– VISAKHAPATNAM
FORM-A
A. DETAILS OF PROPOSAL
1. Description of Equipment/Building layout/ : OBM TRUNION BEARING
Instrument/Process/Piping/Raw Material LUBRICATION PUMP FEED END SIDE
(EAST)
2 Is the change/modification, permanent or PERMANENT
temporary?
3. Description of the present condition: - 4 Description of the post condition: -
Present new lub oil pump was installed and . Before ATA-19 old pump was installed and
running at required pressure 28bar. running in good condition with sufficient
pressure.
5. Reason of Change/Modification? : Previous installed pump model was
obselated and spares were not available.
6. Are P & I diagram and/or standard operating N.A
parameters required to be changed?
B.AUTHORISATION
COMMENTS
HOD-Operations Date
Page 1 of 2
COROMANDEL INTERNATIONAL LTD. – VISAKHAPATNAM
FORM-A
C. COMPLETION REPORT
1. JOB COMPLETED
HOD-Operations Date
Page 2 of 2