Академический Документы
Профессиональный Документы
Культура Документы
LOKASI PEKERJAAN
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
KA Drainase
RI
SI
AN
Ahli Sanitasi
N
dan Limbah
BA
Wilayah Kota
JE
B.1 - 1 NTS
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
20
0
00
10
15
00
13
00
PAKET PEKERJAAN
40 40 4
40
40
PERENCANAAN PENANGANAN
0
KAWASAN PERMUKIMAN KUMUH
00
38
PRIORITAS (P2KPKP) WILAYAH 2
00
18
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
NIP. 19700271998031003
10
-0
.75
-0 DIKETAHUI OLEH :
.60
-0
.4 5
-0
SATKER PKP PROV. KALSEL
.30 Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
-0 NIP. 196803091989021002
.15
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
15
13
00
00
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
KODE SKALA
B.1 - 2 1 : 1000
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
KAYU ULIN 200 x 80mm PLAT BESI T=1cm - L=15cm
FIN.WOODSTAIN DOFF FIN.EFEK TEMBAGA D:\1. Lokak\2017\6. BETING\3. GAMBAR\3\LIMBAH\5, 10\1. GAMBAR\maxresdefault.jpg
POT 2 POT 3
140
10
30
POT 1
40
30
10
PAKET PEKERJAAN
20 15 108 15 20
PERENCANAAN PENANGANAN
28 85 28 KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
KAYU ULIN 200 x 80mm
KAYU ULIN 200 x 80mm
FIN.WOODSTAIN DOFF
FIN.WOODSTAIN DOFF
PLAT BESI T=1cm - L=15cm PLAT BESI T=1cm - L=15cm
FIN.EFEK TEMBAGA FIN.EFEK TEMBAGA
140 40
Boby Ali Azhari, ST, M.Sc
10 30 NIP. 19700271998031003
8
DIKETAHUI OLEH :
45
45
37
37
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
20 15 70 15 20 30 NIP.196502071992031006
28 85 28 DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
8
PLAT BESI PLAT BESI Ahli Teknik Jalan Ir. Haris Budi Purwatjahjono
T=1cm - L=15cm T=1cm - L=15cm
Ahli Sungai dan Joko Sutrisno, ST
FIN.EFEK TEMBAGA FIN.EFEK TEMBAGA Drainase
45
45
45
37
37
37
Ahli Arsitektur Kristieningsih, ST
DYNABOLT DYNABOLT
Ahli Sanitasi
M10 x 50mm M10 x 50mm dan Limbah
Bagus Tri Buko N, ST
Ahli Perencanaan
13 7 3
13 7 3
13 7 3
Rafik Hidayat
Wilayah Kota
Ahli Teknik Chusnan, ST
Air Minum
NAMA GAMBAR
DYNABOLT M10 x 50mm SCREED T=5cm SCREED T=5cm
20 15 108 10 30 30 10 BENCH OUTDOOR
SCREED T=5cm
PLAT STRUKTUR PLAT STRUKTUR TYPE A
28 85 28 BETON T=3cm BETON T=3cm
PLAT STRUKTUR (DETAIL BY STRUKTUR) (DETAIL BY STRUKTUR)
BETON T=3cm KODE SKALA
(DETAIL BY STRUKTUR)
B.3 - 1 1 : 20
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
6
PERENCANAAN PENANGANAN
POT 1 KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
40
52
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
6
5 40 5
50
15
Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
5
5
NIP.196502071992031006
45
45
30
30
30
30
DIPERIKSA OLEH :
KETUA TIM TEKNIS
50 52
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
15
5
45
COBLE STONE T=2cm COBLE STONE T=2cm Ahli Teknik Jalan Ir. Haris Budi Purwatjahjono
30
30
30
30
Ahli Sungai dan Joko Sutrisno, ST
Drainase
Ahli Arsitektur Kristieningsih, ST
73
Ahli Sanitasi
Bagus Tri Buko N, ST
dan Limbah
13
PLAT STRUKTUR
PLAT STRUKTUR BENCH OUTDOOR
BETON T=3cm
BETON T=3cm TYPE B
(DETAIL BY STRUKTUR)
(DETAIL BY STRUKTUR)
KODE SKALA
B.3 - 2 1 : 20
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
POT
POT
1
KONSULTAN PERENCANA
B.3 - 3 1 : 10
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
1080 4000
PAKET PEKERJAAN
759 170
PERENCANAAN PENANGANAN
URUGAN PASIR 10 CM
ANGKUR BAUT M16
30 30
LANTAI KERJA 5 CM
450 75 175 DISETUJUI OLEH :
30 40 80 PEJABAT PEMBUAT KOMITMEN
150
Boby Ali Azhari, ST, M.Sc
300
600
NIP. 19700271998031003
DIKETAHUI OLEH :
150
+SEKRUP TANAM
NIP. 196803091989021002
TEMBAGA 2MM
LUBANG CAHAYA
3
1
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
4560
4520
4280
4000
4140
1425
1300
400
500
200
KONSULTAN PERENCANA
A
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
140
IR. SITI ROCHAMAYANTI, MM
DIREKTUR
250
Team Leader Ir. Martadi Raharjo, MT
140
Ahli Sungai dan
TUTUP SEALANT
Joko Sutrisno, ST
ARMATURE LAMPU
Drainase
GUTTER KABEL
Ahli Sanitasi
Bagus Tri Buko N, ST
dan Limbah
25X25 CM
A
NAMA GAMBAR
KODE SKALA
B.4 - 1 1 : 20
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
482
15 18 12 19 19 18 13 19 9 15 26 21 27 21 28 21 26 15 9 19 13 18 19 19 12 18 15
27
250
250
280
PAKET PEKERJAAN
30 19
PERENCANAAN PENANGANAN
13 13 12 12 13 11 18 15 18 18 15 18 11 13 12 12 13 13 KAWASAN PERMUKIMAN KUMUH
360
NIP. 196803091989021002
NIP.196502071992031006
KAYU SOLID
77 65 65 77 DIPERIKSA OLEH :
140
15
95
140
10
20 Dendy Kurniadi, ST, MT
NIP. 157504202005021001
140 250 140
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
PLAT BAJA 9MM KONSULTAN PERENCANA
905
PLAT TEMBAGA
PLAT SIRIP BAJA 9MM
TBL 1.8MM
FIN. CAT BESI
PONDASI (BY STRUCTURE) IR. SITI ROCHAMAYANTI, MM
400
Ahli Sanitasi
Bagus Tri Buko N, ST
dan Limbah
Ahli Perencanaan Rafik Hidayat
Wilayah Kota
284 284 284 284 Ahli Teknik Chusnan, ST
Air Minum
1136 NAMA GAMBAR
LANTAI KERJA 5 CM
URUGAN PASIR 10 CM
DETAIL PROFIL KAYU 1, 2, 3
150 250 150 DETAIL 1
DETAIL PLAT TEMBAGA PEDESTAL
550 LAMPU JALAN
KODE SKALA
B.4 - 2 1 : 10
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
KACA
10 800 10
35 150 150 35
60 60 PERKERASAN COBBLESTONE
AREA TITIK TANAM POHON BATU ANDESIT
20 30
150
150
PAKET PEKERJAAN
180
200
200
100
TANAH SUBUR PLAT LANTAI
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
50
20
PRIORITAS (P2KPKP) WILAYAH 2
100 100 KOTA BANJARMASIN
BATU SPLIT 5 CM
POTONGAN 2 720
15
AREA TITIK TANAM POHON
20 30
135
PLAT LANTAI NIP. 196803091989021002
100
TANAH SUBUR
NIP.196502071992031006
720
RING KEDUA
SEGMENT 2 SEGMENT 1
PENEMPATAN UP LIGHT
820 Dendy Kurniadi, ST, MT
800 NIP. 157504202005021001
10
KONSULTAN PERENCANA
40
R50
R50
100 100
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
R3
30
DIBUAT OLEH :
25 KONSULTAN PERENCANA
R2 TREE GRIILL ( BESI COR )
00
800 x 800mm-TEBAL 15 mm
35
FINISHING LAPISAN CAT DASAR ZINCROMAT
CAT BESI WARNA : ABU-ABU ( DOFF )
720
820
50 25 25 25 25
DIREKTUR
AREA TITIK TANAM POHON
Team Leader Ir. Martadi Raharjo, MT
R50
Chusnan, ST
Air Minum
10
NAMA GAMBAR
137 400 137
DENAH
RKL RING POHON (RP) KODE SKALA
00001 1 : 10
B.5 - 2
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
TALI PENGIKAT
Boby Ali Azhari, ST, M.Sc
NIP. 19700271998031003
E:\4. PROYEK 2018\15. PROYEK MAS BAGUS\DED KUMUH WISWA\## Paparan Kumuh 26 Nov 2018\2. Album Gambar\1. KUMUH BANJARMASIN\1. DED\1. KAWASAN MASJID\1. GAMBAR\POHON PINANG.jpg
PN PINANG DIKETAHUI OLEH :
( Areca catechu )
SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
3000
PENYANGGA/STEIGER
BAMBU Dendy Kurniadi, ST, MT
NIP. 157504202005021001
KONSULTAN PERENCANA
1500 D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
KETERANGAN JUMLAH
INSTALASI KABEL 80 M DENAH RENCANA TITIK LAMPU SATKER PKP PROV. KALSEL
SKALA 1:20 Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
KODE SKALA
B.6 - 6 1 : 20
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
KODE SKALA
B.6 - 1 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
DIBUAT OLEH :
KONSULTAN PERENCANA
DETAIL Kolom (15/15)
SKALA 1 : 25
15
IR. SITI ROCHAMAYANTI, MM
DIREKTUR
20
4D12 Team Leader Ir. Martadi Raharjo, MT
B.6 - 2 1 : 25
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
POTONGAN BANGUNAN
KODE SKALA
B.6 - 3 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
KODE SKALA
B.6 - 4 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
KUSEN KAYU
: BENGKIRAI 6/15
PINTU - :
MATERIAL D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DENAH BANGUNAN
KODE SKALA
B.6 - 5 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
INLET OUTLET
DIPERIKSA OLEH :
KETUA TIM TEKNIS
BETON K.300
DIBUAT OLEH :
KONSULTAN PERENCANA
DENAH
IPAL BIOFIL 5 KK
KODE SKALA
B.7 - 2 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DISINFEKTAN TUBE
MANHOLE
VENTILASI 50 CM
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
INLET KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
MANHOLE DISETUJUI OLEH :
50 CM DISINFEKTAN TUBE PEJABAT PEMBUAT KOMITMEN
INLET
CHECK VALVE
Boby Ali Azhari, ST, M.Sc
OUTLET NIP. 19700271998031003
DIKETAHUI OLEH :
NIP. 196803091989021002
DISINFEKTAN TUBE
DISINFEKTAN TUBE
MANHOLE VENTILASI MANHOLE
50 CM 50 CM
Dendy Kurniadi, ST, MT
NIP. 157504202005021001
OUTLET
INLET KONSULTAN PERENCANA
KAP. 5 KK
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
CHECK VALVE
KODE SKALA
B.7 - 1 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
SKALA 1:100 SKALA 1:100 Ahli Teknik Jalan Ir. Haris Budi Purwatjahjono
Ahli Sungai dan Joko Sutrisno, ST
Drainase
Ahli Arsitektur Kristieningsih, ST
Ahli Sanitasi
Bagus Tri Buko N, ST
dan Limbah
Ahli Perencanaan Rafik Hidayat
Wilayah Kota
Ahli Teknik Chusnan, ST
Air Minum
NAMA GAMBAR
DETAIL PENULANGAN
IPAL BIOFIL 5 KK
KODE SKALA
B.7 - 5 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
MAN HOLE MAN HOLE KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
NIP.196502071992031006
IPAL BIOFIL
DIPERIKSA OLEH :
KETUA TIM TEKNIS
BETON TUMBUK
KONSULTAN PERENCANA
BETON K.300
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
LANTAI KERJA 5 CM
DIBUAT OLEH :
PASIR URUG 5 CM KONSULTAN PERENCANA
KODE SKALA
B.7 - 3 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
MAN HOLE PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
BETON TUMBUK
KONSULTAN PERENCANA
BETON K.300
LANTAI KERJA 5 CM D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
KODE SKALA
B.7 - 4 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
7 PENATAAN HALAMAN
10 5 SQUARE MASJID DARUL ATTAQWA
6
PENATAAN HALAMAN
113 7 113 7 113 KODE SKALA
SQUARE MASJID DARUL ATTAQWA
SKALA 1:1000 B.8 - 1 1 : 1000
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
14
12
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
10 PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
Datum Elv. +9.00 PEJABAT PEMBUAT KOMITMEN
10.489
10.576
10.620
10.720
10.726
10.730
10.718
ELEVASI
DIKETAHUI OLEH :
CROSS SECTION EKSISTING 0+225
SKALA 1 : 100 SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
12
JALAN RENCANA
10.576
10.620
10.720
10.726
10.730
10.718
ELEVASI
DIBUAT OLEH :
KONSULTAN PERENCANA
JARAK 660.3 1662.9 57.7 119.1 99.6 80.1
URUGAN SIRTU 20 cm
CROSS SECTION 0+225
KODE SKALA
25 250 25
D.3 - 10 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
14
12
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
10 PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
Datum Elv. +9.00 DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
10.804
10.525
10.795
10.800
10.726
10.541
10.511
ELEVASI
SKALA 1 : 100
SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
14
BAPPEDA KOTA JAYAPURA
Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
12
JALAN RENCANA
KONSULTAN PERENCANA
Datum Elv. +9.00
10.804
10.525
10.795
10.800
10.726
10.541
10.511
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
ELEVASI
DIBUAT OLEH :
KONSULTAN PERENCANA
JARAK 750.4 1434.9 194.6 120.1 105.8 84.7
URUGAN SIRTU 20 cm
CROSS SECTION 0+250
KODE SKALA
25 250 25
D.3 - 11 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
13
11
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
9 KOTA BANJARMASIN
DISETUJUI OLEH :
Datum Elv. +8.00 PEJABAT PEMBUAT KOMITMEN
10.634
10.547
10.659
10.666
10.326
10.323
10.676
10.636
10.628
10.625
10.351
ELEVASI
21.7
JARAK 905.8 500.1 268.3 54.3 539.2 112.0 120.4 126.5 145.4
Boby Ali Azhari, ST, M.Sc
NIP. 19700271998031003
DIKETAHUI OLEH :
CROSS SECTION EKSISTING 0+275
SKALA 1 : 100 SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
JALAN RENCANA KETUA TIM TEKNIS
11
10.634
10.547
10.659
10.666
10.326
10.323
10.676
10.636
10.628
10.625
10.351
ELEVASI
DIBUAT OLEH :
KONSULTAN PERENCANA
21.7
JARAK 905.8 500.1 268.3 54.3 539.2 112.0 120.4 126.5 145.4
URUGAN SIRTU 20 cm
CROSS SECTION 0+275
KODE SKALA
25 250 25
D.3 - 12 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
14
12
