficient, but for other laboratory tests, a core of 100 mm diameter and 300 mm length shall be taken unless otherwise
specified by the Engineer.

169
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.52.9.3.5 The upper few millimeters of both types of sample shall be removed as the soil at the bottom of the bore hole
usually gets disturbed by the boring tools.

2.52.9.4 Rock Samples


2.52.9.4.1 Disturbed Samples
The sludge from percussion borings or from rotary borings which have failed to yield a core, shall be collected to serve as a
disturbed sample. It may be recovered by settlement of circulating water in a trough.

2.52.9.4.2 Undisturbed Samples


Block samples taken from the rock formation shall be dressed to a size of about 90 mm x 75 mm x 50 mm.
Cores of rock shall be taken by means of rotary drills fitted with a coring bit with core retainer, if warranted.
2.52.9.4.3 In case rock is met with at shallow depths, test pits or trenches may be dug. These are most dependable
since they permit a direct examination of the surface, the weathered zone and discontinuities, if any. It is also possible to
take representative samples for tests. For guidance, IS:4453 may be referred.

2.52.10 TESTS FOR INVESTIGATION OF SHALLOW FOUNDATIONS OF BRIDGES (cl. 2411 of MoRT&H)
2.52.10.1 Digging of test pits or trenches is the most dependable method of investigation, since it permits direct and
reliable visual examination of the type of soil and its stratification. In-situ tests like plate bearing tests, shear tests and uni-
axial jacking tests can also be conveniently carried out in the test pits.
2.52.10.2 Tests shall be conducted on undisturbed samples, which may be obtained from open pits. The use of Plate
Load Test (as per IS: 1888) is considered desirable to ascertain the safe bearing capacity and settlement characteristics. A
few exploratory bore holes or soundings extending to a depth of about V/2 times the proposed width of foundation shall
also be made to ascertain whether there is any weak strata underlying the foundation.
The results of laboratory tests shall be correlated with those of in-situ tests like Plate Load Tests and Penetration Test.

2.52.11 TESTS FOR INVESTIGATION FOR DEEP FOUNDATIONS OF BRIDGES (cl. 2412 of MoRT&H)

2.52.11.1 The tests to be conducted for obtaining the properties of soil are different for cohesive soils and for
cohensionless soils. These are enumerated below and shall be carried out, wherever practicable, according to soil type.
While selecting the tests and interpreting the results, limitation of applicability of particular tests shall be taken into
account. A most suitable and appropriate combination of tests shall be chosen, depending on the properties needed for
design and constructional aspects.

2.52.11.2 Cohesionless Soil


a) Laboratory Tests
n) Classification tests, index tests, density determination, etc.
ii) Shear strengths by triaxial/direct shear, etc.
b) Field Tests
i) Plate Load Test (as per IS: 1888)
ii) Standard Penetration Tests (as per IS:2131)
iii) Dynamic Cone Penetration Test (as per IS:4968 Part I or Part II)
iv) Static Cone Penetration Test (as per IS:4968 Part III).

2.52.11.3 Cohesive Soil


a) Laboratory Tests
i) Classification tests, index tests, density determination, etc.
ii) Shear strengths by triaxial/direct shear, etc.
iii) Unconfined Compression Test (as per IS:2720 Part X)
iv) Consolidation Test (as per IS:2720 Part V)

170
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

b) Field Tests
i) Plate Load test (as per IS:1888)
ii) Vane Shear Test (as per IS:4434).
iv) Static Cone Penetration Test (as per IS:4968 Part III)
v) Standard Penetration Tests (as per IS:2131),
vi) Dynamic Cone Penetration Test (as per IS:4968 (Part I or Part II)
2.52.11.4 For both cohesionless and cohesive soils where dewatering is expected, permeability tests may be
conducted as per IS: 2720 Part XVII.
2.52.11.5 The subsoil water shall be tested for chemical properties to ascertain whether there is any hazard which may
cause deterioration of concrete in foundations. Where dewatering is expected to be required, permeability characteristics
shall also be determined.

2.53 EXPANSION JOINTS


2.53.1 GENERAL (cl. 2602 of MoRT&H)
2.53.1.1 The type of expansion joint proposed to be used shall conform to the design and got approved by the
Engineer.
2.532.1.2 Expansion joints shall be robust, durable, water-tight and easy for inspection, maintenance and
replacement. Site fabricated expansion joints shall be prohibited. Expansion joints shall be procured from approved
manufacturers and shall be of proven type.
2.53.1.3 Alternative proprietary type deck joints proposed by the Contractor in lieu of the type specified shall comply
in all respects with the manufacturer's specifications and meet the required range of movements and rotations and be fit
for the purpose of ensuring satisfactory long term performance. For such proprietary type deck joints the following
information shall be provided.
i) Name and location of the proposed manufacturer.
ii) Dimensions and general details of the joint including material specifications, holding down bolt or
anchorage details and installation procedures.
iii) Evidence of satisfactory performance under similar environmental conditions of similar joints being
produced by the manufacturer.
Acceptance of any alternative type of expansion joint shall be at the sole discretion of the Engineer. Such deck joints shall
be installed in accordance with the manufacturer's recommendations and to the requirements of these Specifications.
Vehicular traffic shall not be allowed over expansion joints after their installation for such period as may be determined by
the Engineer.
2.53.1.4 The expansion joint shall be provided to cover the entire carriageway, kerb and footpath, wherever provided.
It shall follow the profile of the deck including the kerb, footway and facia. The expansion joint for kerb, footway and facia
may be of different type and specification from that used for the carriageway and it shall cater to all movements and
rotations for which the carriageway expansion joint is designed and shall be water tight.
2.53.2 FILLER JOINTS (cl. 2604 of MoRT&H)
2.53.2.1 Components
The components of this type of joint shall be corrugated copper plate at least 2 mm thick placed slightly below the wearing
coat, 20 mm thick compressible fiber board to protect the edges, 20 mm thick pre-moulded joint filler filling the gap up to
the top level of the wearing coat and sealant of suitable joint sealing compound.
2.53.2.2 Material
i) The material used for filling expansion joint shall be bitumen impregnated felt, elastomer or any
other suitable material, as specified on the drawings, impregnated felt shall conform to the
requirements of IS:1838, and shall be got approved from the Engineer. The joint filler shall consist
of large pieces. Assembly of small pieces to make up the required size shall be avoided.
ii) Expansion joint materials shall be handled with care and stored under cover by the Contractor to
prevent damage.
iii) Any damage occurring after delivery shall be made good to the satisfaction of the Engineer and at
the expense of the Contractor.
171
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.53.2.3 Fabrication and Installation


i) Joint gaps shall be constructed as shown on the drawings. Surfaces of joint grooves shall be
thoroughly cleaned with a wire brush to remove all loose materials, dirt and debris, then washed or
jetted out.
ii) Pre-moulded expansion joint filler shall not be placed in position until immediately prior to the
placing of the abutting material. If the two adjacent faces of the joint are to be installed at different
times, the joint filler shall be placed only when the second face is ready to be kept in position
iii) Sealants shall be installed in accordance with the manufacturer's recommendations.
iv) Sealants shall be finished approximately 3 mm below the upper surfaces of the joint.
v) Joint materials spilt or splashed onto finished surfaces of the bridge during joint filling operations
shall be removed and the surfaces made good to the Engineer's approval.
vi) No joint shall be sealed until inspected by the Engineer and approval is given to proceed with the
work.

2.53.3 REINFORCED ELASTOMERIC JOINT (cl. 2605 of MoRT&H)

2.53.3.1 Components
Reinforced elastomeric expansion joint shall comprise of following components:
i) Steel Inserts : The elastomeric slab units shall be fixed to the steel inserts properly anchored in the
deck concrete. Fixing of elastomeric slab units with anchoring bolts directly embedded in deck
concrete shall not be permitted. Steel inserts along with anchorage shall be fabricated at
manufacturer's workshop and not at site.
ii) Anchorage : The anchorage shall either be loop anchors connected to the inserts by anchor plate or
sinusoidal anchor bars welded with the horizontal leg of the steel inserts. For loop anchors with
anchor ptate, the thickness of the anchor plate shall not be less than 12 mm. Diameter of anchor
loops shall not be less than 16 mm and the spacing of anchors shall not be more than 250 mm. For
sinusoidal anchors, diameter of bar shall not be less than 12 mm.
iii) Fixing Bolts : Fixing bolts and nuts shall be made of stainless steel. Tightened nuts shall be locked
by using lock washers.
iv) Elastomeric Plugs : The plug holes provided in elastomeric slab units to house fixing bolts shall be
plugged with elastomeric plugs pressed in position after applying adhesive on the surfaces.
v) Adhesives and Sealants : Special sealant to be poured into the plug holes before plugging and
special adhesive to be used for installation, shall be as per the recommendation of manufacturer.
vi) Necessary spacer bars to ensure proper positioning of bolts and leveling and aligning steel inserts
during fixing with deck as well as special jigs to be used to preset the elastomeric slab units, shall
be provided by the manufacturer.

2.53.3.2 Material
i) Mild steel to be used for manufacture of steel reinforcing plates, inserts and anchorage shall comply
with Grade B of IS:2062.
ii) Cast steel to be used for manufacture of steel reinforcing plates shall comply with IS:1030.
iii) The elastomer to be used for manufacture of elastomeric slab units shall comply with Clause 915.1
of IRC:83 (Part II), compounded to give hardness IRHD 60 ± 5.

2.53.3.3 Fabrication
j) All surfaces of the steel inserts and anchorage including the surfaces to be in contact with or
embedded in concrete shall be sand/shot blasted to SA 2½ and provided with a coat of epoxy primer
enriched with metallic zinc. Surfaces not to be in contact with or embedded in concrete shall be
provided with an additional coat of epoxy primer enriched with metallic zinc, one intermediate coat of
high build epoxy paint reinforced with MIO (Micaceous Iron Oxide) and one coat of high performance
epoxy finish paint as per manufacturer's specification with minimum total dry film thickness of 150
micron.

172
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

ii) Elastomeric slab units shall be fully moulded to the required size in one single vulcanizing operation
including the reinforcing plates and encasing layers as one integral and homogeneous unit. Edges of
reinforcing steel sections shall be rounded. The elastomeric slab units shall be manufactured
generally as per the stipulations laid down in Clause 917 of IRC: 83 (Part II). Adjoining portions of
elastomeric slab units shall be provided with suitable male-female groove to ensure water tightness.
iii) Permissible tolerances of fabrication shall be as follows:
Plan dimension ± 5 mm
Total height ± 3 mm
2.53.3.4 Supply and Handling
i) The Contractor shall supply all steel-reinforced elastomeric expansion joints including bolts, nuts,
sealant, plugs and all other accessories for the effective installation of the joints including angled
jointing sections for kerbs.
ii) Expansion joint material shall be handled with care and stored under cover by the Contractor to
prevent damage. Any damage occurring after delivery shall be made good at the expense of the
Contractor to the satisfaction of the Engineer.

2.53.4 SINGLE STRIP/BOX SEAL JOINT (cl. 2606 of MoRT&H)

2.53.4.1 Components
Strip seal expansion joint shall comprise the following:
i) Edge Beam : This shall be either extruded or hot rolled steel section including continuously shop welded
section with suitable profile to mechanically lock the sealing element in place throughout the normal
movement cycle. Further, the configuration shall be such that the section has a minimum thickness of 10
mm all along its cross section (flange and web). Thickness of lips holding the seal shall not be less than
6 mm. The minimum height of the edge beam section shall be 80 mm. The minimum cross sectional area
of the edge beam shall be 1500 mm2.
ii) Anchorage : The edge beams of single strip/box seal joints shall be anchored in the concrete with rigid
loop anchorage. The anchor loops shall be connected to the edge beam by means of anchor plate
welded to the edge beam. Total cross sectional area of anchor loop on each side of the joint shall not be
less than 1600 mm2 per metre length of the joint and the centre to centre spacing shall not exceed 250
mm. The thickness of anchor plate shall not be less than 0.7 times the diameter of anchor loop or 12 mm
whichever is higher. The anchor loop at the edge profiles should be at right angles to the joint. Planned
deviations of this direction are allowable only for the range of 90° ± 20°. The anchoring reinforcement of
the construction must lie parallel to the anchor loops.
iii) Sealing Element : This shall be a preformed/extruded single strip of such a shape as to promote self-
removal of foreign material during normal joint operation. The seal shall possess high tear strength and
be insensitive to oil, gasoline and ozone. It shall have high resistance to ageing. The specially designed
proprietary type of locking system of seal in the housing of edge beam shall be such as to ensure 100%
water tightness as well as ease of installation and replacement. Mechanical fastening of sealing element
with edge beam shall not be permitted. Sealing element shall be continuous over the entire joint
The working movement range of the sealing element shall be at least 80 mm with a maximum of 100 mm at right angles to
the joint and ± 40 mm parallel to the joint.
Minimum gap for inserting the Chloroprene seals in the expansion joint shall be 25 mm.
2.53.4.2 Material
i) The steel for edge beams shall conform to any of the steel grade equivalent to RST 37 -2 or 37-3 (DIN),
S235JRG2 or S355K2G3 of EN 10025 (DIN 17100), ASTM A 36 or A 588, CAN/CSA Standard G40.21
Grade 300 W and Grade B of IS:2062. For subzero condition, material for steel shall conform to IS:2062
Grade C.
ii) The sealing element shall be made of Choloroprene Rubber (CR). The properties of CR shall be as
specified in Table 2600-1 of MoRT&H.
iii) Anchorage steel shall conform to Grade B of IS: 2062 or equivalent standard.

173
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.53.4.3 Fabrication (Pre -installation)


i) Rolled steel profiles for edge beams shall be long enough to cater for the full carriageway width. These
shall be cut to size as per actual requirements. Alignment of the steel profiles shall then be made on
work tables in accordance with the actual bridge cross-section. For this purpose, the contour of bridge
cross-section shall be sketched on the tables. After the steel profiles are aligned, these will be fixed to
the tables by means of screw clamps and tacked by arc welding.
ii) Anchor plates shall be cut to the required size by gas cutting. These shall be welded to the edge beams.
iii) Anchor loops shall be bent to the required shape and welded to anchor plates.
iv) All steel sections shall be protected against corrosion by either hot dip galvanizing with a minimum
thickness of 150 micron or by epoxy coating.
v) All surfaces of the steel inserts and anchorage including the surfaces to be in contact with or embedded
in concrete shall be given treatment as mentioned in Clause 2605.3 (i) of MoRT&H.
vi) The finally assembled joints shall then be clamped and transported to the work site.

2.53.4.4 Handling and Storage


i) For transportation and storage, auxiliary brackets shall be provided to hold the joint assembly together.
ii) The manufacturer shall supply either directly to the Engineer or to the Contractor ail the materials of strip
seal joints including sealants and all other accessories for the effective installation of the joint.
iii) Expansion joint material shall be handled with care. It shall be stored under cover on suitable wooden
padding to prevent damage. Any damage occurring after delivery shall be made good at the cost of
Contractor to the satisfaction of the Engineer

2.53.5 MODULAR STRIP/BOX SEAL EXPANSION JOINTS (cl. 2607 of MoRT&H)

2.53.5.1 Components
A modular expansion joint shall consist of two or more modules/cells of individual capacity 80 mm to cater to a horizontal
movement in excess of 80 mm. It shall allow movements in all three directions and rotation about all three axes as per the
design requirements. The structural system shall consist of two edge beams, one or more central/separation beams or
lamellas and cross support bars supporting individuals or multiple central beams to transfer the loads to the bridge deck
through the anchorage system.
i) Edge Beams and Central Beams/Lamella : These shall be as per Clause 2606.1(i) of MoRT&H.
ii) Anchorage : Anchorage of edge beam shall be as per Clause 2606.1 (ii). Studs and/or loop anchors with
anchor plate may be used as anchorage of other components like joist box and covers of controlling
system.
iii) Sealing Element : This shall be as per Clause 2606.1 (iii). Minimum gap for inserting the neoprene seals
in the expansion joint shall be 25 mm.
iv) Support and Control System : The control system should allow closing and opening of the joint and also
ensure that all modules open and close equally during all movement cycles of the joint. The overall
support and control system shall be either single/multiple support bar control system or swivel joint
system comprising of resilient/shock absorption components and elastic/sliding control system
conforming to the specifications recommended by the manufacturer. The gap between the consecutive
centre beams at the joint surface shall be limited to 80 mm when the joint opens fully due to maximum
contraction of deck.

2.53.5.2 Material

i) The steel for edge beams, centre beam/lamella, transverse support bar and other steel components
shall conform to any of the steel grade corresponding to RST 37-2 or 37-3 or 52-3 (DIN), S235JRG2 or
S355K2G3 of EN10025 (DIN 17100), ASTM A36 or A588, CAN/CSA standard G40.21 Grade 300 W.
ii) The sealing element shall be of Chloroprene Rubber (CR). The properties of CR shall be as specified in
Table 2600-1 of MoRT&H.
iii) The specification for all other materials shall be as per manufacturer's recommendation.

174
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.53.5.3 Fabrication (Pre -installation)


i) Profile of edge beam, centre beam/lamella shall be long enough to cater for full carriageway width.
ii) The fabrication of all components of the joints including anchorage system and transportation of
assembled joints shall be as per manufacturer's specification.
iii) All steel sections shall be suitably protected against corrosion as stated in Clause 2606.3 (iv).
iv) All surfaces of the steel inserts and anchorage including the surfaces to be in contact with or embedded
in concrete shall be given treatment as mentioned in Clause 2605.3 (i) of MoRT&H.
2.53.5.4 Handling and Storage
i) Arrangement for transportation and storage shall be as per manufacturer's specification.
ii) The manufacturer shall supply either directly to the Engineer or to the Contractor all the materials of
strip seal joints including all sealants and other accessories for the effective installation of the joint.

2.53.6 ASPHALTIC PLUG JOINT (cl. 2608 of MoRT&H)


2.53.6.1 General
i) This joint shall consist of a polymer modified bitumen binder, carefully selected single size aggregate,
closure/bridging metallic plate and heat resistant foam caulking/backer rod.
ii) The joint shall be capable of performing satisfactorily, within the temperature (ambient) range of-5°C
to +50°C.
2.53.6.2 Material
i) Binder: The polymer modified bitumen binder shall have the capacity to fill the gaps and voids
between single size aggregates and to impart flexibility to accommodate various design movements.
It shall be a patented blend of bitumen, synthetic polymer, filler and surface active agent and shall be
so formulated as to combine necessary fluidity for the installation process, low temperature flexibility
and flow resistance at high ambient temperature. The binder shall satisfy following requirement:
• Softening point : 100°C minimum
• Cone penetration at 25°C, 0.1 mm
(BS:2499) : 100 mm max
• Flow resistance at 70°C, 5 hours
(BS:2499) : 3 mm max
• Extension Test
5 cycle of extension to 50% (blocks prepared
to ASTM D1190atarate of 3.2 mm/hour at and
tested to limits BS:2499) : 25°C
• Safe heating temperature. : 210°C
ii) Aggregates : The aggregate shall be of single size chosen from basalt granite, grit stone or gabro
group. The nominal size of aggregate shall be 12.5 mm for joints up to 75 mm depth and 20 mm for
joints of larger depth. The flakiness index shall not be more than 25 percent. The aggregate shall
satisfy grading requirements stipulated in Table 2600-2 of MoRT&H.

Table 100 : Grading Requirements of Aggregate (Table 2600-2 of MoRT&H)


Nominal S ize of Aggr egat e
IS S iev e Designat ion 2 0 mm 2 5 mm
Per cent age by Weight Passing t he S iev e
26.5 mm 100 -
19.9 mm 85- 100 100
13.0 mm 0-35 85-100
9.5 mm 0-7 0-35
6.3 mm - 0-7
2.3 mm 0-2 0-2
75 micron 0- 1 0-1

175
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

The Polished Stone Value (PSV), Aggregate Abrasion Value (AAV), Aggregate Impact Value (AIV) and
Aggregate Crush Value (ACV) shall be as below:
PSV > 60
AAV > 05
AIV < 18
ACV = 10-25
The surface characteristics should promote proper adhesion,
iii) Closure Plate : The closure plate shall be weld able structural steel conforming to IS:2062. The
minimum thickness of steel plate shall be 6 mm and the width shall not be less than 200 mm. Closure
plate shall preferably be of single length but it shall not have more than 2 pieces per traffic lane width
which shall be welded together to form the required length. It shall be provided with equidistant holes
at a maximum spacing of 300 mm centers for anchorage to the caulking/ backer rod along the
longitudinal centre line of the plate. The plate shall be protected against corrosion by galvanizing or by
any other approved anti-corrosive coating paint with a minimum thickness of 100 micron.
iv) Foam Caulking/Backer Rod: The foam caulking shall be closed cell polyolefin or open cell polyurethane
foam cylindrical type. The backer rod shall be of diameter equal to 150 percent of the joint opening. It
shall be heat resistant and possess good flexibility and recovery characteristics with density of 25
kg/m3 to 30 kg/m3.

2.54 WEARING COAT AND APPURTENANCES

2.54.1 WEARING COAT (cl. 2702 of MoRT&H)


2.54.1.1 Bituminous Wearing Coat
Bituminous wearing coat shall comprise of following types:
Type 1: Bituminous Concrete 50 mm thick laid in single layer
Type 2: Bituminous Concrete 40 mm thick overlaid with 25 mm thick mastic asphalt
Type 3: Stone Matrix Asphalt 50 mm thick laid in single layer
Type 4: Mastic Asphalt 50 mm thick laid in single layer
Before laying wearing coat the deck surface shall be thoroughly cleaned and tack coat shall be applied. The construction
operations and bituminous mixes and tack coat shall conform to Section 500 of MoRT&H Specifications.
2.54.1.2 Cement Concrete Wearing Coat
Cement concrete wearing coat shall be laid separately over the bridge deck. The thickness of wearing coat shall be 75 mm.
The concrete shall be of minimum M30 grade. Steel reinforcement of 8 mm diameter at 150 mm spacing in both directions
shall be provided at the mid depth of the wearing coat. In a length of 1 m near the expansion joint additional reinforcement
of 8 mm diameter bars shall be provided in both directions to make the spacing as 75 mm.
Cement concrete and steel reinforcement shall conform to Section 1700 and Section 1600 respectively of MoRT&H
Specifications.
Curing of wearing coat shall start as early as possible.
All carriageway and footpath surfaces shall have non-skid characteristics.
2.54.1.2.1 The cross slope in the deck shall be kept as 2.5 percent.
2.54.1.2.2 For the structures with flat deck surface, camber/super elevation in the wearing coat shall be achieved as
below:
i) In bituminous wearing coat provide profile making course before laying wearing coat. The profile making
course shall be of the same material as of wearing coat. The thickness of wearing coat at any point shall
not be less than that given in Clause 2702.1 of these Specifications.
ii) In case of cement concrete wearing coat provide profile corrective course along with wearing coat in
single layer.
2.54.1.2.3 Overlay on the existing wearing coat on bridge decks shall not be permitted.
In case the wearing coat is damaged, it shall be repaired or replaced. The dismantling of wearing coat shall be as per
Section 2800 of these Specifications.
176
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.54.2 RAILING AND CRASH BARRIER (cl. 2703 of MoRT&H)

2.54.2.1 General
a) Bridge railing/crash barrier includes the portion of the structure erected on and above the kerb.
b) Railing/crash barrier shall not be constructed until the centering false work for the span has been
released and the span is self-supporting.
c) For concrete with steel reinforcement, specifications for the items of controlled concrete and
reinforcement mentioned under relevant Sections of these Specifications shall be applicable.
d) The railing/crash barrier shall be carefully erected true to line and grade. Posts shall be vertical with a
tolerance not exceeding 6 mm in 3 m. The pockets left for posts shall be filled with non-shrink mortar.
e) The type of railing/crash barrier to be constructed shall be as shown on the drawings and shall conform
to IRC:5 and IRC:6.
f) Care shall be exercised in assembling expansion joints in the railing/ crash barrier to ensure that they
function properly.
g) The railing/crash barrier shall be of such design as to be amenable to quick repairs.
h) The material of metal railing/crash barrier shall be handled and stored with care, so that it remains
clean and free from damage. Railing/crash barrier materials shall be stored above the ground on
platforms, skids, or other supports and kept free from grease, dirt and other contaminants.
Any material which is lost, stolen or damaged after delivery shall be replaced or repaired by the Contractor. Methods of
repairs shall be such that they do not damage the material or protective coating.

2.54.2.2 Metal Railing/Crash Barrier


Materials, fabrication, transportation, erection and painting for bridge railing/crash barrier shall conform to the
requirements of Section 1900 of these Specifications.
All steel railing elements, pipe terminal Sections, posts, bolts, nuts, hardware and other steel fittings shall be galvanised
or painted with an approved paint.
If galvanised, all elements of the railing/crash barrier shall be free from abrasions, rough or sharp edges, and shall not be
kinked, twisted or bent. If straightening is necessary, it shall be done as per method approved by the Engineer.
Damaged galvanised surfaces, edges of holes and ends of steel railing/crash barrier cut after galvanising shall be cleaned
and re-galvanised.
The railing/crash barrier shall be carefully adjusted prior to fixing in place to ensure proper matching at abutting joints and
correct alignment and camber throughout its length. Holes for field connections shall be drilled with the railing/crash
barrier in place in the structure at proper grade and alignment.
Unless otherwise specified on the drawings, metal railing/crash barrier shall be given one shop coat of paint and three
coats of paint after erection, if sections are not galvanised.
Railing/crash barrier shall follow the alignment of the deck. Where required as per the drawings, the rail elements shall be
before erection.

2.54.2.3 Cast In-Situ Concrete Railing/Crash Barrier


The portion of the railing/crash barrier or parapet which is to be cast in-situ shall be constructed in accordance with the
requirements for Structural Concrete Section and reinforcement conforming to Sections 1600 and 1700 of these
Specifications.
Forms shall be fabricated conforming to the shape of railing/crash barrier shown on the drawings. It shall be ensured that
no form joint appears on plane surfaces. For bridges/ viaducts of length more than 500 m horizontal slip forms shall be
used for casting of crash barriers.
All mouldings, panel work and bevel strips shall be constructed according to the details shown on the drawings. All corne rs
in the finished work shall be true, sharp and clean-cut and shall be free from cracks, spalls or other defects. Castings of
posts shall be done in single pour.

177
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.54.3 APPROACH SLAB (cl. 2704 of MoRT&H)


Reinforced concrete approach slab with 12 mm dia bars at 150 mm c/c in each direction both at top and bottom in M30
grade of concrete covering the entire width of the roadway, shall be provided as per details given on the drawings or as
approved by the Engineer. Minimum length of approach slab shall be 3.5 m and minimum thickness 300 mm.
The cement concrete and reinforcement shall conform to Sections 1700 and 1600 respectively of these Specifications.
The approach slab shall rest on a base of 150 mm thick M15 grade concrete or as shown on the drawings o r as directed by
the Engineer.

2.54.4 DRAINAGE SPOUTS (cl. 2705 of MoRT&H)


Drainage along longitudinal direction shall be ensured by sufficient number of drainage fixtures embedded in the deck
slab. The spouts shall be of not less than 100 mm in diameter and shall be of corrosive resistant material such as
galvanised steel with suitable cleanout fixtures. The spacing of drainage spouts shall not exceed 10 m. The discharge from
drainage spout shall be kept away from the deck structure by means of suitable down pipes upto 500 mm above High
Flood Level. In case of viaducts in urban areas, the drainage spouts should be connected with suitably located runners and
down pipes to discharge the surface run-off into drains provided at ground level.

2.54.5 WEEP HOLES (cl. 2706 of MoRT&H)


Weep holes shall be provided on all plain concrete, reinforced concrete, brick masonry and stone masonry structures such
as, abutment, wing wall and return walls as shown on the drawings or as directed by the Engineer to permit water to flow
out without building up pressure in the backfill. Weep holes shall be provided with 100 mm diameter AC/PVC/HDPE pipe
for structures in plain/reinforced concrete or brick masonry. In case of stone masonry, weep holes shall be of rectangular
shape 80 mm wide, 150 mm high or circular with 150 mm diameter. Weep holes shall extend through the full width of
concrete/masonry with slope of about 1 vertical: 20 horizontal towards the draining face. The spacing of weep holes shall
be 1 m in either direction or as shown in the drawings with the lowest at 150 mm above the low water level or ground level
whichever is higher or as directed by the Engineer.

2.55 REINFORCED SOIL

2.55.1 REINFORCING ELEMENT (cl. 3103 of MoRT&H)


2.55.1.1 The reinforcing element shall be metallic in the form of strips (aluminum alloy strip, copper strip, carbon
steel strip, galvanised steel strip, stainless steel strip, ladder) or mats of metal (steel grids, woven and welded steel wire
meshes) or synthetic (PET, HDPE, PVA, PP) reinforcement in the form of grid or strip or strap or combination of metallic or
synthetic or any other proprietary material which may be approved by the Engineer and shown on the drawings
2.55.1.2 Aluminum alloy strip shall comply with BS:1470 quality 5454 in the H 24 condition.
2.55.1.3 Copper strip shall comply with BS:2870 quality C 101 or C 102 in the 1/2 H condition and shall have 0.2
percent proof stress of not less than 180 N/mm2.
2.55.1.4 Carbon steel strip shall comply with BS EN 10025 or IS:2062 and have a silicon content of not more than
0.55 percent. The fabricated element shall be galvanized in accordance with IS:4759 and IS:2629 and the minimum zinc
coating weight shall not be less than 1000gm/sq.m
The steel strips with minimum bearing and shear strength of 490N/mm2 shall comply with the requirements of BS EN
10025, Grade S 355 JR, or IS:2062 grade Fe 490, except the elongation (on base metal) for which minimum 22 percent is
acceptable.
Tests shall be carried out to provide values of
i) Pull-out coefficient as per ASTM D 6706 "Standard Test Method for Measuring Geosynthetic
Pullout Resistance in Soil" and
ii) Coefficient of interaction between reinforced fill soil and geogrids as per ASTM D 5321-"Standard
Test method for Determining the Coefficient of Soil and Geosynthetic or Geosynthetic and
Geosynthetic Friction by the Direct Shear method" or as per IS: 13326: Part 1 -1992 "Method of
test for the evaluation of interface friction between geosynthetics and soil: Part 1 Modified direct
shear technique" for all types of geogrids.

178
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

One set of project specific tests shall be conducted at third party accredited laboratory or at a reputed institute.
Each roll shall have at least one identification label with roll number and product type.
The fill material in the reinforced soil zone shall have drained or effective angle of friction not less than 30°, measured in
accordance with IS: 2720 (Part 13), by conducting a drained direct shear test. In case the fill material has 25 percent or
more particles of 4.75 mm or larger, drained shear test using large shear box may be conducted (IS: 2720 Part 39: Section
1). The gradation of fill soil shall be as per following limits.
Sieve Size Percentage Passing
75 mm 100%
425 micron 0-60%
75 micron less than 15
Pl<6
Materials with more than 15 percent passing 75 micron sieve, but less than 10 percent of particles smaller than 15
microns are acceptable provided PI is less than 6 and angle of friction is not less than 30°.
Fly ash may be used as fill material in reinforced soil walls provided its angle of internal friction is not less than 300 and PI
is less than 6. Gradation requirements need not be completely satisfied. Reference may be made to IRC Guide lines on Use
of Flyash in Road Embankments (IRC:SP-58). Fly ash shall also satisfy requirements concerning pH and environmental
conditions of the fill vis-a-vis the reinforcement type as specified in Clause 3014.1.
The fill material used in the reinforced soil zone shall be free from organic or other deleterious materials and shall not react
adversely (chemically, electrically or biologically) with the reinforcement material and/or facia material.
Properties of fill soil in the reinforced zone, unreinforced zone (or retained/back fill) soil and the foundation soil shall be
determined accurately during the construction phase, as per quality assurance plans and directions of Engineer so as to
ensure that these are the same as those considered in the design phase.
The fill soil in the unreinforced zone shall conform to the requirements specified in the design.
2.55.2 Steel Reinforcement
Where galvanized steel reinforcement is used, the fill material shall be free draining granular material and shall meet the
following requirements as per Table 3100.1.
Table 101: Recommended Limits of Electrochemical Properties for Reinforced Fills with Steel
Reinforcement (Table 3100-1 of MoRT&H)
Pr oper t y Cr it er ia Test Met hod
Resistivity > 3000 ohm-cm AASHTO T-288
pH > 5 and < 10 AASHTO T-289
Chlorides < 100 PPM ASTM D 4327
Sulphates < 200 PPM ASTM D 4327

2.55.3 Geosynthetic Reinforcement


Where geosynthetic reinforcement is used for reinforcing elements manufactured from polyester yarn, pH value of the fill
material shall be between 3 and 9, and for reinforcing elements manufactured from PVA, PP and HDPE, the pH value shall
be greater than 3.

2.55.4 FACIA MATERIAL (cl. 3105 of MoRT&H)


2.55.4.1 The facing system shall be one of the following
a) Precast reinforced concrete panels
b) Precast concrete blocks and precast concrete hollow blocks.
c) Gabion facing
d) Wrap around facing using geosynthetics
e) Metallic facing, prefabricated in different shapes including welded wire grid and woven steel wire mesh
f) Other proprietary and proven systems Facing shall be sufficiently flexible to withstand any deformation
of the fill and foundations.
The facia units to be adopted in the project shall be shown in the drawings and shall be approved by the Engineer.
179
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

2.55.4.1.1 Precast Reinforced Concrete Panels


The minimum thickness of precast concrete panels shall be 180 mm including facing textures, logos and embellishments.
The grade of concrete shall be minimum M35. The concrete shall conform to the requirements of Section 1700 of these
Specifications.
Facia panel systems shall have provision of both horizontal and vertical gaps to prevent concrete to concrete contact. The
horizontal gap between the facing elements shall be maintained by provision of Ethylene Propylene Diene Monomer
(EPDM) pad. Bedding material shall consist of either cement mortar or a durable gasket seating such as resin bonded cork,
bitumen bonded cork or EPDM.
The joints between the panels shall be covered from inside with non-woven geotextile strips glued to the facing element
ensuring full coverage of joints. Synthetic glue shall be used for this purpose. The width of the geotextile strip shall not be
less than 100 mm.
2.55.4.1.2 Precast Concrete Blocks/Segmental Blocks/Modular Blocks
Precast concrete blocks are dry cast and shall be manufactured from fully automatic block making machines. The
minimum grade of concrete shall be M 35 for all kinds of modular blocks. In case of hollow blocks, the hollow area shall
not exceed 40 percent of the cross sectional area of the block. The outer side of the block shall have minimum thickness of
100 mm.
2.55.4.1.3 Gabion Facia
Where gabion facia is used, it shall conform to the provisions of BS 8006 -1:2010 and EN 14475 and made of
mechanically fabricated and selvedged double twisted hexagonal mesh. Wire used for the double twisted mesh shall be
hot dip galvanized as per IS:4826 -heavily coated and soft type, with wire and mesh properties in accordance with EN-
10223 with minimum Zn or Zn + alloy coating as per EN-10244 and 0.5 mm thick PVC coating as per EN-10245 and ISO-
527.
2.55.4.1.4 Wrap Around Facing using Geosynthetics
Where geosynthetics, including geogrids are used as wrap around facia, these shall form a part of the reinforcing element.
The wrap around shall have adequate length to resist pull out and the wrap around length shall be calculated on the basis
of safety in pull out. Wrap around facia shall be protected by suitable means, against adverse effects of natural forces.
2.55.4.1.5 Metallic Facing, Prefabricated in Different Shapes Including Welded Wire Grid, Steel Sheet and Woven S teel
Wire Mesh
Where steel sheet and steel grids facings are used for facing, steel for steel sheet shall be as per BS:1449 -Part 1 and steel
grids shall conform to BS:4482, BS:4483 and BS:4489.
Where mechanically woven steel wire mesh in wrap around form is used for facing, the steel wire mesh (IS:4826, IS:280,
IS:13360, EN:10218, EN:10223, EN:14475) shall be with mechanical selvedging and bottom panel shall continue as an
integrated tail mesh.
Where welded steel wire mesh units in wrap around form (EN:10079, EN:10080, and EN:ISO 1461, EN:14475) are used
as facing, the bottom panel shall continue as an integrated tail mesh.
2.55.4.1.6 Facia type adopted shall be given in the design and shown with complete details in the drawings. The system
supplier shall provide any test data to satisfy the Engineer regarding the properties and suitability of the facia system
adopted, if so required.
Where facia such as wrap around or gabion or welded wire and woven steel wire mesh facings have been used and where
climate conditions are appropriate, a green finish shall be provided where specified.
2.55.5 Connection between the Facia and Reinforcement
Connection between the facia panels and the reinforcing element shall be by using either nut or bolt, HDPE inserts with
bodkin joint, hollow embedded devices, polymeric/steel strips/ rods/pipes, fibre glass dowels or any other material
shown in the drawings. The connection between the panel and the reinforcement shall provide for 100 percent of the long
term design strength of the reinforcing element in continuity.
In case of modular block facia and other type of facia such as gabion facia, where the reinforcement is held by friction
between the facia block and the reinforcement, the connection strength shall be determined as per ASTM D 6638
"Standard Method of Test for Determining Connection Strength between Geosynthetic Reinforcement and Segmental
Concrete Units."
The available connection strength shall satisfy the design requirements and shall not be less than the maximum possible
tensile force that the reinforcement layer under consideration may be subjected to.

180
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

2.55.6 CONSTRUCTION DETAILS (cl. 3106 of MoRT&H)

2.55.6.1 Depth of Foundation


A strip footing, minimum 350 mm wide and 150 mm thick in M15 grade plain concrete, shall be provided at founding level
to receive the facia or the bottom most reinforcement.
The depth of embedment below the finished ground level at the foot of the wall shall not be less than 1000 mm. In case
rock is met above founding level, the depth of embedment shall be adjusted as per ground conditions.

2.55.6.2 Laying of Reinforcement


The reinforcing elements shall be placed at right angles to the face of the wall or design axis, with greater cross -sectional
dimension in the horizontal plane and the length shall be as shown in the drawings. Reinforcing elements such as
geogrids, shall be stretched and held taut by driving nails or pegs at the farther end.

2.55.6.3 Facing Batter


It may be necessary to set facing unit at an additional batter than as provided in the drawings since there is a tendency for
initially positioned units of facia to lean outward as the fill material is placed and compacted. Care and caution shall be
taken to accommodate this phenomenon. At the end of the construction, the face may have a slight residual inward batter.

2.55.6.4 Drainage
Drainage bay shall be provided as shown in the drawings. The width of the drainage bay shall be 600 mm behind the facing
element.
The drainage material shall conform to the specifications of the filter media as per Clause 2504.2.2 of MoRT&H
Specifications.

2.55.6.5 Laying and Compaction


The reinforcing elements shall be laid free from all kinks, damage and displacement during placing, spreading, leveling
and compaction of the fill. The programme of filling shall be such that no construction plant moves directly on the
reinforcement.
All construction plant having a mass exceeding 1500 kg shall be kept at least 2.0 m away from the face of slope or wall.
In the area up to 2.0 m from the face of slope or wall, the following compaction plant shall be used:
i) Vibratory roller having a weight per metre width not exceeding 1300 kg with total weight not exceeding
1500 kg
ii) Vibratory plate compactor of maximum weight 1000 kg
iii) Vibro tamper having a weight not exceeding 75 kg
Before allowing the movement of vehicles over the reinforcement, a minimum compacted thickness of 150 mm shall be
provided over the reinforcement and the speed of the vehicles shall be restricted to 10 km/hr.
During construction of reinforced fill, the retained material beyond the reinforcement at the rear of the structure shall be
maintained at the same level as reinforced fill.
Fill shall not be placed on surface that contains mud, organic soil or area that have not met compaction requirement.
The thickness of compacted layer shall not be more than 200 mm, compacted to 97 percent of maximum laboratory
density measured as per IS:2720 (Part 8).

2.55.6.6 Construction and Serviceability Tolerances


The construction tolerances shall be as per the following:
Casting of pre-cast RCC panels: All elements shall be manufactured within the following tolerances:
All dimensions within ± 5 mm Evenness of the front face: ± 5 mm over 1500 mm Difference between lengths of two
diagonals: 5 mm max. Thickness: + 5 mm (-) 0 mm

181
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

Table 102 : Tolerances for Faces of Retaining Walls and Abutments (Table 3100-2 of MoRT&H)
Tolerance
Location of plane of structure ± 50 mm - metallic reinforcement ± 75 mm - synthetic reinforcement
Bulging (Vertical) and Bowing (Horizontal) ± 20 mm in 4.5 m template (Metallic) ± 30 mm in 4.5 m template (Synthetic)
Steps at joints ± 10 mm

Dimensional Tolerances for Modular Blocks


Dimensions of modular concrete blocks shall not differ more than ± 2.5 mm for length and width and ± 1.5 mm in height.
Minimum Vertical Movement Capacities of Facing Systems
Minimum vertical movement capacities required for facing systems to cope with vertical internal settlement of reinforced
fill shall be as below:

Table 103: Minimum Vertical Movement Capac ities of Facing Systems (Table 3100-3 of MoRT&H)
S t r uct ur al F or m Minimum Ver t ical Mov ement Capacit y of S y st em
Discrete panels Joint closure of 1 in 150 relative to panel height
Full height panels Vertical movement capacity of connections 1 in 150 relative to panel height
Semi-elliptical facings Vertical distortion of 1 in 150 relative to panel height
Geotextile/ Geogrid wrap-around facings No specific limit except for appearance or serviceability considerations

2.55.6.7 Capping Beam, Crash Barrier and Friction Slab


Capping beam, crash barrier and friction slab shall be provided as per the design and drawings.

Table 104 : Minimum Stack Height & Allowance for Sinkage and/or Shrinkage for Different Materials

Sl. Minimum stack height Deduction in volume for


Materials
No. (cm) sinkage and/or shrinkage
1. Stone metal, slag, ballast, chips, shingles/gravels, 35 1/13
Moorum, bajree
2. Stone boulders of size below 15 cm., jhama metal, 45 1/9
khoa or chips
3. Carried earth, rubbish (building or kiln) 35 1/9

3. Sand (necessary deduction for bulkage may be 50 1/8


applied after deduction for sinkage/shrinkage)
4. Stone dust 50 1/8

5. Stone boulders of size 15 cm or above, jhama/brick 55 1/7


bats
6. Lime 60 1/5

182
PWD (WB) Schedule of Rates : 2014 Volume III : Road & Bridge Works

Quality Control Test for Basic Construction Materials


1. For Concrete W orks
1.1 Coarse Aggregate :
S l. Test F r equency Ref. Codes Accept ance S t andar ds

1) Par ticle S ize and S hape


1. At the beginning for approval of each source IS: 383-1970 As per Table 1000-1 of MoRT&H.
a) Sieve Analysis and change of source. IS: 2386
b) Flakiness Index and Elongation 2. Once in a week. (Part I)-1963 35 % Maximum value of combined Elongation and Flakiness Index .
Index
Per cent age
2) Deleterious Materials
Deleterious Material by weight (max imum)
1. Coal & lignite 1
1. At the beginning for approval of each source IS: 383-1970 2. Clay Lumps 1
and change of source. IS: 2386 3. Material finer than 75 micron IS Sieve 3
2. Once in 3 months. (Part II)-1963 4. Soft fragment -
5. Shale -
Total 5
3) S pecific Gravity & Density 1. At the beginning for approval of each source IS: 383-1970 Test is required for maintaining uniformity of material brought from the source.
and change of source. IS: 2386
2. Once in a Fortnight. (Part III)-1963
4) Mechanical Properties
a) Aggregate Crushing Value 1. At the beginning for approval of each source IS: 383-1970 45 % Maximum by Weight
and change of source. IS: 2386
b) Impact Value 2. Once in a week. (Part IV)-1963 45 % Maximum by Weight

c) 10 per cent Fines 1. At the beginning for approval of each source 5T Minimum
and change of source.
d) Abrasion Value 2. Once in 3 months. 50 % Maximum by Weight
5) S oundness 1. At the beginning for approval of each source IS: 383-1970 Maximum Average Loss of Weight after 5 cycles
and change of source. IS: 2386 (i) tested with Sodium Sulphate -12%
2. Once in 3 months. (Part V)-1963 (ii) tested with Magnesium Sulphate -18%
6) S ur face moisture content 1. At the beginning for approval of each source IS: 383-1970 Test required to adjust the water content in the mix design before starting any
and change of source. IS: 2386 concrete mixing.
2. At every change of mix design (Part III)-1963
3. Every time making the concrete
7) Alk ali Reactivity 1. At the beginning for approval of each source IS: 383-1970 Innocuous Aggregate.
and change of source. IS: 2386
2. Once in 3 months. (Part VII)-1963

183
Volume III : Road & Bridge Works PWD (WB) Schedule of Rates : 2014
1.2 Fine Aggregate :
S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Par ticle S ize and S hape 1. At the beginning for approval of each source IS: 383-1970 Fine Aggregate should be of grading from Zone-I to Zone-Ill as per Table 1000-1 of
and change of source. IS: 2386 MoRT&H.
2. Once in a month. (Part I)-1963

2) Deleterious Materials Per cent age


Deleterious Material by weight (max imum)
1. At the beginning for approval of each source IS: 383-1970 1. Coal & lignite 1
and change of source. 2. Clay Lumps 1
IS: 2386
3. Material finer than 75 micron IS Sieve 3
2. Once in a month. (Part II)-1963 4. Soft fragment -
5. Shale -
Total ( 1 to 5 above ) 5
3) S ilt Content 1. At the beginning for approval of each source Maximum 8 % or as specified in the tender.
and change of source.
2. Once daily.
4) S pecific Gravity & Density 1. At the beginning for approval of each source IS: 383-1970 Test is required for maintaining uniformity of material brought from the source.
and change of source. IS: 2386
2. Once in 3 months. (Part III)-1963
5) Wat er Absorption 1. At the beginning for approval of each source IS: 383-1970 Test required for adjusting the water content in the mix design before starting any
and change of source. IS: 2386 concrete mixing.
2. Once daily. (Part III)-1963
6) S oundness 1. At the beginning for approval of each source IS: 383-1970 Maximum Average Loss of Weight after 5 cycles
and change of source. IS: 2386 (i) tested with Sodium Sulphate -10%
2. Once in 3 months. (Part V)-1963 (ii) tested with Magnesium Sulphate -15%

1.3 Water :
S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Chemical Analysis Fine Aggregate should be of grading from Zone-I to Zone-Ill as given below.
a) pH value 1. At the beginning for approval of each source IS: 456-2000 Minimum 6.
b) Chlorides (as Cl) and change of source. IS:3025 (Part 24) 500 mg/l.
c) Sulphates (as SOз)
2. Once in 3 months. IS:3025 (Part 32) 400 mg/l
d) Neutralisation with NаOH (with
phenolphthalein as indicator) 3. Chemical Tests daily in the site Laboratory IS:3025 (Part 22) Maximum 5 ml of .02 normal NaOH to neutralise 100 ml of water.
e) Neutralisation with H2SO4 with testing kits.
(with mixed indicator) IS:3025 (Part 23) Maximum 25 ml of .02 normal H2SO4 to neutralise 100 ml of water.
2) Phy sical Properties
1. At the beginning for approval of each source
a) Suspended matter IS:3025 (Part 17) 2000 mg/l maximum
and change of source.
b) Organic matter IS:3025 (Part 18) 200 mg/l maximum
c) Inorganic matter 2. Once in 3 months.
IS:3025 (Part 18) 3000 mg/l maximum

184
PWD (WB) Schedule of Rates : 2014 Volume III : Road & Bridge Works

2. Steel / Iron
2.1 Reinforcement bars (CTD, TMT)
S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Chemical Tests
1. At the beginning for approval of each source
a) Carbon 0.30 maximum
and change of source.
b) Sulphur 0.06 maximum
2. Once for every lot.
c) Phosphorus 0.06 maximum
3. Once in 3 months.
d) Sulphur + Phosphorus 0.11 maximum
2) Phy sical Test
a) Ultimate Tensile Strength. IS: 1786-2008 10% more than the actual 0.2% proof stress but not less 485 MPa.
b) 0.2% Proof stress 1. At the beginning for approval of each source 415 MPa minimum
c) Percentage Elongation and change of source 14.5 minimum
d) Bend and Rebend Test 2. Once for every lot To be satisfactory -
e) Mass per meter run (Kg) 3. Once in 3 months 6.31 ± 3% for 32 mm dia, 4.830 ± 3% for 28 mm dia,
3.85 ± 3% for 25 mm dia, 2.470 ± 3% for 20 mm dia
1.58 ± 5% for 16 mm dia, 0.888 ± 5% for 12 mm dia

2.2 H. T. Strands (Uncoated Stress relieved low relaxation seven ply strand)
S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Chemical Tests 1. At the beginning for approval of each source
a) Sulphur and change of source. IS:228 (Part-3) -1987 Not greater than 0.05%
b) Phosphorus 2. Once for every lot. IS:228 (Part-9) -1989 Not greater than 0.05%
2) Dimension, Nominal Ar ea of Nominal Mass of
Nominal Dia. Toler ance
Tolerance & Mass S t r ands S t r ands
a) Tolerance in Diameter 1. At the beginning for approval of each source (mm) (mm) ( mm²) (kg/Km)
b) Nominal area and change of source. 12.7 +0.66-0.15 98.7 775
IS: 14268-1995
c) Nominal Mass of strands 2. Once for every lot. 15.2 +0.66-0.15 140.0 1102
d) Difference in dia of central course
Centre wire at least 1 .5 percent greater in diameter than the surrounding wires
and surrounding wires
e) Length of lay 12 to 16 times the nominal diameter.
3) Phy sical Properties Nominal Dia. Br eak ing S t r engt h 0 .2 % Pr oof load
a) Breaking Strength of strands 1. At the beginning for approval of each source (mm) (k N) ( k N)
b) 0.2% Poof load and change of source. 12.7 183.7 165.3
IS: 14268-1995
2. Once for every lot. 15.2 260.7 234.6
c) Elongation Minimum 3.5 % on minimum gauge length of 600 mm
d) Modulus of Elasticity 18870to20910Kg/sqmm
4) Relaxation Properties 1. At the beginning for approval of each source
a) 100 hours and change of source. IS: 14268-1995 Relaxation Losses not more than 1.8% when loaded to 70% of specified minimum
2. Once for every lot. breaking load.
185
Volume III : Road & Bridge Works PWD (WB) Schedule of Rates : 2014
S l. Test F r equency Ref. Codes Accept ance S t andar ds
b) 1000 hours 1. At the beginning for approval of each source Relaxation Losses not more than 2.5% when loaded to 70% of specified minimum
and change of source. breaking load
2. Once in a project for every source.

