Вы находитесь на странице: 1из 14

23/04/2017 originality report 18.10.2016 5­23­12 ­ final report.docx.

html

Plagiarism Detector v. 977 ­ Originality Report:
Analyzed document: 18­Oct­16 5:23:12 AM

"final report.docx"
Licensed to: Originality report generated by unregistered Demo version!
 
Warning: Demo Version ­ reports are
incomplete!

To get full version, please order the
software:

Relation chart:

Distribution graph:

Comparison Preset: Rewrite. Detected language: English
Top sources of plagiarism:
% 19 wrds: 2185 Demo mode! Please register!
% 7 wrds: 810 Demo mode! Please register!
% 7 wrds: 810 Demo mode! Please register!

file:///C:/Users/NILESH%20PADHIYAR/Documents/Plagiarism%20Detector%20reports/originality%20report%2018.10.2016%205­23­12%20­%20final%20rep… 1/14
23/04/2017 originality report 18.10.2016 5­23­12 ­ final report.docx.html

[Show other Sources:]

Processed resources details:
85 ­ Ok / 23 ­ Failed
[Show other Sources:]

Important notes:
Wikipedia: Google Books: Ghostwriting services: Anti­cheating:

Wiki Detected! GoogleBooks Detected! [not detected] [not detected]

Excluded Urls:

Included Urls:

Detailed document analysis:
"
WIRELESS ENERGY METER FOR CONSUMER UTILITY WITH BILLING SYSTEM"
A PROJECT REPORT Submitted by PADHIYAR NILESH
[130870111019]ARPIT PATEL
[130870111023]In partial fulfillment for the award of the degree Of BACHELOR OF ENGINEERING In
ELECTRONICS AND COMMUNCIATION ENGINEERING PARUL INSTITUTE OF TECHNOLOGY, LIMDA
Gujarat Technological University, Ahmedabad NOVEMBER, 2016 Parul Institute of Engineering, Vadodara
Electronics and Communication Engineering November, 2016. CERTIFICATE Date: This is to certify that the
dissertation entitled "A WIRELESS ENERGY METER FOR CONSUMER UTILITY WITH BILLING SYSTEM" has
been carried out by " PADHIYAR NILESH [130870111019]" under my guidance in fulfillment of the degree of
Bachelor of Engineering in 7th Semester of Gujarat Technological University, Ahmedabad during the academic
year 2016­17. Internal Guide
:Head of the DepartmentMrs. Priyanka Shah
Mr. Haresh Suthar,(Asst. Prof., E&C Dept
.)HOD, E&C Dept.,Parul Institute of Engineering, Vadodara Electronics and Communication Engineering
November, 2016. CERTIFICATE Date: This is to certify that the dissertation entitled
Referenced: 37
Quotes detected: 0.09% of this doc is quoted by quote signs: Type: regular
Size: 10 words

"A WIRELESS ENERGY METER FOR CONSUMER UTILITY WITH BILLING SYSTEM"

[Incomplete report data! Please purchase the software to get complete Report!]

 
Warning: Demo Version ­ reports are incomplete!

To get full version, please order the software:

file:///C:/Users/NILESH%20PADHIYAR/Documents/Plagiarism%20Detector%20reports/originality%20report%2018.10.2016%205­23­12%20­%20final%20rep… 2/14
23/04/2017 originality report 18.10.2016 5­23­12 ­ final report.docx.html

