Вы находитесь на странице: 1из 30

Page 1 of 30

Dimensional Solutions FOUNDATION3D Version 6.5.0


Foundation Name BLOW DOWN TANK
Designed By: TR Engineering Consultancy Engineer PRS
K:\J68000\J68396 - SAIH RAWL CCPP\5.0 Engineering\5.7 Strctrl Civil Engg & calcs\01_HRSG\
Filename: HRSG - Blow down tank\Design Calculation\Blow down Tank.mcs

SUMMARY REPORT FOR BLOW DOWN TANK

PROJECT INFORMATION

Project Name: Saih - Rawl Power Station


Project Number: J68396
Client: PDO
Project Location Saih - Rawl
Foundation Description FOUNDATION

DESIGN CODE EN 1992-1-1:2004 INPUT UNITS SI OUTPUT UNITS

CONCRETE PARAMETERS: REINFORCING STEEL PARAMETERS:

Compressive Strength (N/sq mm) 35 Yield Strength (N/sq mm)


Unit Weight (kN/cu m) 25 Unit Weight (kN/cu m)
Pier Concrete Cover - E-W Dir (mm) 50 Modulus of Elasticity (kN/sq mm)
Pier Concrete Cover - N-S Dir (mm) 50 Pier Min Rebar Spacing (mm)
Footing Side Concrete Cover - E-W Dir (mm) 50 Footing Min Rebar Spacing (mm)
Footing Side Concrete Cover - N-S Dir (mm) 50 Footing Max Rebar Spacing (mm)
Footing Top Concrete Cover (mm) 50 Consider Pier Vertical Bar Spacing Limit
Footing Bottom Concrete Cover - X Dir (mm) 50

SOIL PARAMETERS: REBAR PARAMETERS:

Unit Weight (kN/cu m) 19 Max Long Bar Size


Allowable Net Bearing Capacity (kN/sq m) 150 Min Long Bar Size
Bearing Capacity Method Linear Soil Pressure Max Tie Bar Size
Soil Type Granular Min Tie Bar Size
Passive Pressure Coefficient Kp 0.5 Max Ftg Bar Size
Soil To Concrete Friction f 0.4 Min Ftg Bar Size
Allowable Increase in Soil Pressure due to Short Term Loads (%) Temp & Shrinkage Steel Ratio
Wind 0 Earthquake 0 Test 0
Erection Stability Ratio 1.5
Operation Stability Ratio 1.5 BUOYANCY CRITERIA:
Test Stability Ratio 1.5
Safety Factor against Lateral Forces 1.5 Consider Buoyancy:
Safety Factor against Uplift 1.5 Consider soil for buoyancy:
Percent Neglected Overburden 0 Water table below grade (mm)
Percent Neglected Soil Cover 0
Consider Sliding Along Resultant No

MINIMUM FOUNDATION CRITERIA:

Depth of Footing Below Grade (mm) 600


Minimum Soil Cover (mm) 0
Grade Elevation (mm) 100000
Page 2 of 30

Dimensional Solutions FOUNDATION3D Version 6.5.0


Foundation Name BLOW DOWN TANK
Designed By: TR Engineering Consultancy Engineer PRS
K:\J68000\J68396 - SAIH RAWL CCPP\5.0 Engineering\5.7 Strctrl Civil Engg & calcs\01_HRSG\
Filename: HRSG - Blow down tank\Design Calculation\Blow down Tank.mcs

SUMMARY REPORT FOR BLOW DOWN TANK

PIER/BASE PLATE DESIGN INFORMATION

P1
E-W Dim (mm) 2800.00
N-S Dim (mm) 2800.00
Height above grade (mm) 150.00
E-W Offset (mm) 0.00
N-S Offset (mm) 0.00
Requested Reinft. Ratio
Provided Reinft. Ratio
Long Bar Size (mm)

Total Long Bars


Tie Bar Size (mm)
Total No. of Ties
Major Tie Spacing (mm)

FOOTING DESIGN INFORMATION MATERIAL QUANTITIES

E-W Dim (mm) 2800.00 Concrete Cubic Meters (CM)


N-S Dim (mm) 2800.00 Reinforcing Steel Kilograms (KG)
Thickness (mm) 750.00 Formwork Square Meters (SM)
Excavation Cubic Meters (CM)

Top Steel

Governing No of Bar Bar Area Area


Combination Bars Size Spac Prov Req
(mm) (mm) (sq cm/m) (sq cm/m)

19 12 150 7.67 0
19 12 150 7.67 0

Bottom Steel

Governing No of Bar Bar Area Area


Combination Bars Size Spac Prov Req
(mm) (mm) (sq cm/m) (sq cm/m)

19 16 150 13.65 12.26


19 16 150 13.65 12.56
Page 3 of 30

Dimensional Solutions FOUNDATION3D Version 6.5.0


Foundation Name BLOW DOWN TANK
Designed By: TR Engineering Consultancy Engineer PRS
K:\J68000\J68396 - SAIH RAWL CCPP\5.0 Engineering\5.7 Strctrl Civil Engg & calcs\01_HRSG\
Filename: HRSG - Blow down tank\Design Calculation\Blow down Tank.mcs

SUMMARY REPORT FOR BLOW DOWN TANK


Page 4 of 30

Date 28/05/2018
Time 10:34:05 AM
Checker DJK
& calcs\01_HRSG\

UTPUT UNITS SI

G STEEL PARAMETERS:

460
78.5
city (kN/sq mm) 210
75
ar Spacing (mm) 75
ar Spacing (mm) 200
tical Bar Spacing Limit No

20
12
10
10
16
12
0.0013

No
No
0
Page 5 of 30

Date 28/05/2018
Time 10:34:05 AM
Checker DJK
& calcs\01_HRSG\

ATERIAL QUANTITIES

5.88
Kilograms (KG) 253.2
8.4
11.26

Moment Direction

(kN m/m)

0 E-W
0 N-S

Moment Direction

(kN m/m)

0 E-W
0 N-S
Page 6 of 30

Date 28/05/2018
Time 10:34:05 AM
Checker DJK
& calcs\01_HRSG\
Dimensional Solutions FOUNDATION3D Version 6.5.0 Date
Foundation Name BLOW DOWN TANK
Designed By: TR Engineering Consultancy Engineer PRS Checker
Filename: Analysis and Deisgn of HRSG Blow Down Tank Foundation

