Вы находитесь на странице: 1из 8

PROJECT: 33/11 KV OUT DOOR SUBSTATION AT

PREPARED BY: AM
SHAHZADA BAGH GRID

CABLE SCHEDULE FOR LINE


BAY - 01 CLIENT: TATA Power DDL DATE RIV. CHECKED BY: AS

APPROVED BY:
CONTRACTOR : M/s Surya Construction Company 3/28/2018 R0
BND
SWITCH YARD
NOMENCLATURE
CABLE NOMENCLATURE BAY NOMENCLATURE

FOR 33 KV X FOR CABLES


3 Bay - 01 P
SWYD WITHIN SWITCH YARD

Y FOR CABLES
FOR 11 KV FROM SWITCH YARD TO
1
SWYD CONTROL & RELAY
PANEL

Z FOR CABLES
FROM WITHIN CONTROL
& RELAY PANELS

01 - CABLE NO.
STARTING FROM 01 AND
INCREMENT
SUBSEQUENTLY

REFERENCE DRAWING :

TPD-SHZ-24-E-002 Control cable trench layout

CABLE SPECIFICATION FROM TO REFERENCE ROUTE


CABLE TAG
RUNS PURPOSE DRAWING & LENGTH REMARKS
NO.
CABLE SHEET NO. (meters)
CABLE SIZE (mm2) EQUIPMENT TERMINAL NO. EQUIPMENT TERMINAL NO.
CORE ID
1 COMMON +VE OF BCU

2 NO CONTACT FOR STATUS IN BCU

3 NC CONTACT FOR STATUS IN BCU

4
INTERLOCK COIL OF 29A ISO
5
C3-X-P-01 1 19CX2.5 BUS ISOLATOR BMK
6
AUX NC FOR I/L COIL OF 29B
7
8
AUX NO FOR BKR CLOSING I/L CKT
9
10
AUX NC FOR BKR CLOSING I/L CKT
11
12-19

1 of 8 CONTROL CABLE
PROJECT: 33/11 KV OUT DOOR SUBSTATION AT
PREPARED BY: AM
SHAHZADA BAGH GRID

CABLE SCHEDULE FOR LINE


BAY - 01 CLIENT: TATA Power DDL DATE RIV. CHECKED BY: AS

APPROVED BY:
CONTRACTOR : M/s Surya Construction Company 3/28/2018 R0
BND
1 COMMON +VE OF BCU

2 NC CONTACT FROM BCU (STATUS)

3 NO CONTACT FROM BCU (STATUS)

4 SF6 LOCK OUT CONTACT FOR BCU

5 SF6 GAS LOW


C3-X-P-02 1 19CX2.5 Circuit Breaker BMK
6 SPRING CHARGE INDICATION
7 COMMON +VE
8 COMMON +VE FOR INDICATION
9 CB OPEN INDICATION
10 CB CLOSE INDICATION
11 AUX NC FOR BKR INTERLOCKING
12 CIRCUIT OF ISO

13-19

1 TO CB CLOSING CIRCUIT
2
3
C3-Y-P-03 1 12CX2.5 4 Circuit Breaker CR panel
TRIP COIL-1
5
6
7-12

1
SPARE
2
3
C3-Y-P-04 1 12CX2.5 4 Circuit Breaker CR panel
TRIP COIL-2
5
6
7-12

1
2
3 CT CORE-1
5P20
C3-X-P-05 1 6CX4 CT JB
4 Back up protection
R - PHASE
5
6

2 of 8 CONTROL CABLE
PROJECT: 33/11 KV OUT DOOR SUBSTATION AT
PREPARED BY: AM
SHAHZADA BAGH GRID

CABLE SCHEDULE FOR LINE


BAY - 01 CLIENT: TATA Power DDL DATE RIV. CHECKED BY: AS

APPROVED BY:
CONTRACTOR : M/s Surya Construction Company 3/28/2018 R0
BND
1
2
3 CT CORE-2
0.2S
C3-X-P-06 1 6CX4 CT JB
4 metering
R - PHASE
5
6