has been carried out by "PATEL ARPIT [130870111023]" under my guidance in fulfillment of the degree of
Bachelor of Engineering in 7th Semester of Gujarat Technological University, Ahmedabad during the academic
year 2016­17. Internal Guide :Head of the DepartmentMrs. Priyanka shah Mr. Haresh Suthar,(Asst. Prof., E&C
Dept .)HOD, E&C Dept.,ACKNOWLEDGEMENT We are very thankful to the almighty, whose blessing helped
us a lot to make our effort successful. Thanks to our parents who inspired us to go ahead in our work, it is our
pleasure to take this opportunity to thank one and all those who have directly or indirectly helped us in our
project. We are extremely grateful to our interna l project guide Mrs. Priyanka Shah for her excellent guidance,
valuable suggestion and encouragement to carry out this project. We are highly indeb t to our Head of
Department Mr. Haresh Suthar for providing us this opportunity to prepare this project. We would also like to
thank the entire staff of Electronics and Communication department especially to our teachers who were always
there to support us . Finally, we would like to express our deep sense of gratitude for all our classmate and
Friends who have supported and enriched us by sharing their ideas and solving out our doubts having
discussion with us. NILESH PADHIYAR [130870111019]ARPIT PATEL [130870111023]I ABSTRACT Today the
energy meter which is placed in the home/office collects the data of the energy consumed and displays it on
either a number dial or digital display. At the end of every month the person from service provider has to visit
the place where the meter is placed to get the reading and to note it down for further bill generation and after
that for bill payment is another trouble .we have to stand in long lines which consume more time. The present
system of energy billing is error prone and also time consumingSo in order to overcome ab ove problem we
have designed this prototype name "WIRELESS ENERGY METER FOR CONSUMER UTILITY WITH BILLING
SYSTEM " System which we are making is appropriate for manufacturing plants, Industries, Buildings. This
system will provides the centralized Power Monitoring and Control for the electricity department and easy bill
payment for the customers.II TABLE OF CONTENTS ACKNOWLEDGEMENT IABSTRACT IITABLE OF
CONTENTS IIILIST OF FIGURES VChapter 1 INTRODUCTION1Chapter 2 LITERATURE SURVEY4Chapte r
3BLOCK DIAGRAM7C hapter 4HARDWARE DESCRIPTION94.1 ARDUINO UNO
MICROCONTROLLER104.1.1 BRIEF DETAIL114.1.2 POWER114.1.3 MEMORY124.1.4 INPUT AND
OUTPUT124.1.5 FUNCTIONS124.2 BLUETOOTH(HC­05) 134.3 5V POWER SUPPLY 144.4 Energy meter
164.5 RELAY 18III Ch apter 5 SOFTWARE REQUIREMENT205.1 ARDUINO IDE 21Chapter 6 SUMMARY OF
RESULT 236.1 LIMITATONS OF EXISTING SYSTEM246.2 ADVANTAGES246.3 APPLICATION24Chapter 7
CONCLUSION 25REFERENCES APPENDIX 1: CANVAS APPENDIX 2: PPR APPENDIX 3: PSAR IV LIST OF
FIGURES Fig. No. 3.1 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.10 5.1 Details B lock diagram of Hardware
PartArduino Uno board Arduino detailed description Bluetooth device 7805 voltage regulator IC Transformer
Rectifire circuit Diagram of power supply Main parts of energy meter Physical energy meter Relay Arduino ide
home screen Pg. No 8 10 12 13 14 14 14 15 17 17 18 21 V WIRELESS ENERGY METER FOR CONSUMER
UTILITY WITH BILLING SYSTEM CHAPTER: 1 INTRODUCTION Parul Institute of technology Page
1WIRELESS ENERGY METER FOR CONSUMER UTILITY WITH BILLING SYSTEM The Utility meters are
used to monitor the consumption of water, gas or electricity. They differ in terms of measurement technology
and user interface Utility meters with digital readouts are also available. In general billing system there is so
many errors like it takes much time for human operator to visit houses and take readings from every single unit
of society and calculate it for further bill generation plus users can not know its current state bill at time they
wants they have to wait for month. after bill generation there is another problem of payment of bill.So we are
designing a system for electrical billing that will replace conventional meters with the GSM digital meter which
will overcome errors occurred in regular system including time consumption ,human error, overall cost. This
system is microcontroller based with GSM and smartcard . The working and objective of system as follows:­
BILL GENERATION:­ The energy meter records the amount of energy consumed by the load. energy meter
works on by current increment in amount of current flow through circuit which causes the disc rotatetion, means
that the speed of disc is directly proportional to the value of current flowing through circuit. In regular type of
meter have a blinking led for the counting the pulses from this LED are fed to controller for count operation.
Then pulses are sent to the controller and these readings are stored into EEPROM of the micro controller. GSM
module is connected to microcontroller that will send this readings to user as SMS . In our proje ct bill will be
generate twice. We have also ensured that the readings should send to G.E.B at some instant of time with the
help of Bluetooth modem. So there will no data tempering. Per week Bill Generation :­in our system the
electricity consumed by user in week willcalculate and send to user as SMS with the help of gsm module , so
user can control itsconsumption according to its need. Thus our system will be so beneficial in electricity saving
.This system will be more helpful to middle class family as they can save money by controlling their use. Per
file:///C:/Users/NILESH%20PADHIYAR/Documents/Plagiarism%20Detector%20reports/originality%20report%2018.10.2016%205­23­12%20­%20final%20rep… 3/14
23/04/2017 originality report 18.10.2016 5­23­12 ­ final report.docx.html

