Вы находитесь на странице: 1из 190

2016-2025

DISTRIBUTION DEVELOPMENT PLAN


DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

MESSAGE FROM THE SECRETARY

T he Department of Energy recognizes the critical role of the


distribution utilities in the energy sector to be able to deliver the
best services to our electricity consumers at all times. We expect that
these utilities continue to improve on their distribution development
planning and complying with their responsibilities to provide the least
cost supply of power to their captive customers.

This 2016-2025 DDP features the one-page infographic information


to serve as baseline information on the current landscape of each
distribution utility in the country. Each of them has their uniqueness
in terms of geographic location, socio-economic status, distribution
infrastructure configuration, and power supply portfolio or mix. These ALFONSO G. CUSI
snap shots also provide information on investment opportunities to SECRETARY
determine the potential power supply off-takers, as well as distribution
infrastructure expansion, rehabilitation and upgrading.

The DOE fully supports the government’s objective of inclusive growth through our programs and projects
in the grid and off-grid areas towards greater energy access. As of December 2016, the country has reached
90.6% household electrification. However, we are still faced with greater challenges considering the
remaining households are in the far-flung communities and in those areas with peace and order concerns.
The DOE, in collaboration with other government agencies and private entities, are working to achieve the
Administration’s target of 100% household electrification by 2022.

Moving forward, the DOE has cascaded in the preparatory activities with the distribution utilities the 2017
DDP updating to integrate the various energy policy initiatives in their power development planning, giving
equal importance to grid and off-grid areas. These include the optimal power supply mix, Competitive
Selection Process (CSP), Retail Competition and Open Access (RCOA), Renewable Portfolio Standards (RPS),
net metering and energy resiliency. In the long term, we aim to push the distribution utilities to undertake
innovations and initiatives that will result to delivery of electric service to the consumers at par with their
international counterparts.

The DOE acknowledges the support and cooperation of the National Electrification Administration and the
electric distribution utilities in the process of coming up with this integrated 2016-2025 DDP.

Mabuhay tayong lahat!

ALFONSO G. CUSI
Secretary

i DISTRIBUTION DEVELOPMENT PLAN, 2016-2025


DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

CONTENTS
Message from the Secretary i
Contents ii
Tables viii

00 Executive Summary 1

01 1. 2016-2025 DDP Summary Tables 3

2. Distribution Utilities in the Philippines 8


02 2.1. Luzon 9
2.2. Visayas 10
2.3. Mindanao 11

03 3. System Map of Distribution Utilities Per Region 12


3.1. National Capital Region 13
Manila Electric Company (MERALCO) 14
3.2. Cordillera Administrative Region (CAR) 15
Abra Electric Cooperative (ABRECO) 20
Benguet Electric Cooperative, Inc. (BENECO) 16
Ifugao Electric Cooperative, Inc. (IFELCO) 17
Kalinga-Apayao Electric Cooperative, Inc. (KAELCO) 18
Mountain Province Electric Cooperative, Inc. (MOPRECO) 19
3.3. Region I 21
Dagupan Electric Corporation (DECORP) 22
La Union Electric Company, Inc. (LUECO) 23
Central Pangasinan Electric Cooperative, Inc. (CENPELCO) 24
IlocosNorte Electric Cooperative, Inc. (INEC) 25
Ilocos Sur Electric Cooperative, Inc. (ISECO) 26
La Union Electric Cooperative, Inc. (LUELCO) 27
Pangasinan I Electric Cooperative (PANELCO I) 28
Pangasinan III Electric Cooperative (PANELCO III) 29

ii
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

3.4. Region II 30
Cagayan I Electric Cooperative, Inc. (CAGELCO I) 31
Cagayan II Electric Cooperative, Inc. (CAGELCO II) 32
Isabela I Electric Cooperative, Inc. (ISELCO I) 33
Isabela II Electric Cooperative (ISELCO II) 34
Nueva Vizcaya Electric Cooperative (NUVELCO) 35
Quirino Electric Cooperative (QUIRELCO) 36
Batanes Electric Cooperative, Inc. (BATANELCO) 37
3.5. Region III 38
Angeles Electric Corporation (AEC) 39
Clark Electric Distribution Corporation (CEDC) 40
Cabanatuan Electric Corporation (CELCOR) 41
Olongapo Electricity Distribution Company, Inc. (OEDC) 42
Subic Enerzone Corporation (SEZ) 43
San Fernando Electric and Power Company, Inc. (SFELAPCO) 44
Tarlac Electric, Inc. (TEI) 45
Aurora Electric Cooperative, Inc. (AURELCO) 46
Nueva Ecija I Electric Cooperative, Inc. (NEECO-I) 47
Nueva Ecija II Electric Cooperative, Inc.- Area 1 (NEECO II-Area 1) 48
Nueva Ecija II Electric Cooperative, Inc. – Area 2 (NEECO II-Area 2) 49
Pampanga I Electric Cooperative, Inc. (PELCO I) 50
Pampanga II Electric Cooperative, Inc. (PELCO II) 51
Pampanga III Electric Cooperative, Inc. (PELCO III) 52
Peninsula Electric Cooperative, Inc. (PENELCO) 53
Pampanga Rural Electric Service Cooperative, Inc. (PRESCO) 54
San Jose City Electric Cooperative (SAJELCO) 55
Tarlac I Electric Cooperative, Inc. (TARELCO I) 56
Tarlac II Electric Cooperative, Inc. (TARELCO II) 57
Zambales I Electric Cooperative, Inc. (ZAMELCO I) 58
Zambales II Electric Cooperative, Inc. (ZAMECO II) 59
3.6. Region IV-A 60
First Bay Power Corporation (FBPC) 67
Ibaan Electric Corporation (IEC) 61

iii
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Lima Enerzone Corporation (LEZ) 68


Batangas I Electric Cooperative, Inc. (BATELEC I) 62
Batangas II Electric Cooperative, Inc. (BATELEC II) 63
First Laguna Electric Cooperative, Inc. (FLECO) 64
Quezon I Electric Cooperative, Inc. (QUEZELCO I) 65
Quezon II Electric Cooperative, Inc. (QUEZELCO II) 66
3.7. MIMAROPA Region 69
Busuanga Island Electric Cooperative, Inc. (BISELCO) 70
Lubang Electric Cooperative, Inc. (LUBELCO) 71
Marinduque Electric Cooperative, Inc. (MARELCO) 72
Occidental Mindoro Electric Cooperative, Inc. (OMECO) 73
Oriental Mindoro Electric Cooperative, Inc. (ORMECO) 74
Palawan Electric Cooperative (PALECO) 75
Romblon Electric Cooperative, Inc. (ROMELCO) 76
Tablas Island Electric Cooperative, Inc. (TIELCO) 77
Municipality of Banton Electric System 78
Municipality of Concepcion Electric System 79
Municipality of Corcuera Electric System 80
3.8. Region V 81
Albay Electric Cooperative, Inc. (ALECO) 82
CamarinesNorte Electric Cooperative, Inc. (CANORECO) 83
Camarines Sur I Electric Cooperative, Inc. (CASURECO I) 84
Camarines Sur II Electric Cooperative, Inc. (CASURECO II) 85
Camarines Sur III Electric Cooperative, Inc. (CASURECO III) 86
Camarines Sur IV Electric Cooperative, Inc. (CASURECO IV) 87
Sorsogon I Electric Cooperative, Inc. (SORECO I) 88
Sorsogon II Electric Cooperative (SORECO II) 89
First Catanduanes Electric Cooperative, Inc. (FICELCO) 90
Masbate Electric Cooperative, Inc. (MASELCO) 91
Ticao Island Electric Cooperative, Inc. (TISELCO) 92
3.9. Region VI 93
Panay Electric Company, Inc. (PECO) 94
Aklan Electric Cooperative, Inc. (AKELCO) 95

iv
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Antique Electric Cooperative, Inc. (ANTECO) 96


Capiz Electric Cooperative, Inc. (CAPELCO) 97
Central Negros Electric Cooperative, Inc. (CENECO) 98
Guimaras Electric Cooperative (GUIMELCO) 99
Iloilo I Electric Cooperative, Inc. (ILECO I) 100
Iloilo II Electric Cooperative, Inc. (ILECO II) 101
Iloilo III Electric Cooperative, Inc. (ILECO III) 102
Northern Negros Electric Cooperative, Inc. (NONECO) 103
Negros Occidental Electric Cooperative (NOCECO) 104
3.10. Region VII 105
Balamban Enerzone Corporation (BEZ) 106
Bohol Light Company, Inc. (BLCI) 107
Mactan Electric Company, Inc. (MECO) 108
MactanEnerzone Corporation (MEZ) 109
Visayan Electric Company, Inc. (VECO) 110
Bohol I Electric Cooperative, Inc. (BOHECO I) 111
Bohol II Electric Cooperative, Inc. (BOHECO II) 112
Cebu I Electric Cooperative, Inc. (CEBECO I) 113
Cebu II Electric Cooperative, Inc. (CEBECO II) 114
Cebu III Electric Cooperative, Inc. (CEBECO III) 115
Negros Oriental I Electric Cooperative, Inc. (NORECO I) 116
Negros Oriental II Electric Cooperative (NORECO II) 117
Bantayan Island Electric Cooperative, Inc. (BANELCO) 118
Camotes Electric Cooperative, Inc. (CELCO) 119
Province of Siquijor Electric Cooperative, Inc. (PROSIELCO) 120
3.11. Region VIII 121
Biliran Electric Cooperative, Inc. (BILECO) 122
Don Orestes Romualdez Electric Cooperative, Inc. (DORELCO) 123
Eastern Samar Electric Cooperative, Inc. (ESAMELCO) 124
Leyte II Electric Cooperative, Inc. (LEYECO II) 125
Leyte III Electric Cooperative, Inc. (LEYECO III) 126
Leyte IV Electric Cooperative, Inc. (LEYECO IV) 127
Leyte V Electric Cooperative, Inc. (LEYECO V) 128

v
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Northern Samar Electric Cooperative, Inc. (NORSAMELCO) 129


Samar I Electric Cooperative, Inc. (SAMELCO I) 130
Samar II Electric Cooperative, Inc. (SAMELCO II) 131
Southern Leyte Electric Cooperative, Inc. (SOLECO) 132
Maripipi Multi-Purpose Electric Cooperative (MMPC) 133
3.12. Region IX 134
Zamboanga City Electric Cooperative, Inc. (ZAMCELCO) 135
Zamboanga del Sur I Electric Cooperative, Inc. (ZAMSURECO I) 136
Zamboanga del Sur II Electric Cooperative, Inc. (ZAMSURECO II) 137
Zamboanga del Norte Electric Cooperative, Inc. (ZANECO) 138
3.13. Region X 139
Cagayan Electric Power and Light Company, Inc. (CEPALCO) 140
Iligan Light and Power, Inc. (ILPI) 141
Bukidnon II Electric Cooperative, Inc. (BUSECO) 142
Camiguin Electric Cooperative, Inc. (CAMELCO) 143
First Bukidnon Electric Cooperative, Inc. (FIBECO) 144
Lanao del Norte Electric Cooperative, Inc. (LANECO) 145
Misamis Occidental I Electric Cooperative, Inc. (MOELCI I) 146
Misamis Occidental II Electric Cooperative, Inc. (MOELCI II) 147
Misamis Oriental I Rural Electric Cooperative, Inc. (MORESCO I) 148
Misamis Oriental II Electric Cooperative, Inc. (MORESCO II) 149
3.14. Region XI 150
Davao Light and Power Company (DLPC) 151
Davao del Norte Electric Cooperative, Inc. (DANECO) 152
Davao del Sur Electric Cooperative, Inc. (DASURECO) 153
Davao Oriental Electric Cooperative, Inc. (DORECO) 154
3.15. Region XII 155
Cotabato Light and Power Company (CLPC) 156
Cotabato Electric Cooperative, Inc. (COTELCO) 157
Cotabato Electric Cooperative, Inc. – PPALMA (COTELCO-PPALMA) 158
South Cotabato I Electric Cooperative, Inc. (SOCOTECO I) 159
South Cotabato II Electric Cooperative, Inc. (SOCOTECO II) 160
Sultan Kudarat Electric Cooperative, Inc. (SUKELCO) 161

vi
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

3.16. CARAGA 162


Agusan del Norte Electric Cooperative, Inc. (ANECO) 163
Agusan del Sur Electric Cooperative, Inc. (ASELCO) 164
Siargao Electric Cooperative, Inc. (SIARELCO) 165
Surigao del Norte Electric Cooperative, Inc. (SURNECO) 166
Surigao del Sur I Electric Cooperative, Inc. (SURSECO I) 167
Surigao del Sur II Electric Cooperative, Inc. (SURSECO II) 168
Dinagat Island Electric Cooperative, Inc. (DIELCO) 169
3.17. Autonomous Region of Muslim Mindanao (ARMM) 170
Lanao del Sur Electric Cooperative, Inc. (LASURECO) 171
Maguindanao Electric Cooperative, Inc. (MAGELCO) 172
Basilan Electric Cooperative, Inc. (BASELCO) 173
Siasi Electric Cooperative, Inc. (SIASELCO) 174
Sulu Electric Cooperative, Inc. (SULECO) 175
Tawi-tawi Electric Cooperative, Inc. (TAWELCO) 176

vii
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

TABLES
2016-2025 DDP Summary Tables 3
Philippine Statistics
Table 1. Total Number of Metered Customer 4
Table 2. Total Energy Sales, MWh 4
Table 3. Energy Purchased, MWh 4
Table 4. Peak Demand per Region, MW 5
Number of Metered Customers
Table 5. Luzon’s Number of Metered Customer 6
Table 6. Visayas’ Number of Metered Customer 6
Table 7. Mindanao’s Number of Metered Customer 6
Energy Sales
Table 8. Luzon’s Energy Sales, MWh 7
Table 9. Visayas’ Energy Sales, MWh 7
Table 10. Mindanao’s Energy Sales, MWh 7

viii
DISTRIBUTION DEVELOPMENT
DEVELOPMENT PLAN,
PLAN,2016-2025
2016-2025
Executive Summary

Executive Summary

1
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

T he 2016-2025 DDP is presented in infographic


showing the existing system map and
distribution network of the distribution utilities
transmission lines; (ii) 34,233 ckt-km for the
expansion and rehabilitation of distribution
lines; and (iii) 16,375 MVA additional substation
(DUs) indicating its substation and corresponding capacity. All these proposed capital expenditure
substation capacities. It also include the projects will require Php968.41 billion for

Executive Summary
10-year outlook on the DUs’ supply-demand implementation, including the financing
requirements, basic information on their 2015 requirements for electrification projects, network
actual number of customers and energy sales and non-network projects.
for each customer type, system loss, percentage
level of household energization, number of
barangay in the franchise, length of distribution
lines in circuit kilometer, franchise area in square
kilometer and franchise population.

This DDP also featured the summary tables of


the total number of metered customers, energy
sales, energy purchased and peak demand. With
regard to the number of customers, there were
17.7 million customers being served by the DUs
in 2015. With an annual average growth rate
(AAGR) of 3.87%, customer connection is seen to
increase from 18.5 million in 2016 to 26.0 million
in 2025. In terms of energy sales, DUs have sold a
total of 56,393 GWh in 2015 which is forecasted
to rise to 95,626 GWh by 2025 with an AAGR of
5.51% from its 2016 level. On the other hand, a
total of 69,340 GWh was purchased by the DUs in
2015, which slightly increased to 73,103 GWh in
2016 and will continue to grow to 105,874 GWh
by 2025 with an AAGR of 4.32%. For the peak
demand, DUs registered a peak of 11,764 MW
in 2015 which is projected to grow annually at
4.30% AAGR from 12,474 MW in 2015 to 17,914
MW in 2025.

To ensure reliability and security of electricity


supply to the member-consumers, DUs are
proposing the following infrastructure projects
for the ten-year planning period: (i) 5,577 ckt-
km for the expansion and rehabilitation of sub-

2
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
2016-2025 DDP Summary Tables

2016-2025 DDP
Summary Tables

3
SUMMARY TABLES

Table 1. Total Number of Metered Customers, 2015-2025

Customer Actual Forecasted


Classification 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Residential 16,216,648 16,890,389 17,575,916 18,276,755 18,996,254 19,732,937 20,484,616 21,253,343 22,035,911 22,831,983 23,639,353
Commercial 1,172,910 1,221,791 1,264,435 1,309,219 1,356,611 1,406,472 1,458,355 1,512,772 1,569,357 1,628,579 1,689,497
Industrial 59,059 62,079 64,809 67,823 71,073 74,370 77,700 81,188 84,764 88,416 92,136
Others 321,500 344,770 363,385 383,626 405,428 427,900 451,656 476,752 503,218 530,949 558,606
Total 17,770,116 18,519,029 19,268,545 20,037,423 20,829,366 21,641,680 22,472,326 23,324,055 24,193,250 25,079,926 25,979,592

Table 2. Total Energy Sales, 2015-2025 (in MWh)

Customer Actual Forecasted


Classification 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Commercial 18,192,040 21,125,127 22,002,597 22,990,340 23,926,897 24,955,835 26,003,606 27,104,678 28,251,171 29,423,260 30,665,876
Industrial 13,485,765 19,950,894 20,362,338 21,113,220 22,023,797 22,548,022 23,522,780 24,524,869 25,575,334 26,630,745 27,807,608
Others 1,851,421 1,892,331 1,997,561 2,096,458 2,201,000 2,308,994 2,422,622 2,539,918 2,662,495 2,787,936 2,922,506
Residential 22,863,442 23,834,629 25,010,269 26,115,610 27,184,784 28,293,262 29,427,423 30,596,634 31,802,950 33,033,351 34,230,547
Total 56,392,668 66,802,981 69,372,764 72,315,628 75,336,478 78,106,113 81,376,431 84,766,099 88,291,950 91,875,291 95,626,537

Table 3. Energy Purchased by Grid, 2015-2025 (in MWh)

Actual Forecasted
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Luzon 51,986,753 54,296,197 56,431,112 58,861,085 61,189,083 63,643,099 66,125,502 68,716,716 71,423,126 74,168,239 76,699,813
Visayas 8,421,837 8,971,145 9,381,314 9,817,151 10,263,417 10,714,642 11,216,912 11,731,774 12,264,466 12,816,146 13,399,210
Mindanao 8,931,850 9,835,184 11,077,943 11,689,321 12,258,946 12,840,149 13,455,146 14,083,579 14,736,261 15,395,803 15,775,009
Total 69,340,440 73,102,526 76,890,369 80,367,558 83,711,446 87,197,890 90,797,560 94,532,069 98,423,854 102,380,188 105,874,032

4
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

2016-2025 DDP Summary Tables


2016-2025 DDP Summary Tables

5
SUMMARY TABLES

Table 4. Peak Demand by Region, 2015-2025 (in MW)

Actual Forecasted
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Luzon 8,630.07 9,087.00 9,467.52 9,877.07 10,263.06 10,648.55 11,075.00 11,499.76 11,943.58 12,369.04 12,876.06
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

NCR 6,298.44 6,618.09 6,847.60 7,107.29 7,351.13 7,593.29 7,879.48 8,159.74 8,454.56 8,727.07 9,075.55
CAR 92.07 92.73 96.95 101.19 105.45 109.73 114.04 118.38 122.74 127.12 131.53
Region 1 361.14 373.94 393.66 412.18 430.50 449.55 469.15 489.23 509.79 530.83 552.32
Region 2 341.88 362.55 393.15 418.72 444.05 469.46 495.08 521.06 547.30 574.33 602.47
Region 3 883.81 947.06 1,007.05 1,066.42 1,116.80 1,165.72 1,209.44 1,255.29 1,303.62 1,353.63 1,405.71
Region 4A 291.42 299.64 308.21 320.94 333.97 347.65 361.66 375.97 390.76 405.82 421.57
Region 4B 127.34 140.32 152.08 164.31 177.03 190.11 203.52 217.21 231.11 245.21 259.49
Region 5 233.96 252.67 268.83 286.03 304.13 323.03 342.64 362.88 383.69 405.01 427.41
Visayas 1,533.98 1,625.73 1,690.22 1,763.24 1,835.24 1,909.15 1,986.82 2,066.99 2,148.40 2,233.80 2,324.46
Region 6 498.34 526.49 546.76 569.92 589.57 608.97 628.44 647.91 667.58 687.29 708.14
Region 7 850.70 902.99 939.04 980.64 1,024.69 1,070.83 1,121.26 1,172.30 1,225.83 1,283.20 1,344.51
Region 8 184.94 196.26 204.41 212.68 220.98 229.36 237.12 246.78 254.99 263.31 271.81
Mindanao 1,600.10 1,761.10 1,957.07 2,051.77 2,141.17 2,237.59 2,337.36 2,440.88 2,542.90 2,646.94 2,713.87
Region 9 185.84 201.31 210.20 219.85 229.77 240.78 252.42 264.69 277.56 291.01 305.04
Region 10 401.88 479.88 595.58 623.72 652.61 682.57 713.09 745.20 773.25 803.73 835.11
Region 11 507.03 538.07 580.09 607.76 634.13 661.01 691.98 722.46 754.34 783.39 774.14
Region 12 299.90 309.03 319.04 329.74 340.36 351.38 362.61 374.04 385.67 397.51 409.50
CARAGA 148.65 160.57 172.19 182.77 193.51 206.92 218.73 230.99 244.21 257.65 271.03
ARMM 56.82 72.25 79.96 87.94 90.78 94.92 98.52 103.50 107.88 113.64 119.05
TOTAL 11,764.15 12,473.83 13,114.81 13,692.08 14,239.46 14,795.28 15,399.17 16,007.64 16,634.89 17,249.78 17,914.39
SUMMARY TABLES

Table 5. Luzon Number of Metered Customers, 2015-2025

Customer Actual Forecasted


Classification 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Residential 10,414,494 10,796,575 11,177,043 11,564,093 11,956,269 12,354,483 12,758,106 13,167,061 13,580,816 13,999,911 14,422,351
Commercial 797,223 826,520 851,809 877,774 904,563 932,322 961,125 990,828 1,021,705 1,053,846 1,086,840
Industrial 37,864 39,725 41,376 43,150 44,993 46,762 48,505 50,270 52,034 53,774 55,475
Others 165,574 180,266 190,232 200,794 211,951 222,858 234,250 246,112 258,484 271,385 283,338
Total 11,415,156 11,843,086 12,260,460 12,685,811 13,117,775 13,556,424 14,001,987 14,454,272 14,913,038 15,378,916 15,848,004

Table 6. Visayas Number of Metered Customers, 2015-2025

Customer Actual Forecasted


Classification 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Residential 3,009,115 3,132,055 3,270,189 3,407,571 3,547,202 3,686,711 3,826,271 3,967,236 4,109,396 4,251,008 4,393,401
Commercial 161,989 168,499 173,946 179,216 184,927 190,717 196,755 203,045 209,431 215,996 222,823
Industrial 8,113 8,528 8,860 9,180 9,572 9,997 10,383 10,822 11,267 11,736 12,226
Others 66,627 70,065 73,168 76,601 80,393 84,554 89,035 93,941 99,310 105,067 111,409
Total 3,245,843 3,379,147 3,526,162 3,672,568 3,822,094 3,971,979 4,122,445 4,275,044 4,429,404 4,583,807 4,739,859

Table 7. Mindanao Number of Metered Customers, 2015-2025

Customer Actual Forecasted


Classification 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Residential 2,793,038 2,961,759 3,128,684 3,305,092 3,492,783 3,691,743 3,900,239 4,119,046 4,345,699 4,581,064 4,823,601
Commercial 213,698 226,772 238,681 252,229 267,121 283,433 300,474 318,898 338,220 358,736 379,834
Industrial 13,082 13,826 14,573 15,493 16,509 17,611 18,811 20,095 21,464 22,906 24,435
Others 89,299 94,439 99,984 106,231 113,085 120,489 128,371 136,699 145,424 154,497 163,860
Total 3,109,117 3,296,796 3,481,923 3,679,045 3,889,497 4,113,276 4,347,894 4,594,739 4,850,807 5,117,203 5,391,729

6
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

2016-2025 DDP Summary Tables


2016-2025 DDP Summary Tables

7
SUMMARY TABLES

Table 8. Luzon Energy Sales, 2015-2025 (in MWh)

Customer Actual Forecasted


Classification 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Residential 16,620,491 17,215,435 17,917,159 18,648,905 19,361,175 20,104,484 20,845,437 21,609,489 22,399,288 23,196,821 23,793,581
Commercial 15,416,239 18,160,311 18,769,440 19,590,719 20,368,137 21,235,399 22,110,992 23,032,378 23,988,734 24,959,133 25,942,201
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 7,575,080 13,745,990 13,911,674 14,459,381 15,031,691 15,638,855 16,263,893 16,916,248 17,607,316 18,313,260 19,051,483
Others 912,613 945,857 997,435 1,044,234 1,097,980 1,154,179 1,211,661 1,270,936 1,331,657 1,393,806 1,435,181
Total 40,524,422 50,067,592 51,595,707 53,743,238 55,858,983 58,132,918 60,431,983 62,829,051 65,326,995 67,863,020 70,222,446

Table 9. Visayas Energy Sales, 2015-2025 (in MWh)

Customer Actual Forecasted


Classification 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Residential 3,074,991 3,225,830 3,390,658 3,563,018 3,735,955 3,912,917 4,107,783 4,305,866 4,506,995 4,712,443 5,074,109
Commercial 1,401,385 1,464,203 1,527,441 1,596,031 1,667,004 1,740,192 1,817,022 1,894,750 1,974,934 2,058,088 2,189,494
Industrial 2,746,494 2,563,609 2,200,220 2,156,878 2,268,694 1,958,369 2,070,954 2,189,625 2,318,059 2,454,860 2,671,267
Others 541,431 519,231 542,637 565,843 590,127 614,018 639,451 664,674 690,379 716,121 768,237
Total 7,764,301 7,772,874 7,660,956 7,881,769 8,261,780 8,225,497 8,635,210 9,054,913 9,490,368 9,941,512 10,703,107

Table 10. Mindanao Energy Sales, 2015-2025 (in MWh)

Customer Actual Forecasted


Classification 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Residential 3,167,960 3,393,365 3,702,452 3,903,688 4,087,654 4,275,860 4,474,204 4,681,279 4,896,666 5,124,087 5,362,857
Commercial 1,374,416 1,500,613 1,705,717 1,803,590 1,891,757 1,980,244 2,075,592 2,177,550 2,287,503 2,406,038 2,534,181
Industrial 3,164,191 3,641,294 4,250,444 4,496,961 4,723,412 4,950,798 5,187,932 5,418,997 5,649,959 5,862,624 6,084,858
Others 397,378 427,242 457,488 486,381 512,892 540,797 571,510 604,308 640,459 678,009 719,088
Total 8,103,944 8,962,514 10,116,101 10,690,620 11,215,715 11,747,699 12,309,237 12,882,135 13,474,587 14,070,759 14,700,984
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Distribution Utilities in the Philippines


Distribution Utilities
in the Philippines

8
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

NCR REGION I

LUZON
21
1. MERALCO 7. DECORP
Distribution Utilities in the Philippines

8. LUECO
CAR 9. CENPELCO
2. BENECO 10. INEC
3. IFELCO
11. ISECO
4. KAELCO
12. LUELCO
5. MOPRECO
10 16 13. PANELCO I
6. ABRECO
15 14. PANELCO III
6
REGION III 4
11
REGION II
5 18
22. AEC
3 17 15. CAGELCO I
8
23. CEDC
12 2 16. CAGELCO II
24. CELCOR 19 20
13 7 14 17. ISELCO I
25. OEDC 31
9 18. ISELCO II
38 29
26. SEZ 41 39 24
22 28 32 19. NUVELCO
40 43
27. SFELAPCO 42 30
25 34 37 33 20. QUIRELCO
23 35
28. TEI
26 36 1 21. BATANELCO
29. AURELCO 27 51
49
30. NEECO I 64
47 46
31. NEECO II-Area 1 53 44 48 50 68 71
45 66
32. NEECO II-Area 2 54 65 67
56 63
33. PELCO I 61 60 70
55 62
34. PELCO II 69
73
35. PELCO III 59 58
52 72
36. PENELCO
37. PRESCO
REGION IV-A MIMAROPA REGION V
38. SAJELCO
44. FBPC 52. BISELCO 63. ALECO
39. TARELCO I
45. IEC 53. LUBELCO 64. CANORECO
40. TARELCO II 57
46. LEZ 54. MARELCO 65. CASURECO I
41. ZAMECO I
47. BATELEC I 55. OMECO 66. CASURECO II
42. ZAMECO II
48. BATELEC II 56. ORMECO 67. CASURECO III
43. PAMES
49. FLECO 57. PALECO 68. CASURECO IV
50. QUEZELCO I 58. ROMELCO 69. SORECO I
51. QUEZELCO II 59. TIELCO 70. SORECO II
60. Banton 71. FICELCO
61. Concepcion 72. MASELCO
62. Corcuera 73. TISELCO

9
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

REGION VI

Distribution Utilities in the Philippines


VISAYAS
1. PECO 7. ILECO I
2. AKELCO 8. ILECO II
3. ANTECO 9. ILECO III
4. CAPELCO 10. NONECO
5. CENECO 11. NOCECO
6. GUIMELCO
34

35

38
36
2 27
29
4 30
9 24 33
31
3 28
8
20
7 1 10
12
6 5 21 25 32

16 14 37

22 15
11 18
19 17
13

23

26

REGION VII REGION VIII


12. BEZ 20. CEBECO II 27. BILECO 33. LEYECO V
13. BLCI 21. CEBECO III 28. DORELCO 34. NORSAMELCO
14. MECO 22. NORECO I 29. ESAMELCO 35. SAMELCO I
15. MEZ 23. NORECO II 30. LEYECO II 36. SAMELCO II
16. VECO 24. BANELCO 31. LEYECO III 37. SOLECO
17. BOHECO I 25. CELCO 32. LEYECO IV 38. MMPC
18. BOHECO II 26. PROSIELCO
19. CEBECO I

