Вы находитесь на странице: 1из 4

Information and Safety

Heavy Truck Docking Stations LogServ Rules for Visitors


A Plant Upkeep F6 LC01 Mühlbach Office Building C10
Main Workshop LC02 LogServ Engine and A6 Version: March 2012
AH Showroom – voestalpine Cultural B9 Railcar Workshop
Organization LC03 Heavy-load Vehicles B6
B Heavy Plate Shipping, Gate 19 D8 LC04 LogServ River Port Management F3
C Receipt of Goods B9 LC05 Customs building B9
D Push-pull Pickling Line – E7 Gaisenbergerstraße
LC06 Automotive Workshop + Filling A6
Regeneration Station
E Desulfurization Plant C5 LC07 Mühlbach Office Building C9
E1 Pelleting and Briquetting Plant B4
F Neuson B8
F1 Auinger – Cerveny A6
G1
H
OÖGKK – Dental Clinic, APK
Electrical Plate Manufacturing
A2
D7
Directory of Plant Facilities Technically more advanced. Successful together.
I Baar B8 voestalpine Anarbeitung A3 voestalpine Steel Division – the partner you can trust.
ILL Industrial Logistics B9 Strip Coating Line 2 C7
Information Point Vocational Health Center/Ambulance E7
K Hot-dip Galvanizing Line 1 C8 Works Fire Department A6
K1 Hot-dip Galvanizing Line 2 C6 Strip Coating Line 1, colofer® D8
K2 Strip Coating Line D9 Electrical Technical Center C4 High-quality materials are the basis for our products. We strive to be the best
K3 Electro-galvanizing Line C7 Electrical Engineering Center F6
K4 Iron-oxide Shipping C9 Electro-galvanizing Line C7
partner for our customers and want to provide them with the best-possible
K5 Iron Sulfate Loading D6 voestalpine Europlatine B7 solution. We focus our expertise on two aspects:
L Hydraulic Testing Stand F6 Hot-dip Galvanizing Line 1 C8
M VAM Center G7 Hot-dip Galvanizing Line 2 D7 The personal aspect, with dedicated and highly competent employees
N Heavy Load Port G8 Hot-dip Galvanizing Line 3 C6 The technical aspect, with high-quality methods, products and services
O1 Brick-making Plant D5 Hot-dip Galvanizing Line 4 C7
Hot-dip Galvanizing Line 5 C6
P1 External Rolling Mill Storage B6
Area, Bay 4 Scarfing Bay C6
FMA D8 The companies in the voestalpine Steel Division and their employees
P2 Rolling Mill Storage Area 11 D7
Forum.Zukunft/Apprentice Workshop A5 understand partnership to be the following:
P3 Blast Furnace Storage Area 06 D4 voestalpine Giesserei E6
P4 Coking Plant, Repairable Spares C3 voestalpine Grobblech E7 Understanding for their customers’ business
Storage 07 Blast Furnaces 4–6 C4 Expertise and reliability
Q Shipment and Storage Entry 33 A7 Blast Furnace A D4
R Central Storage 01, Storage Area 01 A6 ILL B3 Responsibility for satisfactory project completion
R1 Storage 3 B6 ILL i0 C8
Foundry Auxiliary Materials Ld ILL i2+i3 B8 Partnerships based on trust
R3 LogServ – Automobile Filling Station A6 Cold-rolling Mill 1 D7
S VAM Corrosion Protection F6 Cold-rolling Mill 2 C8
Coking Plant B2 Many years of successful partnerships with our customers prove our point.
T Wuppermann – Steel Strip E8
Continuous Tandem Rolling Mill C7
U Foundry Storage 2501 F6 LD3 B5
U1 Refractory Material Storage 12 – F5 Non-iron-metal Casting Plant F6
Zapf, East Baustoffstraße Regeneration E7
U2 Refractory Material Brick E5 Push-pull Pickling Line E7
Storage 2 Screening Plant C2/D2
U3 Refractory Material Brick F4 Sinter Plant E4
Storage 1 East Brick Yard 2 E5
U4 Refractory Material Storage B5 East Brick Yard F4
LD3 West Works Security B8
Materials Center G6
U5 Alloy Storage 59 E5 ZAPF E5/F5
U6 voestalpine Giesserei Mold Yard G7
V AE – Pressure Die Casting G6
W Bauschutz, Sand Blasting Plant G7
Y Linde C6
Z Scale – Granulation E4 voestalpine Stahl GmbH
Z1 Lentia Concrete G6 voestalpine-Straße 3
Z2 COGNOR – Stahlhandel GmbH F7 4020 Linz, Austria
Z4 Kremsmüller E8 T. +43/50304/15-0
Z6 voestalpine Kindergarten E9 F. +43/50304/55-DW voestalpine Stahl GmbH
www.voestalpine.com/stahl www.voestalpine.com/stahl
Linz Site

