Doc No EEPL/PU/PMM/001

PREVENTIVE MAINTENANCE PLAN FOR MACHINE


Rev No 0
MITER AND MITER ENGS. PVT. LTD Rev Date 12/1/2013
PU DEPT pege No 1 of 1
SR. NO. M/C No MACHINE NAME Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19

WEEK 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

1 PU-RIM POLYURETHENE MACHINE

2 NP NUCLEATION PLANT

3 CVS-01 CONSTANT VOLTAGE STABILISER

4 CVS-02 CONSTANT VOLTAGE STABILISER

5 CVS-03 CONSTANT VOLTAGE STABILISER

6 MC-01 MOULD CARRIER

7 MC-02 MOULD CARRIER

8 MC-03 MOULD CARRIER

9 MC-04 MOULD CARRIER

10 MC-05 MOULD CARRIER

11 MC-06 MOULD CARRIER

12 MC-07 MOULD CARRIER

13 MC-08 MOULD CARRIER

14 MC-09 MOULD CARRIER

15 MC-10 MOULD CARRIER

16 MC-11 MOULD CARRIER

17 MC-12 MOULD CARRIER

18 IMC-01 IN MOULD COATING UNIT

19 IMC-02 IN MOULD COATING UNIT

20 IMC-03 IN MOULD COATING UNIT

21 IMC-04 IN MOULD COATING UNIT

22 IMC-05 IN MOULD COATING UNIT

23 IMC-06 IN MOULD COATING UNIT

24 IMC-07 IN MOULD COATING UNIT

25 IMC-08 IN MOULD COATING UNIT

26 RSU-01 RELEASE SPRAY UNIT

27 RSU-02 RELEASE SPRAY UNIT

28 RSU-03 RELEASE SPRAY UNIT

29 RSU-04 RELEASE SPRAY UNIT

MONTHLY Note : Green colour is indicate work is completed

Doc No EEPL/PU/PMM/001
PREVENTIVE MAINTENANCE PLAN FOR MACHINE
Rev No 0
MITER AND MITER ENGS. PVT. LTD Rev Date 12/1/2013
PU DEPT pege No 1 of 1

SR. NO. M/C No MACHINE NAME Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19

WEEK 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

32 AB AIR BLOWER

33 AB-I AIR BLOWER

34 AB-II AIR BLOWER

35 MTC-01 MOULD TEMP. CONTROLLER

36 MTC-02 MOULD TEMP. CONTROLLER

37 MTC-03 MOULD TEMP. CONTROLLER

38 MTC-04 MOULD TEMP. CONTROLLER

39 MTC-05 MOULD TEMP. CONTROLLER

40 MTC-06 MOULD TEMP. CONTROLLER

41 MTC-07 MOULD TEMP. CONTROLLER

42 MTC-08 MOULD TEMP. CONTROLLER

43 MTC-09 MOULD TEMP. CONTROLLER

44 MTC-10 MOULD CARRIER

45 CP CHILLING PLANT

46 CP-I CHILLING PLANT

47 AD AIR DRYER

48 AIR COMP-04 AIR COMPRESSOR

49 ECPH-02 ELECT. CHAIN PULLY HOIST

MONTHLY Note : Green colour is indicate work is completed


PREVENTIVE MAINTENANCE PLAN FOR MACHINE
MITER AND MITER ENGS. PVT. LTD PU MOLDING - 2018-2019

SR. NO. M/C No MACHINE NAME

MONTH Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19
POLYURETHENE
1 PU-RIM MACHINE

