MODULARIZATION STUDY
PRESENTATION
1
RELP El Palito Refinery Expansion Project
MODULARIZATION STUDY PRESENTATION
MAY 2009
PHASES OF WORK
Feb 2009 March 17th April 27th May 18h June 2009 Sept 2009
Strategy
Basis to Development of Conceptual Project
move to Execution
modules
Outlook to Outlook to
PDVSA PDVSA
2
RELP El Palito Refinery Expansion Project
MODULARIZATION STUDY PRESENTATION
MAY 2009
ESTIMATE DEVELOPMENT
3
RELP El Palito Refinery Expansion Project
MODULARIZATION STUDY PRESENTATION
MAY 2009
MODULE DEFINITION
4
RELP El Palito Refinery Expansion Project
MODULARIZATION STUDY PRESENTATION
MAY 2009
18000
Stick built
16000
manpower curve
14000 based on <8000
skilled workers
12000 Ser i es1
available
Ser i es2
Manpower
Ser i es3
10000
(duration
Ser i es4 13
Ser i es5
8000 months
Ser i es6
longer)
6000
5
RELP El Palito Refinery Expansion Project
MODULARIZATION STUDY PRESENTATION
MAY 2009
MODULE DEFINITION
6
RELP El Palito Refinery Expansion Project
MODULARIZATION STUDY PRESENTATION
MAY 2009
7
RELP El Palito Refinery Expansion Project
MODULARIZATION STUDY PRESENTATION
MAY 2009
MODULE DEFINITION
MODULE DEFINITION CRITERIA
Developed preliminary module definition criteria based on economic and
logistics parameters
Yard locations giving best value to El Palito project
Ship vs barge
Rack modules legs up vs legs down
Items to group into module vs not (e.g. airfans not on PAR’s)
Note : VAU’s (such as dressed columns and airfans), PAB’s (such as satellite
instrument house, substations and analyzer buildings), VPU’s (such as
heaters, furnaces and vendor skids), considered separately. These items
(and others such as civil pre-cast work) are still essential to reduce
site manhours
8
RELP El Palito Refinery Expansion Project
MODULARIZATION STUDY PRESENTATION
MAY 2009
MARKED UP PFD
9
RELP El Palito Refinery Expansion Project
MODULARIZATION STUDY PRESENTATION
MAY 2009
10
RELP El Palito Refinery Expansion Project
MODULARIZATION STUDY PRESENTATION
MAY 2009
11
RELP El Palito Refinery Expansion Project
MODULARIZATION STUDY PRESENTATION
MAY 2009
NUMBER OF YARDS
Based on the total tonnages of modules, the most cost effective module yard split is to
utilise 3 module yards
Total tonnage of modules to be fabricated in the yards is 62,900 tonnes. Duration to
fabricate and assemble is 18 months => ~14,000 tonnes per yard per year < 22,000
Te/annum practical capacity of AG&P sized yards.