month Bill Generation:­ At the end of month the total energy consumed by user willbe calculate and send to
user via SMS that user should have to pay before specific time. Parul Institute of technologyPage 2WIRELESS
ENERGY METER FOR CONSUMER UTILITY WITH BILLING SYSTEM BILL PAYMENT :­Once Billing Process
is done and user gets the message. user can pay his bill at home with use of smart card. A smart card is an IC
card that creates a part of a circuit or system when engaged with a smart card in terface. In our Project we are
using RFID CARD as Smart card whichis prepaid. User can swipe card and pay his bill. Advantages of
prepayment:­ Payment before use No need to bill produce No need of bill distribution No need to chase people
for payments We can Reduce usage when income is tight Saves energy No bills No billing errors by human
operators Time saving Less human efforts Parul Institute of technologyPage 3WIRELESS ENERGY METER
FOR CONSUMER UTILITY WITH BILLING SYSTEM CHAPTER:2 LITERATURE SURVEY Parul Institute of
technology Page 4 WIRELESS ENERGY METER FOR CONSUMER UTILITY WITH BILLING SYSTEM [I]
Paper 1Title :­ " GSM Based Automatic Wireless Energy Meter Reading System". P. Harish M.Tech, and S.
Sandeep M.Tech, Asst.Professor, International Journal of Engineering Research & Technology (IJERT), ISSN:
2278­0181 ,Vol. 1 Issue 9, November­ 2012.   In their paper they have used A GSM modem is connected to
the energy meter with sim card. The the current usage and units consumed is display on LCD  For every 30
days the bill is sends to the electricity board office using GSM  The paper provides a information about how
they had used PIC 16F877A Microcontroller and serially communicated with electric board.[II] Paper 2 Title :"
Smart and Intelligent GSM based Automatic Meter Reading System", Abhinandan Jain Dilip Kumar, Jyoti Kedia
, International Journal of Engineering Research & Technology (IJERT) ISSN: 2278­0181,Vol. 1 Issue 3, May ­
2012.  In This development of a fully Automated Energy Meter having capabilities like remote monitoring and
control of energy meter is shown.   In their project companies can disconnect the power of customer who are
unable to pay bill at given time , after payment companies can reconnect the supply.  In their system also gives
the power cut information and tempering alert. So their system are more helpful to electrical boards to know
activity of particular unit wirelessly.Parul Institute of technology Page 5WIRELESS ENERGY METER FOR
CONSUMER UTILITY WITH BILLING SYSTEM [III] Paper 3 Title :­" Wireless Energy Meter and Billing via
SMS", P.V. Santhoshi Roja, B. Kiran Babu, V. Samson Deva Kumar, International Journal of Science and
Research (IJSR), India Online ISSN: 2319­7064 .   In this system they gave a unique Id number to every unit
.The ID number is linked to SIM card service number which is unique   The SMS is sent to 3 prespecified
phone numbers saved in the microcontroller. The meter reading is stored in database server with thee help of
SMS gateway.  meter also sends the information of the power load, power cut,, and energy provider can also
cut the connection if customer does not require the connection through SMS request.[IV] Paper 4 Title :"GSM
BASED AUTOMATIC ENERGY METER READING WITH LOAD CONTROL", Praveenkumar H S, Rakesh B S,
Preeta P S, International Journal of Science, Engineering and Technology Research (IJSETR), Volume 4, Issue
5, May 2015.    in their research paper we found data about energy consumption by india in
2007.Energy generated by the Coal account for nearly 40 percent   About 30 percent of India's total energy
needs are met through imports.   The goal of this project is to Remote Network Monitoring and control of the
Energy meter. So energy theft can be eliminated. They have used KEIL μVision3 and flash magic for
programing and loading purpose. Parul Institute of technologyPage 6 WIRELESS ENERGY METER FOR
CONSUMER UTILITY WITH BILLING SYSTEM CHAPTER: 3 BLOCK DIAGRAM Parul Institute of technology
Page 7WIRELESS ENERGY METER FOR CONSUMER UTILITY WITH BILLING SYSTEM Figure 3.1 Block
Diagram of hardware part Parul Institute of technologyPage 8WIRELESS ENERGY METER FOR CONSUMER
UTILITY WITH BILLING SYSTEM CHAPTER:4 HARDWARE DESCRIPTION Parul Institute of technologyPage
9WIRELESS ENERGY METER FOR CONSUMER UTILITY WITH BILLING SYSTEM 4.1 ARDUINO UNO
MICROCONTROLLER The Arduino Uno is a based on the ATmega328. It has 14 digital i/o pins, 6 analog
inputs, a 16 MHz resonator, , a power jack, an ICSP header, a USB connection and a reset button. It have
everything that supports the microcontroller; we can connect it to computer with USB cable with an AC­to­DC
adapter or battery to get started. it doesn't use the FTDI USB to­serial driver chip that is something different in
UNO. Instead, it features up to version R2 programmed as a USB­to­serial converter. "Uno" is Italian word and
is named to indicate the upcoming version of Arduino 1.0.The Uno and version 1.0 will be the reference
versions of Arduino Figure 4.1 Arduino Uno Board Parul Institute of technologyPage 10WIRELESS ENERGY
METER FOR CONSUMER UTILITY WITH BILLING SYSTEM 4.1.1 BRIEF DETAILS   Microcontroller
Operating Voltage  Input Voltage (recommended)   Input Voltage (limits)  Digital I/O Pins  Analog Input
Pins  DC Current per I/O Pin  DC Current for 3.3V Pin   Flash Memory  SRAM  EEPROM  Clock
Speed4.1.2 POWER :ATmega ­328:5V olts:7­12V olts:6­20V olts:14 (of which 6 provide PWM output) :6:40 mA
:50 mA :32 KB of which 0.5 KB used by Bootloader :2 KB :1 KB :16 MHz The Ar duino board can be powered
with USB connection or with an power supply. The power source is selected automatically. External power we
can use either AC­to­DC adapter or battery. The adapter can be directly connected by plugging a middle­
positive plug into the board's power jack. Leads of a battery can be inserted in the Ground and Vin pin headers
of the POWER connector. This board can operate on an external power supply of 6 to 20 volts. If supplied with
less than 7Volts , however, the 5volt pin may supply less than five volts and the Arduino board may be unstable.
file:///C:/Users/NILESH%20PADHIYAR/Documents/Plagiarism%20Detector%20reports/originality%20report%2018.10.2016%205­23­12%20­%20final%20rep… 4/14
23/04/2017 originality report 18.10.2016 5­23­12 ­ final report.docx.html

