Вы находитесь на странице: 1из 8

APP ACCESOS NORTE DE BOGOTÁ-ACCENORTE-AMPLIACIÓN CARRERA SÉPTIMA

ANEXO 5
ESTUDIO DE FUNDACIONES
NORMALIZACIÓN ENSAYO SPT AGOSTO, 2015

Prof. Prof. Pres. Total Pres. Efect.


Unidad Unidad Geotécnica NSPT Ƴt F. Reducción F. Sobrecarga F. Energía F. Varillaje
Muestra Sondeo Nivel Freático Muestra 3
σv0 σ´v0 (N1)60 (N1)60 (OK)
Geológica del proyecto (Nm) (t/m ) 2 2
rd CN CE CR
(m) (m) (kg/cm ) (kg/cm )
1 S-CS-1 Qma Qma 3.00 0.50 12 1.70 0.085 0.335 0.996 1.433 1.10 0.75 14.19 14.00
2 S-CS-1 Qma Qma 3.00 0.50 9 1.70 0.085 0.335 0.996 1.433 1.10 0.75 10.64 11.00
3 S-CS-1 Qcc Qcc22 3.00 1.00 14 1.70 0.170 0.370 0.992 1.401 1.10 0.75 16.18 16.00
4 S-CS-1 Qcc Qcc22 3.00 1.50 15 1.70 0.255 0.405 0.989 1.371 1.10 0.75 16.96 17.00
5 S-CS-1 Qcc Qcc21 3.00 2.00 14 1.70 0.340 0.440 0.985 1.341 1.10 0.75 15.49 15.00
6 S-CS-1 Qcc Qcc21 3.00 2.50 5 1.70 0.425 0.475 0.981 1.313 1.10 0.75 5.42 5.00
8 S-CS-1 Qcc Qcc21 3.00 3.50 5 1.70 0.595 0.545 0.973 1.261 1.10 0.80 5.55 6.00
10 S-CS-1 Qcc Qcc21 3.00 4.50 10 1.70 0.765 0.615 0.966 1.212 1.10 0.85 11.33 11.00
11 S-CS-1 Qcc Qcc22 3.00 5.00 16 1.70 0.850 0.650 0.962 1.189 1.10 0.85 17.79 18.00
12 S-CS-1 Qcc Qcc22 3.00 5.50 17 1.70 0.935 0.685 0.958 1.167 1.10 0.85 18.55 19.00
13 S-CS-1 Qcc Qcc11 3.00 6.00 33 1.70 1.020 0.720 0.954 1.146 1.10 0.95 30 40.00
14 S-CS-1 Qcc Qcc11 3.00 6.50 67 1.70 1.105 0.755 0.950 1.125 1.25 0.95 30 90.00
15 S-CS-1 Qcc Qcc11 3.00 7.00 100 1.70 1.190 0.790 0.946 1.106 1.25 0.95 30 131.00
2 S-CS-2 Qa Qa 3.00 0.50 31 1.70 0.085 0.335 0.996 1.433 1.10 0.75 30 37.00
3 S-CS-2 Qa Qa 3.00 1.00 100 1.70 0.170 0.370 0.992 1.401 1.10 0.75 30 116.00
5 S-CS-2 Qcc Qcc11 3.00 3.00 26 1.70 0.510 0.510 0.977 1.287 1.10 0.80 29.44 29.00
7 S-CS-2 Qcc Qcc11 3.00 4.50 28 1.70 0.765 0.615 0.966 1.212 1.10 0.85 30 32.00
9 S-CS-2 Qcc Qcc11 3.00 6.00 34 1.70 1.020 0.720 0.954 1.146 1.10 0.95 30 41.00
10 S-CS-2 Qcc Qcc11 3.00 6.50 29 1.70 1.105 0.755 0.950 1.125 1.25 0.95 30 39.00
11 S-CS-2 Qcc Qcc11 3.00 7.00 29 1.70 1.190 0.790 0.946 1.106 1.25 0.95 30 38.00
12 S-CS-2 Qcc Qcc11 3.00 7.50 31 1.70 1.275 0.825 0.943 1.086 1.25 0.95 30 40.00
14 S-CS-2 Qma Qma 3.00 9.50 32 1.70 1.615 0.965 0.920 1.016 1.25 0.95 30 39.00
17 S-CS-2 Tpb TpbIII 3.00 12.50 47 1.70 2.125 1.175 0.840 0.926 1.30 1.00 30 57.00
19 S-CS-2 Tpb TpbIII 3.00 14.00 51 1.70 2.380 1.280 0.800 0.887 1.30 1.00 30 59.00
21 S-CS-2 Tpb TpbIII 3.00 15.50 57 1.70 2.635 1.385 0.760 0.851 1.30 1.00 30 63.00
23 S-CS-2 Tpb TpbIII 3.00 17.00 69 1.70 2.890 1.490 0.720 0.818 1.30 1.00 30 73.00
26 S-CS-2 Tpb TpbIII 3.00 20.00 61 1.70 3.400 1.700 0.640 0.759 1.30 1.00 30 60.00
28 S-CS-2 Tpb TpbIII 3.00 21.50 60 1.70 3.655 1.805 0.600 0.732 1.30 1.00 30 57.00
30 S-CS-2 Tpb TpbIII 3.00 23.00 60 1.70 3.910 1.910 0.560 0.707 1.30 1.00 30 55.00
32 S-CS-2 Tpb TpbIII 3.00 24.50 65 1.70 4.165 2.015 0.548 0.684 1.30 1.00 30 58.00
34 S-CS-2 Tpb TpbIII 3.00 26.00 63 1.70 4.420 2.120 0.536 0.663 1.30 1.00 30 54.00
36 S-CS-2 Tpb TpbIII 3.00 27.50 70 1.70 4.675 2.225 0.524 0.642 1.30 1.00 30 58.00
1 S-CS-3 Qa Qa 3.00 0.50 13 1.70 0.085 0.335 0.996 1.433 1.10 0.75 15.37 15.00
2 S-CS-3 Qa Qa 3.00 0.50 9 1.70 0.085 0.335 0.996 1.433 1.10 0.75 10.64 11.00
4 S-CS-3 Qlc Qlc21 3.00 1.50 7 1.70 0.255 0.405 0.989 1.371 1.10 0.75 7.92 8.00
6 S-CS-3 Qlc Qlc21 3.00 3.00 5 1.70 0.510 0.510 0.977 1.287 1.10 0.80 5.66 6.00
8 S-CS-3 Qlc Qlc21 3.00 4.00 6 1.70 0.680 0.580 0.969 1.236 1.10 0.85 6.93 7.00
10 S-CS-3 Qlc Qlc21 3.00 5.00 5 1.70 0.850 0.650 0.962 1.189 1.10 0.85 5.56 6.00
12 S-CS-3 Qlc Qlc21 3.00 6.00 4 1.70 1.020 0.720 0.954 1.146 1.10 0.95 4.79 5.00
15 S-CS-3 Qcc Qcc11 3.00 7.50 20 1.70 1.275 0.825 0.943 1.086 1.25 0.95 25.80 26.00
16 S-CS-3 Qcc Qcc11 3.00 8.00 24 1.70 1.360 0.860 0.939 1.068 1.25 0.95 30 30.00
17 S-CS-3 Qcc Qcc11 2.00 8.50 28 1.70 1.445 0.795 0.935 1.103 1.25 0.95 30 37.00
APP ACCESOS NORTE DE BOGOTÁ-ACCENORTE-AMPLIACIÓN CARRERA SÉPTIMA
ANEXO 5
ESTUDIO DE FUNDACIONES
NORMALIZACIÓN ENSAYO SPT AGOSTO, 2015