10
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

REGION IX
Distribution Utilities in the Philippines

MINDANAO
1. ZAMCELCO
2. ZAMSURECO I
3. ZAMSURECO II
4. ZANECO

REGION X REGION XI
5. CEPALCO 15. DLPC 31
6. ILPI 16. DANECO
27
7. BUSECO 17. DASURECO
28
8. CAMELCO 18. DORECO
8
9. FIBECO
25 30
10. LANECO
14
11. MOELCI I 11 5
4 13 26
12. MOELCI II 6 29
12 7
13. MORESCO I 2 10
32 39 9
14. MORESCO II 3 16
19 21 15
18
1
20
33

34 24
17
22
35 23
37

36
38

REGION XII CARAGA ARMM


19. CLPC 25. ANECO 32. LASURECO
20. COTELCO 26. ASELCO 33. MAGELCO
21. COTELCO-PPALMA 27. SIARELCO 34. BASELCO
22. SOCOTECO I 28. SURNECO 35. CASELCO
23. SOCOTECO II 29. SURSECO I 36. SIASELCO
24. SUKELCO 30. SURSECO II 37. SULECO
31. DIELCO 38. TAWELCO
39. Bumbaran

11
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

System Map of Distribution Utilities Per Region


System Map of Distribution
Utilities Per Region

12
System Map
NCR
of Distribution
DistributionUtilities
UtilitiesPer Region

13
NCR
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

1
MERALCO
MANILA ELECTRIC COMPANY (MERALCO)
Number of Barangays: Status of Household Energization:
Grid: 4,298 97.3 % (6,768,173 HH / 6,958,185 HH)
BULACAN Off-grid: 36
1
Franchise Area: Customer Captive Customer
Sales (MWh)
9,337.5 sq. km. Classification Connection
2 3
4 Residential 5,295,458 11,116,664
Franchise Population:
5 RIZAL 472,322 12,535,211
28,003,919 Commercial
6
METRO 9 7 Industrial 9,570 5,253,633
MANILA 8
Circuit kilometer:
LEGEND: Others 4,495 188,221
Energized DU System
21,825
10 5,781,845 29,093,729
Substation 11
TOTAL
Backbone Line 12
14 16 Customer/s Served by RES: 360
13 Sales for Customer/s served by RES: 7,526,041 MWh
CAVITE

15 System Loss: 2,534,635 MWh (6.47%)


LAGUNA
BATANGAS 17
No. SS Name Demand Annual Average Growth Rate (2016-2025) : 3.72%

1 Cruz na Daan S/S QUEZON PROVINCE


2 Malolos S/S
3 San Jose (NGCP) S/S Actual
4 Duhat S/S
Batangas
5 Balintawak S/S City
6 Araneta S/S
7 Santolan S/S
8 Dolores S/S Supply
9 Paco S/S
10 Zapote S/S Demand
11 Sucat S/S
12 Biñan S/S
13 Sta. Rosa S/S
14 Dasmariñas S/S
15 Amadeo S/S
16 Malaya S/S
17 Calauan S/S

14
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

NCR Distribution Utilities


DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

CAR
UtilitiesPer Region
DistributionUtilities
of Distribution

Peak
Distribution
Demand 5
System MapCAR

Utility 2
(MW)
1 BENECO 73.82
2 ABRECO 8.89 3
3 MOPRECO 4.78
4 IFELCO 4.57
4
1
5 KAELCO -
Total 92.07

2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 294,653 159,852
Commercial 15,836 9,294
Industrial 446 42,646
Others 7,435 260,009
Total 318,370 471,801

15
BENGUET ELECTRIC COOPERATIVE, INC. (BENECO)
Number of Barangays: Status of Household Energization:
Grid: 269 89% (169,708 HH / 190,700 HH)
Off-grid: -
Franchise Area:
2,664 sq. km. Customer Captive Customer
Sales (MWh)
Classification Connection
Franchise Population:
170,749 Residential 157,480 191,684
Commercial 10,809 146,702
Circuit kilometer: Industrial 25 1,786
11.8
Others 2,435 26,518
TOTAL 170,749 366,690
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 38,481 MWh (9.50 %)

Demand Annual Average Growth Rate (2016-2025) : 3.52 %

Actual

LEGEND:
Energized DU System
Substation
Backbone Line
Supply
Demand
No. SS Name SS Capacity
1 Bulalacao S/S 3 MVA
2 Atok S/S 5 MVA
3 Lamut S/S 30 MVA
4 NSC S/S 100 MVA
5 Irisan S/S 20 MVA

16
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

CAR Distribution Utilities


CAR Distribution Utilities

17
IFUGAO ELECTRIC COOPERATIVE, INC. (IFELCO)
Number of Barangays: Status of Household Energization:
Grid: 173 87.6 % (35,394 HH / 40,400 HH)
Off-grid: 2
Franchise Area:
2,567 sq. km. Customer Captive Customer
Sales (MWh)
Classification Connection
Franchise Population:
191,078 Residential 29,057 10,962
Commercial 1,292 2,996
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Circuit kilometer: Industrial 93 1,054


718.3
Others 1,505 3,029
TOTAL 31,947 18,041
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 2,692 MWh (12.98 %)

Demand Annual Average Growth Rate (2016-2025) : 5.78 %

Actual

LEGEND:
Energized DU System Supply
Substation
Backbone Line Demand

No. SS Name SS Capacity


1 Lagawe S/S (NGCP) 5 MVA
2 Alfonso Vista S/S 5 MVA
KALINGA-APAYAO ELECTRIC COOPERATIVE, INC. (KAELCO)
Number of Barangays: Status of Household Energization:
Grid: 269 82.8 % (43,205 HH / 52,200 HH)
Off-grid: -

Customer Captive Customer


Sales (MWh)
Classification Connection
Residential 34,534 19,310
Commercial 823 2,883
Industrial 53 2,037
Others 981 3,827
TOTAL 36,391 28,057
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 38,481 MWh (9.50 %)

Demand Annual Average Growth Rate (2016-2025) : 3.52 %

Franchise Area:
2,664 sq. km.

Franchise Population:
170,749

Circuit kilometer:
11.8

LEGEND:
Energized DU System
Energized by other system
Substation No. SS Name SS Capacity
Backbone Line 1 Bulanao S/S 10 MVA

18
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

CAR Distribution Utilities


CAR Distribution Utilities

19
MOUNTAIN PROVINCE ELECTRIC COOPERATIVE, INC. (MOPRECO)
Number of Barangays: Status of Household Energization:
Grid: 144 88.3 % (34,269 HH / 38,800 HH)
Off-grid: -

Customer Captive Customer


Sales (MWh)
Classification Connection
Residential 32,849 9,994
Commercial 1,420 2,631
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 0 0
Others 1,173 4,519
TOTAL 35,442 17,145
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 2,183 MWh (11.89 %)


Franchise Area:
229.23 sq. km.
Demand Annual Average Growth Rate (2016-2025) : 4.17 %
Franchise Population:
140,439 Actual

Circuit kilometer:
139

LEGEND: Supply
Energized DU System
Substation Demand
Backbone Line

No. SS Name SS Capacity


1 Sagada S/S 2.5 MVA
2 Bauko S/S 2.5 MVA
ABRA ELECTRIC COOPERATIVE, INC. (ABRECO)
Number of Barangays: Status of Household Energization:
Grid: 303 86.3 % (49,510 HH / 57,400 HH)
Off-grid: -

Franchise Area: Customer Captive Customer


Sales (MWh)
3,978 sq. km. Classification Connection
Residential 39,797 27,679
Franchise Population:
658,587 Commercial 1,492 4,601
Industrial 275 4,406
Circuit kilometer:
Others 1,341 4,648
55.4
TOTAL 42,905 41,334
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 2,313 MWh (11.89 %)

Demand Annual Average Growth Rate (2016-2025) : 3.07 %

Actual

Supply
LEGEND: Demand
Energized DU System
Substation
Backbone Line

No. SS Name SS Capacity


1 Bangued S/S 2X5 MVA

20
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

CAR Distribution Utilities


DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region I
Utilities
I Distribution Per Region
Utilities

Peak 1
of Distribution

Distribution
Demand
Utility
(MW)
Region

1 INEC 50.59
System Map

2 ISECO 46.08
3 LUELCO 37.02 2
4 LUECO 28.94
5 PANELCO III 54.58 4
6 DECORP 61.05
3
7 CENPELCO 62.09
8
8 PANELCO I 20.79 6 5
7
Total 361.14

2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 929,277 496,345
Commercial 60,113 153,936
Industrial 1,077 112,901
Others 25,401 979,675
Total 1,015,868 1,742,858

21
DAGUPAN ELECTRIC CORPORATION (DECORP)
Number of Barangays: Status of Household Energization:
Grid: 165 83.9 % (112,248 HH / 133,838 HH)
Off-grid: -

Franchise Area: Customer Captive Customer


Sales (MWh)
349 sq. km. Classification Connection
Residential 97,015 135,375
Franchise Population:
574,359 Commercial 9,997 107,799
Industrial 15 53,116
Circuit kilometer: 48 4,502
Others
623.9
TOTAL 107,075 300,793
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 24,190 MWh (7.44 %)

Demand Annual Average Growth Rate (2016-2025) : 3.96 %

Actual

LEGEND:
Energized DU System
Substation
Supply
Backbone Line
Demand
No. SS Name SS Capacity

1 San Jacinto S/S 2 X 15/20 MVA


2 Dagupan S/S 2 X 20/25 MVA
3 Calasiao S/S 2 X 20/27/33 MVA

22
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region I Distribution Utilities


Region I Distribution Utilities

23
LA UNION ELECTRIC COMPANY, INC. (LUECO)
Number of Barangays: Status of Household Energization:
Grid: 139 98.3 % (49,118 HH / 49,961 HH)
Off-grid: -

Franchise Area: Customer Captive Customer


Sales (MWh)
233.01 sq. km. Classification Connection
Residential 37,979 62,507
Franchise Population:
272,846 Commercial 4,742 53,877
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 18 18,056
Circuit kilometer:
Others 57 7,913
623.9
TOTAL 42,796 142,354
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 13,727 MWh (8.79 %)

Demand Annual Average Growth Rate (2016-2025) : 2.91 %

Actual

LEGEND:
Energized DU System
Supply
Substation
Backbone Line Demand
No. SS Name SS Capacity

1 Poro S/S 35 MVA


2 Bauang S/S 27.5 MVA
CENTRAL PANGASINAN ELECTRIC COOPERATIVE, INC. (CENPELCO)
Number of Barangays: Status of Household Energization:
Grid: 553 97.9 % (221,156 HH / 225,900 HH)
Off-grid: -

Customer Captive Customer


Sales (MWh)
Classification Connection
Residential 178,541 186,979
Franchise Area: Commercial 8,884 64,872
1,632 sq. km. Industrial 117 5,802
Others 2,808 27,003
Franchise Population:
225,900 TOTAL 190,350 284,656
Customer/s Served by RES:
Circuit kilometer: Sales for Customer/s served by RES:
2,354.7
System Loss: 36,861 MWh (11.46 %)

LEGEND: Demand Annual Average Growth Rate (2016-2025) : 2.76 %


Energized DU System
Substation
Backbone Line
Actual

No. SS Name SS Capacity


1 San Carlos S/S 20 MVA
2 Bugallon S/S 10 MVA
3 Bayambang S/S 10 MVA Supply
4 Mangaldan Guilig S/S 15 MVA
5 Mangaldan Bari S/S 5 MVA Demand
6 Lingayen S/S 2 X 5 MVA
7 Malasiqui S/S 2 X 5 MVA
8 Labrador S/S 10 MVA
9 Binmaley S/S 7.5 MVA
10 Mangatarem S/S 10 MVA
11 Urbiztondo S/S 5 MVA
12 Bautista S/S 10 MVA

24
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region I Distribution Utilities


Region I Distribution Utilities

25
ILOCOS NORTE ELECTRIC COOPERATIVE, INC. (INEC)
Number of Barangays: Status of Household Energization:
Grid: 557 93.0 % (153,503 HH / 165,100 HH)
Off-grid: -

Customer Captive Customer


Sales (MWh)
Classification Connection

Franchise Area: Residential 132,346 126,385


1,504 sq. km. Commercial 10,151 98,001
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 13 5,013
Franchise Population:
568,017 Others 12,982 12,137
TOTAL 155,492 241,537
Circuit kilometer: Customer/s Served by RES:
2,421.7 Sales for Customer/s served by RES:

System Loss: 31,371 MWh (11.50 %)

Demand Annual Average Growth Rate (2016-2025) : 5.63 %


LEGEND:
Energized DU System
Substation
Backbone Line

Actual

No. SS Name SS Capacity


1 MHPP Pagudpud S/S 2 MVA Supply
2 Burgos S/S 10 MVA
3 Laoag S/S 10 MVA Demand
4 San Nicolas S/S 15 MVA
5 Piddig S/S 5 MVA
6 Dingras S/S 5 MVA
7 Vintar Road S/S 2 X 10 MVA
8 Batac S/S 10 MVA
9 Marcos S/S 5 MVA
10 Curimao S/S 2 X 5 MVA
ILOCOS SUR ELECTRIC COOPERATIVE, INC. (ISECO)
Number of Barangays: Status of Household Energization:
Franchise Area: Grid: 768 91.8 % (172,167 HH / 187,500 HH)
2,596 sq. km. Off-grid: -

Franchise Population: Customer Captive Customer


Sales (MWh)
658,587 Classification Connection
Residential 150,927 145,899
Circuit kilometer:
Commercial 7,558 55,113
1,389.7
Industrial 55 6,882
Others 3,615 22,860
No. SS Name SS Capacity
1 Sto. Domingo S/S 10 MVA TOTAL 162,155 230,754
2 Vigas S/S 25 MVA Customer/s Served by RES:
3 Narvacan S/S 10 MVA Sales for Customer/s served by RES:
4 Santiago S/S 5 MVA
5 Candon S/S 15 MVA System Loss: 26,941 MWh (10.45 %)

Demand Annual Average Growth Rate (2016-2025) : 3.34 %

Actual

Supply
Demand

LEGEND:
Energized DU System
Substation
Backbone Line

26
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region I Distribution Utilities


Region I Distribution Utilities

27
LA UNION ELECTRIC COOPERATIVE, INC. (LUELCO)
Number of Barangays: Status of Household Energization:
Grid: 536 94.5 % (135,170 HH / 143,000 HH)
Off-grid: -

No. SS Name SS Capacity Customer Captive Customer


Sales (MWh)
1 Balaoan S/S 10 MVA Classification Connection
2 Bacnotan S/S 10 MVA Residential 116,508 108,706
3 Naguilian S/S 15 MVA
Commercial 4,489 22,178
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

4 Aringay S/S 15 MVA


5 Damortis S/S 10 MVA Industrial 90 20,642
6 Alacan S/S 5 MVA Others 2,389 14,257
Franchise Area: TOTAL 123,476 165,785
1,504 sq. km. Customer/s Served by RES:
Sales for Customer/s served by RES:
Franchise Population:
623,468 System Loss: 20,339 MWh (10.93 %)

Circuit kilometer: Demand Annual Average Growth Rate (2016-2025) : 7.62 %


1,129.75

LEGEND:
Energized DU System
Substation
Backbone Line Actual

Supply
Demand
PANGASINAN I ELECTRIC COOPERATIVE, INC. (PANELCO I)
Number of Barangays: Status of Household Energization:
Grid: 190 95.2 % (76,274 HH / 80,100 HH)
Off-grid: 2

Customer Captive Customer


Sales (MWh)
Franchise Area: Classification Connection
1,424 sq. km. Residential 63,540 58,740
Commercial 2,332 8,850
Franchise Population:
362,619 Industrial 179 21,400
Others 1,508 4,883
Circuit kilometer: TOTAL 67,559 93,873
1,528.4
Customer/s Served by RES:
Sales for Customer/s served by RES:
LEGEND: System Loss: 14,150 MWh (12.99 %)
Energized DU System
Substation
Backbone Line Demand Annual Average Growth Rate (2016-2025) : 4.93 %

Actual

Supply
Demand
No. SS Name SS Capacity
1 Tara Bolinao S/S 10 MVA
2 San Jose, Bani S/S 5 MVA
3 Palamis Alaminos S/S 15 MVA
4 Bobonot Dasol S/S 10 MVA

28
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region I Distribution Utilities


Region I Distribution Utilities

29
PANGASINAN III ELECTRIC COOPERATIVE, INC. (PANELCO III)
Number of Barangays: Status of Household Energization:
Grid: 421 95.5 % (166,961 HH / 174,800 HH)
Off-grid: -

Customer Captive Customer


Sales (MWh)
Classification Connection
Residential 152,421 155,084
Commercial 11,960 85,654
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 590 23,024


Others 1,994 19,345
TOTAL 166,965 283,106
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 14,150 MWh (12.99 %)

Franchise Area: Demand Annual Average Growth Rate (2016-2025) : 3.93 %


1,560 sq. km.

Franchise Population: LEGEND:


198,889 Energized DU System
Actual
Substation
Backbone Line
Circuit kilometer:
1,040.0

No. SS Name SS Capacity


Supply
1 Urdaneta I S/S 20 MVA Demand
2 Urdaneta II S/S 30 MVA
3 Binalonan S/S 25 MVA
4 Rosales I S/S 15 MVA
5 Rosales II S/S 15 MVA
6 Tayug I S/S 5 MVA
7 Tayug II S/S 10 MVA
8 Umingan S/S 5 MVA
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region II

Per Region
Utilities
1

Utilities
II Distribution
of Distribution
Peak
Distribution
Demand
Utility
(MW)

Region
System Map
1 BATANELCO 1.70
2 CAGELCO II 29.26 2

3 CAGELCO I 45.35 3

4 ISELCO II 36.39
4
5 ISELCO I 72.00 5
6 QUIRELCO 7.61 7
6
7 NUVELCO 22.65
Total 214.94

2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 625,486 221,939
Commercial 32,244 140,677
Industrial 1,661 96,415
Others 22,297 483,906
Total 681,688 942,936

30
Region II Distribution Utilities

31
CAGAYAN I ELECTRIC COOPERATIVE, INC. (CAGELCO I)
Number of Barangays: Status of Household Energization:
Grid: 379 96.1 % (133,021 HH / 138,400 HH)
Off-grid: 7

Customer Captive Customer


Sales (MWh)
Classification Connection
Residential 113,201 94,145
Commercial 8,493 70,151
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 63 1,011
Others 3,362 33,588
TOTAL 125,119 198,895
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 25,120 MWh (11.21 %)

Demand Annual Average Growth Rate (2016-2025) : 6.65 %

Franchise Area:
4,207 sq. km. LEGEND:
Energized DU System
Franchise Population: Substation
Backbone Line
Actual
593,371

Circuit kilometer:
3,001.3
Supply
Demand
No. SS Name SS Capacity
1 Piat S/S 10 MVA
2 Alcala S/S 5 MVA
3 Solana S/S 15 MVA
4 Tuguegarao S/S (NGCP) 15 MVA
5 Carig S/S 10 MVA
CAGAYAN II ELECTRIC COOPERATIVE, INC. (CAGELCO II)
Number of Barangays: Status of Household Energization:
Grid: 510 91.7 % (116,202 HH / 126,700 HH)
Off-grid: -
Franchise Area: Customer Captive Customer
6,851 sq. km. Sales (MWh)
Classification Connection

Franchise Population: Residential 103,089 71,252


141,744 Commercial 4,461 17,810
Industrial 27 17,959
Circuit kilometer:
1,446.2 Others 2,243 9,446
TOTAL 109,820 116,467
LEGEND: Customer/s Served by RES:
Energized DU System Sales for Customer/s served by RES:
Substation
Backbone Line
System Loss: 18,100 MWh (13.45 %)

Demand Annual Average Growth Rate (2016-2025) : 3.10 %

Actual

Supply
Demand
No. SS Name SS Capacity
Magapit-Bantay-Zitanga-
- 30MVA
Lucban
- CEZA-Tangatan 15 MVA
- Mission 5 MVA

32
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region II Distribution Utilities


Region II Distribution Utilities

33
ISABELA I ELECTRIC COOPERATIVE, INC. (ISELCO I)
Number of Barangays: Status of Household Energization:
Grid: 484 98.6 % (194,839 HH / 197,700 HH)
Off-grid: -

Customer Captive Customer


Sales (MWh)
Classification Connection
LEGEND: Residential 159,450 140,086
Energized DU System Commercial 10,347 91,487
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Substation
Backbone Line Industrial 316 66,988
Others 10,242 23,900
TOTAL 180,355 322,460
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 45,207 MWh (12.30 %)

Franchise Area: Demand Annual Average Growth Rate (2016-2025) : 6.13 %


2,268 sq. km.

Franchise Population:
- Actual

Circuit kilometer:
1,763.5

No. SS Name SS Capacity


Supply
1 Reina Mercedes S/S 10 MVA Demand
2 Cauayan S/S 20 MVA
3 Cauayan S/S (NGCP) 10 MVA
4 Cabatuan S/S 5 MVA
5 Santiago S/S (NGCP) 20 MVA
6 Santiago Batal S/S 15 MVA
7 Alicia S/S 15 MVA
8 Cordon S/S 10 MVA
ISABELA II ELECTRIC COOPERATIVE, INC. (ISELCO II)
Number of Barangays: Status of Household Energization:
Grid: 506 83.0 % (130,360 HH / 157,000 HH)
Off-grid: 39

Franchise Area: Customer Captive Customer


Sales (MWh)
6,090 sq. km. Classification Connection
Residential 131,582 90,847
Franchise Population:
- Commercial 3,682 26,697
Industrial 603 25,687
Circuit kilometer: Others 2,193 18,176
2,076.8
TOTAL 138,060 161,407
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 27,365 MWh (14.50 %)

Demand Annual Average Growth Rate (2016-2025) : 3.01 %

Actual
LEGEND:
Energized DU System
Substation
Backbone Line
Supply
SS Demand
No. SS Name
Capacity
1 San Manuel S/S 10 MVA
2 Roxas S/S 10 MVA
3 Cabagan S/S 10 MVA
4 Ilagan S/S (NGCP) 15MVA
5 Naguilian S/S 5 MVA

34
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region II Distribution Utilities


Region II Distribution Utilities

35
NUEVA VIZCAYA ELECTRIC COOPERATIVE, INC. (NUVELCO)
Number of Barangays: Status of Household Energization:
Grid: 255 87.9 % (84,377 HH / 96,000 HH)
Off-grid: 20

Customer Captive Customer


Sales (MWh)
Classification Connection
Residential 79,443 65,163
Franchise Area: 2,505 7,939
Commercial
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

3,904 sq. km.


Industrial 615 26,240
Franchise Population: Others 2,494 6,666
397,876 TOTAL 85,057 106,007
Circuit kilometer: Customer/s Served by RES:
2,648.8 Sales for Customer/s served by RES:

System Loss: 19,075 MWh (15.25 %)

Demand Annual Average Growth Rate (2016-2025) : 5.18 %

Actual
LEGEND:
Energized DU System
Substation
Backbone Line

Supply
Demand
SS
No. SS Name
Capacity
1 Solano S/S 10 MVA
2 Busilac S/S 15 MVA
3 Bambang S/S 10 MVA
QUIRINO ELECTRIC COOPERATIVE, INC. (QUIRELCO)
Number of Barangays: Status of Household Energization:
Grid: 144 95.7 % (46,512 HH / 48,600 HH)
Off-grid: 6

Customer Captive Customer


Sales (MWh)
Classification Connection
Residential 32,829 18,440
Commercial 2,179 6,506
Industrial 37 2,793
Others 933 2,894
TOTAL 35,978 30,632
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 5,570 MWh (15.39 %)

LEGEND:
Demand Annual Average Growth Rate (2016-2025) : 5.04 %
Energized DU System
Substation
Backbone Line

Franchise Area: Actual


3,057 sq. km.

Franchise Population:
163,610
Supply
Circuit kilometer: Demand
1,006.7

SS
No. SS Name
Capacity
1 Cajel S/S 10 MVA
2 San Leonardo S/S 5 MVA

36
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region II Distribution Utilities


Region II Distribution Utilities

37
BATANES ELECTRIC COOPERATIVE, INC. (BATANELCO)
Number of Barangays: Status of Household Energization:
Grid: - 94.4 % (5,761 HH / 6,100 HH)
Off-grid: 29

Customer Captive Customer


Sales (MWh)
Classification Connection*
Residential 4,857 3,541
Commercial 577 1,350
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 0 0
Others 830 1,746
TOTAL 6,264 6,637
LEGEND: Customer/s Served by RES:
Energized DU System Sales for Customer/s served by RES:
Backbone Line
System Loss: 375 MWh (15.39 %)

Demand Annual Average Growth Rate (2016-2025) : 8.57 %

Actual

Supply
Franchise Area:
219 sq. km. Demand
Franchise Population:
16,000

Circuit kilometer:
-
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region III

Per Region
Utilities
Utilities
1

III Distribution
of Distribution
2 Peak
Distribution
Demand
4 Utility (MW)

Region
6 7 TEI 59.00
3

System Map
17 5 8 NEECO I 27.07
7

16 9 PELCO I 39.66
8
15 10 PRESCO 7.72
10
9 11 PELCO III 32.11
18 12 11
12 PELCO II 76.31
19
14 13 SFELAPCO 107.97
21 13
20 14 AEC 98.06
Peak 15 CEDC 81.00
Distribution
Demand
Utility (MW) 16 TARELCO II 41.39
1 AURELCO 8.08 17 ZAMECO I 18.61
2 NEECO II-AREA 1 33.41 18 ZAMECO II 24.00
3 NEECO II-AREA 2 35.14 19 OEDC 32.38
4 SAJELCO 18.41 20 SEZ 100.26
5 CELCOR 43.24 21 PENELCO 83.49
6 TARELCO I 43.46 Total 1,010.75

2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 625,486 221,939
Commercial 32,244 140,677
Industrial 1,661 96,415
Others 22,297 483,906
Total 681,688 942,936

38
Region III Distribution Utilities

39
ANGELES ELECTRIC CORPORATION (AEC)
Number of Barangays: Status of Household Energization:
Grid: 33 100 % (94,387 HH / 94,387 HH)
Off-grid: -

Customer Captive Customer


Sales (MWh)
Classification Connection*
Residential 92,785 228,073
Commercial 12,270 235,380
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 570 31,724


Others 452 7,887
TOTAL 106,077 503,064
Customer/s Served by RES:
Sales for Customer/s served by RES:
Franchise Area:
62 sq. km. System Loss: 47,834 MWh (8.48 %)
Franchise Population:
326,336 Demand Annual Average Growth Rate (2016-2025) : 6.02 %

Circuit kilometer:
514.2

LEGEND: Actual
Energized DU System
Substation
Backbone Line Supply
Demand
SS
No. SS Name
Capacity
1 Milenyo S/S 35 MVA
2 Pampang S/S 50 MVA
3 Calibu S/S 40 MVA
4 Petersville S/S 40 MVA
CLARK ELECTRIC DISTRIBUTION CORPORATION (CEDC)
Number of Barangays: Status of Household Energization:
Grid: 2 -
Off-grid: -
Franchise Area:
45 sq. km. Customer Captive Customer
Sales (MWh)
Classification Connection*
Franchise Population:
- Residential 653 4,004
Commercial 1,066 189,634
Circuit kilometer: Industrial 133 269,289
167.4
Others 62 1,474
TOTAL 1,914 464,401
Customer/s Served by RES: 1
Sales for Customer/s served by RES: 44,999 MWh

System Loss: 21,263 MWh (3.94 %)

Demand Annual Average Growth Rate (2016-2025) : 8.43 %

Actual

Supply
Demand

Note: Franchise area includes Clark


Special Economic Zone which covers
parts of Angeles City and the towns of
Mabalacat and Tarlac.

40
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region III Distribution Utilities


Region III Distribution Utilities

41
CABANATUAN ELECTRIC CORPORATION (CELCOR)
Number of Barangays: Status of Household Energization:
Grid: 89 90.4 % (66,282 HH / 73,354 HH)
Off-grid: -

LEGEND: Customer Captive Customer


Sales (MWh)
Energized DU System Classification Connection
Substation
Backbone Line Residential 58,615 95,461
Commercial 7,716 94,875
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 44 12,095
Others 720 9,286
TOTAL 67,095 211,717
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 15,201 MWh (6.70 %)

Demand Annual Average Growth Rate (2016-2025) : 4.09 %

Actual
Franchise Area:
192 sq. km.

