Project purpose and rationale
The main purpose of this project is to build to customer good will and satisfy
its legal Political and ethical obligations with respect to work health and
Safety and anti-discrimination legislation, standards or code of conduct,
promote high standards in professional conduct. The purpose is also to inform
to clients, tenants and potential tenants of maintenance and light repair and
also achieve employees and clients buy in for imitative.

Project title
Max Lionel Realty Business Plan
Project purpose
In this Case scenario the Company wants to grow its customer base and have
good relation with customer who is good for the company’s reputation and
growth.The project aim to guide ethical work practice and data management
to employees who involve with clients in order to encourage them to behave in
code of conduct and reduce the work mistake by data management
Background and strategic context
The background to the project Max Lionel Realty was founded in 2008 by
property developer Max Lionel. The company currently employs approximately
100 people, 80 of whom are licensed real estate agents. Through its client
agents, the organization manages property sales and rentals (both residential
and commercial) on behalf of a range of clients. The organization also
separately engages in investment activities, such as property and land
development.
And it relates to the strategic context in which Max Lionel Realty will achieve
its mission and vision is through:
• Engaging with customers and clients.
• Building goodwill and reputation for integrity.
• Supporting innovative thinking, management and leadership skills.
• Creating a high performing, highly profitable organization.

Project Title: Max Lionel Realty Business Plan Project Client: Max Date: 01/06/2013
Lionel Version: 1

Project Sponsor: Max Project Manager: Jindarat File Name: Max Lionel Realty Page 1 of 43
Lionel Kraisorn Business Plan

Jindarat Kraisorn
Unit Code: BSBPMG522
Assessment 1
Priority
The organisation needs to implement of the new administration management
system which has high effect to the company due to high competition in the
real estate market. As soon as the company has a strategy to develop work
process the system, the project should be run in July to September 2013.

Related projects
- Skill trainings.
- Customer retention.
- Sustainability project.

Project client/owner
Max Lionel
Project sponsor
Max Lionel

Project manager
Jindarat Kraisorn
Project status
Status project are 25%. Which on process in stakeholder analysis, roles
/responsibilities andcommunication plan.

Special provisions
REIV Code of conduct, WHS, Anti-discrimination legislation, Ethical principles,
Code of practices and Environmental issues.

Project approvals
JindaratKraisorn Max Lionel______________________

Project Manager Project Sponsor

Max Lionel
Project Client/Owner Other

Project Title: Max Lionel Realty Business Plan Project Client: Max Date: 01/06/2013
Lionel Version: 1

Project Sponsor: Max Project Manager: Jindarat File Name: Max Lionel Realty Page 1 of 43
Lionel Kraisorn Page 2 of 43
Business Plan
Stakeholder analysis

Name Work area Stakeholder Impact on/by project,


type (client, requirements,
end-user) success criteria
Max Lionel The Board of Directors
Client He has the most impact
to oversee the business
(CEO). on project because he
is the primary factor of
boards responsible for
incorporating risk as
part of every key
decision.
RizMehra Chief Financial Officer.
Client She is the person who
will ensure the
availability of adequate
financial resources in
the company and
overseeing budgets for
cost center and
individual projects.
Kim Operations General
Client She will be the person
Sweeney Manager.
who will be sponsoring
projects which affect
operations of the
organisation as a
whole.
.
Les
Human Resources Client The person who can
Goodale
Manager. increase moral and
good practice of
employees by training
or suggestions which
are necessary to board
member can complete
the project very well.

Project Title: Max Lionel Realty Business Plan Project Client: Max Date: 01/06/2013
Lionel Version: 1

Project Sponsor: Max Project Manager: Jindarat File Name: Max Lionel Realty Page 1 of 43
Lionel Kraisorn Page 3 of 43
Business Plan
Sam Lee Manager Residential
Client He willbemanagement
Realty
of all aspects of
residential realty such
as maintain and
organize tenant data
accuracy.

Pat Misfud Manager Commercial


Client She will be managing
Realty
of all aspects
commercial realty such
as manages the
activities of commercial
agents for enhance
ability to compete in the
market.
Peter
Manager Investments Client The person who can
Mitchell
help analysis
investment data.

Jindarat Project manager End-user Gain a loyalty of


Kraisorn customer, success in
the task.

All - Sales End-user - Convenience.


Tenants
- Administration - Customer
Loyalty.
- Customer
services - Having adequate
consult via the
new
administrative
management.
- Feel reliable and
happy to stay
with Max Lionel.

All - Sales End-user - Remember good


possible reputation.
- Administration
clients
Project Title: Max Lionel Realty Business Plan Project Client: Max Date: 01/06/2013
Lionel Version: 1

Project Sponsor: Max Project Manager: Jindarat File Name: Max Lionel Realty Page 1 of 43
Lionel Kraisorn Page 4 of 43
Business Plan
- Customer - Easy to contact
services with the clients.
- Rely on the
company.

Project scope document

In Scope Out of scope Assumptions Constraints


(exclusions)

- Build customer - Legislatio - Assume - Skills.


goodwill. n REIV. that
- Knowledge
clients
- Promote high - Training .
will be
standards in of client,
fully - Office.
professional staffs.
trained - Software
conduct.
- Relevant on legal developer.
- Inform agents code of and
of legal and conduct. - High
ethical
ethical speed
- High complia
obligations internet.
performa nce.
- Inform clients, nce data - High
- Assume
tenants and manage capacity
that
potential ment server.
client
tenants of program needs to - Time
MLR’s software. provide consuming
commitments. addition .
- Achieve al
employee and budget.
client buy-in
for initiative.

Human Resource Requirement


Project Title: Max Lionel Realty Business Plan Project Client: Max Date: 01/06/2013
Lionel Version: 1 5 of 43
Page

Project Sponsor: Max Project Manager: Jindarat File Name: Max Lionel Realty Page 1 of 43
Lionel Kraisorn Business Plan
Milestone: Action and/or Date Person Budget or
objective (to achieve responsibl resources
strategic aims of physical or e (where
human resourcing) applicable)

Objective: Prepare 15/06/2013 Board of $1,000


communication letter. directors
and CEO.