13
RELP El Palito Refinery Expansion Project
MODULARIZATION STUDY PRESENTATION
MAY 2009
modules required
$20
over a 14 month
delivery period $0
Modules shipped
ip
ip
ip
e
p
ip
ip
ip
rg
rg
hi
sh
sh
Sh
sh
Sh
Sh
below deck and on
)S
Ba
Ba
+
d
e
in
ne
n
e
e
or
on
on
ai
la
rg
rg
pa
pi
ap
weather deck
ub
st
st
ai
Ba
Ba
(S
ilip
r le
Th
ou
ng
D
Ph
iz
on
ha
H
on
Si
ad
st
C
st
C
le
ou
r
ha
H
C
14
RELP El Palito Refinery Expansion Project
MODULARIZATION STUDY PRESENTATION
MAY 2009
15
RELP El Palito Refinery Expansion Project
MODULARIZATION STUDY PRESENTATION
MAY 2009
16
RELP El Palito Refinery Expansion Project
MODULARIZATION STUDY PRESENTATION
MAY 2009
ip
e
p
ip
ip
ip
rg
rg
hi
sh
sh
Sh
Sh
sh
Sh
)S
Ba
Ba
+
+
nd
e
in
ne
e
e
or
on
on
ai
la
rg
pa
rg
pi
ap
ub
st
st
ai
Ba
Ba
(S
ilip
rle
ou
Th
ng
D
Ph
z
on
ha
H
Si
on
i
ad
st
C
st
C
rle
ou
ha
H
C
17
RELP El Palito Refinery Expansion Project
MODULARIZATION STUDY PRESENTATION
MAY 2009
$65 million
$65 million
+$47 million
18
RELP El Palito Refinery Expansion Project
MODULARIZATION STUDY PRESENTATION
MAY 2009
19
RELP El Palito Refinery Expansion Project
MODULARIZATION STUDY PRESENTATION
MAY 2009
2. REVAMP AND EXPAND EXISTING RORO JETTY PLUS BUILD NEW RORO
AT END OF GROIN OF PET COKE JETTY (Y&V OPTION 6a is cheapest)
20
RELP El Palito Refinery Expansion Project
MODULARIZATION STUDY PRESENTATION
MAY 2009
21
RELP El Palito Refinery Expansion Project
MODULARIZATION STUDY PRESENTATION
MAY 2009
LOGISTICS
MODULE INSTALLATION
Modules to be installed primarily by crane
Where practical, offsite PAR modules will be installed direct from the
transporter
The total modules per unit plus major equipment items were identified and
an installation campaign planned for each unit.
Lift studies were undertaken for “crane defining” lifts
22
RELP El Palito Refinery Expansion Project
MODULARIZATION STUDY PRESENTATION
MAY 2009
23
RELP El Palito Refinery Expansion Project
MODULARIZATION STUDY PRESENTATION
MAY 2009
LOGISTICS
MODULE INSTALLATION
Modules to be installed primarily by crane
Where practical, offsite PAR modules will be installed direct from the
transporter
The total modules per unit plus major equipment items were identified and
an installation campaign planned for each unit.
Lift studies were undertaken for “crane defining” lifts
Number and type of crane locations then determined per unit
24
RELP El Palito Refinery Expansion Project
MODULARIZATION STUDY PRESENTATION
MAY 2009
25
RELP El Palito Refinery Expansion Project
MODULARIZATION STUDY PRESENTATION
MAY 2009
LOGISTICS
MODULE INSTALLATION
Modules to be installed primarily by crane inside the process units
Where practical, offsite PAR modules will be installed direct from the
transporter
The total modules per unit plus major equipment items were identified and
an installation campaign planned for each unit.
Lift studies were undertaken for “crane defining” lifts to establish crane sizes
required to execute the lifts
Reactor weight is now 744 tonnes which falls within the range of installation
by the main crane. A strand jack lift is therefore not required for this item.
Main crane and secondary crane required to work in tandem for installation
of dressed vessels
26
RELP El Palito Refinery Expansion Project
MODULARIZATION STUDY PRESENTATION
MAY 2009
LOGISTICS
MODULE INSTALLATION
Modules to be installed primarily by crane
Where practical, offsite PAR modules will be installed direct from the
transporter
The total modules per unit plus major equipment items were identified and
an installation campaign planned for each unit.