2.3 Cast Steel (For bearings grade 280-520W)


S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Chemical Tests 1. Once in the beginning for source. IS: 1030-1989 C- 0.25% Maximum
2. During execution depending upon the nature Mn- 1.20
of use. Si - 0.60
3. Once in a project for every source. P- 0.0.10
S - 0.035
Ni- 0.40
Cr- 0.35
Cu - 0.40
Mo- 0.15
V - 0.05
2) Phy sical Test
a) Ultrasonic Tests. 1. Once in the beginning for source.
2. During execution depending upon the nature
b) Magnetic Particle Examination IS: 1030-1989 No deformations should be observed.
of use.
c) Liquid Penetration Examination 3. Once in a project for every source.
d) Radiographic Examination

2.4 Mild Steel


S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Chemical Composition 1. At the beginning for approval of each source IS: 2062-1999 Grade Designation C Mn S P Si Carbon
and change of source. equal value maximum
2. Once in a project for every source. A Fe410WA 0.23 1.5 0.005 0.05 0.04 0.42
B Fe410WB 0.22 1.5 0.046 0.045 0.04 0.41
C Fe410WC 0.20 1.5 0.040 0.04 0.04 0.39
Nitrogen Content P 0.012%
Nb, V & Ti content (all or any) 0.2%

2.5 Stainless Steel


S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Chemical Tests 1. At the beginning for approval of each source
a) Carbon and change of source. IS: 6911-1992 C - 0.08% Maximum ±0.01 %
b) Silicon 2. Once in a project for every source. Si-1% Maximum ± 0.05 %

186
PWD (WB) Schedule of Rates : 2014 Volume III : Road & Bridge Works
S l. Test F r equency Ref. Codes Accept ance S t andar ds
c) Manganese Mn - 2% Maximum ± 0.04 %
d) Nickel Ni- 10% to 14% Maximum ±0.15 %
1. At the beginning for approval of each source
e) Chromium Cr-16% to 18% Maximum ± 0.20 %
and change of source. IS: 6911-1992
f) Molybdenum Mo - 2% to 3% Maximum ±0.10%
2. Once in a project for every source.
g) Sulphur S - 0.03% Maximum ±0.05 %
h) Phosphorus P-0.045% Maximum ±0.01 %
2) Mechanical Tests 1. At the beginning for approval of each source IS:1663:1972 Minimum 440 MPa
a) Tensile Test and change of source. IS: 1608:1972 Minimum 200 MPa
b) Yield Strength 2. Once in a project for every source. IS:1500:1983 Brinell - maximum 192, Rockwell - Maximum 95
c) Hardness Test IS:1501:1984 Minimum 40 % in 50 mm
d) Elongation IS: 1586:1988

2.6 Galvanising
S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Mass of Zinc Coating One Test per lot IS:6745-1972 4O0g/m2 minimum total mass of Zinc (inside and outside) per surface area (inside
and outside) of the coated surface.
2) Visual Test One Test per lot IS:2629-1985 The Zinc coating shall be free from imperfection like flux, ash and dross inclusions,
bare patches, black spots, pimples, lumpiness, rums rust stain, blister, white deposit
etc.
3) F r ee Bore Test One Test per lot IS:2633-1986 A 230 mm long shall be passed through the tube to ensure a free bore.
Nominal bore of tube after galvanising dia of rod
8 mm 4 mm
10 mm 6 mm
15 mm 11 mm
20 mm 16 mm
25 mm 21 mm
4) Uniformity of Glavanised Coating One Test per lot IS.-4736-1986 The galvanized coating shall with stand 4 one minute dips.

5) Adhesion Test One Test per lot IS:2629-1985 Galvanised tubes upto and including 50mm nominal bore when bent cold through
90° round grooved, former having radius at the bottoms of groove equal to 8 times its
outer dia shall not develop any crack in the coating. For tubes more than 50mm
nominal bore, this shall be tested by pivoted hammer test.

187
Volume III : Road & Bridge Works PWD (WB) Schedule of Rates : 2014

3. Cement
3.1 Cement (OPC-53 grade)
S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Chemical Tests
a) Chlorides (as cl) 0.05% max
b) Ratio of Alumina to that of Iron 0.66 min
Oxide 1. At the beginning for approval of each source
and change of source.
c) Magnesium (MgO) IS: 12269-1987 6.0% max
2. Once for every lot.
d) Total sulphate content 3.0% max
3. Once in 3 months.
e) Loss on Ignition 4.0% max
f) Insoluble Residue 3.0% max
g) Lime saturation factor. 0.8-1.02
2) Phy sical Test
a) Setting Time
i) Initial Not less than 30 minutes.
ii) Final Not more than 10 hours.
1. At the beginning for approval of each source
b) Soundness (Le Chatelier
and change of source 10mm (maximum)
Expansion) IS: 12269-1987
2. Once for every lot and 0.8% (maximum)
c) Compressive Strength
3. Once in 3 months
i) At 3 Days Not less than 27 MPa Strength
ii) At 7 days Not less than 37 MPa Strength
iii) At 28 days Not less than 53 MPa Strength
d) Fineness 225 m³ / Kg Minimum.

3.2 Cement (OPC-43 grade)


S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Chemical Tests
a) Chlorides (as cl) 0.05% max
b) Ratio of Alumina to that of Iron 0.66 min
Oxide 1. At the beginning for approval of each source
and change of source.
c) Magnesium (MgO) IS: 8112-1989 6.0% max
2. Once for every lot.
d) Total sulphate content 3.0% max
3. Once in 3 months.
e) Loss on Ignition 5.0% max
f) Insoluble Residue 2.0% max
g) Lime saturation factor. 0.66-1.02
2) Phy sical Test 1. At the beginning for approval of each source
a) Setting Time and change of source
IS: 8112-1989
i) Initial 2. Once for every lot Not less than 30 minutes.
ii) Final 3. Once in 3 months Not more than 10 hours.

188
PWD (WB) Schedule of Rates : 2014 Volume III : Road & Bridge Works
S l. Test F r equency Ref. Codes Accept ance S t andar ds
b) Soundness (Le Chatelier 10mm (max.)
Expansion) and 0.8% (max.)
c) Compressive Strength
i) At 3 Days Not less than 23 MPa Strength
ii) At 7 days Not less than 33 MPa Strength
iii) At 28 days Not less than 43 MPa Strength
d) Fineness 225 m² / Kg Minimum.

3.3 Cement (OPC-33 grade)


S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Chemical Tests
a) Chlorides (as cl) 0.05% max
b) Ratio of Alumina to that of Iron 0.66 min
1. At the beginning for approval of each source
Oxide
and change of source.
c) Magnesium (MgO) IS: 8112-1989 6.0% max
2. Once for every lot.
d) Total sulphate content 3.0% max
3. Once in 3 months.
e) Loss on Ignition 5.0% max
f) Insoluble Residue 4.0% max
g) Lime saturation factor. 0.66-1.02
2) Phy sical Test
a) Setting Time
i) Initial Not less than 30 minutes.
ii) Final Not more than 10 hours.
b) Soundness (Le Chatelier 1. At the beginning for approval of each source
and change of source 10mm (maximum)
Expansion) IS: 8112-1989
2. Once for every lot and 0.8% (maximum)
c) Compressive Strength
i) At 3 Days 3. Once in 3 months
Not less than 16 MPa Strength
ii) At 7 days Not less than 22 MPa Strength
iii) At 28 days Not less than 33 MPa Strength
d) Fineness 225 m³ / Kg Minimum.

3.4 Portland Slag cement


S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Chemical Tests
a) Magnesium oxide (MgO) 8.0 % Maximum
1. At the beginning for approval of each source
b) Sulphur Trioxide (SOз) IS: 455-1989 3.0 % Maximum
and change of source.
c) Sulphide Sulphur(S) 1.5 % Maximum
2. Once for every lot.
d) Loss on Ignition IS: 4032-1985 5.0 % Maximum
3. Once in 3 months.
e) Insoluble Residue 4.0 % Maximum
f) Chloride Content 0.05 % Maximum

189
Volume III : Road & Bridge Works PWD (WB) Schedule of Rates : 2014
S l. Test F r equency Ref. Codes Accept ance S t andar ds
2) Phy sical Test
a) Fineness (Blain's Air IS: 4031 Specific Surface shall not be less than 225 m²/Kg
permeability method) (Part 2): 1988
b) Soundness
i) Le-Chateliers Method IS: 4031 Expansion shall not be more than 5 mm
ii) Auto clave expansion 1. At the beginning for approval of each source (Part 3): 1988 Expansion shall not be more than 0.6%
c) Setting time and change of source
i) Initial 2. Once for every lot Initial setting time not less than 30 minutes
ii) Final 3. Once in 3 months IS: 4031 Final setting time not more than 60 minutes
d) Compressive Strength (Part5): 1988
i) 72 ± 1 h Not Less than 16 MPa
ii) 168 ± 2 h IS : 4031 Not Less than 22 MPa
iii) 672 ± 4 (Part 6): 1988 Not Less than 33 MPa

4. Plasticiser (Normal and Retarding Type Super Plasticiser)


S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Wat er content, per cent of control 80 Maximum
sample
2) S lump Not more than 15 mm below that of the control mix concrete
3) Time of Setting, allowable deviation
fr om control sample Maximum +4 for Retarding type and nil for Normal
a) Initial Minimum +1 for Retarding type and +1.5 for Normal
b) Final Maximum ±3 for Retarding type and ± 1.5 for Normal
4) Compressive strength, per cent
of control sample
a) 1 day 140 minimum for Normal only
b) 3 days 125 minimum for Normal as well as Retarding type
1. At the beginning for approval of each source
c) 7 days 125 minimum for Normal as well as Retarding type
and change of source.
d) 28 days IS: 9103-1999 115 minimum for Normal as well as Retarding type
2. Once for every lot.
e) 6 months 100 minimum for Normal as well as Retarding type
3. Once in 3 months.
f) 1 year 100 minimum for Normal as well as Retarding type
5) F lexural Strength, per cent of
control sample
a) 3days 110 minimum
b) 7 days 100 minimum
c) 28 days 100 minimum
6) Length change per cent increase
ov er control sample
a) 28 days 0.01 maximum
b) 6 months 0.01 maximum
c) 1 year 0.01 maximum

190
PWD (WB) Schedule of Rates : 2014 Volume III : Road & Bridge Works
S l. Test F r equency Ref. Codes Accept ance S t andar ds
7) Bleeding, per cent increase over 5 maximum
control sample.
8) Loss of workability At 45 minutes for Normal type admixture and at 2 hours for Retarding type admixture,
the slump shall not be less than that of control mix concrete at 15 minutes.
9) Air content (%) over control 1.5 maximum
1. At the beginning for approval of each source
specimen
and change of source.
10) Uniformity Tests IS: 9103-1999
2. Once for every lot.
a) Dry Material Content 3. Once in 3 months. Within 3% of the value stated by the manufacturer.
b) Ash content Within 1% of the value stated by the manufacturer.
c) Relative Density Within 0.02 of the value stated by the manufacturer.
d) Chlorides ion content Within 10% of the value or within 0.2 % whichever is greater as stated by the
manufacturer.
e) pH 7– 8

5. W ater Proofing Compound


S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Per meability Permeability to water of the standard cylindrical specimens prepared with the
recommended proportion of the water proofing compound shall be less than 50% of
permeability similar specimens prepared without waterproofing compound
2) S etting Time Initial Setting Time - Not less than 30 minimum Final Setting time - Not more than
1. At the beginning for approval of each source 600 minimum
3) Compressive Strength and change of source. IS: 2645-1975 Compressive strength at 72 hrs. - Not less than 160kg/cm2 or 80% of the 3 day
2. Once in a project for every source. Compressive strength of cubes prepared without waterproofing compound.
Compressive Strength at 168 hrs. - Not less than 220 kg/cm2 or 80% of the 7 day
compressive strength of cubes prepared without waterproofing compound.
4) Chloride Content As per the values given by the manufacturer
5) S ulphate Content As per the values given by the manufacturer

6. Pre-stressing System
S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) S t at ic Load t est wit h t endon - 1. Once at the start of work for the approval of 1. The increase in the displacements between the anchorage components as well as
anchor age assembly the Prestressing system between the pre-stressing steel & anchorage components should not be
2. Once in project for each prestressing disproportionate to the increase in .tendon force.
system for every source of strands 2. The above relative displacement during 0.8F pk load should stabilise within first
thirty minutes of the load duration of one hour.
FIP 3. The mode of failure & tendon should be by the fracture of the pre-stressing steel.
Recommendation 4. Anchorage Efficiency (ηа ≥0.95
5. Total elongation £„ in the free length of the tendon under the measured ultimate
force ( Fru shall be ≥ 2 %.
2) Dy namic Load Test wit h Tendon - 1. Manufacturer's test certificate for every Fatigue failure of anchorage components should not occur.
anchor age assembly source Minimum fatigue strength of post tensioning system = 80 Mpa.

191
Volume III : Road & Bridge Works PWD (WB) Schedule of Rates : 2014
S l. Test F r equency Ref. Codes Accept ance S t andar ds
3) Load t r ansfer Test 1 . Once at the start of work for the approval of 1. Crack width upon first attainment of upper force 0.8 F pk ≤ 0.10 mm
the Prestressing system 2. Crack width upon last attainment of lower force 0.12 F pk ≤0.10mm
2. Once in project for each prestressing system 3. Crack width upon final attainment of upper force 0.8 F pk ≤0.25 mm
for, every source of strands 4. Reading of longitudinal & Transverse strains should have stabilised during cyclic
loading (increase in strain in last 2 load cycles <5%)
5. Reading of crack width should have stabilised (increase in crack width in last 2
load cycles > .02 mm )
6. Measured failure Load Fu ≥ F pk (fcm,e/fck.o) and ≥ 1.1 F pk

7. R. C. C. Pipes
S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Toler ances in Dimensions
a) Wall Thickness Up to and including 30 mm ± 2mm
Over 30 mm and up to and including 50 mm ± 3mm
Over 50 mm and up to and including 65 mm ± 4mm
Over 65 mm and up to and including 80 mm ± 5mm
Over 80 mm and up to and including 95 mm ± 6mm,
Over 95 mm ± 7mm
b) Internal Dia. of Pipe or Socket Up to and including 300 mm ± 3mm
Over 300 mm and up to and including 600 mm ± 5mm
1. At the beginning for approval of each source Over 600 mm and up to and including 1200 mm ± 7mm
IS:458:1988
and change of source. Over 1200 mm ± 10mm
IS:3597:1985
2. Once for every Lot.
c) Overall Length ± 1 % of standard Length
2) Thr ee Edge Bear ing Shall withstand the design Load
3) Wat er absor pt ion After 10 minutes, 2.5 % of dry Mass Maximum and total absorption at the end of 24
Hours shall not exceed 6.5 % of dry mass
4) Hy dr ost at ic Pr essur e No leakage under the design pressure
5) S t r aight ness Maximum 3 mm for every m length
6) Reinfor cement On breaking the Pipe and extracting the reinforcement, it shall be as per the provision
7) Cube S t r engt h As per the design strength

8. Thermoplastic Paints
S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Binder cont ent 1. At the beginning for approval of each source BS:3262 and 18% Minimum by weight
and change of source. Clause 803 of
2. Once in a project for every source. MoRT&H Specification

192
PWD (WB) Schedule of Rates : 2014 Volume III : Road & Bridge Works
S l. Test F r equency Ref. Codes Accept ance S t andar ds
2) Glass Beads 30 -40%
Gradation of Glass beads
IS S iev e Per cent age Passing
1.18 mm 0-3
850 micron 5-20
425 micron 65-95
180 micron 0-10
3) Tit anium Diox ide cont ent 10% Minimum
4) Calcium Carbonate & Iner t filler s 1. At the beginning for approval of each source BS:3262 and 42% Max for white paint and at discretion of manufacturer subject to meeting other
and change of source. Clause 803 of specification for yellow paint.
5) Yellow Pigment s 2. Once in a project for every source. MoRT&H Specification At direction of manufacturer subject to meeting of other specifications
6) Luminance (Day light ) 65% Minimum at 45% for white paint and 45% Minimum at 45% for yellow paint
7) Dr y ing Time 15 Minutes Maximum
8) S k id Resist ance Not less than 45
9) Cr ack ing Resist ance at low No cracking on application to concrete blocks.
t emper at ur e
10) S oft ening Point 102.5±9.5°C
11) F low r esist ance Not more than 25%
12) Yellowness Index Not more than 0.1 2

9. Geotextile
S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Thick ness 1. At the beginning for approval of each source ASTM D 4355 Not less than 2mm
2) Weight and change of source. Not less than 225 gm/sqm
3) Tensile S t r engt h 2. Once in a project for every source. Minimum 30Kg per 5cm in either direction
4) F iber Composit ion 100% polypropylene non-woven
5) Chemical Resist ance No appreciable change in breaking strength.
a) Against NaOH
b) Against HCl
6) Resistance against photo oxidation 200-250 hrs.

10. Bentonite
S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Densit y 1. At the beginning for approval of each source MOST Specification 1.05g/cc
2) Mar sh Cone Viscosit y and change of source. for Road & Bridge 30 to 40
3) pH v alue 2. Once for every day of Pilling. Works 9.5 to 12
4) S ilt cont ent less than 1 %
5) Liquid limit not less than 400%

193
Volume III : Road & Bridge Works PWD (WB) Schedule of Rates : 2014

10. Lime (for Bituminous W orks)

S l. Test F r equency Ref. Codes Accept ance S t andar ds


1) CaC0 3 content At the beginning for approval of each source and IS: 1195-1978 80% Minimum.
change of source.
2) S ieve Analysis One Test for every 5 MT of lime consumption. 100% though 75 mm sieve.

11. Paving Bitumen (Viscosity) Grade (for BM , DBM , BC)

S l. Test F r equency Ref. Codes Accept ance S t andar ds


1) S pecific Gravity at 27°C IS: 73-2013 0.99 Minimum
1. At the beginning for approval of each source IS: 1202-1978
and change of source.
2) Wat er, percent by mass IS:1211-1978 0.2 Maximum
2. For every Lot per plant.
3) F lash Point, Cleveland open cup, °C IS:1209:1978 220 Minimum
Requir ement s for Gr ade
4) S oftening point (R&B), °C, Min 1. At the beginning for approval of each source IS:1205:1978 VG 10 VG 20 VG 30 VG 40
and change of source. 40 45 47 50
5) Penetration at 25°C, 2. For every Lot per plant.
IS:1203:1978 80-100 60-80 50-70 40-60
1 0 0 g, 5 s, 0 .1 mm, Min
6) Penetration Ratio IS:1208:1978 35 Minimum
7) Duct ility at 25°C IS:1208:1978 Minimum 75 for VG 10, 50 for VG 20, 40 for VG 30 and 25 for VG 40.
8) Par affin Wax Content, percent by IS:1208:1983 4.5 Maximum
mass
9) F r ass breaking point °C IS:9381:1979
10) Loss an heating IS:1212-1978 Maximum 1% by mass
11) Ret ained Penetration after thin film IS:9382-1979
ov en test, 25°C,100g , 5 sec.,
1 /1 0mm
12) Mat ter soluble in trichloroethylene IS:1216-1978 99 % Minimum
13) Viscosity ( in Poise) at IS:1206 (Part-2) - Requir ement s for Gr ade
1978 VG 10 VG 20 VG 30 VG 40
IS:1206 (Part-3)- 800-1200 1600-2400 2400-3600 3200-4800
a) 60°C,
1978
b) 135 °C 250 300 350 400

194
PWD (WB) Schedule of Rates : 2014 Volume III : Road & Bridge Works

12. Industrial Bitumen (for M astic Asphalt)


S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) S pecific Gravity at 27°C 18:702 Minimum 1.05 g/cc
IS: 1202
2) F lashPoint
IS: 1209 Minimum 225°C
1. At the beginning for approval of each source
3) S oftening point and change of source. IS: 1205 80-90°C
4) Penetration at 25°C,100g , 5 sec., 2. For every Lot per plant. IS: 1203 10-20 mm
1 /1 0mm
5) Duct ility at 27°C IS:1208 3 cm Minimum
6) Loss an heating IS:1212 0.3 % Maximum
7) S olubility in Tri-chloroethylene IS:1216 99 % Minimum

Quality Control Test for Site Activities

1. M ix Design including Trial M ix and Acceptance Criteria

S l. Test F r equency Ref. Codes Accept ance S t andar ds


1) Tr ial Mix 1. For every design Mix. IRC : 21-2000 Initially.
a) Target Mean Strength 2. For every change in source of any material.
Target Mean Strength = specified Characteristic Strength + current Margain
Current Margain = 1 1 M Pa for M 25, 12 MPa for M30, M 35 and M 40, 1 3 MPa for
M 45 and M 55 & 14 MPa for M 55 and M 60
Later on
Target Mean Strength = specified Characteristic Strength + 1 .64 x Standard
Deviation from at least 40 samples.
2) Accept ance Cr it er ia Qty. of Concrete (m3) No. of Samples IRC : 21-2000 1. Mean strength of any group of 4 consecutive samples = Specified Characteristic
1-5 1 Strength + 3Mpa
6-15 2
16-30 3 2. Strength of any sample Specified > Characteristic Strength - 3 Mpa
31-50 4
51 and 4+
above each Plus 1 for 50 m³
or part thereof

195
Volume III : Road & Bridge Works PWD (WB) Schedule of Rates : 2014

2. R.C.C. work
S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Wor k abilit y Every Transit Mixer IRC 516-1959 As per requirement of the item under execution
2) Compr essiv e S t r engt h As per clause 25. IRC : 21 As per clause 25.
a) 7 Days Strength
b) 28 Days Strength
3) F lex ur e Test Once for every design Mix MOST Specification
4) Per meabilit y Test Once in a month for Road & Bridge Maximum 25mm on a specimen of 150mm<j) and 160mm height
5) Densit y Once in a month Works
a) Fresh concrete 97.5% of the specified value
b) Hardened concrete 97.5% of the specified value

3 Piling
S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Init ial Test s
a) Vertical Minimum 2 tests IS : 2911 (Part-4) - The safe vertical load shall be minimum of
1985 i) 50% of the final load corresponding to 12mm displacement
ii) Final load at which displacement in 5mm
iii) Load corresponding to any other specified displacement as per performance
requirements
2) Rout ine Test s
a) Vertical Test Upto 2% of total piles IS : 2911 (Part-4) - Maximum settlement at a test load of 1.5 times the working load shall not exceed
1985 12mm

b) Lateral Load Test Upto 2% of total piles Safe Lateral load shall be the minimum of
i) 50% of the final load corresponding to 12mm displacement
ii) Final load at which displacement is 5mm.
iii) Load corresponding to any other specified displacement as per performance
requirements.
c) Integrity Test Upto 2% of total piles There shall be no unacceptable flaws in concrete as per the recommendation of the
specified agency carrying out the test.

4 Embankment Construction
S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) At t erberg Limits IS : 2720 (Part 5)
a) Liquid Limit Maximum 70
b) Plasticity Index 1. Once for each kind of soil. Maximum 45
2) Clay Content 2. Once at beginning of supply. IS:2720 (Part 4) Maximum 10 %.
3) Deleterious Content Test 3. 2 tests per 3000 m³. S: 2720 Part 27 Material should be free from swamp, marshes and bogs It should not be Peat, log,
sump and perishable material
4) Classification of Soil S:1498 Soil should not be classified as OL, OI, OH or Pt

196
PWD (WB) Schedule of Rates : 2014 Volume III : Road & Bridge Works
S l. Test F r equency Ref. Codes Accept ance S t andar ds
5) CBR S- 2720 Pan 16 Minimum 4% (under fully soaked condition)
6) OMC and Maximum Dry Density 1. Once for each kind of soil. S: 2720 Part 8 Determined to control water content for achieving maximum density.
7) Density 2. Once at beginning of supply. S: 2720 Part 8 1.80 to 2.15gm/cc
8) Gr ading 3. 2 tests per 3000 m³. S: 2720 Part 4 The size of coarse material should not exceed 75 mm in embankment and 50 mm in
subgrade
9) Moist ur e Cont ent One test to be conducted for every 1000 m 2 of MORTH The moisture content shall be in the range of-1 % to +2% of the OMC.
embankment in the lower layers and 500 m 2 in Specification for
the top 60 cm of the embankment (20cm Road & Bridge
thickness). Each test shall comprise of tests at Works
10) Dr y Densit y five locations. IS: 2720 (Part -2) The dry density shall be 95% of the Maximum Dry Density (MOD) in the lower layers of
IS: 2720 (Part-8) embankment and 100% of MDD in the top 60 cm of the embankment

5 Sub-Bases And Bases (Excluding Bitumen Bound Bases)


5.1 Granular and mechanically Stabilised Soil Sub Base :
S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Gr adation IS: 383-1970 As per Table 400-1 of MORT&H.
IS: 2386
(Part I)-1963
1. At the beginning for approval of each source
2) At t erberg’s limits. IS : 2720 (Part V)
and change of source.
a) Liquid Limit Maximum 25 %
2. One test per 400 m³.
b) Plasticity Index Maximum 6 %
3) Moisture content prior to 2% Maximum.
compaction
4) Density of compacted layer One test per 1000 m²
5) Deleterious constituents. As required IS: 383-1970 Free from Organic and other deleterious constituents.
IS: 2386
(Part II)-1963
6) CBR -do- IS:2720 (Part V) At 98% dry density - Minimum 30 unless otherwise specified in the Contract

5.2 Lime/Cement Stabilised Soil Sub-base :


S l. Test F r equency Ref. Codes Accept ance S t andar ds
One test for each consignment subject to a IS: 1514 / Lime shall have purity of not less than 70% by wt. of Quick-lime (CaO) /
1) Quality of lime/cement -
minimum of one test per 5 tonnes IS:269, 455 or 1489 Cement for stabilization shall either is OPC, PSC or PPC.
2) Lime/Cement content Regularly through procedural checks The mix design shall be done to arrive at the appropriate qty. of lime to be added.
3) Degree of pulverization Periodically as considered necessary Minimum percent by weight passing the sieve: 26.5 mm – 100% & 5.6 mm – 80%.
4) CBR or Unconfined Compressive As required The laboratory CBR/UCS value shall be at least 1.5 times the min. field value of
S t rength test on a set of 3 specimens CBR/UCS.
5) Moisture content prior to One test per 500 m2 IS:2720 (Part II) Neither be less than the optimum moisture content corresponding to IS:2720 (Part
compaction VIII) nor more than 2 % above it.
6) Density of compacted layer One test per 500 m2 IS:2720 (Part VIII) At least 98 percent of the maximum dry density
7) Deleterious constituents As required
197
Volume III : Road & Bridge Works PWD (WB) Schedule of Rates : 2014
5.3 Water Bound Macadam :
S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Gr ading of aggregate One test per 250 m3 of aggregate IS: 383-1970 As per Table 400-9 & 400-10 of MORT&H.
IS: 2386
(Part I)-1963
1) Aggr egat e Impact Value One test per 1000 m³ of aggregate IS: 2386 (Part IV) 30 % Maximum by Weight
3) Combined Flakiness & Elongation One test per 500 m³ of aggregate IS: 2386 (Part I) 35 % Maximum by Weight
Indices
S l. Test F r equency Ref. Codes Accept ance S t andar ds
4) At t erberg Limits of binding Material One test per 50 m3 of aggregate. IS:2720 (Part V) Pl ≤ 6
5) At t er ber g’s limit of scr eenings One test per 100 m³ of aggregate IS: 383-1970 Maximum 10%
IS: 2386
(Part I)-1963

5.4 Wet Mix Macadam :


S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Gr ading of aggr egat e One test per 200 m3 of aggregate IS: 383-1970 As per Table 400-13 of MORT&H.
IS: 2386
(Part I)-1963
2) Aggr egat e Impact Value One test per 1000 m³ of aggregate IS: 2386 (Part IV) 30 % Maximum by Weight
3) Combined Flakiness Index & One test per 500 m³ of aggregate IS: 2386 (Part I) 35 % Maximum by Weight
Elongation Index
4) At t er ber g Limit s of por t ion of One test per 200 m3 of aggregate IS:2720 (Part V) Pl ≤ 6
aggregat e passing 4 2 5 micr on
siev e
5) Densit y of compact ed lay er One set of three tests per 1000 m² IS:2720 (Part VIII) At least 98 % of MDD

6 Bituminous Construction W orks


6.1 Prime coat :
S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Quality of binder Number of samples per lot. IS: 73: 2013, Cationic Bitumen Emulsion SS1 grade conforming to IS: 8887.
2) Binder temperature for application At regular close intervals IS: 217 & IS: 8887 140-160 for VG-10, 145-165 for VG-20, 150-165 for VG-30 & 160-170 for VG-40
3) Rat e of spread of Binder Three tests per day For WBM/WMM Surface: 0.7-1.0 kg/sq.m &
For Stabilised soil base/Crusher Run Macadam Surface: 0.9-1.2 kg/sq.m.

6.2 Tack coat :


S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Quality of binder Number of samples per lot. IS: 73: 2013, Cationic Bitumen Emulsion RS1 grade conforming to IS: 8887/IS: 217
2) Binder temperature for application At regular close intervals IS: 217 & IS: 8887 140-160 for VG-10, 145-165 for VG-20, 150-165 for VG-30 & 160-170 for VG-40
3) Rat e of spread of Binder Three tests per day Bituminous surfaces: 0.20-0.30 Kg per sq.m, Granular surfaces treated with primer:
0.25-0.30 Kg per sq.m & Cement concrete pavement: 0.30-0.35 Kg per sq.m

198
PWD (WB) Schedule of Rates : 2014 Volume III : Road & Bridge Works
6.3 Bituminous Macadam (BM) :
S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Quality of binder Number of samples per lot. IS: 73: 2013, The bitumen shall be viscosity grade paving bitumen complying with IS:73.
IS: 217 & IS: 8887
2) Aggregate Impact Value One test per 200 m3 of aggregate of each source IS: 2386 (Part-IV) 30 % Maximum by Weight
Los Angeles Abrasion Value and whenever there is change in the quality of 40 % Maximum by Weight
aggregate.
3) Combined Flakiness and One test per 350 m3 of aggregate of each source IS: 2386 (Part-I) 35 % Maximum by Weight
Elongation Indices
4) S t ripping Value of aggregates One test for each source and whenever there is IS: 6241 Min. retained coating 95%
change in the quality of aggregates
5) Wat er absorption of aggregates - do - IS: 2386 (Part-III) Max. 2%
6) Wat er sensitivity of mix - do - AASHTO 283 Min. 80%
7) Gr ading of aggregates Two tests per day IS: 2386 (Part-I) As per Table 500-7 of MORT&H.
8) S oundness One test for each source and whenever there is IS : 2386 (Part V) Maximum Average Loss of Weight after 5 cycles
(Sodium / Magnesium Sulphate) change in the quality of aggregates (i) tested with Sodium Sulphate -12%
(ii) tested with Magnesium Sulphate -18%
9) Per centage of fractured faces One test per 100 m3 of aggregate
10) Binder content Two tests per day per plant MORTH’s Specification 3.3% for 80-100 mm th. & 3.4 % for 50-75 mm th. (In case aggregates have specific
for Road & Bridge gravity > 2.7, bitumen content can be reduced proportionately. Further, for regions where
Works HDM air temp. ≤ 30°C and LDM air temp. ≤ -10°C, it may be increased by 0.5 %.)
11) Control of temper at ur e of binder At Regular interval As per Table 500-2 of MORT&H.
and aggregate for mixing and of the
mix at the time of laying and rolling.
12) Density of compacted layer One test per 700 m2 of area
13) Rat e of spread of mixed material At Regular intervals

6.4 Dense Bituminous Macadam (DBM)


S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Quality of binder Number of samples per lot IS: 73: 2013, The bitumen shall be viscosity grade paving bitumen complying with IS:73
IS: 217 & IS: 8887
2) Aggregate Impact Value One test per 350 m3 of aggregate of each source 27 % Maximum by Weight
Los Angeles Abrasion Value and whenever there is change in the quality of IS: 383-1970 35 % Maximum by Weight
aggregate. IS: 2386
3) Combined Flakiness and - do - (Part IV)-1963 35 % Maximum by Weight
Elongation Indices
4) S oundness (Magnesium S ulphate/ One test for each source and whenever there is IS : 2386 (Part V) Maximum Average Loss of Weight after 5 cycles
S odium S ulphat e change in the quality of aggregates (i) tested with Sodium Sulphate -12%
(ii) tested with Magnesium Sulphate -18%
5) Wat er absor pt ion of aggr egat es - do - IS : 2386 (Part III) Max. 2%
6) S and equivalent test - do - IS : 2720 (Part 37) Minimum 50
7) Plasticity Index - do - IS : 2720 (Part 5) Minimum 4
8) Polished stone value - do - BS: 812-114 Min 55
199
Volume III : Road & Bridge Works PWD (WB) Schedule of Rates : 2014
S l. Test F r equency Ref. Codes Accept ance S t andar ds
9) Mix gr ading One set for individual constituent and mixed IS: 2386 As per Table 500-10 of MORT&H.
aggregate from dryer for each 400 tonnes of mix (Part I)-1963
subject to minimum of two tests per day per plant
10) S t ability and v oids analy sis of mix Three tests for stability, flow value, density and AASHTO T 245 Minimum stability (at 60°C) : 9.0 kN, Minimum flow : 2-4 mm, Air voids : 3-5 Percent
including t heor et ical max imum void contents for each 400 tonnes of mix subject
specific of loose mix to a minimum of two tests per day per plant
11) Moisture S usceptibility of mix One test for each mix type whenever there is AASHTO T 283 Min. 80%
change in the quality or source of coarse or fine
aggregates
12) Temperature of binder in boiler , At regular intervals Same as mentioned in 6.4 (Bituminous Macadam)
aggregate in dryer and mix at t he
t ime of lay ing and compact ion
13) Binder cont ent One set for each 400 tonnes of mix subject to MORTH’s Min. 4.0 % for 75-100 mm th. & Min. 4.5 % for 50 - 75 mm th.
minimum of two tests per day per plant Specification for (In case aggregates have specific gravity > 2.7, bitumen content can be reduced
Road & Bridge proportionately. Further, for regions where HDM air temp. ≤ 30°C and LDM air temp.
Works ≤ -10°C, it may be increased by 0.5 %.)
14) Rat e of spread of mixed material After every 5 th truck load
15) Density of compacted layer One test per 700 m2 of area ASTM D 2041 Minimum field density equal to or more than 98% of the density based on theoretical
maximum specific gravity (Gmm) obtained on the day of compaction.

6.5 Sand Asphalt Base Course


S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Quality of binder Number of samples per lot and tests as per IS: 73: 2013 The bitumen shall be paving bitumen of viscosity grade VG 30 or VG 20, as specified
IS:73 or IRC:SP:53, IS:15462 in the Contract, conforming to IS:73
2) Aggregate Impact Value / One test per 200 cu.m of each source and IS: 2386 Part IV 40 max.
L.A. Abrasion value whenever there is change in the quality of
aggregate.
3) S and equivalent test One test for each source and whenever there is IS: 2720 Part 37 30 min.
change in the quality of aggregates
4) Plasticity Index - do - 6 max.
5) Mix grading Two tests per day As per Table 500-14 of MoRT&H.
6) Binder content Approx. 5% by weight of the total mixture.
7) S t ability of Mix Three tests for stability, flow value, density and Minimum stability (at 60°C) : 2.0 kN, Minimum flow : 2 mm, Air voids : 3-5 Percent
void contents for each 400 tonnes of mix subject VMA – 16 min. & VFB – 65-75.
to a minimum of two tests per plant per day
8) Temperature of binder in boiler , At regular intervals Same as mentioned in 6.4 (Bituminous Macadam)
aggregate in dryer and mix at t he
t ime of lay ing and r olling
9) Thickness of layer Max. 80 mm
10) Density of compacted layer One test per 700 m2 of area Number of blows – 2 x 75

200
PWD (WB) Schedule of Rates : 2014 Volume III : Road & Bridge Works

6.6 Semi-Dense Bituminous Concrete (SDBC)


S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Quality of binder Number of samples per lot IS: 73: 2013, The bitumen shall be viscosity grade paving bitumen complying with IS:73
IS: 217 & IS: 8887
2) Aggregate Impact Value One test per 350 m3 of aggregate of each source IS: 383-1970 35% Maximum by Weight
Los Angeles Abrasion Value and whenever there is change in the quality of IS: 2386 27% Maximum by Weight
aggregate. (Part IV)-1963
3) Combined Flakiness and One test per 350 m3 of aggregate of each source 30% Maximum by Weight
Elongation Indices and whenever there is change in the quality of
aggregate.
4) S oundness (Magnesium S ulphate/ One test for each source and whenever there is IS : 2386 (Part V) Maximum Average Loss of Weight after 5 cycles
S odium S ulphat e change in the quality of aggregates (i) tested with Sodium Sulphate -12%
(ii) tested with Magnesium Sulphate -18%
5) Wat er absor pt ion of aggr egat es One test for each source and whenever there is IS : 2386 (Part III) Max. 2%
change in the quality of aggregates
6) S and equivalent test One test for each source and whenever there is IS : 2720 (Part 37) Minimum 50
change in the quality of aggregates
7) Plasticity Index One test for each source and whenever there is IS : 2720 (Part 5) Minimum 4
change in the quality of aggregates
8) Polished stone value One test for each source and whenever there is BS: 812-114 Min 55
change in the quality of aggregates
9) Mix gr ading One set for individual constituent and mixed IS: 2386 As per Table 43.
aggregate from dryer for each 400 tonnes of mix (Part I)-1963
subject to minimum of two tests per day per plant
10) S t ability and v oids analy sis of mix Three tests for stability, flow value, density and AASHTO T 245 Minimum stability (at 60°C) : 8.2 kN, Minimum flow : 2-4 mm,
including t heor et ical max imum void contents for each 400 tonnes of mix subject Air voids : See table 38
specific of loose mix to a minimum of two tests per day per plant
11) Moisture S usceptibility of mix One test for each mix type whenever there is AASHTO T 283 Min. 80%
change in the quality or source of coarse or fine
aggregates
12) Temperature of binder in boiler , At regular intervals MORTH’s Same as mentioned in 6.4 (Bituminous Macadam)
aggregate in dryer and mix at t he Specification for
t ime of lay ing and compact ion Road & Bridge
13) Binder cont ent One set for each 400 tonnes of mix subject to Works Min. 4.5 % for 35 - 40 mm thick & Min. 5.0 % for 25 - 30 mm thick
minimum of two tests per day per plant (In case aggregates have specific gravity > 2.7, bitumen content can be reduced
proportionately. Further, for regions where HDM air temp. ≤ 30°C and LDM air temp. ≤-
10°C, it may be increased by 0.5 %.)
14) Rat e of spread of mixed material After every 5 th truck load
15) Density of compacted layer One test per 700 m2 of area ASTM D 2041 Minimum field density equal to or more than 98% of the density based on theoretical
maximum specific gravity (Gmm) obtained on the day of compaction.

201
Volume III : Road & Bridge Works PWD (WB) Schedule of Rates : 2014
6.7 Bituminous Concrete (BC)
S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Quality of binder Number of samples per lot IS: 73: 2013, The bitumen shall be viscosity grade paving bitumen complying with IS:73
IS: 217 & IS: 8887
2) Aggregate Impact Value One test per 350 m3 of aggregate of each source IS: 383-1970 24% Maximum by Weight
Los Angeles Abrasion Value and whenever there is change in the quality of IS: 2386 30% Maximum by Weight
aggregate. (Part IV)-1963
3) Combined Flakiness and One test per 350 m3 of aggregate of each source 35 % Maximum by Weight
Elongation Indices and whenever there is change in the quality of
aggregate.
4) S oundness (Magnesium S ulphate/ One test for each source and whenever there is IS : 2386 (Part V) Maximum Average Loss of Weight after 5 cycles
S odium S ulphat e change in the quality of aggregates (iii) tested with Sodium Sulphate -12%
(iv) tested with Magnesium Sulphate -18%
5) Wat er absor pt ion of aggr egat es One test for each source and whenever there is IS : 2386 (Part III) Max. 2%
change in the quality of aggregates
6) S and equivalent test One test for each source and whenever there is IS : 2720 (Part 37) Minimum 50
change in the quality of aggregates
7) Plasticity Index One test for each source and whenever there is IS : 2720 (Part 5) Minimum 4
change in the quality of aggregates
8) Polished stone value One test for each source and whenever there is BS: 812-114 Min 55
change in the quality of aggregates
9) Mix gr ading One set for individual constituent and mixed IS: 2386 As per Table 500-17 of MoRT&H.
aggregate from dryer for each 400 tonnes of mix (Part I)-1963
subject to minimum of two tests per day per plant
10) S t ability and v oids analy sis of mix Three tests for stability, flow value, density and AASHTO T 245 Minimum stability (at 60°C) : 9.0 kN, Minimum flow : 2-4 mm, Air voids : 3-5 Percent
including t heor et ical max imum void contents for each 400 tonnes of mix subject
specific of loose mix to a minimum of two tests per day per plant
11) Moisture S usceptibility of mix One test for each mix type whenever there is AASHTO T 283 Min. 80%
change in the quality or source of coarse or fine
aggregates
12) Temperature of binder in boiler , At regular intervals MORTH’s Same as mentioned in 6.4 (Bituminous Macadam)
aggregate in dryer and mix at t he Specification for
t ime of lay ing and compact ion Road & Bridge
13) Binder cont ent One set for each 400 tonnes of mix subject to Works Min. 5.2 % for 50 mm thick & Min. 5.4 % for 30 - 40 mm thick
minimum of two tests per day per plant (In case aggregates have specific gravity > 2.7, bitumen content can be reduced
proportionately. Further, for regions where HDM air temp. ≤ 30°C and LDM air temp. ≤-
10°C, it may be increased by 0.5 %.)
14) Rat e of spread of mixed material After every 5 th truck load
15) Density of compacted layer One test per 700 m2 of area ASTM D 2041 Minimum field density equal to or more than 98% of the density based on theoretical
maximum specific gravity (Gmm) obtained on the day of compaction.

202
PWD (WB) Schedule of Rates : 2014 Volume III : Road & Bridge Works
6.8 Surface Dressing :
S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Quality of binder Number of samples per lot. IS: 73: 2013, The binder shall be bitumen conforming to IS: 73 or Rapid setting cationic bitumen
IS: 217 & IS: 8887 emulsion (RS-2) conforming to IS: 8887.
2) Aggregate Impact Value/ Los One test per 200 m3 of aggregate of each source IS : 2386 (Part IV) Max. 27%
Angeles Abrasion Value and whenever there is change in the quality of Max. 35%
aggregate.
3) Combined Flakiness and One test per 100 m3 of aggregate of each source IS : 2386 (Part I) Max. 35%
Elongation Indices and whenever there is change in the quality of
aggregate.
4) S t ripping Value of aggregates One test for each source and whenever there is IS: 6241 Minimum retained coating 95%
(Immersion Tray Test) change in the quality of aggregates
5) Wat er absorption of aggregate - do - IS : 2386 (Part III) Max. 1%
6) Wat er sensitivity of mix - do - AASHTO 283 Min 80%
7) Gr ading of aggregate Two tests per day MORTH’s Specification As per Table 500-21 of MoRT&H.
for Road & Bridge
Works
S l. Test F r equency Ref. Codes Accept ance S t andar ds
8) S oundness (Magnesium Sulphate One test for each source and whenever there is IS : 2386 (Part V) Maximum Average Loss of Weight after 5 cycles, tested with
/ Sodium Sulphate) change in the quality of aggregates (i) Sodium Sulphate - 12% & (ii) Magnesium Sulphate -18%
9) Polished Stone Value - do - BS: 812 (Part-114) Not less than 60
(not applicable for SAM/SAMI)
10) Temperature of binder in boiler, At regular intervals MORTH’s Same as mentioned in 6.4 (Bituminous Macadam)
aggregate in dryer and mix at the Specification for
t ime of laying and compaction. Road & Bridge
11) Rat e of spread of materials Three tests per day Works 19 mm: 0.014-0.015 cu.m/m²; 13 mm: 0.009-0.011 cu.m/m²
12) Per centage of fractured faces One test per 100 m3 of aggregate
(When gravel is used)

6.9 Open-graded Premix Surfacing :


S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Quality of binder Number of samples per lot. IS: 73: 2013, The binder shall be bitumen conforming to IS: 73
IS: 217 & IS: 8887
2) Aggregate Impact Value/ Los One test per 200 m3 of aggregate of each source IS : 2386 (Part IV) Max. 30%
Angeles Abrasion Value and whenever there is change in the quality of Max. 40%
aggregate.
3) Combined Flakiness and One test per 100 m3 of aggregate of each source IS : 2386 (Part I) Max. 35%
Elongation Indices and whenever there is change in the quality of
aggregate.
4) S t ripping Value of aggregates One test for each source and whenever there is IS: 6241 Minimum retained coating 95%
change in the quality of aggregates

203
Volume III : Road & Bridge Works PWD (WB) Schedule of Rates : 2014
S l. Test F r equency Ref. Codes Accept ance S t andar ds
5) Wat er absorption of aggregates - do - IS : 2386 (Part III) Maximum 1%
6) Wat er sensitivity of mix - do - AASHTO 283 Min 80%
7) Gr ading of aggregates Two tests per day As per Table 500-23 of MoRT&H.

8) S oundness (Magnesium Sulphate/ One test for each source and whenever there is IS : 2386 (Part V) Maximum Average Loss of Weight after 5 cycles, tested with
Sodium Sulphate) change in the quality of aggregates (i) Sodium Sulphate - 12% & (ii) Magnesium Sulphate -18%
9) Polished Stone Value - do - BS:812-114 Not less than 55
10) Temperature of binder at application At regular intervals 140-160 for VG-10, 145-165 for VG-20, 150-165 for VG-30 & 160-170 for VG-40
11) Binder content Two tests per day per plant a) For 0.1 8m3 of 13.2 mm nominal size stone of 52 kg bitumen per m3
b) For 0.09m3 of 11.2 mrn nominal size stone of 56 kg bitumen per m3
12) Per centage of fractured faces One test per 100 m3 of aggregate

6.10 Seal coat :


S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Quality of binder Number of samples per lot. IS: 73: 2013, The binder shall be bitumen conforming to IS: 73 & Cationic bitumen emulsion of
IS: 217 & IS: 8887 Medium Setting (MS) grade complying with IS: 8887.
2) Aggregate Impact Value/ Los One test per 200 m3 of aggregate of each source IS : 2386 (Part IV) Max. 27%
Angeles Abrasion Value and whenever there is change in the quality of Max. 35%
aggregate.
3) Combined Flakiness and One test per 100 m3 of aggregate of each source IS : 2386 (Part I) Max. 35%
Elongation Indices and whenever there is change in the quality of
aggregate.
4) S t ripping Value of aggregates One test for each source and whenever there is IS: 6241 Minimum retained coating 95%
(immersion Tray Test) change in the quality of aggregates
5) Wat er absorption of aggregate - do - IS : 2386 (Part III) Maximum 1%
6) Wat er sensitivity of mix - do - AASHTO 283 Min 80%
7) Gr ading of aggregate Two tests per day Ty pe A - Stone chips shall be of 6.7 mm size defined as 100 % passing through 11.2
mm sieve and retained on 2.36 mm sieve
Ty pe B - The aggregate shall pass 2.36 mm sieve & be retained on 180 micron sieve.
8) S oundness (Magnesium Sulphate One test for each source and whenever there is IS : 2386 (Part V) Maximum Average Loss of Weight after 5 cycles, tested with
/ Sodium Sulphate) change in the quality of aggregates (i) Sodium Sulphate - 12% & (ii) Magnesium Sulphate -18%
9) Polished Stone Value - do - BS:812-114 Not less than 55
(not applicable for SAM/SAMI)
10) Temperature of binder in boiler, At regular intervals Same as mentioned in 6.4 (Bituminous Macadam)
aggregate in dryer and mix at the
t ime of laying and compaction.
11) Rat e of spread of materials Three tests per day 9.8 kg/10 sq.m for Type A, and 6.8 kg for Type B seal coat. Where bituminous
emulsion is used as a binder, the quantities for Type A and Type B seal coats shall be
15 kg and 10.5 kg respectively.
12) Per centage of fractured faces One test per 100 m3 of aggregate
(When gravel is used)

204
PWD (WB) Schedule of Rates : 2014 Volume III : Road & Bridge Works
6.11 Slurry Seal :
S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Quality of Aggregate One per source / site.
2) S and Equivalent Value IS: 2720 (Part 37) Min. 50%
3) Wat er Absorption IS: 2720 (Part 3) Max. 2%
4) S oundness Test (Sodium / IS : 2386 (Part V) Maximum Average Loss of Weight after 5 cycles, tested with
Magnesium Sulphate Test). (i) Sodium Sulphate - 12% & (ii) Magnesium Sulphate -18%
5) Quality of Emulsion One per lot of 20t IS:8887 The bitumen emulsion shall be a cationic slow setting type SS 2, conforming to the
requirements of lS:8887
6) Aggregate Moisture Two per day
7) Aggregate Gradation Two per day at site As per Table 500-27 of MoRT&H.
8) Binder content Two per lane per Km 10 to 16 for type I, 7.5 to 13.5 for Type II & 6.5 to 12 for Type III
9) Calibration of Machine Once per Project Appendix 7 of
IRC:SP:81
10) Quantity of Slurry (By weight of Daily (Travel time of Machine) 4.3 to 6.5 kg/m² for type I, 8.4 to 9.8 kg/m² for Type II & 10.1 to 12 for Type III
aggregate

6.12 Fog Spray :


S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Quality of binder Number of samples per lot. IS: 73: 2013, Cationic Bitumen Emulsion SS1 grade conforming to IS: 8887
2) Binder temperature for application At regular close intervals IS: 217 & IS: 8887 140-160 for VG-10, 145-165 for VG-20, 150-165 for VG-30 & 160-170 for VG-40
3) Rat e of spread of Binder Three tests per day 0.5 – 1.0 litres per sq.m.