2 NP NUCLEATION PLANT

CONSTANT VOLTAGE
3 CVS-01 STABILISER

CONSTANT VOLTAGE
4 CVS-02 STABILISER

CONSTANT VOLTAGE
5 CVS-03 STABILISER

6 MC-01 MOULD CARRIER

7 MC-02 MOULD CARRIER

8 MC-03 MOULD CARRIER

9 MC-04 MOULD CARRIER

10 MC-05 MOULD CARRIER

11 MC-06 MOULD CARRIER

12 MC-07 MOULD CARRIER

13 MC-08 MOULD CARRIER

14 MC-09 MOULD CARRIER

15 MC-10 MOULD CARRIER

16 MC-11 MOULD CARRIER

17 MC-12 MOULD CARRIER

IN MOULD COATING
18 IMC-01
UNIT

IN MOULD COATING
19 IMC-02
UNIT

IN MOULD COATING
20 IMC-03
UNIT

IN MOULD COATING
21 IMC-04
UNIT

IN MOULD COATING
22 IMC-05
UNIT

IN MOULD COATING
23 IMC-06
UNIT

PREVENTIVE MAINTENANCE PLAN FOR MACHINE


MITER AND MITER ENGS. PVT. LTD PU MOLDING - 2018-2019

SR. NO. M/C No MACHINE NAME

MONTH Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19
IN MOULD COATING
26 IMC-07
UNIT
IN MOULD COATING
27 IMC-08
UNIT
28 RSU-01 RELEASE SPRAY UNIT

29 RSU-02 RELEASE SPRAY UNIT

30 RSU-03 RELEASE SPRAY UNIT

31 RSU-04 RELEASE SPRAY UNIT

32 AB AIR BLOWER

33 AB-I AIR BLOWER

34 AB-II AIR BLOWER


MOULD TEMP.
35 MTC-01
CONTROLLER
MOULD TEMP.
36 MTC-02
CONTROLLER
MOULD TEMP.
37 MTC-03
CONTROLLER
MOULD TEMP.
38 MTC-04
CONTROLLER
MOULD TEMP.
39 MTC-05
CONTROLLER
MOULD TEMP.
40 MTC-06
CONTROLLER
MOULD TEMP.
41 MTC-07
CONTROLLER
MOULD TEMP.
42 MTC-08
CONTROLLER
MOULD TEMP.
43 MTC-09
CONTROLLER
44 MTC-10 MOULD CARRIER