PROJECT INFORMATION

Project Name: Saih - Rawl Power Station


Project Number: J68396
Client: PDO
Project Location Saih - Rawl
Foundation Description FOUNDATION

DESIGN CODE EN 1992-1-1:2004 INPUT UNITS SI OUTPUT UNITS

CONCRETE PARAMETERS: REINFORCING STEEL PARAMETERS:


Compressive Strength (N/sq mm) 35 Yield Strength (N/sq mm)
Unit Weight (kN/cu m) 25 Unit Weight (kN/cu m)
Pier Concrete Cover - E-W Dir (mm) 50 Modulus of Elasticity (kN/sq mm)
Pier Concrete Cover - N-S Dir (mm) 50 Pier Min Rebar Spacing (mm)
Footing Side Concrete Cover - E-W Dir 50 Footing Min Rebar Spacing (mm)
Footing Side Concrete Cover - N-S Dir 50 Footing Max Rebar Spacing (mm)
Footing Top Concrete Cover (mm) 50 Consider Pier Vertical Bar Spacing
Footing Bottom Concrete Cover - X Dir 50

SOIL PARAMETERS: REBAR PARAMETERS:


Unit Weight (kN/cu m) 19 Max Long Bar Size
Allowable Net Bearing Capacity (kN/sq 150 Min Long Bar Size
Bearing Capacity Method Linear Soil Pressure Max Tie Bar Size
Soil Type Granular Min Tie Bar Size
Passive Pressure Coefficient Kp 0.5 Max Ftg Bar Size
Soil To Concrete Friction f 0.4 Min Ftg Bar Size
Allowable Increase in Soil Pressure due to Short Term Loads (%) Temp & Shrinkage Steel Ratio
Wind 0 Earthquake 0 Test 0
Erection Stability Ratio 1.5
Operation Stability Ratio 1.5 BUOYANCY CRITERIA:
Test Stability Ratio 1.5 Consider Buoyancy:
Safety Factor against Lateral Forces 1.5 Consider soil for buoyancy:
Safety Factor against Uplift 1.5 Water table below grade (mm)
Percent Neglected Overburden 0
Percent Neglected Soil Cover 0
Consider Sliding Along Resultant No

MINIMUM FOUNDATION CRITERIA:


Depth of Footing Below Grade (mm) 600
Minimum Soil Cover (mm) 0
Grade Elevation (mm) 100000

NATIONAL ANNEX FACTORS SECTION NUMBE


Concrete Material Safety Factor gc 1.50 (2.4.2.4)
Reinf Steel Material Safety Factor gs 1.15 (2.4.2.4)
Long Term Effect Compressive Strengthacc 1.00 (3.1.6(1)P)
LNG-75-102961-CS-1206-00007-0000 Appendix - IV Revision:02
06/04/2019
Dimensional Solutions FOUNDATION3D Version 6.5.0 Date
Foundation Name BLOW DOWN TANK
Designed By: TR Engineering Consultancy Engineer PRS Checker
Filename: Analysis and Deisgn of HRSG Blow Down Tank Foundation
Long Term Effect Tension Strength Fact act 1.00 (3.1.6(2)P)
Geometric Imperfection Factor qo 0.01 (5.2(5))
Compression Chord State Coeff acw 1.00 (6.2.3(3))
Conc Shear Strength Reduction Factor u 0.60 (6.6N)
Shear Resistance Factor CRd,c 0.12 (6.2.2(1))
Min Shear Resistance Factor Vmin 0.04 (6.3N)
Max Design Shear Stress Factor VRd,max 0.50 (6.2.3(3))
Max Pier Longitudinal Tension Reinft FaAs,max 0.04 (9.5.2(3))
Max Pier Transverse Reinft Spacing Sclt,max 400.00 (9.5.3(3))
Min Ftg/Pile cap Tension Reinft As,min 0.26 (9.2.1.1(3))
Max Ftg/Pile cap Tension Reinft As,max 0.04 (9.1N)

