LEKIR BULK TERMINAL EXPANSION PROJECT

PACKAGE 1 – DEDICATED BYPASS CONVEYOR


SYSTEM (“LEXPRO P1”)
NOI No: LEX-P1-QAQC-NOI-MECH-0343

NOTIFICATION OF INSPECTION
ITP Ref No. LEX/P1/M/EAC-----F01/MP/020 Date 27/05/2019

To TOKYO ELECTRIC POWER SERVICES CO., LTD. Attn. MR YUSRI

Please be informed that the following item has been checked by us and are found to be conforming to the requirements These

items are now ready for your inspection on:

Date : 28/ 05/ 19 Time : 2.30 pm.

Date of previous inspection (if applicable) Name : Mr. Neechitra Rao


Contractor's Contact Person Telephone No. : 6011 897 9796

Signature : RAO

Location : Stacking Conveyor 3B (SC 3B) & Transfer Station 2C (TS 2C)

Description of Work : To Conduct Final Walk Down for Package 4 – (SC 3B & TS 2C)

Purpose of Inspection : Punch List Clearance for conveyor SC3C & 3D prior Dry Commissioning

Attachments :
☒ AFC Drawing ☐ Method of Statement

☐ Check List ☐ Mill Certificate

☐ Survey Report ☐ Others: ITP Related Page

Participant Sub - contractor Contractor Employer

Signature
BALAN HAZIME

Name
Thanabalan Mr HAZIME
Date
27/05/2019 27/05/2019

Inspection Results:

Date: Time:

Comments:

Inspection Passed, Contractor allowed to proceed with the works


Remedial works listed in the comments to be completed, inspection required after remedial works
Remedial works listed in the comments to be completed, no further inspection required
Inspection reject, not allowed to proceed with the work and comment need to rectify.

Inspected By:
Participant Sub - contractor Contractor Employer

Signature

Name Thanabalan Mr Hazime


Date 28/05/2019 28/05/2019