REVISION AND DISTRIBUTION SHEET

MODIFICATIONS TABLE

Rev CREATED CHECKED APPROVED DATE MODIFICATIONS STAT.

A M. Ramond M. Mazelin B. Schmitt 23.10.15 First Issue Preliminary

B R. Akhtar A.Rathore K.Y. Lye 15.03.16 Second Issue Released

Description Latest Revision: Second Issue

DISTRIBUTION TABLE

S.No Department Discipline

1 RSP Mechanical, Process, I&C

Originator Identification number Rev. Date Lang. Sheet


ALSTOM RENEWABLE POWER KRH/00/M/CJ-20 -----/LO/001 B 15.03.2016 En 2/8
© ALSTOM 2016. All rights reserved. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. COPYRIGHT c ALSTOM (Switzerland) Ltd 2002
1 2 3 4 5 6 7 8

C PFUP FOR SIGNALS FROM WELL SYSTEM CONTROLLER TO W&SC CONTROLLER

F
A 21.10.2015 E Prepared: R.Akhtar
KARAHA GEOTHERMAL Resp.dept.: Title: krh
B 07.03.2016 F Checked: A.K Rathore SIGNALS FROM WELL P1CJ-20EB001 DRAWING PFUP DRAWING CJ
Change

Change

RSP Sheet No.of sh.


C G K.Y Lye
D H
Approved:
Revision: B Dervd. from: Replaces:
SUMMARY Doc.: Format: Lang: en 3 8
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. COPYRIGHT c ALSTOM (Switzerland) Ltd 2002
1 2 3 4 5 6 7 8

TABLE OF CONTENTS: NOTES:


A
Sheet Title Change

1 COVER SHEET
2 TABLE OF CONTENTS B
3 WELL SIGNALS PAGE 1 B

C ENCLOSURES:
none

REFERENCE DOCUMENTS:
KRH/00/M/LBA-------/LO/001 MAIN STEAM SYSTEM
B
E KRH/00/M/-------PMF/NA/260 GUIDELINES FOR PROCESS FUNCTION PLANS (PFUP)
KRH/00/I/-------N80/ES/507 DESCRIPTION AND DESIGN OF DCS ALARM PHILOSOPHY
ALARM MANAGEMENT SYSTEM

KRH/00/I---------N80/LM/01 DCS IO List Hardware

F
A 21.10.2015 E Prepared: R.Akhtar
KARAHA GEOTHERMAL Resp.dept.: Title: krh
B 07.03.2016 F Checked: A.K Rathore SIGNALS FROM WELL P1CJ-20EB001 DRAWING PFUP DRAWING CJ
Change

Change

RSP Sheet No.of sh.


C G K.Y Lye
D H
Approved:
Revision: B Dervd. from: Replaces:
SUMMARY Doc.: Format: Lang: en 4 8
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. COPYRIGHT c ALSTOM (Switzerland) Ltd 2002
1 2 3 4 5 6 7 8
1 34
2 35
CTRL 3/53 CTRL 3/53 CONTROLLER HMI
3 36
A 4 37
5 B to give information the incoming and outgoing signal where the signal come from an go to. 38
WELL KRH 4-1 TO GPP OFF 6 39 WELL OFF RELEASE ACTIVE
P1CJ-20EA201
WELL KRH 5-1 TO GPP OFF 7
& 40
P1CJ-10EA001 LBA/P1LBA10EB100/58.22
P1CJ-20EA202
WELL KRH 5-2 TO GPP B OFF 8 41
P1CJ-20EA203
WELL TLG 3-1 TO GPP OFF 9 42
P1CJ-20EA204
WELL KRH 6-1 TO GPP B OFF 10 43
B P1CJ-20EA205
11 44 WELL FLOW AVAILABLE REF_VAL
P1CJ-20EA002 LBA/P1LBA10EB100/67.19
12 45
13 46
14 B 47
15 48
C 16 49
17 50
18 51
19 52
K4 STEAM FLOW ACT_VAL 20 53
K4LBB31CF001
K5 STEAM FLOW ACT_VAL 21
Σ 54
D K5LBB32CF001
K6 STEAM FLOW ACT_VAL 22 55
K6LBB32CF001
23 56
24 57
25 58
26 59
27 60
E
28 61
29 62
30 63
31 64
32 65
F 33 66
A 03.11.2015 E Prepared: R.Akhtar
KARAHA GEOTHERMAL Resp.dept.: Title: krh
B 07.03.2016 F Checked: S-J Aithal SIGNALS FROM WELL P1CJ-20EU001 DRAWING PFUP DRAWING CJ
Change

Change

RSP Sheet No.of sh.


