OBM BAG FILTER REPAIR AND BAGS RENEWAL SCHEDULE

/5
S.NO ACTIVITY AGENCY Hours
8 9 10
1 Opening of Bagfilter doors, Air line pipes removal , Maintenance
2 Cleaning of tube sheet for clamps removal an inspection Operations
3 Removal of clamps from position and tube sheet inspection. Maint/ inspe
4 Removal of bags , checking and installing of new bags Operations
5 Tube sheet inspection and repair Maintenance
6 Studs fixing & Clamping of bags and air line fixing ,Box up Maintenance
7 air line pulsing checking. Instrumentation

ACTION PLAN TO REDUCE BAG FILTER DUST EMISSION


Following points to be attended to reduce the Dust emission from OBM Bag filter
1.     Out of 6 compartments 4 compartments locking plates are fixed completely till now.
2.     Each compartment is having 36 bags and 6th compartment is having only 12 bags.
3.     Out of total 192bags in ATA-19 operations checked & given only 60 no’s for renewal.
4.     As per present situation we required another 60 no’s new bags and cages to reduce the dust emission form
5.     Tube sheet to be completely checked once again and to be repaired if any minor damage observed.
6.     Air pulse system to be checked by instrumentation and pulsing time to be adjusted.
7.     On available of new Bags and cages we require 1 complete shift to attend the job.
-         All the bags to be removed from position, check and if damaged to be renewed with new o
-         Complete checking of tube sheet and in case of an cracks, holes observation repair to be d
-         Air pulsing time adjustment
EDULE
/5/2019
11 12 13 14 15 16 17 18 19

filter

dust emission form vent fan.


ge observed.

renewed with new one.


ation repair to be done.