Вы находитесь на странице: 1из 253

I a f,a,l

1^),/-

ffiffiresKfi Ashoka Buildcon Limited

Ref . : ABLI NH-7531/ Bhadgaon-Chalisgaon/ pK G-tI/ 2019-20 e e Date:04/05/2019


/S

To,
The Team Leader
Nd/s. TPF Engineering Pvt. Ltd.,
Narayanwadi, Near Old Stone Buitding,
Opp. Suman Nursing Home,
Chalisgaory Dist.: falgaon,
Pin:424101

Sub: Rehabilitation / IJpgadation of existing highway to 2Iane/ 4 lane with paved


shoulder
configuration from Bhadgaon -Chalisgaon r-. so+zoo to Km. L03+000 section of
NH-753 J
(Jalgaon-Manmad) on EPC Mode in the State of Maharashtra Submission
Progress Report for the month of April-2019 -pkg-Il_ Reg.
- of Monthly

Ref.: Clausell.7 of Article i.i. of Contract.

Dear Sir,

In accordance with Clause 11.7 of Contracf we are submitting herewith Monthly progress
Report for
the month of April-20L9 for your information and record.s pleise.

Thanking you and assuring you of our best services all the time.

Yours truly,
For Ashoka Buildcon Limite4

;
Authorized Signatory

Encl.: As above.

Copy to:

1) Executive Engineer, National Divisioru Dhule for kind information please.


!1S_n1vay
2) Assistant Engineer, Grade-L NH Sub Division, Navapur (Jalgaon) for informaition
please.

-n
A\-/

C)O
z--' <\.tlI

H
rdtrr). \'o"t'
r
4..". -atl
ri*6t
5ra
,l'tl-"-
.-'t !$
x61
'
.t\d

Regd" office : s. No. 86i, Ashoka House, Ashoka Marg, Vadara, Nashik 422 01 r, r,,,laharashtra India. . lbl +91 2S3 30it70S
Fax +91 ZSgZ1J6TA4 o w//w.ashokabJitd.on
ctN 145200MH 1993P1C071970
"o*
ASHOW! Ashoka Buildcon Limited

Ref.: ABL/NH-753J/Bhadgaon-Chalisgaon/PKG-Il/2019-20/cod Date: 04/05/2019

To,
The Team Leader
Ws. TPF Engineering Pvt. Ltd.,
Narayanwadi, Near Old Stone Building,
Opp. Suman Nursing Home,
Chalisgaon, Dist.: Jalgaon,
Pin: 424 101

Sub: Rehabilitation / Upgradation of existing highway to 2 lane/ 4 lane with paved shoulder
configuration from Bhadgaon -Chalisgaon Km. 56+200 to Km. 103+000 section of NI-1-753 J
(Jalgaon-Manmad) on EPC Mode in the State of Maharashtra - Submission of Monthly
Progress Report for the month of April-2019 -Pkg-H- Reg.

Ref.: Clause 11.7 of Article 11 of Contract.

Dear Sir,
In accordance with Clause 11.7 of Contract, we are submitting herewith Monthly Progress Report for
the month of April-2019 for your information and records please.

Thanking you and assuring you of our best services all the time.

Yours truly,
For Ashoka Buildcon Limited,

Authorized Signatory

Encl.: As above.

Copy to:

1) Executive Engineer, National Highway Division, Dhule for kind information please.
2) Assistant Engineer, Grade-I, NH Sub Division, Navapur (Jalgaon) for information please.

Regd. Office : S No $61. Ashoka House. Ashoka Masg, Vadala, Nashik 422 011, Maharashtra !n&a. • 101 • 91 263 3011705
Fax ,91 253 2236704 • .ww ashokabuildcon.corn
CIN: 1-45200MH1993PLC071970
AUTHORITY

Public Works Department (National Highway) Maharashtra

AUTHORITY'S ENGINEER
M/s. TPF Engineering Pvt. Ltd. in JV with M/s. TPF Getinsa in
Association with M/s. NASCENCE Consultants Pvt. Ltd.

Up-gradation of Bhadgaon- Chalisgaon (section II )of NH 753J from Chainage 56+200


Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of [
Jalgaon - Bhadgaon -Chalisgaon -Nandgaon -Manmad-NH 7531- (46.800 Km )J in the
state of Maharashtra on EPC mode
Package No. IV
MONTHLY PROGRESS REPORT
Month of April-2019

(Document No. MPR-11)


Submitted by
EPC Contractor

ASHOK/I
ASHOKA BUILDCON LIMITED
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km
to 103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC
Mode.

CONTENTS

IP
Sr. No Description Page No
1 Executive Summary 2-13
2 Introduction 14-15
3 Project Location Plan 16-17
4 Project Key Plan r 18-19
5 Project Details 20-22
6 Key Dates for Achievement and Performance on the Project 23-26
7 Proposed Program for Completion of Construction Works 27-28
8 Status of Preliminary Activities 29-30
9 Construction Progress 31-33
10 Project Progress S- Curve 1 34 i
11 Project Organization 35-39
12 QA/ QC Report [ 40 I
13 Substantial Disputes 41-46
4IP 14 Change of Scope 47-53
15 Maintenance Work 54-55
16 Safety-Traffic Management Steps 56-58
17 Site Visit and meeting held during this month 59-64
11, 18 Annexure 65
A. List of Available Plant and Machinery 66
SI
B. List of Laboratory and Field Test Equipment 67
C. List of Survey Equipment 68
D. Status of Encumbrances as on 30th April 2019 69
E. Progress Photographs 70
F. Letter Correspondence During April 2019 71-73
G. Weather Report 74
H. List of Contractual Obligation 75
I. Mobilization status 76
J. Updated Strip Chart Showing obstruction in work. 77
K. Drawing Register 78
L. List of Applicable permits 79
EP
M. Daily Event Register 80
N. Efforts of EPC Contractor for Utility Shifting 81
0. Status of QA/QC reports for the month of April 2019 82
P. Status of approvals of Mix Design, Source & Borrow Areas
84-86

Ashoka Buildcon Limited Page 1


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km
to 103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC
Mode.

1. EXECUTIVE SUMMARY

Ashoka Buildcon Limited Page 2


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km
to 103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC
• Mode.

1.0 EXECUTIVE SUMMARY


Project Brief:
Up-gradation of Bhadgaon - Chalisgaon (section II)of NI-1 753J[Jalgaon - Bhadgaon -Chalisgaon -
PP
Nandgaon- Manmad (46.800 Km )] from Design Chainage 56+200 Km to 103+000 Km to Two lane
• with paved shoulders/ Two Lane configuration of in the state of Maharashtra on EPC mode.

1.1 PROGRESS AT A GLANCE


• Summary ofprogressattheend of Apri12019(in accordance with program submitted).

Physical Physical
Sr. Weightage in Progress
Component Progress (Cumulative up
No. Project (%) (During Current to Current
Month) Month)
Road work including Culvert, 5.416% 41.948%
1 73.73% 1
Widening and repair of culvert
2 Minor Bridge/Underpass/Overpass 10.22% 0.955% 5.795%

41,
3 Major Bridge 2.97% 0.197% 0.590%
4 Toll Plaza 1.98% 7 0.000% L 0.000%

5 Road Side Drain [ 1.92% 0.000% 0.000%
Road Sign making, Km Stone, Safety 0.000%
6 1.91% 0.000%
Device
7 Bus Bays 0.52% 0.000% 0.000%

41,
8 Truck Lay-Byes 0.26% 0.000% 0.000%
9 Junction (Misc work & Paver Block) 1.47% 0.000% 1 0.000%
IP

10 Road Side Plantation 0.19% 0.000% 0.160%



Repair of protection works other than
41, approaches to the bridge, elevated 0.230 %
11 0.23 % 0.000 %
sections/Flyover/ grade separated
and ROBsJ RUBs.
Safety and Traffic management during
12 0.93% 0.000% 0.310%
construction
13 Site clearance and dismantling 1.45% 0.000% 1.064%
4I
14 Dismantling of existing structures 0.58% 0.000% 0.602%
AP 15 W Beam Crash Barrier & railing 0.50% 0.000% 0.000%
16 Retaining/Toe Wall 0.00%
17 Precast divider (Kerb stone) 0.32% 0.000% 0.000%
18 Street Lighting/Highway Lighting 0.82% 0.000% 0.000%
6.568% 50.699%

IP
Ashoka Buildcon Limited Page 3
4 I I 1 I I

Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of N11-753J From Ch. 56+200Km to 103+000Km Two/Four lane with
Paved Shoulder in the state of Maharashtra on EPC Mode.

Planned in
Sr. Weightage in Cost
Component Unit Item Description Scope (AS Progress % Physical Cost Weightage
No. Project (°/0) Weightage in
per Scope Till Date Progress Progress
Component
of Work)
A- Widening and strengthening of
existing road.
1. Earthwork up to top of the
Km 10.53% 67.07 55.24 82.370% 8.674%
subgrade

Km 2. Sub-base Course - GSB 7.69% 67.07 48.72 72.648% 5.587%

Km a. WMM 0.62% 20.71 3.20 15.448% 0.096%


Km b. DBM 2.31% 41.99 15.14 36.058% 0.833%
Km c. BC 1.34% 41.99 0.00 0.000% 0.000%
Km 3. Dry lean concrete 8.06% 67.07 39.26 58.543% 4.719%
Road works including Km 4. Pavement Quality Concrete 28.79% 67.07 32.92 49.091% 14.133%
1 Culverts, widening 73.73% B- Reconstruction/New 2/4 -lane
and repair of culverts.
realignment/ bypass(Rigid
pavement)
1. Earthwork up to top of the 3.8272 0 0.000% 0.000%
Km 0.64%
subgrade
Km 2. Sub base course 0.54% 3.8272 0 0.000% 0.000%
Km 3. Dry lean concrete 0.49% 3.8272 0 0.000% 0.000%
Km 4. Pavement Quality Concrete 1.8% 3.8272 0 0.000% 0.000%
D-Re-Construction and New Culvert
on existing road, realignment,
bypass.
Nos Culvert (length < 06 m) 10.92% 58 42.00 72.414% 7.908%
1. Widening & Repairing Minor 18 18.00 100.000% 0.270%
Minor Bridges/ 0.27%
2 10. 22% Bridges
Underpass/overpass 2. New Minor Bridges

Ashoka Buildcon Limited Page 4


Ili,* r 4 t I It 4 a e a st g w 0 M I

Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of N11-753) From Ch. 56+200Km to 103+000Km Two/Four lane with
Paved Shoulder in the state of Maharashtra on EPC Mode.

I 21.4
RMT Foundation + Substructure 1.27% 13.40 62.617% 0.795%

21.4
RMT Super-structure 0.15% 7.00 32.710% 0.049%

6
Nos Approaches 0.11% 0.00 0.000% 0.000%

3
Guide Bunds and River Training
Nos 0.01% 0.00 0.000% 0.000%
Works
3. Reconstruction of Minor
Bridges
RMT Foundation + Substructure 6.92% 152.6 99.11 64.944% 4.494%
RMT Super-structure 0.82% 152.6 34.71 22.742% 0.186%
Nos Approaches 0.6% 22 0.00 0.000% 0.000%
Guide Bunds and River 0.000% 0.000%
Nos 0.07% 11 0.00
Training Works
Reconstruction of Major
Bridges
Nos Foundation 0.98% 116.6 70.20 60.206% 0.590%
Nos Sub-structure 0.67% 116.6 0.00 0.000% 0.000%
Major Bridge (length Super structure (including
>60m) works and RMT 0.29% 116.6 0.00 0.000% 0.000%
bearing)
ROB/RUB/ elevated Wearing Coat including
3 2.97% RMT 0.24% 116.6 0.00 0.000% 0.000%
sections/ flyovers expansion joints.
including viaducts if Miscellaneous items like hand
any rails, crash barriers, road 0.18% 116.6 0.00 0.000% 0.000%
RMT
marking etc.
Nos wing wall/return wall 0.26% 2 0.00 0.000% 0.000%
Guide bunds, River Training 1 0.00 0.000% 0.000%
Nos 0.09%
work etc.
Page 5
Ashoka Buildcon Limited
4 4 4 * 4 a 4 4 4
4 4 4 4 Y 4 4 4 4 4 4 4 4

Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of N11-753j From Ch. 56+200Km to 103+000Km Two/Four lane with
Paved Shoulder in the state of Maharashtra on EPC Mode.

Approaches (including Retaining


Nos walls, stone pitching and 0.26% 2 0.00 0.000% 0.000%
protection works)
Nos Toll Plaza 1.98% 1 0.00 0.000% 0.000%
RMT Road side drains 1.92% 5.9 0.00 0.000% 0.000%
Road signs, marking, km
Kin 1.91% 46.8 0 0.000% 0.000%
stones, safety device
Project facilities
Nos Bus Bays 0.52% 17 0 0.000% 0.000%
Nos L Truck lay-byes _ 0.26% 1 0 0.000% 0.000%
Others (Junctions + Misc + Paver 0.000% 0.000%
Nos 1.47% 33 0
Block)
Km Road side plantation 0.19% 36.065 30.278 j 83.954% 0.160%
Repair of protection works other
than approaches to the bridges, 36.15 30.28 83.954% 0.160%
4 Other Work 13.08% 0.23%
elevated sections/flyovers/grade
separators and ROBs/RUBs.
Safety and traffic management 0.93% 18 36.15 100.000% 0.230%
Nos during construction.
Nos Site clearance and dismantling 1.45% 33.52 6.00 33.333% 0.310%
Dismantling of existing 0.58% 26 24.60 73.391% 1.064%
Nos structures
Nos W Beam Crash Barrier & railing 0.5% 10.40 0 0.000% 0.000%

Retaining/Toe Wall

Kin Precast divider (Kerb stone) 0.32% 10.40 0 0.000% 0.000%

Nos Street Lighting/Highway Lighting 0.82% 419 0 0.000% 0.000%

Total 100% 50.699%

Page 6
Ashoka Buildcon Limited
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km
to 103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC
Mode.

1.2 PAVEMENT WORKS-


.
A) Main Carriage Way
Sr. Item Description Unit Total Scope Executed During April Cumulative till end
No. of Work 2019 of Apri12019

1 Excavation Km 70.89 3.96 58.46


2 Embankment Km 70.89 4.23 58.75
3 Sub-Grade Km 70.89 4.96 55.24
4 Granular Sub-Base Km 70.89 7.18 48.72
5 Wet Mix Macadam Km 20.71 0.00 3.20
6 I I::nse Bitumen Macadam Km 41.99 0.00 15.14
7 Bituminous Concrete Km 41.99 0.00 0.00
I I
8 Dry Lean Concrete Km 70.89 7.41 39.26
9 Pavement Quality Km 70.89
6.81 32.92
Concrete

1.3 STRUCTURE WORKS


Sr. No Type of Structure Total Remarks
Nos.
a. 1 Major Bridges 1) 57+088 (Reconstruction) - Work held up due to
directions by concerned SDO to take up the dismantling of
bridges, diversion and construction of bridges only after
monsoon season.

Geotechnical Investigation completed & design & drawings


1 preparation is complete. GAD & P&P drawings submitted &
approval is Complete. New structures are proposed for four
lane instead of Two lane with paved shoulder & footpath
fir proposed as per EPC Agreement in COS.
P1,P2& P3Foundation is completed andP1 & P2Sub-
structure work is completed & Pier cap work is in progress.4
Nos. of RCC Girder casting work is completed.
.10
2 Minor Bridges Work held up due to directions by concerned SDO to take up
the dismantling of bridges, diversion and construction of
bridges only after monsoon season.

Minor Bridges at Ch. 56+964, 60+267, 77+340 are proposed


15 for reconstruction instead of widening as per EPC Agreement
in COS.
Reconstruction of 5 Nos. of Minor Bridge at Ch. 70+628,
Ch.76+610, Ch.102+050 & Ch. 102+880&Ch. 77+340 are
completed and 5 Nos. Minor Bridge Foundation & Sub-
structure work is in progress.
3 flume Pipe Culverts Proof Checked Typical Design & Drawings, GAD & P&P
41
drawings submitted & approved by Authority's Engineer.
a.
Ashoka Buildcon Limited Page 7
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NII-753J From Ch. 56+200Km
to 103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC
Mode.

Sr. No Type of Structure Total Remarks


Nos.
Location specific drawings submitted for 41 Nos. of culverts.
30 Nos. Pipe culvert Construction work is Completed and
remaining Pipe culvert drawings are in progress
4 Slab Culvert Design & Drawing of Box culvert is approved from Authority
Engineer.
15
IP 12 Nos. of Box Culverts construction work are completed and
3 Nos. Box culvert Foundation and Sub-structure work are in
progress as per Design & Drawings.
5 Pedestrian Under Pass Geotechnical Investigation completed. Proof Checked Design
at Ch.69+466 & Drawings approved by Authority's Engineer. During Project
Site Inspection presided by CENH Mumbai on 02.01.2019, it is
1
4V
requested to change the location PUP from Km 69+466 to Km
69+600 to maintain safe distance from the Railway Boundary
40,
for the safety of Road Users.

1.2Clearances Summary
1.2.1 Tree Cutting
Length
Sr. Proposal
Status Impacted Remarks
41P No Description
(Km)
Pa ch ora Forests Range: Ba in h ru d-
KfLIgaonsection-Km 56+200 to Km 78+000.

• Application by EENH to Forests Dept. -


749/2018, Dtd. 22.06.2018.
• Tree Valuation by DCF to EENH -
2681/2018-19, Dtd. 05.10.2018.
• Deposition of Tree valuation by Contractor
- 261/05.10.2018.
PIP
• Deposition of Tree valuation by EENH to
RFO -1090/2018, Dtd. 06.10.2018.
From
• Tree Felling Permission granted by RFO -
1421 Nos. of Trees 1816/2018-19, Dtd. 19.10.2018.
1 Tree Cutting areto be cut in Ch. 56+200 • EENH forwarded Tree felling permission to
handed over length. to Contractor- 396/2018, Dtd. 20.10.2018.
Ch. 103+000 • Tree felling completed.
Chalisgaon Forests Range: Kolgaon to
Khadki section-Km 78+000 to Km 103+000.
• Application by EENH to Forests Dept. -
749/2018, Dtd. 22.06.2018.
• Tree Valuation by DCF to EENII -
2448/2018-19, Dtd. 19.09.2018.
41,
• Deposition of Tree valuation by Contractor
- 204/28.09.2018.
• Deposition of Tree valuation by EENH to
RFO -1087/2018, Dtd. 05.10.2018.

Ashoka Buildcon Limited Page


Project: Up-gradation of Bhadgaon-Chalisgaon (Section 11) of NH-753J From Ch. 56+200Km
vir to 103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC
Mode.
41.
• Tree Felling Permission granted by RFO -
1381/2018-19, Dtd. 12.10.2018.
• EENH forwarded Tree felling permission to
Contractor- 406/2018, Dtd. 26.10.2018.
• Tree felling completed.

Bhadgaon Municipal Corporation: K rn


57+170 to Km 64+680
• Application to EENH -264, Dtd. 12.11.2018.
• Recommendation by EENH to Bhadgaon
d. Municipal Council- 1241/2018, Dtd.
12.11.2018.
• Tree Felling Permission from Jalgaon
Municipal Corporation-32/2018, Dtd.
410
07.01.2019.
• No. of Trees- 236 Nos.
• Tree Fellingstatus: Completed.
iff

Chalisgaon Municipal Council: Km 95+800


to Km 99+200
• Application to EENH -265/2018, Dtd.
12.11.2018.
• Recommendation by EENH to Chalisgaon
Municipal Council- 1240/2018, Dtd.
12.11.2018.
• Tree Felling Permission from Pachora
Municipal Council -2528/2018, Dtd.
W1Y
05.01.2019
• No. of Trees- 55 Nos.
• Tree Felling Status: Completed.

Total No. of Trees : 1421 Nos.


Nos. of Trees felled : 918 Nos.
Balance standing Trees :503 Nos.

-4P

Ashoka Buildcon Limited Page 9


I 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 444,4444
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to 103+000Km Two/Four lane with
Paved Shoulder in the state of Maharashtra on EPC Mode.

1.2.3 Forest Clearance


Sr. Proposal Length
Status Remarks
No Description Impacted
Required clearance Forest Department permission is required to 10.650 Km Overlay is proposed on existing pavement from
of forest land from start work at this location. However, as per Km 83+900 to Km 92+650 Vertical improvement
Ch.83+900 to Circular No. FLD-3102/Pra.Kra.-9/F-10, Dtd. is proposed where vertical sight distance is in
92+650& Ch. 24.06.2003 issued by Under Secretary, sufficient. Work of overlay was initiated &
97+400 to 99+300 Revenue & Forests Dept. Mumbai, completed upto 6.70 Km only. During Project Site
improvements & strengthening activity can Inspection presided by the CENH Mumbai on
be taken up on the already existing highway 02.01.2019 the work of Overlay was stopped
1 including improvements of Shoulders passing instructing that the Overlay shall be done in 7.0 m
through Forests Stretch. width instead of 5.5 m existing width. EPC
Contractor brought out the provision of existing
width in the scope of work is 5.5 m. In the event
of upgrading to 7.0 m overlay, EPC Contractor is
entitled for the Change of Scope. The proposal is
submitted & the decision is pending with
Authority.

1.2.5 Encroachment:
Till date Authority has not removed the Religious Structure, Temporary and Permanent Encroachment existing at the time of handing over
site. The details are as per enclosed "Annexure D".

Ashoka Buildcon Limited Page 10


4 4 4 4 4 4 4 4 4 .4 4 4 4 4 4 4 4 4 4 4 44 444 4 4 i 4 4 4 4 4 4

Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to 103+000Km Two/Four lane with
Paved Shoulder in the state of Maharashtra on EPC Mode.

1.3 Status of Utility Shifting:

Sr. Utility Length Progress of


Name Estimate
No Cate ory Status Affected Physical Remark
Amount(Rs)
(Km) Shifting
1 Water MJP/ZP Water Utility obstructing 9.88 MJP on 29.08.18 raises demand for
Line Supply Line work are identified 1% tech. scrutiny charges.

Contractor has deposited 1%


Technical Scrutiny Fee on 23.11.2018.
Authority further deposited to
respective MJP / ZP Depts. on
28.11.2018 so as to obtain Technically
Sanctioned Costs Estimate from
MJP/ZP Depts.
- Estimates received from MJP/ZP and
forwarded by the Authority to RO
Mumbai for approval.
-RO Mumbai raised observations in
the estimates. Compliance of
observations submitted by EENH
Dhule. RO Mumbai Approved the
Costs Estimates. Work Order issued
by EENH Dhule on 11.03.2019 and
subsequently shifting work is in
progress and about 50% work
completed.
2 Electrical MSEDCLElectrical Utility obstructing 10.47 Estimates received from MSEDCL on
Line Line work are identified 30.08.2018.

Estimates pending for approval of

Ashoka Buildcon Limited Page 11


I r litIt I ill 4 4 4 4 4 4 4 I 1 i I • 4 4 4
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to 103+000Km Two/Four lane with
Paved Shoulder in the state of Maharashtra on EPC Mode.

Sr. Utility Length Progress of


Name Estimate
No Status Affected Physical Remark
Cate or y Amount(Rs)
(Km) Shifting
Authority

-Contractor proactively deposits


supervision charges of MSEDCL to
Authority on 23.10.18
-Meanwhile Authority directed to
conduct Revised Joint Site inspection
with Authority's Engineer to
accommodate the Costs within the
sanctioned Limits.
- Accordingly, Revised Joint Site
inspection conducted for obtaining Cost
Estimate within the limitations as per the
Sanctioned amount.
-Revised Joint Site Report duly signed by
Authority, Authority's Engineer & EPC
Contractor forwarded to respective
MSEDCL Divisions on 21.12.2018.
Revised costs estimate Technically
sanctioned by CE MSEDCL Jalgaon Zone
on 07.03.2019. Accordingly, The Costs
Estimates are recommended to RO
Mumbai.
- RO Mumbai Approved the Costs
Estimates. Order issued by EENH Dhule
on 11.03.2019 & informed EPC
Contractor to deposit 1.3% Supervision
Charges which will be reimbursed during
Bill payment towards shifting work.
Accordingly, EPC Contractor deposited
1.3% Supervision Charges to respective

Ashoka Buildcon Limited Page 12


4 4 4 4 I r 414 4 4 4 4404 4 4404 4 40 4 4 4
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to 103+000Km Two/Four lane with
Paved Shoulder in the state of Maharashtra on EPC Mode.

Length Progress of
Sr. Utility Estimate
Name Status Affected Physical Remark
No Category Amount(Rs)
(1<m) Shifting
MSEDCL Sub Divisions as per Firm
Quotation received from MSEDCL
through EENH Dhule. Shifting work is in
progress and about 60% work
completed.

Page 13
Ashoka Buildcon Limited
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
' 56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

1.4SUBMISSION OF PROJECT DRAWINGS AND REVIEW BY AE


Status of design & drawing submissions is as pergiven below.
e

Sr.
Activity _] Authority Engineer Remarks
No
Plan & Profile —7
Proof Checked Drawings along
with Compliance of comments
submitted to the Authority's
Approval received from Engineer from Ch. 56.200 to Ch.
Authority' Engineer. 103.000 on 12.12.2018.
1
However, modification Approved by the Authority's
Main Carriageway
suggested by CENH during Engineer as per provisions of
project site visit on Two Lane Manual on
02.01.2019 25.12.2018. Regarding 50 mm
thickness raising section
drawing under progress with
Design Consultants.
Proof Checked TCS were
submitted to Authority'
Engineer on 12.11.2018.
V' Compliance of comments of AE
2 TCS Under Review with AE submitted. Approval awaited
from AE. Regarding dispute in
thickness of PQC, the same is
under review with Authority'
11, Engineer.
a. MCW pavement
Submitted for seal & sign of Certified copies awaited from
Overlay
AE in 4 sets AE.
b. MCW Flexible
pavement Overlay Under Review with AE. Approval Awaited.

3 Proof Checked Rigid Pavement


Design submitted to Authority'
Under Review with AE.
Engi neer on 30.10.2018.
Modification suggested by
MCW Rigid pavement
AE for 300 mm thickness
EPC Contractor has submitted
submitted.
Compliance of comments of
AE. Under review with AE.
Under Review of Authority's
Proof Checked design &
Engineer.
drawings duly vetted by IIT
4 Major Bridge - 1 Nos.
Chennai submitted for
IIT Chennai approvedApproval
Major Bridge to AE.
awaited from AE.

Ashoka Buildcon Limited Page 14


Project: Up-gradation of Bhadgaon-Chahsgaon (Section H) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

Sr.
Activity Authority Engineer Remarks
11/ No
12 Nos. Approved by AE. 2
1IP 2 Nos.under review of Proof
No. under review with AE. 1
5 Minor Bridge - 15 Nos. Consultants. 1 No. Approval
11. No. awaited from Design
awaited from AE.
Consultants
Pedestrian Under
6 Passes
PUP at Ch. 69+466 Approved by AE Approved
Culverts
Proof Checked Drawings
Hume Pipe Culvert 2 Nos. Under Review with
7 submitted to Authority's
4IP
Typical Drawings AE.
Engineer. Approval awaited.
4P Hume Pipe Culvert All the Drawings reviewed &
Approved
Working Drawings Approved by AE.
Slab/ Box Culvert Typical Drawings Reviewed &
8 Approved
Drawings Approved by AE
41, Slab/ Box Culvert All the Drawings Reviewed
9 Approved
Working Drawings & Approved by AE.
Proof Checked Drawings
-Or Misc. Drawings - Bus partially submitted to the
10 Under review
bays, truck lay bays Authority's Engineer. Approval
awaited.

Note: While the process of approval of Proof & Safety Consultant by the Authority was
underway, the drawings were submitted to Acting Authority Engineer, Executive Engineer,
national Highway division, Dhule (Authority Engineer was not appointed by that time) in the
interest of the work. Based on the review comments by Acting Authority's Engineer, P&P
drawings were revised and revised drawings submitted to Acting AE. Authority Engineer
appointed on 23.10.2018. Now Proof & Safety Consultants are also appointed. Accordingly,
Revised Design & Drawings, Plan & Profile Drawings duly Proof Checked by Proof & Safety
Consultants are submitted to the Authority's Engineer for its Approval. Under review with
AE & Approval is awaited.

Wir

lor
Ashoka Buildcon Limited Page 15
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

2. INTRODUCTION

Ashoka Buildcon Limited Page 16


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

2.0 INTRODUCTION
2.1 SCOPE OF THE PROJECT
The scope of the Project is broadly summarized as follows.
a) Construction of the Project Highway on the Site set forth in Schedule-A and as
specified in Schedule-B together with provision of Project Facilities as specified in
Schedule-C, and in conformity with the Specifications and Standards set forth in
Schedule-D;

b) Maintenance of the Project Highway in accordance with the provisions of this


Agreement and in conformity with the requirements set forth in Schedule-E; and

c) Performance and fulfillment of all other obligations of the Contractor in accordance


with the provisions of this Agreement and matters incidental thereto or necessary for
the performance of any or all of the obligations of the Contractor under this
Agreement.

The main construction activities involve:


a) Up-gradation of two/Four Lane with paved shoulder.
b) Construction of major bridge at Ch. 57+088.
c) Constructions of minor bridges at 15 Nos.Locations.
d) Construction of PUP at Ch.69+466.
e) Construction of Hume Pipe Culvert at 41 Nos. Locations.
f) Construction of Slab Culvert at 15 Nos.Locations.
d) Construction of Toll Plaza at Ch.81+200 Location.
e) Construction of Bus Bays at 17 Nos. Locations.
0 Construction of Truck lay-byes at 1 Location.
e) Construction of project Facilities and Amenities.
f) Highway Inspection Vehicle
There is no provision of Highway Inspection Vehicleto be provided to Authority
4r,
inSchedule-C of EPC Agreement for this project.
fp,

This document titled "Monthly Progress Report" carries information on the


achievement of targets and progress of above-listed work and other works.
VP
This document is submittedin accordance with clause 11.7 of Article 11 of Contract
Agreement.

Ashoka Buildcon Limited Page 17


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

3. LOCATION PLAN

Ashoka Buildcon Limited Page 18


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

Package -2 From Ch. 56+200 to Ch. 101+000


Abhone
*
31 Adalase ivilMaharashtra State
4-4-4 Juwardi Picharde 1 ' Highway 19
ftr4
46
Gudhe Ch. 56+200

Londhe
w aon Bk.
Bk. Galan BK
Bahal fi BK
Bhawali 4-6r6
Mehunbare Mmbhora Shindad
Janda iff-a
Pi* 514T?
Borkheda
it*
1 h 10 min
8 46.8 km
Umberkhede
4s•
Shindol
Ner Tidka
Kargaon W, .ah Banoti Ptchi Ghosi
wif4
Shirasgaon
Ch. 103+000

Chalisgaon %agad
4 Lora
4in
8 •51urvi

lambda ar
1-xt
,
8

4
EPC Package -2

Ashoka Buildcon Limited Page 19


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

4. PROJECT KEY PLAN

Ashoka Buildcon Limited Page 20


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

thadgaor Bk
BK, Galar

Mchurbare
Jr:

EPC Package -2

Page 21
Ashoka Buildcon Limited
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

5. PROJECT DETAILS

Ashoka Buildcon Limited Page 22


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

5.0 PROJECT DETAILS

+V,
Up-gradation of Bhadgaon- Chalisgaon(section II )of NH 753J from
Chainage56+200 Km to 103+000 Km to Two lane with paved
Name of the Contract shoulders/ Four Lane configuration of [ Jalgaon - Bhadgaon -
Chalisgaon -Nandgaon -Manmad-NH 753J - (46.800 Km )] in the
state of Maharashtra on EPC mode.
Package No. 05/CENH/D-1/3078/2017-18/Package-IV
Authority Public Work Department, National Highway(PWD) Maharashtra
Project Implementing
PP'
Public Work Department, National Highway(PWD) Maharashtra
Agency
EPC Contractor M/s. AshokaBuildcon Limited, Nashik.

Name of Authority's M/s. TPF Engineering Pvt. Ltd. in JV with M/s. TPF Getinsa in
Engineer Association with M/s. NASCENCE Consultant Pvt. Ltd.

Design Consultant M/s. Inroads Techno Consultants Pvt. Ltd.

M/s. Frischmann Prabhu Project Management Consultancy Services Pvt.


Proof Consultant
Ltd.
Safety Consultant M/s. Indian Infratech, Mumbai.
Date of EPC
16thApril 2018
Agreement Signing
Appointed Date 6thlune 2018

Length of Stretch 46.800 Km

Existing carriageway 2-Lane with Earthen Shoulder


Proposed
Up-gradation of 2-Lane/Four Lane with paved shoulder
carriageway
Construction Period 540Days from Appointed date.
Defect Liability 48 Months from the date of Completion Certificate.
Design Traffic 80 km/11r. for MCW

(A)Built up Section- PQC- 300mm, DLC - 150mm, GSB - 150mm, Sub


Grade - 500mm in length except built up stretches.
Pavement (B)Semi Built Up- PQC - 250mm, DLC - 150mm, GSB - 150 mm, Sub-
grade - 500 mm for built up section.
Composition
(C)Overlay - BC - 40 mm, DBM - 90 mm.
(D) Flexible Crust for New construction - BC- 40 mm, DBM - 95 mm,
WMM - 250 mm, GSB - 200 mm, Sub-grade - 500 mm.

Ashoka Buildcon Limited Page 23


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
4, 56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

No. of Major Bridges 1 No.


No. of Minor Bridges 15 Nos.
No. of Pipe & Slab
41Nos.(Pipe Culverts) + 17Nos. (Slab culvert)
Culverts
No. of PUP 1No.
No. of Junctions 3 Nos. ( Major Junction) & 30 Nos. (Minor Junction)

No. of Toll Plaza 1No.

No of Bus Bays 10 Nos.


No of Truck Lay-Byes 1 No.

IP

-V

Ashoka Buildcon Limited Page 24


-V
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

6.KEY DATES FOR


ACHIEVEMENT & PERFORMANCE
OF THE PROJECT

Ashoka Buildcon Limited Page 25


411 1 44 4 4 4 444101114 1 4 4 4 4 44 1 1 1
Project: Up-gradation of Bhadgaon-Chalisgaon (Section 11) of NH-753J From Ch. 56+200Km to 103+000Km Two/Four lane with
Paved Shoulder in the state of Maharashtra on EPC Mode.

6.1 KEY DATES FOR ACHIEVEMENT & PERFORMANCE OF THE PROJECT MILESTONE
Due to unavailability of Project site as per provisions of EPC agreement it has been proposed to rearrange project milestones keeping
project completion date as per Contract Agreement.

As per EPC Agreement


Milestone Duration Due Date of Amount % Milestone Status of mile Remarks
No. from Milestone Amount in stone
Appointed Rs. achievement
Date
Mile Stone - I Due to various delays which are not attributable to
10% of EPC Contractor progress cannot be achieved as per
3rdNovember achieved on
1 150days Contract 21.021 Cr. planning submitted. EPC Contractor has submitted
2018. 31st January
price details of causes of delays time to time & notified
2019.
Authority that there will be required extension of
Mile Stone
30% of time to compensate loss of time suffered in past 4
achieved on months. Ref. EPC Contractor letter ref. no. ABL/ NH-
2 300 days 2ndApril 2019. Contract 63.063 Cr.
28 February 753J/Bhadgaon-Chalisgaon/PKG-II/ 2018-19/167
price
2019. dated 7th September 2018 intimating delays in
60% of project execution due to various reasons. As per
4thSeptember strip charts, work programme and the current status
3 455 days Contract 126.126 Cr.
2019. of the delay events and circumstances, it is evident
price
that the contractor has been trying to overcome the
hurdles not attributable to him in a diligent and
enthusiastic manner in the interest of the work. EPC
Contractor has submitted EOT proposal vide ref no.
100% of ABL/NH-753J/Bhadgaon-Chalisgaon/2018-19/247-
28thNovember
4 540 days Contract 210.210 Cr. A on dated 31.10.2018.
2019.
price Authority's Engineer vide letter No.
TPFEPL/TL/939/ABL/Sec-II/2018-19/51Dtd.
15.03.2019 recommended the Contractor's request
proposal for Extension of Time for 120 Days under

Ashoka Buildcon Limited Page 26


4 I I,,,,, 444 li 4 1 444 4 4 441 4 4 4 4 4 4 4 4 4
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to 103+000Km Two/Four lane with
Paved Shoulder in the state of Maharashtra on EPC Mode.

As per EPC Agreement


Milestone Duration Due Date of Amount % Milestone Status of mile Remarks
No. from Milestone Amount in stone
Appointed Rs. achievement
Date
Contract provisions in Project Completion Schedule
with modification in Schedule-J of Contract.
Accordingly, EENH Dhule recommended EOT
proposal for 105 days to SENH Pune vide letter No.
PB/193/2019, Dtd. 25.04.2019.

6.2 STATUS OF PAYMENT


1. Status of Advance Payment

Sr. Advance Payment Date of submission Date of release of Date of Remarks


No of request Advance payment Repayment
1 1st Installment 21.06.2018 10.09.2018 26.04.2019 After declaration of Appointed date EPC
(Mobilization) Contractor has mobilized necessary
resources but due to unavailability of
Rs. 10,51,05,000/- obstruction free work fronts desired progress
(i.e. 5% of Contract Price) could not be achieved. EPC Contractor has
2 2ndlnstallment 24.08.2018 03.10.2018 -- requested to extend recovery of
(Mobilization) mobilization advance by 148 Days as per
submitted EOT proposal.
Rs. 10,51,05,000/-
(i.e. 5% of Contract Price)
3 3rd Installment 26.10.2018 14.11.2018 --
(Machinery)

Rs. 10,51,05,000/-
(i.e. 5% of Contract Price)

Ashoka Buildcon Limited Page 27


if IIIff 114 4411.04 4 '111114 4 4 if f
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to 103+000Km Two/Four lane with
Paved Shoulder in the state of Maharashtra on EPC Mode.

1. Status of IPC Payment

Sr. IPC Date of Date of Gross Value Total Withheld Net Value Date of Remarks
No. Bill Submission Certification (Certified) Deductions Amount, Rs. in Cr. Release by
No. to Authority's by Authority 's Rs. in Cr. Rs. in Cr. Rs. in Cr. RO Mumbai
Engineer Engineer _
IPC-1 Recommended by EE NH
Dhule on 08.02.2019 to RO
1 (SPS) 12.12.2018 29.01.2019 21.1628 2.2372 1.8925 17.033 05.04.2019. Mumbai for release of
R.A. Bill payment.
No. 04
IPC-2 Recommended by EE NH
Dhule on 22.03.2019 to RO
2 (SPS) 07.02.2019 05.03.2019 19.583 2.0701 1.7512 15.761 15.04.2019. Mumbai for release of
R.A. Bill payment.
No. 05
IPC-3 Recommended by EE NH
Dhule on 26.03.2019 to RO
3 (SPS) 05.03.2019 18.03.2019 22.2668 2.354 1.9913 17.9216 15.04.2019 Mumbai for release of
payment.
R.A. Bill
No. 06
IPC-4 Recommended by EE NH
Dhule on 26.04.2019 to RO
4 01.04.2019 22.04.2019 24.507 1.1203 1.824 22.051 Yet to release. Mumbai for release of
(SPS)
payment.
R.A. Bill
No.07

Page 28
Ashoka Buildcon Limited
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

7. PROPOSED PROGRAM FOR


COMPLETION OF CONSTRUCTION WORKS

Ashoka Buildcon Limited Page 29


Project: Up-gradation of Bhadgao?-Chalisgaon (Section II) of N11-753j From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of

Maharashtra on EPC Mode.

> Planning for completion of project was submitted vide letter ref. no.
ABL/CENH/Bhadgaon-Chalisgaon/18-19/52 dated 2ndJuly2018 after declaration
of appointed date.
As per submitted planning work front available is as follow-
Length Value of
Sr. No. Particular Remark
(Km) work (Cr.)
IP Details as per submitted Joint
Work front Available 14.11 63.37
1 memorandum signed on dated
14th May 2018.
CP Work front Obstructed. 32.69 146.84
VI Details as per submitted EOT
Work front Available 8.59 38.58
proposal vide ref letter no.
2 ABL/NH-753J/Bhadgaon-

Work front Obstructed. 38.21 171.63 Chalisgaon/PKG-Il/2018-


19/247-A on dated 31.10.2018
Details as per present site
Work front Available 34.16 153.44 condition subsequent to the
tree felling permissions
3
granted by the respective tree
Work front Obstructed 12.64 56.77 Authority & clearance of land
dispute in few locations
Total 46.800 210.210

Note: Work fronts made available after issuance of tree felling


permissions from Forests Authority and Land dispute resolved at
some locations by the Revenue Authority. Accordingly, Work is in
progress in available fronts of 34.16 Km stretch only.

1,

Ashoka Buildcon Limited Page 30



6 Project: Up-gradatioA of Bhadgaon-Chalisgaon (Section II) of NH-75I3J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.
6









• 8. STATUS OF PRELIMINARY ACTIVITIES














S
Ashoka Buildcon Limited Page 31

S
Projeci: Up-gradation of Bhadgaon-Chalisgaon (Sectioi II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

8.0 PRELIMINARY ACTIVITIES


8.1 TOPOGRAPHICAL SURVEY
EPC Contractor has completed establishment of GPS Coordinates pillars & all
Temporary Bench Marks. All Topo survey work has been completed.
Coordinates of Proposed Center Line (PCL) of the 2-lane existing carriageway have
been finalized & plan & profiledrawings for 46.800 km are submitted to Authority's
Engineer for verification..
8.2 QUALITY CONTROL
Material Testing is being carried out for preparation of pavement designs & drawings
as per scope given in schedules.

8.3 DESIGN PROGRESS


The progress of detailed engineering design and drawing for the project is as follows:
• All engineering surveys and Geo- technical investigations have been completed.
And all reports are under preparation for submission to Authority Engineer.
• Existing pavement survey, traffic survey has been carried out & Pavement Design
and overlay design reports preparation is in progress.
• Status of submission of design & drawings up to 30thApri12019 is enclosed in
Annexure K.

• Ashoka Buildcon Limited Page 32


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

9. CONSTRUCTION PROGRESS

Ashoka Buildcon Limited Page 33


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

9.0 CONSTRUCTION PROGRESS


The construction activities were taken up after the Appointed Date, 6thjune2018.
Progresses of individual construction activities at available stretches are as follows:
9.1 Earthwork
Earthwork is in progress at available work fronts for MCW for the month of April 2019
and it is as shown in progress chart. Construction of Sub grade has been carried out in the
month of April 2019. Sub grade work of 4.950 km in half width for MCW has been done
during this month. Up to end of April 2019 cumulative 55.24 Km are completed for MCW.

9.2 Granular Work


GSB is in progress at available work fronts for MCW for the month of April 2019 and it is
as shown in progress chart. Construction of GSB has been carried out in the month of
April 2019. GSB work of 7.18 km in half width for MCW has been done during this month.
Up to end of April 2019 cumulative 48.72 Km in half width are completed for MCW.

9.3 Wet Mix Macadam


WMMis in progress at available work fronts for MCW for the month of April 2019 and it is
as shown in progress chart. Construction of WMM has been carried out in the month of
April 2019. WMM work of 0.00 km in half width for MCW has been done during this
month. Up to end of April 2019 cumulative 3.20 Km in half width are completed for MCW.

9.4 DLC Work


DLC is in progress at available work fronts for MCW for the month of April 2019 and it is
as shown in progress chart. Construction of DLC has been carried out in the month of
April 2019. DLC work of 7.41km in half width for MCW has been done during this month.
Up to end of April 2019 cumulative 39.26 Km in half width are completed for MCW.

9.5 PQC work


PQC is in progress at available work fronts for MCW for the month of April 2019 and it is
as shown in progress chart. Construction of PQC has been carried out in the month of
April 2019. PQC work of 6.81 km in half width for MCW has been done during this month.
Up to end of April 2019 cumulative 32.92 Km in half width are completed for MCW

9.6Bituminous works
DBM is in progress at overlay stretches for MCW for the month of April 2019 and it shown
in progress chart. Construction of DBM has been carried out in the month of April 2019.
DBM work of 0.00 km for MCW has been done during this month. Up to end of April 2019
cumulative 15.14 Km are completed for MCW.

Ashoka Buildcon Limited Page 34


I

Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.


56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

9.7 Minor Bridge


Construction of Minor bridges work is in progress.5 Nos. of reconstruction of Minor
Bridge construction work is completed&4 Nos. of Minor Bridge Sub-structure work is in
progress.
e

9.8 Major Bridge


Construction of Major bridges work is in progress. P1, P2& P3 foundation of work is
completed and P1,P2Pier Cap work is in progress.

9.9 Hume Pipe Culvert


Construction works of Pipe Culverts in available work fronts at various locations are in
ZIP
progress. The progress chart for the month of April 2019 is attached.30 Nos. Pipe culvert
Construction work is completed and remaining Pipe culvert are in progress as per submitted
Design & drawings.

9.10 Slab Culvert


Construction works of Box Culverts in available work fronts at various locations are in
progress. The progress chart for the month of April 2019 is attached.12 Nos. of Box
Culverts construction work are completed and 3 Nos. Box culvert Foundation and Sub-structure
work are in progress as per Design & Drawings.

Note: The pre-construction/construction activities have been hampered due to various


reasons attributable either to the Authority or the force majeure which are contributing
to the delay in achieving planned progress. The same are being notified to the Authority
regularly in accordance with the contract provisions.

Ashoka Buildcon Limited Page 35


I I I 4 4 4 4 i 4 4 4 4 6 4 4

LINEAR CHART SHOWING STATUS OF ROAD WORK

PROJECT:- 'Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH 7531 from chainage 56+200 Krn to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of Palgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 753J - (46.800 Km
)J In the State of
Maharashtra on EPC mode".

Client : Public Works Department - NH Division, Govt. Of Maharastra.


Authority Engineer : M/s.TPF Engineering Private Limited.
EPC Contractor : M/s. Ashoka Buildcon Limited. .: Complete Irl In progress
1 • G 7 R, 5 _ I 2 i 4 S i . 7 A.. . Q.. T„ ? 14 k ,IT
Road Fur.& Sign. BOard
I, -6 . °j,'L 1..7 - . 4...1. 7...2 q 1.. • S ..7 )( 9I D
, 1 4. \ E 7 ,••3 Y...j 1-2 4.C-6 7 ...kiii ..:1 1 1 3 4 ,5 5-3 X y..I1 13,3 4 .--..6 1 q

:
DBM ' , TAr,,,,-''''
--i?'7--...,1*-.
120Z141714-.'''.
Poe IIIIIIIII II IN
,,, 70.-** -1
,,:, iir,r,:. MEI II
SS . .....,.. A L.E.,•:i::::ir.:4;4&:, MI= 1 II
IFF.7.4,".::' r n.lagingrusalWr7-
„,.
EarthWork
Chainage 64,200 00+200 56+400 MINI 18.4011 NON 144500 57+000 57+100
Earthwork ,
...Zara; .
Skrboraclo 1
ul
X GSB II
C
LC rEn i.,:,..•:.•!•.. %:%t•',4' ' .f•ii: ;,i .r ' :, :::;,.% :•i•A%: 1
POC
,., • ,,,
' 11...11. 111•111111 II
IN
IIIIIIIIII 1 II
DBP.1 IIIIIIII .ICI M
BC
Roaa Fu P: S gn Board 7
, . : No • . is:sigi . : •Ne • . : Ile ler . : Mole •25. • : -Mr IMP WM;M:11/81:111MIIMIIM•MtIMMeMIIPMEMMEIMMPMMIEMMIMINI:111AMMI MIMII:MI:

Road Fur.& Sign Board. ■


BC K*: Vt. ,-4 : iI11111 I I I
DBM ' *14001001011t0 Isms's. II II 1
I
MI xi.k.o, IMMO' II I
aiM
i:,,-.; ?,:,, $!i::j; : , ..: ii7-. :. „:i W:graiNVIsrAIMUNgigligiM., ' gb-,lam 4.:A:::gi..:,‘.MIOV'" " AS43V..g...44iiriAna NIM
LHS

PQ: IIIMIOM
i_C __,, .-7i.:...: ...4F•i;i.:::::::: .',.'; ig...&.:?:':.•:%3:32 43/81Kaginrifi
. . . '''' ...":10MEILUErtraNaggriMISMOMElialargifiEKOWZ7. r1:r. ' ' " ..j'i'fiARKg1
EN
, 111.11111111
§:,...i ,..* :..,:?:.-.,. .,,.., ,.* :,.,..i::::.::*i...!,m.-:•.,.i.?: .i ' 4 :!i;::%.,"::iM :.'.,-%?. V :I.i: ;•'. Kingegasmagname?-.......4:: 0, 0 . .?;. ", -.0 ..'''''. Yii;-;:. M '''?•,* .MINIEMEV:86 'ffi:r.„...
:.-.i,' ...:<-.;•• f-"A.: ?...fi.i:`: , "—Nii'M
11111111111 ,,...
s“hg'-'' ---':','. ,4,11IIIIIII :::.;::::: iii1]. K :: i..'::it. i:, ::?1ZION1 ;,M3E4inI. ,- .. ).'-,-i-- -..ic. f.R MULTESOINkfigLIBEMBENEEZMNSIMInagnatZi:amig—
,....:::::,,,, , , , , (.: --.. , , :: . : :-.:3: : : :.: : : r.* — :*1: , . :* ;:::. :::., ...., , :,::.: :....; & f: :i.`.,,. ,.r:. Or :5:::a ,.',0,:,..- v :•::.:: !:.i :•!.".1,-:.."4,..g .",!:, '1,0,:ge.k
:•:. :::::i f: .::.*" :-; V r" i,:i:i-zil,-3.*.. ‘i*i ' :,::,*'... ii*• '*
EarthWork - 1111 :9) ::.: :0: :::, *., fli:' ,...g.r.
•1111
57+700 57+600 57+900 58+000 58+100
57+600
Chainage 67.200 57+300 57+400 57+500
i,.' ':,.ii ;•%•,%•:,;. •:•.-I..?:i:; -*i i'.:;:i!i, ,iii ?.: iii1":i i:.% .. iig -:'. ,' '''. .i':3 "..;,̀W.Alk iii':i :.ii g :.':* . :,.. :', r..
0%..iiii..''F.* ?P.', iii:,.-s.?.;-: fr,,I. A :4i..,.5.4::? .: i:: xf ';'.-.::', ,,,,o,w; ,,,,,,..
E•rthWork '°'..'; :: :::'.33 3:: *3 :*:-': . '4 -... • .::::: igiA,1*
':::'. 4 "..iii=-:1% 110
.:r.: 11:1::: !..;1:i::!!!' :':: ;• ...
:! 4'.!;;
; X
.:
,(6
.,4
C1=1111111111111111111111I -..: ...,'p-'';. :,:.• :•! ' '-' ::.: .1 •-:::' '.:•: . :',.•.:T 5! ..,..::i . ‘" i1 C,. .': ?,:,. ':'::"'. ' ' " ' fs: : ' ' :: III! 4:., ,..: 7 ... i.., : , ,
:„..4, .!. :•..:, ...: -: ,
t

iiIii:: iii:?ixi.ii .:.,: ',..:i•..1. ,...: ,.i:,...:i iiri-:i: 5: ?;:; :.(:.i i,.:,?::i-::,.):i :.% ii5• ii!:. .:: i..f.: : .. ::ii,:: ,.:i.
RHS

GsH _ 11111111111
_:*:.i:::i 111 1.: .,,,,ii,i,.,,, ,,:?:: i ::.:i - :::, .::i: :: ::i: :i:. ..,..„ , :,-,......,-,:::, :.;: . 0: igsremporsmen9FR,:.....-.ff..-" .,,,, ;, ,,,,,, ,,,.;::30.:..... ::,..:]':: ,:,.. ::-..:i:-:.:,::, :.;!:.i i:. ,,.. ,i,. il,:,,,?.„,. . :ir: :]:,,,..,....;;;,..• ,eqs,.& 0 .::, •..:i1 1 1
.: 1111 1.
.c ' 111111111111 •
poC NM II II
1111111111.

,,,,,.., I I
1111111
Iic ..
:..111111.1
II ,,, & s,,, Board. "
a 4 4 4 4 tt•CCOPert Wt. ?, ft

LINEAR CHART SHOWING STATUS OF ROAD WORK

PROJECT:- "Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH 7S3J from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of Dalgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 753J - (46.11001(ri )) In the State of
Maharashtra on EPC mode.

Client : Public Works Department - NH Division Govt. Of Nlaharastra.


_
Authority Engineer : NI/s.TPF Engineering Private Limited.
EPC Contractor : M/s. Ashoka Buildcon Limited. IiiI'Complete In progrers
Q. 1 2, 1,4, 6 8_970 1 3 3, 4., rk, 617 ,s --q-- c),.. L2_1,4,5,.,617 • g1k1,,7 kg, \-6 7,ft 4 Q.1„2,1_4.A. Fx..7 lk:TPCLI) 1,41,5,,,E, 7 .11 -7- f) 1,2.3,4,5 fi 7,13 g 01 93,4,5E. 7 R gin_ 1,2 3 4,, . g... Et 1 2 A 4 S. fi 7Ar)
Road Fur.8. Sign Board

8
08

1
LHS

II
E'?__-_ MIIIIIIIIN .: :,.,, ','ii,-4. :ii •,_:-i;*•• iklf,:-. .;.:
GStS
: ..:..IIIIM1 t.f'.:? : .:i'g
' .',,-,-:._/
-,,' -?`W IL-•&;,4,=.:iiwk.,4:armaivixaminumwmoimitut=
---
-- Pn".! ,C.C,LT .1 .rc"rf! ,'''',
','A4;,.-;
.,'' ''-15';7:1 . l':'''
', ..
„..,.. i .̀11111.111P
''' '..'.., ; :.:1
:. 7. C. ': W: :
- EMEWARMEZEAMIRMEREEFIESE '
.n:',!..',!, ' .. . :. .. .... ,... „.
earthwork siSiefilik•: s:AralleinINSIOndgel.NOMIFOMINFMOMMOIMMInf . .,s' 1010:23.0
Chainage 60+200 10000 60+400 60+500 60+600 60+700 40+1100 40+900 6D0M.
EartnWork -,
raaTM: - MINIERNEra ..:i ,:': : 2--, ::•"
: ?"VMDIgirgr;;W;MVERSE•iKallffillirlinglillll , a11114
S° gr.d• '.„_,LIZialtS.XgggTAAW
.._ 4A., ADIMENV
.i4,W,S,
-F -IIMEMINMVi:?' ,!*''' •f- '''' ?;•••AMMIMM
. WHOtl . MEMPOPMPIPI
• • . . •'"AIN}.. •' • ••• . ',.44R4I
= GSB . ____......e. IIII ...111111M111.1111

14 ME
AOC . —

DB M 4111111.11111111111
cc _
Road Fur.gi Vint? 1
7 . : loal . .m.. an:wase. immarmialassasmrswvaamaorimmaximmaaaranalmraisme
11,1 kkk 'CrrCr 7 1.kc k 7 CIT- 1...7. 1 4,s7\,.. )1 rn 1 ,7 -“..\ Fly l 7 -\ 1.. \ 0 7 it..rn 1
r

Road ,Eur.8e.Sifilliktii.
,l3
DBM '4411111111.10P01
L HS

PO,: -..";..

LC
....._— _.
6'4

.
EcrihWork :'9'. ':'' aaa'?..SlC-i i';i":. ':'' ,:,
61+700 1+800 1+900 2+000 24100
chainage 41+200 61+300 61+400 61+500 41+600 , .
EarthWork '
::. ',$"?::';'C' ,'::::i

6,1
2 G
CC .-- '
EL:
FOC

Cf'''.1

EC,
Road Fur.R Sign Board ',"
.-4 i
LINEAR CHART SHOWING STATUS QF ROAD WORK

PROJECT:- "Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH 7531 from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of ilalgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 7531- (46.800 Km )J In the States!
Maharashtra on EPC mode".

Client : Public Works Department - NH Division, Govt. Of Maharastra.


Authority Engineer : M/s.TPF Engineering Private Limited.
EPC Contractor : M/s. Ashoka Buildcon Limited. '17 Complete In progress

MOMMOOMMOOMMOMMIUMIMMOMMOMMOMMOOMMEMINIMOMMEMOMMUMMOMOOMMOMMOMMEMMEMMIMMIMMUMMOMMOMMOMMIMMIN
immimmammummummommummommummummummumummommonmommommummummommumm
snow
POC
NUMMUMMONOMMOMMINOMMI MOMMOMMUMIMMOMMOOMMOMOMMEMOMMOMMOMMUMMOMEIMOMMOMOMMOMMEMMOMMEMOON
e4.4i£3 . .sv , 7•
Iniiiimmilimmainsu IMMO MIN
7-71 9
MOMMUMMORMONEROM NM nil WINNUMMONKNOMMONNOMENOMMEMOMMUMMEMEMMONNEMINUREMOMEMEN EORR7
Saborade
munmgmammumlpmmo Immq permnrolmummIpms mmommmo, mqpnpmmrp,:mmampps ppromprwil mmm.
EanhWoo*

Chainage 55+200

. „ .
68+300

, .
BOW71MOON
„ . .;, ...:, MOO
-num -
ir,.4Lk:..,. ,.... , . . , . „. .
610400

- ; g m,
68+700 MOM 58+900
„.,
10+101
EarthWork

,.
Sutocrade

;se

POC
mumommosommaikianmooidimhiliomomaimpowmiiiiiiiiiiiiii0000
mmilsom..:.:.,...,.,:;;

,mplmmpqmp....................................................................46....i......m.....
11111.111111MMOMIMOMIUMMOMMINIMMINOMMIMMOMMOMMOMMOMMOMMOMMEMOMMUMMOMMEMMOMMIMMOOMMEMEMMOMMOMMEMEMM
.• ‘.... INUMMOMMOMOMMOMMOIMOMMOMMOMMEMOMOOMMEMOOMMOMMOMOOMMOMMMUMMOMMEMMOMMEMOMMOMMUMMOMMUMMINIMMOMMOM
DBM 11111MOOMMINOMMEMMONIMOMMONOMMONOMMOMMUMMMOMMEOMMMOMMIMMEMMOMMOMEMMOMMMEMMOIMMEMMOMMEMOMMOMMEMMEMMO
.c. IMMIMMOMMOMMOMMOMMIIIIMMOMMUMMOMMOMMUMEMOMMINOMMOMMOMMUMMEMOMMOMMEMOMMIMMMOMMOMMOMMUMMINIMMEMM
A
MIIMIIMMIMMEMIIMIIII
Road hr.& Sign Board IIIIIMMIIIMIMMIUMMIUMPUMUMMIBMILIMMMEIMMIL IMMI

11777-7777 iiiiiiiiiii■ATM Mil iiiiiiTail iiiiiiiiiii iiiiiiiiiiiiii iliiiiiii i Min ilia MUM i■ii iiiiiiiiiiiiiMOMMEMMOMME
IOMMINIMOMMUMMEMMOMMOMOMOMMENOMMOOMMOOMMOMMOMMINOMMOOMMOMMOMMOMOMMOMMEMIMMEMEMOMMO
iiiiiiimilliii
zaL IMMOMMOSMOMMOMMOOMMOMOMMEMOMMUMMOMMOOMMUMMOMMOOMMOMMOMMOMOMMOMMEMOMMOMMOOMMEMOMMEMMOMMEMMOMMOMM
..:ba , IMMUMOMMUMMOMOOMMIOMMOOMMOMOMMOMMEMOMPROMIMMORWWWWWWIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
,,,,, • mmommumn
MAX
Ex: mum
Subgractii 7..
-7-7

EanhWorir ,,„,,..,;,, 1, . .*..,,,,Age,..— .:...a t . — e . :AL , — .„,, s .w


59*400 S9•500 59.600 59.700 NOM WON 1"1". 11MMUMMO 100100
59.200 59.300
Chainage
. 41Ek,.,......, ,
Earthwork 1111111WEINIIIMIUMMIMIMMIMITINEMMIIMMINM i.4:&47:•'
Inifillginf 01511NROMMOINIONIMIN pargr — ' • - - -14P'
PPPMWOMMI IMOMMOMMIMONNIMMOM OMNI :,,AMr-iA.,:M, :-t,6,• .-,- 1111111111111111111111111111MMEIRIMI111101111
IMMOMMOMMIUMMONOMOIMMOMMOMMOOMMOMMINOMMOMOMOOMMOMMOMMEMOMMOMMOMM MOMMOMMIMMUMMOOMMOOMMINMEMMOMO
MEMMEMMOMMIMMOMOMMEMOMMOMMOMEMMIN
NOOMMOMMOOMMOOMMEMIMINOMMOMMOMMOMMOMMOMMOOMMOMMOMMOOMMINEMOM MMOMOMIMMOMMEMOMOMMOMMOMMOMMOOMM
IMMOIMMIONOMMOMONISOMOMMOMMOOMMOOMMOMMUMMONIUMMUMMOMMUMMOMO
IMINIMMOMOMOMOMOOMMIMMOMMEMONOMMOMMOMMOMMEMOMMIONOMMEMMUMMOMMOMMOMMOIMMIMMUMMOMMOMMEMOMOMMUM
IOMMINONNIONIMMIIIMMOMOMMONIMMONIMMOMMUMOMMOOMMOMMOMMINUMMOMMOMMOMMOIMMIMMOMMOOMMOMMOMMOMMOME
DBM
1
111. MEMMOMMUMMUMMEMOMMOMORMMOMMI
Road Fur.& SI n Board BIUMMIUMUUNI MIUMIUMI
LINEAR CHART SHDWING STATV$ OF ROAD WQRK

PROJECT:. "Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH 7531 from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of Dalgaon-Bhadgaon-Chalisgaors-Nandgaon-Manmad
NH 75I1 - (46.800 Km )] in the State of
Maharashtra on EPC mode.

Client : Public Works Department - NH Division, Govt. Of Maharastra.


Authority Engineer : M/s.TPF Engineering Private Limited.
EPC Contractor • M/s. Ashoka Buildcon Limited ffqComnlet

I
Road Fur.& Sign Board .
EC

POC
c!.
IIIIIIMM
11111111111111lMil1IllN1111111111llTlfiliii11BIF 11111
1.111.11111111.
II
I
0111111111.1111111111M U
053
1.11.111M110.11111.1 7
Subgrade
=MEM Illinti
: tea, . s,
EarthWork • • ( 4

Chainage 62+200 62+300 62+400 2+500 62+600 62+700 62+800 62+900 63+000 63+100
E.nnwork :.,1< • m'A •s
MEE En MEMO=
111111111111111111111111Milliii
Suhgrade
GSB . ,Ammorammoi
mirmommormar
LC
MIL11111111111111 WM= 11011111111M1111111 IMMIIIIMMIIIIMEN1111111111111
MINIM
DEN1

Road Fur.& Sign Board7s. I 7 S


1, P 7 • • 1 .7• 1, 7 1, 4' 7 I.1

Road Fur.& Sign Board I I


11•11111•11•111111111111EM11IIIM1111
DBM Vteels
1111111111 1111111 111111
GOB
Subgrade
EarthWork 64+100
63+700 - 33400 63+900 64+000
63+300 63+400 3+500 63.600
Chainage 63+200 • A4At
4; 4 a
EarthWork
Stsbgrade .R.Impoomrarstow.mg. . f . ....nomirmemompmetw
GS3
tC

Par. minommum
1111111 I 11111111111111111111111 11111111 mummomm
O. Cid.", anai.‘4.
1 4 1 1 4 4 4 4 I 4 1 4

LINEAR CHART SHOWING STATUS OF ROAD WORK

PROJECT:- "Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH 7531 from chainage 56.200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration al [Jalgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 7511- (46.800 Km )) in the State of
Maharashtra on (PC mode".

Client : Public Works Department NH Division, Govt. Of Maharastra.


