Вы находитесь на странице: 1из 33

Mechanical Design

Selected Topics

Dr. Amr Shaaban


Assistant Professor at
Ain Shams University, Egypt.
Founder of
Design Online Academy.

https://www.facebook.com/designonlineacademy
The Connection Bolt material
Joint material
Bolt type
Design of Bolted Number of bolts
Bolt size
Connections
The Load Shear Load
Axial Load
Load Factor
Safety factor

Results Initial tension/Pre-stress


Tightening torque
Stresses
Margin of safety

2 Dr.Amr Shaaban- Bolted Connections 1/20/2019


Fasteners Designation

Bolt’s head ≈ 0.7d Md*L*b Md*L*b* b1


Nut’s head ≈ 0.8d
Core diameter ≈ 0.85d M: Metric
Across flat ≈ 2d d: Outer diameter
Hole clearance ≈ 1.1d L: Total length
From hole’s center to edge ≈ 1.1d b: Threaded length
Washer diameter ≈ 2d b1 : Length of engaged thread in studs.
3 Dr.Amr Shaaban- Bolted Connections 1/20/2019
Fasteners Designation

4 Dr.Amr Shaaban- Bolted Connections 1/20/2019


Fasteners Designation

5 Dr.Amr Shaaban- Bolted Connections 1/20/2019


Tightening Torque Concept

T2: Friction torque between


bolt ‘s head and joint

T: TIGHTENING TORQUE

T1: Friction torque between bolt


and nut connection

6 Dr.Amr Shaaban- Bolted Connections 1/20/2019


Tightening torque calculations
α Helix angle Tan α =p/∏. dm

µ Coefficient of friction 0.2-0.25

β Inclination angle β=30⁰ (fasteners)

p Pitch Defined by bolt’s designation

dm Bolt mean diameter

rm1 Bolt mean radius rm1=dm/2

rm2 Flat mean radius rm2=1.5d+(d+2)/4

µ̀ Inclined Coefficient of friction µ̀= µ/ cosβ

Fa Axial load on bolt (pre-tension) Following slide

Friction torque consumed


T1 between threads
Friction torque consumed
T2 between flat surfaces

T Tightening torque

7 Dr.Amr Shaaban- Bolted Connections 1/20/2019


Manual Calculation Of Initial Tension
F
Pmax

Pbolt

Pex
Pi

CJ Cb Pjoint

Pr

ΔL
λ
ΔL J ΔL b λ
Manual Calculation Of Bolt And Joint Stiffness

Ab1
C: Stiffness (N/mm) Lb1
E: Young’s modulus (Gpa)
A: Area (mm2)
L: Length (mm)
Lb2 Ab2

AJ1
Lb1 LJ1

AJ2
Lb2 LJ2

10 Dr.Amr Shaaban- Bolted Connections 1/20/2019


11 Dr.Amr Shaaban- Bolted Connections 1/20/2019
Manual bolt’s pre-stress and working stress calculation
T
ASSEMBLY STRESSES
n Safety factor 1.5-2.5
T2
dc Core diameter ≈ 0.85d
Ac Core Area

σy Yield stress Depends on bolt’s material (+)


Normal stress due to
σ initial tension
T1
τ Shear stress due to T1
Tap bolt T.D N.F.D
Combines stress due to
τcomb normal and shear
(Von mises‘s theory)
Allowable shear stress WORKING STRESSES
(depends on bolt’s grade)
τall τall should be ≥ τcomb
Pall should be ≥ Pmax

12 Dr.Amr Shaaban- Bolted Connections 1/20/2019


Dynamic analysis for bolted connections

F
Pmax

Pmin

Pex-max
Pi

Pex-min
Pr-max

Pr-min

Cb CJ
ΔL

13 Dr.Amr Shaaban- Bolted Connections 1/20/2019


Soderberg ‘s theory for fatigue

σvar •Based on the max and min values of the


working load, the mean and variance
σen stresses are calculated, and hence, line
OA can be drawn.
•Based on the bolt’s grade selected
through the static analysis, determine
yield and endurance stress, and hence,
draw the soderberg’s line. Point (B) that
B lays on the line represents the critical
point after which failure occurs.

