To,
The Team Leader
Nd/s. TPF Engineering Pvt. Ltd.,
Narayanwadi, Near Old Stone Buitding,
Opp. Suman Nursing Home,
Chalisgaory Dist.: falgaon,
Pin:424101
Dear Sir,
In accordance with Clause 11.7 of Contracf we are submitting herewith Monthly progress
Report for
the month of April-20L9 for your information and record.s pleise.
Thanking you and assuring you of our best services all the time.
Yours truly,
For Ashoka Buildcon Limite4
;
Authorized Signatory
Encl.: As above.
Copy to:
-n
A\-/
C)O
z--' <\.tlI
H
rdtrr). \'o"t'
r
4..". -atl
ri*6t
5ra
,l'tl-"-
.-'t !$
x61
'
.t\d
Regd" office : s. No. 86i, Ashoka House, Ashoka Marg, Vadara, Nashik 422 01 r, r,,,laharashtra India. . lbl +91 2S3 30it70S
Fax +91 ZSgZ1J6TA4 o w//w.ashokabJitd.on
ctN 145200MH 1993P1C071970
"o*
ASHOW! Ashoka Buildcon Limited
To,
The Team Leader
Ws. TPF Engineering Pvt. Ltd.,
Narayanwadi, Near Old Stone Building,
Opp. Suman Nursing Home,
Chalisgaon, Dist.: Jalgaon,
Pin: 424 101
Sub: Rehabilitation / Upgradation of existing highway to 2 lane/ 4 lane with paved shoulder
configuration from Bhadgaon -Chalisgaon Km. 56+200 to Km. 103+000 section of NI-1-753 J
(Jalgaon-Manmad) on EPC Mode in the State of Maharashtra - Submission of Monthly
Progress Report for the month of April-2019 -Pkg-H- Reg.
Dear Sir,
In accordance with Clause 11.7 of Contract, we are submitting herewith Monthly Progress Report for
the month of April-2019 for your information and records please.
Thanking you and assuring you of our best services all the time.
Yours truly,
For Ashoka Buildcon Limited,
Authorized Signatory
Encl.: As above.
Copy to:
1) Executive Engineer, National Highway Division, Dhule for kind information please.
2) Assistant Engineer, Grade-I, NH Sub Division, Navapur (Jalgaon) for information please.
Regd. Office : S No $61. Ashoka House. Ashoka Masg, Vadala, Nashik 422 011, Maharashtra !n&a. • 101 • 91 263 3011705
Fax ,91 253 2236704 • .ww ashokabuildcon.corn
CIN: 1-45200MH1993PLC071970
AUTHORITY
AUTHORITY'S ENGINEER
M/s. TPF Engineering Pvt. Ltd. in JV with M/s. TPF Getinsa in
Association with M/s. NASCENCE Consultants Pvt. Ltd.
ASHOK/I
ASHOKA BUILDCON LIMITED
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km
to 103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC
Mode.
CONTENTS
IP
Sr. No Description Page No
1 Executive Summary 2-13
2 Introduction 14-15
3 Project Location Plan 16-17
4 Project Key Plan r 18-19
5 Project Details 20-22
6 Key Dates for Achievement and Performance on the Project 23-26
7 Proposed Program for Completion of Construction Works 27-28
8 Status of Preliminary Activities 29-30
9 Construction Progress 31-33
10 Project Progress S- Curve 1 34 i
11 Project Organization 35-39
12 QA/ QC Report [ 40 I
13 Substantial Disputes 41-46
4IP 14 Change of Scope 47-53
15 Maintenance Work 54-55
16 Safety-Traffic Management Steps 56-58
17 Site Visit and meeting held during this month 59-64
11, 18 Annexure 65
A. List of Available Plant and Machinery 66
SI
B. List of Laboratory and Field Test Equipment 67
C. List of Survey Equipment 68
D. Status of Encumbrances as on 30th April 2019 69
E. Progress Photographs 70
F. Letter Correspondence During April 2019 71-73
G. Weather Report 74
H. List of Contractual Obligation 75
I. Mobilization status 76
J. Updated Strip Chart Showing obstruction in work. 77
K. Drawing Register 78
L. List of Applicable permits 79
EP
M. Daily Event Register 80
N. Efforts of EPC Contractor for Utility Shifting 81
0. Status of QA/QC reports for the month of April 2019 82
P. Status of approvals of Mix Design, Source & Borrow Areas
84-86
1. EXECUTIVE SUMMARY
Physical Physical
Sr. Weightage in Progress
Component Progress (Cumulative up
No. Project (%) (During Current to Current
Month) Month)
Road work including Culvert, 5.416% 41.948%
1 73.73% 1
Widening and repair of culvert
2 Minor Bridge/Underpass/Overpass 10.22% 0.955% 5.795%
41,
3 Major Bridge 2.97% 0.197% 0.590%
4 Toll Plaza 1.98% 7 0.000% L 0.000%
•
5 Road Side Drain [ 1.92% 0.000% 0.000%
Road Sign making, Km Stone, Safety 0.000%
6 1.91% 0.000%
Device
7 Bus Bays 0.52% 0.000% 0.000%
41,
8 Truck Lay-Byes 0.26% 0.000% 0.000%
9 Junction (Misc work & Paver Block) 1.47% 0.000% 1 0.000%
IP
IP
Ashoka Buildcon Limited Page 3
4 I I 1 I I
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of N11-753J From Ch. 56+200Km to 103+000Km Two/Four lane with
Paved Shoulder in the state of Maharashtra on EPC Mode.
Planned in
Sr. Weightage in Cost
Component Unit Item Description Scope (AS Progress % Physical Cost Weightage
No. Project (°/0) Weightage in
per Scope Till Date Progress Progress
Component
of Work)
A- Widening and strengthening of
existing road.
1. Earthwork up to top of the
Km 10.53% 67.07 55.24 82.370% 8.674%
subgrade
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of N11-753) From Ch. 56+200Km to 103+000Km Two/Four lane with
Paved Shoulder in the state of Maharashtra on EPC Mode.
I 21.4
RMT Foundation + Substructure 1.27% 13.40 62.617% 0.795%
21.4
RMT Super-structure 0.15% 7.00 32.710% 0.049%
6
Nos Approaches 0.11% 0.00 0.000% 0.000%
3
Guide Bunds and River Training
Nos 0.01% 0.00 0.000% 0.000%
Works
3. Reconstruction of Minor
Bridges
RMT Foundation + Substructure 6.92% 152.6 99.11 64.944% 4.494%
RMT Super-structure 0.82% 152.6 34.71 22.742% 0.186%
Nos Approaches 0.6% 22 0.00 0.000% 0.000%
Guide Bunds and River 0.000% 0.000%
Nos 0.07% 11 0.00
Training Works
Reconstruction of Major
Bridges
Nos Foundation 0.98% 116.6 70.20 60.206% 0.590%
Nos Sub-structure 0.67% 116.6 0.00 0.000% 0.000%
Major Bridge (length Super structure (including
>60m) works and RMT 0.29% 116.6 0.00 0.000% 0.000%
bearing)
ROB/RUB/ elevated Wearing Coat including
3 2.97% RMT 0.24% 116.6 0.00 0.000% 0.000%
sections/ flyovers expansion joints.
including viaducts if Miscellaneous items like hand
any rails, crash barriers, road 0.18% 116.6 0.00 0.000% 0.000%
RMT
marking etc.
Nos wing wall/return wall 0.26% 2 0.00 0.000% 0.000%
Guide bunds, River Training 1 0.00 0.000% 0.000%
Nos 0.09%
work etc.
Page 5
Ashoka Buildcon Limited
4 4 4 * 4 a 4 4 4
4 4 4 4 Y 4 4 4 4 4 4 4 4
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of N11-753j From Ch. 56+200Km to 103+000Km Two/Four lane with
Paved Shoulder in the state of Maharashtra on EPC Mode.
Retaining/Toe Wall
Page 6
Ashoka Buildcon Limited
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km
to 103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC
Mode.
1.2Clearances Summary
1.2.1 Tree Cutting
Length
Sr. Proposal
Status Impacted Remarks
41P No Description
(Km)
Pa ch ora Forests Range: Ba in h ru d-
KfLIgaonsection-Km 56+200 to Km 78+000.
-4P
1.2.5 Encroachment:
Till date Authority has not removed the Religious Structure, Temporary and Permanent Encroachment existing at the time of handing over
site. The details are as per enclosed "Annexure D".
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to 103+000Km Two/Four lane with
Paved Shoulder in the state of Maharashtra on EPC Mode.
Length Progress of
Sr. Utility Estimate
Name Status Affected Physical Remark
No Category Amount(Rs)
(1<m) Shifting
MSEDCL Sub Divisions as per Firm
Quotation received from MSEDCL
through EENH Dhule. Shifting work is in
progress and about 60% work
completed.
Page 13
Ashoka Buildcon Limited
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
' 56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.
Sr.
Activity _] Authority Engineer Remarks
No
Plan & Profile —7
Proof Checked Drawings along
with Compliance of comments
submitted to the Authority's
Approval received from Engineer from Ch. 56.200 to Ch.
Authority' Engineer. 103.000 on 12.12.2018.
1
However, modification Approved by the Authority's
Main Carriageway
suggested by CENH during Engineer as per provisions of
project site visit on Two Lane Manual on
02.01.2019 25.12.2018. Regarding 50 mm
thickness raising section
drawing under progress with
Design Consultants.
Proof Checked TCS were
submitted to Authority'
Engineer on 12.11.2018.
V' Compliance of comments of AE
2 TCS Under Review with AE submitted. Approval awaited
from AE. Regarding dispute in
thickness of PQC, the same is
under review with Authority'
11, Engineer.
a. MCW pavement
Submitted for seal & sign of Certified copies awaited from
Overlay
AE in 4 sets AE.
b. MCW Flexible
pavement Overlay Under Review with AE. Approval Awaited.
Sr.
Activity Authority Engineer Remarks
11/ No
12 Nos. Approved by AE. 2
1IP 2 Nos.under review of Proof
No. under review with AE. 1
5 Minor Bridge - 15 Nos. Consultants. 1 No. Approval
11. No. awaited from Design
awaited from AE.
Consultants
Pedestrian Under
6 Passes
PUP at Ch. 69+466 Approved by AE Approved
Culverts
Proof Checked Drawings
Hume Pipe Culvert 2 Nos. Under Review with
7 submitted to Authority's
4IP
Typical Drawings AE.
Engineer. Approval awaited.
4P Hume Pipe Culvert All the Drawings reviewed &
Approved
Working Drawings Approved by AE.
Slab/ Box Culvert Typical Drawings Reviewed &
8 Approved
Drawings Approved by AE
41, Slab/ Box Culvert All the Drawings Reviewed
9 Approved
Working Drawings & Approved by AE.
Proof Checked Drawings
-Or Misc. Drawings - Bus partially submitted to the
10 Under review
bays, truck lay bays Authority's Engineer. Approval
awaited.
Note: While the process of approval of Proof & Safety Consultant by the Authority was
underway, the drawings were submitted to Acting Authority Engineer, Executive Engineer,
national Highway division, Dhule (Authority Engineer was not appointed by that time) in the
interest of the work. Based on the review comments by Acting Authority's Engineer, P&P
drawings were revised and revised drawings submitted to Acting AE. Authority Engineer
appointed on 23.10.2018. Now Proof & Safety Consultants are also appointed. Accordingly,
Revised Design & Drawings, Plan & Profile Drawings duly Proof Checked by Proof & Safety
Consultants are submitted to the Authority's Engineer for its Approval. Under review with
AE & Approval is awaited.
Wir
lor
Ashoka Buildcon Limited Page 15
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.
2. INTRODUCTION
2.0 INTRODUCTION
2.1 SCOPE OF THE PROJECT
The scope of the Project is broadly summarized as follows.
a) Construction of the Project Highway on the Site set forth in Schedule-A and as
specified in Schedule-B together with provision of Project Facilities as specified in
Schedule-C, and in conformity with the Specifications and Standards set forth in
Schedule-D;
3. LOCATION PLAN
Londhe
w aon Bk.
Bk. Galan BK
Bahal fi BK
Bhawali 4-6r6
Mehunbare Mmbhora Shindad
Janda iff-a
Pi* 514T?
Borkheda
it*
1 h 10 min
8 46.8 km
Umberkhede
4s•
Shindol
Ner Tidka
Kargaon W, .ah Banoti Ptchi Ghosi
wif4
Shirasgaon
Ch. 103+000
Chalisgaon %agad
4 Lora
4in
8 •51urvi
lambda ar
1-xt
,
8
4
EPC Package -2
thadgaor Bk
BK, Galar
Mchurbare
Jr:
EPC Package -2
Page 21
Ashoka Buildcon Limited
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.
5. PROJECT DETAILS
+V,
Up-gradation of Bhadgaon- Chalisgaon(section II )of NH 753J from
Chainage56+200 Km to 103+000 Km to Two lane with paved
Name of the Contract shoulders/ Four Lane configuration of [ Jalgaon - Bhadgaon -
Chalisgaon -Nandgaon -Manmad-NH 753J - (46.800 Km )] in the
state of Maharashtra on EPC mode.
Package No. 05/CENH/D-1/3078/2017-18/Package-IV
Authority Public Work Department, National Highway(PWD) Maharashtra
Project Implementing
PP'
Public Work Department, National Highway(PWD) Maharashtra
Agency
EPC Contractor M/s. AshokaBuildcon Limited, Nashik.
Name of Authority's M/s. TPF Engineering Pvt. Ltd. in JV with M/s. TPF Getinsa in
Engineer Association with M/s. NASCENCE Consultant Pvt. Ltd.
IP
-V
6.1 KEY DATES FOR ACHIEVEMENT & PERFORMANCE OF THE PROJECT MILESTONE
Due to unavailability of Project site as per provisions of EPC agreement it has been proposed to rearrange project milestones keeping
project completion date as per Contract Agreement.
Rs. 10,51,05,000/-
(i.e. 5% of Contract Price)
Sr. IPC Date of Date of Gross Value Total Withheld Net Value Date of Remarks
No. Bill Submission Certification (Certified) Deductions Amount, Rs. in Cr. Release by
No. to Authority's by Authority 's Rs. in Cr. Rs. in Cr. Rs. in Cr. RO Mumbai
Engineer Engineer _
IPC-1 Recommended by EE NH
Dhule on 08.02.2019 to RO
1 (SPS) 12.12.2018 29.01.2019 21.1628 2.2372 1.8925 17.033 05.04.2019. Mumbai for release of
R.A. Bill payment.
No. 04
IPC-2 Recommended by EE NH
Dhule on 22.03.2019 to RO
2 (SPS) 07.02.2019 05.03.2019 19.583 2.0701 1.7512 15.761 15.04.2019. Mumbai for release of
R.A. Bill payment.
No. 05
IPC-3 Recommended by EE NH
Dhule on 26.03.2019 to RO
3 (SPS) 05.03.2019 18.03.2019 22.2668 2.354 1.9913 17.9216 15.04.2019 Mumbai for release of
payment.
R.A. Bill
No. 06
IPC-4 Recommended by EE NH
Dhule on 26.04.2019 to RO
4 01.04.2019 22.04.2019 24.507 1.1203 1.824 22.051 Yet to release. Mumbai for release of
(SPS)
payment.
R.A. Bill
No.07
Page 28
Ashoka Buildcon Limited
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.
> Planning for completion of project was submitted vide letter ref. no.
ABL/CENH/Bhadgaon-Chalisgaon/18-19/52 dated 2ndJuly2018 after declaration
of appointed date.
As per submitted planning work front available is as follow-
Length Value of
Sr. No. Particular Remark
(Km) work (Cr.)
IP Details as per submitted Joint
Work front Available 14.11 63.37
1 memorandum signed on dated
14th May 2018.
CP Work front Obstructed. 32.69 146.84
VI Details as per submitted EOT
Work front Available 8.59 38.58
proposal vide ref letter no.
2 ABL/NH-753J/Bhadgaon-
1,
•
•
•
•
•
•
•
•
•
• 8. STATUS OF PRELIMINARY ACTIVITIES
•
•
•
•
•
•
•
•
•
•
•
•
•
•
S
Ashoka Buildcon Limited Page 31
S
Projeci: Up-gradation of Bhadgaon-Chalisgaon (Sectioi II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.
9. CONSTRUCTION PROGRESS
9.6Bituminous works
DBM is in progress at overlay stretches for MCW for the month of April 2019 and it shown
in progress chart. Construction of DBM has been carried out in the month of April 2019.
DBM work of 0.00 km for MCW has been done during this month. Up to end of April 2019
cumulative 15.14 Km are completed for MCW.
PROJECT:- 'Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH 7531 from chainage 56+200 Krn to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of Palgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 753J - (46.800 Km
)J In the State of
Maharashtra on EPC mode".
:
DBM ' , TAr,,,,-''''
--i?'7--...,1*-.
120Z141714-.'''.
Poe IIIIIIIII II IN
,,, 70.-** -1
,,:, iir,r,:. MEI II
SS . .....,.. A L.E.,•:i::::ir.:4;4&:, MI= 1 II
IFF.7.4,".::' r n.lagingrusalWr7-
„,.
EarthWork
Chainage 64,200 00+200 56+400 MINI 18.4011 NON 144500 57+000 57+100
Earthwork ,
...Zara; .
Skrboraclo 1
ul
X GSB II
C
LC rEn i.,:,..•:.•!•.. %:%t•',4' ' .f•ii: ;,i .r ' :, :::;,.% :•i•A%: 1
POC
,., • ,,,
' 11...11. 111•111111 II
IN
IIIIIIIIII 1 II
DBP.1 IIIIIIII .ICI M
BC
Roaa Fu P: S gn Board 7
, . : No • . is:sigi . : •Ne • . : Ile ler . : Mole •25. • : -Mr IMP WM;M:11/81:111MIIMIIM•MtIMMeMIIPMEMMEIMMPMMIEMMIMINI:111AMMI MIMII:MI:
PQ: IIIMIOM
i_C __,, .-7i.:...: ...4F•i;i.:::::::: .',.'; ig...&.:?:':.•:%3:32 43/81Kaginrifi
. . . '''' ...":10MEILUErtraNaggriMISMOMElialargifiEKOWZ7. r1:r. ' ' " ..j'i'fiARKg1
EN
, 111.11111111
§:,...i ,..* :..,:?:.-.,. .,,.., ,.* :,.,..i::::.::*i...!,m.-:•.,.i.?: .i ' 4 :!i;::%.,"::iM :.'.,-%?. V :I.i: ;•'. Kingegasmagname?-.......4:: 0, 0 . .?;. ", -.0 ..'''''. Yii;-;:. M '''?•,* .MINIEMEV:86 'ffi:r.„...
:.-.i,' ...:<-.;•• f-"A.: ?...fi.i:`: , "—Nii'M
11111111111 ,,...
s“hg'-'' ---':','. ,4,11IIIIIII :::.;::::: iii1]. K :: i..'::it. i:, ::?1ZION1 ;,M3E4inI. ,- .. ).'-,-i-- -..ic. f.R MULTESOINkfigLIBEMBENEEZMNSIMInagnatZi:amig—
,....:::::,,,, , , , , (.: --.. , , :: . : :-.:3: : : :.: : : r.* — :*1: , . :* ;:::. :::., ...., , :,::.: :....; & f: :i.`.,,. ,.r:. Or :5:::a ,.',0,:,..- v :•::.:: !:.i :•!.".1,-:.."4,..g .",!:, '1,0,:ge.k
:•:. :::::i f: .::.*" :-; V r" i,:i:i-zil,-3.*.. ‘i*i ' :,::,*'... ii*• '*
EarthWork - 1111 :9) ::.: :0: :::, *., fli:' ,...g.r.
•1111
57+700 57+600 57+900 58+000 58+100
57+600
Chainage 67.200 57+300 57+400 57+500
i,.' ':,.ii ;•%•,%•:,;. •:•.-I..?:i:; -*i i'.:;:i!i, ,iii ?.: iii1":i i:.% .. iig -:'. ,' '''. .i':3 "..;,̀W.Alk iii':i :.ii g :.':* . :,.. :', r..
0%..iiii..''F.* ?P.', iii:,.-s.?.;-: fr,,I. A :4i..,.5.4::? .: i:: xf ';'.-.::', ,,,,o,w; ,,,,,,..
E•rthWork '°'..'; :: :::'.33 3:: *3 :*:-': . '4 -... • .::::: igiA,1*
':::'. 4 "..iii=-:1% 110
.:r.: 11:1::: !..;1:i::!!!' :':: ;• ...
:! 4'.!;;
; X
.:
,(6
.,4
C1=1111111111111111111111I -..: ...,'p-'';. :,:.• :•! ' '-' ::.: .1 •-:::' '.:•: . :',.•.:T 5! ..,..::i . ‘" i1 C,. .': ?,:,. ':'::"'. ' ' " ' fs: : ' ' :: III! 4:., ,..: 7 ... i.., : , ,
:„..4, .!. :•..:, ...: -: ,
t
iiIii:: iii:?ixi.ii .:.,: ',..:i•..1. ,...: ,.i:,...:i iiri-:i: 5: ?;:; :.(:.i i,.:,?::i-::,.):i :.% ii5• ii!:. .:: i..f.: : .. ::ii,:: ,.:i.
RHS
GsH _ 11111111111
_:*:.i:::i 111 1.: .,,,,ii,i,.,,, ,,:?:: i ::.:i - :::, .::i: :: ::i: :i:. ..,..„ , :,-,......,-,:::, :.;: . 0: igsremporsmen9FR,:.....-.ff..-" .,,,, ;, ,,,,,, ,,,.;::30.:..... ::,..:]':: ,:,.. ::-..:i:-:.:,::, :.;!:.i i:. ,,.. ,i,. il,:,,,?.„,. . :ir: :]:,,,..,....;;;,..• ,eqs,.& 0 .::, •..:i1 1 1
.: 1111 1.
.c ' 111111111111 •
poC NM II II
1111111111.
,,,,,.., I I
1111111
Iic ..
:..111111.1
II ,,, & s,,, Board. "
a 4 4 4 4 tt•CCOPert Wt. ?, ft
PROJECT:- "Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH 7S3J from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of Dalgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 753J - (46.11001(ri )) In the State of
Maharashtra on EPC mode.
8
08
1
LHS
II
E'?__-_ MIIIIIIIIN .: :,.,, ','ii,-4. :ii •,_:-i;*•• iklf,:-. .;.:
GStS
: ..:..IIIIM1 t.f'.:? : .:i'g
' .',,-,-:._/
-,,' -?`W IL-•&;,4,=.:iiwk.,4:armaivixaminumwmoimitut=
---
-- Pn".! ,C.C,LT .1 .rc"rf! ,'''',
','A4;,.-;
.,'' ''-15';7:1 . l':'''
', ..
„..,.. i .̀11111.111P
''' '..'.., ; :.:1
:. 7. C. ': W: :
- EMEWARMEZEAMIRMEREEFIESE '
.n:',!..',!, ' .. . :. .. .... ,... „.
earthwork siSiefilik•: s:AralleinINSIOndgel.NOMIFOMINFMOMMOIMMInf . .,s' 1010:23.0
Chainage 60+200 10000 60+400 60+500 60+600 60+700 40+1100 40+900 6D0M.
EartnWork -,
raaTM: - MINIERNEra ..:i ,:': : 2--, ::•"
: ?"VMDIgirgr;;W;MVERSE•iKallffillirlinglillll , a11114
S° gr.d• '.„_,LIZialtS.XgggTAAW
.._ 4A., ADIMENV
.i4,W,S,
-F -IIMEMINMVi:?' ,!*''' •f- '''' ?;•••AMMIMM
. WHOtl . MEMPOPMPIPI
• • . . •'"AIN}.. •' • ••• . ',.44R4I
= GSB . ____......e. IIII ...111111M111.1111
14 ME
AOC . —
DB M 4111111.11111111111
cc _
Road Fur.gi Vint? 1
7 . : loal . .m.. an:wase. immarmialassasmrswvaamaorimmaximmaaaranalmraisme
11,1 kkk 'CrrCr 7 1.kc k 7 CIT- 1...7. 1 4,s7\,.. )1 rn 1 ,7 -“..\ Fly l 7 -\ 1.. \ 0 7 it..rn 1
r
Road ,Eur.8e.Sifilliktii.
,l3
DBM '4411111111.10P01
L HS
PO,: -..";..
LC
....._— _.
6'4
.
EcrihWork :'9'. ':'' aaa'?..SlC-i i';i":. ':'' ,:,
61+700 1+800 1+900 2+000 24100
chainage 41+200 61+300 61+400 61+500 41+600 , .
EarthWork '
::. ',$"?::';'C' ,'::::i
6,1
2 G
CC .-- '
EL:
FOC
Cf'''.1
EC,
Road Fur.R Sign Board ',"
.-4 i
LINEAR CHART SHOWING STATUS QF ROAD WORK
PROJECT:- "Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH 7531 from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of ilalgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 7531- (46.800 Km )J In the States!
Maharashtra on EPC mode".
MOMMOOMMOOMMOMMIUMIMMOMMOMMOMMOOMMEMINIMOMMEMOMMUMMOMOOMMOMMOMMEMMEMMIMMIMMUMMOMMOMMOMMIMMIN
immimmammummummommummommummummummumummommonmommommummummommumm
snow
POC
NUMMUMMONOMMOMMINOMMI MOMMOMMUMIMMOMMOOMMOMOMMEMOMMOMMOMMUMMOMEIMOMMOMOMMOMMEMMOMMEMOON
e4.4i£3 . .sv , 7•
Iniiiimmilimmainsu IMMO MIN
7-71 9
MOMMUMMORMONEROM NM nil WINNUMMONKNOMMONNOMENOMMEMOMMUMMEMEMMONNEMINUREMOMEMEN EORR7
Saborade
munmgmammumlpmmo Immq permnrolmummIpms mmommmo, mqpnpmmrp,:mmampps ppromprwil mmm.
EanhWoo*
Chainage 55+200
. „ .
68+300
, .
BOW71MOON
„ . .;, ...:, MOO
-num -
ir,.4Lk:..,. ,.... , . . , . „. .
610400
- ; g m,
68+700 MOM 58+900
„.,
10+101
EarthWork
,.
Sutocrade
;se
POC
mumommosommaikianmooidimhiliomomaimpowmiiiiiiiiiiiiii0000
mmilsom..:.:.,...,.,:;;
,mplmmpqmp....................................................................46....i......m.....
11111.111111MMOMIMOMIUMMOMMINIMMINOMMIMMOMMOMMOMMOMMOMMOMMEMOMMUMMOMMEMMOMMIMMOOMMEMEMMOMMOMMEMEMM
.• ‘.... INUMMOMMOMOMMOMMOIMOMMOMMOMMEMOMOOMMEMOOMMOMMOMOOMMOMMMUMMOMMEMMOMMEMOMMOMMUMMOMMUMMINIMMOMMOM
DBM 11111MOOMMINOMMEMMONIMOMMONOMMONOMMOMMUMMMOMMEOMMMOMMIMMEMMOMMOMEMMOMMMEMMOIMMEMMOMMEMOMMOMMEMMEMMO
.c. IMMIMMOMMOMMOMMOMMIIIIMMOMMUMMOMMOMMUMEMOMMINOMMOMMOMMUMMEMOMMOMMEMOMMIMMMOMMOMMOMMUMMINIMMEMM
A
MIIMIIMMIMMEMIIMIIII
Road hr.& Sign Board IIIIIMMIIIMIMMIUMMIUMPUMUMMIBMILIMMMEIMMIL IMMI
11777-7777 iiiiiiiiiii■ATM Mil iiiiiiTail iiiiiiiiiii iiiiiiiiiiiiii iliiiiiii i Min ilia MUM i■ii iiiiiiiiiiiiiMOMMEMMOMME
IOMMINIMOMMUMMEMMOMMOMOMOMMENOMMOOMMOOMMOMMOMMINOMMOOMMOMMOMMOMOMMOMMEMIMMEMEMOMMO
iiiiiiimilliii
zaL IMMOMMOSMOMMOMMOOMMOMOMMEMOMMUMMOMMOOMMUMMOMMOOMMOMMOMMOMOMMOMMEMOMMOMMOOMMEMOMMEMMOMMEMMOMMOMM
..:ba , IMMUMOMMUMMOMOOMMIOMMOOMMOMOMMOMMEMOMPROMIMMORWWWWWWIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
,,,,, • mmommumn
MAX
Ex: mum
Subgractii 7..
-7-7
PROJECT:. "Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH 7531 from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of Dalgaon-Bhadgaon-Chalisgaors-Nandgaon-Manmad
NH 75I1 - (46.800 Km )] in the State of
Maharashtra on EPC mode.
I
Road Fur.& Sign Board .
EC
POC
c!.
IIIIIIMM
11111111111111lMil1IllN1111111111llTlfiliii11BIF 11111
1.111.11111111.
II
I
0111111111.1111111111M U
053
1.11.111M110.11111.1 7
Subgrade
=MEM Illinti
: tea, . s,
EarthWork • • ( 4
Chainage 62+200 62+300 62+400 2+500 62+600 62+700 62+800 62+900 63+000 63+100
E.nnwork :.,1< • m'A •s
MEE En MEMO=
111111111111111111111111Milliii
Suhgrade
GSB . ,Ammorammoi
mirmommormar
LC
MIL11111111111111 WM= 11011111111M1111111 IMMIIIIMMIIIIMEN1111111111111
MINIM
DEN1
Par. minommum
1111111 I 11111111111111111111111 11111111 mummomm
O. Cid.", anai.‘4.
1 4 1 1 4 4 4 4 I 4 1 4
PROJECT:- "Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH 7531 from chainage 56.200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration al [Jalgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 7511- (46.800 Km )) in the State of
Maharashtra on (PC mode".
IfirafirirailarliffaramiliaTigarialaliarifiNarlararalErariamaisraraiNiTariaaraarilla
Road rur.& Sign Board
BC MOOMMOMMOOMMOMMENIMOMUMMOMUMMOMMIMMIMMOMMOMOMOMMEMMOMMOOMMOMMEMMOMMEMMIMEMMOMMOMMEMMOMMOMMOMMI
Ds NOMOMOMMOMMOMMOMOIMMOMMEMONOMMOOMMOMMUMMIMMOMMIUMMEMMUMMOMMOOMMEMMOMMOMMOMMOMMOMMUMMOMMOMMEM
SPLoi OMMOMMOOMMUMMOMMOMIUMMOMOMOMMOMOMMOMMOMMUMMEMOMMOMMOMMOOMMEMMEMMEMOMOMMIMmommilmomMOOMM
POC ab AMMEMOMMOMMOMMMOMMUMMOMMOMMOMMOMMEMOMMEMOMMAMMUMMMBEL_
74F;4: fiC44W614412"ilfaiiii4iiiiMMEMOMMIMMOMMOMMIMMUMMEMMEMMEMMOMMEMMUMMEWNWIMMEMEMOMMOjiiki6agt646wa4,,
MO6ektigiKweINMANBUREEMOMINEWOONIMMOMMEMOMMOMMIMMOOMMEMOOMMEMOMMINEMNEMM 00E00'0 1101100000E0IERFANKie0
.w. ERAMMENAMONNESIEWMEMEMOMMOMMIMOMMOMOMMEMOMMOMMOMMEMEPMEREEMM SEEM '0W-00111P0
EwthWork
MOIRMEMMEAMOMMEMSOMMOMMOMMEMMUMMOMMEMMOMOMMEMIUMMOMMEMMOMMEMMS mommemmom msmommicsammAugga,,
Chainage 64+200 64+300 64+400 64+500 64+600 64+700 64+800 64+900 65.000 68+100
EarthWork orammmmmompgmmxmmwmmpmmmnummmmmmmmmmmmmmmmmmmmmmmmmommmmmmmmmopoxmomso MONOMEEMMOSOMOMOM
MKNRMONMPRWOMOMMOMMKNOMMOMMUMMOOMMUMMOMOMOMMINIMMOMMUMMOOMMENNOMMOMMERPM Am- K'mrArrn,
IMINIMMINOMMOMMONIMMOOMMOMMONOMOMMEMMOMMOMMOMMOMMEMEMMUMMRPRIWPMFM --
IMMOMMEMOMMOMMOMMEIMOMMEMOMOOMMOOMMIMMOMMOMMEMIUMEMMUMMOOMMOMMEMOMMIMMOOMMOMMEMMOMMOMMEMMUMM
IMMIMIUMISMOMMMONIUMMOOMMOIMMOMOMOMMOMMOMMOMMOMMEMMUMMOMMEMOMMOMMOMMIMMOMMOMOMMOMMOMMOMEMMIN
1MMOOMMOONOMMEMMOMINOMMOMOOMMOMMIMMEMOMMUMMOMMOMMEMOMMOMMOMOMMOMMOMOMMIMMOMMEMEMOMMIUMMMOMM
DRNI IMIMOMMONIONMEMOMINNOMMOMUMMOOMMOMMOMOMOMMOMOMMUMMEMMOMMOMMOMMOMOMMOMMIMMMOMOMMOMMOMMEMMOMMO
BC gIMMONOMOMIOMMOMMEMIUMOMMOMMOOMMUMOMMOMMUMMOMOMMEMMOMMOMMEMOMMEMMEMMOMMEMMEMOMMEMOMMEMMOMMO
Road Fur.& Sign Board NIUMMINIMMUMILINIUMINIUMIMEIMUM111111111111”11MILIMIUMMIplIMUMMIIMIUMMIMMEINE
Hold Fur & S An Po3-d
'IMMO fil r
a
l SI rail ■
I
i Ifil a■
■riiiiii Fillirial1 al
l 11
1 i Ilia a all Nan 61 rilliiii i Tara rall ill" Warn Wil
ril Iiii ■
lir
araTi
BC . IMMEMMONIMUMMOOMMIUMMOMOMMOMMOROMMOOMMOMMMOMMIMMOMMEMMEMOMMOMMOMMEMMOMMIMMOMMOMMOMMEMMOMMOMMOM
IAMEMMOMOMM
DBM ---4- OMOMMEMONOMMINIMMOIMOMMUMEMOMMOOMOMMENIMMOMOMMOMOMMOMMUMMOMMOMMEMMEMOMOMMOMMEMOMMOMMEMOMMEMOIMI
Wom.1 MOMMMOMMOOMMOMMINOMMUMNIMMOOMMEMMOMMEMMERMUMMOMMEMMEMMOMMOMMEIMMOMMIMMUMMOMM
POC ONEWNWOUNOMOMMOIMMOMONIMMOOMMAMMUMMNOWENNINNUERMMENNUOMOMMEMMUMOMMEMMONO gmeawmaammum vlui
ZEWIU OONNOONOWONIONFAMMOOMMOMMOOMOOMMEMONOOMORNMOOMONOOMOOOMMUMMOMOOMOOMOMMUMEMOMMEOMM olmomummon,
M3ftummilIMMOMMONOMMORIBUNOMMOMMOOMMOMMOMUOMMOOMMVONNWN BOMMOUN NOOMMOMOROMMENSOMOMMENE ES gramm4,
111:= 111MERIN3MINOMMIIIIIMMIUMNIIMINERIMI SONOMMENNEVEMM4WRIEEMEMINOW77MMTTIMMWMMWM, -- - -'
EarthWork Immo gamommormummummmommummenommumommossmmummumummonem,
65•500 66.600 65+700 ...., 15+500 • 40•10.7:
65+200 65+300 65.400
Chainage
EarthWork glIMMONOMMOOMONIMMOMMEMOOMMEMNOMMEMOOMMOMENOMMEMOINNW4,EMOMMOMMEEMEMEMMUMM•
O MOMEMEME-,
Sobgrade EMMINIMMIUMMOMMOOMIMONUMMINOMMOMPMPOPROMMERRN PRWROOMMEMPRWORRNMEMPRPOMMORNMMOO PRKWW4
rOMMINMIIMMOOMMOMMIOMMONMOMOMMOMMOOMMOMOMOISMOOMMOOMMOOMMOMMOMMOMMIMMIMMEMMR
MMOIONIONMOMMOMMIMMOMMIIMINIMMOMMOOMMONIMINOMMEMOMMOOMMOOMMOMMUMMUMMOMMMOOMMOMMEMOMMIMO
csa
LC
IIMMINIMMOMMUMMOIMMOMOMMOONMOMOMMOMMOMMIMMOOMMOMMOMMOMMOMMEMOMOM MNIMMIMOMMOMMEMOMMIMMOOMMEMO
Poe.
