POWER
Steam turbines
ARABELLE™
Packages
that pack performance
today’s power markets have become highly competitive. It is of prime importance that your nuclear
power plant operates at maximum performance and availability: the whole power plant, not just
nuclear steam supply system, but also the complex equipment that converts the steam into electricity.
alstom can help you meet this challenge. alstom designs, manufactures, installs and maintains all
the critical power conversion equipment of a nuclear turbine island: steam turbine and turbogenerator,
moisture separator-reheaters, condenser and pumps, low and high pressure feedwater heaters, and more.
alstom’s nuclear power conversion solutions are based on its ARABELLE™ steam turbine technology
platform, with its superior performance and exceptional reliability. ARABELLE™ steam turbines can
accommodate power outputs ranging from 900 Mw to 1,800 Mw – the largest turbines in operation
worldwide for the past 10 years are ARABELLE™ steam turbines with a 1,550 Mw power output
provided with extremely high availability. and because alstom has developed the other key equipment
of a nuclear power plant conversion system in co-ordination with the ARABELLE™ family, you,
as plant owner, can benefit from an optimal power integrated conversion package.
alstom has also made your decision-making easier. we can offer you products and systems
integrated into operational packages that range from a turbine-generator package to a complete
turbine island. as a result, our solutions cover the full power conversion process for any major
nuclear steam supply system (Nsss) available on the market.
02
ARABELLE™ steam turbines: the benefits
More MW: a compact, powerful, efficient and reliable turbine
T 60% of the expansion through highly efficient single flow
T a unique combined HP/IP module
T standard interface / footprint for 50 Hz & 60 Hz
T Based on mature 1,550 Mw unit
03
ARABELLE™ turbine-generator package:
get more than just the sum of the key components
04
Plant integrator™ –
creating customer value
Process equipment Plant integrator™ is alstom's solution methodology
alstom has extensive know-how in heat designed to create added value for customers. Plant
exchange across all types of power Integrator™’s starting point is the customers’ viewpoint.
plants, including nuclear applications. It then systematically analyses, measures and optimises
alstom nuclear heat exchangers are the specific customer benefits desired, technically,
adaptable to any reactor output level, economically and ecologically. as a result, Plant
delivering maximum performance and Integrator™ matches customer needs and priorities with
reliability and facilitating maintenance. products and services, delivering a thoroughly tailored
solution and maximising customer value. this then becomes
T 2-pass moisture separation the benchmark for future fine-tuning and upgrades.
reheaters (Msrs) for efficient
moisture separation at high reheat the unrivalled Plant Integrator™ offering from alstom
temperatures – increased plant covers the full palette, from single component packages
performance and control systems to turbine islands, operation and
T complete, integrated condensing maintenance services, as well as retrofit solutions.
systems – the condenser itself,
necked low-pressure heaters and Plant Integrator™ benefits to customers:
desuperheating system, condensate T Improve cash flow – by achieving lowest costs
extraction pumps, a vacuum system T Generate more power
and an optimised bundle arrangement T Increase installation efficiency
T circulating water pumps T Burn less fuel
T HP & lP feed water heaters with the T Improve operational flexibility.
smallest temperature differences –
maximised performance
T compact feed water tanks with
integrated deaerators.
05
What makes ARABELLE™ unique
An innovative architecture This unique ARABELLE™ architecture makes
Previous-generation nuclear turbines feature one double-flow maintenance work much easier.
high-pressure (HP) cylinder followed by four or six low-pressure 1. It needs only four steam readmission butterfly valve sets
(lP) flows (with two or three lPs, respectively) for final instead of six. this facilitates maintenance. In addition,
expansion to the condenser. the araBelle™ turbine offers a the butterfly valves are installed at the level of the HP/IP
new architecture where the steam first expands in a single-flow cylinder, accessible from a platform above the Msrs, instead
HP path. after moisture separation and reheat, it then expands of hanging above the operating floor in front of each lP
in a single-flow intermediate-pressure (IP) section before going cylinder.
through the four or six low-pressure (lP) flows. 2. the lP steam admission pipes are entirely below the turbine
operating floor. this arrangement helps reduce maintenance
duration and cost, because maintenance of the lPs does not
require disassembly of the inlet pipes. large lay-down areas
are available alongside the lP cylinders, further facilitating
maintenance.