6.13 Mastic Asphalt :


S l. Test F r equency Ref. Codes Accept ance S t andar ds
1) Quality of binder Number of samples per lot. IS:1203 Penetration at 25°C - 15±5,
IS:1205 Softening point, °C - 65±10
IS:1212 Loss on heating for 5h at 163°C, % by mass Max. – 2.0
IS:1216 Solubility in trichloroethylene, % by mass Min. – 95
IS:1217 Ash (mineral matter), % by mass Max. – 1.0
2) Aggregate Impact Value/ L.A. One test per 350 m3 of aggregate of each source IS:2386 (Part-IV) Max. 30%
Abr asion v alue and whenever there is change in the quality of Max. 40%
aggregate.
3) Combined Flakiness and Elongation One test per 350 m3 of aggregate of each source IS:2386(Part-I) Max. 35%
Indices and whenever there is change in the quality of
aggregate.
4) S t ripping Value of aggregates One test for each source and whenever there is IS: 6241 Minimum retained coating 95%
change in the quality of aggregates
5) Wat er Sensitivity of mix - do - AASHTO 283 Min. 80%

205
Volume III : Road & Bridge Works PWD (WB) Schedule of Rates : 2014
S l. Test F r equency Ref. Codes Accept ance S t andar ds
6) Gr ading of aggregates Two tests per day per plant both on the individual IS : 2386 (Part-I)
As per Table 500-40 of MoRT&H.
constituents and mixed aggregates from the dryer IS : 383
7) Wat er absorption of aggregates One test for each source and whenever there is IS:2386 (Part-III) Max. 2%
change in the quality of aggregates
8) S oundness (Magnesium Sulphate/ One test for each source and whenever there is IS : 2386 (Part V) Maximum Average Loss of Weight after 5 cycles
Sodium Sulphate) change in the quality of aggregates (i) tested with Sodium Sulphate -12%
(ii) tested with Magnesium Sulphate -18%
9) Per centage of fractured faces One test per 50 m3 of aggregate when crushed
gravel is used
10) Binder Cont ent and aggr egat e Two tests per day per plant IS : 1195-1978 14 to 17 % by weight of total mixture
gr ading
S l. Test F r equency Ref. Codes Accept ance S t andar ds
11) Control of temperature of binder in At regular close intervals Same as mentioned in 6.4 (Bituminous Macadam)
boiler, aggregate in dryer and mix at
the time of laying and compaction
12) Rat e of spread of mixed material Regular control through check of layer thickness
13) Har dness Number Minimum two tests per day. IS : 1195-1978  without coarse aggregate at 25 C - 50-70
 with coarse aggregate at 25°C - 10-20

6.14 Bituminous & Cold Mix (Including Gravel Emulsion) :

S l. Test F r equency Ref. Codes Accept ance S t andar ds


1) Quality of binder Number of samples per lot IS:8887 The bitumen shall be a slow/medium setting bitumen emulsion conforming to
IS:217 IS:8887 or a medium curing cut-back conforming to IS:217
2) Aggregate Impact Value One test per 350 m3 of aggregate of each source IS: 383-1970 24% Maximum by Weight
Los Angeles Abrasion Value and whenever there is change in the quality of IS: 2386 30% Maximum by Weight
aggregate. (Part IV)-1963
3) Combined Flakiness and One test per 350 m3 of aggregate of each source 35 % Maximum by Weight
Elongation Indices and whenever there is change in the quality of
aggregate.
4) S oundness (Magnesium S ulphate/ One test for each source and whenever there is IS : 2386 (Part V) Maximum Average Loss of Weight after 5 cycles
S odium S ulphat e ) change in the quality of aggregates (v) tested with Sodium Sulphate -12%
(vi) tested with Magnesium Sulphate -18%
5) Wat er absor pt ion of aggr egat es - do - IS : 2386 (Part III) Max. 2%
6) S and equivalent test - do - IS : 2720 (Part 37) Minimum 50
7) Plasticity Index - do - IS : 2720 (Part 5) Minimum 4
8) Polished stone value - do - BS: 812-114 Min 55
9) Mix gr ading One set for individual constituent and mixed IS: 2386 As per Table 500-44 of MoRT&H.
aggregate from dryer for each 400 tonnes of mix (Part I)-1963
subject to minimum of two tests per day per plant

206
PWD (WB) Schedule of Rates : 2014 Volume III : Road & Bridge Works
S l. Test F r equency Ref. Codes Accept ance S t andar ds
10) S t ability and v oids analy sis of mix Three tests for stability, flow value, density and AASHTO T 245 Par amet er Emulsion Cut back
including theoretical maximum void contents for each 400 tonnes of mix subject Minimum Stability 2.2 kN at 22.2°C 2.2 kN at 25°C for maintenance
specific of loose mix to a minimum of two tests per day per plant for paving 3.3 kN at 25°C for paving
Percent maximum stability
503 254
loss on soaking
Minimum flow (mm) 2 2
Compaction level number
50 75
of blows)
Per cent air voids 3-55 3-5
Per cent minimum coating 50
Per cent voids in mineral 9.5 mm – 16.0%, 12.5 mm – 15.0%, 19.0 mm –
aggregate (VMA) 14.0%, 25.0 mm – 13.0% & 37.5 mm – 12.05
11) Moisture S usceptibility of mix One test for each mix type whenever there is AASHTO T 283 Min. 80%
change in the quality or source of coarse or fine
aggregates
12) Temperature of binder in boiler , At regular intervals Same as mentioned in 6.4 (Bituminous Macadam)
aggregate in dr y er and mix at the
time of laying and compaction
13) Binder cont ent One set for each 400 tonnes of mix subject to Min. 5.2 % for 50 mm thick & Min. 5.4 % for 30 - 40 mm thick
minimum of two tests per day per plant
14) Rat e of spread of mixed material After every 5 th truck load
15) Density of compacted layer One test per 700 m2 of area ASTM D 2041 Minimum field density equal to or more than 98% of the density based on theoretical
maximum specific gravity (Gmm) obtained on the day of compaction.

7 Reinforced Earth System

S l. Test F r equency Ref. Codes Accept ance S t andar ds


1) Lug Pull Out Test 1 for 500 m2 of Panels ASTM D 6706 As per the structural design requirement for RE Wall system.
2) S t r ip Pull Out Test 1 set of tests (at every 1.5 m height of backfill) for
500 m2 of Panels
3) S t r uct ur al behav iour of Panels 1 for 500 m2 of Panels Structural Form Minimum Vertical Movement Capacity of System
Discrete panels Joint closure of 1 in 150 relative to panel height
Full height panels Vertical movement capacity of connections 1 in 150
relative to panel height
Semi-elliptical facings Vertical distortion of 1 in 150 relative to panel height
Geotextile/ Geogrid wrap- No specific limit except for appearance or
around facings serviceability considerations
4) Impact Test on Pr ecast Cr ash 1 test for 200 m length of crash barrier
bar r ier ov er RE Wall

207
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

Approximate requirement of materials for different items of Works


3.0 Approximate requirement of materials different items of works:
General Notes:
1. Consumption of materials of construction in the corresponding contract items of works shall be computed on the
basis of the quantities shown in the following sections, subject to a variation of plus / minus five percent except for
Bitumen/CRMB/Emulsion. The variation in consumption of Bitumen/CRMB/Emulsion may be allowed upto
plus/minus one percent. Where, however, the circumstances of work so required, the Engineer-in-charge shall have
the authority to allow (with recorded reasons) for a greater variation.
For open graded mixes, having no specific job mix formula, the quantities as shown in the following tables shall be
applicable for estimating the rate of the items.
2. In case of any design mix, the consumption shall be guided by the specific approved job mix formula and relevant
provisions of “SPECIFICATIONS FOR ROAD AND BRIDGE WORKS” published by MoRTH (5th Revision). However, for
Preliminary estimating purposes, the following quantities may be considered for all cases. However it is advisable
to have a mix design with source and type of materials intended to be used in the work and the estimate should be
framed according to the quantities of materials as determined in mix design.
3.1 Approximate requirement of different materials of construction in the corresponding contract items of works shall be
computed on the basis of the quantities shown in Table: 3.1-1, subject to a variation of plus / minus five percent.
Where, however, the circumstances of work so require, the Engineer-in-charge shall be competent to allow (for
record reason) for a greater variation.
N.B. :- This statement is based on the following assumptions:
(1) That dry sand with necessary allowance for bulking is used.
(2) That the size of bricks shall be 9 ¾˝ x 4 ¾˝ x 2 ¾˝.
(3) Volume of 1 bag (50 Kg) cement = 0.035 m3
TABLE 3.1 – 1: APPROXIMATE QUANTITIES OF MATERIALS REQUIRED FOR PLASTERING,
BRICKWORK, CONCRETING & OTHER ITEMS

Sl. No. Description of items Unit Quantities of materials required.


Sand 1.200 m3
1 10 mm cement plaster (4 : 1) 100 m²
Cement 428.6 kg
Sand 1.460 m3
2 15 mm cement plaster (4 : 1) 100 m²
Cement 657.1 kg
Sand 2.170 m3
3 20 mm cement plaster (4 : 1) 100 m² Cement 778.6 kg
Sand 1.800 m3
4 15 mm cement plaster (6 : 1) 100 m²
Cement 428.6 kg
Sand 2.400 m3
5 20 mm cement plaster (6 : 1) 100 m² Cement 571.4 kg
Sand 0.370 m3
6 Ruled pointing 100 m²
Cement 174.3 kg
Brick 388 nos.
7 Brickwork in cement mortar (1 : 3) m³ Cement 152.9 kg
Sand 0.320 m3
Brick 388 nos.
8 Brickwork in cement mortar (1 : 4) m³ Cement 118.6 kg
Sand 0.330 m3
Brick 388 nos.
9 Brickwork in cement mortar (1 : 6) m³ Cement 78.57 kg
Sand 0.330 m3
Stone 1.250 m3
Random / Coursed / Rubble masonry in cement
10 m³ Cement 128.6 kg
mortar in road & jhora works (1 : 4)
Sand 0.360 m3

208
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

Sl. No. Description of items Unit Quantities of materials required.


Stone 1.250 m3
Random / Coursed / Rubble masonry in cement
11 m³ Cement 101.4 kg
mortar in road & jhora works (1 : 5)
Sand 0.374 m3
Stone 1.250 m3
Random / Coursed / Rubble masonry in cement
12 m³ Cement 92.9 kg
mortar in road & jhora works (1 : 6)
Sand 0.385 m3
Stone 1.250 m3
Square & coursed Rubble masonry in cement
13 m³ Cement 107.1 kg
mortar in road & jhora works (1 : 4)
Sand 0.300 m3
Stone 1.250 m3
Square & coursed Rubble masonry in cement
14 m³ Cement 89.1 kg
mortar in road & jhora works (1 : 5)
Sand 0.312 m3
Stone 1.250 m3
Square & coursed Rubble masonry in cement
15 mortar in road & jhora works (1 : 6) m³ Cement 76.4 kg
Sand 0.321 m3
Stone chips (6 to 20 mm) 0.860 m3
16 Nominal mix cement concrete (1 : 1½ : 3) m³ Cement 408.6 kg
Sand 0.430 m3
Stone chips (6 to 20 mm) 0.880 m3
17 Nominal mix cement concrete (1 : 2 : 4) m³ Cement 314.3 kg
Sand 0.440 m3
Stone chips (6 to 20 mm) 0.940 m3
18 Nominal mix cement concrete (1 : 3 : 6) m³ Cement 222.9 kg
Sand 0.470 m3
Stone chips (6 to 20 mm) 0.960 m3
19 Nominal mix cement concrete (1 : 4 : 8) m³ Cement 171.4 kg
Sand 0.480 m3
20 Neat cement punning 100 m² cement 217.1 kg
21 Single brick flat soling 100 m² Brick 3228 nos.
22 Brick on edge flooring 100 m² Brick 5380 nos.
23 75 mm wide brick on end edging 100 m² Brick 800 nos.
24 75 mm wide brick on edge edging 100 m² Brick 400 nos.
25 Boulder for pitching apron & sausage work m³ Boulder 0.90 ³

3.2 Approximate requirement of materials for Design Mix Concrete W orks items
TABLE 3.2–1: APPROXIMATE QUANTITIES OF MATERIALS REQUIRED FOR DESIGN MIX CONCRETE ITEMS
Concr et e Cement content / m3 Recommended t y pe Coarse aggregat es / m 3
Remar k s
Gr ade of concr et e of Cement of concr et e
1 2 3 4 5
M-10 330.00 kg OPC 33 /PSC / PPC 0.9 m3 1. The quantities given in the table are only
for estimating purpose. Actual quantities
M-15 350.00 kg OPC 33 /PSC / PPC 0.9 m3 however, shall be ascertained by proper
Mix Design following BSI / IRC/ACI or any
M-20 400.00 kg OPC 33 /PSC / PPC 0.9 m3 standard method approved by Engineer in
charge.
M-25 420.00 kg OPC 33 /PSC / PPC 0.9 m3 2. During the execution of the item
M-30 430.00 kg OPC 33 /PSC / PPC 0.9 m3 necessary quantity of approved plasticizers
to obtain the desired workability and
M-35 440.00 kg OPC 43/53 0.9 m3 strength is to be added, cost of which has
been incorporated in the rate of the item.
M-40 450.00 kg OPC 43/53 0.9 m3 3. For under water concrete 10% extra
cement over the quantity stated in col.2 is
M-45 450.00 kg OPC 53 0.9 m3
to be added.
M-50 450.00 kg OPC 53 0.9 m3 4. Add the cost of 60 kg, 75 kg and 90 kg
Silica fume for M45, M50 & M55 grade of
M-55 450.00 kg OPC 53 0.9 m3 concrete respectively.

209
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

3.3 Approximate requirement of materials for Sub-base, Bases (Bituminous &


Non-bituminous) and Surface Courses items

TABLE 3.3–1: APPROXIMATE QUANTITIES OF MATERIALS REQUIRED FOR SUB-BASE,


BASES & SURFACE COURSES ITEMS
It em No. Vide
Br ief Descr ipt ion Unit Mat er ials Quant it y
Chapt er
CH. 4 SUB-BASES, BASES ( NON- BITUMINOUS) :
4.08 Granular Sub-base with Graded
(A) & (B) Material (Table:- 400-1)
Grading I: Cum 37.5 mm chips (27%) 0.3456 m³
22.4 mm chips (23%) 0.2944 m³
11.2 mm chips (10%) 0.1280 m³
5.6 mm chips (10%) 0.1280 m³
Sand (30%) 0.3840 m³
Grading II: Cum 37.5 mm chips (15%) 0.1920 m³
22.4 mm chips (10%) 0.1280 m³
11.2 mm chips (10%) 0.1280 m³
5.6 mm chips (12%) 0.1536 m³
Sand (53%) 0.6784 m³
Grading III: Cum 13.2 mm chips (15%) 0.1920 m³
11.2 mm chips (20%) 0.2560 m³
5.6 mm chips (45%) 0.5760 m³
Sand (20%) 0.2560 m³
Grading IV: Cum 13.2 mm chips (15%) 0.1920 m³
11.2 mm chips (20%) 0.2560 m³
5.6 mm chips (40%) 0.5120 m³
Sand (25%) 0.3200 m³
Grading V: Cum 37.5 mm chips (27%) 0.3449 m³
22.4 mm chips (23%) 0.2938 m³
11.2 mm chips (10%) 0.1277 m³
5.6 mm chips (20%) 0.2555 m³
Sand (20%) 0.2555 m³
Grading VI: Cum 37.5 mm chips (15%) 0.1536 m³
22.4 mm chips (10%) 0.1536 m³
11.2 mm chips (10%) 0.1536 m³
5.6 mm chips (22%) 0.2816 m³
Sand (43%) 0.5376 m³
4.12 Wet Mix Macadam Base Course Cum 37.5 mm chips (30%) 0.3960 m³
13.2 mm chips (20%) 0.2640 m³
5.6 mm chips (27%) 0.3564 m³
Stone dust (23%) 0.3036 m³
CH. 5 BASES AND SURFACE COURSES (BITUMINOUS) :
5.01 (i) Primer coat Sqm Cationic Bituminous Emulsion (SS1 grade) 0.85 kg
(for WBM/WMM Surface) conforming to IS: 8887.
(ii) Primer coat Sqm -Do- 1.05 kg
(for Stabilised soil bases/ Crusher
Run Macadam Surface)
5.02 (i) Tack coat (Over Bituminous Sqm Cationic Bituminous Emulsion (RS1 grade) 0.225 kg
surfaces.) conforming to IS: 8887 or suitable low
viscosity paving bitumen of VG: 10 grade
conforming to IS: 73.
(ii) Tack coat (Over Granular surfaces Sqm - Do- 0.275 kg
treated with primer.)
(iii) Tack coat (Over Cement Concrete Sqm - Do- 0.325 kg
Pavement.)

210
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

It em No. Vide
Br ief Descr ipt ion Unit Mat er ials Quant it y
Chapt er
5.03 Bituminous Macadam :
A. Grading – I (40 mm) Cum Bitumen (Packed/Bulk) 72.00 kg
(80 to 100 mm thickness.)
Aggregates: 1.4151 m³
26.5 mm chips (20%) 0.2831 m³
22.4 mm chips (30%) 0.4245 m³
11.2 mm chips (30%) 0.4245 m³
5.6 mm chips (10%) 0.1415 m³
Stone Dust with grit (10%) 0.1415 m³

B. Grading – II (19 mm) Cum Bitumen (Packed/Bulk) 75.00 kg


(50 to 75 mm thickness.)
Aggregates: 1.4137 m³
22.4 mm chips (30%) 0.4241 m³
13.2 mm chips (20%) 0.2827 m³
11.2 mm chips (25%) 0.3534 m³
5.6 mm chips (15%) 0.2121 m³
Stone Dust with grit (10%) 0.1414 m³
5.05 Dense Bituminous Macadam :
A. Grading – I (37.5 mm) Cum Bitumen (Packed/Bulk) or 99.00 kg
(75 to 100 mm thickness.) CRMB (Packed/Bulk)
Aggregates: 1.4723 m³
37.5 mm chips (20%) 0.2945 m³
26.5 mm chips (10%) 0.1472 m³
22.4 mm chips (15%) 0.2208 m³
11.2 mm chips (20%) 0.2945 m³
5.6 mm chips (10%) 0.1472 m³
Stone Dust with grit (25%) 0.3681 m³
Filler @ 2% (Lime stone dust/cement) 44.00 kg
B. Grading – II (26.5 mm) Cum Bitumen (Packed/Bulk) or 111.00 kg
50 to 75 mm thickness. CRMB (Packed/Bulk)
Aggregates: 1.4646 m³
26.5 mm chips (15%) 0.2197 m³
22.4 mm chips (15%) 0.2197 m³
11.2 mm chips (25%) 0.3662 m³
5.6 mm chips (15%) 0.2197 m³
Stone Dust with grit (30%) 0.4394 m³
Filler @ 2% (Lime stone dust/cement) 44.00 kg
5.06 Sand Asphalt Base Course : Cum Bitumen @ 5 per cent 110.00 kg
Filler (lime) @ 2 per cent 44.00 kg
Sand or grit of size 4.75 to 0.075 mm 1.408 m³

5.07 Semi-Dense Bituminous Concrete


(SDBC) :
A. Grading – I (13 mm) Cum Bitumen (Packed/Bulk) or CRMB 104.00 kg
(35 to 40 mm thickness.) (Packed/Bulk)
Aggregates: 1.4398 m³
13.2 mm chips (10%) 0.1469 m³
11.2 mm chips (20%) 0.2938 m³
5.6 mm chips (40%) 0.5877 m³
Stone dust with grit (28%) 0.4114 m³
Filler @ 2% (Lime stone dust) 44.00 kg

211
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

It em No. Vide
Br ief Descr ipt ion Unit Mat er ials Quant it y
Chapt er
5.07 B. Grading – II (10 mm) Cum Bitumen (Packed/Bulk) or CRMB 115.00 kg
(25 to 30 mm thickness.) (Packed/Bulk)
Aggregates: 1.4323 m³
11.2 mm chips (20%) 0.1462 m³
5.6 mm chips (20%) 0.8769 m³
Stone dust with grit (40%) 0.4092 m³
Filler @ 2% (Lime stone dust) 44.00 kg
5.08 Bituminous Concrete (BC) :
C. Grading – I (13 mm) Cum Bitumen (Packed/Bulk) orCRMB 130.00 kg
(50 mm thickness.) (Packed/Bulk)
Aggregates: 1.4843 m³
22.4 mm chips (20%) 0.4453 m³
13.2 mm chips (20%) 0.1485 m³
11.2 mm chips (15%) 0.2226 m³
5.6 mm chips (15%) 0.2226 m³
Stone dust with grit (30%) 0.4453 m³
Filler @ 2% (Lime stone dust) 45.00 kg
D. Grading – II (10 mm) Cum Bitumen (Packed/Bulk) orCRMB 137.00 kg
(30 to 40 mm thickness.) (Packed/Bulk)
Aggregates: 1.4796 m³
13.2 mm chips (20%) 0.2959 m³
11.2 mm chips (20%) 0.2959 m³
5.6 mm chips (20%) 0.2959 m³
Stone dust with grit (40%) 0.5919 m³
Filler @ 2% (Lime stone dust) 45.00 kg
5.09 Surface dressing
A. Single coat or 1st coat Sqm Bitumen (Packed/Bulk) 1.20 kg
13.2 mm chips 0.015 m³
B. Second coat or renewal coat Sqm Bitumen (Packed/Bulk) 1.00 kg
11.2 mm chips 0.010 m³
5.10 & 5.11 Open-Graded Premix Surfacing Sqm Bitumen (Packed/Bulk) 1.46 kg
using Penetration grade Bitumen Aggregates: 0.027 m³
13.2 mm chips 0.018 m³
11.2 mm chips 0.009 m³

5.12 Open Graded Premix Surfacing Sqm Bitumen (Packed/Bulk) 2.15 kg


using Cationic Bitumen Emulsion Aggregates: 0.027 m³
13.2 mm chips 0.018 m³
11.2 mm chips 0.009 m³
5.13 Seal Coat : Type A
(i) With Hot Bitumen Binder Sqm Bitumen (Packed/Bulk) 0.98 kg
5.6 mm chips 0.009 m³

(ii) With Bitumen Emulsion Sqm Cationic Bitumen Emulsion 1.50 kg


5.6 mm chips 0.009 m³
Seal Coat : Type B
(i) With Hot Bitumen Binder Sqm Bitumen (Packed/Bulk) 0.68 kg
Sand/Stone Grit 0.006 m³

(ii) With Bitumen Emulsion Sqm Cationic Bitumen Emulsion 1.05 kg


Sand/Stone Grit 0.006 m³

212
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

It em No. Vide
Br ief Descr ipt ion Unit Mat er ials Quant it y
Chapt er
5.14 Mastic Asphalt
(i) 25 mm thick Sqm Bitumen (Packed/Bulk) 10/20 5.71 kg
[For cold climatic region (temperature <10°C,
use VG-40 grade bitumen]
Bitumen (Packed/Bulk) 60/70 0.0143 kg
Coarse aggregates:
5.6 mm chips (50%) 0.0079 m³
11.2 mm chips (50%) 0.0079 m³
Fine aggregates:
Medium Sand/stone dust/mixture of both 0.0111 m³
Lime stone powder 10.29 kg
13.2 mm chips 0.0005 m³

(ii) 50 mm thick Sqm Bitumen (Packed/Bulk) 10/20 11.43 kg


[For cold climatic region (temperature <10°C,
use VG-40 grade bitumen]

Bitumen (Packed/Bulk) 60/70 0.0143 kg

Coarse aggregates:
5.6 mm chips (50%) 0.0157 m³
11.2 mm chips (50%) 0.0157 m³

Fine aggregates:
Medium Sand/stone dust/mixture of both 0.0224 m³
Lime stone powder 20.48 kg
13.2 mm chips 0.0005 m³
5.15 Slurry Seal
(i) 5 mm thickness Sqm Cationic Bitumen Emulsion 1.21 kg

Stone Grit 0.0064 m³


Cement Filler 0.22 kg
(ii) 3 mm thickness Sqm Cationic Bitumen Emulsion 0.86 kg

Sand 0.0037 m³
Cement Filler 0.132 kg

(iii) 1.5 mm thickness Sqm Cationic Bitumen Emulsion 0.53 kg

Sand 0.0018 m³
Cement Filler 0.066 kg
5.16 Fog Spray Sqm Cationic Bitumen Emulsion 0.75 kg

5.17 Bituminous Cold Mix


( Including Gravel Emulsion)
(i) With 13.2 mm nominal size Cum Bitumen (Packed/Bulk) orCRMB 176.00 kg
aggregate (Packed/Bulk)
Aggregates: 1.3170 m³
13.2 mm chips (14%) 0.1829 m³
11.2 mm chips (14%) 0.1829 m³
5.6 mm chips (32%) 0.4244 m³
Stone dust with grit (40%) 0.5268 m³
Filler @ 2% (Lime stone dust) 44.00 kg

213
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

It em No. Vide
Br ief Descr ipt ion Unit Mat er ials Quant it y
Chapt er

5.17 (ii) With 26.5 mm nominal size Cum Bitumen (Packed/Bulk) orCRMB 176.00 kg
aggregate (Packed/Bulk)
Aggregates: 1.3170 m³
26.5 mm chips (14%) 0.1829 m³
22.4 mm chips (14%) 0.1829 m³
22.4 mm chips (32%) 0.4390 m³
5.6 mm chips (20%) 0.2561 m³
Stone dust with grit (20%) 0.2561 m³
Filler @ 2% (Lime stone dust) 44.00 kg
5.18 Crack Prevention Courses
(i) Stress absorbing membrane (SAM) Sqm Modified Binder 0.90 kg
crack width less than 6 mm 5.6 mm chips 0.010 m³
(ii) Stress absorbing membrane (SAM) Sqm Modified Binder 1.10 kg
with crack width 6 mm to 9 mm 11.2 mm chips 0.006 m³
(iii) Stress absorbing membrane (SAM) Sqm Modified Binder 1.50 kg
crack width above 9 mm and 11.2 mm chips 0.012 m³
cracked area above 50 per cent
(iv) Bitumen impregnated geotextile Sqm Modified Binder 1.05 kg
Geogrid 1.10 m²
CH. 10 MAINTENANCE OF ROADS :
10.06 Pre-coating Chips Cum Bitumen (Packed/Bulk) 56.00 kg

11.2 mm chips 1.00 m³


10.07 Repairing pot-holes
(i) Using Mobile HMP (Light duty) Cum Bitumen (Packed/Bulk) 54.00 kg

Coarse aggregates 1.00 m³


(ii) By grouting method Cum Bitumen (Packed/Bulk) 70.00 kg

Coarse aggregates 1.00 m³


11.2mm chips / Bajree (key aggregates) 0.10 m³
10.08 Repairing pot-holes Cum Bitumen Emulsion 70.70 kg
(using Cationic Bitumen Emulsion)
22.4 mm chips / Bajree 0.60 m³
11.2 mm chips / Bajree 0.40 m³

214
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

SCHEDULE OF RATES
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

BASIC COST OF MATERIALS


AND
ISSUE RATES
PWD (WB), Schedule of Rates: 2014 Volume III : Road & Bridge Works

BASIC COST OF MATERIALS


TABLE NO. I - 1 : ISSUE RATE & BASIC RATES OF CEMENT & STEEL MATERIALS

Issue Rate (`) Basic Price (`)


Item (Supplied by Department) (Supplied by Contractor)

Unit
Description of Items
No.
South Bengal North Bengal South Bengal North Bengal

1. Cement :
PPC / PSC / OPC 33 MT 8100.00 8320.00 7360.00 7560.00
OPC (43 Grade) MT 8100.00 8320.00 7360.00 7560.00
OPC (53 Grade) MT 8320.00 8580.00 7560.00 7800.00

Kolkata/
South Bengal North Bengal Siliguri
Durgapur

2. Steel materials :

(i) Mild Steel rods MT 53900.00 54900.00 49150.00 50240.00


(Fe 250, conforms to IS: 432)

(ii) Tor Steel rods / HYSD bars / TMT bars MT 53900.00 54900.00 49150.00 50240.00
(Fe 415 /Fe 500 /Fe 500D, conforms
to IS: 1786)

(iii) CRS of approved brand. MT - - - -

(iv) H T Strand TATA SSL / USHA Martin or MT - - 58700.00 59700.00


any other approved brand.
(Conforms to IS:6006 /IS:14268)

(v) Steel plates :


(E 250 conforms to IS:2062-2006)

(a) 6 – 10 mm. MT - - 47400.00 48400.00


(b) 10 – 20 mm. MT - - 46000.00 47000.00
(c) 25 – 40 mm. MT - - 47400.00 48400.00

(vi) Structural Steel (MS) angles, joists,


channels, flats etc.
(E 250 conforms to IS:2062 & 808)

(a) Up to 200mm size. MT - - 49300.00 50300.00


(b) Above 200mm & up to 400mm size. MT - - 50800.00 51800.00
(c) Above 400 mm size. MT - - 53200.00 54200.00

Note: Construction Wing is to add the cost of Cement and Steel to the concerned item to arrive at the complete Rate of the item
according to calculation shown in FORMAT C, D, E and F for Cement and Steel as the case may be.

215
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

TABLE NO. I-2 EX-OUTLET PRICES OF BITUMEN

Rates at outlets (`)


Sl. No. Description of item Unit
At Haldia At Kolkata

1. Bitumen (Bulk) : VG-10 (80/100) MT 47167.00 ***

2. Bitumen (Packed) : VG-10 (80/100) MT 50892.00 ***

3. Bitumen (Bulk) : VG-30 (60/70) MT 48128.00 ***

4. Bitumen (Packed) : VG-30 (60/70) MT 51853.00 ***

5. Bitumen (Bulk) : VG-40 (30/40) MT *** ***

6. Bitumen (Packed) : VG-40 (30/40) MT *** ***

7. Penetration grade Bitumen (Packed): (10/20) MT *** 50336.00

8. Bituminous Emulsion (Bulk) MS Type MT 38673.00 ***

9. Bituminous Emulsion (Packed) MS Type MT *** 44546.00

10. CRMB – 55 (Bulk) MT 49054.00 ***

11. CRMB – 55 (Packed) MT 52958.00 ***

12. CRMB – 60 (Bulk) MT 49078.00 ***

13. CRMB – 60 (Packed) MT 52982.00 ***

Note - I:
1. All the above rates (Sl.1 to13) under Col. 4 & 5 above are inclusive of all Taxes, Duties etc. at the outlet of
manufacturer.
2. The rates of packed materials mentioned under column “Description of items” are also inclusive of cost of containers.
3. To evaluate the cost of Bitumen/CRMB/Bitumen emulsion, cost of drums of `1000/- per MT is to be considered.
4. To evaluate Issue Rate and cost at site of bitumen / CRMB / bituminous emulsion issued by the Department refer
Format – A.
5. To evaluate cost at site of bitumen / CRMB / bituminous emulsion supplied by the Contractor refer Format – B.

Note - II : For Penetration grade Bitumen (Packed): (10/20) The binder shall be a paving grade bitumen meeting the
requirements given in table 500-29 of Specification of Road and Bridge Works and should be approved by the
Engineer in charge.

Note - III : The figure in bracket in the description of the above table indicates the old equivalent penetration grade as per No.
RW/NH-33041/3/2001-S & R (R) -Vol. III Dated 04.08.2008 of Director General (Road development) & SS of
MORTH.

216
PWD (WB), Schedule of Rates: 2014 Volume III : Road & Bridge Works

FORMAT – A

Format for analysis of rates of Bitumen / Bitumen Emulsion / CRMB supplied by Department

Step - 1 Cost of materials including all taxes at the nearest source of the manufacturer as given in ` (A)
Table I – 2.
Step – 2 Necessary cost for loading, unloading & stacking. ` (B)

Step – 3 Necessary carriage cost from source of the manufacturer to different departmental ` (C)
godowns. (Vide Appendix – I)
Step – 4 Add storage charge for storing the materials at departmental godowns / stackyard ( @ 1% ` (D)
of (A))
Departmental Issue Rate = (A) + (B) + (C) + (D) ` (E)

Step – 5 Add loading, unloading and carriage charges from departmental godowns / stackyards to ` (F)
the work site.

Step – 6 Deduct cost of container (Vide Note I-3, Table I-2) ` (G)
(in case of packed bitumen, CRMB or bituminous emulsion is considered to be used)

Rate of Material at Site = (E) + (F) – (G) = ` (H)

Note :
1. The total rate marked „(E)‟ is the issue rate of bitumen / CRMB / bituminous emulsion, which will be deducted from the
Contractor‟s bills against any bituminous works done with bitumen supplied by the Department.

2. The total rate marked „(H)‟ is the complete rate of the bitumen / CRMB / bituminous emulsion which has to be added to any
item of bituminous work, where applicable, to arrive at the complete rate of the work.

FORMAT – B

Format for analysis of rates of bitumen / bituminous emulsion / CRMB supplied by Contractor
(Prior approval from concerned Superintending Engineer is necessary before framing an estimate by using this Format-B)

Step - 1 Cost of materials including all taxes at the nearest source of the manufacturer as given in ` (A)
Table I – 2.

Step – 2 Necessary cost for loading, unloading and carriage cost from source of the manufacturer to ` (B)
the work site.

Step – 3 Deduct cost of container (Vide Note-3, Table I-2) ` (C)


(in case of packed bitumen, CRMB or bituminous emulsion is considered to be used)

Rate of Material at Site = (A) + (B) – (C) = ` (D)

Note : The total rate marked „(D)‟ is the complete rate of the bitumen / CRMB / bituminous emulsion which has to be added to
any item of bituminous work, where applicable, to arrive at the complete rate of the work.

217
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

FORMAT – C

Format for analysis of rate of items involving use of cement supplied by contractor.

CASE ( I ) : For Items ,where costs of cement is already included in the item rate :-

Step – 1 Rate of item as per relevant section of this Schedule. ` (A)


Step – 2 Deduct : Cost of cement = (Quantity of cement required ) x (Issue rate of cement vide Item no. 1, ` (B)
column – 4, Table I – 1 of the Schedule of Rates, 2014.).

Note: The quantity of cement shall be as per Section – 3 of this volume of Schedule of rates.
Step – 3 Add : cost of cement supplied by contractor = (Quantity of cement required) x (Basic Price of ` (C)
cement vide Item no. 1, column – 5, Table I – 1 of the Schedule of Rates, 2014.).

Note : The quantity of cement shall be same as Step – 2.

Final rate of item = (A) – (B) + (C) = ` (D)

CASE ( II ) : For items, where costs of cement is to be added to the item rate to arrive at the complete cost: :-

Step – 1 Rate of item as per relevant section of this Schedule. ` (A)


Step – 2 Add: Cost of cement = (Quantity of cement required) x (Basic Price of cement vide Item no. 1, ` (B)
column –5, Table I – 1 of the Schedule of Rates, 2014 .

Note: The quantity of cement shall be as per Section – 3 of this schedule of rates.

Final rate of item = (A) + (B) = ` (C)

FORMAT – D

Format for analysis of rate of items involving use of cement supplied by Department.

CASE-( I ) : For items , Where cots of cement is to be included in the item rate :-

Step – 1 Rate of item as per relevant section of this Schedule. ` (A)


Step – 2 Add : Cost of cement = (Quantity of cement) x (Issue rate of cement vide Item no. 1, column – 4, ` (B)
Table I – 1 of the Schedule of Rates, 2014.).

Note: The quantity of cement shall be as per Section – 3 of this schedule of rates.

Final rate of item = (A) + (B) = ` (C)

CASE-( II ) : For items ,Where cots of cement is already included to the item rate to arrive at the complete cost::

Rate of item as per relevant section of this Schedule. The Rate does not need any modification.

218
PWD (WB), Schedule of Rates: 2014 Volume III : Road & Bridge Works

FORMAT – E

Format for analysis of rate of items involving use of Steel supplied by contractor.

For items, where costs of Steel is to be added to the item rate to arrive at the complete cost: :-

Step – 1 Rate of item as per relevant section of the Schedule of Rate ` (A)

Step – 2 Add: Cost of Steel = Quantity of Steel x Basic Price of Steel vide Item no. 2, column –5, ` (B)
Table I – 1 of the Schedule of Rates, 2014 .

Step-3. Add cost of carriage including necessary loading - unloading and stacking from nearest ` (C)
company out let/Stack yard/Godown to the site of execution.

Final rate of item = (A) + (B) + (C) = ` (D)

FORMAT – F

Format for analysis of rate of items involving use of Steel supplied by Department.

For items, where costs of steel is to be included in the item rate to arrive at the complete cost :

Step – 1 Rate of item as per relevant section of this Schedule. ` (A)

Step – 2 Add : Cost of Steel = (Quantity of Steel) x (Issue rate of Steel vide Item no. 2, column – 4, ` (B)
Table I – 1 of the Schedule of Rates, 2014.).

Step – 3 Add : cost of carriage of from departmental go-down to the site of work including loading , ` (C)
unloading and stacking .

Final rate of item = (A) + (B) + (C) = ` (D)

219
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

TABLE II – 1 : SUPPLY OF DIFFERENT MATERIALS AS PER APPROVED SPECIFICATION.

Jalpaiguri
Kolkata/
Sl. Howrah/ East West N&S Cooch & Darjeeling
Description of Item Unit 24 Pargnas Burdwan Bankura Purulia Birbhum Nadia Murshidabad Malda
No. Hooghly Medinipur Medinipur Dinajpur Behar Darjeeling Hill Area
(N & S)
plains
1 Coarse Sand Cum 1150.00 900.00 550.00 670.00 600.00 450.00 450.00 450.00 800.00 800.00 700.00 850.00 650.00 650.00 1390.00
(Grading Zone I as per IS:
383-1970) stacked at site.

2 Medium Sand Cum 950.00 700.00 400.00 550.00 400.00 350.00 350.00 350.00 700.00 650.00 600.00 700.00 550.00 550.00 1300.00
(Grading Zone II as per IS:
383-1970) stacked at site.

3 Fine Sand Cum 800.00 550.00 350.00 500.00 320.00 300.00 300.00 300.00 550.00 500.00 500.00 400.00 430.00 430.00 1150.00
(Grading Zone III as per IS:
383-1970) stacked at site.

4 Silver Sand Cum 700.00 500.00 330.00 350.00 200.00 200.00 - - 450.00 400.00 250.00 300.00 250.00 330.00 -
Stacked at site.
5 Bricks / Jhama / Bats
Sorted & stacked at site.
(a) 1st Class bricks 1000 8500.00 8500.00 7750.00 8500.00 8500.00 7100.00 6500.00 6500.00 7750.00 7750.00 7750.00 7750.00 7750.00 7750.00 10500.00
(kiln burnt) Nos.
(b) 2nd Class bricks 1000 6050.00 6050.00 5400.00 5750.00 5750.00 4800.00 4250.00 4250.00 5600.00 5600.00 5500.00 5600.00 5500.00 5400.00 7550.00
(kiln burnt) Nos.
(c) 1st Class Picked Jhama 1000 8400.00 8450.00 7650.00 8300.00 8300.00 6900.00 6050.00 6050.00 7650.00 7650.00 7650.00 7650.00 7650.00 7650.00 10300.00
bricks Nos.
(d) Flyash bricks (Modular) 1000 5800.00 5800.00 5500.00 5700.00 5700.00 5500.00 5500.00 5500.00 5700.00 5500.00 5500.00 - - - -
Nos.
(e) Jhama metal (kiln burnt) Cum 1750.00 1750.00 1220.00 1500.00 1500.00 - - 1220.00 1220.00 1220.00 1500.00 1500.00 1500.00 1500.00 -
(f) Brick bats. Cum 1220.00 1220.00 1000.00 1170.00 1150.00 900.00 900.00 900.00 1000.00 1000.00 1050.00 1050.00 1050.00 1050.00 2330.00
(g) Brick Aggregates Cum 1455.00 1455.00 1235.00 1405.00 1385.00 1135.00 1135.00 1135.00 1235.00 1235.00 1285.00 1285.00 1285.00 1285.00 2565.00
(40 mm down)

220
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

Jalpaiguri
Kolkata/
Sl. Howrah / East West N&S Cooch & Darjeeling
Description of Item Unit 24 Pargnas Burdwan Bankura Purulia Birbhum Nadia Murshidabad Malda
No. Hooghly Medinipur Medinipur Dinajpur Behar Darjeeling Hill Area
(N & S)
plains
6 RCC Pipe : (Ex - outlet)
a. 600 dia NP-3 spigot M 2370.00 2370.00 2370.00 2370.00 2370.00 2370.00 2370.00 2370.00 2370.00 2370.00 2370.00 2370.00 2370.00 2370.00 2370.00
b. 600 dia NP-4 spigot M 2744.00 2744.00 2744.00 2744.00 2744.00 2744.00 2744.00 2744.00 2744.00 2744.00 2744.00 2744.00 2744.00 2744.00 2744.00
c. 900 dia NP-3 spigot M 3742.00 3742.00 3742.00 3742.00 3742.00 3742.00 3742.00 3742.00 3742.00 3742.00 3742.00 3742.00 3742.00 3742.00 3742.00
d. 900 dia NP-4 spigot M 5459.00 5459.00 5459.00 5459.00 5459.00 5459.00 5459.00 5459.00 5459.00 5459.00 5459.00 5459.00 5459.00 5459.00 5459.00
e. 1000 dia NP-3 spigot M 4615.00 4615.00 4615.00 4615.00 4615.00 4615.00 4615.00 4615.00 4615.00 4615.00 4615.00 4615.00 4615.00 4615.00 4615.00
f. 1000 dia NP-4 spigot M 6611.00 6611.00 6611.00 6611.00 6611.00 6611.00 6611.00 6611.00 6611.00 6611.00 6611.00 6611.00 6611.00 6611.00 6611.00
g. 1200 dia NP-3 spigot M 5988.00 5988.00 5988.00 5988.00 5988.00 5988.00 5988.00 5988.00 5988.00 5988.00 5988.00 5988.00 5988.00 5988.00 5988.00
h. 1200 dia NP-4 spigot M 7734.00 7734.00 7734.00 7734.00 7734.00 7734.00 7734.00 7734.00 7734.00 7734.00 7734.00 7734.00 7734.00 7734.00 7734.00
7 ADMIXTURE:
a) Supply of approved brand Kg 180.00 180.00 180.00 180.00 180.00 180.00 180.00 180.00 180.00 180.00 180.00 180.00 180.00 180.00 180.00
polycarboxylates based
high grade super -
plasticiser / water reducer.

b) Supply of approved brand Kg 66.00 66.00 66.00 66.00 66.00 66.00 66.00 66.00 66.00 66.00 66.00 66.00 66.00 66.00 66.00
naphthalene based
superplasticiser /water
reducing admixture.
c) Silica Fume (IS: 15388) Kg 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00
8 Lime Kg 4.40 4.40 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 5.00

Note: 1. The above rates are inclusive of all charges such as Royalty, VAT, Supervision Charges, etc. and also include allowance for sinkage, as applicable, and/or shrinkage and 10% contractor’s profit.
2. Rates for sand (Sl. No. 1 to 4) and Brick / Jhama / Bats items (Sl. No. 5) are complete rates at site and no other costs need to be considered. For other items, necessary loading-unloading &
carriage charges are admissible.

221
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

TABLE III-1: COST OF STONE AGGREGATES AT QUARRY SITES

Source Name

Nilgiri (Orissa)

Hura, Puncha
Sl.

Coochbehar
Jalpaiguri &
Rampurhat
Items Unit

Darjeeling
Barabazar
Panchami
Nalhati,

Dhadka
No.

District
Pakur

Malti
1 Stone chips 26.5 mm m³ 638 *** 591 688 636 625
2 Stone chips 22.4 mm m³ 653 *** 659 875 767 693
3 Stone chips 13.2 mm m³ 677 *** 710 989 813 705
4 Stone chips 11.2 mm m³ 532 *** 494 608 625 705
5 Stone chips 5.6 mm m³ 266 *** 290 335 398 398
6 Stone Grit m³ 169 *** 226 271 334 ***
7 Stone dust mixed with grit m³ 145 368 97 97 97 ***
8 40 mm Nominal graded Stone

aggregate 629 *** 607 *** 687 665
9 20 mm Nominal graded Stone

aggregate 619 *** 624 *** 738 705
10 10 mm Nominal graded Stone

aggregate 452 *** 433 *** 557 613
11 Grade - I (63 - 45mm) Stone

Aggregates 557 386 483 *** 335 420
12 Grade - II (53 - 22.4 mm) Stone

Aggregates 580 432 545 *** 392 625
13 Stone Screening Type - A m³ 352 *** 352 *** 466 ***
14 Stone Screening Type - B m³ 148 *** 102 *** 102 ***
15 Stone aggregates 37.5 mm m³ 575 432 545 *** 392 625
16 Shingles 63 mm m³ *** *** *** *** *** 216
17 Shingles 37.5 mm m³ *** *** *** *** *** 250
18 Bajree 22.4 mm m³ *** *** *** *** *** 341
19 Broken Bajree 22.4 mm m³ *** *** *** *** *** 364
20 Bajree 13.2 mm m³ *** *** *** *** *** 375
21 Bajree 11.2 mm m³ *** *** *** *** *** 341
22 Boulder above 225 mm m³ *** *** 273 290 199 307
23 Boulder 225 - 150 mm m³ *** *** 290 *** 227 284
24 Boulder 30 / 45 kg m³ 349 *** *** *** *** ***
25 River Bed Material m³ *** *** *** *** *** 182
26 River Grit m³ *** *** *** *** *** 261

Note : 1. The above rates are inclusive of all charges such as Royalty, VAT, Supervision Charges, etc. and also include allowance for
sinkage and/or shrinkage and 10% contractor's profit.
2. Payment will be made on the basis of net volume.
3. The Superintending Engineers of concerned Construction Circles may select the source(s) of stone aggregates considering the
availability and applicability of aggregates for specific items of work.