45 CP CHILLING PLANT

46 CP-I CHILLING PLANT

47 AD AIR DRYER
AIR COMP-
48 AIR COMPRESSOR
04
ELECT. CHAIN PULLY
49 ECPH-02
HOIST
LIST/PROD/PU REV-00

LIST OF MACHINE

SR. NO. MACHINE MODEL IDENTIFICATION NO. MANUFACTURING YEAR MAKE

A) SHOPFLOOR SECTION

1 POLYURETHENE MACHINE GMA MODEL-H-40 X 4 HEAD PU-RIM 2013 RIM

2 NUCLEATION PLANT NM 2018 KRAUSS MAFFEI GERMANY

3 CONSTANT VOLTAGE STABILISER 60 KVA CVS-01 2013 AIRMEK

4 CONSTANT VOLTAGE STABILISER 50 KVA CVS-2 2004 DATSON

5 CONSTANT VOLTAGE STABILISER 15 KVA CVS-03 2008 LOCAL

6 MOULD CARRIER LOCAL MC-01 2013 AVANZARO

7 MOULD CARRIER LOCAL MC-02 2013 AVANZARO

8 MOULD CARRIER LOCAL MC-03 2013 AVANZARO

9 MOULD CARRIER LOCAL MC-04 2013 AVANZARO

10 MOULD CARRIER LOCAL MC-05 2013 LOCAL

11 MOULD CARRIER LOCAL MC-06 2013 LOCAL

12 MOULD CARRIER LOCAL MC-07 2013 LOCAL

13 MOULD CARRIER LOCAL MC-08 2013 LOCAL

14 IN MOULD COATING SPRAY UNIT I LOCAL IMC-01 2013 LOCAL

15 IN MOULD COATING SPRAY UNIT II LOCAL IMC-02 2013 LOCAL

16 IN MOULD COATING SPRAY UNIT III LOCAL IMC-03 2013 LOCAL

17 IN MOULD COATING SPRAY UNIT IV LOCAL IMC-04 2013 LOCAL

18 IN MOULD COATING SPRAY UNIT I LOCAL IMC-05 2016 SMART COATING EQUIPMENT

19 IN MOULD COATING SPRAY UNIT II LOCAL IMC-06 2016 SMART COATING EQUIPMENT

20 IN MOULD COATING SPRAY UNIT III LOCAL IMC-07 2016 SMART COATING EQUIPMENT

21 IN MOULD COATING SPRAY UNIT IV LOCAL IMC-08 2016 SMART COATING EQUIPMENT

22 RELEASE SPRAY UNIT LOCAL RSU-01 2004 GOODIESONS

23 RELEASE SPRAY UNIT LOCAL RSU-02 2008 GOODIESONS

24 RELEASE SPRAY UNIT LOCAL RSU-03 2013 LOCAL

25 RELEASE SPRAY UNIT LOCAL RSU-04 2016 SMART COATING EQUIPMENT

26 AIR BLOWER 15 HP AB 2004 AIR CONTROL SYSTEM

27 AIR BLOWER 7.5 HP AB-1 2016 AIR CONTROL SYSTEM

28 AIR BLOWER 7.5 HP AB-2 2016 AIR CONTROL SYSTEM

29 POLYURETHENE MACHINE PU-30IQ PU-01 2004 KRAUSS MAFFEI GERMANY

30 POLYURETHENE MACHINE PU 30IQ PU-02 2008 KRAUSS MAFFEI,GOODIESONS

31 MOULD TEMP CONTROLLER LT150 MTC-1 2016 TOSHIBA MACHINE

32 MOULD TEMP CONTROLLER LT150 MTC-2 2016 TOSHIBA MACHINE

33 MOULD TEMP CONTROLLER LT-150 MTC-3 2004 TOSHIBA MACHINE

34 MOULD TEMP CONTROLLER LT-150 MTC-4 2006 TOSHIBA MACHINE

35 MOULD TEMP CONTROLLER LT-150 MTC-5 2013 TOSHIBA MACHINE

36 MOULD TEMP CONTROLLER LT-150 MTC-6 2016 TOSHIBA MACHINE

37 MOULD TEMP CONTROLLER LT-150 MTC-7 2004 TOSHIBA MACHINE

38 MOULD TEMP CONTROLLER LT-150 MTC-8 2016 TOSHIBA MACHINE

39 MOULD TEMP CONTROLLER LT-150 MTC-9 2016 TOSHIBA MACHINE

40 MOULD TEMP CONTROLLER LT-150 MTC-10 2016 TOSHIBA MACHINE

B) UTILITY SECTION

1 AIR COMPRESSOR 20 HP AIR COMP-04 2013 ELGI

2 AIR DRYER UNIT 120 CFM AD-01 2013 ELGI

4 CHILLING PLANT 10 TON CP 2010 EDM

5 CHILLING PLANT 15 TON CP-I 2013 EDM

6 CHILLING PLANT 10 TON CP-II 2016 TROPICCOOLE-NOVATIONS & COOLING SYSTEM

PREPARED BY APPROVED BY
LIST/PROD/PU REV-00

LIST OF MACHINE

SR. NO. MACHINE MODEL IDENTIFICATION NO. MAKE

A) SHOPFLOOR SECTION

1 POLYURETHENE MACHINE GMA MODEL-H-40 X 4 HEAD PU-RIM RIM


2 CONSTANT VOLTAGE STABILISER 60 KVA CVS-01 AIRMEK
3 MOULD CARRIER LOCAL MC-01 AVANZARO
4 MOULD CARRIER LOCAL MC-02 AVANZARO
5 MOULD CARRIER LOCAL MC-03 AVANZARO
6 MOULD CARRIER LOCAL MC-04 AVANZARO
7 MOULD CARRIER LOCAL MC-05 LOCAL
8 MOULD CARRIER LOCAL MC-06 LOCAL
9 IN MOULD COATING SPRAY UNIT I LOCAL IMC-01 LOCAL
10 IN MOULD COATING SPRAY UNIT II LOCAL IMC-02 LOCAL
11 IN MOULD COATING SPRAY UNIT III LOCAL IMC-03 LOCAL
12 IN MOULD COATING SPRAY UNIT IV LOCAL IMC-04 LOCAL
13 RELEASE SPRAY UNIT LOCAL RSU-01 LOCAL
14 AIR BLOWER 15 HP AB AIR CONTROL SYSTEM

