Вы находитесь на странице: 1из 2

FOCUSED ASSESSMENT REPORT

DISCIPLINE BI/JO PROJECT TITLE CONTRACTOR LOCATION DATE OF ASSESSMENT NUMBER


ASSESSMENT

FOCUSSED ASSESSMENT DIMENSIONAL CONTROL. PURPOSE OF THIS FOCUSED ASSESSMENT IS TO MAKE SURE DIMENSIONAL CONTROL REQUIREMENTS ARE COMPLYING WITH SAUDI ARAMCO
AREA ENGINEERING STANDARDS AND PROJECT SPECIFICATION REQUIREMENTS.
REFERENCE STANDARDS/PROCEDURES 6285-6286-PP-QA-010 REV 00,AWS D1.1
Item Item Assessed Reference Compliance Finding Root Corrective Corrective Action
No. Yes No N/A Cause Action compliance
remarks
Ensure the fit up of the item, 6285-6286-   
 
Material Traceability, Weld PP-QA-010  
1 Traceability REV 00,AWS 
D1.1
Verify with the drawing for the 6285-6286-   
 
dimensional requirement for the PP-QA-010  
2 measurement reference REV 00,AWS 
D1.1
Ensure the calibration of the 6285-6286-   

3
measuring instrument and verify PP-QA-010 
the calibration sticker and the REV 00,AWS 
calibration certificate D1.1
Start the measurement of length, 6285-6286-   
 
4
diagonal by calibrated measuring PP-QA-010  
tape REV 00,AWS
D1.1
Level of the frame has to measure 6285-6286-  
 
5
in various location depends on the PP-QA-010 
size and slope of frame REV 00,AWS
D1.1
Dimensional measurement 6285-6286-   
 
6
completed and the readings are PP-QA-010  
recorded in the dimensional report REV 00,AWS
D1.1

Page 1 of 2
FOCUSED ASSESSMENT REPORT

After the completion of report 6285-6286-   



7
tolerances of measurement to PP-QA-010
cross check with acceptance REV 00,AWS
standards and accept the D1.1
measurements if within the limit

Signature Agreed Completion Date: N/A


Name Positive comments/opportunity for improvement
General Comments:
Date

Page 2 of 2