Ambulance

Works Security
Fire Department
Procedures in the event of an emergency

Tel.: +43/50304/15-133
Tel.: +43/50304/15-122
Tel.: +43/50304/15-144
Welcome to voestalpine Stahl GmbH

by voestalpine personnel and by abiding by the rules contained herein.


Your safety while visiting our production site is very important to us. Please

make your own contribution by complying with the instructions given to you

Please call one of the in-house emergency services in the event of an emer-

nel are most familiar with the conditions and circumstances in our facilities.
gency (accident, fire, medical incident, etc.). Our in-house emergency person-
A B C D E F G
Works fence
Legend
Internal access roads
! General access
Allgemeines prohibited
Fahrverbot G
!
( Ambulance station
Rettungsstelle !A Works entrance/Works
Werkseinfahrt security
Werkssicherung
#
ã
Å External access roads
! 4,0m
# Durchfahrtshöhe
Vehicle clearance -
" Information point for
Info Point
truck für LKW
drivers !B Einfahrt für Mitarbeiter mit
Works entrance/Works Transponderkarte
security
1 Parkplatz
Parking lot 1
È

Parking garage, Customs


Zoll - Douane LKW-Ladestellen
Truck loading points Gehtor
Pedestrian gate
¾
Æ
P Parkhaus, Tiefgarage
underground parking
!
#
§ 0 75 150 300 450 600
!E
Meter
meters "
!"E Geh- und Radtor
Pedestrian and bicycle gate
O
SG09
BG73
APK

2 G1 2
Service zone
Coking Plant Screening Plant
T BG56 SG32
UW BG03 SG01
Rittal

P4
voestalpine
Anarbeitung

BG90

3 SG49 3
River Port
Mechatronics Zone Management – LC04
ICON BG88 ILL River port
Hafen

BG75
È

¾
Æ
P BG39 BG72 SG41
BG41 BG38 BG05
Da

P3
n

BG76
ub

Sinter Plant
e

Guest Services,
Gästehaus, Kitchen
Küche VWZVWZ SG38 Blast Furnaces 4–6 SG02 U3
BG44 BG51
<
4 voestalpine Stahlwelt
BG77 East brick yard 4
BG45 SG40 BG18
BG67
E1 Blast Furnace A
BG48
SG07 Z
Siemens VAI E Electrical Technical Center SG08 BG81
SG52
O1 ZAPF U1
SG39 LD3
U4
U2 Central Ladle Refractory Lining Service
Refractory Material
BG47 BG83 Brick Storage 2
Siemens VAI BG61
Slab descaling
5 5
BG02
!
! !
! SG13
BG19 !
! SG25 U5
BG57

