DAILY REPORT

JOB CODE :
P.O. No. : TDO-19-CP-0061 – PV2658
INSPECTION DATE : June 13th, 2019 SHEET 1

CLIENT Supreme Committee for Delivery & Legacy


Main Works For Ras Abu Aboud
PROJECT NAME REPORT No. DR_F1/RAA Stadium 040
Stadium
REQ. No. None Rev. INSPECTOR BUI HUYNH TUAN
ORDERED ITEM
Structural Steel Fabrication Work for RAA Stadium

ITEM No.
Zone 1

Main Hamad Bin Khalid Contracting INSP. PLACE


Contractor Company

VENDER Dai Dung Metallic Manufacture INSP. PLACE Factory 1 – Binh Chanh:
MANUFACTURER Construction & Trade B23/474 C, Tran Dai Nghia
Corporation street, Hamlet 2, Tan Nhut
Village, Binh Chanh District,
Ho Chi Minh City, Vietnam

Documents/ Drawings Weather


SC-C06-CAG-HBK-ITP-ST-00053 - Level 3 Normal X X
SC-C06-STA-HBK-SPE-ST-00004: Technical
Specification For Steel Works Sunny 34oC 34oC
SC-C06-CAG-HBK-PRC-ST-00036: WPS/PQR/WPQ Rainy
SC-C06-CAG-HBK-PRC-ST-00007: Dimensional
Inspection.
SC-C06-CAG-HBK-PRC-ST-00002: Submittal Mtl
SC-C06-CAG-HBK-PRC-ST-00080: Submittal Mtl AM PM
SC-C06-CAG-HBK-PRC-ST-00287: Submittal Mtl
SC-C06-CAG-HBK-PRC-ST-00382: Submittal Mtl

1. Attendees
Name Company Position
BUI HUYNH TUAN Apave Asia Pacific Inspector

2. Material and Equipment deliveries


Main equipment on site. Materials enter site
Welding machine:
Grinding machine :
Cutting machine :
Fuel Gas Heating Equipment
DAILY REPORT

JOB CODE :
P.O. No. : TDO-19-CP-0061 – PV2658
INSPECTION DATE : June 13th, 2019 SHEET 2

3. Carried-out works
Activities in progress or completed: Remarks
1 Material Inspection and Cutting
New material coming at DDC1 storage
Cutting for Base plates No cutting
2 Fit up Process
Na

3 Welding inspection
3.1 Welding Process
FCAW : WPS-DD-FCAW-51 PA (Thickness 3~24mm)
WPS-DD-FCAW-52 PA (Thickness 15~60mm)
WPS-DD-FCAW-53 PC (Thickness 3-24 mm)
WPS-DD-FCAW-64PC (Thickness 40 – 160mm)
SAW : WPS-DD-SAW-47 PA (Thickness 8-32 mm)
FCAW+SAW : WPS-DD-FCAW+SAW-35 PA (40~160mm)
3.2 Welding consumable
FCAW consumable wire: AWS A5.36 E71T1-C1A2-CS1, dia. 1.6mm Correct material
SAW consumable: AWS A5.17 F7A6-EM12K, Dia. 3.2mm Correct material
3.3 Welder
NGO TRI TRUNG : DDC-WD-0118 - FCAW PA,PB,PC
CAO VAN NAM : DDC-WD-0121 - FCAW PA,PB,PC

3.4 Welding inspection


N/a
4 NDT Control
MT test : MT test standard and acceptance criteria ; EN ISO 17638 ;
EN-ISO 23278 level 2X
N/a
Final visual and Dimension inspection: VT test standard and
5
acceptance criteria ; EN 17637 , EN 5817 B
N/a
6 Painting inspection
6.1 Surface preparation
N/a
6.2 Painting material inspection
N/a -
6.2 Primer coat inspection
DAILY REPORT

JOB CODE :
P.O. No. : TDO-19-CP-0061 – PV2658
INSPECTION DATE : June 13th, 2019 SHEET 3

N/a
6.3 2nd coat inspection
N/a
7 Packing
8 Stock
Work plan for the next day:
1 /
2

Critical issues affecting progress:


1 None
2

May 28, 2019


Manpower Remarks
Shift 1 Shift 2
HBK TPI inspectors 2
DDC TPI inspectors 2
NDT inspectors
Cutting & Pre- Fabrication No arrangement for
Assembly - setting out, initial fit up manpower designated
Welders for RAA project was
Trial assembly recorded as of now.
Painting
Packing for shipping
Helper
Total

Working safety Environment sanitation


Pass Fail Good Fair Medium Bad
Observation and Petition:
1 No cutting plan for RAA was recorded today.
2 The main activities of fabrication is focused on Lusail Stadium at DDC1 factory

Remarks: Material Request Inspection

APAVE ASIA PACIFIC


(Sign of APAVE’s Inspector)
BUI HUYNH TUAN
DAILY REPORT

JOB CODE :
P.O. No. : TDO-19-CP-0061 – PV2658
INSPECTION DATE : June 13th, 2019 SHEET 4

◈ Reference Photos and remarks