Prof. Prof. Pres. Total Pres. Efect.


Unidad Unidad Geotécnica NSPT Ƴt F. Reducción F. Sobrecarga F. Energía F. Varillaje
Muestra Sondeo Nivel Freático Muestra 3
σv0 σ´v0 (N1)60 (N1)60 (OK)
Geológica del proyecto (Nm) (t/m ) 2 2
rd CN CE CR
(m) (m) (kg/cm ) (kg/cm )
18 S-CS-3 Qcc Qcc11 2.00 9.00 31 1.70 1.530 0.830 0.931 1.084 1.25 0.95 30 40.00
19 S-CS-3 Qcc Qcc11 2.00 9.50 31 1.70 1.615 0.865 0.920 1.065 1.25 0.95 30 39.00
20 S-CS-3 Qcc Qcc11 2.00 10.00 32 1.70 1.700 0.900 0.907 1.048 1.25 1.00 30 42.00
21 S-CS-3 Qcc Qcc11 2.00 10.50 33 1.70 1.785 0.935 0.894 1.030 1.30 1.00 30 44.00
22 S-CS-3 Qcc Qcc11 2.00 11.00 33 1.70 1.870 0.970 0.880 1.014 1.30 1.00 30 43.00
23 S-CS-3 Qcc Qcc11 2.00 11.50 35 1.70 1.955 1.005 0.867 0.998 1.30 1.00 30 45.00
24 S-CS-3 Qma Qma 2.00 12.00 20 1.70 2.040 1.040 0.854 0.982 1.30 1.00 25.54 26.00
27 S-CS-3 Qma Qma 2.00 13.50 15 1.70 2.295 1.145 0.814 0.938 1.30 1.00 18.29 18.00
28 S-CS-3 Qma Qma 2.00 14.00 18 1.70 2.380 1.180 0.800 0.924 1.30 1.00 21.63 22.00
29 S-CS-3 Qcc Qcc11 2.00 14.50 30 1.70 2.465 1.215 0.787 0.911 1.30 1.00 30 36.00
31 S-CS-3 Qcc Qcc11 2.00 15.50 23 1.70 2.635 1.285 0.760 0.885 1.30 1.00 26.47 26.00
33 S-CS-3 Qcc Qcc22 2.00 16.50 16 1.70 2.805 1.355 0.733 0.861 1.30 1.00 17.91 18.00
35 S-CS-3 Qcc Qcc11 2.00 17.50 21 1.70 2.975 1.425 0.707 0.838 1.30 1.00 22.88 23.00
36 S-CS-3 Qcc Qcc11 2.00 18.00 24 1.70 3.060 1.460 0.693 0.827 1.30 1.00 25.80 26.00
38 S-CS-3 Qcc Qcc11 2.00 19.50 33 1.70 3.315 1.565 0.653 0.796 1.30 1.00 30 34.00
40 S-CS-3 Tpb TpbIV 2.00 21.00 35 1.70 3.570 1.670 0.613 0.767 1.30 1.00 30 35.00
42 S-CS-3 Tpb TpbIV 2.00 22.00 39 1.70 3.740 1.740 0.587 0.748 1.30 1.00 30 38.00
44 S-CS-3 Tpb TpbIV 2.00 23.50 41 1.70 3.995 1.845 0.556 0.722 1.30 1.00 30 39.00
46 S-CS-3 Tpb TpbIV 3.00 25.00 48 1.70 4.250 2.050 0.544 0.677 1.30 1.00 30 42.00
48 S-CS-3 Tpb TpbIV 3.00 27.00 48 1.70 4.590 2.190 0.528 0.649 1.30 1.00 30 40.00
50 S-CS-3 Tpb TpbIV 3.00 29.50 49 1.70 5.015 2.365 0.508 0.617 1.30 1.00 30 39.00
1 S-CS-4 Qma Qma 3.00 0.50 16 1.70 0.085 0.335 0.996 1.433 1.10 0.75 18.92 19.00
2 S-CS-4 Qa Qa 3.00 0.50 23 1.70 0.085 0.335 0.996 1.433 1.10 0.75 27.20 27.00
3 S-CS-4 Qa Qa 3.00 1.00 27 1.70 0.170 0.370 0.992 1.401 1.10 0.75 30 31.00
4 S-CS-4 Qa Qa 3.00 1.50 30 1.70 0.255 0.405 0.989 1.371 1.10 0.75 30 34.00
5 S-CS-4 Qcc Qcc22 3.00 2.00 31 1.70 0.340 0.440 0.985 1.341 1.10 0.75 30 34.00
6 S-CS-4 Qcc Qcc22 3.00 2.50 34 1.70 0.425 0.475 0.981 1.313 1.10 0.75 30 37.00
7 S-CS-4 Qcc Qcc21 3.00 3.00 15 1.70 0.510 0.510 0.977 1.287 1.10 0.80 16.98 17.00
8 S-CS-4 Qcc Qcc21 3.00 3.50 13 1.70 0.595 0.545 0.973 1.261 1.10 0.80 14.42 14.00
9 S-CS-4 Qcc Qcc21 3.00 4.00 11 1.70 0.680 0.580 0.969 1.236 1.10 0.85 12.71 13.00
10 S-CS-4 Qcc Qcc21 3.00 4.50 11 1.70 0.765 0.615 0.966 1.212 1.10 0.85 12.47 12.00
11 S-CS-4 Qcc Qcc21 3.00 5.00 9 1.70 0.850 0.650 0.962 1.189 1.10 0.85 10.01 10.00
13 S-CS-4 Qcc Qcc22 3.00 6.00 25 1.70 1.020 0.720 0.954 1.146 1.10 0.95 29.93 30.00
14 S-CS-4 Tpb TpbIV 3.00 6.50 28 1.70 1.105 0.755 0.950 1.125 1.25 0.95 30 37.00
15 S-CS-4 Tpb TpbIV 3.00 7.00 31 1.70 1.190 0.790 0.946 1.106 1.25 0.95 30 41.00
16 S-CS-4 Tpb TpbIV 3.00 7.50 33 1.70 1.275 0.825 0.943 1.086 1.25 0.95 30 43.00
17 S-CS-4 Tpb TpbIV 3.00 8.00 36 1.70 1.360 0.860 0.939 1.068 1.25 0.95 30 46.00
18 S-CS-4 Tpb TpbIV 3.00 8.50 37 1.70 1.445 0.895 0.935 1.050 1.25 0.95 30 46.00
19 S-CS-4 Tpb TpbIV 3.00 9.00 40 1.70 1.530 0.930 0.931 1.033 1.25 0.95 30 49.00
20 S-CS-4 Tpb TpbIV 3.00 9.50 39 1.70 1.615 0.965 0.920 1.016 1.25 0.95 30 47.00
21 S-CS-4 Tpb TpbIII 3.00 10.00 41 1.70 1.700 1.000 0.907 1.000 1.25 1.00 30 51.00
22 S-CS-4 Tpb TpbIII 3.00 10.50 41 1.70 1.785 1.035 0.894 0.984 1.30 1.00 30 52.00
23 S-CS-4 Tpb TpbIII 3.00 11.50 43 1.70 1.955 1.105 0.867 0.954 1.30 1.00 30 53.00
APP ACCESOS NORTE DE BOGOTÁ-ACCENORTE-AMPLIACIÓN CARRERA SÉPTIMA
ANEXO 5
ESTUDIO DE FUNDACIONES
NORMALIZACIÓN ENSAYO SPT AGOSTO, 2015

Prof. Prof. Pres. Total Pres. Efect.