Authority Engineer : M/s.TPF Engineering Private Limited.
EPC Contractor : M/s. Ashoka Buildcon Limited. Complete ... In prog ess

IfirafirirailarliffaramiliaTigarialaliarifiNarlararalErariamaisraraiNiTariaaraarilla
Road rur.& Sign Board
BC MOOMMOMMOOMMOMMENIMOMUMMOMUMMOMMIMMIMMOMMOMOMOMMEMMOMMOOMMOMMEMMOMMEMMIMEMMOMMOMMEMMOMMOMMOMMI
Ds NOMOMOMMOMMOMMOMOIMMOMMEMONOMMOOMMOMMUMMIMMOMMIUMMEMMUMMOMMOOMMEMMOMMOMMOMMOMMOMMUMMOMMOMMEM
SPLoi OMMOMMOOMMUMMOMMOMIUMMOMOMOMMOMOMMOMMOMMUMMEMOMMOMMOMMOOMMEMMEMMEMOMOMMIMmommilmomMOOMM
POC ab AMMEMOMMOMMOMMMOMMUMMOMMOMMOMMOMMEMOMMEMOMMAMMUMMMBEL_
74F;4: fiC44W614412"ilfaiiii4iiiiMMEMOMMIMMOMMOMMIMMUMMEMMEMMEMMOMMEMMUMMEWNWIMMEMEMOMMOjiiki6agt646wa4,,
MO6ektigiKweINMANBUREEMOMINEWOONIMMOMMEMOMMOMMIMMOOMMEMOOMMEMOMMINEMNEMM 00E00'0 1101100000E0IERFANKie0
.w. ERAMMENAMONNESIEWMEMEMOMMOMMIMOMMOMOMMEMOMMOMMOMMEMEPMEREEMM SEEM '0W-00111P0
EwthWork
MOIRMEMMEAMOMMEMSOMMOMMOMMEMMUMMOMMEMMOMOMMEMIUMMOMMEMMOMMEMMS mommemmom msmommicsammAugga,,
Chainage 64+200 64+300 64+400 64+500 64+600 64+700 64+800 64+900 65.000 68+100
EarthWork orammmmmompgmmxmmwmmpmmmnummmmmmmmmmmmmmmmmmmmmmmmmommmmmmmmmopoxmomso MONOMEEMMOSOMOMOM
MKNRMONMPRWOMOMMOMMKNOMMOMMUMMOOMMUMMOMOMOMMINIMMOMMUMMOOMMENNOMMOMMERPM Am- K'mrArrn,
IMINIMMINOMMOMMONIMMOOMMOMMONOMOMMEMMOMMOMMOMMOMMEMEMMUMMRPRIWPMFM --
IMMOMMEMOMMOMMOMMEIMOMMEMOMOOMMOOMMIMMOMMOMMEMIUMEMMUMMOOMMOMMEMOMMIMMOOMMOMMEMMOMMOMMEMMUMM
IMMIMIUMISMOMMMONIUMMOOMMOIMMOMOMOMMOMMOMMOMMOMMEMMUMMOMMEMOMMOMMOMMIMMOMMOMOMMOMMOMMOMEMMIN
1MMOOMMOONOMMEMMOMINOMMOMOOMMOMMIMMEMOMMUMMOMMOMMEMOMMOMMOMOMMOMMOMOMMIMMOMMEMEMOMMIUMMMOMM
DRNI IMIMOMMONIONMEMOMINNOMMOMUMMOOMMOMMOMOMOMMOMOMMUMMEMMOMMOMMOMMOMOMMOMMIMMMOMOMMOMMOMMEMMOMMO
BC gIMMONOMOMIOMMOMMEMIUMOMMOMMOOMMUMOMMOMMUMMOMOMMEMMOMMOMMEMOMMEMMEMMOMMEMMEMOMMEMOMMEMMOMMO
Road Fur.& Sign Board NIUMMINIMMUMILINIUMINIUMIMEIMUM111111111111”11MILIMIUMMIplIMUMMIIMIUMMIMMEINE
Hold Fur & S An Po3-d
'IMMO fil r
a
l SI rail ■
I
i Ifil a■
■riiiiii Fillirial1 al
l 11
1 i Ilia a all Nan 61 rilliiii i Tara rall ill" Warn Wil
ril Iiii ■
lir
araTi
BC . IMMEMMONIMUMMOOMMIUMMOMOMMOMMOROMMOOMMOMMMOMMIMMOMMEMMEMOMMOMMOMMEMMOMMIMMOMMOMMOMMEMMOMMOMMOM
IAMEMMOMOMM
DBM ---4- OMOMMEMONOMMINIMMOIMOMMUMEMOMMOOMOMMENIMMOMOMMOMOMMOMMUMMOMMOMMEMMEMOMOMMOMMEMOMMOMMEMOMMEMOIMI
Wom.1 MOMMMOMMOOMMOMMINOMMUMNIMMOOMMEMMOMMEMMERMUMMOMMEMMEMMOMMOMMEIMMOMMIMMUMMOMM
POC ONEWNWOUNOMOMMOIMMOMONIMMOOMMAMMUMMNOWENNINNUERMMENNUOMOMMEMMUMOMMEMMONO gmeawmaammum vlui
ZEWIU OONNOONOWONIONFAMMOOMMOMMOOMOOMMEMONOOMORNMOOMONOOMOOOMMUMMOMOOMOOMOMMUMEMOMMEOMM olmomummon,
M3ftummilIMMOMMONOMMORIBUNOMMOMMOOMMOMMOMUOMMOOMMVONNWN BOMMOUN NOOMMOMOROMMENSOMOMMENE ES gramm4,
111:= 111MERIN3MINOMMIIIIIMMIUMNIIMINERIMI SONOMMENNEVEMM4WRIEEMEMINOW77MMTTIMMWMMWM, -- - -'
EarthWork Immo gamommormummummmommummenommumommossmmummumummonem,
65•500 66.600 65+700 ...., 15+500 • 40•10.7:
65+200 65+300 65.400
Chainage
EarthWork glIMMONOMMOOMONIMMOMMEMOOMMEMNOMMEMOOMMOMENOMMEMOINNW4,EMOMMOMMEEMEMEMMUMM•
O MOMEMEME-,
Sobgrade EMMINIMMIUMMOMMOOMIMONUMMINOMMOMPMPOPROMMERRN PRWROOMMEMPRWORRNMEMPRPOMMORNMMOO PRKWW4
rOMMINMIIMMOOMMOMMIOMMONMOMOMMOMMOOMMOMOMOISMOOMMOOMMOOMMOMMOMMOMMIMMIMMEMMR
MMOIONIONMOMMOMMIMMOMMIIMINIMMOMMOOMMONIMINOMMEMOMMOOMMOOMMOMMUMMUMMOMMMOOMMOMMEMOMMIMO
csa
LC
IIMMINIMMOMMUMMOIMMOMOMMOONMOMOMMOMMOMMIMMOOMMOMMOMMOMMOMMEMOMOM MNIMMIMOMMOMMEMOMMIMMOOMMEMO
Poe.
MOMMOOMMOOMMIUMNIUMMEMOOMMUMOMOMEMMIMMOMMUMMOMMOMMOOMMOMMOMMO MMOMMOMIMMUMMOOMMUMMOMMEM
I EMMOMMUMMOMMOMEMMOMMOMMEMOMMEM
DBM f.1.111.01Wair NOMMIMOMMIOMMUOMMIUMMOMOMMOMOOMMUMMOMMOMMOMMOMMOMMOMOMMOMMUMMOMMM
1111111M11•1111111111111111MMISIIIIIIMIIIIMMIIIMIMIMIMMIIII
i•-zwin11111111111111•111111111111111M1111111MIMMUM1111111111M
Road Fur.& Si:ri'Board'1;.
LINEAR CHART SHOWING STATUS OF ROAD WORK

PROJECT:- 'Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH 7511 from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of (lalgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 7511- (46.800 Km )j in the State of
Maharashtra on EPC mode%

Client : Public Works Department - NH Division, Govt. Of Maharastra.


Authority Engineer • M/s.TPF Engineering Private Limited.
EPC Contractor : Ws. Ashoka Buildcon Limited. 0Complete pm In progress
I2 -9- NW S 7 • : . : • i 4 S b 1 7 -11" 1 7 7 -1T- 7_3 • 7 -q- 7 1 2 4,5
Road Eu .II ' 1 1.1
IMMIMIMMIMMOMMOMINIMM
IIIMMIMMIIIIIIMMMIll 1111EIMMIMMIIMMIMMEMMIMMIMMISMIIMMINNIMIMMINUMIMMINIMIMIMIMMIMMM
„, IMMIMMIMMIIIIIIMMOMMII IIIMMISMIMMIMMIIIIIMMOMMIMMIMMIMINIMMINIMMIIMIMMIMMIMAMMIIIMIMIMMIMMIM
11 MMMIMIMMIMMIMMIMMMMIMIIIIM -
..,ik , t., ,., - - - • -,,,i.ZIIMSIMIMEIMMMMMMMI ;'
018 7,22 _ iiimiiiii
ii iiiiiiiiiiiiiio
iiii Emil ii k h st ....zmummumonsommumnfli
Subgrad• • INEGENSEMIENEMENES, EINNEBEENIIMERENEMENEMEICEEMBIENIEMESISSEMESEENNUMMWMINIMINEUIEtilibianktIfigIVENIMME•40
EarthWork
gagnEVOMMINMISSON NIMENEMINOSinglEMMEM3116/111UNERESOMMUMESE> ONIREMPRTMONFAIROMMEMBRINNISMIN 7, - PPRIMEMEMEMEMIZIA
Chainage 66+200 66+300 66+400 66+100 6+600 66+700 66+800 66+900 67+000 67+100
;;• " z: • Eig-e
? ,01111111111111•11•MMINIM111111111111111111111MF
NEMENNEgi- MAINSIENE onsammgmeqopeni% n.ingramosenom ROW:711.NpriL EINNASSM "4 Er MIIIIIMMISMIMMMIMMIIMMIMIM2 [SR
PUFF ' •f: FRIMIRIP •"- • '''..41.INIPARBV,"` • • - • • 'MPIPPWARIPIRP MINIMINIM1111111111MINEME111111111111114
IMIMIMMINIMIMMINIMMIMMEMIMMIMMEMMOMIMIMMIMIMMEMMIMMIIMMMIMMIMMIIIMIMMMIMMEMMIIIIIMMMINIMMIMMIIIIMIMMIHMIMMEMMIll
IMMIMMIIIIIIMMEMEMMIIMMOMMEMMIIM IMMIIMIIIIIMINIMMMEM1111111111MMINIMIIMMIIIMMIIIIMMINIMMINHIMISMIMMUMIMIMMIUMMIN
ESC
Road Fur.& Sign Board IIIIMMil11111111111111111111111111
Road Fur.& Sign Board i 1 Aril griiiii11111151111WANIN 1711
1 1 IIIMMEMIMMMIMIMMIMMIIMMOMMIIIMMIMMEIMIIMMIIMM
• :A! TTM
--
11;

Earthwork
1111•110111
Chainage 67+200 67+300 67+400
EarthWork c, .
strhgrade
M OMB MNINNINE

.01 pommomv polopmessageommilmmmirm nommwmtunnumommummimmosummomommummimim


O',13 MI I

:$•.•
PoC. ' • efathrl MIIMMIMINIIIMMIIMMMIUMNIMMIMMIMMIMMIMMIMMIMMIMMIMIMIMMINIMMM MMIMOMIMIMIMMIIIMMIMMIIMUMMIMMIMMIMINOMMIIM
ORM iirliZiWiliCIL, I

111111111111111 1111111111111111111111111111E1111
Boa4,fiRtAtAk
Road Fur.& Sign Board
4 4 4 I 4 4 4 4 4

LINEAR CHART SHOWING STATUS OF ROAD WORK

PROJECT:- "Up-gradation of Bhadgaon-Chalisgaon (Section ) of NH 753.1 from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of [Jalgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 7531 - (46.800 Km)] In the State of
Maharashtra on EPC mode".

Client : Public Works Department - NH Division, Govt. Of Maharastra.


Authority Engineer : M/s.TPF Engineering Private Limited.
EPC Contractor : M/s. Ashoka Buildcon Limited. P m Mete r In nrnorece
r
1) 3.4 5-8 Z_:1-q 1..1 3 4. 'Lk I„ 2 tkii —6 7 0 I 3 7 17 S 0 i„.2 4 S 6 7 R
Road Fur.& Sign Board
BC

INS

tO
IIIMEr1111121111 111111
IIIIIMEIBMINIIMMIUM1111111NA
A 'A AA A: A Aim
Sub grade A.:: 5A R4: P3: -11
,11a
EarthWork -AA Vv' '
Chainage 6 8+200 68+300 8+400 68+500 88+600 68+700 68+800 68+900 69+000 69+100
EarthVVort, 0*-f4 •

11:11111
Su boracie .70,6444 A •A.

GS B A'4::•:-.**f0"1-1P 4 4,-40',A7Mtri-Or AO • •
.

'LC • OPRIVAVAM.E1,N.V41*7 ' ,Fx4..m10-10mr„


P00

ose4SMOMMINNIM

Road Fur.& Sign Board


T7 7 qn 1211 C 47Rgr" ? . 4 CF 7 R 4n1714ChiRqL)17 4 a C
rk, 7 q 7 1„ k 9 0.
Road Fur.& Sign Board •

BC •
DBM
, .
P00

GSB
Suhgrado "7: :u 5>:. V
•••••--
EarthWork •
69+800 69+900 ;1+0;0 70+100
69+400 69+500 69+600 69+700
Chainage 69+200 69+300
I••f:::
f:f6,
Earthwork

subwade
GSA 3*.
LC
POC ..• •

:t:kftktt.

rt,i&r;141111
LINEAR CHART SHOWING STATUS OF ROAD WORK

PROJECT:. 'Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH 7531 from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of [Jalgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 7531- (46.800 Km In the State of
Maharashtra on EPC mode".
Client : Public Works Department - NH Division, Govt. Of Maharastra.
Authority Engineer : M/s.TPF Engineering Private Limited
EPC Contractor : M/s. Ashoka Buildcon Limited. mcornmete pIn progress
4 7i 9-1 7_5 17 2.. CI, R.3' 0 1 E 0 1T1.4 5 79t01214S 7 0 1 7
Road Fur.& Sign Board
B
DBM 4kPlaPIIMPIPINPV.. I
graiii41' r•: /.-' 1111111MMIIIMME IIIIIIMIMIIMIIMIIMMMIIOMIIIIIIIIIOIIIIII MMIIIIIIIIIIIIIIIIIIIIIIIIII

GSB
NINNONNINNINNINNIN II
NINININENNINNIMNIN
MOMINIMIIIIIIMUMM BIM ININININMINN
. ininummusmirir N
Suegrade
EaehWore
Chainage
EarthWork
Subgrade
MMOMMOMM gint
GSS
MIMMOMMO ININNINNINNINVININNINNENNON MUNN
NOUNS= MIENNINMS ..- NglWfAPWIMRMMPMMMMMMMMMIMMMMMMIMMMMMMMMMMMMNM
Mr:POOP-
MMIMMNIM INNININININNNIMMMINVM : FringRAMMINV"'/
12MOMPOW ININNININNININNNIM
DBM
Bc
Road Fur.& Sign Board.
I i F 7- 9 17 I7T 7 7 P r

Road Fur.& Sign Board


EC
DBM

<
kakeifia. •• 6,7•.

tr , rims
Subq,ad•
,77 MEMO
EarthWork 72+100
71+600 71+700 71+800
Chainage

NINIMIIMMONNIMMINI ]i': ILI ".'" gila a


NOMONMEN
MMOMMIMMOSOMMUMEMOMMEI MIAMMORMAIMMMOM r.
.r.747717R
.,-1. 21r9PP"r
MMOMMUMMOU ,. , MIMINIMMEIMMIIIIIIIIMMOMMIU '
NONNI I MN NONNIMINNISI MN NMI

I II I •__ Hill•1

Road Fur.& Sign Board'


4 4 , I f 4 41 4 4 4

LINEAR CHART SHOWING STATUS OF ROAD WORK

PROJECT:- 'tip-gradation of Bhadgaon-Challsgaon (Section II) of NH 753J from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of Ilalgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 753J - (46.800 Km )] In the State of
Maharashtra on EPC mode".

Client : Public Works Department - NH Division, Govt. Of Maharastra.


Authority Engineer : M/s.TPF Engineering Private Limited.
EPC Contractor : M/s. Ashoka Buildcon Limited. Complete
! In Pr.gren
Road Fur.& Sign Board' ulalTar
fifilaWaTafilaWariarai
ai
r l
iraralermwffi
nTlaw
irefiailWargil6MMITal iaMdifil
DBMS
NOMMOOMMOOMMUMMOMMIOMOMMIMMINUMMOOMMONOMMIMMOMME MEMO MEMOMMEMMUMMIMMIOMMOMMEMMUMMOMMOMMEMMO
IMIUMMOOMMOMMOMMONIMONIMOOMMUMMOOMMINOOMMOMMOM EMMEN MOMMOMMOOMMIMMIMMEMOMMEMEMOMMINUMMEM
immummumummommummummumummons mmommommummommummumummommum
POC
aNk&WAMMUMMBNENUMMUNNBMANNOMMIDURMOOMEMONMONFAMMUIRAMPAMMWOMMENEWAMVAMMNMWMEMMMMEMEM
INOMINI
LC
NOMMICUORNMENESENOMMOMEMOMMOMMORMENOWAINOMENOOMMOOMEMOMEMEAMMOMM MEM= OROMMOMMENWLEMMOMMOMMIMEN
GSP
EMOMINMEN I IMMagg ANINOWOOMI VANABIN INOMUMBE2 =WOW, UMMOVEIMMINEW9- ' 11 OMMOMMOMMOME
Subgmd
NIVAi ':: , ' INA usammumummogs sommosu mingiamm w ,
OM monOMEMOMMIRMSIRM =MOM, MERMEMOMMEMIE
72+800 72+900 73+000 73+100
EMPOMEMMEEMPREMONO , MEMBEENIMEEMMIMMEE
Subqmde
REMMOUNMEMEMMEORNEMMEENMEW:EMMEMOMOMMUMME
G41.1103e7:, MMUMENOOMMEMMEMMENZAMMINNEUtEMMEMMOMMINIMMEM
, ...,RMIETMINFMNEEFF, 7 7 '•
PTINI.
,---„,n,,, 7 :,,7t, r rrlr,-, n 7 :!- 7.,::1:.-
7. 7.
v:Ig
n'' -- 7/7m4ROAMIRPMPMMEWIRW
7. '.7:' 7.'
wmomossommemsnumm
EMERROMRAPMAREMPRUMWMOOMEMOMMOMMMEMEMEM
IRTIF IIIIMOMMMMMEMOMM
,?;, IMINIMUMMUMMUMMliMMOMMOMMOMMOMMIUMMUMMOMMONOMMEMOMMEMMUMMIUMMIUMMOMMIMEMMOMMOMMENOMMEMMEMMEM
CIL_ .___AIMEMOOMMUMMOMMEIMMIMMOOMMOMMIMMOMMOMMOMMOMMOOMMOMMINIMMEMMOMEMMOMMEMMOMMEMMINIMMEMMEMEMMOMMOMMENft
.....„.J.A11111111121111111MMIIIMIUMOMMINIMINIMMIMINEMEMEINIMMINEMIMINIUMBMIIMIMMIN
Road Fur.& Sign Board . MIUMMIIIIIMMISISIMMIIMMMIIIIMMIUMENIUMIUMMINIMIMIUMBEVI MIn ernalli
iminetram=romaisarnmwslIliii6PMMUMilla8/AUlli•MWeicimlientioNormairamatutliestiaraitumisiiminViracmuum7r/Maiimi9OratWivirmiamisimratoznam. imusaismfm ormammvimm
IMOMMOOMMIUMMOMMUMMOMMEMMEMOMMOMOMMUMMEMOMMEMMOMMOMMEMEMOMMUMENIMMOMMINIMOMMOMME
MOMMOMOMMIMMEMOOMMUMMEMOMMONOMMUMMEMOOMMOMMEMMEMMEMMOMMUMMOMMIMMOMMOMMOMMEMOMMEMMEM
MOOMMOMMIOOMMOMMOMMOMMMOMOMMOOMMOOMMOMMOMMEMEMMOMMOMMEMMUMMOMMOMMEMMEMMOMMUMMINIMME
mummommonnommmumnimmummumummommummmummummummommummomm
4m,, , ,-,,4mmminsumummummimmommomommunimplimminippippi
g422NRO ti
, mmnommumuwmmgommNomwomommmwmummmmmmmmmmmmmmmmmmmmmmmmmwmatwamougmw- -
ammo OMMEMENNOMMEMMOOMMOTOMEOMEMOROMMEMMEMMERUMMOMMUMMOMMOMMUMUMME MONHEIHMM,
vallossu 4 : M P
MMUMOMREMEMEMMIg EMMOOMMEMMUNAMMEMOMMEMOMMEMMEMIMMIOMMOMMOMEMMOWARMUNO
BRONNESSONNININNENIONNE MIN MEMMONOMUMMOMMUMMEMMOMMOMMOMMOMMMOMMEMUM.MMERPAW WAM
Earthwork NOWNSIMME 73+700 73+900 73+900 74+100
Chainage 73+200 73+300 73+600 73+400 71+100
MMEEMMOMMOMMEMMOMENOMMIMEMEMEMEME MICERIMMOMUMM
EarthWork
WOMMOOMMOMOMMEMOMMOMMIMMOMMORPROf MBINEMMEMEM
iGsB ZONE OE > MOMMEMOMMOMMOMMIUMMOMMIMMOMMOMMEMEMOMMEOMMEMUM
ac
WWI mpg numnswommosuppgmos nommummummummommummommemmummassiournmegmm
aZMINK NOOMMOMMIMMORNMNICONIPMWIRWARIMPARWAMMERIMPOMMOMMUMMOMMEMOMMEMOMMOMIMMOMMUMMEWTM MMARIMMKNA
SEMMUMOWNOMMIIMMOMMOMMOMMIOMMOMMIUMOMMOMMOMIUMMOMMOMMOMMOMMOMMEMOMMIMOMMEMMOMOMMIMMUMMOMOMM OMMUMMEMO
DRM IMMONOMMIONIMOMMOMIIIIIMMIONNOMMOOMMOMMOOMMINOMMONIMMOMMUMMOMMOMMUMMIMMIMMEMMOMMEMOMMOMMOMMOMMI
MMIMMEMOMMUMMEMOMOMOMMOMM
IMIIMMOMOMMOMMOOMMINIMOMMINOMMEMMINIONOMMOMMINUMMOMMOMOMMEMEMOMMOMMO
•••••••••••••••••• •• •
0••• • •••4 • •01

LINEAR CHART SHOWING STATUS OF ROAD WORK

PROJECT:- "Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH 753.1 from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of [Jalgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 7531- (46.800 Km )1 in the State of
Maharashtra on EPC mode".
Client : Public Works Department - NH Division, Govt. Of Maharastra.
Authority Engineer : M/s.TPF Engineering Private Limited.
EPC Contractor : M/s. Ashoka Buildcon Limited. P Complete r
In progress
' • .- • trt : • 12 4 -5,, 7,/; -1-(11- 7 4._ .. 71TO I,,7 1 t'y.:5,...i; 7 IL:IrI, 1 7 1,4,S,,EL 7,...• 1 2 1 4 4,,(1,7 R -ITIG,1 7 4,5 6 7 11 -ITs 1 2,3 4 5 6 7 FA 0 12 t S 6 :
Road Fur,R, Sign Board tA
BDCBm
'-4:!4'
::: *.
'"'7
''':
't.' 111111111111111111 III I I 1111111
%

- poc, ,, ,,, --. , 1111111111111111111 III I 1111111


.1131111 -7. N.BIORIBUFAIIIIIIIIENSEMINVEMISINIVIIMIIINIIMEI,g ,..0--0, :::.:,::::4ai::g g:::g.:g : : :. ::-:,za5:: 0.....;-.4 0 :::::: some SINIMIS ildIgNiklat4laiti
Emizawsgmemegalgraamaggsmsgg m gi-:i:. :.:i gOVEMILIVIIR-.1 w•;?•;:gs-1::::::,::g.g/=4::::,: - - - - ',,, —,., ',,::=---,,,:.--- E .: : NIE ML .. -,. NEE IPIJ
S"bgr'" '''''M'k IIIIIISMIERIllitelilinIERBE.; ., A: ii0: .-: a .if. !:: : :.i i: 0 i:::?,: 0.,-, NEMEEs g‘:g .g.:.?:: 0 01.-:,:::::' .40 ?...:30 001 :•!- ,.., ,. ,I
gvAi....-!:.;;:,-tx . : ,
: .
,,_
:0 : 0:3..
- : a iig:.: ::* MAMMON mmw? , 11-4AN
....,,, goow.1130wommemennwmanammocisx g Ea V niP rat 44', W.', IFFMMIONSI ESENOPMMENEMERVINOMOARWIMONS
Chainage 74+200 74+300 74+400 74+600 74+600 74+700 74+800 74+900 75+000 75+100 ..'
Earth Work :A :.: .....i ?., A' A Wit a il i::i; A Ai :i]i: iAi :A E,.:i: ;•; 3.: ,;:- ii -'4. '.:.: ::` Y'"•::::::4:tiff,:,i,::i & 'A,'":; ii. iii: -iii M :ii] ii:: i.::*:.: -:i :•,a i:;:' i.-Mi:iig?:?,• a ::•% .E:i ::,iiii:i, ..:- i:]ii:i:m0:,'070 0 %'.' :'
i-r:% ...' .3:'="::3 X ?".,'i iiii?..:-i:E.:76'1.'i: iK": .J.-% 3i,ii it :i %:': ';i'i i..::: c - s . :, :' R §''. iii
sw,g,
.,S GSB ERMIIERRINIENIIIAW. igINIEFINZINTaPenA/,firii: 4. 4•'A 4 g g:g; ai'''' i: 'gig g.i..:,--:'?T?4 A' "Mn'lif ffiriej.,-: ,:afraffeagagSilatirgES . .'• "4 :; M /AMEND=
IIIMEMMEMIIIIIIIilinigEl:;::•g :::iT:iim g 4,- •::?4, tgAiSINSFRINt gi :v i:::: 0 r::iMi iii;-;‘'-1:iiliil•&;•:ii'::. i W'.g g WN ' le• i4".:NMI -. t: L:21 1 33C--; '-WA PEFEMME rfammnEitas
c ''.. NM .;f.,IISZEININ .f..FASINICE: 1:.;,gt :4::-J0 04::i.: :::., Evarkl.EMB:' gi R0 0 4. T,..-i g4i:..;i4i. a a ..i M;...JMi:At;:;.,. ki:Earags(9,,,wuirmwginan&*
, -. , ;-: .:gonommomm
POC .,NAIVPMPIPP.. NM ROMPz:_i1,02WQ ' ..'...INNAke
:...i =aii.lai,,ii,.4,;,,
.;,
;:, ,i"' -,:-'ii:i' i:' 11111 014MWMINEIMINEINNIEVIN

DBM '
Eic. let: S;i.1 40.1.4,,r1t
Road Fur.& Sign Board":-
IIIIIIIII IIII ill 1,7 1 (A
II 111111
. 7 • . 21' 5 0 .7 .1
171 k7 R I
-TU2 41 ' 117-1 -i-4 5...fi 7• 'r•r1 2 1 4... 5...5 7. • -7 . 5. 0 1 2 4... \ 6. 7 .21 q .
Road Fur.& Sign Board ':

DBM
I 1111111
MINISKil4ik i +,' I
t,.. 11111111111111111111111•111111 MEN II 0 111111111•11111
.HS

P oc """ , '-;''''''.
. .:g :z-.1m ( :IIIIAIMMI
1,14Xig. EINIERIIIIINNONIINEIS:ug:::::1-4:;:g: m,,-:..::'s, NIIIII II 11111111•11111MMEM IMINME[III V'
GS8 • tfj,•:-Pir:- .: " ,': normigs, lagolaopergr,-:::-: mi 0: g 0 ::, ii,.: .. , - :t 0 :i!•:1114fissEmemingneffilito migirfialin 5.Earffi
: .,;:m,.aggggigaggosignsgstamIENANI0 ::1 .?, .-1: 0.:-,;-
EINIONEE: ELREgEFER MINNIE•.. INDIMPIREEMEINIMIAME".. ,::,: glix.:0:;g:e :. ''.:::gi 4.. Rim
:0 . ; 0 0 liffilimmagaIt' p,-:
—gr.- -.f,Y* :m:i:ngo:;.,1:-: i:. i .P'. :0-g & iintillaMINA:H:i g; MS 1111111MMli - ME
Earth Work PERONISMO" MOM ,KNORISAMONI"RESEMASINIUMMINIESERIMMisess:
76+700 75+800 75+900 76+000 78+100
Chainage 75+200 75+300 76+400 75+500 75+800
-:". '4i ::=;:4 4i"-';i 4 c:41,;,',:4 4 g 4 .;ii g 4i 4 ' 4 :', iii 4 a A 4 a-.4i ;;=;r.---.,4-.4. a a a ii.---g-Vra-1.,::$-:::).1'::';•:•• i :' :•.i gl;...:W.',..,.*:.i:i i.173
. fi';)**,...4 .:g: 'i...ii i:i:. :ii. ',"ii
:i it -i0.. 0 ''.: .ii ',.. .,aLi'' .iig 4
.. ";„. 4:;'4'. 43. P
Earthwork :I 0 .' . iiif i0 0: :0 *i; ii- i3' •:::: •'.f;. i'% ii ]i ii'M 4 ,iir4 4,2.,
sw,,,,,,J. • . .' vg::11:- :';" ••'.•EtaeMMUIEs . M #1 ,.
"1PMEMERIME
. —WagMEEP .- ,... .'" 4.1
. :
' . ,
:'
" 2
' ..
. 0- -
' -"B,- 1--:
• 5 ':- •FAUFag.,RAg
.,.GSB '''firiiiiiaNgitigEMEN.
Enransomalisormsommufg 0 .,:: ,;-'7.y0:::..rt.,MZ. IU'::•gElffg g:0-0 ::: w:4::.`1:.g!: :,.1..:0 0,g,Ilg:-::,,-,,BiinEM7,, :F.Ageo ;AU ' ODIEWSP,S [flpaNMU .,54 ,
- .Lc i :•i.: 0:: .. i:i: .-,:!:: 0 tzigougi i:e,i: ::::-.:P.rm-0. :?.:: g al :.: i5-0:.; A ,(*ViMEME:giffigig .,..m ES -.S:` musimostion
.
• *:, A g.• ..:: '5:E1......:AV '.. ii?.
SINNEENFMNIMENEMENEW •4 •A :•.', ii:;.i'• gjais . MOM • womPlEmmgMMAN
POC , PPARRERENSTERMIPERMN -1 :iii•Es::aa•li.ilir•Oetai,.4 .••• '• • . 'WWII :1i ;:•• '.::::':::i•:: :'?'1' .A1.4U] ••:-: '''' '..•':-. ''ggiiiii
rl ' / ' •"'.....' ''' • ..: •WIMICiff"•;"•"1""mmotimilimiogisigis
Y.f.'ilm , IIIIIIIIIIIIIIINENIIIIINIIN11111111 Milli ...
NM
BC ..„, .
Roart-iur.8, Sign Board •
4 4 4 4 4 I 4 4

LINEAR CHART SHOWING STATUS OF ROAD WORK

PROJECT:- 'Up-gradation of Bhadgaon-Chalisgaon (Section II ) of NH 753J from chalnage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of Palgaon-Bhadgaon-Chalisgaon-Nancigaon-Nianmad NH 753J - (46.800 Km )( In the State of
Maharashtra on EPC mode".

Client : Public Works Department - NH Division, Govt. Of Maharastra.


Authority Engineer : M/s.TPF Engineering Private Limited.
EPC Contractor : M/s. Ashoka Buildcon limited, Complete InProgress
RIMISWEMIN41011111MINDISeMMIMMIEMAI:15114111111411WMMISMICUMINEMWM/Ilin141410/11MIEMMINSIMMEIMMUMIIIIIPMMISAIMVILIS.II to Mii.lailrIlligelM.111:1M/Wilb
orld ur.& Sign Boar..
BC
111111111MINIC211111
MIIIMIIIIMMIEMEMMIIMIIMEMIIIIIIMINIMM

Assosimpor
mummommummommiummummmommumminummilmmumm
MMOMMOMMOUNUMMEWMUMOVH -
NUMIIMUIPPmlmrmsnrw,`: : : '•-• , 111111111
NWANNMMMMONOMENURMOMMUMUEUERRPOIMMEMMUNENOMMOMMOMMIUMMiiiiiiill
::
MU INIMMOM pplIMMOMp
MOO INIMEMMEOMMOIMMINNOMMEMMUMUMOMMI Si PPM glIM
PROMMONHOMMEMMOOMMOMOMM

Ghainage
E a W,Mr*
Sub wade

PR ■
MN NMI! mom women mmiremummummwmummmomm
POC' • WPWIMA,Pr-- -"VOOMOMMOMMOOMINOMMOMOMMOIMIUMEOM
11111111 IONIIIMIIMMOMMOMMMOMMUMMOMMOOMMMOOMMINECOM
DBm
MOOMMIOMMOMMEMMOMIMMOMMOMMUMMOMMEMOMMEMMOMMImPfmnwn PommmmoWN
gm Y"-"-'3'
NOMMNmmmmmmmmmmmmmmmmmmmmummmmmmmmmmmmmmmmmmmMmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmimmmmmmmmmml
Road Fur.& Sign Board' IIIMMENINIMMEMMUMMIEUMERIMMUMMIIIIIIIIMMUMMIEM
1rEM IMINGINVIIIMPMEMIIMMUNt 411:1531W/11:41:1111M111111WWWIII:M:
OPMELlik MIEMPINERMWSIMil
Road Fur.& Sign Board MO M MOMMOMMOMMOMMEMOMMOOMMUMMOMMEMEMMUMMOMMEMMOMMUMENEMOMMUMMEMMOMMUMEM
wilmannIUMMOOMMEMONIMIMMOMIMMOMMIUMMIONVOOMMIMMOMMOOMMIMMOOMMEMMEMMOMMIMMIMMOMMEMEMOMMEMMEMM
DBM womoRmommoopPiPmmwtroP, mommimmommummommommommIllimpligegg
Sggimsol;booe,. NIONNIMOMINUMUMMium --:1filimmomMilimmommommommimmummilmmu
poc ,,, ,,r4. ORMINIONOMMONNAMERIAMOM : 1MMW A NV
MEIREMYV41, NONUNION=
> , ,o, redr NONNONON
-,,,,,,,,,w,,,:
CZ= •
EarthWoh isaaammammimatimmilwaiii.
.
77+600 77+700 no. 711•1108. • 784,100
Chainage 77+200 77.300 71.400 17000
mmemmummemommtaamok 41
, m my
Earthwork
M z MOON
Ft
NOMMNOWNM
1U
MMMMINIM
mmErmmm.,MIMMMWmPelmmrwmiogfqm w MEMMEMOMM
NOME= ININUMMENNOMUMMIONNIMMIMMIUMMUMM
NOMPPMENMEMP PERMNIMMANMPRWWWIMMOMMOMMOMMONOMMEMOMMIUMUMMEMMO MIMMOMEMMME
PMEIMMOMMOINNOMPOW ,,, M1 NOMMOMMOMMOMMEMMOMMEMOMMOMMOMMUMMIMMOMMOMMUNI MMOMMOMMEM
be 1111011111 ilniMmENEENNUM OMMINIMMEMMEMMOMMMEMMEMISMEMMUMMEMMEMMOMMEMEMEM
1Road Fur,& Sign Board ammummummummumummummummi
4 4 4 4 4 4 4 4 4

LINEAR CHART SHOWING STATUS OF ROAD WORK

PROJECT:- 'Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH 7531 from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of [Jalgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 7531 - (46.800 Km )] in the State of
Maharashtra on EPC mode'.

Client : Public Works Department - NH Division, Govt. Of Maharastra.


Authority Engineer : M/s.TPF Engineering Private Limited.
EPC Contractor M/s. Ashoka Buildcon limited. Complete ': In progren

Road Fur.k Sign Board


Ilasaggiv;4e,-.4,.r <.--
- . IIIMIMIMMIIMOOMMMOOMMIOMMIMMOMINIMO IIIIIIMOOMEMEMIIMIUMMIIMOMOMMIMINI
OIMMIMUMOOMMUSIMOOMBOMMIIIMOOMIIIIMMOMMOIMOMMIMMOMOIMMOIHOO
Mazikii4hi.P215 ,.:,.,. II IMIONIOOOOMMOOMOOMOOMOODOOMOOMOOMOOMMOOMOOMOOMOONOMOOMOSMOOMOOMMOOMMOOMMOO •
PC:C.
. IIMIIIIINIOBMIIMIIMIIIIIIIIIMIIIIIIIMMBIIIIIIIIIIIIIIIMMIIIIIIIIIHIIIIIMMIIIII
LC
iiiiiie,, IIIIIIIIIIIIIIIIIIIIIIIMIIIIMIMIIIMIIIIIIMIIIIMMMIIIIIIIIMMMMMIIIIMMIIMIIIIIIIIII
GSB
IIIIIIMIIIMMENIMIIIIIIIIIIIMUMMIIIIIMMEMOMIIIMMIIM
Subgr•d•
MINOMOMMOMMEMEMOMMUMMIMMOMMOMMEMMEMMEMOMMOMMOMMOMMOMOMMOMM
E•rthiNork
Chainage
MOOMOOMMOOMONMEMOROMOMMEMOOMOOMMOOMMOMOOMMOOMMOOMOOMOOMO
75+200 75.300 75.400 79+500 79400 71.700 79+800 78+900 79+000 IM
EarthWorlt MOOMOOMOOMOOMOOMMMOMMMOOMEMEMEMEMEMMOIMMEMOMMOMMOMMMOOMOMMO
ECM_ IHOOMMIIIMMOIMOOMMIOOOMMOWOMONOMIMIMOMMIM
Miribibmailisiiha.6:' 1- ' • MIIIIIMIIIIIIIM1111111111111MMMIIIIIIIIIMUM111111B1111111111111111MMIIIIIIIIII
•LC IMMIHUMMini111111111111HMMINIMINIIIIIIMM1111111111111111111MMIIIIIMMIIIMMIIIIIMIIMMIIIIIIMILI
Po(-

MOIMINIMMOOMMIMOMMIIMMIMMIIMMOMMOMMOOMIIIMIIIMMIOMNIOOSIOM
DBM IMIIIMMOMMIONOMOMMOSIMOMMOMMIMINIMMIMMOMUMMEOMMNIMOMMIIIM
i ur Sign Board . ;IMMINNO1111
.......... 1111/2”111111,1111111111MOIMMOMIOVIIIIIIIIMMIOINIFIMMIOIWIplISIBMIUMMIlp
......................
Road Fur.& Sign Board
ilOMOOMMOMIOMMOIMOMMIOMMIIMMOOMMMOMOMOOMIMIMMOOMMEMNIIIMOOMPOIMI
DBM ++40.+YesterW.MOMMOOMMONOMMINIUMMOOMMOMOOMMOIONIMEMIONIMIMOISOMINIMINHOOMIZOI
IIIIIIIIMIIIIMIMOMMONIMMOIMOMMOMOMMOMMIONHOMMINENIWIIINWOMIONIONIIN
4w---
GSB
Subv.11.
ElinnWork
79+700 7/1+800 71+900 90+000 80.100
Chainage 71+200 79+300 79+400 71+500 79+600
ErneWork NUM OOSI ONOOTIONOIOOKONOOOSOOSSEROMOSIIRO 11111EIMISINIMMINEICUIZINEINVEUESSIERNEURNISZEINE EOM elitallinfiliVIMIEREff
Subgrade ON SOIIIM MO 1111111 ONION OinfialitIMORMI if MENEM 131
GSB
MEM II WM MOINIONO IMO 111 ppm
MINFogeiroirmvPMPRPTmpinmr.imemps MAPAIR
IIMEMMIPMPIPPIIPIMPRIMMTRATIMPRWAPP551MR4
immommummosimummummammommummu mommil simmimmismisimmissimmuummommuum
IMMOMMIO mmiummumm
NIONIIMINIIIMMI
■IMOINIIIIIIIUMMINIONIONIMOINIUMONIMBIONNOMMOIMOIMMINION
4 1 4 1 4 1 I 1 4 4

LINEAR CHART SHOWING STATUS QF ROAD WORK

PROJECT:- "Up-gradation of Bhadgaon-Challsgaon (Section ) of NH 753.1 from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of [Jalgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 753J - (46.800 Km )) In the State of
Maharashtra on EPC mode'.

Client : Public Works Department - NH Division, Govt. Of Maharastra.


Authority Engineer : M/s.TPF Engineering Private Limited.
EPC Contractor : M/s. Ashoka Buildcon Limited. Complete In proaren
mu.mawg„uwuffiawg.muwmazwprmtww..:...g.•wmtmf.....nrmuarm,ss:s,m.wiRmrim,•:uipwbguw•NL•mam,gdswarumw.g.mvffmm
IMMOOMMOMMEMMOMMOOMMEMOMMOMMEMOOMMIUMEMOMMUMOMMEMOMMEMEMMOMMEMEMOMMOMMOMMUMMOMMOMEMONNEMMEMM
IMMOOMMOOMMOMMUMMINOMMOMMUMMOMMOMMINOMMOMOMMUMMEMOMMMOMMEMMUMMEMOMMEMIMOMMOMMOMMEMMOMMEMOMO
IMIOMMINIMOMMOOMMIUMMOMMOMMOMMOMOONIMOMOMIMOMMOMMEMEMEMOMMEMMEMMOMMOMMIMMUMMEMMOMMIMMEMINEM
IVIMONOMMIMMINIMMITIONIMOMMIMIMMOMMOMMOMMEMOMMUMOMMEMMEMOMMOMMEMMOMMIMMUMMEMOMOMM OMMIUMMEMMEN
ANIMMEMENNU MMUMMOMMIMMEUMMEMMINONSOMMENUMEMEWMFAMMOMMOMMOMMOMMOMMOMMOM MMOMMIMMEMEM
AIMMOSOMORM =MONO MMOMMOSMON MOMMOMMOMUMMOMMOUREMMOMMEMEMOMMIMMIMEMMOMMEMM MOMMEMEMOMMO
Amommummpwww upplommtm ommtrommumwmppmaratLmummommummum I mummumm
n -: T " --T-. rlp-1T77v im . ;<.7ANEWIUMMEMMOMMOMMIUMMINIMMEMMOMMMEMMEMM
EarthWork
,]E.,,, • . , • , ........ u.. ..„.„..A, _:E..2.. ,.... ... ,, ._L4ffifiiiiMINIMEMIEEMINENIMILIMMEMII
Chainage 10+201 80+300 80+400 80+600 80+500 80+700 80+800 80+900 81+000 81+100
EarthWork i
ABIENOMOMMUEMEREMOMMEMEOPMOMMNESEMOBEM ONOMEHMUMMEEHOMMEMMOMMEMMEMMEMMEMEMMUMMEMEMMINIMM
01=L. iatiiikiiiiiiiiliNDESEMINEOREMBSEENINAMMAMMISIMMINEMENEMBEIMMENEMEMMIIIMMMEM11111111=MMEI
MOMEMESESMOMMOOMUMMOMMEMEMONOMNPAMORMOMOMMEMEMONOMMOMMOMMOUNOMMEMMUMMEMMOMMEMMEMMOMMOMMMEMMEMMOM
17"1"111111PRIF!"171"14110011041111WORIPPRIMPAMIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII1
usimmumummunimumum 110111101111111110MMINUMMINUMMOMMOmmommummommommommommom
DBM OMOOMMIMMOMMOMMEMMIUMMOMMIMUMMEMMOMMOMMOMMOMMUMMOMMUMEMEMMOMMOMMEMOMMIMMINIMMOMMOIMMOMMEMEMI
are,— AMONOMMEMUMMUMOMMIMMOMMOMMUMOMOMOMMMOMMOMMEMOMOOMMOMMEMMEMOMMEMMOMMOOMMIMMEMMEMMOM MOMMEMMOMME
11 Road Fur.&< Sigh Board 111111111111MUMplffillUMUMMUMUMIUMMILIII IIMIMMUIIIII911.1111.11pAt BEL
. tUra:11: IsMINIMIWW/MISIONINIMSVNINLVIMIMMIWLIIIIMIPMeatlIMIN
II WORM:EralaillIME It • AM•illi altUFIRMIVIMEM
NIMIRWM• sfaiNtatift1DIMP ELINThillinfl.Mrn.M.1111
Road Fur.& Sign Board IMMIUMMOMOMMMOOMMOIMMOMMOOMMOMMOMMMOMMOMMOROMMOMOMMOMMOMMOMMEMOMMEMOMMOMMOOMMOMMOOMMOMMUMMEMM
IMOMOMMEMOMMOMMINIMOOMMEMMENOMMINIMMINOMMEMOOMMEIMMOMMUMMOMMIMMOOMMIMMIMOMMOMMOMMOMMOMMEMMEMOM
MOOMMOMMUMMEMMOMMIMOMMEMOOMMOOMOMMOOMMIOMMOMEMOMMOMEMOMMOMMOMOMMOMMOOMMIMOOMMMOMMMOMMIMMOMOMMEMMO
IMOOMMOMMUMMOMMOMMINIVIUMMIROMONIMMUROOMMOOMMOMMOMMOOMMIMMOMMOMMOMMOMMIMINEMEMOMM MEMOMMEMMEMO
PDC IIMMOMMOMMIMMOMMUNI, . ,,.T.mr . Hommummommom mmumommom
ummummummum, ■minummommommommommmommum
ME=
_

IIMOMOOMMOMMOMOMMOW -- — Mb
' mommommummommummumm
=1:5 ---.1zmumsommumr . Iiiimmomommmommgmmosomolloppmmmommw. iumnsunis
EannWork

chnag.
ai
Earthwork
IIMMOMMOMMUMMONWL
81.200 g................1............
81+300
tAMOOrm
01+400

NOMMOOMMEMEMMOMMOMMINORMOMOMMPONEMMEMPUMMEWNWOMIUMMWOMMUMMW

:A1111111! 11111111111111111116111111111111111111111111A1111111111111111MNIIIIIIIIIIIIIIIIIIIIIIIIIIII
81000
OSOMMIMENIONNIV
1W600 1H+700 WOW 81+900
iii4IIMMOMMIIMMEMM
82+000 82+100

MOMMOOMMUOMOMMUMMEMMERSEMBENINUMMEMOUNNEMENUMBOOMMOMMOMME NVOMOMMIMMEMMUMMO MOMMOMMOMME

EC
I OMMUMMOMMEMOOMOMMIEWmommaMmwmemmmmmmWIRMIM4MgHERWMPMMINEmTMMMmmmmommommommou mmummommum
MMINIMMOOMMOMMEMMINIMMIUMNIMMUMNIMMUMNIUMNUMMUMMIMMUMMOMMOMMIMMIMMEMMOMMEM MOMMOMMEMORM
MOMMOMMIONOMOMMIONOMMUMMOMMOMOMMOOMMOMMOMMEMMOOMMOMMEMOMMINEMOMMOOMMOMMOMMEMEMOMME MUMMMOMMOMM
IMMOMMINIMOMMOMMONOMMUMMOMMOMMOMMOOMMOIMMOMMOMMIOMMOMMOMMOMMOMMOMMUMMIMMIMMEMMOMMOMMOMMEMOMMOMM
P 3d Ft:, Sign.BOard AMMOMMOMMUM OH IMUMMUMMINIMUNIMIIIIIIIMMEIMMIUMEMUMMIIIMMEMINIMIN
I I. 4 4 4 4 I

LINEAR CHART SHOWING STATUS OF ROAD WORK

PROJECT:- "Up.gradation of Bhadgaon-Chalisgaon (Section II) of NH 753J from chainage 56+200 Km tO 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of (Jalgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 7531- (46.800 Km )) In the State of
Maharashtra on EPC mode'.

Client : Public Works Department - NH Division, Govt. Of Maharastra.


Authority Engineer : M/s.TPF Engineering Private Limited.
EPC Contractor : M/s. Ashoka Buildcon Limited. ' Complete In progress

P.c=d r &SignBoard:.... WIRE Wil MEM 11 MAIM EWA


mmmmmmmnmmmmnmmmmmmmmmmmmummmmmmuummuummmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmu
IMMOOMMOIMMEMMEMEMMIOMMOMOMOMMIIIIMMOMMUMMEMMINIOMMOMMEMMEMOMMEMMOMMEMOMMOMEMMIMMEMEMMUMMEMMUNI
OMMOMMOMMOMMOOMMIUMMOMMOMMOMMUMMUMMEMOMMOMOMMEMOMMOMMEMMOMEMMUMMIMMIMM II MMUMMEMMEM
MOMMOMMUMMOMMOIMOMMEMOMMINOMINOMMOMMMOMMIMMOMMOMMEMEMESSEMUMUMMINSOM a UNIN A MINIMUM=
MOMMEMMINOMMIMMEMMINUMMOMMUMMOOOMMOMMIMMOMMINIMMOOMMOMMENSMUMEMMEMEMINMI MIMS I MINNUMOMME
IMMOMMONNOMMEMEMMIONMOMMOOMMOMOMMOMMOMOMMOOMMEMOMMEMMOMMEMMEMINOMMINMENIMMUN MINN IMMINMESA
Subgrade
MOMMIMMOMMIONOMMOMIIMMUMMOMUMMOMOMOMMUMMOMEMOOMMOMOMMEWASIONE UMMEMMMONN mmmeess.I MEMMONMEN
Eart hWork
1 MOOMMOMMMOMMEMMEMMUMEMMOMMUMMEMMEMMOMMOMMOMMOOMMEMMOU MUNEMOUMEMOMEHOOMMOEm.f EIMMOUNEMMANNM
Chainage 82+200 82+300 82+400 82+600 82+600 82+700 82+800 82+900 83+000 83+100
EannM rk ommummummummummummummummummumplaggimmullummullinsummillil
I GS B
cC InimmummummimmililligilillilliiiimmommsummommimemmonnomummIggymmmTillyamommg
• tse,
•• •-•

amommaxgAIIIIIIIIIIIIIIIIIIIIIIIImmmmillummummumpoommilimpH:::::::::::i;:::
fxras,v,,, .,., iMIMMIMMUMMIMMIIIMMUMMIMMUMMIMMMIIIIIIMMEMMOMMOMMOOMMOMMEMMOMMEMMONOMMUMMOMMOMMEMEMMOMIIIIIIIIII
DBM
mmiummumilmmummum ggmmmmmmmmmmmmmmimmsmmuummmmmummm
IMICOHNIUNOMOMMILim
su
smeruser 111M mmmmaysuir
l ivipTrin ffflin
Road Fur.& Sign Board , UM■MEMOMMIMMEM
Road Fur.& Si n Board ' Wair
i
r rillaili
ri 111 a
rirl Ilir
ffi UI Man
reI I I I ill MIMI Figail i
FMI I I III 11.111 . nifil in . I IIIII . 9
i I li. El Ell a I i
ai II Ii
si NM era a al
,mmommummummommommummommigg_______________
1,
Imm igiggempwwwwwwwimimmi.
mw ,mmelmwww mummummummormummommommummummullmilimmmallummagmm
mmmmmmnmuminmmmmimmm
M:,..... "IP'''' ' "1"141"1"11.111""
44144AiiiiiAgligiiimatimumgiiiii iatH
-''''''''---''''"'"''''--"' ''', aamum11111iiiiiiiiiiiiiiiiiiiiii
777111
-vmpggammmmimmommomusmmosomommummummommummummummegli
gmggmmmuumummmummmmmmm
rado
EarthWor1, iiiiimmaiiiiiiimilIERAIIIIIMAIMILIIIIIIImummommummummummu s
84+000 84+100
83+800 83+500 83+600 83+700 83+900
Chainage 83.200 83.300 83.400
I
Suby
E...
11111111111111111111111111111111111111111IIIIIIIIIIIIIIIIIIIIIIIIIIIIII
;v.0
Gsa.,—
MUMMIMEMMEMMEm NIMMESMO ONIMEMEMEMOMMEMUUMFININUOMMUMMEMMENUMMEMEMMEMMI
MI I
I IMPEll
Tom gsmngnsnmmmpmmumnsrmngsnmmmimnmnmmmmmmummmmmmmmmmmmmmmmm
ZIEMMIMMETUINM11
IMMENCIRIOPUMPFIRMIPMP ww_prIlIfil _ mgMIPMMMMORWM, WNW MPRIMIRES. IMMINTWAEMMONEMEMMINEMEMENIMIMINUMMIUMM
omcv;--- MONISM.' MN MINE 0 MINISONNSIONISMO I ■ Noma ■
011.000is I IMMEMMIAMMOOMIMMOMMUMMOOMMOMMOMMOMME .. -'40g
MOMMINUMMOMMEMMONW . . - H4rOW
DimAlIMMIMOMMEMOOMMOMMOMMIMOMMMOOMMOMMOMM MMEMOMMOMMUMMIMMUMMOMMOMMIUMMEMEMMEM
MLEMZCOMMOMMEMOMOMOMMOMOMIMMIMMOMMONSIMMOMMOMMOMMMOOMMOMMOMMOMMOMMO
IMMUMIUMMIUMMUMNIUMMIUMUUMINUMMIMMINIMMIIIIMMINIMMINI
Road Fur.& Slpn Board'
4 4 rereo•-••••••-•••••,

LINEAR CHART SHOWING STATUS OF ROAD WORK

PROJECT:- "Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH 753.1 from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of Palgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 7511- (46.800 Km)( in the State of
Maharashtra on EPC mode".

Client : Public Works Department • NH Division, Govt. Of Maharastra.


Authority Engineer : M/s.TPF Engineering Private Limited.
EPC Contractor : M/s. Ashoka Buildcon Limited. #1Complete PRP In progress
7 3,-9-112 IA 5 0,7 R.--- , 1 21 ks 07 0„. ..9....1- 20 7 9 tz r 2 3,ks_0 7; 0 1,..7- - _sc . 79- 1 )1,4 rck 7 1{:9- 9 17 .1, ' 4,1\ 7FL,9 0 1 2 456 7 ,9,90123,4,50799
Road Fur.& Sign BoardiT.::

Df3K4,1 . — .• `,V4V044843i ': ." • :.' A: ''''' ' ",...2:' 7':... .3i..:g ii:',iiiimiiiila.146 V .-'''',:f:WAZaak2i4:taiia :i".':':. :"' f<:E.1?...':::;'':'.4disgilie:;x
• t i:kk.i‘daie:a.t1. is:di:.:ii:-.W::4a *'-::'''''''':=f'':: '5;'::';'. •••
a.'kgii..i0.ia:r:r::kUfaila;i'
—il- .` ...:.-r5'''' '''' 4.4iiiiiitie ",&'
"M..
X
...• . ... .
2l-C.Plalli4'2,":
454i.
GSB ''':.
Subgrade "-. ",;',.0?,!. 7*.ir,Z
EarthWork
84+400 84+500 84+600 84+700 84+800 84+900 85+000 85+100
Chainage 84+200 84+300
EarthWork
Subgrade
cd
X GSB .

POC ....,.
gfrOIWWWPW,i,:d!
•.-:: ''''.Z* . -,: n- ''..:-.... ??,::.1; '.•:::".''':..:i'i ':
. , ]i-.K:i:1 .:!,:if.:)'iI,''',""': ;'',-?- i%'''.1'..- :::: '''..]: ::''.: '':
.::: ]:1] :: ;I:: .-:i' .iM....-''':: ;I I•.I': ::.. I.;:. :'-:i'-':: :.:: ..:('''-':. :::ej'', '•`-'. •'_' ,. I 'i'•]I'
DBM :'''''''''-4 ''''..."...' i,'.4-ii'. 4,".i-LVa .1},i:i:] .::i ,.i, ii :i : . il : - : ':.;•:i:
BC
Road Fur.& Sign Board i• 1714 5 a 7 13 9 0 1 1" 14 t, E 7 R 9 9 17Th 4- S E 7 A 9
,A. 7111.161-7
Road Fur.& Sign Board,'' .
..,i
il. : ,,,..:..]:i„i.li:.i, ., •,;;] 4ii ii :ill, i:,:$: ii,:,.ii,.,.:ii,iii,t,.i : ,,: ,;.,:„Lii.,:„:ee:i.:.• .:•••• ...:;. ?:.^ .. -,..., ..x,
:,;,• , . . ,.... •. . .,...,..
4ailiii 1:':, ::...::;.::.:: ,k ..: :::•:, :::;: ::•:•• :::::, :::.,,.:.:::, ;:;:
i:.: :xt.,:x• K: .*i: 3::i :3::,3,:-:g ::;.
,,,, ,.,.%, , ,..,, ;.::. 3;::i i4',
...* ..,V, ;;:::- •;::: .::::: ,,,I; ..f.::,::::: ::, :::.:...2k4a1
' ' - - ' ', '-- ''' ',,•':::,:;.5f, ,'',"-: 'I., -•-• ,,,. •::: -...)vaig i::::, :-::-,
..,.. Pi. :1),Ki.7 7.7.4177 '. ' ' ''' •

GSB ,L ,AACiIX.r.'
SubgrarOAIIIIIIIrr
EarthWork.,1714'MPM.,?,;;'''
. _ 85+900 86+00 86+100
_ 85+600 _ 85+700 85+800
85+200 85+300 85+400 85+500
Chainage
EarthWork "1-..4;tWg

in
Subgrade Z. .1, U
I 1111
X GSe
cc
PC:c
0,.;:;',..•
---
DBm ..

0C
Road Fur.& Sign Board , '
,INEAR CHART SHOWING STATUS OF ROAD WORK

PROJECT:- 'Up-gradation of Bhadgaon-Chalisgaon (Section H ) of NH 7531 from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of [Jalgaon-Bhadgaon-Chalisgaori-Nandgaori-Menmad NH 7511 - (46.800 Km )1 in the State of
Maharashtra on EPC mode.

Client : Public Works Department - NH Division, Govt. Of Maharastra.


Authority Engineer : M/s.TPF Engineering Private limited.
EPC Contractor : M/s. Ashoka Buildcon Limited. PComplete IIII n progress

Road Fur.8, Sign Boar.


O. 1 ) k 4 r6.F 7 .)\-7- f 2 .3.C.--1k-q7 f1. 1,- kc 6 7 A , 1) V_`1. 7 .... k J.) , , '_7-A wo k s-.5...7 A 9 1i-3 k5 2 'F' n I 2 IA c - 6 . 3 .1 -q D 2 1 4 .5 ,6 )1-II 0 i 2 -I 4 .5 6 2 ..a q

I- II
DB < ......,.... ',z -*- ' .„...: . ::::". .:;-,,,:. , :.z.-,:;',i;..,'•;,-Allir;41 -`,......,:,:; . ','OKIPpre4r4: .'i. f,:,-,:,:,", :::, ',.. 44,,,,,,,:i: -,,,- ,,....- .-01V041-':j';',,,,--eiO4*AW- --AMPIM-
.,
LC;
65B
Subgr
E•551,11ork '' -
86+600 86+700 86+800 86+900 87.000 87+100
Chainage 86+200 86+300 86+400 86+500
EarthWork
Subprade 1
N
X GSBC,, tr
cc
Ct. ;n4:i..;'^F VO.

.
50
.1—:' • '''"u ,j. .,. ,..4.
. ,- 1,4.. : M.P. 44iii,`•
DBM .;.,,,,;Wi.-iiiii-iiil, va;filia. , '"--'-* :f:f-. .5*::71-, A • c ..:ii;S:?i..:;;;;;':;', ''.:,:,,,,:,
BC , II
Road Fig.& Sign Board ". 'car si •
IT s
LJ ti 5.A 7 3k..'I rU1_2... a..A k 7 ..X_ 1 .f) I. 2 T_`.. C...f /1,.. ' L2. \ .. '0 ...5 ...7 .-)-. q n I .) IV, .-E -7 ..B
L 2... A... \ 6- 7, 9 IL' 2--j- 4. C.A 7.)Lar
Road Fur.F., Sign Board
....%0-..2.,
BC--er..17, .." '''.!.., t.Iffilf,`..l '.. , ).T:”..;:',.:1::•'. .",:'.:
'/.. ...''"5Y.eVr -0,.4.,:,
DBM

6:1H .'*.
Sut,gr.tri•
E a rth W o ri< 87+900 88+000 88•100
87+700 117+800
I

87+400 87+500 87+600


Chainage 87+200 87+300 —
EarthWorlt
Subgrad•
RHS

05B ,"`""".°M ... 94"


II
IEMMI;CtrAVIll
#•!*,56/4Aita r; I111I1111111111111111 1111111•1111M1111
,....-o ,,,,,,,,, :;....,, .4.4
Sc :-:::•ii:.:::::::. --,,,.. ,...- ::::E: .,:. • .,...75....:::.?...::::.:?,.....,,F.:: ::-....... ,::.i :::•,..,,,?.:-: ,2., ,:,:i ,...f::•... •ll'l. .4040
'.IFA:M
4.,W,
-.. ..*--,...,. )asset .:,.:W..4cp.
DBm.., ..,.: ::: .... ...:, ::

Road For..& SigriBnaid


r • • • 0 iv • • 0. • • • • • # •
LINEAR CHART SHOWING STATUS OF ROAD WORK NO

PROJECT:- 'Up-gradation of Bhadgaon-Chalitgaon (Section II ) of NH 7531 from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of [Jalgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 7531 - (46.800 Km )1 In the State of
Maharashtra on EPC mode'.

Client : Public Works Department - NH Division, Govt. Of Maharastra.


Authority Engineer : Ws.TPF Engineering Private Limited.
EPC Contractor : Ws. Ashoka Buildcon Limited. '.% ?Complete inprnereaa

Road Fur.& Sign Board .111 mii ■iiii iiiiiiiiiiii iiiii iiiiiiiiiraiii ili ii■ii i MN iii i ill iTv TEEMi
■rillNMI
■ii m an■Ian 1 El ■iSii■iiiiii■iii1■i■Li ii■ll
pc-s---• ,7110mmummanummounmommummummummummumummommmmummunmommompimp0
DBmvillimwrOMMMMWOWV. ' -AMMMMW . -IMNPatgoitg - -4,UNM5,• • ,IWIP,Imr54x ,:, .
411641::-,. , iiiiiiiniiiiinUMMIffilinnlinnilliggininiimiummumminiinammumseniiiiiiiiii
L HS

PaC ' '''111.111111111MUMMIMIIIIIIMMMEMMUMMEMMEMEMMIUMIUMIUMENUMMIMIOMMINIMMIIMMOM


14'
. '' 011111111111111111111MMIMINIMMIIMUMMUNIMMEIMMMIIMMUMMIMIIIMMIEMIIIIIMIMEMMMIll
WEENIMI1111111111111111111111111111111MMUIMMINIMIIMMINIMMIMIMINIMMIMMIIIIIMENIMMUMMINEMMIMI
subwa" • =1 ,,, MOMMINIMINIUMIUMMIIIIIMMIMMIIIIMMIMMIIIIIIIIMMIMMIIIIIIIIMINIIIIMMINEIMMEN
EarthWork IIIIMMUMMINIUMMEIMUMMINIUMINIMMIMMIIMMUMEIMIUM1111111111111111111MIMMEMIll
89000
Chainage 88+300 S8+400 88+600 88+600 88+700 88+800 88+900 89+000
88•200
. MUMIIEOMOMII MIIIIIIIIMIMEMO=
Earth Work linMIMI111111.nnUllMIMIlln. llMMIMIllMIIMIEM•MEMM... ll
MIIMIIIIIIIIIIIMINIIIIIIIIMHMMMIMIIIIBMMIIMIIIII

IMailifiumummummummulummimmiumnimmummommummunommummonnumummi
:ia2jIIIIUIIIIMMIIIIMMIUIIIIIIIIIIIIMIIIMAIIIIIIMMIIIIIIIIIIIMMIIIIMIMIMIU

maszazim:::, . IIMIIMMIIIIMMIIIMMIIIMININIIMIIIIIIIIIIIIIIIMMIMMIIIMIIIIMIMMINIIIIIIMIUMIMMIMMUM111111111
IMMIIIMIUMIIIIIIIIIIIIIMMINHIIIIIIIIIIMIIMIIIIMMIIMINIIIIIMIIIIMMIUMIMIMIIIIIIIIIMIUMIIIMINIIMIUM I
' ilinnUMMEMMEHMISMMUMUMMUMUMMUIPMMEMMOMMIIIMMIIMMM
P°C 1'. '' ..'" 44
"Amilrq4"'"'
Dgm ,",-0.-v+,,,i+:A94•46 0.w?:............................................. - '''IRIP"Miw
r.NRVAMMUIKIMMA.FNNIMPROMMIMP-MWMPANPW.. mmummumumminim - Aff'llaggri
r11111100iii0MUMNIONNINIMEMOmmumi000011000mummumummummumumummimummu
Road Fur.& Sign Board' WI lill 1111111MIUMIM MUM WWNNN
■ ■
laWl I jail illaniarilli■
ErnI I■ il■l111111
Road Fur.k5i 0,Boa I I ■ ■al
MIMIiiTI 111
Iiiii iiillWIWINMiraMariaa
mai ur
a ■
lirairail
fill alail
ai r DEIMMIENIMEM
IMIIMMUMMIIMUMUMMINIMIUMMIIIMMIMUNIMMOMMIMIMI WWi '
'',WPW,
insummiglimmummummummumminumnis IMIMMOMOMMUNOMMINOMMIMMIMMUMMOM0000mmumumem0
DBM

. IIINMIIMNIIIIMUUIIUIIIIOIIBIIIUIIUIMIIIUIIUIIIIIIOIIUUIIMIIIEIINIUIMIUI IMMIIIIIMIINIMIIIMIEIMIIIIIIIIIMIIU
P2-62";- ''''''' - IIIMIIIIIIMEINEMNIMMIIIIIIIMIIIIIIMUNIUMIIIIIIMMINIIIMINIMMINIIIIIM ME lIMM
JIMi IIIILSLS11611611
- 2311=,. /•%=...-.: 111111.1MMEIMMII.ME
GS8 1"4" g AllUMMOBIMIUMINIMUMMIMMIMUMINOMM
iimmummumummummini
MMMOMMOMMI
UMMIUMMOMMEMOMMOMMMOMMOMMOMMEMMI miain
....i:ammuummummummummsMIMOMMOMMINOMMO
IMMIIIIIMUNIIIIMMUMMEMIUMIIIIME111110111M111
Subgrado
89+900 80+000 80+100
89+500
89.880 89+600 89+700
Chainage 89+200 89+300 89+400 AMILIMU
I l
a
MISTR
I
MUMMINIMENIMIIMIINMUN
E aM1I1W ork EIMMEIMMIIIIMIUMMUMMILIM
1111111111MMIUMUNIMM
Sobgrada'
NIIIIIIIITII6111111111MMUSIMMINISMINUMMMUMIMINMEMIIII
' -'-11111.111111.111111IMIIIMMIMMIUMMI 116111M1111111111MMMIIMUMEMUMUSIMMIIMMEMMIIMI
, ii,„ 11111061
1181:
I2111;1 1111 1
111111
1111 1111111111
11 11111111
11011
MINIMINIMIMMIMINENIMMUNIIIIIIIIIMMOMUNIMIIIIMINIMMANNIPAIMinrarROMMUMMEMIN . MIN , :4. .,it..wg,
Mrtr)eY':-''''' UMMIMMUMPOPPRIMINIMMIMMINTUMAMMilliMMIllthwmowAltr..
'''-'74

' - • •-•-•''' - iiAMPONtig ..NRUNIPINEMPOIDAVIr• -mumfamM,.,,,.....mm.*1 lIlln IInnrinl


ITL
lnIMIL
- •• - ''''' IMIM ENMMu llUMLm ;Y

. :'1111111111lHIIIIUIIIIIIIIIIIIIIIIIIIIUIIIIIIIIIIIIMIMIMIMMMIIMNMIMM
UMMUMNIMIIMIMME.
Road Fur•& SIEWBOard' MIMEIMMIIMMIIIMMUSIM
LINEAR CHART SHOWING STATUS OF ROAD WORK

PROJECT:- •Up-gradation of Ethadgaon-C.halisgaon (Section II ) of NH 753J from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of ilalgaon-Bhadgaon-Chalis.gaon-Nandgaoin-Manmad NH 7531- (46.800 Km )] In the State of
Maharashtra on EPC mode.

Client : Public Works Department - NH Division, Govt. Of Maharastra.


Authority Engineer : M/s.TPF Engineering Private Limited.
EPC Contractor :M/s. Ashoka Buildcon Limited. fV4Complete In Progress
C 7 . s. 01_ 5 7.10 4 . 11 0 45. 112 , S. 7 . 1 45 fi R • 12 4 . I 45 6 S 9 012
e.,:act, . Fur.& SI n Board
Road
_ _,_. ,..,„
I
,im:.il
DBM

'''''lif"fliiiiiiiiiiiiiiiiiiiiiiiiiiliiiiiiiiii
lllllllllllllllllllllllllllllllllllllllllll
LHS

SS
Subgrad*
,
E•rthWork
Chainage 10+200 90+300 90+400 904400 90+600 90+700 110+1100 90+900 91.000 91.100
EannWork
&Agra& .'. •

ill MI n MI
P OC 'i !c'`i, f,
M IIIMMEMIMM111111 1MIMMIIIIIIMMIIII
I MEDIU NIIIIMIIEIIIIMINIUIIIIIIIIMM II I II
PtINMl"'"--""P
MrwPRIMMIMPIWANININMR*1:i
M OM I I : 14111111MMIIIIIIIIIMINIIIIIIIIIIIIIIMMIHINIMIIIIME 1111111111
4"''
DB M'' '' ORMWN'zPiti
IN IN A NV' .:M1MIMIonm
BC - - 7--1 :,,,,,
Road Fur & $ gr1 Board i / • r s 7

._. -...........................
IINNIEF WPM'I

:•
Road For.& Sign Board
...,........................................1111111111111•11111•=1111111MINIIIIIIIM ii

IMIIIIIIIIIIIIIMEIMM11111111111111111111111111111111111111111111•11111111MIIIMIIIIIIIIIIM1111111•111111111111M11111111111111111M1111111111111M111111•11111111111111
1111111111111111111111111111111111111111111111111111111111111111111111111111111111111M111111111IMINIIIIIIIIMMIBINIMMIENIN
--
11111111•1111111=1111111111M1111111111BIUM111111111111111111111111111111111111111MMINI
LI

11• 11111111111111111IMINWIIIIIMIIMMIMIIIIIIIIM11111111.111 __
_111111111
111
. 1111111111M11111111111111111MIMMINUMUMIMMIIIIIMIIMIIIIIIME IIIMIIIIIIMENIN
'411MIIIMMIIIIIIIIIIIM1111111111111•11111MWMPUMNR.11101•1111111M11111111111111111111•1111111111111111M11111111M11111111M11111111111111111111
Subcra ie
4E. •• • ','" .-- •Ig 11 +go 91+900 92 92+100
91+500 1+700
et +2oo 91+400
Chainage
E a thk IIM IIIMIIIII
70r l=11.111111111111111111111111•111111UNIMIUNI MIIIIIM
•' •

osii"" """mp
o

T os sb37!
. - .• " 1111111111111 1111
dirr
niimonomionimmiiiiraf
MIS
liip
M I
111111M111111111011•1111•1MOMMIII
MM UM 111111 I o
W' - - ..
pLaCc--
.,t, 44! 0 .. - 1 .
mo IMIUM
lii
nti M 4 . iirlirliiiiirdiiiiril
iiiiiiiirill
iii
iiiiiiiiiiiiiiiniiiiii
1111111111111 IIII 11111111111
R,,ad Fur 8 Sign Board II SIM
4
fh- e e 01 r 40 40 0
LINEAR CHART SHOWING STATUS OF ROAD WORK

PROJECT:- 'Up-gradation of Ilhadgaon-Chalisgaon (Section II) of NH 7531 from chainage 56+200 Km to 103.000 Km to Two lane with paved shoulders/ Four Lane configuration of 1.1algaon-Bhadgaon-Challsgaon-Nandgaon-Manmad NH 753J - (46.1100 em )1 in the State of
Maharashtra on EPC mode'.