Objective: Hiring an external 17/06/2013 Board of $2,000


consultant for contracted to directors,
project manage activities to CEO,
achieve the quality standard of operations
company. general
manager
and HR
department.

Objective: Hiring two to four 17/06/2013 Operations $2,000


candidatesto join with our general
team members. manager.

Objective: Training new staff 01/07/2013 HR $6,000


about REIV obligations, anti- department.
discrimination policy and legal
obligations is necessary to
work as a real estate institute.

Objective: Procuring the 17/06/2013 Operations $4,000


meeting room, computer and department
software is necessary to and
training as staff members. purchasing
department.

Project Title: Max Lionel Realty Business Plan Project Client: Max Date: 01/06/2013
Lionel Version: 1 6 of 43
Page

Project Sponsor: Max Project Manager: Jindarat File Name: Max Lionel Realty Page 1 of 43
Lionel Kraisorn Business Plan
Roles and responsibilities

Role Name/s Responsibilities Signature/s


(if required)

Project client/owner Max Lionel Requesting for the Max Lionel


The person who requires project by inform
the project to be the company
undertaken. condition to
project manage
activities to
achieve the
objectives.

Project Max Lionel Approve the Max Lionel


sponsor/project project and
director/project board working with the
Senior management of board of directors
the project. Accountable to oversee the
for the success of the business, set
project. Has the authority overall strategic
to commit resources. directions,
manage risk, and
authorize large
financial
transactions.

Project manager Jindarat - Consult the Jindarat


Person responsible for Kraisorn project to
Kraisorn
running the project on a client.
day-to-day basis within
- Implement the
defined authorities for
project task.
cost and schedule as
agreed with the project - Monitor the
sponsor/board. progress.
- Report and
review the
project
performance.

Project Title: Max Lionel Realty Business Plan Project Client: Max Date: 01/06/2013
Lionel Version: 1

Project Sponsor: Max Project Manager: Jindarat File Name: Max Lionel Realty Page 1 of 43
Lionel Kraisorn Page 7 of 43
Business Plan
Manager of the project Emily Smith - Consult the Emily Smith
manager project
The operational/line manager
manager who the project
manager reports to on a
day-to-day basis.

Project team members Jindarat They have Jindarat


Staff who will be working Kraisorn responsible for the
Kraisorn
on the project. management all of
Max Lionel
aspects of the
RizMehra Max Lionel
project.
Kim RizMehra
Sweeney Kim
Les Goodale Sweeney
Peter Les Goodale
Mitchell Peter Mitchell
Pat Misfud Pat Misfud
Sam Lee Sam Lee

Steering committee/ Emily Smith They are a Emily Smith


working party committee that
To provide advice and
Max Lionel
decides on the Max Lionel
RizMehra
recommendations. priorities of this RizMehra
Kim project of a Kim
Sweeney business. They Sweeney
have responsible
for preparing
quarterly financial
statements and
overall budgeting
on this project.

Project Title: Max Lionel Realty Business Plan Project Client: Max Date: 01/06/2013
Lionel Version: 1

Project Sponsor: Max Project Manager: Jindarat File Name: Max Lionel Realty Page
Page1 8ofof4343
Lionel Kraisorn Business Plan
Communication plan

What Who Purpose When/frequen Type/metho


cy ds
Initiation All stakeholders. Gather - FIRST. Meeting to
meeting information - Before all
for initiation project start stakeholders
plan. date. .

Distribute All stakeholders. Distribute - Before kick- - Project


project plan to alert off meeting. snapshot
initiation stakeholders - Before distributed
plan of project project start via
scope and to date. hardcopy.
gain buy in. - May be
posted on
project
website.
- Or
forward
there file
by email
to all
stakehold
ers.
Project All stakeholders. Communicate At or near Meeting.
kick-off plans and project start
stakeholder date.
roles/
responsibilitie
s. And also
encourage
communicatio
n among
stakeholders.

Project Title: Max Lionel Realty Business Plan Project Client: Max Date: 01/06/2013
Lionel Version: 1

Project Sponsor: Max Project Manager: Jindarat File Name: Max Lionel Realty Page 1 of 43
Lionel Kraisorn Page 9 of 43
Business Plan
What Who Purpose When/frequen Type/metho
cy ds
Status All stakeholders Update - Regularly Distribute
reports and project stakeholders scheduled. status report
office. on progress - Weekly is electronically
of the project. recommend and post via
ed for website.
small-
medium
projects.
Team Entire project To review - Regularly Meeting
meetings team. detailed plans scheduled. detailed
Individual (tasks, - Weekly is plan.
meetings for assignments, recommend
sub-teams as and action ed for entire
appropriate. items). team.
- Weekly or
bi-weekly
for
sub-teams
as needed.
Sponsor Sponsor/s and Update - Regularly Meeting.
meetings Project sponsor/s on scheduled.
Manager. status and - Recommen
discuss ded
critical bi-weekly or
issues. And monthly and
seek also as
approval for needed
changes to when
project plan. issues
cannot be
resolved or
changes
need to be
made to
project plan.

Project Title: Max Lionel Realty Business Plan Project Client: Max Date: 01/06/2013
Lionel Version: 1

Project Sponsor: Max Project Manager: Jindarat File Name: Max Lionel Realty Page 1 of 43
Lionel Kraisorn Page 9 of 43
Business Plan
Project snapshot

Project snapshot

Name of project: Max Lionel Realty Business Plan

Project purpose:
The project aim to guide ethical work practice and data management to
employees who involve with clients in order to encourage them to behave in
code of conduct and reduce the work mistake by data management. And to
ensure the acquisition of resources is carried out consistently, fairly and
transparently and in accordance with organizational requirements by the
goals of this project are:
- Inform agents of legal and ethical obligations and any standards or
codes of conduct followed by the organization.
- Promote high standards in professional conduct (RELV).
- Inform clients, tenants and potential tenants of MLR’s commitment.
- Achieve employee and client buy-in for initiative.