Franchise Population:
301,612

Circuit kilometer:
Supply
911.1 Demand
SS
No. SS Name
Capacity
1 Bitas S/S 25 MVA
2 Barrera S/S 25 MVA
3 Sumacab S/S 25 MVA
OLONGAPO ELECTRICITY DISTRIBUTION COMPANY, INC. (OEDC)
Number of Barangays: Status of Household Energization:
Grid: 17 96.2 % (61,025 HH / 63,454 HH)
Off-grid: -

Customer Captive Customer


Sales (MWh)
Classification Connection
Residential 42,194 103,583
Commercial 6,228 65,057
Industrial 3 1,299
Others 363 6,029
TOTAL 48,788 175,968
Customer/s Served by RES:
Franchise Area: Sales for Customer/s served by RES:
185 sq. km.
System Loss: 15,201 MWh (7.26 %)
Franchise Population:
227,270
Demand Annual Average Growth Rate (2016-2025) : 2.34 %
Circuit kilometer*:
161.1 Actual

LEGEND:
Energized DU System
Substation Supply
Backbone Line
Demand
SS
No. SS Name
Capacity
1 Kale S/S 10 MVA
2 Cbmu S/S 25 MVA
3 Mercurio S/S 2X15 MVA

42
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region III Distribution Utilities


Region III Distribution Utilities

43
SUBIC ENERZONE CORPORATION (SEZ)
Number of Barangays: Status of Household Energization*:
Grid: - 100 % (1,861 HH / 1,861 HH)
Off-grid: -

Franchise Area: Customer Captive Customer


Sales (MWh)
675 sq. km. Classification Connection
Residential 1,860 11,183
Franchise Population:
Commercial 992 53,412
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

6,306
Industrial 116 439,445
Circuit kilometer: Others 92 2,997
194 3,060 507,037
TOTAL
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 7,711 MWh (1.5 %)

Demand Annual Average Growth Rate (2016-2025) : 0.29 %

Actual

Supply
Demand

Note: Franchise area covers the whole


Subic Bay Freeport Zone.
SAN FERNANDO ELECTRIC AND POWER COMPANY, INC. (SFELAPCO)
Number of Barangays: Status of Household Energization:
Grid: 70 100 % (94,578 HH / 94,578 HH)
Off-grid: -
Franchise Area: Customer Captive Customer
203.51 sq. km. Sales (MWh)
Classification Connection
Franchise Population: Residential 84,668 176,700
405,757 Commercial 9,333 135,751
Industrial 50 169,854
Circuit kilometer*:
642.5 Others 175 3,637
TOTAL 94,226 485,942
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 30,273 MWh (6.07 %)

Demand Annual Average Growth Rate (2016-2025) : 2.59 %

Actual

Supply
SS Demand
No. SS Name
Capacity
1 Magdalena S/S 40 MVA
2 Greenville S/S 40 MVA
3 Lourdes Height S/S 40 MVA
4 Baliti S/S 31.25 MVA
5 Fortuna S/S 10 MVA

44
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region III Distribution Utilities


Region III Distribution Utilities

45
TARLAC ELECTRIC, INC. (TEI)
Number of Barangays: Status of Household Energization:
Grid: 76 100 % (80,020 HH / 80,020 HH)
Off-grid: -
Franchise Area: Customer Captive Customer
395 sq. km. Sales (MWh)
Classification Connection
Franchise Population: Residential 66,960 110,376
406,325 Commercial 4,110 117,986
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 10 90,566
Circuit kilometer:
1,121.8 Others 37 4,362
TOTAL 71,117 323,290
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 22,110 MWh (6.40 %)

Demand Annual Average Growth Rate (2016-2025) : 3.61 %

Actual
LEGEND:
Energized DU System
Substation
Backbone Line

SS
Supply
No. SS Name
Capacity Demand
1 TPC S/S 15/20 MVA
2 Panganiban S/S 20/25 MVA
3 Maliwalo S/S 10 MVA
4 San Rafael S/S 21/28 MVA
5 L.I.P. S/S 25/30 MVA
6 CAT S/S 5 MVA
AURORA ELECTRIC COOPERATIVE, INC. (AURELCO)
Number of Barangays: Status of Household Energization:
Grid: 108 95 % (48,155 HH / 50,700 HH)
Off-grid: 49
Franchise Area:
3,722 sq. km. Customer Captive Customer
Sales (MWh)
Classification Connection
Franchise Population: Residential 34,476 20,195
206,717
Commercial 2,066 4,913
Circuit kilometer: Industrial 131 3,453
1,075.2 Others 1,589 4,193
TOTAL 38,262 32,754
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 4,739 MWh (12.64 %)


LEGEND:
Energized DU System
Substation
Demand Annual Average Growth Rate (2016-2025) : 7.29 %
Backbone Line

Actual

Supply
Demand

SS
No. SS Name
Capacity
1 San Isidro S/S 10 MVA

46
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region III Distribution Utilities


Region III Distribution Utilities

47
NUEVA ECIJA I ELECTRIC COOPERATIVE, INC. (NEECO I)
Number of Barangays: Status of Household Energization:
Grid: 97 97.5 % (87,422 HH / 89,700 HH)
Off-grid: -

Franchise Area: Customer Captive Customer


Sales (MWh)
672.06 sq. m. Classification Connection
Residential 72,735 99,276
Franchise Population:
206,717 Commercial 3,250 18,116
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 97 19,261
Circuit kilometer*: 226 2,076
Others
-
TOTAL 76,308 138,728
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 18,882 MWh (11.46 %)

Demand Annual Average Growth Rate (2016-2025) : 6.00 %

LEGEND: Actual
Energized Coop System
Substation
Primary Backbone
Supply
Demand
SS
No. SS Name
Capacity
1 San Isidro S/S 10 MVA
2 Gapan S/S 20 MVA
3 Jaen S/S 20/25 MVA
4 Cabiao S/S 10MVA
NUEVA ECIJA II ELECTRIC COOPERATIVE, INC. (AREA 1) (NEECO II-A1)
Number of Barangays: Status of Household Energization:
Grid: 97 89.4 % (118,399 HH / 132,500 HH)
Off-grid: -
Franchise Area: Customer Captive Customer
5,284 sq. km. Sales (MWh)
Classification Connection
Franchise Population: Residential 104,805 102,500
558,157 Commercial 3,252 7,850
Industrial 588 37,899
Circuit kilometer:
955.78 Others 1,114 4,284
TOTAL 109,759 152,533
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 18,031 MWh (10.57 %)


LEGEND:
Energized DU System Demand Annual Average Growth Rate (2016-2025) : 6.10 %
Substation
Backbone Line

Actual

SS
Supply
No. SS Name
Capacity Demand
1 Muños S/S 10 MVA
2 Lupao S/S 10 MVA
3 Talavera S/S 15 MVA
4 Quezon S/S 5 MVA
5 Aliaga S/S 5 MVA
6 Guimba S/S 10 MVA

48
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region III Distribution Utilities


Region III Distribution Utilities

49
NUEVA ECIJA II ELECTRIC COOPERATIVE, INC.(AREA 2) (NEECO II-A2)
Number of Barangays: Status of Household Energization:
Grid: 228 92.4 % (98,626 HH / 106,700 HH)
Off-grid: -

Customer Captive Customer


Sales (MWh)
Classification Connection
Residential 82,672 102,526
Commercial 1,798 16,224
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 179 38,178


Others 1,298 4,045
TOTAL 85,947 160,973
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 19,539 MWh (10.82 %)

Demand Annual Average Growth Rate (2016-2025) : 3.53 %


Franchise Area:
1,934.2 sq. km.

Franchise Population: LEGEND: Actual


106,700 Energized DU System
Substation
Backbone Line
Circuit kilometer:
127.6 Supply
SS Demand
No. SS Name
Capacity
1 Bongabon S/S 10 MVA
2 Gen. Natividad S/S 10 MVA
3 Sta. Rosa S/S 10 MVA
4 Gen. Tinio S/S 10MVA
5 San Leonardo S/S 10 MVA
PAMPANGA I ELECTRIC COOPERATIVE, INC. (PELCO I)
Number of Barangays: Status of Household Energization:
Grid: 112 98.9 % (100,607 HH / 101,700 HH)
Off-grid: -

Franchise Area: Customer Captive Customer


Sales (MWh)
622 sq. km. Classification Connection
Residential 83,331 136,246
Franchise Population:
523,506 Commercial 4,089 42,172
Industrial 19 14,613
Circuit kilometer: Others 1,346 11,158
628.5
TOTAL 88,785 204,189
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 17,252 MWh (7.79 %)

Demand Annual Average Growth Rate (2016-2025) : 6.85 %

LEGEND:
Energized DU System
Substation Actual
Backbone Line

SS Supply
No. SS Name
Capacity
1 San Isidro S/S 5 MVA Demand
2 Pandacaqui S/S 10 MVA
3 San Nicolas S/S 10 MVA
4 Plazang Luma S/S 10MVA
5 Lagundi S/S 10 MVA
6 Sto. Domingo S/S 10 MVA
7 San Luis S/S 5 MVA

50
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region III Distribution Utilities


Region III Distribution Utilities

51
PAMPANGA II ELECTRIC COOPERATIVE, INC. (PELCO II)
Number of Barangays: Status of Household Energization:
Grid: 175 98.8 % (157,928 HH / 159,900 HH)
Off-grid: -
Franchise Area: Customer Captive Customer
756 sq. km. Sales (MWh)
Classification Connection

Franchise Population: Residential 154,833 249,879


780,069 Commercial 6,175 75,690
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 273 27,591


Circuit kilometer:
22.2 Others 17,511 19,395
TOTAL 178,792 372,556
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 49,015 MWh (11.63 %)

Demand Annual Average Growth Rate (2016-2025) : 6.20 %

LEGEND:
Actual
Energized DU System
Substation
Backbone Line

SS
Supply
No. SS Name
Capacity Demand
1 Mabalacat S/S 35 MVA
2 Manibaug S/S 10 MVA
3 Pio S/S 15 MVA
4 Guagua S/S 30 MVA
5 Remedios S/S 10 MVA
6 Sta. Cruz S/S 10 MVA
PAMPANGA III ELECTRIC COOPERATIVE, INC. (PELCO III)
Number of Barangays: Status of Household Energization:
Grid: 96 96.6 % (70,636 HH / 73,100 HH)
Off-grid: -

Customer Captive Customer


Sales (MWh)
Classification Connection
Residential 98,044 95,698
Commercial 28,790 27,910
Industrial 14,383 13,184
Others 6,021 6,953
TOTAL 147,238 143,745
Franchise Area: Customer/s Served by RES:
2,180.63 sq. km. Sales for Customer/s served by RES:

Franchise Population: System Loss: 29,941 MWh (16.90 %)


305,049
Demand Annual Average Growth Rate (2016-2025) : 4.13 %
Circuit kilometer:
335.1

Actual

LEGEND:
Energized DU System
Substation Supply
Backbone Line
Demand
SS
No. SS Name
Capacity
1 Pau S/S 20 MVA
2 Balite S/S 20 MVA
3 Macabebe S/S 10 MVA

52
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region III Distribution Utilities


Region III Distribution Utilities

53
PENINSULA ELECTRIC COOPERATIVE, INC. (PENELCO)
Number of Barangays: Status of Household Energization:
Grid: 237 97.6 % (178,244 HH / 182,600 HH)
Off-grid: -

Franchise Area: Customer Captive Customer


1,373 sq. km. Sales (MWh)
Classification Connection

Franchise Population: Residential 157,757 234,221


687,482 Commercial 8,679 37,383
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 1,163 133,809


Circuit kilometer:
1,589.4 Others 2,269 52,131
TOTAL 169,868 457,544
Customer/s Served by RES:
LEGEND: Sales for Customer/s served by RES:
Energized DU System
Substation
Backbone Line System Loss: 33,093 MWh (6.74 %)

Demand Annual Average Growth Rate (2016-2025) : 6.35 %

No. SS Name SS Capacity


1 Dinalupihan S/S 2X10 MVA
Actual
2 Hermosa S/S 10 MVA
3 Orani S/S 10 MVA
4 Samal S/S 10 MVA
5 Abucay S/S 5 MVA Supply
6 Balanga City I S/S 20 MVA
7 Balanga City Ii S/S 10 MVA Demand
8 Orion S/S 10 MVA
9 Pilar S/S 10 MVA
10 Bagac S/S 5 MVA
11 Limay S/S 10 MVA
12 Mariveles I S/S 10 MVA
13 Mariveles Ii S/S 10 MVA
14 Mariveles Iii S/S 10 MVA
15 Morong S/S 5 MVA
PAMPANGA RURAL ELECTRIC SERVICE COOPERATIVE, INC. (PRESCO)
Number of Barangays: Status of Household Energization:
Grid: 34 96.8 % (20,030 HH / 20,700 HH)
Magalang
Off-grid: -

Franchise Area: Customer Captive Customer


290 sq. km. Sales (MWh)
Classification Connection

Franchise Population: Residential 17,589 28,206


Arayat 106,276 Commercial 398 8,594
Industrial 0 0
Circuit kilometer*:
336.0 Others 240 1,148
TOTAL 18,227 37,948
Customer/s Served by RES:
Sales for Customer/s served by RES:

Mexico Sta. Ana System Loss: 3,606 MWh (8.68 %)

Demand Annual Average Growth Rate (2016-2025) : 6.49 %

LEGEND:
Energized DU System Actual
Substation
Backbone Line

Supply
Demand

SS
No. SS Name
Capacity
1 Anao S/S 10 MVA

54
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region III Distribution Utilities


Region III Distribution Utilities

55
SAN JOSE CITY ELECTRIC COOPERATIVE, INC. (SAJELCO)
Number of Barangays: Status of Household Energization:
Grid: 38 93.0 % (31,622 HH / 34,000 HH)
Off-grid: -

Franchise Area: Customer Captive Customer


Sales (MWh)
187.25 sq. km. Classification Connection
Residential 25,538 31,503
Franchise Population:
Commercial 1,334 11,694
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

141,581
Industrial 63 31,297
Circuit kilometer: Others 2,009 4,358
216.2
TOTAL 28,944 78,852
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss*: 7,600 MWh (8.79 %)

Demand Annual Average Growth Rate (2016-2025) : 7.38 %

Actual

LEGEND: Supply
Energized DU System
Substation Demand
Backbone Line

SS
No. SS Name
Capacity
1 Calaocan S/S 10 MVA
2 Sto. Tomas S/S 15 MVA
TARLAC I ELECTRIC COOPERATIVE, INC. (TARELCO I)
Number of Barangays: Status of Household Energization:
Franchise Area: Grid: 421 97.7 % (159,774 HH / 163,600 HH)
2,000 sq. km. Off-grid: -

Franchise Population: Customer Captive Customer


Sales (MWh)
159,774 Classification Connection
Residential 148,239 122,428
Circuit kilometer:
1,889.8 Commercial 6,051 13,499
Industrial 259 66,602
LEGEND:
Energized DU System Others 5,225 6,200
Substation 159,774 208,729
Backbone Line
TOTAL
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 18,520 MWh (8.15 %)

Demand Annual Average Growth Rate (2016-2025) : 7.54 %

Actual

SS
Supply
No. SS Name
Capacity Demand
1 Moncada S/S 5 MVA
2 Camiling S/S 10 MVA
3 Paniqui S/S 15 MVA
4 Gerona S/S 10 MVA
5 Victoria S/S 10 MVA
6 Sta. Ignacia S/S 10 MVA

56
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region III Distribution Utilities


Region III Distribution Utilities

57
TARLAC II ELECTRIC COOPERATIVE, INC. (TARELCO II)
Number of Barangays: Status of Household Energization:
Grid: 120 97.7 % (108,035 HH / 110,600 HH)
Franchise Area: Off-grid: -
1,057 sq. km.
Customer Captive Customer
Franchise Population: Sales (MWh)
Classification Connection
465,735
Residential 84,639 107,267
Circuit kilometer: Commercial 5,030 50,094
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

563.1
Industrial 100 51,880
Others 1,048 7,337
TOTAL 90,817 216,578
Customer/s Served by RES: 1
Sales for Customer/s served by RES: 6,008 MWh

System Loss: 19,420 MWh (8.02 %)

Demand Annual Average Growth Rate (2016-2025) : 4.56 %

LEGEND:
Energized DU System Actual
Substation
Backbone Line

SS
Supply
No. SS Name
Capacity Demand
1 Lapaz S/S 10 MVA
2 Concepcion S/S 20 MVA
3 Capas I S/S 10 MVA
4 Capas II S/S 20 MVA
5 Bamban I S/S 5 MVA
6 Bamban II S/S 5 MVA
ZAMBALES I ELECTRIC COOPERATIVE, INC. (ZAMECO I)
Number of Barangays: Status of Household Energization:
Grid: 118 96.2 % (59,751 HH / 62,100 HH)
Off-grid: -
Franchise Area: Customer Captive Customer
2,448.83 sq. km. Sales (MWh)
Classification Connection

Franchise Population: Residential 51,895 56,253


257,710 Commercial 3,281 15,138
Industrial 99 17,378
Circuit kilometer:
830.6 Others 680 5,248
TOTAL 55,955 94,016
Customer/s Served by RES:
LEGEND: Sales for Customer/s served by RES:
Energized DU System
Substation
Backbone Line
System Loss: 11,850 MWh (11.61 %)

Demand Annual Average Growth Rate (2016-2025) : 4.04 %

Actual

Supply
Demand
SS
No. SS Name
Capacity
1 Candelaria S/S 10 MVA
2 Salaza S/S 5 MVA
3 Iba S/S 10 MVA
4 Botolan S/S 5 MVA

58
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region III Distribution Utilities


Region III Distribution Utilities

59
ZAMBALES II ELECTRIC COOPERATIVE, INC. (ZAMECO II)
Number of Barangays: Status of Household Energization:
Grid: 112 97.3 % (77,240 HH / 79,400 HH)
Off-grid: -

Franchise Area: Customer Captive Customer


Sales (MWh)
1,343.69 sq. km. Classification Connection
Residential 63,399 79,894
Franchise Population:
276,733 Commercial 3,938 19,198
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 84 12,232
Circuit kilometer: 2,747 11,057
Others
760.6
TOTAL 70,168 122,382
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 16,056 MWh (11.65 %)

LEGEND: Demand Annual Average Growth Rate (2016-2025) : 4.59 %


Energized DU System
Substation
Backbone Line

Actual

Supply
SS Demand
No. SS Name
Capacity
1 San Felipe S/S 5 MVA
2 San Narciso S/S 10 MVA
3 Castillejos S/S 10 MVA
4 NETC S/S 1.5 MVA
5 Subic S/S 2X10 MVA
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region IV-A

Utilities
Distribution Per Region
Utilities
Peak

Distribution
Distribution
Demand
Utility (MW)
1

Map ofIV-A
1 QUEZELCO II 7.14
2 BATELEC II 136.00

SystemRegion
3 FLECO 17.76
4 QUEZELCO I 32.69
9 5 BATELEC I 57.43
3 6 LEZ 26.46
7 FBPC 9.88
5 8 IEC 4.06
6 Total 291.42
7 2 4
8 9 MERALCO

2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 590,883 305,087
Commercial 22,603 414,193
Industrial 472 113,441
Others 23,204 663,780
Total 637,162 1,496,500
Note: Excluding data for MERALCO

60
Region IV-A Distribution Utilities

61
IBAAN ELECTRIC AND ENGINEERING CORPORATION (IEEC)
Number of Barangays: Status of Household Energization:
Grid: 27 98.4 % (12,251 HH / 12,449 HH)
Off-grid: -

Franchise Area: Customer Captive Customer


Sales (MWh)
72 sq. km. Classification Connection
Residential 11,665 13,363
Franchise Population:
- Commercial 748 5,101
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 37 2,977
Circuit kilometer: Others 64 442
50.2
TOTAL 12,514 21,882
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 2,042 MWh (8.53 %)

Demand Annual Average Growth Rate (2016-2025) : 3.20 %

LEGEND:
Energized DU System
Substation
Actual
Backbone Line

Supply
Demand

SS
No. SS Name
Capacity
1 Palindan S/S 10 MVA
BATANGAS I ELECTRIC COOPERATIVE, INC. (BATELEC I)
Number of Barangays: Status of Household Energization:
Grid: 33 98.2 % (164,587 HH / 167,600 HH)
Off-grid: -

Franchise Area: Customer Captive Customer


Sales (MWh)
1,800 sq. km. Classification Connection
Residential 131,536 145,281
Franchise Population:
- Commercial 4,332 70,251
Industrial 25 55,188
Circuit kilometer:
Others 13,163 27,772
2,203
TOTAL 149,056 298,492
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 38,020 MWh (11.30 %)

Demand Annual Average Growth Rate (2016-2025) : 4.02 %


LEGEND:
Energized DU System
Substation Actual
Backbone Line

SS
No. SS Name Supply
Capacity
1 Butong S/S 15 MVA Demand
2 Palanas S/S 10 MVA
3 Mataas Na Bayan S/S 10 MVA
4 Calaca Mobile S/S 10 MVA
5 Balayan S/S 15 MVA
6 Calatagan S/S 10 MVA
7 Nasugbu S/S 20 MVA
8 Natipuan S/S 10 MVA

62
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region IV-A Distribution Utilities


Region IV-A Distribution Utilities

63
BATANGAS II ELECTRIC COOPERATIVE, INC. (BATELEC II)
Number of Barangays: Status of Household Energization:
Grid: 466 99 % (279,940 HH / 282,700 HH)
Off-grid: 15
LEGEND:
Energized DU System Customer Captive Customer
Substation Sales (MWh)
Classification Connection
Backbone Line
Franchise Area: Residential 222,471 305,282
1,602.21 sq. km. Commercial 8,782 180,573
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 56 184,120
Franchise Population:
1,089,427 Others 3,577 62,578
TOTAL 234,886 732,554
Circuit kilometer:
Customer/s Served by RES: 1
2,137.1
Sales for Customer/s served by RES: 21,072 MWh

System Loss: 83,135 MWh (13.89 %)

Demand Annual Average Growth Rate (2016-2025) : 4.12 %

No. SS Name
1 LAUREL SS
2 TALAGA SS
Actual
3 TANAUAN SS
4 MALVAR SS
5 STO. TORIBIO SS
6 SAN CARLOS SS Supply
7 CUENCA SS
8 SAN JOSE SS Demand
9 PADRE GARCIA SS
10 SAN ROQUE SS
11 MASAYA SS
12 SAN JUAN SS
13 TAYSAN SS
14 NAGSAULAY SS
15 MABINI SS
FIRST LAGUNA ELECTRIC COOPERATIVE, INC. (FLECO)
Number of Barangays: Status of Household Energization:
Grid: 164 98.2 % (64,441 HH / 65,600 HH)
Off-grid: -

Franchise Area: Customer Captive Customer


Sales (MWh)
526.44 sq. km. Classification Connection
Residential 60,792 60,356
Franchise Population:
273,923 Commercial 2,259 10,215
Industrial 164 8,794
Circuit kilometer*: Others 1,043 5,805
512.5
TOTAL 64,258 85,170
Customer/s Served by RES:
Sales for Customer/s served by RES:
LEGEND:
Energized DU System System Loss: 12,525 MWh (12.82 %)
Substation
Backbone Line
Demand Annual Average Growth Rate (2016-2025) : 3.02 %

Actual

Supply
Demand
No. SS
SS Name
Capacity
1 Famy S/S 10 MVA
2 Pakil S/S 5 MVA
3 Lumban S/S 15 MVA
4 Pagsanjan S/S 10 MVA

64
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region IV-A Distribution Utilities


Region IV-A Distribution Utilities

65
QUEZON I ELECTRIC COOPERATIVE, INC. (QUEZELCO I)
Number of Barangays: Status of Household Energization:
Grid: 802 88.4 % (161,036 HH / 182,200 HH)
Off-grid: 3

Customer Captive Customer


Sales (MWh)
Classification Connection
Residential 118,591 91,771
Commercial 3,256 14,168
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 81 14,844
Others 3,405 11,716
LEGEND: TOTAL 125,333 132,498
Energized DU System
Substation Customer/s Served by RES:
Backbone Line Sales for Customer/s served by RES:

Franchise Area: System Loss: 28,212 MWh (17.55 %)


4,481 sq. km.
Demand Annual Average Growth Rate (2016-2025) : 2.35 %
Franchise Population:
934,889

Circuit kilometer: Actual


3,953.5

No. SS
SS Name Supply
Capacity
1 Atimonan S/S 5 MVA
2 Pitogo S/S 5 MVA
Demand
3 Gumaca S/S 5 MVA
4 Hondagua S/S 5 MVA
5 Bacungan S/S 5 MVA
6 Catanauan S/S 5 MVA
7 Mulanay S/S 5 MVA
8 Tagkawayan S/S 5 MVA
QUEZON II ELECTRIC COOPERATIVE, INC. (QUEZELCO II)
Number of Barangays: Status of Household Energization:
Grid: 72 84.1 % (33,453 HH / 39,800 HH)
Off-grid: 57

Customer Captive Customer


Sales (MWh)
Classification Connection
Residential 17,016 14,557
Commercial 1,158 3,772
Industrial 26 1,242
Others 1,010 2,245
TOTAL 19,210 21,816
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 2,975 MWh (12.0 %)

Demand Annual Average Growth Rate (2016-2025) : 4.63 %


Franchise Area:
3,126 sq. km.

Franchise Population:
Actual
211,531

Circuit kilometer:
313.3
LEGEND: Supply
Energized DU System
Substation Demand
Backbone Line

No. SS
SS Name
Capacity
1 Comon S/S 5 MVA
2 Capalong S/S 5 MVA

66
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region IV-A Distribution Utilities


Region IV-A Distribution Utilities

67
FIRST BAY POWER CORPORATION (FBPC)
Number of Barangays: Status of Household Energization:
Grid: 40 0 % (0 HH / 22,214 HH)
Franchise Area: Off-grid: -
53.31 sq. km.
Customer Captive Customer
Sales (MWh)
Franchise Population: Classification Connection
84,196 Residential 19,820 28,390
Commercial 1,945 17,945
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Circuit kilometer:
33.9 Industrial 0 0
Others 358 2,325
TOTAL 22,123 48,660
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 6,440 MWh (11.69 %)

Demand Annual Average Growth Rate (2016-2025) : -0.75%

Actual

LEGEND:
Energized DU System
Substation
Backbone Line Supply
Demand

No. SS
SS Name
Capacity
1 FBPC S/S 15/18 MVA
LIMA ENERZONE CORPORATION (LEZ)
Number of Barangays: Status of Household Energization:
Grid: - - % (1,861 HH / 1,861 HH)
Off-grid: -

Customer Captive Customer


Franchise Area: Sales (MWh)
Classification Connection
5 sq. km.
Residential 0 0
Franchise Population: 16 2,742
Commercial
100
Industrial 83 147,028
Circuit kilometer*: Others 0 49
114 TOTAL 99 149,819
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 1,944 MWh (1.28 %)

Demand Annual Average Growth Rate (2016-2025) : 4.65%

Actual

LEGEND:
Energized DU System Supply
Substation
Backbone Line
Demand

No. SS
SS Name
Capacity
1 LIMA SS 2X50 MVA

68
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region IV-A Distribution Utilities


DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

MIMAROPA Region
Utilities Per
Region Distribution Region
Utilities

9
Map of Distribution

7 1
2
8 4 3
Peak 5
Distribution
Demand
MIMAROPA

Utility (MW) 6
10
1 MARELCO 8.57
System

2 Banton 0.22
3 Corcuera 0.31
11
4 Concepcion 0.23
5 ROMELCO 3.42
6 TIELCO 6.14
7 ORMECO 42.70
8 OMECO 17.34
9 LUBELCO 0.80
10 BISELCO 3.93
11 PALECO 43.70
Total 127.34

2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 397,754 156,872
Commercial 27,338 56,024
Industrial 712 67,984
Others 12,724 303,337
Total 438,528 584,218

69
BUSUANGA ISLAND ELECTRIC COOPERATIVE, INC. (BISELCO)
Number of Barangays:
Grid: - Status of Household Energization:
76.6 % (12,334 HH / 16,100 HH)
Off-grid: 61

Customer Captive Customer


Franchise Area: Sales (MWh)
Classification Connection
1,777 sq. km.
Residential 8,115 6,561
Franchise Population: Commercial 1,160 8,139
109,656 Industrial 6 1,465
Circuit kilometer: Others 331 1,374
316.6 TOTAL 9,612 17,539
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 2,631 MWh (13.04 %)

Demand Annual Average Growth Rate (2016-2025) : 8.75 %


Actual

Supply
LEGEND:
Demand
Energized Coop System
Primary Backbone

70
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

MIMAROPA Region Distribution Utilities


MIMAROPA Region Distribution Utilities

71
LUBANG ELECTRIC COOPERATIVE, INC. (LUBELCO)
Number of Barangays: Status of Household Energization:
Grid: - 80.1 % (7,688 HH / 9,600 HH)
Off-grid: 25

Customer Captive Customer


Sales (MWh)
Classification Connection
Residential 6,225 2,078
Commercial 131 601
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 25 53
Others 181 331
TOTAL 6,562 3,063
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 373 MWh (11.29 %)

Franchise Area: Demand Annual Average Growth Rate (2016-2025) : 1.20 %


31.1 sq. km.

Franchise Population: Actual


-

Circuit kilometer:
-
Supply
LEGEND: Demand
Energized Coop System
Primary Backbone
MARINDUQUE ELECTRIC COOPERATIVE, INC. (MARELCO)
Number of Barangays: Status of Household Energization:
Grid: - 96.3 % (50,859 HH / 52,800 HH)
Off-grid: 218

Customer Captive Customer


Franchise Area: Sales (MWh)
Classification Connection
958 sq. km.
Residential 42,140 23,115
Franchise Population: Commercial 2,617 5,093
232,312
Industrial 192 1,748
Circuit kilometer: Others 1,374 5,974
539.9 TOTAL 46,323 35,931

System Loss: 6,919 MWh (16.15 %)

Demand Annual Average Growth Rate (2016-2025) : 5.11 %

Actual

Supply
Demand
LEGEND:

Energized Coop System


Primary Backbone

72
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

MIMAROPA Region Distribution Utilities


MIMAROPA Region Distribution Utilities

73
OCCIDENTAL MINDORO ELECTRIC COOPERATIVE, INC. (OMECO)
Number of Barangays: Status of Household Energization:
Grid: - 91.1 % (73,606 HH / 80,800 HH)
Off-grid: 137

Customer Captive Customer


Sales (MWh)
Classification Connection
Residential 60,355 39,125
Commercial 3,686 15,857
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 81 14,129
Others 1,525 6,788
TOTAL 65,647 75,899
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 6,919 MWh (16.15 %)

Demand Annual Average Growth Rate (2016-2025) : 5.43 %

Franchise Area:
5,879.85 sq. km.

