EQUIPMENT ID NUMBER(S) or LINE NUMBER FLANGE JOINT NUMBER/S Test Pack No. SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
A General Requirements
Tools for bolt tightening has been identified and resolved between
SAEP-351,
A1 Contractor, SAPMT, Proponent and Inspection prior to commencing the
Para. 6.1
erection of the piping.
Not more than one gasket is used between mating surfaces of the SAES-L-109,
A3
flanges. Para. 11.1
SAEP-351,
B4 Lubricant applied to stud threads an face of nut contacting the flange.
Sec. 7, Step 2
SAEP-351,
B5 All studs and nuts installed hand tight
Sec. 7, Step 3
SAEP-351,
B6 Each stud is numbered as shown in Attachment 3.
Sec. 7, Step 4
Stud are tightened, as numbered, with air impact wrench or equivalent SAEP-351,
B7
following the bolt tightening sequence. Sec. 7, Step 5
1st stage tightening done to not more than 30% of required Torque
SAEP-351,
B8 (Note: Required Torque Value and actual attained torque values to be
Sec. 7, Step 7
entered in the Bolt Tightening Report, Attachment 1 of this checklist. )
SAEP-351,
B9 Final Tightening to + 5% of Torque Required (Actual Torque _____ )
Sec. 7, Step 7
After tightening, all bolts have full thread engagement with the nut.
SAES-L-109,
B10 (NOTE: Lack of complete engagement by not more than one thread is
Sec. I
acceptable. ) -- (ASME B31.3, Para. 335.2.3)
Page 1 of 6
SAUDI ARAMCO ID/PID - 3/01/05 - REV 0 (Standards Cutoff - August 2004)
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Flange Joint Tightening Inspection Report SATR-L-2001 25-May-05 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
Bolt Tensioning Method when approved. (i.e.: HYDRATIGHT - 50% Tensioning Method)
C
NOTE: Items listed below shall be verified against the project approved bolt tensioning procedure for conformance.
Sch. Q,
C1 Pressure gages in the tensioning machine are calibrated.
Att. IV, Para. 6.1
HYDRATIGHT
C2 Mark bolts in 2 Sets, Set 'A' & Set 'B', alternatively. Procedure or
Equivalent
HYDRATIGHT
C3 Tensioners are fitted to every other bolt of Set 'A'. Procedure or
Equivalent
HYDRATIGHT
Pressurize the tensioners to pre-determined "Pressure A" per the
C4 Procedure or
approved procedure. (This is repeated 2 more times.)
Equivalent
Transfer tensioners to Set 'B' bolts and pressurize to pre-determined HYDRATIGHT
C5 "Pressure B" and tighten nuts. This is repeated 2 more times. (NOTE: Procedure or
Pressure B is lower in value than Pressure 'A' ) Equivalent
All findings are recorded in the Bolt Tightening Report Form SATR-L-
E
2001, Attachment 4.
REFERENCE DOCUMENTS:
1. SAES-L-350, Construction of Plant Piping, (30 September, 2003)
2. SAES-L-109, Selection of Flanges, Stud Bolts and Gaskets, (30 September, 2003)
2. SAEP-351, Bolted Flange Joints Assembly, (30 April, 2003)
4. ASME B31.3, Process Piping,
3. Schedule Q, Contractor's Quality Requirements, (November 2003)
4. Recommended Tensoning Procedure-By HYDRATIGHT
Page 2 of 6
SAUDI ARAMCO ID/PID - 3/01/05 - REV 0 (Standards Cutoff - August 2004)
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Flange Joint Tightening Inspection Report SATR-L-2001 25-May-05 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
*Person Responsible for Implementation of Test and Analysis of Results Y = YES N = NO F = FAILED
Page 3 of 6
SAUDI ARAMCO ID/PID - 3/01/05 - REV 0 (Standards Cutoff - August 2004)
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Flange Joint Tightening Inspection Report SATR-L-2001 25-May-05 MECH-
Attachment 1
Notes:
Page 4 of 6
Attachment 2
Attachment 3
Page 5 of 6
SAUDI ARAMCO ID/PID - 3/01/05 - REV 0 (Standards Cutoff - August 2004)
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Flange Joint Inspection & Tightening Report
SATR-L-2001 25-May-05 MECH-
(Attachment 4)
EQUIPMENT ID NUMBER(S) or LINE NUMBER FLANGE JOINT NUMBER/S Test Pack No. SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
RESULT:
REMARKS:
*Person Responsible for Implementation of Test and Analysis of Results Y = YES N = NO F = FAILED
Page 6 of 6