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
10 KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
Datum Elv. +9.00
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
10.474
10.373
10.720
10.827
10.833
10.808
10.809
ELEVASI
NIP. 196803091989021002
14
BAPPEDA KOTA JAYAPURA
Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
12
JALAN RENCANA
10.474
10.373
10.720
10.827
10.833
10.808
10.809
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
ELEVASI
DIBUAT OLEH :
JARAK KONSULTAN PERENCANA
1526.5 663.3 168.5 141.7 126.2 97.4
URUGAN SIRTU 20 cm
CROSS SECTION 0+300
KODE SKALA
25 250 25
D.3 - 13 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
14
12
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
10 PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
Datum Elv. +9.00 DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
10.467
10.326
10.657
10.797
10.805
10.802
10.716
10.751
ELEVASI
NIP. 196803091989021002
14
BAPPEDA KOTA JAYAPURA
Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
12
JALAN RENCANA
KONSULTAN PERENCANA
Datum Elv. +9.00
10.467
10.326
10.657
10.797
10.805
10.802
10.716
10.751
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
ELEVASI
DIBUAT OLEH :
KONSULTAN PERENCANA
JARAK 782.5 1039.8 375.0 184.4 118.4 116.6 111.3
URUGAN SIRTU 20 cm
CROSS SECTION 0+325
KODE SKALA
25 250 25
D.3 - 14 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
14
12
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
10 KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
Datum Elv. +9.00
DISETUJUI OLEH :
10.475
10.840
10.530
10.639
10.856
10.853
10.712
PEJABAT PEMBUAT KOMITMEN
ELEVASI
35.2
JARAK 1874.5 477.3 113.0 116.3 137.7
NIP. 196803091989021002
14
BAPPEDA KOTA JAYAPURA
Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
NIP.196502071992031006
DIPERIKSA OLEH :
12 KETUA TIM TEKNIS
JALAN RENCANA
10.840
10.530
10.639
10.856
10.853
10.712
ELEVASI D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
35.2
JARAK 1874.5 477.3 113.0 116.3 137.7 KONSULTAN PERENCANA
URUGAN SIRTU 20 cm
CROSS SECTION 0+350
KODE SKALA
25 250 25
D.3 - 15 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
14
12
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
10 KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
Datum Elv. +9.00
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
10.487
10.849
10.848
10.848
10.269
10.792
ELEVASI
NIP. 196803091989021002
14
BAPPEDA KOTA JAYAPURA
Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
12 JALAN RENCANA
10.487
10.849
10.848
10.848
10.269
10.792
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
ELEVASI
DIBUAT OLEH :
JARAK 1790.7 407.6 192.5 93.9 123.8 KONSULTAN PERENCANA
URUGAN SIRTU 20 cm
CROSS SECTION 0+400
KODE SKALA
25 250 25
D.3 - 17 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
13
11
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
9 PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
Datum Elv. +8.00 DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
10.477
10.864
10.864
10.864
10.690
10.701
9.855
ELEVASI
JARAK
9.8
1188.6 1084.1 102.4 124.9 124.9 406.9
Boby Ali Azhari, ST, M.Sc
NIP. 19700271998031003
SKALA 1 : 100
SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
13
BAPPEDA KOTA JAYAPURA
Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
NIP.196502071992031006
JALAN RENCANA
DIPERIKSA OLEH :
KETUA TIM TEKNIS
11
KONSULTAN PERENCANA
Datum Elv. +8.00
10.477
10.864
10.864
10.864
10.690
10.701
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
9.855
ELEVASI
DIBUAT OLEH :
KONSULTAN PERENCANA
JARAK
9.8
1188.6 1084.1 102.4 124.9 124.9 406.9
URUGAN SIRTU 20 cm
CROSS SECTION 0+425
KODE SKALA
25 250 25
D.3 - 18 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
13
11
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
9 PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
Datum Elv. +8.00 DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
10.764
10.764
10.223
10.582
10.773
10.591
9.560
ELEVASI
38.0
JARAK 1063.1 986.2 255.2 139.4 145.4
Boby Ali Azhari, ST, M.Sc
NIP. 19700271998031003
CROSS SECTION EKSISTING 0+450 DIKETAHUI OLEH :
SKALA 1 : 100
SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
13
BAPPEDA KOTA JAYAPURA
Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
NIP.196502071992031006
JALAN RENCANA
DIPERIKSA OLEH :
KETUA TIM TEKNIS
11
KONSULTAN PERENCANA
Datum Elv. +8.00
10.764
10.764
10.223
10.582
10.773
10.591
9.560
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
ELEVASI
DIBUAT OLEH :
KONSULTAN PERENCANA
38.0
URUGAN SIRTU 20 cm
CROSS SECTION 0+450
KODE SKALA
25 250 25
D.3 - 19 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
12
10
PAKET PEKERJAAN
8
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
Datum Elv. +7.00 PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
10.382
10.825
10.421
10.431
10.431
10.431
8.480
9.463
8.135
2%
BAPPEDA KOTA JAYAPURA
Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
NIP.196502071992031006
10
DIPERIKSA OLEH :
KETUA TIM TEKNIS
8
Dendy Kurniadi, ST, MT
Datum Elv. +7.00 NIP. 157504202005021001
10.382
10.825
10.421
10.431
10.431
10.431
8.480
9.463
8.135
KONSULTAN PERENCANA
ELEVASI
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
300
D.3 - 2 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
13
11
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
9 KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
Datum Elv. +8.00
DISETUJUI OLEH :
10.423
10.577
10.809
10.807
10.623
10.714
10.816
PEJABAT PEMBUAT KOMITMEN
9.554
9.352
ELEVASI
36.3
JARAK 530.7 1189.1 536.6 87.8 119.6 130.9 89.3
NIP. 196803091989021002
13
BAPPEDA KOTA JAYAPURA
Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
DIPERIKSA OLEH :
11 KETUA TIM TEKNIS
10.423
10.577
10.809
10.807
10.623
10.714
10.816
9.554
9.352
ELEVASI D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
36.3
JARAK 530.7 1189.1 536.6 87.8 119.6 130.9 89.3 KONSULTAN PERENCANA
URUGAN SIRTU 20 cm
CROSS SECTION 0+475
KODE SKALA
25 250 25
D.3 - 20 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
13
11
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
9 PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
Datum Elv. +8.00 DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
10.794
10.674
10.788
10.718
10.781
9.034
9.329
9.503
9.867
ELEVASI
SKALA 1 : 100
SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
13
BAPPEDA KOTA JAYAPURA
Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
NIP.196502071992031006
JALAN RENCANA
DIPERIKSA OLEH :
KETUA TIM TEKNIS
11
KONSULTAN PERENCANA
Datum Elv. +8.00
10.794
10.674
10.788
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
10.718
10.781
9.034
9.329
9.503
9.867
ELEVASI
DIBUAT OLEH :
KONSULTAN PERENCANA
JARAK 585.8 498.8 583.7 595.8 100.2 135.8 125.4 92.5
URUGAN SIRTU 20 cm
CROSS SECTION 0+500
KODE SKALA
25 250 25
D.3 - 21 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
12
10
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
8 KOTA BANJARMASIN
DISETUJUI OLEH :
Datum Elv. +7.00 PEJABAT PEMBUAT KOMITMEN
10.564
10.729
10.729
10.691
8.898
9.299
9.819
ELEVASI
DIKETAHUI OLEH :
CROSS SECTION EKSISTING 0+525
SATKER PKP PROV. KALSEL
SKALA 1 : 100 Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
10
Datum Elv. +7.00 D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
10.564
10.729
10.729
10.691
8.898
9.299
9.819
ELEVASI DIBUAT OLEH :
KONSULTAN PERENCANA
URUGAN SIRTU 20 cm
CROSS SECTION 0+525
KODE SKALA
25 250 25
D.3 - 22 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
12
10
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
8 KOTA BANJARMASIN
DISETUJUI OLEH :
Datum Elv. +7.00 PEJABAT PEMBUAT KOMITMEN
10.493
10.498
10.498
10.355
10.381
8.243
8.479
9.472
ELEVASI
DIKETAHUI OLEH :
CROSS SECTION EKSISTING 0+050
SKALA 1 : 100 SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
NIP.196502071992031006
2% 2%
DIPERIKSA OLEH :
KETUA TIM TEKNIS
10
10.493
10.498
10.498
10.355
10.381
8.243
8.479
9.472
ELEVASI
DIBUAT OLEH :
KONSULTAN PERENCANA
JARAK 397.4 1681.7 64.6 255.8 100.7 99.9 127.0 173.2
12
10
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
8 KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
Datum Elv. +7.00 KOTA BANJARMASIN
DISETUJUI OLEH :
10.469
10.473
10.486
10.485
8.540
8.905
9.588
9.727
PEJABAT PEMBUAT KOMITMEN
ELEVASI
24.8
JARAK 992.9 1066.4 114.3 199.8 101.8 113.7 321.1
NIP. 196803091989021002
12
JALAN RENCANA
BAPPEDA KOTA JAYAPURA
Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
2% 2%
NIP.196502071992031006
DIPERIKSA OLEH :
10 KETUA TIM TEKNIS
10.469
10.473
10.486
10.485
8.540
8.905
9.588
9.727
ELEVASI D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
24.8
JARAK 992.9 1066.4 114.3 199.8 101.8 113.7 321.1 KONSULTAN PERENCANA
12
10
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
8 KOTA BANJARMASIN
DISETUJUI OLEH :
Datum Elv. +7.00 PEJABAT PEMBUAT KOMITMEN
10.472
10.534
10.533
10.532
10.528
8.746
9.565
9.791
ELEVASI
DIKETAHUI OLEH :
CROSS SECTION EKSISTING 0+100
SATKER PKP PROV. KALSEL
SKALA 1 : 100 Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
DIPERIKSA OLEH :
2%
10
Datum Elv. +7.00 D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
10.472
10.534
10.533
10.532
10.528
8.746
9.565
9.791
ELEVASI DIBUAT OLEH :
KONSULTAN PERENCANA
12
10
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
8
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
Datum Elv. +7.00
10.088
10.588
10.613
10.610
8.935
9.375
ELEVASI
JARAK 1163.2 829.8 410.5 96.4 118.6 Boby Ali Azhari, ST, M.Sc
NIP. 19700271998031003
DIKETAHUI OLEH :
DIPERIKSA OLEH :
2% 2% KETUA TIM TEKNIS
10
8 KONSULTAN PERENCANA
Datum Elv. +7.00 D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
10.088
10.588
10.613
10.610
DIBUAT OLEH :
8.935
9.375
12
10
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
8 KOTA BANJARMASIN
DISETUJUI OLEH :
Datum Elv. +7.00 PEJABAT PEMBUAT KOMITMEN
10.768
10.720
10.678
10.522
10.871
8.922
9.280
9.327
ELEVASI
41.0
JARAK 1253.7 516.4 627.0 102.9 104.4 141.5
Boby Ali Azhari, ST, M.Sc
NIP. 19700271998031003
DIKETAHUI OLEH :
CROSS SECTION EKSISTING 0+150
SKALA 1 : 100 SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
NIP.196502071992031006
2% 2%
DIPERIKSA OLEH :
KETUA TIM TEKNIS
10
10.768
10.720
10.678
10.522
10.871
8.922
9.280
9.327
ELEVASI
DIBUAT OLEH :
KONSULTAN PERENCANA
41.0
JARAK 1253.7 516.4 627.0 102.9 104.4 141.5
60 URUGAN SIRTU 20 cm
BETON EKSISTING CROSS SECTION 0+150
(RUSAK)
KODE SKALA
50 200 50
30 300 D.3 - 7 1 : 100
13
11
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
9 KOTA BANJARMASIN
DISETUJUI OLEH :
Datum Elv. +8.00 PEJABAT PEMBUAT KOMITMEN
10.473
10.808
10.808
10.719
10.761
10.617
9.344
9.251
ELEVASI
DIKETAHUI OLEH :
CROSS SECTION EKSISTING 0+175
SKALA 1 : 100 SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
NIP.196502071992031006
11
10.808
10.808
10.719
10.761
10.617
9.344
9.251
ELEVASI
DIBUAT OLEH :
KONSULTAN PERENCANA
JARAK 452.9 698.8 777.9 403.7 166.7 118.4 55.6
URUGAN SIRTU 20 cm
CROSS SECTION 0+175
KODE SKALA
25 250 25
D.3 - 8 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
13
11
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
9 PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
Datum Elv. +8.00 DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
10.744
10.548
10.583
10.630
10.762
10.710
9.849
ELEVASI
SKALA 1 : 100
SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
13
BAPPEDA KOTA JAYAPURA
Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
NIP.196502071992031006
JALAN RENCANA
DIPERIKSA OLEH :
KETUA TIM TEKNIS
11
KONSULTAN PERENCANA
Datum Elv. +8.00
10.744
10.548
10.583
10.630
10.762
10.710
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
9.849
ELEVASI
DIBUAT OLEH :
KONSULTAN PERENCANA
JARAK 1129.9 838.1 365.7 55.6 110.7 133.6 385.2