MOMMOOMMOOMMIUMNIUMMEMOOMMUMOMOMEMMIMMOMMUMMOMMOMMOOMMOMMOMMO MMOMMOMIMMUMMOOMMUMMOMMEM
I EMMOMMUMMOMMOMEMMOMMOMMEMOMMEM
DBM f.1.111.01Wair NOMMIMOMMIOMMUOMMIUMMOMOMMOMOOMMUMMOMMOMMOMMOMMOMMOMOMMOMMUMMOMMM
1111111M11•1111111111111111MMISIIIIIIMIIIIMMIIIMIMIMIMMIIII
i•-zwin11111111111111•111111111111111M1111111MIMMUM1111111111M
Road Fur.& Si:ri'Board'1;.
LINEAR CHART SHOWING STATUS OF ROAD WORK
PROJECT:- 'Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH 7511 from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of (lalgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 7511- (46.800 Km )j in the State of
Maharashtra on EPC mode%
Earthwork
1111•110111
Chainage 67+200 67+300 67+400
EarthWork c, .
strhgrade
M OMB MNINNINE
:$•.•
PoC. ' • efathrl MIIMMIMINIIIMMIIMMMIUMNIMMIMMIMMIMMIMMIMMIMMIMMIMIMIMMINIMMM MMIMOMIMIMIMMIIIMMIMMIIMUMMIMMIMMIMINOMMIIM
ORM iirliZiWiliCIL, I
111111111111111 1111111111111111111111111111E1111
Boa4,fiRtAtAk
Road Fur.& Sign Board
4 4 4 I 4 4 4 4 4
PROJECT:- "Up-gradation of Bhadgaon-Chalisgaon (Section ) of NH 753.1 from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of [Jalgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 7531 - (46.800 Km)] In the State of
Maharashtra on EPC mode".
INS
tO
IIIMEr1111121111 111111
IIIIIMEIBMINIIMMIUM1111111NA
A 'A AA A: A Aim
Sub grade A.:: 5A R4: P3: -11
,11a
EarthWork -AA Vv' '
Chainage 6 8+200 68+300 8+400 68+500 88+600 68+700 68+800 68+900 69+000 69+100
EarthVVort, 0*-f4 •
11:11111
Su boracie .70,6444 A •A.
•
GS B A'4::•:-.**f0"1-1P 4 4,-40',A7Mtri-Or AO • •
.
ose4SMOMMINNIM
BC •
DBM
, .
P00
GSB
Suhgrado "7: :u 5>:. V
•••••--
EarthWork •
69+800 69+900 ;1+0;0 70+100
69+400 69+500 69+600 69+700
Chainage 69+200 69+300
I••f:::
f:f6,
Earthwork
subwade
GSA 3*.
LC
POC ..• •
:t:kftktt.
rt,i&r;141111
LINEAR CHART SHOWING STATUS OF ROAD WORK
PROJECT:. 'Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH 7531 from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of [Jalgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 7531- (46.800 Km In the State of
Maharashtra on EPC mode".
Client : Public Works Department - NH Division, Govt. Of Maharastra.
Authority Engineer : M/s.TPF Engineering Private Limited
EPC Contractor : M/s. Ashoka Buildcon Limited. mcornmete pIn progress
4 7i 9-1 7_5 17 2.. CI, R.3' 0 1 E 0 1T1.4 5 79t01214S 7 0 1 7
Road Fur.& Sign Board
B
DBM 4kPlaPIIMPIPINPV.. I
graiii41' r•: /.-' 1111111MMIIIMME IIIIIIMIMIIMIIMIIMMMIIOMIIIIIIIIIOIIIIII MMIIIIIIIIIIIIIIIIIIIIIIIIII
GSB
NINNONNINNINNINNIN II
NINININENNINNIMNIN
MOMINIMIIIIIIMUMM BIM ININININMINN
. ininummusmirir N
Suegrade
EaehWore
Chainage
EarthWork
Subgrade
MMOMMOMM gint
GSS
MIMMOMMO ININNINNINNINVININNINNENNON MUNN
NOUNS= MIENNINMS ..- NglWfAPWIMRMMPMMMMMMMMMIMMMMMMIMMMMMMMMMMMMNM
Mr:POOP-
MMIMMNIM INNININININNNIMMMINVM : FringRAMMINV"'/
12MOMPOW ININNININNININNNIM
DBM
Bc
Road Fur.& Sign Board.
I i F 7- 9 17 I7T 7 7 P r
<
kakeifia. •• 6,7•.
tr , rims
Subq,ad•
,77 MEMO
EarthWork 72+100
71+600 71+700 71+800
Chainage
I II I •__ Hill•1
PROJECT:- 'tip-gradation of Bhadgaon-Challsgaon (Section II) of NH 753J from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of Ilalgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 753J - (46.800 Km )] In the State of
Maharashtra on EPC mode".
PROJECT:- "Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH 753.1 from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of [Jalgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 7531- (46.800 Km )1 in the State of
Maharashtra on EPC mode".
Client : Public Works Department - NH Division, Govt. Of Maharastra.
Authority Engineer : M/s.TPF Engineering Private Limited.
EPC Contractor : M/s. Ashoka Buildcon Limited. P Complete r
In progress
' • .- • trt : • 12 4 -5,, 7,/; -1-(11- 7 4._ .. 71TO I,,7 1 t'y.:5,...i; 7 IL:IrI, 1 7 1,4,S,,EL 7,...• 1 2 1 4 4,,(1,7 R -ITIG,1 7 4,5 6 7 11 -ITs 1 2,3 4 5 6 7 FA 0 12 t S 6 :
Road Fur,R, Sign Board tA
BDCBm
'-4:!4'
::: *.
'"'7
''':
't.' 111111111111111111 III I I 1111111
%
DBM '
Eic. let: S;i.1 40.1.4,,r1t
Road Fur.& Sign Board":-
IIIIIIIII IIII ill 1,7 1 (A
II 111111
. 7 • . 21' 5 0 .7 .1
171 k7 R I
-TU2 41 ' 117-1 -i-4 5...fi 7• 'r•r1 2 1 4... 5...5 7. • -7 . 5. 0 1 2 4... \ 6. 7 .21 q .
Road Fur.& Sign Board ':
DBM
I 1111111
MINISKil4ik i +,' I
t,.. 11111111111111111111111•111111 MEN II 0 111111111•11111
.HS
P oc """ , '-;''''''.
. .:g :z-.1m ( :IIIIAIMMI
1,14Xig. EINIERIIIIINNONIINEIS:ug:::::1-4:;:g: m,,-:..::'s, NIIIII II 11111111•11111MMEM IMINME[III V'
GS8 • tfj,•:-Pir:- .: " ,': normigs, lagolaopergr,-:::-: mi 0: g 0 ::, ii,.: .. , - :t 0 :i!•:1114fissEmemingneffilito migirfialin 5.Earffi
: .,;:m,.aggggigaggosignsgstamIENANI0 ::1 .?, .-1: 0.:-,;-
EINIONEE: ELREgEFER MINNIE•.. INDIMPIREEMEINIMIAME".. ,::,: glix.:0:;g:e :. ''.:::gi 4.. Rim
:0 . ; 0 0 liffilimmagaIt' p,-:
—gr.- -.f,Y* :m:i:ngo:;.,1:-: i:. i .P'. :0-g & iintillaMINA:H:i g; MS 1111111MMli - ME
Earth Work PERONISMO" MOM ,KNORISAMONI"RESEMASINIUMMINIESERIMMisess:
76+700 75+800 75+900 76+000 78+100
Chainage 75+200 75+300 76+400 75+500 75+800
-:". '4i ::=;:4 4i"-';i 4 c:41,;,',:4 4 g 4 .;ii g 4i 4 ' 4 :', iii 4 a A 4 a-.4i ;;=;r.---.,4-.4. a a a ii.---g-Vra-1.,::$-:::).1'::';•:•• i :' :•.i gl;...:W.',..,.*:.i:i i.173
. fi';)**,...4 .:g: 'i...ii i:i:. :ii. ',"ii
:i it -i0.. 0 ''.: .ii ',.. .,aLi'' .iig 4
.. ";„. 4:;'4'. 43. P
Earthwork :I 0 .' . iiif i0 0: :0 *i; ii- i3' •:::: •'.f;. i'% ii ]i ii'M 4 ,iir4 4,2.,
sw,,,,,,J. • . .' vg::11:- :';" ••'.•EtaeMMUIEs . M #1 ,.
"1PMEMERIME
. —WagMEEP .- ,... .'" 4.1
. :
' . ,
:'
" 2
' ..
. 0- -
' -"B,- 1--:
• 5 ':- •FAUFag.,RAg
.,.GSB '''firiiiiiaNgitigEMEN.
Enransomalisormsommufg 0 .,:: ,;-'7.y0:::..rt.,MZ. IU'::•gElffg g:0-0 ::: w:4::.`1:.g!: :,.1..:0 0,g,Ilg:-::,,-,,BiinEM7,, :F.Ageo ;AU ' ODIEWSP,S [flpaNMU .,54 ,
- .Lc i :•i.: 0:: .. i:i: .-,:!:: 0 tzigougi i:e,i: ::::-.:P.rm-0. :?.:: g al :.: i5-0:.; A ,(*ViMEME:giffigig .,..m ES -.S:` musimostion
.
• *:, A g.• ..:: '5:E1......:AV '.. ii?.
SINNEENFMNIMENEMENEW •4 •A :•.', ii:;.i'• gjais . MOM • womPlEmmgMMAN
POC , PPARRERENSTERMIPERMN -1 :iii•Es::aa•li.ilir•Oetai,.4 .••• '• • . 'WWII :1i ;:•• '.::::':::i•:: :'?'1' .A1.4U] ••:-: '''' '..•':-. ''ggiiiii
rl ' / ' •"'.....' ''' • ..: •WIMICiff"•;"•"1""mmotimilimiogisigis
Y.f.'ilm , IIIIIIIIIIIIIIINENIIIIINIIN11111111 Milli ...
NM
BC ..„, .
Roart-iur.8, Sign Board •
4 4 4 4 4 I 4 4
PROJECT:- 'Up-gradation of Bhadgaon-Chalisgaon (Section II ) of NH 753J from chalnage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of Palgaon-Bhadgaon-Chalisgaon-Nancigaon-Nianmad NH 753J - (46.800 Km )( In the State of
Maharashtra on EPC mode".
Assosimpor
mummommummommiummummmommumminummilmmumm
MMOMMOMMOUNUMMEWMUMOVH -
NUMIIMUIPPmlmrmsnrw,`: : : '•-• , 111111111
NWANNMMMMONOMENURMOMMUMUEUERRPOIMMEMMUNENOMMOMMOMMIUMMiiiiiiill
::
MU INIMMOM pplIMMOMp
MOO INIMEMMEOMMOIMMINNOMMEMMUMUMOMMI Si PPM glIM
PROMMONHOMMEMMOOMMOMOMM
Ghainage
E a W,Mr*
Sub wade
PR ■
MN NMI! mom women mmiremummummwmummmomm
POC' • WPWIMA,Pr-- -"VOOMOMMOMMOOMINOMMOMOMMOIMIUMEOM
11111111 IONIIIMIIMMOMMOMMMOMMUMMOMMOOMMMOOMMINECOM
DBm
MOOMMIOMMOMMEMMOMIMMOMMOMMUMMOMMEMOMMEMMOMMImPfmnwn PommmmoWN
gm Y"-"-'3'
NOMMNmmmmmmmmmmmmmmmmmmmmummmmmmmmmmmmmmmmmmmMmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmimmmmmmmmmml
Road Fur.& Sign Board' IIIMMENINIMMEMMUMMIEUMERIMMUMMIIIIIIIIMMUMMIEM
1rEM IMINGINVIIIMPMEMIIMMUNt 411:1531W/11:41:1111M111111WWWIII:M:
OPMELlik MIEMPINERMWSIMil
Road Fur.& Sign Board MO M MOMMOMMOMMOMMEMOMMOOMMUMMOMMEMEMMUMMOMMEMMOMMUMENEMOMMUMMEMMOMMUMEM
wilmannIUMMOOMMEMONIMIMMOMIMMOMMIUMMIONVOOMMIMMOMMOOMMIMMOOMMEMMEMMOMMIMMIMMOMMEMEMOMMEMMEMM
DBM womoRmommoopPiPmmwtroP, mommimmommummommommommIllimpligegg
Sggimsol;booe,. NIONNIMOMINUMUMMium --:1filimmomMilimmommommommimmummilmmu
poc ,,, ,,r4. ORMINIONOMMONNAMERIAMOM : 1MMW A NV
MEIREMYV41, NONUNION=
> , ,o, redr NONNONON
-,,,,,,,,,w,,,:
CZ= •
EarthWoh isaaammammimatimmilwaiii.
.
77+600 77+700 no. 711•1108. • 784,100
Chainage 77+200 77.300 71.400 17000
mmemmummemommtaamok 41
, m my
Earthwork
M z MOON
Ft
NOMMNOWNM
1U
MMMMINIM
mmErmmm.,MIMMMWmPelmmrwmiogfqm w MEMMEMOMM
NOME= ININUMMENNOMUMMIONNIMMIMMIUMMUMM
NOMPPMENMEMP PERMNIMMANMPRWWWIMMOMMOMMOMMONOMMEMOMMIUMUMMEMMO MIMMOMEMMME
PMEIMMOMMOINNOMPOW ,,, M1 NOMMOMMOMMOMMEMMOMMEMOMMOMMOMMUMMIMMOMMOMMUNI MMOMMOMMEM
be 1111011111 ilniMmENEENNUM OMMINIMMEMMEMMOMMMEMMEMISMEMMUMMEMMEMMOMMEMEMEM
1Road Fur,& Sign Board ammummummummumummummummi
4 4 4 4 4 4 4 4 4
PROJECT:- 'Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH 7531 from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of [Jalgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 7531 - (46.800 Km )] in the State of
Maharashtra on EPC mode'.
MOIMINIMMOOMMIMOMMIIMMIMMIIMMOMMOMMOOMIIIMIIIMMIOMNIOOSIOM
DBM IMIIIMMOMMIONOMOMMOSIMOMMOMMIMINIMMIMMOMUMMEOMMNIMOMMIIIM
i ur Sign Board . ;IMMINNO1111
.......... 1111/2”111111,1111111111MOIMMOMIOVIIIIIIIIMMIOINIFIMMIOIWIplISIBMIUMMIlp
......................
Road Fur.& Sign Board
ilOMOOMMOMIOMMOIMOMMIOMMIIMMOOMMMOMOMOOMIMIMMOOMMEMNIIIMOOMPOIMI
DBM ++40.+YesterW.MOMMOOMMONOMMINIUMMOOMMOMOOMMOIONIMEMIONIMIMOISOMINIMINHOOMIZOI
IIIIIIIIMIIIIMIMOMMONIMMOIMOMMOMOMMOMMIONHOMMINENIWIIINWOMIONIONIIN
4w---
GSB
Subv.11.
ElinnWork
79+700 7/1+800 71+900 90+000 80.100
Chainage 71+200 79+300 79+400 71+500 79+600
ErneWork NUM OOSI ONOOTIONOIOOKONOOOSOOSSEROMOSIIRO 11111EIMISINIMMINEICUIZINEINVEUESSIERNEURNISZEINE EOM elitallinfiliVIMIEREff
Subgrade ON SOIIIM MO 1111111 ONION OinfialitIMORMI if MENEM 131
GSB
MEM II WM MOINIONO IMO 111 ppm
MINFogeiroirmvPMPRPTmpinmr.imemps MAPAIR
IIMEMMIPMPIPPIIPIMPRIMMTRATIMPRWAPP551MR4
immommummosimummummammommummu mommil simmimmismisimmissimmuummommuum
IMMOMMIO mmiummumm
NIONIIMINIIIMMI
■IMOINIIIIIIIUMMINIONIONIMOINIUMONIMBIONNOMMOIMOIMMINION
4 1 4 1 4 1 I 1 4 4
PROJECT:- "Up-gradation of Bhadgaon-Challsgaon (Section ) of NH 753.1 from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of [Jalgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 753J - (46.800 Km )) In the State of
Maharashtra on EPC mode'.
IIMOMOOMMOMMOMOMMOW -- — Mb
' mommommummommummumm
=1:5 ---.1zmumsommumr . Iiiimmomommmommgmmosomolloppmmmommw. iumnsunis
EannWork
chnag.
ai
Earthwork
IIMMOMMOMMUMMONWL
81.200 g................1............
81+300
tAMOOrm
01+400
NOMMOOMMEMEMMOMMOMMINORMOMOMMPONEMMEMPUMMEWNWOMIUMMWOMMUMMW
:A1111111! 11111111111111111116111111111111111111111111A1111111111111111MNIIIIIIIIIIIIIIIIIIIIIIIIIIII
81000
OSOMMIMENIONNIV
1W600 1H+700 WOW 81+900
iii4IIMMOMMIIMMEMM
82+000 82+100
EC
I OMMUMMOMMEMOOMOMMIEWmommaMmwmemmmmmmWIRMIM4MgHERWMPMMINEmTMMMmmmmommommommou mmummommum
MMINIMMOOMMOMMEMMINIMMIUMNIMMUMNIMMUMNIUMNUMMUMMIMMUMMOMMOMMIMMIMMEMMOMMEM MOMMOMMEMORM
MOMMOMMIONOMOMMIONOMMUMMOMMOMOMMOOMMOMMOMMEMMOOMMOMMEMOMMINEMOMMOOMMOMMOMMEMEMOMME MUMMMOMMOMM
IMMOMMINIMOMMOMMONOMMUMMOMMOMMOMMOOMMOIMMOMMOMMIOMMOMMOMMOMMOMMOMMUMMIMMIMMEMMOMMOMMOMMEMOMMOMM
P 3d Ft:, Sign.BOard AMMOMMOMMUM OH IMUMMUMMINIMUNIMIIIIIIIMMEIMMIUMEMUMMIIIMMEMINIMIN
I I. 4 4 4 4 I
PROJECT:- "Up.gradation of Bhadgaon-Chalisgaon (Section II) of NH 753J from chainage 56+200 Km tO 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of (Jalgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 7531- (46.800 Km )) In the State of
Maharashtra on EPC mode'.
amommaxgAIIIIIIIIIIIIIIIIIIIIIIIImmmmillummummumpoommilimpH:::::::::::i;:::
fxras,v,,, .,., iMIMMIMMUMMIMMIIIMMUMMIMMUMMIMMMIIIIIIMMEMMOMMOMMOOMMOMMEMMOMMEMMONOMMUMMOMMOMMEMEMMOMIIIIIIIIII
DBM
mmiummumilmmummum ggmmmmmmmmmmmmmmimmsmmuummmmmummm
IMICOHNIUNOMOMMILim
su
smeruser 111M mmmmaysuir
l ivipTrin ffflin
Road Fur.& Sign Board , UM■MEMOMMIMMEM
Road Fur.& Si n Board ' Wair
i
r rillaili
ri 111 a
rirl Ilir
ffi UI Man
reI I I I ill MIMI Figail i
FMI I I III 11.111 . nifil in . I IIIII . 9
i I li. El Ell a I i
ai II Ii
si NM era a al
,mmommummummommommummommigg_______________
1,
Imm igiggempwwwwwwwimimmi.
mw ,mmelmwww mummummummormummommommummummullmilimmmallummagmm
mmmmmmnmuminmmmmimmm
M:,..... "IP'''' ' "1"141"1"11.111""
44144AiiiiiAgligiiimatimumgiiiii iatH
-''''''''---''''"'"''''--"' ''', aamum11111iiiiiiiiiiiiiiiiiiiiii
777111
-vmpggammmmimmommomusmmosomommummummommummummummegli
gmggmmmuumummmummmmmmm
rado
EarthWor1, iiiiimmaiiiiiiimilIERAIIIIIMAIMILIIIIIIImummommummummummu s
84+000 84+100
83+800 83+500 83+600 83+700 83+900
Chainage 83.200 83.300 83.400
I
Suby
E...
11111111111111111111111111111111111111111IIIIIIIIIIIIIIIIIIIIIIIIIIIIII
;v.0
Gsa.,—
MUMMIMEMMEMMEm NIMMESMO ONIMEMEMEMOMMEMUUMFININUOMMUMMEMMENUMMEMEMMEMMI
MI I
I IMPEll
Tom gsmngnsnmmmpmmumnsrmngsnmmmimnmnmmmmmmummmmmmmmmmmmmmmmm
ZIEMMIMMETUINM11
IMMENCIRIOPUMPFIRMIPMP ww_prIlIfil _ mgMIPMMMMORWM, WNW MPRIMIRES. IMMINTWAEMMONEMEMMINEMEMENIMIMINUMMIUMM
omcv;--- MONISM.' MN MINE 0 MINISONNSIONISMO I ■ Noma ■
011.000is I IMMEMMIAMMOOMIMMOMMUMMOOMMOMMOMMOMME .. -'40g
MOMMINUMMOMMEMMONW . . - H4rOW
DimAlIMMIMOMMEMOOMMOMMOMMIMOMMMOOMMOMMOMM MMEMOMMOMMUMMIMMUMMOMMOMMIUMMEMEMMEM
MLEMZCOMMOMMEMOMOMOMMOMOMIMMIMMOMMONSIMMOMMOMMOMMMOOMMOMMOMMOMMOMMO
IMMUMIUMMIUMMUMNIUMMIUMUUMINUMMIMMINIMMIIIIMMINIMMINI
Road Fur.& Slpn Board'
4 4 rereo•-••••••-•••••,
PROJECT:- "Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH 753.1 from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of Palgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 7511- (46.800 Km)( in the State of
Maharashtra on EPC mode".
Df3K4,1 . — .• `,V4V044843i ': ." • :.' A: ''''' ' ",...2:' 7':... .3i..:g ii:',iiiimiiiila.146 V .-'''',:f:WAZaak2i4:taiia :i".':':. :"' f<:E.1?...':::;'':'.4disgilie:;x
• t i:kk.i‘daie:a.t1. is:di:.:ii:-.W::4a *'-::'''''''':=f'':: '5;'::';'. •••
a.'kgii..i0.ia:r:r::kUfaila;i'
—il- .` ...:.-r5'''' '''' 4.4iiiiiitie ",&'
"M..
X
...• . ... .
2l-C.Plalli4'2,":
454i.
GSB ''':.
Subgrade "-. ",;',.0?,!. 7*.ir,Z
EarthWork
84+400 84+500 84+600 84+700 84+800 84+900 85+000 85+100
Chainage 84+200 84+300
EarthWork
Subgrade
cd
X GSB .
POC ....,.
gfrOIWWWPW,i,:d!
•.-:: ''''.Z* . -,: n- ''..:-.... ??,::.1; '.•:::".''':..:i'i ':
. , ]i-.K:i:1 .:!,:if.:)'iI,''',""': ;'',-?- i%'''.1'..- :::: '''..]: ::''.: '':
.::: ]:1] :: ;I:: .-:i' .iM....-''':: ;I I•.I': ::.. I.;:. :'-:i'-':: :.:: ..:('''-':. :::ej'', '•`-'. •'_' ,. I 'i'•]I'
DBM :'''''''''-4 ''''..."...' i,'.4-ii'. 4,".i-LVa .1},i:i:] .::i ,.i, ii :i : . il : - : ':.;•:i:
BC
Road Fur.& Sign Board i• 1714 5 a 7 13 9 0 1 1" 14 t, E 7 R 9 9 17Th 4- S E 7 A 9
,A. 7111.161-7
Road Fur.& Sign Board,'' .
..,i
il. : ,,,..:..]:i„i.li:.i, ., •,;;] 4ii ii :ill, i:,:$: ii,:,.ii,.,.:ii,iii,t,.i : ,,: ,;.,:„Lii.,:„:ee:i.:.• .:•••• ...:;. ?:.^ .. -,..., ..x,
:,;,• , . . ,.... •. . .,...,..
4ailiii 1:':, ::...::;.::.:: ,k ..: :::•:, :::;: ::•:•• :::::, :::.,,.:.:::, ;:;:
i:.: :xt.,:x• K: .*i: 3::i :3::,3,:-:g ::;.
,,,, ,.,.%, , ,..,, ;.::. 3;::i i4',
...* ..,V, ;;:::- •;::: .::::: ,,,I; ..f.::,::::: ::, :::.:...2k4a1
' ' - - ' ', '-- ''' ',,•':::,:;.5f, ,'',"-: 'I., -•-• ,,,. •::: -...)vaig i::::, :-::-,
..,.. Pi. :1),Ki.7 7.7.4177 '. ' ' ''' •
GSB ,L ,AACiIX.r.'
SubgrarOAIIIIIIIrr
EarthWork.,1714'MPM.,?,;;'''
. _ 85+900 86+00 86+100
_ 85+600 _ 85+700 85+800
85+200 85+300 85+400 85+500
Chainage
EarthWork "1-..4;tWg
in
Subgrade Z. .1, U
I 1111
X GSe
cc
PC:c
0,.;:;',..•
---
DBm ..
0C
Road Fur.& Sign Board , '
,INEAR CHART SHOWING STATUS OF ROAD WORK
PROJECT:- 'Up-gradation of Bhadgaon-Chalisgaon (Section H ) of NH 7531 from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of [Jalgaon-Bhadgaon-Chalisgaori-Nandgaori-Menmad NH 7511 - (46.800 Km )1 in the State of
Maharashtra on EPC mode.
I- II
DB < ......,.... ',z -*- ' .„...: . ::::". .:;-,,,:. , :.z.-,:;',i;..,'•;,-Allir;41 -`,......,:,:; . ','OKIPpre4r4: .'i. f,:,-,:,:,", :::, ',.. 44,,,,,,,:i: -,,,- ,,....- .-01V041-':j';',,,,--eiO4*AW- --AMPIM-
.,
LC;
65B
Subgr
E•551,11ork '' -
86+600 86+700 86+800 86+900 87.000 87+100
Chainage 86+200 86+300 86+400 86+500
EarthWork
Subprade 1
N
X GSBC,, tr
cc
Ct. ;n4:i..;'^F VO.
.
50
.1—:' • '''"u ,j. .,. ,..4.
. ,- 1,4.. : M.P. 44iii,`•
DBM .;.,,,,;Wi.-iiiii-iiil, va;filia. , '"--'-* :f:f-. .5*::71-, A • c ..:ii;S:?i..:;;;;;':;', ''.:,:,,,,:,
BC , II
Road Fig.& Sign Board ". 'car si •
IT s
LJ ti 5.A 7 3k..'I rU1_2... a..A k 7 ..X_ 1 .f) I. 2 T_`.. C...f /1,.. ' L2. \ .. '0 ...5 ...7 .-)-. q n I .) IV, .-E -7 ..B
L 2... A... \ 6- 7, 9 IL' 2--j- 4. C.A 7.)Lar
Road Fur.F., Sign Board
....%0-..2.,
BC--er..17, .." '''.!.., t.Iffilf,`..l '.. , ).T:”..;:',.:1::•'. .",:'.:
'/.. ...''"5Y.eVr -0,.4.,:,
DBM
6:1H .'*.
Sut,gr.tri•
E a rth W o ri< 87+900 88+000 88•100
87+700 117+800
I
PROJECT:- 'Up-gradation of Bhadgaon-Chalitgaon (Section II ) of NH 7531 from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of [Jalgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 7531 - (46.800 Km )1 In the State of
Maharashtra on EPC mode'.
Road Fur.& Sign Board .111 mii ■iiii iiiiiiiiiiii iiiii iiiiiiiiiraiii ili ii■ii i MN iii i ill iTv TEEMi
■rillNMI
■ii m an■Ian 1 El ■iSii■iiiiii■iii1■i■Li ii■ll
pc-s---• ,7110mmummanummounmommummummummummumummommmmummunmommompimp0
DBmvillimwrOMMMMWOWV. ' -AMMMMW . -IMNPatgoitg - -4,UNM5,• • ,IWIP,Imr54x ,:, .
411641::-,. , iiiiiiiniiiiinUMMIffilinnlinnilliggininiimiummumminiinammumseniiiiiiiiii
L HS
IMailifiumummummummulummimmiumnimmummommummunommummonnumummi
:ia2jIIIIUIIIIMMIIIIMMIUIIIIIIIIIIIIMIIIMAIIIIIIMMIIIIIIIIIIIMMIIIIMIMIMIU
maszazim:::, . IIMIIMMIIIIMMIIIMMIIIMININIIMIIIIIIIIIIIIIIIMMIMMIIIMIIIIMIMMINIIIIIIMIUMIMMIMMUM111111111
IMMIIIMIUMIIIIIIIIIIIIIMMINHIIIIIIIIIIMIIMIIIIMMIIMINIIIIIMIIIIMMIUMIMIMIIIIIIIIIMIUMIIIMINIIMIUM I
' ilinnUMMEMMEHMISMMUMUMMUMUMMUIPMMEMMOMMIIIMMIIMMM
P°C 1'. '' ..'" 44
"Amilrq4"'"'
Dgm ,",-0.-v+,,,i+:A94•46 0.w?:............................................. - '''IRIP"Miw
r.NRVAMMUIKIMMA.FNNIMPROMMIMP-MWMPANPW.. mmummumumminim - Aff'llaggri
r11111100iii0MUMNIONNINIMEMOmmumi000011000mummumummummumumummimummu
Road Fur.& Sign Board' WI lill 1111111MIUMIM MUM WWNNN
■ ■
laWl I jail illaniarilli■
ErnI I■ il■l111111
Road Fur.k5i 0,Boa I I ■ ■al
MIMIiiTI 111
Iiiii iiillWIWINMiraMariaa
mai ur
a ■
lirairail
fill alail
ai r DEIMMIENIMEM
IMIIMMUMMIIMUMUMMINIMIUMMIIIMMIMUNIMMOMMIMIMI WWi '
'',WPW,
insummiglimmummummummumminumnis IMIMMOMOMMUNOMMINOMMIMMIMMUMMOM0000mmumumem0
DBM
. IIINMIIMNIIIIMUUIIUIIIIOIIBIIIUIIUIMIIIUIIUIIIIIIOIIUUIIMIIIEIINIUIMIUI IMMIIIIIMIINIMIIIMIEIMIIIIIIIIIMIIU
P2-62";- ''''''' - IIIMIIIIIIMEINEMNIMMIIIIIIIMIIIIIIMUNIUMIIIIIIMMINIIIMINIMMINIIIIIM ME lIMM
JIMi IIIILSLS11611611
- 2311=,. /•%=...-.: 111111.1MMEIMMII.ME
GS8 1"4" g AllUMMOBIMIUMINIMUMMIMMIMUMINOMM
iimmummumummummini
MMMOMMOMMI
UMMIUMMOMMEMOMMOMMMOMMOMMOMMEMMI miain
....i:ammuummummummummsMIMOMMOMMINOMMO
IMMIIIIIMUNIIIIMMUMMEMIUMIIIIME111110111M111
Subgrado
89+900 80+000 80+100
89+500
89.880 89+600 89+700
Chainage 89+200 89+300 89+400 AMILIMU
I l
a
MISTR
I
MUMMINIMENIMIIMIINMUN
E aM1I1W ork EIMMEIMMIIIIMIUMMUMMILIM
1111111111MMIUMUNIMM
Sobgrada'
NIIIIIIIITII6111111111MMUSIMMINISMINUMMMUMIMINMEMIIII
' -'-11111.111111.111111IMIIIMMIMMIUMMI 116111M1111111111MMMIIMUMEMUMUSIMMIIMMEMMIIMI
, ii,„ 11111061
1181:
I2111;1 1111 1
111111
1111 1111111111
11 11111111
11011
MINIMINIMIMMIMINENIMMUNIIIIIIIIIMMOMUNIMIIIIMINIMMANNIPAIMinrarROMMUMMEMIN . MIN , :4. .,it..wg,
Mrtr)eY':-''''' UMMIMMUMPOPPRIMINIMMIMMINTUMAMMilliMMIllthwmowAltr..
'''-'74
. :'1111111111lHIIIIUIIIIIIIIIIIIIIIIIIIIUIIIIIIIIIIIIMIMIMIMMMIIMNMIMM
UMMUMNIMIIMIMME.
Road Fur•& SIEWBOard' MIMEIMMIIMMIIIMMUSIM
LINEAR CHART SHOWING STATUS OF ROAD WORK
PROJECT:- •Up-gradation of Ethadgaon-C.halisgaon (Section II ) of NH 753J from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of ilalgaon-Bhadgaon-Chalis.gaon-Nandgaoin-Manmad NH 7531- (46.800 Km )] In the State of
Maharashtra on EPC mode.
'''''lif"fliiiiiiiiiiiiiiiiiiiiiiiiiiliiiiiiiiii
lllllllllllllllllllllllllllllllllllllllllll
LHS
SS
Subgrad*
,
E•rthWork
Chainage 10+200 90+300 90+400 904400 90+600 90+700 110+1100 90+900 91.000 91.100
EannWork
&Agra& .'. •
ill MI n MI
P OC 'i !c'`i, f,
M IIIMMEMIMM111111 1MIMMIIIIIIMMIIII
I MEDIU NIIIIMIIEIIIIMINIUIIIIIIIIMM II I II
PtINMl"'"--""P
MrwPRIMMIMPIWANININMR*1:i
M OM I I : 14111111MMIIIIIIIIIMINIIIIIIIIIIIIIIMMIHINIMIIIIME 1111111111
4"''
DB M'' '' ORMWN'zPiti
IN IN A NV' .:M1MIMIonm
BC - - 7--1 :,,,,,
Road Fur & $ gr1 Board i / • r s 7
._. -...........................