Client : Public Works Department- NH Division, Govt. Of Maharastra.


Authority Engineer : M/s.TPF Engineering Private Limited.
EPC Contractor : M/s. Ashoka Buildcon Limited. Complete inpmym
momussaisrommaimansuatirsmunomuur:rnimmiwaturimma.virmacimomar.m.unpumtwww.......ffmrnmsdatembuimarnisu:
Road Fur.R. Sign Board IMOOOMMIMMOIMMEMMIONMEMMUMMOMMOMMOMMUMMEMMOMMOMMEMOMMEMOMMOMMOMMEMOMMOMMIMMEMMOMMEMMEMOMMEMMEMMO
-OMMEMOMMOOMMOMMEMMIMMEMMOOMMINOMOOMMOMMUMMEMOMMOOMMOMMOMMOMOMMOMEMOMIMMIMMUMMOMMOMMEMMIMMOMM
DBM 40' . IMOMMOMMOMMOMMOMOMMIMMOMMOMMOOMMOOMMIUMMUMMUMMEMMOMOMOMMOMMEMMOMMOMMIMMEMOMMUMMOMOMOMMOMO
MOMMOMMOIMMOMMOMMOMIMMOMOOMMEMOMMOMMEMMOMOMMIMINIOMMOMMOMMOMMUMMEMMUMMIWIMMIMMOOMMIUMOMMOMMUMO
POC , NOMMIMMOMMOMMOMMONOMMOMMOMMOMMOMMOMMOMOMOWA
IMMOMMEMOMOMMOMOMMINOMMEMOMMEMIMMOOMMOMMOINEW
manissm7mmumummummummummummummumn
ummummumummommommummummomm
Sungrad•
OMMIIMMOMMOMOMMOMMOMMOMMOMMEMOMMOMMIMMOMME
Earthwork
82000
Chainage 82+200 112+300 82+400 82+500 12400
EarthWork IMEMOMMOOMMEMMOMMOMMOMMEMMOOMOMMOMMEMMEMMOM
11 MEMNIMOMMOMMEMOOMMOMMIONIMONNOMIMMOMMEMOMMOMM
EliirmlOMOOMMONOMMINOMONOIMMOOMOMOOMMOMMOMMOMMOMMO ,. _, , , ,
WAWAttILIIAMOOMMINOMMOOMMOMMOINIMOMMOOMMOOMMOMMEMMOMMMAgitiWWWvAlumwgi6 ~kah r h -,,,AL
• -1---.̀ LIIIMMEMINIMIIMMEMIIMUMMUMNIMUMWW 9
.. 11111111MNINIMMIEMIUMMINIMMUMUMINIMMMINIMMIMMIIM1ERNMEREPPIPPMWMPMPROPPR ME122.11106...1161;/66.
WM'- -491 . MOMMOMMINOMMUMMOIMIMMOOMMINIMMEMMOOMOMMEMOMMOOMMOMMOMMOMMOMMEMMOMMIUMMOMMONI UIMm
MMEMMEMMOMMEMMINI
DBM ''''' Z''''' "466.
MILUIDEE=6-111111111111111111MMIMMIMMUMMUMIUMMUMMEIM IIMMEMMUMIIMMINUMNIMIMI
SMOMMUMMERMUMMERMOMMERMERMSRUMMIMMUMBRIMMEMIFEMMEMEMMI
■MI■1■Ma ■Ia■raara ■11
Road fur.& 5en Board

m 1 w m m 6 u g m w"I RI=■illi
lli 11 1■IN IIIIM■II iral■la■lirial■111■I1M1■1
■Via■a lili■ illral■iTal Mil■Val■isI■SE■ilia■ i
Road Fur.& Sign Board,
mummummummumummumummummlimmummummummummumm
DBM"-/r0-41""*"1"4"."4
ammommaammuswanommatemmommammsmommawglmemanimummemoutimummummummommom
MMILMMEMMOMMOMMOMMINIMME
ESEMENOMMUMEMOMMENNIMMOMOSOMMORNMEMOMINNEWAVOUNINENIMME
POC NWMEMEWOMMOMEMOMENEMOONORMOMENNSMEMOMOMMOOMOOMMINOOMMEMOOMENORNMENNEEDEMMUMMOMMUMMOMMOMMEMMOMMEN
;.,•;1;',Z;;'•141/1110
IIMETgrg, SOMMOMMONEMME4MM MENNOMMUMMEMOMMEMEMOMMEMENMEMOMEMEEMMEMBOMMNOMMBROVNEMPIONNFIMMIIIIIIIIIIII
OMMORMONNIMUMOMMONOMMOBBIEMMUMMMOMOMMENSIPMEMIMUNIMENMCZNINIIIIiiiilliallarn
SubgrAd•
1111111111111111111111111111111111111111111111111111111111111 ii
NOMEMON_NMEMEMORMOMOM
EarthWork
13+600 0+800 04+000
C hainage 113+200 83.300 93+400 03+500 03+700
000 EHMEM
93+600
BIAMMOMMINOMERM,
MEMMEMOOMMENOMME ORMOVIERMEMOBBEEMEMEMMOMMOMMIMUMMEMEMMMEMgEMEM ,
EarthWmt

M02126WiiiiidOM ,V.mv*rn BEEMOMMUMMEONOMMEN OMBOONORMENNIVEMEMEROMMEMMUNNURNWEIMMOMMOMM


MERAMMEMOMMEEMMINNEMME4E
ommmomommummommmummommollommmomummumomm-mumm m
OSB'
C .
MUMONOMMOOMMISMOMMENNOVOMONOMOMOOMMOMMOMM*MME MENNEEMOMMOMIVRmairmwmptitow
IMMIMMnimowlmPPMWARMFRIMPPPRIMMPFIRmmoMmimmgmMOMMIWIMPrwOMOMMENIMMOMMEMOMMEM
POC mralf2FIFIPPIXIIIPPA
MINIONIMMINIMUMIN !I ,IR MINIMINIMUNIMINIMMOSINIMMOMMUMMINNIUMMONMEIMMUMOMMEMEMOMMEMMOMMOMM
PAM MMEMMOMMEMMUMMOMMOMMUMMUMMOMMOMMEMM
IMOMMOOMMUMMOOMMOOINOMMOMMIMOMMOMMOMOMONMONOMOMMOMMMOOOMMEMOSUMMUMMIMMUMMOMMOMMUMMUMMOMME
IMIONIMINIONOMMOMMOIOMMOMMOMMEMOMMOMMOOMMINOMOIONOOMMOMM MOMMEMMUOMMEMOMMONIMMOMMIUMUMMUMUMMEMILOMMEMEMEM
11
IIMMEMIIIIIIUMUNIUMMUMMI
I

LINEAR CHART SHOWING STATUS OF ROAD WORK

PROJECT:- 'Up-gradation of Elhadgaon-Chalisgaon (Section II) of NH 7S3J from chainage 56.200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of (Jalgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad
NH 7531- (46.800 Km )1 in the State of
Maharashtra on CPC mode'.

Client : Public Works Department - NH Division, Govt. Of Maharastra.


Authority Engineer : M/s.TPF Engineering Private Limited.
EPC Contractor : M/s. Ashoka Buildcon Limited.
Complete In Progress
MIPIRWILM:110111111UWWWIIIMIN001191.113116M.101./MitiallIalfrIlmfailatisimSWILICVNIconnarnomm:MM:19:1141111119/113WM.MrMillsaffinilintliflilloNM/919191.111Maelfilltele1/1901119119MMAIMM:i
Road Fur.R, Sign Board
IMOMMOOMOMMOMMOMOOMMOMMOOMMOMOMMIMMMOMMOMMOMOMMEMMOMEMMEMMOM
BC
DBM
IMMIMMOOMMIMMOMMIMMIMMIMMOOMMINMOMMIMMMOMMOMMOOMMIMIMMOMMMIN
_IN
111111111 11111111111111111[111
MSMi 10
POC , 4 ia a, • galik;,Agit, V
.
, . a2f
2EGMLISEal, Immmilmm2MMS ORME SIM EMMM Oria
mummem oglim
Mainums mum11111111111111111111111MMEMMENUMWEERVELMILAIhUMMIWA gimmomms
EarthWork

Chainage
ormesemonammummemassmancmansmommemonsommemenummumummommememmumminumminsmons MMIMIMMIMMIM
114+200 94+300 94+400 94+500 94+400 94+700 94+900 94+900 96+000 96.100
.0. IBMOOMMUOMOOMMENNEMPROMERMOMMOMEMMMORMIUMMOUOMMEMOMMEMMEMEMMREMOMMOMOMMEMMUMPMEMME RIUMENN
s.9-4. . ,
ummummummuquapopequommalmemmo RamasomRomm ppownwammammummemir .1 MOW ormm-
immramourriEF IR! Tr!?rqmImms.11Prrlmor amr,4#1741m4719NEER ,,,' mc., 1

4tla
'. r

'OF wommummw- gognv r a


y

-----; IMMUMMINNIMINV------ --- - - mummummummummmummummommiummummummummin


, - Ummummummilliiiiiiiiiiiiiiiiimmummummumummummummummummommommummummomm
IIIMIMMMMIMMMMMMMMMMMMMMMMMIMMMMIIMMMMMMMMMMIMMMMMMMMMMMMMMMIIMMMMMIIMMMMMMMMMMMIMMMMMMMMMMMMMMMMMMIIMMMM
. IMMMIMIMIMMIMMMMMMMMIMMMMMMMMMIMMMMIMIMMMMIMIMMIMMIMMMMIMIMMMMMMIIMMMMMIMIMIIMMMIMMMMMMMIIMMWIMIMMMMIMIMMMMMMM
umuunummuumpumnimummummiusurinanummumuummummumm
Road Fur.& Sign Board '

iiiiiiiiTii■ii ili
■i i■i■WIITEM ■ii ii■i■&WE■i I MI iii iiiiiiiii iiiiiiii iiii WI'a■ liiiiiii Zia iiiiiiii i■i mai■iiiiii
■ llTOMSifilli
mmmommwm7Ammuuummummmmmmummmmmmumummmummmmmummmmnmmmmmmmmmmmmmmmmmmmmmmmmmmmmummmmmmmmmmmm
DBM lumagmamem ONIMMEOMMOMAROMUMMEWOMMAMMINIMMEMUMWMUMUMMOMMEMOMMIMMEMMOMMEMMEMMOMMINIMMINIMMEMM
-:. NOMMUMBIUMMI iii wmmNmmnmmnummmmmmummmmmmmmmmmmmmmmmummmmmmmmm
_ ,
WHIFIFERIST;M7 :. ,:i.:i.. :::,. ,- :::: -,.- :, ,
--, in
URN4*EnMANOMEMONOWOMOMMUMWMNRAMMMWMUULMMOM
LIMMIlma GERNOMONEE MON EsUEVEMEROMBOW464
Men
ose ;1411MMINIMMIMOMMOMOMMOMMMOMMORMEMOMOMOMOMMMOOMMOMMOMMOMMOMMOMMUMMO MIMMOMMAPOOMMUMIUM4MINMERNMOUSIO
Suboracle IIMOMEMEMM NOMMEMINIMPONMOSOMMERMENSOMMONMENOMONOMENOMMIUMMOMMEEMEN IMMEMOMMOUU4NMENA MUMMER
mmmennumom
EarthWork NOSNMEMENW MONMENMOUNUMMUMMONOMENUMOMMUMENNUMBOUSIMMOGRAMMUMEMOMMUMUMMENWOOMMVENEMM
96+800 95.900 941+000 94000
Chainage 95+200 95+300 95.400 116+800 15•600 95.700
EarthWork BEIBMIERIMPININIIIIIIIIIIIMMEMEISIMMILTIMUMMISMEMMEMOMMEMMEMMORMOMMOMOMMOMMOMMOMMOMMEMOIMMEMOMMOM
01=11610011EMEMMISMISMMIKIIIMIIMIMMIMEISIMISMISOMMOMMISMIMISISSIMMEIMISIUSWIMMEHMEMIMISINIMMIMMINIIIMMIIIIMMINSIMMIMM
ONMRIIMMIIMIIMMIIIIIMMMISMEIMMIMIMUMMMMIMENIIMMIMMIIMMAMMIMMEMMIRILIMMIMIMMIIMMIIIMMUIMMIBMINIMIIMMIIIMMIMMIIMMIII
MIM"MMFIMMMIA MOMMIMMIMMMISOMMOMMOMMEMSIMMIUMMISOM MMERISMEMOMMEMMMOMMOMMMOMMIMMIMMOOMMOOMMOMMOMMMEMMEMM
MMINIONONME mommummiummummommummummummommumummimmomummommummmummummummimummin
Altt- MOMMMOMMIMMEMOMOMMINMOMMOMMIUMMOMMOMMMOMMMIMMOMOMMMOOMMMOMOMMEMMMEMEMMUMMIMMIMMEMMEMMEMMEMMEMMEMI
MMIMIMMEMMOMMOMMEOMMIM
IMMOMMIMMIMMUMMISIMIMMMIMMOMMIMMOMMIIMMOMOIMMMOMMMOMMOMOMOMMOMMEMMOMMMEMMOMMIMO
IIIMIIIIIIIIIIIMMIIIMMINUMMIIMISIMMIIIMMOMMIMIIMMIUMMIIMMIMMIIIMMIMMIMMIIIMIIMMIMMINIMINIMMIMMEMMIIMMII
MOM■
cc
Fur.& Sgrl Board IMMIIIIIIIIIMIMMIMMIIII MEM OMMMOMMEMMIMMIMMEMOMMEMMEMMEMMEMMEMMEMMMEMMMEMEMMMEM
LINEAR (HART SHOWING STATUS OF ROAD WORK
PROJECT:- "Up-gradation of Bhadgaon-Chalisgaon (Section II ) of NH 753J from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of Palgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmaci NH 753J - (46.800 Km )1 in the State of
Maharashtra on EPC mode.
Client : Public Works Department - NH Division, Govt. Of Maharastra.
Authority Engineer : M/s.TPF Engineering Private Limited.
EPC Contractor : Ki/s Ashoka Buiidcon Limited. WPComplete Win prom.,
I 67 1 5 6 7 :• 5 a 7 1 .3 • 5 -9 0 7 67 9 CI 1 7
Road cur.& Sign Board
BC 1: .., .. :
DB M '.,,,,--aseekrifetel*
I
LHS

Par' '''' IMIIIIMMIIMMIIIIIMMIMMOMMIIIMINNIMMIBMIMMUMIIIIIIIIIIIMMIIMEMEMINIMMEMMIIII


,. . ' • ' . ...,
MM. in OMMIMOMMUMMENHI
E' - ■
i IMMUMUMI MUM
giiMMUNNIMOMMIN
NE1111111111111111111=1111M111111111111•1
Earth Work ::.•' t. *X: . .. ::: X i: :i: ::: * ,' '. X :i ' '
.:A ,. 111
Chainage 14+200 06+300 116+700 04+400 04+900 97+000 97+100
EarthWork
v..,
Suberad•
=1111
x Culti
q7
o1
- 1
IIIIMMIMIIIIIIIIM111111111111111111111111111111111111111111MINIIIIMIIIIIIIIIIIIIIIMMINIIIIIIIIMIIIIMIIIIIMIIIIIIIIIIIIIIIIIIIIIIIIIII=111111111111
— 11111111111111111111111111111111111111111111111111111111
111111111111111111111111111111111111111111111111111111111
111.1111111111111M111111=1111111=11111MMENIMIIIIIMMIIMM1111111111111
IIIIIIIIMIIIIIIIIMBEIMEMMMIIIIIIIIIIIIIIIMNIM
111111111111111111111111111111111111111111111
110111111111M111111U111111111M111111111111•1111111111M111111111111MIIIIIIIIIIIIIIIIIIIIII11
Ir.; - -
Road Fur.8 Sign Board 7
I

1 1. 2-..0 `lE;ik...q R -7....3 4,CL 7 'C 1 7 * ZA F,..7 q cl- T.7 7... a


Road Rm.& Sign Board II MI I I I
I1 Iital
l III
BC . Ts
DBM
LHS

; /,..1MI: '• .-,,gW.


Poc 111111111111111111111
•LC II II
A.'i.
?PrIta IIMIMIIIOIIIIIIIIIIIIIIIIEIIIM
csa t.'1.1.* -41)-1 - r BILIIIIMMIMUIMI1111111
10111111111111111111111111. I
"10:Mfr:
S.bg. ,-
E•rthWork 17+600 7+1100 4+000 114.100
7+700
I

f7+600 f7+600
Chainage 47+200 97+500 f7+400

EarthWork
$ubgrAd• We'n4!K I I
RHS

........u.........................
°Ls:•..' : _ '--'-.: t;
- L, • 111111111111111111111111111111111111111111111111111111111111
,,;:. ..AIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIMIIIIIIIIIIIMIIIEIIIIIIIIIIIIMUIIIIIIMIIMIIIIIIIIIIIIIHIIIIIIIEIIIMMIIIIIIJIIIIIIIIIIOIIIIIMMIIIIIIMIIIM
,.' crc
' • ' "..- IIIIIIIIMINIIIIIIM1111111111111111111111.111111111111MMUMINIMMININIIIIIIINIMIIIIIIIIMMI11119114111111111Mairan111111111
.k. lr : • ,r" . ''',1

pc, it,,-.kmn.--.
Road Fur.8, Sign Board
ORINIMIIIMI11111111111111 IIIIM111111111111•1111 IIIIII I 111111111M NI MIMI 11111 IMIMEMIMI
I
irwyeep• p•op•oppee•poo -o•p•pe•Appep so
LINEAR CHART SHOWING STATUS OF ROAD WORK

PROJECT:. "Up-gradation of Bhadgaon-Challsgaon (Section II) of NH 753J from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of Dalgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 753.1 - (46.800 Km )1 In the State of
Maharashtra on EPC mode".
Client : Public Works Department - NH Division, Govt. Of Maharastra.
Authority Engineer : M/s.TPF Engineering Private Limited. -..-
EPC Contractor : M/s. Ashoka Buildcon Limited. R., Complete
Min erne ess
12 1,4,r, 8_7 R TOJ. 2 3 4,5 6 7 8 -ri 0 1 2 3..4 5,6 7_8 TO 1,2 1 4 S .„S 7 .2 9 0 L2,3 4 5k 7,::: 411 23,4„56/„8. ,..1.„01,2„34567_„R9,..01284_,5WW2,3,955.789.111f2 4557Br
Road Fur.& Sign Board I.'
BC .
OF M ASIIIIIIIIIMP
LHS

•••••• • ••••••••
Subgracte • ''','''f;, '
EarthWork —
Chainage 98+200 98+300 98+400 98+500 98.600 98.700 98.800 98+900 89+000 99+100
RHS

E a rthWorkaifs..,:-..
Subgra• ' .
GSB: ,T

. ,.•
Wei I I
DOM", _ --
a 111111 I 111111111

7,34,56L T); 4..41123 .1,...54. _7 X 9,...I.1 12...34 552X9i112 4i • r'Ll 17 . 5 7 11 9


_11 23 4567$9d1,23,4„5523y1f1).1 3,4,5,57X 4[117 A4,55,/,1i4I11234„551714,0
Rood FuG8s5i ()Boar „
6c
DB MM
VM .
-. POC
'X' r
111111111 1111111111
GSR
• S'j74:5?FW?; .:..97.5.* '',4?%'', ..r h-.: :
=, lumuiproup
*p, mi - .--' ,
Subgrade %:":•" ?.:XT;IMX .” ' ;, ,:i. X: Xi :::4: T ;X ",!.] : ;'.,''. ...NT-',,..ir:;. 2a
Earthwork _ — _ _.......,
99+700 99+800 99+900 100+000 - 100+100
99+600
Chainage 99+200 99+300 99+400 99.500
-
RHS

a
i-.....:•61
.46----43-
,4x
Ea rthWork i:iAi :i:- ....M.:'•.Entr",/,
Subgrade *
osB IVA' IWO -ii,”
rel , • fi

'41:01;ft,
0BM 11111111 11111111
I

Road F ur.& S gn Board .


LINEAR CHART SHOWING STATUS OF ROAD WORK

PROJECT:. "Up-gradation of Ethadgaon-Chalisgaon (Section II) of NH 753J from chainage S6+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of 1.1algaon-Bhadgaori-Chalisgaon-Nandgaon-Manmad NH 753J - (46.800 Km )1 in the State of
Maharashtra on EPC mode".

Client : Public Works Department • NH Division, Govt. Of Maharastra.


Authority Engineer : M/s.TPF Engineering Private Limited.
EPC Contractor : M/s. Ashoka Buildcon Limited. z: Complete In progress

nillill
Road Fur.& Sign Board 4. irfillaellagairialrae r aragearigalgasirifiligalial lirlailialifilliiiiiiiiiiiiiiiiiiiiiiiii i ii
7-------- 35 IMMINIMMINEEMMEMEIMMINIMMOMMIUMMENIMMEMINIMMINIMMIrn
MMMIMMIMMMMMMMMMMMMMMIMMMMMMOMMMMMMMMMMMMMMMMMMMMMMMMMMM s
IMIIIMMIIMMIMMIIMIMIIIIIMMINIMMIMMENIMMIMMENINDINIMIBMIMMMIMMIMISIMIMMIThimmillIMM
IIUIMIMMIIIMMMIIIINMMIIHMMMMMIIIIMMNMIMIMIMIMMIIIMMMDnai , MMIOAL h., .. , „,
immummunummommummummummummummommummgmammonsmimmkt544mannabilighWiamitima
IMMINIMMUMEMMIUMMEMMEMMEMMUMMUMMUMMINEMMEMMUMMEMMEMOOMMOMMEMANEUVONO =Am MEMOMMUMM1,
SoWatie ,,", MIMMOMBEIMMENSIMMEMMonnountinuw6Wwwam f: =MOM EMM O EMU 5,
EUMEM MEM M
b MOMMMOMEME
Earthwork B zsiNiiMiigNii, MiEsidtslibilifilENCEMMEMMEMMEMOMMEMIE22 MMIPMEMEMOMMOMMEMMOMMOMMMMEEMMEINFAMMEMEll
100+300 100+400 100+600 100+600 100+700 100+600 100+900 101+000 101+100
Chainade 100+200
Earthwork MINEMEEMIMOMMOMM MB MAllipEOMEMOM MMOMMEM320120MOMEN*q4MMEMMUMMENWISOMMEHOOMMEM MOOMMOROMM
s.,,,.d. OPA:MMMWAMMOMM MMINEMBEE EIMMOOMMEMMEEEEMMMOMM
GSB ' AusiglOilimmi PommArmwmmwammmw,mwmnmmmmmma
lumustaatof-rummINUM111 IMMIIIMMIMMIMMIIIMMEMIIMMIS IM MINUMMEMEMMEMMIIIIMMENUmm
, ••••(-..4” IMMIIIIMIIMIMMEIMINSIMINIMMIMMIMIIMMIMMIMMMIIMMUMIIMMIMMIMMIMMIIIMIIIMMEMinummis
201Malla
DOG IIMIMMUMIMMIIIMISIMMIIIMIIMMIMMMIIIMMIMMINIMMMIIMMIMIMMIMUMMIMIMMMIUMMENNEEMMIIMIMM
DBM . '''4" - :"V"'
MMIMIMMIIMMIMMIMIMINIMIMMIMMIMMMIMMIIMIIMIMMIMMMIMINOMEMMIDIMMUMMENEMMIMIIMI
CEINfai--4'.i,IMMIIIMIMIIMMIMMIMMEMIMMIMMIMMINUMMIMMIIMIMMIIMIMMIMIMIIIIIMMEMEMMIMmonaMimmi .. ..MIIILMIMR11111 1
Road Fur.& Sign Board Milip1MIUMNIIMMINUMMNIMMIIIIIMMMIIMMIMMIMISIMMIMMIRMMII •: IDEBINIMAIII1Nri:M:
SIM. •MII/D:WIDISMIEIN.WEY/1:111: BilliMEL1:1111/0:M IMIMPAI/MM.111:11r/I:411: IMINNIMMOLVEWPOMMIMMOLM:111:11•10fairatOtia. . if: • asOIM irligat : ISUNS_W2WIIN •
■BMIMMImIli
Road For.& Sign Board MINIMIHMIMMIMIMIOMMIMMIIMMIMMIIMIMMMIMIMMINMEMMUMmIns MMIIIMmim
ImilliM7-7 IMMIIIMUMMIUMMINIMMIIIIMMMINIMMIIIMUMMINIIMIMIIMMIIIMMIMMIMIIIMMIMMIMIMIMIUMMNIMMIN MMEMNMMIMIMIMMIIIIMMIIIMMIMM
Dem :,11MMMIMIMMIIMIMIIIIIMMIMMMIMMIIMMIIMIMMIMINMIMMIIIMIIMIIM MIM MIMMmu imMINIlinaMmum11.
IMMIMIIIIMMINUMIMMIIIMUMMMIMMIUMMIIIIMIMMIIMIIMMIMIM .-
MEMMVMMOMEEMMEROMMEMMEMMOMMIN
. .. .... . .. ,..,..::::: ................
,24iiia4 IiaiiiPi'momommossmommammogammamommommommu. i. latiur-•r-ia
G5B ihMr. moo= somummassulamomammamummummonumm00a* pa .... ,=..
'
or Mi 7"4 "' •
4.
&Avid.
Earthwork
101.300 101+400 101.600 101.600 101+700 m.o. MHOS ......
Chainage
EaritiWortt
101.200
RUMNIMMErIMMEMENIMMINEarannenTEESIMMINE
4"*?"' 1 r TffP3 . 7MP5.
KIMMONE NONVIMINIMINNEENO MONIES= 01011111011110
MME! IMMRPIPMwMIPMERMAPPIPM MEOW= MMENOMMOMMO J. -- mmimmimmummummum
GSB
LC summumminummiimmummummummummummummiiiiiimiimmini IMMMIMMIMMIIIMMUMMIIIIIIMMINIMMIIMMUM
FOC IIMIIMINMIMMIMMUMMIMIMMINIMMIMMIIMMIIIMMIMMMIII MIIIIIIIMMISIMMISIMMIIMIUMMIMIMMEMB
IMIMIIMMIIMIUMMIIIIIMMINIMMIIMMUMMINIMMIMIM UMMIMMIMMIMMUMMUMMIMMIMMIIMME
11111MMIMMIMIMMIMMUMMIMMIIMIMMMIIIIMIMIUMIMIIMM OMMIMMIMIMMIMMIMMIMMIMIIMMIIMMIIMMI
DBM
IMMIMIIMIIIMIIMIIMMISMUMNIMIMMIMMINIMIIMINUM MIMM MIIIMMINIMMISSIMIMMIMommomMMEIMMUM
BG
RoNIFurAS,nBoard MIBMIIMIMIIM M IMMMIIMIIMMIIMMU 111211112111
LINEAR CHART SHOWING STATUS OF ROAD WORK

PROJECT:- 'Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH 7531 from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of Palgaort-Bhadgaon-Chalisgaon-Nandgaon-Manmad NH 753J • (46.800 Km )1 in the State of
Maharashtra on EPC mode.

Client : Public Works Department - NH Division, Govt. Of Maharastra.


Authority Engineer : M/s.TPF Engineering Private Limited.
EPC Contractor : fv1/s. Ashoka Buildcon Li ailed. or Complete In progress
-1 4 R_ 4S 9
../) 13 3. S3 7 8 '1 5 .1,2 7 _,E110.1.2 3 kS 6 7~ TO 1.
2) 133.4.3 X1133 S 6 1 x,.13 1.2 .
49 Zg 3 7) 4 6 7 „3.

Road Fur R. Sign Board


BC
DBM

ROC *?;
EalkhgEgigg n
rf
GSB fir` AVVM•it:
subgrad. '
EarinWork
02 00 102+700 02+300 02+300 03+000
Chalnage 02+200 102+300 02+400 02+500
EarthWOrk *f: ??
55
S UNFO de 1VONMOVV$
1
;1'
M ckedareaagaraff:
tar4,:lre ::•••

OSB , .", •

DBM
BC
Road Fur.& Sign Board
PROGRESS CHART MAJOR BRIDGE Progress upto 30.04.2019

PROGRESS CHART FOR MAJOR BRIDGE 57+088 (NEW)

57+088 Activity Al P1 P2 P3 A2
Exc rt.- 3 -:1?-±)l I -!;:tizt -s I ;F: 1
b ,
PCC 1x1x1vagal
efr
Raft
S 1st Lift
2nd Lift
• j
6
3rd Lift
4th Lift t - 147: itigi;.„
S 5th Lift , 1 '
B
• 6th Lift .. -,... -;
H 7th Lift ..,...
J
8th Lift
S
9th Lift - .. V/'.:`1
i Ingle it
Final Lift
S CAP
Dirt Wall
Girder
SLAB
S
Crash Barrier
Footpath

S
S
S

I
PR,RESS CHART FOR Minor Bridge Progress upto 30.04.2019

.., LHS RHS


Wall Wall SLAB
d.
Design
No
Raft Found.

Raft Found.
chainage —
.

CrashBarrier
SLAB
PCC

PCC
Sd
Al

a". 2! 2 X 7<- 2r. d a! a 2 Z :-.'


._
v.
.- --/
1

r----
VP. 1 56+566 =y ft 3 *i 1 ge- 3 4k1 11
2 59+964 i^
SI
I
i 3 1 42 H, 4 i
3 60+267 S:
4 69+850 .., 2
z. 3 , Vi.`
70t618 3 2 43 > Mr. '3
IA -
73+180
a 6 LS
7 73+860
my 8 76+610 :-.. I 3 .2 -3 . 3' I
.:J. 3
. 1;,.!
AL
9 77+340 ' "3
r 10 78+782
11 82+295

r 12
13
82+482
89+300 c2 3 r3 - 1 '3
r
,.
:,
14 102+058 3 '1NP41
/ 3 ''.;2 3 tii3 • 3 1 -'?<:3
,,,. •
r 15 102+880 ".e' .4,4..,3 4 --, 5 !:172 3 WA =1-i W3 -: 4 'r 5) W-3 00'3 :i. ;3
www- wirVVIrtgelriteltflf "'fit f tf cif

PROGRESS CHART FOR Box Culvert Progress upto 30.04.2019

MCW
Al Side A2 Side
At Foundation Wall RE wall A2 Foundation Wall RE wall LHS RHS LHS RHS LHS RHS
Design Size
Sr. No >:

Layout/Excay.

RaftFound.

CrashBarrier
A22ndLift
A22nd L ift
A l2nd Lift

A l3rd Lift

A 21st L ift
chainage

A2 1st L ift
SPAN .
. rat -- —
.
x C.) :1 --1 _., : :I co
c.) Je
LA (.3
eL
di' z 2 ri, (..) -
-.
c•-) .
V _1
..0

Ste
0-
8 v)
R
m
'
;2 a a 12

1 62+640 . i -1: 8 ± 2 ,,.. ',' ''-". .. . ' - 8 '-1 ' ...,1:'- ;1':,x
2 60+365
3 63+027 4 414449* 8 AO.
4 64+190
5 64+566
6 65+260 - - 1 " ,- 2'- `<'3 - , .0_ 'Ittf<
7 67+395 1 22 , L3 µ '5 . -
8 68+250 1 ! 2 1 3 2 3 4', 15$ 6'o. itaji.
2 - 3 '4 •:' 5 I- ' 1
9 68+490 1 1 2 l 8 _ -•
itc4.--2-•
10 70+270 ' ' 2 '3 Mr
11 71+660 1 2 • te.3< t., 64
12 74+000 1 2 1. -'2,
13 74+225 1 2 , 5 8 <-, :. ,'7,,.•6,
4' ti 6 = 8
14 75+564 1 2 3 56 7 8 - 1 '" 7
,: 2 akiNE5Ragat!
-
15 75+945 1 i 2 6 -7 8 1 2 ',3 • 8 ,4183.7X1r4 IL
16 93+590 2 • 5 6 8 2 - ,, nIPI
17 97+010
18 97+920
19 99+040
20 96+580
21 99+575 -
ne.
0

'''.,..,
.: r1:•)" 1".i4S '' 4 /.. ' a . A • 0 0 0

. ...g• "ifft, .0•0..


.0....,.

... o o • I,. -

• .. • A 0 •

0 A • 0 44 A

am 4.4 • 0 A A

0 . • 0 A A

0 0 • A 41/ 0

0 A • 41. A 0

0 0 • on . 0

0 A • A 0 0

044 • 0 NO
.
,
ft N • 0 A 0

0y4 •000

0 . • * A 0

..... 0 0 • NI N 0 ....

0 A et N on
Pee OD • A 0 0

46—. Thei V- i en a • v1r---


.. - N en 44

. krk . ;.... .
A A
100 • .NO

aft •NON
a ,.
.....

rfN
i.
..,

en
....

V•rl
N

III
a * en en etri .6
0 in • 40 0 A

,
...$ 0 A • Pee A A . ;
...
en e•
,.);,' : ''. n' A
0 . • A A IV

..0 A a . ese en a e" r. ."-"' V '------ '''


0. •000

VI . N en
0 IA • A A 44
IIIIMMP

0 . • N . 0

A MI • . 44 I*

A N • 0 A A

AA •MAN

c r
1
( SLAB

. .
1
. A .
A
4 A
. S
c
6.1 kZ 3 3 Wm

i 3

i a ; a 7-
3 .r. r. ;
II !E' ZI 1
1 3 ..AJ
3
PROGRESSCHART

X X

g
3 k
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

10. PROJECT PROGRESS


"S Curve"

Ashoka Buildcon Limited Page 36


250.00

209.1

198.9
200.00

187.6

174.8

160.1

150.00
143.9

Amount In Crs.

123.2

103.4 106.6

100.00

92.8

84.8

68.5

64.0

51.9
50.00

40.5
36.7

22.6 26.1

15.4
9.3
9.1
2.7
Planned Cumulative work (Cr) Actual CumulativeWork Done (Cr)
0.0 0.0 0.6 3.6
0.00 0.0 0.0 0.0 0.1
Months Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19

Months Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19
Planned Value of work (Cr) 0.00 0.56 2.12 6.60 13.32 14.06 15.28 16.58 16.24 18.65 19.82 20.63 16.27 14.63 12.88 11.22 10.19 1.15
Planned Cumulative work (Cr) 0.00 0.56 2.68 9.28 22.60 36.66 51.94 68.52 84.77 103.41 123.23 143.87 160.14 174.77 187.64 198.87 209.06 210.21
Actual Work Done (Cr) 0.00 0.00 0.11 3.55 5.54 6.32 10.67 14.41 23.46 28.82 13.81
Actual CumulativeWork Done (Cr) 0.00 0.00 0.11 3.55 9.09 15.41 26.08 40.49 63.95 92.77 106.58
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

11. PROJECT ORGANIZATION

Ashoka Buildcon Limited Page 37


Up-gradation of Bhadgaon-Chalisgaon (section II )of NH 753J from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of [ Jalgaon – Bhadgaon –Chalisgaon –Nandgaon- Manmad-NH 753J – (46.800 Km )] in the state of Maharashtra on EPC mode

Organisation Chart

Name of EPC Contractor: ASHOKA BUILDCON LTD.

Mr. ASHISH
KATARIYA
Project Director

Mr. Arun Patil


DGM
Contract
Administration

Mr.John Victor
Mr. Mahesh Borse
Sr. Project
Project Manager
Manager

Mr.Vishal Ghadke QS & ACCOUNT QA/QC PLANT & PURCHASE STORE


SURVEY SAFETY HR DEPT.
Mr.Vijayan K. Mr.Sugathan K. Head PLANNING Contract DEPT. DEPT. MACHINARY DEPT. DEPT.
DEPT. Administration & DEPT.
Project Manager Project Manager DEPT. DEPT.
Liasoning
STRUCTURE
DEPT. Miss.Sonali
Mr.Ashok Kumar HR Officer
Section Incharge

Yet to be
Mr.Diptesh Borse Appointed
Sr.Engineer Jr. Officer
G.Soni Mr.Mouli L.Jaykumar
Mr.Chetan Patil Mr. Nitin Mr. Deepak Shinde Mr. K V Raju Chandra
Mr.Gajanan Mr.Shah Accountant Store Head
Safety Officer Nandanwar QA/QC Manager P & M Dept
kharat Mr.Datta Pawar Head Manager
Mr. Swapnil Mr. Nirvani Asst Liasoning Contract Head
Sr.Surveyor Mr.Ramanji Mr. Britto Mr. Pranab Sana Mr. Bawin Mr.Amol Patil Mr. Balaji M
Hole Jr.Engineer Mr.Lavkesh Mrs.Asmita
Sr. Engineer Sr. Engineer Jr. Engineer Jr.Engineer Jr.Engineer Sr. Engineer Mr. K.Vishnu Mr.Sandip Nakashe
Jr. Engineer Mahajan Kasbe
Mr.Shaikh Mr.Naiem Ansari Deputy Manager Store Officer
Yet tobe Mr. Rupesh Jr Accountant Officer
Mr. Navnit Jadhav Malik Sr QC Engineer
Mr. Govind Appointed Badgujar
Sr.Surveyor Mr. Sabin Jr.Safety Officer Sr.Engineer
Biradar Mr. Raju Correspondence off.
Samrat Adhikary Jr.Engineer
Supervisor Supervisor Mr.Chandrakant
Engineer Mr Prashant
Mr.Shah Mr.Shinde Mr.Abhijeet Sr Foreman Datta Pawar
Sathe
Deputy. PM Deputy. PM Hawaldar Mr.Motibur Mr. D.R.Yadav Store Keeper
Mr. Noor Md. Officer
Jr.Engineer Rehman Sr.Lab
Mr.Choto Singh Jr.Engineer Lab Technician Mr.Kalpesh
Mr.Ravi Mude Technician
Chavan Mr.Gaurav Rai Mr.Kamal Singh Mr.Vinay Choudhary
Surveyor Jr. Engineer Mr.Ravindra Jagtap Mr.Giribabu Jr Engg
Surveyor Jr. Engineer Jr.Engineer
Sr. Engg Sr. Engg Mr.Vinay
Jr.Engineer
Lab Lab Lab Lab Mr.Asman
Mr. Asst. Asst. Asst. Asst. Supervisor
Amol D Patil Nitin Bhoi Mr. Zameel
Mr.Jebin Singh Akhtar Mr.Shankar Venkatasan
Supervisor Supervisor Jr. Engg
Sr. Engg Sr. Engineer Jr. Engineer

Mr.Santosh Mr. Vaibhav


Supervisor Bhosle
Supervisor
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of N11-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

12.1 Manpower

STAFF
Sr. Surveyor/ Lab Tech./
Type of Work
No. Engineers Sup./HR/Store/P&M/Purchase Total
Accounts
Road &
A 39 92 131
Structure works
Total 39 92 131

Sr. LABOUR
Type of Work
No. Skilled Un-Skilled Total

A Road & Structure works 55 112 167


B Maintenance Work 15 25 40

Total 55 137 207

Ashoka Buildcon Limited Page 38


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

12.2 List of Key Personals

Sr.No. Name of Employee Designation

1 AshishA. Katariya Project Director


2 Arun B. Patil Dy. General Manager (Project Head)
3 AjinkyaGhorpade Project Co-Ordinator (HO)
4 Mahesh Borse Project Manager
5 John Victor Project Manager ( Swastik)
6 Vijayan K. Sr. PM iSwastik)
7 Sukadan A P M (Project Administration)
QS & Planning Dept.
8 Swapnil Magdum Planning & QS Head
9 Shaikh Malik Sr. Engineer
10 Vinay Rohomare GTE
11 Siddharth Jr. Engg
Structure Dept.
12 SamratAdhikary Sr. Engineer 7
13 Balaji r. Engg
14 Govind r Supervisor
15 Suresh Supervisor
Highway Dept.
16 AmratAdhikary Jr. Engineer
17 Nirvani Jr. Engineer
18 Sidhu Supervisor
19 Santosh Kumar Supervisor
ContractDept. 7
20 Nitin Nandanwar Contract Head
21 Rupesh Badgujar Correspondence Officer -7
AdminDept.
22 Britto Administration
QA/QC Dept.
23 Ansari Dept. Head

Ashoka Buildcon Limited Page 39


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

Sr.No. Name of Employee Designation

Store Dept.
24 Datta Dept. Head
25 Raju Store Keeper
Survey Dept.
GajananKharat Sr. Surveyor
26 , NavnitJadhav Sr. Surveyor
Purchase Dept.
27 Mauli Dept. Head
28 Prashant Sathe Purchase Officer
L Plant & Machinery Dept.
29 K.V. Raju P&M Dept. Head
Account Dept.
30 SoniRaju Dept. Head

Ashoka Buildcon Limited Page 40


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
rep 56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

CONTRACTUAL LINK BETWEEN KEY PLAYERS

4I

41. M/s. TPF Engineering Pvt. Ltd. inj •


Public Work Department
Consultancy JV with
NH Division Agreement M/. TPF Getinsa in association
with M/s. NASCENCE
Consultants Pvt. Ltd., Navi
Mumhai
Contract
11, Agreement

a.

M/s- Indian Infratech EPC Contractor


M/s Frischmann Prabhu.
Sr Mumbai Ashoka Buildcon Limited Proof Consultancy Project Management
Safety Consultancy
Agreement Consultancy

-MP

sr

10,

Ashoka Buildcon Limited Page 41


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

12. QA/ QC REPORT


As per Enclosed in Annexure 0.

Ashoka Buildcon Limited Page 42


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

13. MAJOR KEY ISSUES

Ashoka Buildcon Limited Page 43


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.
Agreement was signed between EPC contractor & Authority Engineer on dated
16thApril 2018 after mobilization of resources by EPC contractor for commencement
of work. It was noticed during detailed survey that there are following obstruction
which are necessary to be removed before the commencement of the work.
a) Permission of Forest Department for taking up works in length passing
through forest land.
b) Permission for cutting of Trees from forest department.
c) Encroachment in NH ROW.
d) Land Acquisition for realignment, construction of toll plaza etc.
e) Encroachments of Religious Structure.
f) Obstruction of Utilities-
i. Line
ii. Water Supply Pipe Line & MJP Water Line.
JOINT MEMORANDUM was prepared by notice all above impairments & report was
submitted to competent Authority signed on dated14ThMay 2018.
As per EPC agreement clause Clause 5.2 (h), Authority should hand over not less than
90% length of project highway for commencement of work forthwith on Appointed
41. date. EPC Contractor has requested Authority vide letter under ref. no.
ABL/CENH/Jalgaon-Bhadgaon/2018-19/4758 dated 2nd June 2018 to handover
minimum 90% length free from encumbrances on which work can commence
forthwith.
41.

Authority has handed over site in presence of following encumbrances-


sui Sr. Constraints Description
No.
Total Project Length = 46.80 Km
Work front obstructed = 12.64 Km (27.00 %)
Work Front Available = 34.16 Km (73.00 %)

il
lit The delay in providing minimum ROW as per Contract Provision is
leading to delay in initiating construction/pre-construction activities
1 Delay in Providing ROW
causing delay in commencement of works in these stretches.
lit
Decision on Realignment Alignment Length = 2.335 Km as per sch. A and
1.01 Km as per Authority Decision is still not received, delaying the project
completion.

6 Ashoka Buildcon Limited Page 44


tw
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

7 Temporary and Permanent Encroachment's were existing on site at the


time of handing over site. These obstructions are yet to be removed
1 delaying the commencement of works at such locations. The details are
Delay in shifting of enclosed in "Annexure D".
2 Religious Structures i. Land Affected due to Encroachment is 6.57 Km which is
and Encroachments included in handed over length.
11
ii. Encroachment of Religious Structure: Length affected by
7 Religious Structures (13 Nos.) = 0.86 Km.
There are Encroachment of fields, structures etc. by adjoining farmers in
NH ROW. The work between Km. 94+300 to 94+680=0.380 Km in
1 Village: Ozar Tehsil: Chalisgaon, Dist: Jalgaon & Km. 102 + 200 to Km
102+ 820=0.620 Km in Village: Khadki Tehsil: Chalisgaon, Dist:
7 Jalgaon is obstructed by the locals.

111 While taking up work at such location, Contractor is facing obstructions by


locals & farmers claiming that, the land under cultivation / occupation up
7 3 Local Nuisance / Land
to road edge belongs to them. Due to such disputes contractor's works are
Disputes
getting obstructed repeatedly by adjoining Land owners. Contractor has
7 timely reported such events to the Authority for information and
necessary action.
7
Request has also been made to take up the matter with respective
7 Revenue Authorities to demarcate the Road Boundary as per the revenue
records so that; the dispute in ROW can be resolved. Necessary action is
7
During the project review meeting dated 22.01.2019, CENH, Mumbai
Pr instructed to temporarily withhold the work of overlay in the overlay
stretch from Km 83+900 to Km 92+650. As per instructions of Authority,
7 overlay is to be done in 7m width. The existing width of carriageway is
Suspension of Overlay 5.5m in the overlay stretch which implies change in specification of work
7
4, 4 Work from Km 83+900 pursuant to clause 13.1.2 of contract and constitutes Change of scope.
to Km 92+650. Contractor has submitted proposal for change of scope vide letters dated
I
05.03.2019, 03.04.2019 and 26.04.2019.
Ir
COS Notice from Authority is still pending in this regard and hence the
overlay work is suspended at above mentioned stretches.

1 There was delay in issuing tree cutting permission from respective forest
department and municipal council, which has severely affected work
1 progress. The details of the same are mentioned separately in section
1.2.1.
1
Tree felling work is in progress and till date 918 nos. trees are cut out of
i 5 Tree Cutting 1421 nos.

ITree felling in the Construction corridor affecting the execution of work


are completed. Contractor will try to save the balance 503 Nos of trees
r depending upon site condition and construction requirement of the
project. If required, extension for tree felling permission will be requested
r
from respective authorities.
r

Ashoka Buildcon Limited Page 45


P]roject: Up-gradation of Bhadgaon-Chalisgaon (Sction II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

Contractor vide letter dated 15.01.2019, informed authority that as per the
tree cutting permission dated received from RFO Pachora forwarded by
EE,NH Dhule, the trees on LHS of existing Major Bridge at Km. 57+088 are
considered for valuation and accordingly the same is permitted by RFO
Pachora for cutting. However, as per the approved alignment, the
reconstruction of Major Bridge is proposed on RI-IS of existing Major

1 Bridge.

1 In this regard Contractor informed Authority that, 6 nos. of tress on LHS of


existing Major Bridge at Km. 57+088 which are approved for cutting are
1 no longer required to be cut whereas 8 nos. of Trees on RHS of the said
bridge will have to be cut. Thus Contractor requested Authority to take up
16 Tree cutting permission the matter with respective Forest Authority so that valuation of trees on
on REIS of Major Bridge RHS which are required to be cut can be done and grant permission to cut
1 at Km 57+088 the same.

Further in this regard Authority vide letter dated 07.03.2019 instructed


Authority Engineer to visit the site and verify the issue. Authority Engineer
visited the site and vide letter dated 02.05.2019 recommended Authority
1 to consider 8 Nos. of Trees on RHS for evaluation for getting the tree
cutting permission. In this regard, EE, NH Dhule vide letter dated
1 03.05.2019 has requested Forest Officer, Jalgaon to grant permission for
cutting of 8 Nos of tress on RIIS and save the 6 Nos of trees on LHS.
1 Due to the delay in issuance of tree cutting permission, the construction
1 work of Major Bridge at Km. 57+088 is held up.

dir

MP

eV

}1,

11,
Ashoka Buildcon Limited Page 46
Project: Up-gradation of Bhadgaon1Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.
Approvals of estimates for utility shifting were received after continuous
follow up by Contractor. The details of the same are mentioned separately
in section 1.3.

I. Length obstructed due to presence of electric utilities i.e. [Electrical Line


/ Poles] - 10.470 Km.
RO Mumbai granted approval to the Costs Estimates of Bhadgaon &
Chalisgaon MSEDCL for an Amount Rs. 8,53,31,884/- on 08.02.2019
received on 28.02.2019 by EENH Dhule office. Accordingly, Work order
is issued by EENH Dhule on 11.03.2019 for taking up Shifting of Electric
1 Lines/Poles. Contractor on 14.03.2019 has deposited 1.3% Supervision
Charges on reimbursable basis to respective MSEDCL Sub Divisions as per
7 Delay in Utility Shifting the Firm Quotation received from respective MSEDCL Sub Divisions
through EENH Dhule. Till 30.04.2019 50 0/0 shifting is completed.

II. Length obstructed due to presence of water utilities i.e. [Water Supply
line] - 9.880 Km.
RO Mumbai granted approval to MJP/ZP Costs Estimates of Bhadgaon &
Chalisgaon MJP/ZP for an amount Rs. 1,97,87,311/- on 08.02.2019
received on 28.02.2019 by EENH Dhule office. Work Order is issued by
EENH Dhule on 11.03.2019 for taking up Shifting of Water supply Lines
received by Contractor on 01.04.2019. Till 30.04.2019 60 % shifting is
completed.

The delay in approval from respective utility owning agency has resulted
in delay for initiating construction/pre-construction activities in these
The delay in issuing permission for shifting of existing street light within
ROW in Bhadgaon Municipal Council has delayed the highway works at
the mentioned location.
Existence of street light
poles within ROW in Contractor vide letter under dated 08.04.2019, has requested Bhadgaon
8 Bhadgaon Municipal Municipal Council to direct concerned department to shift the street light
council from Ch. 61+315 poles infringing with highway works from Ch. 61+315 to Ch. 61+470.
to Ch. 61+470
Further instructions in this regard are awaited from utility owning agency
and Authority

Ashoka Buildcon Limited Page 47


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

Contractor vide letters 132 dated 25.08.2018, 241 dated 24.10.2018, 301
dated 05.12.2018, submitted Change of Scope proposals for various
additional works as instructed by the Authority. Inspite of passage of 9
months since the first Change of Scope proposal submission none of the
proposal is approved till date.
During project site inspection of the Chief Engineer, NH (PVV), Navi
Mumbai dated 02.01.2019, additional works have been suggested and it
was instructed to consider the same under Change of Scope.
1 Further CENH Mumbai, during project review meeting convened on
22.01.2019 at Navi Mumbai instructed Contractor to submit consolidated
proposal in respect to Change of Scope adding all the additional works in
the earlier submitted Change of Scope proposals.
Accordingly, Contractor submitted Comprehensive & Consolidated
9 Delay in Approval of proposal on 05.03.2019 to the Authority's Engineer for review and
Change of Scope recommendation. During site visit dated 29.03.2019, Authority and
Authority Engineer verified site requirements and further suggested
modifications in the submitted COS proposal.
Contractor submitted Consolidated COS proposal vide letter dated
03.04.2019 incorporating the modifications suggested during visit dated
29.03.2019. Further EE, NH Dhule convened meeting on 24.04.2019 and
25.04.2019 to review the same and again suggested modifications in the
recommendation of COS proposal. Accordingly Contractor once again
I submitted the modified Consolidated COS proposal on 26.04.2019 and the
same has been reviewed and recommended by AE to Authority for
approval vide letter dated 02.05.2019
Since, COS Notice as per agreement is not issued; it is further leading to
accumulated delay in commencement of the additional works thereby
causing obstructions and non-availability of work fronts.

i) Contractor has submitted credentials of proof consultant on


26.04.2018 for review and approval. The Authority approved proof
Delay in approval of consult on 06.08.2018 after a delay of 45 days as per contract
10 Proof and Safety conditions.
ii) Contractor has submitted credentials of safety consultant on
T Consultant
26.04.2018 for review and approval. The Authority approved
safety consultant on 17.09.2018 after a delay of 86 days as per
contract conditions.
Delay in permission Permission from Dist. Administration for diverting traffic before
from Dist. dismantling existing structures such as Minor bridges, Major Bridges etc.
Administration for was delayed from 27.06.2018 till 06.12.2018 which has delayed
bridge dismantling and construction activities. Traffic diversion permission is received on
traffic diversion 06.12.2018 after a delay of 98 days than the scheduled planned date.
11,

411

Ashoka Buildcon Limited Page 48


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
-OF
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.
Contractor has informed several times the Authority / Authority's
1 Engineer regarding various events / circumstances delaying the project
completion Date and leading to idling and underutilization of Contractor
7 resources and resulting in continuous productivity losses.
7 All such events / circumstances having the continuous effect leading to
accumulated delay are intimated to the Authority /Authority's Engineer
.I vide letter no. 89 dated 08.08.2018, 167 dated 07.09.2018, 316 dated
7 12 Extension of Time 08.12.2018, 449 dated 08.01.2019, 403 dated 09.02.2019, 438 dated
06.03.2019 and 470 dated 03.04.2019.
1 After Continuous efforts and follow up of contractor EOT-1 is
recommended by AE on 15.03.2019 for 120 days.
PI
EE, Nil Dhule has recommended EOT-1 to SE, NH Pune vide letter dated
25.04.2019 for 105 days without specifying the basis for reduction of
EOT-1 to 105 days against 120 days recommended by Authority Engineer.
Pi
Authority Engineer has certified the SPS no.02 on 05.03.2019. Claim of
1 1.95 Km of PQC work of 250mm thickness and additional thickness of PQC
work of 50mm are not certified in the SPS No.2. Contractor vide letter
Idated 18.03.2019 has requested Authority to effect the withheld payment
a in order to maintain the cash flow for the project. Authority is yet to
release the necessary payment.
Further in order to discuss the issue, joint meeting between Authority, AE
PI and Contractor was conveyed on 09.04.2019. CE,NH on reviewing the
Non certification of SPS
issue instructed to immediately release payment of PQC work of 250mm
No.2 Items - PQC
13 thickness executed prior to issue of instructions. The payment of COS for
250mm and COS of
additional 50mm PQC work is denied by Authority. In this regard
additional thickness
contractor vide letter dated 15.04.2019 has invoked the dispute resolution
1 procedure under clause 26.2 Conciliation.
Further in this regard, AE vide letter dated 26.04.2019 has requested
1
Authority to confirm if they wish to appoint AE as conciliator or any other
person will be appointed by mutual agreement between Authority and
if
Contractor.
IAuthority is yet to comment on the same.
1 Contractor vide letter dated 08.02.2019 has informed Authority about the
Government of Maharashtra (GOM) Notification dated 19.01.2019 vide
I Change in law - Increase which the stay given on the notification for increase in rate of royalty for
in rate of royalty of stone is withdrawn.
I stone as per
1 14
Government of As a result of this contractor will have to bear additional cost for royalty of
I stone i.e. Rs. 400/- per brass instead of earlier Rs. 300/- per brass and
Maharashtra
Notification hence contractor has requested Authority to consider the same.
i
Authority is yet to comment on the same.
1
Contractor has achieved Milestone I and II. Contractor vide letter dated
Issuance of certificate 15.04.2019 has submitted request for issuance of Certificate of timely
15 of Achievement of achievement of Milestone I and II.
Milestone I & II
Authority Engineer is yet to review and recommend the same.

Ashoka Buildcon Limited Page 49


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

a. There are obstructions of utilities in available length which are required to be


shifted. Authority shall ensure that approvals for estimates of shifting of
utilities will be given in due time and utilities will be shifted as per contract
provisions.
w

b. There will be Two rainy season in 18 months construction period.


Construction period which is already too less considering overall scope of
work & proposed construction of highway in rigid pavement has further
reduced for actual execution of work.
c. Appointment of Authority's Engineer- Authority Engineer mobilized on
Project Site on 23.10.2018 after 5 Months of delay.
EPC Contractor informed all above issues to Authority & requested vide letters
under ref. no ABL/CENH/Jalgaon - Bhadgaon/2018-19/23, dated 14.06.2018 to
review &extend the appointed date considering the stipulated Contractual
obligations of Contractor & Authority. After resolving above issues and ensuring
90% length for commencement of work forthwith.

Irrespective of all above problems Authority vide letter ref. no CENH/D-


1/1746/2018 dated 06.06.2018 declared appointed date instructing EPC contractor
to commence the work.
Accordingly as per instructions of Authority, EPC contractor commenced the work
under protest. Refer ABL letter ref. no. ABL/Bhadgaon-Chalisgaon/2018-19/23 on
dated 14th June 2018 in available length.
As Authority has not handed over site as per provisions of EPC Agreement Project
mile stones shall be extended appropriately based on available work fronts.

➢ Work Stopped in the month of August 2018 by as per following Force Majeure
issue-
1. Force Majeure Event Road Blockade (Bandh) in Maharashtra state on 09-08-
18 called by Maratha KrantiSangharsh Association.
2. Force Majeure Event strike called by state employees of union from 07th
August to 9th August 2018.

Ashoka Buildcon Limited Page 50


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.
3. Force Majeure Event Road Blockade (Bandh) in Pachora Tehsil on
18.08.2018 called by SamvidhanSangharshSamiti.
4. Ch. 102+000 to Ch.103+000 BHS work stopped due to land disputes.
5. Ch. 67+000 to Ch. 68+000 BHS work stopped due to land disputes.
Work Stopped in the month of September 2018 as per following Force Majeure
issue-
1. Ch. 94+000 to Ch. 95+000 REIS work stopped due to land disputes.
2. Ch. 102+000 to Ch. 103+000 BHS work stopped due to land disputes
3. Ch. 67+000 to Ch. 68+000 BHS work stopped due to land disputes
Work Stopped in the month of October2018 to December 2018 as per following
Force Majeure issue-
1. Ch. 94+000 to Ch. 95+000 REIS work stopped due to land disputes.
2. Ch. 102+000 to Ch. 103+000 BHS work stopped due to land disputes.
3. Ch. 67+000 to Ch. 68+000 BHS work stopped due to land disputes.
Work Stopped in the month of January 2018 to April 2018 as per following
Force Majeure issue-
.
1. Ch. 67+000 to Ch. 68+000 BHS work stopped due to land disputes.
2. Ch. 80+100 to Ch. 80+300 LHS work stopped due to land disputes.
• 3. Ch. 94+000 to Ch. 95+000 RIIS work stopped due to land disputes.
4. Ch. 102+000 to Ch. 103+000 BHS work stopped due to land disputes.

Ashoka Buildcon Limited Page 51


y

Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.


56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

14. CHANGE OF SCOPE

Ashoka Buildcon Limited Page 52


t 4'04 f 4404 4 4 4 ft, 4 4 I I 1 4144
4 I Ai 1 I 4

Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NI1-753) From Ch. 56+200Km to 103+000Km Two/Four lane with Paved
Shoulder in the state of Maharashtra on EPC Mode.

Package-2 Change of Scope

Sr.
Type Description Location @ KM Unit EPC Contractor Submission
No.

As there is no habitation in this length, no four laning


is reuired. Scope reduced due to reducction in length
of Four lane as per instruction of Authority. EPC
59+600 to 59+970
Contractor has submitted COS propsoal accordingly.
(Bhadgaon)
Four lane to be started after minor bridge at ch.
59+964 which is proposed for two lane with paved
shoulder as per schedule B.
Construction of Construction of Bridge at ch 76+610 to be done in Two
Reduction in Scope due to Two lane with lane with Paved Shoulder as per Schedule-B and four
construction of Two lane paved shoulder lane to be started after proposed minor bridge at ch.
1 76+600 to 76+630 RMT
with paved shoulder instead of four 76+610 as there is no habitation. COS proposal is
(Kajgaon)
instead of fourlaning. laning as per site submitted as per decision in joint visit with
condition. representativeof Authority, Authority Engineer & EPC
Contractor.
There is no habitation Near Highway as highway is
passing From out side of village Hingone. Also due to
81+750 to 82+250 Realignment proposed after village highway alignment
(Hingone) has shifted away from village. Hence as decided during
visit of Authority no Fourlaning is required for at this
location.

Asholca Buildcon Limited Page 53


a 4 4 14 4 * * A I A .1 '9 4 4 4 4 4 * W a 9 9 9

Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to 103+000Km Two/Four lane with Paved
Shoulder in the state of Maharashtra on EPC Mode.

There is no ROW availabe for fourlaing due to


habitation Near Highway as highway is passing from
the village. Hence as decided during visit of Authority
102+200 to 102+700
on 2nd February 2019 no Fourlaning is required for at
(Khadaki)
this location. Drain is to be constructed on RHS near
built-up area with flexible pavement between Rigid
pavement & drain in available width.
As bridge falls under Four lane section in built up area
the width of Bridge shall be as per Fig. 7.8 of IRC:
Four Lane Bridge at SP:73-2015, (Manual for 2 Laning of Highways) in lieu
Structure Construction of
2 Ch.60+267 instead 60+267 (Bhadgaon) Sqm of fig. 7.6 as specified in the agreement. Contractor has
Minor Bridge
of Two Lane Bridge. submitted proposal for approval of Authority under
Change of Scope as per instructions of Authority vide
Letter No. 243/2018 dated 12.07.2018
Existing ROB is to be retained. To accommodate
horizontal alignment matching with existing ROB &
Junctions for approaches to village within ROW
raising is to be restricted. There is access from
highway on either side highway to Nagar Deola Village.
Due to which Design Speed is required to be reduced
Improvement &
to 65 KMPH instead of 80 KMPH. Same has been
widening of 69+623 to 70+025
3 Nagardeola ROB Sqm discussed with Authority & Authority's Engineer &
Approaches at (Nagardevala)
accepted due to constraints of ROW. This issue has
Nagardeola ROB
been discussed in meeting with Authority and
accordingly EPC contractor has submitted Plan &
Profile. Changes in design speed will be executed by
EPC contractor without any change of scope by making
necessary safety arrangements. Approval of Authority
for speed restrictions is requested.

Ashoka Buildcon Limited Page 54


4944 4 4 444 4 444 4 4 4 4 I 4 4 44 4 4 4 4 4
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of N11-753j From Ch. 56+200Km to 103+000Km Two/Four lane with Paved
Shoulder in the state of Maharashtra on EPC Mode.

The width of Bridge shall be as per Fig. 7.8 of1RC:


Four Lane Bridge at SP:73-2015, (Manual for 2 Laning of Highways) in lieu
Structure Construction of of fig. 7.6 as specified in the agreement. Contractor has
4 Ch.77+340 instead 77+340 (Kajgaon) Sqm
Minor Bridge submitted proposal for approval of Authority under
of Two Lane Bridge.
Change of Scope. As per Authority's letter No.
243/2018 dated 12.07.2018
Realignment of To follow the alignment as per 80 Kmph speed
Existing Stretches, 1. Ch.80+000 to additional realignment is required and additional land
proposal for Ch.80+200 2. shall be made available. Submitted proposal for
Additional Length of
5 improvement of Ch.82+100 to Ch.82+250 RMT approval of COS from Authority. As per Authority's
Realignment
road geometry to 3.Ch. 82+450 to instruction's vide Letter No. 243/2018 dated
achieve 80 Kmph Ch.82+650 12.07.2018. Authority has given intimation about
design speed. proposal of land acquisition for realignment.
There is existing box culvert at site and as mentioned
in schedule A, but not mentioned in Schedule B for any
improvement.There is representation from locals &
Additional Box Hon. MLA for reconstruction of existing culvert which
Additional Box Culvert is in depleted condition.During site visit Asst. Engineer
6 culvert Found at 96+576 SqM
Found at Site
Site &Authoritiy'sEngineer given instructions to submit
proposal for reconstruction under COS for approval of
Authority. Same are required to be reconstructed
under COS to full width of ROW.

Ashoka Buildcon Limited Page 55


-4
4r1ft4144#41444•144 444114
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to 103+000Km Two/Four lane with Paved
Shoulder in the state of Maharashtra on EPC Mode.

During meeting convened by SE NH Circle Pune, at


Sakri PWD Rest House on 29.08.2018, it is suggested to
provide the drains in built up sections w.r.t actual
requirement compare to that provided in Schedule-B
of EPC Agreement. Accordingly, the locations were
identified with the joint inspection conducted with the
D) Additional Length of Additional Length Authority.
RCC Drain RMT
of RCC Drain
Accordingly, the identified locations are not provided
in the Schedule-B of EPC Agreement and it is decided
to consider the same under Change of Scope.

Hence, the Proposal is submitted for issuance of COS


Notice.
Pipe Culvert F
0 1 ROW with Encasing (1200 mm Dia) As per meeting with Chief Engineer, National Highway
in presence of Superintending Engineer & Executive
Engineer, National Highway, Team Leader of Authority
ii) 1 ROW without Encasing (1200 mm Dia) engineer & representative of EPC contractor. Authority
has given instructions to maintain clear width between
iii) 2 ROW with Encasing (1200 mm Dia) culvert Head walls/ Crash barrier equal to formation
Additional Width of Pipe width (i.e. 10 m Carriageway + 2 m Shoulder should on
7
Culvert & Box Culvert either side). Extra width of Cross Drainage works
iv) 2 ROW without Encasing (1200 mm Dia) required to be constructed as per above instructions
for balance cross drainage works will be payable
v) 3 ROW without encasing (1200 mm Dia) under Change of scope as per direction of Authority.

Box Culvert

Additional area of Box Culvert SqM

Ashoka Buildcon Limited Page 56


4 4 4 4 4 4 4 i 4
t 4 4 4 4 4 4 4 4 4

Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to 103+000Km Two/Four lane with Paved
Shoulder in the state of Maharashtra on EPC Mode.

As per Schedule B of contract, overlay is proposed on


existing carriageway of 5.50m width. During project
Additional scope for widening site visit on 02.01.2019 & review meeting convened by
Widening of Overlay up to 7. Mtr with Flexible Chief Engineer,NH Mumbai on 22.01.2019 at Konkan
section to 7 mtr.width payment and 2 Mtr.Earthen 83+900 to Bhavan, CENH, Mumbai instructed to do widening
8
from Ch:- 83+900 to shoulder on both side instead 92+650 pavement to 7m width instead of 5.5m the work of
92+650 of overlay on existing overlay. From km 83+900 to 92+650 (Length-8.750
pavement. km). This implies change in specification of work
pursuant to clause 13.1.2 of contract. COS proposal
submitted as per instruction of Authority.
During site visit of CE NH ,it was brought out that there
Reduction in Scope due to construction of Four
is no provision of drains in built up areas.Also to
lane with 3.5 Mtr /2.25 Mtr. With flexible
accommodate estimates of utility shifting within
pavement as per site condition
Rmt sanctioned cost it is proposed to shift utilities only
As Per within 9 mtr.width.Hence changes done in TCS to
TCS-3A As Per Aggrement Modified avoid obstruction of utilities and site condition as per
TCS-4 instruction of Authority under change of scope.