POLYURETHENE MACHINE PU-30IQ PU-01 KRAUSS MAFFEI


POLYURETHENE MACHINE PU 30IQ PU-02 KRAUSS MAFFEI

B) UTILITY SECTION

1 AIR COMPRESSOR 20 HP AIR COMP-04 ELGI


2 AIR DRYER UNIT 120 CFM AD-01 ELGI
4 CHILLING PLANT 10 TON CP ARMEC
5 HOT WATER SYSTEM 36 KW HWS LOCAL

PREPARED BY APPROVED BY
MITER AND MITER ENGS. PVT. LTD

INDEX LIST /MCM/PU/001 REV.03

SR. DESCRIPTION CHECK SHEET/ PAGE REV. DATE PREPARED APPROVED


NO. FORMAT NO. NO. BY BY
1 Preventive maintenance checksheet for
PU machine (Daily) QAF0901/4-MCM-25 1 0 4/1/2013 AMMAINT MPM
2 Preventive maintenance checksheet for
PU machine. ( Monthly) QAF0901/4-MCM-26 2 0 4/1/2013 AMMAINT MPM
3 Preventive maintenance checksheet for
Mould carrier. (Monthly) QAF0901/4-MCM-26 6 0 12/1/2005 AMMAINT MPM
4 Preventive maintenance checksheet for
Constant voltage stabilizer. (Monthly) QAF0901/4-MCM-26 8 0 12/1/2005 AMMAINT MPM
5 Preventive maintenance checksheet for
In mould coating spray unit. (Monthly) QAF0901/4-MCM-26 10 0 12/1/2005 AMMAINT MPM
6 Preventive maintenance checksheet for
Release spray unit. (Monthly) QAF0901/4-MCM-26 11 0 12/1/2005 AMMAINT MPM
7 Preventive maintenance checksheet for
Air-compressor. (Monthly) QAF0901/4-MCM-26 13 0 12/1/2005 AMMAINT MPM
8 Preventive maintenance checksheet for
Air dryer unit. (Monthly) QAF0901/4-MCM-26 15 0 12/1/2005 AMMAINT MPM
9 Preventive maintenance checksheet for
Heatless dryer unit. (Monthly) QAF0901/4-MCM-26 17 0 12/1/2005 AMMAINT MPM
10 Preventive maintenance checksheet for
Chilling plant. (Monthly) QAF0901/4-MCM-26 19 0 12/1/2005 AMMAINT MPM
11 Preventive maintenance checksheet for
Hot water system. (Monthly) QAF0901/4-MCM-26 21 0 12/1/2005 AMMAINT MPM
12 Preventive maintenance checksheet for
Moulds. (Monthly) QAF0901/4-MCM-26 22 0 QAF0901/4- AMMAINT MPM

ISSUE : A
REV:00
DATE:- 01/12/2005 PREPARED BY APPROVED BY
MITER AND MITER ENWEEKELY QAF0901/4-RA & IMC REV-01

CHECK SHEET
WEEKELY CHECK SHEET FOR :-
DEPARTMENT :- PU DEPT.
LOCATION :- PU MOULDING SECTION.
EQUIPMENT NO.:__________________
MAINTENANCE FORM NO.:-____________________

SR. CHECK POINT Standard Date:-


NO. DESCRIPTION

a MACHINE AIR PRESSURE MIN. 3 KG/CM 2

b RELEASE TANK PRESSURE 1 - 2 KG / CM 2

c IMC TANK PRESSURE 1 - 2 KG / CM 2

d OUTPUT OF RELEASE GUN 10 - 20 GM / MIN

e OUTPUT OF IMC GUN 25 - 35 GM / MIN


ISSUE:- A
DATE:- 10 / 04 / 2014 PREPARED BY:- APPROVED BY:-

MITER AND MITER ENDAILY QAF0901/4-MCM-25 AA REV-0

CHECK SHEET
ROUTINE MAINTENANCE CHECK SHEET FOR :- PU PLANT,
DEPARTMENT :- PU DEPT.
LOCATION :- PU MOULDING SECTION.
EQUIPMENT NO.:__________________
MAINTENANCE FORM NO.:-____________________