Unidad Unidad Geotécnica NSPT Ƴt F. Reducción F. Sobrecarga F. Energía F. Varillaje
Muestra Sondeo Nivel Freático Muestra 3
σv0 σ´v0 (N1)60 (N1)60 (OK)
Geológica del proyecto (Nm) (t/m ) 2 2
rd CN CE CR
(m) (m) (kg/cm ) (kg/cm )
24 S-CS-4 Tpb TpbIII 3.00 12.00 45 1.70 2.040 1.140 0.854 0.940 1.30 1.00 30 55.00
25 S-CS-4 Tpb TpbIII 3.00 12.50 45 1.70 2.125 1.175 0.840 0.926 1.30 1.00 30 54.00
26 S-CS-4 Tpb TpbIII 3.00 13.00 47 1.70 2.210 1.210 0.827 0.913 1.30 1.00 30 56.00
27 S-CS-4 Tpb TpbIII 3.00 13.50 47 1.70 2.295 1.245 0.814 0.900 1.30 1.00 30 55.00
28 S-CS-4 Tpb TpbIII 3.00 14.00 49 1.70 2.380 1.280 0.800 0.887 1.30 1.00 30 57.00
29 S-CS-4 Tpb TpbIII 3.00 14.50 48 1.70 2.465 1.315 0.787 0.875 1.30 1.00 30 55.00
31 S-CS-4 Tpb TpbIII 3.00 16.50 53 1.70 2.805 1.455 0.733 0.829 1.30 1.00 30 57.00
33 S-CS-4 Tpb TpbIII 3.00 18.50 55 1.70 3.145 1.595 0.680 0.787 1.30 1.00 30 56.00
35 S-CS-4 Tpb TpbIII 3.00 20.50 56 1.70 3.485 1.735 0.627 0.750 1.30 1.00 30 55.00
37 S-CS-4 Tpb TpbIII 3.00 22.50 59 1.70 3.825 1.875 0.573 0.715 1.30 1.00 30 55.00
39 S-CS-4 Tpb TpbIII 3.00 24.50 70 1.70 4.165 2.015 0.548 0.684 1.30 1.00 30 62.00
41 S-CS-4 Tpb TpbIII 3.00 26.50 87 1.70 4.505 2.155 0.532 0.656 1.30 1.00 30 74.00
43 S-CS-4 Tpb TpbIII 3.00 28.50 100 1.70 4.845 2.295 0.516 0.629 1.30 1.00 30 82.00
44 S-CS-4 Tpb TpbIII 3.00 29.00 100 1.70 4.930 2.330 0.512 0.623 1.30 1.00 30 81.00
1 S-CS-5 Qa Qa 3.00 0.50 27 1.70 0.085 0.335 0.996 1.433 1.10 0.75 30 32.00
2 S-CS-5 Qa Qa 3.00 0.50 30 1.70 0.085 0.335 0.996 1.433 1.10 0.75 30 35.00
3 S-CS-5 Qcc Qcc11 3.00 1.00 29 1.70 0.170 0.370 0.992 1.401 1.10 0.75 30 34.00
4 S-CS-5 Qcc Qcc11 3.00 1.50 31 1.70 0.255 0.405 0.989 1.371 1.10 0.75 30 35.00
5 S-CS-5 Qma Qma 3.00 2.00 23 1.70 0.340 0.440 0.985 1.341 1.10 0.75 25.45 25.00
6 S-CS-5 Qma Qma 3.00 2.50 21 1.70 0.425 0.475 0.981 1.313 1.10 0.75 22.76 23.00
9 S-CS-5 Qcc Qcc21 3.00 5.00 11 1.70 0.850 0.650 0.962 1.189 1.10 0.85 12.23 12.00
11 S-CS-5 Qcc Qcc21 3.00 6.50 8 1.70 1.105 0.755 0.950 1.125 1.25 0.95 10.69 11.00
13 S-CS-5 Qcc Qcc21 3.00 8.00 7 1.70 1.360 0.860 0.939 1.068 1.25 0.95 8.88 9.00
15 S-CS-5 Qcc Qcc22 3.00 9.50 13 1.70 1.615 0.965 0.920 1.016 1.25 0.95 15.69 16.00
17 S-CS-5 Qcc Qcc22 3.00 11.00 13 1.70 1.870 1.070 0.880 0.969 1.30 1.00 16.38 16.00
19 S-CS-5 Qcc Qcc21 3.00 12.50 11 1.70 2.125 1.175 0.840 0.926 1.30 1.00 13.25 13.00
21 S-CS-5 Qcc Qcc21 3.00 14.00 12 1.70 2.380 1.280 0.800 0.887 1.30 1.00 13.84 14.00
23 S-CS-5 Qcc Qcc21 3.00 15.50 12 1.70 2.635 1.385 0.760 0.851 1.30 1.00 13.28 13.00
25 S-CS-5 Qma Qma 3.00 17.00 14 1.70 2.890 1.490 0.720 0.818 1.30 1.00 14.88 15.00
28 S-CS-5 Qlc Qlc21 3.00 19.50 9 1.70 3.315 1.665 0.653 0.768 1.30 1.00 8.98 9.00
30 S-CS-5 Qma Qma 3.00 21.00 11 1.70 3.570 1.770 0.613 0.741 1.30 1.00 10.59 11.00
31 S-CS-5 Qma Qma 3.00 21.50 10 1.70 3.655 1.805 0.600 0.732 1.30 1.00 9.52 10.00
33 S-CS-5 Qlc Qlc21 3.00 23.00 13 1.70 3.910 1.910 0.560 0.707 1.30 1.00 11.95 12.00
35 S-CS-5 Qlc Qlc21 3.00 24.50 4 1.70 4.165 2.015 0.548 0.684 1.30 1.00 3.56 4.00
APP ACCESOS NORTE DE BOGOTÁ-ACCENORTE-AMPLIACIÓN CARRERA SÉPTIMA
ANEXO 5
ESTUDIO DE FUNDACIONES
CATEGORIZACIÓN MUETRAS SEGÚN SPT AGOSTO, 2015

Unidad Prof. Prof. Pres. Total Pres. Efect.