222
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

TABLE III-2: RATES OF PAKUR VARIETY STONE AGGREGATES AT DIFFERENT RAILWAY YARDS
Hand broken
Machine made Stone Chips Stone Screening Graded Aggregates
Aggregates

Stone Aggregates

mixed wit grit


30 / 45 kg

Stone dust
Stone grit
37.5 mm
(53 - 22.4 mm)
Boulder
Name of Railway

Nominal size

Nominal size

Nominal size
(63 - 45mm)
aggregates

aggregates
Unit

Grade - II

26.5 mm

22.4 mm

13.2 mm

11.2 mm
Grade - I

Type - B
Type - A
5.6 mm

40 mm

20 mm

10 mm
Yards

Adra jn. Cum 1193.00 1401.00 1424.00 1419.00 1482.00 1497.00 1521.00 1376.00 1110.00 1013.00 989.00 1196.00 992.00 1473.00 1463.00 1296.00
Andal Cum 966.00 1174.00 1197.00 1192.00 1255.00 1270.00 1294.00 1149.00 883.00 786.00 762.00 969.00 765.00 1246.00 1236.00 1069.00
Asansol Cum 1024.00 1232.00 1255.00 1250.00 1313.00 1328.00 1352.00 1207.00 941.00 844.00 820.00 1027.00 823.00 1304.00 1294.00 1127.00
Ballyganj Cum 1250.00 1458.00 1481.00 1476.00 1539.00 1554.00 1578.00 1433.00 1167.00 1070.00 1046.00 1253.00 1049.00 1530.00 1520.00 1353.00
Bankura Jn. Cum 1304.00 1512.00 1535.00 1530.00 1593.00 1608.00 1632.00 1487.00 1221.00 1124.00 1100.00 1307.00 1103.00 1584.00 1574.00 1407.00
Bandel Jn. Cum 1135.00 1343.00 1366.00 1361.00 1424.00 1439.00 1463.00 1318.00 1052.00 955.00 931.00 1138.00 934.00 1415.00 1405.00 1238.00
Barasat Cum 1250.00 1458.00 1481.00 1476.00 1539.00 1554.00 1578.00 1433.00 1167.00 1070.00 1046.00 1253.00 1049.00 1530.00 1520.00 1353.00
Barrackpur Cum 1193.00 1401.00 1424.00 1419.00 1482.00 1497.00 1521.00 1376.00 1110.00 1013.00 989.00 1196.00 992.00 1473.00 1463.00 1296.00
Baripur jn. Cum 1304.00 1512.00 1535.00 1530.00 1593.00 1608.00 1632.00 1487.00 1221.00 1124.00 1100.00 1307.00 1103.00 1584.00 1574.00 1407.00
Berhampur Court Cum 1473.00 1681.00 1704.00 1699.00 1762.00 1777.00 1801.00 1656.00 1390.00 1293.00 1269.00 1476.00 1272.00 1753.00 1743.00 1576.00
Bishnupur Cum 1360.00 1568.00 1591.00 1586.00 1649.00 1664.00 1688.00 1543.00 1277.00 1180.00 1156.00 1363.00 1159.00 1640.00 1630.00 1463.00
Bongaon Cum 1304.00 1512.00 1535.00 1530.00 1593.00 1608.00 1632.00 1487.00 1221.00 1124.00 1100.00 1307.00 1103.00 1584.00 1574.00 1407.00
Burdwan In. Cum 966.00 1174.00 1197.00 1192.00 1255.00 1270.00 1294.00 1149.00 883.00 786.00 762.00 969.00 765.00 1246.00 1236.00 1069.00
Chandrakona Road Cum 1587.00 1795.00 1818.00 1813.00 1876.00 1891.00 1915.00 1770.00 1504.00 1407.00 1383.00 1590.00 1386.00 1867.00 1857.00 1690.00
Contai roads Cum 1587.00 1795.00 1818.00 1813.00 1876.00 1891.00 1915.00 1770.00 1504.00 1407.00 1383.00 1590.00 1386.00 1867.00 1857.00 1690.00
Dalkhola Cum 1024.00 1232.00 1255.00 1250.00 1313.00 1328.00 1352.00 1207.00 941.00 844.00 820.00 1027.00 823.00 1304.00 1294.00 1127.00
Dankuni Cum 1135.00 1343.00 1366.00 1361.00 1424.00 1439.00 1463.00 1318.00 1052.00 955.00 931.00 1138.00 934.00 1415.00 1405.00 1238.00
Dhupguri Cum 1416.00 1624.00 1647.00 1642.00 1705.00 1720.00 1744.00 1599.00 1333.00 1236.00 1212.00 1419.00 1215.00 1696.00 1686.00 1519.00
Durgapur Cum 966.00 1174.00 1197.00 1192.00 1255.00 1270.00 1294.00 1149.00 883.00 786.00 762.00 969.00 765.00 1246.00 1236.00 1069.00
Falakata Cum 1473.00 1681.00 1704.00 1699.00 1762.00 1777.00 1801.00 1656.00 1390.00 1293.00 1269.00 1476.00 1272.00 1753.00 1743.00 1576.00
Haldia Cum 1530.00 1738.00 1761.00 1756.00 1819.00 1834.00 1858.00 1713.00 1447.00 1350.00 1326.00 1533.00 1329.00 1810.00 1800.00 1633.00
Jhargram Cum 1587.00 1795.00 1818.00 1813.00 1876.00 1891.00 1915.00 1770.00 1504.00 1407.00 1383.00 1590.00 1386.00 1867.00 1857.00 1690.00

223
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

Hand broken
Machine made chips Stone screening Graded Aggregates
aggregates

Stone aggregates

mixed wit grit


30 / 45 kg

Stone dust
Stone grit
37.5 mm
(53 - 22.4 mm)
Boulder
Name of Railway

Nominal size

Nominal size

Nominal size
(63 - 45mm)
aggregates

aggregates
Unit

Grade - II

26.5 mm

22.4 mm

13.2 mm

11.2 mm
Grade - I

Type - B
5.6 mm

Type - A
Yards

40 mm

20 mm

10 mm
Kalyani Cum 1193.00 1401.00 1424.00 1419.00 1482.00 1497.00 1521.00 1376.00 1110.00 1013.00 989.00 1196.00 992.00 1473.00 1463.00 1296.00
Kharagpur Jn. Cum 1473.00 1681.00 1704.00 1699.00 1762.00 1777.00 1801.00 1656.00 1390.00 1293.00 1269.00 1476.00 1272.00 1753.00 1743.00 1576.00
Krishnanagar City Cum 1304.00 1512.00 1535.00 1530.00 1593.00 1608.00 1632.00 1487.00 1221.00 1124.00 1100.00 1307.00 1103.00 1584.00 1574.00 1407.00
Maldah Town Cum 795.00 1003.00 1026.00 1021.00 1084.00 1099.00 1123.00 978.00 712.00 615.00 591.00 798.00 594.00 1075.00 1065.00 898.00
Midnapore Cum 1530.00 1738.00 1761.00 1756.00 1819.00 1834.00 1858.00 1713.00 1447.00 1350.00 1326.00 1533.00 1329.00 1810.00 1800.00 1633.00
New Farakka Cum 795.00 1003.00 1026.00 1021.00 1084.00 1099.00 1123.00 978.00 712.00 615.00 591.00 798.00 594.00 1075.00 1065.00 898.00
New Alipore Cum 1250.00 1458.00 1481.00 1476.00 1539.00 1554.00 1578.00 1433.00 1167.00 1070.00 1046.00 1253.00 1049.00 1530.00 1520.00 1353.00
New Alipurduar Cum 1587.00 1795.00 1818.00 1813.00 1876.00 1891.00 1915.00 1770.00 1504.00 1407.00 1383.00 1590.00 1386.00 1867.00 1857.00 1690.00
New Coochbehar Cum 1587.00 1795.00 1818.00 1813.00 1876.00 1891.00 1915.00 1770.00 1504.00 1407.00 1383.00 1590.00 1386.00 1867.00 1857.00 1690.00
New Jalpaiguri Cum 1304.00 1512.00 1535.00 1530.00 1593.00 1608.00 1632.00 1487.00 1221.00 1124.00 1100.00 1307.00 1103.00 1584.00 1574.00 1407.00
Panskura Cum 1360.00 1568.00 1591.00 1586.00 1649.00 1664.00 1688.00 1543.00 1277.00 1180.00 1156.00 1363.00 1159.00 1640.00 1630.00 1463.00
Purulia Cum 1078.00 1286.00 1309.00 1304.00 1367.00 1382.00 1406.00 1261.00 995.00 898.00 874.00 1081.00 877.00 1358.00 1348.00 1181.00
Raniganj Cum 966.00 1174.00 1197.00 1192.00 1255.00 1270.00 1294.00 1149.00 883.00 786.00 762.00 969.00 765.00 1246.00 1236.00 1069.00
Sainthia Cum 795.00 1003.00 1026.00 1021.00 1084.00 1099.00 1123.00 978.00 712.00 615.00 591.00 798.00 594.00 1075.00 1065.00 898.00
Salimar Cum 1250.00 1458.00 1481.00 1476.00 1539.00 1554.00 1578.00 1433.00 1167.00 1070.00 1046.00 1253.00 1049.00 1530.00 1520.00 1353.00
Sealdah Cum 1250.00 1458.00 1481.00 1476.00 1539.00 1554.00 1578.00 1433.00 1167.00 1070.00 1046.00 1253.00 1049.00 1530.00 1520.00 1353.00
Serampore Cum 1193.00 1401.00 1424.00 1419.00 1482.00 1497.00 1521.00 1376.00 1110.00 1013.00 989.00 1196.00 992.00 1473.00 1463.00 1296.00
Suri Cum 795.00 1003.00 1026.00 1021.00 1084.00 1099.00 1123.00 978.00 712.00 615.00 591.00 798.00 594.00 1075.00 1065.00 898.00
Tamluk Cum 1416.00 1624.00 1647.00 1642.00 1705.00 1720.00 1744.00 1599.00 1333.00 1236.00 1212.00 1419.00 1215.00 1696.00 1686.00 1519.00
Tarakeswar Cum 1135.00 1343.00 1366.00 1361.00 1424.00 1439.00 1463.00 1318.00 1052.00 955.00 931.00 1138.00 934.00 1415.00 1405.00 1238.00

224
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

ROAD WORKS
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

CHAPTER - 1
CARRIAGE OF MATERIALS

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division

1.01 Loading materials in to Railway Wagon including


necessary carriage by head load within a lead of 50 m.
N.B.-
(a) Lime, Moorum, Building rubbish and similar 33.00 33.00
cum The Contractor
miscellaneous materials is required to
(c) Sand, Stone aggregate below 40 mm nominal 42.00 42.00 bring materials
cum to the station
size
when wagons
(d) Stone aggregate 40 mm nominal size and above cum 45.00 45.00 are available
(e) Bricks. 1000 78.00 78.00 and stack the
nos. material at the
railway yard or
(g) Cement tonne 28.00 28.00 station for
(h) Steel tonne 52.00 52.00 loading, within
permissible
(i) Tar, Bitumen etc. tonne 30.00 30.00
time limit. The
1.02 Unloading materials from Railway Wagon including Contractor
necessary carriage by head load within a lead of 50 m. shall be liable
to pay any
(a) Lime, Moorum, Building rubbish and similar 56.00 56.00 wharfage
cum
miscellaneous materials demurrage
(c) Sand, Stone aggregate below 40 mm nominal 70.00 70.00 that may have
cum to be paid or
size
any transit
(d) Stone aggregate 40 mm nominal size and above cum 76.00 76.00 arrangement
(e) Bricks. 1000 131.00 131.00 that the
nos. contractor may
make to avoid
(g) Cement tonne 47.00 47.00 such wharfage
(h) Steel tonne 87.00 87.00 for delay, at his
own expense.
(i) Tar, Bitumen etc. tonne 51.00 51.00

1.03 Loading, unloading and stacking by Manual Means.


A. Loading in to trucks at the lifting point, unloading at
destination, stacking properly in go downs or yard
etc. as directed including carriage by head load up to
a lead of 50.00 m at each of the two points.
(a) Lime, Moorum, Building rubbish and similar
cum 62.00 62.00
miscellaneous materials
The
(b) Earth tonne 77.00 77.00 apportionment
(c) Sand, Stone aggregate below 40 mm nominal of cost may be
cum 77.00 77.00 considered as
size
follows:
(d) Stone aggregate 40 mm nominal size and above cum 83.00 83.00
(e) Bricks. 1000 Loading : 40%
144.00 144.00 Unloading: 35%
nos.
Stacking : 25%
(f) Stone blocks ,G.I., C.I. pipes below 100 mm dia
tonne 56.00 56.00
and other heavy material

225
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal and
Item Darjeeling
Description of Items Unit Darjeeling Plain Remarks
No. Hill Area
of Siliguri Sub-
Division
(g) Cement tonne 52.00 52.00
(h) Steel tonne 96.00 96.00
(i) Tar, Bitumen etc. tonne 56.00 56.00
(j) R.C.C. pipes , C.I. pipes and unreinforced
Cement pipes
i) 600, 700, 750 & 800 mm dia 100 mtr. 2592.00 2592.00
ii) 900 mm dia 100 mtr. 4320.00 4320.00
iii) 1000, 11000 & 1200 mm dia 100 mtr. 5184.00 5184.00
B. Extra carriage for addl. 50 m or part thereof
(a) Lime, Moorum, Building rubbish and similar
cum 14.00 14.00
miscellaneous materials
(b) Earth tonne 17.00 17.00
(c) Sand, Stone aggregate below 40 mm nominal
cum 17.00 17.00
size
(d) Stone aggregate 40 mm nominal size and
cum 19.00 19.00
above
(e) Bricks. 1000
32.00 32.00
nos.
(f) Stone blocks, G.I., C.I. pipes below 100 mm dia
tonne 8.00 8.00
and other heavy material
(g) Cement tonne 8.00 8.00
(h) Steel tonne 14.00 14.00
(i) Tar, Bitumen etc. tonne 8.00 8.00
(j) R.C.C. pipes, C.I. pipes and unreinforced
Cement pipes
i) 600, 700, 750 & 800 mm dia 100 mtr. 390.00 390.00
ii) 900 mm dia 100 mtr. 650.00 650.00
iii) 1000, 11000 & 1200 mm dia 100 mtr. 781.00 781.00
1.04 Unloading from truck and loading in to boat at ferry
crossing where loaded trucks are not allowed to be
ferried across including carriage by head load with
necessary lead & lift.
(a) Lime, Moorum, Building rubbish and similar
cum 63.00 63.00
miscellaneous materials
(b) Sand, Stone aggregate below 40 mm nominal
cum 79.00 79.00
size
(c) Stone aggregate 40 mm nominal size and
cum 85.00 85.00
above
(d) Bricks. 1000
147.00 147.00
nos.
(e) Cement tonne 53.00 53.00
(f) Steel tonne 98.00 98.00
(g) Tar, Bitumen etc. tonne 57.00 57.00

226
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All districts of
West Bengal and
Item Darjeeling
Description of Items Unit Darjeeling Plain Remarks
No. Hill Area
of Siliguri Sub-
Division
1.05 Unloading from boat and loading in to truck at ferry
crossing where loaded trucks are not allowed to be
ferried across including carriage by head load with
necessary lead & lift.
(a) Lime, Moorum, Building rubbish and similar
cum 63.00 63.00
miscellaneous materials
(b) Sand, Stone aggregate below 40 mm nominal
cum 79.00 79.00
size
(c) Stone aggregate 40 mm nominal size and
cum 85.00 85.00
above
(d) Bricks. 1000
147.00 147.00
nos.
(e) Cement tonne 53.00 53.00
(f) Steel tonne 98.00 98.00
(g) Tar, Bitumen etc. tonne 57.00 57.00
1.06 Loading into boat and unloading the same at the
opposite bank where loaded trucks are not allowed to
be ferried across including carriage by head load with
necessary lead & lift.
(a) Lime, Moorum, Building rubbish and similar
cum 61.00 61.00
miscellaneous materials
(b) Sand, Stone aggregate below 40 mm nominal
cum 75.00 75.00
size
(c) Stone aggregate 40 mm nominal size and
cum 81.00 81.00
above
(d) Bricks. 1000
141.00 141.00
nos.
(e) Cement tonne 51.00 51.00
(f) Steel tonne 94.00 94.00
(g) Tar, Bitumen etc. tonne 55.00 55.00
1.07 Loading into boat and unloading the same and
loading into truck at the opposite bank or destination
where loaded trucks are not allowed to be ferried across
including carriage by head load with necessary lead &
lift.
(a) Lime, Moorum, Building rubbish and similar
cum 63.00 63.00
miscellaneous materials
(b) Sand, Stone aggregate below 40 mm nominal
cum 79.00 79.00
size
(c) Stone aggregate 40 mm nominal size and
cum 85.00 85.00
above
(d) Bricks. 1000
147.00 147.00
nos.
(e) Cement tonne 53.00 53.00
(f) Steel tonne 98.00 98.00
(g) Tar, Bitumen etc. tonne 57.00 57.00
1.08 Cost of Carriage excluding Loading and Unloading:
(As per Table 1 : Road Transportation & Carriage Works and
Table 2 : Carriage by Boat.)

227
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

TABLE 1 : ROAD TRANSPORTATION & CARRIAGE WORKS

Above Above Above Above Above


Item 5 km 10 km 20 km 50 km

Zone
Description of Items Unit Any distance up to 5 km up to up to up to up to 100 km
No.
10 km 20 km 50 km 100 km
(per km) (per km) (per km) (per km) (per km)

1. Carriage of Sand, Moorum and similar A 124.00 10.90 10.10 9.50 8.40 7.90
Cum
materials over pucca road. B 185.00 16.40 15.20 14.30 12.60 11.90
2. Carriage of Lime, Surki, Cinder, and A 93.00 8.20 7.60 7.10 6.30 5.90
similar miscellaneous materials over Cum
pucca road. B 139.00 12.30 11.40 10.70 9.50 8.90
3. Carriage of Brick-bats, Boulder, Stone
A 124.00 10.90 10.10 9.50 8.40 7.90
metal, Stone chips, Gravel, Slag metal,
Cum
Shingle and similar miscellaneous
materials over pucca road.
B 185.00 16.40 15.20 14.30 12.60 11.90
4. Carriage of Cement (in bags), tar or A 82.00 7.30 6.70 6.30 5.60 5.30
asphalt (in drums), timber and similar MT
miscellaneous materials over pucca road. B 124.00 11.00 10.10 9.50 8.40 8.00
5. Carriage of Steel materials over pucca A 82.00 7.30 6.70 6.30 5.60 5.30
MT
road. B 124.00 11.00 10.10 9.50 8.40 8.00
6. 1000 A 297.00 26.00 24.00 23.00 20.00 19.00
Carriage of Brick over pucca road.
Nos. B 445.00 39.00 36.00 34.50 30.00 28.50
7. Carriage of RCC pipes over pucca road A 49.00 4.40 4.00 3.80 3.40 3.20
M
upto 600 mm diameter. B 74.00 6.60 6.00 5.70 5.10 4.80
8. Carriage of RCC pipes over pucca road A 74.00 6.60 6.00 5.70 5.10 4.70
M
upto 900 mm diameter B 111.00 9.90 9.00 8.60 7.70 7.10
9. Carriage of RCC pipes over pucca road A 148.00 13.10 12.10 11.40 10.10 9.50
M
upto1200 mm diameter. B 222.00 19.70 18.20 17.10 15.20 14.30
10. Carriage of Boundary Pillars, R.C. A 11.00
Guard posts, Km Posts etc. from
Each
godown or stackyard to work site as per
B 16.00
direction.

228
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

Above Above Above Above Above


5 km 10 km 20 km 50 km
Item

Zone
Description of Items Unit Any distance up to 5 km up to up to up to up to 100 km
No.
10 km 20 km 50 km 100 km
(per km) (per km) (per km) (per km) (per km)
11. Carriage of Bitumen in bulk in
insulated tanks from refinery to work
site including loading, unloading the A 654.50 5.30
same at hot mix plant / Bitumen
storage tanks / empty bitumen drums /
MT
tar boiler as per direction of the
Engineer–in–Charge at specified
temperature including necessary B 985.00 8.00
heating arrangements during transfer &
transit with all incidental charges.

TABLE 2 : CARRIAGE BY BOAT INCLUDING LOADING, UNLOADING & STACKING (AS NECESSARY)
(This item is applicable for Zone – A only when carriage by road by any means is not feasible)
Above 5 km upto
Item No. Description of Items Unit Zone Any distance up to 5 km Above 16 km (per km)
16 km (per km)
Carriage of Stone materials, Sand, River 38.00 4.00 2.00
1. Cum
Brick bats and similar materials by boat Canal 26.50 4.50 2.00
1000 River 108.00 9.50 7.00
2. Carriage of Bricks by boat.
Nos. Canal 94.50 8.00 6.50
Carriage of Bitumen (in drums), River 65.00 6.00 5.00
3. MT
cement (in bags) by boat. Canal 55.00 7.50 6.00
River 65.00 6.00 5.00
4. Carriage of Steel materials by boat. MT
Canal 55.00 7.50 6.00

Notes : 1. For carriage of 7m or longer unbent steel rounds, the contractor is required to arrange for trailer trucks for such purpose or to make improved arrangements. In exceptional cases, the Engineer-
in-Charge may, at his discretion, permit bending double with large loops, in such a case the contractor shall have to do the looping and straightening the same back at destination to the
satisfaction of the Engineer-in-Charge. The contractor will be entitled for these works to an additional payment of Rs.20.00 per metric ton of steel rounds.
2. For carriage of heavy section RSJ 460mm x 150mm and above exceeding 7.5m length, add extra 40% over schedule rate of relevant items.
3. In case of Tar or Bitumen, the weight of the container along with contents should be considered.
4. For down-hill area above Hill Cart Road, Tiger Hill Road above Hill Cart Road and for hill roads leading upwards from Teesta Valley Road, Pesoke Road, lower Rishi Road and Relli Road, rate of
items for road transport carriage shall be enhanced by 50% over the rates provided for Darjeeling Hill area.
5. For Sandakhphu – Phalut Road above Manebhanjan, rates of road transport carriage shall be fixed by the concerned Superintending Engineer.
6. The Carriage rates of different items for all districts of West Bengal and plains of Siliguri Sub-division of Darjeeling districts (Zone –A) are furnished in the following tables. The figures
appearing in parenthesis are applicable for Darjeeling Hill area (Zone – B).
229
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

CHAPTER - 2
SITE CLEARANCE

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division

2.01 Cutting of Trees including Cutting of Trunks,


Branches and Removal of Stumps
Cutting of trees, including cutting of trunks, branches
and removal of stumps & roots, refilling, compaction of
backfilling and stacking of serviceable material by
manual means with all lifts as per Technical
Specifications Clause 201 for Rural Roads of MORD.
A. Lead upto 100 m
i) Girth above 300 mm to 600 mm each 211.00 213.00
ii) Girth above 600 mm to 900 mm each 366.00 371.00
iii) Girth above 900 mm to 1800 mm each 726.00 733.00
iv) Girth above 1800 mm to 2700 mm each 1386.00 1396.00
v) Girth above 2700 mm to 4500 mm each 2847.00 2871.00
vi) Girth above 4500 mm each 8365.00 8412.00
B. Lead upto 1000 m
i) Girth above 300 mm to 600 mm each 225.00 228.00
ii) Girth above 600 mm to 900 mm each 409.00 416.00
iii) Girth above 900 mm to 1800 mm each 783.00 792.00
iv) Girth above 1800 mm to 2700 mm each 1471.00 1485.00
v) Girth above 2700 mm to 4500 mm each 2942.00 2970.00
vi) Girth above 4500 mm each 8601.00 8660.00
2.02 Uprooting and Removing Stumps & Roots
Uprooting and Removing Stumps & roots, compaction of
backfilling and stacking of serviceable material by
manual means as per Technical Specifications Clause
201 for Rural Roads of MORD.
A. Lead upto 100 m
i) Girth above 300 mm to 600 mm each 127.00 128.00
ii) Girth above 600 mm to 900 mm each 202.00 203.00
iii) Girth above 900 mm to 1800 mm each 428.00 429.00
iv) Girth above 1800 mm to 2700 mm each 843.00 845.00
v) Girth above 2700 mm to 4500 mm each 1699.00 1705.00
vi) Girth above 4500 mm each 4806.00 4823.00
B. Lead upto 1000 m
i) Girth above 300 mm to 600 mm each 131.00 131.00
ii) Girth above 600 mm to 900 mm each 214.00 215.00
iii) Girth above 900 mm to 1800 mm each 442.00 444.00
iv) Girth above 1800 mm to 2700 mm each 861.00 865.00
v) Girth above 2700 mm to 4500 mm each 1722.00 1729.00
vi) Girth above 4500 mm each 4924.00 4948.00

230
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
2.03 Clearing Grass and Removal of Rubbish
Clearing grass and removal of rubbish up to a distance of hectare 11868.00 11868.00
30 m outside the periphery of the area as per Technical
Specifications Clause 201 for Rural Roads of MORD.
By Manual Means
2.04 Clearing and Grubbing Road Land
Clearing and grubbing road land including uprooting
wild vegetation, grass, bushes, shrubs, saplings and trees
of girth upto 300 mm, removal of stumps of such trees
cut earlier and disposal of unserviceable materials and
stacking of serviceable material to be used or auctioned,
upto a lead of 1000 m including removal and disposal of
top organic soil not exceeding 150 mm in thickness as
per Technical Specifications Clause 201 for Rural Roads
of MORD.
(I) By Manual Means
a) In area of non-thorny jungle hectare 44978.00 45002.00
b) In area of thorny jungle hectare 60286.00 60334.00
(II) By Mechanical Means
a) In area of non-thorny jungle hectare 23363.00 24472.00
b) In area of thorny jungle hectare 28533.00 29871.00
Note: The top soil removed during clearing and grubbing of
site, if suitable for re-use shall be transported, conserved
and stacked as directed by the Engineer and shall be
incidental to the work.
2.05 Dismantling of Structures
Dismantling of existing structures like culverts, bridges,
retaining walls and other structure comprising of
masonry, cement concrete, steel work, including T&P and
scaffolding wherever necessary, sorting the dismantled
material, disposal of unserviceable material and stacking
the serviceable material with all lifts and lead of 1000 m
as per Technical Specifications Clause 202 for Rural
Roads of MORD.
(I) By Manual Means
a) Lime Concrete cum 340.00 345.00
b) Cement Concrete cum 399.00 404.00
c) Reinforced Cement Concrete cum 1011.00 1016.00
(II) By Mechanical Means
a) Cement Concrete cum 470.00 488.00
b) Reinforced Cement Concrete cum 773.00 797.00
2.06 Dismantling Brick/Tile Work
Dismantling of existing structures like culverts, bridges,
retaining walls and other structures comprising of brick
masonry, including disposal of unserviceable material
and stacking the serviceable material with all lift and
lead of 1000 m as per Technical Specifications Clause
202 for Rural Roads of MORD.

231
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division

(a) Lime mortar cum 221.00 226.00


(b) Cement mortar cum 280.00 285.00
(c) Mud Mortar cum 197.00 202.00
(d) Dry Brick Pitching or Brick Soling cum 185.00 190.00
2.07 Dismantling Stone Masonry as per Technical
Specification Clause 202.
Dismantling of existing structures like culverts, bridges,
retaining walls and other structure comprising of stone
masonry, including disposal of unserviceable material
and stacking the serviceable material with all lift and
lead of 1000 m as per Technical Specifications Clause 202
for Rural Roads of MORD.
(a) Rubble Stone Masonry in Lime Mortar cum 245.00 250.00
(b) Rubble Stone Masonry in Cement Mortar cum 280.00 285.00
(c) Rubble Stone Masonry in Mud Mortar cum 221.00 226.00
(d) Dry Rubble Masonry cum 209.00 214.00
(e) Dismantling Stone Pitching / Dry Stone Spalls cum 197.00 202.00
(f) Dismantling boulders laid in wire crates including cum 221.00 226.00
opening of crates and stacking dismantled
materials
2.08 Dismantling Wood Work Wrought and Planed Fixed in cum 496.00 501.00
Frames of Trusses upto a height of 5 m above Plinth Level
as per Technical Specifications Clause 202 for Rural
Roads of MORD.
2.09 Dismantling Steel Work in all Types of Sections upto a
height of 5 m above Plinth Level excluding Cutting of rivet
as per Technical Specifications Clause 202 for Rural
Roads of MORD.
(a) Including dismembering tonne 1241.00 1245.00
(b) Excluding dismembering tonne 889.00 893.00
(c) Extra over Items (A) and (B) for cutting rivets tonne 9.00 9.00
2.10 Scraping of bricks dismantled from brick work 1000 1038.00 1038.00
including stacking as per Technical Specification Clause nos.
202 for Rural Roads of MORD.
2.11 Scraping of Stone from Dismantled Stone Masonry as
per Technical Specification Clause 202 for Rural Roads of
MORD.
In Cement or Lime Mortar cum 417.00 417.00
2.12 Scraping Plaster in Lime or Cement Mortar from sqm 13.00 13.00
Brick / Stone Masonry as per Technical Specification
Clause 202 for Rural Roads of MORD
2.13 Removing all types of Hume pipes and stacking within
a lead of 1000 m including Earthwork and Dismantling of
Masonry Works as per Technical Specification Clause 202
for Rural Roads of MORD.
(a) Upto 600 mm dia Hume pipe metre 154.00 154.00
(b) Above 600 mm to 900 mm dia Hume pipe metre 208.00 208.00
(c) Above 900 mm dia Hume pipe metre 357.00 357.00

232
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division

Note: The excavation of earth, dismantling of stone masonry


work in head walls and protection works is not included
which is to be measured and paid separately.
Credit for retrieved stone from masonry work may be taken
as per actual availability.
2.14 Dismantling of Flexible Pavements
Dismantling of flexible pavements and disposal of
dismantled materials upto a lead of 100 m, stacking
serviceable and unserviceable materials separately as per
Technical Specifications Clause 202 for Rural Roads of
MORD.
(I) By Manual Means
a) Bituminous Courses cum 625.00 634.00
b) Granular Courses cum 453.00 461.00
(II) By Mechanical Means
Bituminous Courses cum 277.00 286.00
2.15 Dismantling of Cement Concrete Pavements
Dismantling of cement concrete pavements by mechanical cum 1046.00 1083.00
means using pneumatic tools breaking to pieces not
exceeding 0.02 cum in volume and stock piling at
designated locations and disposal of dismantled materials
upto a lead of 1000 m, stacking serviceable and
unserviceable materials separately as per Technical
Specification Clause 202 for Rural Roads of MORD.
2.16 Dismantling Guard Rails
Dismantling guard rails by manual means and disposal of rm 68.00 69.00
dismantled material with all lifts and upto a lead of 1000
m, stacking serviceable materials and unserviceable
materials separately as per Technical Specification Clause
202 for Rural Roads of MORD.
2.17 Dismantling Kerb Stones
Dismantling kerb stones by manual means and disposal of rm 14.00 14.00
dismantled material with all lifts and upto a lead of 1000 m
as per Technical Specification Clause 202 for Rural Roads
of MORD.
2.18 Dismantling Kerb Stone Channels
Dismantling kerb stone channels by manual means and rm 21.00 22.00
disposal of dismantled material with all lifts and upto a
lead of 1000 m as per Technical Specification Clause 202
for Rural Roads of MORD.
2.19 Dismantling Kilometre Stones
Dismantling of kilometre stones including cutting of earth,
foundation and disposal of dismantled material with all
lifts and lead upto 1000 m and backfilling of pit as per
Technical Specification Clause 202 for Rural Roads of
MORD.
a) 5th km Stone each 294.00 297.00
b) Ordinary km Stones each 186.00 188.00
c) 200 m Stones each 39.00 40.00

233
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division

Note: Rate for boundary pillar will be same as that of 200 m


stone.
2.20 Dismantling of Fencing
Dismantling of barbed wire fencing / wire mesh fencing rm 42.00 42.00
including posts, foundation concrete, backfilling of pit
by manual means including disposal of dismantled
material with all lifts and upto a lead of 1000 m,
stacking serviceable material and unserviceable
material separately as per Technical Specification
Clause 202 for Rural Roads of MORD
2.21 Dismantling of CI Water Pipe Line
Dismantling of CI water pipe line 600 mm dia including rm 104.00 106.00
disposal with all lifts and lead upto 1000 m and
stacking of serviceable material and unserviceable
material separately under supervision of concerned
department as per Technical Specification Clause 202
for Rural Roads of MORD.
Note: The rate analysis does not include any excavation in
earth or dismantling of masonry works which are to be
measured and paid separately.
2.22 Removal of Cement Concrete Pipe of Sewer Gutter
Removal of cement concrete pipe of sewer gutter 1500 rm 158.00 162.00
mm dia under the supervision of concerned department
including disposal with all lifts and upto a lead of 1000
m and stacking of serviceable and unserviceable
material separately but excluding earth excavation and
dismantling of masonry works as per Technical
Specification Clause 202 for Rural Roads of MORD.
Note: The rate analysis does not include any excavation in
earth or dismantling of masonry works which are to be
measured and paid separately.
2.23 Removal of Telephone/Electric Poles and Lines
Removal of telephone/electric poles with wires each 149.00 150.00
including excavation and dismantling of foundation
concrete and lines under the supervision of concerned
department, disposal with all lifts and upto a lead of
1000 m and stacking the serviceable and unserviceable
material separately as per Technical Specification
Clause 202 for Rural Roads of MORD.

234
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

CHAPTER - 3
EARTH WORK, EROSION CONTROL AND DRAINAGE

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division

3.01 Earthwork in excavation from borrow pits (land


owned/arranged by the Department) and depositing in
layers of 250 mm. including breaking clods in
embankment works and to fill up back of abutments,
depressions and ruts with an initial lead up to 50 m and
initial lift up to 1.5 m making bunds at top as directed
dressing complete. (Borrow pit measurement)
(i) In ordinary soil cum 89.90 89.90
(ii) In mixed soil (i,e. clay mixed with kankar, pebbles, cum 99.90 99.90
moorum etc.)
(iii) In mixed hard soil (i,e hard moorum and soil cum 119.90 119.90
containing laterite and boulders which do not
require blasting)
3.02 Extra for carriage of all kinds of soil for each additional
unit lead of 50 m (or part thereof) including loading and
unloading. (Borrow pit measurement)
(i) Beyond the initial lead of 50 m up to total lead of cum 12.50 12.50
200 m.
(ii) Beyond 200 m & up to total lead of 500 m cum 15.00 15.00
(iii) Beyond 500 m & up to total lead of 1000 m cum 26.10 28.80
3.03 Extra for every additional lift of 1.5 m or part thereof cum 10.00 10.00
in all kind of soil. (Borrow pit measurement)
3.04 Earthwork in cutting to form road section in correct
profile including removal of spoils not exceeding initial
lead of 50m and initial lift of 1.5m
(Mode of measurement: pre works and post works)
(i) In ordinary soil cum 79.90 79.90
(ii) In mixed soil (i,e. clay mixed with kankar, pebbles, cum 89.90 89.90
moorum etc.)
(iii) In mixed hard soil (i,e hard moorum and soil cum 109.90 109.90
containing laterite and boulders which do not
require blasting)
3.05 Extra for manual compaction of earth by rammers / cum 20.00 20.00
hand roller in 250 mm layers including watering etc. if
required. (Borrow pit measurement).
Note: Compensation for earth will vary from place to place and
will have to be assessed realistically as per particular
ground situation. The rate for compensation for earth is
to be determined by the Superintending Engineer of the
concerned Circle. This is applicable for all items of Earth
work where land is to be owned and arranged by
Contractor.

235
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
3.06 Excavation in Soil using Hydraulic Excavator CK 90 cum 37.30 39.10
and Tippers with disposal upto 1000 metres.
Excavation for roadwork in soil with hydraulic excavator
of 0.9 cum bucket capacity including cutting and loading
in tippers, trimming bottom and side slopes, in
accordance with requirements of lines, grades and cross
sections, and transporting to the embankment location
within all lifts and lead upto 1000m as per Clause 301 of
Specifications for Road & Bridge Works of MoRT&H (5th
Revision). (Mode of measurement: pre works and post
works)
3.07 Excavation in Ordinary Rock using Hydraulic cum 49.20 51.50
Excavator CK-90 and Tippers with disposal upto
1000 metres
Excavation for roadway in ordinary rock with hydraulic
excavator of 0.9 cum bucket capacity including cutting
and loading in tippers, transporting to embankment site
within all lifts and lead upto 1000 m, trimming bottom
and side slopes in accordance with requirements of lines,
grades and cross sections as per Clause 301 of
Specifications for Road & Bridge Works of MoRT&H (5th
Revision). (Mode of measurement: pre works and post
works)
3.08 Excavation in Hard Rock (blasting prohibited) cum 431.00 444.00
Excavation for roadway in hard rock (blasting
prohibited) with rock breakers including breaking rock,
loading in tippers and disposal within all lifts and lead
upto 1000 metres, trimming bottom and side slopes in
accordance with requirements of lines, grades and cross
sections as per Clause 301 of Specifications for Road &
Bridge Works of MoRT&H (5th Revision). (Mode of
measurement: pre works and post works)
3.09 Excavation in Marshy Soil cum 41.00 42.90
Excavation for roadway in marshy soil with hydraulic
excavator 0.9 cum bucket capacity including cutting and
loading in tippers and disposal with a lift upto 1.5 m and
lead upto 1000 m, trimming of bottom and side slopes in
accordance with requirements of lines, grades and cross-
sections as per Technical Specification Clause 302.3.6 for
Rural Roads of MORD. (Mode of measurement: pre works
and post works)
3.10 Removal of Unserviceable Soil with Disposal upto cum 27.90 29.30
1000 metres
Removal of unserviceable soil including excavation,
loading and disposal upto 1000 metres lead but
excluding replacement by suitable soil which shall be
paid separately as per Technical Specification Clause
302.3.11 for Rural Roads of MORD. (Mode of
measurement: pre works and post works)

236
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
3.11 Construction of Embankment with Material Obtained cum 85.60 89.80
from Borrow Pits
Construction of embankment with approved material
obtained from borrow pits with a lift upto 1.5 m,
transporting to site, spreading, grading to required slope
and compacting to meet requirement of Tables 300.1 and
300.2 with a lead upto 1000 m as per Technical
Specification Clause 301.5 for Rural Roads of MORD.
(Mode of measurement: pre works and post works)
3.12 Construction of Embankment with Material cum 46.80 49.00 Calculation of
Deposited from Roadway Cutting. Earthwork may
be made using
Construction of embankment with approved materials
the following
deposited at site from roadway cutting and excavation relation: 100 m3
from drain and foundation of other structures graded of naturally
and compacted to meet requirement of Tables 300.1 and occurring earth
300.2 as per Technical Specification Clause 301.5 for = 90 m3 of
Rural Roads of MORD including carriage of material for a mechanically
distance of 1 km. compacted earth
at OMC =120 m3
of loose earth.
3.13 Embankment Construction with Fly ash / Pond ash cum 86.60 90.70
available from coal or lignite burning Thermal
Plants as waste material
Construction of embankment with fly ash conforming to
table 1 of IRC: SP: 58 - 2001 obtained from coal or lignite
burning thermal power stations as waste material,
spread and compacted in layer of 200mm thickness each
at OMC, all as specified in IRC: SP: 58-2001 and as per
approved plans with lead upto 1000 m as per Technical
Specification Clause 306 for Rural Roads of MORD.
3.14 Construction of Subgrade and Earthen Shoulders cum 94.80 99.40
Construction of subgrade and earthen shoulders with
approved material obtained from borrow pits with all
lifts and leads, transporting to site, spreading, grading to
required slope and compacted to meet requirement of
Table 300.2 with lead upto 1000 m as per Technical
Specification Clause 303.1 for Rural Roads of MORD.
(Borrow pit /pre work post work measurement)
3.15 Extra for carriage of all kinds of earth by Mechanical
Transport:
(a) Carriage up to total lead of 1.0 km. cum 95.00 142.50 Note :
(b) Carriage up to total lead of 2.0 km. cum 106.90 160.40 Measurement
(c) Carriage up to total lead of 3.0 km. cum 118.80 178.20 would be as
per finished
(d) Carriage up to total lead of 4.0 km. cum 130.70 196.10 compacted
(e) Carriage up to total lead of 5.0 km. cum 142.60 213.90 embankment
earth work.
(f) Extra for carriage of all kinds of soil for each cum 10.50 15.80
additional km (or part thereof) above 5.0 km & up
to total lead of 10.0 km.

237
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
3.16 Box cutting or filling in Road embankment in all sorts
of soil including spreading the spoils properly over the
flank as necessary or on berm to approximate grade &
camber and rolling the sub-grade with power roller to
proper camber and grade as per direction and
satisfaction of Engineer-in-charge including uprooting
and removing plants and jungles when and where
necessary.
(a) Depth up to 150 mm. sqm 14.40 14.40
(b) For each additional Depth of 150mm and part sqm 19.00 19.00
thereof.
3.17 Compacting Original Ground
A. Compacting original ground supporting cum 55.50 58.20
subgrade
Loosening of the ground upto a level of 300 mm
below the subgrade level, watered, graded and
compacted in layers to meet requirement of Tables
300.1 and 300.2 for subgrade construction as per
Clause 305.3.4 of Specifications for Road & Bridge
Works of MoRT&H (5th Revision).
B. Compacting original ground supporting cum 24.10 25.30
embankment
Loosening, Leveling and Compacting original ground
supporting embankment to facilitate placement of
first layer of embankment, scarified to a depth of 150
mm, mixed with water at OMC and then compacted
by rolling so as to achieve minimum dry density as
given in Tables 300.1 and 300.2 for embankment
construction as per Clause 305.3.4 of Specifications
for Road & Bridge Works of MoRT&H (5th Revision).
3.18 Providing and laying Sand Blanket with medium sand cum 206.00 343.00
to required thickness, in layers not exceeding 150 mm to
proper gradient and camber, inundating each layer by
water and packing and ramming layer by layer to
achieve desired compaction including lighting, guarding,
barricading and making 1.0 m wide earthen bundh on
both the sides, curing with water as per direction,
mending cracks and depressions by ramming wherever
necessary. (The payment is to be made on the basis of the
finished compacted volume.)
Note Labour rate per cubic meter is provided, cost of sand to be
added to arrive at the consolidated rate. The compaction
factor for dry, clean sand is 0.835. Suitable considerations
should be made for bulkage of moist sand.
3.19 Lime Stabilisation for Improving Subgrade cum 330.00 391.00
Laying and spreading available soil in the subgrade on a
prepared surface, pulverising, mixing the spread soil in
place with rotavator with 3 % slaked lime having
minimum content of 70% of CaO, grading with motor
grader and compacting with the road roller at OMC to
the desired density to form a layer of improved sub grade
as per Clause 402 of Specifications for Road & Bridge
Works of MoRT&H (5th Revision). (Mode of measurement
pre work and post work)

238
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
3.20 Turfing with Sods sqm 17.20 17.60
Furnishing and laying of the live sods of perennial turf
forming grass on embankment slope, verges or other
locations shown on the drawing or as directed by the
Engineer including preparation of ground, fetching of
sods and watering as per Clause 307 of Specifications for
Road & Bridge Works of MoRT&H (5th Revision).
3.21 Seeding and Mulching sqm 87.30 88.00
Preparation of seed bed on previously laid top soil,
furnishing and placing of seeds, fertilizer, mulching
material, applying bituminous emulsion at the rate of
0.23 litres per sqm and laying and fixing jute netting,
including watering for 3 months all as per Clause 308 of
Specifications for Road & Bridge Works of MoRT&H (5th
Revision).
3.22 Surface Drains in Soil metre 49.30 51.40
Construction of unlined surface drains of average cross-
sectional area 0.40 sqm in soil to specified lines, grades,
levels and dimensions as per Clause 309 of Specifications
for Road & Bridge Works of MoRT&H (5th Revision).
Excavated material to be used in embankment with a lift
upto 3m and lead of 50 m.
Note: Where lining of drain is provided, quantity shall be worked out
based on approved design and drawing and priced on rate of
cement concrete of approved grade or stone/brick masonry as
the case may be.
3.23 Sub Surface Drains with Perforated Pipe metre 566.00 702.00
Construction of Subsurface drain with perforated pipe of
100 mm internal diameter of metal / asbestos cement /
cement concrete / PVC, closely jointed, perforations
ranging from 3 mm to 6 mm depending upon size of
material surrounding the pipe, with 150 mm bedding
below the pipe and 300 mm cushion above the pipe, cross
section of excavation 450 x 550 mm. as per Clause 309 of
Specifications for Road & Bridge Works of MoRT&H (5th
Revision). Excavated material to be utilised in roadway
at site.
3.24 Aggregate Sub- Surface Drains metre 259.00 335.00
Construction of aggregate sub surface drain 300 mm x
450 mm with 22.4 mm (60%) and 11.2 mm (40%) size
stone aggregates @ 1.35 m³ (loose volume) per metre
length, as per Clause 309 of Specifications for Road &
Bridge Works of MoRT&H (5th Revision). Excavated
material to be utilised in roadway.
3.25 Underground Drain at Edge of Pavement metre 3044.00 3544.00
Construction of an underground drain 1 m x 1 m (inside
dimensions) lined with RCC-20 cm thick and covered with
RCC slab 10 cm in thickness on Urban Roads as per
Clause 309 of Specifications for Road & Bridge Works of
MoRT&H (5th Revision).
3.26 Repairs of Damages Caused by Rain / Spillage of sqm 1.10 1.10
Water
Preparation and surface treatment of formation by
removing mud and slurry, watering to the extent needed-

239
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
to maintain the desired moisture content, trimming to
the required line, grade, and profile and rolling with
three wheels 80-100 kN static roller, complete as per
Technical Specification Clause 301.5.5.1 for Rural Roads
of MORD.
3.27 Chute Drains metre 1153.00 1373.00
Providing Chute drains 250 x 300 mm (inside
dimensions) across Embankment Slopes in approaches of
Bridges and on horizontal curves consists of earthwork in
excavation for foundations of structures as per drawings
and technical specifications Clause 307 for Rural Roads
of MORD including setting out construction of shoring
and bracing deleterious matter, dressings of sides and
bottom and backfilling with approved material (By
manual means), Plain Cement Concrete (1:2:4), 125 mm
thick Brick Masonry followed by 20 mm thick plastering
(1:4) and 75 mm thick Coping with M-20 Concrete on top
of the Chute Walls as per specification, drawing and
direction of the Engineer-in-Charge.
3.28 Land Slide Clearance in Soil cum 59.00 61.80
Clearance of land slides in soil and ordinary rock by a
bull-dozer D 80 A-12, 180 HP and disposal of the same on
the valley side.
3.29 Landslide Clearance in Hard Rock Requiring Blasting cum 99.40 102.50
Clearing of land slide in hard rock requiring blasting for
50 per cent of the boulders and disposal of the same on
the valley side.
3.30 Supplying and laying open mesh Jute Geotextile (JGT) sqm 29.60 29.60
for slope protection in road embankments, having overall
weight of 500gm/m2, thickness 5 mm, width 1220 mm,
strength 10 KN/m (in warp direction) and 7.5 KN/m (in
weft direction) on slopes of embankments dressed and
cut to a stable gradient, providing side lapping of 100
mm and horizontal lapping of 250 mm including cutting
and anchoring trenches upto 150 mm depth at top and
bottom of slope and refilling the same with excavated
earth as per direction complete.
Note Payment of this item will be made on the finished area of
the jute geotextile.
3.31 Supplying, testing and installation of 2.0 m wide
Woven Jute Geotextile for strengthening of sub-grades,
having minimum tensile strength of 25 KN/m with a
porometry range of 200 to 400 micron, duly secured to
sub-grade by u-shaped M.S. staples (11 gauge) at an
interval of 750 mm or as per direction of Engineer-in-
Charge. The jute fabric should be laid with an overlap of
150 mm cross-wise and 300 mm longitudinally as per
direction of the Engineer-in-Charge.
(a) Using Untreated Woven Jute Geotextile (Grey) sqm 42.30 42.30
(b) Using Treated Woven Jute Geotextile with approved sqm 55.00 55.00
rot-resistant additive.
Note Payment of this item will be made on the finished area of the
jute geotextile.

240
PWD (WB), Schedule of Rates : 2014 Road & Bridge Works

CHAPTER - 4
SUB-BASES, BASES ( NON- BITUMINOUS) AND SHOULDERS
All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
4.01 Lime, Fly ash Stabilised Soil Sub-Base cum 361.00 431.00
Construction of Sub-base using Lime – Fly ash N.B. :
admixture with granular soil, free from organic matter Initial lead of
/ deleterious material or clayey silts and low plasticity 1 Km. for soil
clays having PI between 5 and 20 and liquid limit less and fly ash
has been
than 25 and commercial dry lime, slaked at site or pre-
considered.
slaked with CaO content not less than 50 per cent, fly
ash to conform to gradation as per clause 4.3 of IRC: Construction
88-1984, lime + fly ash content ranging between 10 to wing should
30 per cent, the minimum un-confined compressive add cost of
strength and CBR value after 28 days curing and 4 days extra
soaking to be 7.5kg/sq,cm and 25 per cent respectively, carriage
all as specified in IRC: 88-1984. beyond the
Initial lead
Note: 1. Compensation for earth will vary from place to from source
place and will have to be assessed realistically as per to work site
particular ground situation. In case earth is both for soil
available from Govt. land, compensation for earth and fly ash as
will not be required. The position is required to be per actual
clearly stated in the cost estimate. lead.
2. Cost of Fly ash has not been considered in the
analysis as the same will be available free of cost,
only carriage of Fly ash upto 1KM has been
incorporated.
3. Lime + Flyash have been taken as 20 per cent of
total mass and ratio of lime and Flyash as 1:4 for
estimating purposes. Total quantities will be as per
approved design.
4.02 Lime Treated Soil for Sub- Base cum 367.00 430.00
Providing, laying and spreading soil on a prepared sub
grade, pulverising, mixing the spread soil in place with
Rotavator with 3 per cent slaked lime with minimum
content of 70 per cent of CaO, grading with motor
grader and compacting with the road roller at OMC to
achieve at least 98 per cent of the max dry density to
form a layer of sub base, as per Clause 402 of
Specifications for Road & Bridge Works of MoRT&H
(5th Revision).
4.03 Cement Treated Soil Sub Base / Base cum 803.00 828.00
Providing, laying and spreading soil on a prepared sub
grade, pulverising, adding the designed quantity of
cement to the spread soil, mixing in place with
Rotavator, grading with the motor grader and
compacting with the road roller at OMC to achieve the
desired unconfined compressive strength and to form a
layer of sub-base/base, as per Clause 403 of
Specifications for Road & Bridge Works of MoRT&H
(5th Revision). (Using 4 per cent cement by weight
of compacted soil mass).

241
Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
4.04 Supplying, spreading and consolidating Moorum to cum 167.00 -
a depth of 75 mm at desired density and C.B.R. as per
specification with power roller to proper gradient and
camber including watering as necessary, and lighting,
guarding, barricading and making adequate earthen
bundh where necessary to protect the edges and curing
with water for 2 to 3 days, mending cracks by rolling
where necessary including all incidental charges of
roller, cost of fuel & lubricants etc. complete as per
specification.
Note: Add cost at site of the materials to arrive at the
complete rate. The compaction factor may be taken as
0.67.
(The payment is to be made on the basis of the finished
compacted volume of moorum.)
4.05 Supplying, spreading and compacting Sand to Cum 196.00 322.00
required thickness, in layers not exceeding 150 mm to
proper gradient and camber, inundating each layer by
water and packing and ramming layer by layer to
achieve desired compaction, including lighting,
guarding, barricading and making adequate earthen
bundh where necessary, curing with water as per
direction, mending cracks and depressions by ramming
wherever necessary.
Note: Add cost at site of the materials to arrive at the
complete rate. The compaction factor for dry, clean
sand may be taken as 0.835. Suitable considerations
should be made for bulkage of moist sand at site of
work.
(The payment is to be made on the basis of the finished
compacted volume.)
4.06 Supplying, spreading and consolidating Stone Dust cum 209.00 212.00
to a depth of 100 mm and above at desired density and
C.B.R. as per Specification with power roller to proper
gradient and camber including watering as necessary,
and lighting, guarding, barricading and making
adequate earthen bundh where necessary to protect the
edges and curing with water for 2 to 3 days, mending
cracks and depressions by rolling where necessary
including all incidental charges of roller, cost of fuel &
lubricants complete as per specification.
Note: Add cost at site of the materials to arrive at the
complete rate. The compaction factor is 0.70.
(The payment is to be made on the basis of the finished
compacted volume of stone dust.
4.07 Spreading blindage for road topping using sand / sqm 6.30 6.90
moorum / kiln rubbish etc. in approximately 6mm thick
layer, including watering and rolling complete.
Note: To add cost at site of 0.006 m3 of blinding material for
complete rate.

242
PWD (WB), Schedule of Rates : 2014 Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
4.08 Granular Sub-base with Graded Material
(Table:- 400-1)
A. Plant Mix Method:
Construction of granular sub-base by providing
graded material, mixing in Wet Mix Plant at OMC,
carriage of mixed material to work site, spreading
in uniform layers with Motor grader on prepared
surface in proper grade and camber, compacting
with vibratory power roller to achieve the desired
density, including lighting, guarding, barricading,
including cost of all materials, machinery, tools
and plants and cost of quality control complete as
per Clause 401 of Specifications for Road & Bridge
Works of MoRT&H (5th Revision).
(i) Grading - I : cum 397.00 460.00
(ii) Grading - II : cum 387.00 477.00
(iii) Grading - III : cum 378.00 437.00
(iv) Grading - IV : cum 380.00 444.00
(v) Grading - V : cum 395.00 447.00
(vi) Grading - VI : cum 384.00 464.00
Note: Add cost at site of 1.28 m³ of the stone materials as per
specified grading to arrive at the complete rate.
B. By Mix in Place Method :
Construction of granular sub-base by providing
graded material, mixing by mix in place method
with Rotavator at OMC, spreading in uniform
layers with Motor grader on prepared surface in
proper grade and camber, compacting with
vibratory roller to achieve the desired density,
including lighting, guarding, barricading,
including cost of all materials, machinery, tools
and plants including cost of quality control
complete as per Clause 401 of Specifications for
Road & Bridge Works of MoRT&H (5th Revision).
(i) Grading - I : cum 218.00 272.00
(ii) Grading - II : cum 207.00 288.00
(iii) Grading - III : cum 199.00 249.00
(iv) Grading - IV : cum 200.00 255.00
(v) Grading - V : cum 215.00 259.00
(vi) Grading - VI : cum 204.00 276.00
Note: Add cost at site of 1.28 m³ of the stone materials as per
specified grading to arrive at the complete rate.
N.B.: When the width of laying is not adequate for
mechanical operation or in case of small sized jobs,
suitable mixing and spreading equipment capable of
mixing the material to the desired degree and
spreading -the mixed materials uniformly according to
required line and level to the satisfaction of E-in-C may
be approved by the Engineer-in-charge, but the rate of
the item is to be reduced by Rs.30.00/cum.