SR. CHECK POINT Standard Date:-


NO. DESCRIPTION

a Machine cleaning

b polyol temp. 25-45deg.c.

c Iso temp. 25-45deg.c.

d container pressure poly-I 1-3 bar

e container pressure - ISO 1-3 bar

f pump & coupling venting -poly-I

g pump & coupling venting -ISO

h Polyol pressure 90-110 bar

i Iso pressure 90 - 110 bar


ISSUE:- A
DATE:- 01 / 02 / 2014 PREPARED BY:- APPROVED BY:-
EMDET DAILY QAF0901/4-MCM-25 REV-0

CHECK SHEET
ROUTINE MAINTENANCE CHECK SHEET FOR :- PU PLANT,
DEPARTMENT :- PU DEPT.
LOCATION :- PU MOULDING SECTION.
EQUIPMENT NO.:__________________
MAINTENANCE FORM NO.:-____________________

SR. CHECK POINT Standard Date:-


NO. DESCRIPTION

a Machine cleaning

b polyol temp. 20-30deg.c.

c Iso temp. 20-30deg.c.

d container pressure poly-I 2-4 bar

e container pressure - ISO 2-4 bar

f container pressure CDS-I 2-4 bar

g container pressure - CDS-II 2-4 bar

h container pressure - CDS-III 2-4 bar

i pump & coupling venting -poly-I

j pump & coupling venting -ISO

k Polyol pressure 130-150 bar

l Iso pressure 130 - 150 bar

m colour paste pressure 50-70 bar

m Hyd. Pressure 120-160 bar


ISSUE:- A
DATE:- 01 / 04 / 2013 PREPARED BY:- APPROVED BY:-

MITER AND MITER ENG


DAILY QAF0901/4-MCM-25 A REV-0

CHECK SHEET
ROUTINE MAINTENANCE CHECK SHEET FOR :- PU PLANT,
DEPARTMENT :- PU DEPT.
LOCATION :- PU MOULDING SECTION.
EQUIPMENT NO.:__________________
MAINTENANCE FORM NO.:-____________________

SR. CHECK POINT Standard Date:-


NO. DESCRIPTION

a Machine cleaning

b polyol temp. 25-35deg.c.

c Iso temp. 25-35deg.c.

d container pressure poly-I 1-3 bar

e container pressure poly-II 1-3 bar

f container pressure - ISO 1-3 bar

g pump & coupling venting -poly-I

h pump & coupling venting -poly-II

i pump & coupling venting -ISO

j Polyol pressure 115-135 bar

k Iso pressure 100 - 120 bar

l material delivery 150 -190 gm/sec


ISSUE:- A
DATE:- 01 / 02 / 2014 PREPARED BY:- APPROVED BY:-

MITER AND MITER ENG


DAILY QAF0901/4-MCM-25 AA REV-0

CHECK SHEET
ROUTINE MAINTENANCE CHECK SHEET FOR :- PU PLANT,
DEPARTMENT :- PU DEPT.
LOCATION :- PU MOULDING SECTION.
EQUIPMENT NO.:__________________
MAINTENANCE FORM NO.:-____________________

SR. CHECK POINT Standard Date:-


NO. DESCRIPTION

a Machine cleaning

b polyol temp. 25-45deg.c.

c Iso temp. 25-45deg.c.

d container pressure poly-I 1-3 bar

e container pressure - ISO 1-3 bar

f pump & coupling venting -poly-I

g pump & coupling venting -ISO

h Polyol pressure 90-110 bar

i Iso pressure 90 - 110 bar


ISSUE:- A
DATE:- 01 / 02 / 2014 PREPARED BY:- APPROVED BY:-

MITER AND MITER ENG


DAILY QAF0901/4-MCM-25 REV-1

CHECK SHEET
ROUTINE MAINTENANCE CHECK SHEET FOR :- PU PLANT,
DEPARTMENT :- PU DEPT.
LOCATION :- PU MOULDING SECTION.
EQUIPMENT NO.:__________________
MAINTENANCE FORM NO.:-____________________