If we using more than 12Volts, the voltage regulator IC may overheat and damage the whole board. The
recommended voltage range is from 7 to 12 volts. Parul Institute of technologyPage 11 WIRELESS ENERGY
METER FOR CONSUMER UTILITY WITH BILLING SYSTEM Figure 4.2 Arduino detail description4.1.3
MEMORY The ATmega328 has 32 K iloByte in which 0.5 KB used for boot loader. It also has 2 KiloByte
ofSRAM and 1 KB of EEPROM which can be read and written with the EEPROM library.4.1.4 INPUT AND
OUTPUT All of the 14 digital pins of the Unoboard can be used as an input / output, using pin Mode(),D igital
Write(), and digital Read() functions. They all are operate at 5 volts. Every pin can provideor receive a max 40
mA and has an internal pull­up resistor which are disconnected initially of 20­50 k Ohms. plus some pins have
specialized4.1.5 FUNCTIONS   Serial: 0 (RX) and 1 (TX). It is Used to receive (RX) and transmit (TX) TTL
serial data.   External Interrupts: 2 and 3. These pins are configured to trigger an interrupt on a low value, a
rising or falling edge, or a change in value.  PWM: 3, 5, 6, 9, 10, and 11. Provide 8­bit PWM output with the
help of analog Write() function. These all pins support SPI communication using the SPI library.   LED: There
is a built­in LED connected to digital pin 13. When the pin is HIGH value, the LED is on, when the pin is LOW,
it's off.   Reset. Bring this line LOW to reset the microcontroller. Typically used to add a reset button to shields
which block the one on the board. Parul Institute of technologyPage 12WIRELESS ENERGY METER FOR
CONSUMER UTILITY WITH BILLING SYSTEM 4.2 BLUETOOTHThis Bluetooth module allow you to wireless
transmit & receive serial data. It is a used as replacement for wired serial connections which allow transparent
2way data communication. we can use it for serial port replacement and to establish connection between MCU
and PC for data transfering. This modem operates on 5Volts and it has LED indication and 3V regulator
onboard. FEATURES   5V power operation  UART interface  10 meters range  Easy to use  Minimum
External Components  Status LED  Configuration ButtonAPPLICATIONS   Wireless Telemetry  Remote
Data logging  RoboticsFigure 4.4 Bluetooth device Parul Institute of technologyPage 13 WIRELESS ENERGY
METER FOR CONSUMER UTILITY WITH BILLING SYSTEM 4.3 POWER SUPPLY : The Power supply is
made up of transformer, rectifier circuit, ic7805(voltage regulator),some resistors and capacitors . in our project
we need 3 different volts for different peripheral which are going to be connect with controller . so first
transformer will stepdown 240V and after rectification the output will be 12V, after that passing through
capacitor and ic 7805 output will be stedy 5Volt DC.Figure 4.4 7805 Voltage regulator IC Figure 4.5 transformer
Figure 4.6 rectifire circuit Parul Institute of technologyPage 14WIRELESS ENERGY METER FOR CONSUMER
UTILITY WITH BILLING SYSTEM Figure 4.7 Circuit diagram of 5V power supply Parul Institute of
technologyPage 15 WIRELESS ENERGY METER FOR CONSUMER UTILITY WITH BILLING SYSTEM 4.4
Energy Meter: ­ Energy meter is a device which measures electrical energy in terms of watt/hour.it is an
alsoKnown as watt­hour meter. The energy meter is single phase induction type to measureelectrical energy
consumed in home and commercial institutes. It consist s of moving system, braking system, driving system
and registering system they are explained below .Driving system: ­ The unit of energy meter has two silicon
steel laminated electromagnets in which one isseries magnet and other is shunt magnet. The series magnet M1
carries a coil having of a few turns of thick wire called as current coil. The shunt magnet M2 carries a coil
having many turns of thin wire called as voltage coilMoving system: ­ The moving system of meter consists of a
thin aluminum disc on a spindle and it is placed in airgap between the series and shunt magnet. It cuts the flux
of both magnetso forces are producedby the fluxes of each magnets with the eddy current induced in disc by
the flux of other magnets.Braking system: ­ braking system have a permanent magnet known as brake magnet.
It is placed near the edgeof the disc as the disc rotates in the field of brake magnet eddy current are induced in
it. Theeddies current will react with the flux and exert a torque. The torque acts in direction so it oppose motion
of disc. braking torque is proportional to the speed of disc.Registering system: ­ D isc spindle is connected to a
counting mechanism.This mechanism records a number which is proportio nal to the number of rotation of the
disc the counter is calibrated to indicate the energy con sumed directly in (kWh) Parul Institute of
technologyPage 16WIRELESS ENERGY METER FOR CONSUMER UTILITY WITH BILLING SYSTEM Fig 4.8
Diagram of the main parts of energy meter Fig 4.9 Diagram of the energy meterParul I nstitute of
technologyPage 17WIRELESS ENERGY METER FOR CONSUMER UTILITY WITH BILLING SYSTEM 4.5
RELAYRel ay is an electromagnetic device. That is used to isolate two circuit electrically and connect them
magnetically. Relay is very useful device and it allow one circuit to switch another circuit while they are
completely separate. They are sometimes used to interface an electronic circuit to an electrical circuit which
works at very high voltage Thus a small sensor circuit can drive, say, a pc or bulb. R elay switch can is divided
into two parts: input and output. The input has a coil. coil generates magnetic field when a small voltage from
an electronic circuit is applied to it. This is called the operating voltage. Commonly we use relays with voltages
like 6Volts, 12V, etc. The output section consists of contactors which connect or disconnect mechanically. In a
relay there are 3 contactors: normally open , normally closed and common . when there s no the COM is
connected to NC. When operating voltage is applied the relay coil gets energized and the COM changes
contact to NO. Different relay types are available like SPST, SPDT, and DPDT , which have different number
contacts. With using proper combination of contactors, electrical circuit can be switched on and off. Now more
details about structure of a relay switch. Figure 4.10 RELAYParul Institute of technologyPage 18 WIRELESS
file:///C:/Users/NILESH%20PADHIYAR/Documents/Plagiarism%20Detector%20reports/originality%20report%2018.10.2016%205­23­12%20­%20final%20rep… 5/14
23/04/2017 originality report 18.10.2016 5­23­12 ­ final report.docx.html