243
Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
4.09 Construction of Sub Base using Local Materials:
Construction of Sub Base using Local Materials,
spreading in uniform layers with Motor grader on
prepared surface, including screening the metal as
necessary, mixing by mix in place method with
Rotavator at OMC, and compacting with vibratory
roller to achieve the desired density, lighting, guarding
and barricading including cost and carriage of all
materials and making necessary earthen bundh of one
metre wide on each side to protect the edges complete
as per Clause 401 of Specifications for Road & Bridge
Works of MoRT&H (5th Revision).
(i) For Construction of Sub Base by compacting cum 317.00 534.00
1st class brick aggregates (40 mm down) and
sand (in proportion of 60:40).
Note: Add cost at site of 0.90 m3 of brick aggregates and 0.48 m3
of medium sand (loose volume) to arrive at the
consolidated rate.
(ii) For Construction of Sub Base by compacting cum 199.00 295.00
stone chips and sand (in proportion of 40:60).
Note: Add cost at site of 0.51 m3 of 5.6 mm stone chips and 0.77
m3 of medium sand (loose volume) to arrive at the
consolidated rate.
(iii) For Construction of Sub Base by compacting cum 217.00 -
gravel, coarse sand and moorum (A.I. value of
more than 6): (in proportion of 35:40:25)
Note: Add cost at site of 0.45 m3 of gravel 0.32 m3 of moorum
and 0.51 m³ coarse sand (loose volume) to arrive at the
consolidated rate.
(iv) For Construction of Sub Base by compacting cum - 242.00
river bed materials.
Note: Add cost at site of 1.28 m³ of materials to arrive at the
complete rate.
4.10 Water Bound Macadam Sub Base
Water Bound Macadam Sub Base by consolidating
Jhama metal / Laterite chelly or stone metal / shingles
of specific size in hard crust to requisite thickness
(measured after compaction) in layers including
screening of metals etc. as necessary, hand packing,
sweeping, watering and rolling in stages with power
roller to proper line, grade and camber, lighting,
guarding & barricading and making necessary earthen
bundh of one metre width on each side where necessary
to protect edges and preparing the bed by necessary
cutting or filling and rolling all complete including the
cost of all materials and hire and labour charges of all
men and machineries and compacting to the required
density, as per Clause 404 of Specifications for Road &
Bridge Works of MoRT&H (5th Revision).

244
PWD (WB), Schedule of Rates : 2014 Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
(i) For Construction of Sub Base by consolidating cum 419.00 -
Jhama metal (63 mm to 45 mm) with moorum
screening :
Note: Add cost at site of 1.09 m3 of jhama metal and 0.26 m3 of
moorum screening (loose volume) to arrive at the
consolidated rate.
(ii) For Construction of Sub Base by consolidating cum 242.00 -
Laterite (90 mm to 45 mm):
Note: Add cost at site of 1.45 m³ of materials to arrive at the
complete rate.
(iii) For Construction of Sub Base by consolidating cum - 235.00
broken shingles (53 mm to 22.4 mm) with Type-
A screening :
Note: Add cost at site of 1.12 m3 of broken shingles and 0.24
m3 of Type A screening (loose volume) to arrive at the
consolidated rate.
4.11 Water Bound Macadam Base Course
Providing, laying, spreading and compacting stone
aggregates of specific sizes to water bound macadam
specification including spreading in uniform thickness,
hand packing, rolling with vibratory roller 8-10 tonnes
in stages to proper grade and camber, applying and
brooming requisite type of screening / binding
materials to fill up the interstices of coarse aggregate,
watering including lighting, guarding, barricading and
making necessary earthen bundh of one metre width on
each side and preparing the bed by necessary cutting or
filling, including cost of all materials and hire and
labour charges of all men and machinery and
compacting to the required density, as per Clause 404
of Specifications for Road & Bridge Works of MoRT&H
(5th Revision).
(i) Grading-I Aggregate (63 mm to 45 mm) Using
Stone Screening Type A (13.2 mm)
A. Mechanical Means cum 218.00 197.00
B. Manual Means cum 355.00 331.00
Note: Add cost at site of 1.21 m³ of Grading-I Aggregates &
0.16 m³ Stone Screening Type-A to arrive at the
complete rate.
(ii) Grading-I Aggregate (63 mm to 45 mm) Using Costs of
Stone Screening Type B (11.2 mm) binding
materials
A. Mechanical Means cum 215.00 194.00
where
B. Manual Means cum 352.00 328.00
required is to
Note: Add cost at site of 1.21 m³ of Grading-I Aggregates & be added @
0.24 m³ Stone Screening Type-B to arrive at the 0.08 m³ per
complete rate. cum.
(iii) Grading-II Aggregate (53 mm to 22.4 mm) Using
Stone Screening Type B (11.2 mm)
A. Mechanical Means cum 219.00 232.00
B. Manual Means cum 356.00 366.00
Note: Add cost at site of 1.21 m³ of Grading-I Aggregates &
0.24 m³ Stone Screening Type-B to arrive at the
complete rate.

245
Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
4.12 Wet Mix Macadam Base Course cum 338.00 362.00
Providing, laying, spreading and compacting graded
stone aggregate to Wet Mix Macadam specification
including screening of aggregates and granular
materials, premixing the material with water at OMC in
Wet Mix Plant, carriage of mixed material by tipper to
site, laying in uniform layers with Paver in Sub- base /
Base course on well prepared surface and compacting
with Vibratory Roller to achieve the desired density,
including supply of all materials, machinery, fuel and
lubricants, including incidental costs for lighting,
guarding, barricading, making earthen bundh to
protect the edges including cost of quality control
complete as per Clause 406 of Specifications for Road &
Bridge Works of MoRT&H (5th Revision).
Note Add cost at site of 1.32 m³ of the stone materials as per
specified grading to arrive at the complete rate.
4.13 Construction of Median and Island
A. Construction of Median and Island with Soil cum 134.00 137.00
Taken from Roadway Cutting
Construction of Median and Island above road level
with approved material deposited at site from
roadway cutting and excavation for drain and
foundation of other structures, spread, graded and
compacted as per Clause 408 of Specifications for
Road & Bridge Works of MoRT&H (5th Revision).
B. Construction of Median and Island with Soil cum 231.00 240.00
Taken from Borrow Areas
Construction of median and Island above road level
with approved material brought from borrow pits,
spread, sloped and compacted as per clause 408 of
Specifications for Road & Bridge Works of MoRT&H
(5th Revision).
4.14 Construction of Shoulders
A. Earthen Shoulders
The rate as applicable for sub-grade construction
may be adopted.
B. Hard Shoulders
Rate as applicable for sub-base and or base may be
adopted as per approved design.
C. Paved shoulders
The rate may be adopted as applicable for different
layers of pavement depending upon approved
design of paved shoulders
4.15 Footpaths and Separators
Construction of footpath / separator by providing a sqm 1527.00 1690.00
150 mm compacted granular sub base as per clause
401 followed by 25 mm thick cement concrete grade
(1:2:4), over laid with pre-cast concrete tiles in cement
mortar 1:3 including provision of all drainage
arrangements but excluding kerb channel and as per
clause 410 of Specifications for Road & Bridge Works of
MoRT&H (5th Revision).

246
PWD (WB), Schedule of Rates : 2014 Road & Bridge Works

CHAPTER - 5
BASES AND SURFACE COURSES (BITUMINOUS)
All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
5.01 Prime Coat
Providing and applying primer coat with Cationic
Bitumen Emulsion of approved grade conforming to IS:
8887-1978 and requisite quantity on prepared surface
of granular base including cleaning of road surface and
spraying primer using Mechanical means including cost
and carriage of bitumen emulsion and all other
incidental costs of work complete as per Clause 502 of
Specifications for Road & Bridge Works of MoRT&H
(5th Revision).
(i) For WBM / WMM Surface: sqm 7.20 7.20
(with primer @ 0.70-1.0 kg/sqm)
(ii) For Stabilised soil bases / Crusher Run sqm 8.70 8.80
Macadam Surface:
(with primer @ 0.90-1.2 kg/sqm)
Note: Add cost and carriage of materials as per requirement
vide Table 3.3-1 of Section 3 to get the final
consolidated rate.
5.02 Tack Coat
Providing and applying tack coat with Cationic
Bitumen Emulsion of approved grade conforming to IS:
8887-1978 on the prepared surface cleaned with
Hydraulic broom, moistening the surface including cost
and carriage of emulsion, hire charges of machinery
and labour, cost of fuel and lubricants all complete as
per Clause 503 of Specifications for Road & Bridge
Works of MoRT&H (5th Revision).
(i) On Bituminous Surface sqm 3.00 3.00
(Using Bitumen Emulsion at the rate of 0.20 to
0.30 kg per sqm.)
(ii) On Granular surfaces treated with primer sqm 3.10 3.20
(Using Bitumen emulsion at the rate of 0.25 to
0.30 kg per sqm.)
(iii) On Cement concrete pavement sqm 3.50 3.50
(Using Bitumen emulsion at the rate of 0.30 to
0.35 kg per sqm.)
Note: Add cost & carriages of materials as per requirement vide
Table 3.3-1 of Section 3 to get the final consolidated rate.
5.03 Bituminous Macadam using Hot Mix Plant (HMP)
Providing and laying bituminous macadam with Hot
Mix Plant using approved crushed aggregates of
specified grading as per Table 500.4 premixed with
bituminous binder, transported to site laid over a
previously prepared surface at specified laying
temperature with paver finisher to the required grade,
level and alignment and rolled with suitable power
roller for break down, inter-mediate and finished
rolling as per specification to achieve the desired -

247
Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
compaction including cost and carriage of stone
materials and bitumen, hire charges of machinery and
equipment, cost of fuel and lubricants and wages of
operational staff, quality control complete as per Clause
504 of Specifications for Road & Bridge Works of
MoRT&H (5th Revision).
A. For Grading I
(40 mm nominal size, 80-100 mm thick.)
(i) Using Batch Type HMP of minimum capacity 100- cum 1732.00 1799.00
120 TPH.
(ii) Using Batch type HMP of minimum capacity 60- cum 1708.00 1774.00
90 TPH.
(iii) Using Drum mix Type HMP of minimum capacity cum 1629.00 1691.00
40-60 TPH.
B. For Grading II
(19 mm nominal size, 50-75 mm thick.)
(i) Using Batch Type HMP of minimum capacity 100- cum 1748.00 1816.00
120 TPH.
(ii) Using Batch type HMP of minimum capacity 60- cum 1725.00 1791.00
90 TPH.
(iii) Using Drum mix Type HMP of minimum capacity cum 1646.00 1708.00
40-60 TPH.
Note: Add cost & carriages of materials as per requirement vide
Table 3.3-1 of Section 3 to get the final consolidated rate.
5.04 Bituminous Macadam using Mobile Hot Mix Plant
(Light Duty)
Providing and laying bituminous macadam with Mobile
Hot Mix Plant (Light Duty) using approved crushed
aggregates of specified grading as per Table 500.4
premixed with bituminous binder, transported to site
laid over a previously prepared surface at specified
laying temperature by means of approved and suitable
arrangements to the required grade, level and
alignment and rolled with suitable power roller for
break down, inter-mediate and finished rolling as per
specification to achieve the desired compaction
including cost and carriage of stone materials and
bitumen, hire charges of machinery and equipment,
cost of fuel and lubricants and wages of operational
staff, quality control complete as per Specifications for
Road & Bridge Works of MoRT&H (5th Revision).
A. For Grading I cum 1522.00 1561.00
(40 mm nominal size, 80-100 mm thick.)
B. For Grading II cum 1538.00 1579.00
(19 mm nominal size, 50-75 mm thick.)
Note: Add cost & carriages of materials as per requirement vide
Table 3.3-1 of Section 3 to get the final consolidated rate.

248
PWD (WB), Schedule of Rates : 2014 Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
5.05 Dense Bituminous Macadam
Providing and laying dense bituminous macadam with
Hot Mix Plant producing an average output of 75
tonnes per hour using coarse aggregate, fine aggregate,
filler and bituminous binder as per design Job Mix
Formula conforming Marshall Method as per
specification, including screening, cleaning of chips and
preparing a uniform and quality mix in Hot Mix Plant
and ensuring a homogeneous mix, in which all particles
of the mineral aggregates are coated uniformly,
transporting the hot mix to work site, laying the mixed
materials at specified laying temperature with a
hydrostatic paver finisher with sensor control to the
required grade, level and alignment over prepared
surface coated with tack coat, rolling with smooth
wheeled, vibratory and tandem rollers for break down,
inter-mediate and finished rolling to achieve the
desired density of at least 98% of that of Laboratory
Marshall specimen, hand packing and pinning to give
an even surface including cost and carriage of bitumen,
coarse and fine aggregates and filler materials and hire
charges of machinery and equipment for construction
and quality control, fuels and lubricants and wages of
operational staff complete as per Clause 505 of
Specifications for Road & Bridge Works of MoRT&H
(5th Revision).
A. For Grading I
(37.5 mm nominal size, 75-100 mm thick.)
(i) Using Batch Type HMP of minimum capacity cum 2004.00 2077.00
100-120 TPH.
(ii) Using Batch type HMP of minimum capacity cum 1970.00 2042.00
60-90 TPH.
(iii) Using Drum mix Type HMP of minimum capacity cum 1896.00 1967.00
40-60 TPH.
B. For Grading II
(26.5 mm nominal size, 50-75 mm thick.)
(i) Using Batch Type HMP of minimum capacity cum 2088.00 2162.00
100-120 TPH.
(ii) Using Batch type HMP of minimum capacity cum 2054.00 2126.00
60-90 TPH.
(iii) Using Drum mix Type HMP of minimum capacity cum 1980.00 2048.00
40-60 TPH.
Note: Add cost & carriages of materials as per requirement vide
Table 3.3-1 of Section 3 to get the final consolidated rate.
5.06 Sand Asphalt Base Course
Providing, laying and rolling sand-asphalt base course
composed of sand, mineral filler and bituminous binder
on a prepared sub-grade or sub-base to the lines, levels,
grades and cross sections as per the drawings including
mixing in Hot Mix Plant of suitable type and capacity,
transporting, laying, compacting and finishing as per
Clause 506 of Specifications for Road & Bridge Works of
MoRT&H (5th Revision).

249
Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
(i) Using Batch Type HMP of minimum capacity cum 2071.00 2266.00
100-120 TPH.
(ii) Using Batch type HMP of minimum capacity 60- cum 2044.00 2234.00
90 TPH.
(iii)Using Drum mix Type HMP of minimum cum 1964.00 2149.00
capacity 40-60 TPH.
Note: Add cost & carriages of materials as per requirement vide
Table 3.3-1 of Section 3 to get the final consolidated rate.
5.07 Semi-dense Bituminous Concrete
Providing & laying Semi-dense Bituminous Concrete
(SDBC) as wearing coarse by Hot Mix Plant, using
coarse aggregates, fine aggregates, filler materials and
binder of required specification and grading as per
approved job mix formula, over thoroughly cleaned
surface coated with tack coat, including screening,
cleaning of aggregates, mixing the components as per
approved Job Mix Formula with hot binder, carrying the
mixture by tipper truck or any other approved suitable
arrangements, laying the mixture uniformly,
maintaining the specified laying temperature, thorough
rolling with power roller with necessary hand packing
and pinning to give an uniform surface to achieve the
desired density of at least 98% of that of Laboratory
Marshall specimen, including the cost and carriage of
aggregates, filler and binder, heating the binder,
preheating the aggregates, and filler to the specified
temperature, including the hire charges of Hot Mix
Plant and other machineries, pay of operators, cost of
fuel and lubricants and all other incidental charges
complete.
A. For Grading I
(13 mm nominal size, 35-40 mm thick.)
(i) Using Batch Type HMP of minimum capacity cum 2009.00 2089.00
100-120 TPH.
(ii) Using Batch type HMP of minimum capacity 60- cum 1974.00 2052.00
90 TPH.
(iii) Using Drum mix Type HMP of minimum cum 1895.00 1968.00
capacity 40-60 TPH.
B. For Grading II
(10 mm nominal size, 25-30 mm thick.)
(i) Using Batch Type HMP of minimum capacity cum 2086.00 2167.00
100-120 TPH.
(ii) Using Batch type HMP of minimum capacity 60- cum 2051.00 2130.00
90 TPH.
(iii)Using Drum mix Type HMP of minimum cum 1972.00 2047.00
capacity 40-60 TPH.
Note: Add cost & carriages of materials as per requirement vide
Table 3.3-1 of Section 3 to get the final consolidated rate.

250
PWD (WB), Schedule of Rates : 2014 Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
5.08 Bituminous Concrete
Providing and laying bituminous concrete with Hot Mix
Plant using coarse aggregates, fine aggregates, filler
materials and bituminous binder of required
specification including screening, cleaning of chips and
preparing a uniform and quality mix in Hot Mix Plant
and ensuring a homogeneous mix, in which all particles
of the mineral aggregates are coated uniformly,
transporting the hot mix to work site, laying the mixed
materials at specified laying temperature with a
hydrostatic paver finisher with sensor control to the
required grade, level and alignment over prepared
surface coated with tack coat, rolling with smooth
wheeled, vibratory and tandem rollers for break down,
inter-mediate and finished rolling to achieve the
desired density of at least 98% of that of Laboratory
Marshall specimen, including cost and carriage of
bitumen, coarse and fine aggregates and filler
materials and hire charges of machinery and
equipment for construction and quality control, fuels
and lubricants and wages of operational staff complete
as per Clause 507 of Specifications for Road & Bridge
Works of MoRT&H (5th Revision).
A. For Grading I
(13 mm nominal size, 50 mm thick.)
(i) Using Batch Type HMP of minimum capacity cum 2264.00 2338.00
100-120 TPH.
(ii) Using Batch type HMP of minimum capacity 60- cum 2228.00 2301.00
90 TPH.
(iii) Using Drum mix Type HMP of minimum cum 2150.00 2218.00
capacity 40-60 TPH.
B. For Grading II
(10 mm nominal size, 30-40 mm thick.)
(i) Using Batch Type HMP of minimum capacity cum 2304.00 2379.00
100-120 TPH.
(ii) Using Batch type HMP of minimum capacity 60- cum 2268.00 2342.00
90 TPH.
(iii) Using Drum mix Type HMP of minimum cum 2190.00 2259.00
capacity 40-60 TPH.
Note: Add cost & carriages of materials as per requirement vide
Table 3.3-1 of Section 3 to get the final consolidated rate.
5.09 Surface Dressing
Providing and laying surface dressing as wearing
course in single coat using approved quality crushed
stone aggregates of specified size and hot bituminous
binder laid on prepared surface including thorough
cleaning of the surface, screening and cleaning of stone
chips, applying uniformly requisite quantity of hot
bitumen, spreading uniformly dry stone aggregates and
rolling with 8-10 tonne smooth wheeled steel roller
with necessary hand packing or spreading of chips to

251
Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
obtain closed surface including the cost and carriage of
bitumen and stone chips, heating the bitumen and all
other cost and charges of fuel, lubricants in this
connection including hire and operational charges of
machinery and equipment for construction and quality
control complete as per Clause 509 of Specifications for
Road & Bridge Works of MoRT&H (5th Revision).
(By Mechanical Means)
A. Single coat or 1st coat over granular surface sqm 15.20 15.50
using bitumen @ 12 kg per 10 m2 and stone
chips / bajree (100% passing through 22.4 mm
sieve and 100% retained on 11.2 mm sieve) @
0.15 m3 per 10 m2 surface.
B. Second coat or renewal coat on black topped sqm 13.60 14.10
surface using bitumen @ 10 kg per 10 m2 and
stone chips / bajree (100% passing through 13.2
mm sieve and 100% retained on 5.6 mm sieve) @
0.10 m3 per 10 m2 surface.
Note: Add cost & carriages of materials as per requirement vide
Table 3.3-1 of Section 3 to get the final consolidated rate.
5.10 Open-Graded Premix Surfacing using Viscosity
grade Paving Bitumen and HMP
Providing, laying and rolling of Open - graded premix
surfacing of 20 mm thickness composed of 13.2 mm (@
0.018 m³ per m²) and 11.2 mm (@ 0.009 m³ per m²)
size stone aggregates, including thoroughly cleaning of
the surface, screening, cleaning and pre-heating stone
chips and fully pre-coating the same either using
viscosity grade paving bitumen or cut-back or emulsion,
carrying the mixture by tipper trucks or by any other
suitable arrangements, laying the mixture uniformly
over the surface with paver finisher, including manual
operations as and when required for proper line, grade
and level to serve as wearing course on a previously
prepared base, including mixing in Hot Mix Plant and
thoroughly rolling with a smooth wheeled roller 8-10
tonne capacity, finished to required level and grades
including the cost and carriage of stone chips and
matrix, heating the matrix, preheating the aggregates
to required temperature and including the hire charges
of Hot Mix Plant and other machinery, pay of operators,
cost of fuel and lubricants etc. complete as per Clause
510 of Specifications for Road & Bridge Works of
MoRT&H (5th Revision).
(i) Using Batch Type HMP of minimum capacity 100- sqm 34.10 35.40
120 TPH.
(ii) Using Batch type HMP of minimum capacity 60-90 sqm 33.20 34.40
TPH.
(iii) Using Drum mix Type HMP of minimum capacity sqm 31.80 33.00
40-60 TPH.
Note: Add cost & carriages of materials as per requirement vide
Table 3.3-1 of Section 3 to get the final consolidated rate.

252
PWD (WB), Schedule of Rates : 2014 Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
5.11 Open-Graded Premix Surfacing using Bituminous
(Viscosity grade Paving Bitumen / Modified
bitumen) Binder and Mobile Hot Mix Plant (Light
Duty)
Providing, laying and rolling of Open - graded premix sqm 25.90 26.40
surfacing of 20 mm thickness composed of 13.2 mm (@
0.018 m³ per m²) and 11.2 mm (@ 0.009 m³ per m²)
size stone aggregates, including thoroughly cleaning of
the surface, screening, cleaning and pre-heating stone
chips and fully pre-coating the same either using
viscosity grade paving bitumen or cut-back or emulsion,
carrying the mixture by any suitable arrangements,
laying the mixture uniformly over the surface, including
line, grade and level to serve as wearing course on a
previously prepared base, including mixing in Mobile
Hot Mix Plant (Light Duty) and thoroughly rolling with
a smooth wheeled roller 8-10 tonne capacity, finished
to required level and grades including the cost and
carriage of stone chips and matrix, heating the matrix,
preheating the aggregates to required temperature
and including the hire charges of Mobile Hot Mix Plant
(Light Duty) and other machinery, pay of operators,
cost of fuel and lubricants etc. complete to be followed
by seal coat of either Type A or Type B as per Technical
Specification Clause 508 for Rural Roads of MORD.
Note: Add cost & carriages of materials as per requirement
vide Table 3.3-1 of Section 3 to get the final
consolidated rate.
5.12 Open Graded Premix Surfacing with Cationic sqm 26.60 27.10
Bitumen Emulsion using 13.2 mm (@ 0.018 m3/m2)
and 11.2 mm (@ 0.009 m3/m2) size stone aggregates,
premixed with Cationic Bituminous Emulsion (M.S.
grade) conforming to IS : 8887-1970 @ 21.5 kg per 10
m² of surface, including cleaning, moistening the
surface, applying tack coat with cationic bitumen
emulsion, screening, cleaning and washing the stone
chips, intimately mixing with emulsion using Concrete
Mixer, laying the mixture uniformly over the surface
and rolling with power roller after hand packing and
pinning adequately to ensure a compact surface all
complete as per specification and direction of the
Engineer-in-charge including cost and carriage of stone
materials and emulsion, including cost of labour, hire
and running charges of road roller and other tools and
plants and cost of all other incidental charges including
hire charges and cost of fuel and lubricants of
machineries and equipment for construction and
quality control as per Technical Specification Clause
508.2 for Rural Roads of MORD.
Note: Add cost & carriages of materials as per requirement
vide Table 3.3-1 of Section 3 to get the final
consolidated rate.

253
Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
5.13 Seal Coat
A. Providing and laying Liquid Seal Coat (Type A) with
approved quality stone chips and bitumen binder on
thoroughly cleaned black top surface, spreading
screened & cleaned stone aggregates (100 % passing
through 11.2 mm sieve and retained on 2.36 mm sieve)
uniformly @ 0.09 m3 of dry aggregate per 10 m2 of
area using suitable means, brushing the chips, if
necessary, to ensure uniformity, followed by rolling
with power roller including the cost and carriage of
binder and stone chips, cost of heating the binder and
all other incidental charges, cost of fuel and lubricants,
including hire charges of machineries, tools & plants
required for construction and quality control complete
as per Clause 511 of Specifications for Road & Bridge
Works of MoRT&H (5th Revision).
I By Mechanical Means
(i) With Hot Bitumen Binder (@ 9.80 kg / 10 sqm.) sqm 12.40 12.80
(ii) With Cationic Bitumen Emulsion sqm 14.90 15.30
(@ 15.00 kg / 10 sqm.)
II By Manual Means
With Hot Bitumen Binder (@ 9.80 kg / 10 sqm.) sqm 17.50 17.70
B. Providing and laying Premixed Seal Coat (Type B)
with approved quality sand/grit @ 0.6 m3/ 100 m2 and
bitumen binder on thoroughly cleaned black top surface
coated with tack coat, including heating and mixing
cleaned sand/grit (100 % passing through 2.36 mm
sieve and retained on 180 micron sieve) uniformly with
bitumen binder, laying and spreading the mix at an
uniform rate using suitable means, brushing the
surface, if necessary, to ensure uniformity, followed by
rolling with power roller including the cost and
carriage of binder and aggregates, cost of heating the
binder and aggregates and all other incidental charges,
cost of fuel and lubricants, including hire charges of
machineries, tools & plants required for construction
and quality control complete as per Clause 511 of
Specifications for Road & Bridge Works of MoRT&H
(5th Revision).
I By Mechanical Means
(i) With Hot Bitumen Binder (@ 6.80 kg / 10 sqm.) sqm 11.90 12.20
(ii) With Cationic Bitumen Emulsion sqm 13.70 14.00
(@ 10.50 kg / 10 sqm.)
II By Manual Means
With Hot Bitumen Binder (@ 6.80 kg / 10 sqm.) sqm 13.10 13.30
Note: Add cost & carriages of materials as per requirement vide
Table 3.3-1 of Section 3 to get the final consolidated rate.

254
PWD (WB), Schedule of Rates : 2014 Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
5.14 Mastic Asphalt
Providing and laying Mastic asphalt wearing course
with paving grade bitumen meeting the requirements
given in table 500-29 using approved coarse aggregate,
fine aggregate, filler material and bitumen, prepared
by using Mastic cooker including cost and carriage of
all ingredients, cost of heating aggregates and binder,
mixing in specified proportions conforming to approved
Job Mix Formula and laid to required level and slope
after cleaning the surface, compacting, sealing the
construction joints and surface finishing conforming to
specifications including providing antiskid surface with
bitumen pre-coated fine-grained hard stone chipping of
13.2 mm nominal size at the rate of 0.005 cum per 10
sqm and at an approximate spacing of 10 cm center to
center in both directions, pressed into surface when the
temperature of surfaces not less than 100°C, protruding
1 mm to 4 mm over mastic surface, including the hire
charges of all tools and plants and machinery, pay of
operators, cost of fuel and lubricants and all other
incidental charges and quality control all complete as
per Clause 516 of Specifications for Road & Bridge
Works of MoRT&H (5th Revision).
(i) 25 mm thickness sqm 200.00 205.00
(ii) 50 mm thickness sqm 304.00 313.00
Note: Add cost & carriages of materials as per requirement
vide Table 3.3-1 of Section 3 to get the final
consolidated rate.
5.15 Slurry Seal
Providing and laying Slurry seal consisting of a mixture
of approved quality fine aggregates of proper grading,
Portland cement filler, bituminous emulsion and water
on a road surface including cleaning of surface, mixing
of slurry seal in a suitable mobile plant, laying and
compacting with pneumatic-tyred roller, if required, to
provide even riding surface including cost and carriage
of all ingredients, hire and operational charges of roller
and other tools and plants including cost of fuel,
lubricants and all other incidental charges, quality
control as per Clause 512 of Specifications for Road &
Bridge Works of MoRT&H (5th Revision).
(i) 5 mm thickness sqm 10.60 10.70
(ii) 3 mm thickness sqm 7.50 7.90
(iii) 1.5 mm thickness sqm 4.80 5.00
Note: Add cost & carriages of materials as per requirement
vide Table 3.3-1 of Section 3 to get the final
consolidated rate.

255
Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
5.16 Fog Spray
Providing and applying Fog Spray using low viscosity sqm 6.20 6.30
(SS Type) Cationic bitumen emulsion for sealing cracks
less than 3 mm wide or incipient fretting or
disintegration in an existing bituminous surfacing
including thoroughly cleaning of surface using scrubber
and compressed air jets, applying SS type Bituminous
Emulsion using bitumen pressure distributor, including
cost and carriage of all ingredients and hire and
operational charges of all machinery, tools and plants
including fuel, lubricants and cost of quality control as
per Clause 513 of Specifications for Road & Bridge
Works of MoRT&H (5th Revision).
Note: Add cost & carriages of materials as per requirement
vide Table 3.3-1 of Section 3 to get the final
consolidated rate.
5.17 Bituminous Cold Mix ( Including Gravel Emulsion)
Providing, laying and rolling of Bituminous cold mix on
prepared base consisting of a mixture of unheated
mineral aggregate and emulsified, including mixing in
a Plant of suitable type and capacity, transporting,
laying, compacting and finishing to specified grades
and levels as per Clause 518 of Specifications for Road
& Bridge Works of MoRT&H (5th Revision).
(i) Using 9.5mm or 13.2 mm nominal size aggregate cum 1630.00 1666.00
(ii) Using 19mm or 26.5 mm nominal size aggregate cum 1655.00 1704.00
Note: Add cost & carriages of materials as per requirement
vide Table 3.3-1 of Section 3 to get the final
consolidated rate.
5.18 Crack Prevention Courses
(i) Stress Absorbing Membrane (SAM) crack width
less than 6 mm
Providing and laying of a Stress Absorbing sqm 10.50 10.90
Membrane over a cracked road surface, with crack
width below 6 mm after cleaning with a
mechanical broom, using modified binder
complying with clause 517, sprayed at the rate of 9
kg per 10 sqm and spreading 5.6 mm crushed stone
aggregates @ 0.11 cum per 10 sqm with hydraulic
chip spreader, sweeping the surface for uniform
spread of aggregates and surface finished to
conform to clause 902 of Specifications for Road &
Bridge Works of MoRT&H (5th Revision).

256
PWD (WB), Schedule of Rates : 2014 Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
(ii) Stress Absorbing Membrane (SAM) with crack
width 6 mm to 9 mm
Providing and laying of a Stress Absorbing sqm 12.60 13.00
Membrane over a cracked road surface, with crack
width 6 to 9 mm after cleaning with a mechanical
broom, using modified binder complying with
clause 517, sprayed at the rate of 11 kg per 10 sqm
and spreading 11.2 mm crushed stone aggregates
@ 0.12 cum per 10 sqm, sweeping the surface for
uniform spread of aggregates and surface finished
to conform to clause 902 of Specifications for Road
& Bridge Works of MoRT&H (5th Revision).
(iii) Stress Absorbing Membrane (SAM) crack width
above 9 mm and cracked area above 50 per
cent
Providing and laying a single coat of a Stress sqm 16.00 17.00
Absorbing Membrane over a cracked road surface,
with crack width above 9 mm and cracked area
above 50 per cent after cleaning with a mechanical
broom, using modified binder complying with
clause 517, sprayed at the rate of 15 kg per 10 sqm
and spreading 11.2 mm crushed stone aggregates
@ 0.12 cum per 10 sqm, sweeping the surface for
uniform spread of aggregates and surface finished
to conform to clause 902 of Specifications for Road
& Bridge Works of MoRT&H (5th Revision).
(iv) Bitumen Impregnated Geotextile
Providing and laying a Bitumen Impregnated sqm 25.00 25.00
Geotextile layer after cleaning the road surface,
geotextile conforming to requirements of clause
703.2, laid over a tack coat with 1.05 kg per sqm of
paving grade bitumen 80 - 100 penetration and
constructed to the requirement of clause 703.3 of
Specifications for Road & Bridge Works of
MoRT&H (5th Revision).
Note: Add cost & carriages of materials as per requirement
vide Table 3.3-1 of Section 3 to get the final
consolidated rate.

257
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

CHAPTER - 6
CEMENT CONCRETE PAVEMENT
All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
6.01 Dry Lean Cement Concrete Sub- base
Construction of dry lean cement concrete Sub- base cum 832.00 1192.00
over a prepared sub-grade with coarse and fine
aggregate conforming to IS: 383, the size of coarse
aggregate not exceeding 25 mm, aggregate cement
ratio not to exceed 15:1, aggregate gradation after
blending to be as per table 600-1, cement content not to
be less than 150 kg/ cum, optimum moisture content to
be determined during trial length construction,
concrete strength not to be less than 10 Mpa at 7 days,
mixed in a batching plant, transported to site, laid with
a paver with electronic sensor, compacting with 8-10
tonnes vibratory roller, finishing and curing. (As per
clause 601 of specifications for Road & Bridge Works of
MoRT&H (5th Revision).
Note: Construction Wing will add the cost & carriage of 0.90
cum/m³ crushed stone & Cement @ 150 kg/cum of
concrete only to arrive at consolidated rate.
6.02 Cement Concrete Pavement
Construction of un-reinforced, dowel jointed, plain cum 2025.00 2407.00
cement concrete pavement over a prepared sub base
with 43 grade cement @ 400 kg per cum, coarse and
fine aggregate conforming to IS 383, maximum size of
coarse aggregate not exceeding 25 mm, mixed in a
batching and mixing plant as per approved mix design,
transported to site, laid with a fixed form or slip form
paver, spread, compacted and finished in a continuous
operation including provision of contraction, expansion,
construction and longitudinal joints, joint filler,
separation membrane, sealant primer, joint sealant,
debonding strip, dowel bar, tie rod, admixtures as
approved, curing compound, finishing to lines and
grades as per drawing and clause 602 of Specifications
for Road & Bridge Works of MoRT&H (5th Revision).
Note: Construction Wing will add the cost & carriage of 0.90
cum/m³ crushed stone & Cement @ 400 kg/cum of
concrete only to arrive at consolidated rate.
6.03 Roller Compacted Concrete Pavement
Construction of Roller Compacted Concrete Pavement cum 1888.00 2265.00
(RCCP) with coarse and fine aggregates conforming to
IS:383, the size of coarse aggregate not exceeding 25
mm with minimum aggregate cement ratio of 5:1 mm
and with minimum cement content of 310 kg per cum,
aggregate gradation to be as per Table 602.2 after
blending, mixing in concrete mixer at optimum
moisture content, transporting to site, laying with
wheel barrows or steel pans or with mechanical paver,
compacting with 80-100 kN smooth wheel, tandem

258
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
vibratory roller, to achieve, the designed flexural
strength, finishing and curing as per drawings and
Technical Specification Clause 1502 for Rural Roads of
MORD.
Note: Construction Wing will add the cost & carriage of 0.90
cum/m³ crushed stone & Cement @ 310 kg/cum of
concrete only to arrive at consolidated rate.
6.04 Rectangular Concrete Block Pavement
Manufacturing, laying of cement concrete blocks of size sqm 580.00 636.00
0.450 m x 0.300 m x 0.15 m of Cement Concrete (C.C.)
M30 grade and spreading 25 mm thick sand
underneath and filling joints with sand on existing
W.B.M. base as per Technical Specification Clause 1503
for Rural Roads of MORD.
6.05 Interlocking Concrete Block Pavement
(1) Providing and Laying of Interlocking Concrete sqm 465.00 489.00
Block Pavements having thickness 80 mm as per
drawings and Technical Specification Clause 1504
for Rural Roads of MORD.
(2) Providing and Laying of Interlocking Concrete sqm 455.00 473.00
Block Pavements having thickness 60 mm as per
drawing and Technical Specification Clause 1504
for Rural Roads of MORD.

259
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

CHAPTER - 7
GEOSYNTHETICS AND REINFORCED EARTH

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division

7.01 Narrow Filter Sub-Surface Drain


Construction of a narrow filter sub- surface drain metre 433.00 433.00
consisting of porous or perforated pipe laid in narrow
trench surrounded by a geotextile filter fabric, with a
minimum of 450 mm overlap of fabric and installed as
per clause 702.3 and 309.3.5 of Specifications for Road
& Bridge Works of MoRT&H (5th Revision) including
excavation and backfilling.
7.02 Laying Paving Fabric Beneath a Pavement Overlay
Providing and laying paving fabric with physical sqm 133.00 133.00
requirements as per table 704-2 of MoRT&H
Specification over a tack coat of paving grade Bitumen
80-100 penetration, laid at the rate of 1 kg per sqm
over thoroughly cleaned and repaired surface to
provide a water resistant membrane and crack
retarding layer. Paving fabric to be free of wrinkling
and folding and to be laid before cooling of tack coat,
brooming and rolling of surface with pneumatic roller
to maximise paving fabric contact with pavement
surface.
7.03 Laying Boulder Apron in Crates of Synthetic
Geogrids
Providing, preparing and laying of Geogrid crated cum 1658.00 1900.00
apron 1 m x 5 m, 600 mm thick including excavation
and backfilling with baffles at 1 metre interval, made
with geogrids having characteristics as per clause
704.2, joining sides with connectors/ring staples, top
corners to be tie tensioned, placing of suitable cross
interval ties in layers of 300 mm connecting opposite
side with lateral braces and tied with polymer braids to
avoid bulging, constructed as per clause 704.3. filled
with stone with minimum size of 200 mm and specific
gravity not less than 2.65, packed with stone spalls,
keyed to the foundation recess in case of sloping ground
and laid over a layer of geotextile to prevent migration
of fines, all as per clause 704 of MoRT&H Specification
and laid as per clause 2503.3 and approved design.
Note: Construction wing is to add cost and carriage of 1.15
cu.m. of stone with minimum size of 200 mm & 0.15
cu.m of stone spalls only to arrive at consolidated rate.
7.04 Reinforced Earth Structures
Reinforced earth Structures have four main components
as under:
a) Excavation for foundation (to be executed as per cum 114.00 114.00
Item 12.01 of Ch. 12).

260
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
b) Foundation concrete and cement concrete cum
grooved seating in the foundation for facing
elements (to be executed as per Item 12.05 (A) to
(E) of Ch. 12).
c) Providing, carriage, hoisting and placement of sqm 1614.00 1827.00
Facia element (180 mm thick) of RCC (M35) with
dimension and reinforcement as per provision of
clause 703.4 of MORT&H Specifications for Road
& Bridge Works inclusive of reinforcement,
shuttering, curing, transporting, placing, fixing all
complete.
d) Providing assembling, joining with facing
elements and laying of the reinforcing elements
as per provision of Clause 703.4 of Specifications
for Road & Bridge Works of MoRT&H (5th
Revision).
I. With reinforcing element of Galvanised carbon metre 33500 335.00
steel strips of 60 mm wide and 5 mm thick as per
clause 3103 of Specifications for Road & Bridge
Works of MoRT&H (5th Revision) and as per
approved design and specifications.
II. With reinforcing elements of synthetic geogrids as
per clause 3102.8 and approved design and
specifications.
(i) Height of the wall upto 5.0 m. sqm of 2000.00 2000.00
(ii) Height of the wall above 5.0 m & upto 10.0 m. fascia 3000.00 3000.00
wall
e) Earth fill with granular material which is to be cum 765.00 1359.00
retained by the wall. Granular material will be as
per Clause 3104 and placement & compaction as
per clause 3106.5 of Specifications for Road &
Bridge Works of MoRT&H (5th Revision).

Notes :
1. Construction wing should add the cost of Drainage arrangement including filter media as per approved
design and drawings.
2. The specification and construction details to be adopted shall be as per section 3100 of Specifications for
Road & Bridge Works of MoRT&H (5th Revision).
3. Length of reinforcing strips will vary with the height of wall and will be as per approved design and
drawings.
4. The type of reinforcing elements to be adopted shall be as per approved design and specifications.
5. Actual market rate for supply of reinforcing elements and their accessories are to be obtained from
reputed firms in the field of earth reinforcement.
6. The earth fill material shall be clean, free draining, granular with high friction and low cohesion, non -
corrosive, coarse grained with not 10 per cent of particles passing 75 micron sieve, free of any deleterious
matter, chlorides, salts, acids, alkalies, mineral oil, fungus and microbes and shall be of specified pH value.
7. Capping beam is to be priced separately as per approved design. The rate for cement concrete shall be
taken from Chapter 12 of Departmental Schedule of Rates.

261
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

CHAPTER - 8
TRAFFIC SIGNS, MARKINGS AND OTHER ROAD APPURTENANCES
All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
8.01 Cast in Situ Cement Concrete M20 Kerb
Construction of cement concrete kerb with top and
bottom width 115 and 165 mm respectively, 250 mm
high in M 20 grade PCC on M-10 grade foundation 150
mm thick, foundation having 50 mm projection beyond
kerb stone, kerb stone laid with kerb laying machine,
foundation concrete laid manually, all complete as per
clause 409 of Specifications for Road & Bridge Works of
MoRT&H (5th Revision). (The rate is inclusive of cost of
all materials, labour, hire and usage charges of
machinery and all incidental charges in this
connection.)
A) Using Concrete Mixer metre 313.00 378.00
B) Using Concrete Batching and Mixing Plant metre 306.00 372.00
8.02 Cast in Situ Cement Concrete M 20 Kerb with
Channel
Construction of cement concrete kerb with channel with
top and bottom width 115 and 165 mm respectively,
250 mm high in M 20 grade PCC on M10 grade
foundation 150 mm thick, kerb channel 300 mm wide,
50 mm thick in PCC M20 grade, sloped towards the
kerb, kerb stone with channel laid with kerb laying
machine, foundation concrete laid manually, all
complete as per clause 409 of Specifications for Road &
Bridge Works of MoRT&H (5th Revision). (The rate is
inclusive of cost of all materials, labour, hire and usage
charges of machinery and all incidental charges in this
connection.)
A) Using Concrete Mixer metre 592.00 723.00
B) Using Concrete Batching and Mixing Plant metre 587.00 718.00
8.03 Printing New Letters and Figures of any Shade
Printing new letter and figures of any shade with
synthetic enamel paint black or any other approved
colour to give an even shade as per drawings and
Technical Specification Clause 801 of Specifications for
Road & Bridge Works of MoRT&H (5th Revision).
i) Hindi (Matras commas and the like not to be 0.80 0.80
per cm
measured and paid for. Half letters shall be
per
counted as half only)
letter
ii) English and Roman 0.50 0.50
8.04 Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary,
mandatory and informatory sign as per IRC :67 made of
high intensity grade sheeting vide clause 801.3, fixed
over aluminium sheeting, 1.5 mm thick supported on a
mild steel angle iron post 75 mm x 75 mm x 6 mm
firmly fixed to the ground by means of properly
designed foundation with M15 grade cement concrete
45 cm x 45 cm x 60 cm, 60 cm below ground level as per

262
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
approved drawing and Clause 801 of Specifications for
Road & Bridge Works of MoRT&H (5th Revision).
i) 90 cm equilateral triangle each 4860.00 4953.00
ii) 60 cm equilateral triangle each 3164.00 3258.00
iii) 60 cm circular each 4274.00 4368.00
iv) 80 mm x 60 mm rectangular each 5996.00 6090.00
v) 60 cm x 45 cm rectangular each 4161.00 4254.00
vi) 60 cm x 60 cm square each 4947.00 5041.00
vii) 90 cm high octagon each 7675.00 7768.00
8.05 Direction and Place Identification Signs upto 0.9
sqm Size Board.
Providing and erecting direction and place sqm 10731.00 10835.00
identification retro-reflectorised sign as per IRC:67
made of high intensity grade sheeting vide clause 801.3,
fixed over aluminium sheeting, 2 mm thick with area
not exceeding 0.9 sqm supported on a mild steel single
angle iron post 75 x 75 x 6 mm firmly fixed to the
ground by means of properly designed foundation with
M15 grade cement concrete 45 x 45 x 60 cm, 60 cm
below ground level as per approved drawing and Clause
801 of Specifications for Road & Bridge Works of
MoRT&H (5th Revision)..
8.06 Direction and Place Identification Signs with size
more than 0.9 sqm size Board.
Providing and erecting direction and place sqm 11102.00 11226.00
identification retro- reflectorised sign as per IRC :67
made of high intensity grade sheeting vide clause 801.3,
fixed over aluminium sheeting, 2 mm thick with area
exceeding 0.9 sqm supported on a mild steel angle iron
post 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the
ground by means of properly designed foundation with
M 15 grade cement concrete 45 cm x 45 cm x 60 cm, 60
cm below ground level as per approved drawing and
Clause 801 of Specifications for Road & Bridge Works of
MoRT&H (5th Revision)..
8.07 Providing & fixing Concrete Sign Board as per IRC each 2410.00 2841.00
specification of size 900 x 750 x 37 mm. thick made with
RCC 1:1½:3 with pakur variety stone chips reinforced
with double layer IRC febric (75 x 75 mm. mesh) and
fixed with necessary nuts & bolts on two RC precast
posts 100 mm. x 150 mm. of height 2.65 m. of which top
750 mm. is of section 100 x 13 mm. and 1.90 metre
above GL & 0.75 metre below GL including digging hole,
repacking the same with cement concrete 1:3:6 with
jhama khoa or with local stone chips etc. complete
including painting two coats on both faces lettering
sign marks etc. as per direction of the Engineer-in-
Charge. (The rate is inclusive of cost of reinforcement,
concrete, shuttering, nuts & bolts, washer etc.
complete.)
8.08 Retro reflective Road Marking (Cold applied) sqm 349.00 349.00

263
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
8.09 Road Marking with Hot Applied Thermoplastic
Compound with Reflectorising Glass Beads on
Bituminous Surface
Providing and laying of hot applied thermoplastic sqm 584.00 584.00
compound 2.5 mm thick including reflectorising glass
beads @ 250 gms per sqm area, thickness of 2.5 mm is
exclusive of surface applied glass beads as per IRC:35.
The finished surface to be level, uniform and free from
streaks and holes complete as per Clause 803 of
Specifications for Road & Bridge Works of MoRT&H
(5th Revision).
8.10 Kilometre Stone
Reinforced cement concrete M15 grade kilometre stone
of standard design as per IRC:8-1980, fixing in position
including painting and printing etc.
(i) 5th kilometre stone (precast) each 2947.00 3162.00
(ii) Ordinary kilometer stone (precast) each 1749.00 1890.00
(iii) Hectometer stone (precast) each 498.00 527.00
8.11 Road Delineators
Supplying and installation of delineators (road way each 386.00 386.00
indicators, hazard markers, object markers), 80-100 cm
high above ground level, painted black and white in 15
cm wide strips, fitted with 80 x 100 mm rectangular or
75 mm dia circular reflectorised panels at the top,
buried or pressed into the ground and conforming to
IRC-79 and the drawings.
8.12 Fencing With Welded Steel Wire Fabric 75 mm x 50
mm
Providing 1.20 metre high fencing with angle iron posts metre 537.00 542.00
50 mm x 50 mm x 6 mm at 3 metre center to center
with 0.40 metre embedded in M15 grade cement
concrete, corner, end and every 10th post to be strutted,
provided with welded steel wire fabric of 75 mm x 50
mm mesh or 75 mm x 25 mm mesh and fixed to iron
posts by flat iron 50 x 5 mm and bolts etc. complete in
all respects.
8.13 Reinforced Cement Concrete Crash Barrier
Provision of an Reinforced cement concrete crash metre 1791.00 1824.00
barrier at the edges of the road, approaches to bridge
structures and medians, constructed with M-20 grade
concrete with HYSD reinforcement conforming to
IRC:21 and dowel bars 25 mm dia, 450 mm long at
expansion joints filled with pre-moulded asphalt filler
board, keyed to the structure on which it is built and
installed as per design given in the enclosure to MOST
circular No. RW/NH - 33022/1/94-DO III dated 24 June
1994 as per dimensions in the approved drawing and at
locations directed by the Engineer-in-Charge, all as
specified.
Note: Add : Cost of 0.30 cum/metre M20 Grade concrete only
to arrive at consolidated rate.

264
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
8.14 Metal Beam Crash Barrier
A Type - A, "W" : Metal Beam Crash Barrier
Providing and erecting a "W" metal beam crash metre 2615.00 2712.00
barrier comprising of 3 mm thick corrugated sheet
metal beam rail, 70 cm above road/ground level,
fixed on ISMC series channel vertical post, 150 x 75 x
5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m
below ground/road level, all steel parts and fitments
to be galvanized by hot dip process, all fittings to
conform to IS:1367 andIS:1364, metal beam rail to
be fixed on the vertical post with a spacer of channel
section 150 x 75 x 5 mm, 330 mm long complete as
per Clause 811.3 of Specifications for Road & Bridge
Works of MoRT&H (5th Revision)..
B Type - B, "THRIE" : Metal Beam Crash Barrier
Providing and erecting a "Thrie" metal beam crash metre 3301.00 3403.00
barrier comprising of 3 mm thick corrugated sheet
metal beam rail, 85 cm above road/ground level,
fixed on ISMC series channel vertical post, 150 x 75 x
5 mm spaced 2 m centre to centre, 2 m high with 1.15
m below ground level, all steel parts and fitments to
be galvanised by hot dip process, all fittings to
conform to IS:1367 and IS:1364, metal beam rail to
be fixed on the vertical post with a space of channel
section 150 x 75 x 5 mm, 546 mm long complete as
per Clause 811.3 of Specifications for Road & Bridge
Works of MoRT&H (5th Revision)..
8.15 Road Markers/Road Stud with Lense Reflector
Providing and fixing of road stud 100x 100 mm, die-cast each 69.00 69.00
in aluminium, resistant to corrosive effect of salt and
grit, fitted with lens reflectors, installed in concrete or
asphaltic surface by drilling hole 30 mm upto a depth of
60 mm and bedded in a suitable bituminous grout or
epoxy mortar, all as per BIS 873 part 4:1973
8.17 R.C. Guard post
Supplying fitting and fixing R.C. guard post 1.37m long each 912.00 980.00
with C.C. 1:2:4 with graded stone chips of 13.2mm down
casting , curing complete including cost of providing
4nos.of 12mm dia. rod of length 1.54m as main
reinforcement and 6 nos. of round shaped 8mm dia rods
used as binders; the placing of the first binder should be
at 75mm below the top finished surface and the other 5
nos of binders should be placed at 245mm c/c ; the
guard post is of octagonal section with inscribed circle
of dia 24cm at the base tapering to corresponding
dimensions of 16cm at the top including two coats of
painting with best quality synthetic enamel paint of
approved make and grade to form 6 nos. horizontal
alternate bands in white/tannery yellow and black to
90 cm length standing up above ground after
mendinggood damages if any during striking off
shuttering,making hole in ground of 47cm depth and
30cm. minimum dia, fixing the guard posts in the same

265
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
holes and repacking the earth properly so as to keep the
guard posts standing properly erect in correct position
true to line and length including carriage of R. C. Guard
Post with due care to the site including loading into the
truck and unloading at site complete in all respect.
With Pakur variety stone chips
8.18 Painting (one coat) guard posts with 6nos. of 16cm each 120.00 120.00
wide horizontal alternate band in different colours
after the scrapping the surface free from old paint etc.
as directed with best quality synthetic enamel paint of
approved make and brand after fixing old existing
guard post in correct position true to line and level with
repacking the ground at base properly and mending
good damages if necessary complete in all respect.
8.19 Painting (one coat) K.M. post with best quality
synthetic enamel paint of approved make and brand of
different shades as directed after cleaning and washing
the surface including mending good damages as
necessary complete in all respect.
a) 5th K.M. Post each 104.00 104.00
b) Ordinary K.M. Post each 67.00 67.00
8.20 Painting (one coat) 200 m post with best quality each 23.00 23.00
synthetic enamel paint of approved make and brand of
different shades as directed after cleaning and washing
the surface including mending good damages as
necessary, complete in all respect.
8.21 Painting the vertical end faces of posts, wheel
guards or railing or parapet with alternate bands of
different colours as directed by the Engineer-in-charge
with approved synthetic enamel paint.
a) One Coat sqm 62.00 62.00
b) Two Coats sqm 99.00 99.00
8.22 Supply fitting and fixing Boundary Pillars as per each 1179.00 1410.00
type design IRC-25 1969 with cement concrete 1:2:4
with stone chips including cost of providing 2 nos. of 6
mm dia M.S. rods of length 1.84 m in the form of
inverted U-Shape as main reinforcements placed
crosswise to each other and 5 nos. of round shaped 6
mm dia M.S. rods used as binders; the placing of 1st
binder should be at 75mm below the top finished
surface and the other 4 nos. of binders should be placed
at 1.85mm C/C and to be of 90 cm. long with 20cm dia
at the base tapering to 15cm dia at the top with head
properly round and sunk inscriptions (as directed) at
the side with 60cm embedment into the ground after
making hole in the ground of size 50cm x 50cm x 75cm
and repacking the hole properly with cement conc.
1:4:8 with stone chips and finishing the exposed portion
of 30cm length with white wash & painting the
inscription as directed including carriage of the post to
the site with loading & unloading etc. complete in all
respect. With Pakur variety stone chips.