APPLIED LOADS
P1
Load Axial Shear E-W Mom N-SShear N-S Mom E-W
Case (kN) (kN) (kN m) (kN) (kN m)
1 - Dead Load 0.00 0.00 0.00 0.00 0.00
2 - OP Load 80.22 0.00 0.00 0.00 0.00
3 - EMP Load 50.22 0.00 0.00 0.00 0.00
4 - Test Load 230.22 0.00 0.00 0.00 0.00
5 - WIND (X) 0.00 0.00 0.00 4.00 6.00
6 - WIND (Z) 0.00 4.00 6.00 0.00 0.00
7 - Diagonal Wind 0.00 2.83 4.24 2.83 4.24
8 - Seismic Load SLX 0.00 0.00 0.00 56.00 76.00
9 - Seismic Load SLZ 0.00 56.00 76.00 0.00 0.00
10 - Diagoanal Seismic load 0.00 39.59 53.73 39.59 53.73
UNFACTORED (ALLOWABLE) LOAD COMBINATIONS
P1
Load Axial Shear E-W Mom N-SShear N-S Mom E-W
Comb (kN) (kN) (kN m) (kN) (kN m)
1 Dead Load + EMP Load + 50.22 0.00 0.00 2.40 3.60
2 Dead Load + EMP Load + 50.22 2.40 3.60 0.00 0.00
3 Dead Load + EMP Load + 50.22 1.70 2.55 1.70 2.55
4 Dead Load + EMP Load + 50.22 0.00 0.00 4.00 6.00
5 Dead Load + EMP Load + 50.22 4.00 6.00 0.00 0.00
6 Dead Load + EMP Load + 50.22 2.83 4.24 2.83 4.24
7 0.9Dead Load + 0.9EMP Loa 45.20 0.00 0.00 4.00 6.00
8 0.9Dead Load + 0.9EMP Loa 45.20 4.00 6.00 0.00 0.00
9 0.9Dead Load + 0.9EMP Loa 45.20 2.83 4.24 2.83 4.24
10 Dead Load + EMP Load + 50.22 0.00 0.00 6.00 9.00
11 Dead Load + EMP Load + 50.22 6.00 9.00 0.00 0.00
12 Dead Load + EMP Load + 50.22 4.24 6.36 4.24 6.36
13 Dead Load + OP Load + 80.22 0.00 0.00 2.40 3.60
14 Dead Load + OP Load + 80.22 2.40 3.60 0.00 0.00
15 Dead Load + OP Load + 0 80.22 1.70 2.55 1.70 2.55
LNG-75-102961-CS-1206-00007-0000 Appendix - IV Revision:02
06/04/2019
Dimensional Solutions FOUNDATION3D Version 6.5.0 Date
Foundation Name BLOW DOWN TANK
Designed By: TR Engineering Consultancy Engineer PRS Checker
Filename: Analysis and Deisgn of HRSG Blow Down Tank Foundation
16 Dead Load + OP Load + 80.22 0.00 0.00 4.00 6.00
17 Dead Load + OP Load + 80.22 4.00 6.00 0.00 0.00
18 Dead Load + OP Load + D 80.22 2.83 4.24 2.83 4.24
19 Dead Load + Test Load + 230.22 0.00 0.00 1.32 1.98
20 Dead Load + Test Load + 230.22 1.32 1.98 0.00 0.00
21 Dead Load + Test Load + 230.22 0.93 1.40 0.93 1.40
22 Dead Load + EMP Load + 50.22 16.80 22.80 56.00 76.00
23 Dead Load + EMP Load + 50.22 56.00 76.00 16.80 22.80
24 Dead Load + EMP Load + 50.22 39.59 53.73 39.59 53.73
25 Dead Load + OP Load + 80.22 16.80 22.80 56.00 76.00
26 Dead Load + OP Load + 80.22 56.00 76.00 16.80 22.80
27 Dead Load + OP Load + D 80.22 39.59 53.73 39.59 53.73
FACTORED (ULTIMATE) LOAD COMBINATIONS
P1
Load Axial Shear E-W Mom N-SShear N-S Mom E-W
Comb (kN) (kN) (kN m) (kN) (kN m)
1 1.35Dead Load + 1.35EMP L 67.80 0.00 0.00 6.00 9.00
2 1.35Dead Load + 1.35EMP L 67.80 6.00 9.00 0.00 0.00
3 1.35Dead Load + 1.35EMP L 67.80 4.24 6.36 4.24 6.36
4 1.35Dead Load + 1.35EMP L 67.80 0.00 0.00 3.60 5.40
5 1.35Dead Load + 1.35EMP L 67.80 3.60 5.40 0.00 0.00
6 1.35Dead Load + 1.35EMP L 67.80 2.55 3.82 2.55 3.82
7 Dead Load + EMP Load + 50.22 0.00 0.00 6.00 9.00
8 Dead Load + EMP Load + 50.22 6.00 9.00 0.00 0.00
9 Dead Load + EMP Load + 50.22 4.24 6.36 4.24 6.36
10 1.35Dead Load + 1.35OP Lo 108.30 0.00 0.00 3.60 5.40
11 1.35Dead Load + 1.35OP Lo 108.30 3.60 5.40 0.00 0.00
12 1.35Dead Load + 1.35OP Lo 108.30 2.55 3.82 2.55 3.82
13 1.35Dead Load + 1.35OP Lo 108.30 0.00 0.00 6.00 9.00
14 1.35Dead Load + 1.35OP Lo 108.30 6.00 9.00 0.00 0.00
15 1.35Dead Load + 1.35OP Lo 108.30 4.24 6.36 4.24 6.36
16 1.35Dead Load + 1.35Test L 310.80 0.00 0.00 2.00 3.00
17 1.35Dead Load + 1.35Test L 310.80 2.00 3.00 0.00 0.00
18 1.35Dead Load + 1.35Test L 310.80 1.41 2.12 1.41 2.12
19 Dead Load + EMP Load + 50.22 16.80 22.80 56.00 76.00
20 Dead Load + EMP Load + 50.22 56.00 76.00 16.80 22.80
21 Dead Load + EMP Load + 50.22 39.59 53.73 39.59 53.73
22 Dead Load + OP Load + 80.22 16.80 22.80 56.00 76.00
23 Dead Load + OP Load + 80.22 56.00 76.00 16.80 22.80