IINNIEF WPM'I
:•
Road For.& Sign Board
...,........................................1111111111111•11111•=1111111MINIIIIIIIM ii
IMIIIIIIIIIIIIIMEIMM11111111111111111111111111111111111111111111•11111111MIIIMIIIIIIIIIIM1111111•111111111111M11111111111111111M1111111111111M111111•11111111111111
1111111111111111111111111111111111111111111111111111111111111111111111111111111111111M111111111IMINIIIIIIIIMMIBINIMMIENIN
--
11111111•1111111=1111111111M1111111111BIUM111111111111111111111111111111111111111MMINI
LI
11• 11111111111111111IMINWIIIIIMIIMMIMIIIIIIIIM11111111.111 __
_111111111
111
. 1111111111M11111111111111111MIMMINUMUMIMMIIIIIMIIMIIIIIIME IIIMIIIIIIMENIN
'411MIIIMMIIIIIIIIIIIM1111111111111•11111MWMPUMNR.11101•1111111M11111111111111111111•1111111111111111M11111111M11111111M11111111111111111111
Subcra ie
4E. •• • ','" .-- •Ig 11 +go 91+900 92 92+100
91+500 1+700
et +2oo 91+400
Chainage
E a thk IIM IIIMIIIII
70r l=11.111111111111111111111111•111111UNIMIUNI MIIIIIM
•' •
osii"" """mp
o
T os sb37!
. - .• " 1111111111111 1111
dirr
niimonomionimmiiiiraf
MIS
liip
M I
111111M111111111011•1111•1MOMMIII
MM UM 111111 I o
W' - - ..
pLaCc--
.,t, 44! 0 .. - 1 .
mo IMIUM
lii
nti M 4 . iirlirliiiiirdiiiiril
iiiiiiiirill
iii
iiiiiiiiiiiiiiiniiiiii
1111111111111 IIII 11111111111
R,,ad Fur 8 Sign Board II SIM
4
fh- e e 01 r 40 40 0
LINEAR CHART SHOWING STATUS OF ROAD WORK
PROJECT:- 'Up-gradation of Ilhadgaon-Chalisgaon (Section II) of NH 7531 from chainage 56+200 Km to 103.000 Km to Two lane with paved shoulders/ Four Lane configuration of 1.1algaon-Bhadgaon-Challsgaon-Nandgaon-Manmad NH 753J - (46.1100 em )1 in the State of
Maharashtra on EPC mode'.
m 1 w m m 6 u g m w"I RI=■illi
lli 11 1■IN IIIIM■II iral■la■lirial■111■I1M1■1
■Via■a lili■ illral■iTal Mil■Val■isI■SE■ilia■ i
Road Fur.& Sign Board,
mummummummumummumummummlimmummummummummumm
DBM"-/r0-41""*"1"4"."4
ammommaammuswanommatemmommammsmommawglmemanimummemoutimummummummommom
MMILMMEMMOMMOMMOMMINIMME
ESEMENOMMUMEMOMMENNIMMOMOSOMMORNMEMOMINNEWAVOUNINENIMME
POC NWMEMEWOMMOMEMOMENEMOONORMOMENNSMEMOMOMMOOMOOMMINOOMMEMOOMENORNMENNEEDEMMUMMOMMUMMOMMOMMEMMOMMEN
;.,•;1;',Z;;'•141/1110
IIMETgrg, SOMMOMMONEMME4MM MENNOMMUMMEMOMMEMEMOMMEMENMEMOMEMEEMMEMBOMMNOMMBROVNEMPIONNFIMMIIIIIIIIIIII
OMMORMONNIMUMOMMONOMMOBBIEMMUMMMOMOMMENSIPMEMIMUNIMENMCZNINIIIIiiiilliallarn
SubgrAd•
1111111111111111111111111111111111111111111111111111111111111 ii
NOMEMON_NMEMEMORMOMOM
EarthWork
13+600 0+800 04+000
C hainage 113+200 83.300 93+400 03+500 03+700
000 EHMEM
93+600
BIAMMOMMINOMERM,
MEMMEMOOMMENOMME ORMOVIERMEMOBBEEMEMEMMOMMOMMIMUMMEMEMMMEMgEMEM ,
EarthWmt
PROJECT:- 'Up-gradation of Elhadgaon-Chalisgaon (Section II) of NH 7S3J from chainage 56.200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of (Jalgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad
NH 7531- (46.800 Km )1 in the State of
Maharashtra on CPC mode'.
Chainage
ormesemonammummemassmancmansmommemonsommemenummumummommememmumminumminsmons MMIMIMMIMMIM
114+200 94+300 94+400 94+500 94+400 94+700 94+900 94+900 96+000 96.100
.0. IBMOOMMUOMOOMMENNEMPROMERMOMMOMEMMMORMIUMMOUOMMEMOMMEMMEMEMMREMOMMOMOMMEMMUMPMEMME RIUMENN
s.9-4. . ,
ummummummuquapopequommalmemmo RamasomRomm ppownwammammummemir .1 MOW ormm-
immramourriEF IR! Tr!?rqmImms.11Prrlmor amr,4#1741m4719NEER ,,,' mc., 1
4tla
'. r
iiiiiiiiTii■ii ili
■i i■i■WIITEM ■ii ii■i■&WE■i I MI iii iiiiiiiii iiiiiiii iiii WI'a■ liiiiiii Zia iiiiiiii i■i mai■iiiiii
■ llTOMSifilli
mmmommwm7Ammuuummummmmmmummmmmmumummmummmmmummmmnmmmmmmmmmmmmmmmmmmmmmmmmmmmmummmmmmmmmmmm
DBM lumagmamem ONIMMEOMMOMAROMUMMEWOMMAMMINIMMEMUMWMUMUMMOMMEMOMMIMMEMMOMMEMMEMMOMMINIMMINIMMEMM
-:. NOMMUMBIUMMI iii wmmNmmnmmnummmmmmummmmmmmmmmmmmmmmmummmmmmmmm
_ ,
WHIFIFERIST;M7 :. ,:i.:i.. :::,. ,- :::: -,.- :, ,
--, in
URN4*EnMANOMEMONOWOMOMMUMWMNRAMMMWMUULMMOM
LIMMIlma GERNOMONEE MON EsUEVEMEROMBOW464
Men
ose ;1411MMINIMMIMOMMOMOMMOMMMOMMORMEMOMOMOMOMMMOOMMOMMOMMOMMOMMOMMUMMO MIMMOMMAPOOMMUMIUM4MINMERNMOUSIO
Suboracle IIMOMEMEMM NOMMEMINIMPONMOSOMMERMENSOMMONMENOMONOMENOMMIUMMOMMEEMEN IMMEMOMMOUU4NMENA MUMMER
mmmennumom
EarthWork NOSNMEMENW MONMENMOUNUMMUMMONOMENUMOMMUMENNUMBOUSIMMOGRAMMUMEMOMMUMUMMENWOOMMVENEMM
96+800 95.900 941+000 94000
Chainage 95+200 95+300 95.400 116+800 15•600 95.700
EarthWork BEIBMIERIMPININIIIIIIIIIIIMMEMEISIMMILTIMUMMISMEMMEMOMMEMMEMMORMOMMOMOMMOMMOMMOMMOMMEMOIMMEMOMMOM
01=11610011EMEMMISMISMMIKIIIMIIMIMMIMEISIMISMISOMMOMMISMIMISISSIMMEIMISIUSWIMMEHMEMIMISINIMMIMMINIIIMMIIIIMMINSIMMIMM
ONMRIIMMIIMIIMMIIIIIMMMISMEIMMIMIMUMMMMIMENIIMMIMMIIMMAMMIMMEMMIRILIMMIMIMMIIMMIIIMMUIMMIBMINIMIIMMIIIMMIMMIIMMIII
MIM"MMFIMMMIA MOMMIMMIMMMISOMMOMMOMMEMSIMMIUMMISOM MMERISMEMOMMEMMMOMMOMMMOMMIMMIMMOOMMOOMMOMMOMMMEMMEMM
MMINIONONME mommummiummummommummummummommumummimmomummommummmummummummimummin
Altt- MOMMMOMMIMMEMOMOMMINMOMMOMMIUMMOMMOMMMOMMMIMMOMOMMMOOMMMOMOMMEMMMEMEMMUMMIMMIMMEMMEMMEMMEMMEMMEMI
MMIMIMMEMMOMMOMMEOMMIM
IMMOMMIMMIMMUMMISIMIMMMIMMOMMIMMOMMIIMMOMOIMMMOMMMOMMOMOMOMMOMMEMMOMMMEMMOMMIMO
IIIMIIIIIIIIIIIMMIIIMMINUMMIIMISIMMIIIMMOMMIMIIMMIUMMIIMMIMMIIIMMIMMIMMIIIMIIMMIMMINIMINIMMIMMEMMIIMMII
MOM■
cc
Fur.& Sgrl Board IMMIIIIIIIIIMIMMIMMIIII MEM OMMMOMMEMMIMMIMMEMOMMEMMEMMEMMEMMEMMEMMMEMMMEMEMMMEM
LINEAR (HART SHOWING STATUS OF ROAD WORK
PROJECT:- "Up-gradation of Bhadgaon-Chalisgaon (Section II ) of NH 753J from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of Palgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmaci NH 753J - (46.800 Km )1 in the State of
Maharashtra on EPC mode.
Client : Public Works Department - NH Division, Govt. Of Maharastra.
Authority Engineer : M/s.TPF Engineering Private Limited.
EPC Contractor : Ki/s Ashoka Buiidcon Limited. WPComplete Win prom.,
I 67 1 5 6 7 :• 5 a 7 1 .3 • 5 -9 0 7 67 9 CI 1 7
Road cur.& Sign Board
BC 1: .., .. :
DB M '.,,,,--aseekrifetel*
I
LHS
f7+600 f7+600
Chainage 47+200 97+500 f7+400
EarthWork
$ubgrAd• We'n4!K I I
RHS
........u.........................
°Ls:•..' : _ '--'-.: t;
- L, • 111111111111111111111111111111111111111111111111111111111111
,,;:. ..AIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIMIIIIIIIIIIIMIIIEIIIIIIIIIIIIMUIIIIIIMIIMIIIIIIIIIIIIIHIIIIIIIEIIIMMIIIIIIJIIIIIIIIIIOIIIIIMMIIIIIIMIIIM
,.' crc
' • ' "..- IIIIIIIIMINIIIIIIM1111111111111111111111.111111111111MMUMINIMMININIIIIIIINIMIIIIIIIIMMI11119114111111111Mairan111111111
.k. lr : • ,r" . ''',1
pc, it,,-.kmn.--.
Road Fur.8, Sign Board
ORINIMIIIMI11111111111111 IIIIM111111111111•1111 IIIIII I 111111111M NI MIMI 11111 IMIMEMIMI
I
irwyeep• p•op•oppee•poo -o•p•pe•Appep so
LINEAR CHART SHOWING STATUS OF ROAD WORK
PROJECT:. "Up-gradation of Bhadgaon-Challsgaon (Section II) of NH 753J from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of Dalgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 753.1 - (46.800 Km )1 In the State of
Maharashtra on EPC mode".
Client : Public Works Department - NH Division, Govt. Of Maharastra.
Authority Engineer : M/s.TPF Engineering Private Limited. -..-
EPC Contractor : M/s. Ashoka Buildcon Limited. R., Complete
Min erne ess
12 1,4,r, 8_7 R TOJ. 2 3 4,5 6 7 8 -ri 0 1 2 3..4 5,6 7_8 TO 1,2 1 4 S .„S 7 .2 9 0 L2,3 4 5k 7,::: 411 23,4„56/„8. ,..1.„01,2„34567_„R9,..01284_,5WW2,3,955.789.111f2 4557Br
Road Fur.& Sign Board I.'
BC .
OF M ASIIIIIIIIIMP
LHS
•••••• • ••••••••
Subgracte • ''','''f;, '
EarthWork —
Chainage 98+200 98+300 98+400 98+500 98.600 98.700 98.800 98+900 89+000 99+100
RHS
E a rthWorkaifs..,:-..
Subgra• ' .
GSB: ,T
. ,.•
Wei I I
DOM", _ --
a 111111 I 111111111
a
i-.....:•61
.46----43-
,4x
Ea rthWork i:iAi :i:- ....M.:'•.Entr",/,
Subgrade *
osB IVA' IWO -ii,”
rel , • fi
'41:01;ft,
0BM 11111111 11111111
I
PROJECT:. "Up-gradation of Ethadgaon-Chalisgaon (Section II) of NH 753J from chainage S6+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of 1.1algaon-Bhadgaori-Chalisgaon-Nandgaon-Manmad NH 753J - (46.800 Km )1 in the State of
Maharashtra on EPC mode".
nillill
Road Fur.& Sign Board 4. irfillaellagairialrae r aragearigalgasirifiligalial lirlailialifilliiiiiiiiiiiiiiiiiiiiiiiii i ii
7-------- 35 IMMINIMMINEEMMEMEIMMINIMMOMMIUMMENIMMEMINIMMINIMMIrn
MMMIMMIMMMMMMMMMMMMMMIMMMMMMOMMMMMMMMMMMMMMMMMMMMMMMMMMM s
IMIIIMMIIMMIMMIIMIMIIIIIMMINIMMIMMENIMMIMMENINDINIMIBMIMMMIMMIMISIMIMMIThimmillIMM
IIUIMIMMIIIMMMIIIINMMIIHMMMMMIIIIMMNMIMIMIMIMMIIIMMMDnai , MMIOAL h., .. , „,
immummunummommummummummummummommummgmammonsmimmkt544mannabilighWiamitima
IMMINIMMUMEMMIUMMEMMEMMEMMUMMUMMUMMINEMMEMMUMMEMMEMOOMMOMMEMANEUVONO =Am MEMOMMUMM1,
SoWatie ,,", MIMMOMBEIMMENSIMMEMMonnountinuw6Wwwam f: =MOM EMM O EMU 5,
EUMEM MEM M
b MOMMMOMEME
Earthwork B zsiNiiMiigNii, MiEsidtslibilifilENCEMMEMMEMMEMOMMEMIE22 MMIPMEMEMOMMOMMEMMOMMOMMMMEEMMEINFAMMEMEll
100+300 100+400 100+600 100+600 100+700 100+600 100+900 101+000 101+100
Chainade 100+200
Earthwork MINEMEEMIMOMMOMM MB MAllipEOMEMOM MMOMMEM320120MOMEN*q4MMEMMUMMENWISOMMEHOOMMEM MOOMMOROMM
s.,,,.d. OPA:MMMWAMMOMM MMINEMBEE EIMMOOMMEMMEEEEMMMOMM
GSB ' AusiglOilimmi PommArmwmmwammmw,mwmnmmmmmma
lumustaatof-rummINUM111 IMMIIIMMIMMIMMIIIMMEMIIMMIS IM MINUMMEMEMMEMMIIIIMMENUmm
, ••••(-..4” IMMIIIIMIIMIMMEIMINSIMINIMMIMMIMIIMMIMMIMMMIIMMUMIIMMIMMIMMIMMIIIMIIIMMEMinummis
201Malla
DOG IIMIMMUMIMMIIIMISIMMIIIMIIMMIMMMIIIMMIMMINIMMMIIMMIMIMMIMUMMIMIMMMIUMMENNEEMMIIMIMM
DBM . '''4" - :"V"'
MMIMIMMIIMMIMMIMIMINIMIMMIMMIMMMIMMIIMIIMIMMIMMMIMINOMEMMIDIMMUMMENEMMIMIIMI
CEINfai--4'.i,IMMIIIMIMIIMMIMMIMMEMIMMIMMIMMINUMMIMMIIMIMMIIMIMMIMIMIIIIIMMEMEMMIMmonaMimmi .. ..MIIILMIMR11111 1
Road Fur.& Sign Board Milip1MIUMNIIMMINUMMNIMMIIIIIMMMIIMMIMMIMISIMMIMMIRMMII •: IDEBINIMAIII1Nri:M:
SIM. •MII/D:WIDISMIEIN.WEY/1:111: BilliMEL1:1111/0:M IMIMPAI/MM.111:11r/I:411: IMINNIMMOLVEWPOMMIMMOLM:111:11•10fairatOtia. . if: • asOIM irligat : ISUNS_W2WIIN •
■BMIMMImIli
Road For.& Sign Board MINIMIHMIMMIMIMIOMMIMMIIMMIMMIIMIMMMIMIMMINMEMMUMmIns MMIIIMmim
ImilliM7-7 IMMIIIMUMMIUMMINIMMIIIIMMMINIMMIIIMUMMINIIMIMIIMMIIIMMIMMIMIIIMMIMMIMIMIMIUMMNIMMIN MMEMNMMIMIMIMMIIIIMMIIIMMIMM
Dem :,11MMMIMIMMIIMIMIIIIIMMIMMMIMMIIMMIIMIMMIMINMIMMIIIMIIMIIM MIM MIMMmu imMINIlinaMmum11.
IMMIMIIIIMMINUMIMMIIIMUMMMIMMIUMMIIIIMIMMIIMIIMMIMIM .-
MEMMVMMOMEEMMEROMMEMMEMMOMMIN
. .. .... . .. ,..,..::::: ................
,24iiia4 IiaiiiPi'momommossmommammogammamommommommu. i. latiur-•r-ia
G5B ihMr. moo= somummassulamomammamummummonumm00a* pa .... ,=..
'
or Mi 7"4 "' •
4.
&Avid.
Earthwork
101.300 101+400 101.600 101.600 101+700 m.o. MHOS ......
Chainage
EaritiWortt
101.200
RUMNIMMErIMMEMENIMMINEarannenTEESIMMINE
4"*?"' 1 r TffP3 . 7MP5.
KIMMONE NONVIMINIMINNEENO MONIES= 01011111011110
MME! IMMRPIPMwMIPMERMAPPIPM MEOW= MMENOMMOMMO J. -- mmimmimmummummum
GSB
LC summumminummiimmummummummummummummiiiiiimiimmini IMMMIMMIMMIIIMMUMMIIIIIIMMINIMMIIMMUM
FOC IIMIIMINMIMMIMMUMMIMIMMINIMMIMMIIMMIIIMMIMMMIII MIIIIIIIMMISIMMISIMMIIMIUMMIMIMMEMB
IMIMIIMMIIMIUMMIIIIIMMINIMMIIMMUMMINIMMIMIM UMMIMMIMMIMMUMMUMMIMMIMMIIMME
11111MMIMMIMIMMIMMUMMIMMIIMIMMMIIIIMIMIUMIMIIMM OMMIMMIMIMMIMMIMMIMMIMIIMMIIMMIIMMI
DBM
IMMIMIIMIIIMIIMIIMMISMUMNIMIMMIMMINIMIIMINUM MIMM MIIIMMINIMMISSIMIMMIMommomMMEIMMUM
BG
RoNIFurAS,nBoard MIBMIIMIMIIM M IMMMIIMIIMMIIMMU 111211112111
LINEAR CHART SHOWING STATUS OF ROAD WORK
PROJECT:- 'Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH 7531 from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of Palgaort-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 753J • (46.800 Km )1 in the State of
Maharashtra on EPC mode.
ROC *?;
EalkhgEgigg n
rf
GSB fir` AVVM•it:
subgrad. '
EarinWork
02 00 102+700 02+300 02+300 03+000
Chalnage 02+200 102+300 02+400 02+500
EarthWOrk *f: ??
55
S UNFO de 1VONMOVV$
1
;1'
M ckedareaagaraff:
tar4,:lre ::•••
OSB , .", •
DBM
BC
Road Fur.& Sign Board
PROGRESS CHART MAJOR BRIDGE Progress upto 30.04.2019
57+088 Activity Al P1 P2 P3 A2
Exc rt.- 3 -:1?-±)l I -!;:tizt -s I ;F: 1
b ,
PCC 1x1x1vagal
efr
Raft
S 1st Lift
2nd Lift
• j
6
3rd Lift
4th Lift t - 147: itigi;.„
S 5th Lift , 1 '
B
• 6th Lift .. -,... -;
H 7th Lift ..,...
J
8th Lift
S
9th Lift - .. V/'.:`1
i Ingle it
Final Lift
S CAP
Dirt Wall
Girder
SLAB
S
Crash Barrier
Footpath
•
S
S
S
I
PR,RESS CHART FOR Minor Bridge Progress upto 30.04.2019
Raft Found.
chainage —
.
CrashBarrier
SLAB
PCC
PCC
Sd
Al
r----
VP. 1 56+566 =y ft 3 *i 1 ge- 3 4k1 11
2 59+964 i^
SI
I
i 3 1 42 H, 4 i
3 60+267 S:
4 69+850 .., 2
z. 3 , Vi.`
70t618 3 2 43 > Mr. '3
IA -
73+180
a 6 LS
7 73+860
my 8 76+610 :-.. I 3 .2 -3 . 3' I
.:J. 3
. 1;,.!
AL
9 77+340 ' "3
r 10 78+782
11 82+295
r 12
13
82+482
89+300 c2 3 r3 - 1 '3
r
,.
:,
14 102+058 3 '1NP41
/ 3 ''.;2 3 tii3 • 3 1 -'?<:3
,,,. •
r 15 102+880 ".e' .4,4..,3 4 --, 5 !:172 3 WA =1-i W3 -: 4 'r 5) W-3 00'3 :i. ;3
www- wirVVIrtgelriteltflf "'fit f tf cif
MCW
Al Side A2 Side
At Foundation Wall RE wall A2 Foundation Wall RE wall LHS RHS LHS RHS LHS RHS
Design Size
Sr. No >:
Layout/Excay.
RaftFound.
CrashBarrier
A22ndLift
A22nd L ift
A l2nd Lift
A l3rd Lift
A 21st L ift
chainage
A2 1st L ift
SPAN .
. rat -- —
.
x C.) :1 --1 _., : :I co
c.) Je
LA (.3
eL
di' z 2 ri, (..) -
-.
c•-) .
V _1
..0
Ste
0-
8 v)
R
m
'
;2 a a 12
1 62+640 . i -1: 8 ± 2 ,,.. ',' ''-". .. . ' - 8 '-1 ' ...,1:'- ;1':,x
2 60+365
3 63+027 4 414449* 8 AO.
4 64+190
5 64+566
6 65+260 - - 1 " ,- 2'- `<'3 - , .0_ 'Ittf<
7 67+395 1 22 , L3 µ '5 . -
8 68+250 1 ! 2 1 3 2 3 4', 15$ 6'o. itaji.
2 - 3 '4 •:' 5 I- ' 1
9 68+490 1 1 2 l 8 _ -•
itc4.--2-•
10 70+270 ' ' 2 '3 Mr
11 71+660 1 2 • te.3< t., 64
12 74+000 1 2 1. -'2,
13 74+225 1 2 , 5 8 <-, :. ,'7,,.•6,
4' ti 6 = 8
14 75+564 1 2 3 56 7 8 - 1 '" 7
,: 2 akiNE5Ragat!
-
15 75+945 1 i 2 6 -7 8 1 2 ',3 • 8 ,4183.7X1r4 IL
16 93+590 2 • 5 6 8 2 - ,, nIPI
17 97+010
18 97+920
19 99+040
20 96+580
21 99+575 -
ne.
0
'''.,..,
.: r1:•)" 1".i4S '' 4 /.. ' a . A • 0 0 0
... o o • I,. -
• .. • A 0 •
0 A • 0 44 A
am 4.4 • 0 A A
0 . • 0 A A
0 0 • A 41/ 0
0 A • 41. A 0
0 0 • on . 0
0 A • A 0 0
044 • 0 NO
.
,
ft N • 0 A 0
0y4 •000
0 . • * A 0
..... 0 0 • NI N 0 ....
0 A et N on
Pee OD • A 0 0
. krk . ;.... .
A A
100 • .NO
aft •NON
a ,.
.....
rfN
i.
..,
en
....
V•rl
N
III
a * en en etri .6
0 in • 40 0 A
,
...$ 0 A • Pee A A . ;
...
en e•
,.);,' : ''. n' A
0 . • A A IV
VI . N en
0 IA • A A 44
IIIIMMP
■
0 . • N . 0
■
A MI • . 44 I*
A N • 0 A A
AA •MAN
c r
1
( SLAB
. .
1
. A .
A
4 A
. S
c
6.1 kZ 3 3 Wm
i 3
i a ; a 7-
3 .r. r. ;
II !E' ZI 1
1 3 ..AJ
3
PROGRESSCHART
X X
g
3 k
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.
209.1
198.9
200.00
187.6
174.8
160.1
150.00
143.9
Amount In Crs.
123.2
103.4 106.6
100.00
92.8
84.8
68.5
64.0
51.9
50.00
40.5
36.7
22.6 26.1
15.4
9.3
9.1
2.7
Planned Cumulative work (Cr) Actual CumulativeWork Done (Cr)
0.0 0.0 0.6 3.6
0.00 0.0 0.0 0.0 0.1
Months Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19
Months Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19
Planned Value of work (Cr) 0.00 0.56 2.12 6.60 13.32 14.06 15.28 16.58 16.24 18.65 19.82 20.63 16.27 14.63 12.88 11.22 10.19 1.15
Planned Cumulative work (Cr) 0.00 0.56 2.68 9.28 22.60 36.66 51.94 68.52 84.77 103.41 123.23 143.87 160.14 174.77 187.64 198.87 209.06 210.21
Actual Work Done (Cr) 0.00 0.00 0.11 3.55 5.54 6.32 10.67 14.41 23.46 28.82 13.81
Actual CumulativeWork Done (Cr) 0.00 0.00 0.11 3.55 9.09 15.41 26.08 40.49 63.95 92.77 106.58
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.
Organisation Chart
Mr. ASHISH
KATARIYA
Project Director
Mr.John Victor
Mr. Mahesh Borse
Sr. Project
Project Manager
Manager
Yet to be
Mr.Diptesh Borse Appointed
Sr.Engineer Jr. Officer
G.Soni Mr.Mouli L.Jaykumar
Mr.Chetan Patil Mr. Nitin Mr. Deepak Shinde Mr. K V Raju Chandra
Mr.Gajanan Mr.Shah Accountant Store Head
Safety Officer Nandanwar QA/QC Manager P & M Dept
kharat Mr.Datta Pawar Head Manager
Mr. Swapnil Mr. Nirvani Asst Liasoning Contract Head
Sr.Surveyor Mr.Ramanji Mr. Britto Mr. Pranab Sana Mr. Bawin Mr.Amol Patil Mr. Balaji M
Hole Jr.Engineer Mr.Lavkesh Mrs.Asmita
Sr. Engineer Sr. Engineer Jr. Engineer Jr.Engineer Jr.Engineer Sr. Engineer Mr. K.Vishnu Mr.Sandip Nakashe
Jr. Engineer Mahajan Kasbe
Mr.Shaikh Mr.Naiem Ansari Deputy Manager Store Officer
Yet tobe Mr. Rupesh Jr Accountant Officer
Mr. Navnit Jadhav Malik Sr QC Engineer
Mr. Govind Appointed Badgujar
Sr.Surveyor Mr. Sabin Jr.Safety Officer Sr.Engineer
Biradar Mr. Raju Correspondence off.
Samrat Adhikary Jr.Engineer
Supervisor Supervisor Mr.Chandrakant
Engineer Mr Prashant
Mr.Shah Mr.Shinde Mr.Abhijeet Sr Foreman Datta Pawar
Sathe
Deputy. PM Deputy. PM Hawaldar Mr.Motibur Mr. D.R.Yadav Store Keeper
Mr. Noor Md. Officer
Jr.Engineer Rehman Sr.Lab
Mr.Choto Singh Jr.Engineer Lab Technician Mr.Kalpesh
Mr.Ravi Mude Technician
Chavan Mr.Gaurav Rai Mr.Kamal Singh Mr.Vinay Choudhary
Surveyor Jr. Engineer Mr.Ravindra Jagtap Mr.Giribabu Jr Engg
Surveyor Jr. Engineer Jr.Engineer
Sr. Engg Sr. Engg Mr.Vinay
Jr.Engineer
Lab Lab Lab Lab Mr.Asman
Mr. Asst. Asst. Asst. Asst. Supervisor
Amol D Patil Nitin Bhoi Mr. Zameel
Mr.Jebin Singh Akhtar Mr.Shankar Venkatasan
Supervisor Supervisor Jr. Engg
Sr. Engg Sr. Engineer Jr. Engineer
12.1 Manpower
STAFF
Sr. Surveyor/ Lab Tech./
Type of Work
No. Engineers Sup./HR/Store/P&M/Purchase Total
Accounts
Road &
A 39 92 131
Structure works
Total 39 92 131
Sr. LABOUR
Type of Work
No. Skilled Un-Skilled Total
Store Dept.
24 Datta Dept. Head
25 Raju Store Keeper
Survey Dept.
GajananKharat Sr. Surveyor
26 , NavnitJadhav Sr. Surveyor
Purchase Dept.
27 Mauli Dept. Head
28 Prashant Sathe Purchase Officer
L Plant & Machinery Dept.
29 K.V. Raju P&M Dept. Head
Account Dept.
30 SoniRaju Dept. Head
4I
a.
-MP
sr
10,
il
lit The delay in providing minimum ROW as per Contract Provision is
leading to delay in initiating construction/pre-construction activities
1 Delay in Providing ROW
causing delay in commencement of works in these stretches.
lit
Decision on Realignment Alignment Length = 2.335 Km as per sch. A and
1.01 Km as per Authority Decision is still not received, delaying the project
completion.
1 There was delay in issuing tree cutting permission from respective forest
department and municipal council, which has severely affected work
1 progress. The details of the same are mentioned separately in section
1.2.1.
1
Tree felling work is in progress and till date 918 nos. trees are cut out of
i 5 Tree Cutting 1421 nos.
Contractor vide letter dated 15.01.2019, informed authority that as per the
tree cutting permission dated received from RFO Pachora forwarded by
EE,NH Dhule, the trees on LHS of existing Major Bridge at Km. 57+088 are
considered for valuation and accordingly the same is permitted by RFO
Pachora for cutting. However, as per the approved alignment, the
reconstruction of Major Bridge is proposed on RI-IS of existing Major
1 Bridge.
dir
MP
eV
}1,
11,
Ashoka Buildcon Limited Page 46
Project: Up-gradation of Bhadgaon1Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.
Approvals of estimates for utility shifting were received after continuous
follow up by Contractor. The details of the same are mentioned separately
in section 1.3.
II. Length obstructed due to presence of water utilities i.e. [Water Supply
line] - 9.880 Km.
RO Mumbai granted approval to MJP/ZP Costs Estimates of Bhadgaon &
Chalisgaon MJP/ZP for an amount Rs. 1,97,87,311/- on 08.02.2019
received on 28.02.2019 by EENH Dhule office. Work Order is issued by
EENH Dhule on 11.03.2019 for taking up Shifting of Water supply Lines
received by Contractor on 01.04.2019. Till 30.04.2019 60 % shifting is
completed.
The delay in approval from respective utility owning agency has resulted
in delay for initiating construction/pre-construction activities in these
The delay in issuing permission for shifting of existing street light within
ROW in Bhadgaon Municipal Council has delayed the highway works at
the mentioned location.
Existence of street light
poles within ROW in Contractor vide letter under dated 08.04.2019, has requested Bhadgaon
8 Bhadgaon Municipal Municipal Council to direct concerned department to shift the street light
council from Ch. 61+315 poles infringing with highway works from Ch. 61+315 to Ch. 61+470.
to Ch. 61+470
Further instructions in this regard are awaited from utility owning agency
and Authority
Contractor vide letters 132 dated 25.08.2018, 241 dated 24.10.2018, 301
dated 05.12.2018, submitted Change of Scope proposals for various
additional works as instructed by the Authority. Inspite of passage of 9
months since the first Change of Scope proposal submission none of the
proposal is approved till date.
During project site inspection of the Chief Engineer, NH (PVV), Navi
Mumbai dated 02.01.2019, additional works have been suggested and it
was instructed to consider the same under Change of Scope.
1 Further CENH Mumbai, during project review meeting convened on
22.01.2019 at Navi Mumbai instructed Contractor to submit consolidated
proposal in respect to Change of Scope adding all the additional works in
the earlier submitted Change of Scope proposals.
Accordingly, Contractor submitted Comprehensive & Consolidated
9 Delay in Approval of proposal on 05.03.2019 to the Authority's Engineer for review and
Change of Scope recommendation. During site visit dated 29.03.2019, Authority and
Authority Engineer verified site requirements and further suggested
modifications in the submitted COS proposal.
Contractor submitted Consolidated COS proposal vide letter dated
03.04.2019 incorporating the modifications suggested during visit dated
29.03.2019. Further EE, NH Dhule convened meeting on 24.04.2019 and
25.04.2019 to review the same and again suggested modifications in the
recommendation of COS proposal. Accordingly Contractor once again
I submitted the modified Consolidated COS proposal on 26.04.2019 and the
same has been reviewed and recommended by AE to Authority for
approval vide letter dated 02.05.2019
Since, COS Notice as per agreement is not issued; it is further leading to
accumulated delay in commencement of the additional works thereby
causing obstructions and non-availability of work fronts.
411
➢ Work Stopped in the month of August 2018 by as per following Force Majeure
issue-
1. Force Majeure Event Road Blockade (Bandh) in Maharashtra state on 09-08-
18 called by Maratha KrantiSangharsh Association.
2. Force Majeure Event strike called by state employees of union from 07th
August to 9th August 2018.
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NI1-753) From Ch. 56+200Km to 103+000Km Two/Four lane with Paved
Shoulder in the state of Maharashtra on EPC Mode.
Sr.
Type Description Location @ KM Unit EPC Contractor Submission
No.
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to 103+000Km Two/Four lane with Paved
Shoulder in the state of Maharashtra on EPC Mode.
Box Culvert
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to 103+000Km Two/Four lane with Paved
Shoulder in the state of Maharashtra on EPC Mode.
96+300 97+400
99+300 100+100
Page 59
Ashoka Buildcon Limited
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.
lir
*Pt
4IP
Tree Watering work at Ch. 74+500 RHS.
vp
•
•
•
•
•
•
•
• 16. TRAFFIC MANAGEMENT STEPS
•
•
•
•
•
•
•
•
•
•
•
•
•
S Ashoka Buildcon Limited Page 62
I
i
11,
Mr
-OW
lor
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.
•
Ashoka Buildcon Limited Page 69
J
11.
