Вы находитесь на странице: 1из 8

Raj Dalal MEASUREMENT DETAILS OF EARTHERN DRAIN

CHAINAGE SIDE L(Mtrs) B H Qty(M3)


114+054 114+085 R/S 31 3 1.500 139.50
114+300 114+310 R/S 10 3 1.500 45.00
114+325 114+585 R/S 260 3 1.500 1170.00
114+775 115+200 R/S 425 3 1.500 1912.50
115+503 115+870 R/S 180 3 1.500 810.00
116+150 116+330 R/S 160 3 1.500 720.00
116+340 116+500 R/S 68 3 1.500 306.00
116+512 116+580 R/S 367 3 1.500 1651.50
122+960 123+200 L/S 240 3 1.500 1080.00
PC - 200
126+800 126+930 R/S 130 3 1.500 585.00
126+970 127+090 R/S 120 3 1.500 540.00
123+525 123+750 R/S 225 3 1.500 1012.50
123+792 123+900 R/S 108 3 1.500 486.00
123+950 124+990 R/S 1040 3 1.500 4680.00
125+140 125+790 R/S 650 3 1.500 2925.00
Total Qty. 4014 18063.00 M3
MEASUREMENT DETAILS OF EARTHERN DRAIN
Executing Agency :- Raj Dalal (For the period 01/08/17 to 31/08/17)
CHAINAGE Length SIDE L(Mtrs) B H Qty(M3)
31 3 1.200 111.60
114+054 114+085 31 R/S
31 1.5 0.300 13.95
114+300 114+310 10 R/S 10 3 1.500 45.00
260 3 1.300 1014.00
114+325 114+585 260 R/S
260 1.5 0.200 78.00
425 3 1.300 1657.50
114+775 115+200 425 R/S
425 1.5 0.200 127.50
180 3 1.200 648.00
115+503 115+870 180 R/S
180 1.5 0.300 81.00
160 3 1.300 624.00
116+150 116+330 160 R/S
160 1.5 0.200 48.00
116+340 116+500 68 R/S 68 3 1.500 306.00
367 3 1.200 1321.20
116+512 116+580 367 R/S
367 1.5 0.300 165.15
240 3 1.200 864.00
122+960 123+200 240 L/S
240 1.5 0.300 108.00
PC - 200 1741 7212.90
130 3 1.300 507.00
126+800 126+930 130 R/S
130 1.5 0.200 39.00
120 3 1.300 468.00
126+970 127+090 120 R/S
120 1.5 0.200 36.00
225 3 1.200 810.00
123+525 123+750 225 R/S
225 1.5 0.300 101.25
123+792 123+900 108 R/S 108 3 1.500 486.00
1040 3 1.200 3744.00
123+950 124+990 1040 R/S
1040 1.5 0.300 468.00
125+140 125+790 650 R/S 650 3 1.500 2925.00
Total Qty. 5755 24010.05 M3
31
1.500 1.500 1.500
10
260
1.200
425

0.300 180

160

68
1.500 367
240
Side Drain

130

120

225

108
1040
650

4014
MEASUREMENT DETAILS OF EARTHERN DRAIN
Executing Agency :- Raj Dalal (For the period 01/08/17 to 31/08/17)
CHAINAGE SIDE Length Remarks

114+054 114+085 R/S 31

114+300 114+310 R/S 10

114+325 114+585 R/S 260

114+775 115+200 R/S 425

115+503 115+870 R/S 180

116+150 116+330 R/S 160

116+340 116+500 R/S 68

116+512 116+580 R/S 367

122+960 123+200 L/S 240

PC - 200

126+800 126+930 R/S 130

126+970 127+090 R/S 120

123+525 123+750 R/S 225

123+792 123+900 R/S 108

123+950 124+990 R/S 1040

125+140 125+790 R/S 650


Total Length 4014 Mtrs
MEASUREMENT DETAILS OF EARTHERN DRAIN

Executing Agency :- Koushik (For the period 01/08/17 to 31/08/17)

CHAINAGE SIDE Length Remarks

114+000 114+038 L/S 38

114+061.5 114+131.50 L/S 70

114+251 114+305 L/S 54

115+321 115+372 L/S 51

115+286 115+311 L/S 25

115+232 115+262 L/S 30

115+640 115+822 L/S 182

115+833 116+000 L/S 167

116+008 116+490 L/S 482

116+510 116+575 L/S 65

123+610 123+995 L/S 385

124+005 124+200 L/S 195

124+225 124+650 L/S 425

124+910 124+995 L/S 85

125+080 125+545 L/S 465

125+553 125+996 L/S 443

129+070 129+150 R/S 80

129+550 129+800 R/S 250

128+670 128+995 R/S 325

128+570 128+620 R/S 50

127+970 128+445 R/S 475

127+520 127+850 R/S 330

129+560 129+635 L/S 75

129+820 129+920 L/S 100


Total Length 4847 Mtrs

Вам также может понравиться