Deliverables with timeframes Stakeholders


To build ethical trained staffs, new 1. Max Lionel (CEO)
amination steps, program, plans, 2. Riz Mehra (Chief Financial Officer)
reports, policies and procedure. 3. Kim Sweeney (Operations General
Timeframes within 3 months. And Manager)
project status reports are due at 4. Les Goodale (HR Manager)
25%, 50% and 75% of allotted 5. Sam Lee (Manager Residential
timeframe. Realty)
- By we should Weekly is 6. Pat Misfud (Manager Commercial
recommended for entire team. Realty)
Weekly or bi-weekly for sub 7. Peter Mitchell (Manager
teams as needed. Investment)
8. Emily Smith (Manager of the
project manager)
9. Jindarat Kraisorn (External
consultant)
10. Tenants 11. clients

Project Title: Max Lionel Realty Business Plan Project Client: Max Date: 01/06/2013
Lionel Version: 1

Project Sponsor: Max Project Manager: Jindarat File Name: Max Lionel Realty Page 1 of 43
Lionel Kraisorn Page 10 of 43
Business Plan
Resources Risks
- Budget $15,000 approach by - The budget probably not
all reasonable resources enough for this project.
such as meeting room, - Operational costs adhere to
internet, computer, software, budgetary constraint such as
and telecommunication costs hand book.
paper-template. - Sometime technology may be
- People: team leader, team constrained such as
members, project manager, computers can get some
IT manager, marketing problem.
manager. Also the structure
of teams work should include
project sponsor, technical
experts, and quality
assurance of deliverables,
projects manager and an
external consultant.

Interdependencies Success criteria


- We need to share data with - Reviewing from operational
other group members project plan, classify the
frequently, we need objective of the project,
information from existing assigning roles and
system responsibility, manage project
authority and setting timelines
- Coordinate with legacy
for the completion of the
system data extraction is
projects are all critical pieces
client’s responsibility such as
of the strategy implementation
REIV code of conduct and
puzzle.
relevant legislation or WHS.
- We can measure our success
criteria with the help of
stakeholder analysis. Then the
stakeholders can tell us what
to do and that would be very
important.

Project Title: Max Lionel Realty Business Plan Project Client: Max Date: 01/06/2013
Lionel Version: 1

Project Sponsor: Max Project Manager: Jindarat File Name: Max Lionel Realty Page 1 of 43
Lionel Kraisorn Page 11 of 43
Business Plan
1.2 – Planning
Work breakdown structure

Level 1 Level 2 Level 3

Task 1: Consulted and


appointment with team
member.

Sub-task 1.1: Meeting


team members and
board of committee.

Work item 1.1.1:


Prepare communication
letter to invitation with
team member.

Work item 1.1.2:


Classify the objective of
the project.

Work item 1.1.3: Project


scope statement

Sub-task 1.2: Assign


roles and responsibility.

Work item 1.2.1: Set


detail and Information
of roles and
responsibility.

Work item 1.2.2:


Manage project
authority.

Task 2: Brainstorming,
make a decision and
implementation.

Project Title: Max Lionel Realty Business Plan Project Client: Max Date: 01/06/2013
Lionel Version: 1

Project Sponsor: Max Project Manager: Jindarat File Name: Max Lionel Realty Page 1 of 43
Lionel Kraisorn Page 12 of 43
Business Plan
Sub-task 2.1: Discuss
the work practice
ethical and
discriminated against.

Work item 2.1.1:


Organise the training
REIV code of conduct
and the ethical
trainingactivities.

Work item 2.1.2:


Review of the ethic and
work practice training to
project manager.

Task 3: Monitoring,
evaluation and close
the project.

Sub-task 3.1: Feedback


and evaluation.

Work item 3.1.1:


Monitoring feedback
form and personal
interview.

Work item 3.1.2:


Evaluate feedback,
solutions and risk
management.

Sub-task 3.2: Review


the project and report.

Work item 3.2.1:


Review the project
performance.

Work item 3.2.2: Write


a report for present to
board of directors,
Project Title: Max Lionel Realty Business Plan Project Client: Max Date: 01/06/2013
Lionel Version: 1

Project Sponsor: Max Project Manager: Jindarat File Name: Max Lionel Realty Page 1 of 43
Lionel Kraisorn Page 13 of 43
Business Plan
CEO, operations
general manager and
stakeholders.

Project title:

Max Lionel Realty Business Plan

Project purpose

Project aims to guide ethical work practice and data management to


employees who involve with clients in order to encourage them to behave in
code of conduct and reduce the work mistake by data management. And to
ensure the acquisition of resources is carried out consistently, fairly and
transparently and in accordance with organizational requirements by the goals
of this project are:

- Inform agents of legal and ethical obligations and any standards or


codes of conduct followed by the organization.

- Promote high standards in professional conduct (RELV).

- Inform clients, tenants and potential tenants of MLR’s commitment.

- Achieve employee and client buy-in for initiative.

Background and strategic context


The background to the project Max Lionel Realty was founded in 2008 by
property developer Max Lionel. The company currently employs approximately
100 people, 80 of whom are licensed real estate agents. Through its client
agents, the organization manages property sales and rentals (both residential
and commercial) on behalf of a range of clients. The organization also
separately engages in investment activities, such as property and land
development.
And it relates to the strategic context in which Max Lionel Realty will achieve
its mission and vision is through:
• Engaging with customers and clients.
• Building goodwill and reputation for integrity.
• Supporting innovative thinking, management and leadership skills.
• Creating a high performing, highly profitable organization.

Project Title: Max Lionel Realty Business Plan Project Client: Max Date: 01/06/2013
Lionel Version: 1

Project Sponsor: Max Project Manager: Jindarat File Name: Max Lionel Realty Page 1 of 43
Page 14 of 43
Lionel Kraisorn Business Plan
Other related projects
 Skill trainings.