60+250 62+100 59+980 60+250

Change in TCS in built up 76+630 77+550 62+100 62+600


9
areas
94+100 94+820 77+550 77+700

94+820 95+200 93+400 94+100

95+200 95+800 100+100 100+600

96+300 97+400

99+300 100+100

Ashoka Buildcon Limited Page 57


414441144414 41 * i I 4 i 4 t 4 4 4 4 4 4
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to 103+000Km Two/Four lane with Paved
Shoulder in the state of Maharashtra on EPC Mode.

There is a demand from villagers on either side for


provision of Box type structure for cross drainage and
villagers. Also Hon. MLA has given representation vide
Construction of CD work letter ref. no. 2005 dated 11-02-2019 has requested
10 Chainage 78+750 for provision of CD work for crossing of villagers.
for Drainage & crossing of Nos.
Villagers. (Bortek) This point was shown to Authority during site
visit.Authority has given instructions to submit
proposal for construction of Box culvert 3 m X 3 m
which can be used as C/D work as well as for crossing
of villagers from one side to another side of highway.
There are existing utilities below road sides on either
Chainage 99+300 to side of highway in built-up areas.Due to which it is not
100+100, 95+800 possible to cross 900 mm dia. RCC pipes for utility
Change in Utility pipes dia
to 97+400 ,60+000 crossing.As per discussion with Authority's Engineer &
11 450 mm 2 Rows instread Nos.
to 62+000(as per Asst.Engineer grade-I it is proposed to lay two pipes of
of 900 mm dia singl e row
site where ever 450 mmdia.instead of 900 mm dia. pipe.With no cost
required) difference as cost of 2 rows pipe of 450 mm dia. is
more than 900 mm dia. pipe.
There are existing Pipe culverts at site at ch. 56+320 &
Relocation of HPC 95+814 but not mentioned in Schedule B.There is
Additional pipe representation from locals for reconstruction of
culvert found at existing culverts which are in depleted condition.
Change in loaction of Pipe Chainage 56+315 1 During site visit Asst.EngrGr.-I & Authority's Engineer
12 Nos.
culverts and given instructions to submit proposal for
95+814.(instread of reconstruction under Change in location of ch.
56+967 and 56+967 and 58+123 for approval of Authority. Same
58+123) are required to be reconstructed under Change in
location.

Ashoka Buildcon Limited Page 58


4 4 4 4 4 4 4 * 4 4 4 4 4 4 4 4 4 4 I 1 4 4 4 4 4 4 e 4 4 4 4
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to 103+000Km Two/Four lane with Paved
Shoulder in the state of Maharashtra on EPC Mode.
As per instruction of CENH, Mumbai During Project
site inspection on 02.01.2019 all the structural design
& Drawing of Major Bridge shall be vetted by IIT.
Proof checking of
Accordingly appointment of IIT Chennai for proof
Proof Checking of Major major bridge
checking & vetting of structural Design & Drawing of
13 Design & Drawing 57+088 Nos.
Bridge Design Major Bridge of km 57+088 in the project have been
from IIT Madras
proposed. IIT Proof Checking is not provided in scope
(Chennai)
of work as per EPC Agreements. Hence the work is
considered in COS & accordingly, proposed for
approval.

Page 59
Ashoka Buildcon Limited
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

15. MAINTENANCE ACTIVITIES

Ashoka Buildcon Limited Page 60


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.
Road maintenance activities in progress.
BBM laying @ Ch.91+000.

lir

*Pt

4IP
Tree Watering work at Ch. 74+500 RHS.

vp

Ashoka Buildcon Limited Page 61




• Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of

Maharashtra on EPC Mode.








• 16. TRAFFIC MANAGEMENT STEPS













S Ashoka Buildcon Limited Page 62

I
i

Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.


56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.
1. Safety manual submitted by ABL vide letter no. ABL/CENH/Bhadgaon-
Chalisgaon/2018-19/52dated 02nd July 2018 & approved yet to be received
from Authority Engineer.
2. Signage's fixing done as per requirement at construction zones.
3. Placing of safety cone at construction work
4. Sticking of radium stickers on hazard objects.
5. Sand Bags are placed along the construction site with reflected stickers.
6. Fire Safety Instruction to Project Staff & Labour at Nagardeola East Camp
Ch: 70+680.
7. Traffic Diversion Instruction to Project staff & Labour at Nagardeola East Camp
Ch: 70+680.

Safety Board fixing @ Ch.61+700

Ashoka Buildcon Limited Page 63



Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
111
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

11,

Sign Board & Baricade fixing @ Ch. 69+380

Mr

Ashoka Buildcon Limited Page 64


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

-OW

17. Site Visit and Meetings held up to the Month


of April-2019

Ashoka Buildcon Limited Page 65


$

Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.


56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.
Site / Site/
Sr.
Meeting Meeting Attendees Issues Discussed
Xir No.
Date Place
EE NH Dhule & Project Head Modification in Schedules & Release of
1 19.05.2018 Dhule
ABL JBRP Bid security
VI
07.06.2018
Asst. Engineer Grade I &
Obstructions of trees to be cut, utilities of
2 13.06.2018 Dhule Grade II & Project Head ABL
MSEDCL & water supply lines.
41, JBRP
14.06.018

EE NII Dhule & Project Head I


3 15.06.2018 Dhule Trees to be cut for proposed widening.
ABL JBRP
Discussion on Deficient Stretches &
SE NH Pune & Project Head
4 28.06.2018 Sakri Change of Scope issues identified in the
ABL JBRP
Project Highway
Review on project issue and modification
5 02.07.2018 Mumbai CE NH Navi-Mumbai
in schedule.
Discussion on diversion plan of Major &
EE NH Dhule & Project Head
6 05.07.2018 Dhule Minor Bridges and comments on Plan &
ABL JBRP
Profile.
4/ EE NH Dhule & Project I lead Issuing Form-V for Labour Licenses and
7 11.07.2018 Dhule
ABL JBRP modification in DPR Drawing.
4OP EE NH Dhule & Project Head Release of mobilization advance and
8 17.07.2018 Dhule
ABL JBRP comments on Plan & Profile Drawings.
40,
Discussion on discrepancies in culvert
EE NH Dhule & Project Head locations and discussion on Traffic
9 -27.07.2018 Dhule
ABL JBRP diversion during construction of Major
Bridge at Pachora Km. 47+886.
Alternative Routes for Traffic Diversion
during construction of Major Bridge at Km
_ 47+886 near Pachora, Submission of
EE NH Dhule & Project Head Water Supply Joint Inspection Report to
10 06.08.2018 Dhule
ABL JBRP MJP Jalgaon for preparation of Estimate,
Approval of QAP, Drum Mix Plant,
Approval of TCS & Compliance of
Mobilization Advance - 1st Installment.
Asst. Engineer Grade I & Inspection of culvert-deviation in
11 08.08.2018 Dhule Grade II & Project Head ABL provisions of culvert with respect to actual
JBRP existence on site.
Change of Scope, Deviations observed
i—..—,,-- --- ErNIT1Thule &"171577erl'=1—"--7==13frO
I lg 1 e visi on . 11.2018,Work--
12 13.08.2018 Dhule
ABL JBRP Front in Forests Area, Tree Valuation
permissions.
Compliance of Mobilization Advance - 1st
ler EE NH Dhule & Project Head Installment, Change of Scope, Report on
13 16.08.2018 Dhule
ABL JBRP Deviations in Culverts provisions &
Approval of Couplers.

Ashoka Buildcon Limited Page 66

lor
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

Change of Scope, ROW Demarcation on


site, Hiwra River Bridge at Km 47+886-
EE NH Dhule & Project Head
14 24.08.2018 Dhule Traffic Diversion- Intimation to Collector
ABL JBRP
& Dist. Magistrate, Jalgaon, Realignment of
Samner Minor Bridge at Km 26+416.
Change of Scope issues, Deficiencies in
provisions of Drains in Project Highway,
LA requirements at Minor junctions, Bus
Bay & Truck Lay Bye locations, Deviations
SE NH Circle Pune at Sakri in Culverts provisions, Merging portion of
15 29.08.2018 PWD Rest House & Project approaches of Major Bridge at Bahula
Head ABL JBRP River Km 41+812, Traffic Diversions
&Provisions of Two Major Bridge at Km
47+886, discussion on Mile Stone
Completion, Realignment provisions at
Vavadada Bridge & VUP.
Comments on Revised Plan & Profile,
Utility Shifting works- Letter to MSEDCL
EE NH Dhule & Project Head for submission of Detailed costs estimates
16 30.08.2018 Dhule
ABL JBRP for shifting of Electric Lines & Poles &
Water Supply Lines, COS proposal
recommendation to Competent Authority.
EE NH Dhule & Project Head
17 01.09.2018 Dhule Deviations in provisions of Culverts.
ABL JBRP

CE NH Mumbai & Project Change of scope issue, Approval of


18 05.09.2018 Mumbai
Head ABL JBRP Authority Engineer, Labour License etc.

SDO Pachora on & Project Disputes in ROW& procurement of


19 15.09.2018 Pachora
JBRP authentic documents from PWD.
Sources approval &recommendation to
EE NH Dhule & Project Head
20 19.09.2018 Dhule DMO Jalgaon for extraction of Murum
ABL JBRP
from Dam/Rivers.
Issuances of Notices to the encroachers &
EE NH Dhule & Project Head
21 24.09.2018 Dhule processing of Mobilization advance 2nd
ABL JBRP
Installments.
EE Nil Dhule & Project Head Verification of change of scope items &
22 27.09.2018 Dhule
ABL JBRP deviations in culverts provisions.
CE NH Mumbai & Project Change of scope issue, Approval of
23 04.10.2018 Mumbai
Head ABL JBRP Authority Engineer etc.
SDO Pachora on & Project
—24-4 1 2 10 9048] _, Pachora-- EROW=issue from- Clu-33+000 to 41+700ff--
Head ABL MR
EE NH Dhule & Project Head
25 23.102018 Dhule Comments on change of scope proposal.
ABL JBRP
Mobilization Advance Bill processing, Tree
EE NH Dhule & Project Head Cutting Permission, MSEDCL -deposition
26 02.11.2018 Dhule
ABL JBRP of DD to respective MSEDCL Offices & its
Clearance

Ashoka Buildcon Limited Page 67


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of Nil-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.
Hon'ble MP, Jalgaon along with
Jalgaon & Activities and requirements & demands of
27 05.11.2018 PWD NH Officials, Dhule &
Dhule Locals/Villagers.
Project Head ABL JBRP
S
EE NH Div. Dhule, AE-Gr-I Sub
Division Navapur, Authority
28 15.11.2018 Dhule Ongoing progress of work.
S Engineer, M/s TPF Engineering
& Project Head ABL JBRP
SDO, Pachora / Tahasildar, Dispute in ROW with land Owners from
29 16.11.2018 Pachora & Project Head ABL Km 32+000 to Km 41+000 (Nandra to
JBRP Bildi).
1% Technical Scrutiny Fee of MJP / ZP for
EE NH Dhule & Project Head Water Supply Pipe Lines & discussion
30 20.11.2018 Dhule
ABL JBRP regarding tree cutting costs estimate
recommendation for its approval.
S SDO, Pachora, with Tahasildar,
31 21.11.2018 Regarding dispute in ROW.
Pachora, Project JBRP
EE NH Dhule & Project Head Presentation for Scheduled meeting of CE
32 26.11.2018 Dhule
ABL JBRP NH Navi Mumbai.
CE NH Navi Mumbai, SE NH
Circle Pune, EE NH Dhule, AE
Mumbai &
33 27.11.2018 Gr-I Sub Divn. Navapur Project progress.
Dhule
41/
(Jalgaon) & Project Head ABL
JBRP
Team Leader, Authority's
Engineer, M/s. TPF Engineering
34 1.12.2018 Dhule Pvt. Ltd., AE-I, NH Sub Division Related to Change of Scope.
Navapur (Jalgaon) & Project
S Head ABL _JBRP
Team Leader, Authority's Drains to be considered as per Water
Engineer, M/s. TPF Engineering Table. Drains which are not required in
35 04.12.2018 Dhule Pvt. Ltd., AE-I, NH Sub Division habituated areas shall be provided at
Navapur(Jalgaon) & Project required locations under change in
Head ABL JBRP location.
S Issues related to COS. Discussion
EE NH Dhule, Team Leader, regarding deficiency in provision of
Authority's Engineer, M/s. TPF approaches due to restriction in Design
36 06.12.2018 Dhule Engineering Pvt. Ltd., AE-I, NH Speed from 80 KMPH to 60 KMPH at
Sub Division Navapur (Jalgaon) location of ROB due to land constraints
& Project Head ABL JBRP and existence of Service Road on both
sides of approaches at Chalisgaon end.
MD, Authority's Engineer, Discussion on EOT, COS, Billing Schedule,
&Meetin: convened b%/1D _ A • 'royal of PPD Revised Construction
s. ' ngineering Pv7: . ITU
,. Programme up to Nov, 2019 & other
37 18.12.2018 Dhule
with Team Leader, AE-I, NH Sub Project issues. Discussion on MSEDCL
V Division Navapur (Jalgaon) & Costs Estimate Finalization and processing
Project Head ABL JBRP for Approval of Competent Authority.

Ashoka Buildcon Limited Page 68


f

Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.


56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

COS & EOT verification & recommendation


Team Leader, Authority's
to Authority. Billing break up & RA Bills
Engineer, M/s. TPF
38 19.12.2018 Chalisgaon submission. Discussion on issuance of RFI.
•r Engineering Pvt.Ltd. on
Tree felling issues within Municipal Council
19.12.2018at Chalisgaon
Limits.
AP
Recommendation of COS & EOT.
Team Leader, Authority's Finalization of Revised joint site report
Engineer, M/s. TPF of MSEDCL priority list for preparation
39 ' 19.12.2018 Chalisgaon
Engineering Pvt. Ltd. & of Revised costs estimate within the
Project Head ABL JBRP Sanctioned limit as per instructions of
Authority.
Forwarding MSEDCL Revised Priority List
jointly signed by Authority, Authority's
EE NH Dhule & Project Head Engineer & EPC Contractor to respective
7P, 40 22.12.2018 Dhule
ABL JBRP MSEDCL Divisions for procurement of
Revised costs estimates within the
Sanctioned Limit as instructed by Authority.
24.12.2018 Authority's Engineer, M/s. Finalization and approval of proof
- Navi TPF Engineering Pvt. Ltd. Checked Plan &Profile Drawings, other
41
Mumbai Navi Mumbai & Project Head Design & Drawings recommendation of
25.12.2018
ABL JBRP COS & EOT to Authority for approval.

Discussion &clearance of obstructions


raised by adjoining land owners in
Tahasildar, Pachora & Project
42 27.12.2018 Pachora respect of dispute in ROW of NH at Km
Head ABL JBRP
38+330 to Km 41+300 in villages
MP
Khedgaon & Bildi.
CE NH Navi Mumbai &Project
43 02.01.2019 Mumbai Review & Issues related to Project Highway.
Head ABL JBRP
CENH Navi Mumbai meeting
Resolve of dispute in ROW of Project
44 03.02.2019 Jalgaon with Collector & District
highway
Magistrate Jalgaon
Team Leader, Assistant Finalization of Inspection Note of CE NH
45 07.01.2019 Chalisgaon Engineer Grade-I & Project Mumbai, Change of Scope proposal of Phase-
Head ABL JBRP II & EOT recommendation.
Thirty Party Internal Audit by Appointed by MoRTH regarding Quality
46 12.01.2018
MoRTH & Safety review of Project.
EE NH Dhule & Project Head Processing of Stage Payment bill for the
47 19.01.2019 Dhule
ABL JBRP works extended till 31stDecernber 2018.
CE NH Mumbai & Project
8— 22.01-.201-, Muinba , —
HMTAELTBIP -- r __eject Prugrm7---
Team Leader, Authority's
or 49 29.01.2019 Engineer & Project Head ABL Processing and finalization of client Bill.
Chalisgaon
JBRP
• Safety Consultant M/s. Indian Project site visit to review the safety
50 30.01.2019
Infratech Pvt. Ltd. measure of the Project.


Ashoka Buildcon Limited Page 69
J

Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.


56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.
VW EE NH Dhule & Project Head Processing and finalization of Stage
51 31.01.2019 Dhule
ABL JBRP Payment R.A. Bill No. 4 (1PC No. 1).
ww AE-1 NH Sub Division Dhule,
Project site visit to review ongoing works,
Team Leader, Authority's
Project provision of safety measures & additional
,WV
62 04.03.2019 Engineer M/s. TPF Engg. Pvt.
site visit COS items included in revised proposal of
& Project Head ABL JBRP
Change of Scope.
Pachora
EE NH Dhule & AE-I NH Sub Recommendation of COS & EOT proposals.
Division Navapur, Team Issuance of MSEDCL/MJP/ZP Work Order
PW NH
63 05.03.2019' Leader, Authority's Engineer approved by RO Mumbai. Discussion on
Dhule
M/s. TPF Engg. Pvt. Ltd. & Stage Payment Statement No. 2 (IPC No. 2)
Project Head ABL JBRP Bill.
Team Leader, Authority's Preparation and Recommendation of EOT
64 07.03.2019 Chalisgaon Engineer M/s. TPF Engg. Pvt. proposal submitted by EPC Contractor on
Ltd. & Project Head ABL JBRP 31.10.2018 for PKG-I & II to EENII Dhule.
it• EE NH Dhule & AE-I NH Sub Processing of Stage Payment Statement No.
PW NH
65 11.03.2019 Division Navapur & Project 2 (IPC No. 2) Bill & letter for deposition of
Dhule
Head ABL JBRP 1.3% Supervision Charges
Chapora, Material Engineer, M/s. TPF Visit to RCC Hume Pipe factory at Chapora,
66 13.03.2019 Burhanpur Engg. Pvt. Ltd. & Manager Dist. Burhanpur, Madhya Pradesh for testing
MP QA/QC, ABL, JBRP Pachora of Pipes.
110 Discussion on Processing of Stage Payment
Statement No. 2 (IPC No. 2) Bill & letter for
EE NH Dhule & AE -I NH Sub
ter PW NH deposition of 1.3% Supervision Charges &
67 16.03.2019 Division Navapur & Project
Dhule Work Orders for Shifting of Electric
Head ABL JBRP Pachora
Lines/Poles & Water Supply Pipe Lines
approved by RO Mumbai.
Project site visit from Chalisgaon to Jalgaon
AE-I Nil Sub Division Navapur regarding obstructions of work by locals at
Project
68 19.03.2019 & Project Head ABL JBRP Km 18+890 Minor Bridge in Bilwadi &
Site Visit
Pachora Bilkhede villages & dispute of ROW at Km
5+350 to 5+700 at village Mohadi.
Sr. Quantity Surveyor, M/s.
TPF Engg. Pvt. Ltd. manager Compliance of IPC No. 2 Bill required for
69 25.03.2019 Chalisgaon Contracts, ABL JBRP Pachora processing of Bill at RO Mumbai as per their
& Billing Engineer, ABL JBRP, demand.
Pachora.
Project
Thirty Party Internal Audit by Regarding Quality & Safety review of
70 27.03.2019 site Visit-
MoRTH Project-PKG-11.
PKG-II
Project
Thirty Party Internal Audit by Regarding Quality & Safety review of
71 28.03.2019 site Visit-
MoRTH Project-PKG-I.
PKG-I
--..---1111001 Project Co-Ordinator St-
1.....-. ——
Review of COS proposal for its requirements
Project Contracts Head of M/s.
& necessity for finalization of COS Proposal.
72 29.03.2019 site Visit- Authority's Engineer &
Authority's Engineer suggested modification
PKG-I & II Project Head ABL JBRP
in Consolidated COS Proposal.
Pachora
Team Leader, Authority's Discussion & approval regarding Median
73 01.04.2019 Chalisgaon Engineer M/s. TPF Engg. Pvt. Width & Manual PQC from Km 95+780 to
01,
Ltd. & Project Head ABL JBRP Km 97+400 & recommendation of

Ashoka Buildcon Limited Page 70


Project: Up-gradation of Bhadgaon-Chalisgaon (Section 11) of N11-753j From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.
Consolidated COS proposal.

G Team Leader, Authority's


Discussion & recommendation of
74 03.04.2019 Chalisgaon Engineer M/s. TPF Engg. Pvt.
Consolidated COS proposal.
Ltd. & Project Head ABL JBRP
Team Leader, Authority's Discussion on issues regarding
75 04.04.2019 Pachora Engineer M/s. TPF Engg. Pvt. recommendation of Consolidated COS
Ltd. & Project Head ABL JBRP proposal & 1PC No. 4.
Regarding release of 250 mm PQC executed
CE NH Mumbai, SENH Pune & prior to observations raised by Authority.
76 09.04.2019 Mumbai
Project Head ABL JBRP CENH agreed & accepted to release payment
towards 250 mm PQC.
AE-I NH Sub Division
Review of project activities, obstructions in
Project Navapur, Resident Engineer,
AMP Project Highway, verification of penalty
77 10.04.2019 site Visit- Authority's Engineer M/s.
raised & stoppage of work in Municipal
PKG-I & II TPF Engg. Pvt. Ltd. & Project
Limits by the Pachora Municipal Council.
Head ABL JBRP
AE-I NH Sub Division Discussion regarding cancellation of Order
Navapur, Resident Engineer, passed for stoppage of work & revoking of
Pachora
Authority's Engineer M/s. penalty imposed by Pachora Municipal
78 10.04.2019 Municipal
TPF Engg. Pvt. Ltd. & Project Council, plantation work in Pachora
Council
Head ABL JBRP Chief Officer, Municipal Limits, Underground Sewerage
Pachora Municipal Council line crossing Project Highway.
EENH Division Dhule,
Project Resident Engineer,
Review of Project Progress and verification
79 13.04.2019 Site Visit- Authority's Engineer M/s.
of COS Works pf PKG-I.
PKG-I TPF Engg. Pvt. Ltd. & Project
Head ABL JBRP
SENH Pune, EENH Dhule,
Review of COS & EOT recommendations by
Team Leader, Authority's
80 15.04.2019 Nashik TPF . SENH Pune suggested to modify
Engineer M/s. TPF Engg. Pvt.
Consolidated COS proposal.
Ltd. & Project Head ABL JBRP
Team Leader, Authority's
Review of Modifications in Consolidated COS
81 16.04.2019 Chalisgaon Engineer M/s. TPF Engg. Pvt.
Proposals & land dispute issues.
Ltd. & Project Head ABL JBRP
Review of COS & EOT recommended by TPF
EENH
EENH Division Dhule & . Discussion on Land dispute issue of Nandra
82 18.04.2019 Dhule
Project Head ABL JBRP to Bildi. Letter for procurement of Authentic
Office
Records from Revenue Authority.
IP
Project EENH Division Dhule, Team
Review of Project Progress and verification
83 22.04.2019 Site Visit- Leader, Authority's Engineer
of COS Works of PKG-II.
PKG-II & Project Head ABL JBRP
Project MD, VP, TL & RE Authority's Review of Project activities & verification of
Air
84 23.04.2019 Site Visit- Engineer M/s. TPF Engg. Pvt. items included in consolidated COS
. ojecrngt-irAHMERP p roposaTS.
EENH Division Dhule, Team
EENH
Leader, Authority's Engineer Review of COS & EOT recommended by TPF
Air 85 24.04.2019 Dhule
M/s. TPF Engg. Pvt. Ltd. & . Processing of Stage Payment Bill IPC No. 4.
Office
Project Head ABL JBRP
EENH EENH Division Dhule, Team
Review of COS & EOT recommended by TPF
86 25.04.2019 Dhule Leader, Authority's Engineer
Processing of Stage Payment Bill IPC No. 4.
Office M/s. TPF Engg. Pvt. Ltd. &

Ashoka Buildcon Limited Page 71


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.
Project Head ABL JBRP

EENH Division Dhule, Team


EENH
Leader, Authority's Engineer Review of COS & EOT recommended by TPF
87 26.04.2019 Dhule
M/s. TPF Engg. Pvt. Ltd. & . Processing of Stage Payment Bill IPC No. 4.
Office
Project Head ABL JBRP
EENH Division Dhule, Team
EENH Review of COS & processing of Retention
Leader, Authority's Engineer
88 30.04.2019 Dhule Money deducted from Stage Payment Bill
M/s. TPF Engg. Pvt. Ltd. &
Office IPC No. 1, 2 & 3.
Project Head ABL JBRP
4I

11.

AP,

-AP

Ashoka Buildcon Limited Page 72


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

18. ANNEXURE

A. List of Available Plant and Machinery.

B. List of Laboratory and Field Test Equipment.

C. List of Survey Equipment.

D. Status of Encumbrances as on 30thApri12019.

E. Progress Photographs.

F. Letter Correspondence forApriI2019.

G. Weather Report.

H. List of Contractual Obligation.

I. Mobilization status.

J. Updated Strip Chart showing obstruction in work.

K. Drawing Register.

L. List of Applicable permits.

M. Daily event register.

N. Efforts of EPC Contractor for Utility Shifting.

0. Status of QA/QC reports.

Ashoka Buildcon Limited Page 73


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

Annexure - A
LIST OF AVAILABLE PLANT AND MACHINERY
11.

Following plants and machinery are in use at the Project Highway

Sr.No Description of Plant & Machinery No of Plant &


Machinery
1 Bike 13
2 Pick-up (Utility Vehicle (2-Seater) 5
3 Camper (Utility Vehicle (5-Seater) 4
4 Dumper (6-Wheel) 26
5 Bolero Jeep 2
6 Dumper (10-Wheel) 6
7 Water Tanker (10000Ltr Capacity) 4
8 JCB-4DX 6
Er
9 JCB-3DX 3
10 Roller-tandem(10 MT) 2
air 11 Soil Compactor(10 MT) 5
12 Excavator (PC210) 2
13 Excavator (JS220) 4
14 Excavator (JS200) 2
15 Excavator (EX70) 1
16 Excavator (PC71) 1
17 Dozer-CAT (4D) 2
18 Tractor 1
19 Ajax Concrete Mixer (4Cum-Capacity) 1
20 Macons Concrete Mixer 1
NI 21 Hydra 2
22 Motor Grader 1
23 Loader 1
24 Grader 2
25 Tractor 1
26 1 Dozer Tractor 4
27 DLC Paver 1
28 Crusher Plant 1
29 Slip Form Paver 1

air

Ashoka Buildcon Limited Page 74


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

Annexure -B
LIST OF LABORATORY AND FIELD TEST EQUIPMENT

Ashoka Buildcon Limited Page 75


liA i i i
Project Name - Up-Gradation of Bhadgaon-Chalisgaon Section-11 of N11753J (jalgaon-Bhadgaon-Chalisgaon-Nandgaon-
,./anmand) from Chainage 56+200 Km to 103+000 Km (46.8 Km) two lane with Paved shoulder of in the State of
Maharashtra on EPC mode.
_Sr
LIST OF LAB EQUIPMENTS (BCRP NII-753J LAB.) Date- 30.04.2019
Required Available Location of
Sr. No. Name of Equipment Remarks
Quantity Qty. Established

I 1
a
Electronic Weighing Machine
10/15 kg-Capacity, Accuracy-0.5kg 1 1
b 30 kg-Capacity, Accuracy-lkg 2 1
c 50/60 kg-Capacity, Accuracy-5kg 1 1
d 150 kg-Capacity, Accuracy-10kg 1 1
e 500gm -Capacity, Accuracy-0.01gm 2 1
2 Hot Air oven Machine 2 1
3 ElectHot plate 200mm dia 2 2
4 Enamel trays 450mm*300*40mm 4 4
5 Enamel trays 300mm*250*40mm 4 4
6 Circular Enamel traye 200mm dia 4 4
7 GI Sampling trays 500mm*500*50 4 4
8 GI Sampling trays 1 mtr*1 mtr*100 4 4
9 GI Sampling trays 600mm*500min*50 4 4
10 Rain gauge Cylinder (500 ml) 1 1
11 Digital Thermo Hygrometer mixmum- minimum 1 1
•ff,
12 Liquid limit device (Casagrande grooving tools) 1 1
13 Soil Cone penetrometer for Liquid limit test 1 1
14 Sand pouring cylinder 100mm dia &trays 2 2
et,
15 Sand pouring cylinder 150mm dia &trays 2 2
4' 16 Sand pouring cylinder 200mm dia &trays 2 2
17 Standard Ennore sand 25kg Grade-I 2 2
18 Standard Ennore sand 25kg Grade-II 2 2
19 Standard Ennore sand 25 kg Grade-Ill . 2 2
20 Speedy moisture meter (0-25%) 5 5
21 Aluminium sampling Tins with lid. 55mm*35mm 100 50
22 SG bottel 50 ml 6 1
23 SG bottel 100 ml 6 1
24 Vicat Needle apparatue full Set 1 1
25 Concrete Cube mould 150mm*150mm*150mm 100 100
26 Flakiness Index(Thickness) Elongation (Length) 1 1
27 Aggregate Impact Value Test full set 1 1
28 Slum cone test apparatus. 5 2
r 29 Pycnometer 1000 ml 6 2
kr 30 0.5 CFT Cylinder for density of Aggregate 1 1
31 Soundness testing Apparatus. 2 2
rip 32 Meter straight edge for surface measuring wedge. 1 1
I Sr. No.
V
Name of Equipment
Required
Quantity
Available
Qty.
Location of
Established
Remarks

33 Ground glass plate 300mm*300mm 2 2


34 Glass measuring cylinder 100m1 Borosil 20 2
35 Glass pipette 10m1 2 2
I 36 Porcelin Evaporating Dish 100mm dia 2 2

I 37 Glass measuring cylinder 1000m1 Borosil 4 4


Glass rods 8-12 inches.long 2 2
Ir 3938 Glass theromometer rang 0-110 degreeC. 2 2
40 Dial type Thermometer 100mm dia 300mm long 2 2
41 Flexural Beam testing machine 1 1
42 Water testing kit (Chemicals) 2 2
43 Glass Beaker 600m1 Capacity 4 4
44 Soaking Tank for CBR 2 2
45 Standrad penetration SMtr. Long weight 65 kg 1 1

r 46 Core cutting machine 1


27
1
47 Mortar Cube mould 70.6.70.6.70.6 12
48 Concrete mixer pan type machine 1 1
r 49 Variable frequency vibrating table Electrically 1 1

50 Glass Beaker 100m1 Capacity 8 8

51 Glass Funnel 100mm dia 2 2


52 Density basket 200.200 dia 2 2
53 Sieve shaker 200mm and 450mm dia 1 1
54 Proctor Mould 100 dia and 150mm dia full set 2*2 2*2

55 Fine sieve sieve 200mm dia


a 20mm 1 1
b 10mm 2 1
c 4.75mm 2 2
d 2.36mm 2 2
e 1.18mm 2 2
f 1.0mm 2 1
tw
g 600 mic. 2 2
h 425 mic. 2 1
300 mic. 2 2
j 180 mic. 2 1
k 150 mic. 2 2
1 90 mic. 1 1
m 85 mic. 1 1
n 75 mic 2 3 —
.p. o Lin & pan 2 2
p 450 mic 1 1
„,,. q 9.5 mm 1 1
1
56 GI Farame Coarse sieve 450 mm dia
., a 90mm 1 1
b 75mm 1 1
t c 63mm 1 1
d 53mm 1 1
or e 50mm 1 1
Required Available Location of
Sr. No. Name of Equipment Remarks
Quantity Qty. Established
i
r g
f 45mm
40mm
1
1
1
1
1 h 37.5mm 1 1
r i 31.5mm 1 1
1 j 26.5mm 1 1
r k 25mm 1 1
1 1 22mm 1 1
r m 20mm 1 1
1 n 19mm 1 1
r o 16mm 1 1
1 p 13.2mm 1 1
r q 12.5mm 1 1
1 r 11.2mm 1 1
r s 10mm 1 1
1 t 9.5mm 1 1
r u 6.7mm 1 1
v 6.3mm 1 1
r w 5.6mm 1 1
x 4.75mm 1 1
2.36mm 1 1
5y7 CBR Machine 1 1
r a CBR Mould 150mm dia 2250cc vol. 12 12
1 b Proving Rings 1000 Kg capasity 1 1
c Proving Rings 2500 Kg capasity 1 1
r d Surcharge Weight 2.5 kg 15 15
r e Perforated Bass Sweell Plate 12 12
1 f Circular spacer disc 148mm dai 2 2
rg Aluminium swell tripod stand for holding 2 2
1 h CBR Penetration piston 50mm dia with bracket 2 2
i Filter paper for CBR test 5 1
j Set of Stainless steel 100mm and 200mm long 2 2
r k Sampling Scoop 125mm *5mm dia 2 2
58 Digital Thermometer with SS Sensing 50-300 C 1 1 _
r 59
Digital Thermometer with SS Sensing 50-300 C (
pen type )
1 1
60 Gauging Trowel as per is with wooden handle 3 3
r 61 CTM Machine 2000 kg KN 1 1
r 62 Plastic Measuring Cylinder 250m1 4 4
63 Plastic Measuring Cylinder 500m1 4 4
r 64 Plastic Measuring Cylinder 100m1 4 4 _
1 65 Marshal Pedestal for compaction101.6mm(4")dia 1 1
r 66 Marshal mould 18 18 _
1 67 Marshal Compaction Rammer 2 2
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

Annexure -C

LIST OF AVAILABLE SURVEY EQUIPMENT

11,
Sr. no. Item Description Quantity

1 Total Station 02

2 Auto Level 08

U.

Ashoka Buildcon Limited Page 76


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

Annexure - D
List of Encumbrances as on 30thApri12019
As per enclosed Annexure

Ashoka Buildcon Limited Page 77


['Tame of Project Upgradation of Bhadgaon-Chalisgaon (Pkg-ll) of NH 753J from Km 56+200 to Km 103+000 (46.800 Km) to 2 / 4 Lane configuration of Jalgaon
Bhadgaon Chalisgaon Nandgaon Manmad- Section of NH-753 J in State of Maharashtra on EPC mode under NH (0).

Relocation of Religious Structures - Km 56+200 to Km 103+000-Pkg-II

Offset Structure Size


Existing Name of Religious Existing ROW Type of Religious
ff. No. Side from ECL Village Tehsil
Chainage Structure as Per CA Structure
(m) Length (m) Width (m)

Wadgaon Bk.
1 66+535 Mahadev RIIS 11.50 15.00 Bhadgaon 3.50 3.00 RCC 2 X 2
(Kotali)

32 77+795 Munjoba LHS 6.50 15.00 Kajgaon Bhadgaon 3.00 3.60 RCC 2.6X 3

78+055 Firasti Mata RIIS 12.45 15.00 Kajgaon Bhadgaon 1.10 1.10 RCC

4 79+300 Munjoba LIIS 14.30 15.00 Bhortek Bk Chalisgaon 1.50 1.80 RCC
7 5 82+560 Munjoba RHS 10.60 15.00 Hingone Sim Chalisgaon 3.40 3.60 RCC 3.4 X 3.4

6 82+790 Veer BaBa Mandir LHS 11.35 15.00 Hingone Sim Chalisgaon 5.00 3.80 RCC 2.0 X 2.0
ir

7 93+990 Jay Bhavani LHS 6.80 12.00 Ozar Chalisgaon 1.00 1.40 RCC
IV
8 94+010 Maruti LHS 4.50 12.00 Ozar Chalisgaon 1.60 2.50 RCC

9 94+015 Munjoba RHS 10.30 12.00 Ozar Chalisgaon 3.00 3.00 RCC 2.0 X 2.0

ir
10 97+290 Dutta Mandir Otta RHS 8.50 11.00 Chalisgaon Chalisgaon 2.30 1.70 RCC
r
E1 102+015 Devi RHS 8.10 15.00 Khadki Bk Chalisgaon 1.10 1.10 RCC

2 102+865 Munjoba LHS 12.60 15.00 Khadki B k. Chalisgaon 1.00 1.00 RCC

3 102+946 Satvayichi Devi RHS 8.40 15.00 Khadki Bk. Chalisgaon 9.30 10.90 RCC 2.3 X 2.3
l ir'

VII

PP'

IP,
*SP
Name of Work.: Upgradation of Bhadgaon - Chalisgaon (Pkg-II) of NH 753J from Km 56+200 to Km 103+000 (46.800 Km) to Two / Four Lane configuration of Jalgaon Bhadgaon
Chalisgaon Nandgaon Manmad- NH-753 J in State of Maharashtra on EPC mode under NH (0).

Encroachment- Pkg-II (LHS)

Existing Chainage
Length
Illgr. Name of (Km) EROW Offset from House / Buiding / Well / Gate / Farm
A ffecte d, Side Na of the Encroacher Structure No.
No. Village (m) ECL (m) / Boundary Wall
From To (m)
MP
1 Bhadgaon 59.015 59.050 35.000 LHS 15.00 1300 MS. Gate & Boundry Wall Satyam Tiles L-01

ler Bhadgaon 59.095 59.215 120.000 LHS 15.00 14.40 Wire Fencing With MS. Gate Sanjay Jai Singh Pardesi 1-02

60.380 Wooden Gate & Boundry Wall (Hotel


3 Bhadgaon 60.400 20.000 LHS 15.00 12.00 Dilip Sonar L-03
Raiwada)
Shivneri Pravesh Dwar (Gram
4 Bhadgaon 60550 60.560 10.000 LHS 15.00 9.00 Village Entrance Gate L-04
Panchavat
Bhadgaon 60.585 60.625 40.000 LHS 15.00 11.50 Chain Fencing With Cement Pole L-05

25.000 WS Entrance Gate with Concret Pilor & Wire


Bhadgaon 60.625 60.650 15.00 13.90 Had Rao ji Patil 1-06
Fencing
Bhadgaon 60.930 60.932 2.000 LHS 12.00 6.40 Water Tank With Wall Nagar Palika L-07

7 Bhadgaon 61.125 61.160 35.000 INS 12.00 9.30


Boundry Wall & indication Board with
Concret Foundation
Indian Oil Petrol Pump L-08

Bhadgaon 61200 61.205 5.000 LHS 12.00 9.80 Shop (Sainath Auto Part) Sanjay Simpi L-09

Bhadgaon 61.205 61.210 5.000 LHS 12.00 10.00 Shed (Ganesh Auto Part) Bharat Patil L-10

11 Bhadgaon 61.370 61375 5.000 LHS 12.00 10.00 Shop (Taj lyush Centre) Taj Jyuce Centre L-11

2 Bhadgaon 61530 61.535 5.000 INS 12.00 9.60 Shed (Tyre Puncher Shop) Aspak Shaikh L-12

3 Bhadgaon 61.945 61.946 1.000 INS 12.00 10.50 Compound Wall Bhagya Lakshml L-I3

14 Bhadgaon 61.935 61.940 5.000 LHS 12.00 9.00 Plinth Work Praveen Pahl L-I4

62.810 62.900 90.000 Wire Fencing & M.S. Gate With Concret
Bhadgaon INS 15.00 12.30 Taluka Krishl Adhikari Bhadgaon L-15
Pilor
Wire Fencing & MS Gate with Concret
16 Bhadgaon 64.100 64.145 45.000 LHS 15.00 9.60 Sachin Patil L-16
Plior
7 Kotli 66.740 66.750 10.000 LIIS 15.00 9.80 Shed Bhau Shaheb Dagdu Patil L-17

9 Kotli 66.720 66.728 8.000 LIIS 15.00 12.60 Shed Bhau Shaheb Dagdu Patil L-18

19 Kodl 66.703 66.715 12.000 IBS 15.00 14.70 Shed with Iron Angle Bhau Shaheb Dagdu Patil L-19

Kotli 67.145 67.147 2.000 LHS 15.00 13.20 Water Tank Uttam Girdhar Patil L-20

11117,1 Nagar Devla 69.4.40 69.445 5.000 LHS 30.00 23.30 Tin House Suresh Balare L-21

7 2

3
Nagar Devla

Nagar Devla
69.455

69.450
69.457

69.460
2.000

10.000
LHS

INS
30.00

30.00
24.50

27.00
Toilet Block

House
Dagdu Dhana Bhalerao

Dagdu Dhana Bhalerao


L-22

L-23

174 , 74 Nagar Devla

Nagar Devla
69.475

69.552
69.485

69.566
10.000

14.000
LIIS

INS
30.00

30.00
2650

29.00
House & Toilet Block

Ottha & Toilet Block


Gokul lanardhan Sansare

Balmik Sonwane
L-24

L-25

Nagar Devla 70.160 70.167 7.000 MS 30.00 9.90 Bus Stop Govt. 1-26

27 Nagar Devla 70.495 70.515 20.000 INS 30.00 30.00 Toll Building & Toilet Block Toll Plaza Office L-27

H ol Fah 71.238 71.245 7.000 LHS 15.00 12.40 Bus Stop Govt. L-28

n Nimbhora 71.445 71.465 20.000 LHS 15.00 13.10 House & Shed Dilip Pandarkar L-29

111110 Pasardi 73253 73254 1.000 LHS 15.00 1230 Wa ter Vo lye Govt L-30

1 Pasardi 73.430 73.435 5.000 LIIS 15.00 13.60 Water Tank & Well Chandu Tukaram Patil L-31
IIIP
32 Pasardi 73.685 73.705 20.000 LHS 15.00 14.60 Shed & Wire Fencing Jagarnath Jawru Chaure L-32

3 Pasardi 73.750 73.770 20.000 LHS 15.00 13.60 Temp. Shed Jagarnath Jawru Chaure L-33

34 Pasardi 73.885 73.894 9.000 INS 15.00 8.60 Temp. Shed Sanjay Patil L-34

5 Pasardi 73.907 73.912 5.000 LHS 15.00 8.60 Tin Shed Boju Jagarnath Pahl L-35

5 Pasardi 73.923 73.930 7.000 LHS 15.00 12.60 Tin Shed Kailash Shivaji Koli L-36

77 Pasardi 73.965 73.975 10.000 LHS 15.00 10.50 Bus Stop Govt L-37
1
riga Pasardi 73.975 73.980 5.000 INS 15.00 7.00 Balmik Tryambak Koh (Swab
Shop L-38
Coldri n ItS)
1 9 Pasardi 73.985 73.995 10.000 INS 15.00 7.20 Tyre Puncher Shop Gyaneshwar Mahadu Patil L-39
,
40 Pasardi 74.010 74.020 Eknath Ashok Ahire ( Shivam
10.000 LHS 15.00 9.90 Ottha & Shop L-40
Welding)
Pasardi 74.040 74.045 5.000 LHS 15.00 11.00 Water Tank & Wire Fencing Nimba liasrat Patil L-41
41Pri

42 Pasardi 74.151 74260 109.000 LHS 15.00 14.60 Ajay Rameshwar Goyal (Matoshri
Boundry Wall & MS. Gate L-42
lining & Pressing Factorv)
X43 Pasardi 74.152 74.158 6.000 LHS 15.00 12.50 Ajay Rameshwar Goyal (Matoshri
Water Tank L-43
lining & Pressing Factory)
4 Pasardi 74.158 74.170 12.000 LHS 15.00 9.70 Ajay Rameshwar Goya! (Matoshri
Tin House 1-44
illir lining & Pressing Factory)
45 Pasardi 75.179 75.182 3.000 LHS 15.00 1420 Water Tank L-45

.6 Kajgaon 76.825 76.830 5.000 LHS 12.00 9.80 Shop with Shuter L-46

47 Kajgaon 76.843 76.846 3.000 LHS 12.00 6.40 Plinth Work L-47

iiir8 Kajgaon 76.855 76.863 8.000 LHS Rao Saheb Ananda Mahajan (Sam
12.00 10.20 Wire Fencing With MS. Gate L-48
Sawita Traders
[-Sr. Name of

Kajgaon
Existing Chainage

76.863
(Km)

76.870
Length
Affected,
7.000
Side
LHS
EROW

12.00
Offset from House / Bulding / Well / Gate / Farm

11.20 Shop
Name of the Encroacher
Bharat Vasant Mistry (Bharat Auto
Structure No.

L-49
749
Garaz1
0 Kajgaon 77.110 77.115 5.000 LIIS 12.00 11.70 Shed Manoj Traders L-50

77.147 Anil Nagral Patil (Sal Pay Bath


751 Kajgaon 77.142 5.000 LHS 12.00 8.10 Shop L-51
Centre)
Rajendra Mahajan ( !Thole Pan
72 Kajgaon 77.147 77.149 2.000 LHS 12.00 8.00 Pan Shop L-52
Shoo)
Kajgaon 77.158 77.160 2.000 LHS 12.00 9.10 Iron Stair Magan Seth L-53

7 54

5
Kajgaon

Kajgaon
77.170

77.180
77.172

77.185
2.000

5.000
LOS

LHS
12.00

12.00
9.70

10.00
Iron Stair

Shed (Tea Shop)


Magan Seth

Gorakh Mahajan ( jai Bajrang Tea


Swill
L-54

L-S5

7
56 Kajgaon 77.198 77.203 5.000 LOS 12.00 9.70 Shop Dinesh Bhol (Sal Foot wear) L-56

77.203 77.210 Sachin ladhav (Sachin Mobile


7 Kajgaon 7.000 LHS 12.00 10.60 Ottha &Shed L-57
Reoairsl
Devidas Eknath Attire (Clasic
'8 Kajgaon 77.210 77.215 5.000 LOS 12.00 10.50 Tailor Shop L -S8
Tailors)
179 Kajgaon 77.225 77.228 3.000 LOS 12.00 11.70 Tailor Shop Rahlm Isa Maniyar L-59

Kajgaon 77.38 77.383 3.000 LOS 12.00 11.1 Shed & Angle Laxmi Auto Garaz L-60

7 Kajgaon 77.475 77.480 5.000 LHS 12.00 8.60 Shed Washlm Shaikhj Maniyar L-61

7 2

3
Bortek

Bortek
78.185

78.200
78.190

78.220
5.000

20.000
LHS

LHS
15.00

15.00
10.80

14.50
Tyre Shop

Garaz Shed
Bhusan Mahajan

Rajendra Koh
L-62

L-63

7 6.4 Bortek 78.220 78.225 5.000 LHS 15.00 12.60 Shop & Shed Rajendra Koh L-64

rIllt5 Bortek 78.230 78.235 5.000 LHS 15.00 13.80 Auto Part Shop Rajendra Ko h L-65

Bortek 78.240 78.260 20.000 LIIS 15.00 13.60 Wire Fencing Mahajan L-66

7 7

8
Bortek

Bortek
78.270

78.305
78.295

78.315
25.000

10.000
LOS

LOS
15.00

15.00
11.60

12.20
Shree Niwas Raswanti & Restorent

Temp. Shed (Raswanti)


Rangrao Desmukh

Dyaneshwar Ananda Patil


L-67

L-68

7 69 Bortek 78.582 78.589 7.000 LFIS 15.00 10.50 Bus Stop Govt. 1-69

70 Tandewadi 79.465 79.480 15.000 LHS 15.00 7.20 Shed Ananda Kautik Patil (Raswanti) L-70

Tandewadl 79.620 79.640 20.000 LHS Mau Saheb Pandit Paul (Shriram
'1 15.00 8.20 Shed (Nursary) L-71
lursarvl
[72 Tandewadi 79.660 79.695 35.000 LOS 15.00 9.60 Wire Fencing, MS Gate & House Pramod Lalwanl L-72

tor 3 Tandewadl 79.690 79.693 3.000 LIIS 15.00 8.60 Water Tank Pramod Lalwanl L-73

I 74 Tandewadi 80.200 80.220 20.000 LHS 15.00 9.20 Shed & Shop L-74

75 Hingone Kh. 81.440 81.455 15.000 LfiS 15,00 12.00 Shed Waman Aatmaram L-75

"6 Hingone Kh. 81.462 81.464 2.000 LNS 15.00 6.40 Water Tank Waman Aatmaram L-76

7 7 Hingone Kh. 81.792 81.795 3.000 1115 15.00 11.60 Water Tank Dilip Chauhan L-77

r.113 Hingone Kh. 81.795 81.800 5.000 LHS 15.00 14.20 Well Dilip Chauhan L-78

ma Hingone Kh. 81.810 81.820 10.000 LHS 15 10.3 Shed Dilip Chauhan L-79

7 80

1
ilingone Kh.

Hingone Kh.
82.120

82.140
82.130

82.150
10.000

10.000
LOS

LOS
15.00

15.00
14.70

13.20
Shed & Chain Fencing

Shed & Chain Fencing


Samadhan 1-80

L-81

7 82 flingone Kh. 82.170 82.190 20.000 LOS 15.00 12.00 Toilet Block Govt. L-82

r 3 Hingone Kh.

Hingone Kh.
82.350

82.765
82.365

82.767
15.000

2.000
LOS

LIIS
15.00

15.00
9.20

8.00
Shed

Water Tank
Nana Chauhan

Rohidas Borse
L-83

L-84

7 85 flingone Kh.

Hingone Kh.
82.765

82.790
82.775

82.805
10.000

15.000
LHS

LtiS
15.00

15.00
13.50

13.20
Shed

Bound ry Wall (Abondon)


Rohidas Borse 1-85

L-86 •

87 Hingone Kh. 82.912 82.930 18.000 LIIS 15.00 8.30 Shed Gurukrlpa Ftswanti L-87

7 88

9
Waghli

Waghli
83.610

85.300
83.620

85.303
10.000

3.000
LOS

LHS
15.00

12.00
14.50

9.80
Hotel Shed

Tin Shop
Amit Borse (Niyat Dhawa) L-88

L-89

7 90 Waghli 85.420 85.425 5.000 LOS 12.00 720 Shop Nana Shinde (Shivam Parlor) 1-90

41.01 Waghli 85.425 85.430 5.000 LOS 12.00 7.10 Tea Shop Ana Chaudhary L-91

I 92 Waghli 85.430 85.435 5.000 LIIS 12.00 6.00 Tea Shop Shaiklal Bhal L-92

1 93

`4
Waghli

Waghli
85.440

85.455
85.455

85.460
15.000

5.000
LHS

LOS
12.00

12.00
7.10

6.00
Bus Stop

Dhawa
Govt

Satish Chaudhary
L-93

L-94

5 Waghli 85.465 85.470 5.000 LOS 12.00 9.00 Shed L-95

76 Waghll 85.470 85.480 10.000 LIIS 12.00 9.80 Hotel Suresh Fakira Kevat L-96

7 97 Ojhar 93.070 93.075 5.000 LOS 15.00 11.00 MS. Gate With Concret Nor Farms House L-97

98 Ojhar 93.475 93.486 11.000 LOS 12.00 11.60 Ottha & Entry Space Umang Developers L-98
7 Ojhar 93.625 93.630 5.000 LOS 12.00 11.00 Compound Wall & MS. Gate Shivali Patil L-99

riliV
1 00 Ojhar 93.660 93.665 5.000 LHS 12.00 9.00 Compound Wall Yubraj Gujjar L-100
Existing Chalnage
Length
Sr. Name of (Km) EROW Offset from House / Buiding / Well / Gate / Farm

, Affected, Side Name of the Encroacher Structure No.

1
101 Ojhar 93.665 93.670 5.000 LHS 12.00 9.00 Wire Fencing Prahalad Pitambar Patil L-101

"02 Ojhar 93.670 93.675 5.000 LHS 12.00 1030 Shed Suresh Patil 1.102

IIP103

ip 04
Ojhar

Ojhar
93.775

93.980
93.790

93.985
15.000

5.000
LHS

LHS
12.00

12.00
9.70

8.00
Wire Fencing

Bus Stop Govt


L-103

L-I04

105 Ojhar 94.020 94.025 5.000 LHS 12.00 8.10 Shop Prakash Sitaram Patil L-105

7 06

07
Ojhar

Ojhar
94.025

94.040
94.030

94.045
5.000

5.000
LHS

LHS
12.00

12.00
10.00

730
Boundry Wall & M.S.Gate

Boundry Wall & Lawn


Mahatang Patil

Vasant Shinde (Mahalaxmi Traders)


L-106

L-107

71
lipt09
08 Ojhar

Ojhar
94.065

94.070
94.070

94.075
5.000

5.000
LHS

LHS
12.00

12.00
9.00

11.00
Shop with Shed

Stair & Lawn


Raju Dharma

Dinkar Sitaram Sinde


L-108

L-109

110 Ojhar 94.090 94.095 5.000 LHS 12.00 11.00 Stair Bhika Mahadu Patil L-110

7
,
1

12
Ojhar

Ojhar
94.095

94.105
94.100

94.110
5.000

5.000
LHS

LHS
12.00

12.00
8.00

9.20
Shop

Shop
K.B. Path

Yubraj Chinda Paul


L-111

L-112

7 13 Ojhar 94.110 94.115 5.000 LHS 12.00 11.80 Stair Pandurang Patil L-113

7
14 Ojhar 94.150 94.155 5.000 LHS 15.00 10.70 Electrichal Shop Electrichal Shop 1.114

15 Ojhar 94.155 94.160 5.000 LHS 15.00 10.70 Shop Vinod Thakre L-115

7 16

poi7
Ojhar

Ojhar
94.160

94.165
94.165

94.170
5.000

5.000
INS

LISS
15.00

15.00
10.90

11.00
Gen. Store

Shop
Sakaram Totaram Gujjar

Ragho Dasrath jadhav


L-116

L-117

118 Ojhar 94.170 94.18 10.000 LHS 15.00 12.50 Stair & Shed Bapu SitaPatil L-118

7 19

'20
Ojhar

Ojhar
94.190

94.200
94200

94210
10.000

10.000
LHS

LHS
15.00

15.00
13.80

12.80
House Wall & Shed

Stair & Open Space


Venkat Rama Patil

Dharmadas Bhaga Gujjar


L-119

L-120

121 Ojhar 94.210 94220 10.000 LIIS 15.00 11.40 Boundry Wall & Open Space with tiles Bhimrao Kandu Gujjar L-121

fo,22 Ojhar 94.22 94.225 5.000 LHS 15.00 10.60 Boundry Wall & Stair L-122

7
I 123 Ojhar 94.350 94.355 5.000 LHS 15.00 14.60 Toilet + Boundry Wall + Fencing More L-123

7 24

25
Ojhar

Ojhar
94.370

94.375
94.375

94.380
5.000

5.000
LI'S

LHS
15.00

15.00
12.80

14.50
Shop

Stair with Concret Pilor


Sanjay Chudaman Roll

Karbarl Suklal Pawar


L-124

L-125

7 26

rio.27
Ojhar

Ojhar
94385

94.404
94.390

94.413
5.000

9.000
LHS

LHS
15.00

15.00
13.10

1130
Shop

Shop
Gangabai Rameshwar Golayat

Eshwar Ahire
1.126

L-127

128 Ojhar 94.420 94.425 5.000 LIIS 15.00 11.00 Chain Fencing & MS. Gate Sahebrao Golayat L-128

729 Ojhar 94.425 94.430 5.000 LIIS 15.00 820 Gangaram Pandit Borne (Ja i
Pan Shop & Shed L-129
rnitinri TP2 11ricel
30 Ojhar 94445 94.450 5.000 LI'S 15.00 14.40 Stair Pitambar Uttam Gujjar L-130

72131 Ojhar

Ojhar
94.450

94.645
94.455

94.647
5.000

2.000
EMS

LHS
15.00 1130 Toilet Block & foundry Wall Dada Ringa Deore L-131

73
15.00 10.60 Shop (Chicken) Prakash Patil L-132

'3 Ojhar 94.650 94.652 2.000 LHS 15.00 8.60 Pan Shop Nimba More L-133

7 34 Ojhar 94.665 94.670 5.000 LIB 15.00 11.30 Shop (Hair Cutting) L-134

Takli 94.702 94.715 13.000 LHS 15.00 12.50 Building fax Show Room L-135

136
5 Takli 94.720 94.730 10.000 LHS 15.00 1230 Shed & M.S. Gate with MS. Boundry Hemp Patil L-I36

7 37

38
TakIl

Takli
94.735

95295
94.780

95.300
. 45.000

5.000
LIIS

LHS
15.00

12.00
13.00

10.90
Boundry Wall & MS, Gate

Tailor Shop
jalaram Industry

Santosh Gujjar
L-137

L-138

139 Takli 95315 95.325 10.000 1.115 12.00 10.50 Shop Girdhar Colayat L-139

Takli 95325 95.330 5.000 LIIS 12.00 11.50 Grampanchayat (Jai Bhawani
Entrance Gate L-140
Mite, 1141nriall
141 Takil 95350 95.355 5.000 LHS 15.00 &90 Ottha & Parking Space Dinesh Patil L-14I

7 42

53
Takli

Takli
95360

95360
95.365

95.365
5.000

5.000
Ills

L115
15.00

15.00
12.40

12.40
Ottha & Parking Space

Stalre & Rcc Roof


Ramesh Pawar (Sal Niwas)

Mu rlidhar Mohan Gujjar


L-142

L-I43

7 44

5
Takli

Takli
95365

94375
95.370

95.370
5.000

95.375
LIIS

LHS
15.00

15.00
12.70 Stair & Ottha & Partly RCC Roof Madhukar Mohan Pawar L-144

7
13.10 Stair +Boundry Wall • Partly RCC Roof Dharmadeolal Pawar 1-145
46 Takli 94375 95.375 95380 INS 15.00 Stair + Bound ry Wall + Toilet Block +
1430 Nimba Shawan Pawar 1-146
Plrtiv RCC Rnnf
77 Takli 95380 95.385 5.000 LIIS 15.00 12.60 Asha Mahajan ( Pri ya Beauti
Building L-147
Parlarl
Mr58 Takli 95390 95.395 5.000 LIIS 15.00 12.60 Stair with Concret Pilor Mukund Dagdu Mall L-148

149 Takli 95395 95.400 5.000 LHS 15.00 12.00 Sanjay Vitthal Mall ( Varsha Pico
Shop 1-149
Faun
erso Takli 95.400 95.405 5.000 INS 15.00 12.40 Partly Rcc Roof with Concret Pilor Sudam Ramdas Sapkale L-I50

'51 Takil 95.405 95.410 5.000 INS 15.00 12.10 Shop & Partly Rcc Roof Karwarl Chintaman Mahajan L-151
NW
152 Takli 95.410 95.415 5.000 LHS 15.00 13.50 Stair & Galary Bapu Vish ram Mali L-152
[ExistingChalnage Length
Sr. Name of (Km) EROW Offset from House / Bulding / Well / Gate / Farm
Affected, Side . - W , . .- . .. .. Name of the Encroacher Structure No.

TU Takli 95.415 95.420 5.000 LIB 15.00 14.10 Boundry Wall + Ottha & Parking Space Jlbhau Vishram Mahajan 1-153

;4 Takli 95.420 95.425 5.000 LHS 15.00 14.60 Ottha & Parking Space Sahebrao Vishram Mahajan L-154
IP
1S5 Takli 95.425 95.430 5.000 LHS 15.00 1330 Toilet Block & Gate Vijay Mahajan L-155
I
6 TakIl 95.430 95.435 5.000 LHS 15.00 9.60 Boundry Wall & M.S. Gate Dipak Mahajan L-156

S7 TakIl 95.435 95.445 10.000 IRS 15.00 11.00 Shop & Shed Bapu Punju Gujjar L-157

158 Takli 95.450 95.455 5.000 LHS 15.00 13.50 Shop Balmiki Chauhan L-I58

9 Takli 95.455 95.460 5.000 LHS 15.00 11.60 Shop Vijay Pandharynath Gujjar L-159

760 Takli 95.460 95.465 5.000 LHS 15.00 14.30 Building Sambhaji Gangaram Mahajan L-160

61 Takli 95.465 95.470 5.000 LHS 15.00 12.80 Building jijabhai Shivdas Marathe 1-161

S2 Takli 95.470 95.480 10.000 LHS 15.00 12.60 Ottha & Partly Rcc Roof Dattu Singh Ramsingh Pardes1 L-162

163 'Faith 95.480 95.485 5.000 IRS 15.00 13.40 Shop Mahajan Bandhu L-I63

Takli 95.485 95.490 5.000 LHS 15.00 1320 Shed jagarnath Mahajan L-164

165 Takli 95.490 95.495 5.000 IRS 15.00 12.00 Boundry Wall & M.S. Gate Rajendra Nimba Mali 1.165
NI
166 Takli 95.495 95500 5.000 LHS 15.00 13.30 Stair & Partly Rcc Roof Nitin Suresh Mahajan 1-166

"0 Takh 95.500 95.502 2.000 LHS 15.00 9.60 Shop Rohidas Abhimanyu Mahajan L-167

1 68 Takli 95.502 95.507 5.000 LHS

IRS
15.00 13.90 Stair & Galary jagarnath Dhondu Mahajan L-168

7
9 Takli 95.507 95.510 3.000 15.00 11.40 Shop & Shed Jagarnath Dhondu Mahajan L-169

70 TAO 95.510 95515 5.000 LHS 15.00 10.90 Shed Jagarnath Dhondu Mahajan L-170

7 71

2Takli
Takli 95.515

95.520
95520

95540
5.000

20.000
MS

LHS
15.00

15 00
12.70

9.60
Boundry Wall & MS Gate

Wooden Boundry Wall, M.S Gate &


Wpich Rrielop
taxman Patil

Laxman Patil (lakshdip Shaw


Mall
L-171

L-172

7173 Takli 95.540 95.545 5.000 LHS 15.00 13.60 Shop Sadguru Transport L-173

Takli 95.575 95.595 20.000 LHS 15.00 12.30 Boundry Wall & MS Gate L-174

ri
: TAO 95.595 95.605 10.000 1.11S 15.00 12.00 Building Amarshanti Hospital 1-175

176 Takh 95.605 95.617 12.000 IRS 15.00 14.00 Building Wall Sinior Saheb L-176

17 Takli 95.626 95.635 9.000 LHS 15.00 12.70 Building Wall Matri Pitri Chhaya L-177

178 TAO 95.635 95.645 10.000 IRS 15.00 10.00 Ottha & Concret Pilor Sawta Service Centre L-178

79 lath 95.645 95.655 10.000 LHS 15.00 11.60 Wire Fencing & MS. Gate Chandra Kiran L-179

30 Tall 95.655 95.658 3.000 LHS 15.00 12.20 Shop Chandra Kiran L-180

1 81

2
Takli

Takli
95.670

95.750
95.685

95.757
15.000

7.000
LHS

IRS
15.00

15.00
12.50

13.40
Building Wall & Shed

Shed & M.S. Gate


R. K Steel Corporation L-181

L-182

'83 TAM 95.767 10.000 LHS 15.00 10.50 Chaudhary Bandhu ( Hotel
95.757 Shed L-183
Tn,har R, Rnqtnrantl
184 Takli 95.767 95.77 3.000 LIIS MOO 13.20 Hair Cutting Saloon Cut & Corner L-184

Takli 95.770 95.775 5.000 LHS 15.00 13.10 Shop Setkari Agro Agencies L-185

186 Takli 95.775 95.78 5.000 LHS 1500 11.10 MS.Gate Vivek Motiram Chaudhary L-186

1.'87 TAM 95.780 95.785 5.000 L115 15.00 8.70 Fruit Shop Vivek Motiram Chaudhary L-I87

Takli 95.785 95.79 5.000 LHS 15.00 12.00 Hotel Om Sai Vivek Motiram Chaudhary L-188

7 89

0
TAM

Chalisgaon
95.790

95.805
95.795

95.808
5.000

3.000
LIB

IRS
15.00

15.00
13.00

11.00
Shop

Shop
Vivek Motiram Chaudhary

Pedkai Tyre Service


L-189

L-190

191 Chalisgaon 95.982 96.02 38.000 IRS 15.00 11.00 MS. Gate With Chain Fecing Purlapatre Lanes L-19I

"r92 Chalisgaon 96.182 96.190 8.000 IRS 15.00 11.40 Boundry Wall School L-192

13 Chalisgaon 96222 96.225 3.000 IRS 15.00 10.20 Shed & Wire Fencing Kumawat L-193

794 Chalisgaon 96.225 96.230 5.000 IRS 15.00 11.30 Popatlal Kashiram
Shed & Shop 1-194
Ktimawatfilarpl Sall
S Chalisgaon 96.270 96.280 10.000 IRS 15.00 12.90 Shed & Otha Swami Samarth
L-I95
Trairlarc
, 96 Chalisgaon 96.585 96.59 5.000 LEIS 11.00 10.10 Toilet Block Government 1-196

197 Chalisgaon 96.850 96.855 5.000 LHS 11.00 9.00 Tea Shop & Shed Vijay Namdeo Chaudary L-197

I 18 Chalisgaon 96.855 96.86 5.000 LHS 11.00 9.00 Shed Sagar Warkhede L-I98

1
Illbo
99 Chalisgaon

Chalisgaon
96.985

96.990
96.99

96.993
5.000

3.000
LHS

LHS
11.00

11.00
9.00

9.70
Fruit Shop

Shop
Vinod Chaudhary

Naresh Narayan Mandole


L-I99

1-200

'01 Chalisgaon 97.022 97.025 3.000 LHS 11.00 10.30 Shop Nikhil Patil L-201

202 Chalisgaon 97.025 97.03 5.000 WS 11.00 10.00 Shop Nikhil Patil(lio Phone) 1-202

IV 3
Chalisgaon 97.070 97.075 5.000 LHS 11.00 9.00 Shed & Shop Pankaj Patil

Chandan Kumawat(jay Ambe


1-203

204 Chalisgaon 97.060 97.09 10.000 LHS 11.00 10.00 Hotel & Shed 1-204
• fle,tnrentl
Existing Chainage Length
Sr. Name of (Km) EROW Offset from House /Binding /Well /Gate /Farm
Affected. Side . . . Name of the Encroacher Structure No.