MSR MSR
Arabelle™ HP 2F
Former
HP IP LP 1 LP 2 LP 3 Unique LP 1 LP 2 LP 3
configuration
configuration
MSR
MSR
06 L
F
Controlling the automated rotor welding process
07
maximising performance
High-efficiency single-flow expansion
Stage Efficiency
Width
08
Efficient, reliable blading T the lsB is optimised through detailed 3D modelling,
Alstom has leveraged over 35 years of experience validated in numerous laboratory tests and manufactured
in nuclear power plants, and more than 100 years through high-precision forgings. an integral streamlined
in steam turbine technology, to develop – and snubber for blade interconnection and continuous lashing
continuously improve – its efficient and reliable greatly increases stage stability. It helps avoid vibrations,
turbine blade family. which such long blades with high-aspect ratios could
otherwise undergo in service. a curved-entry, fir-tree root
all araBelle™ turbine blades feature three-dimensional fastening provides for excellent transmission of effort to
profiles to optimise their aerodynamic performance. the disk, but also facilitates transportation and inspection.
09
Large steam turbines in action
in nuclear power plants
Alstom supporting the China nuclear program for more than 20 years
Alstom has been at the forefront Ling Ao Phase i and ii Daya Bay
of designing and installing 1,980 mW nuclear turbine island. 1,968 mW nuclear turbine island.
nuclear turbine islands for the ling ao was first commissioned in 2003 – Daya Bay was the first nuclear power
past 30 years, with all kinds of several months ahead of schedule – with plant in china. It started commercial
nuclear reactors. Our long- two 990 Mw units. alstom designed, operation in 1994. alstom designed,
standing expertise is unrivalled. delivered and supervised the erection of delivered and supervised the erection
the following projects are just a the complete integrated turbine island, of the complete integrated turbine
few examples of our impressive including the circulating water pumps. island, based on two 984 Mw units.
track record. alstom also delivered the emergency alstom also delivered the emergency
diesel generators and the safety pumps diesel generators and the safety pumps
for the nuclear island. for the nuclear island. the plant was
ling ao 3+4 turbogenerators packages designed to serve both Hong Kong’s
for 2160 Mw turbine islands were also 400 kV network and china’s new 500 kV
ordered in 2005. system, opening up a new era for
featuring araBelle™ technology, the the chinese power industry. In addition
units will deliver starting in 2010 decisively to being an excellent power generator,
higher output than previous units,. for this it soon demonstrated a solid financial
project, a significant transfer of technology return, fostered by the booming chinese
and manufacturing sharing with our long economy.
term partner Decl has been implemented.
leveraging on this solution, several
similar projects are under construction in
china, such as Hongyanhe, Ningde,
fangjiashan, etc.
10
A strong footprint in France, the leading country in nuclear
Alstom has provided turbine- Flamanville 3
generator sets to all 58 EDF 2,700 mW nuclear turbine island.
French nuclear power plant. flamanville started commercial
operation in 1985 with two 1,350 Mw
units. the reactors are of the four-loop
areva “P4” type. under a number of
separate contracts, alstom designed,
delivered and erected the turbine-
Civaux generators, plus the bulk of the turbine ePr (evolutionary Pressurized reactor)
3,100 mW nuclear turbine island. island mechanical and electrical from areva. when commissioned in
the civaux nuclear power plant started auxiliaries, including condensers, 2012, this will be the highest output
commercial operation in 1998. It feedwater reheaters, and condensate in the world from a single turbine-
includes two 1,550 Mw araBelle™ extraction and circulating water pumps. generator set. alstom will design, deliver
steam turbines and their corresponding a power plant extension is now under and erect the complete turbine island,
Gigatop 4-pole turbogenerators. today, construction. It will include one including the condensate extraction
this still represents a world output araBelle™ steam turbine (unit 3), pumps, circulating water pumps and
record for an operating turboset. delivering 1,750 Mw from the new emergency diesel generator sets.
the reactors are of the areva advanced
“N4” type. under a number of separate
5-year period 2001-2005
Forc Rate
component contracts, alstom designed, 0.3% Alstom data derived from external EDF data (290 unit years) 0.292%
References for benchmark collected from NERC (508 unit years)
ed Outage
11
Alstom gearing up for the nuclear
renaissance in the uSA
Chattanooga’s state-of- its own rotor balancing facility – also uniStar
the-art manufacturing the world’s largest. alstom is to supply Baltimore-based
and engineering facility chattanooga’s situation on the tennessee unistar Nuclear energy, a joint venture
alstom will be shipping its high- river gives it great access to an excellent between constellation energy and eDf,
technology components directly to its network of road and rail links, and in with a minimum of four turbine
customers from chattanooga and particular to the us inland and coastal generators for a planned fleet of
stepping-up its efforts on meeting the waterways system. this allows easier, advanced-design nuclear power plants
specific requirements of the North more efficient shipping of large and in the united states. the chattanooga
american power market. heavy products. a special feature is our facility will play a key role in
the site will serve both new and retrofit on-site barge dock with a lifting capacity manufacturing, assembling, and
equipment markets in North america of up to 1,000 tons – particularly suited delivering key components of steam
and will have the capacity to to shipping large and heavy products. turbine, generator and heat exchangers.
manufacture capital-intensive the target for completion of the first of
components with high-technology these nuclear power plants is 2015.
content for nuclear, coal and gas power
plants.
the new site will manufacture, assemble
and test all products using the most up-
to-date high precision machine-tools and
other equipment available today.
