Академический Документы
Профессиональный Документы
Культура Документы
E01.03 Excavate to reduce levels; Maximum depth n.e. 0.25m 78 m3 11.31 882.38
E01.03 Disposal; Excavated material; Off site 78 m3 63.00 4,914.00
E01.03 Disposal; Excavated material; On site 47 m3 10.35 482.83
E01.09 Dewatering
E01.09 Disposal; Surface Water 1 item 957.75 957.75
E02 SUBSTRUCTURE
E06 ROOF
E15.02 Cupboards
E15.02 Allowance for fitted cupboards 4 No 1,350.00 5,400.00
E22 DRAINAGE