1.0 INTRODUCTION
Final butt welds connecting components which have been successfully
tested may not be pressure tested provided it is demonstrated that pressure
test can’t be practically performed. The welding joint shall be considered a
golden joint, for that hydrotest is not applicable.
1.1 SCOPE
- This document describes the general requirement for golden welds
application on pipe spools with butt weld connection.
- This document is only applicable to a connection of straight length of
pipe to another length of pipe
2.0 PROCEDURE
2.1 GENERAL
- Approved Welding Procedure Qualification Record (WPQR) No. and
Approved Welding Procedure Specification (WPS) No. Shall be used for
the welding process.
- Welders shall be qualified for the particular procedure to which they are
welding in accordance with the requirement of ASME B31.3 All welding
electrodes used in production welding shall be as per the approved and
Qualified Welding Procedure.
- Conformance certificates shall be obtained for all welding electrodes
used in production welding.
- All production welding shall be witnessed by the Contractor’s welding
Inspector ( Certified CSWIP 3.1 or AWS-CWI) and Shell Inspector.
- Where it is necessary to remove coatings, it shall be conducted very
carefully in such a way that no damage or dent shall happen to the pipe
by using hammers and cutting tools.
2.2 WELDING
2.2.1 EDGE PREPARATION
- During the edge preparation, ensure that equipment used shall cause
no detrimental metallurgical effects to the edges to be welded.
- Carry out UT lamination check 150mm minimum beyond the proposed
weld location in line with the procedure ASTM E 213.
- After UT lamination check, carry out 100% MPI (wet method) on same
150mm minimum beyond weld location and on the bevelled edges of the
pipes in line with ASTM E 1444.
- The bevelled faces shall be free from planar defects, tears, moisture,
scales, rust, paint, grease and other matter that may be detrimental to
the weld.