URUGAN SIRTU 20 cm
CROSS SECTION 0+200
KODE SKALA
25 250 25
D.3 - 9 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
12
10
PAKET PEKERJAAN
8 PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
Datum Elv. +7.00 KOTA BANJARMASIN
10.345
10.456
10.570
DISETUJUI OLEH :
8.453
9.466
8.097
9.582
ELEVASI PEJABAT PEMBUAT KOMITMEN
12 NIP. 196803091989021002
JALAN RENCANA
BAPPEDA KOTA JAYAPURA
Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
2%
NIP.196502071992031006
10 DIPERIKSA OLEH :
KETUA TIM TEKNIS
8
Dendy Kurniadi, ST, MT
NIP. 157504202005021001
Datum Elv. +7.00
KONSULTAN PERENCANA
10.345
10.456
10.570
8.453
9.466
8.097
9.582
ELEVASI
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
300
D.3 - 1 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
14
12
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
10 PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
Datum Elv. +9.00 DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
10.492
10.794
10.378
10.533
10.558
10.776
10.650
10.815
ELEVASI
SKALA 1 : 100
SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
14
BAPPEDA KOTA JAYAPURA
Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
12
JALAN RENCANA
KONSULTAN PERENCANA
Datum Elv. +9.00
10.492
10.794
10.378
10.533
10.558
10.776
10.650
10.815
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
ELEVASI
DIBUAT OLEH :
KONSULTAN PERENCANA
JARAK 188.0 730.4 1344.8 111.1 125.7 124.2 74.6
URUGAN SIRTU 20 cm
CROSS SECTION 0+375
KODE SKALA
25 250 25
D.3 - 16 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
BETON K.300
T : 15 cm
PAKET PEKERJAAN
PLASTIK COR
PERENCANAAN PENANGANAN
LANTAI KERJA 5 cm KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
2% KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
URUGAN SIRTU 20 cm
BETON EKSISTING
Boby Ali Azhari, ST, M.Sc
(RUSAK) NIP. 19700271998031003
DIKETAHUI OLEH :
50 200 50
SATKER PKP PROV. KALSEL
300 Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
DIBUAT OLEH :
KONSULTAN PERENCANA
300 TEPIAN YANG RAPI DAN LURUS
15 MEMAKAI BEKISTING BESI
SAMBUNGAN SUSUT LEBAR 3 mm Ahli Teknik Jalan Ir. Haris Budi Purwatjahjono
DETAIL JALAN 2
KODE SKALA
D.4 - 2 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
BETON K.300
T : 15 cm
PLESTERAN 1 PC : 3 PS PLASTIK COR
ACIAN FULL 1,5 cm PAKET PEKERJAAN
30 LANTAI KERJA 5 cm
PERENCANAAN PENANGANAN
SIAR DALAM 1 PC : 2 PS KAWASAN PERMUKIMAN KUMUH
2% 2% PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
60 URUGAN SIRTU 20 cm
BETON EKSISTING
(RUSAK)
Boby Ali Azhari, ST, M.Sc
NIP. 19700271998031003
50 200 50
30 DIKETAHUI OLEH :
300
SATKER PKP PROV. KALSEL
PASANGAN BATU BELAH Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
1:4
30 300
BAPPEDA KOTA JAYAPURA
PASIR URUG Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
5 cm NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
P:4m
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
SAMBUNGAN SUSUT LEBAR 3 mm TEPIAN YANG RAPI DAN LURUS KONSULTAN PERENCANA
TIAP 3 m KEDALAMAN 3 cm MEMAKAI BEKISTING BESI
PLASTIK COR
JALAN BETON K.225 T : 15 cm IR. SITI ROCHAMAYANTI, MM
DIREKTUR
DETAIL JALAN 3
KODE SKALA
D.4 - 3 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
BETON K.300 T : 15 cm
BETON EKSISTING PAKET PEKERJAAN
LANTAI KERJA 5 cm T : 15 cm PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
URUGAN SIRTU 20 cm
Boby Ali Azhari, ST, M.Sc
NIP. 19700271998031003
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
25
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
250 KONSULTAN PERENCANA
DETAIL JALAN 1
KODE SKALA
D.4 - 1 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAK
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
LAYOUT RENCANA
IR
S
KODE SKA
BA
M
JE
D.1 - 1 1:
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
LOKASI PEKERJAAN PE
KOTA BANJARMASIN
IH
KA
SIR
UM
BA
AN
N
TA
BA
DISETUJUI OLEH :
M
JE
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
0+250
0+300
0+200
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
10.808
10.726
10.800
10.628
10.833
10.805
Ahli Perencanaan Rafik Hidayat
ELEVASI EKSISTING Wilayah Kota
Ahli Teknik Chusnan, ST
Air Minum
10.894
NAMA GAMBAR
10.870
10.958
10.876
10.950
10.778
10.983
10.955
ELEVASI RENCANA
LONG SECTION
P. 0+150 - P. 0+300
JARAK PATOK 0+150 0+200 0+250 0+300
KODE SKALA
D.2 - 2 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
LOKASI PEKERJAAN PE
KOTA BANJARMASIN
IH
KA
IR
UM
S
BA
AN
N
TA
BA
DISETUJUI OLEH :
M
JE
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
0+350 0+400
DIPERIKSA OLEH :
KETUA TIM TEKNIS
0
0+30
0+4
50
Dendy Kurniadi, ST, MT
NIP. 157504202005021001
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
10.848
10.864
10.833
10.805
10.776
10.809
10.781
Ahli Perencanaan Rafik Hidayat
ELEVASI EKSISTING Wilayah Kota
Ahli Teknik Chusnan, ST
Air Minum
NAMA GAMBAR
10.983
10.955
10.980
10.826
10.998
10.959
10.931
11.014
ELEVASI RENCANA
LONG SECTION
P. 0+300 - P. 0+450
JARAK PATOK 0+300 0+350 0+400 0+450
KODE SKALA
D.2 - 3 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
LOKASI PEKERJAAN PE
KOTA BANJARMASIN
IH
KA
IR
UM
S
BA
AN
N
TA
BA
DISETUJUI OLEH :
M
JE
DIKETAHUI OLEH :
NIP. 196803091989021002
0+400
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
0+500
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
10.788
10.729
10.781
10.938
10.879
10.931
ELEVASI RENCANA
LONG SECTION
P. 0+450 - P. 0+525
JARAK PATOK 0+450 0+500 0+525
KODE SKALA
D.2 - 4 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAK
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
LOKASI PEKERJAAN PE
KOTA BANJARMASIN
IH
KA
IR
UM
S
BA
AN
N
TA
BA
DISETUJUI OLEH :
M
JE
NIP. 19700271998031003
DIKETAHUI OLEH :
-0.40
-0.40
NIP. 196803091989021002
-0.40
-0.40
NIP.196502071992031006
DIPERIKSA OLEH :
0+050 KETUA TIM TEKNIS
0+000
0+100 0+150
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
10.498
10.486
10.533
10.720
10.808
10.431
10.610
Ahli Perencanaan Rafik Hidayat
ELEVASI EKSISTING Wilayah Kota
Ahli Teknik Chusnan, ST
Air Minum
10.648
10.646
NAMA GAMBAR
10.506
10.683
10.760
10.870
10.958
10.581
ELEVASI RENCANA
LONG SECTION
P. 0+000 - P. 0+150
JARAK PATOK 0+000 0+050 0+100 0+150
KODE SKA
D.2 - 1 1:
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
1080 4000
PAKET PEKERJAAN
759 170
PERENCANAAN PENANGANAN
URUGAN PASIR 10 CM
ANGKUR BAUT M16
30 30
LANTAI KERJA 5 CM
450 75 175 DISETUJUI OLEH :
30 40 80 PEJABAT PEMBUAT KOMITMEN
150
Boby Ali Azhari, ST, M.Sc
300
600
NIP. 19700271998031003
DIKETAHUI OLEH :
150
+SEKRUP TANAM
NIP. 196803091989021002
TEMBAGA 2MM
LUBANG CAHAYA
3
1
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
4560
4520
4280
4000
4140
1425
1300
400
500
200
KONSULTAN PERENCANA
A
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
140
IR. SITI ROCHAMAYANTI, MM
DIREKTUR
250
Team Leader Ir. Martadi Raharjo, MT
140
Ahli Sungai dan
TUTUP SEALANT
Joko Sutrisno, ST
ARMATURE LAMPU
Drainase
GUTTER KABEL
Ahli Sanitasi
Bagus Tri Buko N, ST
dan Limbah
25X25 CM
A
NAMA GAMBAR
KODE SKALA
D.5 - 1 1:100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
482
15 18 12 19 19 18 13 19 9 15 26 21 27 21 28 21 26 15 9 19 13 18 19 19 12 18 15
27
250
250
280
PAKET PEKERJAAN
30 19
PERENCANAAN PENANGANAN
13 13 12 12 13 11 18 15 18 18 15 18 11 13 12 12 13 13 KAWASAN PERMUKIMAN KUMUH
360
NIP. 196803091989021002
NIP.196502071992031006
KAYU SOLID
77 65 65 77 DIPERIKSA OLEH :
140
15
95
140
10
20 Dendy Kurniadi, ST, MT
NIP. 157504202005021001
140 250 140
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
PLAT BAJA 9MM KONSULTAN PERENCANA
905
PLAT TEMBAGA
PLAT SIRIP BAJA 9MM
TBL 1.8MM
FIN. CAT BESI
PONDASI (BY STRUCTURE) IR. SITI ROCHAMAYANTI, MM
400
Ahli Sanitasi
Bagus Tri Buko N, ST
dan Limbah
Ahli Perencanaan Rafik Hidayat
Wilayah Kota
284 284 284 284 Ahli Teknik Chusnan, ST
Air Minum
1136 NAMA GAMBAR
LANTAI KERJA 5 CM
URUGAN PASIR 10 CM
DETAIL PROFIL KAYU 1, 2, 3 DETAIL 1
150 250 150 DETAIL PLAT TEMBAGA PEDESTAL
550 LAMPU JALAN
KODE SKALA
D.5 - 2 1:100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
KACA
10 800 10
35 150 150 35
60 60 PERKERASAN COBBLESTONE
AREA TITIK TANAM POHON BATU ANDESIT
20 30
150
150
PAKET PEKERJAAN
180
200
200
100
TANAH SUBUR PLAT LANTAI
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
50
20
PRIORITAS (P2KPKP) WILAYAH 2
100 100 KOTA BANJARMASIN
BATU SPLIT 5 CM
POTONGAN 2 720
15
AREA TITIK TANAM POHON
20 30
135
PLAT LANTAI NIP. 196803091989021002
100
TANAH SUBUR
NIP.196502071992031006
720
RING KEDUA
SEGMENT 2 SEGMENT 1
PENEMPATAN UP LIGHT
820 Dendy Kurniadi, ST, MT
800 NIP. 157504202005021001
10
KONSULTAN PERENCANA
40
R50
R50
100 100
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
R3
30
DIBUAT OLEH :
25 KONSULTAN PERENCANA
R2 TREE GRIILL ( BESI COR )
00
800 x 800mm-TEBAL 15 mm
35
FINISHING LAPISAN CAT DASAR ZINCROMAT
CAT BESI WARNA : ABU-ABU ( DOFF )
720
820
50 25 25 25 25
DIREKTUR
AREA TITIK TANAM POHON
Team Leader Ir. Martadi Raharjo, MT
R50
Chusnan, ST
Air Minum
10
NAMA GAMBAR
137 400 137
DENAH
RKL RING POHON (RP) KODE SKALA
00001 1 : 10
D.6 - 2 1:10
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
TALI PENGIKAT
Boby Ali Azhari, ST, M.Sc
NIP. 19700271998031003
E:\4. PROYEK 2018\15. PROYEK MAS BAGUS\DED KUMUH WISWA\## Paparan Kumuh 26 Nov 2018\2. Album Gambar\1. KUMUH BANJARMASIN\1. DED\1. KAWASAN MASJID\1. GAMBAR\POHON PINANG.jpg
PN PINANG DIKETAHUI OLEH :
( Areca catechu )
SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
3000
PENYANGGA/STEIGER
BAMBU Dendy Kurniadi, ST, MT
NIP. 157504202005021001
KONSULTAN PERENCANA
1500 D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
POT 2 POT 3
140
10
30
POT 1
40
30
10
PAKET PEKERJAAN
20 15 108 15 20
PERENCANAAN PENANGANAN
28 85 28 KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
KAYU ULIN 200 x 80mm
KAYU ULIN 200 x 80mm
FIN.WOODSTAIN DOFF
FIN.WOODSTAIN DOFF
PLAT BESI T=1cm - L=15cm PLAT BESI T=1cm - L=15cm
FIN.EFEK TEMBAGA FIN.EFEK TEMBAGA
140 40
Boby Ali Azhari, ST, M.Sc
10 30 NIP. 19700271998031003
8
DIKETAHUI OLEH :
45
45
37
37
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
20 15 70 15 20 30 NIP.196502071992031006
28 85 28 DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
8
PLAT BESI PLAT BESI Ahli Teknik Jalan Ir. Haris Budi Purwatjahjono
T=1cm - L=15cm T=1cm - L=15cm
Ahli Sungai dan Joko Sutrisno, ST
FIN.EFEK TEMBAGA FIN.EFEK TEMBAGA Drainase
45
45
45
37
37
37
Ahli Arsitektur Kristieningsih, ST
DYNABOLT DYNABOLT
Ahli Sanitasi
M10 x 50mm M10 x 50mm dan Limbah
Bagus Tri Buko N, ST
Ahli Perencanaan
13 7 3
13 7 3
13 7 3
Rafik Hidayat
Wilayah Kota
Ahli Teknik Chusnan, ST
Air Minum
NAMA GAMBAR
DYNABOLT M10 x 50mm SCREED T=5cm SCREED T=5cm
20 15 108 10 30 30 10 BENCH OUTDOOR
SCREED T=5cm
PLAT STRUKTUR PLAT STRUKTUR TYPE A
28 85 28 BETON T=3cm BETON T=3cm
PLAT STRUKTUR (DETAIL BY STRUKTUR) (DETAIL BY STRUKTUR)
BETON T=3cm KODE SKALA
(DETAIL BY STRUKTUR)
D.7 - 1 1 : 20
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
6
PERENCANAAN PENANGANAN
POT 1 KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
40
52
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
6
5 40 5
50
15
Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
5
5
NIP.196502071992031006
45
45
30
30
30
30
DIPERIKSA OLEH :
KETUA TIM TEKNIS
50 52
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
15
5
45
COBLE STONE T=2cm COBLE STONE T=2cm Ahli Teknik Jalan Ir. Haris Budi Purwatjahjono
30
30
30
30
Ahli Sungai dan Joko Sutrisno, ST
Drainase
Ahli Arsitektur Kristieningsih, ST
73
Ahli Sanitasi
Bagus Tri Buko N, ST
dan Limbah
13
PLAT STRUKTUR
PLAT STRUKTUR BENCH OUTDOOR
BETON T=3cm
BETON T=3cm TYPE B
(DETAIL BY STRUKTUR)
(DETAIL BY STRUKTUR)
KODE SKALA
D.8 - 2 1 : 20
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
12 KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