AP,
-AP
18. ANNEXURE
E. Progress Photographs.
G. Weather Report.
I. Mobilization status.
K. Drawing Register.
Annexure - A
LIST OF AVAILABLE PLANT AND MACHINERY
11.
air
Annexure -B
LIST OF LABORATORY AND FIELD TEST EQUIPMENT
I 1
a
Electronic Weighing Machine
10/15 kg-Capacity, Accuracy-0.5kg 1 1
b 30 kg-Capacity, Accuracy-lkg 2 1
c 50/60 kg-Capacity, Accuracy-5kg 1 1
d 150 kg-Capacity, Accuracy-10kg 1 1
e 500gm -Capacity, Accuracy-0.01gm 2 1
2 Hot Air oven Machine 2 1
3 ElectHot plate 200mm dia 2 2
4 Enamel trays 450mm*300*40mm 4 4
5 Enamel trays 300mm*250*40mm 4 4
6 Circular Enamel traye 200mm dia 4 4
7 GI Sampling trays 500mm*500*50 4 4
8 GI Sampling trays 1 mtr*1 mtr*100 4 4
9 GI Sampling trays 600mm*500min*50 4 4
10 Rain gauge Cylinder (500 ml) 1 1
11 Digital Thermo Hygrometer mixmum- minimum 1 1
•ff,
12 Liquid limit device (Casagrande grooving tools) 1 1
13 Soil Cone penetrometer for Liquid limit test 1 1
14 Sand pouring cylinder 100mm dia &trays 2 2
et,
15 Sand pouring cylinder 150mm dia &trays 2 2
4' 16 Sand pouring cylinder 200mm dia &trays 2 2
17 Standard Ennore sand 25kg Grade-I 2 2
18 Standard Ennore sand 25kg Grade-II 2 2
19 Standard Ennore sand 25 kg Grade-Ill . 2 2
20 Speedy moisture meter (0-25%) 5 5
21 Aluminium sampling Tins with lid. 55mm*35mm 100 50
22 SG bottel 50 ml 6 1
23 SG bottel 100 ml 6 1
24 Vicat Needle apparatue full Set 1 1
25 Concrete Cube mould 150mm*150mm*150mm 100 100
26 Flakiness Index(Thickness) Elongation (Length) 1 1
27 Aggregate Impact Value Test full set 1 1
28 Slum cone test apparatus. 5 2
r 29 Pycnometer 1000 ml 6 2
kr 30 0.5 CFT Cylinder for density of Aggregate 1 1
31 Soundness testing Apparatus. 2 2
rip 32 Meter straight edge for surface measuring wedge. 1 1
I Sr. No.
V
Name of Equipment
Required
Quantity
Available
Qty.
Location of
Established
Remarks
Annexure -C
11,
Sr. no. Item Description Quantity
1 Total Station 02
2 Auto Level 08
U.
Annexure - D
List of Encumbrances as on 30thApri12019
As per enclosed Annexure
Wadgaon Bk.
1 66+535 Mahadev RIIS 11.50 15.00 Bhadgaon 3.50 3.00 RCC 2 X 2
(Kotali)
32 77+795 Munjoba LHS 6.50 15.00 Kajgaon Bhadgaon 3.00 3.60 RCC 2.6X 3
78+055 Firasti Mata RIIS 12.45 15.00 Kajgaon Bhadgaon 1.10 1.10 RCC
4 79+300 Munjoba LIIS 14.30 15.00 Bhortek Bk Chalisgaon 1.50 1.80 RCC
7 5 82+560 Munjoba RHS 10.60 15.00 Hingone Sim Chalisgaon 3.40 3.60 RCC 3.4 X 3.4
6 82+790 Veer BaBa Mandir LHS 11.35 15.00 Hingone Sim Chalisgaon 5.00 3.80 RCC 2.0 X 2.0
ir
7 93+990 Jay Bhavani LHS 6.80 12.00 Ozar Chalisgaon 1.00 1.40 RCC
IV
8 94+010 Maruti LHS 4.50 12.00 Ozar Chalisgaon 1.60 2.50 RCC
9 94+015 Munjoba RHS 10.30 12.00 Ozar Chalisgaon 3.00 3.00 RCC 2.0 X 2.0
ir
10 97+290 Dutta Mandir Otta RHS 8.50 11.00 Chalisgaon Chalisgaon 2.30 1.70 RCC
r
E1 102+015 Devi RHS 8.10 15.00 Khadki Bk Chalisgaon 1.10 1.10 RCC
2 102+865 Munjoba LHS 12.60 15.00 Khadki B k. Chalisgaon 1.00 1.00 RCC
3 102+946 Satvayichi Devi RHS 8.40 15.00 Khadki Bk. Chalisgaon 9.30 10.90 RCC 2.3 X 2.3
l ir'
VII
PP'
IP,
*SP
Name of Work.: Upgradation of Bhadgaon - Chalisgaon (Pkg-II) of NH 753J from Km 56+200 to Km 103+000 (46.800 Km) to Two / Four Lane configuration of Jalgaon Bhadgaon
Chalisgaon Nandgaon Manmad- NH-753 J in State of Maharashtra on EPC mode under NH (0).
Existing Chainage
Length
Illgr. Name of (Km) EROW Offset from House / Buiding / Well / Gate / Farm
A ffecte d, Side Na of the Encroacher Structure No.
No. Village (m) ECL (m) / Boundary Wall
From To (m)
MP
1 Bhadgaon 59.015 59.050 35.000 LHS 15.00 1300 MS. Gate & Boundry Wall Satyam Tiles L-01
ler Bhadgaon 59.095 59.215 120.000 LHS 15.00 14.40 Wire Fencing With MS. Gate Sanjay Jai Singh Pardesi 1-02
Bhadgaon 61200 61.205 5.000 LHS 12.00 9.80 Shop (Sainath Auto Part) Sanjay Simpi L-09
Bhadgaon 61.205 61.210 5.000 LHS 12.00 10.00 Shed (Ganesh Auto Part) Bharat Patil L-10
11 Bhadgaon 61.370 61375 5.000 LHS 12.00 10.00 Shop (Taj lyush Centre) Taj Jyuce Centre L-11
2 Bhadgaon 61530 61.535 5.000 INS 12.00 9.60 Shed (Tyre Puncher Shop) Aspak Shaikh L-12
3 Bhadgaon 61.945 61.946 1.000 INS 12.00 10.50 Compound Wall Bhagya Lakshml L-I3
14 Bhadgaon 61.935 61.940 5.000 LHS 12.00 9.00 Plinth Work Praveen Pahl L-I4
62.810 62.900 90.000 Wire Fencing & M.S. Gate With Concret
Bhadgaon INS 15.00 12.30 Taluka Krishl Adhikari Bhadgaon L-15
Pilor
Wire Fencing & MS Gate with Concret
16 Bhadgaon 64.100 64.145 45.000 LHS 15.00 9.60 Sachin Patil L-16
Plior
7 Kotli 66.740 66.750 10.000 LIIS 15.00 9.80 Shed Bhau Shaheb Dagdu Patil L-17
9 Kotli 66.720 66.728 8.000 LIIS 15.00 12.60 Shed Bhau Shaheb Dagdu Patil L-18
19 Kodl 66.703 66.715 12.000 IBS 15.00 14.70 Shed with Iron Angle Bhau Shaheb Dagdu Patil L-19
Kotli 67.145 67.147 2.000 LHS 15.00 13.20 Water Tank Uttam Girdhar Patil L-20
11117,1 Nagar Devla 69.4.40 69.445 5.000 LHS 30.00 23.30 Tin House Suresh Balare L-21
7 2
3
Nagar Devla
Nagar Devla
69.455
69.450
69.457
69.460
2.000
10.000
LHS
INS
30.00
30.00
24.50
27.00
Toilet Block
House
Dagdu Dhana Bhalerao
L-23
Nagar Devla
69.475
69.552
69.485
69.566
10.000
14.000
LIIS
INS
30.00
30.00
2650
29.00
House & Toilet Block
Balmik Sonwane
L-24
L-25
Nagar Devla 70.160 70.167 7.000 MS 30.00 9.90 Bus Stop Govt. 1-26
27 Nagar Devla 70.495 70.515 20.000 INS 30.00 30.00 Toll Building & Toilet Block Toll Plaza Office L-27
H ol Fah 71.238 71.245 7.000 LHS 15.00 12.40 Bus Stop Govt. L-28
n Nimbhora 71.445 71.465 20.000 LHS 15.00 13.10 House & Shed Dilip Pandarkar L-29
111110 Pasardi 73253 73254 1.000 LHS 15.00 1230 Wa ter Vo lye Govt L-30
1 Pasardi 73.430 73.435 5.000 LIIS 15.00 13.60 Water Tank & Well Chandu Tukaram Patil L-31
IIIP
32 Pasardi 73.685 73.705 20.000 LHS 15.00 14.60 Shed & Wire Fencing Jagarnath Jawru Chaure L-32
3 Pasardi 73.750 73.770 20.000 LHS 15.00 13.60 Temp. Shed Jagarnath Jawru Chaure L-33
34 Pasardi 73.885 73.894 9.000 INS 15.00 8.60 Temp. Shed Sanjay Patil L-34
5 Pasardi 73.907 73.912 5.000 LHS 15.00 8.60 Tin Shed Boju Jagarnath Pahl L-35
5 Pasardi 73.923 73.930 7.000 LHS 15.00 12.60 Tin Shed Kailash Shivaji Koli L-36
77 Pasardi 73.965 73.975 10.000 LHS 15.00 10.50 Bus Stop Govt L-37
1
riga Pasardi 73.975 73.980 5.000 INS 15.00 7.00 Balmik Tryambak Koh (Swab
Shop L-38
Coldri n ItS)
1 9 Pasardi 73.985 73.995 10.000 INS 15.00 7.20 Tyre Puncher Shop Gyaneshwar Mahadu Patil L-39
,
40 Pasardi 74.010 74.020 Eknath Ashok Ahire ( Shivam
10.000 LHS 15.00 9.90 Ottha & Shop L-40
Welding)
Pasardi 74.040 74.045 5.000 LHS 15.00 11.00 Water Tank & Wire Fencing Nimba liasrat Patil L-41
41Pri
42 Pasardi 74.151 74260 109.000 LHS 15.00 14.60 Ajay Rameshwar Goyal (Matoshri
Boundry Wall & MS. Gate L-42
lining & Pressing Factorv)
X43 Pasardi 74.152 74.158 6.000 LHS 15.00 12.50 Ajay Rameshwar Goyal (Matoshri
Water Tank L-43
lining & Pressing Factory)
4 Pasardi 74.158 74.170 12.000 LHS 15.00 9.70 Ajay Rameshwar Goya! (Matoshri
Tin House 1-44
illir lining & Pressing Factory)
45 Pasardi 75.179 75.182 3.000 LHS 15.00 1420 Water Tank L-45
.6 Kajgaon 76.825 76.830 5.000 LHS 12.00 9.80 Shop with Shuter L-46
47 Kajgaon 76.843 76.846 3.000 LHS 12.00 6.40 Plinth Work L-47
iiir8 Kajgaon 76.855 76.863 8.000 LHS Rao Saheb Ananda Mahajan (Sam
12.00 10.20 Wire Fencing With MS. Gate L-48
Sawita Traders
[-Sr. Name of
Kajgaon
Existing Chainage
76.863
(Km)
76.870
Length
Affected,
7.000
Side
LHS
EROW
12.00
Offset from House / Bulding / Well / Gate / Farm
11.20 Shop
Name of the Encroacher
Bharat Vasant Mistry (Bharat Auto
Structure No.
L-49
749
Garaz1
0 Kajgaon 77.110 77.115 5.000 LIIS 12.00 11.70 Shed Manoj Traders L-50
7 54
5
Kajgaon
Kajgaon
77.170
77.180
77.172
77.185
2.000
5.000
LOS
LHS
12.00
12.00
9.70
10.00
Iron Stair
L-S5
7
56 Kajgaon 77.198 77.203 5.000 LOS 12.00 9.70 Shop Dinesh Bhol (Sal Foot wear) L-56
Kajgaon 77.38 77.383 3.000 LOS 12.00 11.1 Shed & Angle Laxmi Auto Garaz L-60
7 Kajgaon 77.475 77.480 5.000 LHS 12.00 8.60 Shed Washlm Shaikhj Maniyar L-61
7 2
3
Bortek
Bortek
78.185
78.200
78.190
78.220
5.000
20.000
LHS
LHS
15.00
15.00
10.80
14.50
Tyre Shop
Garaz Shed
Bhusan Mahajan
Rajendra Koh
L-62
L-63
7 6.4 Bortek 78.220 78.225 5.000 LHS 15.00 12.60 Shop & Shed Rajendra Koh L-64
rIllt5 Bortek 78.230 78.235 5.000 LHS 15.00 13.80 Auto Part Shop Rajendra Ko h L-65
Bortek 78.240 78.260 20.000 LIIS 15.00 13.60 Wire Fencing Mahajan L-66
7 7
8
Bortek
Bortek
78.270
78.305
78.295
78.315
25.000
10.000
LOS
LOS
15.00
15.00
11.60
12.20
Shree Niwas Raswanti & Restorent
L-68
7 69 Bortek 78.582 78.589 7.000 LFIS 15.00 10.50 Bus Stop Govt. 1-69
70 Tandewadi 79.465 79.480 15.000 LHS 15.00 7.20 Shed Ananda Kautik Patil (Raswanti) L-70
Tandewadl 79.620 79.640 20.000 LHS Mau Saheb Pandit Paul (Shriram
'1 15.00 8.20 Shed (Nursary) L-71
lursarvl
[72 Tandewadi 79.660 79.695 35.000 LOS 15.00 9.60 Wire Fencing, MS Gate & House Pramod Lalwanl L-72
tor 3 Tandewadl 79.690 79.693 3.000 LIIS 15.00 8.60 Water Tank Pramod Lalwanl L-73
I 74 Tandewadi 80.200 80.220 20.000 LHS 15.00 9.20 Shed & Shop L-74
75 Hingone Kh. 81.440 81.455 15.000 LfiS 15,00 12.00 Shed Waman Aatmaram L-75
"6 Hingone Kh. 81.462 81.464 2.000 LNS 15.00 6.40 Water Tank Waman Aatmaram L-76
7 7 Hingone Kh. 81.792 81.795 3.000 1115 15.00 11.60 Water Tank Dilip Chauhan L-77
r.113 Hingone Kh. 81.795 81.800 5.000 LHS 15.00 14.20 Well Dilip Chauhan L-78
ma Hingone Kh. 81.810 81.820 10.000 LHS 15 10.3 Shed Dilip Chauhan L-79
7 80
1
ilingone Kh.
Hingone Kh.
82.120
82.140
82.130
82.150
10.000
10.000
LOS
LOS
15.00
15.00
14.70
13.20
Shed & Chain Fencing
L-81
7 82 flingone Kh. 82.170 82.190 20.000 LOS 15.00 12.00 Toilet Block Govt. L-82
r 3 Hingone Kh.
Hingone Kh.
82.350
82.765
82.365
82.767
15.000
2.000
LOS
LIIS
15.00
15.00
9.20
8.00
Shed
Water Tank
Nana Chauhan
Rohidas Borse
L-83
L-84
7 85 flingone Kh.
Hingone Kh.
82.765
82.790
82.775
82.805
10.000
15.000
LHS
LtiS
15.00
15.00
13.50
13.20
Shed
L-86 •
87 Hingone Kh. 82.912 82.930 18.000 LIIS 15.00 8.30 Shed Gurukrlpa Ftswanti L-87
7 88
9
Waghli
Waghli
83.610
85.300
83.620
85.303
10.000
3.000
LOS
LHS
15.00
12.00
14.50
9.80
Hotel Shed
Tin Shop
Amit Borse (Niyat Dhawa) L-88
L-89
7 90 Waghli 85.420 85.425 5.000 LOS 12.00 720 Shop Nana Shinde (Shivam Parlor) 1-90
41.01 Waghli 85.425 85.430 5.000 LOS 12.00 7.10 Tea Shop Ana Chaudhary L-91
I 92 Waghli 85.430 85.435 5.000 LIIS 12.00 6.00 Tea Shop Shaiklal Bhal L-92
1 93
`4
Waghli
Waghli
85.440
85.455
85.455
85.460
15.000
5.000
LHS
LOS
12.00
12.00
7.10
6.00
Bus Stop
Dhawa
Govt
Satish Chaudhary
L-93
L-94
76 Waghll 85.470 85.480 10.000 LIIS 12.00 9.80 Hotel Suresh Fakira Kevat L-96
7 97 Ojhar 93.070 93.075 5.000 LOS 15.00 11.00 MS. Gate With Concret Nor Farms House L-97
98 Ojhar 93.475 93.486 11.000 LOS 12.00 11.60 Ottha & Entry Space Umang Developers L-98
7 Ojhar 93.625 93.630 5.000 LOS 12.00 11.00 Compound Wall & MS. Gate Shivali Patil L-99
riliV
1 00 Ojhar 93.660 93.665 5.000 LHS 12.00 9.00 Compound Wall Yubraj Gujjar L-100
Existing Chalnage
Length
Sr. Name of (Km) EROW Offset from House / Buiding / Well / Gate / Farm
1
101 Ojhar 93.665 93.670 5.000 LHS 12.00 9.00 Wire Fencing Prahalad Pitambar Patil L-101
"02 Ojhar 93.670 93.675 5.000 LHS 12.00 1030 Shed Suresh Patil 1.102
IIP103
ip 04
Ojhar
Ojhar
93.775
93.980
93.790
93.985
15.000
5.000
LHS
LHS
12.00
12.00
9.70
8.00
Wire Fencing
L-I04
105 Ojhar 94.020 94.025 5.000 LHS 12.00 8.10 Shop Prakash Sitaram Patil L-105
7 06
07
Ojhar
Ojhar
94.025
94.040
94.030
94.045
5.000
5.000
LHS
LHS
12.00
12.00
10.00
730
Boundry Wall & M.S.Gate
L-107
71
lipt09
08 Ojhar
Ojhar
94.065
94.070
94.070
94.075
5.000
5.000
LHS
LHS
12.00
12.00
9.00
11.00
Shop with Shed
L-109
110 Ojhar 94.090 94.095 5.000 LHS 12.00 11.00 Stair Bhika Mahadu Patil L-110
7
,
1
12
Ojhar
Ojhar
94.095
94.105
94.100
94.110
5.000
5.000
LHS
LHS
12.00
12.00
8.00
9.20
Shop
Shop
K.B. Path
L-112
7 13 Ojhar 94.110 94.115 5.000 LHS 12.00 11.80 Stair Pandurang Patil L-113
7
14 Ojhar 94.150 94.155 5.000 LHS 15.00 10.70 Electrichal Shop Electrichal Shop 1.114
15 Ojhar 94.155 94.160 5.000 LHS 15.00 10.70 Shop Vinod Thakre L-115
7 16
poi7
Ojhar
Ojhar
94.160
94.165
94.165
94.170
5.000
5.000
INS
LISS
15.00
15.00
10.90
11.00
Gen. Store
Shop
Sakaram Totaram Gujjar
L-117
118 Ojhar 94.170 94.18 10.000 LHS 15.00 12.50 Stair & Shed Bapu SitaPatil L-118
7 19
'20
Ojhar
Ojhar
94.190
94.200
94200
94210
10.000
10.000
LHS
LHS
15.00
15.00
13.80
12.80
House Wall & Shed
L-120
121 Ojhar 94.210 94220 10.000 LIIS 15.00 11.40 Boundry Wall & Open Space with tiles Bhimrao Kandu Gujjar L-121
fo,22 Ojhar 94.22 94.225 5.000 LHS 15.00 10.60 Boundry Wall & Stair L-122
7
I 123 Ojhar 94.350 94.355 5.000 LHS 15.00 14.60 Toilet + Boundry Wall + Fencing More L-123
7 24
25
Ojhar
Ojhar
94.370
94.375
94.375
94.380
5.000
5.000
LI'S
LHS
15.00
15.00
12.80
14.50
Shop
L-125
7 26
rio.27
Ojhar
Ojhar
94385
94.404
94.390
94.413
5.000
9.000
LHS
LHS
15.00
15.00
13.10
1130
Shop
Shop
Gangabai Rameshwar Golayat
Eshwar Ahire
1.126
L-127
128 Ojhar 94.420 94.425 5.000 LIIS 15.00 11.00 Chain Fencing & MS. Gate Sahebrao Golayat L-128
729 Ojhar 94.425 94.430 5.000 LIIS 15.00 820 Gangaram Pandit Borne (Ja i
Pan Shop & Shed L-129
rnitinri TP2 11ricel
30 Ojhar 94445 94.450 5.000 LI'S 15.00 14.40 Stair Pitambar Uttam Gujjar L-130
72131 Ojhar
Ojhar
94.450
94.645
94.455
94.647
5.000
2.000
EMS
LHS
15.00 1130 Toilet Block & foundry Wall Dada Ringa Deore L-131
73
15.00 10.60 Shop (Chicken) Prakash Patil L-132
'3 Ojhar 94.650 94.652 2.000 LHS 15.00 8.60 Pan Shop Nimba More L-133
7 34 Ojhar 94.665 94.670 5.000 LIB 15.00 11.30 Shop (Hair Cutting) L-134
Takli 94.702 94.715 13.000 LHS 15.00 12.50 Building fax Show Room L-135
136
5 Takli 94.720 94.730 10.000 LHS 15.00 1230 Shed & M.S. Gate with MS. Boundry Hemp Patil L-I36
7 37
38
TakIl
Takli
94.735
95295
94.780
95.300
. 45.000
5.000
LIIS
LHS
15.00
12.00
13.00
10.90
Boundry Wall & MS, Gate
Tailor Shop
jalaram Industry
Santosh Gujjar
L-137
L-138
139 Takli 95315 95.325 10.000 1.115 12.00 10.50 Shop Girdhar Colayat L-139
Takli 95325 95.330 5.000 LIIS 12.00 11.50 Grampanchayat (Jai Bhawani
Entrance Gate L-140
Mite, 1141nriall
141 Takil 95350 95.355 5.000 LHS 15.00 &90 Ottha & Parking Space Dinesh Patil L-14I
7 42
53
Takli
Takli
95360
95360
95.365
95.365
5.000
5.000
Ills
L115
15.00
15.00
12.40
12.40
Ottha & Parking Space
L-I43
7 44
5
Takli
Takli
95365
94375
95.370
95.370
5.000
95.375
LIIS
LHS
15.00
15.00
12.70 Stair & Ottha & Partly RCC Roof Madhukar Mohan Pawar L-144
7
13.10 Stair +Boundry Wall • Partly RCC Roof Dharmadeolal Pawar 1-145
46 Takli 94375 95.375 95380 INS 15.00 Stair + Bound ry Wall + Toilet Block +
1430 Nimba Shawan Pawar 1-146
Plrtiv RCC Rnnf
77 Takli 95380 95.385 5.000 LIIS 15.00 12.60 Asha Mahajan ( Pri ya Beauti
Building L-147
Parlarl
Mr58 Takli 95390 95.395 5.000 LIIS 15.00 12.60 Stair with Concret Pilor Mukund Dagdu Mall L-148
149 Takli 95395 95.400 5.000 LHS 15.00 12.00 Sanjay Vitthal Mall ( Varsha Pico
Shop 1-149
Faun
erso Takli 95.400 95.405 5.000 INS 15.00 12.40 Partly Rcc Roof with Concret Pilor Sudam Ramdas Sapkale L-I50
'51 Takil 95.405 95.410 5.000 INS 15.00 12.10 Shop & Partly Rcc Roof Karwarl Chintaman Mahajan L-151
NW
152 Takli 95.410 95.415 5.000 LHS 15.00 13.50 Stair & Galary Bapu Vish ram Mali L-152
[ExistingChalnage Length
Sr. Name of (Km) EROW Offset from House / Bulding / Well / Gate / Farm
Affected, Side . - W , . .- . .. .. Name of the Encroacher Structure No.
TU Takli 95.415 95.420 5.000 LIB 15.00 14.10 Boundry Wall + Ottha & Parking Space Jlbhau Vishram Mahajan 1-153
;4 Takli 95.420 95.425 5.000 LHS 15.00 14.60 Ottha & Parking Space Sahebrao Vishram Mahajan L-154
IP
1S5 Takli 95.425 95.430 5.000 LHS 15.00 1330 Toilet Block & Gate Vijay Mahajan L-155
I
6 TakIl 95.430 95.435 5.000 LHS 15.00 9.60 Boundry Wall & M.S. Gate Dipak Mahajan L-156
S7 TakIl 95.435 95.445 10.000 IRS 15.00 11.00 Shop & Shed Bapu Punju Gujjar L-157
158 Takli 95.450 95.455 5.000 LHS 15.00 13.50 Shop Balmiki Chauhan L-I58
9 Takli 95.455 95.460 5.000 LHS 15.00 11.60 Shop Vijay Pandharynath Gujjar L-159
760 Takli 95.460 95.465 5.000 LHS 15.00 14.30 Building Sambhaji Gangaram Mahajan L-160
61 Takli 95.465 95.470 5.000 LHS 15.00 12.80 Building jijabhai Shivdas Marathe 1-161
S2 Takli 95.470 95.480 10.000 LHS 15.00 12.60 Ottha & Partly Rcc Roof Dattu Singh Ramsingh Pardes1 L-162
163 'Faith 95.480 95.485 5.000 IRS 15.00 13.40 Shop Mahajan Bandhu L-I63
Takli 95.485 95.490 5.000 LHS 15.00 1320 Shed jagarnath Mahajan L-164
165 Takli 95.490 95.495 5.000 IRS 15.00 12.00 Boundry Wall & M.S. Gate Rajendra Nimba Mali 1.165
NI
166 Takli 95.495 95500 5.000 LHS 15.00 13.30 Stair & Partly Rcc Roof Nitin Suresh Mahajan 1-166
"0 Takh 95.500 95.502 2.000 LHS 15.00 9.60 Shop Rohidas Abhimanyu Mahajan L-167
IRS
15.00 13.90 Stair & Galary jagarnath Dhondu Mahajan L-168
7
9 Takli 95.507 95.510 3.000 15.00 11.40 Shop & Shed Jagarnath Dhondu Mahajan L-169
70 TAO 95.510 95515 5.000 LHS 15.00 10.90 Shed Jagarnath Dhondu Mahajan L-170
7 71
2Takli
Takli 95.515
95.520
95520
95540
5.000
20.000
MS
LHS
15.00
15 00
12.70
9.60
Boundry Wall & MS Gate
L-172
7173 Takli 95.540 95.545 5.000 LHS 15.00 13.60 Shop Sadguru Transport L-173
Takli 95.575 95.595 20.000 LHS 15.00 12.30 Boundry Wall & MS Gate L-174
ri
: TAO 95.595 95.605 10.000 1.11S 15.00 12.00 Building Amarshanti Hospital 1-175
176 Takh 95.605 95.617 12.000 IRS 15.00 14.00 Building Wall Sinior Saheb L-176
17 Takli 95.626 95.635 9.000 LHS 15.00 12.70 Building Wall Matri Pitri Chhaya L-177
178 TAO 95.635 95.645 10.000 IRS 15.00 10.00 Ottha & Concret Pilor Sawta Service Centre L-178
79 lath 95.645 95.655 10.000 LHS 15.00 11.60 Wire Fencing & MS. Gate Chandra Kiran L-179
30 Tall 95.655 95.658 3.000 LHS 15.00 12.20 Shop Chandra Kiran L-180
1 81
2
Takli
Takli
95.670
95.750
95.685
95.757
15.000
7.000
LHS
IRS
15.00
15.00
12.50
13.40
Building Wall & Shed
L-182
'83 TAM 95.767 10.000 LHS 15.00 10.50 Chaudhary Bandhu ( Hotel
95.757 Shed L-183
Tn,har R, Rnqtnrantl
184 Takli 95.767 95.77 3.000 LIIS MOO 13.20 Hair Cutting Saloon Cut & Corner L-184
Takli 95.770 95.775 5.000 LHS 15.00 13.10 Shop Setkari Agro Agencies L-185
186 Takli 95.775 95.78 5.000 LHS 1500 11.10 MS.Gate Vivek Motiram Chaudhary L-186
1.'87 TAM 95.780 95.785 5.000 L115 15.00 8.70 Fruit Shop Vivek Motiram Chaudhary L-I87
Takli 95.785 95.79 5.000 LHS 15.00 12.00 Hotel Om Sai Vivek Motiram Chaudhary L-188
7 89
0
TAM
Chalisgaon
95.790
95.805
95.795
95.808
5.000
3.000
LIB
IRS
15.00
15.00
13.00
11.00
Shop
Shop
Vivek Motiram Chaudhary
L-190
191 Chalisgaon 95.982 96.02 38.000 IRS 15.00 11.00 MS. Gate With Chain Fecing Purlapatre Lanes L-19I
"r92 Chalisgaon 96.182 96.190 8.000 IRS 15.00 11.40 Boundry Wall School L-192
13 Chalisgaon 96222 96.225 3.000 IRS 15.00 10.20 Shed & Wire Fencing Kumawat L-193
794 Chalisgaon 96.225 96.230 5.000 IRS 15.00 11.30 Popatlal Kashiram
Shed & Shop 1-194
Ktimawatfilarpl Sall
S Chalisgaon 96.270 96.280 10.000 IRS 15.00 12.90 Shed & Otha Swami Samarth
L-I95
Trairlarc
, 96 Chalisgaon 96.585 96.59 5.000 LEIS 11.00 10.10 Toilet Block Government 1-196
197 Chalisgaon 96.850 96.855 5.000 LHS 11.00 9.00 Tea Shop & Shed Vijay Namdeo Chaudary L-197
I 18 Chalisgaon 96.855 96.86 5.000 LHS 11.00 9.00 Shed Sagar Warkhede L-I98
1
Illbo
99 Chalisgaon
Chalisgaon
96.985
96.990
96.99
96.993
5.000
3.000
LHS
LHS
11.00
11.00
9.00
9.70
Fruit Shop
Shop
Vinod Chaudhary
1-200
'01 Chalisgaon 97.022 97.025 3.000 LHS 11.00 10.30 Shop Nikhil Patil L-201
202 Chalisgaon 97.025 97.03 5.000 WS 11.00 10.00 Shop Nikhil Patil(lio Phone) 1-202
IV 3
Chalisgaon 97.070 97.075 5.000 LHS 11.00 9.00 Shed & Shop Pankaj Patil
204 Chalisgaon 97.060 97.09 10.000 LHS 11.00 10.00 Hotel & Shed 1-204
• fle,tnrentl
Existing Chainage Length
Sr. Name of (Km) EROW Offset from House /Binding /Well /Gate /Farm
Affected. Side . . . Name of the Encroacher Structure No.
7 5 Chalisgaon
Challsgaon
97.336
97.342
97342
97.347
6.000
5.000
RIIS
LIIS
11.00
11.00
10.3
10.40
Shed
Nana Kumawat
L-205
1-206
207 Challsgaon 99.370 99.375 5.000 LIIS 12.00 10.20 Shed & Shop Anil Bagh L-207
7 08
99
Chalisgaon
Chalisgaon
99.380
99.464
99.383
99.474
3.000
10.000
1.115
LHS
12.00
12.00
11.70
10.40
Tailer Shop
Shed
Bhaskar Pawar
Nana Gayate
L-208
L-209
7
run
0
1
Chalisgaon
Chalisgaon
99.598
99.690
99.6
99.723
2.000
33.000
LHS
LHS
12.00
12.00
8.00
9.00
Pan Shop
L-211
I 112 Chalisgaon 99.723 99.755 32.000 LHS 12.00 8.80 Wire Fancing With M.S. Gate Arjun Bhai Patel L-212
Shop
Irian Khatik
Irfan Khatik
L-213
L-214
7 215 Khadkl 100.28 100.282 2.000 1.11S 12.00 11.00 Otha Ibrahim Patel L-215
7
16 Khadki 100.35 100.355 5.000 WS 12.00 8.20 Shed Anif Asim Khatik L-216
17 Khadkl 100.355 100.36 5.000 LIIS 12.00 9.00 Shed Munir Yasir Khatik L-217
1 718
re,.19
Khadkl
Khadkl
100.532
101.633
100.54
101.638
8.000
5.000
LHS
LIB
12.00
15.00
8.00
7.60
Ottha
Hotel Sal
Khandesh Mandal
Sachin Marathe
L-218
1-219
I 220 Khadkl 101.64 101.647 7.000 LIIS 15.00 7.50 Hotel Swaraj & Coldrinks Samadhan Mandole 1-220
7 22
1 Khadkl
Khadkl
101.65
101.66
101.66
101.665
10.000
5.000
LHS
LHS
15.00
15.00
7.60
8.70
Shed (Pan Shop)
Shed
Ashok Shinde
Rajendra Shinde
L-221
L-222
7
r.,24
3 Khadkl
Khadki
101.665
101.707
101.67
101.71
5.000
3.000
LHS
LIIS
15.00
15.00
12.00
13.00
Bus Stop
Loundry Shop
Government
Sanjay Chauhan
L-223
L-224
225 Khadki 101.71 101.716 6.000 LHS 15.00 9.80 Pan Shop & Shed Bapu taxman Kadam L-225
7 26
27
Khadki
Khadkl
102.07
102.095
102.085
102.098
15.000
3.000
LHS
LIIS
15.00
15.00
12.80
10.40
Wire Fencing with Concret Pole
Gen. Store
Ambika Hotel
Dattu Gunjal
L-226
L-227
7
rern
228 Khadki
Khadki
102.245
102.385
102.25
102.39
5.000
5.000
LHS
LHS
15.00
12.00
13.20
11.20
Well & Water Tank Appa Dattatre Wanl L-228
'30 Khadkl 102.345 102.35 5.000 LHS 12.00 9.20 Cycle Shop Dilip Samrao jagtap L-230
141 ;31
32
Khadki
Khadki
102.35
102.355
102.355
102.358
5.000
3.000
LHS
LHS
12.00
12.00
6.60
9.00
Tea Shop
L-232
7 233 Khadki 102.37 102.375 5.000 LHS 12.00 9.30 Punam Tea House Satish Pathade 1.233
34 Khadki 102.375 102.38 5.000 LHS 12.00 6.60 Shed Dhyandeo Bhika Kole L-234
7 '35 Khadkl 102.38 102.385 5.000 LHS 12.00 9.00 Toilet Block & House Wall Dhyandeo Bhika Kole L-235
7 38 Khadki 102.425 102.43 5.000 LIIS 12.00 6.90 Shlvsal Samarth Hotel Pundlik Balmik Mandole L-238
7 39
40
Khadkl
Khadki
102.45
102.72
102.46
102.808
10.000
88.000
LIIS
LHS
12.00
15.00
11.80
6.00
Toilet Block
Wire Fencing
Govt.