7 5 Chalisgaon

Challsgaon
97.336

97.342
97342

97.347
6.000

5.000
RIIS

LIIS
11.00

11.00
10.3

10.40
Shed

Cycle Repair Shop


Bhikam Natthu Kumavat

Nana Kumawat
L-205

1-206

207 Challsgaon 99.370 99.375 5.000 LIIS 12.00 10.20 Shed & Shop Anil Bagh L-207

7 08

99
Chalisgaon

Chalisgaon
99.380

99.464
99.383

99.474
3.000

10.000
1.115

LHS
12.00

12.00
11.70

10.40
Tailer Shop

Shed
Bhaskar Pawar

Nana Gayate
L-208

L-209

7
run
0

1
Chalisgaon

Chalisgaon
99.598

99.690
99.6

99.723
2.000

33.000
LHS

LHS
12.00

12.00
8.00

9.00
Pan Shop

Chain Fancing & M.S. Gate Bhimjl Dhanji Patil


L-210

L-211

I 112 Chalisgaon 99.723 99.755 32.000 LHS 12.00 8.80 Wire Fancing With M.S. Gate Arjun Bhai Patel L-212

13 Khadki 100.260 100.263 3.000 LHS 12.00 9.00


7 14 Khadki 100.263 100.27 7.000 LHS 12.00 8.00
Shop

Shop
Irian Khatik

Irfan Khatik
L-213

L-214

7 215 Khadkl 100.28 100.282 2.000 1.11S 12.00 11.00 Otha Ibrahim Patel L-215

7
16 Khadki 100.35 100.355 5.000 WS 12.00 8.20 Shed Anif Asim Khatik L-216

17 Khadkl 100.355 100.36 5.000 LIIS 12.00 9.00 Shed Munir Yasir Khatik L-217

1 718

re,.19
Khadkl

Khadkl
100.532

101.633
100.54

101.638
8.000

5.000
LHS

LIB
12.00

15.00
8.00

7.60
Ottha

Hotel Sal
Khandesh Mandal

Sachin Marathe
L-218

1-219

I 220 Khadkl 101.64 101.647 7.000 LIIS 15.00 7.50 Hotel Swaraj & Coldrinks Samadhan Mandole 1-220

7 22
1 Khadkl

Khadkl
101.65

101.66
101.66

101.665
10.000

5.000
LHS

LHS
15.00

15.00
7.60

8.70
Shed (Pan Shop)

Shed
Ashok Shinde

Rajendra Shinde
L-221

L-222

7
r.,24
3 Khadkl

Khadki
101.665

101.707
101.67

101.71
5.000

3.000
LHS

LIIS
15.00

15.00
12.00

13.00
Bus Stop

Loundry Shop
Government

Sanjay Chauhan
L-223

L-224

225 Khadki 101.71 101.716 6.000 LHS 15.00 9.80 Pan Shop & Shed Bapu taxman Kadam L-225

7 26

27
Khadki

Khadkl
102.07

102.095
102.085

102.098
15.000

3.000
LHS

LIIS
15.00

15.00
12.80

10.40
Wire Fencing with Concret Pole

Gen. Store
Ambika Hotel

Dattu Gunjal
L-226

L-227

7
rern
228 Khadki

Khadki
102.245

102.385
102.25

102.39
5.000

5.000
LHS

LHS
15.00

12.00
13.20

11.20
Well & Water Tank Appa Dattatre Wanl L-228

Rahul Auto Garraz Sujit Caikwad L-229

'30 Khadkl 102.345 102.35 5.000 LHS 12.00 9.20 Cycle Shop Dilip Samrao jagtap L-230

141 ;31

32
Khadki

Khadki
102.35

102.355
102.355

102.358
5.000

3.000
LHS

LHS
12.00

12.00
6.60

9.00
Tea Shop

Shop with Shutter


Ramchandra Santosh

Sahebrao Sirpat Kole


L-231

L-232

7 233 Khadki 102.37 102.375 5.000 LHS 12.00 9.30 Punam Tea House Satish Pathade 1.233

34 Khadki 102.375 102.38 5.000 LHS 12.00 6.60 Shed Dhyandeo Bhika Kole L-234
7 '35 Khadkl 102.38 102.385 5.000 LHS 12.00 9.00 Toilet Block & House Wall Dhyandeo Bhika Kole L-235

36 Khadki 102.385 102.39 5.000 1.115 12.00 10.20


17 7 Khadkl 3.000 LHS 12.00
Shed Dhyandeo Bhika Kole L-236

102.417 102.42 8.00 Shop Grampanchayat L-237

7 38 Khadki 102.425 102.43 5.000 LIIS 12.00 6.90 Shlvsal Samarth Hotel Pundlik Balmik Mandole L-238

7 39

40
Khadkl

Khadki
102.45

102.72
102.46

102.808
10.000

88.000
LIIS

LHS
12.00

15.00
11.80

6.00
Toilet Block

Wire Fencing
Govt.

Dipak Aggarwal
1-239

L-240

7 41 Khadki 102.74 102.742

Total
2.000

2533
LHS 15.00 11.50 Well Dipak Aggarwal 1-241

filP
Air
Name of Work: Upgradation of Bhadgaon - Chalisgaon (Pkg-II) of NH 753J from Km 56+200 to Km 103+000 (46.800 Km) to Two / Four Lane configuration of jalgaon
Bhadgaon Chalisgaon Nandgaon Manmad- NH-753 J in State of Maharashtra on EPC mode under NH (0).

Encroachment- Pkg- I (RHS)


Existing Chalnage Length Offset
St Name of
(Km) Affected, Side
EROW from
ECL
House / Guiding / Well / Gate / Farm/ Name of the Structure
No. Village (m) Boundary Wall Encroacher No.
From To (m) (m)

ir Bhadgaon 57.980 58.140 160.000 RHS 15.00 14.00 Guard Room, M.S. Gate & Bouddry Wall ITI Collage R-01

Rhadgaon 58.145 58.250 105.000 RHS 15.00 14.00 Wire Fencing & MS Gate with concret Pilor Adup Chacha R-02
IIIIP

1 Bhadgaon 58.800 58.860 60.000 RIIS 14.00 12.40 Wire Fencing R-03
IMP
4 Bhadgaon 58.860 58.955 95.000 RHS 14.00 12.40 Boundry Wall R-04

IIIIP Bhadgaon 58.860 58.955 95.000 RHS 14.00 12.50 MS. Gate With Concret Pilor R-04 A

A Bhadgaon 59.138 59.140 2.000 RHS 15.00 11.90 Water Tank (Shri Dada ji Dhawa) jitendra tidal Patil R-05
NIP
7 Bhadgaon 60.130 60.160 30.000 RHS 12.00 11.80 Boundry Wall & M.S. Gate With Concret Pilor Hotel Punam Garden R-06

ilP Bhadgaon 60.400 60.550 150.000 RIB 15.00 13.70 Wire Fencing Muslim Kabristan R-07

^ Bhadgaon 60.550 60.556 6.000 RHS 15.00 14.50 Bus Stop Govt. R-08
411111,-
10 Bhadgaon 60.655 60.685 30.000 RHS 12.00 10.00 Boundry Wall with Fencing Samir Bhai R-09

MP Bhadgaon 60.860 60.870 10.000 RHS 12.00 10.00 Shed with Iron Angle Chandran R-10

" Bhadgaon 60.900 60.910 10.000 RHS 12.00 11.40 Iron Stair & Ottha Chetan josh) R-11
VP
13 Bhadgaon 60.910 60.920 10.000 RHS 12.00 11.30 Shed & Shutter Ramdas Sonawane R-12

' Bhadgaon 60.940 60.945 5.000 RHS 12.00 11.00 Room with Brick Wall Subabai Sonawane- R-13

Bhadgaon 61.060 61.061 1.000 RHS 12.00 6.50 Water Wall Nagar Palika R-14
OP
Gafar Khan (Hindustan
16 Bhadgaon 61.077 61.082 5.000 RHS 12.00 9.00 Shed (Tyre Shop) R-15
Tyre Servicing)
W Bhadgaon 61.130 61.133 3.000 RHS 12.00 10.00 Tin Shop Ejaj Auto R-16

Sanjay Raghunath
Bhadgaon 61.140 61.143 3.000 RHS 12.00 10.50 Haire Cutting Saloon Shop R-17
I. Nerpagare

19 Bhadgaon 61.155 61.158 3.000 RHS 12.00 11.20 'Tin Shop btu Auto Garaze R-18

TN Bhadgaon 61.158 61.163 5.000 RHS 12.00 '11.4 Shop (Gas Welding Shop) Salyyad Mir Gas Welding R-19

Bhadgaon 61.163 61.168 5.000 RHS 12.00 8.40 Shop (Auto Garaze) Nazim Auto Garaze R-20
ler
22 Bhadgaon 61.172 61.175 3.000 RHS 12.00 10.60 Shop Chi rag Cycle Mart R-21

Yf Bhadgaon 61.185 61.187 2.000 RHS 12.00 11.00 Pan Shop Balmik Patil R-22

Bhadgaon 61.200 61.203 3.000 RHS 12.00 10.10 Tin Shop R-23
1111P
25 Bhadgaon 61.205 61.210 5.000 RHS 12.00 9.40 Pan Shop Suresh Valdhya R-24

Yf Bhadgaon 61.230 61.235 5.000 RHS 12.00 8.20 Shop Abari R-25

Bhadgaon 61.240 61.242 2.000 RIIS 12.00 8.20 Pan Shop Prasad Pan Centre R-26
IV

28 Bhadgaon 61.250 61.255 5.000 RHS 12.00 8.70 Shop Sudhakar Auto Garaz R-27

II; Bhadgaon 61.240 61.265 25.000 RHS 12.00 11.70 Boundry Wall Panchayat Samity R-28

Deore Bandhu (Guru Dutt


Bhadgaon 61.310 61.330 20.000 RHS 12.00 10.20 Shed R-29
41. Pan Shop)
Suresh Borse (Punam Tea
31 Bhadgaon 61.345 61.350 5.000 RIIS 12.00 10.50 Shop & Shed R-30
& Restorant)
IIIIP Bhaiya Mahajan
32 Bhadgaon 61.385 61.388 3.000 RIIS 12.00 10.00 Shed R-31
( Ashirwad Pan Centre)

MP Bhadgaon 61.388 61.395 7.000 RHS 12.00 10.00 Shed Arun Bagwan (Fruit Shop) R-32

14 Bhagwan Chaudhary
Bhadgaon 61.395 61.400 5.000 RIIS 12.00 11.00 Shed R-33
(Ashish Tea Centre)
II
35 Bhadgaon 61.400 61.405 5.000 RIIS 12.00 11.50 Haire Cutting Saloon Shop Sanjay Sirsan R-34

. Bhadgaon 61.440 61.445 5.000 RIIS 12.00 11.40 Shed Keryana Khurpe R-35

,7
Bhadgaon 61.445 61.450 5.000 8115 12.00 11.40 Shed (Balaji Bikaner Sweets) Kudra Rajpurohlt R-36

61.485 Nana Mahajan (Gajanan


38 Bhadgaon 61.480 5.000 RHS 12.00 10.20 Shed R-37
Nasty Centre)
Mikan Shaikh (Kohinoor
P Bhadgaon 61.520 61.525 5.000 RHS 12.00 11.20 Shed R-38
Furnitures Shop)
' c' Bhadgaon 61.540 61.545 5.000 RHS 12.00 8.20 Shed Monall Uphar Grih R-39

11 Bhadgaon 61.580 61.595 15.000 RIIS 12.00 10.00 Ottha * Parking Space Munaf Shaikh R-40

o Kotli 65.505 65.517 12.000 RHS 15.00 13.60 House under Construction Ravindra Paul R-4I

' Kotli 66.517 66.520 3.000 RIIS 15.00 10.80 Water Tank Anita Parve R-42
IP
4 Kotli 66.558 66.577 19.000 RHS 15.00 13.00 Shed Anita Parve R-43

68.601 68.683 Ratilal Mahajan (Hotel


111 Kotli 2.000 RHS 15.00 14.20 Water Tank R-44
Anand)
Existing Chalnage Length Offset
Sr. Name of EROW from Fri_House / Bulling / Well / Gate / Farm / Name of the Structure
(Kral AffeCtPd_ Side
Radial Mahajan (Hotel
Ig Kodi 68.709 68.713 4.000 RIIS • 15.00 11.80 Car Washing Centre R-45
Anand)

Nagar Devla 69.665 69.672 7.000 RIIS 30.00 9.00 Shed R-46
11P"
Pradeep Man Singh Pan!
48 Nagar Devla 69.855 69.857 2.000 RHS 30.00 8.00 Pan Shop 847
(Anirudh General Store)

it Nagar Devla 69.865 69.870 5.000 RHS 30.00 8.70 Haire Cutting Saloon Shop Nitin Pagare R-48

Gautam janardhan
Nagar Devla 69.870 69.880 10.000 RHS 30.00 8.80 Hotel R -49
ler Sansare

Si Nagar Devla 70.130 70.138 8.000 RHS 30.00 6.00 Shed & Shop Purnand Kirana Store R-50

1! Nagar Devla 70.160 70.188 28.000 RHS 30.00 8.20 School Building LP. School R-51

Nagar Devia 70.530 70.543 13.000 RHS 30.00 10.20 Temp. Shed with Iron Angle Abha Pad R-52
1.

<4 Nlmbhora 71.380 71.390 10.000 RHS 15.00 11.60 Tern. Tin (Shed) Supdu Keshav Patil R-53
•411'
55 Pasardl 71.580 71.634 54.000 RHS 15.00 12.30 Boundry Wall Hotel Avinash Garden 8-54

v. Pasardi 73.894 73.899 5.000 RHS 15.00 9.80 Toilet Block Govt 8-55

C7 Kajgaon 76.453 76.460 7.000 RHS 12.00 7.30 Tea Shop Amrutkar Kharana R-56

58 Kajgaon 76.758 76.761 3.000 RHS 12.00 11.00 Toilet Block Govt. 8-57

OP Kajgaon 77.100 77.120 20.000 RHS 12.00 10.40 Boundry Wall (Plinth Work) lwahar Marcket Kajgaon R-58

Elhaskar Shridhar Sonar


-n Kajgaon 77.151 77.158 7.000 RHS 12.00 10.90 Tea Shop R-59
(liholenath Tea Centre)
MP
61 Kajgaon 77.186 77.168 2.000 RHS 12.00 10.20 Pan Shop Himat Mahajan R-60

Inds Singh Rajput (Sai


'sr Kajgaon 77.230 77.235 5.000 RHS 12.00 11.20 Shed & Shop
Electronics)
R-61

Narayan Somnath jagtap


Kajgaon 77.235 77.240 5.000 RIIS 12.00 11.10 Ottha & Shed R-62
if Manoi Mens Parlor)
IMP
64 Kajgaon 77.250 77.255 5.000 RHS 12.00 10.30 Shed & Shop Vijay Waman Pawar R-63

Ramesh Ram krushna


'R Kajgaon 77.255 77.260 5.000 RI'S 12.00 9.80 Shed & Shop R-64
Wani ( Guirat liphar Grih)
Bhaskar Nan Patil ( New8-65
Kajgaon 77.260 77.265 5.000 RHS 12.00 9.20 Shed & Shop
11// Fasion Tailor)

67 Kajgaon 77.265 77.270 5.000 RIIS 12.00 9.20 Tyre Shop Suresh Bhawanilal /bran R-66

ill Kajgaon 77.270 77.275 5.000 RIIS 12.00 9.20 Mobile Shop Asraf Bhai ( K.G.N mobile) R-67

Kajgaon 77.275 77.278 3.000 RIIS 12.00 10.20 Shed & Shop Sudhakar Wankhede R-68
411Ir
70 Kajgaon 77.278 77.283 5.000 RIIS 12.00 8.00 Shed & Shop Sanjay Dhudku Mahajan R-69

*Pi Kajgaon 77.285 77.288 3.000 RHS 12.00 8.00 Mobile Shop Prithiviraj Rajput R-70

Kajgaon 77.300 77.305 5.000 RHS 12.00 11.50 Shed & Shop Dhanraj Sonar R-71
AP,
Prabhakar Patti (Hotel
73 Kajgaon 77.310 77.315 5.000 RIIS 12.00 11.00 Shed & Kitchen R-72
Sarnadhan)

It Kajgaon 77.315 77.320 5.000 RHS 12.00 11.40 Shed Mahendra Sonawane R-73

Kajgaon 77.320 77.325 5.000 RHS 12.00 11.10 Ottha & Shed Sandip Patil R-74
apr
Chavhan Bandhu
76 Kajgaon 77.325 77.330 5.000 RIIS 12.00 11.10 Ottha R-75
(Gurudutt Automobile)
I
F Kajgaon 77.330 77.340 10.000 RHS 12.00 11.20 Shop &Shed Yogesh Hire R-76

Kajgaon 77.360 77.365 5.000 RHS 12.00 11.30 Temp. Shed Jakir Bhagwan R-77
MP

79 Kajgaon 77.580 77.600 20.000 RIIS 12.00 11.10 Tin Boundry jalaram Shaw Mill R-78

TO Bortek 78.300 78.320 20.000 MIS 15.00 7.80 Om Shand Raswantl Bhaiya Shaikh Patil R-79

Bortek 78.330 78.332 2.000 RHS 15.00 11.50 Water Tank Sachln Patil R-80
li,

02 Bortek 78.360 78.362 2.000 RHS 15.00 8.60 Toilet Block R-81
IliIr Shriram Samarth
83 Bortek 78.380 78.395 15.000 MIS 15.00 10.40 Shed & Water Tank R-82
Raswantl

IMP Tandewadi 79.420 79.465 45.000 RIB 15.00 11.60 Wire Fencing R-83

oc Tandewadi 79.665 79.68 15 RHS 15 6.6 Shed & Shop Pramod Lalwani R-84
III
86 Tandewadi 79.645 79.730 85.000 RHS 15.00 12.00 Wire Fencing & M.S. Gate Pramod Lalwani R-85

up Tandewadi 79.725 79.730 5.000 RHS 15.00 9.60 Toilet Block Govt R-86

00 Tandewadi 79.990 80.000 10.000 RHS 15.00 8.50 Bus Stop Govt R-87
NW
39 Tandewadi 80.580 80.582 2.000 RHS 15.00 11.80 Water Tank Bhagatrao Kisan Patil R-88

lig Tandewadi 80.668 80.675 7.000 RHS 15.00 14.80 Ilouse Uttamrao Sadhu Pad! R-89

, Hingane 81.480 81.520 40.000 RHS 15.00 8.60 Wire Fencing, M.S. Gate & Shed Sarad Chauhan R-90
p
2 Hingane 81.813 81.825 12.000 RHS 15.00 12.50 Water Tank & Shed Arvind Bhimrao Chauhan R-91

II Hingane 81.915 81.925 10.000 RHS 15.00 7.20 Tin House Amrut Makunda R-92
Existing Chainage Length Offset
Sr. Name of (Km) Affected. Side
EROW House / Guiding / Well / Gate / Farm / Name of the Structure
from En.
lif Hingane 81.925 81.927 2.000 RHS 15.00 13.20 Toilet Block Govt R-93

Hingane 82.035 82.045 10.000 8115 15.00 10.80 Toilet Block Govt R-94
fir
96 Hingane 82.048 82.050 2.000 RHS 15.00 8.60 Shop (Salun) Bharku Nal R-95

iff Hingane 82.060 82.062 2.000 RHS 15.00 7.50 Tin Shed R-96

Hingane 82.062 82.070 8.000 RHS 15.00 7.50 Bus Stop Govt. R-97
111'
99 Hingane 82.070 82.080 10.000 RHS 15.00 7.50 Shop Lahu Hemraj Chauhan R-98
MP
100 Hingane 82.080 82.083 3.000 R115 15.00 6.80 Shop jairam Maharu nal R-99

lir Hingane 82.088 82.090 2.000 MIS 15.00 7.20 Shop Ismail Suleman Khatik R-100

lir; Hingane 82.095 82.097 2.000 RHS 15.00 7.60 Shop Sahebrao Gorse R-101

103 Hingane 82.090 82.100 10.000 RHS 15.00 11.00 Wire Fencing Grampanchayat R-102
Ratnabai Prabhakar
111111 Hingane 82.105 82.110 5.000 RHS 15.00 14.50 House wall R-103
Barsole
fns Hingane 82.120 82.130 10.000 RIIS 15.00 9.60 Temp. Shed R-104
Mr
106 Hingane 82.135 82.140 5.000 RHS 15.00 10.20 House Anil Nathu Chauhan R-105

VW Hingane 82.395 82.405 10.000 RIIS 15.00 10.40 Shed & Chain Fencing Bana Bhusan Chauhan R-106

' ^9 Waghll 83.232 83.235 3.000 RIIS 15.00 13.40 Water Tank Arjun Adhar R-107
gli
83.320 10.000 Ashok Arjun Mahajan (
109 Waghll 83.310 RIIS 15.00 9.90 Shed R-108
Vtjay Raswantl
Int Waghll 83.410 83.412 2.000 RIIS 15.00 12.60 Water Tank Suresh Govinda Mali R-109

-•1 Waghli 83.883 83.885 2.000 RHS 15.00 12.00 Water Tank R-110
IP'
112 Waghli 83.875 83.885 10.000 RHS 15.00 14.10 House R-111

W3 Waghll 83.890 83.905 15.000 RIIS 15.00 14.30 Shed with Brick Wall R-112

84.240 40.000 RHS Vinayak Mali


' 4 Waghli 84.200 15.00 11.10 Shed with Iron Angle R-113
11 (Mauli Raswanti)
84.870 84.900 30.000 RHS Narmadabal Pandit
115 Waghli 15.00 9.30 Wire Fencing with M.S. Gate R-114
Mahajan
fr6 Waghll 84.900 84.903 3.000 RIIS 15.00 14.00 Water Tank Shankar Ragho Mahajan R-115

7 Waghli 85.353 85.370 17.000 RIIS 12.00 8.00 Shop & Shed Arif Shaikh R-116

118 Waghli 85.390 85.395 5.000 RHS 12.00 7.60 Shop (Samir Auto Part) Ashif Shah R-117

vr9 Waghli 85.395 85.400 5.000 RIIS 12.00 9.00 Chicken Shop Majhar Shaikh R-118
Kailash Sripat Ahire
IMO Waghli 85.42 85.425 5.000 RIIS 12.00 9.60 Shop (Haire Cutting Saloon) (Hariom Hair Cutting R-119
Saloon)
Shivaji Gangaram
,i Waghli 85.425 85.43 5.000 RHS 12.00 8.80 Shed & Shop R-120
Chaudhary
"2 Waghli 85.445 85.448 3.000 RHS 12.00 8.90 Pan Shop Sikandar Shah R-121

123 Waghli 85.448 85.455 7.000 RIIS 12.00 9.00 Hotel With Tin Shop Dilip Maka Bhoi R-122

AK Waghli 85.46 85.462 2.000 RHS 12.00 8.60 Water Tank Govt. R-123

'^S Waghll 85.47 85.475 5.000 RHS 12.00 8.40 Tea Shop Chhotu Patil R-124
IMP
126 Waghli 85.475 85.48 5.000 RIIS 12.00 8.50 Santosh Gaikwad (Haire
Shop R-125
Cutting cialrvinl
7,7 Waghli 85.49 85.492 2.000 RHS 12.00 8.60 Pan Shop Manoj Kevat Acharl R-126

"9 Waghli 85.493 85.497 4.000 RHS 12.00 8.70 Shop Ramesh Jadhav R-127
ilP
129 Waghli 85.497 85.5 3.000 RHS 12.00 8.90 Pan Shop Bhagwan Chaudhary R-128

IllSb Ojhar 92.685 92.69 5.000 RHS 15.00 11.00 M.S. Gate with Concret Pilor Lakshmibai Farms R-129

Ojhar 92.805 92.81 5.000 RHS 15.00 13.30 M.S. Gate with Concret Pilor Lokesh Farms R-130
*IV1
132 Ojhar 92.99 92.995 5.000 RHS 15.00 14.20 M.S. Gate with Concret Pilor Farms R-131

yin Ojhar 93.438 93.441 3.000 RHS 15.00 13.30 Well


Shri Chetan Wanardco
R-132
Mandir
'4 Ojhar 93.885 93.89 5,000 RHS 12.00 6.50 Shop D.M. Gaikwad R-133
OW
135 Ojhar 93.89 93.9 10.000 RHS 12.00 10.50 House Wall & Toilet Block Sandeep Gaikwad R-134

Illi6 Ojhar 93.91 93.92 10.000 RHS 12.00 10.50 Ottha, House & Toilet Block Pundlik Vitthal Patil R-135

r7 Ojhar 93.918 93.92 2.000 RHS 12.00 7.20 Toilet Block Pundlik Vitthal Patil R-13SA

.38 Ojhar 93.94 93.945 5.000 RHS 12.00 9.00 House Dilip Ramdas Jadhav R-136

Nr9 Ojhar 93.945 93.95 5.000 RHS 12.00 8.60 RCC Plinth with Angle Namdeo Jadhav R-137

Ojhar 93.970 93.975 5.000 RHS 12.00 7.50 Toilet Block Dilip Jadhav R-138
IP)
NOP Existing Chainage Length Offset
Sr. Name of
f Km) EROW fromn,L. House / Buiding / Well / Gate / Farm / Name of the Structure
Affected Side
%Pt Ojhar 93.975 93.98 5.000 RHS 12.00 5.00 Abondon House Daulat Jadhav R-139

142 Ojhar 93.980 93.985 5.000 RHS 12.00 4.60 Shop Sopan Girdhar Patil R-140
11,
143 Ojhar 94.000 94.010 10.000 RHS 12.00 8.40 Brush, Toilet & Panchayat Building Gram Panchayat Ojhar R-141

1111$ Ojhar 94.010 94.015 5.000 R115 12.00 8.00 Shop & Shed Bapu Khandu Thakre R-142

Ojhar 94.015 94.025 10.000 RIIS 12.00 8.30 Shed & Shop with Shutter Chhagan Babulal Bhoi R-143
-NIP
146 Ojhar 94.025 94.030 5.000 RIIS 12.00 11.00 Shed Laxman Barku Jhodge R-144

VW Ojhar 94.070 94.075 5.000 RHS 12.00 11.20 Ottha & foundry Wall Sanjay Gujjar R-145

"'9 Ojhar 94.115 94.120 5.000 RHS 12.00 9.00 Pan Shop & Shed Jai Bhole Pan Shop R-146
ler
149 Ojhar 94.115 94.120 5.000 RHS 12.00 9.80 Boundry Wall Lala Supdu More R-147

Ito Ojhar 94.120 94.125 5.000 RHS 12.00 11.00 Shop P. G. Gujjar R-148

' "1 Ojhar 94.125 94.130 5.000 RHS 12.00 9.20 Shop & Shed Santosh Govinda Gujjar R-149

152 Ojhar 94.225 94.230 5.000 RHS 15.00 13.20 Toilet Block Govt 0-150

ilt Ojhar 94.230 94.233 3.000 RHS 15.00 10.30 Shop Harish Jagnath Gujjar R-151

I Ojhar 94.233 94.238 5.000 RIIS 15.00 13.00 Shop (Hair Cutting Saloon) Rahul Hair Art R-152
tor
155 Ojhar 94.238 94.243 5.000 RHS 15.00 12.20 Shop Vijay Lala More R-153

r6 Ojhar 94.273 94.275 2.000 RIIS 15.00 13.30 Shop R-154

Ojhar 94.530 94.540 10.000 RIIS 15.00 14.20 Tin Godown Shekhar Desmukh 0-155
MP
158 Ojhar 94.540 94.565 25.000 RHS 15.00 14.20 Building wall & M.S. Gate Shekhar Desmukh 11-156
IIII Laxman Ananda Aamle (
159 Ojhar 94.615 94.620 5.000 RHS 15.00 12.50 Shop Laxmi Auto & Spare 0-157
Parts)
lb
160 Ojhar 94.620 94.625 5.000 RHS 15.00 12.50 Shop 0-158

IIPL TAO 94.745 94.750 5.000 RIIS 15.00 12.00 Ottha Bhaskar Dada Gujjar R-159

1A2 Takli 94.880 94.890 10.000 RIIS 12.00 9.10 M.S. Gate with concret Pilor Had Seth R-160
w
163 Takli 94.905 94.910 5.000 RHS 12.00 9.90 Pan Shop D.B. Tribhuwan R-161

III4 Takli 94.920 94.930 10.000 OHS 12.00 8.80 Ottha & Enttry Gate Jalaram Marbles R-162

les Takli 95.030 95.035 5.000 RHS 12.00 11.70 Water Tank Anil Pawar R-163
IIIIP
166 Takli 95.040 95.045 5.000 RHS 12.00 8.80 Shed Anil Pawar R-164

illiP/ Takli 95.350 95.360 10.000 RI'S 15.00 12.50 Chain Fencing with M.S. Gate Dilip Nimba Mahajan 0-165

'-4 Takli 95.360 95.365 5.000 RHS 15.00 14.00 Boundry Wall & M.S. Gate Shree Sai Samarth R-166
IP
Saraswati Sangam
169 Takli 95.370 95.380 10.000 RIIS 15.00 12.30 Chain Fencing & M.S. Gate R-167
Complex
/16 Takli 95.395 95.397 2.000 RIIS 15.00 14.60 Shop Bapu Chaudhary R-168

Takli 95.397 95.400 3.000 RIIS 15.00 12.00 Shed Sai Auto R-169
II,
172 Takli 95.400 95.405 5.000 RHS 15.00 9.20 Shop Shiva Rokde 0-170

ITS Takli 95.405 95.410 5.000 RIIS 15.00 12.30 M.S Gate & Shed Shiva Rokde R-171

Takli 95.460 95.462 2.000 RHS 15.00 14.70 Shop Hair Cutting Saloon R-172
MP
Pradeep Mahajan
'-5 Takli 95.505 95.507 2.000 RIIS 15.00 12.00 Shop (Swapnapurt1 R-173
VW Electricals)
176 Takli 95.515 95.520 5.000 RHS 15.00 13.20 House R-174
110
177 Takli 95.530 95.545 15.000 RHS 15.00 12.50 Chain Fencing Bajaj Motorcycles R-175

Ur Takli 95.600 95.615 15.000 RHS 15.00 13.20 Chain Fencing with M.S. Gate Sai TVS R-176

1,9 Takli 95.615 95.630 15.000 RHS 15.00 12.00 Chain Fencing with M.S. Gate Pandit Bhagwan Badri R-177
glIIP
180 Takli 95.670 95.675 5.000 RIIS 15.00 10.20 Chicken Shop Mohim R-178

'Mk Tak11 95.675 95.685 10.000 RHS 15.00 14.80 Tin Shed Bhangar Godown R-179

•^ 7. TaIdi 95.685 95.687 2.000 RHS 15.00 14.20 Shop Sairam Auto Garaz R-180
AP
183 Tak11 95.720 95.725 5.000 RHS 15.00 13.30 Shed 0-181

11114 Takli 95.770 95.780 10.000 RHS 15.00 13.40 Hotel & Shed Krishna Raswantl R-182

" -9 Challsgaon 95.850 95.860 10.000 RHS 15.00 13.00 Ottha, Sriram Washing Centre Sriram Tyre R-183
lur
186 Challsgaon 96.450 96.450 0.000 RHS 11.00 9.50 Shed Latabai Dilip Pawar R-184

let Challsgaon 96.455 96.458 3.000 RIIS 11.00 8.70 Toilet Block Nagar Palika R-185
41110, Existing Chainage Length Offset
Sr. Name of EROW House / Bulding / Well / Gate / Farm / Name of the Structure
(Km) Affected Side from Fn.
yup.) Chalisgaon 96.470 96.475 5.000 RHS 11.00 ' 9.10 Cycle Shop Dilip Kabu 7-odge R-186

189 Chalisgaon 96.475 96.482 7.000 RIIS 11.00 8.80 Boundry Wall& Toilet Block Gopichand Sonawane R-187
41
190 Chalisgaon 96.485 96.490 5.000 RHS 11.00 9.20 Shed House Vlshal More R-188

lopl Chalisgaon 96.490 96.493 3.000 RHS 11.00 9.30 Shop Devidas More R-189

5.000 RIIS 11.00 9.40 Shankar Shrirame


192 Chalisgaon 96.493 96.498 Shed R-190
flrvkate
'VI
193 Chalisgaon 96.505 96.508 3.000 RHS 11.00 9.00 House Devidas Thorat R-191

tup4 RHS 11.00 10.40 Prakash Punju


Chalisgaon 96.512 96.520 8.000 Shop & Shed R-192
chandhani.
1 O5 ChalIsgaon 96.530 96.535 5.000 RIIS 11.00 9.50 House Valmik Tatyava Arjun 11-193
Namadabal Prabhakar
196 Chalisgaon 96.535 96.538 3.000 RHS 11.00 10.50 House R-194
Mitkare
lir Chalisgaon 96.540 96.550 10.000 RIIS 11.00 10.70 Shed Handubhavat R-195

Chalisgaon 96.555 96.565 10.000 RHS 11.00 10.20 Wire Fencing R-I96
ililr9
199 Chalisgaon 96.605 96.608 3.000 RHS 11.00 9.00 Pan Shop Ramdas Mandavi R-197

ilk Chalisgaon 96.608 96.615 7.000 RIIS 11.00 10.00 Shed Ramdas Mandavi R-198

, Chalisgaon 96.710 96.725 15.000 RHS 11.00 9.00 Angle Shyam Raswanti R-199
liar
202 Chalisgaon 96.980 96.990 10.000 RIIS 11.00 10.00 Temple Boundary Wall Temple R-200

V3 Chalisgaon 96.997 97.000 3.000 RIIS 11.00 9.00 Shop Dilip Pentar R-201

t Chalisgaon 97.000 97.005 5.000 RIIS 11.00 9.50 Pan Shop Balaji Pan Shop R-202
fer
205 Chalisgaon 97.010 97.015 5.000 RIIS 11.00 9.00 Shed Dattatraya Mahajan R-203

n Chalisgaon 97.015 97.020 5.000 PIS 11.00 9.00 Shed Prabhu Gawli R-204

Chalisgaon 97.020 97.023 3.000 RIIS 11.00 10.30 Shop Yogesh Patil R-205
or'

Chandu Patil (Gurudatt


"3 Chaltsgaon 97.025 97.028 3.000 RIIS 11.00 10.50 Shop R-206
Auto Garrage)

- ''') Chalisgaon 97.080 97.09 10.000 BUS 11.00 10.00 Shop Ravindra Patil R-207
IIP

210 Chalisgaon 97.100 97.105 5.000 BUS 11.00 10.00 Xerox Shop Gaurav Purankar R-208

In Chalisgaon 97.160 97.167 7.000 RHS 11.00 9.40 Fruit Shop R-209

' Chalisgaon 97.217 97.222 5.000 RIIS 11.00 9.20 Shop Hari Tour & Travels R-210
*P.
213 Chalisgaon 97.222 97.227 5.000 RHS 11.00 10.00 Auto Garrage Rahul Auto Garrage R-211

` 4 Chalisgaon 97.270 97.275 5.000 RHS 11.00 8.00 Balaji Travels Balaji Travels R-212

Chalisgaon 97.275 97.285 10.000 RIIS 11.00 10.00 Shed R-213


line

216 Chalisgaon 97.285 97.300 15.000 RIIS 11.00 6.00 Chain Fancing Shree Datt Mandir R-214
My
New Bombay Shilai
217 Challsgaon 97.300 97.310 10.000 RIIS 11.00 9.00 Taler Shop R-215
Machine

I'M Chalisgaon 97.310 97.320 10.000 MIS 11.00 9.00 Shop Chaudhary Bandhu R-216

' i Chalisgaon 97.320 97.323 3.000 RIIS 11.00 8.50 Shed Dashrat Chaudhary R-217
li.
Prakash Shimpi
220 Chalisgaon 97.323 97.326 3.000 RIIS 11.00 8.50 Shed R-218
(Swami Travels)
111 Chalisgaon 97.326 97.332 6.000 RHS 11.00 8.50 Shed & Shop Villa Marathe R-219

ler Chalisgaon 97.350 97.360 10.000 RIIS 11.00 9.00 Hotel Shed Kishor Rana R-220

273 Chalisgaon 99.370 99.375 5.000 RIIS 12.00 6.30 Shop Meat Shop R-221

224 Chalisgaon 99.394 99.397 3.000 RIIS 12.00 7.30 Shop Jamin Chicken Shop R-222

Chalisgaon 99.397 99.400 3.000 RIIS 12.00 6.30 Jay Shriram Pan &
Alpo Shop R-223
roldrinkc
7/6 Chalisgaon 99.400 99.406 6.000 RHS 12.00 5.40 Shed Said= Meva Kulfi R-224
II
227 Chalisgaon 99.475 99.485 10.000 RIIS 12.00 8.00 Tyres Shop & Shed Santosh Daga Shinde R-225

mit Chalisgaon 99.493 99.500 7.000 RIIS 12.00 7.40 Shed Awada Gavi R-226

7'0 Chalisgaon 99.505 99.510 5.000 RIIS 12.00 8.40 Cycle Shop Bablu Marathe R-227
VP
230 Chalisgaon 99.538 99.540 2.000 BUS 12.00 6.80 Loundry Shop Sanjay Raut R-228

MI Chalisgaon 99.663 99.666 3.000 BUS 12.00 7.70 Welding Shop Dasrat Galkwad R-229

7'7 Chalisgaon 99.967 99.970 3.000 RIIS 12.00 6.00 Pan Shop Sachin Jadhav R-230

233 Chalisgaon 100.045 100.050 5.000 RIB 12.00 6.00 Wire Fancing R-231

AM Chalisgaon 100.22 100.223 3.000 RIIS 12.00 9.20 Toilet Block Gram Panchayat Khadki R-232
Existing Chainage Length Offset
Sr. Name of (Km] EROW House / Bidding / Well / Gate / Farm / Name of the Structure
Affected itch. from Fel
tS Khadid 100.37 100.372 2.000 RHS 12.00 11.00 Shop Om Sal General Store R-233

10 Khadkl 100.400 100.405 5.000 RHS 12.00 10.40 Shop Asma Bulty Parler R-234

237 Khadid 100.410 100.415 5.000 RHS 12.00 6.00 Temp. Shed Gymkhana R-235
Alli.-

410

INP

IMP

fir
7 r. Name of
Existing Chainage
(KmL
Length
Afferted. Cid,
EROW
Offset
frnrrt FTI
House / Bidding /Well /Gate /Farm / Name of the Structure

8 Khadkl 100.45 100.455 5.000 RHS 12.00 8.70 Shop' Shashibai Khaire R-236

r 9 Khadkl 100.455 100.457 2.000 RHS 12.00 7.60 Shop Akshay Kiran Shop R-237

11 240

rOP1
Khadkl

Khadkl
100.46

100.475
100.462

100.485
2.000

10.000
RHS

RHS
12.00

12.00
8.70

11.00
Mobile Shop

Shed & Shop


Vikash Kumawat

Punjab Deshmukh
R-238

R-239

'42 Khadkl 100.485 100.495 10.000 RIIS 12.00 11.00 Shed &Shop Roshan Patil R-240

7
re"
3 Khadkl

Khadkl
100.635

101.66
100.64

101.665
5.000

5.000
RHS

RHS
12.00

15.00
8.30

9.40
Ottha

Tea Shop Aspak Khatik


R-241

R-242

I^ 45 Khadkl 101.665 101.670 5.000 RHS 15.00 9.80 Tea Shop Ganesh Ahire R-243

746 Khadki 101.707 101.715 8.000 RHS 15.00 13.20 Bhau Saheb N arar
h i
Tea House R-244
Rh idf.
7 Khadkl 102.360 102.375 15.000 RHS 12.00 7.00 Boundry Wall & M.S. Gate Sanjay Mandole R-245

7
iiP
Khadkl 102.380 102.39 10.000 RIIS 12.00 6.00 Bus Stop Govt R-246

249 Khadkl 102.390 102.395 5.000 RIIS 12.00 4.40 Tea Shop Gulab Subash Dokle R-247

lift Khadkl 102.400 102.403 3.000 RHS 12.00 7.00 STD Booth Dhananjay Mandole R-248

-1 Khadkl 102.403 102.406 3.000 RHS 12.00 5.30 Tyre Puncher Shop Ashok Pawar R-249
Jo.
252 Khadkl 102.406 102.412 6.000 RIIS 12.00 7.50 Hotel Shed Vinayak Pawar R-250

illn Khadkl 102.42 102.425 5.000 RIIS 12.00 11.00 Iron Stair Sopan Pawar R-251

r 4 Khadki 102.44 102.445 5.000 RIIS 12.00 9.20 Building Dilip Gaikwad R-252

255 Khadkl 102.445 102.449 4.000 RHS 12.00 6.20 Shed House & Toilet Block Ramchandra Santosh R-253

"6 Khadki 102.46 102.47 10.000 RHS 12.00 Wire Fencing, Toilet Block & House Dada Bhau Gopichand
8.80 R•254
Rtilldino 5plar
7 Khadki 102.48 102.485 5.000 RHS 12.00 8.90 House Building & Toilet Block Bapu Balmik Mandole R-255
OW

258 Khadki 102.495 102.5 5.000 RHS 12.00 10.00 Toilet Block Laxman Sajan Lauke R-2S6

T9 Khadkl 102.5 102.502 2.000 RIIS 12.00 10.10 Shed House Nana Sirpat Kole R-257

Khadki 102.505 102.507 2.000 RIIS 12.00 9.70 Shop (Moton) Jakir Khatik R•258
IF)
261 Khadki 102.55 102.555 5.000 RHS 12.00 9.00 Shed with Angle Raju Kole R-259

2 Khadkl 102.555 102.56 5.000 RIIS 12.00 8.20 House with Toilet Block Tukaram Pawar R-260

3 Khadki 102.56 102.565 5.000 RI'S 12.00 7.80 House with Toilet Block Gulab Nikam R-261
IMP

264 Khadki 102.64 102.65 10.000 RIIS 12.00 6.00 Tea Shop Bapu Jagtap R-262
.u.
265 Khadkl 102.65 102.655 5.000 RHS 15.00 13.4 Toilet Block & Ottha Mohan Mandole R-263

Sukhdeo Mandole (Shiv


1116 Khadki 102.86 102.865 5.000 RHS 15.00 14.1 M.S. Gate with concret Pilor
Sakti Tiles)

Total 2619.000
viIMP

SIP

VP
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

Annexure - E
PROGRESS PHOTOGRAPHS

Ashoka Buildcon Limited Page 78


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to
103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC Mode.

DLC Curing @ Ch. 93+500 LHS

-re

DBM Laying @ Ch.87+920

Ashoka Buildcon Limited


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to
103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC Mode.

DBM Laying @ 88+000

Safety Board fixing @ Ch.61+700

Ashoka Buildcon Limited


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to
103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC Mode.

DBM Laying @ 88+200

Diversion @ 60+000

Ashoka Buildcon Limited


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to
103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC Mode.

PQC Curing @Ch. 102+000

IMP

Delinater fixing @Ch. 69+200


Ashoka Buildcon Limited
mop

Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to


103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC Mode.

PQC Curing @Ch. 72+600

4
1
1

Or

fir

(b.

DBM Layer thickness checking


ok•

fay
iiiiiIIIII111111121pligily111. 111114inliillilliii1111111111111 ilia III illllllll IIII~IiII
1I0 1
to, •lI III IIIIIIIIIII IIiIIIIIIIIIFl
1 4i
414'"1"'
r

tit

Ashoka Buildcon Limited


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to
103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC Mode.

PQC Shoulder filling @ Sec-5

411

tar

thr
41,
DBM laying @ Ch. 89+160

4
6
Ashoka Buildcon Limited
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to
103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC Mode.

DLC Laying @ Ch. 94+800 RHS

Encasing Slab Curing @ Ch. 63+000

Ashoka Buildcon Limited


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to
103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC Mode.

Safety work @ Ch. 69+600 with drum @ delinater

'An7111.

Tree Curing @ Ch. 74+500 RHS

Ashoka Buildcon Limited


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to
103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC Mode.

Slab casting @ Ch. 77+600 RHS

• DBM Laying @ ch. 90+000




S
S

Ashoka Buildcon Limited

Alp
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to
103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC Mode.

Slab Curing with Safety @ Ch. 77+600 RHS

PQC Curing @ Ch. 73+000

Ashoka Buildcon Limited


Project: Up-gradation of Bhadgaon-Chalisgaon (Section H) of NH-753J From Ch. 56+200Km to
103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC Mode.

H/W 2nd lift @ Ch. 96+308

Sign Board & Baricade fixing @ Ch. 69+380

Ashoka Buildcon Limited


6

Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to


103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC Mode.
61
64

401 BBM laying @ Ch.91+000

6
46
46
4

4
4
Crash Barrier casting @Ch. 75+575 LHS of Box Culvert

4
8

Ashoka Buildcon Limited


6

Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to


103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC Mode.

PQC laying & Curing @ Ch. 80+600


611

111

4
4

4
Profile Correction for DBM laying @ Ch. 90+450
it
4

4
4

4
4
4
4
4
4

ti• Ashoka Buildcon Limited

4
ger

Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to


103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC Mode.

. Watering on Subgrade @ Ch. 60+300

Pipe Repairing @ Ch. 61+000

Ashoka Buildcon Limited


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to
103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC Mode.

Raft Concrete @Ch. 69+850 MNB

`wr

4
4
4

Diversion Making @Ch. 89+305 MNB


4

4
oho

4
4

4 Ashoka Buildcon Limited


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to
103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC Mode.
tir
tr. DLC curing @ Ch. 74+700 LHS

4
4
4

4
6

6
Profile Correction for DBM laying @ Ch. 90+600
4

4
4
4
4

' Ashoka Buildcon Limited

4
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to
103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC Mode.

Raft concrete of Retaining Wall @ 77+350

Raft concrete @Ch. 89+305 MNB

Ashoka Buildcon Limited


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to
103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC Mode.

Watering on Side sholder @ 100+840 LHS

ep

Curing of Raft concrete @Ch. 89+305 MNB

Ashoka Buildcon Limited

S
t
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to
103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC Mode.

Delinater fixing @ sign Board fixing @Ch. 69+300

SLOA .•
., .

r
v .

.. ,..' ,,,,.
' "'Z..'
k--A

•,... "


--
-

- .
..,. - • -
, .,,,
.z.

*
'
. . ..

. .
,
rig

• - .Yn

PQC laying @ Ch. 64+000

. ,...-N
t aka
, -

- .

Ag.

°
AN I,

.-

-.0
*

* _ _
' - -z

'...

Ashoka Buildcon Limited


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to
103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC Mode.

PQC laying @ Ch. 64+500

Site Visit of Exective Engineer NH-PWD

OSP

Ashoka Buildcon Limited


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to
103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC Mode.

Site Visit of Exective Engineer NH-PWD

4
4
4

Site Visit of Exective Engineer NH-PWD


4
4
4
4
4

4
oir

flit

Ashoka Buildcon Limited


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to
103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC Mode.

PCC of MNB @ Ch. 89+305

Girder Casting of MJB @ Ch. 57

Ashoka Buildcon Limited


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to
103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC Mode.

• DBM Side Shoulder @Ch. 77+100 LHS

(iv

gb,

"Is

4
fir

4
4i.
Ashoka Buildcon Limited

8
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to
103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC Mode.

Visit of Executive Engineer @ RMC plant Nagardevla

4
4
4
4

4
4

4
4

kr
kr
kr
4
4
4
4

4
kr
4
4

Ashoka Buildcon Limited


' Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to
103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC Mode.

Sign Board fixing

•Ashoka Buildcon Limited


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch. 56+200Km to
103+000Km Two/Four lane with Paved Shoulder in the state of Maharashtra on EPC Mode.

PQC laying @ Ch. 65+300 LHS

-Su

PQC thickness checking in Site visit of TL Sir

Ashoka Buildcon Limited


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

Annexure - F
Letter Correspondence during April-2019

Ashoka Buildcon Limited Page 79


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

Inward Correspondence

Ashoka Buildcon Limited Page 80


Project Name - Up-gradation of Bhadgaon - Chalisgaon (section II )of NH 7531 from chainage 56+200 Km to 103+000 Km to Two lane
with paved shoulders/ Four Lane configuration of [ Jalgaon - Bhadgaon -Chalisgaon -Nandgaon -Manmad-NH 753J - (46.800 Km )] in
the state of Maharashtra on EPC mode

INWARD Correspondence Sheet - NH-753j Package-II


Inward
Letter Date Receive Date Letter No. From To Subject Remark
. No.
TPF Engineering pvt Ltd.
1 04-Apr-19 04-Apr-19 Sec-I1/2018-19/60 ABL Regarding site visit
JV with TPF Getinsa
2 30-Mar-19 08-Apr-19 RSA/01 Indian Infratech ABL Regarding Design Stage Road Safety Audit Report.
TPF Engineering pvt Ltd. Regarding Review of Design & Drawing of Pipe Culverts at
3 10-Apr-19 10-Apr-19 Sec-II/2018-19/61 ABL
JV with TPF Getinsa Ch. 80+065, Ch. 96+308.
TPF Engineering pvt Ltd. Regarding Review of Design & Drawing of Minor Bridge at
4 10-Apr-19 10-Apr-19 Sec-II/2018-19/62 ABL
JV with TPF Getinsa Ch. 89+300

11-Apr-19
OP-iti‘Ozicf 6044+5 Sat ABL 4f-4 .Iialt,S Zi. Ur. ,IT-diTT ttfig it-czti ci did ur.4.41
5 11-Apr-19
smilir D.. ula51111 7134<-03.i glIatri.
17111 4 414(4 cars sm. irigq, tKi-0. 4171FIT 711. 4. 4141,5 T2S. sr. qr. ar. qr-oYrr zrr-4
6 11-Apr-19 11-Apr-19 ABL
71-417T fa. vi a:Wild 41

11-Apr-19 BSNL
Sub Divi(sional Engineer
ABL
1 -
d-517LW cnioNcf iii,..ti 4-161kii,4 i•••414,•oni 4 IT
7 10-Apr-19
ch
paora tart arTa.
KcIT. kies-qi 4,14 rth;1ii‘ria rric,81tulicr tro-
dra acart ,fienr ..lciaLSIQr TO-RMA
8 18-Apr-19 18-Apr-19 ABL
111 1.-o/157/2019 .id1148a4. 41A114 1111 3TA- A tortra. p -Ri-
atM <1,(or cocr.
joint secrtary to
9 16-Apr-18 20-Apr-19 Government of ABL Contruction Workeni Welfgre Cens Rules, 1998
Maharashtra

A.P. Vidhale, Joint Building and Other Construction Workers ( Employent and
10 18-Aug-17 20-Apr-19 ABL
Secretary to Government Regulation Condition of Service) Act 1996

TPF Engineering pvt. Ltd. Recommendation of Stage Payment Statement No. 04 (01
11 22-Apr-19 23-Apr-19 Sec-II/2018-19/65 ABL
JV with TPF Getinsa Mar' 19 to 31 Mar'2019
TPF Engineering pvt Ltd. Submission of GAD & Reinforcement Drawing of Minor
12 04-Apr-19 25-Apr-19 Sec-II/2018-19/59 ABL
jV with TPF Getinsa Bridge at Ch. 73+860- Approval.
Submission of GAD & Reinforcement Drawings of Box
TPF Engineering pvt. Ltd.
13 24-Apr-19 25-Apr-19 Sec-II/2018-19/67 ABL Culverts at Ch. 99+575 and Pedestrian Underpass (PUP) at
JV with TPF Getinsa
Ch. 69+600-Approval.
Submission of Dimensional and Reinforcement Details
TPF Engineering pvt Ltd.
14 24-Apr-19 25-Apr-19 Sec-II/2018-19/68IV ABL Drawing of Widening Portion for Minor Bridge at Km.
with TPF Getinsa
77+340-Approval.
TPF Engineering pvt Ltd. Submission of GAD & Reinforcement Drawings of Minor
15 24-Apr-19 25-Apr-19 Sec-II/2018-19/69 ABL
JV with TPF Getinsa Bridge at Ch. 69+850-Approval.
TPF Engineering pvt Ltd. Submission of GAD of Pipe Culvert at Ch. 80+065 and Ch.
16 24-Apr-19 25-Apr-19 Sec-II/2018-19/70 ABL
JV with TPF Getinsa 96+308-Approval.

TPF Engineering pvt. Ltd. Submission of GAD, Reinforcement and Dimensional


17 24-Apr-19 25-Apr-19 Sec-I1/2018-19/71 ABL
JV with TPF Getinsa Details Drawings of Minor Bridge at Ch. 89+300-ApprovaL

7r.w.trrptfui- Ti=1,nfh 3ri17:17f, u.elei


18 25-Apr-19 25-Apr-19 ABL c4S1,I4 4,1 iii 114e141C. ci5 414d.
N /362/2019 n-pTrat ftarrn sit
Outward No.
19 25-Apr-19 25-Apr-19 EE.Engg.NH Div.Dhule ABL Submission of Comments for Release of Retention Money
AB/191/2019
TPF Engineering pvt Ltd. Regardign Review of Typical Details of Retaining wall for
20 25-Apr-19 26-Apr-19 Sec-II/2018-19/72 ABL
JV with TPF Getinsa Box Culverts & Minor Bridges.
Sec-I & 11 2019- TPF Engineering pvt Ltd.
21 26-Apr-19 27-Apr-19 ABL Request for Appointment of Concilitor.
20/101 pr with TPF Getinsa
TPF Engineering pvt. Ltd.
22 26-Apr-19 28-Apr-19 Sec-II /2019-20/100 ABL Regarding Relese of Retention Money
JV with TPF Getinsa
TPF Engineering pvt Ltd.
23 29-Apr-19 30-Apr-19 Sec-II /2019-20/73 ABL Regarding Review of Fleible Percent Design Report
JV with TPF Getinsa

Request for Time Extension in the Project Completion


24 25-Apr-19 25-Apr-19 P8/193/2019 EE.Engg.NH Div.Dhule ABL Schedule -Recommendation for Modification in Schedule-J
and Interim Extension of Time

TPF Engineering pvt. Ltd.


25 09-Apr-19 30-Apr-19 Sec-I & 11 2019.20/83 ABL Regarding Claim for COS for additional 50 mm PQC Thk.
JV with TPF Getinsa
f*.4". 57+088 4i Titqz11 rl-Rifi alignment Titfra. eidicid.
26 03-May-19 03-May-19 33IT/387/2019 4'144111 Ytri:i7t ill4 ABL 8 aw 38Tattr-4t a. as-6--
Irt tRoi•riAti6 IkTi-4' 1c-4-ii,t,•1
tbrras sit ,tb.i l'
Aceul Wiaa
NH753j/BL/STEP/19 Swastik Inde LOFIX INSI
27 27-Apr-19 02-May-19 ABL Regarding Payment received up to 28/2/2019
04059 Pvt Lit

Sec-I & II 2019- TPF Engineering pvt Ltd. Submission of Consolidated Change of Scope Proposal-'In
28 02-May-19 04-May-19 ABL
20/106 JV with TPF Getinsa Principal' Approval on revised Proposal of change of scope.
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

Outward Correspondence

Ashoka Buildcon Limited Page 81


_ _ ,_ ______ ___
_ ._ c ____ -0—. .. .. ..........,... ..........vu 7._ jur. 411 r.,.,) r. uliAs.liairkagc ..crrG'vU iv...1 Lo -... us-r
siuu:an ru iwu l aim wirii pad shoulders!
Four Lane configuration of [ Jalgaon - Bhadgaon -Chalisgaon -Nandgaon -Manmad-NH 753J - (46.800 Km )] in the state of Maharashtra on EPC mode

OUTWARD Correspondence Sheet - NI1-753J Package-II


Outward.
Date Letter No. From
No. To Subject Remark

1 01-Apr-19 ABL/NH-7 53j/Bhadgaon-Chalisgaon/Pkg-11/2018-19/465 TPF Engineering PvtLtd. Submission of Box Culvert at Ch. 99+575 & PUP at Ch. 69+600-along-
ABL
TPF Getinsa, Chalisgaon with comments compliance sheet

2 01-Apr-19 ABL/NH-753j/Bhadgaon-Chalisgaon/Pkg-11/2018-19/467 TPF Engineering PvtLtd. Request for Manual PQC in Chalisgaon City in Median Portion due to
ABL
TPF Getinsa, Chalisgaon Existence of Street Light poles & Electric Lines

3 03-Apr-19 TPF Engineering PvtLtd. Submission of Compliance of Comments raised during site verification
ABL/NH-7531/Bhadgaon-Chalisgaon/Pkg-11/2018-19/468 ABL
TPF Getinsa, Chalisgaon on 29.03.2019 in respect of Consolidated Change of Scope Proposal.

TPF Engineering PvtLtd.


4 03-Apr-19 Submission of Proof Checked Shop Drawign of Elastomeric Bearing for
ABL/N11-753j/Bhadgaon-Chalisgaon/Pkg-11/20113-19/469 ABL TPF Getinsa, Vashi,
Minor Bridge at Ch. 56+566 & Ch. 57+088.
Mumbai

TPF Engineering Pvt.Ltd. Status of Preconstruction Activites & Intimation regarding Events
5 03-Apr-19 ABL/NH-753j/Bhadgaon-Chalisgaon/Pkg-11/2018-19/470 ABL
TPF Getinsa, Chalisgaon having continuing delay effect for Extension of Time.

TPF Engineering Pvt.Ltd. Approval of Source for Supply of Elastomeric Bearing from M/s
6 03-Apr-19 ABL/NH-753j/Bhadgaon-Chalisgaon/Pkg-11/2018-19/471 ABL
TPF Getinsa, Chalisgaon Polymer Products.

TPF Engineering PvtLtd.


Submission of Proof Checked Report of Hydraulic Design Calculation
7 03-Apr-19 ABL/NH-7531/Bhadgaon-Chalisgaon/Pkg-11/2018-19/472 ABL TPF Getinsa, Vashi,
Report of Major Bridge at Ch. 57+008
Mumbai

TPF Engineering Pvt.Ltd. Approval for Supply of Mastic Asphalt for Bridge Deck Water Proofing
8 03-Apr-19 ABL/NH-753j/Bhadgaon-Chalisgaon/Pkg-11/2018-19/473 ABL
TPF Getinsa, Chalisgaon Membrane.

TPF Engineering PvtLtd.


9 OS-Apr-19 ABL/NH-753j/Bhadgaon-Chalisgaon/Pkg-11/2018-19/473-A ABL Submission of Monthly Progress Report for the month of March-2019
TPF Getinsa, Chalisgaon

TPF Engineering Pvt.Ltd.


10 08-Apr-19 ABL/NH-753j/Bhadgaon-Chalisgaon/Pkg-11/2018-19/474 ABL Aproval of Hot Applied Bitumen Sealing Compound
TPF Getinsa, Chalisgaon

TPF Engineering PvtLtd. Approval of Source M/s Choksey Chemical Pvt. Ltd., Mumbai for Supply
11 08-Apr-19 ABL/NH-753j/Bhadgaon-Chalisgaon/Pkg-11/2018-19/475 ABL
TPF Getinsa, Chalisgaon of Curing Compound & Polysulphide Sealant.

TPF Engineering Pvt.Ltd.


ABL/NH-753j/Bhadgaon-Chalisgaon/Pkg-11/2018-19/476 ABL Shifing of Street Lights at Km. 95+790 Near Kharjai Naka.
12 08-Apr-19 TPF Getinsa, Chalisgaon

Executive Engineer Shifting of Street Lights at Km. 61+315 & 61+470 Near Bhadgaon ST
08-Apr-19 ABL/N11-7531/Bhadgaon-Chalisgaon/Pkg-11/2018-19/477 ABL Electrical Division,
13 Bus Stand.
Bhadgaon

.1,1z4 +1 3i it fdukU 3r37Tia a 4-64 ,71 4 v4 t.g.t. 61+315 a 61+470 tilt-6 •c•i-c4i1L-Lii
ABL/NH-7531/Bhadgaon-Chalisgaon/Pkg-11/2018-19/478 ABL R
- 1 cbiLA silgicr.
14 08-Apr-19 f4341-4 arTerta 4,161 .11-ki.R# cftitt tt(Street lights) FT6
_c_4 4.24
- uLti , efivi- i±113haiaolAialise/IT-I1/418-14/479 4 AV ;144111 4" . li
firTiti-d ,„7.•Iirct14"1°511, t it 95+29.0 t_YrR FIX. Wit
I claI • Ff4n1 il . (401 (St'', t lig, 1 FM .ratti I 4 4
16 08-Apr-19 ABL/NH- 753)/Bhadgaon-Chalisgaon/Pkg-I1/2018-19/480 TPF Engineering PvLLtd. Submission of Minor Bridge at Ch. 89+300 along- with comments
ABL
TPF Getinsa, Chalisgaon Compliance sheet.

17 08-Apr-19 ABL/N11- 7531/Bhadgaon-Chalisgaon/pkg-11/2018-19/481 TPF Engineering PvLLtd. Submission of Pipe Culvert at Ch. 80+065 & Pipe Culvert at Ch. 96+308
ABL
TPF Getinsa, Chalisgaon along-with Commnts Compliance sheet.

18 10-Apr-19 ABL/NH-7 S3J/Bhadgaon-Chalisgaon/Pkg-11/2018-19/482 ABL EE Nil Dhule. Utility Shifting- Shifting of Water Supply Lines- Approval of RO Mumbai.

Notice for Stopping/ Holding of Excavation for Widening work during


19 10-Apr-19 ABL/NH-7531/Bhadgaon-Chalisgaon/Pkg-11/2018-19/483 Project Manager Swastik
ABL Lok Sabha Election period from 21.04.2019 to 23.04.2019 and
Infra Logics India Pvt. Ltd.
22.05.2019 to 23.05.2019
20 12-Apr-19 ABL/NH- 753)/Bhadgaon-Chalisgaon/Pkg-11/2018-19/484 TPF Engineering PvtLtd. Submission of Typical Details of Retaining Wall for Minor Bridges&
ABL
TPFGetinsa, Mumbai Retaining Wall along with comments compliance sheet.
21 12-Apr-19 ABL/NH-753)/Bhadgaon-Chalisgaon/Pkg-11/2018-19/485 TPF Engineering PvtLtd. Submission of Minor Bridge at Ch. 69+850 (Design Ch. 69+858) along
ABL
TPF Getinsa, Chalisgaon with comments compliance sheet.

22 12-Apr-19 TPF Engineering Pvt.Ltd. Submission of Dimensional & Reinforcement Detailed Drawing of
ABL/NH-753J/Bhadgaon-Chalisgaon/Pkg-I1/2018-19/486 ABL
TPF Getinsa, Chalisgaon Widning Portion for Minor Bridge at Km. 77+340 (Design Ch. 77+417)

74. +141.4 a 54 +o-61i4


23 12-Apr-19 ABL/NH-753)/Bhadgaon-Chalisgaon/Pkg-11/2018-19/487 ABL .taii•kici k. 44(4i t. ii-ceiiciiici 3TTAA' /Iiii4Lf rtrA'i iffl—ellf ifiski.
r5Tw
Issuance of Certificate towards Achievement of Project Milestone-1 & II
TPF Engineering PvLLtd.
24 15-Apr-19 ABL/NH-753)/Bhadgaon-Chalisgaon/Pkg-11/2018-19/488 ABL in accordance with Schedule-) of Contract and Release the amount
TPF Getinsa, Chalisgaon
withhold from IPC No. 1,2 &3
TPF Engineering PvtLtd.
25 15-Apr-19 ABL/NH-7531/Bhadgaon-Chalisgaon/Pkg-11/2018-19/489 ABL Aproval of Prestress Neoprene/ POT/PTFE Bearings
TPF Getinsa, Chalisgaon
TPF Engineering PvtLtd.
26 22-Apr-19 ABL/NH-753J/Bhadgaon-Chalisgaon/Pkg-11/2018-19/490 ABL Rectification of Work.
TPF Getinsa, Chalisgaon
TPF Engineering PvtLtd.
27 22-Apr-19 ABL/NH-753)/Bhadgaon-Chalisgaon/Pkg-11/2018-19/491 ABL TPF Getinsa, Vashi, Submission of Proof Checked Report of Hydraulic Design Calculation of
Murnhai Minor Bridge at Ch. 82+295 & Minor Bridge at Ch. 82+475.
TPF Engineering PvtLtd.
Submission of Comments Compliance Sheet along-with Certified Copy
28 22-Apr-19 ABL/NH-753)/Bhadgaon-Chalisgaon/Pkg-11/2018-19/492 ABL TPF Getinsa, Vashi,
of Proof Checked Report of Flexible Pavement Design.
Mumbai

TPF Engineering PvtLtd.


29 23-Apr-19 ABL/NH-753J/Bhadgaon-Chalisgaon/Pkg-11/2018-19/493 ABL Submission of Design Stage Road Safety Audit Report
TPF Getinsa, Chalisgaon

TPF Engineering Pvt.Ltd.


30 23-Apr-19 ABL/NH-753J/Bhadgaon-Chalisgaon/Pkg-11/2018-1 9/494 ABL Rectification of PQC Work-Approval of Source.
TPF Getinsa, Chalisgaon

TPF Engineering PvtLtd. Submission of Proof Checked Miscellaneous Design & Drawing of
31 24-Apr-19 ABL/N1-1-7531/Bhadgaon-Chalisgaon/Pkg-11/2018-19/495 ABL TPF Getinsa, Vashi,
Structure.
Mumbai
TPF Engineering Pvt.Ltd. Submission of Proof Checked Typical Design & Drawing of Retaining
32 24-Apr-19 ABL/NH-753J/Bhadgaon-Chalisgaon/Pkg-11/2018-19/496 ABL TPF Getinsa, Vashi,
Wall for Minor Bridges.
Mumbal
TiFTpEineenrigvPasved.
OP13 # 24,r-110. t L/40753111361.on.alisanfiell/41k8-.497e AfP.. subn, :ioni ' Reged P0001001tede sig4 Dr lig ok final Oh 4' fr •
Bridge at Ch. 82+475.
Mumbai
TPF Engineering PvtLtd.
34 24-Apr-19 ABL/NH-753J/Bhadgaon-Chalisgaon/Pkg-II/2018-19/498 Submission of Proof Checked Shop Drawing of Elastomeric Bearing for
ABL TPF Getinsa, Vashi,
Minor Bridge at Ch. 69+850 & Minor Bridge at Ch. 89+300.
Mumbai

TPF Engineering PvtLtd. Submission of Typical Details of Retaining Wall for Minor Bridges &
35 24-Apr-19 ABL/NH-753J/Bhadgaon-Chalisgaon/Pkg-H/2018-19/499 ABL
TPF Getinsa, Chalisgaon Retaining Wall along-with comments compliance sheet for Seal.

Submission of Compliance of Comments raised During Meeting with SE,


TPF Engineering PvtLtd.
36 26-Apr-19 ABL/NH-753J/Bhadgaon-Chalisgaon/Pkg-II/2018-19/500 ABL EE, (Nil) & AE on 15.04.2019 in respect of Consolidated Change of
TPF Getinsa, Chalisgaon
Scope Proposal.

TPF Engineering PvtLtd.Approval


37 30-Apr-19 ABL/NH-753J/Bhadgaon-Chalisgaon/Pkg-11/2018-19/501 ABL of Polyprp[ylene fibers Sources.
TPF Getinsa, Chalisgaon

Submission of Proof Checked Report of Hydaulic Design Calculation


TPF Engineering PvtLtd.
38 30-Apr-19 ABL/NH-753J/Bhadgaon-Chalisgaon/Pkg-11/2018-19/502 ABL Report of Minor Bridge at Ch. 78+782 (Design Ch. 78+793) & Ch.
TPF Getinsa, Mumbai
102+898 (Design Ch. 102+893)

Swastik
39 30-Apr-19 ABL/NH-753J/Bhadgaon-Chalisgaon/Pkg-11/2018-19/503 ABL infralogics.Nagardeola COS Km83+900 to Km 92+650.
camp
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

Annexure - G
Weather Report

Ashoka Buildcon Limited Page 82


Rehab'lotion / Upgradation of Bhadgaon- Chalisgaon (Pkg-II) of NH-753J From Km-56.200 to 103.000 (46.800 Km.) 2J4 Laning Configuration
Pre"ct Name of Jalgaon Bhadgaon Chalisgaon Nandgaon Munmad-Section of NH-753J in State of Maharashtra on EPC Mode.
4. I..... ... - . -.1 ..'
Client Public Works Department (N H Division, Dhule)
-ior
Authority Engineer TPF Engineering PvtLtd. In JV with TPF Getinsa in association with NASCENCE Consultants Pvl Ltd.

