Академический Документы
Профессиональный Документы
Культура Документы
CARRER OBJECTIVE:
To join in a most reputed and highly esteemed organization for the
And to secure a challenging position with a strong dedication and hard work. I
towards the overall development of the organization and can also give me a
Key Deliverables:
Planning, scheduling, and executing Installation work in a safe and environmental sound manner with
EPC standard.
Directing all activities regarding installation, alignment, preservation, handover for rotating/static
equipment activities for the site.
Preparation for work sequence as per the project schedule.
Conducting the Factory inspection in the Sub-Contractor’s factory and checking whether the products
are been manufactured as per the company approved data sheets.
Allocating/Supervising all site activities including providing technical inputs for methodologies of
installation and commissioning of equipment, piping& systems.
Installation, Alignment, Pre-commissioning and Commissioning for Heat Exchangers, Boilers, furnace,
Fin Fan cooler, Flares, Column, Vessels, Column Internals, Drums, Cooler, Air blower, Mixer and
Package Equipment, Air Handling Units, Fan Coil Units, Ventilation supply and Ventilation Exhaust
Units, Ducting etc.
Installation, Alignment, Pre-commissioning, Commissioning and start-up for Centrifugal compressors,
Steam Turbines, Air coolers/heat exchangers, Pumps etc.
Installation of Equipment platforms, modifications and punch clearing.
Assigning the work for all the supervisors and foreman in site as per the client’s priority requirements
and monitoring the work flow continuously and getting the job done in time with best quality and more
safety manner.
Receiving drawings and Issuing equipment and its materials from Client, Erection and installation of
equipment and its internal materials as per the Drawing, and release to QC for all kinds of Inspections
and after grouting release to painting.
Review of Work Method statements like installation of the Rotary, Static, Package Equipment and
rigging Plane
Onsite Modifications according to site condition and Client Corrections.
Drawing Revisions for Field Design Changes by Client and Site conditions.
Monitored and maintained a track record of daily ongoing activities at site.
Erection Updating to the Client and attending Meetings.
Communicating and coordinating our discipline activities with other disciplines to avoid the re work and
getting the jobs done in proper sequence.
Final Box Up- Internal Cleaning of Equipments, Inspection and Punch Killing, Final Box Up with
original Gasket and Torquing.
Preparations for loading the materials as per the procedure (Catalyst Filling).
Loading of Catalyst, Carbon, Inert balls as per procedure within the schedule in a safe manner, and
inspections.
Preparations and Conducting the Lube oil flushing activities for the Rotary equipment.
Taking the design issues facing in site to design team and making coordination’s with other disciplines
and solving it smoothly.
Checking the Bills submitted by Sub-Contractors and cross checking with site condition and approval for
payment.
Updating the progress daily and updating to the Company and attending the progress meetings
Serve as day-to-day interface with Contractor craft labor providing a focus on safety and quality
Ensure that procedures and processes are understood and followed by the construction personnel
Monitor and ensure compliance with specification, procedures, and plans
Provide on-site knowledge of project specific installation requirements
Interface with QA/QC personnel to address quality issues/progress
Provide oversight of Contractor’s materials management/verification systems
Monitor workforce progress as relative to schedule
Verify arrival of procured equipment and engineering equipment
Implement field surveillance plans
Assist with incident response case management
Interface as needed with on-site Marine Warranty Surveyor to ensure requirements are being met
Ensure that site planning activities are appropriate to meet objectives
Provide safety monitoring/leadership/coaching as well as participate in safety meetings
Conducting/Participate, coach and assist in effective pre-task planning measures in JSA's, and toolbox
meetings
Participate in on site Risk Assessments and JSA development
Assist in implementation of emergency response plans as needed
Monitor environmental compliance as required
Monitor site condition / readiness
Record data for inclusion of 'lessons learned'
Record data for inclusion in the preparation of close-out report
Ensure that changes in the project or equipment design proposals are documented and reviewed by
competent staff from Contractor and Company, and are in line with the design intent and HSE
requirements. Ensure that changes (e.g. Field & Plant changes) are approved on behalf of Company
before implementation.
Taking care of field troubleshooting for the equipments.
Planning/Allocating the requirements’ of manpower, Equipments, Materials, Tools and Spares.
Maintaining heavy lifting rigging documents, Lifting, Study and Planning.
Responsible for managing rotating equipment in construction, pre-commissioning and commissioning
activity till start-up and performances test with API standard.
Maintaining proper records and data sheets of preservation works in rotating and static equipment
Monitoring the unit priority database to ensure the jobs being worked are in accordance with Project
schedules, safety concerns.
Understanding specifications and drawings and interpreting complex construction drawings.
Developing and implementing plans & schedules for maintenance operations and annual turnaround
with focus on optimum utilisation of manpower and material.
Highlights:
Major assignments handled:
Successful Installation of Distillation column ( height:62m), and its Platforms and internal trays
Successful assembly, installation and alignment of multistage reciprocating compressor (Make up gas
compressor) in LPG unit.
Installation of over head cranes with capacity 15 ton and 5 ton in compressor shelters.
Installation of pressure vessels, Reactors, Pumps, fin fan coolers and drums in ISOMERIZATION UNIT.
Successfully completed 40 vessels and 26 drums final box up .
Successfully completed 45 reciprocating pumps final alignment and handover to commissioning.
Successfully installed fired heater and its components like radiant arch, radiant coil , convection module,
ID Fan ,FD Fan ,ducting, stack and air pre heater.
Skill Sets:
Erection
Alignment
Internal Trays
Fired Heaters
Flare Stack
Rigging
Rotating & Static Equipment
Shutdown
Revamping
Steel structure Erection (Pipe Racks)
Piping
SOFTWARE SKILLS:
STRENGTHS:
TRAININGS ATTENDED:
EDUCATIONAL QUALIFICATION:
DECLARATION:
I, here by solemnly declare that the above information is true to my knowledge and nothing has been
concealed or distorted.
Place: Visakhapatnam
Date:
P. LOKESH NAIDU