10
10.998
10.992
11.054
10.961
10.801
11.096
11.021
11.108
ELEVASI Boby Ali Azhari, ST, M.Sc
NIP. 19700271998031003
DIKETAHUI OLEH :
JARAK 995.2 358.3 146.5 137.4 42.6 207.8 287.6 824.6
SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
JALAN RENCANA
12 DIBUAT OLEH :
KONSULTAN PERENCANA
2% 2%
10.998
10.992
11.204
11.246
10.961
10.801
11.108
Ahli Teknik Jalan Ir. Haris Budi Purwatjahjono
11.171
ELEVASI
Ahli Sungai dan Joko Sutrisno, ST
Drainase
Ahli Arsitektur Kristieningsih, ST
JARAK 995.2 358.3 146.5 137.4 42.6 207.8 287.6 824.6 Ahli Sanitasi
Bagus Tri Buko N, ST
dan Limbah
Ahli Perencanaan Rafik Hidayat
Wilayah Kota
Ahli Teknik Chusnan, ST
Air Minum
NAMA GAMBAR
CROSS SECTION RENCANA 0+000
CROSS SECTION
SKALA 1 : 100 STA 0+000
KODE SKALA
C.3 - 1 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
FLOOR HARDENER
BETON K.300
T : 15 cm
PLASTIK COR
PAKET PEKERJAAN
PERKERASAN EKSISTING
PERENCANAAN PENANGANAN
2% 2% KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
15 DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
300
Boby Ali Azhari, ST, M.Sc
NIP. 19700271998031003
DIKETAHUI OLEH :
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
PERKERASAN EKSISTING
KODE SKALA
C.4 - 1 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
BETON K.300
T : 15 cm
PLESTERAN 1 PC : 3 PS PLASTIK COR
ACIAN FULL 1,5 cm
30 PERKERASAN EKSISTING
SIAR DALAM 1 PC : 2 PS PAKET PEKERJAAN
2% 2%
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
15 PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
60 PEJABAT PEMBUAT KOMITMEN
300
PASANGAN BATU BELAH
1 PC : 4 PS
30 SAMBUNGAN SUSUT LEBAR 3 mm Boby Ali Azhari, ST, M.Sc
NIP. 19700271998031003
TIAP 3 m KEDALAMAN 3 cm
PASIR URUG DIKETAHUI OLEH :
5 cm PLASTIK COR
SATKER PKP PROV. KALSEL
JALAN BETON K.300 T : 15 cm Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
P:4m
BAPPEDA KOTA JAYAPURA
Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
NIP.196502071992031006
DIPERIKSA OLEH :
15 KETUA TIM TEKNIS
PERKERASAN EKSISTING
300
50 Dendy Kurniadi, ST, MT
NIP. 157504202005021001
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
JARAK SAMBUNGAN SUSUT
KODE SKALA
C.4 - 2 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
Wilayah Kota
RI
Ahli Teknik
SI
Chusnan, ST
Air Minum
BA
LAYOUT PEKERJAAN
M
SKALA N T S
KODE SKALA
C.1 - 1 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
PE
IH
KA
LOKASI PEKERJAAN
SIR
UM
BA
AN
N
TA
BA
M
JE
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
0+00
0
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
12
10
8 IR. SITI ROCHAMAYANTI, MM
DIREKTUR
DATUM ELV. + 5 6
Team Leader Ir. Martadi Raharjo, MT
10.724
10.724
10.589
10.725
10.726
10.705
10.566
11.054
10.915
10.631
8.650
10.864
10.874
10.739
10.875
10.876
10.855
11.204
11.065
10.781
10.716
8.800
Ahli Sanitasi
Bagus Tri Buko N, ST
dan Limbah
ELEVASI RENCANA Ahli Perencanaan Rafik Hidayat
Wilayah Kota
Ahli Teknik Chusnan, ST
Air Minum
NAMA GAMBAR
JARAK PATOK 0+000 0+015 0+030 0+045 0+060 0+075 0+090 0+105 0+120 0+035 0+158
LONG SECTION
STA 0+000 - STA 0+158
LONG SECTION RENCANA JALAN
P. 0+000 - P. 0+158 KODE SKALA
SKALA 1 : 100
C.2 - 1 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
12 KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
10
10.397
10.859
10.878
10.883
10.959
10.950
10.938
10.471
ELEVASI Boby Ali Azhari, ST, M.Sc
NIP. 19700271998031003
DIKETAHUI OLEH :
JARAK 495.0 683.9 148.0 173.1 132.1 267.2 351.0 243.3 506.4
SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
10.397
10.959
10.950
10.938
10.471
11.009
11.028
11.033
Ahli Teknik Jalan Ir. Haris Budi Purwatjahjono
ELEVASI
Ahli Sungai dan Joko Sutrisno, ST
Drainase
Ahli Arsitektur Kristieningsih, ST
JARAK 495.0 683.9 148.0 173.1 132.1 267.2 351.0 243.3 506.4
Ahli Sanitasi
Bagus Tri Buko N, ST
dan Limbah
Ahli Perencanaan Rafik Hidayat
Wilayah Kota
Ahli Teknik Chusnan, ST
Air Minum
NAMA GAMBAR
CROSS SECTION RENCANA 0+020
CROSS SECTION
SKALA 1 : 100 STA 0+020
KODE SKALA
C.3 - 2 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
12
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
10 KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
10.434
10.094
10.740
10.894
10.502
10.583
10.666
10.903
10.593
8.574
9.972
8.666
9.641
8.771
ELEVASI DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
12 KONSULTAN PERENCANA
JALAN RENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
2% 2%
DIBUAT OLEH :
KONSULTAN PERENCANA
10
Datum Elv. +7.00 Ahli Teknik Jalan Ir. Haris Budi Purwatjahjono
Ahli Sungai dan
10.434
Joko Sutrisno, ST
10.094
10.740
10.894
10.502
10.583
10.666
10.903
10.593
8.574
9.972
8.666
Drainase
9.641
8.771
ELEVASI Kristieningsih, ST
Ahli Arsitektur
Ahli Sanitasi
Bagus Tri Buko N, ST
dan Limbah
JARAK 327.9 200.6 378.6 266.8 25.6 161.1 139.5 163.4 88.0 528.6 55.8 351.7 75.3 Ahli Perencanaan Rafik Hidayat
Wilayah Kota
Ahli Teknik Chusnan, ST
Air Minum
NAMA GAMBAR
CROSS SECTION
CROSS SECTION RENCANA 0+040 STA 0+040
SKALA 1 : 100
KODE SKALA
C.3 - 3 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
12 KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
10
10.426
10.628
10.722
10.723
Boby Ali Azhari, ST, M.Sc
10.160
10.631
ELEVASI NIP. 19700271998031003
DIKETAHUI OLEH :
JARAK 931.3 325.1 99.9 141.7 143.5 203.7 1078.3
SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
12 DIBUAT OLEH :
JALAN RENCANA KONSULTAN PERENCANA
2% 2%
10.426
10.628
10.722
10.723
10.160
10.631
ELEVASI Ahli Sungai dan Joko Sutrisno, ST
Drainase
Ahli Arsitektur Kristieningsih, ST
JARAK 931.3 325.1 99.9 141.7 143.5 203.7 1078.3 Ahli Sanitasi
Bagus Tri Buko N, ST
dan Limbah
Ahli Perencanaan Rafik Hidayat
Wilayah Kota
Ahli Teknik Chusnan, ST
Air Minum
NAMA GAMBAR
KODE SKALA
C.3 - 4 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
12 PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
10
10.523
10.722
10.726
10.729
10.699
10.698
ELEVASI
Boby Ali Azhari, ST, M.Sc
NIP. 19700271998031003
JARAK 1256.3 102.5 141.2 143.5 181.3 423.6 751.5 DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
SKALA 1 : 100
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
12 JALAN RENCANA
DIBUAT OLEH :
KONSULTAN PERENCANA
2% 2%
10
IR. SITI ROCHAMAYANTI, MM
Datum Elv. +9.00 DIREKTUR
10.523
10.722
10.726
10.729
10.699
10.698
ELEVASI Ahli Teknik Jalan Ir. Haris Budi Purwatjahjono
Ahli Sungai dan Joko Sutrisno, ST
Drainase
JARAK 1256.3 102.5 141.2 143.5 181.3 423.6 751.5 Ahli Arsitektur Kristieningsih, ST
Ahli Sanitasi
Bagus Tri Buko N, ST
dan Limbah
Ahli Perencanaan Rafik Hidayat
Wilayah Kota
Ahli Teknik Chusnan, ST
Air Minum
NAMA GAMBAR
CROSS SECTION RENCANA 0+080
SKALA 1 : 100 CROSS SECTION
STA 0+080
KODE SKALA
C.3 - 5 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
12 KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
10
10.426
10.386
10.323
10.330
10.723
10.725
10.669
10.657
10.401
10.431
ELEVASI Boby Ali Azhari, ST, M.Sc
NIP. 19700271998031003
DIKETAHUI OLEH :
JARAK 219.0 111.6 13.0 176.6 17.5 511.4 59.2 391.6 447.6 723.2
SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
2% 2%
10.426
10.386
10.323
10.330
10.723
10.725
10.669
10.657
10.401
10.431
KODE SKALA
C.3 - 6 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
12 PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
10 PEJABAT PEMBUAT KOMITMEN
10.402
10.435
10.724
10.441
10.599
10.725
10.723
10.614
10.581
ELEVASI
Boby Ali Azhari, ST, M.Sc
JARAK NIP. 19700271998031003
887.8 194.1 170.9 84.5 152.9 152.9 57.3 475.9 814.0
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
12 JALAN RENCANA D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
2% 2%
KONSULTAN PERENCANA
10
10.435
10.724
10.441
10.599
10.725
10.723
10.614
10.581
ELEVASI Team Leader Ir. Martadi Raharjo, MT
KODE SKALA
C.3 - 7 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
12 KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
10
10.545
10.624
10.604
10.262
10.292
10.368
10.628
10.627
10.566
10.569
10.351
Boby Ali Azhari, ST, M.Sc
ELEVASI NIP. 19700271998031003
DIKETAHUI OLEH :
JARAK 366.1 247.6 358.7 339.7 48.0 139.9 139.6 84.0 21.0 672.6 582.8
SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
12 DIBUAT OLEH :
JALAN RENCANA KONSULTAN PERENCANA
2% 2%
10.624
10.604
10.262
10.292
10.368
10.628
10.627
10.566
10.569
Ir. Haris Budi Purwatjahjono
10.351
KODE SKALA
C.3 - 8 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
12 PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
10
10.564
10.564
10.653
10.692
10.696
10.696
10.727
10.671
ELEVASI
Boby Ali Azhari, ST, M.Sc
NIP. 19700271998031003
JARAK 1039.0 181.3 96.3 183.4 36.3 159.0 277.0 353.8 673.9 DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
SKALA 1 : 100
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
12 JALAN RENCANA
DIBUAT OLEH :
KONSULTAN PERENCANA
2% 2%
10
IR. SITI ROCHAMAYANTI, MM
Datum Elv. +9.00 DIREKTUR
10.564
10.564
10.653
10.692
10.696
10.696
10.727
10.671
KODE SKALA
C.3 - 9 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
J
+0 ALA
DIPERIKSA OLEH :
KETUA TIM TEKNIS
.00 N
PAP
AD
AA
N
Dendy Kurniadi, ST, MT
NIP. 157504202005021001
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
J
MA ALA
+0 NT N
.00 U TE
IL MB
US IR. SITI ROCHAMAYANTI, MM
DIREKTUR
KO
Ahli Teknik Jalan Ir. Haris Budi Purwatjahjono
Ahli Sungai dan Joko Sutrisno, ST
TO AYU
Drainase
Ahli Arsitektur Kristieningsih, ST
Ahli Sanitasi
K dan Limbah
Ahli Perencanaan
Bagus Tri Buko N, ST
Rafik Hidayat
Wilayah Kota
Ahli Teknik Chusnan, ST
Air Minum
NAMA GAMBAR
DENAH
GERBANG KAWASAN
KODE SKALA
C.5 - 1 NTS
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
PERU
SAHA
AN R
OTAN
+0.00 N CITRA K
Dendy Kurniadi, ST, MT
JALA
NIP. 157504202005021001
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
ARYA
KONSULTAN PERENCANA
3.0000
NAMA GAMBAR
DENAH
GERBANG KAWASAN
KODE SKALA
C.5 - 2 NTS
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
1080 4000
PAKET PEKERJAAN
759 170
PERENCANAAN PENANGANAN
URUGAN PASIR 10 CM
ANGKUR BAUT M16
30 30
LANTAI KERJA 5 CM
450 75 175 DISETUJUI OLEH :
30 40 80 PEJABAT PEMBUAT KOMITMEN
150
Boby Ali Azhari, ST, M.Sc
300
600
NIP. 19700271998031003
DIKETAHUI OLEH :
150
+SEKRUP TANAM
NIP. 196803091989021002
TEMBAGA 2MM
LUBANG CAHAYA
3
1
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
4560
4520
4280
4000
4140
1425
1300
400
500
200
KONSULTAN PERENCANA
A
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
140
IR. SITI ROCHAMAYANTI, MM
DIREKTUR
250
Team Leader Ir. Martadi Raharjo, MT
140
Ahli Sungai dan
TUTUP SEALANT
Joko Sutrisno, ST
ARMATURE LAMPU
Drainase
GUTTER KABEL
Ahli Sanitasi
Bagus Tri Buko N, ST
dan Limbah
25X25 CM
A
NAMA GAMBAR
KODE SKALA
C.6 - 1 1 : 20
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
482
15 18 12 19 19 18 13 19 9 15 26 21 27 21 28 21 26 15 9 19 13 18 19 19 12 18 15
27
250
250
280
PAKET PEKERJAAN
30 19
PERENCANAAN PENANGANAN
13 13 12 12 13 11 18 15 18 18 15 18 11 13 12 12 13 13 KAWASAN PERMUKIMAN KUMUH
360
NIP. 196803091989021002
NIP.196502071992031006
KAYU SOLID
77 65 65 77 DIPERIKSA OLEH :
140
15
95
140
10
20 Dendy Kurniadi, ST, MT
NIP. 157504202005021001
140 250 140
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
PLAT BAJA 9MM KONSULTAN PERENCANA
905
PLAT TEMBAGA
PLAT SIRIP BAJA 9MM
TBL 1.8MM
FIN. CAT BESI
PONDASI (BY STRUCTURE) IR. SITI ROCHAMAYANTI, MM
400
Ahli Sanitasi
Bagus Tri Buko N, ST
dan Limbah
Ahli Perencanaan Rafik Hidayat
Wilayah Kota
284 284 284 284 Ahli Teknik Chusnan, ST
Air Minum
1136 NAMA GAMBAR
LANTAI KERJA 5 CM
URUGAN PASIR 10 CM
DETAIL PROFIL KAYU 1, 2, 3 DETAIL 1
150 250 150 DETAIL PLAT TEMBAGA PEDESTAL
550 LAMPU JALAN
KODE SKALA
C.6 - 2 1 : 10
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
KACA
10 800 10
35 150 150 35
60 60 PERKERASAN COBBLESTONE
AREA TITIK TANAM POHON BATU ANDESIT
20 30
150
150
PAKET PEKERJAAN