Unidad Unidad Geotécnica NSPT F. Reducción F. Sobrecarga F. Energía F. Varillaje
Muestra Sondeo Geotécnica del Nivel Freático Muestra σv0 σ´v0 (N1)60 (N1)60 (OK)
Geológica Terzaghi (Nm) rd CN CE CR
proyecto (m) (m) (kg/cm2) (kg/cm2)
13 S-CS-1 Qcc Qcc13 Qcc11 3.00 6.00 33 1.020 0.720 0.954 1.146 1.10 0.95 30 40.00
14 S-CS-1 Qcc Qcc14 Qcc11 3.00 6.50 67 1.105 0.755 0.950 1.125 1.25 0.95 30 90.00
15 S-CS-1 Qcc Qcc14 Qcc11 3.00 7.00 100 1.190 0.790 0.946 1.106 1.25 0.95 30 131.00
5 S-CS-2 Qcc Qcc12 Qcc11 3.00 3.00 26 0.510 0.510 0.977 1.287 1.10 0.80 29.44 29.00
7 S-CS-2 Qcc Qcc13 Qcc11 3.00 4.50 28 0.765 0.615 0.966 1.212 1.10 0.85 30 32.00
9 S-CS-2 Qcc Qcc13 Qcc11 3.00 6.00 34 1.020 0.720 0.954 1.146 1.10 0.95 30 41.00
10 S-CS-2 Qcc Qcc13 Qcc11 3.00 6.50 29 1.105 0.755 0.950 1.125 1.25 0.95 30 39.00
11 S-CS-2 Qcc Qcc13 Qcc11 3.00 7.00 29 1.190 0.790 0.946 1.106 1.25 0.95 30 38.00
12 S-CS-2 Qcc Qcc13 Qcc11 3.00 7.50 31 1.275 0.825 0.943 1.086 1.25 0.95 30 40.00
15 S-CS-3 Qcc Qcc12 Qcc11 3.00 7.50 20 1.275 0.825 0.943 1.086 1.25 0.95 25.80 26.00
16 S-CS-3 Qcc Qcc12 Qcc11 3.00 8.00 24 1.360 0.860 0.939 1.068 1.25 0.95 30 30.00
17 S-CS-3 Qcc Qcc13 Qcc11 2.00 8.50 28 1.445 0.795 0.935 1.103 1.25 0.95 30 37.00
18 S-CS-3 Qcc Qcc13 Qcc11 2.00 9.00 31 1.530 0.830 0.931 1.084 1.25 0.95 30 40.00
19 S-CS-3 Qcc Qcc13 Qcc11 2.00 9.50 31 1.615 0.865 0.920 1.065 1.25 0.95 30 39.00
20 S-CS-3 Qcc Qcc13 Qcc11 2.00 10.00 32 1.700 0.900 0.907 1.048 1.25 1.00 30 42.00
21 S-CS-3 Qcc Qcc13 Qcc11 2.00 10.50 33 1.785 0.935 0.894 1.030 1.30 1.00 30 44.00
22 S-CS-3 Qcc Qcc13 Qcc11 2.00 11.00 33 1.870 0.970 0.880 1.014 1.30 1.00 30 43.00
23 S-CS-3 Qcc Qcc13 Qcc11 2.00 11.50 35 1.955 1.005 0.867 0.998 1.30 1.00 30 45.00
29 S-CS-3 Qcc Qcc13 Qcc11 2.00 14.50 30 2.465 1.215 0.787 0.911 1.30 1.00 30 36.00
31 S-CS-3 Qcc Qcc12 Qcc11 2.00 15.50 23 2.635 1.285 0.760 0.885 1.30 1.00 26.47 26.00
35 S-CS-3 Qcc Qcc12 Qcc11 2.00 17.50 21 2.975 1.425 0.707 0.838 1.30 1.00 22.88 23.00
36 S-CS-3 Qcc Qcc12 Qcc11 2.00 18.00 24 3.060 1.460 0.693 0.827 1.30 1.00 25.80 26.00
38 S-CS-3 Qcc Qcc13 Qcc11 2.00 19.50 33 3.315 1.565 0.653 0.796 1.30 1.00 30 34.00
3 S-CS-5 Qcc Qcc13 Qcc11 3.00 1.00 29 0.170 0.370 0.992 1.401 1.10 0.75 30 34.00
4 S-CS-5 Qcc Qcc13 Qcc11 3.00 1.50 31 0.255 0.405 0.989 1.371 1.10 0.75 30 35.00

Categoría Terzaghi Número de Muestras Porcentaje Unidad Geotécnica para el proyecto Descripción

Qcc11 0 0.00
Qcc12 6 24.00 Suelos Granulares de Origen Coluvial de compacidad predominantemente
Qcc11
Qcc13 17 68.00 Densa en menor medida Medianamente Densa
Qcc14 2 8.00
Total 25 100.00
APP ACCESOS NORTE DE BOGOTÁ-ACCENORTE-AMPLIACIÓN CARRERA SÉPTIMA
ANEXO 5
ESTUDIO DE FUNDACIONES
CATEGORIZACIÓN MUETRAS SEGÚN SPT AGOSTO, 2015

Unidad Prof. Prof. Pres. Total Pres. Efect.


