Академический Документы
Профессиональный Документы
Культура Документы
S.No. Description
1 Project Capacity (AC)
2 Project Capacity (DC)
3 Technology
4 PV Cell rating
5 PV module efficiecy
6 Performance Ratio (PR)
7 Type of mounting
8 PV module mounting structure
9 PV module tilt angle
10 Array junction box
11 Solar Inverter
a) Type of Inverter
b) Inverter efficiency
c) Losses in Inverter due to efficiency
d) Inverter losses on sleep mode
e) Number of Modules in a String
f) Strings per Inverter
g) String Power Capacity
12 Evacuation Voltage
13 DC to AC ratio (DC : AC)
14 ACDB panel
15 ACDB outgoing MCCB rating
16 Connectors
17 Lightning arrestor
18 DC cable
19 Average Power Generation per Year
20 Low Voltage Power Cables
a) Rated Voltage
b) Service Voltage
c) Conductor Material
d) Cross Section of Conductors
e) Type of Insulation
f) Screening of Cable
g) Inner & Outer Sheath
h) Cable Loading
i) Derating Factors
j) Cables Trays filling
21 High Voltage Power Cables
a) Rated Voltage
b) Service Voltage
c) System (UE / E)
d) Conductor Material
e) Maximum Cross Section of Conductors
f) Insulation Material
g) Screening of Cable
h) Temperature protection of winding
i) Moisture protection
j) Loading
k) Derating Factors
22 Generator Transformer
a) Capacity (kVA)
b) Winding Material
c) Primary Voltage
d) Secondary Voltage
e) Tapping step and Range
f) Impedance Voltage
g) Vector Group
h) Accessories and Fittings
i) Class of Insulation
j) Protection
k) Protection Devices
p) Monitoring Indication
q) DCS Interface
23 Distribution Transformer
a) Capacity (kVA)
b) Winding Material
c) Primary Voltage
d) Secondary Voltage
e) Tapping step and Range
f) Impedance Voltage
g) Vector Group
h) Accessories and Fittings
i) Class of Insulation
j) Protection
k) Protection Devices
p) Monitoring Indication
q) DCS Interface
h) Protection
i) Metering
j) Earthing
k) Spare Feeders
l) Earthing Trucks
m) Maintenance Trolley
25 Low Voltage Distribution Board
a) Rated voltage
b) Rated symmetrical shortcircuit capacity
c) Control Voltage
d) Control System Voltage
e) Flexibility of Board
f) Type of Module
g) Busbar Material
h) Maximum Current Density
i) Protection
j) Metering
k) Spare Feeders
l) Protection Class (minimum)
m) Double front MCC
n) Earthing Trucks
o) Maintenance Trolley
1.1 kV
0.415 kV
Alumnium
sqmm (max)
XLPE
Individually Screened
PVC
80%
As per IEC
70%
11 Kv(UE)
11 kV
UE
Alumnium
AS per IEC
XLPE
Individually Screened
NA
NA
80%
As per IEC
VCB
11 kV
630 A
40 kA (3s)
80 kA
Copper Material
As per Type TC
Microprocessor Relay with Profibus communication
and remote programming terminal (50, 51, 80, 86,
94, 95)
Multifunction digital energy meters with Profibus
communication and remote load management
system
GI Material
1 no.
1 set
1 set
0.415 kV
50 kA
110V AC
110 V AC, 50 Hz
Extendible on either side
Drawout Type
Aluminium
As per OEM type test certificates
Microprocessor Relay
Multifunction digital energy meters with Profibus
communication and remote load management
system
20% each type but Min one
IP 42
Double Front Compartmentalized
NA
One Set for each Station
Yes
GI / Copper
As per requirement
Shall be provided separate
Shall be provided separate
1 Ohm (Max)
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
11 kV, 50 Hz
3P+N, 0.415 kV(+/-)10%, 50Hz(+/-) 5%
220 VAC, 50Hz, 1P+N
Supplier to specify as per PV module
220 VAC, 50 Hz
110 V AC, 50 Hz
Output 220V / Input 415 VAC, 3 Ph, 50 Hz
Portable