SQUEEZE CEMENTING PROPOSAL

PERTAMINA REGION JAWA


WELL :BBS-07

I. WELL DATA :
TOTAL DEPTH 2,271 MTR
PREV. CASING 9 5/8 INCH 43.5 LB/FT 8.755 INCH I.D 1,556 MTR
EXIST. CASING 7 INCH 29.0 LB/FT 6.184 INCH I.D 2,271 MTR
TUBING 2 7/8 INCH 6.5 LB/FT 2.441 INCH I.D 2,120 MTR
D.P 3 1/2 INCH 13.3 LB/FT 2.764 INCH I.D 2,025 MTR
PERFORATION 12 SPF Interval 2117 MTR ─ 2118 MTR
BHST 272 0
F Interval MTR ─ MTR
SACK OF CEMENT 26 SACKS Interval MTR ─ MTR

II. VOLUME CALCULATION :


INSIDE CASING
WHEN TUBING OUT
CASING CAPACITY 0.2086 CUFT/FT x 47.16 MTR = 32.27 CUFT
SQUEEZE VOL 1.48 BBL = 12.11 MTR = 8.29 CUFT
TOTAL VOLUME 59.27 MTR = 40.56 CUFT
7.22 BBL
WHEN TUBING IN
TUB 2 7/8 CAP 0.0325 CUFT/FT DP 3 1/2 CAP 0.0417 CUFT/FT
CASING 7 - TBG 2 7/8 0.1635 CUFT/FT CASING 7"- DP 3 1/2 0.1418 CUFT/FT
CASING 7 - DP 3 1/2 0.1418 CUFT/FT DP 3 1/2 CAP + (CSG 7"-DP 3 1/2) 0.1834 CUFT/FT
TBG CAP + (CSG-TBG) 0.1960 CUFT/FT
SLURRY HEIGHT SLURRY HEIGHT 63.07 MTR = 7.22 BBL
WH HEIGHT AT 7" CSG-TBG 2 7/8 31.93 MTR = 3.05 BBL
WATER HEAD
WH HEIGHT AT 7" CSG-DP 3 1/2 83.89 MTR = 6.95 BBL
WB HEIGHT AT TBG 2 7/8 31.93 MTR = 0.61 BBL
WATER BEHIND
WB HEIGHTAT DP 3 1/2 83.89 MTR = 2.04 BBL

DISPLACEMENT VOLUME TBG 2 7/8 = 0.6 BBL


DISPLACEMENT VOLUME DP 3 1/2 = 47.3 BBL
DISPLACEMENT VOLUME TOTAL = 47.9 BBL

III. CEMENT SLURRY CALCULATION


CEMENT SLURRY
EXCESS 0 SACKS
SLURRY VOLUME 40.56 CUFT
SACK OF CEMENT 26 SACKS
DENSITY 15.80 PPG
YIELD 1.56 CUFT/SX
WATER 3.93 GPS 2.4 BBL
TOTAL MIX. FLUID 6.57 GPS 4.1 BBL
SQUEEZE CEMENTING PROPOSAL
PERTAMINA REGION JAWA
WELL :BBS-07

IV. MATERIAL REQUIRED :


ADDITIVES/ EXCESS CEMENT SLURRY
PRODUCTS CONCENTRATION TOTAL CONCENTRATION TOTAL
Cement 26 SACKS
BAS - 200 35% % BWOC 855.40 LBS
BAD - 14L 0.07 GPS 1.82 GALS
BAR - 19L 0.035 GPS 0.91 GALS
BAL - 22L 1.50 GPS 39.00 GALS
BAG - 17L 1.00 GPS 26.00 GALS
BAF - 26L 0.03 GPS 0.78 GALS

V. TOTAL MATERIAL REQUIRED :


PRODUCTS EXCESS CEMENT SLURRY TOTAL
Cement 26.0 SACKS 26.0 SACKS
BAS - 200 855.0 LBS 855.0 LBS
BAD - 14L 1.82 GALS 1.82 GALS
BAR - 19L 0.91 GALS 0.91 GALS
BAL - 22L 39.00 GALS 39.00 GALS
BAG - 17L 26.00 GALS 26.00 GALS
BAF - 26L 0.78 GALS 0.78 GALS
SQUEEZE CEMENTING PROPOSAL
PERTAMINA REGION JAWA
WELL :BBS-07

VI. JOB PROCEDURE VII. ESTIMATE JOB TIME

1. Conduct Pre-Job safety meeting, Fill and discuss Work Permit and JSA.
2. Pressure test line 2000 psi and hold for 5 minutes.
3. Injection Rate, recalculate cement slurry volume based on injectivity rate result.
4. Check and discussion well condition. If well in loss condition, need to be cure first
5. Circulation 2x Bottom Up for Cooling down Well Temperature
6. Pump with 10 bbls fresh water as water ahead. 2 BPM
7. Mix and Pump cement with 7.2 bbls at 15.8 ppg. 2 BPM
8. Pump 2.65 bbls with fresh water as water behind. 1 BPM
9. Displace with 47.87 bbls Mud. 3 BPM
10. Stop Pumping.
11. POOH tubing with 9 stand (2 tbg/stand) of 2 7/8 inch tubing. 5 MIN / STND
12. Reverse circulation as tubing volume, until clean (2 x Bottom up). 4 BPM
13. Close BOP and squeeze with brine water / CF maximum 1.5 bbl at 1077 psi 2 BPM
14. Record rate and pressure, do not exceed frac pressure
15. Stop pump, hold pressure, Record return volume at displacement tank
16. Job completed.
Total Job Time
Safety Time 50 %
Total Time
SQUEEZE CEMENTING PROPOSAL
PERTAMINA REGION JAWA
WELL :BBS-07
SQUEEZE CEMENTING PROPOSAL
PERTAMINA REGION JAWA
WELL :BBS-07