266
PWD (WB), Schedule of Rates : 2014 Volume II : Road & Bridge Works

CHAPTER - 9
HORTICULTURE
All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
9.01 Spreading of Sludge Farm Yard Manure or/and
good Earth
Spreading of sludge farm yard manure or/ and good cum 19.80 19.80
earth in required thickness (cost of sludge, farm yard
manure or/and good earth to be paid for separately)
9.02 Making Lawns including Ploughing and Dragging
with 'Swagha' Breaking of Clod
Making lawns including ploughing and breaking of sqm 20.20 20.20
clod, removal of rubbish, dressing and supplying doobs
grass roots and planting at 15 cm apart, including
supplying and spreading of farm yard manure at rate of
0.18 cum per 100 sqm
9.03 Maintenance of Lawns or Turfing of Slopes
Maintenance of lawns or Turfing of slopes (rough sqm 60.30 61.60
grassing) for a period of one year including watering
etc.
9.04 Planting and Maintaining of Permanent Hedges
(a) Planting permanent hedges including digging
of trenches
Planting permanent hedges including digging of metre 205.80 205.80
trenches, 60 cm wide and 45 cm deep, refilling the
excavated earth mixed with farmyard manure,
supplied at the rate of 4.65 cum per 100 metres
and supplying and planting hedge plants at 30 cm
apart.
(b) Maintenance of hedge for one year metre 122.30 122.70
9.05 Planting and Maintaining of Flowering Plants and
Shrubs
(a) Planting flowering plants and shrubs in km 22397.00 22449.00
central verge
per km
Maintenance of flowering plants and shrubs
(b) per 133653.00 134433.00
in central verge for one year
year
9.06 Planting of Trees and their Maintenance for one
Year
Planting of trees by the road side (Avenue trees) in each 688.00 690.00
0.60m dia holes, 1 m deep dug in the ground, mixing the
soil with decayed farm yard/sludge manure, planting
the saplings, backfilling the trench, watering, fixing the
tree guard and maintaining the plants for one year.
9.07 Renovation Lawns including, Weeding, Forking the
Ground, Top Dressing with Forked Soil
Renovation lawns including, weeding, forking the sqm 9.80 9.80
ground, top dressing with forked soil, watering and
maintenance the lawns, for 30 days or more, till the
grass forms a thick lawn, free from weeds, and fit for
moving and disposal of rubbish as directed, including
supplying good earth, if needed but excluding the cost
of well decayed farm yard manure.

267
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
9.08 Half Brick Circular Tree Guard, in 2nd Class Brick,
internal diameter 1.25 metres, and height 1.2
metres, above ground and 0.20 metre below ground
Half brick circular tree guard, in 2nd class brick, each 1705.00 2312.00
internal diametre 1.25 metres, and height 1.2 metres,
above ground and 0.20 metre below ground, bottom
two courses laid dry, and top three courses in cement
mortar 1:6 (1 cement 6 sand) and the intermediate
courses being in dry honey comb masonry, as per design
complete
9.09 Edging with 2nd Class Bricks, Laid Dry Lengthwise
Edging with 2nd class bricks, laid dry lengthwise, metre 34.30 47.00
including excavation, refilling, consolidation, with a
hand packing and spreading nearly surplus earth
within a lead of 50 metres
9.10 Making Tree Guard 53 cm dia and 2 Metre High as
per Design from Empty Bitumen Drums
Making tree guard 53 cm dia and 2 metres high as per each 482.00 491.00
design from empty bitumen drums, slit suitably to
permit sun and air, (supplied by the department at
stock issue rate) including providing and fixing four
legs 40 cm long of 30 x 3 mm MS riveted to tree guard
and providing and fixing 2 nos MS sheet rings 50 x 0.5
mm with rivets complete in all respects.
9.11 Tree Guard with MS Angle Iron and Steel Wire
Providing and fixing tree guard 0.60 metre square, 2.00 each 2550.00 3094.00
metre high fabricated with MS angle iron 30 x 30 x 3
mm, MS iron 25 x 3 mm and steel wire3 mm dia welded
and fabricated as per design in two halves bolted
together.
9.12 Compensatory Afforestation
Planting trees as compensatory afforestation at the hetare 90002.00 91921.00
rate of 290 trees per hectare at a spacing of 6 m by
grubbing and leveling the ground upto a depth of 150
mm, digging holes 0.9 m dia, 1 m deep, mixing farm
yard/sludge manure with soil, planting of sapling 2 m
high with 25 cm dia stem, backfilling the hole and
watering.

268
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

CHAPTER - 10
MAINTENANCE OF ROADS
All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
10.01 Dressing and chilchalling Road flanks including sqm 12.20 12.20
cutting and filling with earth up to 150 mm average
thickness finished with outward cross-grade of 1 in 30.
(Extra quantity of earth for filling shall be obtained
from road side borrow pits.)
10.02 Restoration of Rain Cuts
Restoration of rain cuts with soil, moorum gravel or a cum 140.00 144.00
mixture of these, clearing the loose soil, benching for
300mm width laying fresh material in layers not
exceeding 250 mm and compaction with plate
compactor or power rammer to restore the original
alignment, level and slopes as per drawings and
technical specifications Clause 1902 for Rural Roads of
MORD.
10.03 A. Maintenance of Earthen shoulder (filling with
fresh selected soil)
Making up loss of material/irregularities on sqm 26.20 26.80
shoulders to the design level by adding fresh
approved selected soil and compacting with
appropriate equipment at OMC upto a lead of 1000
m as per technical specification Clause 1903 for
Rural Roads of MORD. (Average thickness 150 mm)
B. Maintenance of Earthen shoulder (stripping of
excess soil)
Stripping excess soil from the shoulder surface to sqm 13.20 13.50
achieve the approved level and compacting with
plate compactor at OMC as per drawings and
Technical Specification Clause 1903 for Rural
Roads of MORD. (Average thickness 150 mm)
10.04 Maintenance of Non-bituminous Base and Sub-Base
or WBM Road
Patching of potholes by draining water, cutting the cum 448.00 424.00 Construction
pothole area to rectangular shape with vertical edges, wing is to add
removing all loose materials, screening and stacking the cost of
1.21 m3 of
the same for reuse with new materials as per
Grading-II
requirement, filling the pothole area with additional aggregates &
volume of crushed stone materials / laterite / Jhama / 0.24 m3 of
broken shingles / coated stones of Pakur variety etc. Type-B
and screenings as applicable, and compacting the same screening to
with static roller as per Water Bound Macadam arrive at the
Specification, including cost of all materials and complete
machineries. rate.
Note: 1. The payment is to be done based on loose net volume
of coarse aggregates only.
2. This item of work may be executed for temporary
restoration of road and should be covered with
bituminous overlay as soon as possible.

269
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
3. If filling is done using coated stone aggregates, a 75mm
thick WBM (grading- II) layer shall overlay the fill using
Pakur stone materials, before laying of bituminous course.
10.05 Maintenance of Bituminous surface road
i) Repair to pot holes by removal of failed material, cum 2259.00 2325.00
trimming the sides to vertical and leveling the
bottom, cleaning the same with compressed air or
any appropriate method filled with B.M (thickness
not more than 75 mm in single layer) applying
bitumen emulsion prime coat at the bottom and
bitumen emulsion tack coat on sides and on bottom
as per technical specifications Clauses 502 and 503
for Rural Roads of MORD.
ii) Patch repair on already filled pot holes with BM sqm 75.00 77.00
with 20 mm premix carpet and seal coat Type B as
per drawings and technical specification Clause
1904.2 for Rural Roads of MORD.
iii) Patch repair on already filled pot holes with BM sqm 17.50 18.10
with 12 mm premix carpet using premixed stone
chips of approved quality with hot matrix using
1.00 m3 of 11.2 mm chips and 0.6m3 of 5.6 mm
chips per 100 m2 of surface, including preheating
the stone chips on suitable pans and intimately
mixing the hot chips separately with hot matrix @
56 kg per m3 of stone chips, laying the mixture
uniformly over the surface and rolling with power
roller, after hand packing and pinning adequately
to ensure a compact surface.
iv) Patch repair on already filled pot holes with BM sqm 10.60 11.20
with 6 mm premix carpet using premixed stone
chips of approved quality with hot matrix using
0.80 m3 of 11.2 mm chips and 0.25m3 of 5.6 mm
chips per 100 m2 of surface, including preheating
the stone chips on suitable pans and intimately
mixing the hot chips separately with hot matrix @
70 kg per m3 of stone chips, laying the mixture
uniformly over the surface and rolling with power
roller, after hand packing and pinning adequately
to ensure a compact surface.
Note: Add cost and carriages of materials as specified to get
the final consolidated rate.
10.06 A. Pre-coating Chips
Pre-coating stone aggregates with hot matrix @ 56 cum 714.00 727.00
kg/m3 of net volume of stone aggregate in concrete
mixer including preheating the stone aggregate at a
suitable temperature including the cost of carriage
of the stone aggregate at the mixing yard and
carriage of the pre-coated materials for dumping at
a suitable place as directed including cost and
carriage of bitumen and hire charges of machineries
and all incidental charges complete as per direction
of Engineer-in-charge.

270
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division

Note: Add cost of materials and carriages as per requirement


vide Table 3.3-1 of Section 3 to get the final
consolidated rate.
B. Repairing pot holes by pre-coated Chips
Repairing pot holes with pre-coated stone materials
including cutting, loading pre-coated stone
materials at departmental stack-yard or any other
approved pre-defined location, including carriage of
pre-coated stone materials from source to different
kilometers of road by truck and laying directly from
truck and compacting with plate compactor / power
roller including cutting the pot hole to regular shape
clearing the pot holes of loose materials, drying the
bed of pot holes, where necessary, by soaking with
gunny bags and using lime, where necessary, before
laying of pre-coated materials etc. complete as per
direction of Engineer-in-charge.
(i) Within a distance up to 10 kms. cum 1129.00 1171.00

(ii) Within a distance above 10 kms and up to 20 kms. cum 1235.00 1282.00

10.07 Repairing pot-holes and making up small


depressions with ramming or power rolling including
screening, cleaning chips or metals and washing, drying
as necessary and heating the chips or metal where
necessary, cutting pot holes to regular shapes with
vertical edges, cleaning the disintegrated materials,
heating matrix and applying tack coat (including sides),
finishing the top of repaired surface levelled with
adjoining area, including cost and carriage of stone
aggregates and matrix, excluding cost of applying tack
coat. [Tack coat is to be considered separately]
i) With premixed Chips or Bajrees with 54 kg of [Payment to
bitumen per m3 of loose net volume of stone chips the
using concrete mixer machine. (The payment is to be Contractor is
to be made
made on the basis of loose net volume of stone
on the basis
materials consumed in the work) of loose net
(a) Using suitable pan cum 1126.00 1156.00 volume of
coarse
(b) Using Mobile HMP (Light duty) cum 819.00 854.00 aggregate
only
ii) By grouting method using matrix @ 70 kg / m3 of cum 1173.00 1185.00
excluding key
loose net volume of course aggregate. Requirement aggregates]
of key aggregate may be taken as 10% of coarse
aggregate and size 11.2 mm.
Note: Add cost of materials and carriages as per requirement
vide Table 3.3-1 of Section 3 to get the final
consolidated rate.

271
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division

10.08 Repairing pot-holes and making up small cum 1234.00 1252.00


depressions using Cationic Bitumen Emulsion
conforming to IS 8887- 1978 with stone metals / chips
premixed with emulsion in concrete mixer or any other
method approved by the Engineer-in-Charge, including
cutting the pot-hole area in regular shapes with (The
vertical edges, thorough cleaning & moistening of payment is
surface, applying tack coat, filling up the pot-holes with to be made
pre-mixed metals/chips in layer/layers as per on the basis
specification and direction of the Engineer-in-charge, of loose net
compacting by power roller, finishing the top of volume of
repaired surface levelled with adjoining area including stone
cost and carriage of stone aggregates, blinding materials
material & bitumen emulsion, hire & running charges of consumed in
rollers and other tools & plants, cost of fuel & lubricants the work).
and other incidental charges excluding cost of applying
tack coat.
[Using stone chips of size 22.4 mm and 11.2 mm in 60:
40 proportion, premixing with bitumen emulsion @
70.7 kg per m3 of loose net volume of stone chips.]
Note: Add cost of materials and carriages as per requirement
vide Table 3.3-1 of Section 3 to get the final
consolidated rate.
10.09 Mending Potholes and depressions by stitching
picked jhama bricks with one brick-on-edge laid in
herring bone pattern and including necessary cushion
of sand below the soling (and in between layers)
including cutting the pothole area to rectangular shape
with vertical edges, removing all loose materials,
finishing the surface to match with adjacent areas
complete as per direction.
(a) One brick-on-edge laid in herring bone pattern on a sqm 854.00 1129.00
layer of brick flat (thickness 75 mm. plus 125 mm)
(b) One brick-on-edge laid in herring bone pattern sqm 541.00 712.00
(thickness 125 mm)
10.10 Crack Filling
Filling of crack using slow - curing bitumen emulsion metre 1.00 1.00
and applying crusher dust in case crack are wider than
3mm.
10.11 Spreading of sand over the bituminous surface @ 100 146.00 349.00
0.003 m3 per m2 of surface from the road side stacks sqm
and carriage of the same up to a distance of 150 m from
stack complete including cost of sand.
10.12 Maintenance of Drains
The maintenance of drains include erosion, repair, metre 2.40 2.40
clearing, cleaning, reshaping, regarding, deepening of
side drains as well as catch water drains as per
technical specification Clause 1907 for Rural Roads of
MORD.

272
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division

10.13 I) Maintenance of Culverts


Maintenance of Hume pipe Culvert by way of each 1029.00 1029.00
Clearing, Cleaning, Erosion repair, repairs to (1000
cracks, parapet wall and protection work as per mm
drawing and technical specification Clause 1908 dia)
for Rural Roads of MORD.
II) Maintenance of Culverts Slab type
Maintenance of Slab type Culverts by way of each 2121.00 2121.00
clearing, Cleaning, Erosion repair, repairs to (2 m
cracks, parapet walls and Protection works as per span)
drawing and technical specification Clause 1908
for Rural Roads of MORD.
10.14 Maintenance of 200 metre and Km stones
Maintenance of 200 metre km stone by way of refitting km 598.00 598.00
of tilted stones repairing with cement mortar, cleaning,
repairing and lettering on 200 metre km stone and 5th
km stone as per drawing and technical specification
Clause 1912 for Rural Roads of MORD.
10.15 Cutting kutcha drain of 600 mm wide and depth up to
300 mm, including disposal of excavated material in
embankment slopes within a lead of 50 m.
(a) Through ordinary soil. metre 14.40 14.40
(b) Through Mixed soil. metre 16.20 16.20
10.16 Cutting of branches of trees shrubs and trimming of
grass and weeds
i) Cutting of branches of trees and shrubs from the per 95.00 95.00
road way or with in R.O.W including disposal of tree
wood and leaves to suitable location as per
technical specification Clause 1914 for Rural
Roads of MORD.
ii) Cutting of shrubs from the road way or with in each 5.90 5.90
R.O.W and disposal of shrubs to suitable locations
as per technical specifications Clause 1914 for
Rural Roads of MORD.
iii) Trimming of grass and weeds from the sqm 2.00 2.00
shoulders/berms and disposing off the same to
suitable locations as per technical specifications
Clause 1914 for Rural Roads of MORD.

273
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

BRIDGE AND CULVERT WORKS


Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

CHAPTER - 11
PIPE CULVERTS
All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
11.01 Excavation for Structures
Earthwork in excavation for foundation of structures cum 104.00 104.00
upto 3 m depth as per drawing and technical
specification Clause 1104 for Rural Roads of MORD
including setting out, construction of shoring and
bracing, removal of stumps and other deleterious
matter, dressing of sides and bottom and backfilling
with approved material.
11.02 Bedding for Pipe
i) Type A (Concrete Cradle) Bedding
Laying concrete cradle bedding with M15 Grade cum 1605.00 1985.00
Cement Concrete as per Clause 1105 (i) for Rural
Roads of MORD
ii) Type B (First Class) Bedding
Laying (First Class) bedding on well compacted cum 164.00 283.00
sand, moorum or approved granular material as
per Clause 1105 (ii) for Rural Roads of MORD
Note: Add cost and carriage of materials to get the final
consolidated item rate.
11.03 Providing and Laying Reinforced Cement Concrete
Pipe NP3 as per design in Single Row
Providing and laying reinforced cement concrete pipe
NP3 with spigot socket for culverts on first class
bedding of granular material in single row including
fixing with cement mortar 1:2 but excluding excavation,
protection works, backfilling, concrete and masonry
works in head walls and parapets Clause 1106 for Rural
Roads of MORD.
(A) 1200 mm dia metre 946.00 954.00
(B) 1000 mm dia metre 680.00 685.00
(C) 900 mm dia metre 567.00 572.00
(D) 600 mm dia metre 350.00 353.00
Note: Add cost and carriage of Pipe to get the final
consolidated item rate.
11.04 Providing and Laying Reinforced Cement Concrete
Pipe NP4 as per design in Single Row
Providing and laying reinforced cement concrete pipe
NP4 with spigot socket for culverts on first class
bedding of granular material in single row including
fixing with cement mortar 1:2 but excluding excavation,
protection works, backfilling, concrete and masonry
works in head walls and parapets Clause 1106 for Rural
Roads of MORD.
(A) 1200 mm dia metre 1153.00 1161.00
(B) 1000 mm dia metre 917.00 922.00
(C) 900 mm dia metre 771.00 776.00
(D) 600 mm dia metre 394.00 397.00

274
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
Note: Add cost and carriage of Pipe to get the final
consolidated item rate.
11.05 Providing and Laying Reinforced Cement Concrete
Pipe NP3 as per Design in Double Row
Providing and laying reinforced cement concrete pipe
NP3 with spigot socket for culverts on first class
bedding of granular material in double row including
fixing with cement mortar 1:2 but excluding excavation,
protection works, backfilling, concrete and masonry
works in head walls and parapets as per Clause 1106
for Rural Roads of MORD.
(A) 1200 mm dia metre 1951.00 2129.00
(B) 1000 mm dia metre 1397.00 1408.00
(C) 900 mm dia metre 1168.00 1178.00
(D) 600 mm dia metre 699.00 704.00
Note: Add cost and carriage of Pipe to get the final
consolidated item rate.
11.06 Providing and Laying Reinforced Cement Concrete
Pipe NP4 as per Design in Double Row
Providing and laying reinforced cement concrete pipe
NP4 with spigot socket for culverts on first class
bedding of granular material in double row including
fixing with cement mortar 1:2 but excluding excavation,
protection works, backfilling, concrete and masonry
works in head walls and parapets as per Clause 1106
for Rural Roads of MORD.
(A) 1200 mm dia metre 2365.00 2381.00
(B) 1000 mm dia metre 1871.00 1881.00
(C) 900 mm dia metre 1575.00 1586.00
(D) 600 mm dia metre 788.00 793.00
Note: Add cost and carriage of Pipe to get the final
consolidated item rate.

275
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

CHAPTER - 12
FOUNDATIONS

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
12.01 Excavation for Structures
Earth work in excavation of foundation of structures
as per drawing and technical specification, including
setting out, removing, spreading or stacking of spoils
within a lead of 150 m. as directed and including
trimming the sides of the trenches, leveling, dressing
and ramming the bottom, and backfilling with
approved material complete as per direction of the
Engineer-in-Charge .
I. In all sorts of soil excluding marshy soil &
rocks (soft or hard) by manual means.
a) upto 3 m depth
(i) With pumping out water including shoring cum 124.00 124.00
as required.
(ii) With pumping out water excluding shoring cum 123.00 123.00
(iii) Without pumping out water but including cum 115.00 115.00
shoring as required
(iv) Without pumping out water and shoring cum 114.00 114.00
b) 3 m to 6 m depth
(i) With pumping out water including shoring cum 165.00 165.00
as required.
(ii) With pumping out water excluding shoring cum 164.00 164.00
(iii) Without pumping out water but including cum 148.00 148.00
shoring as required
(iv) Without pumping out water and shoring cum 146.00 146.00
c) Above 6 m depth
(i) With pumping out water including shoring cum 228.00 228.00
as required.
(ii) With pumping out water excluding shoring cum 226.00 226.00
(iii) Without pumping out water but including cum 197.00 197.00
shoring as required
(iv) Without pumping out water and shoring cum 195.00 195.00
II. In all sorts of soil excluding marshy soil &
rocks (soft or hard) by mechanical means
(using excavator of suitable capacity).
(i) Depth upto 3 m
(i) With pumping out water. cum 47.00 49.00
(ii) Without pumping out water cum 46.00 47.00
(ii) Depth 3 m to 6 m
(i) With pumping out water. cum 55.00 57.00
(ii) Without pumping out water cum 52.00 54.00
(iii) Depth above 6m
(i) With pumping out water. cum 69.00 72.00
(ii) Without pumping out water cum 64.00 67.00

276
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
III. In ordinary rock (not requiring blasting)
A By Manual Means
(i) With pumping out water. cum 175.00 175.00
(ii) Without pumping out water cum 162.00 162.00
B By mechanical means (using excavator of
suitable capacity).
(i) With pumping out water. cum 62.00 64.00
(ii) Without pumping out water cum 57.00 59.00
IV In Hard rock (requiring blasting) including
cost of hire & operational charges of air
compressor with necessary accessories and cost
of all necessary blasting materials.
(i) With pumping out water. cum 62.00 64.00
(ii) Without pumping out water cum 57.00 59.00
V In Hard rock ( blasting prohibited )
(i) With pumping out water. cum 411.00 414.00
(ii) Without pumping out water cum 385.00 387.00
VI In Marshy soil for depth upto 3 m depth
A By Manual means
(i) With pumping out water including shoring cum 579.00 586.00
as required.
(ii) With pumping out water excluding shoring cum 540.00 547.00
(iii) Without pumping out water but including cum 502.00 509.00
shoring as required
(iv) Without pumping out water and shoring cum 463.00 470.00
B By Mechanical Means using excavator of
suitable capacity and tipper trucks.
(i) With pumping out water including shoring cum 130.00 132.00
as required.
(ii) With pumping out water excluding shoring cum 121.00 124.00
(iii) Without pumping out water but including cum 113.00 115.00
shoring as required
(iv) Without pumping out water and shoring cum 105.00 107.00
12.02 Earthwork in filling in foundation trenches with cum 92.00 92.00
good earth in layers not exceeding 15cm. including
watering and ramming layer by layer complete with
earth obtained from excavation of foundation or from
fresh excavation of land arranged by Department Applicable
within a lead of 150 m. for
12.03 Earth in filling in foundation trenches and at the cum 161.00 161.00 foundation
back of abutments with good earth (sandy soil) in trenches in
layers not exceeding 15 cm. including watering and Rocky &
ramming layer by layer complete with earth obtained Marshy soil.
by fresh excavation from land arranged by
Department beyond 150 m. but within 300 m.
including all lifts. Earth to be approved by the
Engineer-in-charge.

277
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
12.04 Sand filling in foundation trenches and at the back cum 177.00 304.00
of abutments, wing-walls etc. with good local sand
free from earth in layers not exceeding 15 cm.
including inundating each layer by profuse water and
poking and ramming layer by layer complete including
supply of sand. Quality of sand is to be approved by the
Engineer-in-charge.
Note : 1. Labour rate per m³ is provided; Cost of sand is to be
added to arrive at the complete item rate.
2. Compaction factor of dry clean sand is 0.835;
Suitable correction should be made for bulkage of
sand.
12.05 Plain / Reinforced Cement Concrete in Open
foundation with or without reinforcements, in any
part of foundation of bridges / culverts with graded
stone chips of appropriate nominal sizes, including
screening and cleaning of coarse aggregates, fine
aggregate (sand) conforming to proper grading zone,
both of approved quality and cement, as necessary,
cost of curing with water, including cost and carriage
of all materials and including preparation of design
mix, approval of the same by the Engineer-in-Charge,
cost for quality control, sampling, testing etc. including
cost of formwork but excluding reinforcement
complete as per drawing and technical specifications.
A PCC Grade M20 cum 2175.00 2617.00
B RCC Grade M20
I) Using concrete mixer cum 2178.00 2625.00
II) With Batching Plant, Transit Mixer and cum 1913.00 2369.00
Concrete Pump
C PCC Grade M25
I) Using concrete mixer cum 2302.00 2746.00
II) With Batching Plant, Transit Mixer and cum 2039.00 2491.00
Concrete Pump
D RCC Grade M25
I) Using concrete mixer cum 2306.00 2755.00
II) With Batching Plant, Transit Mixer and cum 2043.00 2500.00
Concrete Pump
E PCC Grade M30
I) Using concrete mixer cum 2302.00 2745.00
II) With Batching Plant, Transit Mixer and cum 2039.00 2490.00
Concrete Pump
F RCC Grade M30
I) Using concrete mixer cum 2300.00 2748.00
II) With Batching Plant, Transit Mixer and cum 2037.00 2494.00
Concrete Pump
G RCC Grade M35
I) Using concrete mixer cum 2336.00 2787.00
II) With Batching Plant, Transit Mixer and cum 2075.00 2534.00
Concrete Pump

278
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
Note: (Applicable for all the item in Sl.12.05)
1 Construction wing is to add cost and carriage of
cement and coarse aggregates as per requirement
vide Table 3.2-1 of Section only, as per consumption
chart to arrive at consolidated rate.
2 While actually providing the item in estimate or
agreement of work, maximum nominal size of
coarse aggregates intended to be used should be
selected and mentioned in the item.
3 From durability consideration, the value of
minimum cement content and maximum water
cement ratio to be considered in the mix design
shall be mentioned in the items as per the direction
of the Engineer-in-Charge.
12.06 Providing and constructing Temporary Island for
construction of Well foundation.
A Construction of Temporary Island assuming
depth of water 1.0 m and height of island upto
1.25m. by sand / dry soil filled cement /
polyethylene bags and removal of the same after
main construction activity.
i) Area of Island between 100 m² to 120 m² each 23448.00 24095.00
ii) Area of Island between 120 m² to 140 m² each 27119.00 27902.00
iii) Area of Island between 140 m² to 160 m² each 31049.00 31982.00
B Construction of Temporary Island by
construction of outer annular layer with two rows
of bullahs, suitable spaced, of dia. not less than
150 mm, driven at least half of the total length,
properly tied, braced and supported and filling the
annular space with sand / soil filled bags,
protected by drum sheet walling on both side and
filling the core portion with locally available
materials including the dismantling, removing
and cleaning the site of the construction of main
component of the structure.
i) Area of Island between 100 m² to 120 m²
a) Height above bed level upto 2.25 m. each 273317.00 274829.00
b) Height above bed level upto 3.25 m. each 389754.00 392152.00
a) Height above bed level upto 4.25 m. each 501445.00 503280.00
ii) Area of Island between 120 m² to 140 m²
a) Height above bed level upto 2.25 m. each 304428.00 305408.00
b) Height above bed level upto 3.25 m. each 429047.00 430462.00
a) Height above bed level upto 4.25 m. each 553659.00 555509.00
iii) Area of Island between 140 m² to 160 m²
a) Height above bed level upto 2.25 m. each 331467.00 332632.00
b) Height above bed level upto 3.25 m. each 467117.00 468800.00
a) Height above bed level upto 4.25 m. each 618672.00 621668.00

279
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
12.07 A. Providing and constructing Service Road of metre 1365.00 1385.00
width 4.0 m to reach island location from one pier
location to another pier location with height upto 1
m. by sand / dry soil filled cement / polyethylene
bags and removal of the same after main
construction activity.
B. Providing and constructing Temporary Service
Road of width not less than 3.75 m over river for
movement of men, equipment and construction
machineries from one pier / abutment location to
another pier / abutment location considering
necessary stability and safety aspects by providing
and driving suitable piles, providing fitting, fixing
suitable R.S. Joist, Channels, angles and wooden
sleeper as per design requirement including
dismantling and taking out the entire service road
after construction.
i) With Eucalyptus bullah Pile: metre 5188.00 5244.00
(Height of deck above bed level upto 2.25m)
ii) With R. S. Joist Pile
a) Height of deck above bed level above 2.25 m metre 11194.00 -
& upto 3.25 m.
b) Height of deck above bed level above 3.25 m metre 11363.00 -
& upto 4.25 m.
12.08 Providing and laying Steel Cutting edge weighing kg 36.00 36.30
40 kg per metre for Well foundation including cost
& carriage of all materials complete as per drawing
and technical specification and direction of Engineer-
in-charge.
Note: Add cost and carriage of Structural steel in plates,
angles, etc. to arrive at complete rate.
12.09 Plain / Reinforced Cement Concrete, in Well
foundation with coarse aggregates of appropriate
nominal size and grading, fine aggregate (sand)
conforming to proper grading zone, both of approved
quality, cement and water reducing admixtures, as
necessary, including labour, cost and carriage of all
materials and including preparation of design mix,
approval of the same by the Engineer-in-Charge and
cost for quality control, sampling, testing etc. all
complete as per drawing and technical specification
including the cost of necessary form work and staging
complete.
A In Well curb
(i) RCC M20 Grade
I) Using concrete mixer cum 3023.00 3566.00
II) With Batching Plant, Transit Mixer and cum 2717.00 3271.00
Concrete Pump

280
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
(ii) RCC M25 Grade
I) Using concrete mixer cum 3258.00 3807.00
II) With Batching Plant, Transit Mixer and cum 2953.00 3511.00
Concrete Pump
(iii) RCC M35 Grade
I) Using concrete mixer cum 3385.00 3945.00
II) With Batching Plant, Transit Mixer and cum 3080.00 3650.00
Concrete Pump
B In Well steining
(i) PCC M20 Grade cum 2492.00 2969.00
(ii) RCC M20 Grade
I) Using concrete mixer cum 2495.00 2978.00
II) With Batching Plant, Transit Mixer and cum 2215.00 2708.00
Concrete Pump
(iii) PCC M25 Grade
I) Using concrete mixer cum 2667.00 3148.00
II) With Batching Plant, Transit Mixer and cum 2389.00 2879.00
Concrete Pump
(iv) RCC M25 Grade
I) Using concrete mixer cum 2673.00 3160.00
II) With Batching Plant, Transit Mixer and cum 2393.00 2889.00
Concrete Pump
(v) PCC M30 Grade
I) Using concrete mixer cum 2686.00 3168.00
II) With Batching Plant, Transit Mixer and cum 2405.00 2897.00
Concrete Pump
(vi) RCC M30 Grade
I) Using concrete mixer cum 2684.00 3172.00
II) With Batching Plant, Transit Mixer and cum 2404.00 2902.00
Concrete Pump
(vii) RCC M35 Grade
I) Using concrete mixer cum 2769.00 3264.00
II) With Batching Plant, Transit Mixer and cum 2489.00 2994.00
Concrete Pump
(viii) RCC M40 Grade (With Batching Plant, cum 2672.00 3178.00
Transit Mixer and Concrete Pump)
C In Bottom Plug
(i) PCC Grade M20
I) Using concrete mixer cum 2562.00 3019.00
II) With Batching Plant, Transit Mixer and cum 2112.00 2574.00
Crane / Concrete Pump
(ii) PCC Grade M25
I) Using concrete mixer cum 2657.00 3117.00
II) With Batching Plant, Transit Mixer and cum 2207.00 2671.00
Crane / Concrete Pump

281
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
(iii) PCC Grade M30
I) Using concrete mixer cum 2673.00 3133.00
II) With Batching Plant, Transit Mixer and cum 2224.00 2688.00
Crane / Concrete Pump
(iv) PCC Grade M35
I) Using concrete mixer cum 2741.00 3207.00
II) With Batching Plant, Transit Mixer and cum 2290.00 2761.00
Crane / Concrete Pump
D In Intermediate plug
(i) PCC Grade M20
I) Using concrete mixer cum 2293.00 2721.00
II) With Batching Plant, Transit Mixer and cum 1866.00 2297.00
Crane / Concrete Pump
(ii) PCC Grade M25
I) Using concrete mixer cum 2373.00 2804.00
II) With Batching Plant, Transit Mixer and cum 1945.00 2379.00
Crane / Concrete Pump
(iii) PCC Grade M30
I) Using concrete mixer cum 2387.00 2817.00
II) With Batching Plant, Transit Mixer and cum 1958.00 2393.00
Crane / Concrete Pump
E In Top plug
(i) PCC Grade M20
Using Concrete Mixer cum 2293.00 2721.00
(ii) PCC Grade M25
I) Using concrete mixer cum 2373.00 2804.00
II) With Batching Plant, Transit Mixer and cum 1945.00 2379.00
Crane / Concrete Pump
(iii) PCC Grade M30
I) Using concrete mixer cum 2387.00 2817.00
II) With Batching Plant, Transit Mixer and cum 1958.00 2393.00
Crane / Concrete Pump
F In Well cap
(i) RCC Grade M20
I) Using concrete mixer cum 2162.00 2609.00
II) With Batching Plant, Transit Mixer and cum 1898.00 2352.00
Concrete Pump
(ii) RCC Grade M25
I) Using concrete mixer cum 2306.00 2755.00
II) With Batching Plant, Transit Mixer and cum 2043.00 2501.00
Concrete Pump

282
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
(iii) RCC Grade M30
I) Using concrete mixer cum 2300.00 2748.00
II) With Batching Plant, Transit Mixer and cum 2037.00 2493.00
Concrete Pump
(iv) RCC Grade M35
I) Using concrete mixer cum 2336.00 2787.00
II) With Batching Plant, Transit Mixer and cum 2075.00 2534.00
Concrete Pump
(v) RCC M40 Grade (With Batching Plant, cum 2255.00 2716.00
Transit Mixer and Concrete Pump)
Note: (Applicable for all the items in Sl.12.09.)
1 Construction wing is to add cost and carriage of
cement & coarse aggregates as per requirement vide
Table 3.2-1 of Section only to arrive at consolidated
rate.
2 While actually providing the item in estimate or
agreement of work, maximum nominal size of coarse
aggregates intended to be used should be selected
and mentioned in the item.
3 From durability consideration, the value of minimum
cement content and maximum water cement ratio to
be considered in the mix design shall be 400 kg/cu.m.
and 0.4 respectively.
12.10 Sinking of Well as per IRC specification through all
types of strata namely sandy soil, clayey soil and rock
as shown against each case, including drawing
Foundation Wells true to position and plumb with dia
under cutting edge as mentioned below, including hire
charges of all tools and plants etc. and supplying
power, dewatering etc, initial excavation of earth
complete as per drawing and technical specifications
and direction of the Engineer-in-charge including
throwing the spoils clear off the well up to 150m.
radius (Measurement to be taken in the following
stages from the level of the bottom of capping slab on
well up to the bottom of cutting edge) through any
kind of soil including rocky soil and rock till 25% of
cutting edge (linear) comes in contact with rock
including testing of bottom plug by dewatering the
well upto 5 meters and checking the rise in water level
as per clause 1208 of IRC Specification. Depth of
sinking is reckoned from bed level.
I. Sinking of 8 m external diameter Well
A In any kind of soil including Clayey soil
(i) Depth upto 3.0 M metre 12530.00 13065.00
(ii) Depth beyond 3.0 m upto 6.0 m metre 14167.00 14772.00
(iii) Depth beyond 6.0 m upto 10.0 m metre 15806.00 16482.00
(iv) Depth beyond 10.0 m upto 20.0 m :
Add 5% for every additional meter depth of metre Example –
sinking over the rate of sinking for the Say for 14m
previous meter. rate will be =
` 19212/- per
metre.

283
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
(v) Depth beyond 20.0 m upto 30.0 m :
a) Add 7.5% for every additional meter metre
depth of sinking over the rate of sinking Example –
for the previous meter Say for 23m,
rate will be =
b) Add 25% of cost for Kentledge including metre
` 39982/-
supports, loading arrangement and per metre.
Labour ).
(vi) Depth beyond 30.0 m upto 40.0 m :
a) Add 10% for every additional meter metre
depth of sinking over the rate of sinking Example –
for the previous meter Say for 35m,
rate will be =
b) Add 20% of cost for Kentledge including metre
` 107684/-
supports, loading arrangement and per metre.
Labour).
B. In Soft Rock ( 8m dia well )
Depth in soft rock strata upto 3m metre 20998.00 21719.00
II. Sinking of 10 m external diameter Well
A In any kind of soil including Clayey soil
(i) Depth upto 3.0 M metre 13094.00 13656.00
(ii) Depth beyond 3.0 m upto 6.0 m metre 15403.00 16064.00
(iii) Depth beyond 6.0 m upto 10.0 m metre 18601.00 19394.00
(iv) Depth beyond 10.0 m upto 20.0 m :
Add 5% for every additional meter depth of metre
sinking over the rate of sinking for the
previous meter.
(v) Depth beyond 20.0 m upto 30.0 m :
a) Add 7.5% for every additional meter metre
depth of sinking over the rate of sinking
for the previous meter
b) Add 25% of cost for Kentledge including metre
supports, loading arrangement and
Labour ).
(vi) Depth beyond 30.0 m upto 40.0 m :
a) Add 10% for every additional meter metre
depth of sinking over the rate of sinking
for the previous meter
b) Add 20% of cost for Kentledge including metre
supports, loading arrangement and
Labour).
B In Soft Rock (10m dia well )
Depth of soft rock strata upto 3m metre 27356.00 28330.00
III. Sinking of 12 m external diameter well
A In any kind of soil including Clayey soil
(i) Depth upto 3.0 M metre 63768.00 66468.00
(ii) Depth beyond 3.0 m upto 6.0 m metre 79125.00 82476.00
(iii) Depth beyond 6.0 m upto 10.0 m metre 91312.00 95244.00
(iv) Depth beyond 10.0 m upto 20.0 m :
Add 5% for every additional meter depth of metre
sinking over the rate of sinking for the
previous meter

284
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
(v) Depth beyond 20.0 m upto 30.0 m :
a) Add 7.5% for every additional meter metre
depth of sinking over the rate of sinking
for the previous meter
b) Add 25% of cost for Kentledge including metre
supports, loading arrangement and
Labour ).
(vi) Depth beyond 30.0 m upto 40.0 m :
a) Add 10% for every additional meter metre
depth of sinking over the rate of sinking
for the previous meter
b) Add 20% of cost for Kentledge including metre
supports, loading arrangement and
Labour).
B In Soft Rock (12m dia well )
Depth of soft rock strata upto 3m metre 146255.00 151639.00
12.11 Sinking of Twin D Type well through all types of
strata namely sandy soil, clayey soil and rock as shown
against each case complete as per drawing and
technical specifications. Depth of sinking is reckoned
from bed level.
A In any kind of soil including Clayey soil
(8m dia. Well )
(i) Depth below bed level upto 3.0 M metre 15333.00 15994.00
(ii) Depth beyond 3.0 m upto 6.0 m depth metre 17804.00 18571.00
(iii) Depth beyond 6.0 m upto 10.0 m depth metre 19834.00 20689.00
(iv) Depth beyond 10 m upto 20 m :
Add 5% for every additional meter depth of metre
sinking over the rate of sinking for the
previous meter
(v) Depth beyond 20.0 m upto 30.0 m :
a) Add 7.5% for every additional meter metre
depth of sinking over the rate of sinking
for the previous meter
b) Add 25% of cost for Kentledge including metre
supports, loading arrangement and
Labour ).
(vi) Depth beyond 30.0 m upto 40.0 m :
a) Add 10% for every additional meter metre
depth of sinking over the rate of sinking
for the previous meter
b) Add 20% of cost for Kentledge including metre
supports, loading arrangement and
Labour).
B In Soft Rock (Twin D Type well )
Depth of soft rock strata upto 3m metre 31600.00 32792.00

285
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
12.12 Sand filling in Wells in layers duly compacted by cum 161.00 304.00
inundation with water including local carriages etc.
complete as per drawing and technical specifications.
Note: 1. Labour rate per m³ is provided; cost of sand is to be
added to arrive at the complete item rate.
2. Compaction factor of dry clean sand is 0.835;
suitable correction should be made for bulkage of
sand.
12.13 Providing Steel liner for Curbs and 6 mm thick for tonne 26317.00 26662.00
Steining of Wells including fabricating and setting out
as per detailed drawing.
Note: Add cost & carriage of materials only to arrive at the
consolidated rate.
12.14 Providing Bored Cast-in-situ R.C.C. pile in position as
per specifications in all kinds of soil including cost of
boring using drilling mud to stabilize the bore and
flushing the bore of excess mud with freshly prepared
drilling fluid by using pumps prior to placing concrete
by tremie pipe in one continuous operation and
including the cost of all materials and labour for
placing of concrete and also including the cost of
mobilization and hire charges of all equipment
necessary for boring, welding of reinforcement cage as
necessary and lowering of reinforcement cage,
preparation and placing of concrete, including the cost
of concrete but excluding the cost of reinforcement and
labour for bending binding etc. complete as per
Drawing and Technical Specifications and removal of
excavated earth with all lifts and lead upto 1000 m.
Work to be executed as per IS: 2911 (Part II Sec 2).
(a) Using hydraulic piling rig
i) Pile diameter - 750 mm. metre 2549.00 -
ii) Pile diameter - 1000 mm. metre 3873.00 -
iii) Pile diameter - 1200 mm. metre 4352.00 -
(b) Using tripod, winches
i) Pile diameter - 750 mm. metre 1515.00 -
ii) Pile diameter - 1000 mm. metre 1878.00 -
iii) Pile diameter - 1200 mm. metre 2213.00 -
Note: 1. The rate provided is exclusive of cost of concrete.
Construction wing is to add cost of concrete of
desired grade for volume corresponding to 1.0m
length of pile length, to arrive at the complete rate.
Also the desired crushing strength is to be
mentioned. The Rate of providing the temporary
steel casing upto 3m depth is included.
2. Rate for concrete may be adopted same as for
bottom plug vide item no. 12.09(C) (IV).
3. The cost of dismantling the length of the pile above
cut off level is to be added.

286
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
12.15 Driven Cast-in-place vertical R.C.C. pile of required
diameter and required length (length to be measured
from the bottom of raft / Pile Cap to the bottom of
shoe) including cost of all materials and labour for
casting, hoisting, driving etc. and also including cost of
dummy lengths of pile and of hire charges of all
instruments as necessary but excluding reinforcement
complete as per drawing and & Technical
Specification.
(i) Pile diameter - 750 mm. metre 1331.00 1375.00
(ii) Pile diameter - 1000 mm. metre 1792.00 1852.00
(iii) Pile diameter - 1200 mm. metre 2686.00 2775.00
Note: 1. The rate provided is exclusive of cost of concrete.
Construction wing is to add cost of concrete of
desired grade for volume corresponding to 1.0m
length of pile length, to arrive at the complete rate.
Also the desired crushing strength is to be
mentioned in the space provided in the description
of item.
2. Rate for concrete may be adopted same as for
bottom plug vide item no. 12.09 (C) (iv).
3. The quantity of concrete required to be removed
above the designed top level of the concrete, if any,
is to be added in the rate analysis.
4. The cost of dismantling the length of the pile above
cut off level is to be added.
5. In case steel lining is included in the design for
driven cast in situ pile and is planned to be retained,
the same is to be included in the rate analysis. In
case the temporary steel casing used during casting
is planned to be removed an additional cost of 0.5%
of the cost of concrete is to be provided to cover in
usage.
12.16 Driven Precast vertical R.C.C. piles of required
diameter and required length (length to be measured
from the bottom of raft / Pile Cap to the bottom of
shoe) including cost of all materials and labour for
casting, hoisting, driving etc. and also including cost of
dummy lengths of pile and of hire charges of all
instruments as necessary but excluding reinforcement
complete as per drawing and & Technical
Specification.
(i) Pile Diameter - 500 mm metre 587.00 597.00
(ii) Pile Diameter - 750 mm. metre 639.00 655.00
(iii) Pile Diameter - 1000 mm. metre 825.00 847.00
Note: 1. The rate provided is exclusive of cost of concrete.
Construction wing is to add cost of concrete of
desired grade for volume corresponding to 1.0m
length of pile length, to arrive at the complete rate.
Also the desired crushing strength is to be
mentioned in the space provided in the description
of item.

287
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
2. Rate for concrete may be adopted same as for
bottom plug vide item no. 12.09 (C) (iv).
3. The cost of dismantling the length of the pile above
cut off level is to be added.
12.17 Driven vertical Steel piles of required diameter and
required length (length to be measured from the
bottom of raft / Pile Cap to the bottom of shoe)
including cost of all materials and labour for casting,
hoisting, driving etc. and also including cost of dummy
lengths of pile and of hire charges of all instruments as
necessary but excluding reinforcement complete as per
drawing and & Technical Specification.
(i) Section of the pile - H Section steel column 400 x metre 1264.00 1295.00
250 mm (ISHB Series)
(ii) Section of the pile - H Section steel column 450 x metre 1433.00 1467.00
250 mm (ISHB Series)
Note Add cost of structural steel only to arrive at complete
rate.
12.18 Performing Lateral load test on two piles or two Each 27400.00 27400.00
groups of piles by introducing a hydraulic jack with
gauge between two piles or pile groups under test by
applying horizontal loads in increments of about 20%
of the estimated safe load at each stage and applying
the next increment after the rate of displacement is
nearer to 0.1 mm. per 30 minutes till the total
displacement becomes, 12 mm at the cut-off level
including the cost of arranging the entire set-up, hire
charges of all implements including at least two dial
gauges, preparing the pile head if necessary, and
removal of all arrangement after completion etc.
complete in all respect including cost of carriage of all
materials and as per IS specification and direction of
Engineer-in-charge.
12.19 Performing Vertical load test on single Pile in
accordance with IS:2911(Part-IV) by hydraulic jacks N.B.
on pile/piles with 1.5 times the design load including This item is
preparation of the head of piles with concrete of applicable
required strength for receiving the jacks with all for both
ancillary arrangements for setting up gauges, work pile
construction of suitable platforms, keeping the loads and test
and dismantling and removing all arrangement etc. pile. Test
complete as per IS specification and direction of should be
Engineer-in-charge carried out
i) Testing load up to 100 T. Each 47500.00 47500.00 as per IS
ii) Testing load between 100 T and 150 T. Each 67200.00 67200.00 2911 part
iii) Testing load between 150 T and 200 T. Each 89600.00 89600.00 IV 1985.
iv) Testing load between 200 T and 250 T. Each 112000.00 112000.00
v) Testing load between 250 T and 300 T. Each 134400.00 134400.00
Note : This test shall be done on working piles only in a pile
group and should satisfy the provisions of routine test as
given in IS-2911 (Part-4) 1985.

288
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
12.20 Cement Concrete for Reinforced Concrete in Pile
Cap complete as per drawing and Technical
Specification.
A RCC Grade M20
(i) Using Concrete Mixer cum 2185.00 2631.00
(ii) Using Batching Plant, Transit Mixer and cum 1936.00 2391.00
Concrete Pump
B RCC Grade M25
(i) Using Concrete Mixer cum 2333.00 2784.00
(ii) Using Batching Plant, Transit Mixer and cum 2088.00 2548.00
Concrete Pump
C RCC Grade M30
(i) Using Concrete Mixer cum 2352.00 2803.00
(ii) Using Batching Plant, Transit Mixer and cum 2103.00 2562.00
Concrete Pump
D RCC Grade M35
(i) Using Concrete Mixer cum 2420.00 2878.00
(ii) Using Batching Plant, Transit Mixer and cum 2176.00 2642.00
Concrete Pump
Note: (Applicable for all the item in Sl.12.20)
1. Construction wing is to add cost and carriage of
cement & coarse aggregates as per requirement
vide Table 3.2-1 of Section only to arrive at
consolidated rate.
2. While actually providing the item in estimate or
agreement of work, maximum nominal size of
coarse aggregates intended to be used should be
selected and mentioned in the item.
3. From durability consideration, the value of
minimum cement content and maximum water
cement ratio to be considered in the mix design
shall be as per the direction of the Engineer-in-
Charge.
12.21 Supplying, fitting and placing un-coated HYSD bar tonne 18235.00 18513.00
reinforcement in Bridge Foundation including
initial straightening, straightening of coils bars,
removal of loose rust (if any), cutting to requisite
length bending, binding with annealed wire not less
than 1 mm in size and conforming to IS 280 at every
intersection hooked and bent to correct shape and
placed on forms etc. including cost of black annealed
wire and cost of loading, unloading, carriage of all
steel materials complete as per drawing and technical
specifications and direction of Engineer-in-charge.

Note: The rate provided is exclusive of cost of steel materials.


Construction wing should add cost & carriage of 1.05
MT (considering 5% wastage) of steel materials to
arrive at the final consolidated item rate.