WAB1
SG45

SG23 BG49
Forum.Zukunft

Andritz Hydro
Ausbildungszentrum
Au

BG74
Linde
Lin
BG21
BG

F1 R BG24 L
shop
n,

!
9

! Y SG37 SG34
U
BG66 R1 P1
BG09

SG54 BG35
Foundry
M

R3
Filling Station,

NEM
at

BG29 BG31
BG55

BG58
er

6 BG22 6
Automotive Workshop

SG60
ia

BG54
ls

LC03 BG04 S
LC06
Ce

LogServ/BM

BG34 Z1
nt

È
Center

SG50 SG20 BG20


Corrosion Protection

BG40 ¾
er

Æ
P
Scarfing Bay

A
BG32
Alpine Bau

LC02
BIS VAM

K5 V
LogServ
Electrical Engineering

Works Fire SG14 Cognor


K1
Department voestalpine
Heavy-load Vehicles

Stahlhandel
Anarbeitung
Z2
SG15
P2
Hot-dip Galvanizing Line 3

Hot-dip Galvanizing Line 5

BG13 Bilfinger Berger


K3 W
Rolling Mill

H
BG12

Cold-rolling Mill 1

7 7
Continuous Tandem

Q M
BG80
voestalpine Grobblech

Felbermayr
Push-pull Pickling Line

Strip Coating Line 2


Line

Hot-dip Galvanizing Line 4


BG17 SG17

U6
Galvanizing2Line 2

BG06 BG26
Vocational Health Center D Z
Europlatinen SG36 LV Z
Feuerverzinkung

WFL TH
Hot-dip

BG82

SG85 BG36 M
BG37

VA
BG85 B T S
SG59 Electro-galvanizing

BI 08
I BG Sasol Wax
MCE Maschinenbau

TMS office K Felbermayr


BG27 BG15 ro N
Neuson

BG11 d
8 Cold-rolling Mill 2 33 z H y 8
FMA
SG27

BG d ri
BG65

An
ASA F
Linz AG

Z4 Linz AG
Sorting station

District heating power plant


colofer ®
Hot-dip Galvanizing Line 1

Z6
Concrete Sports club, Kreksi, Schwaighofer
<

K2
Continuous

reinforcement Traun
AH K4
center
BG

ILL i2+i3
ILL i0
64

BG69 Annealing Plant


BG

ry
63

Works nurse al
in
TM

9 rm 9
S

C te Bilfinger
ng Berger
a di
LKW-Terminal e lo
nc ck
Truck/ILL te tr u
pe e
Stand: 7.3.2012

om 0 7 t tim
c LC igh
of N
Funkbeton er
Lisag nt
ce 0 1
y
South il wa LC
construction Ra
yard

10
10 10
h <
ac

Standortservice Tel. 6575


lb
üh
M

A B C D E F G
Site Directory

Buildings

BG02 Steelmaking Plant, TWS, A5 BG64 BIS Industrial Services Austria E9


voestalpine group-IT BG65 Hot-dip Galvanizing Line 1 and D8
BG03 Coking Plant, Environment and A2 Strip Coating Line 1
Process Analysis BG66 Welding Apprentice Shop A6
BG04 SF/TK, Test Engineering TSP D6 BG67 Hot Metal Facility Engineering C4
BG06 WFL A7 BG69 Continuous Annealing Plant C9
BG08 Felbermayr F7/E8 BG72 Barrack TWC B4
BG09 Central Storage 01, Kontext Print A6 BG73 Wet-type B2
Shop, VIVO, GWL Sand-and-gravel Processing Plant
BG11 MCE Maschinen- und A8 BG74 Siemens VAI A5
Apparatebau GmbH BG75 Sales and A3/A4
BG12 TR, TW, E7 Financial Services
voestalpine Anarbeitung BG75-PD BG75 Parking Lot A4
BG13 Main Mechanical Workshop F7 BG76 Unloading/Loading A4
BG15 voestalpine Anarbeitung D8 Employee Catering Services
BG17 First-aid Station, Ambulance E7 BG77 voestalpine Stahlwelt A4
Services, voestalpine Grobblech BG81 Engineering Office HOA D4
BG18 Materials Center F4 BG82 Workshop C8
BG19 Works Council, BU, TWS A5 Cold-rolled Strip/Surface
BG20 Technical Services, Engineering, F6 Treatment
Copy Shop BG83 Plant services D5
BG21 Linde C5/C6 BG85 voestalpine Europlatine B7/B8
BG22 Baubetrieb A6 Office Building
BG26 Vocational Health Center E7 BG88 Mechatronics Zone A3
BG27 TMS B8 BG90 voestalpine Anarbeitung A3
BG28 Electrical Engineering Center F6 Shape-cutting Facility
BG29 TSP – Test Engineering and D6 GBZ1 Central Blower Station No. 1 C4
Analysis SG01 Coking Plant B2
BG32 Baubetrieb A6 SG02 Ore Preparation D4
BG33 Andritz Hydro E8 SG07 Electrical Technical Center C4 Personal conduct on the works premises
BG34 Technical Engineering, E6 SG08 Dolomitstraße Furniture Storage D4
TW – Hot-rolled Steel Strip, SG13 MCE E5
voestalpine Grobblech SG14 Main Mechanical Workshop F6 p Entrance to the works premises and production plants is at the visitor‘s
BG35 TS – Technical Services E6 SG15 Main Mechanical Workshop F7
BG36 TK – Cold-rolled Strip/Surface C8 Works Canteen own risk. To the extent legally permitted, voestalpine Stahl GmbH assumes
Treatment SG17 Cold-rolling Mill 1 (see BG17) E7 no liability for damage of any kind occurring on the works premises.
BG37 TK – Cold-rolled Strip/Surface C8 SG20 voestalpine Giesserei, TSM E6
Treatment SG23 Commons Building D5
BG38 TR – Hot Metal, VARB A4 SG25 Refractory Engineering D5
BG39 voestalpine group-IT, B4 p Any person in the possession of a duly issued entrance badge will be
SG27 FMA D8
Postal Services SG34 voestalpine Giesserei – F6 held liable for misuse of any access authorization.
BG41 voestalpine AG, A4 Model Production
voestalpine Stahl GmbH, SG36 South Rolling Mill C8
voestalpine Metal Forming, SG37 North Rolling Mill C6
voestalpine group-IT p Children under fifteen years of age and animals are strictly forbidden
SG38 Blast Furnace Operations B4
BG44 Guest Services, Kitchen VWZ A4 SG39 LD Steelmaking Plant B5 on the works premises.
BG45 Siemens VAI A4 SG40 Granulation Materials Center E4
BG47 Siemens VAI A5 SG41 Maintenance D4
BG48 Siemens VAI A4 Blast Furnace/Ore Preparation p Alcoholic beverages, weapons and explosives are strictly forbidden
BG49 Andritz Hydro F5/F6 SG45 Training Center A5
BG51 Blast Furnace Ambulance Station D4 SG49 LogServ River Port Management F3 on the works premises.
BG54 Scrap Yard Office B6 – LC04
BG55 voestalpine Giesserei GmbH E6 SG50 Works Fire Department A6
BG57 Forum.Zukunft A5 SG52 Central Ladle Refractory Lining E5/F5 p Instructions issued by works security personnel must be followed.
BG58 LogServ Automotive Workshop B6 Service (ZAPF)
BG60/A Works Entrance A – Stahlstraße B8 SG54 Scrap Handling B6
BG60/B Works Entrance B – Lunzerstraße D9 SG59 ELO Bay Engineering C8 p The company reserves the right to conduct inspections of baggage,
BG60/C Works Entrance C – Franckstraße A2 SG60 Materials Center G6
BG60/D Works Entrance D – Steyregger F2 SG85 voestalpine Europlatine Production B7/B8 vehicles and access badges and to check materials and tools carried
Weg on and through the works premises. Such materials and tools may be
BG60-1 Customs B9
Gaisenbergerstraße rejected for transport to and/or from the premises.
BG61 LD Steelmaking Plant B5
BG63 Bilfinger Berger (formerly MCE) E9
p Transported materials and tools are to be listed in a materials/tools
protocol and submitted to the works security at the time of entry.