180
200
200
100
TANAH SUBUR PLAT LANTAI
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
50
20
PRIORITAS (P2KPKP) WILAYAH 2
100 100 KOTA BANJARMASIN
BATU SPLIT 5 CM
POTONGAN 2 720
15
AREA TITIK TANAM POHON
20 30
135
PLAT LANTAI NIP. 196803091989021002
100
TANAH SUBUR
NIP.196502071992031006
720
RING KEDUA
SEGMENT 2 SEGMENT 1
PENEMPATAN UP LIGHT
820 Dendy Kurniadi, ST, MT
800 NIP. 157504202005021001
10
KONSULTAN PERENCANA
40
R50
R50
100 100
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
R3
30
DIBUAT OLEH :
25 KONSULTAN PERENCANA
R2 TREE GRIILL ( BESI COR )
00
800 x 800mm-TEBAL 15 mm
35
FINISHING LAPISAN CAT DASAR ZINCROMAT
CAT BESI WARNA : ABU-ABU ( DOFF )
720
820
50 25 25 25 25
DIREKTUR
AREA TITIK TANAM POHON
Team Leader Ir. Martadi Raharjo, MT
R50
Chusnan, ST
Air Minum
10
NAMA GAMBAR
137 400 137
DENAH
RKL RING POHON (RP) KODE SKALA
00001 1 : 10
C.7 - 2 1:10
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
TALI PENGIKAT
Boby Ali Azhari, ST, M.Sc
NIP. 19700271998031003
E:\4. PROYEK 2018\15. PROYEK MAS BAGUS\DED KUMUH WISWA\## Paparan Kumuh 26 Nov 2018\2. Album Gambar\1. KUMUH BANJARMASIN\1. DED\1. KAWASAN MASJID\1. GAMBAR\POHON PINANG.jpg
PN PINANG DIKETAHUI OLEH :
( Areca catechu )
SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
3000
PENYANGGA/STEIGER
BAMBU Dendy Kurniadi, ST, MT
NIP. 157504202005021001
KONSULTAN PERENCANA
1500 D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
14
12
10 PAKET PEKERJAAN
PERENCANAAN PENANGANAN
Datum Elv. +9.00 KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
10.484
10.753
10.676
10.699
10.514
10.715
10.681
ELEVASI KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
22.8
JARAK 1292.6 95.6 89.0 89.9 270.2 1139.8
DIKETAHUI OLEH :
NIP. 196803091989021002
12 NIP.196502071992031006
JALAN RENCANA
DIPERIKSA OLEH :
2%
KETUA TIM TEKNIS
10
10.484
10.753
10.676
10.699
10.514
10.715
10.681
ELEVASI KONSULTAN PERENCANA
22.8
JARAK 1292.6 95.6 89.0 89.9 270.2 1139.8
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
CROSS SECTION RENCANA 0+000
SKALA 1 : 100
300
PASIR URUG KODE SKALA
P:2m 5 cm
50 E.3 - 1 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
BETON K.300
T : 15 cm
PLESTERAN 1 PC : 3 PS PLASTIK COR
ACIAN FULL 1,5 cm
30 LANTAI KERJA 5 cm
SIAR DALAM 1 PC : 2 PS PAKET PEKERJAAN
2% PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
15 PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
50 PEJABAT PEMBUAT KOMITMEN
BETON EKSISTING
URUGAN SIRTU 50 cm
30 Boby Ali Azhari, ST, M.Sc
NIP. 19700271998031003
DIKETAHUI OLEH :
120 180
PASIR URUG 300 SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
5 cm NIP. 196803091989021002
P:2m
BAPPEDA KOTA JAYAPURA
Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
30 300 NIP.196502071992031006
50 DIPERIKSA OLEH :
KETUA TIM TEKNIS
PLASTIK COR D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DETAIL JALAN 1
KODE SKALA
E.4 - 1 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
Wilayah Kota
RI
Ahli Teknik
SI
Chusnan, ST
Air Minum
BA
NAMA GAMBAR
N
TA
BA
GG. PAPADAAN 3
KODE SKALA
E.1 - 1 1 : 1000
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
LOKASI PEKERJAAN DISETUJUI OLEH :
IH
SIR
BA
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
12 DIBUAT OLEH :
KONSULTAN PERENCANA
12
10
IR. SITI ROCHAMAYANTI, MM
DIREKTUR
8
Team Leader Ir. Martadi Raharjo, MT
10.597
10.522
10.232
10.613
10.747
10.763
10.672
10.382
10.814
Chusnan, ST
Air Minum
ELEVASI RENCANA NAMA GAMBAR
E.2 - 1 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
12
10
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
Datum Elv. +9.00
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
10.284
10.294
10.498
10.649
10.664
10.339
10.262
10.663
ELEVASI KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
16.6
JARAK 292.6 559.3 479.1 61.9 87.0 94.6 1408.9
DIKETAHUI OLEH :
14
SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
12 NIP.196502071992031006
JALAN RENCANA
DIPERIKSA OLEH :
2%
KETUA TIM TEKNIS
10
10.294
10.498
10.649
10.664
10.339
10.262
10.663
ELEVASI
KONSULTAN PERENCANA
16.6
JARAK 292.6 559.3 479.1 61.9 87.0 94.6 1408.9 D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
CROSS SECTION RENCANA 0+010
SKALA 1 : 100
300
PASIR URUG KODE SKALA
P:2m 5 cm
50 E.3 - 2 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
12
10
PAKET PEKERJAAN
Datum Elv. +9.00 PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
10.024
10.074
10.463
10.035
10.035
10.630
PRIORITAS (P2KPKP) WILAYAH 2
10.613
10.612
ELEVASI KOTA BANJARMASIN
DISETUJUI OLEH :
17.9
JARAK PEJABAT PEMBUAT KOMITMEN
389.2 309.2 575.4 118.0 90.2 96.7 1403.4
DIKETAHUI OLEH :
14
SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
DIPERIKSA OLEH :
2% KETUA TIM TEKNIS
10
10.074
10.463
10.035
10.035
10.630
10.613
10.612
NIP. 157504202005021001
ELEVASI
KONSULTAN PERENCANA
17.9
JARAK 389.2 309.2 575.4 118.0 90.2 96.7 1403.4 D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
CROSS SECTION RENCANA 0+020
SKALA 1 : 100
300
PASIR URUG KODE SKALA
P:2m 5 cm
50 E.3 - 3 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
12
10
PAKET PEKERJAAN
10.394
10.594
10.457
10.095
10.088
10.597
10.602
10.362
PRIORITAS (P2KPKP) WILAYAH 2
10.124
10.141
ELEVASI KOTA BANJARMASIN
DISETUJUI OLEH :
JARAK PEJABAT PEMBUAT KOMITMEN
211.2 558.2 461.6 118.7
44.9 105.4 105.7 792.4 409.6
DIKETAHUI OLEH :
14
SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
12 NIP.196502071992031006
JALAN RENCANA
DIPERIKSA OLEH :
2%
KETUA TIM TEKNIS
10
10.394
10.594
10.457
10.095
10.088
10.597
10.602
10.362
10.124
NIP. 157504202005021001
10.141
ELEVASI
KONSULTAN PERENCANA
DIBUAT OLEH :
KONSULTAN PERENCANA
CROSS SECTION RENCANA 0+030
SKALA 1 : 100
300
PASIR URUG KODE SKALA
P:2m 5 cm
50 E.3 - 4 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
12
10
PAKET PEKERJAAN
10.224
10.407
10.524
10.472
10.407
PRIORITAS (P2KPKP) WILAYAH 2
10.222
10.269
10.523
10.522
10.155
10.150
ELEVASI KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
23.0
JARAK 78.5 1082.3 49.2 147.3 98.8 100.4 731.8 358.6
DIKETAHUI OLEH :
14
SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
12 NIP.196502071992031006
JALAN RENCANA
DIPERIKSA OLEH :
KETUA TIM TEKNIS
2%
10
10.224
10.407
10.524
10.472
10.407
10.222
10.269
10.523
10.522
NIP. 157504202005021001
10.155
10.150
ELEVASI
KONSULTAN PERENCANA
23.0
JARAK 78.5 1082.3 49.2 147.3 98.8 100.4 731.8 358.6 D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
CROSS SECTION RENCANA 0+040
SKALA 1 : 100
300
PASIR URUG KODE SKALA
P:2m 5 cm
50 E.3 - 5 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
12
10
PAKET PEKERJAAN
10.494
PRIORITAS (P2KPKP) WILAYAH 2
10.364
10.347
10.495
10.493
10.373
10.419
10.371
ELEVASI KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
27.3
23.8
JARAK 689.1 664.3 94.6 97.8 1033.2
DIKETAHUI OLEH :
14
SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
12 NIP.196502071992031006
JALAN RENCANA
DIPERIKSA OLEH :
KETUA TIM TEKNIS
2%
10
10.494
10.364
10.347
10.495
10.493
NIP. 157504202005021001
10.373
10.419
10.371
ELEVASI
KONSULTAN PERENCANA
27.3
23.8
JARAK 689.1 664.3 94.6 97.8 1033.2 D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
CROSS SECTION RENCANA 0+048
SKALA 1 : 100
300
PASIR URUG KODE SKALA
P:2m 5 cm
50 E.3 - 6 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
660
500
BERMOTOR Ir. Martadi Raharjo, MT
Team Leader
ELV +0.000
Ahli Teknik Jalan Ir. Haris Budi Purwatjahjono
Ahli Sungai dan Joko Sutrisno, ST
Drainase
Ahli Arsitektur Kristieningsih, ST
VEGETASI/ VEGETASI/ Ahli Sanitasi
Bagus Tri Buko N, ST
dan Limbah
RUMPUT RUMPUT Ahli Perencanaan Rafik Hidayat
Wilayah Kota
Ahli Teknik Chusnan, ST
300 500 300 3000 300 500 300 Air Minum
NAMA GAMBAR
5185
DENAH
GERBANG KAWASAN
KODE SKALA
E.5 - 2 1 : 30
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
200
LUBANG PLAT
140
6400 3 6400
6320 6320
2
6000 6000
PAKET PEKERJAAN
5700 5700
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
910
5200 5200 KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
4690 PAPAN 20X200MM
200
LUBANG KAYU
4400
NIP.196502071992031006
4780
2400 PAPAN KAYU 30X300MM 2400
DIPERIKSA OLEH :
CARRIAGE BOLT M22-170 KETUA TIM TEKNIS
660
1050
650
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
220
150 125
150 150
660 PENEBALAN BETON FIN ACI CAT EKSTERIOR
0 0
500 300 3000 300 500 200
500
4600 660
IR. SITI ROCHAMAYANTI, MM
DIREKTUR
E.5 - 3 1 : 40
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
D 19 D 19
SIKU 40.40.3
MUR BAUT M12
CARRIAGE BOLT M22-170
PAPAN 30X300MM
30 30 30 30 30
250
660
500
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
100 KAWASAN PERMUKIMAN KUMUH
300 PRIORITAS (P2KPKP) WILAYAH 2
530
KOTA BANJARMASIN
330
DISETUJUI OLEH :
40
PEJABAT PEMBUAT KOMITMEN
500
240
660 SIKU 40.40.3
Boby Ali Azhari, ST, M.Sc
NIP. 19700271998031003
40
DIKETAHUI OLEH :
MUR BAUT M12 PER 1MTR
BALOK STRUKTUR 320X330 SATKER PKP PROV. KALSEL
(BY STRUCTURE) CARRIAGE BOLT M22-170 Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
150
MUR BAUT M12 PAPAN 30X300MM CARRIAGE BOLT M22-170
KONSULTAN PERENCANA
207
500 D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
PLAT BETON 36CM BALOK STRUKTUR 320X330 PLAT BETON 4CM
(BY STRUCTURE) (BY STRUCTURE) (BY STRUCTURE)
276
530
330
Joko Sutrisno, ST
Drainase
Ahli Arsitektur Kristieningsih, ST
Ahli Sanitasi
Bagus Tri Buko N, ST
dan Limbah
Ahli Perencanaan Rafik Hidayat
Wilayah Kota
Ahli Teknik Chusnan, ST
Air Minum
NAMA GAMBAR
DETAIL POTONGAN 1, 2, 3, 4
GERBANG KAWASAN
KODE SKALA
E.5 - 4 1 : 10
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
660
150
PLAT BETON 15CM
(BY STRUCTURE)
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
800
300
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
1450
Boby Ali Azhari, ST, M.Sc
NIP. 19700271998031003
DIKETAHUI OLEH :
660
SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP.196502071992031006
DIPERIKSA OLEH :
500
500
KETUA TIM TEKNIS
DIBUAT OLEH :
KONSULTAN PERENCANA
D 16 - 15 D 16 - 15
2800
2800
2000
2000
IR. SITI ROCHAMAYANTI, MM
DIREKTUR
D 16 - 15 D 16 - 15 NAMA GAMBAR
200 100
KODE SKALA
E.5 - 5 1 : 30
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
615
RANGKA BESI SIKU 40.40.4
FIN CAT DUCO LETTER SIGN PLAT TEMBAGA
METAL SHEET 2MM
FINISH CAT DUCO
303 10 TEBAL LETTER 2CM 15
193 215 215 173 204 199
39
49
200
66
LUBANG
28 LAMPU
156
29 17 21 143 18 25 21 29 23 28 KACA KULIT JERUK
158 31 143 129 37 143 87 133 33 176 148 151 140 87 147 31 146 105 151 148 166 33 149 129 31 38 146 6MM
463
66
LUBANG
LAMPU
140
PAKET PEKERJAAN
180
163 PERENCANAAN PENANGANAN
73
393
146
175
40 33
245
273 PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
280
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
40
LETTER SIGN
METAL SHEET
RANGKA BESI SIKU 40.40.4 FINISH CAT DUCO
FIN CAT DUCO
303
TEBAL LETTER 4CM
10 15
Boby Ali Azhari, ST, M.Sc
193 215 215 173 204 199 FONT LETTER : COPPERPLATE GOTHIC BOLD NIP. 19700271998031003
TEBAL LETTER : 4 CM
39 TINGGI LETTER : 20 CM
BAHAN LETTER : METAL SHEET 1,8MM FIN DIKETAHUI OLEH :
200
200
DUCO MATT
BAHAN RANGKA : BAJA SIKU 40.40.4 MM DAN
RANGKA BESI SIKU 40.40.4 STRIP PLAT 30.3 MM SATKER PKP PROV. KALSEL
FIN CAT DUCO
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
28
29 17 21 143 18 25 21 29 23 28
158 31 143 129 37 143 87 133 33 176 148 151 140 87 147 31 146 105 151 148 166 33 149 129 31 38 146
BAPPEDA KOTA JAYAPURA
Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
140
NIP.196502071992031006
DIPERIKSA OLEH :
154
KONSULTAN PERENCANA
DIBUAT OLEH :
KONSULTAN PERENCANA
200
Rafik Hidayat
SIKU 20.20.2 + SCREW Wilayah Kota
Ahli Teknik Chusnan, ST
Air Minum
NAMA GAMBAR
TAMPAK DEPAN LETTER SIGN
BALOK BETON GERBANG DETAIL RANGKA DAN LETTER SIGN
DETAIL PEMASANGAN LETTER
SIGN GERBANG KAWASAN
KODE SKALA
E.5 - 7 1 : 30