289
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

CHAPTER - 13
SUB-STRUCTURE
All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
13.01 Plain / Reinforced Cement Concrete in Sub-
structure with coarse aggregates of appropriate
nominal size and grading, fine aggregate (sand)
conforming to proper grading zone, both of approved
quality, cement and water reducing admixtures, as
necessary, including labour, cost and carriage of all
materials and including preparation of design mix,
approval of the same by the Engineer-in-Charge and
cost for quality control, sampling, testing etc. all
complete as per drawing and technical specification
including the cost of necessary form work and staging
complete as per drawing and technical specifications.
A PCC Grade M20
(i) Height upto 5m cum 2492.00 2969.00
B PCC Grade M25
(i) Height upto 5m
I) Using concrete Mixer cum 2667.00 3148.00
II) With Batching Plant, Transit Mixer and cum 2389.00 2879.00
Concrete Pump
(ii) Height 5m to 10m
I) Using concrete Mixer cum 2900.00 3406.00
II) With Batching Plant, Transit Mixer and cum 2613.00 3127.00
Concrete Pump
(iii) Height above 10m
I) Using concrete Mixer cum 3192.00 3727.00
II) With Batching Plant, Transit Mixer and cum 2892.00 3436.00
Concrete Pump
C PCC Grade M30
(i) Height upto 5m
I) Using concrete Mixer cum 2684.00 3168.00
II) With Batching Plant, Transit Mixer and cum 2405.00 2897.00
Concrete Pump
(ii) Height 5m to 10m
I) Using concrete Mixer cum 2922.00 3428.00
II) With Batching Plant, Transit Mixer and cum 2631.00 3147.00
Concrete Pump
(iii) Height above 10m
I) Using concrete Mixer cum 3217.00 3753.00
II) With Batching Plant, Transit Mixer and cum 2913.00 3459.00
Concrete Pump
D RCC Grade M20
(i) Height upto 5m
I) Using concrete Mixer cum 2495.00 2978.00
II) With Batching Plant, Transit Mixer and cum 2215.00 2708.00
Concrete Pump
(ii) Height 5m to 10m
I) Using concrete Mixer cum 2706.00 3213.00
II) With Batching Plant, Transit Mixer and cum 2416.00 2933.00
Concrete Pump

290
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
(iii) Height above 10m
I) Using concrete Mixer cum 2970.00 3507.00
II) With Batching Plant, Transit Mixer cum 2667.00 3215.00
and Concrete Pump
E RCC Grade M25
(i) Height upto 5m
I) Using concrete Mixer cum 2673.00 3160.00
II) With Batching Plant, Transit Mixer cum 2393.00 2889.00
and Concrete Pump
(ii) Height 5m to 10m
I) Using concrete Mixer cum 2884.00 3393.00
II) With Batching Plant, Transit Mixer cum 2595.00 3113.00
and Concrete Pump
(iii) Height above 10m
I) Using concrete Mixer cum 3200.00 3743.00
II) With Batching Plant, Transit Mixer cum 2897.00 3449.00
and Concrete Pump
F RCC Grade M30
(i) Height upto 5m
I) Using concrete Mixer cum 2684.00 3172.00
II) With Batching Plant, Transit Mixer cum 2404.00 2902.00
and Concrete Pump
(ii) Height 5m to 10m
I) Using concrete Mixer cum 2866.00 3373.00
II) With Batching Plant, Transit Mixer cum 2579.00 3096.00
and Concrete Pump
(iii) Height above 10m
I) Using concrete Mixer cum 3125.00 3660.00
II) With Batching Plant, Transit Mixer cum 2826.00 3371.00
and Concrete Pump
G RCC Grade M35
(i) Height upto 5m
I) Using concrete Mixer cum 2769.00 3264.00
II) With Batching Plant, Transit Mixer and cum 2489.00 2994.00
Concrete Pump
(ii) Height 5m to 10m
I) Using concrete Mixer cum 2916.00 3427.00
II) With Batching Plant, Transit Mixer and cum 2631.00 3152.00
Concrete Pump
(iii) Height above 10m
I) Using concrete Mixer cum 3138.00 3672.00
II) With Batching Plant, Transit Mixer and cum 2843.00 3388.00
Concrete Pump
Note: (Applicable for all the item in Sl.13.01)
1 Construction wing is to add cost and carriage of
cement & coarse aggregates as per requirement vide
Table 3.2-1 of Section only to arrive at consolidated
rate.

291
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
2 While actually providing the item in estimate or
agreement of work, maximum nominal size of coarse
aggregates intended to be used should be selected
and mentioned in the item.
3 From durability consideration, the value of minimum
cement content and maximum water cement ratio to
be considered in the mix design shall be as per the
direction of the Engineer-in-Charge
13.02 Supplying, fitting and placing HYSD bar tonne 18367.00 18645.00
reinforcement in Sub-structure including initial
straightening, straightening of coils bars, removal of
loose rust (if any), cutting to requisite length bending,
binding with annealed wire not less than 1 mm in size
and conforming to IS 280 at every intersection hooked
and bent to correct shape and placed on forms etc.
including cost of black annealed wire and cost of
loading, unloading, carriage of all steel materials
complete as per drawing and technical specifications
and direction of Engineer-in-charge.
Note: The rate provided is exclusive of cost of steel materials.
Construction wing should add cost & carriage of 1.05 MT
(considering 5% wastage) of steel materials to arrive at
the final consolidated item rate.
13.03 Providing weep holes in Brick masonry / Plain / each 126.00 128.00
Reinforced concrete abutment, wing wall / return wall
with 100 mm dia AC pipe, extending through the full
width of the structure with slope of 1V:20H towards
drawing face. Complete as per drawing and Technical
specifications.
13.04 Back filling behind abutment, wing wall and
return wall complete as per drawing and Technical
specification.
A) Granular material cum 501.00 807.00
Note: Add cost at site of 1.20 m3 of granular materials (brick
bats and fine sand in proportion of 60:40) to arrive at the
consolidated rate.
B) Sandy material cum 397.00 603.00
Note: Add cost at site of 1.20 m³ of fine sand (dry loose volume)
to arrive at the complete rate.
13.05 Providing and laying of Filter media with granular cum 570.00 463.00
materials/stone crushed aggregates/brick aggregates
/river bed materials satisfying the requirements laid
down in clause 2504.2.2 of MoRT&H Specifications to a
thickness of not less than 600 mm with smaller size
towards the soil and bigger size towards the wall and
provided over the entire surface behind abutment,
wing wall and return wall to the full height compacted
to a firm condition complete as per drawing and
technical specification.
Note: Add cost at site of 0.72 m3 of granular materials/stone
crushed aggregates/brick aggregates/river bed
materials and 0.48 m3 of coarse sand (dry loose volume)
to arrive at the consolidated rate.

292
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
13.06 Supplying, fitting and fixing in position true to line kg 250.00 250.00
and level cast steel Rocker bearing conforming to
IRC: 83(Pt.-1) section IX and clause 2003 of MoRT&H
specifications complete including all accessories as per
drawing and Technical Specifications.
13.07 Supplying, fitting and fixing in position true to line kg 225.00 225.00
and level forged steel Roller bearing conforming to
IRC: 83(Pt.-1) section IX and clause 2003 of MoRT&H
specifications complete including all accessories as per
drawing and Technical Specifications.
13.08 Supplying, fitting and fixing in position true to line kg 380.00 380.00
and level Sliding Plate bearing with PTFE surface
sliding on stainless steel complete including all
accessories as per drawing and Technical Specifications
and BS: 5400, section 9.1 & 9.2 (for PTFE) and clause
2004 of MoRT&H Specifications.
13.09 Supplying, fitting and fixing in position true to line Cu.cm 1.20 1.20
and level Elastomeric bearing conforming to IRC: 83
(Part-II) Section IX and Clause 2005 of MoRT&H
specifications complete including all accessories as per
drawing and Technical Specifications.
13.10 Supplying, fitting and fixing in position true to line kg 330.00 330.00
and level Sliding Plate bearing with Stainless steel
Plate sliding on stainless steel plate with mild steel
matrix complete including all accessories as per
drawing and Technical Specifications.
13.11 Supplying, fitting and fixing in position true to line
and level POT-PTFE bearing consisting of a metal
piston supported by a disc or unreinforced elastomer
confined within a metal cylinder, sealing rings, dust
seals, PTFE surface sliding against stainless steel
mating surface, complete assembly to be of cast
steel/fabricated structural steel, metal and elastomer
elements to be as per IRC: 83 part-I & II respectively and
other parts conforming to BS: 5400, section 9.1 & 9.2
and clause 2006 of MoRT&H Specifications complete as
per drawing and approved technical specifications.
a) For max. Horizontal force within 10% of the max. tonne 300.00 300.00
Vertical load.
b) For max. Horizontal force within 25% of the max. tonne 400.00 400.00
Vertical load.
13.12 Supplying fitting and fixing in position true to line and
level cast steel spherical / cylindrical type bearing
with stainless steel plate with PTFE sliding surface
as per clause 2004 of Specification of Roads and bridge
works of MORT&H complete with all accessories as per
drawing and direction of E-in-C and including cost of all
material installation and testing.
a) For max. Horizontal force within 10% of the max. tonne 400.00 400.00
Vertical load.
b) For max. Horizontal force within 25% of the max. tonne 500.00 500.00
Vertical load.

293
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

CHAPTER - 14
SUPER-STRUCTURE
All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
14.01 Furnishing and Placing Reinforced / Prestressed
Cement concrete in Super-structure with coarse
aggregates of appropriate nominal size and grading,
fine aggregate (sand) conforming to proper grading
zone, both of approved quality and cement and
admixtures, as necessary, including labour, cost and
carriage of all materials and including preparation of
design mix, approval of the same by the Engineer-in-
Charge and cost for quality control, sampling, testing
etc. all complete as per drawing and technical
specification including the cost of necessary form work
and staging complete. as per drawing and technical
specifications.
Note: 1 Construction wing is to add cost and carriage of
cement & coarse aggregates as per requirement
vide Table 3.2-1 of Section only to arrive at
consolidated rate.
2 While actually providing the item in estimate or
agreement of work, maximum nominal size of
coarse aggregates intended to be used should be
selected and mentioned in the item.
3 From durability consideration, the value of
minimum cement content and maximum water
cement ratio to be considered in the mix design
shall be as per the direction of the Engineer-in-
Charge
A RCC Grade M20
I. Using Concrete Mixer
(i) For solid slab super-structure,
a) Height upto 5m cum 2997.00 3540.00
b) Height 5m to 10m cum 3258.00 3831.00
c) Height above 10m cum 3518.00 4121.00
(ii) For T-beam & slab,
a) Height upto 5m cum 3258.00 3831.00
b) Height 5m to 10m cum 3518.00 4121.00
c) Height above 10m cum 3779.00 4412.00
II. Using Batching Plant, Transit Mixer and
Concrete Pump
(i) For solid slab super-structure,
a) Height upto 5m cum 2691.00 3243.00
b) Height 5m to 10m cum 2939.00 3522.00
c) Height above 10m cum 3187.00 3800.00
(ii) For T-beam & slab,
a) Height upto 5m cum 2939.00 3522.00
b) Height 5m to 10m cum 3187.00 3800.00
c) Height above 10m cum 3435.00 4079.00

294
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
B RCC Grade M25
I. Using Concrete Mixer
(i) For solid slab super-structure,
a) Height upto 5m cum 3240.00 3790.00
b) Height 5m to 10m cum 3531.00 4111.00
c) Height above 10m cum 3821.00 4432.00
(ii) For T-beam & slab,
a) Height upto 5m cum 3531.00 4111.00
b) Height 5m to 10m cum 3821.00 4432.00
c) Height above 10m cum 4112.00 4754.00
II. Using Batching Plant, Transit Mixer and
Concrete Pump
(i) For solid slab super-structure,
a) Height upto 5m cum 2938.00 3499.00
b) Height 5m to 10m cum 3216.00 3808.00
c) Height above 10m cum 3494.00 4118.00
(ii) For T-beam & slab,
a) Height upto 5m cum 3216.00 3808.00
b) Height 5m to 10m cum 3494.00 4118.00
c) Height above 10m cum 3772.00 4427.00
C RCC Grade M 30
I. Using Concrete Mixer
(i) For solid slab super-structure,
a) Height upto 5m cum 3297.00 3847.00
b) Height 5m to 10m cum 3592.00 4174.00
c) Height above 10m cum 3888.00 4500.00
(ii) For T-beam & slab,
a) Height upto 5m cum 3592.00 4174.00
b) Height 5m to 10m cum 3888.00 4500.00
c) Height above 10m cum 4183.00 4826.00
II. Using Batching Plant, Transit Mixer and
Concrete Pump.
(i) For solid slab super-structure,
a) Height upto 5m cum 2974.00 3539.00
b) Height 5m to 10m cum 3256.00 3852.00
c) Height above 10m cum 3538.00 4166.00
(ii) For T-beam & slab,
a) Height upto 5m cum 3256.00 3852.00
b) Height 5m to 10m cum 3538.00 4166.00
c) Height above 10m cum 3820.00 4479.00
D RCC / PSC Grade M35
I. Using concrete mixer.
(i) For solid slab super-structure,
a) Height upto 5m cum 3286.00 3834.00
b) Height 5m to 10m cum 3595.00 4175.00
c) Height above 10m cum 3904.00 4516.00

295
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
(ii) For T-beam & slab,
a) Height upto 5m cum 3595.00 4175.00
b) Height 5m to 10m cum 3904.00 4516.00
c) Height above 10m cum 4213.00 4858.00
(iii) For box girder and balanced cantilever,
a) Height upto 5m cum 4522.00 5199.00
b) Height 5m to 10m cum 5140.00 5882.00
c) Height above 10m cum 5758.00 6564.00
II. Using Batching Plant, Transit Mixer and
Concrete Pump
(i) For solid slab super-structure,
a) Height upto 5m cum 2964.00 3521.00
b) Height 5m to 10m cum 3259.00 3849.00
c) Height above 10m cum 3555.00 4178.00
(ii) For T-beam & slab,
a) Height upto 5m cum 3259.00 3849.00
b) Height 5m to 10m cum 3555.00 4178.00
c) Height above 10m cum 3850.00 4506.00
(iii) For box girder and balanced cantilever,
a) Height upto 5m cum 4146.00 4834.00
b) Height 5m to 10m cum 4737.00 5490.00
c) Height above 10m cum 5327.00 6146.00
E PSC Grade M-40
I. Using concrete mixer.
(i) For solid slab super-structure,
a) Height upto 5m cum 3658.00 4220.00
b) Height 5m to 10m cum 3980.00 4574.00
c) Height above 10m cum 4302.00 4929.00
(ii) For T-beam & slab,
a) Height upto 5m cum 3980.00 4574.00
b) Height 5m to 10m cum 4302.00 4929.00
c) Height above 10m cum 4624.00 5284.00
II. Using Batching Plant, Transit Mixer and
Concrete Pump
(i) For solid slab super-structure,
a) Height upto 5m cum 3178.00 3736.00
b) Height 5m to 10m cum 3485.00 4076.00
c) Height above 10m cum 3792.00 4417.00
(ii) For T-beam & slab,
a) Height upto 5m cum 3485.00 4076.00
b) Height 5m to 10m cum 3792.00 4417.00
c) Height above 10m cum 4100.00 4757.00
(iii) For box girder and balanced cantilever,
a) Height upto 5m cum 4407.00 5097.00
b) Height 5m to 10m cum 5021.00 5777.00
c) Height above 10m cum 5636.00 6457.00

296
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
F PSC Grade M-45
(i) For solid slab/voided slab super-structure
a) Height upto 5m cum 3198.00 3748.00
b) Height 5m to 10m cum 3524.00 4107.00
c) Height above 10m cum 3850.00 4467.00
(ii) For I-beam & slab including launching of
precast girders by launching truss upto
40 m span
a) Height upto 5m cum 3524.00 4107.00
b) Height 5m to 10m cum 3850.00 4467.00
c) Height above 10m cum 4176.00 4826.00
(iii) For cast-in-situ box girder, segmental
construction and balanced cantilever
a) Height upto 5m cum 4502.00 5185.00
b) Height 5m to 10m cum 5154.00 5904.00
c) Height above 10m cum 5807.00 6623.00
G PSC Grade M-50
(i) For cast-in-situ box girder, segmental
construction and balanced cantilever
a) Height upto 5m cum 4596.00 5277.00
b) Height 5m to 10m cum 5275.00 6023.00
c) Height above 10m cum 5954.00 6770.00
H PSC Grade M- 55
(i) For cast-in-situ box girder, segmental
construction and balanced cantilever
a) Height upto 5m cum 4844.00 5532.00
b) Height 5m to 10m cum 5566.00 6323.00
c) Height above 10m cum 6287.00 7113.00
Note: (Applicable for all the item in Sl.14.01)
1 Construction wing is to add cost and carriage of
cement and coarse aggregates as per
requirement vide Table 3.2-1 of Section 3 to
arrive at consolidated rate.
2 While actually providing the item in estimate or
agreement of work, maximum nominal size of
coarse aggregates intended to be used should be
selected and mentioned in the item.
3 From durability consideration, the value of
minimum cement content and maximum water
cement ratio to be considered in the mix design
shall be as per the direction of the Engineer-in-
Charge
14.02 Providing Sal-bullah / Eucalyptus bullah piles of sqm 2000.00 2000.00
diameter not less than 150mm, driving upto desired
depth but not less than 4 m and spacing as per
approved design and joining each bullah piles with the
staging props by proper arrangement capable to
transmit the loads from superstructure, all complete.

297
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division

Note: 1 Diameter of bullah to be measured at 1.5 m from


thicker end.
2 Projected area of the deck on river bed should be
considered for arriving at the cost.
14.03 Supplying, fitting and placing HYSD bar tonne 19306.00 19584.00
reinforcement in Bridge Super-structure including
initial straightening, straightening of coils bars,
removal of loose rust (if any), cutting to requisite
length bending, binding with annealed wire not less
than 1 mm in size and conforming to IS 280 at every
intersection hooked and bent to correct shape and
placed on forms etc. including cost of black annealed
wire and cost of loading, unloading, carriage of all
steel materials complete as per drawing and technical
specifications.
Note: The rate provided is exclusive of cost of steel materials.
Construction wing should add cost & carriage of 1.05
MT (considering 5% wastage) of steel materials to
arrive at the final consolidated item rate.
14.04 Supplying & laying High Tensile Steel wires / tonne 61400.00 62350.00
Strands including all accessories for stressing,
stressing operations and grouting complete as per
drawing and Technical Specifications.
Note: The rate provided is exclusive of cost of steel materials.
Construction wing should add cost & carriage of
1.02MT (considering 2% wastage) of steel materials to
arrive at the final consolidated item rate.
14.05 M. S. work in fabrication (including cutting to size, tonne 35830.00 36700.00
forging, drilling holes, welding, riveting, bolting to
make built up steel girder or plate girder including
stiffener, bracing ties etc. all complete, excluding the
cost of steel members or plates but including the cost
of bolts, nuts, rivets, welds etc.), transporting to site,
hoisting and placing in position all complete.
14.06 Providing and laying Cement concrete Wearing cum 11376.00 12108.00
coat M-30 grade with graded stone chips 19mm
down including screening and cleaning approved
stone chips and sand as necessary laying, finishing
complete to camber and grade, curing with water,
including cost and carriage of all materials and hire
charges for form work including reinforcement
complete as per drawing and Technical Specifications
vide clause no. 2702 of MoRT&H’s Specification for
Road & Bridge Works.

298
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
14.07 Bituminous Wearing Coat
Providing and laying Bituminous Wearing coat with N.B.:
paving grade bitumen including screening and Before laying
wearing coat
cleaning approved stone aggregates and filler
the deck
materials as necessary laying, finishing complete to surface shall
camber and grade, including cost and carriage of all be thoroughly
materials complete as per drawing and Technical cleaned and
Specifications vide clause no. 2702 of MoRT&H’s tack coat shall
Specification for Road & Bridge Works. be applied. The
(i) Type 1: Bituminous Concrete 50 mm thick laid cum construction
in single layer. operations and
(ii) Type 2: Bituminous Concrete 40 mm thick over- cum bituminous
mixes and tack
laid with 25 mm thick Mastic Asphalt.
coat shall
(iii) Type 3: Mastic Asphalt 50mm thick laid in cum conform to
single layer. Section 500 of
Note: Bituminous Concrete Rate as per item No. 5.08 & Mastic MoRT&H
Asphalt Rate may be worked out on pro-rata basis as per Specifications.
item No. 5.14.
14.08 Construction of precast RCC railing of M30 Grade, metre 1966.00 2051.00
aggregate size not exceeding 12 mm, true to line and
grade, tolerance of vertical RCC post not to exceed 1 in
500, centre to centre spacing between vertical post
not to exceed 2000 mm, leaving adequate space
between vertical post for expansion, complete as per
approved drawings and technical specifications.
14.09 Drainage Spouts in Superstructure including each 930.00 935.00
providing drip mouldings and also including
supplying, fitting and fixing approved type of
materials complete as per drawing and Technical
specification vide clause no. 2705 of MoRT&H’s
Specification for Road & Bridge Works.
14.10 Precast - Pretensioned Girders cum 10710.00 11267.00
Providing, precasting, transportation and placing in
position precast pretensioned concrete girders as per
drawing and technical specifications.
Note: Construction Wing is to add the cost of concrete, HT
strand and steel reinforcements to arrive at the final
consolidated item rate.
14.11 Labour for transportation and placing in position cum 1014.00 1055.00
precast concrete girders as per drawing and
technical specifications.
14.12 Providing and fixing Helical pipes in voided metre 1541.00 1541.00
concrete slabs
14.13 Burried Joint metre 902.00 902.00
Providing and laying a burried expansion joint,
expansion gap being 20 mm, covered with 12 mm
thick, 200 mm wide galvanised wieldable structural
steel plate as per IS: 2062, placed symmetrical to
centre line of the joint, resting freely over the top
surface of the deck concrete, welding of 8 mm dia. 100
mm long galvanised nails spaced 300 mm c/c along
the centre line of the plate, all as specified in clause
2604.

299
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
14.14 Filler joint
(i) Providing & fixing 2 mm thick corrugated metre 4030.00 4030.00
copper plate in expansion joint complete as
per drawing & Technical Specification.
(ii) Providing & fixing 20 mm thick compressible metre 259.00 259.00
fibre board in expansion joint complete as per
drawing & Technical Specification.
(iii) Providing and fixing in position 20 mm thick metre 198.00 198.00
premoulded joint filler in expansion joint for
fixed ends of simply supported spans not
exceeding 10 m to cater for a horizontal
movement upto 20 mm, covered with sealant
complete as per drawing and technical
specifications.
(iv) Providing and filling joint sealing compound as metre 23.00 24.00
per drawings and technical specifications with
coarse sand and 6% bitumen by weight
14.15 Asphaltic Plug joint metre 9875.00 9875.00
Providing and laying of asphaltic plug joint to provide
for horizontal movement of 25 mm and vertical
movement of 2 mm, depth of joint varying from 75
mm to 100 mm, width varying from 500 mm to 750
mm (in traffic direction), covered with a closure plate
of 200mm x 6mm of wieldable structural steel
conforming to IS: 2062, asphaltic plug to consist of
polymer modified bitumen binder, carefully selected
single size aggregate of 12.5 mm nominal size and a
heat resistant foam caulking/backer rod, all as per
approved drawings and specifications.
14.16 Elastomeric Slab Steel Expansion Joint
Providing and laying of an elastomeric slab steel
expansion joint, catering to right or skew (less than 20
deg., moderately curved with maximum horizontal
movement upto 50 mm, complete as per approved
drawings and standard specifications to be installed
by the manufacturer/supplier or their authorised
representative ensuring compliance to the
manufacturer's instructions for installation and as per
Clause 2606 of Specifications for Road & Bridge works
of MoRT&H (5th Revision).
(a) For movement up to ± 10 mm - Type : m 20 metre 15000.00 15000.00
(b) For movement up to ± 16 mm - Type : m 32 metre 22000.00 22000.00
(c) For movement up to ± 25 mm - Type : m 50 metre 30000.00 30000.00
(d) For movement up to ± 40 mm - Type : m 80 metre 46000.00 46000.00
(e) For movement up to ± 62.5 mm - Type : m 125 metre 71000.00 71000.00
(f) For movement up to ± 80 mm - Type : m 160 metre 104000.00 104000.00
(g) For movement up to ± 115 mm - Type : m 230 metre 140000.00 140000.00

300
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
14.17 Compression Seal Joint metre 7500.00 7500.00
Providing and laying of compression seal joint
consisting of steel armoured nosing at two edges of the
joint gap suitably anchored to the deck concrete and a
preformed chloroprene elastomer or closed cell foam
joint sealer compressed and fixed into the joint gap
with special adhesive binder to cater for a horizontal
movement upto 40 mm and vertical movement of 3
mm.
14.18 Strip Seal Expansion Joint metre 10000.00 10000.00
Providing and laying of a strip seal expansion joint
catering to maximum horizontal movement upto 70
mm, complete as per approved drawings and standard
specifications to be installed by the manufacturer/
supplier or their authorised representative ensuring
compliance to the manufacturer's instructions for
installation.
14.19 Modular Strip / Box Seal Joint metre 80000.00 80000.00
Providing and laying of a modular strip Box steel
expansion joint including anchorage catering to a
horizontal movement beyond 70mm and upto 140mm,
complete as per approved drawings and standard
specifications to be installed by the manufacturer/
supplier or their authorised representative ensuring
compliance to the manufacturer's instructions for
installation.
14.20 Modular Strip / Box Seal Joint metre 120000.00 120000.00
Providing and laying of a modular strip box seal
expansion joint catering to a horizontal movement
beyond 140mm and upto 210mm, complete as per
approved drawings and standard specifications to be
installed by the manufacturer/supplier or their
authorised representative ensuring compliance to the
manufacturer's instructions for installation.

301
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

CHAPTER - 15
PROTECTION WORKS
All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
15.01 Providing and laying boulders apron on river bed cum 502.00 493.00
for protection against scour with stone boulders
weighing not less than 40 kg each complete as per
drawing and Technical specification. Boulder Laid
Dry Without Wire Crates.
Note: Construction wing is to add cost and carriage of 1.00
cum. of stone with minimum size of 200 mm & 0.20
cum of stone spalls only to arrive at consolidated rate.
15.02 Boulder Apron Laid in Wire Crates
Providing and laying of boulder apron laid in wire cum 1417.00 1408.00
crates made with 4mm dia GI wire conforming to IS:
280 & IS:4826 in 100mm x 100mm mesh (weaved
diagonally) including 10 per cent extra for laps and
joints laid with stone boulders weighing not less than
40 kg each.
Note: Construction wing is to add cost and carriage of 1.00
cu.m. of stone with minimum size of 200 mm & 0.20
cu.m of stone spalls only to arrive at consolidated rate.
15.03 Providing and laying Pitching on slopes laid over
prepared filter media including boulder apron laid dry
in front of toe of embankment complete as per drawing
and Technical specifications.
I. Stone/Boulder cum 502.00 493.00
Note: Construction wing is to add cost and carriage of 1.00
cu.m. of stone with minimum size of 200 mm & 0.20
cu.m of stone spalls only to arrive at consolidated rate.
II. Cement Concrete Blocks of size 0.3x0.3 x0.3 m cum 1918.00 2334.00
cast in cement concrete of Grade M15
Note: Construction wing is to add cost and carriage of
cement & coarse aggregates as per requirement vide
Table 3.2-1 only to arrive at consolidated rate.
15.04 Providing and laying Filter material underneath cum 725.00 618.00
pitching in slopes complete as per drawing and
Technical specification.
Note: Add cost of 0.72 m3 of brick aggregates / river bed
materials and 0.48 m3 of coarse sand (loose volume) to
arrive at the consolidated rate.
15.05 Geotextile Filter
Laying of a geotextile filter between pitching and sqm 126.00 126.00
embankment slopes on which pitching is laid to
prevent escape of the embankment material through
the voids of the stone pitching/cement concrete blocks
as well as to allow free movement of water without
creating any uplift head on the pitching.

302
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division

15.06 Providing and laying Flooring complete as per


drawing and Technical specifications laid over cement
concert bedding.
I. Rubble stone laid in cement mortar 1:3 cum 4437.00 4928.00
Note: Construction wing is to add cost and carriage of 1.00
cu.m. of stone with minimum size of 200 mm & 0.20
cu.m of stone spalls only to arrive at consolidated rate.
II. Cement Concrete blocks Grade M15 cum 2576.00 3135.00
Note: Add cost & carriage of cement & coarse aggregates
only to arrive at the consolidated rate.
15.07 Dry Rubble Flooring
Construction of dry rubble flooring at cross drainage cum 820.00 812.00
works for relatively less important works.
Note: Construction wing is to add cost and carriage of 1.00
cu.m. of stone with minimum size of 200 mm & 0.20
cu.m of stone spalls only to arrive at consolidated rate.
15.08 Curtain wall complete as per drawing and
Technical specification
I. Stone masonry in cement mortar (1:3) cum 3285.00 3569.00
Note: Construction wing is to add cost & carriage of 1.1m³ of
stone boulders weighing not less than 40 kg to arrive
at the complete rate.
II. Cement concrete Grade M15 cum 1918.00 2334.00
Note: 1. Add cost & carriage of cement & coarse
aggregates only to arrive at the consolidated rate.
2. Other items like excavation for foundation, filling
behind wall, filter media, weep holes etc. shall be
added separately as per approved design.
15.09 Flexible Apron cum 556.00 547.00
Construction of flexible apron 1 m thick comprising of
loose stone boulders weighing not less than 40 kg
beyond curtain wall.
Note: Add cost & carriage of stone materials only to arrive at
the consolidated rate.
15.10 Gabion Structure for Retaining Earth
Providing and construction of a gabion structure for cum 1573.00 1565.00
retaining earth with segments of wire crates of size 7
m x 3 m x 0.6 m each divided into 1.5 m compartments
by cross netting, made from 4 mm galvanised steel
wire @ 32 kg per 10 sqm having minimum tensile
strength of 300 Mpa conforming to IS:280 and
galvanizing coating conforming to IS:4826, woven into
mesh with double twist, mesh size not exceeding 100 x
100 mm, filled with boulders with least dimension of
200 mm, all loose ends to be tied with 4 mm
galvanised steel wire.

303
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division

Note: Construction wing is to add cost and carriage of 1.00


cu.m. of stone with minimum size of 200 mm & 0.20
cu.m of stone spalls only to arrive at consolidated rate.
15.11 Gabion Structure for Erosion Control, River
Training Works and Protection works
Providing and constructing gabion structures for cum 3141.00 3133.00
erosion control, river training works and protection
works with wire crates of size 2 m x 1 m x 0.3 m each
divided into 1m compartments by cross netting, made
from 4 mm galvanised steel wire @ 32 kg per 10 sqm
having minimum tensile strength of 300 MPa
conforming to IS:280 and galvanizing coating
conforming to IS:4826, woven into mesh with double
twist, mesh size not exceeding 100 mm x 100 mm,
filled with boulders with least dimension of 200 mm,
all loose ends to be securely tied with 4 mm galvanised
steel wire.
Note: Construction wing is to add cost and carriage of 1.00
cu.m. of stone with minimum size of 200 mm & 0.20
cu.m of stone spalls only to arrive at consolidated rate.

304
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

CHAPTER - 16
REPAIR AND REHABILITATION
All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
16.01 Removal of existing cement concrete wearing coat sqm 105.00 108.00
including its disposal complete as per Technical
specification without causing any detrimental effect to
any part of the bridge structure and removal of
dismantled material with all lifts and lead upto 1000m
(Thickness 75 mm)
16.02 Removal of existing asphaltic wearing coat sqm 79.00 82.00
comprising of 50 mm thick asphaltic concrete laid over
12 mm thick mastic asphalt including disposal with all
lift and lead upto 1000m.
16.03 Guniting concrete surface with cement mortar (25 sqm 924.00 965.00
mm nominal thick) applied with compressor after
cleaning surface and spraying with epoxy complete as
per Technical specification.
16.04 Providing and inserting nipples with approved each 96.00 96.00
fixing compound after drilling holes for grouting as
per Technical specifications including subsequent
cutting/removal and sealing of the hole as necessary
of nipples after completion of grouting with
Cement/Epoxy.
16.05 Sealing of cracks / porous concrete by injection
process through nipples/Grouting complete as per
Technical specification.
A Cement Grout kg 48.00 49.00
B Cement mortar (1:1) Grouting kg 130.00 132.00
16.06 Patching of damaged concrete surface with sqm 1343.00 1345.00
polymer concrete (25 mm nominal thick) and curing
compounds, initiator and promoter, available in
present formulations, to be applied as per instructions
of manufacturer and as approved by the Engineer.
16.07 Sealing of crack / porous concrete with Epoxy kg 848.00 849.00
Grout by injection through nipples complete as per
clause 2803.1.
16.08 Applying epoxy mortar ( 10 mm nominal thick) over sqm 643.00 643.00
leached, honey combed and spalled concrete surface
and exposed steel reinforcement complete as per
Technical specification
16.09 Removal of defective concrete, cleaning the surface sqm 268.00 290.00
thoroughly, applying the shotcrete mixture
mechanically with compressed air under pressure,
comprising of cement, sand, coarse aggregates,
water and quick setting compound in the proportion
as per clause 2807.1., sand and coarse aggregates
conforming to IS: 383 and table 1 of IS: 9012
respectively, water cement ratio ranging from 0.35 to
0.50, density of gunite not less than 2000 kg/cum,
strength not less than 25 MPa and workmanship
conforming to clause 2807.6. (40 mm average
thickness.)

305
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
16.10 Applying pre-packed cement based polymer sqm 110.00 110.00
mortar ( 10 mm nominal thick) of strength 45 MPa at
28 days for replacement of spalled concrete
16.11 Epoxy bonding of new concrete to old concrete sqm 500.00 500.00
16.12 Providing external prestressing with high tensile
steel wires/strands including drilling for passage of
prestessing steel, all accessories for stressing and
stressing operation and grouting complete as per
drawing and Technical specification
(i) Span assumed: 25 m (12.7mm dia. Strand in tonne 252830.00 256895.00
12T13 system. Weight-9.42 kg/m of cable.)
(ii) Span assumed: 50 m (12.7mm dia. Strand in tonne 240909.00 245154.00
19T13 system. Weight-14.73 kg/m of cable.)
(iii) Span assumed: 100 m (12.7mm dia. Strand in tonne 231026.00 235100.00
19T13 system. Weight-14.73 kg/m of cable.)
Note: The rate provided is exclusive of cost of H.T. Strand.
Construction wing should add cost & carriage of 1.02
MT (considering 2% wastage) of H.T. Strand to arrive
at the final consolidated item rate.
16.13 Replacement of bearings complete as per each 7712.00 7720.00
Technical specification
Note: Add cost of bearing to arrive at the final consolidated
item rate.
16.14 Rectification of bearings as per Technical each 4516.00 4524.00
specifications
16.15 Replacement of Expansion Joints complete as per metre 2564.00 2578.00
drawings
Note: The rate for the installation of new expansion joints
may be taken from the chapter on superstructure.
Broken concrete will have to be replaced which has
been included in this analysis.
16.16 Replacement of damaged Concrete Railing. metre 224.00 226.00
Note: The rate for the provision of new railing may be
adopted from the chapter on superstructure.
16.17 Replacement of Crash barrier. metre 393.00 396.00
Note: The rate for the construction of new crash barrier may
be adopted from Chapter 8 on Traffic and
Transportation.
16.18 Repair of Crash barrier metre 219.00 238.00
Repair of concrete crash barrier with cement concrete
of M-30 grade by cutting and trimming the damaged
portion to a regular shape, cleaning the area to be
repaired thoroughly, applying cement concrete after
erection of proper form work.
16.19 Repair of RCC Railing metre 172.00 180.00
Carrying out repair of RCC M30 railing to bring it to
the original shape.
16.20 Repair of Steel Railing metre 289.00 294.00
Repair of steel railing to bring it to the original shape.

306
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

CHAPTER - 17
SOIL BORING & TESTING WORKS

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
17.01 Mobilisation Charges of all tools & Plants along with
accessories, material, labour, supervision etc. at site of
work required in connection with boring and testing
work, including setting up boring rigs and shifting to
different Bore-hole points etc. and also including
withdrawal of same from the site after completion of
work, complete as per direction of Engineer-in-Charge.
a) Preliminary Investigation L.S 8000.00 8500.00
b) Detailed Investigation L.S 25000.00 27000.00
Note Payment will be made after successful completion of
work.
Preliminary Investigation is mainly for collection of
disturbed samples where deployment of heavy
machineries is not involved.
17.02 Carriage of all Disturbed & Undisturbed Samples L.S 1600.00 1700.00
from site of work to the Divisional office or elsewhere
including loading and unloading as per direction of
Engineer-in-Charge. Detailed Investigation.
Note: Some samples are to be kept at Sub-Division Office for
Additional testing By the Engineer-in-Charge.
17.03 Labour for boring by sinking and finally
withdrawing 50mm to 100mm dia. (internal) pipe by
a standard method to any depth below ground level /
bed level in all types of soil like clay, silt, sand, stiff clay,
mixed soils etc. except rocks, including collection of
disturbed soil samples and including preparation and
submission of bore-log as per standard proforma and
also including hire charges of tool and plants complete
as per direction of Engineer-in-Charge.
a) Depth 0m to 30m metre 150.00 160.00

b) Depth greater than 30m upto 60m metre 200.00 220.00

c) Extra for boring in water (with depth of Water L.S 9500.00 10000.00
upto 3.0 m)
17.04 Labour for making Bore-Holes of 150mm to 250mm
dia. by any standard method to any depth below
ground level / bed level in all kinds of soil like clay, ,
silt, sand, stiff clay, mixed soils etc. except rocks (for the
purpose of collecting Disturbed & Un disturbed soil
samples, conducting Standard Penetration Test at
suitable intervals etc.) including preparation and
submission of bore-log as per IRC : 75 and 78 and
Clause 2400 of Specifications for Road & Bridge Works
(5th Revision), Published by IRC, and also including
hire charges of tools and plants complete as per the
direction of Engineer-in-Charge.

307
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
a) When Casing pipe is used to prevent collapse of
bore hole (casing pipe to be finally withdrawn)
(i) Depth 0m to 10m metre 340.00 360.00
(ii) Depth greater than 10m and upto 20m metre 400.00 430.00
(iii) Depth greater than 20m and upto 30m metre 470.00 500.00
(iv) Depth greater than 30m. and upto 40m metre 550.00 590.00
(v) Depth greater than 40m and upto 50m metre 650.00 700.00
(vi) Depth greater than 50m and upto 60m metre 750.00 810.00
b) When drilling mud “Bentonite of suitable
consistency” is used to prevent collapse of bore
hole.
(i) Depth 0m to 10m metre 290.00 310.00
(ii) Depth greater than 10m and upto 20m metre 350.00 380.00
(iii) Depth greater than 20m and upto 30m metre 420.00 450.00
(iv) Depth greater than 30m. and upto 40m metre 470.00 500.00
(v) Depth greater than 40m and upto 50m metre 520.00 560.00
(vi) Depth greater than 50m and upto 60m metre 690.00 740.00
c) Extra for boring in water (1.2m and higher metre 10670.00 11420.00
depths).
17.05 A. Laboratory Investigation:
i) Liquid Limit as per IS 2720 (Part – V). each 350.00 380.00
ii) Plastic Limit as per IS 2720 (Part – V) each 350.00 380.00
iii) Grain size analysis by Sieving as per IS 2720 each 530.00 570.00
(Part – IV).
iv) Grain size analysis by Hydrometer Method as each 690.00 750.00
per IS 2720 (Part – IV).
v) Determination of Water Content as per IS each 140.00 150.00
2720 (Part – II).
vi) Determination of Specific Gravity as per IS each 460.00 500.00
2720 (Part – III).
vii) Direct Shear Test as per IS 2720 (Part – XIII). each 570.00 620.00
viii) Determination of Unconfined Compression
Strength as per IS 2720 (Part – X).
a) Undisturbed. each 690.00 750.00
b) Remoulded. each 920.00 990.00
ix) Determination of Sand Content as per IS 2720 each 410.00 440.00
(Part – IV).
x) Determination of Shrinkage Factor as per IS each 510.00 550.00
2720 (Part – VI).
xi) Determination of Water Content Dry Density each 1150.00 1240.00
relation using light compaction as per IS
2720 (Part – VII).
xii) Determination of Water Content Dry Density each 1590.00 1720.00
relation using heavy compaction as per IS
2720 (Part – VIII).
xiii) Determination of Density Index (Relative each 920.00 990.00
Density of cohesion less soil) as per IS 2720
(Part – XIV).

308
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All districts of
West Bengal and
Item Darjeeling
Description of Items Unit Darjeeling Plain Remarks
No. Hill Area
of Siliguri Sub-
Division
xiv) Determination of Consolidation Properties as each 920.00 990.00
per IS 2720 (Part – XIV).
xv) Laboratory Determination of California
Bearing Ratio on Disturbed / Remoulded
samples as per IS: 2720, Part XVIII.
a) Un soaked each 920.00 990.00
b) Soaked each 1150.00 1240.00
xvi) Tri-Axial Shear Test.
a) Determination of Shear strength Parameters each 920.00 990.00
of a specimen tested in Unconsolidated
Undrained Tri-axial compression without
measurement of pore water pressure as per
IS 2720 (Part – XI).
b) Determination of Shear strength Parameters each 1150.00 1240.00
of a specimen tested in Consolidated
Undrained Tri-axial compression Test with
measurement of pore water pressure as per
IS 2720 (Part – XII).
c) Determination of Shear strength Parameters each 1380.00 1490.00
of a soil from Consolidated Drained Test as
per IS 2720 (Part – X).
xvii) Laboratory Determination of Permeability as each 690.00 750.00
per IS 2720 (Part– XVII).
xviii) Determination of Field Moisture Equivalent each 460.00 500.00
as per IS 2720 (Part– XVIII).
xix) Determination of Centrifuge Moisture each 460.00 500.00
Equivalent as per IS 2720 (Part– XIX).
xx) Determination of Linear Shrinkage as per IS each 800.00 860.00
2720 (Part– XX).
xxi) Laboratory Total Soluble Solid as per IS 2720 each 690.00 750.00
(Part– XXI).
xxii) Determination of Organic Matter as per IS each 460.00 500.00
2720 (Part– XXII).
xxiii) Determination of Calcium Carbonate as per IS each 510.00 550.00
2720 (Part– VIII).
xxiv) Determination of pH Value as per IS 2720 each 460.00 500.00
(Part– VIII).
xxv) Determination of Total Soluble Sulphate as each 460.00 500.00
per IS 2720 (Part– VIII).
xxvi) Laboratory Vane Shear Test as per IS 2720 each 690.00 750.00
(Part-XVIII).
xxvii) Determination of Free Swell Index of Soil as each 460.00 500.00
per IS 2720 (Part– VIII).
xxviii) Determination of Swelling Pressure of Soil as each 690.00 750.00
per IS 2720 (Part– VIII).

309
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal and
Item Darjeeling
Description of Items Unit Darjeeling Plain Remarks
No. Hill Area
of Siliguri Sub-
Division
B Field Investigation:
i) Shallow boring by auger and collection of
disturbed sample upto 10m. Depth (In Clayey
Silty soil)
a) 0m.-6.0m. Per m 350.00 380.00
b) 6.0m.-10.0m. Per m 460.00 500.00
ii) Collection of Undisturbed Samples from the Per 460.00 500.00
open pits (Pits to be dug by client) sample
iii) Collection of Samples from the bore hole made
as per B-a
(a) Undisturbed Per 350.00 380.00
sample
(b) Disturbed Per 120.00 130.00
sample
iv) Collection of Undisturbed Samples by core Per 1150.00 1240.00
cutter method sample
v) Collection of Undisturbed soil sample from the
bore hole to be made by the concerned
Division / Party at their cost.
(i) 0.0m - 10.0m each 230.00 250.00
(ii) 10.0m-20.0m each 350.00 380.00
(iii) 20.0m-30.0m each 460.00 500.00
vi) Standard Penetration Tests (S.P.T.) by Split
Spoon Sampler in the bore hole as per IS 2131.
(i) 0.0m - 10.0m each 350.00 380.00
(ii) 10.0m-20.0m each 460.00 500.00
(iii) 20.0m-30.0m each 570.00 620.00
vii) Static Cone-Penetration Test as per IS 4968 each 460.00 500.00
(Part - III).
viii) Dynamic Cone-Penetration Test using each 460.00 500.00
50mm cone without using Bentonite slurry
as per IS 4968 (Part – I).
ix) Conduction of Benkelman Beam Test Per 270.00 290.00
(Standard Loaded Truck to be arranged) Point
x) Collection of Undisturbed sample by C.B.R. Per 690.00 750.00
Mould upto 1.5 m depth. sample
xi) Determination of Density of soil in place by Per 570.00 620.00
Sand-replacement Method as per IS 2720 test
(Part – XXIII).
xii) Field determination of California Bearing Per 2300.00 2480.00
Ratio as per IS 2720 (Part XXXI) test
xiii) Load Tests of Soils (Loading arrangement
shall be done by the client) as per IS 1888.
a) For evaluation of Bearing Capacity & Per 5670.00 6120.00
Settlement test
b) For evaluation of sub-grade modulus Per 6910.00 7460.00
test
xiv) Observation of Water Table Per 6910.00 7460.00
test

310
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
17.06 TEST OF MATERIAL:
A. Blast Furnace Slag, Cinder, Stone, Jhama,
Laterite, etc.
(i) Grading by Sieve Analysis as per IS: 2386 Per 350.00 380.00
(Part – I) sample
(ii) Flakiness Index & Elongation Index Per 460.00 500.00
Combined sample
(iii) Estimation of Deleterious Materials as per IS: Per 920.00 990.00
2386 (Part – II) sample
(iv) Determination of Specific Gravity as per IS: Per 460.00 500.00
2386 (Part – III) sample
(v) Determination of Bulk Density as per IS: Per 230.00 250.00
2386 (Part – III) sample
(vi) Determination of Void Ratio as per IS: 2386 Per 230.00 250.00
(Part – III) sample
(vii) Determination of Water Absorption as per IS: Per 230.00 250.00
2386 (Part – III) sample
(viii) Determination of Aggregate Crushing Value Per 690.00 750.00
as per IS: 2386 (Part – IV) sample
(ix) Determination of the 10% Fines Value per IS: Per 690.00 750.00
2386 (Part – IV) sample
(x) Determination of Aggregate Impact Value as Per 690.00 750.00
per IS: 2386 (Part – IV) sample
(xi) Determination of Aggregate Abration Value Per 920.00 990.00
(Los Angles) as per IS: 2386 (Part – IV) sample
(xii) Soundness Test as per IS: 2386 (Part – V) Per 460.00 500.00
sample
(xiii) Determination of Compressive Strength
a) For Prepared Sample Per 460.00 500.00
b) For Sample to be Prepared sample 690.00 750.00
(xiv) Determination of Stripping Value of Road Per 690.00 750.00
Aggregate (Bitumen to be supplied and sample
determination of specification will be
charged) as per IS: 6241
B. (I) FIELD TEST ON ROCKS :
Boring and drilling of rocks and collection / recovery
of rock core including supplying information on the
physical condition and type of rock, length of pieces of
core, joints, colour, weathering changes and other
effects in the drilling logs as per IS 4464 and IS 5313
complete.
a) By Diamond Drills each 1850.00 1980.00
b) By Tungsten Cutters each 950.00 1020.00
(II) LABORATORY TEST ON ROCKS
(i) Compressive Strength of Rock as per IS 1121 Per 580.00 630.00
(Part-I) sample
(ii) Transverse Strength of Rock as per IS 1121 Per 680.00 730.00
(Part-II) sample
(iii) Tensile Strength of Rock as per IS 1121 (Part Per 580.00 630.00
– III). sample

311
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
(iv) Shear Strength of Rock as per IS 1121 (Part - Per 530.00 570.00
IV). sample
(v) Determination of True Specific Gravity as Per 460.00 500.00
per IS 1122 sample
(vi) Determination of Water Absorption as per Per 230.00 250.00
IS: 1124 sample
(vii) Determination of Toughness of rock. Per 570.00 620.00
sample
C. BRICKS
(i) Determination of Compressive Strength as Per 920.00 990.00
per IS: 3405 (Part I-IV) sample
(ii) Determination of Water Absorption as per Per 230.00 250.00
IS: 3405 (Part I-IV) sample
(iii) Determination of Efflorence as per IS: 3405 Per 580.00 630.00
(Part I-IV) sample
D. SAND
(i) Grading by Sieve Analysis as per IS: 2386 Per 460.00 500.00
(Part – I) sample
(ii) Estimation of Deleterious Materials as per IS: Per 580.00 630.00
2386 (Part – II) sample
(iii) Estimation of Organic Impurities as per IS: Per test 580.00 630.00
2116 & 383
(iv) Determination of Specific Gravity as per IS: Per test 460.00 500.00
2386 (Part III)
(v) Determination of Bulk Density as per IS: Per test 180.00 190.00
2386 (Part III)
(vi) Determination of Bulking of Sand Per test 320.00 350.00
(vii) Determination of Lecy’s Silt Factor Per test 920.00 990.00
E. LIME
(i) Determination of Fineness of Hydrated Lime Per test 280.00 300.00
as per IS: 712
(ii) Determination of Setting Time (Initial & Per test 280.00 300.00
Final as per IS: 712
(iii) Determination of Workability as per IS: 712 Per test 430.00 460.00
(iv) Test of Soundness as per IS: 712 Per test 230.00 250.00
(v) Determination of Compressive Strength (14 Per test 920.00 990.00
days & 28 days) as per IS: 712
(vi) Determination of Calcium Oxide Content as Per 320.00 350.00
per IS: 712 sample
(vii) Determination of Free Lime Content as per Per 690.00 750.00
IS: 15514 sample
(viii) Determination of Calcium Carbonate as per Per 510.00 550.00
IS: 712 sample
F. BITUMEN
(i) Determination of Specific Gravity as per IS: Per 430.00 460.00
1202 sample
(ii) Determination of Penetration as per IS: 1203 Per 460.00 500.00
sample
(iii) Determination of Softening Point as per IS: Per 430.00 460.00
1205 sample

312
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
(iv) Determination of Kinematic Viscosity as per Per 460.00 500.00
IS: 1206 (Part-III) sample
(v) Determination of Ductility as per IS: 1206 Per 460.00 500.00
sample
(vi) Determination of Flash Point & Fire Point as Per 350.00 380.00
per IS: 1209 sample
(vii) Float Test as per IS: 1210 Per 580.00 630.00
sample
(viii) Determination of Water Content as per IS: Per 350.00 380.00
1211 sample
(ix) Determination of Loss on Heating as per IS: Per 350.00 380.00
1212 sample
(x) Determination of Solubility on Carbon Dy Per 580.00 630.00
Sulphide or Trichloroethylene as per IS: 1216 sample
(xi) Marshal Stability & Flow Test:
a) Supply Sample Per 1150.00 1240.00
b) Sample to be prepared sample 1840.00 1990.00
(xii) Determination of Stripping Value Per 690.00 750.00
sample
(xiii) Design of Asphaltic Concrete including L.S. 17710.00 19130.00
necessary Test
(xiv) Determination of Hardness of Mastic Asphalt Per 690.00 750.00
as per IS: 1195 sample
(xv) Determination of Bitumen Content Per 710.00 770.00
sample
(xvi) Miscibility in Water of Bituminous Emulsion Per 230.00 250.00
as per IS: 3117 sample
(xvii) Coating Test of Bituminous Emulsion as per Per 460.00 500.00
IS: 3117 sample
G. MODIFIED BITUMEN
(i) Determination of Flash Point as per IS: 1209 Per 350.00 380.00
sample
(ii) Elastic Recovery of half tread in Ductilometer Per 710.00 770.00
as per ASTM D5976 sample
(iii) Determination of Loss in weight on Heating Per 530.00 570.00
as per IS: 9382 sample
H. STEEL
(i) Tensile Strength of Steel as per IS: 1608 Per 460.00 500.00
&2026 sample
(ii) Determination of 2% Proof Stress as per IS: Per 460.00 500.00
1608 &2026 sample
(iii) Elongation Test as per IS: 1608 &2026 Per 390.00 420.00
sample
(iv) Bend Test as per IS: 1599 &2060 Per 350.00 380.00
sample
I. CEMENT
(i) Fineness by dry sieving as per IS: 4031 (Part- Per 280.00 300.00
I) sample
(ii) Fineness by Specific Surface by blown air Per 580.00 630.00
permeability method as per IS: 4031 (Part-II) sample

313
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
(iii) Determination of Soundness by Leechatelier Per 230.00 250.00
method as per IS: 4031 (Part-III) sample
(iv) Determination of Consistency of Standard Per 280.00 300.00
Cement Paste as per IS: 4031 (Part-IV) sample
(v) Determination of Initial & Final Setting Time Per 300.00 320.00
as per IS: 4031 (Part-V) sample
(vi) Determination of Compressive Strength of Per 1660.00 1790.00
Hydraulic Cement as per IS: 4031 (Part-VI) sample
(3 days, 7 days & 28 days)
(vii) Determination of Heat Hydration of Cement Per 1770.00 1910.00
as per IS: 4031 (Part-IX) sample
(viii) Determination of Drying Shrinkage of Per 580.00 630.00
Cement as per IS: 4031 (Part-X) sample
(ix) Determination of Specific Gravity of Cement Per 340.00 370.00
as per IS: 4031 (Part-XI) sample
17.07 CONCRETE
(i) Slump Test as per IS: 1199 Per 230.00 250.00
sample
(ii) Compacting Factor Test as per IS: 1199 Per 460.00 500.00
sample
(iii) Determination of Consistency of Concrete by Per 1150.00 1240.00
Vee - Bee Consistometer as per IS: 1199 sample
(iv) Flexural Strength of Concrete Beam as per IS:
1199 & 516
a) Supply Specimen Per 1040.00 1120.00
b) Specimen to be prepared sample 2000.00 2160.00
(v) Compressive Strength Test of Concrete Per 280.00 300.00
Specimen as per IS: 516 sample
(vi) Preparation of Concrete Specimen & Per 1040.00 1120.00
Compressive Strength Test as per IS: 1199 & sample
516
(vii) Bulk Density, Water absorption & Void Ratio Per 810.00 870.00
of Concrete Specimen sample
(viii) Determination of Compressive Strength of Per 460.00 500.00
Cored Sample (Sample to be supplied) as per sample
IS: 1199 & 516
(ix) Test of Permeability of Concrete as per IS: Per 1150.00 1240.00
3085 sample
(x) Test for Sulphate & Chloride in Water Per 1180.00 1270.00
sample
17.08 Preparation and submission of report in 6 (Six) copies,
giving all relevant information data like site plan, Bore
log and water table, test results, calculations,
discussions, suggestions and recommendations in
respect of suitable foundation etc. including
determination of silt factor calculation of waterways
and complete design of foundation including analysis
of Bearing Capacities and settlements in bound and
presentable form complete as per direction of
Engineer-in-Charge.
a) Preliminary Investigation L.S 5000.00 5500.00
b) Detailed Investigation L.S 12500.00 13500.00

314
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

MISCELLANEOUS WORKS
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

CHAPTER - 18
MISCELLANEOUS WORKS

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
18.01 Labour for picking up existing metalled road
surface to a specified average depth, including
screening and stacking the pavement materials.
(a) For average depth up to 40 mm by manual means:
(i) Stone-metal surface. sqm 12.90 12.90
(ii) Brick / Jhama metal surface. sqm 9.50 9.50
(b) For average depth above 40 mm but not
exceeding 75 mm by manual means:
(i) Stone-metal surface. sqm 19.00 19.00
(ii) Brick / Jhama metal surface. sqm 12.90 12.90
(c) For average depth above 75 mm but not exceeding
150 mm by manual means:
(i) Stone-metal surface. sqm 25.50 25.50
(ii) Brick / Jhama metal surface. sqm 19.00 19.00
18.02 Picking up and removing old bituminous layer or
sand sealing coat from old black topped surface and
cleaning the exposed surface by scraping and stacking
the material as directed.
(a) By manual means :
(i) From 25 mm to 50 mm thick. sqm 22.60 22.60
(ii) From 50 mm to 100 mm thick. sqm 30.40 30.40
(iii) Above 100 mm thick. sqm 45.20 45.20
(b) By mechanical means :
(i) From 25 mm to 50 mm thick. sqm 3.80 3.90
(ii) From 50 mm to 100 mm thick. sqm 7.50 7.80
(iii) Above 100 mm thick. sqm 15.00 15.60
18.03 Labour for mixing stable anti-stripping agent of kg 4.50 4.50
approved quality conforming to Table - A4-1 of
Appendix–4 of Specification for Road & Bridge Works
of MoRT&H (5th Revision) to the binder @ 0.5% to 1%
by weight of binder (depending up on size & stripping
value of the aggregates) and allowing 15 to 30
minutes of circulation or stirring in the hot bitumen
tank to ensure a homogeneous mix of binder and anti-
stripping agent for different bituminous works as per
Technical Specifications given in Appendix – 4 of
Specification for Road & Bridge Works of MoRT&H (5th
Revision) and direction of Engineer-in-Charge
complete including cost and carriage of all materials,
labours, hire charges of T&P but excluding the cost but
including carriage of anti-stripping agent to site of
works.

