ITTEHAD ENERGY

PROPOSAL FOR AUTOMATIC FEED SYSTEM


To maintain hopper level by regulating material flow rate

OVERVIEW

Ittehad Energy is pleased to submit a proposal to automatically maintain hopper level. The system will improve the
process not only in term of production but also shall decrease the stoppage time caused by manual opening and
closing of feed valve. The system will also indicate if the hopper level is too high or too low (custom set) by setting off
an alarm.

The Objective

 Need #1: Maintain the desired in range level of hopper


 Need #2: Notify abnormal hopper level
 Need #3: To regulate material flow rate as per process need

The Opportunity

The Current system has to be manually operated to open or close feed valve to regulate flow rate as per the
process. This regulation is un-calculated which does not always maintains the correct flow causing unproductivity.

The Solution

 Recommendation: We are suggesting, based on our Industrial Automation expertise, to install our fully automatic
feed system adaptive to harsh industrial environment.

OUR PROPOSAL-TECHNICAL
Proposed is the PLC based control valve system which shall maintain in range hopper level and the flow rate for later
processes. The Scheme of the system is shown below:

1
Max Level

Minimum Level

PLC Controller

Actuator

Opened Valve Closed Valve

2
PRICING
The following table details the pricing for delivery of the Components and Services outlined in this proposal. This
pricing is valid for 15 days days from the date of this proposal:

S. No Main Items Cost

Option 1: Fully Automatic Control System with alarms

1 Delta PLC 24,000

2 Actuatorx6 18,000

3 Paddle Sensors x 3 22,000

4 Alarms 2,500

5 Installation & backup Services 35,500

Total 100,000

S. No Main Items Cost

Option 2: Low level alarm initiator

1 Paddle sensors 8000

2 Alarms + wiring 2,500

4 Installation charges & backup services 20,000

Total 30,500

3
Pricing Terms:

1) 15% Advance
2) 80% on Final Commissioning as per following Deliverables
3) 5% after one month of successful operation of Deliverable

Sample Disclaimer: Estimates are subject to change if project specifications are changed or costs for outsourced
services change before a contract is executed.

4
Project Deliverables
Following is a complete list of all project deliverables:

Deliverable

1. Designing of Components

2. Fabrication of actuator housing

3. Sourcing & Delivery of other components (actuators and electronic devices)

4. Installing & Commission of Components

Timeline for Execution

After proposal approval and payment of 20% advance, we are estimating that 15 working days are required to
commission the project.

Thank you for your consideration,

Regards,

Muzammil Ejaz,
Techno-commercial Director