 Customer retention.

 Sustainability project.

Project objective

- To maintain customer relationship and Ethical standard of services


- To organise and manage customer’s data.

Scope including key deliverables


- To maintain clients relationship
- To maintain the ethical work practice

Assumptions
- Assume that clients will be fully trained on legal and ethical compliance.
- Assume that client needs to provide additional budget.

Constraints
- Skills.
- Knowledge.
- Office.
- Software developer.
- High speed internet.
- High capacity server.
- Time consuming.

Deliverables
From everything that is planned, we have been able to find out that there are
going to be a lot of deliverables. We need to have deliverables in order to
achieve our goals. However, time frame of this project it should be within 3
months form project start date.

Governance
 Organisation chart

 REIV Code of conduct

Project Title: Max Lionel Realty Business Plan Project Client: Max Date: 01/06/2013
Lionel Version: 1

Project Sponsor: Max Project Manager: Jindarat File Name: Max Lionel Realty Page 1 of 43
Lionel Kraisorn Page 15 of 43
Business Plan
Project client/owner
Max Lionel.

Project sponsor
Max Lionel.

Project Manager
Jindarat Kraisorn.

Manager of the project manager


Emily Smith.

Project team members


Jindarat Kraisorn.
Max Lionel.
Riz Mehra.
Kim Sweeney.
Les Goodale.
Peter Mitchell.
Pat Misfud

Project Title: Max Lionel Realty Business Plan Project Client: Max Date: 01/06/2013
Lionel Version: 1

Project Sponsor: Max Project Manager: Jindarat File Name: Max Lionel Realty Page 1 of 43
Lionel Kraisorn Page 16 of 43
Business Plan
Sam Lee.

Key stakeholders
- CEO
- Project manager
- Operational general manager
- Chief financial manager
- Manager Residential Realty

Schedule
Milestone
Item Responsibility
date

Meeting with team members 3 Weeks Board of directors, CEO and


and board of committee. operations general
managermeeting with team
members for classify the
objective of the project. Then
assign roles and responsibility.

Brainstorming, make a 6 Weeks Board of directors,external


decision and consultant and HR department
implementation. have to make a decision about
work practice ethical and
discriminated against. Also
training staffs about REIV
obligation and training about
software is necessary to work
as a real estate institute.

Feedback and evaluation. 2 Weeks HR department do monitoring


and evaluation of trained.

Review the project and 1 Weeks After reviewing the results of


report. the operation, HR manager
and operations general
manager have to make the
report and present that to
board of directors and CEO.

Project Title: Max Lionel Realty Business Plan Project Client: Max Date: 01/06/2013
Lionel Version: 1

Project Sponsor: Max Project Manager: Jindarat File Name: Max Lionel Realty Page 1 of 43
Lionel Kraisorn Page 17 of 43
Business Plan
Resource and cost plan

Deliverable/milestone/phase Resource Cost

Task 1: Consulted and Email $2,000


appointment with team
member.

Sub-task 1.1: Meeting team Meeting room $2,000


members and board of
committee.

Work item 1.1.1: Prepare Meeting room $1,000


communication letter to Presentation
invitation with team member.

Work item 1.1.2: Classify the Meeting room $500


objective of the project. Presentation

Work item 1.1.3: Project Meeting room $500


scope statement Presentation
Financial resource

Task 2: Brainstorming, make Business plan resource $10,000


a decision and
implementation.

Sub-task 2.1: Discuss the Human resource $4,000


work practice ethical and Anti-discriminated
discriminated against. resource

Work item 2.1.1: Organise the REIV code of conduct $3,000


training REIV code of conduct Legal resource
and the ethical training
activities.

Work item 2.1.2: Review of Reviewing practice $3,000


the ethic and work practice training.
training to project manager.

Project Title: Max Lionel Realty Business Plan Project Client: Max Date: 01/06/2013
Lionel Version: 1

Project Sponsor: Max Project Manager: Jindarat File Name: Max Lionel Realty Page 1 of 43
Lionel Kraisorn Page 18 of 43
Business Plan
Task 3: Monitoring, evaluation Feedback $3,000
and close the project.

Sub-task 3.1: Feedback and Personal Interview $1,500


evaluation.

Work item 3.1.1: Monitoring Personal Interview


feedback form and personal record
interview.

Work item 3.1.2: Evaluate Meeting room


feedback, solutions and risk
management.

Sub-task 3.2: Review the Meeting room $1,500


project and report. Computer

Work item 3.2.1: Review the Report


project performance.

Work item 3.2.2: Write a Report


report for present to board of Computer
directors, CEO, operations
general manager and Presentation
stakeholders.

Project risk assessment

Level
Risk Management strategy
(high/medium/low)
Failure to recruit New staff should be
Medium
qualified real estate performance plans align with
agents due to business plan and six-monthly
increased review process in place. And
competition. staff trained in use of
technology as needed.

Project Title: Max Lionel Realty Business Plan Project Client: Max Date: 01/06/2013
Lionel Version: 1

Project Sponsor: Max Project Manager: Jindarat File Name: Max Lionel Realty Page 1 of 43
Lionel Kraisorn Page 19 of 43
Business Plan
Failure to realize Industry benchmarking in all
High
revenue gains due areas of organizational
to recent slump in performance. All office
real estate prices. equipment regularly reviewed
and updated as required; IT
security monitored and
maintained.

Appropriate insurances held


Inadequate Low
and coverage reviewed
insurance cover. annually.

Non-compliance on Project to raise awareness of


Medium
anti-discrimination. anti-discrimination, WHS and
other legislation/codes of
conduct among agents, clients,
tenants.
Perception of Keep abreast of changes in
Medium
discriminatory potential liabilities. And
practice reducing conduct periodic reviews of
client and tenant agent performance to ensure
base. professional conduct. Mangers
encouraged and incentive to
follow performance
management policy.