A •If point (A) lays on the safe zoon, then


the bolt’s grade is accepted, and the
safety factor is simply (OB/OA).
σvar
SAFETY ZONE •If point (A) lays out the safe zone, then
o the bolt should be upgraded.
σmean σy σmean
14 Dr.Amr Shaaban- Bolted Connections 1/20/2019
Applications
15 Dr.Amr Shaaban- Bolted Connections 1/20/2019
BRACKETS
F1 F2

F2

F1

Tilting edge

W.L = F1 . L1 + F2 . L2
Pex = (F2/n)+(W/n)
Pex = (F2/n)+(W/µ.n) F1 / L1 = F2 / L2
Tilting load Direct normal

Tilting load Direct shear

16 Dr.Amr Shaaban- Bolted Connections 1/20/2019


BRACKETS

40cos60*175 +40sin60*100 = 2F1 *60 + 2F2 *(120+60)


Tilting edge
F1 / 60 = F2 / (120+60)

Pex = (F2) )+(40sin60/n) +(40cos60/ µn)

Tilting load Direct normal Direct shear

17 Dr.Amr Shaaban- Bolted Connections 1/20/2019


WORK BENCH PRESS

P*(150+400) = 2F *300

Pex = F+(p/2)

Tilting edge Tilting load Direct normal

18 Dr.Amr Shaaban- Bolted Connections 1/20/2019


19 Dr.Amr Shaaban- Bolted Connections 1/20/2019
JIB CRANE

Tilting edge

W . 200 = F1 . 80 + F2 . (160+80)

F1 / 80 = F2 / (160+80)
Pex = F2/2
FOR ONE BOLT

20 Dr.Amr Shaaban- Bolted Connections 1/20/2019


21 Dr.Amr Shaaban- Bolted Connections 1/20/2019
STEEL STRUCTURES

Ps : Direct shear force on bolt=60/6=10KN


F1,2,3,.. : Due to tilting moment (M=P.e) about G.

Pex = Rmax /µ

Rmax: The max resultant force of the 6 bolts


22 Dr.Amr Shaaban- Bolted Connections 1/20/2019
STEEL STRUCTURES

Ps : Direct shear force on bolt=60/6=10KN


F1,2,3,.. : Due to tilting moment (M=60*200) about G.
Pex = Rmax /µ

Rmax: The max resultant force of the 6 bolts

23 Dr.Amr Shaaban- Bolted Connections 1/20/2019


PRESSURE VESSELS

Pex = P.A/n

P: Pressure inside vessel


n: number of bolts
A: projected area of the cover

24 Dr.Amr Shaaban- Bolted Connections 1/20/2019


•Vessel’s inner diameter = 150mm.
•Vessel’s wall thickness = 12mm.
•Number of studs recommended = 8 of M12*1.25.
•Bolt’s pitch circle diameter = 200mm.
•Pressure inside vessel in working status = 2Mpa.
•The residual load in the connection should be 80% of external load.

25 Dr.Amr Shaaban- Bolted Connections 1/20/2019


26 Dr.Amr Shaaban- Bolted Connections 1/20/2019
27 Dr.Amr Shaaban- Bolted Connections 1/20/2019
28 Dr.Amr Shaaban- Bolted Connections 1/20/2019
29 Dr.Amr Shaaban- Bolted Connections 1/20/2019
30 Dr.Amr Shaaban- Bolted Connections 1/20/2019
31 Dr.Amr Shaaban- Bolted Connections 1/20/2019
32 Dr.Amr Shaaban- Bolted Connections 1/20/2019
33 Dr.Amr Shaaban- Bolted Connections 1/20/2019

Вам также может понравиться