BID BULLETIN
As of 01 October 2014
ADDENDUM NO. CBS-001
As a result of the Pre-Bid Conference held on 25 September 2014, the Bids and Awards
Committee of Duty Free Philippines Corporation would like to notify all prospective
bidders of the following revisions, forms/documents to be included in the submission of
their bid for the Construction of DFPC Bacolod Store.
1. A revised Section VI. Specifications supersedes the previously issued. Please refer
“Annex A”.
2. A revised E1 Drawings supersedes the previously issued. Please refer to “Annex B”.
3. A revised Section VIII. Bill of Quantities supersedes the previously issued. Please
refer to “Annex C”.
4. A revised Bidding Form No. 6 Bill of Materials supersedes the previously issued.
Please refer to “Annex D”.
“Annex A”
Page 1 of 2
VI. SPECIFICATIONS
Construction of DFPC Bacolod Store
Bid Bulletin Addendum No. CBS-001
A. Glass and Aluminum Works:
- For fixed glass use 10mm thk clear glass frameless, tempered with U-channel
(stainless clip) embedded to flooring (provide sample).
- Frameless patch fitting double leaf swing door with side fixed panel.
- ½ thk clear glass (tempered)
- Patch fitting (hardware) top, bottom, lock, H type handle
- Dorma brand floor hinges.
“Annex A”
Page 2 of 2
-“Duty Free Philippines” word – acrylic text built-up; backlit with LED strip lights
font “Times New Roman” bold color: black DFP 100% yellow acrylic with backlit
LED strips, 1.5mm stainless steel border in hairline finish.
G. Electrical Materials:
*Lighting Accessories
- Duplex outlet (National 10 Amp)
- Switch (National rating as indicated)
* Electrical Hardware:
- GA #18, 4”x 4” square box, 2” x 4” utility box.
- Pull box wire gutter GA #18 painted gray finish, size as indicated in the plan.
H. Mechanical Works:
- Use 3TR Mitsubishi ceiling cassette ACU.
- Single Phase
- 220 volts
- 2.0 Hp wall mounted
- 1.0 Hp wall mounted
________________________________ _____________________________
Signature over printed name Position
“Annex D”
Page 1 of 5
Bidding Form No. 6
BILL OF MATERIALS
I. Ceiling (Carpentry)
Materials Units Unit Cost Total Cost
“Annex D”
Page 2 of 5
“Annex D”
Page 3 of 5
V. Temporary Enclosure
Materials Description Units Unit Cost Total Cost
¼" Thk x 4' x 8' Ordinary Plywood
2" x 3" x10' Metal Stud
Flat Latex White
Blind Rivet 1/4" x ½"
1½" Black Screw
3" x 3" Loose Pin Hinges
7" Roller Brush
Paint Brush 2"
Roller Tray
Total
“Annex D”
Page 4 of 5
Total
VII. Telephone and Network Infrastructure
FOC Connection to Departure:
Materials Description Units Unit Cost Total Cost
Multi mode indoor 4 core FOC 50
micron OM3
Fiber patch cord
Gigabit Transceiver (UTP to SC)
Fabricated FOC box
FOC Roughing-ins, materials and
consumables
FOC Labor cost
Arrival Telephone Network Infrastructure:
“Annex D”
Page 5 of 5
P
D. Supply and Installation of 1 Unit
3 Ton Ceiling Cassette
(Mitsubishi)
1 Unit - 2.0HP Wall Mounted
1 Unit - 1.0HP Wall Mounted
P
E. Supply and Installation of
Aluminum Cladding (Column / Lower Edge of Corbel
P
F. Fire Alarm (Manual)
P