Dipak Aggarwal
1-239
L-240
Total
2.000
2533
LHS 15.00 11.50 Well Dipak Aggarwal 1-241
filP
Air
Name of Work: Upgradation of Bhadgaon - Chalisgaon (Pkg-II) of NH 753J from Km 56+200 to Km 103+000 (46.800 Km) to Two / Four Lane configuration of jalgaon
Bhadgaon Chalisgaon Nandgaon Manmad- NH-753 J in State of Maharashtra on EPC mode under NH (0).
ir Bhadgaon 57.980 58.140 160.000 RHS 15.00 14.00 Guard Room, M.S. Gate & Bouddry Wall ITI Collage R-01
Rhadgaon 58.145 58.250 105.000 RHS 15.00 14.00 Wire Fencing & MS Gate with concret Pilor Adup Chacha R-02
IIIIP
1 Bhadgaon 58.800 58.860 60.000 RIIS 14.00 12.40 Wire Fencing R-03
IMP
4 Bhadgaon 58.860 58.955 95.000 RHS 14.00 12.40 Boundry Wall R-04
IIIIP Bhadgaon 58.860 58.955 95.000 RHS 14.00 12.50 MS. Gate With Concret Pilor R-04 A
A Bhadgaon 59.138 59.140 2.000 RHS 15.00 11.90 Water Tank (Shri Dada ji Dhawa) jitendra tidal Patil R-05
NIP
7 Bhadgaon 60.130 60.160 30.000 RHS 12.00 11.80 Boundry Wall & M.S. Gate With Concret Pilor Hotel Punam Garden R-06
ilP Bhadgaon 60.400 60.550 150.000 RIB 15.00 13.70 Wire Fencing Muslim Kabristan R-07
^ Bhadgaon 60.550 60.556 6.000 RHS 15.00 14.50 Bus Stop Govt. R-08
411111,-
10 Bhadgaon 60.655 60.685 30.000 RHS 12.00 10.00 Boundry Wall with Fencing Samir Bhai R-09
MP Bhadgaon 60.860 60.870 10.000 RHS 12.00 10.00 Shed with Iron Angle Chandran R-10
" Bhadgaon 60.900 60.910 10.000 RHS 12.00 11.40 Iron Stair & Ottha Chetan josh) R-11
VP
13 Bhadgaon 60.910 60.920 10.000 RHS 12.00 11.30 Shed & Shutter Ramdas Sonawane R-12
' Bhadgaon 60.940 60.945 5.000 RHS 12.00 11.00 Room with Brick Wall Subabai Sonawane- R-13
Bhadgaon 61.060 61.061 1.000 RHS 12.00 6.50 Water Wall Nagar Palika R-14
OP
Gafar Khan (Hindustan
16 Bhadgaon 61.077 61.082 5.000 RHS 12.00 9.00 Shed (Tyre Shop) R-15
Tyre Servicing)
W Bhadgaon 61.130 61.133 3.000 RHS 12.00 10.00 Tin Shop Ejaj Auto R-16
Sanjay Raghunath
Bhadgaon 61.140 61.143 3.000 RHS 12.00 10.50 Haire Cutting Saloon Shop R-17
I. Nerpagare
19 Bhadgaon 61.155 61.158 3.000 RHS 12.00 11.20 'Tin Shop btu Auto Garaze R-18
TN Bhadgaon 61.158 61.163 5.000 RHS 12.00 '11.4 Shop (Gas Welding Shop) Salyyad Mir Gas Welding R-19
Bhadgaon 61.163 61.168 5.000 RHS 12.00 8.40 Shop (Auto Garaze) Nazim Auto Garaze R-20
ler
22 Bhadgaon 61.172 61.175 3.000 RHS 12.00 10.60 Shop Chi rag Cycle Mart R-21
Yf Bhadgaon 61.185 61.187 2.000 RHS 12.00 11.00 Pan Shop Balmik Patil R-22
Bhadgaon 61.200 61.203 3.000 RHS 12.00 10.10 Tin Shop R-23
1111P
25 Bhadgaon 61.205 61.210 5.000 RHS 12.00 9.40 Pan Shop Suresh Valdhya R-24
Yf Bhadgaon 61.230 61.235 5.000 RHS 12.00 8.20 Shop Abari R-25
Bhadgaon 61.240 61.242 2.000 RIIS 12.00 8.20 Pan Shop Prasad Pan Centre R-26
IV
28 Bhadgaon 61.250 61.255 5.000 RHS 12.00 8.70 Shop Sudhakar Auto Garaz R-27
II; Bhadgaon 61.240 61.265 25.000 RHS 12.00 11.70 Boundry Wall Panchayat Samity R-28
MP Bhadgaon 61.388 61.395 7.000 RHS 12.00 10.00 Shed Arun Bagwan (Fruit Shop) R-32
14 Bhagwan Chaudhary
Bhadgaon 61.395 61.400 5.000 RIIS 12.00 11.00 Shed R-33
(Ashish Tea Centre)
II
35 Bhadgaon 61.400 61.405 5.000 RIIS 12.00 11.50 Haire Cutting Saloon Shop Sanjay Sirsan R-34
. Bhadgaon 61.440 61.445 5.000 RIIS 12.00 11.40 Shed Keryana Khurpe R-35
,7
Bhadgaon 61.445 61.450 5.000 8115 12.00 11.40 Shed (Balaji Bikaner Sweets) Kudra Rajpurohlt R-36
11 Bhadgaon 61.580 61.595 15.000 RIIS 12.00 10.00 Ottha * Parking Space Munaf Shaikh R-40
o Kotli 65.505 65.517 12.000 RHS 15.00 13.60 House under Construction Ravindra Paul R-4I
' Kotli 66.517 66.520 3.000 RIIS 15.00 10.80 Water Tank Anita Parve R-42
IP
4 Kotli 66.558 66.577 19.000 RHS 15.00 13.00 Shed Anita Parve R-43
Nagar Devla 69.665 69.672 7.000 RIIS 30.00 9.00 Shed R-46
11P"
Pradeep Man Singh Pan!
48 Nagar Devla 69.855 69.857 2.000 RHS 30.00 8.00 Pan Shop 847
(Anirudh General Store)
it Nagar Devla 69.865 69.870 5.000 RHS 30.00 8.70 Haire Cutting Saloon Shop Nitin Pagare R-48
Gautam janardhan
Nagar Devla 69.870 69.880 10.000 RHS 30.00 8.80 Hotel R -49
ler Sansare
Si Nagar Devla 70.130 70.138 8.000 RHS 30.00 6.00 Shed & Shop Purnand Kirana Store R-50
1! Nagar Devla 70.160 70.188 28.000 RHS 30.00 8.20 School Building LP. School R-51
Nagar Devia 70.530 70.543 13.000 RHS 30.00 10.20 Temp. Shed with Iron Angle Abha Pad R-52
1.
<4 Nlmbhora 71.380 71.390 10.000 RHS 15.00 11.60 Tern. Tin (Shed) Supdu Keshav Patil R-53
•411'
55 Pasardl 71.580 71.634 54.000 RHS 15.00 12.30 Boundry Wall Hotel Avinash Garden 8-54
v. Pasardi 73.894 73.899 5.000 RHS 15.00 9.80 Toilet Block Govt 8-55
C7 Kajgaon 76.453 76.460 7.000 RHS 12.00 7.30 Tea Shop Amrutkar Kharana R-56
58 Kajgaon 76.758 76.761 3.000 RHS 12.00 11.00 Toilet Block Govt. 8-57
OP Kajgaon 77.100 77.120 20.000 RHS 12.00 10.40 Boundry Wall (Plinth Work) lwahar Marcket Kajgaon R-58
67 Kajgaon 77.265 77.270 5.000 RIIS 12.00 9.20 Tyre Shop Suresh Bhawanilal /bran R-66
ill Kajgaon 77.270 77.275 5.000 RIIS 12.00 9.20 Mobile Shop Asraf Bhai ( K.G.N mobile) R-67
Kajgaon 77.275 77.278 3.000 RIIS 12.00 10.20 Shed & Shop Sudhakar Wankhede R-68
411Ir
70 Kajgaon 77.278 77.283 5.000 RIIS 12.00 8.00 Shed & Shop Sanjay Dhudku Mahajan R-69
*Pi Kajgaon 77.285 77.288 3.000 RHS 12.00 8.00 Mobile Shop Prithiviraj Rajput R-70
Kajgaon 77.300 77.305 5.000 RHS 12.00 11.50 Shed & Shop Dhanraj Sonar R-71
AP,
Prabhakar Patti (Hotel
73 Kajgaon 77.310 77.315 5.000 RIIS 12.00 11.00 Shed & Kitchen R-72
Sarnadhan)
It Kajgaon 77.315 77.320 5.000 RHS 12.00 11.40 Shed Mahendra Sonawane R-73
Kajgaon 77.320 77.325 5.000 RHS 12.00 11.10 Ottha & Shed Sandip Patil R-74
apr
Chavhan Bandhu
76 Kajgaon 77.325 77.330 5.000 RIIS 12.00 11.10 Ottha R-75
(Gurudutt Automobile)
I
F Kajgaon 77.330 77.340 10.000 RHS 12.00 11.20 Shop &Shed Yogesh Hire R-76
Kajgaon 77.360 77.365 5.000 RHS 12.00 11.30 Temp. Shed Jakir Bhagwan R-77
MP
79 Kajgaon 77.580 77.600 20.000 RIIS 12.00 11.10 Tin Boundry jalaram Shaw Mill R-78
TO Bortek 78.300 78.320 20.000 MIS 15.00 7.80 Om Shand Raswantl Bhaiya Shaikh Patil R-79
Bortek 78.330 78.332 2.000 RHS 15.00 11.50 Water Tank Sachln Patil R-80
li,
02 Bortek 78.360 78.362 2.000 RHS 15.00 8.60 Toilet Block R-81
IliIr Shriram Samarth
83 Bortek 78.380 78.395 15.000 MIS 15.00 10.40 Shed & Water Tank R-82
Raswantl
IMP Tandewadi 79.420 79.465 45.000 RIB 15.00 11.60 Wire Fencing R-83
oc Tandewadi 79.665 79.68 15 RHS 15 6.6 Shed & Shop Pramod Lalwani R-84
III
86 Tandewadi 79.645 79.730 85.000 RHS 15.00 12.00 Wire Fencing & M.S. Gate Pramod Lalwani R-85
up Tandewadi 79.725 79.730 5.000 RHS 15.00 9.60 Toilet Block Govt R-86
00 Tandewadi 79.990 80.000 10.000 RHS 15.00 8.50 Bus Stop Govt R-87
NW
39 Tandewadi 80.580 80.582 2.000 RHS 15.00 11.80 Water Tank Bhagatrao Kisan Patil R-88
lig Tandewadi 80.668 80.675 7.000 RHS 15.00 14.80 Ilouse Uttamrao Sadhu Pad! R-89
, Hingane 81.480 81.520 40.000 RHS 15.00 8.60 Wire Fencing, M.S. Gate & Shed Sarad Chauhan R-90
p
2 Hingane 81.813 81.825 12.000 RHS 15.00 12.50 Water Tank & Shed Arvind Bhimrao Chauhan R-91
II Hingane 81.915 81.925 10.000 RHS 15.00 7.20 Tin House Amrut Makunda R-92
Existing Chainage Length Offset
Sr. Name of (Km) Affected. Side
EROW House / Guiding / Well / Gate / Farm / Name of the Structure
from En.
lif Hingane 81.925 81.927 2.000 RHS 15.00 13.20 Toilet Block Govt R-93
Hingane 82.035 82.045 10.000 8115 15.00 10.80 Toilet Block Govt R-94
fir
96 Hingane 82.048 82.050 2.000 RHS 15.00 8.60 Shop (Salun) Bharku Nal R-95
iff Hingane 82.060 82.062 2.000 RHS 15.00 7.50 Tin Shed R-96
Hingane 82.062 82.070 8.000 RHS 15.00 7.50 Bus Stop Govt. R-97
111'
99 Hingane 82.070 82.080 10.000 RHS 15.00 7.50 Shop Lahu Hemraj Chauhan R-98
MP
100 Hingane 82.080 82.083 3.000 R115 15.00 6.80 Shop jairam Maharu nal R-99
lir Hingane 82.088 82.090 2.000 MIS 15.00 7.20 Shop Ismail Suleman Khatik R-100
lir; Hingane 82.095 82.097 2.000 RHS 15.00 7.60 Shop Sahebrao Gorse R-101
103 Hingane 82.090 82.100 10.000 RHS 15.00 11.00 Wire Fencing Grampanchayat R-102
Ratnabai Prabhakar
111111 Hingane 82.105 82.110 5.000 RHS 15.00 14.50 House wall R-103
Barsole
fns Hingane 82.120 82.130 10.000 RIIS 15.00 9.60 Temp. Shed R-104
Mr
106 Hingane 82.135 82.140 5.000 RHS 15.00 10.20 House Anil Nathu Chauhan R-105
VW Hingane 82.395 82.405 10.000 RIIS 15.00 10.40 Shed & Chain Fencing Bana Bhusan Chauhan R-106
' ^9 Waghll 83.232 83.235 3.000 RIIS 15.00 13.40 Water Tank Arjun Adhar R-107
gli
83.320 10.000 Ashok Arjun Mahajan (
109 Waghll 83.310 RIIS 15.00 9.90 Shed R-108
Vtjay Raswantl
Int Waghll 83.410 83.412 2.000 RIIS 15.00 12.60 Water Tank Suresh Govinda Mali R-109
-•1 Waghli 83.883 83.885 2.000 RHS 15.00 12.00 Water Tank R-110
IP'
112 Waghli 83.875 83.885 10.000 RHS 15.00 14.10 House R-111
W3 Waghll 83.890 83.905 15.000 RIIS 15.00 14.30 Shed with Brick Wall R-112
7 Waghli 85.353 85.370 17.000 RIIS 12.00 8.00 Shop & Shed Arif Shaikh R-116
118 Waghli 85.390 85.395 5.000 RHS 12.00 7.60 Shop (Samir Auto Part) Ashif Shah R-117
vr9 Waghli 85.395 85.400 5.000 RIIS 12.00 9.00 Chicken Shop Majhar Shaikh R-118
Kailash Sripat Ahire
IMO Waghli 85.42 85.425 5.000 RIIS 12.00 9.60 Shop (Haire Cutting Saloon) (Hariom Hair Cutting R-119
Saloon)
Shivaji Gangaram
,i Waghli 85.425 85.43 5.000 RHS 12.00 8.80 Shed & Shop R-120
Chaudhary
"2 Waghli 85.445 85.448 3.000 RHS 12.00 8.90 Pan Shop Sikandar Shah R-121
123 Waghli 85.448 85.455 7.000 RIIS 12.00 9.00 Hotel With Tin Shop Dilip Maka Bhoi R-122
AK Waghli 85.46 85.462 2.000 RHS 12.00 8.60 Water Tank Govt. R-123
'^S Waghll 85.47 85.475 5.000 RHS 12.00 8.40 Tea Shop Chhotu Patil R-124
IMP
126 Waghli 85.475 85.48 5.000 RIIS 12.00 8.50 Santosh Gaikwad (Haire
Shop R-125
Cutting cialrvinl
7,7 Waghli 85.49 85.492 2.000 RHS 12.00 8.60 Pan Shop Manoj Kevat Acharl R-126
"9 Waghli 85.493 85.497 4.000 RHS 12.00 8.70 Shop Ramesh Jadhav R-127
ilP
129 Waghli 85.497 85.5 3.000 RHS 12.00 8.90 Pan Shop Bhagwan Chaudhary R-128
IllSb Ojhar 92.685 92.69 5.000 RHS 15.00 11.00 M.S. Gate with Concret Pilor Lakshmibai Farms R-129
Ojhar 92.805 92.81 5.000 RHS 15.00 13.30 M.S. Gate with Concret Pilor Lokesh Farms R-130
*IV1
132 Ojhar 92.99 92.995 5.000 RHS 15.00 14.20 M.S. Gate with Concret Pilor Farms R-131
Illi6 Ojhar 93.91 93.92 10.000 RHS 12.00 10.50 Ottha, House & Toilet Block Pundlik Vitthal Patil R-135
r7 Ojhar 93.918 93.92 2.000 RHS 12.00 7.20 Toilet Block Pundlik Vitthal Patil R-13SA
.38 Ojhar 93.94 93.945 5.000 RHS 12.00 9.00 House Dilip Ramdas Jadhav R-136
Nr9 Ojhar 93.945 93.95 5.000 RHS 12.00 8.60 RCC Plinth with Angle Namdeo Jadhav R-137
Ojhar 93.970 93.975 5.000 RHS 12.00 7.50 Toilet Block Dilip Jadhav R-138
IP)
NOP Existing Chainage Length Offset
Sr. Name of
f Km) EROW fromn,L. House / Buiding / Well / Gate / Farm / Name of the Structure
Affected Side
%Pt Ojhar 93.975 93.98 5.000 RHS 12.00 5.00 Abondon House Daulat Jadhav R-139
142 Ojhar 93.980 93.985 5.000 RHS 12.00 4.60 Shop Sopan Girdhar Patil R-140
11,
143 Ojhar 94.000 94.010 10.000 RHS 12.00 8.40 Brush, Toilet & Panchayat Building Gram Panchayat Ojhar R-141
1111$ Ojhar 94.010 94.015 5.000 R115 12.00 8.00 Shop & Shed Bapu Khandu Thakre R-142
Ojhar 94.015 94.025 10.000 RIIS 12.00 8.30 Shed & Shop with Shutter Chhagan Babulal Bhoi R-143
-NIP
146 Ojhar 94.025 94.030 5.000 RIIS 12.00 11.00 Shed Laxman Barku Jhodge R-144
VW Ojhar 94.070 94.075 5.000 RHS 12.00 11.20 Ottha & foundry Wall Sanjay Gujjar R-145
"'9 Ojhar 94.115 94.120 5.000 RHS 12.00 9.00 Pan Shop & Shed Jai Bhole Pan Shop R-146
ler
149 Ojhar 94.115 94.120 5.000 RHS 12.00 9.80 Boundry Wall Lala Supdu More R-147
Ito Ojhar 94.120 94.125 5.000 RHS 12.00 11.00 Shop P. G. Gujjar R-148
' "1 Ojhar 94.125 94.130 5.000 RHS 12.00 9.20 Shop & Shed Santosh Govinda Gujjar R-149
152 Ojhar 94.225 94.230 5.000 RHS 15.00 13.20 Toilet Block Govt 0-150
ilt Ojhar 94.230 94.233 3.000 RHS 15.00 10.30 Shop Harish Jagnath Gujjar R-151
I Ojhar 94.233 94.238 5.000 RIIS 15.00 13.00 Shop (Hair Cutting Saloon) Rahul Hair Art R-152
tor
155 Ojhar 94.238 94.243 5.000 RHS 15.00 12.20 Shop Vijay Lala More R-153
Ojhar 94.530 94.540 10.000 RIIS 15.00 14.20 Tin Godown Shekhar Desmukh 0-155
MP
158 Ojhar 94.540 94.565 25.000 RHS 15.00 14.20 Building wall & M.S. Gate Shekhar Desmukh 11-156
IIII Laxman Ananda Aamle (
159 Ojhar 94.615 94.620 5.000 RHS 15.00 12.50 Shop Laxmi Auto & Spare 0-157
Parts)
lb
160 Ojhar 94.620 94.625 5.000 RHS 15.00 12.50 Shop 0-158
IIPL TAO 94.745 94.750 5.000 RIIS 15.00 12.00 Ottha Bhaskar Dada Gujjar R-159
1A2 Takli 94.880 94.890 10.000 RIIS 12.00 9.10 M.S. Gate with concret Pilor Had Seth R-160
w
163 Takli 94.905 94.910 5.000 RHS 12.00 9.90 Pan Shop D.B. Tribhuwan R-161
III4 Takli 94.920 94.930 10.000 OHS 12.00 8.80 Ottha & Enttry Gate Jalaram Marbles R-162
les Takli 95.030 95.035 5.000 RHS 12.00 11.70 Water Tank Anil Pawar R-163
IIIIP
166 Takli 95.040 95.045 5.000 RHS 12.00 8.80 Shed Anil Pawar R-164
illiP/ Takli 95.350 95.360 10.000 RI'S 15.00 12.50 Chain Fencing with M.S. Gate Dilip Nimba Mahajan 0-165
'-4 Takli 95.360 95.365 5.000 RHS 15.00 14.00 Boundry Wall & M.S. Gate Shree Sai Samarth R-166
IP
Saraswati Sangam
169 Takli 95.370 95.380 10.000 RIIS 15.00 12.30 Chain Fencing & M.S. Gate R-167
Complex
/16 Takli 95.395 95.397 2.000 RIIS 15.00 14.60 Shop Bapu Chaudhary R-168
Takli 95.397 95.400 3.000 RIIS 15.00 12.00 Shed Sai Auto R-169
II,
172 Takli 95.400 95.405 5.000 RHS 15.00 9.20 Shop Shiva Rokde 0-170
ITS Takli 95.405 95.410 5.000 RIIS 15.00 12.30 M.S Gate & Shed Shiva Rokde R-171
Takli 95.460 95.462 2.000 RHS 15.00 14.70 Shop Hair Cutting Saloon R-172
MP
Pradeep Mahajan
'-5 Takli 95.505 95.507 2.000 RIIS 15.00 12.00 Shop (Swapnapurt1 R-173
VW Electricals)
176 Takli 95.515 95.520 5.000 RHS 15.00 13.20 House R-174
110
177 Takli 95.530 95.545 15.000 RHS 15.00 12.50 Chain Fencing Bajaj Motorcycles R-175
Ur Takli 95.600 95.615 15.000 RHS 15.00 13.20 Chain Fencing with M.S. Gate Sai TVS R-176
1,9 Takli 95.615 95.630 15.000 RHS 15.00 12.00 Chain Fencing with M.S. Gate Pandit Bhagwan Badri R-177
glIIP
180 Takli 95.670 95.675 5.000 RIIS 15.00 10.20 Chicken Shop Mohim R-178
'Mk Tak11 95.675 95.685 10.000 RHS 15.00 14.80 Tin Shed Bhangar Godown R-179
•^ 7. TaIdi 95.685 95.687 2.000 RHS 15.00 14.20 Shop Sairam Auto Garaz R-180
AP
183 Tak11 95.720 95.725 5.000 RHS 15.00 13.30 Shed 0-181
11114 Takli 95.770 95.780 10.000 RHS 15.00 13.40 Hotel & Shed Krishna Raswantl R-182
" -9 Challsgaon 95.850 95.860 10.000 RHS 15.00 13.00 Ottha, Sriram Washing Centre Sriram Tyre R-183
lur
186 Challsgaon 96.450 96.450 0.000 RHS 11.00 9.50 Shed Latabai Dilip Pawar R-184
let Challsgaon 96.455 96.458 3.000 RIIS 11.00 8.70 Toilet Block Nagar Palika R-185
41110, Existing Chainage Length Offset
Sr. Name of EROW House / Bulding / Well / Gate / Farm / Name of the Structure
(Km) Affected Side from Fn.
yup.) Chalisgaon 96.470 96.475 5.000 RHS 11.00 ' 9.10 Cycle Shop Dilip Kabu 7-odge R-186
189 Chalisgaon 96.475 96.482 7.000 RIIS 11.00 8.80 Boundry Wall& Toilet Block Gopichand Sonawane R-187
41
190 Chalisgaon 96.485 96.490 5.000 RHS 11.00 9.20 Shed House Vlshal More R-188
lopl Chalisgaon 96.490 96.493 3.000 RHS 11.00 9.30 Shop Devidas More R-189
Chalisgaon 96.555 96.565 10.000 RHS 11.00 10.20 Wire Fencing R-I96
ililr9
199 Chalisgaon 96.605 96.608 3.000 RHS 11.00 9.00 Pan Shop Ramdas Mandavi R-197
ilk Chalisgaon 96.608 96.615 7.000 RIIS 11.00 10.00 Shed Ramdas Mandavi R-198
, Chalisgaon 96.710 96.725 15.000 RHS 11.00 9.00 Angle Shyam Raswanti R-199
liar
202 Chalisgaon 96.980 96.990 10.000 RIIS 11.00 10.00 Temple Boundary Wall Temple R-200
V3 Chalisgaon 96.997 97.000 3.000 RIIS 11.00 9.00 Shop Dilip Pentar R-201
t Chalisgaon 97.000 97.005 5.000 RIIS 11.00 9.50 Pan Shop Balaji Pan Shop R-202
fer
205 Chalisgaon 97.010 97.015 5.000 RIIS 11.00 9.00 Shed Dattatraya Mahajan R-203
n Chalisgaon 97.015 97.020 5.000 PIS 11.00 9.00 Shed Prabhu Gawli R-204
Chalisgaon 97.020 97.023 3.000 RIIS 11.00 10.30 Shop Yogesh Patil R-205
or'
- ''') Chalisgaon 97.080 97.09 10.000 BUS 11.00 10.00 Shop Ravindra Patil R-207
IIP
210 Chalisgaon 97.100 97.105 5.000 BUS 11.00 10.00 Xerox Shop Gaurav Purankar R-208
In Chalisgaon 97.160 97.167 7.000 RHS 11.00 9.40 Fruit Shop R-209
' Chalisgaon 97.217 97.222 5.000 RIIS 11.00 9.20 Shop Hari Tour & Travels R-210
*P.
213 Chalisgaon 97.222 97.227 5.000 RHS 11.00 10.00 Auto Garrage Rahul Auto Garrage R-211
` 4 Chalisgaon 97.270 97.275 5.000 RHS 11.00 8.00 Balaji Travels Balaji Travels R-212
216 Chalisgaon 97.285 97.300 15.000 RIIS 11.00 6.00 Chain Fancing Shree Datt Mandir R-214
My
New Bombay Shilai
217 Challsgaon 97.300 97.310 10.000 RIIS 11.00 9.00 Taler Shop R-215
Machine
I'M Chalisgaon 97.310 97.320 10.000 MIS 11.00 9.00 Shop Chaudhary Bandhu R-216
' i Chalisgaon 97.320 97.323 3.000 RIIS 11.00 8.50 Shed Dashrat Chaudhary R-217
li.
Prakash Shimpi
220 Chalisgaon 97.323 97.326 3.000 RIIS 11.00 8.50 Shed R-218
(Swami Travels)
111 Chalisgaon 97.326 97.332 6.000 RHS 11.00 8.50 Shed & Shop Villa Marathe R-219
ler Chalisgaon 97.350 97.360 10.000 RIIS 11.00 9.00 Hotel Shed Kishor Rana R-220
273 Chalisgaon 99.370 99.375 5.000 RIIS 12.00 6.30 Shop Meat Shop R-221
224 Chalisgaon 99.394 99.397 3.000 RIIS 12.00 7.30 Shop Jamin Chicken Shop R-222
Chalisgaon 99.397 99.400 3.000 RIIS 12.00 6.30 Jay Shriram Pan &
Alpo Shop R-223
roldrinkc
7/6 Chalisgaon 99.400 99.406 6.000 RHS 12.00 5.40 Shed Said= Meva Kulfi R-224
II
227 Chalisgaon 99.475 99.485 10.000 RIIS 12.00 8.00 Tyres Shop & Shed Santosh Daga Shinde R-225
mit Chalisgaon 99.493 99.500 7.000 RIIS 12.00 7.40 Shed Awada Gavi R-226
7'0 Chalisgaon 99.505 99.510 5.000 RIIS 12.00 8.40 Cycle Shop Bablu Marathe R-227
VP
230 Chalisgaon 99.538 99.540 2.000 BUS 12.00 6.80 Loundry Shop Sanjay Raut R-228
MI Chalisgaon 99.663 99.666 3.000 BUS 12.00 7.70 Welding Shop Dasrat Galkwad R-229
7'7 Chalisgaon 99.967 99.970 3.000 RIIS 12.00 6.00 Pan Shop Sachin Jadhav R-230
233 Chalisgaon 100.045 100.050 5.000 RIB 12.00 6.00 Wire Fancing R-231
AM Chalisgaon 100.22 100.223 3.000 RIIS 12.00 9.20 Toilet Block Gram Panchayat Khadki R-232
Existing Chainage Length Offset
Sr. Name of (Km] EROW House / Bidding / Well / Gate / Farm / Name of the Structure
Affected itch. from Fel
tS Khadid 100.37 100.372 2.000 RHS 12.00 11.00 Shop Om Sal General Store R-233
10 Khadkl 100.400 100.405 5.000 RHS 12.00 10.40 Shop Asma Bulty Parler R-234
237 Khadid 100.410 100.415 5.000 RHS 12.00 6.00 Temp. Shed Gymkhana R-235
Alli.-
410
INP
IMP
fir
7 r. Name of
Existing Chainage
(KmL
Length
Afferted. Cid,
EROW
Offset
frnrrt FTI
House / Bidding /Well /Gate /Farm / Name of the Structure
8 Khadkl 100.45 100.455 5.000 RHS 12.00 8.70 Shop' Shashibai Khaire R-236
r 9 Khadkl 100.455 100.457 2.000 RHS 12.00 7.60 Shop Akshay Kiran Shop R-237
11 240
rOP1
Khadkl
Khadkl
100.46
100.475
100.462
100.485
2.000
10.000
RHS
RHS
12.00
12.00
8.70
11.00
Mobile Shop
Punjab Deshmukh
R-238
R-239
'42 Khadkl 100.485 100.495 10.000 RIIS 12.00 11.00 Shed &Shop Roshan Patil R-240
7
re"
3 Khadkl
Khadkl
100.635
101.66
100.64
101.665
5.000
5.000
RHS
RHS
12.00
15.00
8.30
9.40
Ottha
R-242
I^ 45 Khadkl 101.665 101.670 5.000 RHS 15.00 9.80 Tea Shop Ganesh Ahire R-243
746 Khadki 101.707 101.715 8.000 RHS 15.00 13.20 Bhau Saheb N arar
h i
Tea House R-244
Rh idf.
7 Khadkl 102.360 102.375 15.000 RHS 12.00 7.00 Boundry Wall & M.S. Gate Sanjay Mandole R-245
7
iiP
Khadkl 102.380 102.39 10.000 RIIS 12.00 6.00 Bus Stop Govt R-246
249 Khadkl 102.390 102.395 5.000 RIIS 12.00 4.40 Tea Shop Gulab Subash Dokle R-247
lift Khadkl 102.400 102.403 3.000 RHS 12.00 7.00 STD Booth Dhananjay Mandole R-248
-1 Khadkl 102.403 102.406 3.000 RHS 12.00 5.30 Tyre Puncher Shop Ashok Pawar R-249
Jo.
252 Khadkl 102.406 102.412 6.000 RIIS 12.00 7.50 Hotel Shed Vinayak Pawar R-250
illn Khadkl 102.42 102.425 5.000 RIIS 12.00 11.00 Iron Stair Sopan Pawar R-251
r 4 Khadki 102.44 102.445 5.000 RIIS 12.00 9.20 Building Dilip Gaikwad R-252
255 Khadkl 102.445 102.449 4.000 RHS 12.00 6.20 Shed House & Toilet Block Ramchandra Santosh R-253
"6 Khadki 102.46 102.47 10.000 RHS 12.00 Wire Fencing, Toilet Block & House Dada Bhau Gopichand
8.80 R•254
Rtilldino 5plar
7 Khadki 102.48 102.485 5.000 RHS 12.00 8.90 House Building & Toilet Block Bapu Balmik Mandole R-255
OW
258 Khadki 102.495 102.5 5.000 RHS 12.00 10.00 Toilet Block Laxman Sajan Lauke R-2S6
T9 Khadkl 102.5 102.502 2.000 RIIS 12.00 10.10 Shed House Nana Sirpat Kole R-257
Khadki 102.505 102.507 2.000 RIIS 12.00 9.70 Shop (Moton) Jakir Khatik R•258
IF)
261 Khadki 102.55 102.555 5.000 RHS 12.00 9.00 Shed with Angle Raju Kole R-259
2 Khadkl 102.555 102.56 5.000 RIIS 12.00 8.20 House with Toilet Block Tukaram Pawar R-260
3 Khadki 102.56 102.565 5.000 RI'S 12.00 7.80 House with Toilet Block Gulab Nikam R-261
IMP
264 Khadki 102.64 102.65 10.000 RIIS 12.00 6.00 Tea Shop Bapu Jagtap R-262
.u.
265 Khadkl 102.65 102.655 5.000 RHS 15.00 13.4 Toilet Block & Ottha Mohan Mandole R-263
Total 2619.000
viIMP
SIP
VP
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.
Annexure - E
PROGRESS PHOTOGRAPHS
-re
Diversion @ 60+000
IMP
•
Ashoka Buildcon Limited
mop
4
1
1
Or
fir
(b.
fay
iiiiiIIIII111111121pligily111. 111114inliillilliii1111111111111 ilia III illllllll IIII~IiII
1I0 1
to, •lI III IIIIIIIIIII IIiIIIIIIIIIFl
1 4i
414'"1"'
r
tit
411
tar
thr
41,
DBM laying @ Ch. 89+160
4
6
Ashoka Buildcon Limited
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to
103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC Mode.
'An7111.
•
•
•
S
S
Alp
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to
103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC Mode.
6
46
46
4
4
4
Crash Barrier casting @Ch. 75+575 LHS of Box Culvert
4
8
111
4
4
4
Profile Correction for DBM laying @ Ch. 90+450
it
4
4
4
4
4
4
4
4
4
4
ger
`wr
4
4
4
4
oho
4
4
4
4
4
4
6
6
Profile Correction for DBM laying @ Ch. 90+600
4
4
4
4
4
4
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to
103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC Mode.
ep
S
t
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to
103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC Mode.
SLOA .•
., .
r
v .
•
.. ,..' ,,,,.
' "'Z..'
k--A
•,... "
•
--
-
- .
..,. - • -
, .,,,
.z.
*
'
. . ..
. .
,
rig
• - .Yn
. ,...-N
t aka
, -
- .
Ag.
°
AN I,
.-
-.0
*
* _ _
' - -z
'...
OSP
4
4
4
4
oir
flit
(iv
gb,
"Is
4
fir
4
4i.
Ashoka Buildcon Limited
8
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to
103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC Mode.
4
4
4
4
4
4
4
4
kr
kr
kr
4
4
4
4
4
kr
4
4
-Su
Annexure - F
Letter Correspondence during April-2019
Inward Correspondence
11-Apr-19
OP-iti‘Ozicf 6044+5 Sat ABL 4f-4 .Iialt,S Zi. Ur. ,IT-diTT ttfig it-czti ci did ur.4.41
5 11-Apr-19
smilir D.. ula51111 7134<-03.i glIatri.