315
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
18.04 Labour charges for transferring Bulk Bitumen from MT 445.00 445.00
departmental vats in to empty bitumen drums by
cutting or other suitable means, including hire charges
of bitumen drums, carriage & handling up to a lead of
30 m, including all incidental charges, T&P, fuel,
lubricants etc. complete.
18.05 Hire and labour charges for Shuttering with or
without staging upto 4.0 m height using approved
stout props with wooden planks/ply wood/steel sheet
plate with required bracing for any kind of plain or
reinforced concrete works in all sorts of minor
structure including culvert, box culvert, cross-drain
etc. The rate is inclusive of fitting, fixing and striking
out after completion of work as per specification and
direction.
(a) Where staging is required. sqm 354.00 354.00
(b) Where staging is not required. sqm 214.00 214.00
18.06 First class Brick work in cement sand mortar in
steining of well, pier, abutment, wing wall, parapets
cross drain. H.P. culverts, guard wall etc. including
curing, scaffolding, raking out joints etc. complete
including cost and carriage of all materials.
(a) In 1:4 proportion. cum 2590.00 3040.00
(b) In 1:6 proportion cum 2365.00 2846.00
Note: Construction wing is to add cost and carriage of bricks
as per requirement vide Table 3.1-1 only to arrive at
consolidated rate.
18.07 Providing and laying Design Mix concrete for plain
/ reinforced concrete work in any part of bridge
(excluding bottom plugging) with coarse aggregates
of appropriate nominal size and grading, fine
aggregate (sand) conforming to proper grading zone,
both of approved quality and cement, as necessary,
including labour, cost and carriage of all materials
and including preparation of design mix, approval of
the same by the Engineer-in-Charge and cost for
quality control, sampling, testing etc. all complete but
excluding cost of labour and materials for formwork &
reinforcement works.
(a) M-15 Grade
Using concrete mixer. cum 1425.00 1786.00
(b) M-20 Grade
Using concrete mixer. cum 1508.00 1878.00
(c) M-25 Grade:
Using concrete mixer. cum 1578.00 1950.00
(d) M-30 Grade:
(i) Using concrete mixer. cum 1582.00 1955.00
(ii) Using Batching Plant, Transit Mixer & cum 1351.00 1730.00
Concrete Pump

316
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
(e) M-35 Grade:
(i) Using concrete mixer. cum 1616.00 1991.00
(ii) Using Batching Plant, Transit Mixer & cum 1384.00 1767.00
Concrete Pump
Note: (Applicable for all the item in Sl.18.08)
1. Construction wing is to add cost and carriage of
cement & coarse aggregates as per requirement vide
Table 3.2-1 only to arrive at consolidated rate.
2. While actually providing the item in estimate or
agreement of work, maximum nominal size of coarse
aggregates intended to be used should be selected and
mentioned in the item.
3. From durability consideration, the value of minimum
cement content and maximum water cement ratio to
be considered in the mix design shall be as per the
direction of the Engineer-in-Charge.
18.08 Mixing Superplastisizer in concrete as per
manufacturer's specification and direction of
Engineer-in-Charge. The rate is inclusive of cost of
superplastisizer.
(a) Carboxylate based kg 220.00 222.00
(b) Naptha based kg 90.40 90.40
18.09 Providing Steel anchor dowels at the base of the well each 3584.00 3584.00
including drilling holes upto 2.5 m. depth in rock,
placing the dowels in position and effectively grouting
the holes (32 mm. diameter steel rod of 4.0 m length
grouted upto 2.5 m. depth) etc. Complete as directed
by Engineer in charge.
18.10 Welding by gas / electric plant including cm 1.80 1.80
transportation of welding plant at site including
cutting, forging & drilling to required shape.
18.11 A) Supplying and fitting fixing M.S. Iron pile shoe as kg 84.40 85.50
per approved drawing.
B) Supplying and fitting fixing M.S. Iron ring with kg 85.20 86.20
50mmx6mm flat over head of pile for driving
including cutting of pile head.
18.12 M.S. Works in bolts and nuts of different sizes fitted kg 76.70 76.70
and fixed in position including drilling holes and
welding including cost of labour and materials.
18.13 Labour for M.S. work in Rolled steel joists, channels, kg 7.30 7.30
angles. Tees, plates etc. including hoisting, placing in
position including providing staging and removing
after completion of works and cutting to sizes as
required.
Note: The item is exclusive of the cost of steel materials,
necessary nuts & bolts and cost of welding.
18.14 Re- fitting R.S. Joist, Angles, Tees, Plates, and other MT 397.00 397.00
steel materials by sawing.
18.15 Re- fitting the railing with old and new bolts as m 62.80 62.80
required.
Note: Cost of new bolts, if required, is to be added.

317
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal Darjeelin
Item
Description of Items Unit and Darjeeling g Hill Remarks
No.
Plain of Siliguri Area
Sub-Division
18.16 Straightening curved or twisted steel elements.
(a) R.S. joists and Channel kg 4.40 4.40
(b) Angles, Tees kg 3.30 3.30
18.17 Labour for driving Sal-bullah / Eucalyptus bullah
piles by monkey in sorts of soil including hoisting and
placing piles in position, protecting the pile head with
iron ring and cutting and shaping heads before and
after driving and including hire and labour for
necessary driving appliances and all tackles.
(i) 100mm diameter m 83.00 83.00
(ii) 125mm diameter m 92.00 92.00
(iii) 150mm diameter m 105.00 105.00
(iv) 175mm diameter m 112.00 112.00
(v) 200mm diameter m 119.00 119.00
(vi) 225mm diameter m 126.00 126.00
Note: 1) Payment to be made on the length driven into the
ground, diameter of the measured at 1.5m. from the
thicker end.
2) For string staging under specific instruction of
Engineer-in-charge or for driving from pontoon or
boats the rate will be enhanced by ` 4.00 per meter.
3) For driving done by pile engine set (without staging)
under specific instruction of Engineer-in-charge, the
rates will be enhanced by ` 4.00 per meter.
4) For driving done by pile engine set (with heavy
staging or from specially made pontoon) under
specific instruction of Engineer-in-charge. The rates
will be enhanced by ` 7.00 per m.
18.18 Supplying Eucalyptus-bullah piles at work site,
including dressing and making one end pointed.
(i) 100mm diameter m 96.00 -
(ii) 125mm diameter m 145.00 -
(iii) 150mm diameter m 217.00 -
(iv) 175mm diameter m 267.00 -
(v) 200mm diameter m 305.00 -
(vi) 225mm diameter m 460.00 -
Note: Diameter of pile to be measured at a distance of 1.5m
from the thicker end.
18.19 Supplying Sal-bullah piles at work site, including
dressing and making one end pointed
(i) 100mm diameter m 142.00 142.00
(ii) 125mm diameter m 214.00 214.00
(iii) 150mm diameter m 263.00 263.00
(iv) 175mm diameter m 313.00 313.00
(v) 200mm diameter m 386.00 386.00
(vi) 225mm diameter m 575.00 575.00
Note: Diameter of pile to be measured at a distance of 1.5m
from the thicker end.

318
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All districts of
West Bengal Darjeelin
Item
Description of Items Unit and Darjeeling g Hill Remarks
No.
Plain of Siliguri Area
Sub-Division
18.20 Joining Sal-bullah / Eucalyptus bullah pile of 20 cm. each 78.90 79.30
to 30 cm. diameter with half lap joints (lap length at
least 90 cm long) with 3 nos. of collars made of 50 cm. x
6 mm. M.S. Flat, clamps, bolts and nuts and washers as
per approved drawing and design.
18.21 Butt joining Sal-bullah / Eucalyptus bullah piles of each 198.00 200.00
diameter from 20 cm. to 30 cm. inserting 25 mm. dia
and 45 cm long M.S. Rod as dowel bar 22 cm. minimum
at the centre of each bullah and fastened with 4 nos. 75
cm. long 65 mm. x 65 mm. x 10 mm. M.S. angles placed
diametrically opposite to each other and fixed by nuts
and bolts (16 mm. dia.)-8 nos. and washers being tied
with 4 Nos. 50 mm. x 6 mm. M.S. Flat suitably profiled to
grip the M.S. angle at upper and lower ends of M.S.
angles fitted and fixed with nuts, bolts and washers etc.
including coal-tarring two coats complete etc. as per,
drawing and direction of the Engineer-in- Charge.
18.22 Sal-wood work rough dressed including necessary cum 62730.00 62730.00
hoisting and fitting, and fixing in position including cost
of nails but excluding cost of bolts, nuts and washer in
Bridge Work excluding Bridge Floor.
18.23 Sal-wood work rough dressed in bridge floor fitted cum 73070.00 73070.00
and fixed with patent or round headed nails including
cost of materials and fittings.
18.24 Labour for Sal-wood work undressed in scantling in cum 2544.00 2544.00
bridge floor, railing post, wheel guard including cost of
supply of bolts, nuts, washers etc. as directed.
18.25 Labour for Sal-wood work in bridge members with cum 2324.00 2324.00
old timber including cutting out rotten portion sizing,
dressing, cutting to sizes, taking out nails etc. complete
with supply of new snap headed country nails.
18.26 Taking out Sal-bullah / Eucalyptus piles from river
bed or from elsewhere including carrying stacking
materials in the nearest stack yard.
(a) Up to 17.5 cm. diameter. m 11.80 11.80
(b) Above 17.5 cm. and up to 25 cm. diameter m 14.10 14.10
18.27 Coal tarring on wooden surfaces including cost of
materials
(a) Double coat. sqm 36.00 38.00
(b) Single coat sqm 22.00 23.00
18.28 Supplying empty Cement bags in good condition. 100 330.00 330.00
Nos.
18.29 Filling empty Cement bags with dry earth or sand, 100 350.00 350.00
stitching the bag (cost of thread included) and carrying bags
and placing them in position and all incidental charges
complete but excluding cost of sand and gunny bags.

319
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
18.30 Weaving wire mattress as directed with wire of 4mm sqm 23800 238.00
dia. and making sausage crate of required shape after
tying all intersections including joining longitudinal
ends, closing ends of sausage, carriage of wire to site of
work complete in all respect as per direction of the
Engineer-in-charge including cost of supply of G.I.
wire. (With 100mm x 100mm mesh.)
18.31 Filling properly the empty sausage crates with cum 454.00 449.00
boulders of any size & shape with hand packing after
preparation of bed of placement, placing the crate in
position, carriage of boulders from road stacks with a
lead upto 150m etc. complete in all respect including
stitching the rest of the crate with wire (passage for
filling boulders) after filling up the crate with boulders
and launching the crate in position if necessary and as
directed by the Engineer-in charge.
[Rate provided is exclusive of the cost of stone boulders
and sausage crate]
18.32 Masonry work with rough dressed Stones of size as
directed with cement mortar, true to line, level and
shape, including dressing and shaping boulders to size
as required, curing complete including cost and
carriage of all materials complete.
(a) With cement-sand mortar 1 : 6
(i) In Road & Jhora Work cum 1740.00 -
(ii) In Bridge & Culvert Work cum 1789.00 -
(b) With cement-sand mortar 1 : 4
(i) In Road & Jhora Work cum 2060.00 -
(ii) In Bridge & Culvert Work
1) Upto height 4.0 m cum 2131.00 -
2) Height above 4.0 m cum 2237.00 -
Note: Construction wing is to add cost and carriage of 1.25
cu.m. of laterite / stone only to arrive at consolidated
rate.
18.33 Brick pavement with 1st class / picked jhama bricks
(as per direction of Engineer in charge) with joints set
closed in cement mortar 1:6 including preparation of
bed by cutting or filling with ramming the filled up
earth to the same profile as that of the finished
pavement. Rate is inclusive of cost of supply of all
materials, labour and all incidental charges in this
connection.
(a) When laid with a cushion of sand below
including cost thereof:
(i) One brick flat pavement. sqm 398.00 522.00
(ii) One brick on edge pavement. sqm 597.00 777.00
(iii) One brick on edge pavement laid in herring sqm 621.00 801.00
bone bond pattern

320
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
(b) When laid in cement mortar (1:6) on the
underside as well.
(i) One brick flat pavement. sqm 455.00 581.00

(ii) One brick on edge pavement. sqm 657.00 839.00

(iii) One brick on edge pavement laid in herring sqm 688.00 870.00
bone bond pattern
18.34 Painting with approved quality Curing compound sqm 39.80 39.80
on the vertical or inclined surfaces of concrete, where
water curing is not possible. Painting is to be done with
a brush on new surfaces, immediately after removal of
shuttering, including supply of all materials and other
incidental charges complete as per direction of the
Engineer-in-charge.
18.35 Painting with approved synthetic enamel paint sqm 55.00 55.00
Circular panel (upto 30cm dia.) or Rectangular
panel (size 38cm to 30cm x 25cm to 20cm) including
the Load classification number or the number of bridge
or culvert painted thereon in a different colour,
complete as directed by Engineer-in-charge.
18.36 Painting (one coat) to Sal bullah Guard post with 6 each 54.30 54.30
nos. of 16cm wide horizontal alternate band with
white/Tannery yellow and black with best quality
synthetic enamel paint of approved make and brand
after fixing old existing guard post in correct position
true to line and level with repacking the ground at base
properly complete in all respect.
18.37 Close Bamboo Walling made of 65mm to 75mm dia.
bamboos (in single line) driven about half-length into
the ground side by side, with stout stays at an interval
of 1m, 3nos. of half split bamboo runner of same dia
fitted and fixed with nails etc. complete as per direction.
(Measurement to be taken along the length of piling
after finishing the works).
(i) With bamboos of length upto 2.00m metre 448.00 448.00
(ii) With bamboos of length above 2.00m and upto metre 517.00 517.00
2.50m
(iii) With bamboos of length above 2.50m and upto metre 587.00 587.00
3.00m
18.38 Bamboo Pile Walling made of 6.5cm to 7.5cm dia
bamboo (in single line) driven about half-length into
ground at very close spacing of 30cm c/c side by side,
with stout stays at an interval of 90cm fixed with
bamboo post of length 1.25m driven 1m below G.L., 3
nos. of half split bamboo runner of same dia fitted and
fixed with nails etc. and lining exposed portion with
sheets made from cut drums (empty bitumen drums)
fitted and fixed with a lap width of 100 mm at each
joint, complete as per direction including the cost of
drum sheets and including the cost of nails, wires etc.

321
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

All districts of
West Bengal
Item Darjeeling
Description of Items Unit and Darjeeling Remarks
No. Hill Area
Plain of Siliguri
Sub-Division
(i) With bamboos of length upto 2.00m metre 526.00 526.00
(ii) With bamboos of length above 2.00m and upto metre 626.00 626.00
2.50m
(iii) With bamboos of length above 2.50m and upto metre 735.00 735.00
3.00m
18.39 Drum Sheet Walling 1.40m (av.) high on Sal-bullah
/ Eucalyptus bullah piling 10 cm dia. and 3.25m long
driven 1.75m (av.) below G.L. and 75cm centre to
centre including fitting fixing 3 nos. of half bullah
pieces (from 10 cm dia) and drum(empty bitumen)
sheet (approved condition) of height 1.5m , cutting and
straightening drum sheet (each joint must have lap
length of min.50mm) including cost of necessary nails,
bolts, nuts etc. and providing 2 to 3m long half bullah
ties of 10cm dia. @ 2.25 m centre to centre fixed with
10 cm dia. bullah posts driven 1.5m below G.L.
including cost of all materials and one coat of coal
tarring to all bullah etc. complete as per direction.
(i) Using Eucalyptus bullah metre 1244.00 -
(ii) Using Sal-bullah metre 1569.00 1569.00

322
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

APPENDICES
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

APPENDIX – I
DISTANCES FROM HALDIA REFINERY & KOLKATA
TO DIFFERENT DEPARTMENTAL GODOW N / STACKYARD
UNDER P. W . (ROADS) DIRECTORATE

Distances (km) by road from


Sl. No. Divisions / Departmental godowns
Haldia Kolkata
1. Barasat Highway Division No. – I
a) Baguihati 129
b) Basirhat 186
c) Barasat 143
2. Barasat Highway Division No. – II
a) Barasat 143
b) Habra 167
c) Bongaon 196
d) Gaighata 179
3. Diamond Harbour Highway Division
a) Diamond Harbour 161
b) Kakdwip 204
c) Lakshmikantapur / Karbala 171
d) Chakdah 163
e) Falta (EPZ) 163
f) Namkhana 218
4. 24 Parganas Highway Division
g) Canning 166
h) Baruipur 140
5. Howrah Highway Division & NH Division No. - I
a) Amta 80
b) Kona 100
c) Eksara 109
d) Jagatpur 83
e) Mahisrekha 72
f) Ankurhati 103
g) Mrigola 117
6. Hooghly Highway Division No. – I
a) Hooghly / Kidalia stackyard 147
b) Srirampore 128
c) Kalachara 142
d) Sheakhala 134
e) Jangipara 146
f) Arambag 147
g) Khanakul 173
h) Ramjibanpur 124
i) Kuntighat / Mogra 153
j) Gurap 177
k) Pandua 167
7. Hooghly Highway Division No. – II
a) Bansberia / Borapara 156
b) Bera 138
8. Nadia Highway Division No. – I
a) Krishnanagar 228
b) Majdia 249
c) Palasi 284
d) Chakdah 184
e) Devagram 273

323
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

Distances (km) by road from


Sl. No. Divisions / Departmental godowns
Haldia Kolkata
9. Nadia Highway Division No. – II
a) Kalyani 161
b) Ranaghat 194
10. Murshidabad Highway Division No. – I
a) Berhampore 323
b) Beldanga 302
11. Murshidabad Highway Division No. – II
a) Berhampore 323
b) Kandi 352
c) Kuli 359
d) Salar 380
e) Palsunda 340
12. Malda Highway Division & NH Division - VII
a) Malda 458
b) Narayanpur (NH-VII) 466
c) Mangalbari 461
d) Gajole 487
e) Chanchol 524
f) Kaliachak 435
g) Manikchak Ghat 494
h) Samsi 511
i) Farrakka (NH-VII) 426
j) Umerpore More 373
k) Raghunathgunj 377
13. Birbhum Highway Division
a) Suri 302
b) Bolpur 276
c) Rampurhat 348
d) Nalhati 364
e) Kirnahar 277
14. Bankura Highway Division
a) Bishnupur 175
b) Bankura / Natunchati 209
15. Purulia Highway Division & NH Division - III
a) Purulia 290
b) Hura 259
c) Balarampore 320
d) Manbazar 250
16. North Dinajpur Highway Division
a) Raigunj 534
b) Kaliagunj 549
c) Islampore 643
17. South Dinajpur Highway Division
a) Balurghat 570
b) Buniadpore 518
c) Dalkhola 583
d) Kushmandi 529
e) Karnajhora 539
18. Darjeeling Highway Division
a) Siliguri 716
b) Matigara 712
c) Saktigarh 716
19. Coochbehar Highway Division & NH Division - X
a) Coochbehar 855
b) Mathabhanga 825
c) Silbari (Coochbehar NH Sub-Division) 863
d) Moratorsha 855

324
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

Distances (km) by road from


Sl. No. Divisions / Departmental godowns
Haldia Kolkata
20. Jalpaiguri Highway Division &
NH Division - XI, X
a) Jalpaiguri 760
b) Moynaguri 771
c) Lataguri 789
d) Dhupguri 791
e) Falakata (NH-XI) 814
f) Gayerkata 864
g) Hasimara (NH-X) 843
h) Madarihat (NH-X) 831
i) Malbajar 770
21. Burdwan Highway Division No. – I
a) Burdwan (Sadarghat) 193
b) Nabadwip 217
c) Kalna 193
d) Jamuria 285
e) Memary 189
f) Guskara 223
22. Burdwan Highway Division No. – II &
NH Division –III
a) Durgapur (NH) 254
b) Asansole 294
c) Rayna 192
d) Khandaghosh 194
e) Samudragarh 206
23. Burdwan Highway Division No. – III &
NH Division –III
a) Bhatar 209
b) Katwa 247
c) Ramjibanpore 274
d) Ketugram 265
e) Nandan Ghat 219
f) Panagarh (NH-III) 240
g) Shaktigarh (NH-III) 179
24. Tamluk Highway Division
a) Tamluk 45
b) Contai (Kanthi) 80
c) Norghat 35
25. Midnapore Highway Division No. – I
a) Midnapore 112
b) Baliachak 84
c) Bagnan 67
d) Chaitanyapur 18
e) Chandrakona Road 135
f) Kharagpur 108
g) Krishnanagar (Kharagpur) 100
h) Mahisrekha 72
i) Panskura 62
26. Midnapore Highway Division No. – II
a) Midnapore 112
b) Jhargram 155
c) Garbeta 147
d) Debra 82
e) Lodha Suli 140
f) Belda 136
g) Egra 109

325
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

APPENDIX – II
DISTANCES FROM QUARRIES OF STONE AGGREGATES
AND RIVER BED LOCATIONS OF SAND

(A) QUARRY LOCATIONS :

Init ial leads (k m) by r oad


Name of Quarries
F r om quarry to Lead
Rampurhat Railway Station 14

Rampurhat (Birbhum) Moregram Junction (232 kmp of NH-34) 50

Panagarh (513 kmp of NH-2) 129

Nalhati (Birbhum) Nalhati Railway Station 6

Panchami More (Suri-Rampurhat Road) 12

Panchami (Birbhum) Moregram Junction (232 kmp of NH-34) 81

Panagarh (513 kmp of NH-2) 98

Dhadka (Burdwan) Asansol Town (462 kmp of NH - 2) 2

Hura (Lalpur More) (Purulia) Purulia Town (90 kmp of NH-32) 30

Puncha / Laulara (Purulia) Purulia Town (90 kmp of NH-32) 50

Barabazar Purulia Town (90 kmp of NH-32) 30

Purulia Town (90 kmp of NH-32) 32


Malti / Balarampur (Purulia)
Balarampur (126 kmp of NH-32) 4

(B) RIVER BED LOCATIONS :

Init ial leads (k m) by r oad


Name of Sources
F r om source to Lead
Dudhia River Bed 69 kmp of NH - 55 23

Jaldhaka River bed 115 kmp of NH - 31C 6

Upper Basra River bed 182 kmp of NH - 31D 30

Bhutanghat River bed 226 kmp of NH-31C 43

Balason River bed 570 kmp of NH-31 6

Pagli River bed 718 kmp of NH - 31 12

Shilbari River bed 718 kmp of NH - 31 16

Kajli River bed 202 kmp of NH-31C 10

326
PWD (WB), Schedule of Rates :2014 Volume III : Road & Bridge Works
APPENDIX - III
SIGN OF DISTRESS, PROBABLE CAUSES AND SUGGESTED MEASURE IN BITUMINOUS PAVEMENT
Sl. Type of Distress Sign of distress Probable causes Suggested treatment
A. Surface Defects –
1. Fatty surface Collection of binder on the surface. Excessive binder in premix, spray or tack coat, Sand blinding; open-graded premix; liquid
loss of cover to aggregates; excessively heavy seal coat.
axle loads.
2. Smooth surface Slippery Polishing of aggregates under traffic, or Resurfacing with surface dressing or
excessive binder. premix carpet.
3. Streaking Presence of alternate lean and heavy Non-uniform application of bitumen or at a low Application of a new surface.
lines of bitumen. temperature.
4. Hungry surface Loss of aggregates or presence of fine Use of less bitumen or absorptive aggregates. Slurry seal or fog seal.
cracks.
B. Cracks –
1. Hair-line cracks Short and fine cracks at close intervals Insufficient bitumen, excessive filler or improper
on the surface. compaction.
2. Alligator cracks Inter-connected cracks forming a Weak pavement, unstable conditions of
series of small blocks. subgrade or lower layers, excessive over loads The treatment will depend on whether
or brittleness of binder. pavement is structurally sound, or
3. Longitudinal crack Crack on a straight line along the road. Poor drainage, shoulder settlement, weak joint unsound. Where the pavement is
between adjoining spreads of pavement layers structurally sound, the cracks should
or differential frost heave. be filled with a low viscosity binder or
4. Edge crack Crack near and parallel to pavement Lack of support from shoulder, poor drainage, a slurry seal or fog seal depending on
edge. frost heave, or inadequate pavement width. the width of cracks. Unsound cracked
5. Shrinkage cracks Cracks in transverse direction or inter- Shrinkage of bituminous layer with age. pavements will need strengthening or
connected cracks forming a series of rehabilitation treatment.
large blocks
6. Reflection cracks Symmetrical cracks over joints and Due to joints and cracks in the pavement
cracks in the pavement underneath. underneath.
C. Deformation –
1. Slippage Formation of crescent-shaped cracks Usual thrust of wheel in a direction, lack or Removal of the surface layer in the affected
pointing in the direction of the thrust failure of bond between surface and lower area and replacement with fresh material.
of wheels. pavement courses
2. Rutting Longitudinal depression in the wheel Heavy channalised traffic inadequate Filling the depressions with premix
tracks. compaction of pavement layers, poor stability of material.
pavement material, or heavy bullock-cart traffic.
3. Corrugations Formation of regular undulations Lack of stability in mix, oscillations set up by Scarification and relaying of surfacing, of
vehicles, springs, or faulty laying of surface cutting of high spots and filling of low
course. spots.

327
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2013-2014

Sl. Type of Distress Sign of distress Probable causes Suggested treatment


4. Shoving Localized bulging of pavement surface Unstable mix, lack of bond between layers, or Removing the material to firm base and
along the crescent-shaped cracks. stop type movements and those involving relaying a stable mix.
negotiation of curves and gradients.
5. Shallow depression Localized shallow depressions Presence of inadequately compacted pockets. Filling with premix materials.
6. Settlement and upheaval Large deformation of pavement Poor compaction of fills, poor drainage, Where fill is weak the defective fill should be
inadequate pavement or frost heave. excavation and re-done. Where inadequate
pavement is the cause, the pavement should
be strengthened.
D. Disintegration –
1. Stripping Separation of bitumen from aggregate Use of hydrophilic aggregate, inadequate mix Spreading and compacting heated sand over
in the presence of moisture composition, continuous contact with water, the affected area in the case of surface
poor bond between binder and aggregate, poor dressing; replacement with fresh bituminous
compaction, etc. mix with added anti-stripping agent in other
cases.
2. Loss of aggregate Rough surface with loss of aggregate in Ageing and hardening of binder, stripping poor Application of liquid seal, fog seal, or slurry
some portions bond between binder and aggregate seal depending on the extent of damage.
insufficient binder, brittleness of binder, etc.
3. Raveling Failure of binder to hold the aggregate Poor compaction, poor bond between binder Application of cutback covered with coarse
shown up by pock marks or eroded and or aggregate insufficient binder, sand, or slurry seal, or a premix renewal
areas on the surface. brittleness of binder, etc. coat.
4. Pothole Appearance of bowl-shaped holes, Ingress of water into the pavement, lack of Filling potholes with premix material or
usually after rain. bond between the surfacing and WBM base, penetration patching.
insufficient bitumen content, etc.
5. Edge breaking Irregular breaker of pavement edges Water infiltration poor lateral support from Cutting the affected area to regular sections
shoulders, inadequate strength of pavement and re-building with simultaneous attention
edges, etc. paid to the proper construction of shoulders.

328
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

Appendix - IV
(Refer Clause 2.26.2.4)

Table A.1-1 Specification for Antistripping Compound

S.No. Test Method Limit


1. Appearance Visual Liquid/Solid
2. Odour Smelling Agreeable
3. Specific gravity 27°C 15:1202-1978 0.860-1.03
4. Pour point °C Maximum IS:1448 42
5. Flash Point °(COC) Minimum IS:1448 150
6. Water Content percent Vol. Maximum IS:1448 1.0
7. Solubility in diesel oil (HDO or LDO) in the ratio As given at the end of Complete
of 2:98 at 50°C Appendix
8. Total base value mg KOH/g minimum ASTM D 664 200
9. Nitrogen content percent Wt. minimum Elemental Analyser 7.0
10. Stripping value with bitumen containing 1 IS:6241 As given at the No stripping
percent Wt. antistripping compound at 40°C 24 end of Appendix
hours
11. Under water coating test -do- Complete Coating
12. Thermal stability at 163°C 5 hours -do- Should not lose its
efficiency
13. Boiling water test percent minimum coating ASTM D 3625 95

14. Retained Marshall Stability percent minimum As given at the end of 75


appendix

Table A.1-2 Tentative Recommended Minimum Dose of Antistripping Agent for Sprayed Work

Dose of antistripping agent in percent by weight of


Aggregate Surface dressing bitumen
Pentration Surface Dressing
stripping value with precoated Macadam/Built with uncoated Liquid seal coat
aggregate up spray grout aggregate
0-25 0.5 0.6 0.7 0.8
25-50 0.6 0.7 0.8 1.0
50-100 0.75 1.0 1.0 1.0

Table A.1-3 Tentative Recommended Minimum Dose of Antistripping Compound in Bitumen


Premix Works

Dose of antistripping agent in percent by weight of bitumen


Stripping value of
aggregate Voids content 3-5 Voids content 5-10 Voids content 10-15
percent percent percent
0-25 0.3 0.4 0.5
25-50 0.4 0.5 0.6
50-100 0.6 0.8 1.0

329
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

Appendix - V
(Refer Clause 2.49.8)

GROUTING RECORD

Job Name:

Span No. Cable No.

Date of Cable Installation: Date of Grouting:

Type of Cement: OPC/II ISOPC Week and Year of Manufacture of


OPC/II ISOPC
W/C Ratio: Name and amount of admixture used, if any

Temperature: Mixing water : Grout

Time: Start : Finish

Equipment: Grout mixture : Grout pump = _____________________

Cable duct: Diameter _________ Length

Volume of grout in litres _______________ Regrouting

Grouting pressure:

Cement consumption: Theoretical : Actual

Pre-grouting checks:

Free of blockage Inlet: Yes/No : Outlet: Yes/No


Vents: Yes/No : Cable duct: Yes/No

Leakage observed: Yes/No Sealed: Yes/No

If cable duct blocked: Remedial Measures

Grouting observations:

Passage of grout through vents : Yes/No

Passage of grout through outlet : Yes/No

Any equipment failure

Post grouting checks :

Probbing by stiffwire :

Remarks

Signatures of officers present during grouting :

Client Collector System supplier

330
1
DATE

REDUCED LEVEL (RL) OF

2
BOTTOM OF CUTTING EDGE

RL OF TOP OF STEINING

3
BEFORE CASTING

RL OF TOP OF STEINING

4
AFTER CASTING
HEIGHT OF CURB __________

STEINING
LOWEST BED LEVEL __________

HEIGHT OF STEINING CAST

5
(COL.4-COL.3) (METRE)
PWD (WB), Schedule of Rates : 2014

TOTAL HEIGHT OF STEINING


(INCLUDING) CURB AND

6
CUTTING EDGE
(COL.4-COL.3) METRE
RL.OF REFERENCE LEVEL

7
(AT WHICH CUTTING EDGE
IS PLACED)

INITIAL GAUGE
8
READING (METRE)

FINAL GAUGE
9

READING (METRE)
SINKING

SINKING DURING THE DAY


LOWEST WATER LEVEL _________

10

(COL9-COL.8) METRE
HEIGHT OF CUTTING EDGE ___________

RL OF BOTTOM OF
11

CUTTING EDGE
(CO1.7-COL.8) METRE

331
DEPTH OF SUMP BELOW
12

CUTTING EDGE (METRE)


Appendix - VI
(Refer Clause 2.45.7.1)

13

STRATA MET WITH


14

WEIGHT (TONNES)
HISTORY OF SINKING Of WELL NO. _______________

ECCENTRICITY ALONG
15

X AXIS (METRE)
KENTLEDGE
HIGHEST FLOOD LEVEL _________

ECCENTRICITY ALONG
16

Y-AXIS (METRE)

QUANTITY OF DREDGED
17

MATERIAL (CUBIC METRE)

REPORT REGARDING
18

OBSTACLES OR SAND BELOW


DURING SINKING
REPORT ANY SPECIAL
19

METHOD OF SINKING
EMPLOYED
FOUNDING LEVEL __________

20

REMARKS
Volume III : Road & Bridge Works

SIGNATURE OF
21

SUPERVISING OFFICER
1
DATE

TOTAL STE1NING

2
(METRE )

TOTAL SINKING

3
(METRE )

4
(PLACE) END
Volume III : Road & Bridge Works

5
(PLACE) END
ALONG X - AXIS

DEFERENCE (COL.5-COL-4)
6
(METRE)
7
(U/S)
8

(D/S)

DEFERENCE (COL.8-COL.7)
REDUCED LEVELS (RL'S) OF GAUGE MARKS

(METRE)
ALONG Y - AXIS

TILT ALONG X-AXIS


10

COLUMN 6 DIVIDED BY WELL DIA

TILT ALONG Y - AXIS


11

332
COLUMN 9 DIVIDED BY WELL DIA

RESULTANT TILT
Appendix - VII

12

√(COL.10² + COL.11²)
(Refer Clause 2.45.7.10)

TILT AND SIIIFT IN WELL NO.:

ALONG X-AXIS WITH DIRECTION


13

(METRE)

ALONG Y AXIS WITH DIRECTION


14
SHIFT

(METRE)

RESULTANT
15

√S (COL.13²) + {(COL I4²)½


(METRE)

ACTION TAKEN
16

FOR RECTIFICATION
17

REMARKS

SIGNATURE OF
18

SUPERVISING OFFICER
PWD (WB), Schedule of Rates : 2014
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

Appendix - VIII
(Refer Clause 2.49.3.2)

PRESTRESSING REPORT:

NUMBER OR NAME OF THE BRIDGE: SPAN No. ________________________________ Stressing Sequence Drg. No. Left end of Cable = A
Right end of Cable = B
Ave. Cube Strength at the time of stressing : ___________ kg/cm² ELEMENT / GIRDER No. ________________ Marks of Plant Used Jacks : Specified Gauge Pressure
During Jacking
High Tensile Steel (UTS) ____________ kg/cm² LAST DATE OF CONCRETING _____________ Pumps :

Cube Strength : at 28 days ___________ kg/cm² DATE OF PRESTRESSING _______________ Gauges :

Max-Jack Pressure not to exceed under any circumstances ____________ kg/cm²

COLUMNS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
Gauge Mark Gauge Mark SLIP (Draw-in) mm
Cable Calculated Readings of Readings of
Total

in deviation after draw in


DEVIATION After Draw-in
Stressing Elongation extension in mm extension in mm Reading at Instant of Locking

e7 = e5 – e3 + e6 mm
Immediately After

% Excess or shortfall
INITIAL ELONGATION

TOTAL ELONGATION
e6 = (e4 – e3) mm
Draw-

upto 100 kg/cm²

NET ELONGATION
Sequence mm at the pressure of at the pressure of

e8 = e7 – S mm
after locking 24 Hrs.
in

e1 – e7 MM

e2 – e8 mm
DEVIATION
100 kg/cm² 200 kg/cm²

Remarks
e4 = ∆ A1 + ∆ B1

e5 = ∆ A2 + ∆ B2
e3 - ∆ Ao + ∆ Bo

S = SAo + SBo +
SA24 + SB24
Cable MKD

PB kg/cm²
PA kg/cm²
Draw-in e1

Draw-in e2
Sequence

∆ A2 mm

∆ B2 mm
Before

Before

∆ Bo

∆ A1

∆ B1

SB24
∆ Ao

SA24
SBo
mm

SAo
Signature of Officers present during prestressing :

Client Collector System supplier

333
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

APPENDIX – IX
Table - XII.1 Area & linear weights of common reinforcement bars:
Cross sectional area Weight per meter length
Diameter of bar
(cm 2) (kg / m)
(mm)
M.S. Bars H.Y.S.D. Bars M.S. Bars H.Y.S.D. Bars
6 28.27 28.30 0.222 0.222
8 50.26 50.30 0.390 0.395
10 78.54 78.50 0.616 0.617
12 113.10 113.10 0.888 0.888
16 201.06 201.10 1.578 1.579
20 314.16 314.20 2.466 2.467
22 380.13 380.10 2.984 2.985
25 490.87 490.90 3.853 3.855
28 615.75 615.70 4.834 4.836
32 804.24 804.20 6.313 6.316
36 1017.88 1017.90 7.990 7.994
40 1256.64 1256.60 9.865 9.869
Table - XII.2 Conversion factors for Linear Measurements:
Conversion Conversion
To convert To To convert To
factor factor
millimeter inch 0.03937 mile kilometer 1.60934
Inch millimeter 25.4000 kilometer mile 0.62137
meter foot 3.28084 centimeter inch 0.39370
foot meter 0.30480 meter yard 1.09361
yard meter 0.91440 mile yard 1760.00
Table - XII.3 Conversion factors for Weight:
Conversion Conversion
To convert To To convert To
factor factor
kilogram pound 2.20459 ton metric ton 1.01606
pound kilogram 0.45360 metric ton ton 0.98419
Metric ton kip
2.20459 ton pound 2240.00
(tonne) (kilo pound)
kip Metric ton 0.45360 ton kilogram 1016.06
Table - XII.4 Conversion factors for Area:
Conversion Conversion
To convert To To convert To
factor factor
centimeter 2 inch 2 0.15500 acre hectare 0.40467
inch 2 centimeter 2 6.45160 hectare acre 2.47113
meter 2 foot 2 10.76391 meter 2 hectare 0.00010
foot 2 meter 2 0.09290 sq. mile sq. kilometer 2.58998
Table - XII.5 Conversion factors for volume:
Conversion Conversion
To convert To To convert To
factor factor
Imperial
litre 4.54610 inch 3 centimeter 3 16.38706
gallon
US gallon litre 3.76902 foot 3 (cft) meter 3 0.02832
foot 3 (cft) litre 28.31685
Table - XII.6 Conversion factors for density:
Conversion Conversion
To convert To To convert To
factor factor
gram /
pound / cft tonne / meter 3 0.01602 pound / cft 62.42691
centimeter 3
gram / kilogram /
pound / inch 3 27.6804 pound / cft 0.06243
centimeter 3 meter 3

334
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

Appendix - X
LIST OF SOME INDIAN AND FOREIGN STANDARDS
REFERRED IN THE SPECIFICATION

Number Designation Title

(A) INDIAN STANDARDS


IS: 73-1992 Paving Bitumen Specification (Second Revision)
IS: 226-1975 Structural Steel (Standard Quality) (Fifth Revision)
IS: 269-1989 Specification for 33 Grade Ordinary Portland Cement (Fourth Revision)
IS: 383-1970 Specification for Coarse and Fine aggregates from Natural Sources for Concrete
(Second Revision)
IS: 460-1985 Specification for Test Sieves: Part III Methods of Examination of Apertures of
(Part 3) Test Sieves (Third Revision)
IS: 516-1959 Methods of Test for Strength of Concrete
IS: 961-1975 Structural Steel (High Tensile) (Second Revision)
IS: 1199-1959 Method of Sampling and Analysis of Concrete
IS: 1785-1983 Specification for Plain, Hard Drawn Steel Wire for Prestressed Concrete: Part 1
(Part-1) Cold Drawn Stress Relieved Wire (Second Revision)
IS: 1785-1983 Specification for Plain, Hard Drawn Steel Wire for Prestressed Concrete: Part 2
(Part-II) As Drawn Wire (First Revision)
IS: 1786-1985 High Strength Deformed Steel Bars and Wires for Concrete Reinforcement
(Third Revision)
IS: 1888-1982 Method of Load Test on Soils (Second Revision)
IS: 1892-1979 Code of Practice for Sub Surface Investigation for Foundations (First Revision)
IS: 2062-2006 Hot Rolled Low, Medium and High Tensile Structural Steel (Sixth Revision)
IS: 2090-1983 Specifications for High Tensile Steel Bars used in Prestressed Concrete(First
Revision)
IS: 2131-1981 Method for Standard Penetration Test for Soils (First Revision)
IS: 2386-1963 Methods of Test for Aggregates for Concrete
(Part 1) Particle size and shape
(Part 2) Estimation of Deleterious Materials and Organic Impurities
(Part 3) Specific Gravity, Density, Voids, Absorption and Bulking
(Part 4) Mechanical Properties
(Part 5) Soundness
(Part 6) Measuring Mortar Making Properties of Fine Aggregates
(Part 7) Alkali Aggregate Reactivity Test
(Part 8) Petro graphic examination
IS: 2502-1963 Code of Practice for Bending and Fixing of Bars for Concrete Reinforcement
IS: 3138-1966 Specifications for Hexagonal Bolts and Nuts
IS: 3812:1981 Specification for Fly Ash for Use as Pozzolana and Admixture (First Revision)
IS: 4826-1979 Hot Dipped Galvanised Coating on Round Steel Wires (First Revision)
IS: 5640-1970 Method for Determining the Aggregate Impact Value of Soft Coarse Aggregate
IS: 6003-1983 Specification for indented Wire for Prestressed Concrete (First Revision)
IS: 6006-1983 Specification for Uncoated Stress Relieved Strand for Prestressed Concrete
(First Revision)

335
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

Number Designation Title

IS: 9012-1978 Recommended Practice for Shotcreting


IS: 11587-1986 Structural Weather Resistant Steels
1S: 12269-1987 Specification for 53 Grade Ordinary Portland Cement
IS: 12330-1988 Specification for Sulphate Resisting Portland Cement
IS: 12594-1988 Hot Dip Zinc Coating on Structural Steel Bars for Concrete Reinforcement-
Specification
IS: 13162 Geotextiles- Methods of Test-Part 4: Determination of Puncture Resistance by
(Part-4)-1992 Falling Cone Method
IS: 13162 Geotextiles- Methods of Test-Part 5: Determination of Tensile Properties
(Part-5)-1992 using a Wide Width Strip
IS: 15462-2004 Polymer and Rubber Modified Bitumen-Specification

(B) FOREIGN STANDARDS


ASTM 36 Standard Specifications for Carbon Structural Steel
ASTM E 810 Standard Test Method for Coefficient of Retro-reflection of Retro-
reflective Sheeting Utilizing the Coplanar Geometry
ASTM D: 2041 Standard Test Method for Theoretical Maximum Specific Gravity and Density of
Bituminous Paving Mixtures
ASTM 2172 Standard Test Methods for Quantitative Extraction of Bitumen from Bituminous
Paving Mixtures
ASTM 4280 Standard Specification for Extended Life Type, Non-plowable, Raised Retro-
reflective Pavement Markers
ASTM D 4491 Standard Test Methods for Water Permeability of Geotextiles by Permittivity
ASTM D 4533 Standard Test Method for Trapezoid Tearing Strength of Geotextiles
ASTM D-4595 Standard Test Method for Tensile Properties of Geotextiles by the Wide-Width
Strip Method
ASTM D: 4632 Standard Test Method for Grab Breaking Load and Elongation of Geotextiles
ASTM D: 5581 Standard Test Method for Resistance to Plastic Flow of Bituminous Mixtures
Using Marshall Apparatus (6 inch-Diameter Specimen)
BS: 873-4:1973 Specification for the Construction of Road Traffic Signs and Internally
Illuminated Bollards & Road Studs
BS1047 Specification for Air-cooled Blast Furnace Slag Aggregate for Use in Construction
BS1377 Methods of Test for Soils for Civil Engineering Purposes
BS 4483 Specification for Steel Fabric for the Reinforcement of Concrete.
BS 6088:1981 Specification for Solid Glass Beads for Use with Road Marking Compounds and
for other Industrial Uses
BS: 7542 Method of Test for Curing Compounds for Concrete
BS EN ISO 9863-1:2005 Geosynthetics. Determination of Thickness at Specified Pressures. Single Layers
BS EN ISO 9864:2005 Geosynthetics. Test Method for the Determination of Mass per Unit Area of
Geotextiles and Geotextile-Related Products.
BS 8006-1: 2010 Code of Practice for Strengthened / Reinforced Soil and other Fills.

336
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

DRAWINGS
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

337
Volume III : Road & Bridge Works PWD (WB), Schedule of Rates : 2014

338
PWD (WB), Schedule of Rates : 2014 Volume III : Road & Bridge Works

FIG. 1 TERMS USED IN THE SPECIFICATIONS TO DESCRIBE ROAD CROSS-SECTION ELEMENTS


WITH A FLEXIBLE PAVEMENT

FIG. 2 TERMS USED IN THE SPECIFICATIONS TO DESCRIBE ROAD CROSS-SECTION ELEMENTS


WITH A CONCRETE PAVEMENT

FIG. 3 TERMS USED IN THE SPECIFICATIONS TO DESCRIBE ROAD CROSS-SECTION


ELEMENTS OF A DUAL CARRIAGEWAY

339