Franchise Population:
458,494 Actual

Circuit kilometer:
1,102.9
Supply
Demand
LEGEND:

Energized Coop System


Primary Backbone
ORIENTAL MINDORO ELECTRIC COOPERATIVE, INC. (ORMECO)
Number of Barangays: Status of Household Energization:
Grid: - 97.9 % (187,425 HH / 191,400 HH)
Off-grid: 426

Customer Captive Customer


Sales (MWh)
Classification Connection
Residential 144,418 110,525
Commercial 9,621 42,904
Industrial 139 25,429
Franchise Area: Others 4,194 20,506
4,238.38 sq. km. TOTAL 158,372 199,364
Franchise Population: Customer/s Served by RES:
158,000 Sales for Customer/s served by RES:

Circuit kilometer: System Loss: 25,007 MWh (11.15 %)


2,432.0
Demand Annual Average Growth Rate (2016-2025) : 6.90 %

LEGEND:
Energized DU System
Substation
Backbone Line Actual

No. SS Supply
SS Name
Capacity
1 Calapan City S/S
Demand
2 Puerto Galera S/S 10 MVA
3 Naujan S/S 5 MVA
4 Pinamalayan S/S 5 MVA
5 Bansud S/S
6 Roxas S/S 5 MVA
7 Victoria S/S 2.5 MVA

74
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

MIMAROPA Region Distribution Utilities


MIMAROPA Region Distribution Utilities

75
PALAWAN ELECTRIC COOPERATIVE, INC. (PALECO)
Number of Barangays: Status of Household Energization:
Grid: - 57.2 % (121,802 HH / 213,000 HH)
Off-grid: 371

Customer Captive Customer


Sales (MWh)
Franchise Area: Classification Connection
14,694 sq. km.
Agudaya Residential 83,130 91,944
Franchise Population: Commercial 7,881 78,375
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

896,096 Industrial 129 11,784


Others 2,438 26,218
Circuit kilometer:
1,123.3 TOTAL 93,578 208,320
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 26,812 MWh (11.40 %)

Demand Annual Average Growth Rate (2016-2025) : 9.17 %

Actual

Supply
Demand
LEGEND:

Energized Coop System


Primary Backbone
ROMBLON ELECTRIC COOPERATIVE, INC. (ROMELCO)
Number of Barangays: Status of Household Energization:
Grid: - 99.3 % (20,951 HH / 21,100 HH)
Off-grid: 66

Customer Captive Customer


Sales (MWh)
Classification Connection
Residential 16,502 8,784
Commercial 799 2,099
Industrial 14 269
Others 728 2,590
TOTAL 18,043 13,743
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 1,565 MWh (10.23 %)

Demand Annual Average Growth Rate (2016-2025) : 3.86 %

Franchise Area:
517 sq. km.
Actual
Franchise Population:
-

Circuit kilometer:
378.7 Supply
Demand
LEGEND:

Energized Coop System


Primary Backbone

76
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

MIMAROPA Region Distribution Utilities


MIMAROPA Region Distribution Utilities

77
TABLAS ISLAND ELECTRIC COOPERATIVE, INC. (TIELCO)
Number of Barangays: Status of Household Energization:
Grid: - 98.4 % (37,309 HH / 37,900 HH)
Off-grid: 112

Customer Captive Customer


Franchise Area: Sales (MWh)
Classification Connection
23.43 sq. km.
Residential 31,996 18,663
Franchise Population: Commercial 1,337 3,512
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

152,638
Industrial 126 1,147
Circuit kilometer: Others 1,766 3,543
552.6 TOTAL 35,225 26,866
Customer/s Served by RES:
LEGEND: Sales for Customer/s served by RES:
Energized Coop System
System Loss: 2,633 MWh (8.92 %)
Primary Backbone

Demand Annual Average Growth Rate (2016-2025) : 6.72 %

Actual

Supply
Demand
BANTON ELECTRIC SYSTEM (BANTON)
Number of Barangays: Status of Household Energization:
Grid: - 0 % (0 HH / 1,816 HH)
Off-grid: 112

Customer Captive Customer


Franchise Area: Sales (MWh)
Classification Connection
32.48 sq. km.
Residential 1,377 175
Franchise Population: Commercial 33 28
5,963
Industrial 0 0
Circuit kilometer: Others 44 16
28.7 TOTAL 1,454 218
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 37 MWh (14.60 %)

Demand Annual Average Growth Rate (2016-2025) : 3.50 %

Actual

Supply
Demand
LEGEND:

Energized Coop System


Primary Backbone

78
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

MIMAROPA Region Distribution Utilities


MIMAROPA Region Distribution Utilities

79
CONCEPCION ELECTRIC SYSTEM (CONCEPCION)
Number of Barangays: Status of Household Energization:
Grid: - 100 % (1,294 HH / 1,294 HH)
Off-grid: 9

Customer Captive Customer


Sales (MWh)
Classification Connection
Residential 1,191 1,970
Commercial 35 243
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 0 0
Others 62 559
TOTAL 1,288 2,773
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 352 MWh (10.7 %)

Demand Annual Average Growth Rate (2016-2025) : 5.61 %

Franchise Area:
20 sq. km. Actual

Franchise Population:
4,445

Circuit kilometer: Supply


-
Demand
CORCUERA ELECTRIC SYSTEM (CORCUERA)
Number of Barangays: Status of Household Energization:
Grid: - 87 % (2,457 HH / 2,825 HH)
Off-grid: 9

Customer Captive Customer


Sales (MWh)
Classification Connection
Residential 2,305 398
Commercial 38 20
Industrial 0 0
Others 81 84
TOTAL 2,424 502
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 315 MWh (38.6 %)

Demand Annual Average Growth Rate (2016-2025) : 4.50 %

Franchise Area: Actual


23.43 sq. km.

Franchise Population:
12,057 Supply
Circuit kilometer: Demand
-

80
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

MIMAROPA Region Distribution Utilities


DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region V
Utilities
V Distribution Per Region
Utilities

1
of Distribution

Peak
Distribution 4 5
Demand
Utility
(MW)
Region

3
System Map

1 CANORECO 29.57
6
2 CASURECO I 12.91 2

3 CASURECO II 54.65 7

4 CASURECO IV 10.06 8
5 FICELCO 9.13
9
6 CASURECO III -
10
7 ALECO/APEC 70.61
8 SORECO II 20.11
11
9 SORECO I 9.76
10 TISELCO 1.71
11 MASELCO 15.45
Total 233.96

2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 744,823 299,794
Commercial 46,751 65,668
Industrial 5,559 115,385
Others 24,515 614,845
Total 821,648 1,095,692

81
ALBAY ELECTRIC COOPERATIVE, INC./ALBAY POWER ENERGY CORPORATION (ALECO/APEC)
Number of Barangays: Status of Household Energization:
Grid: 686 93.8 % (235,235 HH / 250,700 HH)
Off-grid: 34

Franchise Area: Customer Captive Customer


Sales (MWh)
LEGEND: 2,554 sq. km. Classification Connection
Energized DU System Residential 167,632 159,244
Substation Franchise Population:
Backbone Line Commercial 9,343 87,878
1,223,433
Industrial 382 22,863
Circuit kilometer: Others 2,805 29,627
1,833.5
TOTAL 180,162 299,611
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 104,650 MWh (25.89 %)

Demand Annual Average Growth Rate (2016-2025) : 5.57 %

Actual

No. SS Supply
SS Name
Capacity Demand
1 Malinao S/S 10 MVA
2 Tabaco S/S 40 MVA
3 Sto Domingo S/S 10 MVA
4 Bitano S/S 25 MVA
5 Washington S/S 20 MVA
6 Ligao S/S 15 MVA
7 Polangui S/S 10 MVA

82
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region V Distribution Utilities


Region V Distribution Utilities

83
CAMARINES NORTE ELECTRIC COOPERATIVE, INC. (CANORECO)
Number of Barangays: Status of Household Energization:
Grid: 273 94.1 % (108,911 HH / 115,800 HH)
Off-grid: -

Customer Captive Customer


Franchise Area: Sales (MWh)
Classification Connection
2,200 sq. km.
Residential 83,792 81,882
Franchise Population: Commercial 4,240 31,850
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

-
Industrial 42 5,622
Circuit kilometer: Others 2,127 13,794
- TOTAL 90,201 133,147
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 13,924 MWh (9.47 %)

Demand Annual Average Growth Rate (2016-2025) : 5.10 %

LEGEND:
Energized DU System
Substation Actual
Backbone Line

SS Supply
No. SS Name
Capacity Demand
1 Malatap S/S 5 MVA
2 Sta. Rosa S/S 5 MVA
3 Tawig S/S 5 MVA
4 Talobatib S/S 5 MVA
5 Calintaan S/S 15 MVA
6 Lag-on S/S 10 MVA
CAMARINES SUR I ELECTRIC COOPERATIVE, INC. (CASURECO I)
Number of Barangays: Status of Household Energization:
Grid: 287 81.5 % (71,470 HH / 87,700 HH)
Off-grid: -

Customer Captive Customer


Franchise Area: Sales (MWh)
Classification Connection
1,528.97 sq. km.
Residential 61,918 40,160
Franchise Population: Commercial 2,655 8,895
414,490
Industrial 65 2,680
Circuit kilometer: Others 4,724 4,919
869.7 TOTAL 69,362 56,654
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 7,650 MWh (11.90 %)

Demand Annual Average Growth Rate (2016-2025) : 7.90 %

Actual

LEGEND:
Energized DU System
Substation
Backbone Line Supply
Demand
No. SS
SS Name
Capacity
1 Sipocot S/S 5 MVA
2 Libmanan S/S 5 MVA
3 Pamplona S/S 10 MVA

84
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region V Distribution Utilities


Region V Distribution Utilities

85
CAMARINES SUR II ELECTRIC COOPERATIVE, INC. (CASURECO II)
Number of Barangays: Status of Household Energization:
Grid: 287 95.6 % (113,339 HH / 118,500 HH)
Off-grid: -
No. SS Customer Captive Customer
SS Name Sales (MWh)
Capacity Classification Connection
1 Tinambak S/S 5 MVA
2 Calabanga S/S 10 MVA Residential 87,256 111,328
3 Naga S/S 40 MVA Commercial 5,321 101,248
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

4 Pili S/S 10 MVA 83 19,489


Industrial
5 Del Rosario S/S 20 MVA
Others 1,446 26,260
TOTAL 94,106 258,326
LEGEND:
Energized DU System Franchise Area: Customer/s Served by RES:
Substation 976 sq. km. Sales for Customer/s served by RES:
Backbone Line
Franchise Population: System Loss: 41,577 MWh (13.86 %)
123,380
Demand Annual Average Growth Rate (2016-2025) : 5.99 %
Circuit kilometer:
1,155.7

Actual

Supply
Demand
CAMARINES SUR III ELECTRIC COOPERATIVE, INC. (CASURECO III)
Number of Barangays: Status of Household Energization:
Grid: 287 87.0 % (73,419 HH / 84,400 HH)
Off-grid: -

Customer Captive Customer


Sales (MWh)*
Classification Connection*
Residential 67,735 45,454
Commercial 2,689 14,017
Industrial 149 3,344
Others 1,263 8,670
TOTAL 71,836 71,485
Customer/s Served by RES*:
Sales for Customer/s served by RES*:

System Loss*: 41,577 MWh (13.86 %)

Demand Annual Average Growth Rate (2016-2025) : 5.99 %

Franchise Area:
976 sq. km.

Franchise Population:
LEGEND: No. SS 123,380
Energized DU System
SS Name
Capacity
Substation 1 Bula S/S 7.5 MVA Circuit kilometer:
Backbone Line
2 Iriga S/S 15 MVA 1,155.7

86
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region V Distribution Utilities


Region V Distribution Utilities

87
CAMARINES SUR IV ELECTRIC COOPERATIVE, INC. (CASURECO IV)
Number of Barangays: Status of Household Energization:
Grid: 245 84.8 % (58,091 HH / 68,500 HH)
Off-grid: 13

Customer Captive Customer


Sales (MWh)
Classification Connection
Residential 46,415 27,235
Commercial 2,032 7,801
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 39 2,744
Others 1,009 4,159
TOTAL 49,495 41,939
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 5,609 MWh (11.80 %)


Franchise Area:
159.1 sq. km.
Demand Annual Average Growth Rate (2016-2025) : 6.60 %
Franchise Population:
-

Circuit kilometer: Actual


821.1

LEGEND:
Energized DU System
Supply
Substation
Backbone Line Demand
No. SS
SS Name
Capacity
1 Tigaon S/S 5 MVA
2 Lagonoy S/S 5 MVA
SORSOGON I ELECTRIC COOPERATIVE, INC. (SORECO I)
Number of Barangays: Status of Household Energization:
Grid: 253 102.6 % (76,843 HH / 74,900 HH)
Off-grid: -

Customer Captive Customer


Franchise Area: Sales (MWh)
Classification Connection
1,008 sq. km.
Residential 59,926 28,070
Franchise Population: Commercial 1,519 5,282
318,743
Industrial 53 3,693
Circuit kilometer: Others 1,233 3,471
- TOTAL 62,731 40,517
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 6,384 MWh (13.61 %)

Demand Annual Average Growth Rate (2016-2025) : 4.22 %

Actual

LEGEND:
Energized DU System
Supply
Substation
Backbone Line
Demand

No. SS
SS Name
Capacity
1 Sta. Teresita S/S 5 MVA

88
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region V Distribution Utilities


Region V Distribution Utilities

89
SORSOGON II ELECTRIC COOPERATIVE, INC. (SORECO II)
Number of Barangays: Status of Household Energization:
Grid: 288 94.1 % (80,236 HH / 85,300 HH)
Off-grid: -

Customer Captive Customer


Sales (MWh)
Classification Connection
Residential 73,775 46,073
Commercial 2,349 20,197
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 14 749
Others 1,791 9,640
TOTAL 77,929 76,660
Customer/s Served by RES:
Sales for Customer/s served by RES:
Franchise Area:
System Loss: 11,783 MWh (12.19 %)
1,134 sq. km.

Franchise Population: Demand Annual Average Growth Rate (2016-2025) : 5.88 %


77,891

Circuit kilometer:
741.24 Actual

LEGEND:
Energized DU System
Substation Supply
Backbone Line
Demand
No. SS
SS Name
Capacity
1 Danlog S/S 5 MVA
2 Balogo S/S 2X10 MVA
3 Gubat S/S 5 MVA
FIRST CATANDUANES ELECTRIC COOPERATIVE, INC. (FICELCO)
Number of Barangays: Status of Household Energization:
Grid: - 94.7 % (52,477 HH / 55,400 HH)
Off-grid: 315

Customer Captive Customer


Franchise Area: Sales (MWh)
Classification Connection
1,492.16 sq. km.
Residential 43,765 25,611
Franchise Population: Commercial 2,059 8,697
246,300
Industrial 0 0
Circuit kilometer: Others 1,643 5,889
- TOTAL 47,467 40,196
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 6,129 MWh (13.23 %)

Demand Annual Average Growth Rate (2016-2025) : 15.02%

Actual
Supply
Demand
LEGEND:

Energized Coop System


Primary Backbone

90
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region V Distribution Utilities


Region V Distribution Utilities

91
MASBATE ELECTRIC COOPERATIVE, INC. (MASELCO)
Number of Barangays: Status of Household Energization:
Grid: - 60.0 % (59,255 HH / 98,800 HH)
Off-grid: 434

Customer Captive Customer


Franchise Area: Sales (MWh)
Classification Connection
3,298 sq. km.
Residential 42,318 44,234
Franchise Population: Commercial 14,183 13,092
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

-
Industrial 4,728 4,482
Circuit kilometer: Others 6,288 8,394
- TOTAL 67,518 70,202
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 18,053 MWh (21.1 %)

Demand Annual Average Growth Rate (2016-2025) : 15.01%

Actual
LEGEND: Supply
Energized Coop System Demand
Primary Backbone
TICAO ISLAND ELECTRIC COOPERATIVE, INC. (TISELCO)
Number of Barangays: Status of Household Energization:
Grid: - 70.2 % (10,670 HH / 15,200 HH)
Off-grid: 72

Customer Captive Customer


Sales (MWh)
Classification Connection
Residential 8,730 4,689
Franchise Area:
Commercial 347 706
38,485 sq. km.
Industrial 0 0
Franchise Population: Others 173 482
58,660
TOTAL 9,250 5,878
Circuit kilometer: Customer/s Served by RES:
212.3 Sales for Customer/s served by RES:

System Loss*: 1,346 MWh (18.41 %)

Demand Annual Average Growth Rate (2016-2025) : 2.46 %

Actual

LEGEND:
Supply
Energized Coop System
Demand
Primary Backbone

92
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region V Distribution Utilities


DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region VI
Utilities
VI Distribution
of Distribution Per Region
Utilities

Peak
Distribution
Demand 1
Utility
(MW)
Region

2
System Map

1 AKELCO 49.53
5
2 CAPELCO 29.57
3 4
3 ANTECO 19.84
6 9
4 ILECO II 29.05 7
8 10
5 ILECO III 14.41

6 ILECO I 46.00

7 PECO 96.05

8 GUIMELCO 6.32 11
9 NONECO 33.74

10 CENECO 132.52

11 NOCECO 41.30

Total 498.34

2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 689,972 353,050
Commercial 24,828 263,544
Industrial 1,470 110,139
Others 11,831 679,113
Total 728,101 1,405,846

93
PANAY ELECTRIC COMPANY, INC (PECO)
Number of Barangays: Status of Household Energization:
Grid: 180 86.9 % (95,713 HH / 110,142 HH)

LEGEND:
Off-grid: -
Energized DU System
Substation Customer Captive Customer
Franchise Area: Sales (MWh)
Backbone Line Classification Connection
64 sq. km.
Residential 54,086 155,573
Franchise Population: Commercial 2,912 92,508
-
Jaro Industrial 911 189,296
Circuit kilometer: Others 1,104 30,094
405.3 TOTAL 59,013 467,471
Customer/s Served by RES:
Sales for Customer/s served by RES:

Mandurriao System Loss: 58,736 MWh (11.17 %)

La Paz Demand Annual Average Growth Rate (2016-2025) : 3.35 %


Lapuz
140.00
City Proper
120.00
Actual
Molo
100.00

Villa Arevalo 80.00

MW
60.00
Supply 40.00

SS Demand 20.00
No. SS Name
Capacity 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
1 Gen. Luna S/S 20 MVA
Supply Indicative 22.80 25.50 30.20 33.90 36.31 38.54 40.81 43.12 45.54 62.94
2 La Paz S/S 50 MVA
Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 Jaro S/S 10 MVA
Supply Contracted: Captive Customers 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00 70.02
4 Mandurriao S/S 25 MVA
Peak Demand: Franchise 96.05 107.80 110.50 115.20 118.90 121.31 123.54 125.81 128.12 130.54 132.95
5 Molo S/S 25 MVA
Peak Demand: Captive Customers 96.05 107.80 110.50 115.20 118.90 121.31 123.54 125.81 128.12 130.54 132.95

94
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region VI Distribution Utilities


Region VI Distribution Utilities

95
AKLAN ELECTRIC COOPERATIVE, INC. (AKELCO)
Boracay
Number of Barangays: Status of Household Energization:
Grid: 378 94.6 % (122,606 HH / 129,600 HH)
Off-grid: 7

Customer Captive Customer


Franchise Area: Sales (MWh)
Classification Connection
2,044 sq. km.
Residential 111,929 94,663
Franchise Population: Commercial 8,074 142,918
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

583,888
Industrial 27 1,561
Circuit kilometer: Others 2,535 15,586
New Washington 1,766.2 TOTAL 122,565 254,729
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 29,238 MWh (10.30 %)

Demand Annual Average Growth Rate (2016-2025) : 3.75 %


80.00
70.00
LEGEND: 60.00
Actual
Energized DU System
Substation 50.00
Backbone Line 40.00

MW
30.00
Supply 20.00
SS
No. SS Name Demand 10.00
Capacity
1 Boracay S/S 30 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
2 Caticlan S/S 10 MVA Supply Indicative 3.75 8.94 10.07 11.12 1.11 3.03 4.89 6.70 8.46 10.16
3 Nabas S/S 5 MVA Supply for PSA Approval: Captive Customers 7.00 8.00 9.00 10.00 22.00 22.00 22.00 22.00 22.00 22.00
4 Lezo S/S 5 MVA Supply Contracted: Captive Customers 38.00 38.00 34.00 34.00 34.00 34.00 34.00 34.00 34.00 34.00 34.00
5 Andagao S/S 20 MVA Peak Demand: Franchise 49.53 52.01 54.43 56.77 59.06 61.28 63.44 65.55 67.61 69.62 71.58
6 Altavas S/S 5 MVA Peak Demand: Captive Customers 49.53 48.75 50.94 53.07 55.12 57.11 59.03 60.89 62.70 64.46 66.16
ANTIQUE ELECTRIC COOPERATIVE, INC. (ANTECO)
Number of Barangays: Status of Household Energization:
Grid: 519 93.7 % (98,475 HH / 105,100 HH)
Sebaste
Off-grid: 18

Franchise Area: Customer Captive Customer


Culasi Sales (MWh)
2,386 sq. km. Classification Connection

Franchise Population:
Residential 86,431 55,500
497,868 Commercial 2,122 15,273
Industrial 114 3,418
Circuit kilometer:
1,034.5
Others 1,848 11,746
TOTAL 90,515 85,936
Valderrama Customer/s Served by RES:
Sales for Customer/s served by RES:

Patnongon System Loss: 11,841 MWh (11.86 %)

Belison Demand Annual Average Growth Rate (2016-2025) : 4.75 %


San 35.00
Jose
30.00

25.00
Actual
LEGEND: Hamtic
Energized DU System 20.00
Substation Tobias

MW
Backbone Line Fornier 15.00
Supply 10.00

Demand 5.00
SS
No. SS Name
Capacity 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
1 Hamtic S/S 5 MVA Supply Indicative 6.95 8.10 10.76 11.91 13.06 14.22 15.37 16.53 17.68 18.84
2 San Jose S/S 10 MVA Supply for PSA Approval: Captive Customers 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00
3 Sibalom S/S 10 MVA Supply Contracted: Captive Customers 21.72 8.50 8.50 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00
4 Bugasong S/S 10 MVA Peak Demand: Franchise 19.17 20.73 21.81 22.89 23.98 25.06 26.14 27.22 28.30 29.39 30.47
5 Culasi S/S 5 MVA Peak Demand: Captive Customers 18.82 20.45 21.60 22.76 23.91 25.06 26.22 27.37 28.53 29.68 30.84

96
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region VI Distribution Utilities


Region VI Distribution Utilities

97
CAPIZ ELECTRIC COOPERATIVE, INC. (CAPELCO)
Number of Barangays: Status of Household Energization:
Grid: 454 94.0 % (153,243 HH / 163,000 HH)

Franchise Area:
Off-grid: 19
2,633 sq. km.
Customer Captive Customer
Sales (MWh)
Classification Connection
Franchise Population:
701,664 Residential 125,044 95,349
Commercial 3,916 50,679
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Circuit kilometer:
124.1 Industrial 44 5,875
Others 1,882 16,704
Pres. Roxas
TOTAL 130,886 168,607
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 17,559 MWh (9.43 %)

Demand Annual Average Growth Rate (2016-2025) : 3.16 %


45.00
40.00
Actual
35.00
30.00
LEGEND: 25.00
Energized DU System

MW
20.00
Substation
Backbone Line Supply 15.00
10.00
SS Demand 5.00
No. SS Name
Capacity 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
1 Dao S/S 10 MVA Supply Indicative 0.00 0.00 0.00 0.66 1.66 2.79 3.91 5.12 6.24 22.34
2 Mambusao S/S 5 MVA Supply for PSA Approval: Captive Customers 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
3 Lawaan S/S 30 MVA Supply Contracted: Captive Customers 32.22 31.00 31.00 31.00 31.00 31.00 31.00 31.00 31.00 31.00 16.00
4 Panitan S/S 10 MVA Peak Demand: Franchise 29.57 30.68 31.71 32.66 33.66 34.66 35.79 36.91 38.12 39.24 40.34
5 Pres. Roxas S/S 5 MVA Peak Demand: Captive Customers 29.57 30.68 31.71 32.66 33.66 34.66 35.79 36.91 38.12 39.24 40.34
CENTRAL NEGROS ELECTRIC COOPERATIVE, INC. (CENECO)
Number of Barangays: Status of Household Energization:
Grid: 158 93.5 % (207,644 HH / 222,000 HH)
LEGEND: Off-grid: -
Energized DU System
Substation
Backbone Line Customer Captive Customer
Sales (MWh)
Classification Connection
Residential 154,675 299,812
Commercial 10,878 173,649
Franchise Area:
1,416.5 sq. km. Industrial 141 168,080
Others 580 8,134
Franchise Population: TOTAL 166,274 649,676
212,015
Customer/s Served by RES:
Circuit kilometer: Sales for Customer/s served by RES:
1,186.8
System Loss: 99,912 MWh (13.33 %)

Demand Annual Average Growth Rate (2016-2025) : 1.05 %


180.00
160.00 Actual
140.00
120.00
SS 100.00
No. SS Name
Capacity

MW
80.00
1 Hilangban S/S 10 MVA
60.00
2 Sum-ag S/S 10 MVA Supply
40.00
3 Alijis S/S 30 MVA
4 Reclamation S/S 20 MVA Demand 20.00
5 Gonzaga S/S 30 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
6 Burgos S/S 30 MVA Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 77.77 78.33 78.73 79.00
7 Mt. View S/S 30 MVA Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8 Talisay S/S 10 MVA Supply Contracted: Captive Customers 122.90 157.90 137.90 137.90 137.90 137.90 137.90 53.90 53.90 53.90 53.90
9 Panaogao S/S 5 MVA Peak Demand: Franchise 132.52 136.04 138.70 140.81 142.50 143.83 144.88 145.69 146.30 146.75 147.05
10 Lopez S/S 5 MVA Peak Demand: Captive Customers 119.77 122.95 125.35 127.26 128.78 129.99 130.94 131.67 132.23 132.63 132.90

98
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region VI Distribution Utilities


Region VI Distribution Utilities

99
GUIMARAS ELECTRIC CORPORATION (GUIMELCO)
Number of Barangays: Status of Household Energization:
Grid: 95 87.3 % (29,084 HH / 33,300 HH)
Off-grid: 3

Franchise Area: Customer Captive Customer


Sales (MWh)
604.57 sq. km. Classification Connection
Residential 27,945 16,539
Franchise Population:
Commercial 993 2,898
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

162,943
Industrial 29 1,672
Circuit kilometer: Others 550 3,203
662.9
TOTAL 29,517 24,312
LEGEND: Customer/s Served by RES:
Energized DU System
Sales for Customer/s served by RES:
Substation
Backbone Line System Loss: 3,345 MWh (12.09 %)

Demand Annual Average Growth Rate (2016-2025) : 4.21 %


12.00

10.00
Actual
8.00

6.00

MW
4.00
Supply
2.00
Demand
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.29 0.63 0.96 1.29 1.61
SS
No. SS Name Supply for PSA Approval: Captive Customers 4.47 4.82 4.18 4.53 4.88 2.00 2.00 5.00 5.00 5.00
Capacity
Supply Contracted: Captive Customers 5.94 5.94 5.94 5.94 5.94 5.94 5.94 5.94 2.94 2.94 2.94
1 Zaldivar S/S 10 MVA
Peak Demand: Franchise 6.32 6.47 6.82 7.18 7.53 7.88 8.23 8.57 8.90 9.23 9.55
Peak Demand: Captive Customers 6.32 6.47 6.82 7.18 7.53 7.88 8.23 8.57 8.90 9.23 9.55
ILOILO I ELECTRIC COOPERATIVE, INC. (ILECO I)
Number of Barangays: Status of Household Energization:
Grid: 794 94.7 % (142,352 HH / 150,300 HH)
Off-grid: -
Franchise Area: Customer Captive Customer
1,430 sq. km. Sales (MWh)
Classification Connection
Franchise Population: Residential 119,333 123,185
134,753 Commercial 2,279 23,491
Santa
Circuit kilometer: Barbara
Industrial 237 44,799
722.8 Others 1,904 14,409
TOTAL 123,753 205,884
Pavia
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 22,210 MWh (9.74 %)

Demand Annual Average Growth Rate (2016-2025) : 5.38 %

LEGEND: 90.00
Energized DU System
80.00
Substation
Backbone Line 70.00
60.00 Actual
50.00

MW
40.00
Supply 30.00
SS 20.00
No. SS Name Demand
Capacity 10.00
1 Miagao S/S 5 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
2 Tigbauan S/S 10 MVA
Supply Indicative 15.82 19.13 22.42 25.68 28.89 32.05 35.16 38.22 41.22 44.17
3 Oton S/S 10 MVA
Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 Pavia S/S 10 MVA
Supply Contracted: Captive Customers 33.50 33.50 33.50 33.50 33.50 33.50 33.50 33.50 33.50 33.50 33.50
5 San Miguel S/S 20 MVA
Peak Demand: Franchise 46.00 49.32 52.63 55.92 59.18 62.39 65.55 68.66 71.72 74.72 77.67
6 Sta. Barbaral S/S 10 MVA
Peak Demand: Captive Customers 46.00 49.32 52.63 55.92 59.18 62.39 65.55 68.66 71.72 74.72 77.67

100
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region VI Distribution Utilities


Region VI Distribution Utilities

101
ILOILO II ELECTRIC COOPERATIVE, INC. (ILECO II)
Number of Barangays: Status of Household Energization:
Grid: 578 89.2 % (116,002 HH / 130,100 HH)
Off-grid: 9

Customer Captive Customer


Sales (MWh)
Classification Connection
Residential 100,053 89,337
Commercial 3,112 18,239
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 82 8,009
Others 1,317 13,036
TOTAL 104,564 128,622
Customer/s Served by RES:
Sales for Customer/s served by RES:

Franchise Area: System Loss: 16,961 MWh (11.65 %)


2,036 sq. km.
Demand Annual Average Growth Rate (2016-2025) : 7.46 %
Franchise Population:
141,008 70.00