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
DIKETAHUI OLEH :
615
NIP.196502071992031006
49
66
KONSULTAN PERENCANA
LUBANG D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
28 LAMPU
156
KACA KULIT JERUK
129 31 38 146 6MM DIBUAT OLEH :
KONSULTAN PERENCANA
463
5200
66
LUBANG
LAMPU
180
IR. SITI ROCHAMAYANTI, MM
DIREKTUR
73
393 Ahli Teknik Jalan Ir. Haris Budi Purwatjahjono
146
175 Ahli Sungai dan
40 33
Joko Sutrisno, ST
Drainase
245
Ahli Arsitektur Kristieningsih, ST
273 Ahli Sanitasi
Bagus Tri Buko N, ST
dan Limbah
Ahli Perencanaan Rafik Hidayat
Wilayah Kota
4400
280
Ahli Teknik Chusnan, ST
Air Minum
NAMA GAMBAR
DETAIL SAYAP
DETAIL ARMATUR LAMPU
40
GERBANG KAWASAN
KODE SKALA
E.5 - 6 1 : 10
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
J
+0 ALA
DIPERIKSA OLEH :
KETUA TIM TEKNIS
.00 N
PAP
AD
AA
N
Dendy Kurniadi, ST, MT
NIP. 157504202005021001
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
J
MA ALA
+0 NT N
.00 U TE
IL MB
US IR. SITI ROCHAMAYANTI, MM
DIREKTUR
KO
Ahli Teknik Jalan Ir. Haris Budi Purwatjahjono
Ahli Sungai dan Joko Sutrisno, ST
TO AYU
Drainase
Ahli Arsitektur Kristieningsih, ST
Ahli Sanitasi
K dan Limbah
Ahli Perencanaan
Bagus Tri Buko N, ST
Rafik Hidayat
Wilayah Kota
Ahli Teknik Chusnan, ST
Air Minum
NAMA GAMBAR
DENAH
GERBANG KAWASAN
KODE SKALA
E.5 - 1 NTS
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
1080 4000
PAKET PEKERJAAN
759 170
PERENCANAAN PENANGANAN
URUGAN PASIR 10 CM
ANGKUR BAUT M16
30 30
LANTAI KERJA 5 CM
450 75 175 DISETUJUI OLEH :
30 40 80 PEJABAT PEMBUAT KOMITMEN
150
Boby Ali Azhari, ST, M.Sc
300
600
NIP. 19700271998031003
DIKETAHUI OLEH :
150
+SEKRUP TANAM
NIP. 196803091989021002
TEMBAGA 2MM
LUBANG CAHAYA
3
1
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
4560
4520
4280
4000
4140
1425
1300
400
500
200
KONSULTAN PERENCANA
A
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
140
IR. SITI ROCHAMAYANTI, MM
DIREKTUR
250
Team Leader Ir. Martadi Raharjo, MT
140
Ahli Sungai dan
TUTUP SEALANT
Joko Sutrisno, ST
ARMATURE LAMPU
Drainase
GUTTER KABEL
Ahli Sanitasi
Bagus Tri Buko N, ST
dan Limbah
25X25 CM
A
NAMA GAMBAR
KODE SKALA
E.6 - 1 1:100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
482
15 18 12 19 19 18 13 19 9 15 26 21 27 21 28 21 26 15 9 19 13 18 19 19 12 18 15
27
250
250
280
PAKET PEKERJAAN
30 19
PERENCANAAN PENANGANAN
13 13 12 12 13 11 18 15 18 18 15 18 11 13 12 12 13 13 KAWASAN PERMUKIMAN KUMUH
360
NIP. 196803091989021002
NIP.196502071992031006
KAYU SOLID
77 65 65 77 DIPERIKSA OLEH :
140
15
95
140
10
20 Dendy Kurniadi, ST, MT
NIP. 157504202005021001
140 250 140
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
PLAT BAJA 9MM KONSULTAN PERENCANA
905
PLAT TEMBAGA
PLAT SIRIP BAJA 9MM
TBL 1.8MM
FIN. CAT BESI
PONDASI (BY STRUCTURE) IR. SITI ROCHAMAYANTI, MM
400
Ahli Sanitasi
Bagus Tri Buko N, ST
dan Limbah
Ahli Perencanaan Rafik Hidayat
Wilayah Kota
284 284 284 284 Ahli Teknik Chusnan, ST
Air Minum
1136 NAMA GAMBAR
LANTAI KERJA 5 CM
URUGAN PASIR 10 CM
DETAIL PROFIL KAYU 1, 2, 3 DETAIL 1
150 250 150 DETAIL PLAT TEMBAGA PEDESTAL
550 LAMPU JALAN
KODE SKALA
E.6 - 2 1:100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
KACA
10 800 10
35 150 150 35
60 60 PERKERASAN COBBLESTONE
AREA TITIK TANAM POHON BATU ANDESIT
20 30
150
150
PAKET PEKERJAAN
180
200
200
100
TANAH SUBUR PLAT LANTAI
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
50
20
PRIORITAS (P2KPKP) WILAYAH 2
100 100 KOTA BANJARMASIN
BATU SPLIT 5 CM
POTONGAN 2 720
15
AREA TITIK TANAM POHON
20 30
135
PLAT LANTAI NIP. 196803091989021002
100
TANAH SUBUR
NIP.196502071992031006
720
RING KEDUA
SEGMENT 2 SEGMENT 1
PENEMPATAN UP LIGHT
820 Dendy Kurniadi, ST, MT
800 NIP. 157504202005021001
10
KONSULTAN PERENCANA
40
R50
R50
100 100
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
R3
30
DIBUAT OLEH :
25 KONSULTAN PERENCANA
R2 TREE GRIILL ( BESI COR )
00
800 x 800mm-TEBAL 15 mm
35
FINISHING LAPISAN CAT DASAR ZINCROMAT
CAT BESI WARNA : ABU-ABU ( DOFF )
720
820
50 25 25 25 25
DIREKTUR
AREA TITIK TANAM POHON
Team Leader Ir. Martadi Raharjo, MT
R50
Chusnan, ST
Air Minum
10
NAMA GAMBAR
137 400 137
DENAH
RKL RING POHON (RP) KODE SKALA
00001 1 : 10
E.7 - 2 1:10
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
TALI PENGIKAT
Boby Ali Azhari, ST, M.Sc
NIP. 19700271998031003
E:\4. PROYEK 2018\15. PROYEK MAS BAGUS\DED KUMUH WISWA\## Paparan Kumuh 26 Nov 2018\2. Album Gambar\1. KUMUH BANJARMASIN\1. DED\1. KAWASAN MASJID\1. GAMBAR\POHON PINANG.jpg
PN PINANG DIKETAHUI OLEH :
( Areca catechu )
SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
3000
PENYANGGA/STEIGER
BAMBU Dendy Kurniadi, ST, MT
NIP. 157504202005021001
KONSULTAN PERENCANA
1500 D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
15 12
14 13 11 10
D:\1. Lokak\2017\6. BETING\3. GAMBAR\3\LIMBAH\5, 10\1. GAMBAR\maxresdefault.jpg
16 9
17 8 7
18 6
5
19 4
20 3
2
21
22
23
24
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
25 KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
IH
R
SI
BA
N
TA
NIP. 19700271998031003
NIP.196502071992031006
1. FADLI 5. M LAMRI
DIPERIKSA OLEH :
2. SURYANI 6. MUSLIM KETUA TIM TEKNIS
3. BASTIAN 7. MASNUN
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
LAYOUT SEPTIC 1
KODE SKALA
G.1.1 - 2 NTS
18
17
16
15
14 13 12 11 10 9
8 7
6
5
9 D:\1. Lokak\2017\6. BETING\3. GAMBAR\3\LIMBAH\5, 10\1. GAMBAR\maxresdefault.jpg
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
19 4
20 3
2
21
22
10
23
24 11 PAKET PEKERJAAN
PERENCANAAN PENANGANAN
25 KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
IH
R
SI
BA
N
TA
NIP. 19700271998031003
NIP. 196803091989021002
NAMA
BAPPEDA KOTA JAYAPURA
1. BARIAH 6. AGUS Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
NIP.196502071992031006
4. BAENAH 9. SUHADI
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
LAYOUT SEPTIC 10
KODE SKALA
G.1.1 - 11 NTS
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
15 12
14 13 11 10
D:\1. Lokak\2017\6. BETING\3. GAMBAR\3\LIMBAH\5, 10\1. GAMBAR\maxresdefault.jpg
16 9
17 8 7
18 6
5
19 4
20 3
2
21
23
22
11 10
24
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
25 KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
IH
R
SI
BA
N
TA
NIP. 19700271998031003
DIKETAHUI OLEH :
NO KAPASITAS VOLUME
SATKER PKP PROV. KALSEL
11 10 SR 5,4 M3 Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
DIPERIKSA OLEH :
2. ALIANSAH 7. RAHMAD KETUA TIM TEKNIS
3. LAILA 8. SEIUMAR
4. HALIM 9. LAMSAH
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
LAYOUT SEPTIC 11
KODE SKALA
G.1.1 - 12 NTS
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
15 12
14 13 11 10
D:\1. Lokak\2017\6. BETING\3. GAMBAR\3\LIMBAH\5, 10\1. GAMBAR\maxresdefault.jpg
16 9
17 8 7
18 6
5
19 4
20 3
2
21
22
23
24
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
25 KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
12
11
IH
R
SI
BA
N
TA
NIP. 19700271998031003
DIKETAHUI OLEH :
NO KAPASITAS VOLUME
SATKER PKP PROV. KALSEL
12 10 SR 5,4 M3 Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
NAMA
13
BAPPEDA KOTA JAYAPURA
Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
3. KHAIRUN 8. MASRANI
4. ESAH 9. BASRANI
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
14
IR. SITI ROCHAMAYANTI, MM
DIREKTUR
LAYOUT SEPTIC 12
KODE SKALA
G.1.1 - 13 NTS
12
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
15 12
13
11
14 11 10
D:\1. Lokak\2017\6. BETING\3. GAMBAR\3\LIMBAH\5, 10\1. GAMBAR\maxresdefault.jpg
16 9
17 8 7
18 6
5
19 4
20 3
2
21
22
23
24
13 PAKET PEKERJAAN
PERENCANAAN PENANGANAN
25 KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
IH
R
SI
BA
N
TA
NIP. 19700271998031003
DIKETAHUI OLEH :
NO KAPASITAS VOLUME
14
SATKER PKP PROV. KALSEL
13 10 SR 5,4 M3 Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
NAMA
BAPPEDA KOTA JAYAPURA
Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
3. SAINAH/AHAR 8. NO NAME
4. YUSUF 9. MASNUN
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
LAYOUT SEPTIC 13
KODE SKALA
G.1.1 - 14 NTS
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
16 12
15 12
14 13 11 10
D:\1. Lokak\2017\6. BETING\3. GAMBAR\3\LIMBAH\5, 10\1. GAMBAR\maxresdefault.jpg
16 9
17 8 7
18 6
5
19 4
20 3
2
21
15
22
23
24
25
13 PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PAKET PEKERJAAN
NIP. 19700271998031003
DIKETAHUI OLEH :
14
NIP. 196803091989021002
14 5 SR 2,8 M3
BAPPEDA KOTA JAYAPURA
Ir. A. Fanani Saifudin, SH
NAMA
.\fanani kadis perkim banjarmasin 2.jpeg
NIP.196502071992031006
2. FATIMAH 5. SALIANUR
3. YUSRAN
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
LAYOUT SEPTIC 14
KODE SKALA
G.1.1 - 15 NTS
17
16
15
14 13 12 11 10 9
8 7
16 12 D:\1. Lokak\2017\6. BETING\3. GAMBAR\3\LIMBAH\5, 10\1. GAMBAR\maxresdefault.jpg
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
18 6
5
19 4
20 3
2
15
21
22
23
24 13 PAKET PEKERJAAN
PERENCANAAN PENANGANAN
25 KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
IH
R
SI
BA
N
TA
NIP. 19700271998031003
DIKETAHUI OLEH :
NO KAPASITAS VOLUME
15 7 SR 5,4 M3 14 SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT
NIP. 196803091989021002
.\arkan banjarmasin 2.jpeg
NIP.196502071992031006
1. H. TAMRIN 5. HADRAN
DIPERIKSA OLEH :
2. SAIFUL ANWAR 6. IMRAN KETUA TIM TEKNIS
3. AHMAD 7. UMAR
4. USMAN
Dendy Kurniadi, ST, MT
NIP. 157504202005021001
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
LAYOUT SEPTIC 15
KODE SKALA
G.1.1 - 16 NTS
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
15 12
14 13 11 10
D:\1. Lokak\2017\6. BETING\3. GAMBAR\3\LIMBAH\5, 10\1. GAMBAR\maxresdefault.jpg
16 9
17 8 7
18 6
5
19 4
20 3
2
21
22
23
24
PAKET PEKERJAAN
25
16 PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
15
IH
R
SI
BA
N
TA
NIP. 19700271998031003
DIKETAHUI OLEH :
NO KAPASITAS VOLUME
SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NAMA
18
BAPPEDA KOTA JAYAPURA
Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
DIPERIKSA OLEH :
2. YANTI 6. SUPIANI KETUA TIM TEKNIS
3. H. MUHAMMAD
4. NARDI
7. NARDI / HUSNAINI
17
Dendy Kurniadi, ST, MT
NIP. 157504202005021001
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
LAYOUT SEPTIC 16
KODE SKALA
G.1.1 - 17 NTS
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
15 12
14 13 11 10
D:\1. Lokak\2017\6. BETING\3. GAMBAR\3\LIMBAH\5, 10\1. GAMBAR\maxresdefault.jpg
16 9
17 8 7
18 6
5
19 4
20 3
18
2
21
22
23
24
17 PAKET PEKERJAAN
PERENCANAAN PENANGANAN
25 KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
IH
R
SI
BA
N
TA
NIP. 19700271998031003
DIKETAHUI OLEH :
NO KAPASITAS VOLUME
SATKER PKP PROV. KALSEL
17 10 SR 5,4 M3 Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
NAMA
BAPPEDA KOTA JAYAPURA
Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
3. SAPARUDIN 8. KOSONG
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
LAYOUT SEPTIC 17
KODE SKALA
G.1.1 - 18 NTS
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
15 12
14 13 11 10
D:\1. Lokak\2017\6. BETING\3. GAMBAR\3\LIMBAH\5, 10\1. GAMBAR\maxresdefault.jpg
16 9
17 8 7
18 6
5
19 4
20 3
2
21
22
23
24
25
3 PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PAKET PEKERJAAN
NIP. 19700271998031003
DIKETAHUI OLEH :
NIP. 196803091989021002
2 6 SR 5,4 M3
NIP.196502071992031006
1. JARKASIH 4. ABDI SETIADI
DIPERIKSA OLEH :
KETUA TIM TEKNIS
2. JARMIDI 5. AHMADI
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
LAYOUT SEPTIC 2
KODE SKALA
G.1.1 - 3 NTS
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
15 12
14 13 11 10
D:\1. Lokak\2017\6. BETING\3. GAMBAR\3\LIMBAH\5, 10\1. GAMBAR\maxresdefault.jpg
16 9
17 8 7
18 6
5
19 4
20 3
2
21
22
23
24
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
25 KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
IH
R
SI
BA
N
TA
3
M
JE
NIP. 19700271998031003
DIKETAHUI OLEH :
NO KAPASITAS VOLUME
SATKER PKP PROV. KALSEL