17111 4 414(4 cars sm. irigq, tKi-0. 4171FIT 711. 4. 4141,5 T2S. sr. qr. ar. qr-oYrr zrr-4
6 11-Apr-19 11-Apr-19 ABL
71-417T fa. vi a:Wild 41
11-Apr-19 BSNL
Sub Divi(sional Engineer
ABL
1 -
d-517LW cnioNcf iii,..ti 4-161kii,4 i•••414,•oni 4 IT
7 10-Apr-19
ch
paora tart arTa.
KcIT. kies-qi 4,14 rth;1ii‘ria rric,81tulicr tro-
dra acart ,fienr ..lciaLSIQr TO-RMA
8 18-Apr-19 18-Apr-19 ABL
111 1.-o/157/2019 .id1148a4. 41A114 1111 3TA- A tortra. p -Ri-
atM <1,(or cocr.
joint secrtary to
9 16-Apr-18 20-Apr-19 Government of ABL Contruction Workeni Welfgre Cens Rules, 1998
Maharashtra
A.P. Vidhale, Joint Building and Other Construction Workers ( Employent and
10 18-Aug-17 20-Apr-19 ABL
Secretary to Government Regulation Condition of Service) Act 1996
TPF Engineering pvt. Ltd. Recommendation of Stage Payment Statement No. 04 (01
11 22-Apr-19 23-Apr-19 Sec-II/2018-19/65 ABL
JV with TPF Getinsa Mar' 19 to 31 Mar'2019
TPF Engineering pvt Ltd. Submission of GAD & Reinforcement Drawing of Minor
12 04-Apr-19 25-Apr-19 Sec-II/2018-19/59 ABL
jV with TPF Getinsa Bridge at Ch. 73+860- Approval.
Submission of GAD & Reinforcement Drawings of Box
TPF Engineering pvt. Ltd.
13 24-Apr-19 25-Apr-19 Sec-II/2018-19/67 ABL Culverts at Ch. 99+575 and Pedestrian Underpass (PUP) at
JV with TPF Getinsa
Ch. 69+600-Approval.
Submission of Dimensional and Reinforcement Details
TPF Engineering pvt Ltd.
14 24-Apr-19 25-Apr-19 Sec-II/2018-19/68IV ABL Drawing of Widening Portion for Minor Bridge at Km.
with TPF Getinsa
77+340-Approval.
TPF Engineering pvt Ltd. Submission of GAD & Reinforcement Drawings of Minor
15 24-Apr-19 25-Apr-19 Sec-II/2018-19/69 ABL
JV with TPF Getinsa Bridge at Ch. 69+850-Approval.
TPF Engineering pvt Ltd. Submission of GAD of Pipe Culvert at Ch. 80+065 and Ch.
16 24-Apr-19 25-Apr-19 Sec-II/2018-19/70 ABL
JV with TPF Getinsa 96+308-Approval.
Sec-I & II 2019- TPF Engineering pvt Ltd. Submission of Consolidated Change of Scope Proposal-'In
28 02-May-19 04-May-19 ABL
20/106 JV with TPF Getinsa Principal' Approval on revised Proposal of change of scope.
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.
Outward Correspondence
1 01-Apr-19 ABL/NH-7 53j/Bhadgaon-Chalisgaon/Pkg-11/2018-19/465 TPF Engineering PvtLtd. Submission of Box Culvert at Ch. 99+575 & PUP at Ch. 69+600-along-
ABL
TPF Getinsa, Chalisgaon with comments compliance sheet
2 01-Apr-19 ABL/NH-753j/Bhadgaon-Chalisgaon/Pkg-11/2018-19/467 TPF Engineering PvtLtd. Request for Manual PQC in Chalisgaon City in Median Portion due to
ABL
TPF Getinsa, Chalisgaon Existence of Street Light poles & Electric Lines
3 03-Apr-19 TPF Engineering PvtLtd. Submission of Compliance of Comments raised during site verification
ABL/NH-7531/Bhadgaon-Chalisgaon/Pkg-11/2018-19/468 ABL
TPF Getinsa, Chalisgaon on 29.03.2019 in respect of Consolidated Change of Scope Proposal.
TPF Engineering Pvt.Ltd. Status of Preconstruction Activites & Intimation regarding Events
5 03-Apr-19 ABL/NH-753j/Bhadgaon-Chalisgaon/Pkg-11/2018-19/470 ABL
TPF Getinsa, Chalisgaon having continuing delay effect for Extension of Time.
TPF Engineering Pvt.Ltd. Approval of Source for Supply of Elastomeric Bearing from M/s
6 03-Apr-19 ABL/NH-753j/Bhadgaon-Chalisgaon/Pkg-11/2018-19/471 ABL
TPF Getinsa, Chalisgaon Polymer Products.
TPF Engineering Pvt.Ltd. Approval for Supply of Mastic Asphalt for Bridge Deck Water Proofing
8 03-Apr-19 ABL/NH-753j/Bhadgaon-Chalisgaon/Pkg-11/2018-19/473 ABL
TPF Getinsa, Chalisgaon Membrane.
TPF Engineering PvtLtd. Approval of Source M/s Choksey Chemical Pvt. Ltd., Mumbai for Supply
11 08-Apr-19 ABL/NH-753j/Bhadgaon-Chalisgaon/Pkg-11/2018-19/475 ABL
TPF Getinsa, Chalisgaon of Curing Compound & Polysulphide Sealant.
Executive Engineer Shifting of Street Lights at Km. 61+315 & 61+470 Near Bhadgaon ST
08-Apr-19 ABL/N11-7531/Bhadgaon-Chalisgaon/Pkg-11/2018-19/477 ABL Electrical Division,
13 Bus Stand.
Bhadgaon
.1,1z4 +1 3i it fdukU 3r37Tia a 4-64 ,71 4 v4 t.g.t. 61+315 a 61+470 tilt-6 •c•i-c4i1L-Lii
ABL/NH-7531/Bhadgaon-Chalisgaon/Pkg-11/2018-19/478 ABL R
- 1 cbiLA silgicr.
14 08-Apr-19 f4341-4 arTerta 4,161 .11-ki.R# cftitt tt(Street lights) FT6
_c_4 4.24
- uLti , efivi- i±113haiaolAialise/IT-I1/418-14/479 4 AV ;144111 4" . li
firTiti-d ,„7.•Iirct14"1°511, t it 95+29.0 t_YrR FIX. Wit
I claI • Ff4n1 il . (401 (St'', t lig, 1 FM .ratti I 4 4
16 08-Apr-19 ABL/NH- 753)/Bhadgaon-Chalisgaon/Pkg-I1/2018-19/480 TPF Engineering PvLLtd. Submission of Minor Bridge at Ch. 89+300 along- with comments
ABL
TPF Getinsa, Chalisgaon Compliance sheet.
17 08-Apr-19 ABL/N11- 7531/Bhadgaon-Chalisgaon/pkg-11/2018-19/481 TPF Engineering PvLLtd. Submission of Pipe Culvert at Ch. 80+065 & Pipe Culvert at Ch. 96+308
ABL
TPF Getinsa, Chalisgaon along-with Commnts Compliance sheet.
18 10-Apr-19 ABL/NH-7 S3J/Bhadgaon-Chalisgaon/Pkg-11/2018-19/482 ABL EE Nil Dhule. Utility Shifting- Shifting of Water Supply Lines- Approval of RO Mumbai.
22 12-Apr-19 TPF Engineering Pvt.Ltd. Submission of Dimensional & Reinforcement Detailed Drawing of
ABL/NH-753J/Bhadgaon-Chalisgaon/Pkg-I1/2018-19/486 ABL
TPF Getinsa, Chalisgaon Widning Portion for Minor Bridge at Km. 77+340 (Design Ch. 77+417)
TPF Engineering PvtLtd. Submission of Proof Checked Miscellaneous Design & Drawing of
31 24-Apr-19 ABL/N1-1-7531/Bhadgaon-Chalisgaon/Pkg-11/2018-19/495 ABL TPF Getinsa, Vashi,
Structure.
Mumbai
TPF Engineering Pvt.Ltd. Submission of Proof Checked Typical Design & Drawing of Retaining
32 24-Apr-19 ABL/NH-753J/Bhadgaon-Chalisgaon/Pkg-11/2018-19/496 ABL TPF Getinsa, Vashi,
Wall for Minor Bridges.
Mumbal
TiFTpEineenrigvPasved.
OP13 # 24,r-110. t L/40753111361.on.alisanfiell/41k8-.497e AfP.. subn, :ioni ' Reged P0001001tede sig4 Dr lig ok final Oh 4' fr •
Bridge at Ch. 82+475.
Mumbai
TPF Engineering PvtLtd.
34 24-Apr-19 ABL/NH-753J/Bhadgaon-Chalisgaon/Pkg-II/2018-19/498 Submission of Proof Checked Shop Drawing of Elastomeric Bearing for
ABL TPF Getinsa, Vashi,
Minor Bridge at Ch. 69+850 & Minor Bridge at Ch. 89+300.
Mumbai
TPF Engineering PvtLtd. Submission of Typical Details of Retaining Wall for Minor Bridges &
35 24-Apr-19 ABL/NH-753J/Bhadgaon-Chalisgaon/Pkg-H/2018-19/499 ABL
TPF Getinsa, Chalisgaon Retaining Wall along-with comments compliance sheet for Seal.
Swastik
39 30-Apr-19 ABL/NH-753J/Bhadgaon-Chalisgaon/Pkg-11/2018-19/503 ABL infralogics.Nagardeola COS Km83+900 to Km 92+650.
camp
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.
Annexure - G
Weather Report
EFlopZontractor
Ashoka Buildcon Limited
air
Weather Report of Apri1.2019
Package-II
ler
Temparature deg.c Humidly (%) Rain Fall (mm) Weather
Date Time
Min. Max. Conditions
,ur Min. Max. Day Month Year
Ill-A pr- 2019 8.00Am 29.2 46.5 29 70 0.00 0.00 0.00 Sunny
Annexure - H
List of Contractual Obligation
Up-gradation of Bhadgaon-Chalisgaon (section II )of NH 753J from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of [ Jalgaon - Bhadgaon -Chalisgaon -Nandgaon
-Mantnad-NH 753J - (46.800 Km )] in the State of Maharashtra on EPC mode
LIST OF CONTRACTUAL OBLIGATION
Date as per
Responsibility Obligations Refer clause Description Status as on 30.04.2019
contract
Notice inviting tender 07.12.2018
BID date BID date 02-02-18
LOA Letter of Acceptance 28-03-18
Both Signing of agreement Recital E(ii) execute this Agreement within 15 (fifteen) days of the date of issue of LOA. 16-04-18
Authority Appointed Date means that date which is later of the 15th day of the date of this Agreement, the date on which the Contractor has
delivered the Performance Security in accordance with the provisions of Article 7 and the date on which the Authority
CENH/D-1/1748/2018 on
has provided the Right of Way on no less than 90% (Ninety per cent) of the total length of Project Highway; 06-06-18
dated 06.06.2018
Contractor Scheduled Completion Date 10.3.1 The 540th (Five Hundred and Forty ) day from the Appointed Date shall be the scheduled completion date (the
"Scheduled Completion Date") 27-11-19
Contractor Expiry of maintenance period 14.1 Contractor shall maintain the Project Highway for a period of 4 years commencing from date of Provisional Certificate
(Maintenance Period) 26-11-23
Contractor Legal opinion Recital E(i) deliver to the Authority a legal opinion from the legal counsel of the selected bidder with respect to the authority of the
selected bidder to enter into this Agreement and the enforceability of the provisions thereof, within 10 (ten) days of the 07-04-18 Submitted
date of issue of LOA;
Contractor Right of Way 4.1.3 (a) upon receiving the Performance Security under Clause 7.1.1, the Right of Way in accordance with the provisions of
Clauses 8.2 and 8.3, within a period of 15 (fifteen) days from the date of this Agreement, on no less than 90% (ninety
30-04-18 73.00%
per cent) of the total length of the Project Highway;
Contractor Performance Security 7.1.1 The Contractor shall, for the performance of its obligations hereunder during the Construction Period, provide to the
Authority, within 10 (ten) days of the date of this Agreement, an irrevocable and unconditional guarantee from a Bank
in the form set forth in Schedule-G (the "Performance Security") for an amount equal to 5% (five percent) of the
25-04-18 Submitted
Contract Price. The Performance Security shall be valid until 60 (sixty) days after the Defects Liability Period.
Contractor Obligations prior to 10.1.1 Within 20 (twenty) days of the Appointed Date, the Contractor shall
ommencement of Works 25-06-18 Completed
Contractor 10.1.1 (a) appoint its representative, duly authorised to deal with the Authority in respect of all matters under or arising out of or
relating to this 25-06-18 Completed
Contractor 10.1.1 (b) appoint a design director (the "Design Director") who will head the Contractor's design unit and shall be responsible for
surveys, investigations, collection of data, and preparation of preliminary and detailed designs; CENH/D-1/2243/2018 on
25-06-18
dated 18.07.2018
Contractor 10.1.1 (c) undertake and perform all such acts, deeds and things as may be necessary or required before commencement of
Works under and in accordance with this Agreement, the Applicable Laws and Applicable Permits; and 25-06.18 Being Completed
Contractor 10.1.1 (d) make its own arrangements for quarrying of materials needed for the Project Highway under and in accordance with
the Applicable Laws and Applicable Permits. 25-06-18 Being Completed
444 4 I 1 411414 fif 4 $41114 a 4
Contractor Applicable permit 10.1.1 The Contractor shall obtain, as required under the Applicable Laws, the following Applicable Permits:
25-06-18 Obtained
Contractor Schedule F a Permission of the State Government for extraction of boulders from quarry
25-06-18 Obtained
Contractor Schedule F b Permission of Village Panchayats and Pollution Control Board for installation of crushers
25-06-18 Obtained
Contractor Schedule F c Licence for use of explosives
25-06-18 Obtained
Contractor Schedule F d Permission of the State Government for drawing water from river/reservoir
25.06-18 Obtained
Contractor Schedule F e Licence from inspector of factories or other competent Authority for setting up batching plant
25.06-18 Obtained
Contractor Schedule F f Clearance of Pollution Control Board for setting up batching plant
25-06-18 Obtained
Contractor Schedule F g Clearance of Village Panchayats and Pollution Control Board for setting up asphalt plant
25-06-18 Obtained
Contractor Schedule F h Permission of Village Panchayats and State Government for borrow earth; and
25-06-18 Obtained
Contractor Schedule F i Any other permits or clearances required under Applicable Laws.
25-06-18 Obtained
Contractor Submission of Construction 10.1.3 Within 30 (thirty) days of the Appointed Date, the Contractor shall submit to the Authority and the Authority's
programmed Engineer a programmed (the "Programmed") for the Works, ABL/CENH/Bhadgaon
05-07-18 Chalisgaon /2018-19/52
on dated 02.06.2018.
Contractor Drawings 10.2.1 Contractor to develop Design and Drawings in conformity with Specifications and Standards set forth in Schedule D
Approved
10.2.5 AE to comment within 15 days of receipt of drawing. Contractor not obliged to wait beyond 15 days and can continue
AE Appointed on
works except in case of Major Bridge or Structure where the period is 30 days.
23.10.2018
Contractor Appointment of proof 10.2.2 The Contractor shall appoint a proof check consultant (the "Proof Consultant") after proposing to the Authority a panel
consultant of three names of qualified and experienced firms from whom the Authority may choose one to be the Proof Consultant. 25-06-18 06-08-18
Provided.
Contractor decision of Authority on proof The Authority shall, within 15 (fifteen) days of receiving a proposal from the Contractor hereunder, convey its decision,
consultant 09-07-18 30-08.18
Contractor Construction of the Project 10.3.1 The Contractor shall construct the Project Highway as specified in Schedule- B and Schedule-C, and in conformity with
Highway the Specifications and Standards set forth in Schedule-D. The Contractor shall be responsible for the correct positioning
of all parts of the Works, and shall rectify any error in the positions, levels, dimensions or alignment of the Works. The
540th (Five Hundred and fortieth ) day from the Appointed Date shall be the scheduled completion date (the 27-11-19
"Scheduled Completion Date")
Contractor Damage for delay in project 10.3.2 The Contractor shall construct the Project Highway in accordance with the Project Completion Schedule set forth in
completion schedule Schedule-J. In the event that the Contractor fails to achieve any Project Milestone or the Scheduled Completion Date
within a period of 30 (thirty) days from the date set forth in Schedule-J, unless such failure has occurred due to Force
Majeure or for reasons solely attributable to the Authority, it shall pay Damages to the Authority of a sum calculated at
the rate of 0.05% (zero point zero five percent) of the Contract Price for delay of each day reckoned from the date
specified in Schedule -J and until such Project Milestone is achieved or the Works arc completed;
Delay in achieving Mile Stones 10.3.2 & 10.3.3 Failure to achieve Project Milestone within 30 days from the date set forth In Sch J for such mile stone unless failure
due to Force Majeure or reason solely attributable to Authority. Damages @ 0.5% of Contract Price for each day of delay Mile Stone-I & II
till Milestone is achieved or till Works are completed. Achieved
Provided further that in the event Works are completed on or before the Scheduled Completion Date, the Damages paid
under c1-10.3.2 shall be refunded without interest
114 444 4 4 4 I 4 4 4 4 4 41 111411 f f if f f , 4
Authority shall first notify and take into account Contractors representations before levying damages. Contractor shall
reply within 20 days. Damages under Clause 10.3.2 shall not exceed 10% of Contract price
Maintenance during 10.4 During the Construction Period, the Contractor shall maintain, at its cost, the existing lane(s) of the Project Highway so
Construction Period that the traffic worthiness and safety thereof are at no time materially inferior as compared to their condition 10 (ten) Completed & being
06-04-18
days prior to the date of this Agreement, maintained
EOT for Completion 10.5.1 Delay in providing ROW, environmental clearances or approval of Railway authorities specified in Clause 4.1.4
COS unless an adjustment to the Scheduled Completion Date has been agreed under Article 13
COS Proposal submitted
on dated 25.08.2018
Contractor Maintenance Manual 10.7 No later than 60 (sixty) days prior to the Project Completion Date, the Contractor shall, in consultation with the
Authority's Engineer, evolve a maintenance manual (the "Maintenance Manual") for the regular and preventive
12.04-19
maintenance of the Project Highway
Contractor Tests on completion 11.1.1 At least 30 (thirty) days prior to the likely completion of the Project Highway, or a Section thereof, the Contractor shall
notify the Authority's Engineer of its intent to subject the Project Highway or a Section thereof, to Tests. 12-05-19 yet to Achieve
Contractor Quality Assurance Plan 11.2.2 The Contractor shall, within 30 (thirty) days of the Appointed Date, submit to the Authority's Engineer its Quality
ABL/CENH/Bhadgaon-
Assurance Plan
05.07.18 Chalisgaon /2018-19/54
on dated 02.06.2018.
Contractor Monthly Progress Report 11.7 Monthly Progress Report to submit - within 10 days after close of each month. 10th of every
Completed
month
Contractor Suspension of unsafe 11.17.4 If suspension of construction works is for reasons not attributable to the Contractor AE shall determine any EOT Status submitted on
construction
09.10.2018
Video Recording 11.16 Video recording to be provided, covering status and progress of work in that quarter, first recording within 15 days of
the Appointed 20-06-18 Submitted
Suspension of unsafe 11.17.3 Preservation cost shall be borne by the Contractor, provided that if the suspension has occurred due to breach of this
construction agreement by the yet to Achieve
Maintenance obligations of the 14.1 Contractor shall maintain the Project Highway for a period of 4 years commencing from date of Provisional Certificate
Contractor (Maintenance 26-11-23 yet to Achieve
Maintenance Requirements 14.2 Contractor shall ensure that during Maintenance Period the Project Highway confirms to maintenance requirement set
forth in Schedule E yet to Achieve
Maintenance Programme 14.3 Contractor to prepare monthly maintenance programme (Maintenance Programme ) and submit the same to AE not
later than 10 days prior to the commencement of the month in which the maintenance is to be carried out yet to Achieve
I , , 4444 444#4441444 4 S I I 4 S
Maintenance Programme 14.3.1 The Contractor shall prepare a monthly maintenance programmed (the Maintenance Programmed") in consultation
with the Authority's Engineer and submit the same to the Authority's Engineer not later than 10 (ten) days prior to the 20th of each month yet to Achieve
commencement of the month in which the Maintenance is to be carried out
Reports of unusual occurrence 15.4 A monthly summary of such reports shall also be sent within 3 (three) business days of the closing of month. For the
purposes of this Clause 15.4, accidents and unusual occurrences on the Project Highway shall include:
(a) accident, death or severe injury to any person;
(b) damaged or dislodged fixed equipment; 3rd ()leach month yet to Achieve
(c) flooding of Project Highway; and
(d) any other unusual occurrence.
Lane Closure 14.5.2 Delay in reopening designated lane shall attract damages @ 0.1% of the monthly maintenance payment for each day of
delay yet to Achieve
Authority Authority's Engineer 18.1.1 Authority shall appoint a consulting engineering firm as set forth in Schedule N
23-10-18
18.1.2 The Authority's Engineer should be appointed within 30 days from the date of this Agreement or before declaration of
Appointed Date. The Authority shall notify the appointment or replacement of the Authority's Engineer to the 15-05-18 23-10-18
.r. —
Contractor Payment 10.1.14 Interim Payments
Contractor Advance Payments 19.2.1 The Authority shall make an interest-bearing (@ Bank RateS) advance payment (the "Advance Payment"), equal in
amount to 10 (ten) percent of the Contract Price, exclusive for mobilisation expenses. The Advance Payment for
mobilisation expenses shall be made in two instalments each equal to 5% (five percent) of the Contract Price. The
second 5% (five percent) mobilisation advance would be released after submission of utilization certificate by the
Contractor for the first 5% advance already released earlier
Contractor Advance Payments 19.2.2 Contractor to apply for first installment after AD along with an irrevocable and uncond. BG equal to 100% of such
installment 06-06-18 Payment Received
Contractor Advance Payments 19.2.4 Any time after 60 days from AD Contractor may apply for 2nd installment
06.08-18 Payment Received
Contractor payment of advence payment 19.2.5 The Advance Payment shall be paid by the Authority to the Contractor within 15 (fifteen) days of the receipt of its
respective requests in accordance with the provisions of this Clause 19.2 Work executed
Contractor Return of advance payment 19.2.7 The advance payment shall be repaid through percentage deductions from the stage payments determined by the
Authority's Engineer in accordance with Sub-Clause 19.5, as follows
(a) deductions shall commence in the next Stage Payment Statement following that in which the total of all certified
stage payments (excluding the advance payment and deductions and repayments of retention) exceeds 20% (twenty
percent) of the Contract Price; and deductions shall be made at the rate of 15% (fifteen percent) of each Stage Payment Deductions are done in
Statement until such time as the advance payment has been repaid; provided that the advance payment shall be 10-06-19 line with contract
completely repaid prior to the time when 80% (80 percent) of the Contract Price has been certified for payment
provisions
Stage Payment for Works 19.4 Contractor shall submit Stage Payment Statement by 7th day of the month to AE
7th of eachmonth Complied Monthly
19.5 Within 10 days of receipt of Stage Payment Statement pursuant to Clause 19.4,AE shall determine and recommend
release of 90% as part payment pending issue of IPC if the AE. Payment to be made within 10 days of recommendation Complied Monthly
by Electronic transfer
Monthly Maintenance Statement to be submitted by 7th of each month as per format in Sch-O
7th of eachmonth
NV, 4,111'41
f f tfl 141
Bonus for early completion 19.20 In the event that the Project Completion Date occurs prior to the Scheduled Completion Date, the Contractor shall be --w --7 —V —1, -I ---1
entitled to receive a payment of bonus equivalent to 0.03% (zero point zero three per cent) of the Contract Price for
each day by which the Project Completion Date precedes the Scheduled Completion Date, but subject to a maximum of 13-06-19 yet to Achieve
5% (five per cent) of the Contract Price.
Insurance 20.1 Contractor shall effect and maintain at its own cost the insurance specified in Sch P. ABL/NH753j/Bhadgaon -
Chalisgaon /PKG-1/2018-
19/77 on dated
23.07.2018.
Insurance for professional 20.1.6 The Contractor shall provide to the Authority, within 30 days of the Appointed Date, evidence of professional liability
liibility insurance maintained by its Design Director and/or consultants to cover the risk of professional negligence in the 05-07-18 Submitted
design of Works.
Notice to the Authority 20.2 No later than 15 (fifteen) days after the date of this Agreement, the Contractor shall by notice furnish to the Authority,
in reasonable detail, information in respect of the insurances that it proposes to effect and maintain in accordance with 30-04-18 Notified
this Article 20
20.3 All insurances obtained by the Contractor in accordance with this Article 20 shall be maintained with insurers on terms
consistent with Good Industry Practice. Within 10 (ten) days from the Appointed Date, the Contractor shall furnish to
the Authority notarised true copies 15-06-18 Being Maintained
of the certificate(s) of insurance, copies of insurance policies and premia payment receipts in respect of such insurance,
Duty to report Force Majeure 21.5.1 Upon occurrence of a Force Majeure event the affected party shall by Notice report to other party forthwith
Immediate Notified
Event
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.
•
•
•
•
•
•
• Annexure - I
• Mobilization Status
•
•
•
•
•
•
4
4
•
•
4
411,
Ashoka Buildcon Limited Page 84
•• Project Name - Up-gradation of Bhadgaon- Chalisgaon (section II )of NH 753J from chainage 56+200 Km to
103+000 Km to Two lane with paved shoulders/ Four Lane configuration of [ Jalgaon - Bhadgaon -Chalisgaon
-Nandgaon -Manmad-NH 753J - (46.800 Km )] in the State of Maharashtra on EPC mode
Annexure - j
Updated Strip chart showing obstruction in Work
-,0111 411111171'
Religious Structure
Trees .
Encroachments / 0 ,
Trees
u Religious Structure
X
_ Land Disputes/Obstruction By Farmer
Religious Structure
Trees
Encroachments / Obstruction
Trees
t
• IP • • • • EP ek • • • • • • • •••••••• P•MPOPP•P
Religious Structure
Trees
_
Encroa
onotitit i i vinotwontatoto
_ ,. .. ,.. .2 ,
66720
66740
66730
66750
— „.._. ,..
66520
66530
Chalnage
$ IWIPOIMI
. 10- 14 '° SSS 'ZS. S.1.4 S
Encroachmen
Trees
11
°. e
.2 i ii s° °
ii.. .„i 9 s ° ,::.. .♦
e.s T° g g 2 P. 8 "
T' 8 ' '2 2 ? 8 .5', , -In r. ..., es,' in •-i ti. en .4 en
Chain:age ..., or ,,, u• .,.. o ..,. .v. 0 0 0 0 0 neu •-• •-• •-• •-• •-• •-• •-. ... en eV en .4 en n4 e. .4 en .4 en en en en en en en ser n• n• ne * VI LA IA VI IA tA VI
hnnnnnnnnnnn n. n n n
IA VI
n 4, 0 J1 In ,
n r. nnnnn
.
..
..0
. e,n n- e,,le-- .... n. n r. n n. nnnnn
4, 4) 4, 4) 4> vrs .. J. 4, •0 4:. •12 4, . . '4 . .41
nnn.....nnnn.nnnnt.nnnnnn n. n
V) ,1)
.0 60 ',0,.. .._ ..
n. .. 1
n , n. nnnn
...
n. n n• n 1, in
in -nr.
II
Trees
Water Pipe Line L
Electric Line & Pole
Religious Structure
la nd DIsputes/Obstru, ■
Forest Permission/ Overia -
COS & additional Realignment
Beall
4 4 4, t t l t t ( t. t ( ( ( t t t t ( tt
0••••••••••••••*•••••••peppe•popp•o.1
■
11•1111 Ill II■i
Trees ME IIIII i• MIN 1
Ii
ii i
Land Disputes/Ob •.
Forest Permission/ Dire a
COS & addin
COS &additional Realignment
Encroachm
Trees
Water Pipe tine
Electric Line & Pole
,Religious Structure
T:
Land Disputes/Obstruction
rz
Forest Permission/ Overlay
- - - - - -
P • • • IP IP • • • IP • • • • IP • • • • •11, 100•00•11#••••P
Forest Permission/Overlay
....
, 'i' Land Disputes/Obstruction By Farm
= Religious Structure
Trees
En.
70160
70170
70100
.0 0 0 0 0 0 0 0 4, 41 NO 41 •.0 ,12 0 .0 0 0 41 ,0 4. 4) ,0 ,0 *114111ftittli*M1"4* •
1"111141t.
7 P..
If.
Trees
Land Disputes/Obstruction By Fa
70530
70510
70520
70490
70500
70270
—
Trees
Water Pipe Line
Electric Line & Pole ■
RHS.MCW
Religious Structure •
Land Disputes/Obstruction.
Forest Permission/ Overlay
._ _.
COS & additional Realignment
Itealignme
4...
401
fr?Religmus Structure
r Pipe -
1.
1111
71410
71430
71440
.. . .'-
Mimeo 2 .... ••••
Ln In •.0 . .0 .1 4, ...is ,
I, I, 1, TZ111Z 1• 1,- N 1, 1, 1,.. 1, h,.1,. IS N. 1, 1,..... , o.,.- :
Encroa
Trees t
Water Pi: s, :,-.
Electric Line & Pole
Religious Structure
7
Land Disputes/Obstruction By Fa
2
Forest Permission/ Overlay
= Religious Structure
...1
-----.
Electric Line & Pole
Trees API
Encroachments /
_. N. ,
Chainage en . Z c r , "
,ce..... o g ..c
. goo. '
c> 0
en ey N en en en en en en
0 44 en
r
Vi P.
IN .1 en en 1,
.. 4' .1 rel
ee• en en
en
lel ,...
el te, el en
OS
en en ne 71" 1:: 'e.; Y. . . LI: , . .. .,-, rfl -
-
V) VI 4 rt; to ,Il 7.• .1! 75 4i, rj 3 2 t,'6 2 2, — 1,. g.":
. .,
Trees
S
ce .......• ....
Forest Permission/ Overlay
ealignmes
4 4 4. t ((tt (t l( ll(
IP.PIPIPW4P,P4P•••••••••.11, 41Per 41^,,PftIP•P
ea grime, impel- .
I
COS &addiuonal Realignment '
73530
73510
o o o ci ci o
73520
73430
Chainage : ., er• as ' o o 0- ._- co
00
o• o ... ,,, m 222g8882 2 - ., , - -. :-.
" na e^.4 IN r. CV 1,4 ,1 r..1 ev tv N
r. e, eq mr e. et, ev tv na to en en NI r, en en en en en en tn en en en en e.en 01 rn VI •
tr, 1.- PS tt Pl. .t,gh eit b.-Rab, b, sis, r. n., b. re. r., b...4.,_,at. n. ti. ra r. e,s, n. e- n. n. n. n. e. n. n. r. . r. r. r. in g ' 4145114011011011EMEN:'
En
Trees
Water Pipe Line
Electric Line & Po!e
3
Li Religious Srrtat.ire
X .
Land Disputes/Obstruction By Farm
E
Forest Permission/ Overlay
Religious Structure
t
Electric Line & Pole
Trees
74040I
73970 I
74010 I
74050
• • 8 2 2 g ? ..?, 2 P. 8 8 E 7, 8 • — -'4.
73920
73930
73940
73950
73980
74030
73960
2 ::.,' 2 F, 2 P. c2. —8 8 2 P, nsg 2 --
73990
74000
74020
, o'' $ IT CT
Chainage •0 1.-- 1--- I--- 1.-- 1--- I--- 1.-- - .• ..
P^
P. P. P P. P. g'.
1,- 1--- 1--- CO CO CO OD CO CO CO CO OD v. no n. NI n.I n1 (4
... ...... ... _ ._ _, ...... _ . '
p.
. P.P.P.P .
P.P .P.P.P.g'
Trees
_... ____,..
ForeSt Permission/Overlay -
Realignment as
,----,------ ,...,
COS & additional Realignment
— land Disputes/Obstruction y
in I I 111 II I I I 111 II
Religious Structure ,' ^
Electric Line & Pole . 11
Water Pipe Line
s
11 I II I
Forest Permission/Overlay - .
3
2 Land Disputes/Obstruct'
,.:.,
:-.-: Religious Structure
Encroachments / Obs
_
g
75870
, . • —. ,.... .., v. ,..0 1.•-• tO . •-• oc co C. CO •-• c. en co .4) n co -. n m co F - - E ''.. - - F a' 2 2 2 2 2.
Chainage rO M. M CO 01, ol co In 1/1 *.f. an In VI *0 Wit+4,43
4KW44414: 2 "'
.. 2h fr; 5.1 2 2 2 2
I
, I, I, I, 1, r, t, I, 1,
Encroachments / Obstruction
Trees
Religious Structure .
Ial CI I .11...
Land
rc •
Forest Permission./ Overtay
tit t t t 4. t t ttt lc tt l tt ( t
P•••.•••••••••••••••01PWIP • telP•e•••,
73 Religious Structure
Electric Line &Pole
Water Pipe Line
I
Trees
88822g $
0
8' 3 g 8 8 8 2
g g $ 6 ZS P 8 8 8 2 g g,' g3 8 S P 8 - • 2 2 g V' $ ‘.`7= g 8 8 8 2 F.; g$5,'sg.' 8 8 2 2 g ? E3 .13 g 8 8 8
Chalnage a...........r4,...4,1,4reve4c4e4rmmmmmmmmM
.o.o...p.o..o.4,..0.o....o..,,
1.
....1,,,NNI., ,N,1,4,NN,,NI
04›.4p...0 ,4) ,c4a
,NNNNN,NNt...1,NNN 1
e
E l '014444144W
'sr.' „,, -
t $$ $1,
NNO.1....NI,
.
1 1 .o .s:
e. c-; to
.-. 73. ', Z 'V'S L'S , 73 ti; ?It 53 33 33 3 8 13 33 8 11 8
o
1,,,..,,,f,,,,,,l ,,,f , 1%. ,,,,I,V,.. , -
Trees
a
Water Pipe Line ■ ... 0.-
Encroachments / Obstruction
Trees
,-,
WaterNpeLine 3. 3 33333 3 3 3 3. ll
Electric Line & Pole
3
u Religious Structure
z
,,..=
ON
Land Disputes/ObstructionBy Farmer
Y ii,..
Forest Permission/ Overlay
1 4 4 4 4 (llt ((llt (t I I (l
e•- •••••••••••••••••••••••••••••••
ea gnniin per ue
I .