60.00
Circuit kilometer:
- 50.00

40.00
Actual
LEGEND:
Energized DU System

MW
30.00
Substation Supply
Backbone Line 20.00

SS Demand 10.00
No. SS Name
Capacity
0.00
1 Calinog S/S 10 MVA 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
2 Passi S/S 10 MVA Supply Indicative 8.60 10.87 17.41 20.21 23.28 26.61 30.20 34.05 38.17 42.56
3 Pototan S/S 10 MVA Supply for PSA Approval: Captive Customers 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
4 Dumangas S/S 15 MVA Supply Contracted: Captive Customers 19.00 18.00 18.00 14.00 14.00 14.00 14.00 14.00 14.00 14.00 14.00
5 Janiuay S/S 5 MVA Peak Demand: Franchise 29.05 29.60 31.87 34.41 37.21 40.28 43.61 47.20 51.05 55.17 59.56
Peak Demand: Captive Customers 29.05 29.60 31.87 34.41 37.21 40.28 43.61 47.20 51.05 55.17 59.56
ILOILO III ELECTRIC COOPERATIVE, INC. (ILECO III)
Number of Barangays: Status of Household Energization:
Grid: 309 88.4 % (77,591 HH / 87,800 HH)
Franchise Area: Off-grid: 31
2,641.9 sq. km. North Giganti
Customer Captive Customer
Sales (MWh)
Franchise Population: Classification Connection
South Giganti
462,191
Calagnaan
Residential 65,151 48,966
Circuit kilometer: Commercial 1,420 7,043
845.4 Industrial 26 8,915
Estancia Others 691 5,361
LEGEND: Sicogon
Energized DU System
TOTAL 67,288 70,285
Substation Customer/s Served by RES:
Backbone Line Sales for Customer/s served by RES:
San Dionisio Pan De Azucar
System Loss: 4,666 MWh (6.23 %)
Matangaban
Demand Annual Average Growth Rate (2016-2025) : 7.07 %

Concepcion 30.00
Igbon
25.00

Tagubanhan 20.00
Actual
15.00

MW
Supply 10.00

Demand 5.00

0.00
SS 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
No. SS Name Supply Indicative 4.76 5.73 8.02 8.02 9.35 11.78 13.35 15.06 16.90 18.92
Capacity
Supply for PSA Approval: Captive Customers 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00 0.00
1 Natividad S/S 10 MVA
Supply Contracted: Captive Customers 9.50 9.50 9.50 9.50 9.50 9.50 9.50 9.50 9.50 9.50 9.50
2 Sara S/S 10 MVA
Peak Demand: Franchise 14.41 15.26 16.23 18.52 18.52 19.85 21.28 22.85 24.56 26.40 28.42
3 Pani-an S/S 5 MVA
Peak Demand: Captive Customers 14.41 15.26 16.23 18.52 18.52 19.85 21.28 22.85 24.56 26.40 28.42

102
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region VI Distribution Utilities


Region VI Distribution Utilities

103
NORTHERN NEGROS ELECTRIC COOPERATIVE, INC. (NONECO)
Number of Barangays: Status of Household Energization:
Grid: 194 88.8 % (141,342 HH / 159,200 HH)
Off-grid: 2

Customer Captive Customer


Sales (MWh)
Classification Connection
Residential 114,309 88,089
Commercial 3,444 29,890
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 103 34,815


Others 2,002 14,929
LEGEND:
Energized DU System TOTAL 119,858 167,722
Substation Customer/s Served by RES:
Backbone Line
Sales for Customer/s served by RES:

System Loss: 19,000 MWh (10.18 %)


Franchise Area:
2,841 sq. km.
Demand Annual Average Growth Rate (2016-2025) : 3.32 %
Franchise Population:
50.00
184,905
45.00
40.00
Actual
Circuit kilometer:
35.00
1,444
30.00
25.00

MW
20.00
SS
Supply 15.00
No. SS Name 10.00
Capacity Demand
1 Victorias S/S 15 MVA 5.00
2 Manapla S/S 5 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
3 Cadiz S/S 10 MVA Supply Indicative 0.00 2.18 3.40 4.62 11.76 28.06 29.28 30.50 31.63 33.77
4 Lopez S/S 5 MVA Supply for PSA Approval: Captive Customers 13.00 13.00 13.00 13.00 13.00 13.00 13.00 13.00 13.00 13.00
5 Sagay S/S 10 MVA Supply Contracted: Captive Customers 25.00 25.00 21.00 21.00 21.00 15.00 0.00 0.00 0.00 0.00 0.00
6 Escalante S/S 5 MVA Peak Demand: Franchise 33.74 34.96 36.18 37.40 38.62 39.76 41.06 42.28 43.50 44.63 46.77
7 San Carlos S/S 20 MVA Peak Demand: Captive Customers 33.74 34.96 36.18 37.40 38.62 39.76 41.06 42.28 43.50 44.63 46.77
NEGROS OCCIDENTAL ELECTRIC COOPERATIVE, INC. (NOCECO)
Pulupandan
Number of Barangays: Status of Household Energization:
8
Valladolid Grid: 308 89.4 % (170,023 HH / 190,100 HH)
San Enrique Off-grid: -
La Castellana
Franchise Area: Customer Captive Customer
Sales (MWh)
4,186 sq. km. Classification Connection
Residential 133,645 116,181
Franchise Population:
1,079,280 Commercial 4,563 29,387
Industrial 21 6,224
Himamaylan City Circuit kilometer: Others 2,801 43,465
2,196.9
TOTAL 141,030 195,258
Customer/s Served by RES:
Kabankalan City Sales for Customer/s served by RES:

System Loss: 24,561 MWh (11.17 %)

Demand Annual Average Growth Rate (2016-2025) : 4.22 %


LEGEND:
Energized DU System 70.00
Substation 60.00
Backbone Line
50.00
Actual

40.00

MW
30.00
SS Supply
No. SS Name 20.00
Capacity
1 Sipalay S/S 5 MVA Demand 10.00
2 Cauyan S/S 5 MVA
0.00
3 Kabankalan-Overflow S/S 10 MVA 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
4 Kabankalan - Naga S/S 10 MVA Supply Indicative 18.88 25.06 27.25 29.45 31.64 33.82 36.00 38.15 40.29 52.41
5 Binalbagan S/S 10 MVA Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 La Castellana S/S 10 MVA Supply Contracted: Captive Customers 25.00 24.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 10.00
7 San Enrique S/S 10 MVA Peak Demand: Franchise 41.30 42.88 45.06 47.25 49.45 51.64 53.82 56.00 58.15 60.29 62.41
8 Valladolid S/S 10 MVA Peak Demand: Captive Customers 41.30 42.88 45.06 47.25 49.45 51.64 53.82 56.00 58.15 60.29 62.41

104
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region VI Distribution Utilities


DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region VII
Per Region
Utilities
Utilities

Peak
Distribution
Demand
Distribution

Utility 1
(MW)
Distribution

1 BANELCO 4.50
2 CEBECO II 52.51
of VII

2 3
Region

3 CELCO 3.00
System Map

5 4
4 CEBECO III 23.03
5 BEZ 28.41 6
7
6 VECO 474.88
8
7 MECO 73.95
10
8 MEZ 22.16 9
13 11
9 CEBECO I 32.92
10 BOHECO II 18.87 12
14
11 BOHECO I 28.60
15
12 BLCI 22.37
13 NORECO I 12.48
14 NORECO II 48.46
15 PROSIELCO 4.56
Total 850.70

2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 1,031,760 638,709
Commercial 82,615 2,146,209
Industrial 3,316 173,872
Others 27,650 1,283,008
Total 1,145,341 4,241,798

105
BALAMBAN ENERZONE CORPORATION (BEZ)
Number of Barangays: Status of Household Energization:
Grid: - -
Off-grid: -

Customer Captive Customer


Sales (MWh)
Classification Connection
Residential - -
Commercial 10 425
Industrial 21 113,342
Others 2 107
TOTAL 33 113,874
Customer/s Served by RES:
Sales for Customer/s served by RES:

Franchise Area: System Loss: 1,038 MWh (0.90 %)


2.8 sq. km.
Demand Annual Average Growth Rate (2016-2025) : 0.36 %
Franchise Population: 35.00
18,560 Actual
30.00
Circuit kilometer: 25.00
8.8
20.00

MW
15.00
LEGEND:
Supply 10.00
Energized DU System
Substation 5.00
Backbone Line Demand
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 13.49 16.30 16.17 16.17 16.17 16.17 16.17 16.17 16.17 16.17
SS
No. SS Name Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Capacity
Supply Contracted: Captive Customers 23.26 18.26 13.00 13.00 13.00 13.00 13.00 13.00 13.00 13.00 13.00
1 Buanoy S/S 33 MVA
Peak Demand: Franchise 28.41 31.74 29.30 29.17 29.17 29.17 29.17 29.17 29.17 29.17 29.17
2 Arpili S/S 25 MVA
Peak Demand: Captive Customers 28.41 31.74 29.30 29.17 29.17 29.17 29.17 29.17 29.17 29.17 29.17

106
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region VII Distribution Utilities


Region VII Distribution Utilities

107
BOHOL LIGHT COMPANY, INC. (BLCI)
Number of Barangays: Status of Household Energization:
Grid: 15 94.5 % (22,911 HH / 24,253 HH)
Off-grid: -

Customer Captive Customer


Franchise Area: Sales (MWh)
Classification Connection
33 sq. km.
Residential 16,635 40,097
Franchise Population: Commercial 2,607 53,114
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

92,297
Industrial - -
Circuit kilometer: Others 175 11,042
113.2 TOTAL 19,417 104,253
Customer/s Served by RES:
LEGEND: Sales for Customer/s served by RES:
Energized DU System
Substation
Backbone Line
System Loss: 9,070 MWh (8.00 %)

Demand Annual Average Growth Rate (2016-2025) : 2.51 %


40.00
35.00
30.00
Actual
25.00
20.00

MW
15.00
Supply 10.00
Demand 5.00
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 3.26 3.88 10.42 11.11
Supply for PSA Approval: Captive Customers 11.00 11.00 11.00 11.00 11.00 11.00 0.00 0.00 0.00 0.00
SS
No. SS Name Supply Contracted: Captive Customers 23.52 23.52 23.52 23.52 23.52 23.52 23.52 23.52 23.52 17.52 17.52
Capacity
Peak Demand: Franchise 22.37 22.36 23.18 23.92 24.66 25.32 26.12 26.79 27.41 27.95 28.64
1 Dampas S/S 30 MVA
Peak Demand: Captive Customers 22.37 22.36 23.18 23.92 24.66 25.32 26.12 26.79 27.41 27.95 28.64
MACTAN ELECTRIC COMPANY, INC. (MECO)
Number of Barangays: Status of Household Energization:
Grid: 31 94.4 % (104,864 HH / 111,126 HH)
Off-grid: 12
LEGEND:
Customer Captive Customer
Energized DU System Sales (MWh)
Substation Classification Connection
Backbone Line
Residential 81,802 151,736
Commercial 3,957 18,603
Industrial 885 230,770
Others 348 18,631
TOTAL 86,992 419,740
Customer/s Served by RES:
Olango Island
Sales for Customer/s served by RES:

System Loss: 38,028 MWh (8.31 %)

Demand Annual Average Growth Rate (2016-2025) : 4.92 %


140.00
Franchise Area:
83.3 sq. km. 120.00

100.00
Franchise Population: Actual
350,467 80.00

MW
60.00
Circuit kilometer:
259.7 Supply 40.00

Demand 20.00
SS
No. SS Name
Capacity 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
1 CLIP S/S 30 MVA Supply Indicative 6.04 10.07 13.00 15.78 17.56 34.13 66.08 70.43 73.44 77.62
2 Basak S/S 20 MVA Supply for PSA Approval: Captive Customers 12.00 12.00 12.00 12.00 12.00 0.00 0.00 0.00 0.00 0.00
3 Load End S/S 10 MVA Supply Contracted: Captive Customers 73.26 43.00 43.00 43.00 43.00 43.00 43.00 15.00 15.00 15.00 15.00
4 Airport S/S 10 MVA Peak Demand: Franchise 73.16 79.15 84.20 87.95 91.33 93.51 99.29 104.20 109.60 113.33 118.15
5 Mactan S/S 20 MVA Peak Demand: Captive Customers 73.95 61.04 65.07 68.00 70.78 72.56 77.13 81.08 85.43 88.44 92.62

108
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region VII Distribution Utilities


Region VII Distribution Utilities

109
MACTAN ENERZONE CORPORATION (MEZ)
Number of Barangays: Status of Household Energization:
Grid: - -
Off-grid: -

Customer Captive Customer


Sales (MWh)
Classification Connection
Residential - -
Commercial 26 5,743
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Franchise Area: Industrial 60 114,774


0.7 sq. km. Others - -
TOTAL 86 120,516
Franchise Population:
Mactan Economic Zone - Customer/s Served by RES:
Mactan Economic Zone
Sales for Customer/s served by RES:
Circuit kilometer:
5.6 System Loss: 845 MWh (0.70 %)

Demand Annual Average Growth Rate (2016-2025) : -0.15 %

25.00
Actual

20.00

15.00

MW
10.00

LEGEND:
Supply
5.00
Energized DU System Demand
Substation
Backbone Line 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 0.00 0.00 0.83 0.15 1.72 10.68 10.29 9.18 10.30 11.45
Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SS
No. SS Name Supply Contracted: Captive Customers 22.80 20.00 20.00 20.00 20.00 20.00 10.00 10.00 10.00 10.00 10.00
Capacity
Peak Demand: Franchise 22.16 19.58 19.89 20.83 20.15 21.72 20.68 20.29 19.18 20.30 21.45
1 MEZ S/S 58 MVA
Peak Demand: Captive Customers 22.16 19.58 19.89 20.83 20.15 21.72 20.68 20.29 19.18 20.30 21.45
VISAYAN ELECTRIC COMPANY, INC. (VECO)
SS Number of Barangays: Status of Household Energization:
No. SS Name
Capacity Grid: 232 97.1% (498,780 HH / 513,537 HH)
1 Consolacion S/S 33 MVA Off-grid: -
2 Cabancalan S/S 33 MVA
3 Pakna-an S/S 33 MVA Customer Captive Customer
4 Banilad S/S 33 MVA Sales (MWh)
Classification Connection
5 Mandaue S/S 33 MVA
6 MRA S/S 33 MVA Residential 353,485 704,338
7 Mabolo S/S 33 MVA Commercial 40,421 384,461
8 Ayala S/S 33 MVA
9 Camputhaw S/S 33 MVA Industrial 1,646 1,470,572
10 Lorega S/S 33 MVA Others 138 26,332
11 Calamba S/S 33 MVA
TOTAL 395,690 2,585,704
12 Don Gil Garcia S/S 33 MVA
13 Pardo S/S 33 MVA Customer/s Served by RES:
14 Talisay S/S 33 MVA Sales for Customer/s served by RES:
16 Naga S/S 33 MVA
System Loss: 211,770 MWh (7.57 %)

LEGEND: Demand Annual Average Growth Rate (2016-2025) : 4.70 %


Energized DU System 800.00
Substation Talisay
Backbone Line City 700.00
600.00
Actual
500.00
400.00

MW
300.00
Supply 200.00

Franchise Area: 100.00


674 sq. km.
Demand 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 111.27 71.58 0.00 0.00 0.00 0.00 12.71 30.38 49.16 128.44
Franchise Population: Supply for PSA Approval: Captive Customers 0.00 0.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00
2,076,151 Supply Contracted: Captive Customers 474.88 379.72 349.72 333.72 283.72 283.72 283.72 226.72 226.72 226.72 166.72
Peak Demand: Franchise 474.88 510.19 531.16 554.83 580.54 606.20 633.90 661.24 689.84 720.23 751.43
Circuit kilometer: Peak Demand: Captive Customers 474.88 490.99 421.30 404.56 424.20 355.42 372.53 389.43 407.10 425.88 445.16
1,741.9

110
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region VII Distribution Utilities


Region VII Distribution Utilities

111
BOHOL I ELECTRIC COOPERATIVE, INC. (BOHECO I)
Number of Barangays: Status of Household Energization:
Grid: 593 94.3 % (149,823 HH / 158,900 HH)
Franchise Area:
1,914 sq. km. Off-grid: 10

Customer Captive Customer


Franchise Population: Sales (MWh)
Classification Connection
554,706
Residential 117,076 72,947
Circuit kilometer: Commercial 5,628 33,853
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

2,324.76
Industrial 45 29,373
Others 11,988 9,385
TOTAL 134,737 145,558
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 9,059 MWh (5.86 %)

Demand Annual Average Growth Rate (2016-2025) : 4.79 %


LEGEND:
Energized DU System 50.00
Substation 45.00
Backbone Line
40.00
Actual
35.00
30.00
25.00

MW
20.00
Supply 15.00
SS 10.00
No. SS Name Demand 5.00
Capacity
1 Maribojoc S/S 5 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
2 Maca-as S/S 10 MVA Supply Indicative 3.21 3.93 4.91 2.69 4.47 6.26 8.05 9.84 25.63 39.42
3 Carmen S/S 5 MVA Supply for PSA Approval: Captive Customers 5.00 6.00 8.00 12.00 12.00 12.00 12.00 12.00 12.00 0.00
4 Loay S/S 10 MVA Supply Contracted: Captive Customers 22.76 22.71 22.72 21.50 21.50 21.50 21.50 21.50 21.50 7.50 7.50
5 Dampas S/S 10 MVA Peak Demand: Franchise 28.23 30.47 32.12 33.78 35.43 37.07 38.69 40.30 41.90 43.47 45.03
6 Panglao S/S 10 MVA Peak Demand: Captive Customers 28.60 30.91 32.65 34.41 36.19 37.97 39.76 41.55 43.34 45.13 46.92
BOHOL II ELECTRIC COOPERATIVE, INC. (BOHECO II)
Banacan Island Number of Barangays: Status of Household Energization:
Mahanay Island Grid: 465 96.1 % (127,299 HH / 132,500 HH)
Hundayan Island Off-grid: 26
Jao Island

Bien Unido
Customer Captive Customer
Sales (MWh)
Classification Connection
Pres. Carlos P. Garcia Residential 101,493 55,266
Commercial 4,505 10,310
Industrial 320 12,901
Others 4,989 7,928
TOTAL 111,307 86,405
Customer/s Served by RES:
LEGEND: Sales for Customer/s served by RES:
Energized DU System
Substation System Loss: 9,022 MWh (9.45 %)
Backbone Line

Demand Annual Average Growth Rate (2016-2025) : 2.06 %


Franchise Area:
2,101 sq. km. 30.00
Actual
25.00
Franchise Population:
128,448 20.00

Circuit kilometer: 15.00

MW
Valencia
35.8
Supply 10.00

SS Demand 5.00
No. SS Name
Capacity
1 Mahayag S/S 5 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
2 Trinidad S/S 10 MVA Supply Indicative 9.91 10.03 10.42 0.00 0.00 0.00 0.00 0.34 12.73 13.11
3 Imelda S/S 5 MVA Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 12.00 12.00 12.00 12.00 12.00 0.00 0.00
4 Alicia S/S 5 MVA Supply Contracted: Captive Customers 25.80 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
5 Guindulman S/S 5 MVA Peak Demand: Franchise 18.87 19.91 20.03 20.42 20.80 21.19 21.57 21.96 22.34 22.73 23.11
6 Garcia S/S 5 MVA Peak Demand: Captive Customers 18.87 19.91 20.03 20.42 20.80 21.19 21.57 21.96 22.34 22.73 23.11

112
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region VII Distribution Utilities


Region VII Distribution Utilities

113
CEBU I ELECTRIC COOPERATIVE, INC. (CEBECO I)
Number of Barangays: Status of Household Energization:
Grid: 366 96.9 % (133,233 HH / 137,500 HH)
Off-grid: -

Customer Captive Customer


Franchise Area: Sales (MWh)
Classification Connection
1,680.9 sq. km.
Residential 107,478 80,693
Franchise Population:
Commercial 8,146 35,130
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

734,047
Industrial 33 6,602
Circuit kilometer: Others 3,575 41,969
1,718.7 TOTAL 119,232 164,394
LEGEND: Customer/s Served by RES:
Energized DU System
Sales for Customer/s served by RES:
Substation
Backbone Line System Loss: 18,137 MWh (9.94 %)

Demand Annual Average Growth Rate (2016-2025) : 4.68 %

60.00

50.00
Actual
40.00

30.00

MW
SS
No. SS Name Supply 20.00
Capacity
1 Dumanjug S/S 10 MVA Demand 10.00
2 Samboan S/S 5 MVA
3 Dalaguete S/S 10 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
4 Sibonga S/S 5 MVA Supply Indicative 5.74 7.82 7.86 9.86 11.81 13.71 25.57 27.38 29.14 30.87
5 Carcar 1 S/S 5 MVA Supply for PSA Approval: Captive Customers 0.00 0.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
6 Carcar 2 S/S 10 MVA Supply Contracted: Captive Customers 22.15 22.15 22.15 22.15 22.15 22.15 22.15 12.15 12.15 12.15 12.15
7 Steel Asia S/S 10 MVA Peak Demand: Franchise 32.92 34.85 36.93 38.98 40.98 42.93 44.83 46.69 48.49 50.26 51.98
8 CP KELCO S/S 3.75 MVA Peak Demand: Captive Customers 32.92 27.89 29.97 32.01 34.01 35.96 37.86 39.72 41.53 43.29 45.02
CEBU II ELECTRIC COOPERATIVE, INC. (CEBECO II)
Number of Barangays: Status of Household Energization:
Daanbantayan 97.9 % (149,047 HH / 152,200 HH)
Grid: 320
Off-grid: 3

Medellin SS Customer Captive Customer


No. SS Name Sales (MWh)
Capacity Classification Connection
1 Lanao S/S 10 MVA
2 Luy-A S/S 5 MVA Residential 122,208 90,326
3 Dayhagon S/S 10 MVA Commercial 8,591 58,366
Bogo City 4 Lugo S/S 5 MVA
San Remegio 5 Damolog S/S 10 MVA
Industrial 55 148,949
Tabogon 6 Carmen S/S 10 MVA Others 3,148 12,281
7 Guinsay S/S 10 MVA TOTAL 134,002 309,923
8 MRI S/S 20 MVA
Tabuelan 9 Cogon S/S 10 MVA Customer/s Served by RES:
Borbon 10 Danao Paper Mill S/S 4 MVA Sales for Customer/s served by RES:
11 La Farge S/S 10 MVA
System Loss: 32,361 MWh (9.45 %)
Sogod
Tuburan Demand Annual Average Growth Rate (2016-2025) : 10.04 %
LEGEND:
Energized DU System
Catmon Substation 160.00
Backbone Line 140.00
Carmen
120.00
Danao City
100.00
80.00
Actual

MW
60.00
Compostela
Supply
Franchise Area: 40.00
1,235 sq. km. Demand 20.00
0.00
Franchise Population: 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
149,047 Supply Indicative 28.24 32.53 33.73 40.41 48.18 57.16 82.49 94.32 107.81 123.17
Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Circuit kilometer: Supply Contracted: Captive Customers 35.51 26.00 25.00 28.00 28.00 28.00 28.00 13.00 13.00 13.00 13.00

3,837.1 Peak Demand: Franchise 52.51 54.24 57.53 61.73 68.41 76.18 85.16 95.49 107.32 120.81 136.17
Peak Demand: Captive Customers 52.51 54.24 57.53 61.73 68.41 76.18 85.16 95.49 107.32 120.81 136.17

114
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region VII Distribution Utilities


Region VII Distribution Utilities

115
CEBU III ELECTRIC COOPERATIVE, INC. (CEBECO III)
Number of Barangays: Status of Household Energization:
Grid: 134 100.1 % (90,790 HH / 90,700 HH)
Off-grid: -

Franchise Area: Customer Captive Customer


Sales (MWh)
850.1 sq. km. Classification Connection
Residential 73,134 60,143
Franchise Population:
358,694 Commercial 4,302 27,088
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 28 14,167
Circuit kilometer: Others 1,293 39,391
3.7
TOTAL 78,757 140,789
Customer/s Served by RES:
LEGEND: Sales for Customer/s served by RES:
Energized DU System
Substation
Backbone Line System Loss: 12,176 MWh (7.96 %)

Demand Annual Average Growth Rate (2016-2025) : 1.39 %

30.00
Actual
25.00

20.00

15.00

MW
Supply 10.00

Demand 5.00

0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 6.26 6.49 6.75 7.02 7.32 7.65 8.02 8.44 8.91 9.44
SS
No. SS Name Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Capacity
Supply Contracted: Captive Customers 17.00 17.00 17.00 17.00 17.00 17.00 17.00 17.00 17.00 17.00 17.00
1 Toledo S/S 20 MVA
Peak Demand: Franchise 23.03 23.26 23.49 23.75 24.02 24.32 24.65 25.02 25.44 25.91 26.44
2 Balamban S/S 10 MVA
Peak Demand: Captive Customers 23.03 23.26 23.49 23.75 24.02 24.32 24.65 25.02 25.44 25.91 26.44
NEGROS ORIENTAL I ELECTRIC COOPERATIVE, INC. (NORECO I)
Number of Barangays: Status of Household Energization:
Grid: 285 78.8 % (72,090 HH / 91,500 HH)
Canlaon City Off-grid: -
Vallehermoso

Customer Captive Customer


Franchise Area: Sales (MWh)
Classification Connection
2,425 sq. km.
Residential 60,938 32,477
Franchise Population: Commercial 2,003 6,184
159,049
Industrial 211 6,030
Circuit kilometer: Others 1,244 7,687
2,444.9 TOTAL 64,397 52,378
Customer/s Served by RES:
LEGEND:
Sales for Customer/s served by RES:
Energized DU System
Substation
Backbone Line System Loss: 8,705 MWh (14.25 %)

Demand Annual Average Growth Rate (2016-2025) : 2.11 %

18.00
16.00
14.00 Actual
12.00
10.00

MW
8.00
Supply 6.00
4.00
Demand 2.00
SS 0.00
No. SS Name 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Capacity Supply Indicative 0.82 2.36 6.78 6.94 7.24 3.23 3.52 3.81 4.10 4.37
1 Guihulngan S/S 10 MVA Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 7.00 7.00 7.00 7.00 7.00
2 Bindoy S/S 5 MVA Supply Contracted: Captive Customers 11.70 11.70 10.70 6.70 6.70 6.70 4.00 4.00 4.00 4.00 4.00
3 Mabinay S/S 3.75 MVA Peak Demand: Franchise 12.48 12.53 13.06 13.48 13.64 13.94 14.23 14.52 14.81 15.10 15.37
4 Bais S/S 5 MVA Peak Demand: Captive Customers 12.48 12.53 13.06 13.48 13.64 13.94 14.23 14.52 14.81 15.10 15.37

116
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region VII Distribution Utilities


Region VII Distribution Utilities

117
NEGROS ORIENTAL II ELECTRIC COOPERATIVE, INC. (NORECO II)
Number of Barangays: Status of Household Energization:
Grid: 272 89.1 % (141,009 HH / 158,200 HH)
Off-grid: -

Franchise Area: Customer Captive Customer


Sales (MWh)
2,802 sq. km. Classification Connection
Residential 130,335 111,765
Franchise Population:
Commercial 8,414 57,612
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

569,809
Industrial 146 4,424
Circuit kilometer: Others 2,117 71,707
2,009.6
TOTAL 141,012 245,508
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 41,749 MWh (14.53 %)

Demand Annual Average Growth Rate (2016-2025) : 3.67 %

80.00
LEGEND: 70.00
Energized DU System Actual
Substation 60.00
Backbone Line 50.00
40.00

MW
SS Supply 30.00
No. SS Name
Capacity 20.00
1 Banaba S/S 3.75 MVA Demand 10.00
2 Tanjay S/S 10 MVA
3 Pulantubig-1 S/S 10 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
4 Pulantubig-2 S/S 20 MVA Supply Indicative 12.01 14.22 16.39 18.50 20.56 22.55 32.68 34.55 36.36 38.12
5 Bagacay S/S 20 MVA Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 Dauin S/S 4.2 MVA Supply Contracted: Captive Customers 33.20 33.20 33.20 33.20 33.20 33.20 33.20 25.00 25.00 25.00 25.00
7 Siaton S/S 10 MVA Peak Demand: Franchise 48.46 50.77 53.08 55.35 57.56 59.70 61.78 63.80 65.76 67.66 69.51
8 Bayawan S/S 10 MVA Peak Demand: Captive Customers 48.46 45.21 47.42 49.59 51.70 53.76 55.75 57.68 59.55 61.36 63.12
BANTAYAN ISLAND ELECTRIC COOPERATIVE, INC. (BANELCO)
Number of Barangays: Status of Household Energization:
Grid: - 91.5% (24,971 HH / 27,300 HH)
Off-grid: 49

Franchise Area: Customer Captive Customer


Sales (MWh)
14.2 sq. km. Classification Connection
Residential 21,212 12,396
Madridejos Franchise Population:
138,000 Commercial 1,815 5,817
Industrial 29 3,530
Circuit kilometer: Others 345 710
242
TOTAL 23,401 22,453
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 2,094 MWh (8.53 %)

Demand Annual Average Growth Rate (2016-2025) : 5.82 %

9.00
8.00
7.00
6.00
Actual

LEGEND: 5.00

MW
Energized DU System 4.00
Substation Supply 3.00
Backbone Line
2.00
Demand 1.00
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
SS
No. SS Name Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Capacity Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 6.88 7.23 7.58 7.92
1 BIPCOR 8.33 MVA Supply Contracted: Captive Customers 5.17 5.18 5.49 5.51 5.85 6.19 6.53 0.00 0.00 0.00 0.00
2 NPC-SPUG Doong 0.300 MVA Peak Demand: Franchise
3 NPC-SPUG Kinatarcan 0.300 MVA Peak Demand: Captive Customers 4.50 4.87 5.18 5.51 5.84 6.18 6.53 6.87 7.22 7.57 7.92

118
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region VII Distribution Utilities


Region VII Distribution Utilities

119
CAMOTES ELECTRIC COOPERATIVE, INC. (CELCO)
Number of Barangays: Status of Household Energization:
Grid: - 85.7% (19,292 HH / 22,500 HH)
Off-grid: 56
Franchise Area:
14.2 sq. km. Customer Captive Customer
Sales (MWh)
Classification Connection
Franchise Population:
Residential 17,965 6,284
138,000
Commercial 779 2,445
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Circuit kilometer: Industrial 27 720