C G KY Lye
D H
Approved:
Revision: B Dervd. from: Replaces:
WELL SIGNALS PAGE 1 Doc.: Format: Lang: en 5 8
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. COPYRIGHT c ALSTOM (Switzerland) Ltd 2002
1 2 3 4 5 6 7 8

PFUP FOR SIGNALS FROM W&SC CONTROLLER TO WELL SYSTEM CONTROLLER


C

F
A 21.10.2015 E Prepared: R.Akhtar
KARAHA GEOTHERMAL Resp.dept.: Title: krh
B 07.03.2016 F Checked: A.K Rathore SIGNALS TO WELL P1CJ-21EB001 DRAWING PFUP DRAWING CJ
Change

Change

RSP Sheet No.of sh.


C G K.Y Lye
D H
Approved:
Revision: B Dervd. from: Replaces:
COVER SHEET Doc.: Format: Lang: en 6 8
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. COPYRIGHT c ALSTOM (Switzerland) Ltd 2002
1 2 3 4 5 6 7 8

TABLE OF CONTENTS: NOTES:


A
Sheet Title Change

1 COVER SHEET
2 TABLE OF CONTENTS B
3 WELL SIGNALS PAGE 1 B

C ENCLOSURES:
none

REFERENCE DOCUMENTS:
KRH/00/M/LBA-------/LO/001 MAIN STEAM SYSTEM
B
E KRH/00/M/-------PMF/NA/260 GUIDELINES FOR PROCESS FUNCTION PLANS (PFUP)
KRH/00/I/-------N80/ES/507 DESCRIPTION AND DESIGN OF DCS ALARM PHILOSOPHY
ALARM MANAGEMENT SYSTEM

F
A 21.10.2015 E Prepared: R.Akhtar
KARAHA GEOTHERMAL Resp.dept.: Title: krh
B 07.03.2016 F Checked: A.K Rathore SIGNALS TO WELL P1CJ-21EB001 DRAWING PFUP DRAWING CJ
Change

Change

RSP Sheet No.of sh.


C G K.Y Lye
D H
Approved:
Revision: B Dervd. from: Replaces:
SUMMARY Doc.: Format: Lang: en 7 8
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. COPYRIGHT c ALSTOM (Switzerland) Ltd 2002
1 2 3 4 5 6 7 8
1 34

which DCS panel?


2 35 HMI
??? CONTROLLER
3 36 B
A SEQ WELL RELEASE CMD_ON 4 37 KRH GPP RELEASE ACTIVE
P1CJA01EA109 CJA/P1CJA01EB001/9.38
5
1 38
P1CJ-21EU001

6 to give information the incoming and outgoing signal. Where the signal come from an to where. 39
FG STM BYPASS FB_ON 7 40
P1LBF10EB100 LBA/P1LBA10EB100/58.59
FG DRN RECOV & TRANSF FB_ON 8
& 41
P1LCM10EB100 LCM/P1LCM10EB100/11.55
9 42
SCRUBB DRN CV AUTO 10 43
B P1LBG01AA202
STM SCRUB MISOV 1 OP
LBA/P1LBA10EB100/73.61
ACTIVE 11
& 1 44
P1LBA01CG201 LBA/P1LBA10EB100/9.37
STM SCRUB MISOV 2 OP ACTIVE 12 45
P1LBA01CG202 LBA/P1LBA10EB100/10.37
13 46
SCRUBB DRN CV AUTO 14 47
P1LBG01AA202
STM SCRUB MISOV 1 OP
LBA/P1LBA10EB100/73.61
ACTIVE 15
& 48
P1LBA01CG201 LBA/P1LBA10EB100/9.37
C 16 49
17 50
18 51
19 52
20 53
21 54
D
22 55
23 56
24 57
25 58
26 59
27 60
E
28 61
29 62
30 63
31 64
32 65
F 33 66
A 03.11.2015 E Prepared: R.Akhtar
KARAHA GEOTHERMAL Resp.dept.: Title: krh
B 07.03.2016 F Checked: S-J Aithal SIGNALS FROM WELL P1CJ-21EU001 DRAWING PFUP DRAWING CJ
Change

Change

RSP Sheet No.of sh.


C G KY Lye
D H
Approved:
Revision: B Dervd. from: Replaces:
WELL SIGNALS PAGE 1 Doc.: Format: Lang: en 8 8