ENERGY METER FOR CONSUMER UTILITY WITH BILLING SYSTEM 4.5.1 Pole and Throw Since relays are
switches, the terminology applied to switches is also applied to relays; a relay switches one or more poles, each
of whose contacts can be thrown by energizing the coil.Normally open (NO) contacts connect the circuit when
the relay is activated; the circuit is disconnected when the relay is inactive. It is also called a "Form A" contact
or "make" contact. NO contacts may also be distinguished as "early­make" or "NOEM", which means that the
contacts close before the button or switch is fully engaged. Normally closed (NC) contacts disconnect the circuit
when the relay is activated; the circuit is connected when the relay is inactive. It is also called a "Form B"
contact or "break" contact. NC contacts may also be distinguished as "late­break" or "NCLB", which means that
the contacts stay closed until the button or switch is fully disengaged. Change­over (CO), or double­throw (DT),
contacts control two circuits: one normally open contact and one normally closed contact with a common
terminal. It is also called a "Form C" contact or "transfer" contact ("break before make"). If this type of contact
has a "make before break" action, then it is called a "Form D" contact. The following designations are
commonly encountered:   SPST ­ Single Pole Single Throw. These have two terminals which can be
connected or disconnected. Including two for the coil, such a relay has four terminals in total. It is ambiguous
whether the pole is normally open or normally closed. The terminology "SPNO" and "SPNC" is sometimes used
to resolve the ambiguity.   SPDT ­ Single Pole Double Throw. A common terminal connects to either of two
others. Including two for the coil, such a relay has five terminals in total.   DPST ­ Double Pole Single Throw.
These have two pairs of terminals. Equivalent to two SPST switches or relays actuated by a single coil.
Including two for the coil, such a relay has six terminals in total. The poles may be Form A or Form B (or one of
each).   DPDT ­ Double Pole Double Throw. These have two rows of change­over terminals. Equivalent to two
SPDT switches or relays actuated by a single coil. Such a relay has eight terminals, including the coil. Parul
Institute of technologyPage 19 WIRELESS ENERGY METER FOR CONSUMER UTILITY WITH BILLING
SYSTEM CHAPTER: 5 SOFTWARE REQUIREMENT Parul Institute of technologyPage 20 WIRELESS
ENERGY METER FOR CONSUMER UTILITY WITH BILLING SYSTEM5.1 ARDUINO IDEThe Arduino
Integrated Development Environment (IDE) is a application which is written in Java, and came from the IDE for
the Processing programming language and the Wiring projects. IDE is designed to introduce programming to
artists and other newcomers unfamiliar with software development. It have a code editor with some features
such as brace matching, and automatic indentation, syntax highlighting. IDE is capable of compiling and
uploading programs to the board with a single click. A program or code written for Arduino is called a "sketch".
We use C or C++ for writin in IDE . it has software library called "Wiring" from the original Wiring project, which
makes many common input/output operations much easier. We need only to define two functions to make an
executive program:   setup(): a function run once at the start of a program that can initialize settings   loop(): a
function called repeatedly until the board powers off Figure 5.1 Arduino ide home screen and its description
Parul Institute of technologyPage 21WIRELESS ENERGY METER FOR CONSUMER UTILITY WITH BILLING
SYSTEM Arduino boards in now days contain LED and a load resistor connected between the pin 13 and
ground, which is a helpfull feature for many simple tests The previous code would not be seen by a standard
C++ compiler as a valid program, so when the user clicks the "Upload to I/O board" button in the IDE, a copy of
the code is written to a temporary file with an extra include header at the top and a very simple main() function
at the bottom, to make it a valid C++ program. The GNU tool chain is and AVR Libto compile programs used by
Arduino , it uses avr dude to upload programs to the board. As the Arduino board uses Atmel microcontrollers,
Atmel's development environment, AVR Studio, can used to develop software for the Arduino. Parul Institute of
technology Page 22WIRELESS ENERGY METER FOR CONSUMER UTILITY WITH BILLING SYSTEM
CHAPTER: 6 SUMMARY OF RESULT Parul Institute of technologyPage 23WIRELESS ENERGY METER FOR
CONSUMER UTILITY WITH BILLING SYSTEM 6.1 LIMITATONS OF EXISTING SYSTEM   human operator
needs to go every place to take readings   human calculation errors.   time consuming .   overall cost is
much.   for payment consumer have to go bill station. 6.2 ADVANTAGES  Moderate cost.   Electricity bill
payment becomes easier   better utilization of manpower   Time saving  Smart and cost effective wireless
system.   eco friendly as it saves paper .   useful for remote area or small villages.   less error as no human
operator. 6.3 APPLICATIONS  Colleges and Schools   Banks   Hospitals   Government Offices   Societies
Parul Institute of technologyPage 24WIRELESS ENERGY METER FOR CONSUMER UTILITY WITH BILLING
SYSTEM CHAPTER: 7 CONCLUSION Parul I nstitute of technologyPage 25 WIRELESS ENERGY METER
FOR CONSUMER UTILITY WITH BILLING SYSTEMOur project aim is to replace regular energy meters which
are time consuming and faulty with too many error with our system. In our system consumer can directly know
the amount has to pay plus bill will be send per week so user can save his money and thus energy will be also
save. User can pay his monthly bill at home itself. Our system is ecofriendly to as it saves paper.Parul Institute
of technologyPage 26REFERENCES RESEARCH PAPER :­ [I] "GSM Based Automatic Wireless Energy Meter
Reading System" P. Harish M.Tech, S. Sandeep M.Tech , International Journal of Engineering Research &
Technology (IJERT) , Technology (IJERT),Vol. 1 Issue 9, November­ 2012[II] "GSM BASED AUTOMATIC
ENERGY METER READING WITH LOAD CONTROL", PRAVEENKUMAR H S, RAKESH B S, PREETHA P S,
International Journal of Science, Engineering and Technology Research (IJSETR), Volume 4, Issue 5, May
file:///C:/Users/NILESH%20PADHIYAR/Documents/Plagiarism%20Detector%20reports/originality%20report%2018.10.2016%205­23­12%20­%20final%20rep… 6/14
23/04/2017 originality report 18.10.2016 5­23­12 ­ final report.docx.html