24 Dead Load + OP Load + D 80.22 39.59 53.73 39.59 53.73
BEARING CAPACITY - LINEAR SOIL PRESSURE METHOD
Load Max All Ecc Ecc Moment Moment
Comb Pressure Pressure N/S Dir E/W Dir N/S axis E/W axis
(kN/sq m) (kN/sq m) (cm) (cm) (kN-m) (kN-m)
1 Dead Load + EMP Load + 26.63 161.40 2.74 0.00 0.00 5.40
2 Dead Load + EMP Load + 26.63 161.40 0.00 2.74 5.40 0.00
3 Dead Load + EMP Load + 27.24 161.40 1.94 1.94 3.82 3.82
4 Dead Load + EMP Load + 27.62 161.40 4.56 0.00 0.00 9.00
5 Dead Load + EMP Load + 27.62 161.40 0.00 4.56 9.00 0.00
LNG-75-102961-CS-1206-00007-0000 Appendix - IV Revision:02
06/04/2019
Dimensional Solutions FOUNDATION3D Version 6.5.0 Date
Foundation Name BLOW DOWN TANK
Designed By: TR Engineering Consultancy Engineer PRS Checker
Filename: Analysis and Deisgn of HRSG Blow Down Tank Foundation
6 Dead Load + EMP Load + 28.63 161.40 3.23 3.23 6.36 6.36
7 0.9Dead Load + 0.9EMP Loa 25.10 161.40 5.07 0.00 0.00 9.00
8 0.9Dead Load + 0.9EMP Loa 25.10 161.40 0.00 5.07 9.00 0.00
9 0.9Dead Load + 0.9EMP Loa 26.12 161.40 3.58 3.58 6.36 6.36
10 Dead Load + EMP Load + 28.85 161.40 6.85 0.00 0.00 13.50
11 Dead Load + EMP Load + 28.85 161.40 0.00 6.85 13.50 0.00
12 Dead Load + EMP Load + 30.37 161.40 4.84 4.84 9.54 9.54
13 Dead Load + OP Load + 30.46 161.40 2.38 0.00 0.00 5.40
14 Dead Load + OP Load + 30.46 161.40 0.00 2.38 5.40 0.00
15 Dead Load + OP Load + 0 31.07 161.40 1.68 1.68 3.82 3.82
16 Dead Load + OP Load + 31.44 161.40 3.96 0.00 0.00 9.00
17 Dead Load + OP Load + 31.44 161.40 0.00 3.96 9.00 0.00
18 Dead Load + OP Load + D 32.46 161.40 2.80 2.80 6.36 6.36
19 Dead Load + Test Load + 48.93 161.40 0.79 0.00 0.00 2.97
20 Dead Load + Test Load + 48.93 161.40 0.00 0.79 2.97 0.00
21 Dead Load + Test Load + 49.26 161.40 0.56 0.56 2.10 2.10
22 Dead Load + EMP Load + 70.83 161.40 59.83 17.95 35.40 118.00
23 Dead Load + EMP Load + 70.83 161.40 17.95 59.83 118.00 35.40
24 Dead Load + EMP Load + 75.25 161.40 42.30 42.30 83.43 83.43
25 Dead Load + OP Load + 72.43 161.40 51.93 15.58 35.40 118.00
26 Dead Load + OP Load + 72.43 161.40 15.58 51.93 118.00 35.40
27 Dead Load + OP Load + D 76.69 161.40 36.72 36.72 83.43 83.43
STABILITY RATIO / SLIDING SAFETY FACTOR
Load S.R. S.R. All Sliding Sliding All
Comb N/S Dir E/W Dir S.R. FS - N/S FS - E/W FS
1 Dead Load + EMP Load + 51.13 100.00 1.50 35.36 100.00 1.50
2 Dead Load + EMP Load + 100.00 51.13 1.50 100.00 35.36 1.50
3 Dead Load + EMP Load + 72.32 72.32 1.50 50.02 50.02 1.50
4 Dead Load + EMP Load + 30.68 100.00 1.50 21.22 100.00 1.50
5 Dead Load + EMP Load + 100.00 30.68 1.50 100.00 21.22 1.50
6 Dead Load + EMP Load + 43.39 43.39 1.50 30.01 30.01 1.50
7 0.9Dead Load + 0.9EMP Loa 27.61 100.00 1.50 19.25 100.00 1.50
8 0.9Dead Load + 0.9EMP Loa 100.00 27.61 1.50 100.00 19.25 1.50
9 0.9Dead Load + 0.9EMP Loa 39.05 39.05 1.50 27.22 27.22 1.50
10 Dead Load + EMP Load + 20.45 100.00 1.50 14.15 100.00 1.50
11 Dead Load + EMP Load + 100.00 20.45 1.50 100.00 14.15 1.50
12 Dead Load + EMP Load + 28.93 28.93 1.50 20.01 20.01 1.50
13 Dead Load + OP Load + 58.91 100.00 1.50 40.36 100.00 1.50
14 Dead Load + OP Load + 100.00 58.91 1.50 100.00 40.36 1.50
15 Dead Load + OP Load + 0 83.32 83.32 1.50 57.09 57.09 1.50
16 Dead Load + OP Load + 35.35 100.00 1.50 24.22 100.00 1.50
17 Dead Load + OP Load + 100.00 35.35 1.50 100.00 24.22 1.50
18 Dead Load + OP Load + D 49.99 49.99 1.50 34.25 34.25 1.50
19 Dead Load + Test Load + 100.00 100.00 1.50 100.00 100.00 1.50
20 Dead Load + Test Load + 100.00 100.00 1.50 100.00 100.00 1.50
21 Dead Load + Test Load + 100.00 100.00 1.50 100.00 100.00 1.50
22 Dead Load + EMP Load + 2.34 7.80 1.50 1.52 5.05 1.50
23 Dead Load + EMP Load + 7.80 2.34 1.50 5.05 1.52 1.50
24 Dead Load + EMP Load + 3.31 3.31 1.50 2.14 2.14 1.50
LNG-75-102961-CS-1206-00007-0000 Appendix - IV Revision:02