Poor organizational Development of ethical


Medium
culture; low level of charter, including principles all
staff engagement agents must follow.
and morale.

Loss of knowledge Review and develop HR


Low
and capability related policies where
through departing required. Appropriate HR
staff. policies and procedures in
place.

Failure to meet WHS management system in


Low
occupational health place.
and safety
requirements.

Project Title: Max Lionel Realty Business Plan Project Client: Max Date: 01/06/2013
Lionel Version: 1

Project Sponsor: Max Project Manager: Jindarat File Name: Max Lionel Realty Page 1 of 43
Lionel Kraisorn Page 20 of 43
Business Plan
Communications and reporting

When
Stakeholder Information required Format
required
1. Project The process of the Every weeks Information
manager operational aspect in status report
the project and scope
as day-to-day update.
2. Team Indentifying resources Every 2 Hand on
members need and assign weeks or in training or
responsibilities to the training brainstorm
each members and activity. meeting
training course.
3. Clients Property information, Every Magazine,
Sales promotion and months website or
Marketing materials. poster
4. Tenants Details of property and Before Notice, email or
inspection inspection. phone call

Controls
● status reports
● exception reports
● issues/risk log
● Variance requests.

Appendices
● stakeholder needs analysis
● work breakdown structure
● Gantt chart
● activities schedule
● budget/cash flow
● human resource planning schedule
● roles and responsibilities
Project Title: Max Lionel Realty Business Plan Project Client: Max Date: 01/06/2013
Lionel Version: 1

Project Sponsor: Max Project Manager: Jindarat File Name: Max Lionel Realty Page 1 of 43
Lionel Kraisorn Page 21 of 43
Business Plan
● procurement schedule
● combined resources and cost schedule
● risk management plan
● quality management plan
● Communications management plan.

Future related projects


Sustainability Project

Project approvals
Jindarat Kraisorn Max Lionel______________________

Project Manager Project Sponsor

Max Lionel
Project Client/Owner Other

Project Title: Max Lionel Realty Business Plan Project Client: Max Date: 01/06/2013
Lionel Version: 1

Project Sponsor: Max Project Manager: Jindarat File Name: Max Lionel Realty Page 1 of 43
Lionel Kraisorn Page 22 of 43
Business Plan
Gantt chart

Activity/task 1 2 3 4 5 6 7 8 9 10 11 12

Task 1: Consulted and


appointment with team member.
Sub-task 1.1: Meeting team
members and board of
committee.
Work item 1.1.1: Prepare
communication letter to invitation
with team member.
Work item 1.1.2: Classify the
objective of the project.
Work item 1.1.3: Project scope
statement

Task 2: Brainstorming, make a


decision and implementation.
Sub-task 2.1: Discuss the work
practice ethical and discriminated
against.
Work item 2.1.1: Organise the
training REIV code of conduct
and the ethical training activities.
Work item 2.1.2: Review of the
ethic and work practice training
to project manager.

Project Title: Max Lionel Realty Business Plan Project Client: Max Date: 01/06/2013
Lionel Version: 1

Project Sponsor: Max Project Manager: Jindarat File Name: Max Lionel Realty Page 1 of 43
Lionel Kraisorn Page 23 of 43
Business Plan
Task 3: Monitoring, evaluation
and close the project.
Sub-task 3.1: Feedback and
evaluation.
Work item 3.1.1: Monitoring
feedback form and personal
interview.
Work item 3.1.2: Evaluate
feedback, solutions and risk
management.
Sub-task 3.2: Review the project
and report.
Work item 3.2.1: Review the
project performance.
Work item 3.2.2: Write a report
for present to board of directors,
CEO, operations general
manager and stakeholders.

Legend
If there are many tasks or stages in your project, you can identify them with a key or legend.

Task 1
Task 2
Task 3

Project Title: Max Lionel Realty Business Plan Project Client: Max Date: 01/06/2013
Lionel Version: 1

Project Sponsor: Max Project Manager: Jindarat File Name: Max Lionel Realty Page 1 of 43
Lionel Kraisorn Page 24 of 43
Business Plan
Activities schedule

Effort Actually Comment/st


Phases & activities Responsibility Resources Started Deadline
(hrs) completed atus

Task 1: Consulted and appointment with team member.

Sub-task 1.1: Meeting team members and board of committee.

Work item 1.1.1: Board of Email. 1 01/06/2013 01/06/2013 Yes Completed


Prepare directors, CEO
communication letter to and project
invitation with team manager.
member.

Work item 1.1.2: Board of Meeting 8 05/06/2013 05/06/2013 Yes Completed


Classify the objective directors, CEO room,
of the project. and project Projector and
manager. computer.

Work item 1.1.3: Board of Meeting 2 06/06/2013 06/06/2013 Yes Completed


Project scope directors, CEO, room,
statement project manager Projector and
and chief financial computer.
officer.

Sub-task 1.2: Assign roles and responsibility.

Project Title: Max Lionel Realty Business Plan Project Client: Max Date: 01/06/2013
Lionel Version: 1

Project Sponsor: Max Lionel Project Manager: File Name: Max Lionel Realty Page 25 of 43
Jindarat Kraisorn Business Plan
Work item 1.2.1: Set Board of Meeting 5 06/06/2013 06/06/2013 Yes Completed
detail and Information directors, CEO, room,
of roles and project manager Projector and
responsibility. and HR manager. computer.

Work item 1.2.2: Board of Meeting 1 06/06/2013 06/06/2013 Yes Completed


Manage project directors, CEO, room.
authority. project manager,
project consultant
and HR manager.

Task 2: Brainstorming, make a decision and implementation.

Sub-task 2.1: Discuss the work practice ethical and discriminated against.

Work item 2.1.1: Project manager, Training 300 15/06/2013 22/07/2013 Yes Completed
Organise the training HR manager and room.
REIV code of conduct team members.
and the ethical training
activities.

