CEMENT CORPORATION OF INDIA LIMITED

RAJBAN CEMENT FACTORY


CHECK LIST OF CEMENT MILL EQUIPMENTS
FOR THE MONTH OF

Sl. No. Equipment Name Activity Frequency 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29


1 Weigh Feeders a) Bearing checking Daily
b) Idlers Daily
c) Pulley condition Daily
d) Belt condition (Joint, scrapper,etc) Daily

2 Mill Inlet Chute a) Condition of Chute Daily


b) Inlet rubber seal Daily

3 Cement Mill a) Main Bearing Lubrication pumps Daily


b) Pre-Jack Pump checking Daily
c) Main Gearbox Oil Pump Daily
d) Water pumps Daily
e) Girth gear compound Daily
f) Girth gear pinion foundation bolts Daily
g) Girth gear bolts checking 15 days
h) Main Gearbox Foundation & Flange 15 days
I) Main Bearing Checking Daily
j) Mill Door Bolts checking Daily
k) Mill Internals (1st chamber ) 15 days
l) Mill Internals (2nd chamber) 15 days

m) Mill Internals (3rd chamber) 15 days

n) Rotary Screen checking 30 days

4 Fluxo Pump a) Compressor Valve Daily


b) Pilot Valve Daily
c) Piston Valve Daily
d) Paddle Valve Daily
e) Non Return Valve Daily
f) Centre Nozzle 10 days
g) Cone and seal 10 days
h) Annular ring and nozzles 10 days
i) Feed Box Air slide 10 days

5 ESP FAN a) ESP Fan Bearing Greesing Daily


b) Fan foundation bolts Daily
c) Fan Impeller checking 15 days
d) Fan V-belt checking Daily

6 Screw Conveyor a) Gearbox oil level checking Daily


b) Coupling checking Daily
c) Gearbox foundation bolts Daily
d) Greasing of all bearings Daily
e) Journal bearing liner and flange bo 7 days

7 Transportin Line a) Checking of leakages in Transportin Daily


b) Checking of diverting valve Daily
c) Checking of Dust collector at silo t Daily
30 31 Remarks