EFlopZontractor
Ashoka Buildcon Limited

air
Weather Report of Apri1.2019
Package-II
ler
Temparature deg.c Humidly (%) Rain Fall (mm) Weather
Date Time
Min. Max. Conditions
,ur Min. Max. Day Month Year

1-Apr-2019 8.00Am 28.5 43.4 32 66 0.00 0.00 0.00 Sunny


-Alp
2-Apr-2019 8.00Am 28.7 44.1 31 67 0.00 0.00 0.00 Sunny

TApr-2019 8.00Am 29.6 45.3 35 68 0.00 0.00 0.00


Sunny

.4"Apr-2019 8.00Am 30.1 44.2 34 66 0.00 0.00 0.00 Sunny

4pr-2019 8.00Am 29.8 43.9 25 67 0.00 0.00 0.00 Sunny


or

A-Apr-2019 8.00Am 30.2 45.6 26 69 0.00 0.00 0.00 Sunny


air
7-Apr-2019 8.00Am 30.7 46.9 25 68 0.00 0.00 0.00 Sunny

rApr-2019 8.00Am 29.4 48.6 26 67 0.00 0.00 0.00 Sunny

4PAK-2019 8.00Am 29.8 47.2 26.9 69 0.00 0.00 0.00 Sunny

,,Apr-2019 8.00Am 30.3 48.1 26 68 0.00 0.00 0.00 Sunny

',-Apr-2019 8.00Am 28.5 47.3 24 67 0.00 0.00 0.00 Sunny


s
12-Apr-2019 8.00Am 29.4 49.2 28 69 0.00 0.00 0.00 Sunny
lir
13-Apr-2019 8.00Am 28.5 47.2 26 69 0.00 0.00 0.00 Sunny

Ill-A pr- 2019 8.00Am 29.2 46.5 29 70 0.00 0.00 0.00 Sunny

,..Apr-2019 8.00Am 27.1 45.7 28.1 65 0.00 0.00 0.00 Sunny

- Apr-2019 8.00Am 26.1 41.6 27.9 63 0.00 0.00 0.00 Sunny


4IP
17-Apr-2019 8.00Am 27.3 48.6 30 62 0.00 0.00 0.00 Sunny
-vir
18-Apr-2019 8.00Am 27.8 47.6 29 63 0.00 0.00 0.00 Sunny

gApr-2019 8.00Am 28.3 46.9 31.2 65 0.00 0.00 0.00 Sunny

mir Apr-2019 8.00Am 29.7 47.2 27 68 0.00 0.00 0.00 Sunny

Apr-2019 8.00Am 29.3 48.3 29.5 69 0.00 0.00 0.00 Sunny


Air

27-Apr-2019 8.00Am 29.5 47.6 27 64 0.00 0.00 0.00 Sunny


-sr
23-Apr-2019 8.00Am 29.6 47.9 28.1 67 0.00 0.00 0.00 Sunny
-sr
24-Apr-2019 8.00Am 28.5 48.2 27.8 66 0.00 0.00 0.00 Sunny

.Apr-2019 8.00Am 29.2 47.9 28.7 68 0.00 0.00 0.00 Sunny


-
Apr-2019 8.00Am 27.1 48.2 29.1 65 0.00 0.00 0.00 Sunny

"-Apr-2019 8.00Am 28.70 47.9 28.4 70 0.00 0.00 0.00 Sunny


......
28-Apr-2019 8.00Am 27.9 46.8 29.2 64 0.00 0.00 0.00 Sunny
yr
29-Apr-2019 8.00Am 28.6 48.5 31.1 66 0.00 0.00 0.00 Sunny

geApr-2019 8.00Am 28.3 47.6 28.9 63 0.00 0.00 0.00 Sunny

Contractor Authority Engineer


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

Annexure - H
List of Contractual Obligation

Ashoka Buildcon Limited Page 83


1.44444 444444 4 4444 4444 411114.1111

Up-gradation of Bhadgaon-Chalisgaon (section II )of NH 753J from chainage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane configuration of [ Jalgaon - Bhadgaon -Chalisgaon -Nandgaon
-Mantnad-NH 753J - (46.800 Km )] in the State of Maharashtra on EPC mode
LIST OF CONTRACTUAL OBLIGATION

Date as per
Responsibility Obligations Refer clause Description Status as on 30.04.2019
contract
Notice inviting tender 07.12.2018
BID date BID date 02-02-18
LOA Letter of Acceptance 28-03-18
Both Signing of agreement Recital E(ii) execute this Agreement within 15 (fifteen) days of the date of issue of LOA. 16-04-18
Authority Appointed Date means that date which is later of the 15th day of the date of this Agreement, the date on which the Contractor has
delivered the Performance Security in accordance with the provisions of Article 7 and the date on which the Authority
CENH/D-1/1748/2018 on
has provided the Right of Way on no less than 90% (Ninety per cent) of the total length of Project Highway; 06-06-18
dated 06.06.2018

Contractor Scheduled Completion Date 10.3.1 The 540th (Five Hundred and Forty ) day from the Appointed Date shall be the scheduled completion date (the
"Scheduled Completion Date") 27-11-19

Contractor Expiry of maintenance period 14.1 Contractor shall maintain the Project Highway for a period of 4 years commencing from date of Provisional Certificate
(Maintenance Period) 26-11-23

Contractor Legal opinion Recital E(i) deliver to the Authority a legal opinion from the legal counsel of the selected bidder with respect to the authority of the
selected bidder to enter into this Agreement and the enforceability of the provisions thereof, within 10 (ten) days of the 07-04-18 Submitted
date of issue of LOA;

Contractor Right of Way 4.1.3 (a) upon receiving the Performance Security under Clause 7.1.1, the Right of Way in accordance with the provisions of
Clauses 8.2 and 8.3, within a period of 15 (fifteen) days from the date of this Agreement, on no less than 90% (ninety
30-04-18 73.00%
per cent) of the total length of the Project Highway;

Contractor Performance Security 7.1.1 The Contractor shall, for the performance of its obligations hereunder during the Construction Period, provide to the
Authority, within 10 (ten) days of the date of this Agreement, an irrevocable and unconditional guarantee from a Bank
in the form set forth in Schedule-G (the "Performance Security") for an amount equal to 5% (five percent) of the
25-04-18 Submitted
Contract Price. The Performance Security shall be valid until 60 (sixty) days after the Defects Liability Period.

letter intimating completion of upon completion of work or achievement of milestone


works for the portion of land EOT Letter issued to
Immediate
handed over. Authority

Contractor Obligations prior to 10.1.1 Within 20 (twenty) days of the Appointed Date, the Contractor shall
ommencement of Works 25-06-18 Completed

Contractor 10.1.1 (a) appoint its representative, duly authorised to deal with the Authority in respect of all matters under or arising out of or
relating to this 25-06-18 Completed

Contractor 10.1.1 (b) appoint a design director (the "Design Director") who will head the Contractor's design unit and shall be responsible for
surveys, investigations, collection of data, and preparation of preliminary and detailed designs; CENH/D-1/2243/2018 on
25-06-18
dated 18.07.2018

Contractor 10.1.1 (c) undertake and perform all such acts, deeds and things as may be necessary or required before commencement of
Works under and in accordance with this Agreement, the Applicable Laws and Applicable Permits; and 25-06.18 Being Completed

Contractor 10.1.1 (d) make its own arrangements for quarrying of materials needed for the Project Highway under and in accordance with
the Applicable Laws and Applicable Permits. 25-06-18 Being Completed
444 4 I 1 411414 fif 4 $41114 a 4

Contractor Applicable permit 10.1.1 The Contractor shall obtain, as required under the Applicable Laws, the following Applicable Permits:
25-06-18 Obtained
Contractor Schedule F a Permission of the State Government for extraction of boulders from quarry
25-06-18 Obtained
Contractor Schedule F b Permission of Village Panchayats and Pollution Control Board for installation of crushers
25-06-18 Obtained
Contractor Schedule F c Licence for use of explosives
25-06-18 Obtained
Contractor Schedule F d Permission of the State Government for drawing water from river/reservoir
25.06-18 Obtained
Contractor Schedule F e Licence from inspector of factories or other competent Authority for setting up batching plant
25.06-18 Obtained
Contractor Schedule F f Clearance of Pollution Control Board for setting up batching plant
25-06-18 Obtained
Contractor Schedule F g Clearance of Village Panchayats and Pollution Control Board for setting up asphalt plant
25-06-18 Obtained
Contractor Schedule F h Permission of Village Panchayats and State Government for borrow earth; and
25-06-18 Obtained
Contractor Schedule F i Any other permits or clearances required under Applicable Laws.
25-06-18 Obtained
Contractor Submission of Construction 10.1.3 Within 30 (thirty) days of the Appointed Date, the Contractor shall submit to the Authority and the Authority's
programmed Engineer a programmed (the "Programmed") for the Works, ABL/CENH/Bhadgaon
05-07-18 Chalisgaon /2018-19/52
on dated 02.06.2018.

Contractor Drawings 10.2.1 Contractor to develop Design and Drawings in conformity with Specifications and Standards set forth in Schedule D
Approved

10.2.5 AE to comment within 15 days of receipt of drawing. Contractor not obliged to wait beyond 15 days and can continue
AE Appointed on
works except in case of Major Bridge or Structure where the period is 30 days.
23.10.2018
Contractor Appointment of proof 10.2.2 The Contractor shall appoint a proof check consultant (the "Proof Consultant") after proposing to the Authority a panel
consultant of three names of qualified and experienced firms from whom the Authority may choose one to be the Proof Consultant. 25-06-18 06-08-18
Provided.

Contractor decision of Authority on proof The Authority shall, within 15 (fifteen) days of receiving a proposal from the Contractor hereunder, convey its decision,
consultant 09-07-18 30-08.18

Contractor Construction of the Project 10.3.1 The Contractor shall construct the Project Highway as specified in Schedule- B and Schedule-C, and in conformity with
Highway the Specifications and Standards set forth in Schedule-D. The Contractor shall be responsible for the correct positioning
of all parts of the Works, and shall rectify any error in the positions, levels, dimensions or alignment of the Works. The
540th (Five Hundred and fortieth ) day from the Appointed Date shall be the scheduled completion date (the 27-11-19
"Scheduled Completion Date")

Contractor Damage for delay in project 10.3.2 The Contractor shall construct the Project Highway in accordance with the Project Completion Schedule set forth in
completion schedule Schedule-J. In the event that the Contractor fails to achieve any Project Milestone or the Scheduled Completion Date
within a period of 30 (thirty) days from the date set forth in Schedule-J, unless such failure has occurred due to Force
Majeure or for reasons solely attributable to the Authority, it shall pay Damages to the Authority of a sum calculated at
the rate of 0.05% (zero point zero five percent) of the Contract Price for delay of each day reckoned from the date
specified in Schedule -J and until such Project Milestone is achieved or the Works arc completed;

Delay in achieving Mile Stones 10.3.2 & 10.3.3 Failure to achieve Project Milestone within 30 days from the date set forth In Sch J for such mile stone unless failure
due to Force Majeure or reason solely attributable to Authority. Damages @ 0.5% of Contract Price for each day of delay Mile Stone-I & II
till Milestone is achieved or till Works are completed. Achieved

Provided further that in the event Works are completed on or before the Scheduled Completion Date, the Damages paid
under c1-10.3.2 shall be refunded without interest
114 444 4 4 4 I 4 4 4 4 4 41 111411 f f if f f , 4
Authority shall first notify and take into account Contractors representations before levying damages. Contractor shall
reply within 20 days. Damages under Clause 10.3.2 shall not exceed 10% of Contract price

Maintenance during 10.4 During the Construction Period, the Contractor shall maintain, at its cost, the existing lane(s) of the Project Highway so
Construction Period that the traffic worthiness and safety thereof are at no time materially inferior as compared to their condition 10 (ten) Completed & being
06-04-18
days prior to the date of this Agreement, maintained

EOT for Completion 10.5.1 Delay in providing ROW, environmental clearances or approval of Railway authorities specified in Clause 4.1.4

COS unless an adjustment to the Scheduled Completion Date has been agreed under Article 13
COS Proposal submitted
on dated 25.08.2018

Occurrence of Force Majeure Event


10.08.2018 & 20.08.2018

Any delay, impediment or prevention caused or attributable to the Authority


Delay in approval of Proof
Consultant & Safety
Consultant
Any other cause which entitles Contractor to EOT EOT submitted on dated
31.10.2018
Application of Extension of time 10.5.2 The Contractor shall, no later than 15 (fifteen) business days from the occurrence of an event or circumstance specified
in Clause 10.5.1
EOT-1 recommended by
EE, NH Dhule to SE, Nil
Pune on 25.04.2019

Contractor Maintenance Manual 10.7 No later than 60 (sixty) days prior to the Project Completion Date, the Contractor shall, in consultation with the
Authority's Engineer, evolve a maintenance manual (the "Maintenance Manual") for the regular and preventive
12.04-19
maintenance of the Project Highway

Contractor Tests on completion 11.1.1 At least 30 (thirty) days prior to the likely completion of the Project Highway, or a Section thereof, the Contractor shall
notify the Authority's Engineer of its intent to subject the Project Highway or a Section thereof, to Tests. 12-05-19 yet to Achieve

Contractor Quality Assurance Plan 11.2.2 The Contractor shall, within 30 (thirty) days of the Appointed Date, submit to the Authority's Engineer its Quality
ABL/CENH/Bhadgaon-
Assurance Plan
05.07.18 Chalisgaon /2018-19/54
on dated 02.06.2018.

Contractor Monthly Progress Report 11.7 Monthly Progress Report to submit - within 10 days after close of each month. 10th of every
Completed
month
Contractor Suspension of unsafe 11.17.4 If suspension of construction works is for reasons not attributable to the Contractor AE shall determine any EOT Status submitted on
construction
09.10.2018
Video Recording 11.16 Video recording to be provided, covering status and progress of work in that quarter, first recording within 15 days of
the Appointed 20-06-18 Submitted

Suspension of unsafe 11.17.3 Preservation cost shall be borne by the Contractor, provided that if the suspension has occurred due to breach of this
construction agreement by the yet to Achieve

Maintenance obligations of the 14.1 Contractor shall maintain the Project Highway for a period of 4 years commencing from date of Provisional Certificate
Contractor (Maintenance 26-11-23 yet to Achieve

Maintenance Requirements 14.2 Contractor shall ensure that during Maintenance Period the Project Highway confirms to maintenance requirement set
forth in Schedule E yet to Achieve

Maintenance Programme 14.3 Contractor to prepare monthly maintenance programme (Maintenance Programme ) and submit the same to AE not
later than 10 days prior to the commencement of the month in which the maintenance is to be carried out yet to Achieve
I , , 4444 444#4441444 4 S I I 4 S

Maintenance Programme 14.3.1 The Contractor shall prepare a monthly maintenance programmed (the Maintenance Programmed") in consultation
with the Authority's Engineer and submit the same to the Authority's Engineer not later than 10 (ten) days prior to the 20th of each month yet to Achieve
commencement of the month in which the Maintenance is to be carried out

Reports of unusual occurrence 15.4 A monthly summary of such reports shall also be sent within 3 (three) business days of the closing of month. For the
purposes of this Clause 15.4, accidents and unusual occurrences on the Project Highway shall include:
(a) accident, death or severe injury to any person;
(b) damaged or dislodged fixed equipment; 3rd ()leach month yet to Achieve
(c) flooding of Project Highway; and
(d) any other unusual occurrence.

Lane Closure 14.5.2 Delay in reopening designated lane shall attract damages @ 0.1% of the monthly maintenance payment for each day of
delay yet to Achieve

Authority Authority's Engineer 18.1.1 Authority shall appoint a consulting engineering firm as set forth in Schedule N
23-10-18
18.1.2 The Authority's Engineer should be appointed within 30 days from the date of this Agreement or before declaration of
Appointed Date. The Authority shall notify the appointment or replacement of the Authority's Engineer to the 15-05-18 23-10-18
.r. —
Contractor Payment 10.1.14 Interim Payments

Contractor Advance Payments 19.2.1 The Authority shall make an interest-bearing (@ Bank RateS) advance payment (the "Advance Payment"), equal in
amount to 10 (ten) percent of the Contract Price, exclusive for mobilisation expenses. The Advance Payment for
mobilisation expenses shall be made in two instalments each equal to 5% (five percent) of the Contract Price. The
second 5% (five percent) mobilisation advance would be released after submission of utilization certificate by the
Contractor for the first 5% advance already released earlier

Contractor Advance Payments 19.2.2 Contractor to apply for first installment after AD along with an irrevocable and uncond. BG equal to 100% of such
installment 06-06-18 Payment Received

Contractor Advance Payments 19.2.4 Any time after 60 days from AD Contractor may apply for 2nd installment
06.08-18 Payment Received

Contractor payment of advence payment 19.2.5 The Advance Payment shall be paid by the Authority to the Contractor within 15 (fifteen) days of the receipt of its
respective requests in accordance with the provisions of this Clause 19.2 Work executed

Contractor Return of advance payment 19.2.7 The advance payment shall be repaid through percentage deductions from the stage payments determined by the
Authority's Engineer in accordance with Sub-Clause 19.5, as follows

(a) deductions shall commence in the next Stage Payment Statement following that in which the total of all certified
stage payments (excluding the advance payment and deductions and repayments of retention) exceeds 20% (twenty
percent) of the Contract Price; and deductions shall be made at the rate of 15% (fifteen percent) of each Stage Payment Deductions are done in
Statement until such time as the advance payment has been repaid; provided that the advance payment shall be 10-06-19 line with contract
completely repaid prior to the time when 80% (80 percent) of the Contract Price has been certified for payment
provisions

Stage Payment for Works 19.4 Contractor shall submit Stage Payment Statement by 7th day of the month to AE
7th of eachmonth Complied Monthly

19.5 Within 10 days of receipt of Stage Payment Statement pursuant to Clause 19.4,AE shall determine and recommend
release of 90% as part payment pending issue of IPC if the AE. Payment to be made within 10 days of recommendation Complied Monthly
by Electronic transfer

Monthly Maintenance Statement to be submitted by 7th of each month as per format in Sch-O
7th of eachmonth
NV, 4,111'41
f f tfl 141
Bonus for early completion 19.20 In the event that the Project Completion Date occurs prior to the Scheduled Completion Date, the Contractor shall be --w --7 —V —1, -I ---1
entitled to receive a payment of bonus equivalent to 0.03% (zero point zero three per cent) of the Contract Price for
each day by which the Project Completion Date precedes the Scheduled Completion Date, but subject to a maximum of 13-06-19 yet to Achieve
5% (five per cent) of the Contract Price.

Insurance 20.1 Contractor shall effect and maintain at its own cost the insurance specified in Sch P. ABL/NH753j/Bhadgaon -
Chalisgaon /PKG-1/2018-
19/77 on dated
23.07.2018.

Insurance for professional 20.1.6 The Contractor shall provide to the Authority, within 30 days of the Appointed Date, evidence of professional liability
liibility insurance maintained by its Design Director and/or consultants to cover the risk of professional negligence in the 05-07-18 Submitted
design of Works.

Notice to the Authority 20.2 No later than 15 (fifteen) days after the date of this Agreement, the Contractor shall by notice furnish to the Authority,
in reasonable detail, information in respect of the insurances that it proposes to effect and maintain in accordance with 30-04-18 Notified
this Article 20
20.3 All insurances obtained by the Contractor in accordance with this Article 20 shall be maintained with insurers on terms
consistent with Good Industry Practice. Within 10 (ten) days from the Appointed Date, the Contractor shall furnish to
the Authority notarised true copies 15-06-18 Being Maintained
of the certificate(s) of insurance, copies of insurance policies and premia payment receipts in respect of such insurance,

Duty to report Force Majeure 21.5.1 Upon occurrence of a Force Majeure event the affected party shall by Notice report to other party forthwith
Immediate Notified
Event
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.






• Annexure - I
• Mobilization Status





4
4



4
411,
Ashoka Buildcon Limited Page 84
•• Project Name - Up-gradation of Bhadgaon- Chalisgaon (section II )of NH 753J from chainage 56+200 Km to
103+000 Km to Two lane with paved shoulders/ Four Lane configuration of [ Jalgaon - Bhadgaon -Chalisgaon
-Nandgaon -Manmad-NH 753J - (46.800 Km )] in the State of Maharashtra on EPC mode

Mobilization Status of Plant

Sr. No. Description of Activities Status Remarks

Setup of Camp location (Nagardevla)


1
Ch:70+680 LHS
A Erection & commissioning of Weigh Bridge. Completed
Erection & commissioning of Weigh Bridge
B Completed
for RMC Plant
C RMC Plant of 120 Cum/hr Completed

D Erection & Commissioning of RMC Plant Completed

E Labour Camp and Site office Set-up Completed


F Laboratory Set up- Central LAB Completed
Setup of Camp location (Gondgaon) 5km
2
from Ch:75+000 RHS
A Setup Quarry & Crusher Area Completed
B Erection & commissioning of WMM Plant. WIP

C Erection & commissioning of Weigh Bridge. Completed


Erection & commissioning of Drum Mix
D Completed
Plant
Setup of Camp location
3
(Chalisgaon)Ch:91+500 RHS
C RMC Plant of 90 Cum/hr Completed Reached at site

D Erection & Commissioning of RMC Plant Completed

E Labour Camp and Site office Set-up Completed


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

Annexure - j
Updated Strip chart showing obstruction in Work

Ashoka Buildcon Limited Page 85


10 ••••••••••••••••••••••••••••••••••

-,0111 411111171'

cos& addiuonal Realignment

Forest Permission/ Overlay


LHs-mcw

Land Disputes/Obstruction By Farm.

Religious Structure

Electric Line & Pole

ater Pipe Line

Trees .

Encroachments / 0 ,

,4! Fr., ii,, 882988289888988887,988 8 - ,.' • '.. :- .- - - - _ ,. ,...- - '.... ,, ,0 0 „0 0 0 .


Chalnage
I .0 .0 i "'.: : ".: : r. ro '''... L'.,:.:D
' iiiiiiii .1) i i "- sr ...
_ 0 0 0
II IA %A
I
a2
If) th LI tr. IA %A 411 til u, in' u, vt u, . 1
7 44 V,

Trees

Electric Line & Pole

u Religious Structure
X
_ Land Disputes/Obstruction By Farmer

Forest Permission/ Overlay

tS& additional Realignment


1

ilealignment as per Schedule R. ' .

COS& additional Realignment

Forest Permission/ Overlay


ifig mc,rit

Land Disputes/Obstruction Ry Farmer

Religious Structure

Electric Line & Pole ,


Water Pipe Line

Trees

Encroachments / Obstruction

00.0000Q000000000 .9 .Q. 000 ... ,


h.
Chainage g4 74 ,T, '4, 7, g,' ,:r, 4 4 4 4 4 4 4 :,-• 4 4 ,Y. ,,, 7, g,' ,,, ,r, ,,, ,,," - ,0 -q, .. ,,,, ,- ,... ,... e. ,,-. r, n r, n n CO 0 LO 03 CO 02 CO
,f,
Os Os 0^ Os 0, Os Os Os 0, 0, 0 0 0 C,
t2 .2 4S tfri r> ,/i t2 t2 t2 r ,0 tO TO tO tin
, .43 % r3 ra ,i4 s2 ' 2. ,‘
i ' Z 2 "' -* '" :2

Trees

Water Pipe Line


Electric Line & Pole
3
Religious Structure
7
'4 Land Disputes/Obstruction By arnt '
= .
Forest Permission/ Overlay r'

COS & additional Realignment

t
• IP • • • • EP ek • • • • • • • •••••••• P•MPOPP•P

' ealignment as per .

COS & addMonal Realignment

Forest Permission/ Overlay

Land Disputes/Obstruction By Farm

Religious Structure

Electric Line & PoO ,_. - ....


Water Pipe Li

Trees

_
Encroa

onotitit i i vinotwontatoto
_ ,. .. ,.. .2 ,

66720

66740
66730

66750
— „.._. ,..

66520
66530
Chalnage
$ IWIPOIMI
. 10- 14 '° SSS 'ZS. S.1.4 S
Encroachmen
Trees

Water Pipe Line



Electric Line & Pole
3
Religious Structure

Land Disputes/Obstruction By Farm

Forest Permission/ Overlay

COS & additional Realignment


eidigninent as per Schedule B '

COS & additional Realtgnmen

Forest Permission/ Overlay

Land Disputes/ Obstruction By Farmer


_—.............—. J —,
Religious Structure _
Electric Li n e & Pole
Water Pipe Line
Trees

11
°. e
.2 i ii s° °
ii.. .„i 9 s ° ,::.. .♦
e.s T° g g 2 P. 8 "
T' 8 ' '2 2 ? 8 .5', , -In r. ..., es,' in •-i ti. en .4 en
Chain:age ..., or ,,, u• .,.. o ..,. .v. 0 0 0 0 0 neu •-• •-• •-• •-• •-• •-• •-. ... en eV en .4 en n4 e. .4 en .4 en en en en en en en ser n• n• ne * VI LA IA VI IA tA VI
hnnnnnnnnnnn n. n n n
IA VI
n 4, 0 J1 In ,
n r. nnnnn
.
..
..0
. e,n n- e,,le-- .... n. n r. n n. nnnnn
4, 4) 4, 4) 4> vrs .. J. 4, •0 4:. •12 4, . . '4 . .41
nnn.....nnnn.nnnnt.nnnnnn n. n
V) ,1)
.0 60 ',0,.. .._ ..
n. .. 1
n , n. nnnn
...
n. n n• n 1, in
in -nr.

II

Trees
Water Pipe Line L
Electric Line & Pole
Religious Structure

la nd DIsputes/Obstru, ■
Forest Permission/ Overia -
COS & additional Realignment

Beall

4 4 4, t t l t t ( t. t ( ( ( t t t t ( tt
0••••••••••••••*•••••••peppe•popp•o.1

„., . ...,..... ., .—, —.......... . , ..


COS &additional Realignment
Permission/ Overlay
• Disutes/Obstruction By Farr ■ I
I 111 111 I II II III
Igious Structure
lc Line & Pole
11 III I
r Pipe Line I 11111 II■II 1111111111■ -a

■■11■~■■ 1!_■ ■_■■~■■11I1


' s
1911r1111,1111r9,1 ^
I ■!I! ■■■ 1
8 _„._ . . - ,—
Chalnage Or,; ca SO CO CO CO Os 0, Os o• cr. o., .3. O4 04 .,,,
.07 . ,i, ., .cse; ,,,-
,..! — 72 . . :, . .— ..-:GO
e., ee Of O.. fsl - •• -
-f CV C-I "I el Of CO * . * WI U5' VI
r- l•-• N I, 6, Li t, I, 1,ta „Iii e• r-• t.
.. I,L., I,I, ,.. 07 % a? . : CO
YO 4.
: .• 33 8 31 8 8 8 4 8 8 33 8.33 33' 1 2 '


11•1111 Ill II■i
Trees ME IIIII i• MIN 1

Water Pipe Line I il=■ I 1 I NM . ■


Electric Line & Pole I I I II I
Religious Structure > A

Ii
ii i
Land Disputes/Ob •.
Forest Permission/ Dire a
COS & addin
COS &additional Realignment

Forest Permission/ Overlay

.. I Land Disputes/Obstruction By Farmer .


,A
X Religious Structure
...1
Electric Line & Pole
Water Pipe Line
Trees
Encroachments / Ob
0ffi
-- t i r, utomm
; ...._-_
. i
tt fmt. ._
mittintoptisonsatonmswtw
..- ...- . _
. -
ilia inage - - .. , . .. .. .. .. .. .. . .. . . . . . ............

Encroachm
Trees
Water Pipe tine
Electric Line & Pole
,Religious Structure
T:
Land Disputes/Obstruction
rz
Forest Permission/ Overlay

COS & additional Realignment

- - - - - -
P • • • IP IP • • • IP • • • • IP • • • • •11, 100•00•11#••••P

COS & additional Realignment

Forest Permission/Overlay
....
, 'i' Land Disputes/Obstruction By Farm

= Religious Structure

Electric Line & Pole

Water Pipe Line

Trees

En.

70160
70170
70100
.0 0 0 0 0 0 0 0 4, 41 NO 41 •.0 ,12 0 .0 0 0 41 ,0 4. 4) ,0 ,0 *114111ftittli*M1"4* •
1"111141t.
7 P..
If.

Trees

Water Pipe Line

Electric Line & Pole


•,,
• Religiel15 Structure

Land Disputes/Obstruction By Fa

Forest Permission/ Overlay

COS & additional Realignment


,
Realignment as per Schedul
COS & additional Realignmen
Forest Permission/ Overlay .
-. —
in-MCW

Land Disputes/Obstruction By Farmer


= Religious Structure
Electric Line & P.
Water Pipe Line
Trees ri

70530
70510
70520
70490
70500
70270

Chainage '4411F-11-Mt044* 'g 41440134


,_,.:__:
. _ 14110*MH4RICHaitinlin
-;______._,___„_„'__:.:144MOMMIWW
. . . , . . . . - _ ._, — ,1*,
- - - - , _


Trees
Water Pipe Line
Electric Line & Pole ■
RHS.MCW

Religious Structure •
Land Disputes/Obstruction.
Forest Permission/ Overlay
._ _.
COS & additional Realignment
Itealignme
4...

(((ll (( (It( (t (((((


et! 1PIP•40,4P••••••IPPIPWIP.PW1'P? r r et,

401

Realignment as per Sc edu e B '

COS & additional Realignment

Forest Permission/ Overlay


3
`±' Land Disputes/Obstruction By Farm

fr?Religmus Structure

Electric Une &P9.1e. .., •

r Pipe -

1.
1111
71410
71430
71440
.. . .'-
Mimeo 2 .... ••••
Ln In •.0 . .0 .1 4, ...is ,
I, I, 1, TZ111Z 1• 1,- N 1, 1, 1,.. 1, h,.1,. IS N. 1, 1,..... , o.,.- :

Encroa

Trees t
Water Pi: s, :,-.
Electric Line & Pole

Religious Structure
7
Land Disputes/Obstruction By Fa
2
Forest Permission/ Overlay

COS & additional Realignment

Realignment as per Schedule B


COS & additional Realignment

Forest Permission/ Overlay

7,- IA rid Disputes/Obstruction

= Religious Structure
...1
-----.
Electric Line & Pole

Water Pipe Line

Trees API
Encroachments /
_. N. ,
Chainage en . Z c r , "
,ce..... o g ..c
. goo. '
c> 0
en ey N en en en en en en
0 44 en
r
Vi P.
IN .1 en en 1,
.. 4' .1 rel
ee• en en
en
lel ,...
el te, el en
OS
en en ne 71" 1:: 'e.; Y. . . LI: , . .. .,-, rfl -
-
V) VI 4 rt; to ,Il 7.• .1! 75 4i, rj 3 2 t,'6 2 2, — 1,. g.":
. .,

Trees

Water Pipe Line


Electric Line & Pole

,..., Religious Structure

S
ce .......• ....
Forest Permission/ Overlay

COS& additional Realignmen:s

ealignmes

4 4 4. t ((tt (t l( ll(
IP.PIPIPW4P,P4P•••••••••.11, 41Per 41^,,PftIP•P

ea grime, impel- .
I
COS &addiuonal Realignment '

Forest Permission/ Overlay


3 -
f Land Disputes/Obstruction By
. ___,...
= Religious Structure ,
--,
Electric Line & Pole' . , •
Water Pipe Line
"Frees

73530
73510
o o o ci ci o

73520
73430
Chainage : ., er• as ' o o 0- ._- co
00
o• o ... ,,, m 222g8882 2 - ., , - -. :-.
" na e^.4 IN r. CV 1,4 ,1 r..1 ev tv N
r. e, eq mr e. et, ev tv na to en en NI r, en en en en en en tn en en en en e.en 01 rn VI •
tr, 1.- PS tt Pl. .t,gh eit b.-Rab, b, sis, r. n., b. re. r., b...4.,_,at. n. ti. ra r. e,s, n. e- n. n. n. n. e. n. n. r. . r. r. r. in g ' 4145114011011011EMEN:'

En
Trees
Water Pipe Line
Electric Line & Po!e
3
Li Religious Srrtat.ire
X .
Land Disputes/Obstruction By Farm
E
Forest Permission/ Overlay

COS & additional Realignment

Realignment as per Schedule B '


la,
Realignment as per.
,
COS& additional Realignment iipp
Forest Permission/ Overlay

Land Disputes/Obstruction By Farmer

Religious Structure
t
Electric Line & Pole

Water Pipe Lane

Trees

74040I
73970 I

74010 I

74050
• • 8 2 2 g ? ..?, 2 P. 8 8 E 7, 8 • — -'4.

73920
73930
73940
73950

73980

74030
73960
2 ::.,' 2 F, 2 P. c2. —8 8 2 P, nsg 2 --

73990
74000

74020
, o'' $ IT CT
Chainage •0 1.-- 1--- I--- 1.-- 1--- I--- 1.-- - .• ..
P^
P. P. P P. P. g'.
1,- 1--- 1--- CO CO CO OD CO CO CO CO OD v. no n. NI n.I n1 (4
... ...... ... _ ._ _, ...... _ . '

p.
. P.P.P.P .
P.P .P.P.P.g'

Trees

Water Pipe Line


Electric lane & Pole
111
Religious Structure

_... ____,..
ForeSt Permission/Overlay -

COS & additional Realignmen

Realignment as

ti t4.(4,4„( (ti4 t t 4 4 ktttllttlltttlt


1110•••••••••••••••••••••••••••"•,,,,

,----,------ ,...,
COS & additional Realignment

Forest Permission/ Ove

— land Disputes/Obstruction y
in I I 111 II I I I 111 II
Religious Structure ,' ^
Electric Line & Pole . 11
Water Pipe Line
s

11 I II I

Chalnage m" ...tqr,!..- ,c, Is N §


..e.1-Z.I.ZVVYi=1 1...-1.-v.
r. n .r. r. r. N N N N r., r. rs I-, 11. g", 1, r• 5,- r.s.,-ts
N N N
d d • t . V. ... V. * V. •Ir V d d d * d d
s...c.r.r,r.r...e.c.e-r..r.rst-r..P..r..Ntst, t, r-
dstddddd ..d.:4- 0tel
C.
NONVI
t..,,,t".,rst-.Nt'sr,t,t.r.-r.st"-t"--,r, r
Encroachments / 0: OM MOM MEM■MOO
Trees
Water Pipe Line
Electric Line & Pole I I II 11111 I
Religious Structure
7
,),
' Land Disputes/Obstruction By Far
Forest Permission/ Overlay

COS& additional Realignment


COS & additional Realignment

Forest Permission/Overlay - .
3
2 Land Disputes/Obstruct'
,.:.,
:-.-: Religious Structure

Electric Line & Pole

Water Pipe Line


Trees

Encroachments / Obs
_
g

75870
, . • —. ,.... .., v. ,..0 1.•-• tO . •-• oc co C. CO •-• c. en co .4) n co -. n m co F - - E ''.. - - F a' 2 2 2 2 2.
Chainage rO M. M CO 01, ol co In 1/1 *.f. an In VI *0 Wit+4,43
4KW44414: 2 "'
.. 2h fr; 5.1 2 2 2 2
I
, I, I, I, 1, r, t, I, 1,

Encroachments / Obstruction
Trees

Water Pipe Line •


Electric Line & Pole

Religious Structure .
Ial CI I .11...
Land
rc •
Forest Permission./ Overtay

COS & additional Realignment

tit t t t 4. t t ttt lc tt l tt ( t
P•••.•••••••••••••••01PWIP • telP•e•••,

COS & additional Realignment '

Forest Permission/ Overlay

' 7 Land Disputes/Obstruction By F3 .

73 Religious Structure
Electric Line &Pole
Water Pipe Line
I
Trees

88822g $
0
8' 3 g 8 8 8 2
g g $ 6 ZS P 8 8 8 2 g g,' g3 8 S P 8 - • 2 2 g V' $ ‘.`7= g 8 8 8 2 F.; g$5,'sg.' 8 8 2 2 g ? E3 .13 g 8 8 8
Chalnage a...........r4,...4,1,4reve4c4e4rmmmmmmmmM
.o.o...p.o..o.4,..0.o....o..,,
1.
....1,,,NNI., ,N,1,4,NN,,NI
04›.4p...0 ,4) ,c4a
,NNNNN,NNt...1,NNN 1
e
E l '014444144W
'sr.' „,, -
t $$ $1,
NNO.1....NI,
.
1 1 .o .s:
e. c-; to
.-. 73. ', Z 'V'S L'S , 73 ti; ?It 53 33 33 3 8 13 33 8 11 8
o
1,,,..,,,f,,,,,,l ,,,f , 1%. ,,,,I,V,.. , -

Trees
a
Water Pipe Line ■ ... 0.-

Electric Line & Pole


Religious Structure
7
r:: Land Disputes/Obstru on y
cc
Forest Permission/ Overlay

ii COS 8: additional Realignment

Realignment as per Schedule


4
Realignment as per Schedule

COS & additional Realignment


_
ForestPemission/Overlay
3
...,
Land Disputes/Obstruction
in
= Religious Structure
Eleartajne&POle
,-, le.41,, 1 1
• MONNiI litk itfIlfi1NNN M
Water Pipe Line

Trees
Encroachments /Obstruction 1
3 111
000000000000000000 ocaopecii 000000000000000000000040000000000000000000000000000
.-.e.,,o.irioi0,000...e.m.eioireino.o—ie.m.iio.onceirioi,m,v.i,000 , 0—e..m.rioiorm ies
Chainage ia ria ry
o—r.m.rio,o,moio—e.wio., —e.*io,xi
en en en en rn en 0 a it * ..... a a in an in tie in in in in in in a 0 0 a 0 0 a 0 0
ciii a, oi a, iiri it oii ea oii Oaaa0aoaea •-• •-• •-• •-• •-• •-• •-• -. •-• •-• ni rii ris ,
000000000,,,,,,,, ,n,,i+,,,,r,,,,,e ,t,,,,,,,,,,,na.,,,,rn,,,,t.,,nr.r , ,,,r,nnnni,,,i,ntse,p.,
rni...,re..ni,nt..ntsi...,i,e......1,,f, ,,,,nnr..,,....c.
,r.nr,r, ,,ro...,....i.,Nnie,r,nni.ne..nrni..nr.nint.nrsnrainn,r.,,....,1,11,1,11,r,

Encroachments / Obstruction
Trees
,-,
WaterNpeLine 3. 3 33333 3 3 3 3. ll
Electric Line & Pole
3
u Religious Structure
z
,,..=
ON
Land Disputes/ObstructionBy Farmer
Y ii,..
Forest Permission/ Overlay

COS & additional Realignment

1 4 4 4 4 (llt ((llt (t I I (l
e•- •••••••••••••••••••••••••••••••

ea gnniin per ue
I .
COS & additional Realignment

Forest Permission/ Overlay


3
i_i
x Land Disputes/Obstruction By Pa
,..;,
5 Religious Structure •
Electric Line & Pole
I I I
Water Pipe Line
es

78360
—8" —. " m 7 .,2 2 2 8 8 8 :2 2 2 8
8 8 8 :2 2 g
0 0 0
_ - 7,28
Chalnage ..,, ,-, ,i,, - .'or 0.I NI r4 f•I CV 01 04 ne ne 01 nl 01 01 00 CO Of 1/1 . WI tfl tr, 1.0
,-. 1.1. 'e P P. , - P. 7! ,-. r. , - ,. ,- 7' 7 7. ... r. g CO CO CO CO CO CO 0 . CO C0 CO CO CO CO CO CO CO CO CO CO CO 01 CO CO CO CO CO 01 CO CO 01 CO CO CO CO CO CO
ir, t, r. I', C.. e...e., N. IN C,r,C,r, 1,, n n n P., e. is Cs., r, IN t, I
,, , ,I , , t,I,r, , , ts I , Vs I, n n n n n n n n t• n 11,n n n n n

III

EBIIIIIIIIIL ,-..-....

Electric Line & Pole


Rellizmas Striicture
111 III
1
Land Disputes/Obstruction By Fa

Forest Permission/ Overlay

COS &additional Realignment •


'
COS & additional Realignment

Forest Permission/ Overlay


LHS-MCW

Land Disputes/Obstruction By Fanner .


Religious Structure
I
Electric Line & Pole . ••
—.
Water Pipe Line

Trees 1.

Encroachments / Obstruction.
111 ir.-Y

S! m? 8 -_. 8 2 7 8 2 I! 8 8 8 2 g 2 7 5,'
,,,,,o.o....,...0.0...0.0c.c..,,......, 2
co 2 ° ,T, $ ' FS 2 8 8 8 "2 7 ' 2 2 8 ..-":. ' - -. - 1 - .. :• - -,-- • -s--. .. - 2 .,. - ..
cbalnage
mcomm.......=.mw=.
c. r. c. c, c... es n es IN I, II, I, r. irs rs r es r ts co itErcrcE&rcgragiWgg i' ggg
n es r ..... es es es es es is es n ts I, .
.. . ... „ .. „, .. • .. ,, , . . ..:

En .,

Trees

Water Pipe Line


Electric Line & Pole
3
X
Religious Structure
.II
Land Disputes/Obstruction By
;
Forest Permission/ Overlay •
ad
COS & additional Realignmen
:A III

10-4.) el t. ( ( t ( l ( t t t ( l t ( tttttttt
P e • • IP • • • • • • • • • • • • • • • ••••••••PWIP•11,

COS & additional Realignment


8 8 8 8 8.8 8 8 8 88 8 8 8_8._8_,8 81
Forest Permission/ Overlay
3
`±' Land Disputes/Obstruction By Fanner—

...1 Religious Structure


Electric Line & Pole
Water Pipe Line
aimi
I •
Trees
Encroachments / Obstrucd

( hainage i ;7, 3 Fsi. 3 ,..7. .3 „, ,,, ,,, V" Vi T,. F.,, 3 F,, 3 E0000000
!I 3 3 F c: F, F, FFFF 3 :-.. .T, F ?, r„ ..f. F, si,. F. 8 22F4 A,7,222F822AA A222,1.822'2 AAS2AA.822
a. a a a. N.
NNNNNNNN.
a. 0,
N N
0, 0' 0
N.
0 0 0 0 7 0
N. N. N N
TO dr,8888888,28g0000000000000
0 0, 0, CP 0 0, CO a' a' 0 0, CO 0, 0, 0, Co 0 0, CO CP CO 0 CT CP CP 0, 0 CO g T, : 0: g a, r, &
N. N N. N N. N. ,.... N. N N. N. N. N. N N. N. N N N. N. N N N ‘..... N. NNNNN I,1,1-, 1, 1, 1, 1, 11., COCOCOOCCOO,COCOODOCCOCOCOCOCOCOCOOCCOCOOCCOCO

Encroachments / Obstru.
Trees
Water Pipe lane
Electric Line & Pole II

= • ;,:rt,--,,
ct
Forest Permission/ Overlay

COS& 4-...Y...
iL

rest Permission/ Overlay


rid Disputes/Obstruction By Farmer
Religiiiu% Structure '."'11
ectric Line & Pole
ater Pipe Line
Trees
Encroachments / Obstructi •
000fp000g000g0000m0000poeoe00000.000000000040gSg
mv.,......-m.....,...0-,.....,.....--,m,,,,.,.m.-.,m,,,, ,,i; ,"--,
. . — 2.218.92AS22P2g82,921§
Chainage e.e,e.e.e.e.,..mmm,.,mmmmmm ****** .....e**
00.0000000.000000000.00.000.000.000000000.0
.i.i.i.-0.0.0.0.0.0
.e so
00
I, ps ,
82gOggggggggg e'°©
WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW WWWWWWWWWWWWWWWOMMWO

Encroachments / Obstruction
Trees
Water Pipe Line
Electric Line & Pole
Religious Structure
7
,Land Disputes/Obstruction B ,F
cr
Forest Permission/ 0 •
._ ..s.
COS & additional Realignment
P • • • • • • • • • • • • • • • • IP • • • • • • IP • • f elPt • et •

COS& additional Realignment

Forest Permission/ Overlay


t
._ Land Disputes/Obstruction By Farmer
n
5 Religious Structure _
Electric Line & Pole'
Water Pipe Line
Trees MIMI
.

..7O2 ,!.@?22g?...2,TER8 .

06L 1 8
00818
01818
02818
Chalnage 0 22?2.7g,75!8 0 2gg2g2W8
w .,..„, .......... ,,,,,,,,,.......,*,,,,mmmmmm.
7g.Tgg282g
• . • ... — • VI IA Ira
e.
r.
mcommcommcommwmcommoacomoommcomwmcommwwwwwcom COCI;;;;;I m ' .... . . .. ,
To.

Encroachments / Obstruction
Trees
Water Pipe Line
Electric Line & Pole 11
Religious Structure
E
.),-' Land Disputes/Obstruction By Farm
Forest Permission/ Overlay

COS & additional Realignment


COS & additional

Forest Permission/ Overlay


3
Li
.a. 1 0AAPIIRAL900,SE6ELPYFa
. "
= ,
: M7—•
Electric Line & Pole V
Water Pipe Line 8
2
Trees

I.

MI
MI
*
Encroachments / Obstruct
4

82390
Chain:age 2g7.25,3,9-ggg'g2:?253Pg?..8'2g$gT,P2?822g$g 2 F2g8'2A 7 '2,9gg8'2g$2 gpS'
F'.'ir(4"TFggTgg2222Z-4-4Waggig-4-4=f4
wwwwwwwwwwwww000000000000000000000
PI
SI
,..ItAAX1r.r.g115
00000000
,,44;W.4
00000000000
,T.,..A
00000

ii
Trees D N

Water Pipe Line


.
Electric Line & Pole =
3
u Religious Structure
2
Land
s
Forest Permission/ Overlay
WIT1 7,74"71,17lr zq. sca malleif
COS & additional Realignment
8 8, 8 8 88, 8 8 8 4,8,8 GA 8.8„8 8 8 8 8 8 8,8 8 8 8 8 8,_8 8 8

i_ 1

tI t)t lt t llt l(
r e••EPIPIP•IPIPP•tet••••••ePelPIP e,t1P•tIPIP

ea giun

COS & additIonal Realignment •


II
IIIIIIIIII I
IIIIIIIIIIIII IIIII
IIIIIIIIIIIIII
III I
IIIIIII I
IIIIIII I
IIIIIIII I
III IIIIII

Forest Permission/ Overlay 1
11 11111 1111 11 111 11
r land Disputes/Onstruction By a
I III III I I III II I I I II I II
P Religious Structure
1111 11 11 NMI II III I MI 11 111 11 INN 111■1111 MEIN 1 MI SIN
Electric line & Pole
Water Pipe Line II I II IIIII I 11111 II III

II III
00
'UIIII I 1111
2
1
___ ___,._
• ;..;. a
Cbal nage e." ,F2' F 'fi ,§' F gl F 1
r . fil . - . - - ••• g .._,,,...... .

: ;a
/0. roe . v. (44 IV 0•11 Ve 1.4

a SI ; ; ; ; ; a ; al ; ; ; 1Z.' ; ; a ; ; " ; ; a a a a . . a a a ; a cr2, ; a .2 a a a ; a a ; a 2 aaa `a !,;M


3 al i' . ,* t14. t rz2. -_ cc..1,2 i. 12
In IIII■1111 n NI IN Mill IIIIII II II MOW
Trees
Water Pipe Line
Electric lane & Pole
II IIIIIII II II IIIIIII
I I II IIII IIIIIIIIIII III 1IIHIIIIIIIIIIIIIIIIIIIIlIIII IIIIIIII
I I I

Religiete: Structure
Ws-Ys

Disputes/Obstruction By Far
orest Permission/ Overlay

COS & additional Realignment

1.5
COS & additional Realignment

Forest Permission/ Overlay


.-..t.
57 Land Disputes/Obstruction By Farmer

= Relrgum, Structure
Electric Line & Pole

Water Pipe Line

frees

84240
7

84220 -
Encroachments / Obstruction

83910
83880
83890
83870

83900

04210

84230
1... e•
Chalnage co. o% e, 0,
PI rn en ..... . . .. . . .. ,
CO Oa CO

Encroachm • ___
Trees

Water Pipe Line


Electric Line & Pole
RIIS•MCW

Religious Structure

Land Disputes/Obstruction By Farmer

Forest Permission/ Overlay .

COS& additional Realignment


re•••••,•11,4P4PIPP•,00.40•••fpetw•er tr.

Realignment as per . ', I


r
COS& additional Realignment '

...
Forest Permission/ Overlay
.
; Land Disputes/Obstruction Ry Farin

Religious Structure

Electric Line & Pole

Water Pipe Line

Trees

•••
Chalnage
4 .,- t: V CO
4 := i! 4 V ,. I e. t..
1' IP . s'• +4, V. ••• i • .. V` V .1. 0, , , , In , , 5 0, V. n „, ,.,-., '4.1, ,
CO CO 03 CO 03 CO CO 03 03 03 CO 03 CO 03 03 CO CO 0 0
.t. 1, et
CO 03 0 03 00 CO CO 03 CO 0? 03 GO CO 0 CO 0 CO CO 0 CO 03 CO 03 m CO CO CO CO CO CO (r. m po CO CO 0 CO 33 CO GC 03 CO CO CO CO CO CO 03. 0 0 ..

Trees
Water Pipe Line

Electric line & Po:e

Religious Structure

Land Disputes/Obstruction By Fa
..sese
Forest Permission/ Overlay

COS& additional Realignment

•• •
1•q

CO S &

Forest Permission/ Overlay ..


3
,_;
7 Lan 1.
,.i.
=
Electric tine & Pole
Water Pipe Line
Trees . . II
RI
.....^ -:-. 7..
s .s ,s:
. g. .
g§ , .. .a.r; en '-- .; ,. . . Amm[4-
85420
85430
85400

P ,.• .;. :.; ‘& <,


Chainage RRE
cos a
.
v a r. a ri: a
-.7
VI in In N N N ..0
. V rt, 2 2
r-
,'; C O,-11-111444
$

Encroi
Trees
Water Pipe Line
Electric Line & Pole ..
3
u Religious Structure I
X
ir, Land Disputes/Obstruction By F
1 -
Forest Permission/ Overlay

COS & additional Realignmen..

. ealignmeritas . Saiedu
- -—
PIP•••••0•0•0•IPP••••IPIP•IPPIIPIPt•te IPPte,

COS & additional Realignment

Forest Permiss:on/ Overlay -


c.:
2 Lind Disputes/Obstruction By
,i,
= Religious Structure

Electric Line & Pole

Water Pipe Line

Trees

Encroachments / Obstruction

[hal n.lge ... .... .... ••••• . . lue 1.4 ••• I NI 0 4 ••• 14 N P..S. MI 4.) 101 MI NN
01 4 4 4' a t a, ;,‘,.e., - 4 4 g, 43 a a 4 4 4 4 '4 , a 4, 4' 4444.'6,. a . 6, .-E. 4 ,,, , ,.,, 4 4 4 4 4 1 4 .,, .., ,,, ., 4 ., .. 4 4 4 4 4 1' 4
,, . 'I' 4
Encroachments / Obstruction
Trees

Water Pipe Line


Electric Line & Pole

.. Religious Structure

Land Disputes/Obstruction By Farmer

Forest Permission/ Overlay

COS & addmonal RealIgnrnent


COS & additional Realign ..

Forest Permission/ Overlay


> .
Land Disputes/Obstruction By Farm

= P,1::,,,,,
. ,, ,::-,,:turr ,
Electric lane & Pole

Water Pipe Line

Trees

Chainage
0 -O
O -•
.
err
a.
-=
o' 0 ,,..,
0
o ,-.:. ., ,,,, ,
o oo 0 ga.... ;
4 S. 0
,
.,;.,.,-17::,;"2 7
c .27
... F.Z.,,, 1
,.. , a " 7 ,.. g 2., ,.., .,.,lii! 741. °
4,,,,iiitg.:1
. .
7 cT
t ... Z o e. ..
t". ';95-1IFT72.9.27Ta;'",i'Z

Encroachments / Obstruction
Trees

Water Pipe Line


Electric Line & Pole
3
c-i Religious Structure
X ,
=' Land Disputes/Obstruction By.
Ei
Forest Permission/ Overlay •

COS& additional Realignment

• t tllt(llt t tt
r ett•reette••••••et fteve•rn tee et

Realignments*

COS & additional Realignment

Forest Permission/ Overlay


‘...,
7 Land Disputes/Obstruction By
.;,
7-: Religious Structure
Electric Line & Pole
Water Pipe Line
Trees
Encroachments t , 1 . 4• . —

•eo ee -• .. .... • . ,....


Chalnage
- t. . . ...;, 'us
.i .Zi . 'e 1-.; re
. e !:-- - L;c"i',1',.'6',Z6- !:-.1,7itc̀,,%',I,ILZtzt;tii,7, N. Z41T22°,2 2.'
1 s% %1'7,T2221' C.o' 13 co co co °'
co co
'6 C0 CO CO 0. CO CO CO CO 04 CO CO CO CO CO cO as
co "
x <0 "
0 CO CO c°
0 02

Encroachments / Obstruction
Trees
Water Pipe Line
Electric Line & Pole
.. Religious Structure
i:
= Land Disputes/Obstruction By
=
Forest Permission/ Overlay

COS & additional Realignment

e.
COS & additional Real

Forest Permission/ Overlay -


LHS-MCW

Land Disputes/Obstruction By Fa

Religious Structure

Electric Line & Pole


I i.R..

Water Pipe Line

Trees

.
ClminJge
,,,.7 Ptr g .
g e ,..,42 , T .., 7- - N 01 in g g 0 * en U24'1
CO
e` C.
Z.
- t:.; Fr - .- 1 g
;) CO el In 0r....
11;14t44514141R-
WIr4ififil

Encroachments / Obstruction
Trees
Water Pipe Line
Electric Line & Pole
RHS-MCW

Religious Structure

Land Disputes/0

Forest Permission/ Overlay'.


- _
COS & additional Realignment

__ _ I_

l( lt lt t l t t t ( ( ( ( Lt t.
eerretecereetereeereeer verefeeceeee

COS & additional Realignment


Forest Permission/ Overlay

IIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIilllll
LHS-MCW

Land Disputes/Obstruction By Pa N
Religious Structure u
I .............. n......III
Electric Line & Pole
'.; .; 111111111111111111111111
I

Water Pipe Line I 11 I


+ tO

Trees
11111111111111111111 1 1111111111NH 1111111
1

Encroachments, Obstruction 1

90020
Chainage ,:” I 0., X' V 4, V ' VC4 COCO * TI 'C00:*,, GOCPCO
tis' .,,, .,,, c,, a,• ..., . 317. ,..,,
. il., '.
:it 1 g: ci, T.
Moat° X CO CD 03 CO OW CAA,000:, 0.
, ,
w (ACCCOCCC0000:“005‘00t,
,.,....— ,.,
WI:GODC0 MM. ,.
..,,, —,,, 1

Encroachments / Obstruction , II IN
Water Pipe Line IIII I 111 IIIIII
Electric Line & Pole
i-i Religious Structure
Land Disputes/Obstruction By Farmer
ii
Forest Permission/ Overlay
COS & additional Realignment
Realignment as per Schedule 8
Realignment as per ScilgliIMP

COS & additional Realignment

Forest Permission/ Overlay

7 Land Disputes/Obstruction By Farmer


,.:,
7,, Religious Structure
Electric Line & Pole
Water Pipe Line
Trees
Encroachments/Obstruction

$ . 2 - T. c̀r43 ' 8 a
M 8 T <4 2 ? ' 8 .,. 8 3 8 ' g, g g 2 ,s. '" 8 8 ' ,,., 'g g 1' g: 1' . F._ '" '"
...-,, c 0 .0 0 0 0 e
Chainage . en

Encroachments / Obstruction
Trees
Water Pipe Line
Electric Line & Pole
RHS-MCW

Religious Structure:— --'''

Land Disputes/0

Forest Permission/ Ov:.


.—., . .
COS &additional Realignment

•alignment
• as per Sched '

( ( ( ( ( ( ( ( ( ( ( ( ( ( (
Realignmentasper ScheduleB
&additional Realignment
stPermission/Overlay
"ILHS-14CW

Disputes/Obstruction ByFarmer
Il
irlfpous Structure '
ria

E
a.
-v
g_

WerPipe Line
.....

111

.
117
112

14 •

18.'
11.
E

141

147

151

157
12 1

172
9171

177
162
3

1 3•

13*
pp

16'
n

11
11
10

10

11
11

11
11
10
10

12
12

12

12

13
12

12

12

13

.13
13

13

13
12

13

13
12

14

14

IS
14

IS

IS
IS

IS
15

16
15

8
16

16

16

917

17
17
17

7
17

8
1•
I•
1

I
I

I
V
7.

WaterPipeLine
Electric Line&Pole
iilismcw

Religious Structure
Disputes/Obstruction By Farmer
R est Permission/ Overlay
z

.
71.,
-
d
-1

A
U
COS &additl. 0 ''.-1.i.:'

Forest Permission/ Overlay


....,
y Land Disputes/Obstruction 13y Farm*?
Ez3 Religious Structure

Electric Line & Pole

Water Pipe Line

Trees

e`15 el o'.I{, e"ere a- en ea - ,"


.. o ep. es ts e - 2 - , e e es e e - es - 'o
;' " 52,
— 7' — P.
e. ...,-- -. 7.
,'T`,".
C. 7 ese - '', -,r, 7 F;
. s ,,,,,,- 7 . e t°' ,'.'. ? g '' F.' "' F g es P 7 7 7. IS P. 47 7 ' ' P 7 es 7r.
chainage ici 8 le ; ; ; ; gZ ; ; ; & 8 -"4 m • :. .7.1 4 '4 ' '.4 4 C. J.

Encroachments / Obstruction
Trees

Water Pipe Line


Electric Line & Pole
3
c..; Religious Structure
Y
Land Disputes/Obstruction By Fa
ce
Forest Permission/ Overlay

COS & additional Realignment

ltti_lttlittlttlttlillttlttitt
4
4

1
4

4
4
S

4
4
4'

S
9

9
4

4
a

a
a
a

a
COS& additional Realignment
tPermission/ Ove rlay
rid Disputes/Obstruction By Farmer

1
'goys Structu re
c Li ne & Pol e
r Pipe Line

si
ents/ O bstruct

93480
93390
93400
93410
93420

93440
93450

93470
92680
92690

92710
92720
92730
92740
92750
92760
92770
92780
92790
92800
92810
92820
92830
92840
92850

92890
92900

92940
92950
92960
92970
92990
■ 92990
93000
93010
93020
93030
93040
93050
93060
93070
93080
93090
92860
92870
92880

92910
92920
92930
S

ot

,-'
•chments/ 0 -
211111111111111111111 111111L

1
r Pipe Line
11
rf •

2=11
ZIME
Disputes/Obstruction By Farmer ..
St Permission/Overlay
i. . . & additionalRealignment
y
COS & adthtmnal Reallgnment

Forest Permission/ Overlay


..
,-J
7 Land Disputes/Obstruction By Fa
,:,
= Religious !;euctu,e
.4
Electric Line & Pole

Water Pipe Line


11
Trees

Mi
93 52 0

Chainage
S
us
8. 000""
_—,..m.,,.
.0.0 ,
0 ,
00""S
,00, 0—,-.0 8 0 2gSF.9.9,2g80 2P,S22P.S8 0 2gSF,22g8 0 2P,S22gS?8 0 2gS22,2@g8 0 2
0 ,0 ,04,...1.- rnnnnrnn,mmmmwmwmcommmM0, 0, 400.00.-Q0p9o..0?00 .......... r4r...rarvr4r4e4r4r4r4mmmm
mmmmmmmmmmmmmmmmmmmmmmmmmmmmmMmmmmmmm,......**.e
0, 00.00.00, 00.0 00, 0, 0, 0 00, 0, 0 0, 0, 0, 0, 0, 0•0 0 0 0 0, 00, 0 00, 0 0, 0 0 0 0, 0 0 0, 0, 0, 0 0 0, 0, 0 0 0. ; 0 0 O. 00, 0, O. 00, 0 0 000, 0 0 0 0 0 0,
I
Encroachments / Obstru

Electric Line & Pole

R!!!OF, WtaCLAIM.

t t ci l t C) t. t Lfr ttt t t l It t l k it
eterttItter et tett ettt ft'? ref r r r r,*Lc

COS & additional Realignment

Forest Permission/ Overlay


I 11 11
7 Land Disputes/Obstructi . • -
-..zkaa I 111
= Religious Structure
Electric Line & Pole
Water Pipe line •3

Trees
Encroachments / Obstruction

0.0.000.00.00.00.00.00.00.000.00000.00.0.00.00.0.000000.000.00.0.0.0.06p00.00.00.000
.d. m.,cop, .....e.4m.timr-cOPOr.naM*ul.,WCP0-.,,mV.I.,W0, 0..rvm.drul.,M0, 0*c4mVIA,O1 . 00, 0-marmvar, WC,.....r4,1Vm.
ChaMage mmmmmm .d. ...1 . .******LnintArnmvImm. ..0,,,,,,,,,,mWMWM010=Wmma, C,P0, 0, 47PPCAcn....00.0.0
..f. .f.. ........V....d..4.....d. ...... ..1. * ,,I. ,aerv—tr*.r**, ,taa*.V. V. V*.tal. .. **.d......,,,..1 - .** .d. .4MW14 LA IA LI1 IA tn In Lil ul IA LA LA
C, C,,,, ,TPC, P.0. 0, ...0, 0, 0, rna.PMMCPMCPCPMPO, PMPO, PPPPO PPO CI, O, PMCPCPMPO, CPPQ, ”PITPMC,'

Encroachments / Obstruction
Trees
Water Pipe Line
I 11111
MEI I I

Religious Structure

Land Disputes/Obstruction ByF


...
Forest Permission/ Overlay • ..

COS & additional Realignment


COS & additional Realignmen

Forest Permission/ Ove ,


>
F Land Disputes/Ohstru
L;)
= Religious Structure
...J
Electric Line & Pole II I I
Water Pipe Line
Trees IIIII IIIIIIIIII III 11111 MINI
Encroachments / Obstruction
um
...........0...........................00........0..............0........
a
CO 0, 0 .-. CV CO TO In . , Oa 0, 0 r. ni r•I , IA 4. 3- O. 0, 0 •-. 31 CO at to r co t o -. CV CO .3 IA V. I,CO 0,0 •-• 34 3I SO WI . I, 03 CO. 0 •-• 34 CO VI NO I,CO N 0 .... t". en
0 0 0 0 0 0 0 0 0 0
1 VI • u, . f... 0' Cr,
111 "0 1.-- CO CP 0 r. C,
Chainage - .-. - C. CY ,.I c..a r‘l eu 31 NI O.I IN VI VI 31 31 31 31 CO 31 CO CO ..1- •• ..3 •RO .1. sl. al. .d. TO ,I. In In VI ln In In VI IA In VI . . . . . 40 '0 NO 10 NO I,I,I,I, N C, N I, IN CO CO 03 03 CO CO CO 03 CO CO 0` 0, 0, 0, CO 0, 0, CP
IA VI YI In IA LA In In In In 1/I VI In IA In IA In In VI IA VI VI IA 1./1 IA 1/1 IA IA In 1/1 VI I.0 vl ul vl IA vl vl 1/1 IA vl vl vl VI l/I In LII IA In VI lal WI . In IA VI VI IA IA IA VI III VI VI IN In In IA In IA VI VI IA VI In In VI 0'
VI IA VI VI I, VI
0, 0, 0, 0, 0, 0, 0 , 0, 0, 0, 0, 0^ 0, 0` 0, 0, 0, 0,0, 0, 0, 0, 0,CO CO 0, 0, 0,CI, 0, 0, 0,CI, 0, 0,0, CO 0, 0, 0,CI, 0,0,CI, 0, 0,CO 0, 0,Os 0, 0,CA CO 0,0, 0,CI,0,as at at at at at at a. a. 0,CO 0,CO 0, 0' 0,0,0,CP CO 0, 0,CO 0,

Encroachments / Obstruction
Trees
Water Pipe Line
Electric Line & Pole
ReliglougStructure M'.
`*'
cc
Forest Permission/ Overlay

COS & additional Realignment

tsRealignment.as

( ( ( ( ( ( ( ( ( ( ( ( t ( ( ( ( ( ( ( ( ( ( ( ( (
I teett•WWWW4Petflo ettePtP4P••

....
COS & additional Realient
gnm

Forest Permission/ Overlay .


Land Disputes/Obstruction By Farm I II
Religmus Structure
Electric Line& Pole :
■ NMI OM I I II II ....
MO..........0
MIMI......
Water Pipe Line
Trees
Encroachments / Obstruction .
96220
96230
0000000000Q000Q00000 Vhf ?.f?-ggga2
a000"00000"V2r20gggg022g531g802g?ra2g!ggg02g?
Chainage 0.-,NMPUI,C00,0.-.NMWVV,C00,
0000000000 •
-•
V VVVV VC V V V V V V V V VC VV.>
I, CO 0, 0 •-• na el • vl .1, I, CO 0 r•
VV. V V VV... V V V V V V VC V V VV. V V, Cr
q.
eV ea 44 el re el el el el el le VI el ♦ VVVVV .1. .0. .. 4. V V V V V VI V V V VI V V V V V V V r, e• 1, r... r• t..- r-,- 1,e• e• O. CO CO
V V V V V V V V.V.. VV. ,O .O V V V V V. V V V ....V V
0 Cr 0 Cr 0^ 0
0, 0, 0, 0, 0 0 0, Os Os Os Os Os Os 0 P, 0 Os Os Os Os Os 0, 0 Os Os 0 Os Os Os Os Os 0 Os Os Cr 0 0, Cr 0 0 Cr Cr 0^ Cr 0, 0 0 0 Ol Cr 0 0 Cr 0 Ce 0 Cr Cr, Cr, Cr, Ce 0 Cr 0 Cr 0, Cr Cr Cr

Encroachments / Obstruction
Trees Mil I 11 MOSSIMMIIIMMOMMIIIIIIMMUMMIN Mil O CM
Water Pipe Line
Electric Line & Pole ,. II I ME II IN II I
Religious Structure
Realignment as per Schedule

COS & additional Realignment

Forest Permission/ Overlay •


:_,
7 Land Disputes/Obstruction By Fa
.:,
= ReIlg.ous Structure
..4
Electric lane & Pole
I
Water Pipe Line
I Trees

Encroachments / Obstruction
1111 1111

97540
97500
97490

97510
Chainage
2.7.22gg5:822g?..22g28 0 22:;22,9
.280 22.7g2g%?8 0 , 0 7
coMOCCOmWMCIM, M,00000.000v ..........rnerampnoNnameemmmmmmmmmmm
0 2g.722 '
0
.
. 4, 43 •0 .0 ..0 .4 .. •O •0 4) es es rnrrr es N N ts rrrrrrr es r n es r es r es NNNNNNNNN NNNNNNN ...N N N N N
C C . ,e, e:,
• PCPPPPPPO.O.PMPPCPPPO.PPC, PPPITPPPCPCPPPP.0, 00.0.0.0.0, POP000CP.00, 47, PCPPPPPO,

Encroachments / Obstructi
Trees

Water Pipe lane III


Electric Line & Pole •• •
3 1...
s.;
7
Religious Structure
I A 1
L": Land Disputes/Obstruction By Fa
s
Forest Permission/ Overlay

COS & additional Realignmen

l(ll t(t lttl lt t tt


f fit, fret f et • eft', ft 'Pt, treCteAtt

Realignment as per Schedule B --

COS & additional Realignment

Forest Permission/ Overlay,


3
7 Land Disputes/Ohs fi
in
Ei Religious Structure
I
.
Electric Line & Pole
Water Pipe Line
Trees .-- _ ..... - -

Encroachments/Obstruction . . ..