2015WEBSITES :­www.engineersgarage.com www.electronicshub.org www.elprocus.com
http://electronicsforu.com http://digital.csic.es/bitstream/10261/127788/7/D­c­
%20Arduino%20uno.pdfhttp://www.circuit­projects.com APPENDIX: 1 CANVAS APPENDIX:2 PPR 08/10/2016
Periodic Progress Report (PPR) DetailsPRINT BACKEnrollment No : 130870111019College :Parul Institute Of
Technology, LimdaStudent Name : Padhiyar Nileshkumar BharatbhaiDepartment : Electronics &
Communication EngineeringMobile No : 9714373075Discipline :BEEmail :
padhiyarnilesh81@gmail.comSemester :Semester 7PPR Details Time Interval : ­Periodic Progess Report : First
PPRProject Wireless Meter For Consumer Utility With Billing System: Status : Reviewed (Freeze) 1. What
Progress you have made in the Project ? We had started search for journal paper and the patents related to our
project. we have started working on hardware parts like components identification,testing and implementation
on bread board 2. What challenge you have faced ? in literature paper search there was difficulty in findings the
proper patent and journal related to our project.also in testing and identifying components because lack of
knowledge 3. What support you need ? our internal guide and Faculties are supporting us too well so not really
needed for now 4. Which literature you have referred ? 1) international journal & Magazine of Engineering
,technology, Management and research.ISSN:2348­48485,volume 3,march 2015. 2)international journal of
Advanced Research in computer Science and Software Engineering ISSN:2277­128volume,issue 11,nowember
2014. 1/2 08/10/2016 Periodic Progress Report (PPR) DetailsComments Comment by Internal Guide : None
Comment by External Guide : None Comment by HOD : None Comment by Principal : None Comment by
University Admin : None 2/2 08/10/2016 Periodic Progress Report (PPR) DetailsPRINT BACKEnrollment No :
130870111019College :Parul Institute Of Technology, LimdaStudent Name : Padhiyar Nileshkumar
BharatbhaiDepartment : Electronics & Communication EngineeringMobile No : 9714373075Discipline :BEEmail
: padhiyarnilesh81@gmail.comSemester :Semester 7PPR Details Time Interval : 27 days, 23 hoursPeriodic
Progess Report : Second PPRProject Wireless Meter For Consumer Utility With Billing System: Status :
Reviewed (Freeze) 1. What Progress you have made in the Project ? we already had completed our power
supply circuit and learned basic knowledge of components then we finished our relay circuit . 2. What challenge
you have faced ? only in power supply because the AC wire we purchased was faulty from inside . our internal
guide helped us to troubleshoot the problem. 3. What support you need ? no need for now . 4. Which literature
you have referred ? our internal guide reffer us two books to learn basic component properties and operation
and they are: 1)Electronic Principles 7th edition By Albert Malvino . 2)digital logic and computer design(old
edition) by morris mano Comments 1/2 08/10/2016 Periodic Progress Report (PPR) DetailsComment by
Internal Guide : None Comment by External Guide : None Comment by HOD : None Comment by Principal :
None Comment by University Admin : None 2/2 08/10/2016 Periodic Progress Report (PPR) DetailsPRINT
BACKEnrollment No : 130870111019College :Parul Institute Of Technology, LimdaStudent Name : Padhiyar
Nileshkumar BharatbhaiDepartment : Electronics & Communication EngineeringMobile No :
9714373075Discipline :BEEmail : padhiyarnilesh81@gmail.comSemester :Semester 7PPR Details Time
Interval : 0 days, 1 hoursPeriodic Progess Report : Third PPRProject Wireless Meter For Consumer Utility With
Billing System: Status : Reviewed (Freeze) 1. What Progress you have made in the Project ? we started
learning basic C language ( data types,operators , loops,etc).we are learning different statements which are
going to be useful for us to properly interface the components and make them work. 2. What challenge you
have faced ? Due to lack of knowledge related to C language program. During running program we got lots of
error and many problem we got lot of errors and many problems. 3. What support you need ? internal guide and
other faculties helping us in programming related help 4. Which literature you have referred ? Object oriented
programming with C++ (E Balaguruswamy) Comments 1/2 08/10/2016 Periodic Progress Report (PPR)
DetailsComment by Internal Guide : None Comment by External Guide : None Comment by HOD : None
Comment by Principal : None Comment by University Admin : None 2/2 08/10/2016 Periodic Progress Report
(PPR) DetailsPRINT BACKEnrollment No : 130870111019College :Parul Institute Of Technology, LimdaStudent
Name : Padhiyar Nileshkumar BharatbhaiDepartment : Electronics & Communication EngineeringMobile No :
9714373075Discipline :BEEmail : padhiyarnilesh81@gmail.comSemester :Semester 7PPR Details Time
Interval : 7 days, 22 hoursPeriodic Progess Report : Forth PPRProject Wireless Meter For Consumer Utility
With Billing System: Status : Reviewed (Freeze) 1. What Progress you have made in the Project ? now we are
searching components required as per data sheets 2. What challenge you have faced ? as per datasheets
components are not available in local market 3. What support you need ? suggest me some places or sites to
buy components 4. Which literature you have referred ? we are referring IEEE Comments Comment by Internal
Guide : 1/2 08/10/2016 Periodic Progress Report (PPR) DetailsNone Comment by External Guide : None
Comment by HOD : None Comment by Principal : None Comment by University Admin : None 2/2 Periodic
Progress Report (PPR) Details http://projects.gtu.ac.in/SitePages/PeriodicProgressReportDetails.aspx...PRINT
BACKEnrollment No : 130870111023College :Parul Institute Of Technology, LimdaStudent Name : Patel
Arpitbhai Prakashbhai Department : Electronics & Communication EngineeringMobile No :
7405520670Discipline :BEEmail : aarpitpatel97@gmail.comSemester :Semester 71 of 3 13­10­2016 21:14
Periodic Progress Report (PPR) Details
file:///C:/Users/NILESH%20PADHIYAR/Documents/Plagiarism%20Detector%20reports/originality%20report%2018.10.2016%205­23­12%20­%20final%20rep… 7/14
23/04/2017 originality report 18.10.2016 5­23­12 ­ final report.docx.html