Lift studies were undertaken for crane defining lifts
Number and type of crane locations then determined per unit
Installation campaign durations for main and support cranes were then
developed for each unit (Crane type 2 not shown)
Lift
Module count Equipment count Crane type 1
System
Days to Days per Total Total
Other Days Days Number of Total days
Unit PAU PAR PAS VAU VPU Airfan Heaters mobilize position weeks in months in
equipment lifting lifting positions in unit
into unit move unit unit
2800 17 5 1 26 0 4 0 4 4 75 5 2 89.0 14.8 3.4
2900 20 8 3 20 0 4 0 0 4 71 8 2 91.0 15.2 3.5
3400 11 3 0 6 0 3 0 0 4 26 2 2 34.0 5.7 1.3
3500 9 3 0 5 0 3 1 0 4 22 1 2 28.0 4.7 1.1
3600 1 2 0 1 0 0 0 0 4 5 0 2 9.0 1.5 0.3
5100 4 1 0 7 0 0 0 0 4 19 1 2 25.0 4.2 1.0
5300 6 0 0 7 0 0 0 9 4 20 2 2 28.0 4.7 1.1
5400 2 1 1 1 0 0 0 0 4 6 0 2 10.0 1.7 0.4
5500 1 2 0 0 0 0 0 0 4 3 0 2 7.0 1.2 0.3
5600 0 1 0 5 0 0 0 0 4 11 0 2 15.0 2.5 0.6
5700 0 0 0 1 0 0 0 0 4 2 0 2 6.0 1.0 0.2
5800 0 1 0 3 0 0 0 1 4 7 0 2 11.0 1.8 0.4
8300 37 17 5 20 0 9 2 2 4 99 6 2 115.0 19.2 4.4
8400 10 4 6 8 0 8 0 7 4 36 9 2 58.0 9.7 2.227
9200 3 9 0 1 0 0 0 0 4 14 1 2 20.0 3.3 0.8
9600 0 87 0 0 0 0 0 0
RELP El Palito Refinery Expansion Project
MODULARIZATION STUDY PRESENTATION
MAY 2009
LOGISTICS
MODULE INSTALLATION
Total crane months were then developed for each crane type required
The total duration of the Heavy Lift campaign (to support the overall
construction schedule) was then used to determine the number of
installation teams required
Lifting schedule by Crane.
Months
Unit 1 2 3 4 5 6 7 8 9 10 11 12 13
9600 Interconnect unit Crane type 1
Crane type 2 TW O CRANES WORKING
8300 Delayed Coker Crane type 1
Crane type 2
9200 Flare Crane type 1
Crane type 2
8100/8200 Vacuum/Crude Crane type 1
Crane type 2
5300 Raw Water Crane type 1
Crane type 2
3200/3300 Amine regeneration Crane type 1
Crane type 2
3400 Sulfur recovery Crane type 1
Crane type 2
5600 Plant/Instrument Air Crane type 1
Crane type 2
5800 Nitrogen Crane type 1
Crane type 2
2800 VGO Hydrotreatment Crane type 1
Crane type 2
2900 Diesel Hydrotreater Crane type 1
Crane type 2
8400 CN Hydrotreater Crane type 1
Crane type 2
3500 Hydrogen Production Crane type 1
Crane type 2
2100/2200/2600 CCR Crane type 1
Crane type 2
5100 LPG Fractionation Crane type 1
Crane type 2
*smaller process units omitted for clarity.
28
RELP El Palito Refinery Expansion Project
MODULARIZATION STUDY PRESENTATION
MAY 2009
LOGISTICS
PATH OF CONSTRUCTION
The path of
construction
was
developed to
support the
overall
schedule and
give
preliminary
direction to
module
delivery
priorities.
29
RELP El Palito Refinery Expansion Project
MODULARIZATION STUDY PRESENTATION
MAY 2009
LOGISTICS
MODULE TRANSPORT
SPMT’s will be used to transport all the modules from the jetty to the
delivery location, and will install those modules to be installed direct from
the transporter.
Sufficient axles have been included in the estimate to provide 1 set of
transporters to feed each of the two installation work-fronts, plus one
additional set to offload ships and take modules to the staging area. 3 Total
Individual transporter units can be coupled together to accommodate the
largest loads (744 tonne reactor and modules up to 900 tonnes).
Loads exerted by transporters on the jetty and haul roads will not exceed
7 Te/m2 compared with x for maintenance of jetties.
30
RELP El Palito Refinery Expansion Project
MODULARIZATION STUDY PRESENTATION
MAY 2009
LOGISTICS
MODULE TRANSPORT
31
RELP El Palito Refinery Expansion Project
MODULARIZATION STUDY PRESENTATION
MAY 2009
LOGISTICS - COST
32