242 Others 521 942
TOTAL 19,292 10,391
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 870 MWh (7.73 %)

Demand Annual Average Growth Rate (2016-2025) : 12.03


%
10.00
9.00
8.00
7.00 Actual
6.00
5.00
LEGEND:

MW
4.00
Energized DU System Supply
Substation 3.00
Backbone Line Demand 2.00
1.00
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 0.53 0.93 4.62 5.24 5.89 6.55 7.23 7.92 8.61 9.30
SS
No. SS Name Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Capacity
Supply Contracted: Captive Customers 3.10 2.94 3.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 Camotes S/S 2.7 MVA
Peak Demand: Franchise
2 Pilar S/S 1.45 MVA
Peak Demand: Captive Customers 3.00 3.47 4.02 4.62 5.24 5.89 6.55 7.23 7.92 8.61 9.30
PROVINCE OF SIQUIJOR ELECTRIC COOPERATIVE, INC. (PROSIELCO)
Number of Barangays: Status of Household Energization:
Grid: - 89.8 % (23,791 HH / 26,500HH)
Off-grid: 134
LEGEND:
Energized DU System
Substation Enrique Customer Captive Customer
Villanueva
Sales (MWh)
Backbone Line Classification Connection
Residential 19,272 8,782
Commercial 1,828 3,354
Industrial 167 510
Others 1,128 5,153
TOTAL 22,395 17,800
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 1,757 MWh (9.29 %)

Demand Annual Average Growth Rate (2016-2025) : 6.13 %

9.00
Franchise Area: 8.00
343 sq. km. 7.00
6.00
Franchise Population: Actual
5.00
291,066

MW
4.00
Supply 3.00
Circuit kilometer:
227.9 2.00
Demand 1.00
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
SS Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No. SS Name Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Capacity
1 SIPCOR - Candanay 4.1 MVA Supply Contracted: Captive Customers 4.56 4.71 4.87 5.25 5.65 6.07 6.49 6.92 7.35 7.79 8.26
Peak Demand: Franchise
2 SIPCOR - Tignao 4.1 MVA
Peak Demand: Captive Customers 4.56 4.71 4.87 5.25 5.65 6.07 6.49 6.92 7.35 7.79 8.26

120
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region VII Distribution Utilities


DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region VIII
Per Region
Utilities
Utilities

Peak
Distribution

Distribution
Demand
Distribution

Utility
(MW)
1
1 NORSAMELCO 15.27
Map of VIII

2 SAMELCO I 10.67 2
System Region

3 SAMELCO II 12.92
4 ESAMELCO 15.54 6 3
5 BILECO 6.62 5 4
6 MMPC 0.16 9
8
7 LEYECO V 34.32 7
8 LEYECO III 7.22 10
9 LEYECO II 40.30
10 DORELCO 12.43 11
12
11 LEYECO IV 11.30
12 SOLECO 18.19
Total 184.94

2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 693,481 112,904
Commercial 25,243 117,167
Industrial 2,705 111,498
Others 18,402 464,545
Total 739,830 806,115

121
BILIRAN ELECTRIC COOPERATIVE, INC. (BILECO)
Number of Barangays: Status of Household Energization:
Grid: 115 92.8 % (31,453 HH / 33,900 HH)
Off-grid: 2

Customer Captive Customer


Sales (MWh)
Classification Connection
Residential 26,941 20,348
Commercial 1,016 4,125
Industrial - -
Others 726 3,574
TOTAL 28,683 28,048
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 6,128 MWh (17.92 %)

Franchise Area:
Demand Annual Average Growth Rate (2016-2025) : 5.67 %
511.4 sq. km.
14.00
Franchise Population: 12.00
163,556
10.00
Circuit kilometer: 8.00
Actual
305.9

MW
6.00
Supply 4.00
LEGEND:
Energized DU System Demand 2.00
Substation
Backbone Line 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 2.07 4.54 5.02 0.00 0.00 0.00 0.00 0.49 0.98 1.48
SS Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No. SS Name
Capacity Supply Contracted: Captive Customers 4.00 5.00 3.00 3.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
1 San Roque S/S 10 MVA Peak Demand: Franchise 6.62 7.07 7.54 8.02 8.50 8.99 9.49 9.99 10.49 10.98 11.48
Peak Demand: Captive Customers 6.62 7.07 7.54 8.02 8.50 8.99 9.49 9.99 10.49 10.98 11.48

122
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region VIII Distribution Utilities


Region VIII Distribution Utilities

123
DON ORESTES ROMULADEZ ELECTRIC COOPERATIVE, INC. (DORELCO)
Number of Barangays: Status of Household Energization:
Grid: 499 75.3 % (61,787 HH / 82,100 HH)
Off-grid: -

Customer Captive Customer


Franchise Area: Sales (MWh)
Classification Connection
1,644.3 sq. km.
Residential 59,063 35,100
Franchise Population: Commercial 1,476 7,801
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

408,639
Industrial 10 6,365
Circuit kilometer: Others 1,239 3,726
- TOTAL 61,788 52,993
Customer/s Served by RES:
Sales for Customer/s served by RES:
LEGEND:
Energized DU System
System Loss: 7,558 MWh (12.48 %)
Substation
Backbone Line
Demand Annual Average Growth Rate (2016-2025) : 4.28 %
20.00
18.00
16.00
14.00 Actual
12.00
10.00

MW
8.00
Supply 6.00
4.00
Demand 2.00
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 3.19 5.72 6.25 12.78 15.31 15.84 16.37 16.90 17.43 17.96
SS Supply for PSA Approval: Captive Customers 5.00 6.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No. SS Name
Capacity Supply Contracted: Captive Customers 8.00 5.00 2.00 2.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00
1 Tolosa S/S 10 MVA Peak Demand: Franchise 12.43 14.05 14.58 15.12 15.65 16.18 16.71 17.24 17.77 18.30 18.83
2 Javier S/S 5 MVA Peak Demand: Captive Customers 12.43 13.19 13.72 14.25 14.78 15.31 15.84 16.37 16.90 17.43 17.96
EASTERN SAMAR ELECTRIC COOPERATIVE, INC. (ESAMELCO)
Jipapad Number of Barangays: Status of Household Energization:
Grid: 570 92.8 % (83,364 HH / 89,800 HH)
San Policarpio
Off-grid: 26

Customer Captive Customer


Franchise Area: Sales (MWh)
Classification Connection
4,660 sq. km.
Residential 72,602 45,287
Franchise Population: Commercial 1,325 6,690
428,877
Industrial 180 2,386
Circuit kilometer: Others 1,496 7,349
1,104.7 TOTAL 75,603 61,712
Customer/s Served by RES:
LEGEND: Sales for Customer/s served by RES:
Energized DU System
Substation System Loss: 8,456 MWh (12.15 %)
Balangkayan Backbone Line
Hernani
General MacArthur Demand Annual Average Growth Rate (2016-2025) : 4.28 %
Balangiga
Lawa-an 25.00
Quinapondan Salcedo
Mercedes 20.00
Giporlos Guian Actual
15.00
Manicani Island

MW
10.00
Homonhon Supply
Caliloan Island Island 5.00
Demand
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
SS
No. SS Name Supply Indicative 4.82 5.65 5.53 3.41 4.29 5.17 6.04 6.90 7.76 8.63
Capacity
Supply for PSA Approval: Captive Customers 0.00 11.00 12.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00
1 Taft S/S 5 MVA
Supply Contracted: Captive Customers 8.00 11.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Cabong S/S 15 MVA
Peak Demand: Franchise 15.54 15.82 16.65 17.53 18.41 19.29 20.17 21.04 21.90 22.76 23.63
3 Buenavista S/S 5 MVA Peak Demand: Captive Customers 15.54 15.82 16.65 17.53 18.41 19.29 20.17 21.04 21.90 22.76 23.63

124
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region VIII Distribution Utilities


Region VIII Distribution Utilities

125
LEYTE II ELECTRIC COOPERATIVE, INC. (LEYECO II)
Number of Barangays: Status of Household Energization:
Grid: 196 83.7 % (57,364 HH / 68,500 HH)
Off-grid: -

Customer Captive Customer


Franchise Area: Sales (MWh)
Classification Connection
362.3 sq. km.
Residential 50,589 69,055
Franchise Population: Commercial 4,485 23,256
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

-
Industrial 802 60,242
Circuit kilometer: Others 694 16,870
- TOTAL 56,570 169,423
Customer/s Served by RES:
Sales for Customer/s served by RES:
Tacloban City
System Loss: 21,723 MWh (11.20 %)

Demand Annual Average Growth Rate (2016-2025) : 2.50 %


LEGEND: 60.00
Energized DU System Actual
Substation 50.00
Backbone Line
40.00

30.00

MW
Supply 20.00

10.00
Demand
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
SS Supply Indicative 14.38 12.38 12.54 18.74 19.97 20.48 22.85 23.67 24.51 25.36
No. SS Name
Capacity Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 Abucay S/S 20 MVA Supply Contracted: Captive Customers 26.00 27.00 28.00 29.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00
2 Sagkahan S/S 20 MVA Peak Demand: Franchise 40.30 41.38 42.56 43.72 44.92 46.15 46.66 49.03 49.85 50.69 51.54
3 Campetic S/S 20 MVA Peak Demand: Captive Customers 40.30 41.38 40.38 41.54 42.74 43.97 44.48 46.85 47.67 48.51 49.36
LEYTE III ELECTRIC COOPERATIVE, INC. (LEYECO III)
Number of Barangays: Status of Household Energization:
Grid: 285 91.9 % (47,982 HH / 52,200 HH)
LEGEND:
Energized DU System
Off-grid: -
Substation
Backbone Line Customer Captive Customer
Sales (MWh)
Classification Connection
Residential 46,112 23,073
Commercial 1,084 2,768
Industrial 205 2,392
Others 581 2,339
TOTAL 47,982 30,572
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 3,307 MWh (10.97 %)

Demand Annual Average Growth Rate (2016-2025) : 3.89 %

Franchise Area: 12.00


1,965 sq. km. 10.00
Actual
Franchise Population: 8.00
218,136
6.00

MW
Circuit kilometer:
4.00
519.5 Supply
2.00
Demand
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
SS Supply Indicative 3.10 5.43 5.76 6.09 6.42 6.75 9.58 9.91 10.25 10.58
No. SS Name Supply for PSA Approval: Captive Customers 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Capacity
1 Tunga S/S 5 MVA Supply Contracted: Captive Customers 3.50 3.50 2.50 2.50 2.50 2.50 2.50 0.00 0.00 0.00 0.00
Peak Demand: Franchise 7.22 7.60 7.93 8.26 8.59 8.92 9.25 9.58 9.91 10.25 10.58
2 Alangalang S/S 5 MVA
Peak Demand: Captive Customers 7.22 7.60 7.93 8.26 8.59 8.92 9.25 9.58 9.91 10.25 10.58

126
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region VIII Distribution Utilities


Region VIII Distribution Utilities

127
LEYTE IV ELECTRIC COOPERATIVE, INC. (LEYECO IV)
Number of Barangays: Status of Household Energization:
Grid: 242 97.3 % (70,189 HH / 72,100 HH)
Off-grid: 3

Franchise Area: Customer Captive Customer


Sales (MWh)
1,176.3 sq. km. Classification Connection
Residential 61,188 32,252
Franchise Population:
Commercial 5,473 12,669
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

63,634
Industrial 531 2,236
Circuit kilometer: Others 2,997 8,363
774.9
TOTAL 70,189 55,520
Customer/s Served by RES:
LEGEND: Sales for Customer/s served by RES:
Energized DU System
Substation System Loss: 6,756 MWh (10.85 %)
Backbone Line
Demand Annual Average Growth Rate (2016-2025) : 5.68 %
25.00

20.00

Actual
15.00

MW
10.00
Supply
5.00
Demand
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
SS Supply Indicative 1.80 2.33 1.93 0.00 0.00 0.00 0.15 1.20 2.35 3.63
No. SS Name
Capacity Supply for PSA Approval: Captive Customers 2.00 2.00 6.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00
1 San Agustin S/S 5 MVA Supply Contracted: Captive Customers 9.00 8.00 8.00 5.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Baybay S/S 10 MVA Peak Demand: Franchise 11.30 11.80 12.33 12.93 13.60 14.36 15.21 16.15 17.20 18.35 19.63
3 Hilongos S/S 10 MVA Peak Demand: Captive Customers 11.30 11.80 12.33 12.93 13.60 14.36 15.21 16.15 17.20 18.35 19.63
LEYTE V ELECTRIC COOPERATIVE, INC. (LEYECO V)
Number of Barangays: Status of Household Energization:
Grid: 415 86.8 % (111,512 HH / 128,500 HH)
Off-grid: -

Customer Captive Customer


Franchise Area: Sales (MWh)
Classification Connection
2,102.5 sq. km.
Residential 105,811 77,945
Franchise Population: Commercial 2,845 9,185
588,278
Industrial 957 29,136
Circuit kilometer: Others 1,900 40,066
1,622.8 TOTAL 111,513 156,331
Customer/s Served by RES:
LEGEND: Sales for Customer/s served by RES:
Energized DU System
Substation System Loss: 14,556 MWh (8.52 %)
Backbone Line

Demand Annual Average Growth Rate (2016-2025) : 5.38 %

50.00
45.00
40.00
Actual
35.00
30.00
25.00

MW
20.00
Supply 15.00
Demand 10.00
SS 5.00
No. SS Name
Capacity 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
1 Leyte S/S 5 MVA Supply Indicative 8.60 8.91 9.21 7.52 8.83 10.14 11.45 12.75 14.06 15.37
2 Tabango S/S 5 MVA Supply for PSA Approval: Captive Customers 14.00 22.00 23.00 31.00 31.00 31.00 31.00 31.00 31.00 31.00
3 Isabel S/S 12 MVA Supply Contracted: Captive Customers 17.00 12.00 5.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 Ormoc S/S 20 MVA Peak Demand: Franchise 34.32 35.63 36.94 38.24 39.55 40.86 42.17 43.48 44.78 46.09 47.40
5 Albuera S/S 10 MVA Peak Demand: Captive Customers 34.32 34.60 35.91 37.21 38.52 39.83 41.14 42.45 43.75 45.06 46.37

128
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region VIII Distribution Utilities


Region VIII Distribution Utilities

129
NORTHERN SAMAR ELECTRIC COOPERATIVE, INC. (NORSAMELCO)
Number of Barangays: Status of Household Energization:
Grid: 440 64.4 % (66,173 HH / 102,700HH)
Off-grid: 129

Marubay Island Customer Captive Customer


Sales (MWh)
Classification Connection
San Juan
Cabanongan Island Residential 63,303 42,776
Lavezares Commercial 1,856 10,422
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 5 2,540
Capul Others 1,009 8,506
TOTAL 66,173 64,245
San Antonio
Customer/s Served by RES:
San Sales for Customer/s served by RES:
Lapinig
Vicente
System Loss: 11,909 MWh (15.64 %)

LEGEND: Demand Annual Average Growth Rate (2016-2025) : 3.83 %


Energized DU System
Substation
Backbone Line 25.00

Franchise Area: 20.00


Actual
3,498 sq. km.
15.00
Franchise Population:

MW
113,442 10.00
Supply
Circuit kilometer: Demand 5.00
735
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
SS Supply Indicative 3.63 4.34 4.85 2.52 3.17 3.79 4.39 4.97 5.53 6.07
No. SS Name
Capacity Supply for PSA Approval: Captive Customers 0.00 12.00 13.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00
1 Allen S/S 5 MVA Supply Contracted: Captive Customers 12.08 12.79 0.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Bobon S/S 15 MVA Peak Demand: Franchise 14.43 15.57 16.27 16.95 17.60 18.22 18.82 19.39 19.95 20.49 21.00
3 Bobolosan S/S 5 MVA Peak Demand: Captive Customers 15.27 16.42 17.15 17.85 18.52 19.17 19.79 20.39 20.97 21.53 22.07
SAMAR I ELECTRIC COOPERATIVE, INC. (SAMELCO I)
Number of Barangays: Status of Household Energization:
Grid: 316 83.6 % (54,350 HH / 65,000 HH)
LEGEND: Off-grid: 111
Energized DU System
Substation Customer Captive Customer
Sales (MWh)
Backbone Line Classification Connection
Residential 49,017 28,462
Commercial 1,767 10,328
Industrial 3 4,062
Others 3,627 5,818
TOTAL 54,414 48,670
Customer/s Served by RES:
Sales for Customer/s served by RES:
Tagapul-An
Camandag System Loss: 8,491 MWh (14.85 %)

Almagro Demand Annual Average Growth Rate (2016-2025) : 5.89 %


Sto. Niño

Libucan 25.00

Franchise Area:
20.00
2,269.1 sq. km.
Actual
15.00
Franchise Population:

MW
317,183
10.00
Supply
Circuit kilometer:
Demand 5.00
612.9
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
SS Supply Indicative 0.00 4.33 3.96 2.59 3.23 3.88 4.54 5.22 5.90 6.60
No. SS Name
Capacity Supply for PSA Approval: Captive Customers 10.00 9.00 10.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00
1 Palanas Cara S/S 5 MVA Supply Contracted: Captive Customers 7.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Capoocan S/S 10 MVA Peak Demand: Franchise 10.39 12.43 13.04 13.66 14.28 14.92 15.56 16.22 16.89 17.57 18.26
3 San Agustin S/S 5 MVA Peak Demand: Captive Customers 10.67 12.72 13.33 13.96 14.59 15.23 15.88 16.54 17.22 17.90 18.60

130
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region VIII Distribution Utilities


Region VIII Distribution Utilities

131
SAMAR II ELECTRIC COOPERATIVE, INC. (SAMELCO II)
Number of Barangays: Status of Household Energization:
Grid: 491 87.9 % (72,626 HH / 82,600 HH)
San Jose de Buan Off-grid: 33

Customer Captive Customer


Franchise Area: Sales (MWh)
Classification Connection
857.9 sq. km.
Residential 69,639 36,942
Franchise Population: Commercial 1,277 10,948
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

387,112
Industrial 5 3,728
Circuit kilometer: Others 1,707 6,390
Zumarraga 1,207.9 TOTAL 72,628 58,008
San Sebastian
Daram Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 7,814 MWh (11.87 %)


Talalora

Demand Annual Average Growth Rate (2016-2025) : 3.61 %


Santa Rita
20.00
18.00
16.00
Actual
14.00
12.00
10.00

MW
Marabut 8.00
LEGEND: Supply
Energized DU System 6.00
Substation Demand 4.00
Backbone Line 2.00
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
SS Supply Indicative 2.31 8.89 9.85 0.38 0.88 1.41 1.88 2.37 2.88 3.40
No. SS Name
Capacity Supply for PSA Approval: Captive Customers 4.00 0.00 0.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00
1 Catbalogan S/S 10 MVA Supply Contracted: Captive Customers 9.33 7.34 5.35 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Paranas S/S 5 MVA Peak Demand: Franchise 12.57 13.25 13.84 14.40 14.93 15.43 15.91 16.38 16.87 17.38 17.90
3 Bagolibas S/S 5 MVA Peak Demand: Captive Customers 12.92 13.65 14.24 14.85 15.38 15.88 16.41 16.88 17.37 17.88 18.40
SOUTHERN LEYTE ELECTRIC COOPERATIVE, INC. (SOLECO)
Number of Barangays: Status of Household Energization:
Grid: 492 96.1 % (92,893 HH / 96,700HH)
Off-grid: 8

Customer Captive Customer


Franchise Area: Sales (MWh)
Classification Connection
1,735 sq. km.
Residential 87,907 52,936
Franchise Population: Commercial 2,601 14,644
87,300
Industrial 6 4,081
Circuit kilometer: Others 2,379 8,455
811.9 TOTAL 92,893 80,115
Customer/s Served by RES:
LEGEND: Sales for Customer/s served by RES:
Libagon Energized DU System
Tomas Oppus Substation
Backbone Line System Loss: 11,172 MWh (12.24 %)

Demand Annual Average Growth Rate (2016-2025) : 4.92 %


Malitbog
35.00

30.00
Actual
San Francisco 25.00

20.00
San Ricardo

MW
Pintuyan 15.00
Supply 10.00
Limasawa
Demand 5.00
SS 0.00
No. SS Name 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Capacity
Supply Indicative 6.75 6.79 8.03 7.09 8.15 9.20 10.27 11.33 12.37 13.44
1 Himay-angan S/S 5 MVA
Supply for PSA Approval: Captive Customers 9.00 14.00 14.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00
2 San Isidro S/S 5 MVA
Supply Contracted: Captive Customers 21.38 4.19 0.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 Pandan S/S 10 MVA
Peak Demand: Franchise 18.02 19.75 20.79 21.83 22.87 23.91 24.95 25.99 27.03 28.07 29.11
4 Maasin S/S 10 MVA
Peak Demand: Captive Customers 18.19 19.93 20.98 22.03 23.09 24.15 25.20 26.27 27.33 28.37 29.44

132
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region VIII Distribution Utilities


Region VIII Distribution Utilities

133
MARIPIPI MULTI-PURPOSE COOPERATIVE, INC. (MMPC)
Number of Barangays: Status of Household Energization:
Grid: - 42.9 % (818 HH / 1,907 HH)
Off-grid: 15

Franchise Area: Customer Captive Customer


Sales (MWh)
28.2 sq. km. Classification Connection

Franchise Population:
Residential 1,309 369
6,252 Commercial 38 68
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial - -
Circuit kilometer:
Others 47 42
-
TOTAL 1,394 479
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 46 MWh (8.76 %)

Demand Annual Average Growth Rate (2016-2025) : 3.00 %

0.35
Actual
0.30

0.25

0.20

MW
LEGEND: 0.15
Energized DU System Supply 0.10
Substation
Backbone Line Demand 0.05

0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply for PSA Approval: Captive Customers 0.00 0.00 0.23 0.24 0.25 0.26 0.27 0.28 0.29 0.30
Supply Contracted: Captive Customers 0.28 0.30 0.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Peak Demand: Franchise
Peak Demand: Captive Customers 0.16 0.16 0.16 0.17 0.17 0.18 0.19 0.19 0.20 0.20 0.21
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region IX

Utilities
IX Distribution
of Distribution Per Region
Utilities
Peak
Distribution
Demand
Utility

Region
1 (MW)

System Map
1 ZANECO 34.35
2 2 ZAMSURECO I 35.07
3 ZAMSURECO II 22.43
3
4 ZAMCELCO 93.99
Total 185.84

2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 380,042 201,143
Commercial 25,427 157,924
Industrial 1,524 99,160
Others 15,007 405,395
Total 422,001 863,621

134
Region IX Distribution Utilities

135
ZAMBOANGA CITY ELECTRIC COOPERATIVE, INC (ZAMCELCO)
Number of Barangays: Status of Household Energization:
Grid: 90 68.4 % (131,288 HH / 192,000HH)
Off-grid: 8

Customer Captive Customer


Franchise Area: Sales (MWh)
Classification Connection
1,483.4 sq. km.
Residential 92,679 169,714
Franchise Population: Commercial 8,940 121,190
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

807,129
Industrial 159 111,204
Circuit kilometer: Others 1,697 39,312
- TOTAL 103,475 441,420
Customer/s Served by RES:
LEGEND: Sales for Customer/s served by RES:
Energized DU System
Substation System Loss: 121,586 MWh (21.60 %)
Backbone Line

Demand Annual Average Growth Rate (2016-2025) : 5.90 %


180.00
7 160.00
140.00
Actual
120.00
100.00

MW
80.00

Supply 60.00

SS 40.00
No. SS Name Demand 20.00
Capacity
1 Sangali S/S 10 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
2 Putik S/S 40 MVA Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.82
3 Camanchile S/S 20 MVA Supply for PSA Approval: Captive Customers 35.00 35.00 35.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00
4 Cabatangan S/S 10 MVA Supply Contracted: Captive Customers 59.00 119.56 101.56 89.56 106.56 106.56 106.56 106.56 106.56 106.56 106.56
5 San Jose Gusu S/S 30 MVA Peak Demand: Franchise 93.99 105.58 110.26 115.46 121.18 127.42 134.17 141.44 149.23 157.55 166.38
6 Recodo S/S 10 MVA Peak Demand: Captive Customers 93.99 105.58 110.26 115.46 121.18 127.42 134.17 141.44 149.23 157.55 166.38
ZAMBOANGA DEL SUR I ELECTRIC COOPERATIVE, INC. (ZAMSURECO I)
Number of Barangays: Status of Household Energization:
Grid: 616 71.0 % (116,112 HH / 163,500 HH)
Don Victoriano Chiongban Off-grid: 12

Franchise Area: Customer Captive Customer


Mahayag Sales (MWh)
4,026 sq. km. Classification Connection
Residential 100,713 83,029
Franchise Population:
948,290
Commercial 6,106 36,897
Industrial 222 19,508
Circuit kilometer: Others 6,480 32,345
2,620.5
TOTAL 113,521 171,780
Pagadian City
Customer/s Served by RES:
LEGEND: Sales for Customer/s served by RES:
Energized DU System
Dumalinao Substation System Loss: 22,922 MWh (11.77 %)
Backbone Line

Demand Annual Average Growth Rate (2016-2025) : 3.02 %


San Pablo
80.00
70.00
Margosatubig Dimataning
60.00
Vincenzo A. Sagun 50.00
Actual
40.00

MW
Pitogo
30.00
Tabina Supply 20.00
SS 10.00
No. SS Name Demand
Capacity
0.00
1 Culo S/S 5 MVA 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
2 Switch S/S 5 MVA Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 Tiguma S/S 10 MVA Supply for PSA Approval: Captive Customers 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00
4 Balangasan S/S 10 MVA Supply Contracted: Captive Customers 15.00 22.00 27.00 51.24 51.24 51.24 51.24 51.24 51.24 51.24 51.24
5 San Jose S/S 10 MVA Peak Demand: Franchise 35.07 36.32 37.62 38.90 40.15 41.39 42.60 43.78 44.95 46.09 47.21
6 San Miguel S/S 5 MVA Peak Demand: Captive Customers 35.07 36.32 37.62 38.90 40.15 41.39 42.60 43.78 44.95 46.09 47.21

136
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region IX Distribution Utilities


Region IX Distribution Utilities

137
ZAMBOANGA DEL SUR II ELECTRIC COOPERATIVE, INC. (ZAMSURECO II)
Number of Barangays: Status of Household Energization:
Grid: 524 74.3 % (111,080 HH / 149,500 HH)
LEGEND:
Energized DU System Off-grid: 36
Substation
Backbone Line Lakewood Customer Captive Customer
Sales (MWh)
Classification Connection
Kabasalan
Residential 89,621 58,364
Commercial 5,317 23,504
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Kumalarang Industrial 547 8,825


Others 3,107 9,686
Siocon TOTAL 98,592 100,379
Payao Imelda
Malangas Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 16,412 MWh (14.05 %)


Mabuhay

Demand Annual Average Growth Rate (2016-2025) : 3.36 %


Franchise Area:
35.00
6,370.2 sq. km. Olutanga Actual
30.00
Franchise Population:
25.00
790,665
20.00
Circuit kilometer:

MW
15.00
1,964.5
Supply 10.00

SS 5.00
No. SS Name Demand
Capacity
0.00
1 Sirawai S/S 5 MVA 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
2 R.T. Lim S/S 3.5 MVA Supply Indicative 0.19 6.09 0.00 0.00 0.13 1.08 2.04 3.00 3.95 4.90
3 Pangi S/S 10 MVA Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 Danda S/S 5 MVA Supply Contracted: Captive Customers 28.72 23.04 18.00 33.30 28.30 26.30 26.30 26.30 26.30 26.30 26.30
5 Imelda S/S 5 MVA Peak Demand: Franchise 22.43 23.23 24.09 24.99 25.50 26.43 27.38 28.34 29.30 30.25 31.20

6 Imelda 2 S/S 5 MVA Peak Demand: Captive Customers 22.43 23.23 24.09 24.99 25.50 26.43 27.38 28.34 29.30 30.25 31.20
ZAMBOANGA DEL NORTE ELECTRIC COOPERATIVE, INC. (ZANECO)
Number of Barangays: Status of Household Energization:
Grid: 578 70.8 % (105,480 HH / 149,000 HH)
Off-grid: 7
Franchise Area:
Customer Captive Customer
5,267.7 sq. km. Dapitan City Sales (MWh)
Classification Connection
Franchise Population: Sibutad Residential 97,029 94,287
Rizal
957,997 Commercial 5,064 19,552
Circuit kilometer: Industrial 596 18,386
La Libertad
2,987.3 Katipunan Others 3,723 17,816
Roxas
TOTAL 106,413 150,042
LEGEND: Customer/s Served by RES:
Energized DU System Sales for Customer/s served by RES:
Substation
Backbone Line System Loss: 24,648 MWh (12.50 %)

Sindangan
Demand Annual Average Growth Rate (2016-2025) : 5.78 %
70.00
Liloy
60.00

50.00
Actual
40.00

MW
30.00

Supply 20.00

10.00
SS Demand
No. SS Name
Capacity 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
1 Polo S/S 10 MVA Supply Indicative 3.10 9.24 0.00 0.00 0.00 0.00 1.13 4.08 7.12 10.24
2 Obay S/S 20 MVA Supply for PSA Approval: Captive Customers 0.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00
3 Piao S/S 5 MVA Supply Contracted: Captive Customers 29.97 33.08 24.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00
4 Mucas S/S 5 MVA Peak Demand: Franchise 34.35 36.18 38.24 40.49 42.94 45.54 48.27 51.13 54.08 57.12 60.24
5 Comunal S/S 5 MVA Peak Demand: Captive Customers 34.35 36.18 38.24 40.49 42.94 45.54 48.27 51.13 54.08 57.12 60.24

138
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region IX Distribution Utilities


DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region X
Per Region
Utilities
Utilities