http://projects.gtu.ac.in/SitePages/PeriodicProgressReportDetails.aspx...PPR Details Time Interval : ­ Periodic
Progess Report : First PPR Project Wireless Meter For Consumer Utility With Billing System: Status : Reviewed
(Freeze) 1. What Progress you have made in the Project ? After project proposal submit to our internal guide
we have worked on hardware parts like components identification,testing and implementation on bread board
GPB .We made search for journal paper and the patents related to our project.Now we have completed the
implementation of the power supply,interfacing circuit,load relay and LCD interfacing. 2. What challenge you
have faced ? Due to lack information identifying the component we sorted out that.During the literature paper
search there was dificulty in findings the proper patent and journal related to our topic.We have also faced
problem in implementing the components on the general purpose board as due to overheating and improper
soldering it damages the electronic component. 3. What support you need ? Faculties are giving us large
support so no,but we need to do more research and work on regarding our project.We need a support from
GTU side that the website for monitoring the project of the students of project has lack of information and
improper date of update to data on PMMS tool so this year we are not able to work on it. 4. Which literature you
have referred ? literature survey paper:1) international journal& Magazine of Engineering ,technology,
Management and research.ISSN:2348­48485,volume 3,march 2015.2)international journal of Advanced
Research in computer Science and Software Engineering ISSN: 2277­128volume,issue 11,nowember 2014. 3)
international Journal of Emeging Technology and Advanced Engineering,ISSN: 2250­2459 Volume 4,Issue
1,January 2014.4)international journal of Scientific Engineering and Research,ISN:2347­3887.Volume 3 issue
1,January 2015. 2 of 3 13­10­2016 21:14 Periodic Progress Report (PPR) Details
http://projects.gtu.ac.in/SitePages/PeriodicProgressReportDetails.aspx...Comments Comment by Internal
Guide : None Comment by External Guide : None Comment by HOD : None Comment by Principal : None
Comment by University Admin : None 3 of 3 13­10­2016 21:14 Periodic Progress Report (PPR) Details
http://projects.gtu.ac.in/SitePages/PeriodicProgressReportDetails.aspx...Enrollment No : 130870111023Student
Name : Patel Arpitbhai Prakashbhai Mobile No : 7405520670Email : aarpitpatel97@gmail.comPPR Details
Time Interval : 27 days, 0 hours Periodic Progess Report : Second PPR PRINT BACKCollege : Parul Institute
Of Technology, LimdaDepartment : Electronics & Communication Engineering Discipline : BESemester :
Semester 7 Project Wireless Meter For Consumer Utility With Billing System: Status : Reviewed (Freeze) 1.
What Progress you have made in the Project ? We started learning basic C language as well as we deeply
studied data types,operators , loops,etc. 2. What challenge you have faced ? Due to lack of knowledge related
to C language program. During running program we got lots of error and many problem we got lot of errors and
many problems. 3. What support you need ? Our internal guide providing a good support and solving our
doubts. So we do not need more support. 4. Which literature you have referred ? (1) Object oriented
programming with C++ (E Balaguruswamy), (2) www.tutorials.com, (3) www.c4learn.com 1 of 2 13­10­2016
21:16 Periodic Progress Report (PPR) Details
http://projects.gtu.ac.in/SitePages/PeriodicProgressReportDetails.aspx...Comments Comment by Internal
Guide : None Comment by External Guide : None Comment by HOD : None Comment by Principal : None
Comment by University Admin : None 2 of 2 13­10­2016 21:16 Periodic Progress Report (PPR) Details
http://projects.gtu.ac.in/SitePages/PeriodicProgressReportDetails.aspx...Enrollment No : 130870111023Student
Name : Patel Arpitbhai Prakashbhai Mobile No : 7405520670Email : aarpitpatel97@gmail.comPPR Details
Time Interval : 3 days, 0 hours Periodic Progess Report : Third PPR PRINT BACKCollege : Parul Institute Of
Technology, LimdaDepartment : Electronics & Communication Engineering Discipline : BESemester : Semester
7 Project Wireless Meter For Consumer Utility With Billing System: Status : Reviewed (Freeze) 1. What
Progress you have made in the Project ? We are still learning c programming in detail.we are learning dif ferent
statements which are going to be useful for us to properly interface the component and make them work. 2.
What challenge you have faced ? We are having much problems in learning c programing. 3. What support you
need ? Internal guide and other faculties helping us in programing related help. 4. Which literature you have
referred ? Object oriented programming with C++(E Balaguruswamy) 1 of 2 13­10­2016 21:19 Periodic
Progress Report (PPR) Details
http://projects.gtu.ac.in/SitePages/PeriodicProgressReportDetails.aspx...Comments Comment by Internal
Guide : None Comment by External Guide : None Comment by HOD : None Comment by Principal : None
Comment by University Admin : None 2 of 2 13­10­2016 21:19 Periodic Progress Report (PPR) Details
http://projects.gtu.ac.in/SitePages/PeriodicProgressReportDetails.aspx...Enrollment No : 130870111023Student
Name : Patel Arpitbhai Prakashbhai Mobile No : 7405520670Email : aarpitpatel97@gmail.comPPR Details
Time Interval : 19 days, 23 hours Periodic Progess Report : Forth PPR PRINT BACKCollege : Parul Institute Of
Technology, LimdaDepartment : Electronics & Communication Engineering Discipline : BESemester : Semester
7 Project Wireless Meter For Consumer Utility With Billing System: Status : Submitted (Freeze) 1. What
Progress you have made in the Project ? Searching components required as per data sheets. 2. What
challenge you have faced ? As per datasheets components are not available in local market. 3. What support
you need ? Suggest me some places or sites to buy components. 4. Which literature you have referred ? We
are referring IEEE. 1 of 2 13­10­2016 21:20 Periodic Progress Report (PPR) Details
file:///C:/Users/NILESH%20PADHIYAR/Documents/Plagiarism%20Detector%20reports/originality%20report%2018.10.2016%205­23­12%20­%20final%20rep… 8/14
23/04/2017 originality report 18.10.2016 5­23­12 ­ final report.docx.html