3 10 SR 5,4 M3 Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
1. NANANG
NAMA
6. RUKAYAH
2 BAPPEDA KOTA JAYAPURA
Ir. A. Fanani Saifudin, SH
NIP.196502071992031006
.\fanani kadis perkim banjarmasin 2.jpeg
4. SARKANI 9. FAUZIAH
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
LAYOUT SEPTIC 3
KODE SKALA
G.1.1 - 4 NTS
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
15 12
14 13 11 10
D:\1. Lokak\2017\6. BETING\3. GAMBAR\3\LIMBAH\5, 10\1. GAMBAR\maxresdefault.jpg
16 9
17 8 7
18 6
5
19 4
20 3
2
21
22
23
24
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
25 KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
4
IH
R
SI
BA
N
TA
NIP. 19700271998031003
DIKETAHUI OLEH :
NO KAPASITAS VOLUME
SATKER PKP PROV. KALSEL
4 10 SR 5,4 M3 Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
NAMA
BAPPEDA KOTA JAYAPURA
Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
3. SAMSURI 8. FATIMAH
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
LAYOUT SEPTIC 4
KODE SKALA
G.1.1 - 5 NTS
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
15 12
14 13 11 10
D:\1. Lokak\2017\6. BETING\3. GAMBAR\3\LIMBAH\5, 10\1. GAMBAR\maxresdefault.jpg
16 9
17 8 7
18 6
5
19 4
20 3
2
21
22
23
24
PAKET PEKERJAAN
25
6 PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
7 DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
5
IH
R
SI
BA
N
TA
NIP. 19700271998031003
NIP. 196803091989021002
NAMA
BAPPEDA KOTA JAYAPURA
1. ASRIP 6. ARBAIN Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
NIP.196502071992031006
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
LAYOUT SEPTIC 5
KODE SKALA
G.1.1 - 6 NTS
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
15 12
14 13 11 10
D:\1. Lokak\2017\6. BETING\3. GAMBAR\3\LIMBAH\5, 10\1. GAMBAR\maxresdefault.jpg
16 9
17 8 7
18 6
5
19 4
20 3
2
21
22
23
24
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
8
25 KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
6
PEJABAT PEMBUAT KOMITMEN
7
IH
R
SI
BA
N
TA
NIP. 19700271998031003
NO KAPASITAS
6 10 SR
VOLUME
5,4 M3
5 SATKER PKP PROV. KALSEL
DIKETAHUI OLEH :
NIP. 196803091989021002
NAMA
BAPPEDA KOTA JAYAPURA
1. M YASIN 6. MARNI Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
NIP.196502071992031006
4. IMRAN 9. WAHID
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
LAYOUT SEPTIC 6
KODE SKALA
G.1.1 - 7 NTS
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
15 12
14 13 11 10
D:\1. Lokak\2017\6. BETING\3. GAMBAR\3\LIMBAH\5, 10\1. GAMBAR\maxresdefault.jpg
16 9
17 8 7
18 6
5
19 4
20 3
2
21
22
23
24
9 PAKET PEKERJAAN
PERENCANAAN PENANGANAN
25 KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
8
IH
R
SI
BA
N
TA
6
JE
NIP. 19700271998031003
DIKETAHUI OLEH :
NO KAPASITAS VOLUME
SATKER PKP PROV. KALSEL
7 10 SR
NAMA
5,4 M3
7 Arkan Yamri, ST, MT
NIP. 196803091989021002
.\arkan banjarmasin 2.jpeg
3. BURHAN 8. IDAH
4. NURIANSAH 9. PAI
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
LAYOUT SEPTIC 7
KODE SKALA
G.1.1 - 8 NTS
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
15 12
14 13 11 10
D:\1. Lokak\2017\6. BETING\3. GAMBAR\3\LIMBAH\5, 10\1. GAMBAR\maxresdefault.jpg
16 9
17 8 7
18 6
5
19 4
20 3
2
21
22
9
23
24
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
25 KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
8
IH
R
SI
BA
N
TA
NIP. 19700271998031003
DIKETAHUI OLEH :
NO KAPASITAS VOLUME
8 9 SR 5,4 M3 7 SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT
NIP. 196803091989021002
.\arkan banjarmasin 2.jpeg
NAMA
BAPPEDA KOTA JAYAPURA
1. PAHRUL Ir. A. Fanani Saifudin, SH
6. CEMIMIL
.\fanani kadis perkim banjarmasin 2.jpeg
NIP.196502071992031006
4. FATIMAH 9. MARNI
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
LAYOUT SEPTIC 8
KODE SKALA
G.1.1 - 9 NTS
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
15 12
14 13 11 10
D:\1. Lokak\2017\6. BETING\3. GAMBAR\3\LIMBAH\5, 10\1. GAMBAR\maxresdefault.jpg
16 9
17 8 7
18 6
5
19 4
20 3
2
21
22
23
9
24
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
25 KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
10
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
IH
R
SI
BA
N
TA
NIP. 19700271998031003
DIKETAHUI OLEH :
NO KAPASITAS VOLUME
SATKER PKP PROV. KALSEL
9 10 SR 5,4 M3 Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
NAMA
BAPPEDA KOTA JAYAPURA
Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
3. SAHLAN 8. CI IMUN
4. TAUFIK 9. UYAN
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
LAYOUT SEPTIC 9
KODE SKALA
G.1.1 - 10 NTS
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
15 12
14 13 11 10
16 9
17 8 7
18 6
5
19 PAKET PEKERJAAN
4
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
20 3 KOTA BANJARMASIN
2 DISETUJUI OLEH :
21 PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
23 NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
24 KETUA TIM TEKNIS
KONSULTAN PERENCANA
25
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
KODE SKALA
BA
M
JE
G.1.1 - 1 1 : 1000
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
1500
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
A
Boby Ali Azhari, ST, M.Sc
NIP. 19700271998031003
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
PLAT LANTAI
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
POTONGAN B-B DETAIL LANTAI FRP, KLOSET DETAIL LANTAI FRP, KLOSET,
DAN FLOORDRAIN
DAN FLOORDRAIN
skala 1 : 50 KODE SKALA
G.1.1 - 28 1 : 50
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
INPUT AIR LIMBAH DISETUJUI OLEH :
INPUT AIR LIMBAH TINJA INPUT AIR LIMBAH PEJABAT PEMBUAT KOMITMEN
CUCIAN
WASTAFEL
DIKETAHUI OLEH :
NIP.196502071992031006
BALOK RUMAH
TIANG KOLOM
C JALAN
DIPERIKSA OLEH :
KETUA TIM TEKNIS
TIANG KOLOM A
RUMAH PANGGUNG
TEE
100 x 100 mm 100 x 100 mm B TEE Y
CLAMP PIPA
TEE Y
100 x 100 mm 100 x 100 mm
100 x 100 mm
Dendy Kurniadi, ST, MT
NIP. 157504202005021001
TEE Y
150 x 100 mm
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
CLAMP PIPA
IR. SITI ROCHAMAYANTI, MM
DIREKTUR
PIPA PVC SDR 41
Team Leader Ir. Martadi Raharjo, MT
G.1.1 - 27 NTS
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
BALOK ULIN 5/7 BALOK ULIN 5/7 TIANG ULIN 10/10 KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
TIANG ULIN 10/10
BALOK ULIN 5/7
DENAH
IPAL BIOFIL 10 KK
KODE SKALA
G.1.1 - 35 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DISINFEKTAN TUBE
MANHOLE
50 CM
INLET
VENTILASI
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
MANHOLE
DISINFEKTAN TUBE DISETUJUI OLEH :
50 CM PEJABAT PEMBUAT KOMITMEN
INLET
CHECK VALVE
Boby Ali Azhari, ST, M.Sc
OUTLET NIP. 19700271998031003
DIKETAHUI OLEH :
NIP. 196803091989021002
CHECK VALVE
DIBUAT OLEH :
OUTLET KONSULTAN PERENCANA
KODE SKALA
G.1.1 - 34 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIKETAHUI OLEH :
NIP. 196803091989021002
SKALA 1:10
DETAIL C NIP.196502071992031006
Chusnan, ST
Air Minum
SKALA 1:10
NAMA GAMBAR
G.1.1 - 38 1 : 10
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIKETAHUI OLEH :
TIANG ULIN 10/10
SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
BALOK PENGUNCI D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
ULIN
DIBUAT OLEH :
KONSULTAN PERENCANA
DASAR SUNGAI DASAR SUNGAI
TAMPAK DEPAN
IPAL BIOFIL 10 KK
TAMPAK DEPAN IPAL BIOFIL 10 KK
SKALA 1:100 KODE SKALA
G.1.1 - 36 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DETAIL B
Boby Ali Azhari, ST, M.Sc
NIP. 19700271998031003
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
BALOK PENGUNCI D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
ULIN
DIBUAT OLEH :
KONSULTAN PERENCANA
DASAR SUNGAI DASAR SUNGAI
TAMPAK SAMPING
IPAL BIOFIL 10 KK
TAMPAK SAMPING IPAL BIOFIL 10 KK
SKALA 1:100 KODE SKALA
G.1.1 - 37 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
KODE SKALA
G.1.1 - 41 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
IPAL Biofil
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
KODE SKALA
G.1.1 - 39 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
IPAL Biofil
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
KODE SKALA
G.1.1 - 40 1 : 50
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
NAMA GAMBAR
R
SI
BA
KODE SKALA
JE
G.1.2 - 1 1 : 1000
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
KODE SKALA
G.1.2 - 2 1 : 50
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
GREASE TRAP
FIBERGLASS
KONSULTAN PERENCANA
TEE D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
KODE SKALA
G.1.2 - 3 NTS
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
TYPIKEL CLEANOUT
KODE SKALA
G.1.2 - 4 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
KODE SKALA
G.1.2 - 5 1 : 10
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
KOLOM 20 x 20 PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
14 05
KOTA BANJARMASIN
12
13 DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
10 11
02
1 INLET 01 03 04 05 05 06 07 08 09
Boby Ali Azhari, ST, M.Sc
NIP. 19700271998031003
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
4 2
5 2
DENAH 6
7
2
2
DIBUAT OLEH :
KONSULTAN PERENCANA
8 2
SEKALA : 1 : 25 9 6m
10 2
11 2 IR. SITI ROCHAMAYANTI, MM
DIREKTUR
12 -
13 1 Team Leader Ir. Martadi Raharjo, MT
KODE SKALA
G.1.2 - 6 1 : 25
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DETAIL PENULANGAN
SEKALA : 1 : 25
NATURAL SURFACE
RL. 108.800
CRUSHED ROCK PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
Lantai Kerja t = 10 cm
KODE SKALA
G.1.2 - 9 1 : 25
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
Kolom 20 x 20
D10-150
D10-150
Boby Ali Azhari, ST, M.Sc
D10-150
NIP. 19700271998031003
D10-150
D10-150
D10-150
DIKETAHUI OLEH :
NIP. 196803091989021002
D10-150
D10-150 D10-150
BAPPEDA KOTA JAYAPURA
D10-150 Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
KODE SKALA
G.1.2 - 10 1 : 25
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
18 CRUSHED ROCK
NATURAL SURFACE 21 20 21 20
RL. 108.800 10.166
PAKET PEKERJAAN
VERY HIGH LEVEL ALARM RL. 108.200 PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
23 03 19 DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
09 08 07 06 05 05 04
8.666
8.466
HIGH LEVEL ALARM RL. 102.550 Boby Ali Azhari, ST, M.Sc
8.166 NIP. 19700271998031003
DIKETAHUI OLEH :
VALVES SUPPORTS
17 DIPLASTER SEMEN DENGAN DI CAT
LAPISAN LUAR COALTAR EPOXY (2 LAPIS) SATKER PKP PROV. KALSEL
50 mm PVC PIPE WITH
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
02
NIP. 196803091989021002
DUCKBILL CHECK VALVE 11 10
FALL AT 1:10
13 12
BAPPEDA KOTA JAYAPURA
16 Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
8 2
9 1.5 m DIBUAT OLEH :
Lantai Kerja t = 10 cm KONSULTAN PERENCANA
10 1
11 1
12 1
13 1
14 1m IR. SITI ROCHAMAYANTI, MM
15 FLOAT SWITCH BAR 2 DIREKTUR
16 PUMP GUIDE RAILS 2 Pjg 5 m Ir. Martadi Raharjo, MT
Team Leader
17 PUMP LIFTING CHAIN - DOUBLE POINT LIFTING 2
Ahli Teknik Jalan Ir. Haris Budi Purwatjahjono
18 PANEL LISTRIK 1
Ahli Sungai dan Joko Sutrisno, ST
19 TANGGA - Drainase
20 TUTUP BETON Ahli Arsitektur Kristieningsih, ST
-
21 TULANGAN COR BETON Ahli Sanitasi
- Bagus Tri Buko N, ST
dan Limbah
22 1 Ahli Perencanaan Rafik Hidayat
Wilayah Kota
23 2
Ahli Teknik Chusnan, ST
Air Minum
NAMA GAMBAR
POTONGAN 1 - 1
SUMP PUMP
POTONGAN 1 - 1
SEKALA : 1 : 25 KODE SKALA
G.1.2 - 7 1 : 25
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
Dinding Beton t = 20 cm KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
Pompa Submersible
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
Lantai Kerja t = 10 cm
DIBUAT OLEH :
KONSULTAN PERENCANA
G.1.2 - 8 1 : 25
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
KODE SKALA
G.2 - 2 1 : 1000
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
15 12
HYDRANT SIAMESE 16 14 13 11 10 9
17 8 7
18 6
5
19
4
PAKET PEKERJAAN
20 3 PERENCANAAN PENANGANAN
2 KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
21 KOTA BANJARMASIN
DISETUJUI OLEH :