Peak
Distribution
Demand
X Distribution

Utility
(MW)
of Distribution

1 1 CAMELCO 4.02
2 MORESCO II 22.52
2
Region

3 CEPALCO 165.39
System Map

4 3
5 4 MOELCI I 10.04
8 6 5 MORESCO I 68.36
7
6 BUSECO 26.05
9
7 MOELCI II 23.72
10
8 ILPI 35.64
9 LANECO 15.19
10 FIBECO 30.95
Total 401.88

2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 674,530 412,578
Commercial 50,070 885,860
Industrial 2,148 68,890
Others 17,959 670,565
Total 744,707 2,037,893

139
CAGAYAN ELECTRIC POWER & LIGHT COMPANY, INC. (CEPALCO)
Number of Barangays: Status of Household Energization:
Grid: 112 59.9 % (112,611 HH / 187,949 HH)
Off-grid: -

Franchise Area: Customer Captive Customer


Sales (MWh)
720 sq. km. Classification Connection
Residential 113,393 225,110
Franchise Population:
Tagoloan Commercial 16,421 210,614
819,187
Industrial 331 446,152
Circuit kilometer: Others 192 13,139
6 417.7
TOTAL 130,337 895,015
Cagayan de Oro Customer/s Served by RES:
Sales for Customer/s served by RES:
LEGEND: System Loss: 51,031 MWh (5.39 %)
Energized DU System
Substation
Backbone Line Demand Annual Average Growth Rate (2016-2025) : 11.19 %
500.00
450.00
400.00
350.00
300.00
Actual
SS 250.00

MW
No. SS Name 200.00
Capacity
1 Pagawan S/S 10 MVA Supply 150.00
2 Moog S/S 10 MVA 100.00
3 Lumbo S/S 10 MVA Demand 50.00
4 Abi S/S 10 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
5 Quibonbon S/S 10 MVA Supply Indicative 60.39 9.26 16.13 33.01 49.88 66.76 98.94 115.82 132.69 149.57
6 Opol S/S 10 MVA Supply for PSA Approval: Captive Customers 0.00 0.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00
7 Taboc S/S 10 MVA Supply Contracted: Captive Customers 209.25 152.25 302.25 292.25 292.25 292.25 292.25 276.94 276.94 276.94 276.94
8 Canituan S/S 10 MVA Peak Demand: Franchise 165.39 212.63 311.50 328.38 345.25 362.13 379.00 395.88 412.75 429.63 446.50
9 Sobros S/S 7 MVA Peak Demand: Captive Customers 165.39 212.63 311.50 328.38 345.25 362.13 379.00 395.88 412.75 429.63 446.50

140
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region X Distribution Utilities


Region X Distribution Utilities

141
ILIGAN LIGHT & POWER, INC. (ILPI)
Number of Barangays: Status of Household Energization:
Grid: 40 73.6 % (60,738 HH / 82,551 HH)
Off-grid: 4

Customer Captive Customer


Sales (MWh)
Classification Connection
Residential 53,672 95,149
Commercial 7,808 63,792
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 34 41,514
Others 22 2,138
TOTAL 61,536 202,593
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 13,844 MWh (6.40 %)


LEGEND:
Energized DU System
Demand Annual Average Growth Rate (2016-2025) : 6.70 %
Substation
Backbone Line 80.00
70.00
Franchise Area:
60.00
813.4 sq. km. Actual
50.00
Franchise Population: 40.00

MW
308,406 30.00
Supply 20.00
Circuit kilometer:
322.3 Demand 10.00
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
SS
No. SS Name Supply Indicative 0.00 0.00 10.07 13.39 16.75 19.97 22.87 25.27 26.99 27.85
Capacity Supply for PSA Approval: Captive Customers 10.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 Kiwalan S/S 12.5 MVA Supply Contracted: Captive Customers 40.45 47.09 39.75 39.75 39.75 39.75 39.75 39.75 39.75 39.75 39.75
2 Luinab S/S 30 MVA Peak Demand: Franchise 35.64 41.44 46.73 49.82 53.14 56.50 59.72 62.62 65.02 66.74 67.60
4 Palao S/S 30 MVA Peak Demand: Captive Customers 35.64 41.44 46.73 49.82 53.14 56.50 59.72 62.62 65.02 66.74 67.60
BUKIDNON SECOND ELECTRIC COOPERATIVE, INC. (BUSECO)
Number of Barangays: Status of Household Energization:
Grid: 173 80.6 % (89,599 HH / 111,200 HH)
Off-grid: -

LEGEND: Customer Captive Customer


Sales (MWh)
Energized DU System Classification Connection
Substation
Backbone Line Residential 76,777 45,873
Commercial 4,458 22,029
Industrial 516 60,027
Others 2,289 7,105
TOTAL 84,040 135,034
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 11,826 MWh (8.05 %)

Demand Annual Average Growth Rate (2016-2025) : 8.92 %

70.00
Franchise Area:
60.00
4,904.3 sq. km.
50.00
Franchise Population:
40.00
563,991 Actual

MW
30.00
Circuit kilometer: Supply 20.00
1,464.4
Demand 10.00
SS
No. SS Name 0.00
Capacity 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
1 Damilag S/S 5 MVA Supply Indicative 1.04 6.68 0.00 0.00 0.44 0.00 2.53 3.57 6.80 10.23
2 Lunocan S/S 15 MVA Supply for PSA Approval: Captive Customers 10.60 22.60 40.79 40.79 40.79 45.19 45.19 47.19 47.19 47.19
3 Sumilao S/S 10 MVA Supply Contracted: Captive Customers 23.19 23.23 8.23 8.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23
4 Casisang S/S 10 MVA Peak Demand: Franchise 26.05 34.87 37.50 39.63 41.93 43.45 47.09 49.94 52.99 56.22 59.64
5 Aglayan S/S 10 MVA Peak Demand: Captive Customers 26.05 34.87 37.50 39.63 41.93 43.45 47.09 49.94 52.99 56.22 59.64

142
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region X Distribution Utilities


Region X Distribution Utilities

143
CAMIGUIN ELECTRIC COOPERATIVE, INC. (CAMELCO)
Number of Barangays: Status of Household Energization:
Grid: 58 97.2 % (20,995 HH / 21,600 HH)
Off-grid: -
Franchise Area: Customer Captive Customer
238 sq. km. Sales (MWh)
Classification Connection
Franchise Population: Residential 19,437 10,453
- Commercial 898 4,039
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Circuit kilometer:
Industrial - -
250.84 Others 616 2,560
TOTAL 20,951 17,052
Customer/s Served by RES:
Sales for Customer/s served by RES:

Submarine Cable to Esperanza System Loss: 3,080 MWh (15.35 %)


Substation, Misamis Oriental

Demand Annual Average Growth Rate (2016-2025) : 5.37 %

12.00

10.00

LEGEND: 8.00
Actual
Energized Coop System
Substation 6.00

MW
Primary Backbone
Supply 4.00

Demand 2.00

0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.07 0.02
SS
No. SS Name Supply for PSA Approval: Captive Customers 0.00 4.00 6.73 6.73 6.73 6.73 6.73 6.73 6.73 6.73
Capacity
Supply Contracted: Captive Customers 6.43 5.43 3.01 3.01 3.01 3.01 3.01 3.01 0.00 0.00 0.00
1 Esperanza S/S 5 MVA
Peak Demand: Franchise 4.02 4.10 4.21 4.37 4.58 4.85 5.20 5.63 6.16 6.80 6.75
Peak Demand: Captive Customers 4.02 4.10 4.21 4.37 4.58 4.85 5.20 5.63 6.16 6.80 6.75
FIRST BUKIDNON ELECTRIC COOPERATIVE, INC. (FIBECO)
Number of Barangays: Status of Household Energization:
Grid: 300 79.2 % (136,721HH / 172,600 HH)
Off-grid: -
LEGEND:
Energized DU System Customer Captive Customer
Substation Sales (MWh)
Classification Connection
Backbone Line
Residential 111,590 66,595
Commercial 8,073 28,848
Industrial 353 41,591
Kalilangan Others 3,876 10,141
San Fernando TOTAL 123,892 147,176
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 21,250 MWh (12.62 %)

Demand Annual Average Growth Rate (2016-2025) : 2.10 %


Franchise Area:
6,077 sq. km. 80.00

Kadingilan 70.00
Franchise Population: 60.00
791,420 Actual
50.00

Circuit kilometer: 40.00

MW
5,789.7 Supply 30.00
20.00
SS
No. SS Name Demand 10.00
Capacity
1 Dabong-dabong S/S 10 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
2 Lumbo S/S 10 MVA
Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 Anahawon S/S 10 MVA
Supply for PSA Approval: Captive Customers 10.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 39.00 35.00
4 Camp 1 S/S 10 MVA
Supply Contracted: Captive Customers 42.18 24.60 24.00 24.00 24.00 24.00 24.00 21.00 21.00 21.00 21.00
5 Palma S/S 5 MVA
Peak Demand: Franchise 30.95 31.76 32.47 33.17 33.88 34.58 35.29 35.99 36.70 37.40 38.11
6 Barandias S/S 5 MVA
Peak Demand: Captive Customers 30.95 31.76 32.47 33.17 33.88 34.58 35.29 35.99 36.70 37.40 38.11

144
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region X Distribution Utilities


Region X Distribution Utilities

145
LANAO DEL NORTE ELECTRIC COOPERATIVE, INC. (LANECO)
Number of Barangays: Status of Household Energization:
Grid: 340 74.1 % (88,641 HH / 119,600 HH)
Off-grid: 70

LEGEND: Linamon Customer Captive Customer


Energized DU System Kauswagan Sales (MWh)
Tagoloan Classification Connection
Substation
Backbone Line Residential 68,667 41,723
Commercial 3,267 9,630
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 366 5,286


Others 2,892 10,230
TOTAL 75,192 66,869
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 15,147 MWh (18.47 %)

Demand Annual Average Growth Rate (2016-2025) : 6.40 %

30.00
Sultan Naga Dimaporo
Franchise Area: 25.00
3,011.4 sq. km. Actual
20.00
Franchise Population: 15.00

MW
676,395
Supply 10.00
Circuit kilometer:
61.3 Demand 5.00

0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.18 1.73 3.42 5.26
SS Supply for PSA Approval: Captive Customers 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00
No. SS Name
Capacity Supply Contracted: Captive Customers 5.00 11.15 13.00 18.00 18.00 15.00 15.00 15.00 15.00 15.00 15.00
1 Kauswagan S/S 10 MVA Peak Demand: Franchise 15.19 16.26 17.17 18.17 19.26 20.45 21.75 23.18 24.73 26.42 28.26
2 Kapatagan S/S 10 MVA Peak Demand: Captive Customers 15.19 16.26 17.17 18.17 19.26 20.45 21.75 23.18 24.73 26.42 28.26
MISAMIS OCCIDENTAL I ELECTRIC COOPERATIVE, INC. (MOELCI I)
Number of Barangays: Status of Household Energization:
Grid: 227 94.7 % (55,287 HH / 58,400 HH)
Off-grid: -

Plaridel
Customer Captive Customer
Sales (MWh)
Franchise Area: Classification Connection
797 sq. km. Sapang Dalaga Residential 43,588 25,064
Franchise Population: Lopez Jaena Commercial 2,090 10,280
568,661 Industrial 91 5,019
Others 1,362 6,030
Circuit kilometer:
1,750.3 TOTAL 47,131 46,393
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 6,649 MWh (12.53 %)

Demand Annual Average Growth Rate (2016-2025) : 5.24 %

Don Victoriano 35.00


Chiongban
30.00

LEGEND: 25.00
Energized DU System 20.00
Substation
Actual

MW
Backbone Line 15.00
Supply 10.00
Demand 5.00

0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SS
No. SS Name Supply for PSA Approval: Captive Customers 16.00 16.00 16.00 19.50 19.50 19.50 19.50 19.50 19.50 19.50
Capacity
Supply Contracted: Captive Customers 9.92 11.35 8.76 15.56 13.56 13.56 13.56 13.56 13.56 13.56 13.56
1 Bunawan S/S 5 MVA
Peak Demand: Franchise 10.04 10.53 11.01 11.53 12.12 12.75 13.44 14.18 14.98 15.83 16.73
2 Villaflor S/S 10 MVA
Peak Demand: Captive Customers 10.04 10.53 11.01 11.53 12.12 12.75 13.44 14.18 14.98 15.83 16.73

146
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region X Distribution Utilities


Region X Distribution Utilities

147
MISAMIS OCCIDENTAL II ELECTRIC COOPERATIVE, INC. (MOELCI II)
Number of Barangays: Status of Household Energization:
Grid: 253 93.6 % (81,943 HH / 87,500 HH)
Off-grid: -

Franchise Area: Customer Captive Customer


Sales (MWh)
1,059 sq. km. Classification Connection
Residential 60,345 56,974
Franchise Population:
Commercial 2,439 27,409
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

-
Industrial 46 32,689
Circuit kilometer: Others 1,296 6,473
794.9
TOTAL 64,126 123,545
Customer/s Served by RES:
LEGEND: Sales for Customer/s served by RES:
Energized DU System
Substation System Loss: 16,210 MWh (11.60 %)
Backbone Line

Demand Annual Average Growth Rate (2016-2025) : 3.37 %

40.00
35.00
30.00
Actual
25.00
20.00

MW
Supply 15.00
10.00
Demand 5.00
SS 0.00
No. SS Name 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Capacity
Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.95
1 Jomi S/S 5 MVA
Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Basirang S/S 10 MVA
Supply Contracted: Captive Customers 26.11 30.19 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 25.00
3 Bañadero S/S 20 MVA
Peak Demand: Franchise 23.72 26.09 27.45 28.10 28.75 29.41 30.08 30.77 31.47 32.20 32.95
4 Basirang S/S 10 MVA Peak Demand: Captive Customers 23.72 26.09 27.45 28.10 28.75 29.41 30.08 30.77 31.47 32.20 32.95
MISAMIS ORIENTAL I RURAL ELECTRIC SERVICE COOPERATIVE, INC. (MORESCO I)
Laguindingan Number of Barangays: Status of Household Energization:
Grid: 156 92.0 % (83,188 HH / 90,400 HH)
City of El Salvador
Libertad Off-grid: -

Customer Captive Customer


Sales (MWh)
Cagayan de Oro Classification Connection
Residential 69,134 62,490
LEGEND: Commercial 2,765 30,717
Lugait Energized DU System
Substation Industrial 23 211,840
Backbone Line Others 3,987 5,948
Franchise Area:
TOTAL 75,909 310,994
757 sq. km. Customer/s Served by RES:
Sales for Customer/s served by RES:
Franchise Population:
75,358 System Loss: 9,449 MWh (2.95 %)

Circuit kilometer: Demand Annual Average Growth Rate (2016-2025) : 4.52 %


1,283.8
120.00

100.00
SS Actual
No. SS Name 80.00
Capacity
1 Pagawan S/S 10 MVA 60.00

MW
2 Moog S/S 10 MVA
3 Lumbo S/S 10 MVA Supply 40.00
4 Abi S/S 10 MVA
5 Quibonbon S/S 10 MVA 20.00
Demand
6 Opol S/S 10 MVA
0.00
7 Taboc S/S 10 MVA 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
8 Canituan S/S 10 MVA Supply Indicative 12.87 15.52 6.43 8.55 12.25 14.28 18.74 19.14 22.14 27.18
9 Cabula S/S 1 MVA Supply for PSA Approval: Captive Customers 5.00 15.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00
10 Mabuaya S/S 0.58 MVA Supply Contracted: Captive Customers 54.92 60.84 52.50 73.55 73.55 73.55 73.55 73.55 73.55 73.55 73.55
11 Talakag S/S 1.5 MVA Peak Demand: Franchise 68.36 78.71 83.02 84.98 87.10 90.80 92.83 97.29 97.69 100.69 105.73
12 Sobros S/S 7 MVA Peak Demand: Captive Customers 68.36 78.71 83.02 84.98 87.10 90.80 92.83 97.29 97.69 100.69 105.73

148
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region X Distribution Utilities


Region X Distribution Utilities

149
MISAMIS ORIENTAL II ELECTRIC SERVICE COOPERATIVE, INC. (MORESCO II)
Number of Barangays: Status of Household Energization:
Grid: 269 77.6 % (69,388 HH / 89,400 HH)
LEGEND:
Energized DU System
Off-grid: -
Substation
Backbone Line Franchise Area: Customer Captive Customer
Magsaysay Sales (MWh)
150 sq. km. Classification Connection
Talisayan Residential
Sugbongcogon 57,927 41,133
Franchise Population:
Binuangan Balingoan Commercial 1,851 5,220
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

-
Industrial 388 41,743
Circuit kilometer: Others 1,427 5,126
673.3
TOTAL 61,593 93,222
Lagonglong Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 9,970 MWh (9.66 %)

Demand Annual Average Growth Rate (2016-2025) : 3.85 %


50.00
45.00
40.00
Jasaan 35.00
30.00
Actual
25.00

MW
20.00
SS Supply 15.00
No. SS Name 10.00
Capacity
1 Magsaysay S/S 5 MVA Demand 5.00
2 Gingoog S/S 10 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
3 Agay-ayan S/S 10 MVA Supply Indicative 3.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 Wilmar S/S 4 MVA Supply for PSA Approval: Captive Customers 0.00 8.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00
5 Sugbongcogon S/S 5 MVA Supply Contracted: Captive Customers 23.23 19.66 34.40 34.40 34.40 34.40 34.40 34.40 34.40 25.00 25.00
6 Balingasag S/S 5 MVA Peak Demand: Franchise 22.52 23.47 24.51 25.55 26.60 27.64 28.68 29.72 30.76 31.81 32.85
7 Solana S/S 5 MVA Peak Demand: Captive Customers 22.52 23.47 24.51 25.55 26.60 27.64 28.68 29.72 30.76 31.81 32.85
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region XI

Utilities
XI Distribution
of Distribution Per Region
Utilities
Peak 1
Distribution
Demand

Region
Utility
(MW)

System Map
3 2
1 DANECO 80.70
2 DORECO 20.48
3 DLPC 357.04
4 DASURECO 48.81 4
Total 507.03

2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 626,119 323,857
Commercial 70,443 1,427,006
Industrial 5,967 85,919
Others 21,405 972,682
Total 723,935 2,809,464

150
Region XI Distribution Utilities

151
DAVAO LIGHT AND POWER COMPANY, INC (DLPC)
Number of Barangays: Status of Household Energization:
Grid: 261 98.1 % (499,177 HH / 508,609 HH)
Off-grid: 5
Franchise Area: Customer Captive Customer
3,561 sq. km. Sales (MWh)
Classification Connection

Franchise Population: Residential 304,248 639,352


2,041,123 Commercial 42,870 225,487
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 3,850 1,164,718


Circuit kilometer:
3,122.1 Others 111 39,570
TOTAL 351,079 2,069,127
Customer/s Served by RES:
Sales for Customer/s served by RES:
LEGEND:
Energized DU System System Loss: 159,691 MWh (7.16 %)
Substation
Backbone Line
Demand Annual Average Growth Rate (2016-2025) : 3.42 %
600.00
Actual
500.00

400.00

300.00

MW
200.00
Supply
100.00
Demand
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 0.00 141.67 239.59 255.12 269.98 287.70 357.13 373.14 384.94 357.00
SS Supply for PSA Approval: Captive Customers 68.00 50.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No. SS Name
Capacity Supply Contracted: Captive Customers 449.13 388.28 223.47 193.47 193.47 193.47 193.47 140.00 140.00 140.00 140.00
1 DRA S/S 100 MVA Peak Demand: Franchise 357.04 383.32 415.14 433.06 448.59 463.45 481.17 497.13 513.14 524.94 497.00
2 ERA S/S 150 MVA Peak Demand: Captive Customers 357.04 383.32 415.14 433.06 448.59 463.45 481.17 497.13 513.14 524.94 497.00
DAVAO DEL NORTE ELECTRIC COOPERATIVE, INC. (DANECO)
Number of Barangays: Status of Household Energization:
Grid: 373 72.8 % (177,867 HH / 244,300 HH)
Off-grid: 1

Franchise Area: Customer Captive Customer


Sales (MWh)
6,622 sq. km. Classification Connection
Talaingod Residential 124,936 178,657
Asuncion New Corella Franchise Population:
2,379,471 Commercial 11,343 59,244
Industrial 1,024 124,936
New Bataan Circuit kilometer: Others 7,338 20,861
Tagum City 3,127.9
TOTAL 144,641 383,698
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 68,669 MWh (15.18 %)

Samal
City
Demand Annual Average Growth Rate (2016-2025) : 7.17 %
LEGEND:
Energized DU System 180.00
Substation 160.00
Backbone Line
140.00
120.00
SS Actual
No. SS Name 100.00
Capacity

MW
1 Monkayo S/S 10 MVA 80.00
2 Montevista S/S 12 MVA 60.00
3 Compostela S/S 10 MVA
Supply 40.00
4 Mipangi S/S 10 MVA Demand 20.00
5 Asuncion S/S 20 MVA
0.00
6 Mirafuentes S/S 10 MVA 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
7 Mirafuentes 2 S/S 10 MVA Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.29 31.18 55.78

8 Apocon S/S 20 MVA Supply for PSA Approval: Captive Customers 35.00 40.00 40.00 40.00 40.00 40.00 40.00 35.00 35.00 35.00

9 Canocotan S/S 20 MVA Supply Contracted: Captive Customers 91.37 114.23 116.26 113.00 98.00 98.00 98.00 98.00 93.00 80.00 70.00

10 Maco S/S 10 MVA Peak Demand: Franchise 80.70 81.47 85.54 90.52 96.55 103.73 112.17 121.99 133.29 146.18 160.78

11 Mabini S/S 5 MVA Peak Demand: Captive Customers 80.70 81.47 85.54 90.52 96.55 103.73 112.17 121.99 133.29 146.18 160.78

152
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region XI Distribution Utilities


Region XI Distribution Utilities

153
DAVAO DEL SUR ELECTRIC COOPERATIVE, INC. (DASURECO)
Santa Cruz
Bansalan Number of Barangays: Status of Household Energization:
Digos City Grid: 305 75.3 % (152,177 HH / 202,200 HH)
Magsaysay Off-grid: 32

Matanao Customer Captive Customer


Padada Franchise Area: Sales (MWh)
Kiblawan Sulop Classification Connection
4,014 sq. km.
Residential 131,611 108,047
Santa Maria Franchise Population:
Commercial 9,584 18,997
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

868,700
Industrial 900 117,135
Circuit kilometer: Others 11,613 15,186
2,191.6 TOTAL 153,709 259,364
LEGEND: Customer/s Served by RES:
Energized DU System Don Marcelino Sales for Customer/s served by RES:
Substation
Jose
Backbone Line System Loss: 25,038 MWh (9.29 %)
Abad
Santos
Demand Annual Average Growth Rate (2016-2025) : 6.24 %
100.00
90.00
80.00
70.00
Actual
60.00
Sarangani
Island 50.00
Balut

MW
Island 40.00
Supply 30.00
SS 20.00
No. SS Name Demand 10.00
Capacity
1 Astorga S/S 10 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
2 Matanao S/S 10 MVA Supply Indicative 0.00 0.00 1.07 5.38 4.72 9.03 13.25 17.31 21.15 25.33
3 Cogon S/S 20 MVA Supply for PSA Approval: Captive Customers 17.00 22.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
4 Paligue S/S 10 MVA Supply Contracted: Captive Customers 55.15 53.83 44.32 49.36 49.40 54.44 54.48 54.52 54.56 54.60 54.00
5 Malalag S/S 5 MVA Peak Demand: Franchise 48.81 52.11 56.19 60.43 64.77 69.15 73.50 77.76 81.87 85.75 89.33
6 Malita S/S 5 MVA Peak Demand: Captive Customers 48.81 52.11 56.19 60.43 64.77 69.15 73.50 77.76 81.87 85.75 89.33
DAVO ORIENTAL ELECTRIC COOPERATIVE, INC. (DORECO)
Number of Barangays: Status of Household Energization:
Grid: 183 87.4 % (95,336 HH / 109,100 HH)
Off-grid: -

Franchise Area: Customer Captive Customer


Sales (MWh)
5,164.5 sq. km. Classification Connection

Franchise Population:
Residential 65,324 46,627
517,618 Commercial 6,646 20,129
Industrial 193 20,217
Circuit kilometer:
Others 2,343 10,302
1,438.2
TOTAL 74,506 97,274
Banaybanay Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 13,355 MWh (12.10 %)


Mati City
Demand Annual Average Growth Rate (2016-2025) : 2.84 %
San Isidro 30.00

25.00
Actual
LEGEND:
Energized DU System 20.00
Substation Governor Generoso
Backbone Line 15.00

MW
Supply 10.00

5.00
SS Demand
No. SS Name
Capacity 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
1 Cateel S/S 3.75 MVA
Supply Indicative 1.95 2.74 5.74 6.22 6.68 7.13 7.58 8.04 8.52 9.04
2 Baganga S/S 5 MVA Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 Mati S/S 20 MVA Supply Contracted: Captive Customers 17.37 19.22 20.50 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00
4 Lupon S/S 10 MVA Peak Demand: Franchise 20.48 21.16 23.24 23.74 24.22 24.68 25.13 25.58 26.04 26.52 27.04
5 San Isidro S/S 10 MVA Peak Demand: Captive Customers 20.48 21.16 23.24 23.74 24.22 24.68 25.13 25.58 26.04 26.52 27.04

154
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region XI Distribution Utilities


DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region XII
Utilities
Distribution
Distribution Per Region
Utilities

Peak
Distribution
Demand
1 Utility
of XII

(MW)
3
Region

2 COTELCO -
System Map

1 14.39
PPALMA
2 COTELCO 35.02
3 CLPC 26.30
4
4 SUKELCO 28.71
5
6 5 SOCOTECO I 40.22
6 SOCOTECO II 155.25
Total 299.90

2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 507,040 282,655
Commercial 40,085 466,225
Industrial 1,648 69,206
Others 18,201 639,668
Total 566,974 1,457,755

155
COTABATO LIGHT AND POWER COMPANY, INC. (CLPC)
Number of Barangays: Status of Household Energization:
Grid: 63 100.0 % (82,905 HH / 82,905 HH)
Off-grid: -

Customer Captive Customer


Franchise Area: Sales (MWh)
Classification Connection
191.2 sq. km.
Residential 34,266 68,960
Franchise Population: Commercial 3,034 18,519
364,235
Industrial 376 42,369
Circuit kilometer: Others 21 2,736
265.8 TOTAL 37,697 132,584
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 7,518 MWh (5.37 %)


Cotabato City

Demand Annual Average Growth Rate (2016-2025) : 1.75 %


70.00
Actual
60.00
Datu Odin Sinsuat
50.00

40.00

MW
30.00
LEGEND:
Energized DU System Supply 20.00
Substation
Backbone Line Demand 10.00

0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
SS Supply Indicative 0.00 7.53 14.24 14.96 15.67 16.38 17.10 17.81 18.52 19.23
No. SS Name
Capacity Supply for PSA Approval: Captive Customers 5.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 Salimbao S/S 15 MVA Supply Contracted: Captive Customers 61.55 41.45 12.95 11.95 11.95 11.95 11.95 11.95 11.95 11.95 11.95
2 Sinsuat S/S 12 MVA Peak Demand: Franchise 26.30 24.77 25.48 26.19 26.91 27.62 28.33 29.05 29.76 30.47 31.18
3 Malagapas S/S 10 MVA Peak Demand: Captive Customers 26.30 24.77 25.48 26.19 26.91 27.62 28.33 29.05 29.76 30.47 31.18

156
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region XII Distribution Utilities


Region XII Distribution Utilities

157
COTABATO ELECTRIC COOPERATIVE, INC. (COTELCO)
Number of Barangays: Status of Household Energization:
Grid: 348 83.4 % (137,807 HH / 165,300 HH)
Off-grid: -

Franchise Area: Customer Captive Customer


Sales (MWh)
4,652 sq. km. Classification Connection
Residential 123,441 78,897
Franchise Population:
Commercial 8,254 39,622
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

110,521
Industrial 264 28,514
Circuit kilometer: Others 5,848 17,338
3,636.1
TOTAL 137,807 164,371
Customer/s Served by RES:
LEGEND: Sales for Customer/s served by RES:
Kabacan Energized DU System
Substation
System Loss: 23,637 MWh (12.57 %)
Backbone Line

Demand Annual Average Growth Rate (2016-2025) : 4.00 %


70.00

60.00

50.00
Actual
40.00

MW
30.00

Supply 20.00
SS 10.00
No. SS Name Demand
Capacity
1 Bagong Silang S/S 10 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
2 Kidapawaan S/S 10 MVA Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.93 16.85 18.84
3 Paco S/S 10 MVA Supply for PSA Approval: Captive Customers 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00
4 Manubuan S/S 5 MVA Supply Contracted: Captive Customers 40.00 45.00 38.00 38.00 43.00 43.00 43.00 43.00 23.00 18.00 18.00
5 Kabacan S/S 10 MVA Peak Demand: Franchise 35.02 36.42 37.88 39.40 40.97 42.61 44.32 46.09 47.93 49.85 51.84
6 Mlang S/S 10 MVA Peak Demand: Captive Customers 35.02 36.42 37.88 39.40 40.97 42.61 44.32 46.09 47.93 49.85 51.84
COTABATO ELECTRIC COOPERATIVE, INC. – PPALMA (COTELCO-PPALMA)
Number of Barangays: Status of Household Energization:
Grid: 195 56.7 % (45.564 HH / 80,400 HH)
Off-grid: -

Customer Captive Customer


Franchise Area: Sales (MWh)
Classification Connection
3,292.2 sq. km.
Residential 40,148 36,565
Franchise Population: Commercial 4,188 10,004
112,000
Industrial 170 12,509
Circuit kilometer: Others 1,058 4,087
1,249.3 TOTAL 45,564 63,165
Customer/s Served by RES:
Sales for Customer/s served by RES:
LEGEND:
Energized DU System System Loss: 15,481 MWh (19.68 %)
Substation
Backbone Line
Demand Annual Average Growth Rate (2016-2025) : 4.47 %