COS & additional Realignment
78360
—8" —. " m 7 .,2 2 2 8 8 8 :2 2 2 8
8 8 8 :2 2 g
0 0 0
_ - 7,28
Chalnage ..,, ,-, ,i,, - .'or 0.I NI r4 f•I CV 01 04 ne ne 01 nl 01 01 00 CO Of 1/1 . WI tfl tr, 1.0
,-. 1.1. 'e P P. , - P. 7! ,-. r. , - ,. ,- 7' 7 7. ... r. g CO CO CO CO CO CO 0 . CO C0 CO CO CO CO CO CO CO CO CO CO CO 01 CO CO CO CO CO 01 CO CO 01 CO CO CO CO CO CO
ir, t, r. I', C.. e...e., N. IN C,r,C,r, 1,, n n n P., e. is Cs., r, IN t, I
,, , ,I , , t,I,r, , , ts I , Vs I, n n n n n n n n t• n 11,n n n n n
III
EBIIIIIIIIIL ,-..-....
Trees 1.
Encroachments / Obstruction.
111 ir.-Y
S! m? 8 -_. 8 2 7 8 2 I! 8 8 8 2 g 2 7 5,'
,,,,,o.o....,...0.0...0.0c.c..,,......, 2
co 2 ° ,T, $ ' FS 2 8 8 8 "2 7 ' 2 2 8 ..-":. ' - -. - 1 - .. :• - -,-- • -s--. .. - 2 .,. - ..
cbalnage
mcomm.......=.mw=.
c. r. c. c, c... es n es IN I, II, I, r. irs rs r es r ts co itErcrcE&rcgragiWgg i' ggg
n es r ..... es es es es es is es n ts I, .
.. . ... „ .. „, .. • .. ,, , . . ..:
En .,
Trees
10-4.) el t. ( ( t ( l ( t t t ( l t ( tttttttt
P e • • IP • • • • • • • • • • • • • • • ••••••••PWIP•11,
( hainage i ;7, 3 Fsi. 3 ,..7. .3 „, ,,, ,,, V" Vi T,. F.,, 3 F,, 3 E0000000
!I 3 3 F c: F, F, FFFF 3 :-.. .T, F ?, r„ ..f. F, si,. F. 8 22F4 A,7,222F822AA A222,1.822'2 AAS2AA.822
a. a a a. N.
NNNNNNNN.
a. 0,
N N
0, 0' 0
N.
0 0 0 0 7 0
N. N. N N
TO dr,8888888,28g0000000000000
0 0, 0, CP 0 0, CO a' a' 0 0, CO 0, 0, 0, Co 0 0, CO CP CO 0 CT CP CP 0, 0 CO g T, : 0: g a, r, &
N. N N. N N. N. ,.... N. N N. N. N. N. N N. N. N N N. N. N N N ‘..... N. NNNNN I,1,1-, 1, 1, 1, 1, 11., COCOCOOCCOO,COCOODOCCOCOCOCOCOCOCOOCCOCOOCCOCO
Encroachments / Obstru.
Trees
Water Pipe lane
Electric Line & Pole II
= • ;,:rt,--,,
ct
Forest Permission/ Overlay
COS& 4-...Y...
iL
Encroachments / Obstruction
Trees
Water Pipe Line
Electric Line & Pole
Religious Structure
7
,Land Disputes/Obstruction B ,F
cr
Forest Permission/ 0 •
._ ..s.
COS & additional Realignment
P • • • • • • • • • • • • • • • • IP • • • • • • IP • • f elPt • et •
..7O2 ,!.@?22g?...2,TER8 .
06L 1 8
00818
01818
02818
Chalnage 0 22?2.7g,75!8 0 2gg2g2W8
w .,..„, .......... ,,,,,,,,,.......,*,,,,mmmmmm.
7g.Tgg282g
• . • ... — • VI IA Ira
e.
r.
mcommcommcommwmcommoacomoommcomwmcommwwwwwcom COCI;;;;;I m ' .... . . .. ,
To.
Encroachments / Obstruction
Trees
Water Pipe Line
Electric Line & Pole 11
Religious Structure
E
.),-' Land Disputes/Obstruction By Farm
Forest Permission/ Overlay
I.
MI
MI
*
Encroachments / Obstruct
4
82390
Chain:age 2g7.25,3,9-ggg'g2:?253Pg?..8'2g$gT,P2?822g$g 2 F2g8'2A 7 '2,9gg8'2g$2 gpS'
F'.'ir(4"TFggTgg2222Z-4-4Waggig-4-4=f4
wwwwwwwwwwwww000000000000000000000
PI
SI
,..ItAAX1r.r.g115
00000000
,,44;W.4
00000000000
,T.,..A
00000
ii
Trees D N
i_ 1
tI t)t lt t llt l(
r e••EPIPIP•IPIPP•tet••••••ePelPIP e,t1P•tIPIP
ea giun
II III
00
'UIIII I 1111
2
1
___ ___,._
• ;..;. a
Cbal nage e." ,F2' F 'fi ,§' F gl F 1
r . fil . - . - - ••• g .._,,,...... .
: ;a
/0. roe . v. (44 IV 0•11 Ve 1.4
Religiete: Structure
Ws-Ys
Disputes/Obstruction By Far
orest Permission/ Overlay
1.5
COS & additional Realignment
= Relrgum, Structure
Electric Line & Pole
frees
84240
7
84220 -
Encroachments / Obstruction
83910
83880
83890
83870
83900
04210
84230
1... e•
Chalnage co. o% e, 0,
PI rn en ..... . . .. . . .. ,
CO Oa CO
Encroachm • ___
Trees
Religious Structure
...
Forest Permission/ Overlay
.
; Land Disputes/Obstruction Ry Farin
Religious Structure
Trees
•••
Chalnage
4 .,- t: V CO
4 := i! 4 V ,. I e. t..
1' IP . s'• +4, V. ••• i • .. V` V .1. 0, , , , In , , 5 0, V. n „, ,.,-., '4.1, ,
CO CO 03 CO 03 CO CO 03 03 03 CO 03 CO 03 03 CO CO 0 0
.t. 1, et
CO 03 0 03 00 CO CO 03 CO 0? 03 GO CO 0 CO 0 CO CO 0 CO 03 CO 03 m CO CO CO CO CO CO (r. m po CO CO 0 CO 33 CO GC 03 CO CO CO CO CO CO 03. 0 0 ..
Trees
Water Pipe Line
Religious Structure
Land Disputes/Obstruction By Fa
..sese
Forest Permission/ Overlay
•• •
1•q
CO S &
Encroi
Trees
Water Pipe Line
Electric Line & Pole ..
3
u Religious Structure I
X
ir, Land Disputes/Obstruction By F
1 -
Forest Permission/ Overlay
. ealignmeritas . Saiedu
- -—
PIP•••••0•0•0•IPP••••IPIP•IPPIIPIPt•te IPPte,
Trees
Encroachments / Obstruction
[hal n.lge ... .... .... ••••• . . lue 1.4 ••• I NI 0 4 ••• 14 N P..S. MI 4.) 101 MI NN
01 4 4 4' a t a, ;,‘,.e., - 4 4 g, 43 a a 4 4 4 4 '4 , a 4, 4' 4444.'6,. a . 6, .-E. 4 ,,, , ,.,, 4 4 4 4 4 1 4 .,, .., ,,, ., 4 ., .. 4 4 4 4 4 1' 4
,, . 'I' 4
Encroachments / Obstruction
Trees
.. Religious Structure
= P,1::,,,,,
. ,, ,::-,,:turr ,
Electric lane & Pole
Trees
Chainage
0 -O
O -•
.
err
a.
-=
o' 0 ,,..,
0
o ,-.:. ., ,,,, ,
o oo 0 ga.... ;
4 S. 0
,
.,;.,.,-17::,;"2 7
c .27
... F.Z.,,, 1
,.. , a " 7 ,.. g 2., ,.., .,.,lii! 741. °
4,,,,iiitg.:1
. .
7 cT
t ... Z o e. ..
t". ';95-1IFT72.9.27Ta;'",i'Z
Encroachments / Obstruction
Trees
• t tllt(llt t tt
r ett•reette••••••et fteve•rn tee et
Realignments*
Encroachments / Obstruction
Trees
Water Pipe Line
Electric Line & Pole
.. Religious Structure
i:
= Land Disputes/Obstruction By
=
Forest Permission/ Overlay
e.
COS & additional Real
Land Disputes/Obstruction By Fa
Religious Structure
Trees
.
ClminJge
,,,.7 Ptr g .
g e ,..,42 , T .., 7- - N 01 in g g 0 * en U24'1
CO
e` C.
Z.
- t:.; Fr - .- 1 g
;) CO el In 0r....
11;14t44514141R-
WIr4ififil
Encroachments / Obstruction
Trees
Water Pipe Line
Electric Line & Pole
RHS-MCW
Religious Structure
Land Disputes/0
__ _ I_
l( lt lt t l t t t ( ( ( ( Lt t.
eerretecereetereeereeer verefeeceeee
IIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIilllll
LHS-MCW
Land Disputes/Obstruction By Pa N
Religious Structure u
I .............. n......III
Electric Line & Pole
'.; .; 111111111111111111111111
I
Trees
11111111111111111111 1 1111111111NH 1111111
1
Encroachments, Obstruction 1
90020
Chainage ,:” I 0., X' V 4, V ' VC4 COCO * TI 'C00:*,, GOCPCO
tis' .,,, .,,, c,, a,• ..., . 317. ,..,,
. il., '.
:it 1 g: ci, T.
Moat° X CO CD 03 CO OW CAA,000:, 0.
, ,
w (ACCCOCCC0000:“005‘00t,
,.,....— ,.,
WI:GODC0 MM. ,.
..,,, —,,, 1
Encroachments / Obstruction , II IN
Water Pipe Line IIII I 111 IIIIII
Electric Line & Pole
i-i Religious Structure
Land Disputes/Obstruction By Farmer
ii
Forest Permission/ Overlay
COS & additional Realignment
Realignment as per Schedule 8
Realignment as per ScilgliIMP
$ . 2 - T. c̀r43 ' 8 a
M 8 T <4 2 ? ' 8 .,. 8 3 8 ' g, g g 2 ,s. '" 8 8 ' ,,., 'g g 1' g: 1' . F._ '" '"
...-,, c 0 .0 0 0 0 e
Chainage . en
Encroachments / Obstruction
Trees
Water Pipe Line
Electric Line & Pole
RHS-MCW
Land Disputes/0
•alignment
• as per Sched '
( ( ( ( ( ( ( ( ( ( ( ( ( ( (
Realignmentasper ScheduleB
&additional Realignment
stPermission/Overlay
"ILHS-14CW
Disputes/Obstruction ByFarmer
Il
irlfpous Structure '
ria
E
a.
-v
g_
WerPipe Line
.....
111
.
117
112
14 •
18.'
11.
E
141
147
151
157
12 1
172
9171
177
162
3
1 3•
13*
pp
16'
n
11
11
10
10
11
11
11
11
10
10
12
12
12
12
13
12
12
12
13
.13
13
13
13
12
13
13
12
14
14
IS
14
IS
IS
IS
IS
15
16
15
8
16
16
16
917
17
17
17
7
17
8
1•
I•
1
I
I
I
V
7.
WaterPipeLine
Electric Line&Pole
iilismcw
Religious Structure
Disputes/Obstruction By Farmer
R est Permission/ Overlay
z
.
71.,
-
d
-1
A
U
COS &additl. 0 ''.-1.i.:'
Trees
Encroachments / Obstruction
Trees
ltti_lttlittlttlttlillttlttitt
4
4
1
4
4
4
S
4
4
4'
S
9
9
4
4
a
a
a
a
a
COS& additional Realignment
tPermission/ Ove rlay
rid Disputes/Obstruction By Farmer
1
'goys Structu re
c Li ne & Pol e
r Pipe Line
si
ents/ O bstruct
93480
93390
93400
93410
93420
93440
93450
93470
92680
92690
92710
92720
92730
92740
92750
92760
92770
92780
92790
92800
92810
92820
92830
92840
92850
92890
92900
92940
92950
92960
92970
92990
■ 92990
93000
93010
93020
93030
93040
93050
93060
93070
93080
93090
92860
92870
92880
92910
92920
92930
S
ot
,-'
•chments/ 0 -
211111111111111111111 111111L
1
r Pipe Line
11
rf •
2=11
ZIME
Disputes/Obstruction By Farmer ..
St Permission/Overlay
i. . . & additionalRealignment
y
COS & adthtmnal Reallgnment
Mi
93 52 0
Chainage
S
us
8. 000""
_—,..m.,,.
.0.0 ,
0 ,
00""S
,00, 0—,-.0 8 0 2gSF.9.9,2g80 2P,S22P.S8 0 2gSF,22g8 0 2P,S22gS?8 0 2gS22,2@g8 0 2
0 ,0 ,04,...1.- rnnnnrnn,mmmmwmwmcommmM0, 0, 400.00.-Q0p9o..0?00 .......... r4r...rarvr4r4e4r4r4r4mmmm
mmmmmmmmmmmmmmmmmmmmmmmmmmmmmMmmmmmmm,......**.e
0, 00.00.00, 00.0 00, 0, 0, 0 00, 0, 0 0, 0, 0, 0, 0, 0•0 0 0 0 0, 00, 0 00, 0 0, 0 0 0 0, 0 0 0, 0, 0, 0 0 0, 0, 0 0 0. ; 0 0 O. 00, 0, O. 00, 0 0 000, 0 0 0 0 0 0,
I
Encroachments / Obstru
R!!!OF, WtaCLAIM.
t t ci l t C) t. t Lfr ttt t t l It t l k it
eterttItter et tett ettt ft'? ref r r r r,*Lc
Trees
Encroachments / Obstruction
0.0.000.00.00.00.00.00.00.000.00000.00.0.00.00.0.000000.000.00.0.0.0.06p00.00.00.000
.d. m.,cop, .....e.4m.timr-cOPOr.naM*ul.,WCP0-.,,mV.I.,W0, 0..rvm.drul.,M0, 0*c4mVIA,O1 . 00, 0-marmvar, WC,.....r4,1Vm.
ChaMage mmmmmm .d. ...1 . .******LnintArnmvImm. ..0,,,,,,,,,,mWMWM010=Wmma, C,P0, 0, 47PPCAcn....00.0.0
..f. .f.. ........V....d..4.....d. ...... ..1. * ,,I. ,aerv—tr*.r**, ,taa*.V. V. V*.tal. .. **.d......,,,..1 - .** .d. .4MW14 LA IA LI1 IA tn In Lil ul IA LA LA
C, C,,,, ,TPC, P.0. 0, ...0, 0, 0, rna.PMMCPMCPCPMPO, PMPO, PPPPO PPO CI, O, PMCPCPMPO, CPPQ, ”PITPMC,'
Encroachments / Obstruction
Trees
Water Pipe Line
I 11111
MEI I I
Religious Structure
Encroachments / Obstruction
Trees
Water Pipe Line
Electric Line & Pole
ReliglougStructure M'.
`*'
cc
Forest Permission/ Overlay
tsRealignment.as
( ( ( ( ( ( ( ( ( ( ( ( t ( ( ( ( ( ( ( ( ( ( ( ( (
I teett•WWWW4Petflo ettePtP4P••
....
COS & additional Realient
gnm
Encroachments / Obstruction
Trees Mil I 11 MOSSIMMIIIMMOMMIIIIIIMMUMMIN Mil O CM
Water Pipe Line
Electric Line & Pole ,. II I ME II IN II I
Religious Structure
Realignment as per Schedule
Encroachments / Obstruction
1111 1111
97540
97500
97490
97510
Chainage
2.7.22gg5:822g?..22g28 0 22:;22,9
.280 22.7g2g%?8 0 , 0 7
coMOCCOmWMCIM, M,00000.000v ..........rnerampnoNnameemmmmmmmmmmm
0 2g.722 '
0
.
. 4, 43 •0 .0 ..0 .4 .. •O •0 4) es es rnrrr es N N ts rrrrrrr es r n es r es r es NNNNNNNNN NNNNNNN ...N N N N N
C C . ,e, e:,
• PCPPPPPPO.O.PMPPCPPPO.PPC, PPPITPPPCPCPPPP.0, 00.0.0.0.0, POP000CP.00, 47, PCPPPPPO,
Encroachments / Obstructi
Trees
Encroachments/Obstruction . . ..
.,. ..., co
Chainage "i'im " '''' ow :
t. t. I, t. e.
at 0, c, ,F 0% II, 0, 0' 0, 0' 0, C. 0% C, ,C, 0, C. C, 0' tr, c2,. 0' C, 0" Crl '' cr ,§: ""' 7 7' 7 7' 7
' 7 PPP 7' 7 7 7 ,:., cs,
Encroachments / Obstruction
Trees
Water Pipe Line
Electric Line 8, Pole
3
Religious Structure
iligliaillialigel l l I
t•
= Religious Structure
I
Electric Line & Pole
Encroachments / Obstrucoott
Cbainage
g S. S; 2 . '22F22.3
, ,
'cF.' . S ' f-?. 2 T
,... es
--',2: F. 2 S.' 2 2 P'
2 i7.1 2 .7 5, 2 a ,7> ,o. z o - 2 .7, I.' F. 2 ". g c' 2 2 .2 2_ 2 2 F, 'L,' 2 0000000
. so c-.. co Os co
cv N N Iv na
ggggggg
I
E i ;..•.- i :,;
Trees
Water Pipe line
Electric Line & Pole
RHS-MCW
Religious S;Netti
Land
•,
4 I 4 I I • • tectitterteretetteretereereee
cos. f „„:".„,,,,,•,,_:„.__:_.,,
I I II II II I II1
I I I IIII I I I I Il
1001 10
0000.00.0000q000000.000000000000Q00000.00.00000. 00 .0 q 00 . 00 . 00 .00 . 0 $
Chainage NM*N.,00, NMPIA.,00•0.NM*Ul.NOOPO...NM,111.1,1204:1,0....NM*111.,00,0 NM,V1.,00,......NM.PN.,
mmmmmmmm,* ........ mminioiniominiALci..".....0.°,0,0,,,,,,,,,,..=..00.000,,,,,0•0,0,,pci• ezi
iiy, ci, Os 0, 0, 0, Os 0, 0, 0 , Os 0, Os Os 0, 8
0,
, o, o,m0, 00, o, o, cpa,
ci, o‘cpci
0, 0 , Os
c, mi"mcAoo‘os,, ma, , o,, 00, c, mmci, c,o, 0°, 0-, m ,, cAciso, m0,,, 00,,,,, c,,,,, i, a.mmoNo‘mmmo
a, o, ,
Religious Structure
Land Disputes/Obstniction By III'
Forest Permission/ Overlay
Religious Structure
I
Electric Line & Pole
ti
Water Pipe Line
Trees
Encroachments / Obstruction
■ 11111111111
o o o op 5 0 0 O
0 I, CO
0 0 0 0 0 o
t,
o 0000 O 0 O
O o r,co 0 0
Chalnage fsa CA CV rn m en enen tn rn rn •
0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 40 0 0 0 0 0
v. v.
0 8 0 0
Encroachments / Obstruction
Trees
Religious Structure,
I
cT
Forest Permission/ Ov
•
1
•
•
•
•
4
•
q
4
4
4
41
aq
•
4
•
9
•
•
•
9
COS& add i tionseali gn me nt
ForestPermi ssion/ Overlay
Land Disputes/Obstructi onBy Fa rmer
R el• i gious St ruct ure
7
S C:
,
=n -,
a
RQ
-c, -
■
i g
*
:4
',Trees
Encroa ch ments/ Obstruction
101360
101630
101640
101670
101630
101660
101710
101720
0.•
n
!,..
101 ;
E
R
10 '
101
101 j
101
101
10'
101
101
101
101
101
101
101'
101
101
101
101
101
01
01
10
101
101
101
10
10
10
01
101
101
101
101
10
10
01
10
101
10
10
10
10
01
01
01
101
01
a ch ments/Obstruction
a
1=11111111.1111111111-
4
L.,Religious Struct u re
Disputes/ObstructionBy Farmer
t Permission/Overlay
2111=1.11111
• 11
• •
COS& additional Realignment
102010
102070
102080
102090
102100
.... . io
o
Chainage . ....
0 0, in 0 CY CY 0 0 0 0 0 0 0 0 0 0
,... ... ...i ,... ...... ..., .... — .....
i... . — . ..... .... 5
RHS-MCW
Encroachments / Obstruction 0
Trees
hi
Water Pipe Line • N _
Electric Line & Pole 5
Religious Structure
I
Land Disputes/Obstru .
Forest Permission/ Over % ........„.s.....,.,
A
(((4(1(1
(1 t 4 II( t
t I' t, t t t t. (
• f IP' V•e • • EP e IIP IP •• • Pt IP IP Pr e. • • • Pi
Trees
Encroachmsagebs
2
III
102880
102930
102860
102870
000090000000009000000000i0000000 p00009000000000900000 900
0 •-• IN el V' It1 •D I,03 Os 0 t... is. 01 4' WI sO 1., CO Os 9 . eg 01♦ ill 0 o. 0 oN os . vs 0 r. co O., 0 •-• co en ••• 0 0 I,CO Co 0 •-• os co • 0 0 o. co co o .-. os
Chahar CV ts. el el ell el el el el el el (11 el el el el el el 141 el •Ir .0. gl• * .0. tr •t• • I. 01 ...1 V/ WI 1/1 L. IA 4:0 1
• 0 4,
sO 4) sO sO sO ,C, VD I, I, I, I, l•
`. Is t, t, t, t,CO CO CO
N el el el 44 el el 44 el el el e4 el el el el el el el el el el el e4 el el el el el el el el el el el el el el e4 el el el el el el IN el e4 el .1 el el el el el el 44 e4 el oa
0000000000000000000000000000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00
0 0 0 0 0 0 0 0 0 0 0 v.
Encroachments /Obstruction
Trees
Annexure - K
Drawing Register
(As enclosed on Page no. 12)
ANNEXURE-K
1.4 Status of Design Submitted Monthly Progress Report April/2019
Preparation of Design and Drawing are in progress for locations where the survey and geotechnical activities are completed.
ABL/NH-753J/Bhadgaon-
GAD of Minor Bridge at Ch.
16 Chalisgaon/Pkg-11/2018- 19.02.2019 Approved R2 33 27.02.2019
70+618(Design Ch. 70+628)
19/ 415
ABL/NH-753J/Bhadgaon-
GAD of Minor Bridge at Ch.
17 Chalisgaon/Pkg-I1/2018- 19.02.2019 Approved R2 33 27.02.2019
70+618(Design Ch. 70+628)
19/415
ABL/NH-753J/Bhadgaon-
GAD of Minor Bridge at Ch.
19 Chalisgaon/Pkg-II/2018- 19.02.2019 Approved R2 33 27.02.2019
73+180(Design Ch. 73+187)
19/415
ABL/NH-753J/Bhadgaon-
GAD of Minor Bridge at Ch. 27.02.2019
20 Chalisgaon/Pkg-11/2018- 19.02.2019 Approved R2 33
73+180(Design Ch. 73+187)
19/415
ABL/NH-753J/Bhadgaon-
GAD of Minor Bridge at Ch. 19.02.2019 Approved R2 33 27.02.2019
22 Chalisgaon/Pkg-11/2018-
64+566(Design Ch. 64+566) 19/415
ABL/NH-753J/Bhadgaon-
GAD of Minor Bridge at Ch.
32 Chalisgaon/Pkg-II/2018- 19.02.2019 Approved R2 34 27.02.2019
102+880(Design Ch. 102+898)
19/416
ABL/NH-753J/Bhadgaon-
GAD of Minor Bridge at Ch.
33 Chalisgaon/Pkg-II/2018- 19.02.2019 Approved R2 34 27.02.2019
102+880(Design Ch. 102+898) 19/416
ABL/N11-7531/Bhadgaon-
GAD of Minor Bridge at Ch.
42 Chalisgaon/Pkg-II/2018- 14.02.2019 Approved R2 35 27.02.2019
77+340(Design Ch. 77+417)
19/408
ABL/NH-753J/Bhadgaon-
GAD of Minor Bridge at Ch.
43 Chalisgaon/Pkg-11/2018- 14.02.2019 Approved R2 35 27.02.2019
77+340(Design Ch. 77+417)
19/408
ABL/NH-753J/Bhadgaon-
GAD of MNB at Ch. 56+561 Approved RO 46 14.03.2019
80 Chalisgaon/Pkg-11/2018- 14.03.2019
(Design Ch. 56+561 19/442
ABL/NH-753J/Bhadgaon-
GAD of MNB at Ch. 56+561 Approved RO 46 14.03.2019
81 Chalisgaon/Pkg-I1/2018- 14.03.2019
(Design Ch. 56+561 19/442
4 CAD 14NEluc C0,641 4 NBI. H-74 1/134 igac4 4 4 4 4 4 4 4 a 4 if f E lf 4 414
82
(Design Ch. 56+561
Chalisgaon/Pkg-I1/2018- 14.03.2019 Approved RO 46f 14.03.Z019
19/442
Dimension Details of ABL/NH-753J/Bhadgaon-
83 Superstructure of MNB at Ch. Chalisgaon/Pkg-I1/2018- 14.03.2019 Approved RO 46 14.03.2019
56+561 (Design Ch. 56+561) 19/442
Reinforcement Details of
ABL/NH-753J/Bhadgaon-
Substructure Girder of MNB at
86 Chalisgaon/Pkg-11/2018- 14.03.2019 Approved RO 46 14.03.2019
Ch. 56+561 (Design Ch.
19/442
56+561)
Reinforcement Details of
ABL/NH-753J/Bhadgaon-
Substructure Girder of MNB at
87 Chalisgaon/Pkg-I1/2018- 14.03.2019 Approved RO 46 14.03.2019
Ch. 56+561 (Design Ch.
19/442
56+561)
Reinforcement Details of
ABL/NH-753J/Bhadgaon-
Substructure Girder of MNB at
88 Chalisgaon/Pkg-I1/2018- 14.03.2019 Approved RO 46 14.03.2019
Ch. 56+561 (Design Ch. 19/442
56+561)
Reinforcement Details of
ABL/NH-753J/Bhadgaon-
Substructure Girder of MNB at 46 14.03.2019
89 Chalisgaon/Pkg-II/2018- 14.03.2019 Approved RO
Ch. 56+561 (Design Ch. 19/442
56+561)
Reinforcement Details of
ABL/NH-753J/Bhadgaon-
Substructure Girder of MNB at Approved RO 46 14.03.2019
90 Chalisgaon/Pkg-11/2018- 14.03.2019
Ch. 56+561 (Design Ch. 19/442
56+561)
Reinforcement Details of
ABL/NH-7531/Bhadgaon-
Substructure Girder of MNB at Approved RO 46 14.03.2019
91 Chalisgaon/Pkg-11/2018- 14.03.2019
Ch. 56+561 (Design Ch. 19/442
56+561)
Dimensoional Details of
ABL/NH-753J/Bhadgaon-
Abutment Substructure &
125 Chalisgaon/Pkg-I1/2018- 12.04.2019 Approved R1 69 24.04.2019
Foundation for MNB at Ch.
19/485
69+850 (Design Ch. 69+858)
Reinforcement Details of
ABL/NH-753J/Bhadgaon-
Abutment Substructure &
126 Chalisgaon/Pkg-I1/2018- 12.04.2019 Approved R2 69 24.04.2019
Foundation for MNB at Ch.
19/485
69+850 (Design Ch. 69+858
ABL/NH-753J/Bhadgaon-
Geo-Technical Investigation - 24.04.2019
129 Chalisgaon/Pkg-I1/2018- 12.04.2019 Approved 69
Report of MNB at Ch. 69+850 19/485
ABL/NH-753J/Bhadgaon-
GAD of Pipe Culvert at Ch. Approved R3 70 24.04.2019
130 Chalisgaon/Pkg-II/2018- 08.04.2019
80+065 (Design Ch. 80+075) 19/481
ABL/NH-753J/Bhadgaon-
GAD of Pipe Culvert at Ch. Approved R3 70 24.04.2019
131 Chalisgaon/Pkg-Il/2018- 08.04.2019
80+065 (Design Ch. 80+075) 19/481
ABL/NH-753J/Bhadgaon-
GAD of Pipe Culvert at Ch. Approved R4 70 24.04.2019
132 Chalisgaon/Pkg-II/2018- 08.04.2019
96+308 (Design Ch. 96+318) 19/481
ABL/NH-753J/Bhadgaon-
GAD of Pipe Culvert at Ch. Approved R4 70 24.04.2019
133 Chalisgaon/Pkg-11/2018- 08.04.2019
96+308 (Design Ch. 96+318) 19/481
ABL/NII-753J/Bhadgaon-
GAD of MNB at Ch. 89+300
134 Chalisgaon/Pkg-I1/2018- 08.04.2019 Approved R1 71 24.04.2019
(Design Ch. 89+305)
19/480
ABL/NH-753J/Bhadgaon-
GAD for MNB at Ch. 89+300
135 Chalisgaon/Pkg-I1/2018- 08.04.2019 Approved R1 71 24.04.2019
(Design Ch. 89+305)
19/480
ABL/NH-753J/Bhadgaon-
Geo-Technical Investigation R1 71 24.04.2019
140 Chalisgaon/Pkg-I1/2018- 08.04.2019 Approved
Report of MNB at Ch. 89+300 19/480
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753j From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
0' Maharashtra on EPC Mode.
Annexure - L
Applicable Permits
Project Name : Up-gradation of Bhadgaon- Chalisgaon (section II )of NH 753J from chainage 56+200 Km to 103+000 Km to Two
lane with paved shoulders/ Four Lane configuration of [ Jalgaon - Bhadgaon -Chalisgaon -Nandgaon -Manmad-NH 753J -
(46.800 Km )] in the State of Maharashtra on EPC mode
7 4 Permission of the State Government for drawing water from river/reservoir Obtained
•
r
YIP
Ur
+0,
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.
Annexure - M
Daily Event Register
1 048
rr
Sr. No. Date Event Outcome
Force Majeure Event _ Strike called by State Employees of Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
r 43 10-Aug-2018
Union from 07.08.2018 to 09.08.2018-Pkg-II- Reg. 11/2018-19/94
Kodgaon, Mundkheda, Galan and Agnawati Parmission for Communicated to EE NH Dlv Vide our letter No ABL/CENH/Bhadgaon-C.halisgaon/PKG-
63 21-Aug-2018
Water. 11/2018-19/119
Communicated to EE NH Div Vide our letter No ABL/CENII/Bhadgaon-Chalisgaon/PKG-
64 22-Aug-2018 Submission of Drainage Plan & Profile-Pkg-1l-Reg.
11/2018-19/120
Legal Laying of pipes through Slab Culvert @ Km 70+270
Communicated to Grampanchayat. Nagardevla vide our letter No ABL/CENH/Bhadgaon-
65 22-Aug-2018 within the ROW by Grampanychayat Nagargevala•Pkg-II-
Chalisgaon/PKG-11/2018-19/121
Reg.
Submission of Drainage Plan & Profile from Ch. 59600 To Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
66 23-Aug-2018
59+900•Pkg-II-Reg. II/2018-19/122
Submission of Pipe Culverts at Ch. 70+975 (Design Ch.
Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
67 23-Aug-2018 71085), at Ch. 82+950 (Design Ch. 82+958) & at Ch.
11/2018.19/123
1n 1 + 4 5 11 (Desien Ch. 101+4631-Pkv-11-Rer,
Utilization of Pond Ash and Fly Ash of Deep Nagar Thermal
68 24-Aug-2018 Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Challsgaon/PKG-
Power Plant, Bhuswal of Mahagenco in Project
11/201849/124
Highway_Pkg-11-reg.
Legal Laying of pipes through Slab Culvert @ Km 70+270 Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
69 25-Aug-2018
within the ROW by Grampanychayt Nimbhora-Pkg-11-Reg, 11/2018-19/125
70 25-Aug-2018 Testing the Sample of Steel-Pkg-Reg. Communicated to Director„ CSRT-Structwel Lab Pvt. Ltd. Pune vide letter No
ABL/CENH/Bhadgaon•Chalisgaon/PKG-11/2018-19/126
2018
IV'
Sr. No. Date Event Outcome
Submission of General Arrangement Drawing of Minor Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
P 75 27-Aug-2018
Bridge at Ch. 60+267 ( Design Ch. 60+270) - Pkg-II-Reg. 11/2018-19/135
Submission of General Arrangement Drawing of Minor Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
85 3-Sep-2018
Bridge at Ch. 102+880 (Design Ch. 102+898)-Pkg-11- Reg. 11/2018-19/147
Submission of Hydraulic Design Calculation of Minor Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Challsgaon/PKG-
86 3-Sep-2018
Bridge at Ch. 70+618 (Design Ch. 70+628) Pkg-II-Reg. 11/2018-19/148
Submission of Hydraulic Design Calculation of Minor Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Challsgaon/PKG-
87 3-Sep-2018
Bridge at Ch. 102+050 (Design ch. 102+058) Pkg-II-Reg. 11/2018-19/149
Submission of Hydraulic Design Calculation of Minor Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
88 3-Sep-2018
Bridge at Ch. 102+880 (Design Ch. 102+898) Pkg-11-Reg. 11/2018-19/150
Submission of General Arrangement Drawing of Minor Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
89 3-Sep-2018
Bridge at Ch. 105+050 (Design Co. 102+058)-Pkg-II-Reg. 11/2018-19/151
Submission of Geneal Arrangement Drawing of Box Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
90 3-Sep-2018
Culvert at Ch. 7S+945(Design Ch. 75+957) Pkg-Il-Reg. 11/2018-19/152
Submission of Geneal Arrangement Drawing of Box Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
91 3-Sep-2018
Culvert at Ch. 71+660 (Design Ch. 668)-Pkg-II-Reg. 11/2018-19/153
Submission of General Arrangement Drawing of Minor Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
92 3-Sep-2018
Bridge at Ch. 70+168 (Design Ch.70+628) Pkg-11-Re& 11/2018-19/154
Minutes of Meeting convened by SE, NH Circle Pune at Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
93 3-Sep-2018
Sakari PWD Rest House on 29th August, 2018-Pkg-II-Reg. 11/2018-19/155
Submission of Lab. Equipment Calibration Report-Pkg-11- Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
94 4-Sep-2018
Reg 11/2018-19/156
Submission of General Arrangment Drawing of Minor Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
95 7-Sep-2018
Bridge at Ch. 73+180 (Design Ch. 73+187) Pkg-11-Reg. II/2018-19/157
Submission of Hydraulic Design Calculation of Minor Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
96 7-Sep-2018
Brdige at Ch. 73+180 (Design Ch. 73+187) Pkg-II-Reg. 11/2018-19/158
Submission of Hydraulic Design Calculation of Minor Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
97 7-Sep-2018
Bridge at Ch. 82+595 (Design Ch. 82+302) Pkg-11-Reg. 11/2018.19/159
Submission of General Arrangement Drawing of Pipe
Culver at Ch. 68+782 (Design Ch. 68+786), Ch. 56+967
Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
98 7-Sep-2018 (Design Ch. 56+878), Ch. 57+965 (Design ch. 58+328) &
11/2018-19/160
Pipe Culvert at Ch. 67+665 (Design Ch. 67+668). Pkg-II-
Reg.