Unidad Unidad Geotécnica NSPT F. Reducción F. Sobrecarga F. Energía F. Varillaje
Muestra Sondeo Geotécnica del Nivel Freático Muestra σv0 σ´v0 (N1)60 (N1)60 (OK)
Geológica Terzaghi (Nm) rd CN CE CR
proyecto (m) (m) (kg/cm2) (kg/cm2)
3 S-CS-1 Qcc Qcc24 Qcc22 3.00 1.00 14 0.170 0.370 0.992 1.401 1.10 0.75 16.18 16.00
4 S-CS-1 Qcc Qcc24 Qcc22 3.00 1.50 15 0.255 0.405 0.989 1.371 1.10 0.75 16.96 17.00
5 S-CS-1 Qcc Qcc23 Qcc21 3.00 2.00 14 0.340 0.440 0.985 1.341 1.10 0.75 15.49 15.00
6 S-CS-1 Qcc Qcc13 Qcc21 3.00 2.50 5 0.425 0.475 0.981 1.313 1.10 0.75 5.42 5.00
8 S-CS-1 Qcc Qcc13 Qcc21 3.00 3.50 5 0.595 0.545 0.973 1.261 1.10 0.80 5.55 6.00
10 S-CS-1 Qcc Qcc23 Qcc21 3.00 4.50 10 0.765 0.615 0.966 1.212 1.10 0.85 11.33 11.00
11 S-CS-1 Qcc Qcc24 Qcc22 3.00 5.00 16 0.850 0.650 0.962 1.189 1.10 0.85 17.79 18.00
12 S-CS-1 Qcc Qcc24 Qcc22 3.00 5.50 17 0.935 0.685 0.958 1.167 1.10 0.85 18.55 19.00
33 S-CS-3 Qcc Qcc24 Qcc22 2.00 16.50 16 2.805 1.355 0.733 0.861 1.30 1.00 17.91 18.00
5 S-CS-4 Qcc Qcc25 Qcc22 3.00 2.00 31 0.340 0.440 0.985 1.341 1.10 0.75 30 34.00
6 S-CS-4 Qcc Qcc25 Qcc22 3.00 2.50 34 0.425 0.475 0.981 1.313 1.10 0.75 30 37.00
7 S-CS-4 Qcc Qcc23 Qcc21 3.00 3.00 15 0.510 0.510 0.977 1.287 1.10 0.80 16.98 17.00
8 S-CS-4 Qcc Qcc23 Qcc21 3.00 3.50 13 0.595 0.545 0.973 1.261 1.10 0.80 14.42 14.00
9 S-CS-4 Qcc Qcc23 Qcc21 3.00 4.00 11 0.680 0.580 0.969 1.236 1.10 0.85 12.71 13.00
10 S-CS-4 Qcc Qcc23 Qcc21 3.00 4.50 11 0.765 0.615 0.966 1.212 1.10 0.85 12.47 12.00
11 S-CS-4 Qcc Qcc23 Qcc21 3.00 5.00 9 0.850 0.650 0.962 1.189 1.10 0.85 10.01 10.00
13 S-CS-4 Qcc Qcc24 Qcc22 3.00 6.00 25 1.020 0.720 0.954 1.146 1.10 0.95 29.93 30.00
9 S-CS-5 Qcc Qcc23 Qcc21 3.00 5.00 11 0.850 0.650 0.962 1.189 1.10 0.85 12.23 12.00
11 S-CS-5 Qcc Qcc23 Qcc21 3.00 6.50 8 1.105 0.755 0.950 1.125 1.25 0.95 10.69 11.00
13 S-CS-5 Qcc Qcc23 Qcc21 3.00 8.00 7 1.360 0.860 0.939 1.068 1.25 0.95 8.88 9.00
15 S-CS-5 Qcc Qcc24 Qcc22 3.00 9.50 13 1.615 0.965 0.920 1.016 1.25 0.95 15.69 16.00
17 S-CS-5 Qcc Qcc24 Qcc22 3.00 11.00 13 1.870 1.070 0.880 0.969 1.30 1.00 16.38 16.00
19 S-CS-5 Qcc Qcc23 Qcc21 3.00 12.50 11 2.125 1.175 0.840 0.926 1.30 1.00 13.25 13.00
21 S-CS-5 Qcc Qcc23 Qcc21 3.00 14.00 12 2.380 1.280 0.800 0.887 1.30 1.00 13.84 14.00
23 S-CS-5 Qcc Qcc23 Qcc21 3.00 15.50 12 2.635 1.385 0.760 0.851 1.30 1.00 13.28 13.00

Categoría Terzaghi Número de Muestras Porcentaje Unidad Geotécnica del proyecto Descripción
Qcc21 0 0.00
Qcc22 0 0.00 Qcc21 Suelos cohesivos de origen coluvial de consistencia Firme.
Qcc23 13 57
Qcc24 8 35 Suelos cohesivos de origen coluvial de consistencia predominantemente Muy
Qcc22
Qcc25 2 9 Firme a Duro.
Total 23 100.00
APP ACCESOS NORTE DE BOGOTÁ-ACCENORTE-AMPLIACIÓN CARRERA SÉPTIMA
ANEXO 5
ESTUDIO DE FUNDACIONES
CATEGORIZACIÓN MUETRAS SEGÚN SPT AGOSTO, 2015

Unidad Prof. Prof. Pres. Total Pres. Efect.