.,. ..., co
Chainage "i'im " '''' ow :
t. t. I, t. e.
at 0, c, ,F 0% II, 0, 0' 0, 0' 0, C. 0% C, ,C, 0, C. C, 0' tr, c2,. 0' C, 0" Crl '' cr ,§: ""' 7 7' 7 7' 7
' 7 PPP 7' 7 7 7 ,:., cs,

Encroachments / Obstruction
Trees
Water Pipe Line
Electric Line 8, Pole
3
Religious Structure

Land Disputes/Obstruction By Farmer


cc
Forest Permission/ Overlay

COS & additional Realignment

iligliaillialigel l l I
t•

Realignment as per Schedule B 1M


P,
COS & addmona I Realignment

Forest Permission/ Overlay


,_,
7 Land Disputes/Obstruction By Farmer

= Religious Structure
I
Electric Line & Pole

Water Pipe Line


Trees

Encroachments / Obstrucoott

Cbainage
g S. S; 2 . '22F22.3
, ,
'cF.' . S ' f-?. 2 T
,... es
--',2: F. 2 S.' 2 2 P'
2 i7.1 2 .7 5, 2 a ,7> ,o. z o - 2 .7, I.' F. 2 ". g c' 2 2 .2 2_ 2 2 F, 'L,' 2 0000000
. so c-.. co Os co
cv N N Iv na
ggggggg
I

E i ;..•.- i :,;

Trees
Water Pipe line
Electric Line & Pole
RHS-MCW

Religious S;Netti

Land

Forest Permission/ Overlay

COS & additional Realignment

•,
4 I 4 I I • • tectitterteretetteretereereee

cos. f „„:".„,,,,,•,,_:„.__:_.,,
I I II II II I II1
I I I IIII I I I I Il

Religious Structure, - ,,, , 1111 I I I

Electric Line & Pole I 11111 II MEM I


waterpipeu" I I
Trees
I■MUM II IIIIIIIIIIMOM 1111111111111111111111 ll II MIN I II
Encroachments / Obstruction - , I 111111. 111

1001 10
0000.00.0000q000000.000000000000Q00000.00.00000. 00 .0 q 00 . 00 . 00 .00 . 0 $
Chainage NM*N.,00, NMPIA.,00•0.NM*Ul.NOOPO...NM,111.1,1204:1,0....NM*111.,00,0 NM,V1.,00,......NM.PN.,
mmmmmmmm,* ........ mminioiniominiALci..".....0.°,0,0,,,,,,,,,,..=..00.000,,,,,0•0,0,,pci• ezi
iiy, ci, Os 0, 0, 0, Os 0, 0, 0 , Os 0, Os Os 0, 8
0,
, o, o,m0, 00, o, o, cpa,
ci, o‘cpci
0, 0 , Os
c, mi"mcAoo‘os,, ma, , o,, 00, c, mmci, c,o, 0°, 0-, m ,, cAciso, m0,,, 00,,,,, c,,,,, i, a.mmoNo‘mmmo
a, o, ,

Encroachments / Obstruction .1111 1111.


Trees
Water Pipe Line
Electric Line & Pole
RHS-M CW

Religious Structure
Land Disputes/Obstniction By III'
Forest Permission/ Overlay

Cps& additional Realignment


COS & additional Realignment

Forest Permission/ Overlay


L.,
Land Disputes/Obstruction

Religious Structure
I
Electric Line & Pole
ti
Water Pipe Line

Trees

Encroachments / Obstruction
■ 11111111111
o o o op 5 0 0 O
0 I, CO
0 0 0 0 0 o
t,
o 0000 O 0 O
O o r,co 0 0
Chalnage fsa CA CV rn m en enen tn rn rn •
0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 40 0 0 0 0 0
v. v.
0 8 0 0
Encroachments / Obstruction
Trees

Water Pipe line


Electric Line & Pole

Religious Structure,
I
cT
Forest Permission/ Ov

COS & additional Realignment

44 4 44 4 4 (4441(4 t It( 4444



1





4


q
4
4
4

41

aq


4


9



9
COS& add i tionseali gn me nt
ForestPermi ssion/ Overlay
Land Disputes/Obstructi onBy Fa rmer
R el• i gious St ruct ure
7
S C:

,
=n -,
a
RQ
-c, -


i g

*
:4

',Trees
Encroa ch ments/ Obstruction

101360

101630
101640

101670
101630
101660

101710
101720
0.•
n
!,..

101 ;
E
R

10 '

101

101 j
101

101
10'

101
101

101
101
101

101

101'
101
101
101

101
101

01
01
10

101
101

101
10
10
10

01
101
101
101
101
10
10

01
10

101
10
10

10
10

01

01
01

101

01
a ch ments/Obstruction

a
1=11111111.1111111111-

4
L.,Religious Struct u re
Disputes/ObstructionBy Farmer
t Permission/Overlay
2111=1.11111
• 11

• •
COS& additional Realignment

Forest Permission/ Overlay


3
"±' Land Disputes/Obstruction By .) •
N
= Religious Structure
Electric lane & Pole
Water Pipe Line
Trees
d',
Encroachments Obstruction .

102010

102070
102080
102090
102100
.... . io
o
Chainage . ....
0 0, in 0 CY CY 0 0 0 0 0 0 0 0 0 0
,... ... ...i ,... ...... ..., .... — .....
i... . — . ..... .... 5
RHS-MCW

Encroachments / Obstruction 0

Trees
hi
Water Pipe Line • N _
Electric Line & Pole 5
Religious Structure
I
Land Disputes/Obstru .
Forest Permission/ Over % ........„.s.....,.,

COS & additional Realignment

A
(((4(1(1
(1 t 4 II( t
t I' t, t t t t. (
• f IP' V•e • • EP e IIP IP •• • Pt IP IP Pr e. • • • Pi

Realignment as per Schedule B

COS & additional Realignment

Forest Permission/ Overlay


3
S Land Disputes/Obstruction By Pa I.
sj,
= Religious Structure

Electric Line & Pole

Water Pipe Line

Trees

Encroachmsagebs
2
III

102880

102930
102860
102870
000090000000009000000000i0000000 p00009000000000900000 900
0 •-• IN el V' It1 •D I,03 Os 0 t... is. 01 4' WI sO 1., CO Os 9 . eg 01♦ ill 0 o. 0 oN os . vs 0 r. co O., 0 •-• co en ••• 0 0 I,CO Co 0 •-• os co • 0 0 o. co co o .-. os
Chahar CV ts. el el ell el el el el el el (11 el el el el el el 141 el •Ir .0. gl• * .0. tr •t• • I. 01 ...1 V/ WI 1/1 L. IA 4:0 1
• 0 4,
sO 4) sO sO sO ,C, VD I, I, I, I, l•
`. Is t, t, t, t,CO CO CO
N el el el 44 el el 44 el el el e4 el el el el el el el el el el el e4 el el el el el el el el el el el el el el e4 el el el el el el IN el e4 el .1 el el el el el el 44 e4 el oa
0000000000000000000000000000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00
0 0 0 0 0 0 0 0 0 0 0 v.

Encroachments /Obstruction
Trees

Water Pipe Line 4 —.


Electric Line & Pole

s., Religious Structure


Z II
..':'., Land Disputes/Obstruction By Pa li,
...,
ce
Forest Permission/ Overlay

COS & additional Realignment

Realignment as per Schedule B Ail


Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

Annexure - K
Drawing Register
(As enclosed on Page no. 12)

Ashoka Buildcon Limited Page 86


Up-gradation of Bhadgaon-Chalisgaon (section II )of NH 753J from Chainage 56+200 Km to 103+000 Km to Two lane with
paved shoulders/ Four Lane configuration of [ Jalgaon - Bhadgaon -Chalisgaon -Nandgaon- Manmad-NH 753J - (52.200 Km )]
in the State of Maharashtra on EPC mode

ANNEXURE-K
1.4 Status of Design Submitted Monthly Progress Report April/2019

Preparation of Design and Drawing are in progress for locations where the survey and geotechnical activities are completed.

Design Director: M/s. Inroads Techno Consultants Pvt Ltd.


Proof Consultant: M/s. Frischmann Prabhu Project Management Consultancy Services Pvt Ltd.

Safety Consultant: M/s. Indian Infratech, Mumbai.

Design & Drawing Status-PKG-II


Authority's
Sr. EPC Contractor Submission Approval Revision Engineer
Title Date of Submission Date of Approval Remarks
No. Letter Status No. Approval
Letter No.
ABL/NH-753J/Bhadgaon -
GAD of Box Culvert at Ch. 68+250
1 Chalisgaon/Pkg-11/2018- 11.02.2018 Approoval R3 28 15.02.2019
(Design Ch. 68+254)
19/404
Reinforcement Drawing of Box ABL/NH-753J/Bhadgaon-
2 Culvert at Ch. 68+250 (Design Ch. Chalisgaon/Pkg-11/2018- 11.02.2018 Approoval R2 28 15.02.2019
68+254 19/404
ABL/NH-753J/Bhadgaon-
Gad of Box Culvert at Ch. 68+490
3 Chalisgaon/Pkg-11/2018- 11.02.2018 Approoval R3 28 15.02.2019
(Design Ch. 68+494)
19/404
Reinforcement Drawing of Box ABL/NH-753J/Bhadgaon-
4 Culvert at Ch. 68+490 ( Design Ch. Chalisgaon/Pkg-I1/2018- 11.02.2018 Approoval R2 28 15.02.2019
68+494) 19/404
ABL/NH-753J/Bhadgaon-
GAD Box Culvert at Ch. 74+225 28 15.02.2019
5 Chalisgaon/Pkg-11/2018- 11.02.2018 Approoval R3
(Design Ch. 74+235)
19/404
Reinforcement Drawing of Box ABL/NH-753J/Bhadgaon-
6 Culvert at Ch. 74+225 (Design Ch. Chalisgaon/Pkg-11/2018- 11.02.2018 Approoval R2 28 15.02.2019
74+235) 19/404
ABL/N11-753J/Bhadgaon-
GAD Box Culvert at Ch. 75+564 Approoval R3 28 15.02.2019
7 Chalisgaon/Pkg-11/2018- 11.02.2018
(Design Ch. 75+574)
19/404
Reinforcement Drawing og Box ABL/N/1-753J/Bhadgaon-
8 Culvert at Ch. 75+564 (Design Ch. Chalisgaon/Pkg-11/2018- 11.02.2018 Approoval R2 28 15.02.2019
75+574) 19/404
ABL/N11-753J/Bhadgaon-
GAD of Box Culvert at Ch. 75+945 11.02.2018 Approoval R3 28 15.02.2019
9 Chalisgaon/Pkg-11/2018-
(Design Ch. 75+957)
19/404
--, ---1 7.-fal TWA Dra4 3, ..7-11 TOA 7egrai 74 ---, ---4 ---, ---, ---, ---, 774 ---74 ---4 ---11 -1 ---4 ---4 ---4
Tal ,i-4 Tkii I
10 Culvert at Ch. 75+945 (Design Ch. Chalisgaon/Pkg-11/2018- 11.02.2018 Approoval R2 28 15.02.2019
75+957) 19/404
ABL/NH-753J/Bhadgaon-
GAD of Box Culvert at Ch. 93+590
11 Chalisgaon/Pkg-I1/2018- 11.02.2018 Approoval R3 28 15.02.2019
(Design Ch. 93+603)
19/404
Reinforcement Drawing of Box ABL/NH-753J/Bhadgaon-
12 Culvert at Ch. 93+590 (Design Ch. Chalisgaon/Pkg-I1/2018- 11.02.2018 Approoval R2 28 15.02.2019
93+603) 19/404
ABL/NH-7531/Bhadgaon-
GAD of Minor Bridge at Ch.
13 Chalisgaon/Pkg-11/2018- 19.02.2019 Approved R2 33 27.02.2019
60+2679(Design Ch. 60+270)
19/ 415
ABL/NH-753J/Bhadgaon-
GAD of Minor Bridge at Ch.
14 Chalisgaon/Pkg-11/2018- 19.02.2019 Approved R2 33 27.02.2019
60+2679(Design Ch. 60+270)
19/415

Reinforcement Drawing of ABL/NH-753J/Bhadgaon-


15 Minor Bridge at Ch. Chalisgaon/Pkg-I1/2018- 19.02.2019 Approved R1 33 27.02.2019
60+267(Design Ch. 60+270) 19/415

ABL/NH-753J/Bhadgaon-
GAD of Minor Bridge at Ch.
16 Chalisgaon/Pkg-11/2018- 19.02.2019 Approved R2 33 27.02.2019
70+618(Design Ch. 70+628)
19/ 415
ABL/NH-753J/Bhadgaon-
GAD of Minor Bridge at Ch.
17 Chalisgaon/Pkg-I1/2018- 19.02.2019 Approved R2 33 27.02.2019
70+618(Design Ch. 70+628)
19/415

Reinforcement Drawing of ABL/NH-753J/Bhadgaon-


18 Minor Bridge at Ch. Chalisgaon/Pkg-11/2018- 19.02.2019 Approved R1 33 27.02.2019
70+618(Design Ch. 70+628) 19/415

ABL/NH-753J/Bhadgaon-
GAD of Minor Bridge at Ch.
19 Chalisgaon/Pkg-II/2018- 19.02.2019 Approved R2 33 27.02.2019
73+180(Design Ch. 73+187)
19/415
ABL/NH-753J/Bhadgaon-
GAD of Minor Bridge at Ch. 27.02.2019
20 Chalisgaon/Pkg-11/2018- 19.02.2019 Approved R2 33
73+180(Design Ch. 73+187)
19/415

Reinforcement Drawing of ABL/NH-753J/Bhadgaon-


21 Minor Bridge at Ch. Chalisgaon/Pkg-11/2018- 19.02.2019 Approved R1 33 27.02.2019
73+180(Design Ch. 73+187) 19/415

ABL/NH-753J/Bhadgaon-
GAD of Minor Bridge at Ch. 19.02.2019 Approved R2 33 27.02.2019
22 Chalisgaon/Pkg-11/2018-
64+566(Design Ch. 64+566) 19/415

Reinforcement Drawing of ABL/NH-753J/Bhadgaon-


23 Minor Bridge at Ch. Chalisgaon/Pkg-11/2018- 19.02.2019 Approved R1 33 27.02.2019
64+566(Design Ch. 64+566) 19/415
i4 1 Ali 111HC3J/ tradgr
AD. Mi4 Br" _;e 4 :h.. t
73+960(Design Ch. 73+994)
Chliisgadii/Pk7-11/201d- 4 t.0219 4 4, pppro ed 4 A . / . 4 271.20ii II
19/415
Reinforcement Drawing of ABL/NH-753J/Bhadgaon-
25 Minor Bridge at Ch. Chalisgaon/Pkg-I1/2018- 19.02.2019 Approved - 33 27.02.2019
73+960(Design Ch. 73+994) 19/415

Geo-Technical Investigation ABL/NH-753J/Bhadgaon-


26 Report of Minor Bridge at Ch. Chalisgaon/Pkg-II/2018- 19.02.2019 Approved - 33 27.02.2019
60+267 19/ 415
Geo-Technical Investigation ABL/NH-753J/Bhadgaon-
27 Report of Minor Bridge at Ch. Chalisgaon/Pkg-I1/2018- 19.02.2019 Approved - 33 27.02.2019
70+618 19/415
Geo-Technical Investigation ABL/NH-753J/Bhadgaon-
28 Report of Minor Bridge at Ch. Chalisgaon/Pkg-11/2018- 19.02.2019 Approved - 33 27.02.2019
73+180 19/415
ABL/NH-753J/Bhadgaon-
GAD of Minor Bridge at Ch.
29 Chalisgaon/Pkg-II/2018- 19.02.2019 Approved R1 34 27.02.2019
59+964(Design Ch. 59+965)
19/416
ABL/NH-753J/Bhadgaon-
GAD of Minor Bridge at Ch.
30 Chalisgaon/Pkg-11/2018- 19.02.2019 Approved R1 34 27.02.2019
59+964(Design Ch. 59+965)
19/ 416

Reinforcement Drawing of ABL/NH-753J/Bhadgaon-


31 Minor Bridge at Ch. Chalisgaon/Pkg-II/2018- 19.02.2019 Approved R1 34 27.02.2019
59+964(Design Ch. 59+965) 19/416

ABL/NH-753J/Bhadgaon-
GAD of Minor Bridge at Ch.
32 Chalisgaon/Pkg-II/2018- 19.02.2019 Approved R2 34 27.02.2019
102+880(Design Ch. 102+898)
19/416
ABL/NH-753J/Bhadgaon-
GAD of Minor Bridge at Ch.
33 Chalisgaon/Pkg-II/2018- 19.02.2019 Approved R2 34 27.02.2019
102+880(Design Ch. 102+898) 19/416

Reinforcement Drawing of ABL/NH-753J/Bhadgaon-


34 Minor Bridge at Ch. Chalisgaon/Pkg-II/2018- 19.02.2019 Approved R2 34 27.02.2019
102+880(Design Ch. 102+898) 19/416
Yf
ABL/NH-753J/Bhadgaon-
GAD of Minor Bridge at Ch. Approved R1 34 27.02.2019
35 Chalisgaon/Pkg-II/2018- 19.02.2019
71+660(Design Ch. 71+668) 19/416

Reinforcement Drawing of ABL/NH-753J/Bhadgaon-


36 Minor Bridge at Ch. Chalisgaon/Pkg-I1/2018- 19.02.2019 Approved RO 34 27.02.2019
71+660(Design Ch. 71+668) 19/416

Geo-Technical Investigation ABL/NH-753J/Bhadgaon-


37 Report of Minor Bridge at Ch. Chalisgaon/Pkg-II/2018- 19.02.2019 Approved - 34 27.02.2019
59+964 19/416
' -7J e7Irech711117/1stigation ABL/NH-7531/Bhadgaon ---q —. —11 —4 -4 -4 ---'‘ -4 —4 —4 —4 —4 —4 —4 —I —4
4

38 Report of Minor Bridge at Ch. Chalisgaon/Pkg-II/2018- 19.02.2019 Approved- 34 27.02.2019


102+880 19/416

GAD of Minor Bridge at Ch. ABL/NI1-753J/Bhadgaon-


39 Chalisgaon/Pkg-II/2018- 14.02.2019 Approved R1 35 27.02.2019
76+610(Design Ch. 76+261)
19/408

GAD of Minor Bridge at Ch. ABL/NH-753J/Bhadgaon-


40 Chalisgaon/Pkg-II/2018- 14.02.2019 Approved R1 35 27.02.2019
76+610(Design Ch. 76+261)
19/408

Reinforcement Drawing of ABL/NH-753J/Bhadgaon-


41 Minor Bridge at Ch. Chalisgaon/Pkg-11/2018- 14.02.2019 Approved R1 35 27.02.2019
76+610(Design Ch. 76+621) 19/408

ABL/N11-7531/Bhadgaon-
GAD of Minor Bridge at Ch.
42 Chalisgaon/Pkg-II/2018- 14.02.2019 Approved R2 35 27.02.2019
77+340(Design Ch. 77+417)
19/408
ABL/NH-753J/Bhadgaon-
GAD of Minor Bridge at Ch.
43 Chalisgaon/Pkg-11/2018- 14.02.2019 Approved R2 35 27.02.2019
77+340(Design Ch. 77+417)
19/408

Reinforcement Drawing of ABL/NH-753J/Bhadgaon-


44 Minor Bridge at Ch. Chalisgaon/Pkg-II/2018- 14.02.2019 Approved R2 35 27.02.2019
77+340(Design Ch. 77+417) 19/408

Geo-Technical Investigation ABL/NH-753J/Bhadgaon-


45 Report of Minor Bridge at Ch. Chalisgaon/Pkg-11/2018- 14.02.2019 Approved- 35 27.02.2019
76+610 19/408
Geo-Technical Investigation ABL/NH-753J/Bhadgaon-
46 Report of Minor Bridge at Ch. Chalisgaon/Pkg-II/2018- 14.02.2019 Approved- 35 27.02.2019
77+340 19/408
ABL/NH-753J/Bhadgaon-
GAD of Minor Bridge at Ch.
47 Chalisgaon/Pkg-II/2018- 19.02.2019 Approved R2 37 25.02.2019
65+975(Design Ch. 65+980)
19/418
ABL/NH-753J/Bhadgaon-
GAD of Minor Bridge at Ch.
48 Chalisgaon/Pkg-II/2018- 19.02.2019 Approved R2 37 25.02.2019
65+350(Design Ch. 65+352)
19/418
ABL/N11-753J/Bhadgaon-
GAD of Minor Bridge at Ch.
49 Chalisgaon/Pkg-11/2018- 19.02.2019 Approved R2 37 25.02.2019
72+625(Design Ch. 72+635)
19/418
ABL/N11-753J/Bhadgaon-
GAD of Minor Bridge at Ch.
50 Chalisgaon/Pkg-II/2018- 19.02.2019 Approved R2 37 25.02.2019
72+625(Design Ch. 72+635) 19/418
ABL/NH-7531/Bhadgaon-
GAD of Minor Bridge at Ch. 25.02.2019
51 Chalisgaon/Pkg-11/2018- 19.02.2019 Approved R2 37
82+950(Design Ch. 82+958) 19/418
i tAD !Minor Bri7ge at gCh. ir Adr.,1H-4.71/3....dgal.711 t -,-I -II -I --1 ---ii —4 -0 ---4 —it —4 4 4 1
52 Chalisgaon/Pkg-I1/2018- 19.02.2019 Approved R2 37 25.02.2019
85+180(Design Ch. 82+198)
19/418
ABL/NH-753J/Bhadgaon-
GAD of Minor Bridge at Ch.
53 Chalisgaon/Pkg-I1/2018- 19.02.2019 Approved R2 37 25.02.2019
85+180(Design Ch. 82+198)
19/418
ABL/NH-753J/Bhadgaon-
GAD of Minor Bridge at Ch.
54 Chalisgaon/Pkg-II/2018- 19.02.2019 Approved R2 37 25.02.2019
86+565(Design Ch. 86+580)
19/418
ABL/NH-753J/13hadgaon-
GAD of Minor Bridge at Ch.
55 Chalisgaon/Pkg-11/2018- 19.02.2019 Approved R2 37 25.02.2019
90+625(Design Ch. 90+640)
19/418
ABL/NH-753J/Bhadgaon-
GAD of Minor Bridge at Ch.
56 Chalisgaon/Pkg-11/2018- 19.02.2019 Approved R2 37 25.02.2019
91+510(Design Ch. 91+521)
19/418
ABL/NH-753J/Bhadgaon-
GAD of Minor Bridge at Ch.
57 Chalisgaon/Pkg-11/2018- 19.02.2019 Approved R2 37 25.02.2019
100+720(Design Ch. 100+732)
19/418
ABL/NH-753J/Bhadgaon-
GAD of Minor Bridge at Ch.
58 Chalisgaon/Pkg-11/2018- 19.02.2019 Approved R2 37 25.02.2019
101+450(Design Ch. 101+463)
19/418
ABL/NH-753J/Bhadgaon-
GAD of Minor Bridge at Ch.
59 Chalisgaon/Pkg-11/2018- 19.02.2019 Approved R2 37 25.02.2019
101+450(Design Ch. 101+463)
19/418
ABL/NH-753J/Bhadgaon-
GAD of Pipe Culvert at Ch.
60 Chalisgaon/Pkg-11/2018- 20.02.2019 Approved R2 41 04.03.2019
65+662 (Design Ch. 65+667
19/417
ABL/NH-7531/Bhadgaon-
GAD of Pipe Culvert at Ch.
61 Chalisgaon/Pkg-I1/2018- 20.02.2019 Approved R2 41 04.03.2019
80+320 (Design Ch.80+330)
19/417
ABL/NH-7531/Bhadgaon-
GAD of Pipe Culvert at Ch.
62 Chalisgaon/Pkg-I1/2018- 20.02.2019 Approved R2 41 04.03.2019
83+806 (Design Ch. 83+806)
19/417
ABL/NH-753J/Bhadgaon-
GAD of Pipe Culvert at Ch.
63 Chalisgaon/Pkg-I1/2018- 20.02.2019 Approved R2 41 04.03.2019
83+806 (Design Ch. 83+806) 19/417
ABL/NH-753J/Bhadgaon-
GAD of Box Culvert at Ch. 42 04.03.2019
64 Chalisgaon/Pkg-I1/2018- 19.02.2019 Approved R1
64+190 (Design Ch. 64+195) 19/414
Reinforcement Drawing of Box ABL/NH-753J/Bhadgaon-
65 Culvert at Ch.64+190 (Design Chalisgaon/Pkg-I1/2018- 19.02.2019 Approved R1 42 04.03.2019
Ch. 64+195) 19/414
ABL/NH-753J/Bhadgaon-
GAD of Box Culverta at Ch. Approved R3 42 04.03.2019
66 Chalisgaon/Pkg-I1/2018- 19.02.2019
63+027 (Design Ch. 63+060) 19/414
4471
1f0 -74
.n DrA .ngf Bol All NH./ 31/4 idgi,- 1 441 4 4 I 4 4 4 -1-I-4-i-1
67 Culvert at Ch. 63+027 (Design Chalisgao
n/Pkg-11/2018- 19.02.2019 Approved R2 42 04.03.2019
Ch. 63+060) 19/414

GAD of Box Culvert at Ch. ABL/NH-753J/Bhadgaon-


68 Chalisgaon/Pkg-II/2018- 07.03.2019 Approved R3 45 04.03.2019
62+640(Design Ch. 62+640)
19/431
Reinforcement Drawing of Box ABL/NH-753J/Bhadgaon-
69 Culvert at Ch. 62+640 (Design Chalisgaon/Pkg-11/2018- 07.03.2019 Approved R2 45 04.03.2019
Ch.62+640 19/431

GAD of Box Culverta at Ch. ABL/NH-753J/Bhadgaon-


70 Chalisgaon/Pkg-I1/2018- 07.03.2019 Approved R3 45 04.03.2019
65+260 (Design Ch. 65+264)
19/431
Reinforcement Drawing of Box ABL/NH-753J/Bhadgaon- 41.

71 Culvert at Ch. 65+260 (Design Chalisgaon/Pkg-II/2018- 07.03.2019 Approved R2 45 04.03.2019


Ch. 65+264) 19/431
ABL/NH-753J/Bhadgaon-
GAD of Box Culvert at Ch.
72 Chalisgaon/Pkg-I1/2018- 07.03.2019 Approved R3 45 04.03.2019
67+395 (Design Ch. 67+399)
19/431
Reinforcement Drawing of at ABL/NH-753J/Bhadgaon-
73 Ch. 67+395 (Design Ch. Chalisgaon/Pkg-11/2018- 07.03.2019 Approved R2 45 04.03.2019
67+399) 19/431
ABL/NH-753J/Bhadgaon-
GAD of Box Culvert at Ch.
74 Chalisgaon/Pkg-11/2018- 07.03.2019 Approved R2 45 04.03.2019
70+270 (Design Ch. 70+276)
19/431
Reinforcement Drawing of Box ABL/NH-753J/Bhadgaon-
75 Culvert at Ch. 70+270 (Design Chalisgaon/Pkg-11/2018- 07.03.2019 Approved R2 45 04.03.2019
Ch. 70+276) 19/431
ABL/NH-753J/Bhadgaon-
GAD of Box Culvert at Ch.
76 Chalisgaon/Pkg-11/2018- 07.03.2019 Approved R3 45 04.03.2019
96+580 (Design Ch. 96+592) 19/431
Reinforcement Drawing of Box ABL/NH-753J/Bhadgaon-
77 Culvert at Ch. 96+580 (Design Chalisgaon/Pkg-11/2018- 07.03.2019 Approved R2 45 04.03.2019
Ch. 96+592) 19/431
ABL/NH-753J/Bhadgaon-
GAD of Box Culvert at Ch. Approved R3 45 04.03.2019
78 Chalisgaon/Pkg-11/2018- 07.03.2019
97+010 (Design Ch. 97+019) 19/431

Reeinforcement Drawing of ABL/NH-753J/Bhadgaon-


79 Box Culvert at Ch. 97+010 Chalisgaon/Pkg-I1/2018- 07.03.2019 Approved R2 45 04.03.2019
(Design Ch. 97+019) 19/431

ABL/NH-753J/Bhadgaon-
GAD of MNB at Ch. 56+561 Approved RO 46 14.03.2019
80 Chalisgaon/Pkg-11/2018- 14.03.2019
(Design Ch. 56+561 19/442
ABL/NH-753J/Bhadgaon-
GAD of MNB at Ch. 56+561 Approved RO 46 14.03.2019
81 Chalisgaon/Pkg-I1/2018- 14.03.2019
(Design Ch. 56+561 19/442
4 CAD 14NEluc C0,641 4 NBI. H-74 1/134 igac4 4 4 4 4 4 4 4 a 4 if f E lf 4 414
82
(Design Ch. 56+561
Chalisgaon/Pkg-I1/2018- 14.03.2019 Approved RO 46f 14.03.Z019
19/442
Dimension Details of ABL/NH-753J/Bhadgaon-
83 Superstructure of MNB at Ch. Chalisgaon/Pkg-I1/2018- 14.03.2019 Approved RO 46 14.03.2019
56+561 (Design Ch. 56+561) 19/442

Dimension Details of ABL/NH-753J/Bhadgaon-


84 Superstructure of MNB at Ch. Chalisgaon/Pkg-I1/2018- 14.03.2019 Approved R1 46 14.03.2019
56+561 (Design Ch. 56+561) 19/442

Dimension Details of ABL/NH-753J/Bhadgaon-


85 Superstructure of MNB at Ch. Chalisgaon/Pkg-I1/2018- 14.03.2019 Approved R1 46 14.03.2019
56+561 (Design Ch. 56+561) 19/442

Reinforcement Details of
ABL/NH-753J/Bhadgaon-
Substructure Girder of MNB at
86 Chalisgaon/Pkg-11/2018- 14.03.2019 Approved RO 46 14.03.2019
Ch. 56+561 (Design Ch.
19/442
56+561)
Reinforcement Details of
ABL/NH-753J/Bhadgaon-
Substructure Girder of MNB at
87 Chalisgaon/Pkg-I1/2018- 14.03.2019 Approved RO 46 14.03.2019
Ch. 56+561 (Design Ch.
19/442
56+561)
Reinforcement Details of
ABL/NH-753J/Bhadgaon-
Substructure Girder of MNB at
88 Chalisgaon/Pkg-I1/2018- 14.03.2019 Approved RO 46 14.03.2019
Ch. 56+561 (Design Ch. 19/442
56+561)
Reinforcement Details of
ABL/NH-753J/Bhadgaon-
Substructure Girder of MNB at 46 14.03.2019
89 Chalisgaon/Pkg-II/2018- 14.03.2019 Approved RO
Ch. 56+561 (Design Ch. 19/442
56+561)
Reinforcement Details of
ABL/NH-753J/Bhadgaon-
Substructure Girder of MNB at Approved RO 46 14.03.2019
90 Chalisgaon/Pkg-11/2018- 14.03.2019
Ch. 56+561 (Design Ch. 19/442
56+561)
Reinforcement Details of
ABL/NH-7531/Bhadgaon-
Substructure Girder of MNB at Approved RO 46 14.03.2019
91 Chalisgaon/Pkg-11/2018- 14.03.2019
Ch. 56+561 (Design Ch. 19/442
56+561)

Details of Elastomeric Bearing ABL/NH-753J/Bhadgaon-


92 of MNB at Ch. 56+561 (Design Chalisgaon/Pkg-11/2018- 14.03.2019 Approved RO 46 14.03.2019
Ch. 56+561) 19/442

Geo-Technical Report of MNB ABL/NH-753J/Bhadgaon-


93 at Ch. 56+561 (Deisgn Ch. Chalisgaon/Plcg-11/2018- 14.03.2019 Approved- 46 14.03.2019
56+561) 19/442
-4 -4 -4 -4 -4 -4 -4 -4 -4 -4 -4 -4 -4 -1 -4 -* —A —4 —11 —A —II _I _II _I _I _I _I
Design of MNB (Al & Bearing
at Ch. 56+561 (Part copy of ABL/N11-7531/Bhadgaon-
94 Chalisgaon/Pkg-11/2018- 14.03.2019 Approved RO 46 14.03.2019
Design Document For
19/442
Elastomeric Bearing Design )
GAD of Box Culvert at ABL/NH-753J/Bhadgaon-
95 Ch.56+967 (Design Ch. Chalisgaon/Pkg-II/2018- 13.03.2019 Approved R2 47 14.03.2019
56+878) 19/434
GAD of Box Culvert at ABL/NH-753J/Bhadgaon-
96 Ch.57+965 (Design Ch. Chalisgaon/Pkg-II/2018- 13.03.2019 Approved R2 47 14.03.2019
58+328) 19/434
GAD of Box Culvert at ABL/NH-753J/Bhadgaon-
97 Ch.58+985 (Design Ch. Chalisgaon/Pkg-II/2018- 13.03.2019 Approved R2 47 14.03.2019
58+832) 19/434
GAD of Box Culvert at ABL/NH-753J/Bhadgaon-
98 Ch.58+985 (Design Ch. Chalisgaon/Pkg-II/2018- 13.03.2019 Approved R2 47 14.03.2019
58+832) 19/434
GAD of Box Culvert at ABL/NH-753J/Bhadgaon-
99 Ch.59+200 (Design Ch. Chalisgaon/Pkg-II/2018- 13.03.2019 Approved R2 47 14.03.2019
59+108) 19/434
GAD of Box Culvert at ABL/NH-753J/Bhadgaon-
100 Ch.59+200 (Design Ch. Chalisgaon/Pkg-II/2018- 13.03.2019 Approved R2 47 14.03.2019
59+108) 19/434
GAD of Box Culvert at ABL/NI1-753J/Bhadgaon-
101 Ch.59+482 (Design Ch. Chalisgaon/Pkg-11/2018- 13.03.2019 Approved R2 47 14.03.2019
59+305) 19/434
GAD of Box Culvert at ABL/NH-753J/Bhadgaon-
102 Ch.59+482 (Design Ch. Chalisgaon/Pkg-II/2018- 13.03.2019 Approved R2 47 14.03.2019
59+305) 19/434
GAD of Box Culvert at ABL/NH-753J/Bhadgaon-
103 Ch.59+673 (Design Chalisgaon/Pkg-I1/2018- 13.03.2019 Approved R2 47 14.03.2019
Ch.59+515) 19/434
GAD of Box Culvert at ABL/NH-753J/Bhadgaon-
104 Ch.66+765 (Design Ch. Chalisgaon/Plcg-11/2018- 13.03.2019 Approved R2 47 14.03.2019
66+770) 19/434
GAD of Box Culvert at ABL/M1-753J/Bhadgaon-
105 Ch.67+665 (Design Ch. Chalisgaon/Pkg-11/2018- 13.03.2019 Approved R2 47 14.03.2019
67+668) 19/434
GAD of Box Culvert at ABL/N11-753J/Bhadgaon-
106 Ch.68+782 (Design Ch. Chalisgaon/Pkg-II/2018- 13.03.2019 Approved R2 47 14.03.2019
68+786) 19/434
GAD of Box Culvert at ABL/NH-753J/Bhadgaon-
107 Ch.70+120(Design Ch. Chalisgaon/Pkg-11/2018- 13.03.2019 Approved R2 47 14.03.2019
70+129) 19/434
4 4 4 4 4 0 e 4 4 1 4 4 1 4

GAD of Box Culvert at ABL/NH-753J/Bhadgaon-


108 Ch.70+975 (Design Ch. Chalisgaon/Pkg-I1/2018- 13.03.2019 Approved R2 47 14.03.2019
71+085) 19/434
GAD of Box Culvert at ABL/NH-753J/Bhadgaon-
109 Ch.78+500 (Design Ch. Chalisgaon/Pkg-II/2018- 13.03.2019 Approved R2 47 14.03.2019
78+501) 19/434
GAD of MNB at Ch. 73+860 ABL/NH-753J/Bhadgaon-
110 Chalisgaon/Pkg-11/2018- 14.03.2019 Approved R1 59 04.04.2019
(Design Ch. 73+869)
19/448
GAD of MNB at Ch. 73+860 ABL/NH-753J/Bhadgaon-
111 Chalisgaon/Pkg-I1/2018- 14.03.2019 Approved R1 59 04.04.2019
(Design Ch. 73+869)
19/448
Reinforcement Drawing of ABL/NH-753J/Bhadgaon-
112 MNB at Ch. 73+860 (Design Ch. Chalisgaon/Pkg-11/2018- 14.03.2019 Approved RO 59 04.04.2019
73+869) 19/448
ABL/NH-753J/Bhadgaon-
Geo-technical Investigation
113 Chalisgaon/Pkg-II/2018- 14.03.2019 Approved - 59 04.04.2019
Report of MNB at Ch. 73+860
19/448
ABL/NH-753J/Bhadgaon-
114 Key Plan Ch. 73+860 Chalisgaon/Pkg-II/2018- 14.03.2019 Approved- 59 04.04.2019
19/448
ABL/NH-753J/Bhadgaon-
GAD of Box Culvert at Ch.
115 Chalisgaon/Pkg-II/2018- 01.04.2019 Approved R3 67 24.04.2019
9+575 (Design Ch. 9+575)
19/465
Reinforcement Drawing of Box ABL/NH-753J/Bhadgaon-
116 Culvert at Ch. 9+575 (Design Chalisgaon/Pkg-II/2018- 01.04.2019 Approved R2 67 24.04.2019
Ch. 9+575) 19/465
ABL/NH-753J/Bhadgaon-
GAD of Box Culvert at Ch.
117 Chalisgaon/Pkg-I1/2018- 01.04.2019 Approved RO 67 24.04.2019
9+575 (Design Ch. 9+575) 19/465
ABL/NH-753J/Bhadgaon-
GAD of Pedestrian Underpass 24.04.2019
118 Chalisgaon/Pkg-11/2018- 01.04.2019 Approved R1 67
(PUP) at Ch. 69+600 19/465
ABL/NH-753J/Bhadgaon-
GAD of Pedestrian Underpass Approved R1 67 24.04.2019
119 Chalisgaon/Pkg-I1/2018- 01.04.2019
(PUP) at Ch. 69+600 19/465
Reinforcement of Pedestrian ABL/NH-753J/Bhadgaon-
120 Underpass (PUP) at Ch. Chalisgaon/Pkg-11/2018- 01.04.2019 Approved R1 67 24.04.2019
69+600) 19/465
Geo-Technical Investigation
ABL/NH-753J/Bhadgaon-
Report of Approved - 67 24.04.2019
121 Chalisgaon/Pkg-11/2018- 01.04.2019
PedestrianUnderpass (PUP) at 19/465
Ch. 69+600
I-4-4 .mail Ad I ---i ---i ---1 ---4 ---4 ---4 ---4 ---4 ---1 ---1 ---1 ----s ---; 4 --i 4 t 4 4

Reinforcement Details of ABL/NH-753J/Bhadgaon-


122 Widening Portion for MNB at Chalisgaon/Pkg-I1/2018- 12.04.2019 Approved RO 68 24.04.2019
Ch. 77+340 (Design Ch. 19/486
77+417)
GAD for MNB at Ch. 69+850 ABL/NH-753J/Bhadgaon-
123 Chalisgaon/Pkg-11/2018- 12.04.2019 Approved R1 69 24.04.2019
(Design Ch. 69+858)
19/485
GAD for MNB at Ch. 69+850 ABL/NH-753J/Bhadgaon-
124 Chalisgaon/Pkg-11/2018- 12.04.2019 Approved R1 69 24.04.2019
(Design Ch. 69+858)
19/485

Dimensoional Details of
ABL/NH-753J/Bhadgaon-
Abutment Substructure &
125 Chalisgaon/Pkg-I1/2018- 12.04.2019 Approved R1 69 24.04.2019
Foundation for MNB at Ch.
19/485
69+850 (Design Ch. 69+858)

Reinforcement Details of
ABL/NH-753J/Bhadgaon-
Abutment Substructure &
126 Chalisgaon/Pkg-I1/2018- 12.04.2019 Approved R2 69 24.04.2019
Foundation for MNB at Ch.
19/485
69+850 (Design Ch. 69+858

Dimensional Reinforcement ABL/NH-753J/Bhadgaon-


127 Details of Slab for MNB at Ch. Chalisgaon/Pkg-11/2018- 12.04.2019 Approved R1 69 24.04.2019
69+850 (Design Ch. 69+858) 19/485

Details Of Elastomeric Bearing ABL/NH-753J/Bhadgaon-


128 for MNB at Ch. 69+850 (Design Chalisgaon/Pkg-11/2018- 12.04.2019 Approved R1 69 24.04.2019
Ch. 69+858) 19/485

ABL/NH-753J/Bhadgaon-
Geo-Technical Investigation - 24.04.2019
129 Chalisgaon/Pkg-I1/2018- 12.04.2019 Approved 69
Report of MNB at Ch. 69+850 19/485
ABL/NH-753J/Bhadgaon-
GAD of Pipe Culvert at Ch. Approved R3 70 24.04.2019
130 Chalisgaon/Pkg-II/2018- 08.04.2019
80+065 (Design Ch. 80+075) 19/481
ABL/NH-753J/Bhadgaon-
GAD of Pipe Culvert at Ch. Approved R3 70 24.04.2019
131 Chalisgaon/Pkg-Il/2018- 08.04.2019
80+065 (Design Ch. 80+075) 19/481
ABL/NH-753J/Bhadgaon-
GAD of Pipe Culvert at Ch. Approved R4 70 24.04.2019
132 Chalisgaon/Pkg-II/2018- 08.04.2019
96+308 (Design Ch. 96+318) 19/481
ABL/NH-753J/Bhadgaon-
GAD of Pipe Culvert at Ch. Approved R4 70 24.04.2019
133 Chalisgaon/Pkg-11/2018- 08.04.2019
96+308 (Design Ch. 96+318) 19/481
ABL/NII-753J/Bhadgaon-
GAD of MNB at Ch. 89+300
134 Chalisgaon/Pkg-I1/2018- 08.04.2019 Approved R1 71 24.04.2019
(Design Ch. 89+305)
19/480
ABL/NH-753J/Bhadgaon-
GAD for MNB at Ch. 89+300
135 Chalisgaon/Pkg-I1/2018- 08.04.2019 Approved R1 71 24.04.2019
(Design Ch. 89+305)
19/480

Dimensional Details of Slab for ABL/NH-753J/Bhadgaon-


136 Minor Bridge at Ch. 89+300 Chalisgaon/Pkg-II/2018- 08.04.2019 Approved RO 71 24.04.2019
(Design Ch. 89+305) 19/480

Reinforcement Details of Slab ABL/NH-753J/Bhadgaon-


137 for MNB at Ch. 89+300 (Design Chalisgaon/Pkg-11/2018- 08.04.2019 Approved RO 71 24.04.2019
Ch. 89+305) 19/480

Dimensional Details of ABL/NI1-753J/Bhadgaon-


138 Abutment for MNB at Ch. Chalisgaon/Pkg-I1/2018- 08.04.2019 Approved RO 71 24.04.2019
89+300 (Design Ch. 89+305) 19/480

Reinforcement Details of ABL/NH-753J/Bhadgaon-


139 Abutment for MNB at Ch. Chalisgaon/Pkg-11/2018- 08.04.2019 Approved R1 71 24.04.2019
89+300 (Design Ch. 89+305) 19/480

ABL/NH-753J/Bhadgaon-
Geo-Technical Investigation R1 71 24.04.2019
140 Chalisgaon/Pkg-I1/2018- 08.04.2019 Approved
Report of MNB at Ch. 89+300 19/480
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753j From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
0' Maharashtra on EPC Mode.

Annexure - L
Applicable Permits

Ashoka Buildcon Limited Page 87


41.

Project Name : Up-gradation of Bhadgaon- Chalisgaon (section II )of NH 753J from chainage 56+200 Km to 103+000 Km to Two
lane with paved shoulders/ Four Lane configuration of [ Jalgaon - Bhadgaon -Chalisgaon -Nandgaon -Manmad-NH 753J -
(46.800 Km )] in the State of Maharashtra on EPC mode

Name of EPC Contractor: Ashoka Buildcon Ltd.


Compliance Report

Sr. No. Nature of Permits Status as on 31.03.2019

1 Permission of the State Government for extraction of boulders fromquarry; Obtained

Permission of Village Panchayats and Pollution Control Board for installation of


2 Obtained
crushers
3 Licence for use of explosives Obtained

7 4 Permission of the State Government for drawing water from river/reservoir Obtained

1 Licence from inspector of factories or other competent Authority for setting up


5 Applied for permission
4 batching plant
1 Clearance of Village Panchayats and Pollution Control Board for setting up asphalt
6 Obtained
plant
If
7 Permission of Village Panchayats and State Government for borrow earth Obtained

8 Diesel pump Applied for permission

9 Explosive license Obtained

IP 10 Submission of Insurance ( WC & CAR) Obtained

11 Labour Licence Obtained


r

YIP

Ur

+0,
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

Annexure - M
Daily Event Register

Ashoka Buildcon Limited Page 88


Project Name - Up-gradation of Bhadgaon- Challsgaon (section II )of NH 753) from chatnage 56+200 Km to 103+000 Km to Two lane with paved shoulders/ Four Lane
configuration of [ Jalgaon - Bhadgaon -Challsgaon -Nandgaon -Manmad-NH 753) - (46.800 Km )] In the State of Maharashtra on EPC mode

IMPORTANT EVENTS ON THE PROJECT

Sr. No. Date Event Outcome

1 28-Mar-2018 Acceptance of Letter of Award (LOA)

2 Submission of Performance Guarantee

3 16-Apr-2018 Signing of Agreement -----


Communicated to PWD, NH DIV Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/2018-
4 18-May-2018 Shifting of Utility of MSEDCL lines.
19/15 dated 1805.2018
Shifting / Relocation of Religious Structures-Thadgoaon & Communicated to PWD, NH DIV Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/2018-
5 31-May-2018
Challsgaon. 19/17 dated 31.05.2018
Utility Shifting-Shifting of Water Supply Lines Infringing Communicated to PWD, NH DIV Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/2018-
6 31-May-2018
construction zone within Existing Right of Way. 19/19 dated 31.05.2018
Utility Shifting - Shifting of Electric Lines/ Poles-Joint Site Communicated to PWD, NH DIV Vide our letter No ABL/CENII/Bhadgaon-Chalisgaon/2018-
7 1-Jun-2018
Inspection. 19/20 dated 01.06.2018
Permission for Lifting of Earth / Murum / Boulder
Communicated to PWD, NH DIV Vide our letter No ABL/CENII/Bhadgaon-Chafisgaon/2018-
8 4-Jun-2018 Material from the bed of Dam /Reservoir / Ponds / Small
19/22 dated 04.06.2018
Barrages etc for the Project
Communicated to GM, Airtel India Pvt Ltd. Vide our letter No ABL/CENH/Bhadgaon•
9 16-Jun-2018 Utility Shifting - Shifting of Cables/ Repeators
Chalisgaon/2018-19/24 dated 16_06.2018
Communicated to GM, Bharati, Telesonic Pvt Ltd Vide our letter No ABL/CENH/Bhadgaon-
10 16-Jun-2018 Utility Shifting - Shifting of Cables/ Repeators
Chalisgaon/2018-19/25 dated 16.06.2018
Communicated to GM,Co-axial cable RO, BSNL Vide our letter No ABL/CENH/Bhadgaon-
11 16-Jun-2018 Utility Shifting - Shifting of Cables/ Repeators
Challsgaon/2018-19/26 dated 16.06.2018
Communicated to GM,Idea. Pvt Ltd Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/2018-
12 16-Jun-2018 Utility Shifting - Shifting of Cables/ Repeators
19/27dated 16.06.2018
Communicated to GM,Rellance Nextling, Pvt Ltd Vide our letter No ABL/CENH/Bliadgeon-
13 16-Jun-2018 Utility Shifting - Shifting of Cables/ Repeators
Chalisgaon/2018-19/28 dated 16.06.2018
Communicated to GM, Tata Indicom, Pet Ltd Vide our letter No ABL/CENH/Bhadgaon-
14 16-Jun-2018 Utility Shifting - Shifting of Cables/ Repeators
Chalisgaon/2018.19/29 dated 16.06.2018
Communicated to GM, Vodafone, Pvt Ltd Vide our letter No ABL/CENH/Bhadgaon-
15 16-Jun-2018 Utility Shifting - Shifting of Cables/ Repeators
Chalisgaon/2018-19/30 dated 16.06.2018

Submission of Typical Details of Metal Beam Crash-barrier,


Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/2018-19/32
16 22-Jun-2018 Typical Details of Truck Lay Bye, Typical Details of
dated 22.06.2018
Kilometer, Hectometer & Boundary Stones

Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/2018-19/33


17 25-Jun-2018 Approval of Project Quality Assurance Plan.
dated 25.06.2018
Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/2018-19/35
18 25-Jun-2018 Approval of Third Party Laboratories (NABL Accredited)
dated 25.06.2018
Communicated to EE NH Div Vide our letter No ABL/CENII/Iihadgaon-Chalisgaon/2018-19/42
19 21-Jun-2018 Advance Payment Guarantee.
dated 25.06.2018
Communicated to EE NH Div Vide our letter No ABL/CENH/Ithadgaon-Chalisgaon/20113-19/43
20 26-Jun-2018 Submission of Typical Cross Sectiuon-TCS for Pkg-11.
dated 25.06.2018
Submission of Traffic Diversion Plan for the Project during
Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/2018-19/45
21 27-Jun•2018 Construction in accordance with Clause 10.1.3 (Pkg_II) of
dated 27.06.2018
Contract
Appointment of Proof Consultant-Delay in Project Communicated to CE NH Div, Navi-Mumbai Vide our letter No ABL/CENH/Bhadgaon-
22 29-Jun-2018
Activities. Chalisgaon/2018-19/47 dated 29.06.2018
Appointment of Safety Consultant-Delay in Project Communicated to CE NH Div, Navi-Mumbai Vide our letter No ABL/CENH/Bhadgaon-
23 29-Jun-2018
Activities. Chalisgaon/2018-19/48 dated 29.06.2018
Factory Visit for Inspection & Testing for KC Hume Pipes Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
24 16-Jul-2018
of Class NP-3 & NP-4 Reg. 11/2018-19/64
Submission of Plan & Profit Drawing from ch. 56+223 Km Communicated to EE NH Dlv Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
25 21-Jul-2018
To 103+000 Km-Pkg-II-reg. 11/2018-19/66
Submission of Test Report of RCC Hume Pipe of M/s.
Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
26 23-Jul-2018 Garima Cement Pipe Industries of Dia. 900 mm & 1200
11/2018-19/67
mm for Anoroval-reg.
Submission of Hydraulic Design Calculation of Major Communicated to EE NH Div Vide our letter No ABL/CENH/Iihadgaon-Chalisgaon/PKG-
27 27-Jul-2018
Bridge at Ch.57+088 -Pkg-II-Reg. II/2018.19/73
Soil/Muroom/Boulder Upgradation of exsting highway Communicated to Division Office vide our Letter No ABL/CENII/Bhadgaon-Chalisgaon/PKG-
28 30-Jul-2018
Vechicles. 11/2018-19/76
Soil/Muroom/Boulder tlpgradation of exsting highway Communicated to Division Office vide our Letter No AHL/CENII/Bhadgaon-Chalisgaon/PKG-
29 30-1u1-2018
Vechicies. 11/2018-19/85
UnauthoriZed Occupation-Removal of Private Structures Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
30 2-Aug-2018
Falling within the FROW (Govt I and)- Pkg-11- Reg. 11/2018-19/78
Maintenance during Construction Period as per Clause Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
31 3-Aug-2018
10.4 of Contract-reg. 11/2018-19/79
Obstruction to Execution during tree plantatioan within Communicated to BE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
32 3-Aug-2018
EROW- Reg. 11/2018-19/81
Factory Visit for Inspection & Testing REINFORCEMENT Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
33 3-Aug-2018
STEEL (TMT) FE 550 D-Pkg-II-Reg. 11/2018-19/82
Submission of General Arrangement Drawing of Pipe
Culverts at Ch.65+662 (Design Ch.65+667), Ch.66+350 Communicated to EE NH Div Vide our letter No ABL/CENH/Ithadgaon-Chalisgaon/PKG-
34 4-Aug-2018
(Design Ch. 66+352) & at Ch. 66+765 (Design Ch. 66+770) 11/2018-19/82-A
Pkg-II-Reg.

Submission of General Arrangement Drawing of Pipe


Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
35 4-Aug-2018 Culverts at Ch.72+625 (Design Ch.72+635), Ch72+930
11/2018-19/83
(Design Ch.72940)- Pkg-II-Reg.

Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-


36 4-Aug-2018 Regardomg Additionally Found & Missing Culverts
11/2018-19/84
Regarding Submission of Revised Typical Cross Section Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
37 7-Aug-2018
TCS-111A-Pkg-11-Reg. 11/2018-19/86

1 048
rr
Sr. No. Date Event Outcome

Status of Preconstructlon Activities & Intimation regarding


lir Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
38 8-Aug•2018 Events having continuing delay effect seeking Extension of
11/2018-19/89
Time-Reg.
Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
11° 39 8-Aug-2018 Payment of Mobilization Advance-Reg.
11/2018-19/90
Submission of Monthly Progress report for the month of Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
40 9-Aug•2018
up july•2018-Reg. 11/2018-19/91
Sumbmission Drawing of Major Bridge at Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
41 9-Aug-2018
Ch.57+088(Design ch. 57093)•Pkg-II•Reg. 11/2018-19/92
r
Sumbmission of General Arrangement Drawing of Box
Culvert at Ch. 62+640 (Design Ch. 62+640), Box Culvert at Communicated to EE NH Div Vide our letter No ABL/CEN11/Bhadgaon-Chalisgaon/PKG-
42 10-Aug-2018
Ch. 68+250 (Design Ch. 68+254), Box Culvert at Ch. 74225 11/2018-19/93
r
(Design Ch.74+235).

Force Majeure Event _ Strike called by State Employees of Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
r 43 10-Aug-2018
Union from 07.08.2018 to 09.08.2018-Pkg-II- Reg. 11/2018-19/94

Force Majeure Event- Road Blockade (Bandh) in


Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon•Chalisgaon/PKG-
44 10-Aug-2018 Maharashtra State on 09.08.2018 Called by Maratha Kranti
11/2018-19/95
Sangharsh AssociatIOnaeL
Submission of Test Reports of RCC Hume Pipe of M/s.
Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon•Challsgaon/PKG-
. 45 13-Aug-2018 Unicem Vibro Cast Pipe Industries of Dia. 900mm & 1200
11/2018-19/97
mm for Approval-Pkg-II-Reg.
Submission of Test Reports of RCC Hume Pipe of M/s.
Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
46 I3-Aug-2018 Paras Spum Pipes. Dhule of Dia. 900mm & 1200mm for
11/2018-19/98
Approval•Pkg•11-reg.
Submission of Test Reports of Reinforcement Steel (TMT)
Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon•C.halisgaon/PKG-
47 13-Aug-2018 FE 550 D Grade of M/s Bhagwati Steel Cast Pvt Ltd.,
11/2018-19/99
Sinnar. Dist Nashike for AoorovalTke-11-Reg.
Submission of Hydraulic Design Calculation for Pipe Communicated to EE NI1 Div Vide our letter No ABL/CENH/Bhadgaon•Chalisgaon/PKG-
48 13•Aug•2018
Culverts (PART-B)-Pkg-11-Reg. 11/2018-19/100
Submission of Hydraulic Design Calculation for Box Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
49 13-Aug-2018
culverts (PART•8)-Pkg-11-Reg. 11/2018-19/101
Dispute Raised by Adjoining Land Owner abut ROW- Communicated to EE NH Div Vide our letter No ABL/CEN11/13hadgaon-Chalisgaon/PKG-
50 14-Aug-2018
Demarcation of ROW on Site-Pkg-11-Reg. 11/2018.19/102
Submission of General Arrangment Drawing of Box Culvert
Communicated to EE NH Div Vide our letter No ABL/CENII/Bhadgaon•Chalisgaon/PKG-
51 14-Aug-2018 at Ch. 63+027 (Design Ch. 63+060) & Ch. 68+490 (Design
11/2018-19/103
Ch. 68+494)-Pkg-II- Reg.
Regarding Submission of Rigid Pavement Design Report- Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
52 20•Aug•2018
Pkg-II-Reg. 11/2018-19/107
Source Approval of Water of Open Well at Base 0 Km Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon•Chalisgaon/PKG-
53 20-Aug-2018
70+765 to 2 Km LHS - Pkg-11-Reg. 11/2018-19/108
Submission of Hydraulic Design Calculation of Minor Communicated to EE NI1 Div Vide our letter No ABL/CENII/Lihadgaon-Chalisgaon/PKG-
54 20-Aug-2018
Bridge at Ch. 59+964 (Design Ch.59+965)- Pkg-II-Reg. 11/2018-19/109
Submission of General Arrangment Drawing of Minor Communicated to EE NH Div Vide our letter No ABL/CEN11/Bhadgaon-Chalisgaon/PKG-
55 20-Aug-2018
Bridge at Ch. 59+964 (Design Ch. 59965•Pkg-Reg. 11/2018.19/110
Submission of Hydraulic Design Calculation of Minor Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
56 20-Aug-2018
Bridge at Ch. 60+267 (Design Ch. 62+270)-Pkg-11-Reg. 11/2018-19/111
Submission of General Arrangment Drawing of Minor Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
57 20-Aug-2018
Bridge at Ch. 60+267 (Design Ch. 60+270)-Pkg-11-Reg. 11/2018-19/112
Submission of Hydraulic Design Calculation of Minor Communicated to EE NH Dlv Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
58 20-Aug-2018
Bridge at Ch. 76+610 (Design Ch. 76621)-Pkg-11-Reg. 11/2018-19/113
Submission of General Arrangment Drawing of Minor Communicated to BE NH Div Vide our letter No ABL/CENI1/13hadgaon-Chalisgaon/PKG.
59 20-Aug-2018
Bridge at Ch. 76+610 (Design Ch. 76+621)-Pkg-ll-Reg. II/2018-19/114
Submission of Mescellaneous Drawing & Design of Box Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
60 20-Aug-2018
Drain with Precast Cover-Pkg•II•Reg. 11/2018-19/116
Force Majeure-Road Blockade (Bandh) in Bhadgaon Tehsil
Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
61 20-Aug-2018 on 18.08.2018 Called by Samvidhan Sangharsh Samiti •
11/2018-19/117
Reg.

Submission of General Arrangement Drawing of Pipe


Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
62 21-Aug-2018 Culvert at Ch. 80+320 (Design Ch. 80+330) & at Ch.
11/2018-19/118
100+720 (Design Ch.100+732)-Pkg-11-Reg.

Kodgaon, Mundkheda, Galan and Agnawati Parmission for Communicated to EE NH Dlv Vide our letter No ABL/CENH/Bhadgaon-C.halisgaon/PKG-
63 21-Aug-2018
Water. 11/2018-19/119
Communicated to EE NH Div Vide our letter No ABL/CENII/Bhadgaon-Chalisgaon/PKG-
64 22-Aug-2018 Submission of Drainage Plan & Profile-Pkg-1l-Reg.
11/2018-19/120
Legal Laying of pipes through Slab Culvert @ Km 70+270
Communicated to Grampanchayat. Nagardevla vide our letter No ABL/CENH/Bhadgaon-
65 22-Aug-2018 within the ROW by Grampanychayat Nagargevala•Pkg-II-
Chalisgaon/PKG-11/2018-19/121
Reg.

Submission of Drainage Plan & Profile from Ch. 59600 To Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
66 23-Aug-2018
59+900•Pkg-II-Reg. II/2018-19/122
Submission of Pipe Culverts at Ch. 70+975 (Design Ch.
Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
67 23-Aug-2018 71085), at Ch. 82+950 (Design Ch. 82+958) & at Ch.
11/2018.19/123
1n 1 + 4 5 11 (Desien Ch. 101+4631-Pkv-11-Rer,
Utilization of Pond Ash and Fly Ash of Deep Nagar Thermal
68 24-Aug-2018 Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Challsgaon/PKG-
Power Plant, Bhuswal of Mahagenco in Project
11/201849/124
Highway_Pkg-11-reg.

Legal Laying of pipes through Slab Culvert @ Km 70+270 Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
69 25-Aug-2018
within the ROW by Grampanychayt Nimbhora-Pkg-11-Reg, 11/2018-19/125

70 25-Aug-2018 Testing the Sample of Steel-Pkg-Reg. Communicated to Director„ CSRT-Structwel Lab Pvt. Ltd. Pune vide letter No
ABL/CENH/Bhadgaon•Chalisgaon/PKG-11/2018-19/126

71 25-Aug-2018 Communicated to Director„CSRT-Structwel Lab Pvt. Ltd. Pune vide letter No


Testing the Sample of Steel-Pkg-Reg.
ABL/CENH/Bhadgaon-Chalisgaon/PKG-11/2018-19/127

2018
IV'
Sr. No. Date Event Outcome

Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Challsgaon/PKG-


72 25-Aug-2018 Submission of Test Result of Borrow Area No-01-reg.
W 11/2018-19/128
Submission of Plant & Profile Drawing of Ch.56+200 km to Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
73 25-Aug-2018
103+010.478 km 11/2018-19/129
Ve
Submission of General Arrangement Drawing of Pipe
Culverts At Ch. 59+200 (Design Ch.59+108), at Ch. 59+482 Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
74 25-Aug-2018
F (Design Ch. 59+305) at Ch. 83+806 (Design Ch. 83+813)- 11/2018-19/131
Pkg-II-Reg.

Submission of General Arrangement Drawing of Minor Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
P 75 27-Aug-2018
Bridge at Ch. 60+267 ( Design Ch. 60+270) - Pkg-II-Reg. 11/2018-19/135

Submission of General Arrangement Drawing of Minor


Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
76 27-Aug-2018 Bridge at Ch. 77+340 (Design Ch. 77+417) in widening
11/2018-19/136
protion-Pkg-II-Reg.
Submission of Typical Design & drawing of Retaining Wall Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
C 77 27-Aug-2018
for Box Culvert-Pkg-II-Reg. 11/2018.19/137
Requirement of Hydrology Data of Culverts located on Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
78 28-Aug-2018
r Irrigation Canal-Pkg-11-Reg. 11/2018-19/138
Submission of General Arrangement Drawing of Pipe
Culvert at Ch.86+565 (Design Ch. 86+580), Pipe Culvert at Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Challsgaon/PKG-
, 79 30-Aug-2018
Ch. 85+180 (Design Ch. 85+198), Pipe Culvert at Co. 11/2018-19/139
90+625 (Design Ch. 90+640).
Submission of General Arrangment Drawing of Pipe
Culvert at Ch. 87+310 (Design Co. 87+317), Ch. 84+790 Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisg-aon/PKG-
80 31-Aug-2018
(Design Ch. 84+798) & Pipe Culvert at Ch. 91+865 (Design 11/2018-19/142
Ch. 90+877) Pkg-II Reg.
Submission of General Arrangement Drawing of Pipe
Communicated to EE NH Div Vide our letter No ABL/CEN H/Bhadgaon-Chalisgaon/PKG-
81 31-Aug-2018 Culvert at Ch. 61+217 (Design Ch. 61+310), Pipe Culvert at
11/2010.19/143
Ch. 102+430 (Design Ch. 102+435) Pkg-11-Reg.
Submission of General Arrangment Drawing of Pipe
Culvert at Co. 61+54.6 (Design Ch. 61+500) & Pipe Culvert Communicated to EE NH Dlv Vide our letter No ABL/CEN H/Bhadgaon-Chalisgaon/PKG-
82 31-Aug-2018
at Ch. 96+308 (Design Ch. 96+318), Pipe Culvert at Ch. 11/2018-19/144
80+065 (Design Ch. 80+0751 Pkg-11-Reg,
Submission of General Arrangement Drawing of Box Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
83 3-Sep-2018
Culvert at Ch. 75+564 (Design Ch. 75+574) Pkg-II-Reg. 11/2018-19/145
Submission of General Arrangement Drawing of Box Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
84 3-Sep-2018
Culvert at Ch. 73.960(Design Ch. 73+994) Pkg-II- Reg. 11/2018-19/146

Submission of General Arrangement Drawing of Minor Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
85 3-Sep-2018
Bridge at Ch. 102+880 (Design Ch. 102+898)-Pkg-11- Reg. 11/2018-19/147

Submission of Hydraulic Design Calculation of Minor Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Challsgaon/PKG-
86 3-Sep-2018
Bridge at Ch. 70+618 (Design Ch. 70+628) Pkg-II-Reg. 11/2018-19/148

Submission of Hydraulic Design Calculation of Minor Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Challsgaon/PKG-
87 3-Sep-2018
Bridge at Ch. 102+050 (Design ch. 102+058) Pkg-II-Reg. 11/2018-19/149

Submission of Hydraulic Design Calculation of Minor Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
88 3-Sep-2018
Bridge at Ch. 102+880 (Design Ch. 102+898) Pkg-11-Reg. 11/2018-19/150

Submission of General Arrangement Drawing of Minor Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
89 3-Sep-2018
Bridge at Ch. 105+050 (Design Co. 102+058)-Pkg-II-Reg. 11/2018-19/151

Submission of Geneal Arrangement Drawing of Box Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
90 3-Sep-2018
Culvert at Ch. 7S+945(Design Ch. 75+957) Pkg-Il-Reg. 11/2018-19/152
Submission of Geneal Arrangement Drawing of Box Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
91 3-Sep-2018
Culvert at Ch. 71+660 (Design Ch. 668)-Pkg-II-Reg. 11/2018-19/153
Submission of General Arrangement Drawing of Minor Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
92 3-Sep-2018
Bridge at Ch. 70+168 (Design Ch.70+628) Pkg-11-Re& 11/2018-19/154

Minutes of Meeting convened by SE, NH Circle Pune at Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
93 3-Sep-2018
Sakari PWD Rest House on 29th August, 2018-Pkg-II-Reg. 11/2018-19/155

Submission of Lab. Equipment Calibration Report-Pkg-11- Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
94 4-Sep-2018
Reg 11/2018-19/156
Submission of General Arrangment Drawing of Minor Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
95 7-Sep-2018
Bridge at Ch. 73+180 (Design Ch. 73+187) Pkg-11-Reg. II/2018-19/157
Submission of Hydraulic Design Calculation of Minor Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
96 7-Sep-2018
Brdige at Ch. 73+180 (Design Ch. 73+187) Pkg-II-Reg. 11/2018-19/158
Submission of Hydraulic Design Calculation of Minor Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
97 7-Sep-2018
Bridge at Ch. 82+595 (Design Ch. 82+302) Pkg-11-Reg. 11/2018.19/159
Submission of General Arrangement Drawing of Pipe
Culver at Ch. 68+782 (Design Ch. 68+786), Ch. 56+967
Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
98 7-Sep-2018 (Design Ch. 56+878), Ch. 57+965 (Design ch. 58+328) &
11/2018-19/160
Pipe Culvert at Ch. 67+665 (Design Ch. 67+668). Pkg-II-
Reg.
Submission of GAD of Minor Bridge at Ch. 82+302-Pkg-II- Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
99 7-Sep-20I8
Reg. 11/2018-19/161
Submission of General Arrangement Drawing of Pipe
Culvert at Ch. 70+120 (Design Ch. 70+129), Pipe Culvert at Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
100 7-Sep-2018
Ch. 58+985 (Design Co. 58+832), Pipe Culvert at Co. 11/2018-19/162
78+500 (Design Ch. 78+501).

