Design Wind loads By (ASCE 7-05)


Ref. Calculations input
output
6.5.15 F = qz G Cf Af
where:
F = wind force act normal to the surfaces
6.5.10 qz = velocity pressure = 0.613 Kz Kzt Kd V2 I (N/m2)
Kz = Velocity pressure Coefficient
Kzt = Topographic Factor
Kd = Wind directionality factor
I = importance factor (1.15)
V = Velocity of wind
G = Gust-effect factor
Cf = Force Coefficient
Af = Projected area normal to the wind m2
Af 89.61 m2 Normal Windward
Calculate qz:
q z = 0.613 Kz Kzt Kd V2 I
table 6-4 Kd = 0.85 see sheet no. (1)
6.5.6.6 Kz = 2.01x(z/zg)2/α for 15ft< Z<Zg
2.01x(15/zg) 2/α for Z< 15ft
where:
Z= height of building
α &Zg see sheet no. ( 1)

Z= 5.8
Zg = 213.36
α= 11.5
Kz = 1.073749593

6.5.7.2 Kzt = (1+K1K2k3)2 see sheet no. ( 1)


Kzt = 1 =1.0 if not meet all condition

V= 43.06 m/s

qz = 1192.966653 N/m2
Calculate G:

6.5.8 G = 0.925 ((1+1.7gQIẑQ)/1+1.7gvIẑ)


where:
gQ &gv = 3.4
Iẑ = c(10/ẑ)1/6

ẑ = 0.6h > zmin zmin & c from table 6-2 (sheet 1)


h = height of building
ẑ 3.48
c 0.15
Iẑ = 0.178915318

Q =√1/(1+0.63*(B+h/Lẑ )0.63)
where:
B : horizontal dimension of building normal to
wind direction
h : height of building
Lẑ = ℓ(ẑ /10)€ ℓ &€ from table 6-2 (sheet 1)
B 15.45
h 5.8
ẑ 3.48
ℓ 198.12
€ 0.125
Lẑ 173.6303836
Q 0.925398215
G 0.889917745
Calculate Cf:
10.5 see table 6-20 or 6-21 or 6-22 or 6-23 (sheet
(sheetno.
no.2)2)

Cf = 0.8

Check qz G Cf > 500 N/m2


value = 849.313755 N/m2 ok
http://structural-engineering-prof.com
https://m.facebook.com/StructuralEngineeringProfessional/

Wind loads By (ASCE)


Ref. Calculations input
output
6.5.15 F = qz G Cf Af
where:
F = wind force act normal to the surfaces
6.5.10 qz = velocity pressure = 0.613 Kz Kzt Kd V2 I (N/m2)
Kz = Velocity pressure Coefficient
Kzt = Topographic Factor
Kd = Wind directionality factor
I = importance factor (1.15)
V = Velocity of wind
G = Gust-effect factor
Cf = Force Coefficient
Af = Projected area normal to the wind m2
Af 89.61 m2 Leeward Wind
Calculate qz:
q z = 0.613 Kz Kzt Kd V2 I
table 6-4 Kd = 0.85 sheet no. (1)
6.5.6.6 Kz = 2.01x(z/zg) for 15ft< Z<Zg
2/α

2.01x(15/zg) 2/α for Z< 15ft


where:
Z= height of building
α &Zg sheet no. ( 1)

Z= 5.8
Zg = 213.36
α= 11.5
Kz = 1.073749593

6.5.7.2 Kzt = (1+K1K2k3)2 sheet no. ( 1)


Kzt = 1 =1.0 if not meet all condition

V= 43.06 m/s

qz = 1192.966653 N/m2
Calculate G:

6.5.8 G = 0.925 ((1+1.7gQIẑQ)/1+1.7gvIẑ)


where:
gQ &gv = 3.4
Iẑ = c(10/ẑ)1/6

ẑ = 0.6h > zmin zmin & c from table 6-2 (sheet 1)


h = height of building
ẑ 3.48
c 0.15
Iẑ = 0.178915318

Q =√1/(1+0.63*(B+h/Lẑ )0.63)
where:
B : horizontal dimension of building normal to
wind direction
h : height of building
Lẑ = ℓ(ẑ /10)€ ℓ &€ from table 6-2 (sheet 1)
B 15.45
h 5.8
ẑ 3.48
ℓ 198.12
€ 0.125
Lẑ 173.6303836
Q 0.925398215
G 0.889917745
Calculate Cf:
10.5 see table 6-20 or 6-21 or 6-22 or 6-23 (sheet
(sheetno.
no.2)2)

Cf = -0.5

Check qz G Cf > 500 N/m2


value = -530.821097 N/m2 take = 500