Unidad Unidad Geotécnica NSPT F. Reducción F. Sobrecarga F. Energía F. Varillaje
Muestra Sondeo Geotécnica Nivel Freático Muestra σv0 σ´v0 (N1)60 (N1)60 (OK)
Geológica del proyecto (Nm) 2 2 rd CN CE CR
Terzaghi (m) (m) (kg/cm ) (kg/cm )
4 S-CS-3 Qlc Qlc22 Qlc 21 3.00 1.50 7 0.255 0.405 0.989 1.371 1.10 0.75 7.92 8.00
6 S-CS-3 Qlc Qlc22 Qlc 21 3.00 3.00 5 0.510 0.510 0.977 1.287 1.10 0.80 5.66 6.00
8 S-CS-3 Qlc Qlc22 Qlc 21 3.00 4.00 6 0.680 0.580 0.969 1.236 1.10 0.85 6.93 7.00
10 S-CS-3 Qlc Qlc22 Qlc 21 3.00 5.00 5 0.850 0.650 0.962 1.189 1.10 0.85 5.56 6.00
12 S-CS-3 Qlc Qlc22 Qlc 21 3.00 6.00 4 1.020 0.720 0.954 1.146 1.10 0.95 4.79 5.00
28 S-CS-5 Qlc Qlc23 Qlc 21 3.00 19.50 9 3.315 1.665 0.653 0.768 1.30 1.00 8.98 9.00
33 S-CS-5 Qlc Qlc23 Qlc 21 3.00 23.00 13 3.910 1.910 0.560 0.707 1.30 1.00 11.95 12.00
35 S-CS-5 Qlc Qlc21 Qlc 21 3.00 24.50 4 4.165 2.015 0.548 0.684 1.30 1.00 3.56 4.00

Categoría
Número de Muestras Porcentaje Unidad Geotécnica del proyecto Descripción
Terzaghi
Qlc21 1 12.50
Qlc22 5 62.50 Suelos cohesivos de origen lacustre de consistencia Moderadamente Firme a
Qlc21
Qlc23 2 25.00 Firme
Qlc24 0 0.00
Qlc25 0 0.00
Total 8 100.00
APP ACCESOS NORTE DE BOGOTÁ-ACCENORTE-AMPLIACIÓN CARRERA SEPTIMA
ANEXO 5
ESTUDIO DE FUNDACIONES
CATEGORIZACIÓN MUETRAS SEGÚN SPT AGOSTO, 2015

Unidad Prof. Prof. Pres. Total Pres. Efect.