In fact, with chattanooga, alstom will
be able to manufacture the largest
turbines in the world and test them in
12
Expert services to optimise
your power plant
alstom has a complete range of services, from traditional Outage optimisation
spare parts supply and field service specialists to full outage performance is paramount, since poor performance
maintenance of steam turbines for nuclear power plants. can lead to delays and increases the chance of a forced outage
as an original equipment Manufacturer (oeM) of steam in the future. equally, high-quality outages reduce the risk of
turbines for nuclear power plants, we are ideally placed to breakdowns and can bring the plant online earlier. By working
provide continuous plant improvement packages. these would in advance of the outage season, we can plan your outage
include: performance and reliability upgrades, lifetime extensions programme for optimal execution.
and consultancy packages developed to meet the changing
market requirements during a plant’s operational lifetime.
alstom Power’s 200 local service centres, located in 70 countries, upgrades
are there to provide local facilities and expertise directly to our If the condition of a steam turbine requires major
customers, helping them to optimise their asset. refurbishment, an upgrade offers a very economic opportunity
to benefit from alstom’s latest technology. Various upgrade
packages have been developed to improve the performance
Long-term service contracts of existing steam turbines manufactured by alstom and
alstom’s long-term service contracts are flexible in scope of other manufacturers. the upgrade project can be tailored to
services and equipment covered as well as contract duration in optimally meet your requirements. Increase of power output
order to meet your unique business requirements. their modular or thermal efficiency, or improvement of operational flexibility
structure allows tailor-made packages to be assembled based on or reliability are usually the major aims of an upgrade project.
the level of risk mitigation and guarantees required.
our service contracts ensure key requirements (depending upon
scope of supply) are met: Lifetime extension
alstom has service packages that use modern techniques
T Predictable operation and maintenance costs to establish the residual life of turbine components. this,
T reliability and availability coupled with newer design techniques and modern materials,
T Heat rate and power output enables alstom to extend plant life whilst incorporating
T environmentally sound products performance and reliability upgrades. this ensures the plant
T 24-hour / 7-day plant support remains competitive over longer periods at optimised costs.
T Broad oeM experience.
13
Alstom Power R&D
Alstom Power R&D is decidedly market and customer oriented and focuses on creating
innovative technologies to be applied at all stages of the products’ life cycles.
We aim for the best utilisation of the customers’ investment, alstom Power works with more than 30 universities worldwide.
the earth’s materials and the fuel used, through efficiency, we establish close, long-term links with institutions and
availability and cost reduction. the increased environmental professors who are experts in fields that are important to
concern applies to all types of power plants, new or existing. us, for example, with MIt and stanford research Institute
for fossil thermal plants, we develop cleaner combustion on co2, Grenoble and lausanne universities on hydro turbines
systems coupled with more efficient turbines and flue gas and fluid dynamics, cologne's Dlr on combustion, and oxford
cleaning systems. co2-free nuclear power plants also benefit university on heat transfer, as well as with engineering institutes
from our clean power solutions with, for example, our in china, India and russia.
condensers and pumps minimizing auxiliary power and water
consumption. In the field of international collaboration, alstom Power has
played a leading role in establishing the european technology
alstom’s engineering and r&D workforce totals 5,500 people, platform for zero emission fossil fuel power generation (ZeP).
of which 4,000 are in engineering and 1,500 in r&D in 22 r&D
centres. there are 13 laboratories with dedicated infrastructure,
equipment and testing facilities.
14
A world leader in
clean power generation
15
PT-PE/BPROB/RBLSTN07/eng/TMG/03.09/CH/6379 © - ALSTOM 2009. Alstom, the Alstom logo and any alternative version thereof are trademarks and service marks of Alstom. The other names mentioned, registered
or not, are the property of their respective companies. The technical and other data contained in this document is provided for information only. Neither Alstom, its officers nor employees accept responsibility for or should
be taken as making any representation or warranty (whether express or implied) as to the accuracy or completeness of such data or the achievements of any projected performance criteria where these are indicated. No
liability is accepted for any reliance placed upon the information contained in this brochure. Alstom reserves the right to revise or change this data at any time without further notice. If any provision of this disclaimer is
held by any competent authority to be invalid or unenforceable in whole or in part the validity of the other provisions and the remainder of the provision in question shall not be affected.
Design and realisation: Les Editions Stratégiques. Photo credits: © 2007 Bryon Paul McCartney | www.atelier-mccartney.com, Alstom and others.