Work item 2.1.2: Project manager, Meeting 8 23/07/2013 23/07/2013 Yes Completed
Review of the ethic and team members room and
work practice training and HR manager. equipment.
to project manager.

Task 3: Monitoring, evaluation and close the project

Project Title: Max Lionel Realty Business Plan Project Client: Max Date: 01/06/2013
Lionel Version: 1

Project Sponsor: Max Lionel Project Manager: File Name: Max Lionel Realty Page 25 of 43
Page 26 of 43
Jindarat Kraisorn Business Plan
Sub-task 3.1: Feedback and evaluation.

Work item 3.1.1: Project manager, Meeting 10 24/07/2013 02/08/2013 Yes 25%
Monitoring feedback operations room and
form and personal general manager interview
interview. and HR manager. recode.

Work item 3.1.2: Project manager Meeting 10 03/08/2013 04/08/2013 Yes


Evaluate feedback, and operations room,
solutions and risk general manager. computer
management and
projector.

Sub-task 3.2: Review the project and report.

Work item 3.2.1: Board of Meeting 10 06/08/2013 08/08/2013 Yes


Review the project directors, CEO, room,
performance. project manager, computer
and HR manager. and
projector.

Work item 3.2.2: Write Board of Meeting 10 09/08/2013 10/08/2013 Yes


a report for present to directors, CEO, room,
board of directors, project manager computer
CEO, operations and project and
general manager and consultant. projector.
stakeholders.

Project Title: Max Lionel Realty Business Plan Project Client: Max Date: 01/06/2013
Lionel Version: 1

Project Sponsor: Max Lionel Project Manager: File Name: Max Lionel Realty Page 25 of 43
Jindarat Kraisorn Page 27 of 43
Business Plan
Budget

Project Name: Max Lionel Realty Business Plan

Expense Version 1 Version 2

Project sponsor, technical expert $5,000 $6,200

All reasonable resources [meeting room access, $7,000 $8,300


computer, software, template, paper and
telecommunication costs]

Poster, promotional materials $3,000 $2,100

Subtotal $15,000 $16,600

Contingency (+10%) $1,500 $1,660

TOTAL $16,500 $18,260

Risk register

Likeliho Risk response


Impact Responsib
Risk od (contingency
(H/M/L) le
(H/M/L) strategies)
1. Failure to
Medium High Benchmarking in all Project
recruit qualified
real estate areas of manager,
agents due to organizational IT
increased performance. And department
competition. create program to and HR
train new staff. Also manager.
staff trained in use of
technology as
needed.

Project Title: Max Lionel Realty Project Client: Max Date: 01/06/2013
Business Plan Lionel Version: 1

Project Sponsor: Project Manager: File Name: Max Lionel Page x of y


Max Lionel Jindarat Kraisorn Page 28 of 43
Realty Business Plan
2. Failure to Investigate resourcing
High High Project
realize revenue needs: number of
gains due to agents; personnel; manager,
recent slump in office equipment, CEO and
real estate cars, etc. Fulfill financial
prices. resourcing needs in department
accordance with .
policies and
procedures.

Appropriate
3. Inadequate Low High Project
insurances held and
insurance coverage reviewed manager
cover. annually. and
operations
general
manager.
4. Non-
Medium High Project to raise Project
compliance on
anti- awareness of anti- manager
discrimination. discrimination, WHS and
and other operations
legislation/codes of general
conduct among manager
agents, clients,
tenants.

5. Perception of Project to raise


Medium High Project
discriminatory awareness of anti-
practice discrimination, WHS manager,
reducing client and other HR
and tenant legislation/codes of department
base. conduct among and
agents, clients, operations
tenants. And conduct general
of quarterly surveys:
manager.
clients and tenants.

Project Title: Max Lionel Realty Project Client: Max Date: 01/06/2013
Business Plan Lionel Version: 1

Project Sponsor: Project Manager: File Name: Max Lionel Page x of y


Max Lionel Jindarat Kraisorn Page 29 of 43
Realty Business Plan
6. Poor Development of
Medium Medium Project
organizational culture or ethical
culture; low charter, including manager,
level of staff principles all agents HR
engagement must follow. department
and morale. and
operations
general
manager.
7. Loss of
Low High Commence training/ Project
knowledge and
capability mentoring program manager,
through prior to HR
departing staff. implementation. department
and
operations
general
manager.
8. Failure to Training need
Low High Project
meet analysis and training
occupational on WHS and manager,
health and implementation of HR
safety recently launched department
requirements. MLR WHS and
management system. operations
general
manager.

Risk assessment form


Identified risks are logged on a risk form and a copy is forwarded to the project
manager.

Project details

Project Name: Max Lionel Realty Business Plan


Project Manager: Jindarat Kraisorn.

Project Title: Max Lionel Realty Project Client: Max Date: 01/06/2013
Business Plan Lionel Version: 1

Project Sponsor: Project Manager: File Name: Max Lionel Page x of y


Max Lionel Jindarat Kraisorn Page 30 of 43
Realty Business Plan
Risk details

Risk ID: MLR001


Raised by: Max Lionel
Date raised: 10/06/2013

Description of risk:
Perception of discriminatory practice reducing client and tenant base.

Likelihood of risk: Impact of risk:


High Risk It should be High Risk

Risk mitigation

Preventative actions recommended:


 Development of culture or ethical charter, including principles
all agents must follow.
Contingency actions recommended:
 Provide project to raise awareness of anti-discrimination, WHS
and other legislation/codes of conduct among agents, clients,
and tenants. And conduct of quarterly surveys: clients and
tenants.

Approval details

Supporting documentation:
Details of any supporting documentation used to substantiate this risk.

Signature: Jindarat Kraisorn Date: 10/06/2013

PLEASE FORWARD THIS FORM TO THE PROJECT MANAGER

Project Title: Max Lionel Realty Project Client: Max Date: 01/06/2013
Business Plan Lionel Version: 1

Project Sponsor: Project Manager: File Name: Max Lionel Page x of y


Max Lionel Jindarat Kraisorn Page 31 of 43
Realty Business Plan
1.3 – Implementation
Change requests

Change request – Project

Issued by Jindarat Kraisorn

Item affected Research is behind time schedule and budget is out


of control.