Submission of GAD of Minor Bridge at Ch. 82+302-Pkg-II- Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
99 7-Sep-20I8
Reg. 11/2018-19/161
Submission of General Arrangement Drawing of Pipe
Culvert at Ch. 70+120 (Design Ch. 70+129), Pipe Culvert at Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
100 7-Sep-2018
Ch. 58+985 (Design Co. 58+832), Pipe Culvert at Co. 11/2018-19/162
78+500 (Design Ch. 78+501).
Submission of Concrete Mix Design - Job Mix Forumula Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Challsgaon/PKG-
101 7-Sep-2018
(JMF) Grade-M10, M15 (PCC) & M20 (RCC) - Pkg-Il-Reg 11/2018-19/163
Issurance of Form-V for Labour License-Gentle Remidner- Communicated to EE NH Div Vide our letter No ABL/CEN H/Bhadgaon-Chalisgaon/PKG-
102 7-Sep-2018
Pkg-11-Reg. 11/2018-19/164
Communicated to EE NH Div Vide our letter No ABL/CEN H/Bhadgaon-Chalisgaon/PKG-
103 7-Sep-2018 Approval of Concrete dmixture Source-Pkg-II-Reg.
11/2018-19/165
3 of 6
INP*
1 1
Event Outcome i
Sr. No. Date
Submission of Monthly Progress Report for the month o Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
04 7-Sep-2018 11/2018-19/166
August-20 113-Pkg-11-Reg.
Status of Preconstruction Activities & Intimation regarding
Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
rpti75 7-Sep-2018 Events having continuting delay effect for Extension o
11/2018-19/167
Time-Reg.
Submission of Lab. Equipment Calibration Report-Pkg-11- Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
rip 06 7-Sep-2018
11/2018-19/168
Reg
Intimation for Conducting BBd Survey In Overlay Stretches
I Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
07 8•Sep-2018 at Design Ch. 83+800 to 92+350 & Design Ch. 97+400 To
11/2018-19/169
99+000 (As per Schecule B)-Pkg-11-Reg.
I Submission of GAD of Minor Bridge at Ch. 56+566 (Design Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
r
108 8-Sep-2018
Ch. 56+561) Pkg-11-Reg. 11/2018.19/170
Submission of General Arrangement Drawing of Pipe
Communicated to EE Nil Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
109 8-Sep-2018 Culvert at Ch. 81+990 (Design Ch. 82+000), Ch. 91+510
11/2018-19/171
(Design Ch. 91+521) Ch. 95+025 (Design Ch. 95+003) &
Submission of GAD of Minor Bridge at Ch. 82+475 (Design Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Challsgaon/PKG-
7 110 8-Sep-2018
Ch. 82+482) Pkg-11-Reg. 11/2018-19/ 172
Submission of Hydrualic Design Calculation of Minor Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
Till 8-Sep-2018
Bridge at Ch. 56+566 (Design Ch. 56+561) Pkg-II-Reg 1112018-19/173
T 112 8-Sep-2018
Submission of General Arrangement Drawing of box
Culvertat Ch. 93+590), Box Culvert at Ch. 99+575 (Design
Ch. 99+575) Pkg-11-Reg.
Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
11/2018-19/174
7 113 8-Sep-2018
Submission of GAD of Minor Bridge at Ch. 78+782 (Design Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
Ch. 78+793) Pkg-11-Reg. 11/2018-19/175
Submission of GAD of Minor Bridge at Ch. 89+300 (Design Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
114 8-Sep-2018
Ch. 89+305) Pkg-II-Reg. 11/2018-19/176
Submission of Hydraulic Design Calculation of Minor Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
7 115 8-Sep-2018
Bridge at Ch. 69+850 (Design Ch. 69+858) Pke-11-Reg 11/2018-19/177
Submission of Hydraulic Design Calculation of Minor Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
7 116 8-Sep-2018
Brdige at Ch. 82+475 (Design Ch. 82+482) Pkg-II-Reg. 11/2018-19/178
Submission of Hydraulic Design Calculation of Minor Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
1 117 8-Sep-2018
Bridge at Ch. 78+782 (Design Ch. 78.793)-Pkg-11-Reg. 11/2018•19/179
Submission of Hydraulic Design Calculation of Minor Communicated to EE N11 Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
118 8-Sep-2018
Bridge at Ch. 89+300 (Design Ch. 89+305) Pkg-11-Reg. II/2018-19/180
411
Submission of GAD of Minor Bridge at Ch. 69+850 (Design Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
11 119 12-Sep-2018
Ch. 69+858) Pkg-II-Reg. II/2018-19/181
Demand of Grampanchayat Waghali for Provision of Pipe
. Communicated to EE NH Dlv Vide our letter No ABL/CENH/Bhadgaon-Chalisg-aon/PKG-
120 12-Sep-2018 Culverts at Village: Waghali, Tehsil : Chalisgoan, Dist •
11/2018-19/182
jalgaon Pkg-11-Reg.
• Approval of Revised Plant & Profile Drawing From Km Communicated to EE NH Div Vide our letter No ABL/CEN11/Bhadgaon-Chalisgaon/PKG-
121 17-Sep-2018
56+200 to Km 103+000-Pkg-II-Reg. 11/2018-19/183
Approval of Bitumen Emulsion (SSI&RS-1) Source-Pkg- Communicated to EE Nil Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
, 122 20-Sep-2018
Reg. 11/2018.19/184
Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
123 20-Sep-2018 Approval of Bitument Source-Pkg-II-Reg.
11/2018-19/185
Approval of Fly Ash (Mineral Admixture) Source-Pkg-II- Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
124 20-Sep-2018
Reg. 11/2018-19/186
AMP
Obstruction in execution of Works due to existence o
Communicated to EE NH Dlv Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
125 20•Sep-2018 Water Supply Lines the Construction Zone & Lines
11/2018-19/187
damaged during excavation-Pkg-II-Reg.
Submission of Video Recording in accordance with Clause Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
126 20-Sep-2018
11.6 of Contract-Pkg-11-Reg. 11/2018-19/191
4 orb
11.
Outcome
I
Sr. No. Date Event I
Communicated to EE NH Div, Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/P KG-
142 17-Oct-2018 Approval of Stone Quarry Source-Pkg-11-Reg.
II/2018-19/232
;k 'kkldh; tehuhrhy ik>) rykok e/lcwu egkekxZ fodkik P;k
143 19-Oct-2018 dkekdjhrk ekrh@eq:e@mpy.;klkBh xzkelaplca- ;leaps ukgjdr ABL/CENH/Bhadgaon-Challsgaon/PKG-11/2018-19/233
V.• nklkyk feGsks ckcr-
oulfj(lcs'Icicr jl.r;kyxr vMFkGk Bj.kkjh ollcrIcsMh
144 19-Oct-2018 ABL/CENH/Bhadgaon-Chalisgaon/PKG-11/2018.19/234
ckcr-
145 19.Oct-2018 ji.Rigxr vlysys o'{krksMh ckcr- ABL/CENH/Bhadgaon-Chalisgaon/PKG-11/2018-19/235
Utility Shifting-Payment of 1.3% Supervision Charges for
Communicated to EE NH Div, Vide our letter No ABL/CENH/Bhadgaon-Challsgaon/PKG-
146 23-Oct-2018 Shifting of MSEDCL Electrical lines/Poles obstructing
11/2018-19/236
Construction Works-reg.
Approval of Admixture, Curing Compound, Poysulphlde Communicated to EE NH Dlv, Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
148 24-Oct-2018
Sealant Primer & Road Marking Source-Reg 11/2018-19/239
a.
Utility Shifting-Payment of 1.0% Technical Scutiny fee for
Communicated to EE NH Div. Vide our letter No ABL/CENH/Bhadgaon-Challsgaon/PKG-
149 24-Oct-2018 shifting of water Supply Lines, obsturcting construction
II/2018.19/240
a. workslpkg-reg
Submission of Proof Check Drawing Typical Details of Box Communicated to TPF Engineering Pvt Ltd. In JV with TPF Getinsa Association With NASCENCE
150 30-Oct-2018
Culvert-Pkg-II-Reg Consultant Pvt. Ltd., Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-11/2018-19/243
SP
Submission of Proof Check Drawing of typical of Pipe Communicated to TPF Engineering Pvt Ltd. In IV with TPF Getinsa Association With NASCENCE
151 30-Oct-2018
SP
Culvert-Pkg-II-Reg Consultant Pvt Ltd, Vide our letter No ABL/CENH/Bhadgaon-Challsgaon/PKG-11/2018-19/244
Submission of Proof Check Rigid Pavement Design Report Communicated to TPF Engineering Pvt Ltd. In IV with TPF Getinsa Association With NASCENCE
152 30-Oct-2018
Pkg-II-reg Consultant Pvt. Ltd., Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-11/2018-19/245
The Chief Engineer & Regional Officer, MORT&H, Vide our letter No ABL/CENH/Bhadgaon-
153 30-Oct-2018 Approval's for Utility Shifting wortk-Reg
Chalisgaon/PKG-II/2018-19/246
a.
Submission of Proof Checked Drawing of Typical Communicated to TPF Engineering Pvt Ltd. In IV with TPF Getinsa Association With NASCENCE
154 31-Oct-2018
Miscellaneous Highway Drawing-Pkg-II-Reg. Consultant Pvt Ltd., Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-11/2018-19/247
a.
Existence of Archaeological Structure Mudhal Devi Ancient Communicated to EE NH Div, Vide our letter No ABL/CEN H/Bhadgaon-Chalisgaon/PKG-
155 1-Nov-2018
Temple at Km. 86+900 on LHS of Project Highway 11/2018-19/250 on dated 01.11.2018.
submission of aditional change of scofre in respect to Communicated to TPF-Engg JV with TPF Getinsa, Vide our letter No ABL/CENH/Bhadgaon-
164 5-Dec-20113
a. culverts Chalisg,aon/PKG-11/2018-19/300 on dated 05.12/018.
Communicated to TPF-Engg JV with TPF Getinsa, Vide our letter No ABL/CEN H/Bhadgaon-
• 165 8-Dec-2018 Submission of Trial Patch Test Results PQC
Chalisgaon/PKG-11/2018-19/313 on dated 08.12.2018.
cfr Submussion of Billing Breakup as per scope of project for Communicated to TPF-Engg IV with TPF Getinsa, Vide our letter No ABL/CENH/Bhadgaon-
166 12-Dec-2018
Interim Payment pursusant in accordance with Schedule-H Chalisgaon/PKG-11/2018-19/319 on dated 12.12.2018.
as
•
son s
Sr. No. Date 1 Event t Outcome
Communicated to TPF-Engg jV with TPF Gednsa, Vide our letter No ABL/CEN H/Bhadgaon-
171 25-Dec-2018 Slow Progress Reply
Challsgaon/PKG-11/2018-19/338 on dated 25.122018.
Communicated to TPF-Engg IV with TPF Getinsa, Vide our letter No ABL/CEN H/Bhadgaon-
172 25-Dec-2018 Safety Arrangements Reply
Chalisgaon/PKG-11/2018-19/339 on dated 25.12.2018.
Delay In Tree Felling Permission from Bhadgaon & Communicated to TPF•Engg JV with TPF Getinsa, Vide our letter No ABL/CEN H/Bhadgaon-
173 28-Dec-2018
chalisgaon Municipal Council Chalisgaon/PKG-11/2018-19/345 on dated 28.12.2018.
Conduction of 30 National Road Safety Week from Communicated to TPF Engineering Pvt.Ltd. TPF Getinsa, Vashi.Chalisgaon our letter NoABL/N11.
177 4-Feb-2019
0+02.2018 to 10.02.2019 753J/Bhadgaon-Chalisgaon/Pkg-11/2018-19/392
Communicated to Chief General Manager Bhusawal thermal power station deep nagar
178 12-Feb-2019 Allotment of Fly ash our above referred NH project
Bhusawal. our letter No ABL/NH-7531/Bhadgaon-Chalisgaon/Pkg-11/2018-19/406
Communicated to TPF Engineering Pvt Ltd. TPF Getinsa, Vashi, Chalisgaon our letter No
179 25-Feb-2019 Submission of Overlay Design Report for final Seal & Sign
ABL/NH-753j/Bhadgaon-Chalisgaon/Pkg-11/2018•19/422
Statas of Preconstruction Activities & intimataion
Communicated to TPF Engineering PvtLtd. TPF Getinsa, Vashi. Chalisgaon our letter No
180 6-Mar-2019 regarding Events having continuing delay offect for
ABL/NH-753J/Bhadgaon-Chalisgaon/Pkg-11/2018-19/438 on dated 06.032019.
extension of time.
Utility Shifting Deposition of Payment of 1.3% Supervision
Communicated to The Deputy Executive Engineer MSEDCL Bhadgaon our letter No ABL/N H-
181 11-Mar-2019 Charges for Shifting of MSEDCL Electrical lines poles
7531/Bhadgaon-Chalisgaon/Pkg-11/2018-19/444 on dated 11.03.2019.
obstructing Construction works
Non certification of the stage payment statement-items • Communicated to TPF Engineering PvtLtd. TPF Getlnsa. Vashi, Chalisgaon our letter No
183 18-Mar-2019
PQC 2S0 mm and COS of additional thickness in IPC-2 ABL/NH-753J/Bhadgaon-Chalisgaon/Pkg-11/2018-19/449 on dated 18.03.2019.
Submission of Retention Money Bank Guarantee and Communicated to EE NH Dhule our letter No ABL/NH-7531/Bhadgaon-Chalisgaon/Pkg-11/2018
184 29-Mar-2019
request for release of Retention Money. 19/461 on dated 29.03.2019.
Request for Manual PQC in Chalisgaon City in Median
Communicated to TPF Engineering rvt.Ltd.TPF Getinsa, Vashi, Chalisgaon our letter No
185 1-Apr-2019 Portion due to Existence of Street Light poles & Electric
ABL/NH-753J/Bhadgaon-Chalisgaon/Pkg-11/2018-19/467 on dated 01.04.2019.
Lines
Submission of Compliance of Comments raised during site
Communicated to TPF Engineering Pvt.Ltd.TPF Getinsa, Vashi, Chalisgaon our letter No
186 3-Apr-2019 verification on 29.03.2019 in respect of Consolidated
ABL/NH•753J/Bhadgaon-Chalisgaon/Pkg-I1/2018-19/468 on dated 03.04.2019.
Change of Scope Proposal.
Communicated to TPF Engineering Pvt Ltd. Getinsa,Vashi, Chalisgaon our letter No
187 8-Apr-2019 Shifing of Street Lights at Km. 95+790 Near Kharlai Naka.
ABL/NH-7531/Bhadgaon-Chalisgaon/Pkg•11/2018•19/476 on dated 08.04.2019.
Utility Shifting- Shifting of Water Supply Lines- Approval Communicated to EE NH Dhule our letter No ABL/NH-753J/Bhadgaon-Challsgaon/Pkg-11/2018
188 10-Apr-2019
of RO Mumbai. 19/482 on dated 10.04.2019.
6 of 6
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.
Annexure - N
Efforts of EPC Contractors for Utility Shifting
Project Name : Up-gradation of Bhadgaon- Chalisgaon (section II )of NH 753J from chainage 56+200 Km to 103+000 Km to Two lane with paved
shoulders/ Four Lane configuration of [ Jalgaon - Bhadgaon -Chalisgaon -Nandgaon -Manmad-NH 753J - (46.800 Km )] in the State of Maharashtra on
EPC mode
Follow -Up details with various Utility Agencies
Sr. Name of the Utility & Obstructing Date of Follow- Name & Designation of Reply of representative ABL person name &
Status
No. Utility Owning Entity Chainage Up person visited from Utility Owning Entity designation
From 56+200 to 7,11,18 June Mr. S.D. Kalikem, Chief Regarding shifting of MJP Joint survey is done & awaited for Detailed estimate of water Supply Mr. Jayesh Patel & Mr.
1 MJP Water Supply Line
103+000 2018 engg, Nashik Div Water supply line Line. Sujay Thube
Forest Department From 83+900 to 13-Jun-18 MR. khatri, Assitant of Regarding permission for List of Tree cutting submitted to Authority Mr. Mahesh Borse
92+650 & From DFO Tree cutting & Estimates of
3 Tree Cutting
97+400 to 99+300
1.Mr.S.D.kalikem, Chief
06, 19, 20 July engg,Nashik div 2.DE- Regarding shifting of MJP Joint survey is done & awaited for Detailed estimate of water Supply Mr Jayesh Patel & Mr.
From 56+200 to
1 MJP Water Supply Line Water supply Line Line Sujay Thube
103+000 2018 PWD NH 3.zila Parishad -
Jalgaon & Pachora.
1 of 6
4
Sr. Name of the Utility & Obstructing Date of Follow- Name & Designation of Reply of representative
ABL person name &
No. Utility Owning Entity Chainage Up person visited from Utility Owning Entity Status
designation
1.Mr.S.D.kalikem, Chief
From 56+200 to 14,16, 20,21 & engg,Nashik div 2.DE- Regarding shifting of MJP Detailed estimate of water Supply Line is submitted to Authority for
1 MW Water Supply Line Mr Jayesh Patel & Mr.
103+000 28 August 2018 PWD NH 3.zila Parishad - Water supply Line Approval. Sujay Thube
Jalgaon & Pachora.
1.Mr.S.D.kalikem, Chief MJP on 29.08.2018 raises demand for 1% tech. scrutiny charges
engg,Nashik div - Demand under consideration of Authority
From 56+200 to 1,3,9,16,23 Regarding shifting of MJP Mr Jayesh Patel & Mr.
2.DE'PWD NH 3.zila _ Contractor on 24.10.18 has proactively requested Authority to allow
1 MJP Water Supply Line Sujay Thube
103+000 October 2018 Water supply Line depositing of scrutiny charges of MJP pending decision on demand by
Parishad - Jalgaon &
Pachora. Authority
2 of 6
4 t 4 4 4 (4 4 4 104404 4% 0 0 I I I I I
Sr. Name of the Utility & Obstructing Date of Follow- Name & Designation of Reply of representative ABL person name &
No. Utility Owning Entity Chainage Up Status
person visited from Utility Owning Entity designation
Tree cutting permission is given vide letter no. 1128 dated 16.10.2018.
From 56+200 to 1,3,9,16 October Mr.Khatri , Assitant of Regarding permission for Mr. Arun Patil & Mr.
4 Tree Cutting Tree cutting work is in progress in the month of October 2018 & 520 no
103+000 2018 DFO tree cutting Mahesh Borse
of trees to be cut at the end of October 2018.
From 83+900 to
92+650 & From 2,5,7,15,16,21,2 Mr. Arun Patil & Mr.
3 Forest Clearance 2 November The NOC from Forest Dept. for overlay work is still awaited.
97+400 to 99+300 Mahesh Borse
2018,
14,16,21,27,29 Tree cutting permission is given vide letter no. 1128 dated 16.10.2018.
Mr.Khatrl , Assitant of Regarding permission for Mr. Arun Patil & Mr.
From 56+200 to Tree cutting work is started in the month of October 2018 & 855 no of
4 Tree Cutting November Mahesh Borse
103+000 DFO tree cutting
2018, trees to be cut at the end of November 2018.
3 of 6
4 4 4 I 4 4 4 I I 9 4 4 I I 4
Sr. Name of the Utility & Obstructing Date of Follow- Name & Designation of Reply of representative
ABL person name &
No. Utility Owning Entity Chainage Up person visited Status
from Utility Owning Entity designation
Tree cutting permission is given vide letter no. 1128 dated 16.10.2018.
From 56+200 to 3,4,7,17,24,27 Mr.Khatri , Assitant of Regarding permission for Mr. Arun Patil & Mr.
3 Tree Cutting Tree cutting work is started in the month of October 2018 & 855 no of
103+000 December 2018 DFO tree cutting Mahesh Borse
trees to be cut at the end of November 2018.
Month of January 2019
Tree cutting permission is given vide letter no. 1128 dated 16.10.2018.Mr.
From 56+200 to 3,14,18,22,18 Mr.Khatri , Assitant of Regarding permission for Arun Patil & Mr.
3 Tree Cutting Tree cutting work is started in the month of October 2018 & 855 no of Mahesh Borse
103+000 January 2019 DFO tree cutting
trees to be cut at the end of November 2018.
4 of 6
A A II I I I I 44444
Sr. Name of the Utility & Obstructing Date of Follow- Name & Designation of Reply of representative
ABL person name &
No. Utility Owning Entity Chainage Up person visited Status
from Utility Owning Entity designation
Tree cutting permission is given vide letter no. 1128 dated 16.10.2018.
From Ch. 4+000 to 4,6,11 February Mr.Khatri , Assitant of Regarding permission for Mr. Arun Patil & Mr.
3 Tree Cutting Tree cutting work is started in the month of October 2018 & 855 no of
Ch. 56+200 2019 DFO tree cutting Mahesh Borse
trees to be cut at the end of November 2018.
—
Month of March 2019
MJP on 29.08.18 raises demand for 1% tech. scrutiny charges
- Demand under consideration of Authority
1.Mr.S.D.kalikem, Chief - Contractor on 24.10.18 has proactively requested Authority to allow
engg,Nashik div depositing of scrutiny charges of MJP pending decision on demand by
From Ch. 4+000 to 5,7,11,18,25 Regarding shifting of MJP Mr Jayesh Patel & Mr.
1 MJP Water Supply Line 2.DE'PWD NH 3.zila Authority
Ch. 56+200 March 2019 Water supply Line Sujay Thube
Parishad - Jalgaon & - Clearance for construction awaited
Pachora. - ABL has pay 1% Technical Scrunity Fee to MJP jalgaon & Zila Parishad
dated 23.11.2018.
Tree cutting permission is given vide letter no. 1128 dated 16.10.2018.
From Ch. 4+000 to 6,18,21,27 Mr.Khatri , Assitant of Regarding permission for Mr. Arun Patil & Mr.
3 Tree Cutting Tree cutting work is started in the month of October 2018 & 855 no of
Ch. 56+200 March 2019 DFO tree cutting Mahesh Borse
trees to be cut at the end of November 2018.
5 of 6
4 4 a 4 1 4 4 a 4 I a a I 4 4 1 a I
Sr. Name of the Utility & Obstructing Date of Follow- Name & Designation of Reply of representative ABL person name &
No. Utility Owning Entity Status
Chainage Up person visited from Utility Owning Entity designation
Tree cutting permission is given vide letter no. 1128 dated 16.10.2018.
From Ch. 4+000 to 2,8,16 April Mr.Khatri ,Assitant of Regarding permission for Mr. Arun Patil & Mr.
3 Tree Cutting Tree cutting work is started in the month of October 2018 & 855 no of
Ch. 56+200 2019 DFO tree cutting Mahesh Borse
trees to be cut at the end of November 2018.
6 of 6
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.
Ann exure - 0
No.
Pass Failed Pass Fail Pass Fail Fail Pass Fail Pass Fail Pass
Atterberg's Limit 1S:2720, Pan 5 LL-50 max, P1=25 max 631 0 0 0 631 0 0 126 0 0 0 126 20.00
2 Sieve Analysis IS:2720, Part 4 75 mm maximum size 631 0 0 0 631 0 0 126 0 0 0 126 20.00
15.2 kNim' min. for emb upto 3m ht
3 Proctor Test IS:2720, Part 8 631 0 0
and 16.0 kN/n t for emb more than 0 631 0 0 0 0
3m 126 0 126 20.00
4 Free Swelling Index IS:2720,Part 40 50% max. 751 63 0 0 751 63 0 0 0
150 0 ISO 20.00
5 Field Density(test) IS:2720, Part 28 95% 430 106 30 0 460 106 10 0 7
86 10 93 22.39
2) Soil / Embankment Materials
Atterbcrg's Limit IS:2720, Part 5 1 test/ 1500 m) LL-,50 max, PI-25 max 88 0 7 0 95 0 0 16 0 3 0 19 22.04545
2 Sieve Analysis 1S:2720, Part 4 1 test/ 1500 m' 75 mm maximum size 88 0 7 0 95 0 0 16 0 3 0 19 22.04545
15.2 1l‘1.'m' nun. for emb upto 3m ht
3 Proctor Test IS:2720, Part 8 1 test/ 1500 en' 88 0 7 0 95 0 0
and 16.0 kN/n? for emb more than 16 0 3 0 19 22.04545
5 Field Density(test) 1S:2720, Part 28 10 tests/ 3000 ris2 95% 526 106 100 12 626 118 2 105 0 18 4 123 23.42205
Atterberg's Limit IS:2720, Pan 5 1 test/ 1500 m' LL=50 max, PI-25 max 119 0 19 0 138 0 0 24 0 4 0 28 20.28986
138 0 24 0 4 0 28 20.28986
5 Free Swelling Index 1S:2720,Part 40 As required 50% max. 119 0 19 0 0
4) GSB Materials
0 45 0 244 0 0 40 0 IS 0 55 22.54098
Atterbcrg's Limit IS:2720, Part S 1 test/400 m' LL=25 max, P1=6 max 199
0 0 0 0 0 0 0 0 0 0 0
3 Proctor Test 1S:2720, Part 8 1 test/ source
46 0 42 0 88 0 4 7 4 15 8 22 25.00
4 Moisture Content 1S:2720, Part 2 1 test/400 m5 (+) 1% (-) 2% of OMC
0 0 0 0 0 0 0 0 0
IS:2720,Part 16 As required 30% minimum 0 0
5 CBR
0 0 0 8 0 0 2 0 2 0 4 45
As required Mort&h Table 400-2 8
6 MV 1S:5640
0 0 0 0 0 0 0 0 20
As required 2% max. > 2%, do soundness test 0 0
7 Water Absorption IS:2386, Part 3
52 8 204 37 6 37 3 12 4 49 24.01961
I tests/ 1000 m2 98%,Mort&h 401.3.2 152 29
Field Density (set) IS:2720, Part 28
—4 —4 —4 —4 —41 -11
II 1 IF f...crbert ,..inTiti
l LS!...77a, —T11 -1
, ,:s;-
/-2(R in' /I 4 —11. 6-7.4-2! *, 2 —1 --o--74 7? ---'t —"4—4 22 2 0 4 0 6 27.27273
4
2 Sieve Analysis IS:2386, Pan 1 I test/ 200 m' MORTII Table 400-11 12 0 10 0 22 0 0 2 0 4 0 6 27.27273
3 Proctor Test IS:2720, Pan 8 1 test/source 1 0 0 0 I 0 0 0 0 0 0 0 0
S Deleterious Content IS:2386, Part 2 As required No deleterious constituent. 6 0 0 0 6 0 0 1 0 0 0 1 20
6 Aggregate Impact Value LS: 2386, Part 4 1 test/1000 m' 30% maximum 12 0 10 0 22 0 0 2 0 4 0 6 29.09091
7 Comb. Flakiness Elongation IS: 2386, Part I 1 test/500 m' 35% maximum 19 0 10 0 29 0 0 0 4 0
2 6 22.069
S Water Absorption IS: 2386, Part 3 As required 2% max. > 2%, do soundness test 2 0 0 0 2 0 0 0 0 0 0 0 20,
12 Field density IS: 2720, Part 28 1 Set of Three Hole/1000 m' 98% 9 0 10 0 19 0 1 3 2 5
2 I 25.263
3 Residue 600 micron sieve Ref.IS: 8887 2 tests/lot 0.05% Mass maximum 2 0 0 0 2 0 0 0 0 0 0 0 0
2 tcsts/lot 100 2 0 0 0 2 0 0 0 0 0 0 0 •0
6 Ductility at 27°C cm IS: 1208
97.5% to 99% 0 0 0 0 0 0 0 0 0 0 0 0 0
7 Solubility in Carbondisulphide IS: 1216 2 tests/lot
2 %max Coagulation 0 0 0 0 0 0 0 0 0 0 0 0 0
9 Stability to Mixing Cement Ref.IS: 8887 As Required
0 0 0 0 0 0 0 0 0 0 0 0 0
Particle Charge RclIS: 8887 2 tests/lot Positive
10 -...
0 0 0 0 0 0 0 0 0 0 70
2 tests/lot 80/100 0 0
11 Penetration Grade IS: 217; LS:72; IS: 1203
7 0 5 0 12 0 0 2 0 3 0 5 45.000
Rate of Application (Set) MORTII 502.2.2 3 test per day 6 kgs/10 sq.m.
12
1 Sieve Analysis IS: 2386, Part 1 MORTH Table 500-10 62 0 26 0 88 0 0 13 0 6 0 19 21.59091 -41
Comb. Flakiness & Elongation IS: 2386, Part 1 1 test per 350 m3 35 % maximum 22 0 15 0 37 0 0 4 0 4 0 8 21.62162
5
2% max. If>r/scarryout Soundness 0 I 0 0 0 I 20
6 Water Absorption 15: 2386, Part 3 As Required by the Engineer 3 0 0 0 3 0
Test
Sct of 3 Marshall moulds - 2
Marshall Stability (In Set) ASTM D-1559 at 60°C -900 kgs min. e 0 4 0 12 24.4898
0 12 0 49 0 0 8 0 4 0 12 24.4898
8 Marshall Flow (In Set) ASTM 0-1559 2% to 4% 37
0 113 0 0 16 0 18 0 34 30.0885
Drilled Core Density ASTM D-1559 1 test per 700 mt As per aped. Job Mix Formula 71 0 42
10
1 1 1 -' 1 1 1 4 i e il I I I 4 4 a 4 4 4 r v t 4
Sieve Analysis IS: 2386, Part 1 2 tests per day MORTH Table 500-18 0
I 6 0 0 0 6 0 2 0 0 0 2 30
Gradation after Extraction LS: 2386, Part 1 2 tests per day As per apvd. Job Mix Formula 0
3 2 0 0 0 2 0 1 0 0 0 I 30
Aggregate Impact Value IS: 2386, Part 4 1 test per 200 in' 24% maximum 0
4 3 0 0 0 3 0 I 0 0 0 1 30
Comb. Flakiness & Elongation IS: 2386, Part 1 1 test per 350 m 30% maximum 0
5 3 0 0 0 3 0 1 0 0 0 1 30
Drilled Core Density ASTM D-1559 1 test per 700 in' As pen apvd. Job Mix Formula 0
6 0 0 0 0 0 0 0 0 0 0 0 0
Laboratory Density ASTM D-15$9 2 tests per day As per apvd. Job Mix Formula 0
7 0 0 0 0 0 0 0 0 0 0 0 0
I test/told and or as directed 10% more of Yield, but not less than 0
Re-bend Test IS: 1786 3 0 I 0 0 0 1 ' 24
by the Engineer 457 N/mm' 5 0 0 0
8
-4
.- it
lir --I—.I—ai —4- ..4 _i. sour.A. a74 _..4 _I _41 _4 _.4 —I _.% _..4 _i -4 _...0 ._,„ -I -, __q _..i, _ 4 ,.....4 _.4 _4 _4
pH Vale 1 -
6 minimum 2 0 0 0 2 0 0 1 0 0
directed by the Fneineer 0 1 30
2 Suspended Matter 1 test per source or as
IS: 3025 2000 mg! Lit. (Maximum) 2 0 0 0 2 0 0 1 0 0
directed by the FIltlfleff 0 1 30
1 test per
p sceour or u _m..-
3 Chlorides (CL) IS: 3025 500 mg / Lit. (Maximum) 2 0 0 0 2 0 0 I 0 0 0 1
directed by the Frivinerr 30
4 1 test per source or as
Sulphates (SO4) IS: 3025 500 mg / Lit (Maximum) 2 0 0 0 2 0 0 1 0 0
directed by the Fnrinerr 0 I 30
S Inorganic Matter (TDS) I test per source or as
IS: 3025 3000 mg / Lit. (Maximum) 2 0 0 0 2 0 0 I 0 0
directed by the Frwineer 0 1 30
6 Total Organic Matter I test per source or as
IS: 3025 200 max (as total volatile soild) 2 0 0 0 2 0 0 0 0 0 0
directed by the Fneinrer 0 0
12) Cement (OPC Grade 53)
1 Fineness (Blaine's Method) IS: 4031, Part 2 1 test per lot 225 min (sp. Surface m2/kg 126 0 0 0 126 0 0 25 0 0 0 25 20
2 Fineness (Dry Sieve) IS: 4031, Part 4 1 test per lot 10% max (ret on 90 mic sieve) 220 0 36 0 256 0 0 45 0 12 0 57 22.26563
3 Le Chatelier Expansion IS: 4031, Part 3 1 test per lot 10 mm max (expansion) 220 0 36 0 256 0 0 45 0 12 0 57 22.26563
Compressive Strength IS: 4031, Part 6 37 Mpa min after 168 hrs; 7 days 277 0 32 0 3(9 0 0 39 0 12 0 71 22.97735
1 Fineness (Blaine's Method) IS: 4031, Part 2 1 test per lot 225 min (sp. Surface m2/kg 3 0 0 0 3 0 0 I 0 0 0 1 30
Fineness (Dry Sieve) IS: 4031, Part 4 1 test per lot 10% max (ret on 90 mic sieve) 3 0 0 0 3 0 0 1 0 0 0 1 30 '.
2
10 mm max (expansion) 3 0 0 0 3 0 0 I 0 0 0 1 30
3 Le Chatelier Expansion IS: 4031, Part 3 1 test per lot
1 Sieve Analysis of CA IS:2386, Part 1 1 test/ operation IS:383 340 0 84 0 424 0 0 69 0 18 0 87 20.51887
2 Sieve Analysis of FA 1S:2386, Part 1 I test/operation IS:383 340 0 84 0 424 0 0 69 0 21 0 90 21.22642
3 Flakiness Index IS:2386, Part 1 I test/ 200 m' 35% maximum 296 0 84 0 380 0 0 60 0 18 0 78 20.52632
4 Aggregate Impact Value IS:2386, Part 4 I test/ 200 m3 45% maximum 296 0 84 0 380 0 0 60 0 18 0 78 20.52632
161Concrete Compressive Strength Test (in set)
M-I0 (7 days) IS:516 See • below NORTH Clause 1700 85 0 0 0 85 0 0 17 0 0 0 17 20
I
M-10(28 days) 81 0 0 0 81 0 0 16 0 0 0 16 19.75309
M-15(7 days) 213 0 57 0 270 0 0 46 0 21 0 67 24.81481
2
M-15 (28 days) 204 0 78 0 282 0 0 47 0 30 0 77 27.30496
M-25 (7 days) IS:516 See • below NORTH Clause 1700 166 0 90 0 256 0 0 43 0 24 0 67 26.17188
4
M-25 (28 days) 97 0 81 0 178 0 0 29 0 20 0 49 27.52809
Frequency
Quantity of Concrete in work, m' No. of Samples (sheet)
0-5 I
6.15 2
16-30 3
31.50 4
51 and above 4 plus one additional sample for each additional 550m' or part thereof
Authority Engineer
Cotroctor