25.00

20.00
Actual

15.00

MW
10.00
Supply
Demand 5.00

0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.69 1.53 7.41 8.27
SS Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No. SS Name
Capacity Supply Contracted: Captive Customers 18.23 16.07 19.00 19.00 19.00 19.00 19.00 19.00 19.00 14.00 14.00
1 Gumaga S/S 10 MVA Peak Demand: Franchise 14.39 15.04 15.89 16.80 17.35 18.10 18.87 19.69 20.53 21.41 22.27
2 Villarica S/S 10 MVA Peak Demand: Captive Customers 14.39 15.04 15.89 16.80 17.35 18.10 18.87 19.69 20.53 21.41 22.27

158
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region XII Distribution Utilities


Region XII Distribution Utilities

159
SOUTH COTABATO I ELECTRIC COOPERATIVE, INC. (SOCOTECO I)
Number of Barangays: Status of Household Energization:
Grid: 169 64.8 % (106,006 HH / 163,500 HH)
Off-grid: 6

Customer Captive Customer


Sales (MWh)
Classification Connection

LEGEND:
Residential 81,856 98,656
Energized DU System Commercial 10,200 39,582
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Santo Niño
Substation
Backbone Line
Industrial 447 69,291
Others - 384
TOTAL 92,503 207,913
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 25,740 MWh (11.02 %)

Demand Annual Average Growth Rate (2016-2025) : 5.51 %


Franchise Area:
678 sq. km.
80.00

Franchise Population: 70.00


115,742 60.00
Actual
50.00
Circuit kilometer:
40.00
1,673.3

MW
Supply 30.00
20.00
SS Demand
No. SS Name 10.00
Capacity
1 Norala S/S 5 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
2 Dajay S/S 10 MVA
Supply Indicative 0.00 1.61 0.00 17.78 20.51 13.34 11.27 14.30 17.42 20.64
3 Morales S/S 10 MVA
Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 KCC S/S 5 MVA Supply Contracted: Captive Customers 43.65 56.39 44.10 49.10 33.10 33.10 43.10 48.10 48.10 48.10 48.10
5 Matulas S/S 10 MVA Peak Demand: Franchise 40.22 44.04 45.71 48.24 50.88 53.61 56.44 59.37 62.40 65.52 68.74
6 San Roque S/S 5 MVA Peak Demand: Captive Customers 40.22 44.04 45.71 48.24 50.88 53.61 56.44 59.37 62.40 65.52 68.74
SOUTH COTABATO II ELECTRIC COOPERATIVE, INC. (SOCOTECO II)
Number of Barangays: Status of Household Energization:
Franchise Area:
Grid: 204 57.1 % (173,052 HH / 303,000 HH)
466,208 sq. km.
Off-grid: -
Franchise Population:
1,237,106 Customer Captive Customer
Sales (MWh)
Classification Connection
Circuit kilometer: Residential 149,769 275,053
7,720.7 Gen. Santos City
Polomolok Commercial 9,788 152,024
Industrial 234 282,610
Others 7,993 38,306
TOTAL 167,784 747,992
Kiamba
Customer/s Served by RES:
LEGEND: Sales for Customer/s served by RES:
Energized DU System
Substation
Backbone Line System Loss: 91,807 MWh (10.93 %)

SS
No. SS Name Demand Annual Average Growth Rate (2016-2025) : 2.28 %
Capacity
1 Kiamba S/S 5 MVA
350.00
2 Maasim S/S 5 MVA
3 Cargrill S/S 10 MVA 300.00
4 Fishport S/S 20 MVA
250.00
5 Airport S/S 2 MVA
Actual
6 DOLE S/S 5 MVA 200.00
7 Calumpang S/S 20 MVA

MW
150.00
8 Pentagon S/S 35 MVA Supply
9 Main S/S 20 MVA 100.00
10 Leon Llido S/S 20 MVA Demand 50.00
11 Tupi S/S 5 MVA
12 New Society S/S 20 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
13 Polomolok S/S 20 MVA
Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14 DOLE Cananery S/S 10 MVA
Supply for PSA Approval: Captive Customers 0.00 30.00 110.00 110.00 110.00 110.00 110.00 110.00 110.00 110.00
15 Ligaya S/S 10 MVA
Supply Contracted: Captive Customers 169.13 184.13 205.00 205.00 205.00 205.00 205.00 205.00 205.00 205.00 205.00
16 Alabel S/S 10 MVA Peak Demand: Franchise 155.25 159.18 163.12 167.05 170.98 174.91 178.85 182.78 186.71 190.64 194.58
17 Glan S/S 5 MVA Peak Demand: Captive Customers 155.25 159.18 163.12 167.05 170.98 174.91 178.85 182.78 186.71 190.64 194.58

160
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Region XII Distribution Utilities


Region XII Distribution Utilities

161
SULTAN KUDARAT ELECTRIC COOPERATIVE, INC. (SUKELCO)
Number of Barangays: Status of Household Energization:
Franchise Area: Kabuntalan Grid: 188 53.2 % (95,713 HH / 179,800 HH)
6,262 sq. km. Off-grid: 124
Franchise Population: Customer Captive Customer
798,310 Sales (MWh)
Classification Connection
Gen. S.K. Pendatun
Circuit kilometer: Lambayong Paglat Residential 77,560 81,538
3,614.7 Commercial 4,621 22,903
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Pandag
Industrial 157 30,932
Buluan
Mangudadatu Others 3,281 6,356
Tacurong Pres. Quirino TOTAL 85,619 141,730
City
Customer/s Served by RES:
Sales for Customer/s served by RES:
LEGEND:
Energized DU System System Loss: 19,213 MWh (11.94 %)
Substation
Backbone Line
Demand Annual Average Growth Rate (2016-2025) : 3.60 %

45.00
40.00
Actual
35.00
30.00
25.00

MW
20.00
Supply 15.00
10.00
SS Demand
No. SS Name 5.00
Capacity
1 Datupaglas S/S 5 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
2 Malipayon S/S 7.5 MVA Supply Indicative 0.00 4.29 2.09 6.30 7.56 11.48 12.75 14.02 15.29 16.56
3 Kalandagan S/S 5 MVA Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 Malvar S/S 10 MVA Supply Contracted: Captive Customers 34.25 33.48 26.68 29.97 26.97 26.97 24.32 24.32 24.32 24.32 24.32
5 Isulan S/S 10 MVA Peak Demand: Franchise 28.71 29.58 30.97 32.06 33.27 34.53 35.80 37.07 38.34 39.61 40.88
6 Dukay S/S 5 MVA Peak Demand: Captive Customers 28.71 29.58 30.97 32.06 33.27 34.53 35.80 37.07 38.34 39.61 40.88
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

CARAGA

Utilities
Distribution
of Distribution Per Region
Utilities
Peak
Distribution
1 Demand
Utility

CARAGA
(MW)
1 DIELCO 3.06

System Map
2
3 2 SIARELCO 4.21
3 SURNECO 29.68
4 ANECO 54.50
4
5 SURSECO II 13.39
5
6 ASELCO 33.01
7 SURSECO I 10.79
7 Total 148.65
6

2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 473,234 134,348
Commercial 21,841 220,023
Industrial 1,584 58,131
Others 14,787 334,770
Total 511,446 747,272

162
CARAGA Distribution Utilities

163
AGUSAN DEL NORTE ELECTRIC COOPERATIVE, INC (ANECO)
Number of Barangays: Status of Household Energization:
Grid: 253 97.1 % (151,845 HH / 156,300 HH)
Off-grid: -

Franchise Area: Customer Captive Customer


Sales (MWh)
2,730.2 sq. km. Classification Connection
Residential 116,831 129,298
Franchise Population:
642,196 Commercial 5,584 39,985
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 665 98,794


Remedios T. Circuit kilometer: Others 2,177 19,718
Romualdez 1,743.3
TOTAL 125,257 287,796
Magallanes
LEGEND: Customer/s Served by RES:
Carmen Sales for Customer/s served by RES:
Energized DU System
Substation
Backbone Line System Loss: 40,145 MWh (12.24 %)

Demand Annual Average Growth Rate (2016-2025) : 5.18 %


120.00

100.00

80.00
Actual

SS 60.00

MW
No. SS Name
Capacity 40.00
1 Santiago S/S 5 MVA Supply
2 Cabadbaran S/S 5 MVA 20.00
3 Soriano S/S 5 MVA Demand
4 Emco S/S 5 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
5 Ampayon S/S 10 MVA Supply Indicative 0.00 0.00 0.00 0.00 0.00 1.10 4.76 8.45 12.43 15.88
6 Villakanangga S/S 10 MVA Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7 Butuan S/S 40 MVA Supply Contracted: Captive Customers 60.51 79.47 104.43 74.43 74.43 74.43 74.43 74.43 74.43 74.43 74.43
8 Manapa S/S 15 MVA Peak Demand: Franchise 54.50 58.33 61.53 64.89 68.36 71.91 75.53 79.19 82.88 86.86 90.31
9 Nasipit S/S 5 MVA Peak Demand: Captive Customers 54.50 58.33 61.53 64.89 68.36 71.91 75.53 79.19 82.88 86.86 90.31
AGUSAN DEL SUR ELECTRIC COOPERATIVE, INC (ASELCO)
Number of Barangays: Status of Household Energization:
Grid: 301 92.4 % (131,417 HH / 142,300 HH)
Off-grid: 13

Customer Captive Customer


Franchise Area: Sales (MWh)
Classification Connection
8,966 sq. km.
Residential 121,601 56,693
Franchise Population:
Commercial 4,986 11,312
656,418
Industrial 846 107,240
Circuit kilometer: Others 3,984 5,494
3,991.7 TOTAL 131,417 180,739
LEGEND: Customer/s Served by RES:
Energized DU System Sales for Customer/s served by RES:
Substation
Backbone Line System Loss: 17,540 MWh (8.85 %)

Demand Annual Average Growth Rate (2016-2025) : 7.08 %


70.00

60.00

50.00 Actual

40.00

MW
30.00
Supply 20.00

Demand 10.00
SS
No. SS Name
Capacity 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
1 Bayugan S/S 10 MVA Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.63 3.25
2 Talacogon S/S 5 MVA Supply for PSA Approval: Captive Customers 10.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00
3 San Francisco S/S 10 MVA Supply Contracted: Captive Customers 36.89 44.10 34.10 46.82 46.82 46.82 46.82 46.82 46.82 46.82 46.82
4 Philsaga S/S 20 MVA Peak Demand: Franchise 33.01 38.84 42.10 45.26 48.32 51.31 54.21 57.03 59.78 62.45 65.07
5 Trento S/S 5 MVA Peak Demand: Captive Customers 33.01 38.84 42.10 45.26 48.32 51.31 54.21 57.03 59.78 62.45 65.07

164
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

CARAGA Distribution Utilities


CARAGA Distribution Utilities

165
SIARGAO ELECTRIC COOPERATIVE, INC. (SIARELCO)
Number of Barangays: Status of Household Energization:
Grid: 126 91.8 % (29,006 HH / 31,600 HH)
Santa Monica
Off-grid: 6
Burgos
Franchise Area: Customer Captive Customer
Sales (MWh)
650.4 sq. km. Classification Connection
Residential 27,292 12,232
Franchise Population:
San Benito Commercial 911 4,634
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

110,653
Industrial - -
Circuit kilometer: Others 803 2,359
567.3
TOTAL 29,006 19,226
Customer/s Served by RES:
LEGEND: Sales for Customer/s served by RES:
Energized DU System
General Substation System Loss: 1,726 MWh (8.24 %)
Luna Backbone Line
Demand Annual Average Growth Rate (2016-2025) : 5.41 %
Middle
8.00
Bucas
7.00
Socorro
6.00
Actual
5.00
East Bucas 4.00

MW
3.00
Supply 2.00
Demand 1.00
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 0.20 2.74 2.97 3.18 3.53 3.86 4.20 4.52 4.83 5.13
Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SS Supply Contracted: Captive Customers 4.21 4.28 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
No. SS Name
Capacity Peak Demand: Franchise 4.21 4.49 4.74 4.97 5.18 5.53 5.86 6.20 6.52 6.83 7.13
1 Cagdianao S/S 5 MVA Peak Demand: Captive Customers 4.21 4.49 4.74 4.97 5.18 5.53 5.86 6.20 6.52 6.83 7.13
SURIGAO DEL NORTE ELECTRIC COOPERATIVE, INC. (SURNECO)
Number of Barangays: Status of Household Energization:
Grid: 188 86.7 % (70,213 HH / 81,000 HH)
Off-grid: 15
Hikdop Island

Customer Captive Customer


Nonok Island Franchise Area: Sales (MWh)
Classification Connection
1,398.3 sq. km.
Residential 62,300 67,037
Franchise Population: Commercial 4,155 48,893
San Francisco 313,152
Industrial 7 7,533
Circuit kilometer: Others 3,703 12,176
976.6 TOTAL 70,165 135,638
Customer/s Served by RES:
Malimono Sales for Customer/s served by RES:

System Loss: 15,030 MWh (9.98 %)

Demand Annual Average Growth Rate (2016-2025) : 6.29 %


60.00

50.00
Actual
40.00

LEGEND: 30.00

MW
Energized DU System
Substation 20.00
Backbone Line Supply
10.00
Demand
0.00
SS 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
No. SS Name Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Capacity
1 Looc S/S 20 MVA Supply for PSA Approval: Captive Customers 10.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Mapaso S/S 5 MVA Supply Contracted: Captive Customers 18.22 31.23 33.25 49.00 56.80 56.80 56.80 56.80 56.80 56.80 56.80

3 Tubod S/S 10 MVA Peak Demand: Franchise 29.68 29.95 33.34 35.38 37.32 41.48 43.73 46.12 49.11 51.71 54.40

4 Claver S/S 5 MVA Peak Demand: Captive Customers 29.68 29.95 33.34 35.38 37.32 41.48 43.73 46.12 49.11 51.71 54.40

166
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

CARAGA Distribution Utilities


CARAGA Distribution Utilities

167
SURIGAO DEL SUR I ELECTRIC COOPERATIVE, INC. (SURSECO I)
Number of Barangays: Status of Household Energization:
Grid: 112 96.1 % (72,153 HH / 75,100 HH)
Off-grid: -

Franchise Area: Customer Captive Customer


Sales (MWh)
1,679 sq. km. Classification Connection
Residential 68,353 25,403
Franchise Population:
245,328 Commercial 2,469 14,068
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial 4 3,416
Circuit kilometer:
Others 1,330 6,417
1,027.6
TOTAL 72,156 49,303
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 5,790 MWh (10.51 %)

Demand Annual Average Growth Rate (2016-2025) : 2.26 %


25.00

20.00

Actual
15.00
LEGEND:

MW
Energized DU System 10.00
Substation Supply
Backbone Line 5.00
Demand
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
SS
No. SS Name Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Capacity
Supply for PSA Approval: Captive Customers 4.00 9.00 9.00 9.00 9.00 9.01 9.01 9.01 9.01 9.01
1 Tabon S/S 5 MVA
Supply Contracted: Captive Customers 8.68 7.64 5.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00
2 San Fernando S/S 5 MVA
Peak Demand: Franchise 10.79 11.02 11.33 11.63 11.92 12.20 12.47 12.74 12.99 13.25 13.49
3 Barobo S/S 5 MVA
Peak Demand: Captive Customers 10.79 11.02 11.33 11.63 11.92 12.20 12.47 12.74 12.99 13.25 13.49
SURIGAO DEL SUR II ELECTRIC COOPERATIVE, INC. (SURSECO II)
Number of Barangays: Status of Household Energization:
Grid: 191 90.4 % (70,687 HH / 78,200 HH)
Off-grid: 6

Customer Captive Customer


Franchise Area: Sales (MWh)
Classification Connection
3,365 sq. km.
Residential 55,821 35,375
Franchise Population: Commercial 2,903 13,001
68,500
Industrial 62 3,041
Circuit kilometer: Others 1,829 10,034
844.6 TOTAL 60,615 61,450
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 9,049 MWh (12.84 %)

Demand Annual Average Growth Rate (2016-2025) : 9.93 %


45.00
40.00
35.00
30.00
25.00
LEGEND: Actual

MW
Energized DU System 20.00
Substation Supply 15.00
Backbone Line
10.00
Demand 5.00
SS 0.00
No. SS Name 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Capacity Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 Madrid S/S 5 MVA Supply for PSA Approval: Captive Customers 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00
2 Tandag S/S 10 MVA Supply Contracted: Captive Customers 17.22 16.47 10.46 23.46 23.46 23.46 23.46 23.46 23.46 23.46 23.46
3 Cagwait S/S 5 MVA Peak Demand: Franchise 13.39 14.78 15.77 17.00 18.49 20.27 22.36 24.81 27.62 30.84 34.48
4 Lianga S/S 5 MVA Peak Demand: Captive Customers 13.39 14.78 15.77 17.00 18.49 20.27 22.36 24.81 27.62 30.84 34.48

168
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

CARAGA Distribution Utilities


CARAGA Distribution Utilities

169
DINAGAT ISLAND ELECTRIC COOPERATIVE, INC. (DIELCO)
Number of Barangays: Status of Household Energization:
Grid: - 82.4 % (23,976 HH / 29,100 HH)
Off-grid: 100

Franchise Area: Customer Captive Customer


Sales (MWh)
1,036.3 sq. km. Classification Connection
Residential 21,036 8,731
Franchise Population:
128,489 Commercial 833 2,455
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial - -
Circuit kilometer: Others 961 1,933
365.4
TOTAL 22,830 13,119
Customer/s Served by RES:
LEGEND: Sales for Customer/s served by RES:
Energized DU System
Substation
Backbone Line
System Loss: 735 MWh (5.31 %)

Demand Annual Average Growth Rate (2016-2025) : 7.22 %


7.00

6.00

5.00
Actual

4.00

MW
Cagdianao 3.00
Supply 2.00

San Jose Demand 1.00

0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Dinagat Supply Indicative 0.00 0.00 3.65 3.93 4.23 4.56 4.92 5.30 5.71 6.14
Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SS Supply Contracted: Captive Customers 4.21 4.81 5.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No. SS Name
Capacity Peak Demand: Franchise 3.06 3.16 3.39 3.65 3.93 4.23 4.56 4.92 5.30 5.71 6.14
1 NPC-SPUG Dinagat - Peak Demand: Captive Customers 3.06 3.16 3.39 3.65 3.93 4.23 4.56 4.92 5.30 5.71 6.14
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

ARMM

Distribution
of Distribution Utilities
Utilities Per Region
Peak
Distribution
Demand
1 Utility (MW)

ARMM
1 LASURECO 23.69

System Map
2 MAGELCO 11.32
2
3 BASELCO 8.36
3
4 SULECO 7.87
4 5 SIASELCO 0.66
6 TAWELCO 4.92
6 5
Total 56.82

2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 132,073 19,836
Commercial 5,832 7,153
Industrial 211 16,072
Others 1,939 144,879
Total 140,055 187,940

170
ARMM Distribution Utilities

171
LANAO DEL SUR ELECTRIC COOPERATIVE, INC. (LASURECO)
Number of Barangays: Status of Household Energization:
Grid: 1,159 40.4 % (56,357 HH / 139,500 HH)
Franchise Area: Off-grid: 24
13,979 sq. km.
Customer Captive Customer
Sales (MWh)
Franchise Population: Classification Connection
1,025,209 Saguiaran
Residential 48,647 62,127
Pantar
Piagapo Ditsaan-Ramain Commercial 2,056 5,737
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Circuit kilometer:
1,159.3 Buadiposo-Buntong Industrial 20 676
Balindong Mulondo Others 678 3,511
TOTAL 51,401 72,052
Bacolod Kalawi
Madamba Poona Bayabao Customer/s Served by RES:
Pualas Sales for Customer/s served by RES:

System Loss: 44,561 MWh (38.21 %)


Lumbayanague
Demand Annual Average Growth Rate (2016-2025) : 6.52 %

45.00
Sultan
40.00
Dumalondong Actual
35.00
30.00
25.00
Kapatagan

MW
20.00
Supply 15.00
LEGEND:
Energized DU System 10.00
Substation
Demand 5.00
Backbone Line
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 25.77 25.77 27.77 27.77 28.77 28.77 29.77 29.77 30.77 30.77
SS Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No. SS Name Supply Contracted: Captive Customers 17.96 10.23 10.23 10.23 10.23 10.23 10.23 10.23 10.23 10.23 10.23
Capacity
1 Dansalan S/S 40 MVA Peak Demand: Franchise 23.69 36.00 36.00 38.00 38.00 39.00 39.00 40.00 40.00 41.00 41.00
Peak Demand: Captive Customers 23.69 36.00 36.00 38.00 38.00 39.00 39.00 40.00 40.00 41.00 41.00
MAGUINDANAO ELECTRIC COOPERATIVE, INC. (MAGELCO)
Number of Barangays: Status of Household Energization:
Grid: 330 23.7 % (27,485 HH / 116,200 HH)
Off-grid: 49

Customer Captive Customer


Franchise Area: Sales (MWh)
Matanog Classification Connection
7,448 sq. km.
Residential 31,130 30,288
Franchise Population:
Commercial 1,196 2,096
944,718
Sultan Mastura
Industrial 184 5,398
Circuit kilometer: Others 570 2,959
Sultan Kudarat 2,055.3 TOTAL 33,080 40,742
Northern Kabantalan Customer/s Served by RES:
Sales for Customer/s served by RES:

Pagagawan System Loss: 15,601 MWh (27.69 %)


Datu Piang

Demand Annual Average Growth Rate (2016-2025) : 10.44


Datu Blah T. Sinsuat %
35.00

30.00

25.00
Datu
Abdullah 20.00
Sanki Actual

MW
15.00
LEGEND:
Supply 10.00
Energized DU System Demand
Substation 5.00
Backbone Line
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
SS Supply Indicative 0.00 8.97 13.13 13.85 14.59 15.36 16.16 16.97 17.81 18.66
No. SS Name
Capacity Supply for PSA Approval: Captive Customers 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
1 Simuay S/S 10 MVA Supply Contracted: Captive Customers 4.52 4.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Salbu S/S 5 MVA Peak Demand: Franchise 11.32 13.04 18.97 23.13 23.85 24.59 25.36 26.16 26.97 27.81 28.66
3 Capiton S/S 5 MVA Peak Demand: Captive Customers 11.32 13.04 18.97 23.13 23.85 24.59 25.36 26.16 26.97 27.81 28.66

172
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

ARMM Distribution Utilities


ARMM Distribution Utilities

173
BASILAN ELECTRIC COOPERATIVE, INC. (BASELCO)
Number of Barangays: Status of Household Energization:
Grid: - 55.5 % (42,305 HH / 76,200 HH)
Off-grid: 269

Customer Captive Customer


Hadji Mutamad
Sales (MWh)
Classification Connection
Baluk
Hadji Mohammad Ajul
Residential 27,842 17,240
Commercial 1,073 4,002
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Tuburan
Industrial 7 1,079
Maluso Others 399 3,597
Tipo Tipo
Franchise Area: TOTAL 29,321 25,918
Al Barka
1,359 sq. km. Customer/s Served by RES:
Sales for Customer/s served by RES:
Franchise Population: Ungkaya Pukan
391,179 System Loss: 11,226 MWh (30.22 %)
Circuit kilometer:
679.6 Demand Annual Average Growth Rate (2016-2025) : 8.13 %

Tabuan-Lasa 20.00
18.00
LEGEND: 16.00
Energized DU System 14.00
Substation
Actual
12.00
Backbone Line 10.00

MW
8.00
Tongkil
Supply 6.00
Demand 4.00
2.00
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 0.00 0.00 7.18 7.94 8.82 9.85 11.03 12.37 13.89 15.60
SS Supply for PSA Approval: Captive Customers 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
No. SS Name Supply Contracted: Captive Customers 9.82 10.15 10.46 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64
Capacity
1 NPC-SPUG Basilan - Peak Demand: Franchise 8.36 8.65 9.19 9.82 10.58 11.46 12.49 13.67 15.01 16.53 18.24
Peak Demand: Captive Customers 8.36 8.65 9.19 9.82 10.58 11.46 12.49 13.67 15.01 16.53 18.24
SIASI ELECTRIC COOPERATIVE, INC. (SIASELCO)
Number of Barangays: Status of Household Energization:
Grid: - 31.5 % (4,258 HH / 13,500 HH)
Franchise Area: Off-grid: 66
18.0 sq. km.
Customer Captive Customer
Franchise Population: Sales (MWh)
Classification Connection
17,029
Residential 2,481 1,761
Circuit kilometer: Commercial 234 587
-
Industrial
Others 144 208
TOTAL 2,859 2,556
Customer/s Served by RES:
Sales for Customer/s served by RES:

System Loss: 291 MWh (10.21 %)

Demand Annual Average Growth Rate (2016-2025) : 4.44 %


Actual
3.00

2.50

2.00

1.50

MW
Supply 1.00

LEGEND: Demand 0.50


Energized DU System
Substation 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Backbone Line
Supply Indicative 0.00 0.00 0.90 0.95 0.97 0.99 0.99 0.99 0.99 0.99
SS Supply for PSA Approval: Captive Customers 0.68 0.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No. SS Name Supply Contracted: Captive Customers 2.85 0.68 0.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Capacity
1 NPC-SPUG Siasi - Peak Demand: Franchise 0.66 0.70 0.90 0.90 0.95 0.97 0.99 0.99 0.99 0.99 0.99
Peak Demand: Captive Customers 0.66 0.70 0.90 0.90 0.95 0.97 0.99 0.99 0.99 0.99 0.99

174
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

ARMM Distribution Utilities


ARMM Distribution Utilities

175
SULU ELECTRIC COOPERATIVE, INC. (SULECO)
Number of Barangays: Status of Household Energization:
Kulassian Grid: - 30.8 % (26,428 HH / 85,800 HH)

Pandukan
Off-grid: 330

Pangutaran Customer Captive Customer


Sales (MWh)
Classification Connection
Residential 14,229 23,989
Hadji Panglima Tahil
Commercial 950 4,140
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

Industrial - -
Others 29 4,556
Capual
TOTAL 15,208 32,685
Customer/s Served by RES:
Sales for Customer/s served by RES:

Kalingalan System Loss: 14,720 MWh (31.05 %)


Caluang

Demand Annual Average Growth Rate (2016-2025) : 2.68 %


Franchise Area:
1,604.4 sq. km. 12.00
Actual
10.00
Franchise Population: Tapul
106,346 8.00

Circuit kilometer: 6.00

MW
395.7
Supply 4.00
LEGEND: Demand 2.00
Energized DU System
Substation 0.00
Backbone Line 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 0.20 0.20 0.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SS Supply for PSA Approval: Captive Customers 0.00 0.00 8.50 8.85 9.05 9.35 9.65 9.90 10.05 10.30
No. SS Name Supply Contracted: Captive Customers 7.35 8.00 8.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Capacity
1 NPC-SPUG Sulu - Peak Demand: Franchise 7.87 8.20 8.40 8.60 8.80 9.00 9.30 9.60 9.85 10.00 10.25
Peak Demand: Captive Customers 7.87 8.20 8.40 8.60 8.80 9.00 9.30 9.60 9.85 10.00 10.25
TAWI-TAWI ELECTRIC COOPERATIVE, INC. (TAWELCO)
Number of Barangays: Status of Household Energization:
Grid: - 27.8 % (13,110 HH / 47,200 HH)
Off-grid: 186
Franchise Area:
1,208.1 sq. km. Customer Captive Customer
South Ubian
Sales (MWh)
Classification Connection
Franchise Population:
86,926 Residential 10,225 11,235
Commercial 557 3,861
Circuit kilometer:
198.6
Industrial - -
Tandubas
Languyan Tandubas Others 263 1,449
TOTAL 11,045 16,544
Panglima Sugala Customer/s Served by RES:
Sapa-Sapa
Bongao Sales for Customer/s served by RES:

System Loss: 5,218 MWh (23.98 %)

Demand Annual Average Growth Rate (2016-2025) : 15.00 %


Simunul
30.00

Sitangkai 25.00
Sibutu
20.00

15.00

MW
LEGEND: Actual
Energized DU System
Supply 10.00
Substation
Demand 5.00

0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SS Supply for PSA Approval: Captive Customers 5.68 5.85 6.39 6.99 7.65 8.37 9.16 10.03 10.98 12.02
No. SS Name Supply Contracted: Captive Customers 5.40 5.68 5.85 6.39 6.99 7.65 8.37 9.16 10.03 10.98 12.02
Capacity
1 NPC-SPUG Bongao - Peak Demand: Franchise 4.92 5.66 6.51 7.48 8.61 9.90 11.38 13.09 15.05 17.31 19.90
Peak Demand: Captive Customers 4.92 5.66 6.51 7.48 8.61 9.90 11.38 13.09 15.05 17.31 19.90

176
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025

ARMM Distribution Utilities


For inquiries, please contact:

Felix William B. Fuentebella


Undersecretary

Redentor E. Delola
Assistant Secretary

Electric Power Industry Management Bureau

Mario C. Marasigan, CESO III


Director IV

Irma C. Exconde
Assistant Director

Thelma B. Ejercito
OIC-Chief, Power Planning and Development Division

Madonna M. Naling
Rodel S. Limbaga
Verdick D. Idanan
Ladylyn T. Castañeda - Salvanera
Andrew P. Catayong
Cezar John A. Estrada
Marc Louie L. Olap
Arthur Kent M. Holt
Gilbert T. Sy

This development plan is updated annually and published by:

Department of Energy
Energy Center, Rizal Drive, Bonifacio Global City (BGC)
Taguig City, Philippines 1632
Tel. Nos. 840-2173; 479-2900 local 202, 386
Website: http://www.doe.gov.ph
Facebook: http://www.facebook.com/doe.gov.ph
Instagram: @DOE_PH
Twitter: @DOE_PH