SR. CHECK POINT Standard Date:-


NO. DESCRIPTION

a Machine cleaning

b polyol temp. 20-30deg.c.

c Iso temp. 20-30deg.c.

d container pressure poly-I 2-4 bar

e container pressure - ISO 2-4 bar

f container pressure CDS-I 2-4 bar

g container pressure - CDS-II 2-4 bar

h container pressure - CDS-III 2-4 bar

i pump & coupling venting -poly-I

j pump & coupling venting -ISO

k Polyol pressure 130-150 bar

l Iso pressure 130 - 150 bar

m colour paste pressure 70-110 bar

m Hyd. Pressure 120-160 bar

ISSUE:- A
DATE:- 13 / 11 / 2014 PREPARED BY:- APPROVED BY:-

MITER AND MITER ENG


DAILY QAF0901/4-MCM-25 AA REV-0

CHECK SHEET
ROUTINE MAINTENANCE CHECK SHEET FOR :- PU PLANT,
DEPARTMENT :- PU DEPT.
LOCATION :- PU MOULDING SECTION.
EQUIPMENT NO.:__________________
MAINTENANCE FORM NO.:-____________________

SR. CHECK POINT Standard Date:-

NO. DESCRIPTION

a Machine cleaning

b polyol temp. 25-45deg.c.

c Iso temp. 25-45deg.c.

d container pressure poly-I 1-3 bar

e container pressure - ISO 1-3 bar

f pump & coupling venting -poly-I

g pump & coupling venting -ISO

h Polyol pressure 90-110 bar

i Iso pressure 50 - 70 bar

ISSUE:- A
DATE:- 01 / 07 / 2014 PREPARED BY:- APPROVED BY:-
Doc No EEPL/PP MOLDING/PMM/ELECTRICAL HOIST
Rev No 0
MITER AND MITER ENGS. PVT.MACHINE
LTD PREVENTIVE MAINTANANCE REPORT Rev Date 01.11.18
Page 1 OF 1
Year
MONTHLY PREVENTIVE MAINTENANCE MONITORING SHEET Machine
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

CHECKING OF ALL ELECTRICAL CONNECTIONS.

CHECKING ALL FUNCTIONS ARE WORKING OK.

CHECK WIRE ROPE & HOOK CONDITION.

GREASE WHEREVER NECESSARY.

CHECK OIL IN GEAR BOX.

Sign

Date

PREPARED BY APPROVED BY
PU PLANT

QAF0901/4-MCM-26
PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

A) CHECK HYDRAULIC OIL LEVEL IN HYDRAULIC TANK. B) CHECK ALL PRESSURE GAUGES,NEEDLE VALVE FUNCTIONING,
IF NEEDED TOP-UP THE LEVEL. CHECK MAX. PRESSURE.
MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/12/2005 PREPARED BY APPROVED BY

QAF0901/4-MCM-26
PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

C) OBSERVE PUMP NOISE WITH & WITHOUT LOAD. D) CHECK ALL SAFETY FEATURES OF MACHINE,
SUCH AS LEVEL , EMMERGENCY SWITCH & PRESSURE SETTING.
MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/12/2005 PREPARED BY APPROVED BY

QAF0901/4-MCM-26
PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

E) CHECK NOZZLE CONDITION OF POLY & ISO. F) CHECK MACHINE OUTPUTS,

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/12/2005 PREPARED BY APPROVED BY

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-26


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

G) CHECK ACCUMULATOR OPERATION. H) CLEAN THE FILTERS,

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/12/2005 PREPARED BY APPROVED BY

NUCLEATION PLANT

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-27


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

A) CHECK THE LEAKAGE OF MATERAL. B) CHECK FOR ANY AIR LEAKAGE

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/01/2018 PREPARED BY APPROVED BY

