Piping condition
Piping Description (flange,lap join,reducer ,elbow,patching,welding, Start End
No Thickness test Action
(process) clamp,support,vibration, (process) (process)
thickness,leaking)
Digester area
Digester 1
Pipe; 14.06, 12.07, 13.20
Elbow; 13.95, 12.14, 13.03
Digester 2
Pipe; 13.66, 12.19, 12.57
Elbow; 13.89, 11.59, 13.03
Digester 3
*Have patch at blow pipe Dig.1 inlet blow tank outler digester body
5 Digester blow pipe inlet blow tank Pipe; 18.84, 16.24, 17.59 Repair/Change Pipe with good material.
*Welding at Nozzle Blow Pipe Dig. 3 Leaking flange
Elbow; 18.04, 16.31, 17.62
Digester 4
Pipe; 14.96, 14.72, 15.61
Elbow; 17.03, 16.44, 16.52
Digester 5
Pipe; 18.98, 19.04, 19.27
Elbow; 15.93, 14.86, 15.67
Washer area
*Not Be Found Clamp at the stand pipe O2 MC pump Inlet BS3 dilution screw Reducer; 4.93, 4.90, 5.07
13 BS3 dilution screw dilution pipe outlet pump 23u357 Install Clamp at the stand pipe O2 MC pump 223M8601
223M8601 flange Pipe; 4.67, 4.71, 4.63
20 inlet CD tower dilution pipe Pipe Leakage at Outlet Pump 24U8309 outlet pump 24u8309 Inlet CD tower top flange FRP Reinforce Pipe
Befound Patching at Outlet Pump IP224-M1165, Y Pipe Joint Reducer; 11.05, 10.82, 11.35
26 inlet D2 tower pulp pipe Leakage & Flange slightly tenuous & leakage at inlet bottom outlet pump 24M1156 Inlet D2 tower bottm flange Pipe; 6.53, 8.45, 6.55
D2 tower Y; 6.44, 6.64, 6.72
29 Clo2 pipe Flange, MV & Bolth corrosive at routing piping inlet clo2 booster pump inlet CD/D1/D2 CV FRP Repair flange & Change M/V
30 inlet CD Filter pulp pipe no balance floor 2# pulp pipe floor 2# pulp pipe
Progress Notification Photo
1004977479 (M1-outs)
1004977572 (M1)-Outs.
1004977601 (M1)Outs
1004977702 (M1-FM1)
1004977706 ( M1-FM1)
1004977734 (M1-FM1)
1004977734 (M1-FM1)
1004977763 (M1-FRP
team & outs )
1004977801(M1-FRP
team)
1004977805 (M1-FRP
team)
1004977853 (M1-Outs)
1004977863 (M1-OUTS
& FM1)
1004977885 (M1-FM1)
1004977903 ( M1-FM1)