06/04/2019
Dimensional Solutions FOUNDATION3D Version 6.5.0 Date
Foundation Name BLOW DOWN TANK
Designed By: TR Engineering Consultancy Engineer PRS Checker
Filename: Analysis and Deisgn of HRSG Blow Down Tank Foundation
25 Dead Load + OP Load + 2.70 8.99 1.50 1.73 5.77 1.50
26 Dead Load + OP Load + 8.99 2.70 1.50 5.77 1.73 1.50
27 Dead Load + OP Load + D 3.81 3.81 1.50 2.45 2.45 1.50
FOOTING DESIGN INFORMATION
E-W Dim (mm) 2800.00
N-S Dim (mm) 2800.00
Thickness (mm) 750.00
Top Steel
Governing No of Bar Bar Area Area Moment
Combination Bars Size Spac Prov Req
(mm) (mm) (sq cm/m) (sq cm/m) (kN m/m)
19 12 150 7.67 0 0
19 12 150 7.67 0 0
Bottom Steel
Governing No of Bar Bar Area Area Moment
Combination Bars Size Spac Prov Req
(mm) (mm) (sq cm/m) (sq cm/m) (kN m/m)
19 16 150 13.65 12.26 0
19 16 150 13.65 12.56 0
PUNCHING SHEAR
P1
Control Net Ult Punch. All Rem
Comb Load Stress Stress
(kN) (N/sq mm)(N/sq mm)
17 : 1.35Dead Load + 1.35Test Load 0.00 0.00 0.40
MAXIMUM SHEAR - E-W DIRECTION
Load Left Max Shear All Rem
Comb Dist Shear Stress Stress
(m) (kN)(N/sq mm)(N/sq mm)
1 1.35Dead Load + 1.35EMP L 2.80 0.00 0.00 0.40
2 1.35Dead Load + 1.35EMP L 2.80 0.00 0.00 0.40
3 1.35Dead Load + 1.35EMP L 2.80 0.00 0.00 0.40
4 1.35Dead Load + 1.35EMP L 2.80 0.00 0.00 0.40
5 1.35Dead Load + 1.35EMP L 2.80 0.00 0.00 0.40
6 1.35Dead Load + 1.35EMP L 2.80 0.00 0.00 0.40
7 Dead Load + EMP Load + 2.80 0.00 0.00 0.40
8 Dead Load + EMP Load + 2.80 0.00 0.00 0.40
9 Dead Load + EMP Load + 2.80 0.00 0.00 0.40
10 1.35Dead Load + 1.35OP Lo 2.80 0.00 0.00 0.40
11 1.35Dead Load + 1.35OP Lo 2.80 0.00 0.00 0.40
12 1.35Dead Load + 1.35OP Lo 2.80 0.00 0.00 0.40
13 1.35Dead Load + 1.35OP Lo 2.80 0.00 0.00 0.40
14 1.35Dead Load + 1.35OP Lo 2.80 0.00 0.00 0.40
15 1.35Dead Load + 1.35OP Lo 2.80 0.00 0.00 0.40
16 1.35Dead Load + 1.35Test L 2.80 0.00 0.00 0.40
17 1.35Dead Load + 1.35Test L 2.80 0.00 0.00 0.40
18 1.35Dead Load + 1.35Test L 2.80 0.00 0.00 0.40
19 Dead Load + EMP Load + 2.80 0.00 0.00 0.40
20 Dead Load + EMP Load + 0.00 0.00 0.00 0.40
LNG-75-102961-CS-1206-00007-0000 Appendix - IV Revision:02
06/04/2019
Dimensional Solutions FOUNDATION3D Version 6.5.0 Date
Foundation Name BLOW DOWN TANK
Designed By: TR Engineering Consultancy Engineer PRS Checker
Filename: Analysis and Deisgn of HRSG Blow Down Tank Foundation
21 Dead Load + EMP Load + 2.80 0.00 0.00 0.40
22 Dead Load + OP Load + 2.80 0.00 0.00 0.40
23 Dead Load + OP Load + 2.80 0.00 0.00 0.40
24 Dead Load + OP Load + D 2.80 0.00 0.00 0.40
MAXIMUM SHEAR - N-S DIRECTION
Load Bottom Max Shear All Rem
Comb Dist Shear Stress Stress
(m) (kN)(N/sq mm)(N/sq mm)
1 1.35Dead Load + 1.35EMP L 2.80 0.00 0.00 0.40
2 1.35Dead Load + 1.35EMP L 2.80 0.00 0.00 0.40
3 1.35Dead Load + 1.35EMP L 2.80 0.00 0.00 0.40
4 1.35Dead Load + 1.35EMP L 2.80 0.00 0.00 0.40
5 1.35Dead Load + 1.35EMP L 2.80 0.00 0.00 0.40
6 1.35Dead Load + 1.35EMP L 2.80 0.00 0.00 0.40
7 Dead Load + EMP Load + 2.80 0.00 0.00 0.40
8 Dead Load + EMP Load + 2.80 0.00 0.00 0.40
9 Dead Load + EMP Load + 2.80 0.00 0.00 0.40
10 1.35Dead Load + 1.35OP Lo 2.80 0.00 0.00 0.40
11 1.35Dead Load + 1.35OP Lo 2.80 0.00 0.00 0.40
12 1.35Dead Load + 1.35OP Lo 2.80 0.00 0.00 0.40
13 1.35Dead Load + 1.35OP Lo 2.80 0.00 0.00 0.40
14 1.35Dead Load + 1.35OP Lo 2.80 0.00 0.00 0.40
15 1.35Dead Load + 1.35OP Lo 2.80 0.00 0.00 0.40
16 1.35Dead Load + 1.35Test L 2.80 0.00 0.00 0.40
17 1.35Dead Load + 1.35Test L 2.80 0.00 0.00 0.40
18 1.35Dead Load + 1.35Test L 2.80 0.00 0.00 0.40
19 Dead Load + EMP Load + 0.00 0.00 0.00 0.40
20 Dead Load + EMP Load + 2.80 0.00 0.00 0.40
21 Dead Load + EMP Load + 2.80 0.00 0.00 0.40
22 Dead Load + OP Load + 2.80 0.00 0.00 0.40
23 Dead Load + OP Load + 2.80 0.00 0.00 0.40
24 Dead Load + OP Load + D 2.80 0.00 0.00 0.40