Nature of change Adjust in budgetary, risk , schedule , budget and


requested scope.

Reason for change Recovering process for project.

Impact on scope Implementing cost processing.

Impact on budget Cost has been reduced and saved money.

Impact on schedule Delay closed to the individual work.

Change authorised: Yes Adj. completion Adj. final


date:- budget: $
Jindarat Kraisorn

Signed: Jindarat Signed:Max Signed:Max Signed:Max


Kraisorn Lionel Lionel Lionel
Project Manager Sponsor Client

Date 31/06/2013 Date 31/06/2013 Date 31/06/2013 Date 31/06/2013

Project Title: Max Lionel Realty Project Client: Max Date: 01/06/2013
Business Plan Lionel Version: 1

Project Sponsor: Project Manager: File Name: Max Lionel Page x of y


Max Lionel Jindarat Kraisorn Page 32 of 43
Realty Business Plan

Jindarat Kraisorn
Unit Code: BSBPMG522
Assessment 2
Issues log

Item Strategy Date logged Date resolved

1. Budget can be Financial 01/06/2013 01/06/2013


less for the planning
project

Human resource 01/06/2013 31/06/2013


2. It could be planning and
hard to find
organize
skilled people
trainers.

3. Staffs could Organize time 01/06/2013 10/06/2013


not attend the and invite staffs
training before the
project run and
request for
training skill
time.

Signed: Jindarat Signed: Max Signed: Max Signed: Max


Kraisorn Lionel Lionel Lionel
Project Sponsor Client
Manager

Date 31/06/2013 Date 31/06/2013 Date 31/06/2013 Date 31/06/2013

Project Title: Max Lionel Realty Project Client: Max Date: 01/06/2013
Business Plan Lionel Version: 1

Project Sponsor: Project Manager: File Name: Max Lionel Page x of y


Max Lionel Jindarat Kraisorn Page 33 of 43
Realty Business Plan
1.4 – Monitoring
Status update report
This is one example of a status report. The preferred format should be negotiated with the project sponsor. Attach minutes of project meetings.

Status report – Project

Item Work Milestone date Revised/ Budgeted cost Revised/ Responsible


completed actual date actual cost
to-date

Meeting with 06/06/2013 3 Weeks 22/06/2016 $5,000 $4,500 Project manager


team members
and board of
committee.

Brainstorming, 23/07/2013 6 Weeks 5/07/2016 $3,500 $4,000 Project manager


make a decision
and
implementation.

Feedback and 04/08/2013 2 Weeks 17/08/2016 $2,500 $3,500 Project manager


evaluation.

Project Title: Max Lionel Realty Business Plan Project Client: Max Date: 01/06/2013
Lionel Version: 1

Project Sponsor: Max Lionel Project Manager: File Name: Max Lionel Realty Page x of y
Page 34 of 43
Jindarat Kraisorn Business Plan
Review the 10/08/2013 1 Weeks 24/08/2016 $2,000 $3,000 Project manager
project and
report.

Project Title: Max Lionel Realty Business Plan Project Client: Max Date: 01/06/2013
Lionel Version: 1

Project Sponsor: Max Lionel Project Manager: File Name: Max Lionel Realty Page x of y
Jindarat Kraisorn Page 35 of 43
Business Plan
1.5 – Finalizing and review
Budget variation report
The project budget is a prediction of the costs associated with a particular
project. These costs include labour, materials, and other resources required to
complete the project.

Project name:

Expense Budget Actual %


Variation

Project Structure of work includes; $8,000 $8,500 6.25%


 Employee’s salary.
 Technical expert.

All reasonable resources includes; $5,000 $6,000 -20%


 Office supplies.
 Data management Software.
 Telecommunications.

Promotional materials includes; $2,000 $1,500 25%


 Website
 Brochures

Subtotal 15,000 16,000 11.25%

TOTAL 15,000 16,000 11.25%

Project Title: Max Lionel Realty Project Client: Max Date: 01/06/2013
Business Plan Lionel Version: 1

Project Sponsor: Project Manager: File Name: Max Lionel Page x of


Max Lionel Jindarat Kraisorn Page 36 of 43
Realty Business Plan

Jindarat Kraisorn
Unit Code: BSBPMG522
Assessment 3
Post-project review meeting

Post-Project Review Meeting – Agenda

Topic: Implementation of administrative system Speaker Time

Brief overview of project: Project 5 mins


To grow the customer base and have good relation Manager
with customers which is good for the company
reputation and growth. The project manager has
overall authority and responsibility for managing and
executing this project team will consist of personnel
from the coding group, quality control. The project
manager is responsible for communicating with
organisational managers on the progress and
performance of each project resource..

Review by team: All 10


Goals of the project have been achieved by everyone. mins
It has been tole again and gain. So everyone knew the
gaols from the beginning. Deliverables have been
achieved just on time. Work has been very organised.
Employees could have come to work on time instead
of being late by fifteen minutes and half on hour
Planning had been done in advanced and everything
has gone according to plan.

What worked/what could have gone better? All 20


Worked well: Stakeholders management has been mins
handling well by the Public relations officer. Without
his help, it would not have been able to keep good
relation with all the stakeholders
Planning had been done in advance and everything
has gone according to plan
Could have gone better: Employees could have
come to work on time instead of being late by fifteen
minutes and half hour
Communication has been poor among team members.

Project Title: Max Lionel Realty Project Client: Max Date: 01/06/2013
Business Plan Lionel Version: 1

Project Sponsor: Project Manager: File Name: Max Lionel Page x of


Max Lionel Jindarat Kraisorn Page 37 of 43
Realty Business Plan
Team members always got messages late. Some
team members always argued that they had not been
told to do the task properly by the manager. There
have been arguments with the manager.
We had been struggling with resource. At this time, we
could not pay our employees for all the hard work they
have done.
.
Lessons learned All 10
mins
Always finish work on time. Managers should be strict
with staff about being late to work. Initiative needs to
be taken and work should not be left at the last minute.