p Any person who does not comply with these safety rules and regulati-
ons or with applicable laws will be denied access to the works premi-
ses. Persons denied access will not be permitted to enter the works
premises at a later date.

p Hazardous and dangerous goods of all classes must be registered at the


time of entry. This also applies to exempted quantities according to ADR
regulations (≤ 1000 points) or exemptions for construction workers.

p Each visitor, including accompanying persons, is issued an access


authorization badge and must be registered at the security checkpoint.

p Wear your badge so that it remains clearly visible at all times.

p Your visit is limited to a specific target area as well as to the roads


and pathways that lead you to this point. When traveling to and from
the area you visit, you must use the shortest possible route in both
directions. Safety Precautions

p Shortcuts on unauthorized travel routes are prohibited. p All visitors must register with their contact partner at
the designated site of their visit. Visitors must comply
p Parking is permitted exclusively on designated parking lots. with the instructions of their contact partner and must Persons with Beware
pacemakers of hot
follow all traffic, restrictive and warning signs in ent- prohibited! surfaces!
p The road traffic regulations of Austria (StVO) are applicable throug- rances and facilities. Pay special attention to traffic
hout the entire works premises. lights and acoustic signals such as the honking of
crane drivers.
p Beware of frequent crossing of special vehicles carrying hot slabs,
other hot materials and extremely heavy loads. Special caution is p Entrance to the production and storage facilities is not
Unauthorized Beware of
required when encountering special transport vehicles, which permitted without being accompanied by your contact entry floor-level
prohibited! transports!
need more time to stop and in which the drivers have limited partner.
vision of other vehicles in their path.
p In many areas of our production site, you will be re-
p Filming or photographing on the works premises or quired to wear personal protective equipment (PPE).
the publishing of anything heard or seen is strictly
Fire, open light Beware of
prohibited. Special permission must be obtained from Your signature in the PDA (personal digital assistant) and smoking hanging
Picture taking confirms your acceptance of these rules. prohibited! loads!
Corporate Communications.
prohibited!

Вам также может понравиться