Unidad Unidad Geotécnica NSPT F. Reducción F. Sobrecarga F. Energía F. Varillaje
Muestra Sondeo Geotécnica Nivel Freático Muestra σv0 σ´v0 (N1)60 (N1)60 (OK)
Geológica del proyecto (Nm) 2 2
rd CN CE CR
Terzaghi (m) (m) (kg/cm ) (kg/cm )
17 S-CS-2 Tpb Tpb14 TpbIII 3.00 12.50 47 2.125 1.175 0.840 0.926 1.30 1.00 30 57.00
19 S-CS-2 Tpb Tpb14 TpbIII 3.00 14.00 51 2.380 1.280 0.800 0.887 1.30 1.00 30 59.00
21 S-CS-2 Tpb Tpb14 TpbIII 3.00 15.50 57 2.635 1.385 0.760 0.851 1.30 1.00 30 63.00
23 S-CS-2 Tpb Tpb14 TpbIII 3.00 17.00 69 2.890 1.490 0.720 0.818 1.30 1.00 30 73.00
26 S-CS-2 Tpb Tpb14 TpbIII 3.00 20.00 61 3.400 1.700 0.640 0.759 1.30 1.00 30 60.00
28 S-CS-2 Tpb Tpb14 TpbIII 3.00 21.50 60 3.655 1.805 0.600 0.732 1.30 1.00 30 57.00
30 S-CS-2 Tpb Tpb14 TpbIII 3.00 23.00 60 3.910 1.910 0.560 0.707 1.30 1.00 30 55.00
32 S-CS-2 Tpb Tpb14 TpbIII 3.00 24.50 65 4.165 2.015 0.548 0.684 1.30 1.00 30 58.00
34 S-CS-2 Tpb Tpb14 TpbIII 3.00 26.00 63 4.420 2.120 0.536 0.663 1.30 1.00 30 54.00
36 S-CS-2 Tpb Tpb14 TpbIII 3.00 27.50 70 4.675 2.225 0.524 0.642 1.30 1.00 30 58.00
40 S-CS-3 Tpb Tpb13 TpbIV 2.00 21.00 35 3.570 1.670 0.613 0.767 1.30 1.00 30 35.00
42 S-CS-3 Tpb Tpb13 TpbIV 2.00 22.00 39 3.740 1.740 0.587 0.748 1.30 1.00 30 38.00
44 S-CS-3 Tpb Tpb13 TpbIV 2.00 23.50 41 3.995 1.845 0.556 0.722 1.30 1.00 30 39.00
46 S-CS-3 Tpb Tpb13 TpbIV 3.00 25.00 48 4.250 2.050 0.544 0.677 1.30 1.00 30 42.00
48 S-CS-3 Tpb Tpb13 TpbIV 3.00 27.00 48 4.590 2.190 0.528 0.649 1.30 1.00 30 40.00
50 S-CS-3 Tpb Tpb13 TpbIV 3.00 29.50 49 5.015 2.365 0.508 0.617 1.30 1.00 30 39.00
14 S-CS-4 Tpb Tpb13 TpbIV 3.00 6.50 28 1.105 0.755 0.950 1.125 1.25 0.95 30 37.00
15 S-CS-4 Tpb Tpb13 TpbIV 3.00 7.00 31 1.190 0.790 0.946 1.106 1.25 0.95 30 41.00
16 S-CS-4 Tpb Tpb13 TpbIV 3.00 7.50 33 1.275 0.825 0.943 1.086 1.25 0.95 30 43.00
17 S-CS-4 Tpb Tpb13 TpbIV 3.00 8.00 36 1.360 0.860 0.939 1.068 1.25 0.95 30 46.00
18 S-CS-4 Tpb Tpb13 TpbIV 3.00 8.50 37 1.445 0.895 0.935 1.050 1.25 0.95 30 46.00
19 S-CS-4 Tpb Tpb13 TpbIV 3.00 9.00 40 1.530 0.930 0.931 1.033 1.25 0.95 30 49.00
20 S-CS-4 Tpb Tpb13 TpbIV 3.00 9.50 39 1.615 0.965 0.920 1.016 1.25 0.95 30 47.00