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-27


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

C) CHECK FOR ANY OIL LEAKAGE. D) CHECK ALL ELECTRICAL CONNECTIONS.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/01/2018 PREPARED BY APPROVED BY

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-27


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

E) CHECK NOISE OF PUMP & MOTOR. F) CLEAN THE PLANT.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS
ISSUE :- A
REV.00
DATE :- 01/01/2018 PREPARED BY APPROVED BY

MOULD CARRIER

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-28


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

A) CHECK ALL SAFETY FEATURES. B)OILING & GREASING TO BE DONE.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/12/2005 PREPARED BY APPROVED BY

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-28


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

C) CHECK FOR OIL LEAKAGE. D)CHECK FOR OIL LEVEL.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/12/2005 PREPARED BY APPROVED BY

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-28


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

E)CHECK FOR NOISE OF PUMP & MOTOR. F)CHECK ALL ELECTRICAL CONNECTION.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/12/2005 PREPARED BY APPROVED BY

CONSTANT VOLTAGE STABILIZER

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-29


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

A) CLEAN THE MACHINE . B) CHECK ALL ELECTRICAL CONNECTIONS.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/12/2005 PREPARED BY APPROVED BY

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-29


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

C) CHECK INPUT OUT PUT VOLTAGE. D)CHECK ALL SAFETY FEATURES.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/12/2005 PREPARED BY APPROVED BY

COLOUR PASTE PRE-MIXER

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-30


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

A)CLEAN THE MACHINE. B)OILING & GREASING TO BE DONE.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/12/2005 PREPARED BY APPROVED BY

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-30


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-
C)CHECK FOR LOOSE FITTING. D)CHECK ALL ELECTRICAL CONNECTIONS.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/12/2005 PREPARED BY APPROVED BY

IN MOULD COATING SPRAY UNIT

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-34


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

A) CLEAN THE IN MOULD COATING UNIT. B)CLEAN THE NOZZLE POINT OF GUN.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/12/2005 PREPARED BY APPROVED BY

RELEASE SPRAY UNIT

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-35


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

A)CLEAN THE SPRAY UNIT. B)CLEAN THE NOZZLE POINT OF NOZZLE.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/12/2005 PREPARED BY APPROVED BY

AIR COMPRESSOR

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-PU-13


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

A) CLEAN THE AIR COMPRESSOR. B)CLEAN THE AIR FILTER .

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/12/2005 PREPARED BY APPROVED BY

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-PU-13


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

C) CHECK THE OIL LEVEL ,REPLACE IF NECESSARY. D) CHECK ALL ELECTRICAL CONNECTIONS.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/12/2005 PREPARED BY APPROVED BY

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-PU-13


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

E) CHECK FUNCTION OF LOADING & UNLOADING. F) CHECK AUTO DRAIN SYSTEM.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/12/2005 PREPARED BY APPROVED BY

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-PU-13


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

G) CHECK FOR AIR LEAKAGE. H) CHECK AFTER COOLER FUNCTION.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS
ISSUE :- A
REV.00
DATE :- 01/12/2005 PREPARED BY APPROVED BY

AIR DRYER UNIT

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-31


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

A) CLEAN THE AIR DRYER. B)CHECK FOR GAS LEAKAGE.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/12/2005 PREPARED BY APPROVED BY

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-31


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

C) CHECK ALL ELECTRICAL CONNECTIONS. D) CLEAN THE PREFILTERS.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/12/2005 PREPARED BY APPROVED BY

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-31


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

E) CHECK FUNCTION OF LOADING & UNLOADING. F) CHECK AUTO DRAIN SYSTEM.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/12/2005 PREPARED BY APPROVED BY

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-31


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

G) CHECK FOR AIR LEAKAGE.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/12/2005 PREPARED BY APPROVED BY

HEAT LESS DRYER UNIT

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-32


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

A) CLEAN THE HEATLESS DRYER. B)CHECK FOR AIR LEAKAGE.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/12/2005 PREPARED BY APPROVED BY