LNG-75-102961-CS-1206-00007-0000 Appendix - IV Revision:02


06/04/2019
Dimensional Solutions FOUNDATION3D Version 6.5.0 Date
Foundation Name BLOW DOWN TANK
Designed By: TR Engineering Consultancy Engineer PRS Checker
Filename: Analysis and Deisgn of HRSG Blow Down Tank Foundation

SOIL BEARING RESULTS - LINEAR SOIL PRESSURE METHOD


No. Load Combination Max MinEW CompNS Comp Area in % in
Bearing Bearing Len Len Comp Comp
kN/sq m kN/sq m m m sq m
1 Dead Load + EMP Load + 26.632 23.68 2.8 2.8 7.84 100
2 Dead Load + EMP Load + 26.632 23.68 2.8 2.8 7.84 100
3 Dead Load + EMP Load + 27.243 23.069 36.55 36.55 7.84 100
4 Dead Load + EMP Load + 27.616 22.696 2.8 2.8 7.84 100
5 Dead Load + EMP Load + 27.616 22.696 2.8 2.8 7.84 100
6 Dead Load + EMP Load + 28.634 21.677 23.05 23.05 7.84 100
7 0.9Dead Load + 0.9EMP Loa 25.1 20.18 2.8 2.8 7.84 100
8 0.9Dead Load + 0.9EMP Loa 25.1 20.18 2.8 2.8 7.84 100
9 0.9Dead Load + 0.9EMP Loa 26.118 19.162 21.025 21.025 7.84 100
10 Dead Load + EMP Load + 28.845 21.466 2.8 2.8 7.84 100
11 Dead Load + EMP Load + 28.845 21.466 2.8 2.8 7.84 100
12 Dead Load + EMP Load + 30.373 19.938 16.3 16.3 7.84 100
13 Dead Load + OP Load + 30.458 27.506 2.8 2.8 7.84 100
14 Dead Load + OP Load + 30.458 27.506 2.8 2.8 7.84 100
15 Dead Load + OP Load + 0 31.069 26.895 41.684 41.684 7.84 100
16 Dead Load + OP Load + 31.442 26.522 2.8 2.8 7.84 100
17 Dead Load + OP Load + 31.442 26.522 2.8 2.8 7.84 100
18 Dead Load + OP Load + D 32.46 25.504 26.13 26.13 7.84 100
19 Dead Load + Test Load + 48.927 47.303 2.8 2.8 7.84 100
20 Dead Load + Test Load + 48.927 47.303 2.8 2.8 7.84 100
21 Dead Load + Test Load + 49.263 46.967 120.168 120.168 7.84 100
22 Dead Load + EMP Load + 70.832 0 8.589 2.803 6.57 83.802
23 Dead Load + EMP Load + 70.832 0 2.803 8.589 6.57 83.802
24 Dead Load + EMP Load + 75.245 0 4.098 4.098 6.712 85.616
25 Dead Load + OP Load + 72.435 0 9.666 3.037 7.183 91.617
26 Dead Load + OP Load + 72.435 0 3.037 9.666 7.183 91.617
27 Dead Load + OP Load + D 76.693 0 4.449 4.449 7.177 91.547
BEARING PRESSURE CALCULATION FOR UNFACTORED LOAD COMBINATION 27
Eccentricity condition: Biaxial eccentricity
Eccentricity - Z direction = Ecc,ns = 367.16 mm
Eccentricity - EW direction = Ecc,ew = 367.16 mm
Total Axial Load = P= 227.22 kN
Footing length = Lew = 2.8 m
Footing width = Lns = 2.8 m
LNG-75-102961-CS-1206-00007-0000 Appendix - IV Revision:02
06/04/2019
Dimensional Solutions FOUNDATION3D Version 6.5.0 Date
Foundation Name BLOW DOWN TANK
Designed By: TR Engineering Consultancy Engineer PRS Checker
Filename: Analysis and Deisgn of HRSG Blow Down Tank Foundation
Mat Area A = Lew * Lns = 7.84 sq m
Soil overburden = S= 11.4 kN/sq m
Gross bearing pressure = Gbp = Solved by trial and error 76.693 kN/sq m
Net soil bearing = Nbp = Gbp - S = 65.293 kN/sq m
STABILITY RATIO CALCULATIONS
No. Load Combination Overturn Resist SRew Overturn Resist SRns
Mom - EW Mom - EW Mom - NS Mom - NS
kNm kNm kNm kNm
1 Dead Load + EMP Load + 0 276.108 100 5.4 276.108 51.131
2 Dead Load + EMP Load + 5.4 276.108 51.131 0 276.108 100
3 Dead Load + EMP Load + 3.818 276.108 72.321 3.818 276.108 72.321
4 Dead Load + EMP Load + 0 276.108 100 9 276.108 30.679
5 Dead Load + EMP Load + 9 276.108 30.679 0 276.108 100
6 Dead Load + EMP Load + 6.363 276.108 43.393 6.363 276.108 43.393
7 0.9Dead Load + 0.9EMP Loa 0 248.497 100 9 248.497 27.611
8 0.9Dead Load + 0.9EMP Loa 9 248.497 27.611 0 248.497 100
9 0.9Dead Load + 0.9EMP Loa 6.363 248.497 39.053 6.363 248.497 39.053
10 Dead Load + EMP Load + 0 276.108 100 13.5 276.108 20.452
11 Dead Load + EMP Load + 13.5 276.108 20.452 0 276.108 100
12 Dead Load + EMP Load + 9.545 276.108 28.929 9.545 276.108 28.929
13 Dead Load + OP Load + 0 318.108 100 5.4 318.108 58.909
14 Dead Load + OP Load + 5.4 318.108 58.909 0 318.108 100
15 Dead Load + OP Load + 0 3.818 318.108 83.322 3.818 318.108 83.322
16 Dead Load + OP Load + 0 318.108 100 9 318.108 35.345
17 Dead Load + OP Load + 9 318.108 35.345 0 318.108 100
18 Dead Load + OP Load + D 6.363 318.108 49.993 6.363 318.108 49.993
19 Dead Load + Test Load + 0 528.108 100 2.97 528.108 100
20 Dead Load + Test Load + 2.97 528.108 100 0 528.108 100