21 S-CS-4 Tpb Tpb14 TpbIII 3.00 10.00 41 1.700 1.000 0.907 1.000 1.25 1.00 30 51.00
22 S-CS-4 Tpb Tpb14 TpbIII 3.00 10.50 41 1.785 1.035 0.894 0.984 1.30 1.00 30 52.00
23 S-CS-4 Tpb Tpb14 TpbIII 3.00 11.50 43 1.955 1.105 0.867 0.954 1.30 1.00 30 53.00
24 S-CS-4 Tpb Tpb14 TpbIII 3.00 12.00 45 2.040 1.140 0.854 0.940 1.30 1.00 30 55.00
25 S-CS-4 Tpb Tpb14 TpbIII 3.00 12.50 45 2.125 1.175 0.840 0.926 1.30 1.00 30 54.00
26 S-CS-4 Tpb Tpb14 TpbIII 3.00 13.00 47 2.210 1.210 0.827 0.913 1.30 1.00 30 56.00
27 S-CS-4 Tpb Tpb14 TpbIII 3.00 13.50 47 2.295 1.245 0.814 0.900 1.30 1.00 30 55.00
APP ACCESOS NORTE DE BOGOTÁ-ACCENORTE-AMPLIACIÓN CARRERA SEPTIMA
ANEXO 5
ESTUDIO DE FUNDACIONES
CATEGORIZACIÓN MUETRAS SEGÚN SPT AGOSTO, 2015

Unidad Prof. Prof. Pres. Total Pres. Efect.


Unidad Unidad Geotécnica NSPT F. Reducción F. Sobrecarga F. Energía F. Varillaje
Muestra Sondeo Geotécnica Nivel Freático Muestra σv0 σ´v0 (N1)60 (N1)60 (OK)
Geológica del proyecto (Nm) 2 2
rd CN CE CR
Terzaghi (m) (m) (kg/cm ) (kg/cm )
28 S-CS-4 Tpb Tpb14 TpbIII 3.00 14.00 49 2.380 1.280 0.800 0.887 1.30 1.00 30 57.00
29 S-CS-4 Tpb Tpb14 TpbIII 3.00 14.50 48 2.465 1.315 0.787 0.875 1.30 1.00 30 55.00
31 S-CS-4 Tpb Tpb14 TpbIII 3.00 16.50 53 2.805 1.455 0.733 0.829 1.30 1.00 30 57.00
33 S-CS-4 Tpb Tpb14 TpbIII 3.00 18.50 55 3.145 1.595 0.680 0.787 1.30 1.00 30 56.00
35 S-CS-4 Tpb Tpb14 TpbIII 3.00 20.50 56 3.485 1.735 0.627 0.750 1.30 1.00 30 55.00
37 S-CS-4 Tpb Tpb14 TpbIII 3.00 22.50 59 3.825 1.875 0.573 0.715 1.30 1.00 30 55.00
39 S-CS-4 Tpb Tpb14 TpbIII 3.00 24.50 70 4.165 2.015 0.548 0.684 1.30 1.00 30 62.00
41 S-CS-4 Tpb Tpb14 TpbIII 3.00 26.50 87 4.505 2.155 0.532 0.656 1.30 1.00 30 74.00
43 S-CS-4 Tpb Tpb14 TpbIII 3.00 28.50 100 4.845 2.295 0.516 0.629 1.30 1.00 30 82.00
44 S-CS-4 Tpb Tpb14 TpbIII 3.00 29.00 100 4.930 2.330 0.512 0.623 1.30 1.00 30 81.00

Categoría
Número de Muestras Porcentaje Unidad Geotécnica del proyecto Descripción
Terzaghi
Tpb13 13 32.50 TpbIV Suelo residual con grado de meteorización IV
Tpb14 27 67.50 TpbIII Suelo residual con grado de meteorización III
Total 40 100.00