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-32


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

C) CHECK ALL ELECTRICAL CONNECTIONS. D) CLEAN THE PREFILTERS.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/12/2005 PREPARED BY APPROVED BY

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-32


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

E) CHECK FUNCTION OF LOADING & UNLOADING. F) CHECK AUTO DRAIN SYSTEM.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/12/2005 PREPARED BY APPROVED BY

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-32


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

G) CHECK THE CONDITION OF RECEIVER.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/12/2005 PREPARED BY APPROVED BY

CHILLING PLANT

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-36


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

A) CLEAN THE CHILLING PLANT. B)CHECK FOR GAS LEAKAGE.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/12/2005 PREPARED BY APPROVED BY

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-36


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

C) CHECK ALL ELECTRICAL CONNECTIONS. D) CLEAN THE WATER TANK & REPLACE THE WATER.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/12/2005 PREPARED BY APPROVED BY

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-36


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

E) CHECK FUNCTION OF LOADING & UNLOADING. F) CHECK COOLING OF CONDENSOR.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/12/2005 PREPARED BY APPROVED BY

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-36


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

G) CHECK THE CURRENT OF COMPRESSOR.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/12/2005 PREPARED BY APPROVED BY

HOT WATER SYSTEM

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-37


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

A) CLEAN THE TANK. B)CHECK FOR WATER LEAKAGE.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS
ISSUE :- A
REV.01
DATE :- 10/07/2015 PREPARED BY APPROVED BY

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-37


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

C) CHECK ALL ELECTRICAL CONNECTIONS. D) CHECK THE NOISE OF PUMP & MOTOR.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.01
DATE :- 10/07/2015 PREPARED BY APPROVED BY

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-37


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

E) REMOVE SCALING FROM SUCTION PIPE OF PUMP.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.01
DATE :- 10/07/2015 PREPARED BY APPROVED BY

OVEN

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-39


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

A) CHECK ALL ELECTRICAL CONNECTIONS. B) CHECK THE NOISE OF FAN & MOTOR.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.01
DATE :- 10/07/2015 PREPARED BY APPROVED BY

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-39


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

C) CLEANED THE OVEN. D) GREASING TO BE DONE FOR BEARING IF NECESSARY.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.01
DATE :- 10/07/2015 PREPARED BY APPROVED BY

AIR BLOWER

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-PU-38


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

A) CHECK ALL ELECTRICAL CONNECTIONS. B) CHECK THE NOISE OF FAN & MOTOR.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/04/2013 PREPARED BY APPROVED BY

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-38


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

C) CLEANED THE FILTER ELEMENT. D) GREASING TO BE DONE FOR BEARINGS.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS
ISSUE :- A
REV.00
DATE :- 01/04/2013 PREPARED BY APPROVED BY

OVEN

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-PU-39


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

A) CHECK ALL ELECTRICAL CONNECTIONS. B) CHECK THE NOISE OF FAN & MOTOR.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/04/2013 PREPARED BY APPROVED BY

MITER AND MITER ENGS. PVT. LTD QAF0901/4-MCM-39


PREVENTIVE MAINTENANCE CHECK SHEET
EQUIPMENT NO.:- DEPARTMENT :- PRODUCTION DEPT.
EQUIPMENT NAME :- LOCATION :- PU MOULDING SECTION.
MAINTENANCE FREQUENCY:-

C) CLEANED THE OVEN. D) GREASING TO BE DONE FOR BEARINGS IF NECESSARY.

MONTH DATE CONDITION OBSERVED ACTION TAKEN REMARKS CONDITION OBSERVED ACTION TAKEN REMARKS

ISSUE :- A
REV.00
DATE :- 01/04/2013 PREPARED BY APPROVED BY
Doc No EEPL/PS/PMM/F-04
Rev No 0
MITER AND MITER ENGS. MACHINE
PVT. LTDBREAKDOWN MAINTANANCE REPORT
Rev Date 01.12.13
Page 1 OF 1

Machine

Date

REASON FOR BREAKDOWN ACTION TAKEN

Maintenance By Checked By