Submission of Concrete Mix Design - Job Mix Forumula Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Challsgaon/PKG-
101 7-Sep-2018
(JMF) Grade-M10, M15 (PCC) & M20 (RCC) - Pkg-Il-Reg 11/2018-19/163

Issurance of Form-V for Labour License-Gentle Remidner- Communicated to EE NH Div Vide our letter No ABL/CEN H/Bhadgaon-Chalisgaon/PKG-
102 7-Sep-2018
Pkg-11-Reg. 11/2018-19/164
Communicated to EE NH Div Vide our letter No ABL/CEN H/Bhadgaon-Chalisgaon/PKG-
103 7-Sep-2018 Approval of Concrete dmixture Source-Pkg-II-Reg.
11/2018-19/165

3 of 6
INP*
1 1
Event Outcome i
Sr. No. Date

Submission of Monthly Progress Report for the month o Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
04 7-Sep-2018 11/2018-19/166
August-20 113-Pkg-11-Reg.
Status of Preconstruction Activities & Intimation regarding
Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
rpti75 7-Sep-2018 Events having continuting delay effect for Extension o
11/2018-19/167
Time-Reg.
Submission of Lab. Equipment Calibration Report-Pkg-11- Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
rip 06 7-Sep-2018
11/2018-19/168
Reg
Intimation for Conducting BBd Survey In Overlay Stretches
I Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
07 8•Sep-2018 at Design Ch. 83+800 to 92+350 & Design Ch. 97+400 To
11/2018-19/169
99+000 (As per Schecule B)-Pkg-11-Reg.
I Submission of GAD of Minor Bridge at Ch. 56+566 (Design Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-

r
108 8-Sep-2018
Ch. 56+561) Pkg-11-Reg. 11/2018.19/170
Submission of General Arrangement Drawing of Pipe
Communicated to EE Nil Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
109 8-Sep-2018 Culvert at Ch. 81+990 (Design Ch. 82+000), Ch. 91+510
11/2018-19/171
(Design Ch. 91+521) Ch. 95+025 (Design Ch. 95+003) &
Submission of GAD of Minor Bridge at Ch. 82+475 (Design Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Challsgaon/PKG-
7 110 8-Sep-2018
Ch. 82+482) Pkg-11-Reg. 11/2018-19/ 172
Submission of Hydrualic Design Calculation of Minor Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
Till 8-Sep-2018
Bridge at Ch. 56+566 (Design Ch. 56+561) Pkg-II-Reg 1112018-19/173

T 112 8-Sep-2018
Submission of General Arrangement Drawing of box
Culvertat Ch. 93+590), Box Culvert at Ch. 99+575 (Design
Ch. 99+575) Pkg-11-Reg.
Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
11/2018-19/174

7 113 8-Sep-2018
Submission of GAD of Minor Bridge at Ch. 78+782 (Design Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
Ch. 78+793) Pkg-11-Reg. 11/2018-19/175
Submission of GAD of Minor Bridge at Ch. 89+300 (Design Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
114 8-Sep-2018
Ch. 89+305) Pkg-II-Reg. 11/2018-19/176
Submission of Hydraulic Design Calculation of Minor Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
7 115 8-Sep-2018
Bridge at Ch. 69+850 (Design Ch. 69+858) Pke-11-Reg 11/2018-19/177
Submission of Hydraulic Design Calculation of Minor Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
7 116 8-Sep-2018
Brdige at Ch. 82+475 (Design Ch. 82+482) Pkg-II-Reg. 11/2018-19/178
Submission of Hydraulic Design Calculation of Minor Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
1 117 8-Sep-2018
Bridge at Ch. 78+782 (Design Ch. 78.793)-Pkg-11-Reg. 11/2018•19/179
Submission of Hydraulic Design Calculation of Minor Communicated to EE N11 Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
118 8-Sep-2018
Bridge at Ch. 89+300 (Design Ch. 89+305) Pkg-11-Reg. II/2018-19/180
411
Submission of GAD of Minor Bridge at Ch. 69+850 (Design Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
11 119 12-Sep-2018
Ch. 69+858) Pkg-II-Reg. II/2018-19/181
Demand of Grampanchayat Waghali for Provision of Pipe
. Communicated to EE NH Dlv Vide our letter No ABL/CENH/Bhadgaon-Chalisg-aon/PKG-
120 12-Sep-2018 Culverts at Village: Waghali, Tehsil : Chalisgoan, Dist •
11/2018-19/182
jalgaon Pkg-11-Reg.
• Approval of Revised Plant & Profile Drawing From Km Communicated to EE NH Div Vide our letter No ABL/CEN11/Bhadgaon-Chalisgaon/PKG-
121 17-Sep-2018
56+200 to Km 103+000-Pkg-II-Reg. 11/2018-19/183
Approval of Bitumen Emulsion (SSI&RS-1) Source-Pkg- Communicated to EE Nil Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
, 122 20-Sep-2018
Reg. 11/2018.19/184
Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
123 20-Sep-2018 Approval of Bitument Source-Pkg-II-Reg.
11/2018-19/185
Approval of Fly Ash (Mineral Admixture) Source-Pkg-II- Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
124 20-Sep-2018
Reg. 11/2018-19/186
AMP
Obstruction in execution of Works due to existence o
Communicated to EE NH Dlv Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
125 20•Sep-2018 Water Supply Lines the Construction Zone & Lines
11/2018-19/187
damaged during excavation-Pkg-II-Reg.

Submission of Video Recording in accordance with Clause Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
126 20-Sep-2018
11.6 of Contract-Pkg-11-Reg. 11/2018-19/191

Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-


127 26-Sep-2018 Approval of PQC Raw Material Source-Pkg-II-Reg.
11/2018-19/196
4/le Submission of Test Results of Borrow Area No-02&03-Pkg Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
128 26-Sep-2018
II-Reg. 11/2018-19/197
Approval of Bituminous Drum Mix Plant-DM for the Communicated to EE NH Div Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
129 28-Sep-2018
Project-Re Submission•Pkg--11-Reg. 11/2018-19/201
Obstruction In Road Widening due to Encoachments Communicated to EE Nil Div Vide our letter No ABL/CEN11/Bhadgaon-Chalisgaon/PKG-
130 28•Sep-2018
withing Existing Right of Way-Reg. 11/2018.19/203
Extraction of Murrum/Soil from Govt. Land, Gat No.
Communicated to EE NH Div,Vide our letter No : ABL/CENH/Bhadgaon-Chalisgaon/PKG-
131 8-Oct-2018 173/2,177,237,&240 of Vilage: Nimbhora, Tehshil:
11/2018-19/218
Bhadgaon & Dist: Jalgaon-Pkg-11-Reg.
ere
egkeka fodkl dladzekikBh xkG.k /kl.kkrwu elahCreq:e ps
132 8-Oct-2018 ABL/CENH/Bhadgaon-Chalisgaon/PKG-11/2018.19/219
mR[kuu dj.ksdkeh eqnr ok< feG.ks ckcr uez fouaeh-

egkekx2 fodkl dk;Zdzeklidth vXukorh ca/kkU;krqu


133 8-Oct-2018 elcrhReq:e ps mR[kuu dj.ksdkeh eqnr ok< feG.ks ckcr uez ABL/CENH/Bhadgaon-Chalisgaon/PKG-11/2018-19/220
fouaeh-
ED'
Approval of Curling Compound & Polysulphide Sealant Communicated to EE NH Div,Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
134 8-Oct-2018
Source-Pkg-II-Reg. 11/2018-19/22I
Approval of Third Party Laboratory (NABL Accredited- Communicated to EE NH Div, Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
135 8-Oct-2018
Pkg. II-Reg. 11/2018-19/222
Status of Preconstruction Activities & Intimation regarding
136 Communicated to EE NH Div, Vide our letter No ABL/CENII/Bhadgaon-Chalisgaon/PKG-
8-Oct-2018 Events having continuting delay effect for Extension o
11/2018-19/223
Time-Reg.
137 13-Oct-2018 jL12,1cyxr vlysys olkrIcsMh ckcr- ABL/CENH/Bhadgaon-Chalisgaon/PKG-11/2018-19/227
138 13-Oct-2018 jLR;kyxr vlysys olkrksMh ckcr- ABL/CENII/Ithadgaon-Chalisgaon/PKG-11/2018-19/228
pkGhlxkao oulfj(ks'"kkr jLr;kyxr vMFkGk Bj.kkjh
139 13-Oct-2018 ABL/CENH/Bhadgaon-Chalisgaon/PKG-11/2018-19/229
o'fkrksMh ckcr-
ale Approval of Mix Design of Dry Lean Concrete (DLC)-Pkg-II- Communicated to EE NH Div.Vide our letter No ABL/CENII/Bhadgaon-Chalisgaon/PKG-11/2018-
140 17-Oct-2018
Reg. 19/230
Communicated to EE NH Div, Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
141 17-Oct-2018 Approval of Mix Sesign of Granular Base (GSB)•Pkg-11-Reg.
11/2018-19/231

4 orb
11.

Outcome
I
Sr. No. Date Event I
Communicated to EE NH Div, Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/P KG-
142 17-Oct-2018 Approval of Stone Quarry Source-Pkg-11-Reg.
II/2018-19/232
;k 'kkldh; tehuhrhy ik>) rykok e/lcwu egkekxZ fodkik P;k
143 19-Oct-2018 dkekdjhrk ekrh@eq:e@mpy.;klkBh xzkelaplca- ;leaps ukgjdr ABL/CENH/Bhadgaon-Challsgaon/PKG-11/2018-19/233
V.• nklkyk feGsks ckcr-
oulfj(lcs'Icicr jl.r;kyxr vMFkGk Bj.kkjh ollcrIcsMh
144 19-Oct-2018 ABL/CENH/Bhadgaon-Chalisgaon/PKG-11/2018.19/234
ckcr-
145 19.Oct-2018 ji.Rigxr vlysys o'{krksMh ckcr- ABL/CENH/Bhadgaon-Chalisgaon/PKG-11/2018-19/235
Utility Shifting-Payment of 1.3% Supervision Charges for
Communicated to EE NH Div, Vide our letter No ABL/CENH/Bhadgaon-Challsgaon/PKG-
146 23-Oct-2018 Shifting of MSEDCL Electrical lines/Poles obstructing
11/2018-19/236
Construction Works-reg.

NOC of Grampanchayat Bambrud Pra. U. for Extraction of


Soli/Murrum from Got No. 177 Deepening of Percolation Communicated to EE NH Div, Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
147 24-Oct-2018
Tank/Pond near Village: Eambrud Pra.U. Tehshil: Pachora 11/2018-19/238
Dist. jalgaon-Pkg-II-Reg.

Approval of Admixture, Curing Compound, Poysulphlde Communicated to EE NH Dlv, Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
148 24-Oct-2018
Sealant Primer & Road Marking Source-Reg 11/2018-19/239
a.
Utility Shifting-Payment of 1.0% Technical Scutiny fee for
Communicated to EE NH Div. Vide our letter No ABL/CENH/Bhadgaon-Challsgaon/PKG-
149 24-Oct-2018 shifting of water Supply Lines, obsturcting construction
II/2018.19/240
a. workslpkg-reg

Submission of Proof Check Drawing Typical Details of Box Communicated to TPF Engineering Pvt Ltd. In JV with TPF Getinsa Association With NASCENCE
150 30-Oct-2018
Culvert-Pkg-II-Reg Consultant Pvt. Ltd., Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-11/2018-19/243
SP

Submission of Proof Check Drawing of typical of Pipe Communicated to TPF Engineering Pvt Ltd. In IV with TPF Getinsa Association With NASCENCE
151 30-Oct-2018
SP
Culvert-Pkg-II-Reg Consultant Pvt Ltd, Vide our letter No ABL/CENH/Bhadgaon-Challsgaon/PKG-11/2018-19/244

Submission of Proof Check Rigid Pavement Design Report Communicated to TPF Engineering Pvt Ltd. In IV with TPF Getinsa Association With NASCENCE
152 30-Oct-2018
Pkg-II-reg Consultant Pvt. Ltd., Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-11/2018-19/245

The Chief Engineer & Regional Officer, MORT&H, Vide our letter No ABL/CENH/Bhadgaon-
153 30-Oct-2018 Approval's for Utility Shifting wortk-Reg
Chalisgaon/PKG-II/2018-19/246
a.
Submission of Proof Checked Drawing of Typical Communicated to TPF Engineering Pvt Ltd. In IV with TPF Getinsa Association With NASCENCE
154 31-Oct-2018
Miscellaneous Highway Drawing-Pkg-II-Reg. Consultant Pvt Ltd., Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-11/2018-19/247
a.
Existence of Archaeological Structure Mudhal Devi Ancient Communicated to EE NH Div, Vide our letter No ABL/CEN H/Bhadgaon-Chalisgaon/PKG-
155 1-Nov-2018
Temple at Km. 86+900 on LHS of Project Highway 11/2018-19/250 on dated 01.11.2018.

Utility Shifting-Deposition of Payment of 1.3%


Supervision Charges to MSEDCL Chalisgaon & Pachora for Communicated to EE NH Div, Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
156 2-Nov-2018
Shifting of Electrical Lines/Poles obstructing Construction 11/2018-19/252 on dated 02.112018.
Works.
Cancellation of Tree Cutting Permission by RFO Pachora in
Communicated to EE NH Div, Vide our letter No ABL/CEN H/Bhadgaon-Chalisgaon/PKG-
157 12-Nov-2018 respect of Trees falling under Bhadgaon Municipal Council
11/2018-19/264 on dated 12.11.2018.
Limits.
Utility Shifting of Electrical Cable passing through Hume
a. Communicated to EE NH Div, Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
158 12-Nov-2018 Pipe Culvert at Km 100+720 obstructing Construction
11/2018.19/266 on dated 12.11.2018.
Works.

• Utility Shifting of Water Supply Line Passing through


Communicated to EE NH Div, Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
159 12-Nov-2018 Hume Pipe Culvert at Km. 66+765 obstructing
11/2018-19/267 on dated 12.11.2018.
Construction Works.
JO,
Utility Shifting-Deposition of payment of 1.0% Technical
Communicated to EE NH Div, Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
160 23-Nov-2018 Scrutiny Fee to Mil' jalgaon for Shifting of Water Supply
11/2018-19/282 on dated 23.11.2018.
Lines Pertaining to Bhadgaon Municipal Council- Pkg II

Communicated to EE NH Div, Vide our letter No ABL/CENH/B hadgaon-Chalisgaon/PKG-


161 29-Nov-2018 Grievances of Prahar Janshakti Party
11/2018-19/292 on dated 29.11.2018.
• Communicated to EE NH Div, Vide our letter No ABL/CENH/B hadgaon-Chalisgaon/PKG-
162 3-Dec-2018 Problem In execution of widening warkIn khadkl villge
11/2018-19/298 on dated 03.12.2018.
Permission for tree eating from km 64+680 to 76+580 Communicated to EE NH Div, Vide our letter No ABL/CENH/B hadgaon-Challsgaon/PKG-
• 163 5-Dec-2018
Pachora Range-Bhadgaon section saving of trees 1112018-19/300 on dated 05.12.2018.

submission of aditional change of scofre in respect to Communicated to TPF-Engg JV with TPF Getinsa, Vide our letter No ABL/CENH/Bhadgaon-
164 5-Dec-20113
a. culverts Chalisg,aon/PKG-11/2018-19/300 on dated 05.12/018.

Communicated to TPF-Engg JV with TPF Getinsa, Vide our letter No ABL/CEN H/Bhadgaon-
• 165 8-Dec-2018 Submission of Trial Patch Test Results PQC
Chalisgaon/PKG-11/2018-19/313 on dated 08.12.2018.

cfr Submussion of Billing Breakup as per scope of project for Communicated to TPF-Engg IV with TPF Getinsa, Vide our letter No ABL/CENH/Bhadgaon-
166 12-Dec-2018
Interim Payment pursusant in accordance with Schedule-H Chalisgaon/PKG-11/2018-19/319 on dated 12.12.2018.

Submission of Inerim Payment Certificate No.1 of Work


• Communicated to TPF-Engg IV with TPF Getinsa. Vide our letter No ABL/CENH/Bhadgaon-
167 12-Dec-2018 Done Pursuant to Clause 10.1.4 & 19.3 accprdamce vrwith
Chalisgaon/PKG-11/2018-19/320 on dated 12.12.2018.
Sched ule-H-
Prermission for Closure of one side of Road from Kariai
168 12-Dec-2018 naka (Km 95+500) to Chalisgaon Bus stand (km 97+400) Communicated to EE NH Div, Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
for Conlisgaon of four lahe & permission for over lay on 11/2018-19/321 on dated 12.12.2018.
• Obstrrtion by locals during Rosad Construction work From
Km 94+300 to 94+680 villag ozar & Km 102+300 to Communicated to EE NH Div, Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
169 18-Dec-2018
102+820 villge Khadkhl Tehsil Chalisgaon Dist Jalgaon 11/2018-19/334 on dated 18.12.2018.
Reauest to Provide administrative Support
Submission of Video Recording in accordance with Clause Communicated to TPF-Engg JV with TPF Getinsa, Vide our letter No ABL/CEN H/Bhadgaon-
170 20-Dec-2018
11.16 of contract Challsgaon/PKG-II/2018-19/336 on dated 20.12.2018.

as


son s
Sr. No. Date 1 Event t Outcome

Communicated to TPF-Engg jV with TPF Gednsa, Vide our letter No ABL/CEN H/Bhadgaon-
171 25-Dec-2018 Slow Progress Reply
Challsgaon/PKG-11/2018-19/338 on dated 25.122018.

Communicated to TPF-Engg IV with TPF Getinsa, Vide our letter No ABL/CEN H/Bhadgaon-
172 25-Dec-2018 Safety Arrangements Reply
Chalisgaon/PKG-11/2018-19/339 on dated 25.12.2018.

Delay In Tree Felling Permission from Bhadgaon & Communicated to TPF•Engg JV with TPF Getinsa, Vide our letter No ABL/CEN H/Bhadgaon-
173 28-Dec-2018
chalisgaon Municipal Council Chalisgaon/PKG-11/2018-19/345 on dated 28.12.2018.

Tree Felling Permission within Bhadgaon Municipal


Communicated to EE NH Div, Vide our letter No ABL/CENH/Bhadgaon-Chalisgaon/PKG-
174 1-Jan-2019 Council Limits Deposition of Tree Sub Tax For 236 Noz. Of
II/2018-19/346-A on dated 01.01.2019.
Trees Within Bhadgaon Municipal Council Limits.
Appointment of IIT Chennai for Proof Checking & Vetting
Communicated to TPF•Engg JV with TPF Getinsa, Vide our letter No ABL/CEN H/B hadgaon-
175 17-Jan-2019 of Structural design & drawingof mijor Bridges at Km
Chalisgaon/PKG-11/2018-19/376 on dated 17.01.2019.
57+088.
Difference in values of RL w.r.t DPR Values due to non Communicated to TPF-Engg JV with TPF Getinsa, Vide our letter No ABL/CENH/Bhadgaon-
176 24-Jan-2019
provision of GTS Bench Mark Chalisgaon/PKG-11/2018-19/386 on dated 24.01.2019.

Conduction of 30 National Road Safety Week from Communicated to TPF Engineering Pvt.Ltd. TPF Getinsa, Vashi.Chalisgaon our letter NoABL/N11.
177 4-Feb-2019
0+02.2018 to 10.02.2019 753J/Bhadgaon-Chalisgaon/Pkg-11/2018-19/392

Communicated to Chief General Manager Bhusawal thermal power station deep nagar
178 12-Feb-2019 Allotment of Fly ash our above referred NH project
Bhusawal. our letter No ABL/NH-7531/Bhadgaon-Chalisgaon/Pkg-11/2018-19/406

Communicated to TPF Engineering Pvt Ltd. TPF Getinsa, Vashi, Chalisgaon our letter No
179 25-Feb-2019 Submission of Overlay Design Report for final Seal & Sign
ABL/NH-753j/Bhadgaon-Chalisgaon/Pkg-11/2018•19/422
Statas of Preconstruction Activities & intimataion
Communicated to TPF Engineering PvtLtd. TPF Getinsa, Vashi. Chalisgaon our letter No
180 6-Mar-2019 regarding Events having continuing delay offect for
ABL/NH-753J/Bhadgaon-Chalisgaon/Pkg-11/2018-19/438 on dated 06.032019.
extension of time.
Utility Shifting Deposition of Payment of 1.3% Supervision
Communicated to The Deputy Executive Engineer MSEDCL Bhadgaon our letter No ABL/N H-
181 11-Mar-2019 Charges for Shifting of MSEDCL Electrical lines poles
7531/Bhadgaon-Chalisgaon/Pkg-11/2018-19/444 on dated 11.03.2019.
obstructing Construction works

Obstruction by locals during Road Construction Work at


location from Km 102+600 to 102+820 Village Khadld, Communicated to TPF Engineering Pvt.Ltd. TPF Getinsa„ Vashi, Chalisgaon our letter No
182 13-Mar-2019
Tehcil. Chalsgon, Dist Jalgaon Request to provide Xerox ABL/NH-753J/Bhadgaon-Chalisgaon/Pkg-11/2018-19/445 on dated 13.03.2019.
Copy of Joint Measurement sheet from TILR Office.

Non certification of the stage payment statement-items • Communicated to TPF Engineering PvtLtd. TPF Getlnsa. Vashi, Chalisgaon our letter No
183 18-Mar-2019
PQC 2S0 mm and COS of additional thickness in IPC-2 ABL/NH-753J/Bhadgaon-Chalisgaon/Pkg-11/2018-19/449 on dated 18.03.2019.

Submission of Retention Money Bank Guarantee and Communicated to EE NH Dhule our letter No ABL/NH-7531/Bhadgaon-Chalisgaon/Pkg-11/2018
184 29-Mar-2019
request for release of Retention Money. 19/461 on dated 29.03.2019.
Request for Manual PQC in Chalisgaon City in Median
Communicated to TPF Engineering rvt.Ltd.TPF Getinsa, Vashi, Chalisgaon our letter No
185 1-Apr-2019 Portion due to Existence of Street Light poles & Electric
ABL/NH-753J/Bhadgaon-Chalisgaon/Pkg-11/2018-19/467 on dated 01.04.2019.
Lines
Submission of Compliance of Comments raised during site
Communicated to TPF Engineering Pvt.Ltd.TPF Getinsa, Vashi, Chalisgaon our letter No
186 3-Apr-2019 verification on 29.03.2019 in respect of Consolidated
ABL/NH•753J/Bhadgaon-Chalisgaon/Pkg-I1/2018-19/468 on dated 03.04.2019.
Change of Scope Proposal.
Communicated to TPF Engineering Pvt Ltd. Getinsa,Vashi, Chalisgaon our letter No
187 8-Apr-2019 Shifing of Street Lights at Km. 95+790 Near Kharlai Naka.
ABL/NH-7531/Bhadgaon-Chalisgaon/Pkg•11/2018•19/476 on dated 08.04.2019.
Utility Shifting- Shifting of Water Supply Lines- Approval Communicated to EE NH Dhule our letter No ABL/NH-753J/Bhadgaon-Challsgaon/Pkg-11/2018
188 10-Apr-2019
of RO Mumbai. 19/482 on dated 10.04.2019.

Issuance of Certificate towards Achievement of Project


Communicated to TPF Engineering PvtLtd. TPF Getinsa, Vashi, Chalisgaon our letter No
189 15-Apr-2019 Milestone-I & II in accordance with Schedule-1 of Contract
ABL/NH-7531/Bhadgaon-Challsgaon/Pkg-11/2018-19/488 on dated 15.04.2019.
and Release the amount withhold from IPC No. 1,2 &3

6 of 6
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

Annexure - N
Efforts of EPC Contractors for Utility Shifting

Ashoka Buildcon Limited Page 89


4

Project Name : Up-gradation of Bhadgaon- Chalisgaon (section II )of NH 753J from chainage 56+200 Km to 103+000 Km to Two lane with paved
shoulders/ Four Lane configuration of [ Jalgaon - Bhadgaon -Chalisgaon -Nandgaon -Manmad-NH 753J - (46.800 Km )] in the State of Maharashtra on
EPC mode
Follow -Up details with various Utility Agencies
Sr. Name of the Utility & Obstructing Date of Follow- Name & Designation of Reply of representative ABL person name &
Status
No. Utility Owning Entity Chainage Up person visited from Utility Owning Entity designation

Month of June 2018

From 56+200 to 7,11,18 June Mr. S.D. Kalikem, Chief Regarding shifting of MJP Joint survey is done & awaited for Detailed estimate of water Supply Mr. Jayesh Patel & Mr.
1 MJP Water Supply Line
103+000 2018 engg, Nashik Div Water supply line Line. Sujay Thube

12,19,21 June Mr Mahesh Borse sir


2018 1) Mr. Gupta Sir, Deputy
Engg Bhadgaon section
Electrical Utility From 56+200 to Regarding shifting of Joint survey is done & awaited for Detailed estimate of MSEDCL elctrical
2 2) Mr. Sachin Joshi,
Shifting 103+000 MSEDCL electrical Line Line
Deputy Engg, Chalisgaon
section •up.

Forest Department From 83+900 to 13-Jun-18 MR. khatri, Assitant of Regarding permission for List of Tree cutting submitted to Authority Mr. Mahesh Borse
92+650 & From DFO Tree cutting & Estimates of
3 Tree Cutting
97+400 to 99+300

Month of July 2018

1.Mr.S.D.kalikem, Chief
06, 19, 20 July engg,Nashik div 2.DE- Regarding shifting of MJP Joint survey is done & awaited for Detailed estimate of water Supply Mr Jayesh Patel & Mr.
From 56+200 to
1 MJP Water Supply Line Water supply Line Line Sujay Thube
103+000 2018 PWD NH 3.zila Parishad -
Jalgaon & Pachora.

1)Mr. S.K. Patil


Sir,Deputy executive
Engg. Sub Division
Electrical Utility From 56+200 to 11,20,24 July Regarding shifting of MSDCL Joint survey is done & awaited for Detailed estimate of MSDCL electrical Mr. Sanjog Dongare
2 Jalgaon Rural Line
Shifting 103+000 2018. electrical Line
2)Mr. P.D. More sir,
Additional Executive
Engg, Pachora 3
From 83+900 to Regarding permission for
92+650 & From Mr.Khatri , Assitant of List of Tree cutting submitted to Authority and awaited for Tress felling Mr. Mahesh Borse
3 Forest Department 2,9,16 July 2018. tree cutting & Estimates of permission.
97+400 to 99+300 DFO
Tree Cutting

Month of August 2018

1 of 6
4

Sr. Name of the Utility & Obstructing Date of Follow- Name & Designation of Reply of representative
ABL person name &
No. Utility Owning Entity Chainage Up person visited from Utility Owning Entity Status
designation

1.Mr.S.D.kalikem, Chief
From 56+200 to 14,16, 20,21 & engg,Nashik div 2.DE- Regarding shifting of MJP Detailed estimate of water Supply Line is submitted to Authority for
1 MW Water Supply Line Mr Jayesh Patel & Mr.
103+000 28 August 2018 PWD NH 3.zila Parishad - Water supply Line Approval. Sujay Thube
Jalgaon & Pachora.

1)Mr. S.K. Patil


Sir,Deputy executive
13,
Electrical Utility Engg. Sub Division
From 56+200 to 17,18,21,22,23,2 Regarding shifting of MSDCL Detailed estimate of Electrical Line is submitted to Authority for
2 Jalgaon Rural
Shifting 103+000 7,28 August electrical Line Mr. Sanjog Dongre
2)Mr. P.D. More sir, Approval.
2018.
Additional Executive
Engg, Pachora 3 ow
From 83+900 to
92+650 & From Regarding permission for
6,13,17,20,28 Mr.Khatri , Assitant of List of Tree cutting submitted to Authority and awaited for Tress felling
3 Forest Department 97+400 to 99+300 tree cutting & Estimates of Mr. Mahesh Borse
August 2018. DFO permission.
Tree Cutting

Month of September 2018


...
Detailed cost estimate of Water supply Line is completed and ready with
1.Mr.S.D.kalikem, Chief
4,5,6,11,15,19 & utility owning agencies. Utility owning agencies has submitted demand
From 56+200 to engg,Nashik div 2.DE- Regarding shifting of MJP Mr Jayesh Patel & Mr.
1 MJP Water Supply Line 24,29 to Authority for Deposition of 1% technical scrutiny fee. Approval for
103+000 PWD NH 3.zila Parishad - Water supply Line Sujay Thube
September 2018 payment is awaited from Authority. EPC Contractor is ready to deposit
Jalgaon & Pachora.
payment after approval of Authority to avoid further delay.

1)Mr. S.K. Patil


Sir,Deputy executive Detailed estimate of Electrical Line is submitted to Authority for
5,6,15,18 & Engg. Sub Division Approval. Approval from Authority is awaited for estimate and payment
Electrical Utility From 56+200 to Regarding shifting of MSDCL Mr Jayesh Patel & Mr.
2 25,27,30 Jalgaon Rural of 1.3% supervision charges to MSEDCL. EPC Contractor is ready to pay
Shifting 103+000 electrical Line Sujay Thube
September 2018 2)Mr. P.D. More sir, supervision charges after approval of Authority to avoid delay in
Additional Executive procedure..
Engg, Pachora 3
From 83+900 to
6,14,18,24,26 Regarding permission for Valuation of Trees received & for Jalgaon RFO payment is deposited
92+650 & From Mr.Khatri , Assitant of
3 Forest Department September tree cutting & Estimates of with Authority. Tree cutting permission is awaited from Forest Mr. Mahesh Borse
97+400 to 99+300 DFO
2018. Tree Cutting Department.

Month of October 2018

1.Mr.S.D.kalikem, Chief MJP on 29.08.2018 raises demand for 1% tech. scrutiny charges
engg,Nashik div - Demand under consideration of Authority
From 56+200 to 1,3,9,16,23 Regarding shifting of MJP Mr Jayesh Patel & Mr.
2.DE'PWD NH 3.zila _ Contractor on 24.10.18 has proactively requested Authority to allow
1 MJP Water Supply Line Sujay Thube
103+000 October 2018 Water supply Line depositing of scrutiny charges of MJP pending decision on demand by
Parishad - Jalgaon &
Pachora. Authority

2 of 6
4 t 4 4 4 (4 4 4 104404 4% 0 0 I I I I I

Sr. Name of the Utility & Obstructing Date of Follow- Name & Designation of Reply of representative ABL person name &
No. Utility Owning Entity Chainage Up Status
person visited from Utility Owning Entity designation

Estimates recd from MSEDCL on 30.08.2018.


1)Mr. S.K. Patil
Estimates pending for approval of Authority
Sir,Deputy executive
- Contractor proactively deposits supervision charges of MSEDCL to
4,9,12,17,24 & Engg. Sub Division
Electrical Utility From 56+200 to Regarding shifting of MSDCL Authority on 23.10.18 Mr Jayesh Patel & Mr.
2 30 October Jalgaon Rural
Shifting 103+000 electrical Line - EE NH directs to wait till approval by Authority Sujay Thube
2018 2)Mr. P.D. More sir,
- On 31.10.18, CE & RO, NH accepted contractor request subject to
Additional Executive
reimbursement after approval.
Engg, Pachora 3
- Clearance for construction awaited.
From 83+900 to
1,3,9,16,19,25 Mr. Arun Patil & Mr.
pt. for overlay work is still awaited.
October 2018 Mahesh Borse
97+400 to 99+300

Tree cutting permission is given vide letter no. 1128 dated 16.10.2018.
From 56+200 to 1,3,9,16 October Mr.Khatri , Assitant of Regarding permission for Mr. Arun Patil & Mr.
4 Tree Cutting Tree cutting work is in progress in the month of October 2018 & 520 no
103+000 2018 DFO tree cutting Mahesh Borse
of trees to be cut at the end of October 2018.

Month of November 2018


MJP on 29.08.18 raises demand for 1% tech. scrutiny charges
- Demand under consideration of Authority
1.Mr.S.D.kalikem, Chief - Contractor on 24.10.18 has proactively requested Authority to allow
engg,Nashik div depositing of scrutiny charges of MJP pending decision on demand by
From 56+200 to 2,5,15,20,28 Regarding shifting of MJP Mr Jayesh Patel & Mr.
1 MJP Water Supply Line 2.DE'PWD NH 3.zila Authority
103+000 November 2018 Water supply Line Sujay Thube
Parishad - Jalgaon & - Clearance for construction awaited
Pachora. - ABL has pay 1% Technical Scrunity Fee to MJP jalgaon & Zila Parishad
dated 23.11.2018.

Estimates recd from MSEDCL on 30.08.18


1)Mr. S.K. Patil - Estimates pending for approval of Authority
Sir,Deputy executive - Contractor proactively deposits supervision charges of MSEDCL to
Engg. Sub Division Authority on 23.10.18
Electrical Utility From 56+200 to 1,6,16,21,29 Regarding shifting of MSDCL Mr Jayesh Patel & Mr.
2 Jalgaon Rural - EE NH directs to wait till approval by Authority
Shifting 103+000 November 2018 electrical Line Sujay Thube
2)Mr. P.D. More sir, - On 31.10.18, CE & RO, NH accepted contractor request subject to
Additional Executive reimbursement after approval.
Engg, Pachora 3 - Clearance for construction awaited.

From 83+900 to
92+650 & From 2,5,7,15,16,21,2 Mr. Arun Patil & Mr.
3 Forest Clearance 2 November The NOC from Forest Dept. for overlay work is still awaited.
97+400 to 99+300 Mahesh Borse
2018,

14,16,21,27,29 Tree cutting permission is given vide letter no. 1128 dated 16.10.2018.
Mr.Khatrl , Assitant of Regarding permission for Mr. Arun Patil & Mr.
From 56+200 to Tree cutting work is started in the month of October 2018 & 855 no of
4 Tree Cutting November Mahesh Borse
103+000 DFO tree cutting
2018, trees to be cut at the end of November 2018.

3 of 6
4 4 4 I 4 4 4 I I 9 4 4 I I 4

Sr. Name of the Utility & Obstructing Date of Follow- Name & Designation of Reply of representative
ABL person name &
No. Utility Owning Entity Chainage Up person visited Status
from Utility Owning Entity designation

Month of December 2018

MJP on 29.08.18 raises demand for 1% tech. scrutiny charges


- Demand under consideration of Authority
1.Mr.S.D.kalikem, Chief - Contractor on 24.10.18 has proactively requested Authority to allow
4,5,10,11,14,18, engg,Nashik div depositing of scrutiny charges of MJP pending decision on demand by
From 56+200 to Regarding shifting of MJP Mr Jayesh Patel & Mr.
1 MJP Water Supply Line 26,28 December 2.DE'PWD NH 3.zila Authority
103+000 Water supply Line Sujay Thube
2018 Parishad - Jalgaon & - Clearance for construction awaited
Pachora. - ABL has pay 1% Technical Scrunity Fee to MJP Jalgaon & Zila Parishad
dated 23.11.2018.

Estimates recd from MSEDCL on 30.08.18


1)Mr. S.K. Patil - Estimates pending for approval of Authority
Sir,Deputy executive - Contractor proactively deposits supervision charges of MSEDCL to
4,5,10,11,14,18, Engg. Sub Division Authority on 23.10.18
Electrical Utility From 56+200 to Regarding shifting of MSDCL Mr Jayesh Patel & Mr.
2 26,28 December Jalgaon Rural - EE NH directs to wait till approval by Authority
Shifting 103+000 electrical Line Sujay Thube
2018 2)Mr. P.D. More sir, - On 31.10.18, CE & RO, NH accepted contractor request subject to
Additional Executive reimbursement after approval.
Engg, Pachora 3 - Clearance for construction awaited.

Tree cutting permission is given vide letter no. 1128 dated 16.10.2018.
From 56+200 to 3,4,7,17,24,27 Mr.Khatri , Assitant of Regarding permission for Mr. Arun Patil & Mr.
3 Tree Cutting Tree cutting work is started in the month of October 2018 & 855 no of
103+000 December 2018 DFO tree cutting Mahesh Borse
trees to be cut at the end of November 2018.
Month of January 2019

MJP on 29.08.18 raises demand for 1% tech. scrutiny charges


- Demand under consideration of Authority
1.Mr.S.D.kalikem, Chief
- Contractor on 24.10.18 has proactively requested Authority to allow
engg,Nashik div
From 56+200 to 1,2,8,14,22 Regarding shift ing of MJP depositing of scrutiny charges of MJP pending decision on demand by Mr Jayesh Patel & Mr.
1 MJP Water Supply Line 2.DE'PWD NH 3.zila
103+000 January 2019 Water supply Line Authority Sujay Thube
Parishad - Jalgaon &
- Clearance for construction awaited
Pachora.
- ABL has pay 1% Technical Scrunity Fee to MJP Jalgaon & Zila Parishad
dated 23.11.2018.
Estimates recd from MSEDCL on 30.08.18
- Estimates pending for approval of Authority
1)Mr. S.K. Patil
- Contractor proactively deposits supervision charges of MSEDCL to
Sir,Deputy executive
Authority on 23.10.18
Engg. Sub Division Mr Jayesh Patel & Mr.
Electrical Utility From 56+200 to 3,7,8,15,18 Regarding shifting of MSDCL - EE NH directs to wait till approval by Authority
2 Jalgaon Rural Sujay Thube
Shifting 103+000 January 2019 electrical Line - On 31.10.18, CE & RO, NH accepted contractor request subject to
2)Mr. P.D. More sir,
reimbursement after approval.
Additional Executive
- Clearance for construction awaited.
Engg,Pachora 3

Tree cutting permission is given vide letter no. 1128 dated 16.10.2018.Mr.
From 56+200 to 3,14,18,22,18 Mr.Khatri , Assitant of Regarding permission for Arun Patil & Mr.
3 Tree Cutting Tree cutting work is started in the month of October 2018 & 855 no of Mahesh Borse
103+000 January 2019 DFO tree cutting
trees to be cut at the end of November 2018.

4 of 6
A A II I I I I 44444

Sr. Name of the Utility & Obstructing Date of Follow- Name & Designation of Reply of representative
ABL person name &
No. Utility Owning Entity Chainage Up person visited Status
from Utility Owning Entity designation

Month of February 2019


MJP on 29.08.18 raises demand for 1% tech. scrutiny charges
- Demand under consideration of Authority
1.MrS.D.kalikem, Chief
- Contractor on 24.10.18 has proactively requested Authority to allow
engg,Nashik div
From Ch. 4+000 to 4,5,14,18 Regarding shifting of MJP depositing of scrutiny charges of MJP pending decision on demand by Mr Jayesh Patel & Mr.
1 MJP Water Supply Line 2.DE'PWD NH 3.zila
Ch. 56+200 February 2019 Water supply Line Authority Sujay Thube
Parishad - Jalgaon &
- Clearance for construction awaited
Pachora.
- ABL has pay 1% Technical Scrunity Fee to MW jalgaon & Zila Parishad
dated 23.11.2018.
Estimates recd from MSEDCL on 30.08.18
1)Mr. S.K. Patil - Estimates pending for approval of Authority
Sir,Deputy executive - Contractor proactively deposits supervision charges of MSEDCL to
4,7,12,15,19,20, Engg. Sub Division
2
Electrical Utility From Ch. 4+000 to Regarding shifting of MSDCL Authority on 23.10.18 Mr Jayesh Patel & Mr.
26 February Jalgaon Rural - EE NH directs to wait till approval by Authority
Shifting Ch. 56+200 electrical Line Sujay Thube
2019 2)Mr. P.D. More sir, - On 31.10.18, CE & RO, NH accepted contractor request subject to
Additional Executive reimbursement after approval.
Engg, Pachora 3 - Clearance for construction awaited.

Tree cutting permission is given vide letter no. 1128 dated 16.10.2018.
From Ch. 4+000 to 4,6,11 February Mr.Khatri , Assitant of Regarding permission for Mr. Arun Patil & Mr.
3 Tree Cutting Tree cutting work is started in the month of October 2018 & 855 no of
Ch. 56+200 2019 DFO tree cutting Mahesh Borse
trees to be cut at the end of November 2018.


Month of March 2019
MJP on 29.08.18 raises demand for 1% tech. scrutiny charges
- Demand under consideration of Authority
1.Mr.S.D.kalikem, Chief - Contractor on 24.10.18 has proactively requested Authority to allow
engg,Nashik div depositing of scrutiny charges of MJP pending decision on demand by
From Ch. 4+000 to 5,7,11,18,25 Regarding shifting of MJP Mr Jayesh Patel & Mr.
1 MJP Water Supply Line 2.DE'PWD NH 3.zila Authority
Ch. 56+200 March 2019 Water supply Line Sujay Thube
Parishad - Jalgaon & - Clearance for construction awaited
Pachora. - ABL has pay 1% Technical Scrunity Fee to MJP jalgaon & Zila Parishad
dated 23.11.2018.

Estimates recd from MSEDCL on 30.08.18


1)Mr. S.K. Patil - Estimates pending for approval of Authority
Sir,Deputy executive - Contractor proactively deposits supervision charges of MSEDCL to
Engg. Sub Division
Electrical Utility From Ch. 4+000 to 7,11,13,19,20,27 Regarding shifting of MSDCL Authority on 23.10.18 Mr Jayesh Patel & Mr.
2 Jalgaon Rural - EE NH directs to wait till approval by Authority Sujay Thube
Shifting Ch. 56+200 March 2019 electrical Line
2)Mr. P.D. More sir, - On 31.10.18, CE & RO, NH accepted contractor request subject to
Additional Executive reimbursement after approval.
Engg, Pachora 3 - Clearance for construction awaited.

Tree cutting permission is given vide letter no. 1128 dated 16.10.2018.
From Ch. 4+000 to 6,18,21,27 Mr.Khatri , Assitant of Regarding permission for Mr. Arun Patil & Mr.
3 Tree Cutting Tree cutting work is started in the month of October 2018 & 855 no of
Ch. 56+200 March 2019 DFO tree cutting Mahesh Borse
trees to be cut at the end of November 2018.

5 of 6
4 4 a 4 1 4 4 a 4 I a a I 4 4 1 a I
Sr. Name of the Utility & Obstructing Date of Follow- Name & Designation of Reply of representative ABL person name &
No. Utility Owning Entity Status
Chainage Up person visited from Utility Owning Entity designation

Month of April 2019

MJP on 29.08.18 raises demand for 1% tech. scrutiny charges


- Demand under consideration of Authority
1.Mr.S.D.kalikem, Chief - Contractor on 24.10.18 has proactively requested Authority to allow
engg,Nashik div depositing of scrutiny charges of MJP pending decision on demand by
From Ch. 4+000 to 3,5,11,15 April Regarding shifting of MJP Mr Jayesh Patel & Mr.
1 MJP Water Supply Line 2.DE'PWD NH 3.zila
Ch. 56+200 2019 Water supply Line Authority Sujay Thube
Parishad - Jalgaon & - Clearance for construction awaited
Pachora. - ABL has pay 1% Technical Scrunity Fee to MJP jalgaon & Zila Parishad
dated 23.11.2018.
Estimates recd from MSEDCL on 30.08.18
1)Mr. S.K. Patil
- Estimates pending for approval of Authority
Sir,Deputy executive
- Contractor proactively deposits supervision charges of MSEDCL to
Engg. Sub Division
Electrical Utility From Ch. 4+000 to 1,4,11,16,23 Regarding shifting of MSDCL Authority on 23.10.18 Mr Jayesh Patel & Mr.
2 Jalgaon Rural
Shifting Ch. 56+200 April 2019 electrical Line - EE NH directs to wait till approval by Authority Sujay Thube
2)Mr. P.D. More sir, - On 31.10.18, CE & RO, NH accepted contractor request subject to ..
Additional Executive reimbursement after approval.
Engg, Pachora 3 - Clearance for construction awaited.

Tree cutting permission is given vide letter no. 1128 dated 16.10.2018.
From Ch. 4+000 to 2,8,16 April Mr.Khatri ,Assitant of Regarding permission for Mr. Arun Patil & Mr.
3 Tree Cutting Tree cutting work is started in the month of October 2018 & 855 no of
Ch. 56+200 2019 DFO tree cutting Mahesh Borse
trees to be cut at the end of November 2018.

6 of 6
Project: Up-gradation of Bhadgaon-Chalisgaon (Section II) of NH-753J From Ch.
56+200Km to 103+000Km Two/Four lane with Paved Shoulder in the state of
Maharashtra on EPC Mode.

Ann exure - 0

Status of QA/QC Reports for the Month of April 2019.

Ashoka Buildcon Limited Page 90


Anomaly Regort rfor ths,Aloqh ofietprip 0194
ftvhadr.on .on _ iltject/(.:10/...JJ) 4 4 4 I 4 4 1

I) Soil / OCL Materials


Package-11

Number of Tests Conducted Check By Authority


Check By Authority Check By Authority % Check
Engineer up to
Engineer This Month Engineer up to date By AE
SL Up to Previous Previous Month
This Month Total up to date
Name of Test Testing Method Frequency of Test Specification Requirement s Months

No.
Pass Failed Pass Fail Pass Fail Fail Pass Fail Pass Fail Pass
Atterberg's Limit 1S:2720, Pan 5 LL-50 max, P1=25 max 631 0 0 0 631 0 0 126 0 0 0 126 20.00
2 Sieve Analysis IS:2720, Part 4 75 mm maximum size 631 0 0 0 631 0 0 126 0 0 0 126 20.00
15.2 kNim' min. for emb upto 3m ht
3 Proctor Test IS:2720, Part 8 631 0 0
and 16.0 kN/n t for emb more than 0 631 0 0 0 0
3m 126 0 126 20.00
4 Free Swelling Index IS:2720,Part 40 50% max. 751 63 0 0 751 63 0 0 0
150 0 ISO 20.00
5 Field Density(test) IS:2720, Part 28 95% 430 106 30 0 460 106 10 0 7
86 10 93 22.39
2) Soil / Embankment Materials

Atterbcrg's Limit IS:2720, Part 5 1 test/ 1500 m) LL-,50 max, PI-25 max 88 0 7 0 95 0 0 16 0 3 0 19 22.04545

2 Sieve Analysis 1S:2720, Part 4 1 test/ 1500 m' 75 mm maximum size 88 0 7 0 95 0 0 16 0 3 0 19 22.04545
15.2 1l‘1.'m' nun. for emb upto 3m ht
3 Proctor Test IS:2720, Part 8 1 test/ 1500 en' 88 0 7 0 95 0 0
and 16.0 kN/n? for emb more than 16 0 3 0 19 22.04545

4 Free Swelling Index IS:2720,Part 40 As required 50% max. 88 0 7 0 95 0 0 16 0 3 0 19 22.04545

5 Field Density(test) 1S:2720, Part 28 10 tests/ 3000 ris2 95% 526 106 100 12 626 118 2 105 0 18 4 123 23.42205

3) Sub grade Materials

Atterberg's Limit IS:2720, Pan 5 1 test/ 1500 m' LL=50 max, PI-25 max 119 0 19 0 138 0 0 24 0 4 0 28 20.28986

Sieve Analysis IS:2720, Part 4 50 mm maximum size 0 19 0 63 0 0 24 0 4 0 28 44.44444


2 1 test/ 1500 mi 44

17.5 kN/m) min. 44 0 19 0 63 0 0 24 0 4 0 28 44.44444


3 Proctor Test IS:2720, Part 8 1 test/ 1500 m5

As required No deleterious constituent 69 0 0 0 69 0 0 17 0 0 0 17 24.63768


4 Deleterious Content IS:2720, Part 27

138 0 24 0 4 0 28 20.28986
5 Free Swelling Index 1S:2720,Part 40 As required 50% max. 119 0 19 0 0

139 0 19 0 158 0 0 17 0 9 0 26 16.4557


6 CBR IS:2720, Part 16 I test/3000 m3

608 143 102 11 710 154 12 118 4 42 16 160 22.53521


7 Field Density(test) IS:2720, Part 28 10 testsr2000 M2 97%

4) GSB Materials
0 45 0 244 0 0 40 0 IS 0 55 22.54098
Atterbcrg's Limit IS:2720, Part S 1 test/400 m' LL=25 max, P1=6 max 199

204 0 45 0 249 0 0 41 0 15 0 56 22.48996


2 Sieve Analysis IS:2386, Part I 1 test/400 m3 Mort&h Table 400-1

0 0 0 0 0 0 0 0 0 0 0
3 Proctor Test 1S:2720, Part 8 1 test/ source

46 0 42 0 88 0 4 7 4 15 8 22 25.00
4 Moisture Content 1S:2720, Part 2 1 test/400 m5 (+) 1% (-) 2% of OMC

0 0 0 0 0 0 0 0 0
IS:2720,Part 16 As required 30% minimum 0 0
5 CBR
0 0 0 8 0 0 2 0 2 0 4 45
As required Mort&h Table 400-2 8
6 MV 1S:5640

0 0 0 0 0 0 0 0 20
As required 2% max. > 2%, do soundness test 0 0
7 Water Absorption IS:2386, Part 3

52 8 204 37 6 37 3 12 4 49 24.01961
I tests/ 1000 m2 98%,Mort&h 401.3.2 152 29
Field Density (set) IS:2720, Part 28
—4 —4 —4 —4 —41 -11
II 1 IF f...crbert ,..inTiti
l LS!...77a, —T11 -1
, ,:s;-
/-2(R in' /I 4 —11. 6-7.4-2! *, 2 —1 --o--74 7? ---'t —"4—4 22 2 0 4 0 6 27.27273
4

2 Sieve Analysis IS:2386, Pan 1 I test/ 200 m' MORTII Table 400-11 12 0 10 0 22 0 0 2 0 4 0 6 27.27273
3 Proctor Test IS:2720, Pan 8 1 test/source 1 0 0 0 I 0 0 0 0 0 0 0 0
S Deleterious Content IS:2386, Part 2 As required No deleterious constituent. 6 0 0 0 6 0 0 1 0 0 0 1 20

6 Aggregate Impact Value LS: 2386, Part 4 1 test/1000 m' 30% maximum 12 0 10 0 22 0 0 2 0 4 0 6 29.09091

7 Comb. Flakiness Elongation IS: 2386, Part I 1 test/500 m' 35% maximum 19 0 10 0 29 0 0 0 4 0
2 6 22.069

S Water Absorption IS: 2386, Part 3 As required 2% max. > 2%, do soundness test 2 0 0 0 2 0 0 0 0 0 0 0 20,

IS: 2386, Part IV Test to be


9 Soundness (5 cycles) As required 0 0 0 0 0 0 0
done if WA is r/.> 0 0 0 0 0 o
10 I .Sodium Sulphate 1) .
1 2.,i maximum 0 0 0 0 0 0 0 0 0 0 0 0 0,

11 2.Magnesium Sulphate 2) 18% maximum 0 0 0 0 0 0 0 0 0 0 0 0 0

12 Field density IS: 2720, Part 28 1 Set of Three Hole/1000 m' 98% 9 0 10 0 19 0 1 3 2 5
2 I 25.263

6) Bituminous Emulsified Prime Coat Materials

I Binder Content, °A by Mass MIS: 8887 2 tests/lot 57 minimum 0 0 0 0 0 0 0 0 0 0 0 0 0


.....
2 Viscosity by Furol Viscometer IS: 3117 2 tests/lot 20 to 100 seconds 0 0 0 0 0 0 0 0 0 0 0 0 0

3 Residue 600 micron sieve Ref.IS: 8887 2 tests/lot 0.05% Mass maximum 2 0 0 0 2 0 0 0 0 0 0 0 0

Stability to Mixing with CA Ref.IS: 8887 2 tests/lot 5% maximum 2 0 0 0 2 0 0 0 0 0 0 0 0


4
......
2 tests/lot 60 to 210 - 100g/5 sec 2 0 0 0 2 0 0 0 0 0 0 0 •0
5 Penetration at 25°C IS: 1204

2 tcsts/lot 100 2 0 0 0 2 0 0 0 0 0 0 0 •0
6 Ductility at 27°C cm IS: 1208

97.5% to 99% 0 0 0 0 0 0 0 0 0 0 0 0 0
7 Solubility in Carbondisulphide IS: 1216 2 tests/lot

8 Residue by Evaporation Ref IS: 8887 2 tests/lot 57 minimum 0 0 0 0 0 0 0 0 0 0 0 0 •o

2 %max Coagulation 0 0 0 0 0 0 0 0 0 0 0 0 0
9 Stability to Mixing Cement Ref.IS: 8887 As Required

0 0 0 0 0 0 0 0 0 0 0 0 0
Particle Charge RclIS: 8887 2 tests/lot Positive
10 -...

0 0 0 0 0 0 0 0 0 0 70
2 tests/lot 80/100 0 0
11 Penetration Grade IS: 217; LS:72; IS: 1203

7 0 5 0 12 0 0 2 0 3 0 5 45.000
Rate of Application (Set) MORTII 502.2.2 3 test per day 6 kgs/10 sq.m.
12

13 Temperature Application (Set) MORTII 503.4.3 I test/operation 20°C to 70°C 7 0 s 0 12 0 0 2 0 3 0 5 45.000


I 1 I Bi.i. :..A...byt,s-1- .7a ---1 .--1 :71.-1 —I —)..-71-1 —14 --11 71 —4
0 4
— V --.4 ---'
4 4 —701---t --I —"I -4 -' -4 -4 -1
0 0 0 1 20
2 Viscosity by Furol Viscometer IS: 3117 2 tests/lot 20 to 100 seconds 4 0 0 0 4 0 0 1 0 0 0 1 20
3 Residue 600 micron sieve Ref1S: 8887 2 tests/lot 0.05% Mass maximum 4 0 0 0 4 0 0 1 0 0 0 1 20
4 Stability to Mixing with CA RefIS: 8887 2 tests/lot 5% maximum 0 0 0 0 0 0 0 0 0 0 0 0 0
5 Penetration at 25°C IS: 1204 2 tests/lot 60 to 210 - 100g/5 sec 0 0 0 0 0 0 0 0 0 0 0 0 0
6 Ductility at 27°C cm IS: 1208 2 tests/lot 100 0 0 0 0 0 0 0 0
. 0 0 0 0 0
7 Solubility in Carbondisulphide IS: 1216 2 tests/lot 97.5% to 99% 0 0 0 0 0 0 0 0 0 0 0 0 0
8 Residue by Evaporation RefIS: 8887 2 tests/lot 57 minimum 0 0 0 0 0 0 0 0
0 0 0 0 0
9 Stability to Mixing Cement RefIS: 8887 As Required 2% max Coagulation 0 0 0 0 0 0 0 0 0 0 0 0 0
10 Particle Charge RefIS: 8887 2 tests/lot Positive 0 0 0 0 0 0 0 0 0 0 0 0 10
11 Penetration Grade IS: 217; IS:72;15: 1203 2 tests/lot 80/100 0 0 0 0 0 0 0 0 0 0 0 0 0
12 Rate of Application (Set) MORTH 502.2.2 1 test/ 500 Sqm 2 kgs/10 sq.m. 29 0 23 0 54 0 0 0
0 13 S 18 33.33333
13 Temperature Application (Set) MORTH 503.4.3 1 test/operation 20°C to 70°C 63 0 25 0 88 0 13 0 5 0
0 18 20.45455
Bitumen for BM, 61151 and BC 0 0 0
...„
i Penetration Grade at 25oC IS: 1203; IS: 73 1 test/lot 50-70 18 0 10 0 28 0 0 4 0 5 0 9 32.14286

2 Softening Point IS: 1203; IS: 73 I test/lot Minimum 47°C 18 0 10 0 28 0 0 4 0 5 0 9 32.14286

3 Ductility at 27oC IS: 1208 1 test/lot 40 cm. Minimum 18 0 10 0 28 0 0 4 0 5 0 9 32.14286

4 Specific Gravity IS: 1201 1 testlot 0.99 minimum IS 0 10 0 28 0 0 4 0 5 0 9 32.14286

8) Dense Bituminous Macadam Materials (DBM)

1 Sieve Analysis IS: 2386, Part 1 MORTH Table 500-10 62 0 26 0 88 0 0 13 0 6 0 19 21.59091 -41

Apvd. JMF+ 0.30% by weight of


Extraction Test of Bitumen ASTM D-2192 48 0 26 0 74 0 0 10 0 6 0 16 21.62162
2 total mix •
Gradation after Extraction IS: 2386, Part I As per apvd. Job Mix Formula 31 0 12 0 43 0 0 7 0 3 0 10 23.25581
3

27% maximum 22 0 15 0 37 0 0 4 0 4 0 8 21.62162


4 Aggregate Impact Value IS: 2386, Part 4 1 test per 350 m5

Comb. Flakiness & Elongation IS: 2386, Part 1 1 test per 350 m3 35 % maximum 22 0 15 0 37 0 0 4 0 4 0 8 21.62162
5
2% max. If>r/scarryout Soundness 0 I 0 0 0 I 20
6 Water Absorption 15: 2386, Part 3 As Required by the Engineer 3 0 0 0 3 0
Test
Sct of 3 Marshall moulds - 2
Marshall Stability (In Set) ASTM D-1559 at 60°C -900 kgs min. e 0 4 0 12 24.4898

0 12 0 49 0 0 8 0 4 0 12 24.4898
8 Marshall Flow (In Set) ASTM 0-1559 2% to 4% 37

10% to 12% 12 0 49 0 0 8 0 4 0 12 24.4898


9 % Voids in Mineral Agg. (In Set) ASTM D-1559 As per 7 & 8 37 0

0 113 0 0 16 0 18 0 34 30.0885
Drilled Core Density ASTM D-1559 1 test per 700 mt As per aped. Job Mix Formula 71 0 42
10
1 1 1 -' 1 1 1 4 i e il I I I 4 4 a 4 4 4 r v t 4

Sieve Analysis IS: 2386, Part 1 2 tests per day MORTH Table 500-18 0
I 6 0 0 0 6 0 2 0 0 0 2 30

Extraction Test of Bitumen Apvd. JMFLO.30% by weight of


ASTM D-2192 2 tests per day 0
2 total mix 2 0 0 0 2 0 1 0 0 0 I 30

Gradation after Extraction LS: 2386, Part 1 2 tests per day As per apvd. Job Mix Formula 0
3 2 0 0 0 2 0 1 0 0 0 I 30

Aggregate Impact Value IS: 2386, Part 4 1 test per 200 in' 24% maximum 0
4 3 0 0 0 3 0 I 0 0 0 1 30

Comb. Flakiness & Elongation IS: 2386, Part 1 1 test per 350 m 30% maximum 0
5 3 0 0 0 3 0 1 0 0 0 1 30

Drilled Core Density ASTM D-1559 1 test per 700 in' As pen apvd. Job Mix Formula 0
6 0 0 0 0 0 0 0 0 0 0 0 0

Laboratory Density ASTM D-15$9 2 tests per day As per apvd. Job Mix Formula 0
7 0 0 0 0 0 0 0 0 0 0 0 0

10) Steel Reinforcing Bars

I test/ lot and or as directed


Carbon IS: 228 0.30% maximum 0
I by the Engineer 5 0 I 0 6 0 I 0 0 0 1 20

1 test/ lot and or as directed


Sulphur IS: 228 0.06% maximum 0
2 by the Engineer 5 0 1 0 6 0 1 0 I 0 2 36.66667

I test/ lot and or as directed 0


Phosporous IS: 228 0.06% maximum
by the Engineer 5 0 0 0 5 0 I 0 0 0 1 24
3

0.12 0 rnm2/m for < 10 0


0
Mean Area of Ribs IS: 1786 mm; 0.15 0 min' for 10 0 1 2 0 2 1 24
5 0 0 0 5 0
4

1 test/told and or as directed 0


o.r4 Proof Stress (yield) IS: 1608; IS: 226 500 N/mm2 minimum I 0 0 0 1 24
by the Engineer 5 0 0 0 5 0
5

I tesetold and or as directed 0


Elongation IS: 1608; IS: 226 12.0 % maximum 0 0 0 1 24
by the Engineer 5 0 0 0 5 0 I
6

I test/told and or as directed 0


Bend Test IS: 1599 No fracture in the bent portion. 0 0 0 1 24
by the Engineer 5 0 0 0 5 0 1
7

I test/told and or as directed 10% more of Yield, but not less than 0
Re-bend Test IS: 1786 3 0 I 0 0 0 1 ' 24
by the Engineer 457 N/mm' 5 0 0 0
8

1 test/told and or as directed 0


Tensile Strength IS: 1608; IS: 226 0 1 0 0 0 1 ' 24
by the Engineer 5 0 0 0 5
9

-4
.- it
lir --I—.I—ai —4- ..4 _i. sour.A. a74 _..4 _I _41 _4 _.4 —I _.% _..4 _i -4 _...0 ._,„ -I -, __q _..i, _ 4 ,.....4 _.4 _4 _4
pH Vale 1 -
6 minimum 2 0 0 0 2 0 0 1 0 0
directed by the Fneineer 0 1 30
2 Suspended Matter 1 test per source or as
IS: 3025 2000 mg! Lit. (Maximum) 2 0 0 0 2 0 0 1 0 0
directed by the FIltlfleff 0 1 30
1 test per
p sceour or u _m..-
3 Chlorides (CL) IS: 3025 500 mg / Lit. (Maximum) 2 0 0 0 2 0 0 I 0 0 0 1
directed by the Frivinerr 30
4 1 test per source or as
Sulphates (SO4) IS: 3025 500 mg / Lit (Maximum) 2 0 0 0 2 0 0 1 0 0
directed by the Fnrinerr 0 I 30
S Inorganic Matter (TDS) I test per source or as
IS: 3025 3000 mg / Lit. (Maximum) 2 0 0 0 2 0 0 I 0 0
directed by the Frwineer 0 1 30
6 Total Organic Matter I test per source or as
IS: 3025 200 max (as total volatile soild) 2 0 0 0 2 0 0 0 0 0 0
directed by the Fneinrer 0 0
12) Cement (OPC Grade 53)

1 Fineness (Blaine's Method) IS: 4031, Part 2 1 test per lot 225 min (sp. Surface m2/kg 126 0 0 0 126 0 0 25 0 0 0 25 20

2 Fineness (Dry Sieve) IS: 4031, Part 4 1 test per lot 10% max (ret on 90 mic sieve) 220 0 36 0 256 0 0 45 0 12 0 57 22.26563

3 Le Chatelier Expansion IS: 4031, Part 3 1 test per lot 10 mm max (expansion) 220 0 36 0 256 0 0 45 0 12 0 57 22.26563

4 30 mi min (initial) 600 mi


Time of Setting IS: 4031, Part 5 220 0 36 0 256 0 0 45 0 12 0
max (final) 57 22.26563,

5 27 MPa min after 72 hrs; 3 days 275 0 36 0 311 0 0 59 0 12 0 71 22.82958

Compressive Strength IS: 4031, Part 6 37 Mpa min after 168 hrs; 7 days 277 0 32 0 3(9 0 0 39 0 12 0 71 22.97735

53 Mpa min after 672 hrs 28 days 221 0 40 0 261 0 0 48 0 12 0 60 22.98851

13) Cement (OPC Grade 43)

1 Fineness (Blaine's Method) IS: 4031, Part 2 1 test per lot 225 min (sp. Surface m2/kg 3 0 0 0 3 0 0 I 0 0 0 1 30

Fineness (Dry Sieve) IS: 4031, Part 4 1 test per lot 10% max (ret on 90 mic sieve) 3 0 0 0 3 0 0 1 0 0 0 1 30 '.
2

10 mm max (expansion) 3 0 0 0 3 0 0 I 0 0 0 1 30
3 Le Chatelier Expansion IS: 4031, Part 3 1 test per lot

30 mi min (initial) 600 mi 0 0 0 3 0 0 1 0 0 0 1 30 '


4 Time of Setting IS: 4031, Part 5 3
mar ill -
3 0 0 0 3 0 0 1 0 0 0 1 30
5 23 MPa min after 72 hrs; 3 days

Compressive Strength IS: 4031, Part 6 3 0 0 0 3 0 0 I 0 0 0 1 30


6 33 Mpa min after 168 hrs; 7 days
0 0 I 0 0 0 1 30
43 Mpa min after 672 hrs 2R days 3 0 0 0 3
7
14) KCC !MC Pines(1200 I)ia) 0
3 0 0 I 0 0 1 30
See • below 3 0 0 0
1 Dimensional Tolerances IS: 458 - 1991
0 0 0 0 1 30
+ 10 mm 3 0 0 0 3 0 I
2 Internal Diameter See • below
0 0 0 1 30
(4) 7mm and (-) 3.5 mm 3 0 0 0 3 0 0 I
3 Wall Thickness See • below
0 3 0 0 I 0 0 0 1 30
See • below 72.6 KN/LM 3 0 0
3 Edge Bearing test (Load to
4 0 0 0 0 0
produce 0.25 mm. crack), kN/Irn (minimum)
3 0 0 1 0 0 0 1 30
108.9 KN/LM (minimum) 3 0 0 0
5 Ultimate Load (1200 Dia) IS: 3597
1
I I Dimi!, .„114..i,i7ell " 712701 " —4 . •b7l'
oi ---% "—I " " "-1 ,-4 71 7, -4 , ---"' 01 74 ---1, -4 04 ---1, 30
2 Internal Diameter See • below + 10 mm 3 0 0 0 3 0 0 I 0 0 0 1 30
3 Wall Thickness See • below (+) 7mm and (-) 3.5 mm 3 0 0 0 3 0 0 1 0 0 0 I 30
3 Edge Bearing test (Load to
4 Sec • below 66.3 KN/LM (Minimum) 3 0 0 0 3 0 0 I 0 o
produce 0.25 mm. crack), kN/lm
0 1 30
S Ultimate Load (900 Dia) IS: 3597 99.4 KN/LM (minimum) 3 0 0 0 3 0 0 1 0 0 0 I 30
•a). 2 tests for 1 to 50 pcs Pipe in lot. b). 3 les s for 51 to 100 pcs Pipe in lot. c). 5 tests for 101 to 300 pcs Pipe in lot

15) Concrete Works

1 Sieve Analysis of CA IS:2386, Part 1 1 test/ operation IS:383 340 0 84 0 424 0 0 69 0 18 0 87 20.51887
2 Sieve Analysis of FA 1S:2386, Part 1 I test/operation IS:383 340 0 84 0 424 0 0 69 0 21 0 90 21.22642
3 Flakiness Index IS:2386, Part 1 I test/ 200 m' 35% maximum 296 0 84 0 380 0 0 60 0 18 0 78 20.52632
4 Aggregate Impact Value IS:2386, Part 4 I test/ 200 m3 45% maximum 296 0 84 0 380 0 0 60 0 18 0 78 20.52632
161Concrete Compressive Strength Test (in set)
M-I0 (7 days) IS:516 See • below NORTH Clause 1700 85 0 0 0 85 0 0 17 0 0 0 17 20
I
M-10(28 days) 81 0 0 0 81 0 0 16 0 0 0 16 19.75309
M-15(7 days) 213 0 57 0 270 0 0 46 0 21 0 67 24.81481
2
M-15 (28 days) 204 0 78 0 282 0 0 47 0 30 0 77 27.30496

M-20 (7 days) IS:516 MORTH Clause 1700 267 0 84 0 351 0 0 53 0 18 0 71 20.22792


3
M-20 (28 days) See • below 307 0 42 0 349 0 0 65 0 24 0 89 25.50143

M-25 (7 days) IS:516 See • below NORTH Clause 1700 166 0 90 0 256 0 0 43 0 24 0 67 26.17188
4
M-25 (28 days) 97 0 81 0 178 0 0 29 0 20 0 49 27.52809

See • below NORTH Clause 1700 336 0 93 0 429 0 0 70 0 33 0 103 24.00932


M-30 (7 days) IS:516
5
270 0 117 0 387 0 0 56 0 24 0 80 20.67183
M-30 (28 day s)
319 0 0 49 0 60 0 1 09 34.16928
M-35 (7 days) IS:516 See • below NORTH Clause 1700 172 0 147 0
6 207 0 247 0 0 13 0 42 0 55 22,26721
M-35 (28 days) 40 0
6 0 36 0 0 6 0 6 0 12 33.33333
M-40 (7 days) IS- 516 NORTH Clause 1700 30 0
76 3 0 24 0 27 0 0 1 0 0 7 25.92593
M-40 (28 days) 3 samples / 5 m'

481 0 162 0 643 0 0 105 0 69 0 174 27.06065


8 DLC (7 days) 1S:516 3 samples / 150 m'/1000m2 MORTH Clause 903.5.1.1

17)Flexure Strength Test (in set)


0 166 0 463 0 0 60 0 42 0 102 22.03024
IS:516 NORTH Clause 900 277
M-40 (7 days) PQC 3 samples / 150 in) or 3 pair
1 of cube & Beam per day 452 0 0 60 0 42 0 102 22.56637
260 0 192 0
M-40 (28 days) PQC

Frequency
Quantity of Concrete in work, m' No. of Samples (sheet)

0-5 I
6.15 2
16-30 3

31.50 4

51 and above 4 plus one additional sample for each additional 550m' or part thereof

Authority Engineer

Cotroctor

Вам также может понравиться