1 PEJABAT PEMBUAT KOMITMEN
22
DIKETAHUI OLEH :
23
SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
24 NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
Air Minum
SI
NAMA GAMBAR
BA
AN
HJYDRANT SIAMESE
M
JE
KODE SKALA
G.2 - 1 1 : 1000
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
120 D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
51 DIBUAT OLEH :
KONSULTAN PERENCANA
51
KODE SKALA
G.4 - 2 1 : 30
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
LAYOUT RENCANA
DRAINASE U-DITCH 40
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
dan Limbah
RI
Wilayah Kota
LAYOUT RENCANA DRAINASE
BA
NAMA GAMBAR
SKALA 1 : 1000
BA
M
JE
KODE SKALA
G.4 - 1 1 : 1000
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
LOKASI TPS
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
600
DIBUAT OLEH :
KONSULTAN PERENCANA
865
SKALA 1 : 100
SI
BA
KODE SKALA
M
JE
G.3 - 1 1 : 1000
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
LOKASI TPS
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
600 PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
2.9800 NIP.196502071992031006
DIPERIKSA OLEH :
3.4400
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
HYDRANT
HYDRANT PILLAR
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
HYDRANT BOX OUTDOOR D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
BOX VALVE PIPA HDPE PN 10 KONSULTAN PERENCANA
10 HYDRANT PILLAR
PIPA GIP A53 SCH 40 IR. SITI ROCHAMAYANTI, MM
TEE ALL FLANGE GI DIREKTUR
Rafik Hidayat
Wilayah Kota
70 Ahli Teknik
Air Minum
Chusnan, ST
NAMA GAMBAR
15 40 15
DETAIL CONNECTION
70 HYDRANT PILLAR
KODE SKALA
G.2 - 3 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
HYDRANT
HYDRANT SIAMESE
HYDRANT BOX OUTDOOR
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
CLAMP PIPA DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
HYDRANT BOX OUTDOOR
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
NAMA GAMBAR
DETAIL CONNECTION
HYDRANT SIAMESE DENGAN CLAMP
TEE ALL FLANGE GI
KODE SKALA
G.2 - 4 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
HYDRANT
HYDRANT SIAMESE
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
10 HYDRANT SIAMESE
IR. SITI ROCHAMAYANTI, MM
TEE ALL FLANGE GI DIREKTUR
G.2 - 5 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
SKALA 1 : 100
DENAH ATAP
KODE SKALA
G.3 - 5 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
SKALA 1 : 100
DENAH PONDASI DAN SLOOF
KODE SKALA
G.3 - 4 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
D C PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
B
SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
SKALA 1 : 100
DENAH TPS
KODE SKALA
G.3 - 3 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
URUGAN PASIR 5 D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
cm DIBUAT OLEH :
KONSULTAN PERENCANA
KOLOM 15/15
IR. SITI ROCHAMAYANTI, MM
DETAIL PONDASI DIREKTUR
NAMA GAMBAR
DETAIL
KODE SKALA
G.3 - 10 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
ATAP SPANDEK KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
RENG 0.45 KOTA BANJARMASIN
CHANAL DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
0.75.100
RING BALK 15/20
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
DIBUAT OLEH :
KONSULTAN PERENCANA
KODE SKALA
G.3 - 6 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
PAS BATU BATA
LANTAI BETON
KONTAINER 6 M3
URUGAN PASIR
10 cm
Dendy Kurniadi, ST, MT
SALURAN LEACHETE NIP. 157504202005021001
L = 7 cm, H = 10 cm
KONSULTAN PERENCANA
SLOOF 15/20
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
LANTAI BETON KONSULTAN PERENCANA
URUGAN PASIR 5 cm
POTONGAN B - B
KODE SKALA
G.3 - 7 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
GUNUNGAN RENG 0.45 CHANAL
PAS. BATA 0.75.100 PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KODE SKALA
G.3 - 8 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
DIBUAT OLEH :
LANTAI BETON KONSULTAN PERENCANA
URUGAN PASIR 5
cm
SKALA 1 : 100
POTONGAN D - D
KODE SKALA
G.3 - 9 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
KAYU PENYANGGA
JALAN TITIAN JALAN TITIAN
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
MUR BAUT
DIKETAHUI OLEH :
NIP. 196803091989021002
PIPA GIP A53 SCH 40
BAPPEDA KOTA JAYAPURA
Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
CLAMP PIPA
IR. SITI ROCHAMAYANTI, MM
DIREKTUR
KODE SKALA
G.2 - 6 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
15 BETON
Boby Ali Azhari, ST, M.Sc
NIP. 19700271998031003
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
80 DIPERIKSA OLEH :
URUGAN TANAH KETUA TIM TEKNIS
25 PILIHAN
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
10 URUGAN PASIR
DIBUAT OLEH :
KONSULTAN PERENCANA
Joko Sutrisno, ST
Drainase
Ahli Arsitektur Kristieningsih, ST
Ahli Sanitasi
Bagus Tri Buko N, ST
dan Limbah
Ahli Perencanaan Rafik Hidayat
Wilayah Kota
Ahli Teknik Chusnan, ST
Air Minum
NAMA GAMBAR
KODE SKALA
G.2 - 7 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
1200
40 55 300 300 300 300 55 40
55 40
PILE CAP 50/40 PILE CAP 50/40 PILE CAP 50/40 PILE CAP 50/40 PILE CAP 50/40
SLOOF 20/25 SLOOF 20/25 SLOOF 20/25 SLOOF 20/25 SLOOF 20/25
310
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
620
KOTA BANJARMASIN
PILE CAP 50/40 PILE CAP 50/40 PILE CAP 50/40 PILE CAP 50/40 PILE CAP 50/40 DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
SLOOF 20/25 SLOOF 20/25 SLOOF 20/25 SLOOF 20/25 SLOOF 20/25
135
310
240
105
Boby Ali Azhari, ST, M.Sc
NIP. 19700271998031003
40 55
40 55 300 300 300 300 55 40 187 190 SATKER PKP PROV. KALSEL
1200 473 Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
NIP.196502071992031006
SKALA 1 : 100
DIPERIKSA OLEH :
KETUA TIM TEKNIS
1200
40 55 300 300 300 300 55 40
NIP. 157504202005021001
55
SPUN PILE 30
P : 42 M KONSULTAN PERENCANA
KOLOM 25X25 KOLOM 25X25 KOLOM 25X25 KOLOM 25X25 KOLOM 25X25 D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
SLOOF 20/25 SLOOF 20/25 SLOOF 20/25 SLOOF 20/25 SLOOF 20/25
DIBUAT OLEH :
310
KONSULTAN PERENCANA
620
KOLOM 25X25
IR. SITI ROCHAMAYANTI, MM
KOLOM 25X25 KOLOM 25X25 KOLOM 25X25 KOLOM 25X25
DIREKTUR
SLOOF 20/25 SLOOF 20/25 SLOOF 20/25 SLOOF 20/25 SLOOF 20/25 Team Leader Ir. Martadi Raharjo, MT
135
310
240
A Ahli Sungai dan
Drainase
Joko Sutrisno, ST
Kristieningsih, ST
105
Ahli Arsitektur
Ahli Sanitasi
Bagus Tri Buko N, ST
dan Limbah
55
1200
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
1200
40 55 300 300 300 300 55 40
55 40
KOLOM 25X25 KOLOM 25X25 KOLOM 25X25 KOLOM 25X25 KOLOM 25X25
BALOK 20/25 BALOK 20/25 BALOK 20/25 BALOK 20/25 BALOK 20/25
310
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
620
KOTA BANJARMASIN
KOLOM 25X25 KOLOM 25X25 KOLOM 25X25 KOLOM 25X25 KOLOM 25X25 DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
BALOK 20/25 BALOK 20/25 BALOK 20/25 BALOK 20/25 BALOK 20/25
135
310
240
105
Boby Ali Azhari, ST, M.Sc
NIP. 19700271998031003
40 55
40 55 300 300 300 300 55 40 187 190 SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP.196502071992031006
SKALA 1 : 100
DIPERIKSA OLEH :
KETUA TIM TEKNIS
1200
40 55 300 300 300 300 55 40
Dendy Kurniadi, ST, MT
NIP. 157504202005021001
55 40
KONSULTAN PERENCANA
KOLOM 25X25 KOLOM 25X25 KOLOM 25X25 KOLOM 25X25 KOLOM 25X25 D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
RING BALK 15/20 RING BALK 15/20 RING BALK 15/20 RING BALK 15/20 RING BALK 15/20 DIBUAT OLEH :
310
KONSULTAN PERENCANA
620
135
Ahli Teknik Jalan Ir. Haris Budi Purwatjahjono
310
240
Joko Sutrisno, ST
Drainase
Ahli Arsitektur Kristieningsih, ST
105
Ahli Sanitasi
Bagus Tri Buko N, ST
dan Limbah
Ahli Perencanaan
40 55
Rafik Hidayat
Wilayah Kota
BALOK KAYU 8X12 Ahli Teknik Chusnan, ST
Air Minum
NAMA GAMBAR
40 55 300 300 300 300 55 40 187 190
1200 473
DENAH BALOK DAN RING BALK
DENAH RING BALK
PAUD BANJARMASIN KODE SKALA
SKALA 1 : 100
F.1 - 4 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
KODE SKALA
F.1 - 6 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
1200
40 55 300 300 300 300 55 40
40
55
SPUN PILE 30
P : 42 M
KOLOM 25X25
SLOOF 20/25
310
KAYU ULIN 4/20
620
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
135
310
240
105
Boby Ali Azhari, ST, M.Sc
55
NIP. 19700271998031003
BALOK KAYU 8X12
40
DIKETAHUI OLEH :
40 55 300 300 300 300 55 40 187 190
1200 473 SATKER PKP PROV. KALSEL
Arkan Yamri, ST, MT .\arkan banjarmasin 2.jpeg
NIP. 196803091989021002
NIP.196502071992031006
SKALA 1 : 100
DIPERIKSA OLEH :
KETUA TIM TEKNIS
1200
40 55 300 300 300 300 55 40
Dendy Kurniadi, ST, MT
NIP. 157504202005021001
55 40
KOLOM 25X25 D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
135
Ahli Teknik Jalan Ir. Haris Budi Purwatjahjono
310
240
Joko Sutrisno, ST
Drainase
Ahli Arsitektur Kristieningsih, ST
105
Ahli Sanitasi
Bagus Tri Buko N, ST
dan Limbah
Ahli Perencanaan
40 55
Rafik Hidayat
Wilayah Kota
BALOK KAYU 8X12 Ahli Teknik Chusnan, ST
Air Minum
NAMA GAMBAR
40 55 300 300 300 300 55 40 187 190
1200 473
DENAH LANTAI 1 DAN 2 PAUD
DENAH LANTAI 2
PAUD BANJARMASIN KODE SKALA
SKALA 1 : 100
F.1 - 5 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
LOKASI PEKERJAAN KAWASAN PERMUKIMAN KUMUH
RENCANA PAUD PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
Ahli Teknik
IR
Chusnan, ST
Air Minum
S
BA
NAMA GAMBAR
SKALA 1 : 1000
N
TA
BA
KODE SKALA
F.1 - 1
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
890 KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
20 NIP. 196803091989021002
BALOK 15/20
BAPPEDA KOTA JAYAPURA
Ir. A. Fanani Saifudin, SH .\fanani kadis perkim banjarmasin 2.jpeg
NIP.196502071992031006
KAYU ULIN 3/10
DIPERIKSA OLEH :
378 KETUA TIM TEKNIS
HOLLOW 60.40.12
96
Dendy Kurniadi, ST, MT
25 31 NIP. 157504202005021001
31
31 KONSULTAN PERENCANA
31
BALOK 20/25
31 D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
KOLOM 25/25 31
31 DIBUAT OLEH :
375 31 KONSULTAN PERENCANA
31
KAYU ULIN 4/20 KAYU ULIN 4/20 KAYU ULIN 4/20 KAYU ULIN 4/20 32
29
37
50 IR. SITI ROCHAMAYANTI, MM
SLOFF 20/25 SLOFF 20/25 SLOFF 20/25 SLOFF 20/25 PILE CAP 50/50 DIREKTUR
KAYU 6/12 KAYU 6/12 KAYU 6/12 KAYU 6/12
Team Leader Ir. Martadi Raharjo, MT
F.1 - 7 1 : 100
1200
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
1200
40 55 300 300 300 300 55 40
55 40
KUDA-KUDA
CHANAL 0.75.100
RENG 0.45
KUDA-KUDA
CHANAL 0.75.100 PAKET PEKERJAAN
PERENCANAAN PENANGANAN
310
RENG 0.45 KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
KUDA-KUDA
CHANAL 0.75.100 DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
620
RENG 0.45
KUDA-KUDA
CHANAL 0.75.100
Boby Ali Azhari, ST, M.Sc
310
NIP. 19700271998031003
RENG 0.45
DIKETAHUI OLEH :
NIP. 196803091989021002
RENG 0.45
40 55
NIP.196502071992031006
DIPERIKSA OLEH :
40 55 300 300 300 300 55 40 KETUA TIM TEKNIS
1200
KONSULTAN PERENCANA
D13-15
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
25
DIBUAT OLEH :
KONSULTAN PERENCANA
50
25
3D13
KOLOM (25/25)
SKALA 1 : 25 IR. SITI ROCHAMAYANTI, MM
25 50 DIREKTUR
F.1 - 9 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
ORNAMEN UKIRAN
KAYU
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
890
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
NIP.196502071992031006
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
325 KOLOM 25/25 KONSULTAN PERENCANA
KODE SKALA
POTONGAN B-B PAUD RENCANA
SKALA 1 : 100 F.1 - 8 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PAKET PEKERJAAN
PERENCANAAN PENANGANAN
KAWASAN PERMUKIMAN KUMUH
PRIORITAS (P2KPKP) WILAYAH 2
KOTA BANJARMASIN
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN
DIKETAHUI OLEH :
NIP. 196803091989021002
NIP.196502071992031006
DIPERIKSA OLEH :
KETUA TIM TEKNIS
KONSULTAN PERENCANA
D:\2018\2. Air Limbah\1. Kumuh\Kumuh 2\1. GAMBAR BASIRIH\5. JALAN BASIRIH\KOP PT SHIDDIQ SARANA MULYA- ISO 2018_001.jpg
DIBUAT OLEH :
KONSULTAN PERENCANA
NAMA GAMBAR
SKALA 1 : 100
KODE SKALA
F.1 - 2 1 : 100