21 Dead Load + Test Load + 2.1 528.108 100 2.1 528.108 100
22 Dead Load + EMP Load + 35.4 276.108 7.8 118 276.108 2.34
23 Dead Load + EMP Load + 118 276.108 2.34 35.4 276.108 7.8
24 Dead Load + EMP Load + 83.426 276.108 3.31 83.426 276.108 3.31
25 Dead Load + OP Load + 35.4 318.108 8.986 118 318.108 2.696
26 Dead Load + OP Load + 118 318.108 2.696 35.4 318.108 8.986
27 Dead Load + OP Load + D 83.426 318.108 3.813 83.426 318.108 3.813
Note: Stability ratio values greater than 100 are displayed as 100.
SLIDING RESISTANCE CALCULATION - EW DIRECTION - UNFACTORED LOAD COMBINATION 27
Effective footing width = Lns = 2.8 m
Effective footing length = Lew = 2.8 m
Footing thickness in soil = h= 0.6 m
Soil cover = h1 = 0 m
Soil unit weight = Y= 19 kN/cu m
Passive Pressure at the p1 = Yh1 = 0 kN/sq m
top of the base
Passive Pressure at the p2 = Y(h + h1) = 11.4 kN/sq m
bottom of the base
Passive resistance R1 = 0.5*Lns*h*(p1+p2) = 11.97 kN
LNG-75-102961-CS-1206-00007-0000 Appendix - IV Revision:02
06/04/2019
Dimensional Solutions FOUNDATION3D Version 6.5.0 Date
Foundation Name BLOW DOWN TANK
Designed By: TR Engineering Consultancy Engineer PRS Checker
Filename: Analysis and Deisgn of HRSG Blow Down Tank Foundation
Passive pressure coeff. Kp = 0.5
Friction coeff. u= 0.4
Total Axial Load P= 227.22 kN
Total Passive resistance R2 = R1*Kp = 5.985 kN
Friction resistance R3 = u*P = 90.888 kN
Total lateral resistance R= R2+R3 = 96.873 kN
Total applied lateral load S= 39.592 kN
Sliding Factor of Safety FS,slid = R/S = 2.447
Note: Sliding factor of safety value greater than 100 is displayed as 100.
SLIDING RESISTANCE CALCULATION - NS DIRECTION - UNFACTORED LOAD COMBINATION 27
Effective footing width = Lew = 2.8 m
Effective footing length = Lns = 2.8 m
Footing thickness in soil = h= 0.6 m
Soil cover = h1 = 0 m
Soil unit weight = Y= 19 kN/cu m
Passive Pressure at the p1 = Yh1 = 0 kN/sq m
top of the base
Passive Pressure at the p2 = Y(h + h1) = 11.4 kN/sq m
bottom of the base
Passive resistance R1 = 0.5*Lew*h*(p1+p2) = 11.97 kN
Passive pressure coeff. Kp = 0.5
Friction coeff. u= 0.4
Total Axial Load P= 227.22 kN
Total Passive resistance R2 = R1*Kp = 5.985 kN
Friction resistance R3 = u*P = 90.888 kN
Total lateral resistance R= R2+R3 = 96.873 kN
Total applied lateral load S= 39.592 kN
Sliding Factor of Safety FS,slid = R/S = 2.447
Note: Sliding factor of safety value greater than 100 is displayed as 100.
FACTORED LOADS - SOIL BEARING VALUES
No. Load Combination Max EW Min EW Max NS Min NS
Bearing Bearing Bearing Bearing
kN/sq m kN/sq m kN/sq m kN/sq m
1 1.35Dead Load + 1.35EMP L 33.96 33.96 37.65 30.27
2 1.35Dead Load + 1.35EMP L 37.65 30.27 33.96 33.96
3 1.35Dead Load + 1.35EMP L 36.569 31.351 36.569 31.351
4 1.35Dead Load + 1.35EMP L 33.96 33.96 36.174 31.746
5 1.35Dead Load + 1.35EMP L 36.174 31.746 33.96 33.96
6 1.35Dead Load + 1.35EMP L 35.525 32.395 35.525 32.395
7 Dead Load + EMP Load + 25.156 25.156 28.845 21.466
8 Dead Load + EMP Load + 28.845 21.466 25.156 25.156
9 Dead Load + EMP Load + 27.764 22.547 27.764 22.547
10 1.35Dead Load + 1.35OP Lo 39.126 39.126 41.34 36.912
11 1.35Dead Load + 1.35OP Lo 41.34 36.912 39.126 39.126
12 1.35Dead Load + 1.35OP Lo 40.691 37.561 40.691 37.561
13 1.35Dead Load + 1.35OP Lo 39.126 39.126 42.816 35.436
14 1.35Dead Load + 1.35OP Lo 42.816 35.436 39.126 39.126
LNG-75-102961-CS-1206-00007-0000 Appendix - IV Revision:02
06/04/2019
Dimensional Solutions FOUNDATION3D Version 6.5.0 Date
Foundation Name BLOW DOWN TANK
Designed By: TR Engineering Consultancy Engineer PRS Checker
Filename: Analysis and Deisgn of HRSG Blow Down Tank Foundation
15 1.35Dead Load + 1.35OP Lo 41.735 36.517 41.735 36.517
16 1.35Dead Load + 1.35Test L 64.955 64.955 66.185 63.725
17 1.35Dead Load + 1.35Test L 66.185 63.725 64.955 64.955
18 1.35Dead Load + 1.35Test L 65.825 64.085 65.825 64.085
19 Dead Load + EMP Load + 34.831 15.48 58.573 0
20 Dead Load + EMP Load + 58.573 0 34.831 15.48
21 Dead Load + EMP Load + 47.958 2.353 47.958 2.353
22 Dead Load + OP Load + 38.658 19.306 61.43 0
23 Dead Load + OP Load + 61.43 0 38.658 19.306
24 Dead Load + OP Load + D 51.784 6.18 51.784 6.18