1
2
3 CT CORE-3
C3-X-P-07 1 6CX4 CT JB PS differential
4 R - PHASE
5
6

1
2
3 CT CORE-4
C3-X-P-08 1 6CX4 CT JB Spare
4 R - PHASE
5
6

1
2
3 CT CORE-1
5P20
C3-X-P-09 1 6CX4 CT JB
4 Back up protection
Y - PHASE
5
6

1
2
3 CT CORE-2
C3-X-P-10 1 6CX4 CT JB 0.2s metering
4 Y - PHASE
5
6

3 of 8 CONTROL CABLE
PROJECT: 33/11 KV OUT DOOR SUBSTATION AT
PREPARED BY: AM
SHAHZADA BAGH GRID

CABLE SCHEDULE FOR LINE


BAY - 01 CLIENT: TATA Power DDL DATE RIV. CHECKED BY: AS

APPROVED BY:
CONTRACTOR : M/s Surya Construction Company 3/28/2018 R0
BND

1
2
3 CT CORE-3
C3-X-P-11 1 6CX4 CT JB PS differential
4 Y - PHASE
5
6

1
2
3 CT CORE-4
C3-X-P-12 1 6CX4 CT JB Spare
4 Y - PHASE
5
6

1
2
3 CT CORE-1
5P20
C3-X-P-13 1 6CX4 CT JB
4 Backup protection
B - PHASE
5
6

1
2
3 CT CORE-2
C3-X-P-14 1 6CX4 CT JB 0.2S metering
4 B - PHASE
5
6

1
2
3 CT CORE-3
C3-X-P-15 1 6CX4 CT JB PS differential
4 B - PHASE
5
6

1
2
3 CT CORE-4
C3-X-P-16 1 6CX4 CT JB Spare
4 B - PHASE
5
6

4 of 8 CONTROL CABLE
PROJECT: 33/11 KV OUT DOOR SUBSTATION AT
PREPARED BY: AM
SHAHZADA BAGH GRID

CABLE SCHEDULE FOR LINE


BAY - 01 CLIENT: TATA Power DDL DATE RIV. CHECKED BY: AS

APPROVED BY:
CONTRACTOR : M/s Surya Construction Company 3/28/2018 R0
BND

1
2
CT JB
3 CORE-1 5P20
C3-Y-P-17 1 6CX4 CR panel
4 back up protection

5-6

1
2
3 CT JB
CORE-2
C3-Y-P-18 1 6CX4 4 CR panel 0.2S metering
5-6

1
2
CT JB
3 CORE-3
C3-Y-P-19 1 6CX4 CR panel PS differential
4
5-6

1
2
CT JB
3 CORE-4
C3-Y-P-20 1 6CX4 CR panel Spare
4
5-6

1 COMMON +VE OF BCU

2 NO CONTACT FOR STATUS IN BCU

3
INTERLOCK COIL OF 29T ISO
4
C3-X-P-21 1 12CX2.5 Line Isolator BMK
5
AUX NC FOR I/L COIL OF 29TE
6
7
AUX NO FOR BKR CLOSING I/L CKT
8
9-12

5 of 8 CONTROL CABLE
PROJECT: 33/11 KV OUT DOOR SUBSTATION AT
PREPARED BY: AM
SHAHZADA BAGH GRID

CABLE SCHEDULE FOR LINE


BAY - 01 CLIENT: TATA Power DDL DATE RIV. CHECKED BY: AS

APPROVED BY:
CONTRACTOR : M/s Surya Construction Company 3/28/2018 R0
BND

1 COMMON +VE OF BCU


2 NO CONTACT FOR STATUS IN BCU
3
INTERLOCK OF 29TE E/S
4
C3-X-P-22 1 12CX2.5 5 Line Isolator BMK
AUX NC FOR BKR CLOSING I/L CKT
6
7
AUX NC FOR I/L COIL OF 29T
8
9-12

1
2
3 PT CORE-1
C3-Y-P-23 1 6CX4 CR panel BCU circuit(back-up protection)
4 R - PHASE
5
6

1
2
3 PT CORE-2
C3-Y-P-24 1 6CX4 CR panel Distance protection
4 R - PHASE
5
6

1
2
3 PT CORE-3
C3-Y-P-25 1 6CX4 CR panel Metering circuit
4 R - PHASE
5
6

1
2
3 PT CORE-1
C3-Y-P-26 1 6CX4 CR panel BCU circuit(back-up protection)
4 Y - PHASE
5
6

6 of 8 CONTROL CABLE
PROJECT: 33/11 KV OUT DOOR SUBSTATION AT
PREPARED BY: AM
SHAHZADA BAGH GRID

CABLE SCHEDULE FOR LINE


BAY - 01 CLIENT: TATA Power DDL DATE RIV. CHECKED BY: AS

APPROVED BY:
CONTRACTOR : M/s Surya Construction Company 3/28/2018 R0
BND
1
2
3 PT CORE-2
C3-Y-P-27 1 6CX4 CR panel Distance protection
4 Y - PHASE
5
6

1
2
3 PT CORE-3
C3-Y-P-28 1 6CX4 CR panel Metering circuit
4 Y - PHASE
5
6

1
2
3 PT CORE-1
C3-Y-P-29 1 6CX4 CR panel BCU circuit(back-up protection)
4 B - PHASE
5
6

1
2
3 PT CORE-2
C3-Y-P-30 1 6CX4 CR panel Distance protection
4 B - PHASE
5
6

1
2
3 PT CORE-3
C3-Y-P-31 1 6CX4 CR panel Metering circuit
4 B - PHASE
5
6

1 COMMON +VE OF BCU

2 CB-52 NC CONTACT FROM BCU (STATUS)

3 CB-52 NO CONTACT FROM BCU (STATUS)

C3-Y-P-32 1 12CX2.5 BMK CR panel

7 of 8 CONTROL CABLE
PROJECT: 33/11 KV OUT DOOR SUBSTATION AT
PREPARED BY: AM
SHAHZADA BAGH GRID

CABLE SCHEDULE FOR LINE


BAY - 01 CLIENT: TATA Power DDL DATE RIV. CHECKED BY: AS

APPROVED BY:
CONTRACTOR : M/s Surya Construction Company 3/28/2018 R0
BND
C3-Y-P-32 1 12CX2.5 BMK CR panel
4 COMMON +VE FOR ISO

5 29A NO CONTACT FOR STATUS IN BCU

6 29A NC CONTACT FOR STATUS IN BCU

7-12

1 29A NO FOR BKR CLOSING I/L CKT

2 29TE NO FOR BKR CLOSING I/L CKT

3 29TE NO CONTACT FOR STATUS IN BCU

C3-Y-P-33 1 12CX2.5 4 BMK CR panel 29B NO CONTACT FOR STATUS IN BCU

5 29B NC CONTACT FOR STATUS IN BCU

6 29T NO CONTACT FOR STATUS IN BCU

7-12

1 CB-52 SF6 LOCK OUT CONTACT FOR BCU

2 CB-52 SF6 GAS LOW

3 CB-52 SPRING CHARGE INDICATION

4 COMMON +VE
C3-Y-P-34 1 12CX2.5 BMK CR panel
5 COMMON +VE FOR INDICATION

6 CB-52 CB OPEN INDICATION

7 CB-52 CB CLOSE INDICATION

8-12

8 of 8 CONTROL CABLE

Вам также может понравиться