Next steps: All 5 mins


Hire staff who are more reliable, who are on time at
work and hire staff that would not take a lot of leave or
change jobs frequently

Project Title: Max Lionel Realty Project Client: Max Date: 01/06/2013
Business Plan Lionel Version: 1

Project Sponsor: Project Manager: File Name: Max Lionel Page x of


Max Lionel Jindarat Kraisorn Page 38 of 43
Realty Business Plan
Handover report

Handover report

Initial overall
objectives

Agreed changes to N/A


objectives

Final agreed deliverables

Budget Final Schedule


Item Final date
ed cost cost date

Project initiation $5,000 $4,550 10/08/2013 15/08/2013

Set software data $9,000 $12,000 11/08/2013 16/08/2013

Meeting catering $200 $300 12/08/2013 17/08/2013

Setting up wiring system $300 $250 13/08/2013 18/08/2013

Install phone connection $200 $400 14/08/2013 19/08/2013

Installation $300 $500 15/08/2013 20/08/2013

Total $15,000 $18,000

Issues summary

Date Date
Item Strategy
logged resolved

To maintain ethnical Training REIV code 01/06/2016 15/06/2016


work practice. of conduct and
Penalty of
breaching the law

To manage and Implement a new 01/06/2016 15/06/2016


organize client’s data. software of data
management

Project Title: Max Lionel Realty Project Client: Max Date: 01/06/2013
Business Plan Lionel Version: 1

Project Sponsor: Project Manager: File Name: Max Lionel Page


Pagex 39
of of 43
Max Lionel Jindarat Kraisorn Realty Business Plan
Documents attached

No. Title

1.  Stakeholder analysis.
2.  Stakeholder needs analysis.
3.  Work breakdown structure.
4.  Gantt chart.
5.  Activities schedule.

____Jindarat___ ___Max Lionel_ ___Max Lionel ____


Project Manager Project Sponsor Project Client

Project Title: Max Lionel Realty Project Client: Max Date: 01/06/2013
Business Plan Lionel Version: 1

Project Sponsor: Project Manager: File Name: Max Lionel Page x of


Max Lionel Jindarat Kraisorn Page 40 of 43
Realty Business Plan
Post-project review report

Post-Project Review Report

Name of project: Max Lionel Realty Business Plan


Date and location of meeting: 01/06/2013 at 9.30-11.30
Meeting Room 1, Max Lionel Realty Building Liverpool street, Sydney,
NSW, 3027
Names of attendees:
1. Max Lionel (CEO)
2. Riz Mehra (Chief Financial Officer)
3. Kim Sweeney (Operations General Manager)
4. Les Goodale (HR Manager)
5. Sam Lee (Manager Residential Realty)
6. Pat Misfud (Manager Commercial Realty)
7. Peter Mitchell (Manager Investment)
8. Emily Smith (Manager of the project manager)
9. Jindarat Kraisorn (External consultant)
10. Tenants
11. clients

1. Overview by Project Manager:


To grow the customer base and have good relation with customers
which is good for the company’s reputation and growth.

2. Review by team of goals, objectives/deliverables and schedule as


outlined in project plan
Planning had been done in advanced and everything has gone
according to plan, reduce direct and indirect costs of operations by 10%,
and engage with customers / build to raise organisation profile. Improve
health of employees.

Project Title: Max Lionel Realty Project Client: Max Date: 01/06/2013
Business Plan Lionel Version: 1

Project Sponsor: Project Manager: File Name: Max Lionel Page x of


Max Lionel Jindarat Kraisorn Page 41 of 43
Realty Business Plan
Met Missed Partially Comments
met

Project goal/s
 To maintain ethnical / The project
work practice completed and
 To manage and satisfied.
organize clients’ data

Objectives/deliverables

To build ethical trained /


staffs, new amination
steps, program, plans,
reports, policies and
procedurewithin 3 months.

Success criteria
 Employees understand / The project
of the Ethical work completed and
practise, they apply in satisfied.
their work to uplifting
the standard. So there
is no complaint about
work knowledge and
from clients.
 Errors of clients data is /
reduced and
eliminated.

Schedule

The time schedule is changed / Allow


to suitable for employee’s employee to
training. join the
trainings.

Budget / The variance


of budget is
33%.
Project Title: Max Lionel Realty Project Client: Max Date: 01/06/2013
Business Plan Lionel Version: 1

Project Sponsor: Project Manager: File Name: Max Lionel Page x of


Max Lionel Jindarat Kraisorn Page 42 of 43
Realty Business Plan
3. What worked well; what could have gone better?

Worked well Could have gone better

Stakeholder management has been Employees could have come to


handled well by the Public relations work on time instead of being late
officer. Without his help, it would not by fifteen minutes and half an hour.
have been able to keep good relation
with all the stakeholders.

Planning had been done in advanced Communication has been poor


and everything has gone according to among team members. Team
plan. members always got messages
late. Some team members always
argued that they had not been told
to do the task properly by the
manager. There have been
arguments with the manager.

We had been struggling with


resources. At times, we could not
pay our employees for all the hard
work they have done.

4. Lessons learned

Always finish work on time. Managers should be strict with staff about being
late to work. Initiative needs to be taken and work should not be left at the
last minute.

5. Next steps / improvement plans

Hiring staff who are more reliable, who are on time at work and hire staff
that would not take a lot of leave or change jobs frequently.

Project Title: Max Lionel Realty Project Client: Max Date: 01/06/2013
Business Plan Lionel Version: 1

Project Sponsor: Project Manager: File Name: Max Lionel Page x of


Max Lionel Jindarat Kraisorn Page 43 of 43
Realty Business Plan

Вам также может понравиться