BEAM SHEAR STRESS - EW DIRECTION


No. Load Location Shear ShearAllowable Location Shear Shear
Combination Crit Sect Crit Sect Stress Stress ear Supp Near Supp Stress
m kN N/sq mm N/sq mm m kN N/sq mm
1 1.35Dead Load 2.8 0 0 0.397 2.8 0 0
2 1.35Dead Load 2.8 0 0 0.397 2.8 0 0
3 1.35Dead Load 2.8 0 0 0.397 2.8 0 0
4 1.35Dead Load 2.8 0 0 0.397 2.8 0 0
5 1.35Dead Load 2.8 0 0 0.397 2.8 0 0
6 1.35Dead Load 2.8 0 0 0.397 2.8 0 0
7 Dead Load + 2.8 0 0 0.397 2.8 0 0
8 Dead Load + 2.8 0 0 0.397 2.8 0 0
9 Dead Load + 2.8 0 0 0.397 2.8 0 0
10 1.35Dead Load 2.8 0 0 0.397 2.8 0 0
11 1.35Dead Load 2.8 0 0 0.397 2.8 0 0
12 1.35Dead Load 2.8 0 0 0.397 2.8 0 0
13 1.35Dead Load 2.8 0 0 0.397 2.8 0 0
14 1.35Dead Load 2.8 0 0 0.397 2.8 0 0
15 1.35Dead Load 2.8 0 0 0.397 2.8 0 0
16 1.35Dead Load 2.8 0 0 0.397 2.8 0 0
17 1.35Dead Load 2.8 0 0 0.397 2.8 0 0
18 1.35Dead Load 2.8 0 0 0.397 2.8 0 0
19 Dead Load + 2.8 0 0 0.397 2.8 0 0
20 Dead Load + 0 0 0 0.397 0 0 0
21 Dead Load + 2.8 0 0 0.397 2.8 0 0
22 Dead Load + 2.8 0 0 0.397 2.8 0 0
23 Dead Load + 2.8 0 0 0.397 2.8 0 0
24 Dead Load + 2.8 0 0 0.397 2.8 0 0
BEAM SHEAR STRESS - NS DIRECTION
No. Load Location Shear ShearAllowable Location Shear Shear
Combination Crit Sect Crit Sect Stress Stress ear Supp Near Supp Stress
m kN N/sq mm N/sq mm m kN N/sq mm
1 1.35Dead Load 2.8 0 0 0.397 2.8 0 0
2 1.35Dead Load 2.8 0 0 0.397 2.8 0 0
3 1.35Dead Load 2.8 0 0 0.397 2.8 0 0
4 1.35Dead Load 2.8 0 0 0.397 2.8 0 0
LNG-75-102961-CS-1206-00007-0000 Appendix - IV Revision:02
06/04/2019
Dimensional Solutions FOUNDATION3D Version 6.5.0 Date
Foundation Name BLOW DOWN TANK
Designed By: TR Engineering Consultancy Engineer PRS Checker
Filename: Analysis and Deisgn of HRSG Blow Down Tank Foundation
5 1.35Dead Load 2.8 0 0 0.397 2.8 0 0
6 1.35Dead Load 2.8 0 0 0.397 2.8 0 0
7 Dead Load + 2.8 0 0 0.397 2.8 0 0
8 Dead Load + 2.8 0 0 0.397 2.8 0 0
9 Dead Load + 2.8 0 0 0.397 2.8 0 0
10 1.35Dead Load 2.8 0 0 0.397 2.8 0 0
11 1.35Dead Load 2.8 0 0 0.397 2.8 0 0
12 1.35Dead Load 2.8 0 0 0.397 2.8 0 0
13 1.35Dead Load 2.8 0 0 0.397 2.8 0 0
14 1.35Dead Load 2.8 0 0 0.397 2.8 0 0
15 1.35Dead Load 2.8 0 0 0.397 2.8 0 0
16 1.35Dead Load 2.8 0 0 0.397 2.8 0 0
17 1.35Dead Load 2.8 0 0 0.397 2.8 0 0
18 1.35Dead Load 2.8 0 0 0.397 2.8 0 0
19 Dead Load + 0 0 0 0.397 0 0 0
20 Dead Load + 2.8 0 0 0.397 2.8 0 0
21 Dead Load + 2.8 0 0 0.397 2.8 0 0
22 Dead Load + 2.8 0 0 0.397 2.8 0 0
23 Dead Load + 2.8 0 0 0.397 2.8 0 0
24 Dead Load + 2.8 0 0 0.397 2.8 0 0
USER INPUT EURO NATIONAL ANNEX FACTORS SECTION NUMBE
Concrete Material Safety Factor gc 1.500 (2.4.2.4)
Reinf Steel Material Safety Factor gs 1.150 (2.4.2.4)
Long Term Effect Compressive Strengthacc 1.000 (3.1.6(1)P)
Long Term Effect Tension Strength Fact act 1.000 (3.1.6(2)P)
Geometric Imperfection Factor qo 0.005 (5.2(5))
Compression Chord State Coeff acw 1.000 (6.2.3(3))
Conc Shear Strength Reduction Factor u 0.600 (6.6N)
Shear Resistance Factor CRd,c 0.120 (6.2.2(1))
Min Shear Resistance Factor Vmin 0.035 (6.3N)
Max Design Shear Stress Factor VRd,max 0.500 (6.2.3(3))
Max Pier Longitudinal Tension Reinft FaAs,max 0.040 (9.5.2(3))
Max Pier Transverse Reinft Spacing Sclt,max 400.000 (9.5.3(3))
Min Ftg/Pile cap Tension Reinft As,min 0.260 (9.1N)
Max Ftg/Pile cap Tension Reinft As,max 0.040 (9.2.1.1(3))
ALLOWABLE BEAM SHEAR STRESS - EW DIRECTION - FACTORED LOAD COMBINATION 1
AT A CRITICAL SECTION
Concrete comp strength = fc' = 35 N/sq mm
Approx effective depth = d= 675 mm
Footing width = Lns = 2.8 m
Footing thickness = Df = 0.75 m
Critical section location = l= 2.8 m
Shear Resistance Factor = k = (1 + sqr(200/d)) {<= 2} 1.544
Min Shear Resistance stress vmin = 0.035*sqr(fc')*(k^1.5) 0.397 N/sq mm
Footing steel area = As = 3822 sq mm
LNG-75-102961-CS-1206-00007-0000 Appendix - IV Revision:02
06/04/2019
Dimensional Solutions FOUNDATION3D Version 6.5.0 Date
Foundation Name BLOW DOWN TANK
Designed By: TR Engineering Consultancy Engineer PRS Checker
Filename: Analysis and Deisgn of HRSG Blow Down Tank Foundation
Footing steel ratio percent = Rw = 100*As/bvd = 0.202
Shear resistance stress = vrd,c = Crd,c*k*((Rw*fc')^(1/3)) = 0.356 N/sq mm
Used Conc Strength Reduction v= 0.516
Max Design Shear resistancevrd,m = Vrd,max*v*fcd = 6.02 N/sq mm
Note: Allowable shear stress with enhancement may apply depending on the shear section location.

LNG-75-102961-CS-1206-00007-0000 Appendix - IV Revision:02


06/04/2019
28/05/2018

BDN

SI

REINFORCING STEEL PARAMETERS:


460
78.5
210
75
75
200
No

20
12
10
10
16
12
0.0013

No
No
0

SECTION NUMBER

LNG-75-102961-CS-1206-00007-0000 Appendix - IV Revision:02


06/04/2019
28/05/2018

BDN

(9.2.1.1(3))

LNG-75-102961-CS-1206-00007-0000 Appendix - IV Revision:02


06/04/2019
28/05/2018

BDN

Rem

LNG-75-102961-CS-1206-00007-0000 Appendix - IV Revision:02


06/04/2019
28/05/2018

BDN

Remarks

LNG-75-102961-CS-1206-00007-0000 Appendix - IV Revision:02


06/04/2019
28/05/2018

BDN

Direction

E-W
N-S

Direction

E-W
N-S

LNG-75-102961-CS-1206-00007-0000 Appendix - IV Revision:02


06/04/2019
28/05/2018

BDN

LNG-75-102961-CS-1206-00007-0000 Appendix - IV Revision:02


06/04/2019
28/05/2018

BDN

LNG-75-102961-CS-1206-00007-0000 Appendix - IV Revision:02


06/04/2019
28/05/2018

BDN

EW DIRECTION - UNFACTORED LOAD COMBINATION 27

LNG-75-102961-CS-1206-00007-0000 Appendix - IV Revision:02


06/04/2019
28/05/2018

BDN

NS DIRECTION - UNFACTORED LOAD COMBINATION 27

LNG-75-102961-CS-1206-00007-0000 Appendix - IV Revision:02


06/04/2019
28/05/2018

BDN

Allowable
Stress
N/sq mm
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397

Allowable
Stress
N/sq mm
0.397
0.397
0.397
0.397
LNG-75-102961-CS-1206-00007-0000 Appendix - IV Revision:02
06/04/2019
28/05/2018

BDN

0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
SECTION NUMBER

(9.2.1.1(3))
EW DIRECTION - FACTORED LOAD COMBINATION 1

LNG-75-102961-CS-1206-00007-0000 Appendix - IV Revision:02


06/04/2019
28/05/2018

BDN

ment may apply depending on the shear section location.

LNG-75-102961-CS-1206-00007-0000 Appendix - IV Revision:02


06/04/2019

Вам также может понравиться