I. WELL DATA :
TOTAL DEPTH 2,271 MTR
PREV. CASING 9 5/8 INCH 43.5 LB/FT 8.755 INCH I.D 1,556 MTR
EXIST. CASING 7 INCH 29.0 LB/FT 6.184 INCH I.D 2,271 MTR
TUBING 2 7/8 INCH 6.5 LB/FT 2.441 INCH I.D 2,120 MTR
D.P 3 1/2 INCH 13.3 LB/FT 2.764 INCH I.D 2,025 MTR
PERFORATION 12 SPF Interval 2117 MTR ─ 2118 MTR
BHST 272 0
F Interval MTR ─ MTR
SACK OF CEMENT 26 SACKS Interval MTR ─ MTR

II. VOLUME CALCULATION :


INSIDE CASING
WHEN TUBING OUT
CASING CAPACITY 0.2086 CUFT/FT x 47.16 MTR = 32.27 CUFT
SQUEEZE VOL 1.48 BBL = 12.11 MTR = 8.29 CUFT
TOTAL VOLUME 59.27 MTR = 40.56 CUFT
7.22 BBL
WHEN TUBING IN
TUB 2 7/8 CAP 0.0325 CUFT/FT DP 3 1/2 CAP 0.0417 CUFT/FT
CASING 7 - TBG 2 7/8 0.1635 CUFT/FT CASING 7"- DP 3 1/2 0.1418 CUFT/FT
CASING 7 - DP 3 1/2 0.1418 CUFT/FT DP 3 1/2 CAP + (CSG 7"-DP 3 1/2) 0.1834 CUFT/FT
TBG CAP + (CSG-TBG) 0.1960 CUFT/FT
SLURRY HEIGHT SLURRY HEIGHT 63.07 MTR = 7.22 BBL
WH HEIGHT AT 7" CSG-TBG 2 7/8 31.93 MTR = 3.05 BBL
WATER HEAD
WH HEIGHT AT 7" CSG-DP 3 1/2 83.89 MTR = 6.95 BBL
WB HEIGHT AT TBG 2 7/8 31.93 MTR = 0.61 BBL
WATER BEHIND
WB HEIGHTAT DP 3 1/2 83.89 MTR = 2.04 BBL

DISPLACEMENT VOLUME TBG 2 7/8 = 0.6 BBL


DISPLACEMENT VOLUME DP 3 1/2 = 47.3 BBL
DISPLACEMENT VOLUME TOTAL = 47.9 BBL

III. CEMENT SLURRY CALCULATION


CEMENT SLURRY
EXCESS 0 SACKS
SLURRY VOLUME 40.56 CUFT
SACK OF CEMENT 26 SACKS
DENSITY 15.80 PPG
YIELD 1.56 CUFT/SX
WATER 3.93 GPS 2.4 BBL
TOTAL MIX. FLUID 6.57 GPS 4.1 BBL
SQUEEZE CEMENTING PROPOSAL
PERTAMINA REGION JAWA
WELL :BBS-07

IV. MATERIAL REQUIRED :


ADDITIVES/ EXCESS CEMENT SLURRY
PRODUCTS CONCENTRATION TOTAL CONCENTRATION TOTAL
Cement 26 SACKS
BAS - 200 35% % BWOC 855.40 LBS
BAD - 14L 0.07 GPS 1.82 GALS
BAR - 19L 0.035 GPS 0.91 GALS
BAL - 22L 1.50 GPS 39.00 GALS
BAG - 17L 1.00 GPS 26.00 GALS
BAF - 26L 0.03 GPS 0.78 GALS

V. TOTAL MATERIAL REQUIRED :


PRODUCTS EXCESS CEMENT SLURRY TOTAL
Cement 26.0 SACKS 26.0 SACKS No
BAS - 200 855.0 LBS 855.0 LBS TO
BAD - 14L 1.82 GALS 1.82 GALS TO
BAR - 19L 0.91 GALS 0.91 GALS TO
BAL - 22L 39.00 GALS 39.00 GALS W
BAG - 17L 26.00 GALS 26.00 GALS
BAF - 26L 0.78 GALS 0.78 GALS
SQUEEZE CEMENTING PROPOSAL
PERTAMINA REGION JAWA
WELL :BBS-07

VI. JOB PROCEDURE VII. ESTIMATE JOB TIME

1. Conduct Pre-Job safety meeting, Fill and discuss Work Permit and JSA.
2. Pressure test line 2000 psi and hold for 5 minutes.
3. Injection Rate, recalculate cement slurry volume based on injectivity rate result.
4. Check and discussion well condition. If well in loss condition, need to be cure first
5. Circulation 2x Bottom Up for Cooling down Well Temperature
6. Pump with 10 bbls fresh water as water ahead. 2 BPM
7. Mix and Pump cement with 7.2 bbls at 15.8 ppg. 2 BPM
8. Pump 2.65 bbls with fresh water as water behind. 1 BPM
9. Displace with 47.87 bbls Mud. 3 BPM
10. Stop Pumping.
11. POOH tubing with 9 stand (2 tbg/stand) of 2 7/8 inch tubing. 5 MIN / STND
12. Reverse circulation as tubing volume, until clean (2 x Bottom up). 4 BPM
13. Close BOP and squeeze with brine water / CF maximum 1.5 bbl at 1077 psi 2 BPM
14. Record rate and pressure, do not exceed frac pressure
15. Stop pump, hold pressure, Record return volume at displacement tank
16. Job completed.
Total Job Time
Safety Time 50 %
Total Time
SQUEEZE CEMENTING PROPOSAL
PERTAMINA REGION JAWA
WELL :BBS-07