http://projects.gtu.ac.in/SitePages/PeriodicProgressReportDetails.aspx...Comments Comment by Internal
Guide : None Comment by External Guide : None Comment by HOD : None Comment by Principal : None
Comment by University Admin : None 2 of 2 13­10­2016 21:20 APPENDIX:3 PSAR GUJARAT
TECHNOLOGICAL UNIVERSITY (GTU) INNOVATION COUNCIL (GIC) Patent Search & Analysis Report
(PSAR) Date of Submission : 07/10/2016Dear Patel Arpitbhai Prakashbhai, Studied Patent Number for
generation of PSAR PART 1: PATENT SEARCH DATABASE USED 1. Patent Search Database used Web link
of database 2. Keywords Used for Search 3. Search String Used 4. Number of Results/Hits getting :
16BE7_130870111023_1: USPTO Patent Database: http://patft.uspto.gov/: Microcontroller ,energy
meter,energy: 6: 21 PART 2: BASIC DATA OF PATENTED INVENTION /BIBLIOGRAPHIC DATA 5. Category/
Field of Invention 6. Invention is Related to/Class of Invention 6 (a) : IPC class of the studied patent 7. Title of
Invention 8. Patent No. 9. Application Number 9 (a) : Web link of the studied patent 10. Date of
Filing/Application (DD/MM/YYYY) 11. Priority Date (DD/MM/YYYY) 12. Publication/Journal Number 13.
Publication Date (DD/MM/YYYY) 14. First Filled Country : Albania : Electronics and Communication
Engineering: Embedded: G06F: Automated meter reading system: US6088659 A: US 09/082,647:
http://www.google.co.in/patents/US6088659: 21/05/1998: 11/09/1997: US6088659 A: 11/07/2000: Page 1 15.
Also Published as Sr.No Country Where FilledApplication No./Patent No.1 16. Inventor/s Details. Sr.No Name
of InventorAddress/City/Country of Inventor1 Raymond H KelleyRaleigh2 Richard Chnstophe
CarpentenFuquay­Varlna17. Applicant/Assignee Details. Sr.No Name of
Applicant/AssigneeAddress/City/Country of Applicant1 ABB Power TandD company IncRaleigh,N.C.18.
Applicant for Patent is :CompanyPART 3: TECHNICAL PART OF PATENTED INVENTION 19. Limitation of
Prior Technology / Art Large source codes,Unstable,And complex algorithm and system..etc 20. Specific
Problem Solved / Objective of Invention An automated meter reading (AMR) server having an open, distributed
architecture that collects, loads, and manages system­wide data collected from energy meters and routes the
data automatically to upstream business systems. The AMR server includes a repository of metering data, and
additionally provides timely access to information by including collection, storage, validation, estimation, editing,
publishing and securing of meter consumption and interval data. The AMR server obtains data from meters
equipped with modems via standard telephone lines or public RF networks. The data is converted from the
format of the meter/communications infrastructure to a format usable by the AMR server and the repository.
The data is converted from the AMR­compatible form to a format of a specific upstream business system prior
to transmission. The data may also be validated in accordance with the upstream business system
requirements. The AMR server provides for online users, interfacing with multiple dissimilar platforms and
meter firmware, maintenance of system availability, data recovery, access to multiple legacy systems, and
access by common set of Application Program Interfaces. 21. Brief about Invention The invention relates to a
method and apparatus for identifying individuals for the purposes of determining clearance access or for
surveillance through a facial recognition system 900, as shown in FIG. 9. The facial recognition system 900 is
comprised of a stand­alone camera 920 for taking a facial scan or image of a person and a separate computer
910 for image processing and database management.6 22. Key learning Points Bu this patent we have learn
that facial recognition system for security access and identification. 23. Summary of Invention To overcome the
above­noted issues, it is a primary object of the present invention to provide a method and apparatus for
enrolling and identifying individuals for clearance access based upon computer matching of a region of interest
in a facial image scan. In particular, the present invention utilizes a personal identification number which is
assigned to each enrolled individual. The personal identification number identifies a location in a database
containing camera positioning information, clearance data and the reference facial image scan. Upon entering
the personal identification number and standing before the system, a scan image is taken and processed for
comparison with the enrollment image. Page 2 24. Number of Claims :12225. Patent Status :Granted Patent &
In­force Patent26. How much this invention is related with your IDP/UDP? 70 % 27. Do you have any idea to do
anything around the said invention to improve it? (Give short note in not more than 500 words) none Page 3
GUJARAT TECHNOLOGICAL UNIVERSITY (GTU) INNOVATION COUNCIL (GIC) Patent Search & Analysis
Report (PSAR) Date of Submission : 07/10/2016Dear Patel Arpitbhai Prakashbhai, Studied Patent Number for
generation of PSAR PART 1: PATENT SEARCH DATABASE USED 1. Patent Search Database used Web link
of database 2. Keywords Used for Search 3. Search String Used 4. Number of Results/Hits getting :
16BE7_130870111023_2: USPTO Patent Database: http://patft.uspto.gov/: meter,fiber,sensor: Self­paying
smart utility meter and payment service: 4600 PART 2: BASIC DATA OF PATENTED INVENTION
/BIBLIOGRAPHIC DATA 5. Category/ Field of Invention 6. Invention is Related to/Class of Invention 6 (a) : IPC
class of the studied patent 7. Title of Invention 8. Patent No. 9. Application Number 9 (a) : Web link of the
studied patent 10. Date of Filing/Application (DD/MM/YYYY) 11. Priority Date (DD/MM/YYYY) 12.
Publication/Journal Number 13. Publication Date (DD/MM/YYYY) 14. First Filled Country : Albania : Electronics
and Communication Engineering: Embedded: G06F: Self­paying smart utility meter and payment service: US
6980973 B1: US 09/390,937: http://www.google.co.in/patents/US6980973: 07/09/1999: 07/09/1999:
US6980973 B1: 27/12/2005: Page 1 15. Also Published as Sr.No Country Where FilledApplication No./Patent
file:///C:/Users/NILESH%20PADHIYAR/Documents/Plagiarism%20Detector%20reports/originality%20report%2018.10.2016%205­23­12%20­%20final%20rep… 9/14
23/04/2017 originality report 18.10.2016 5­23­12 ­ final report.docx.html

No.1 16. Inventor/s Details. Sr.No Name of InventorAddress/City/Country of Inventor1 Igor V
KarpenkoMountain View CA (US)17. Applicant/Assignee Details. Sr.No Name of
Applicant/AssigneeAddress/City/Country of Applicant1 Visa International Service AssociationFoster City, CA
(US)18. Applicant for Patent is :CompanyPART 3: TECHNICAL PART OF PATENTED INVENTION 19.
Limitation of Prior Technology / Art detection of face not accurate. 20. Specific Problem Solved / Objective of
Invention A payment service enables a credit account or a debit account of a customer to be automatically
billed for utility usage based on a reading that is automatically taken by an electronic utility meter. A method for
processing information relating to usage of a utility includes receiving a utility reading that is a measure of the
usage of the utility by a customer. The utility reading is received from a customer site across a first transmission
medium. The method next determines an amount using the utility reading and transmitting the amount to a
utility provider that is arranged to cause the amount to be paid. The amount is transmitted to the second remote
location across a second transmission medium. The first transmission medium and the second transmission
medium are each either a network communications line, a fiberoptic line, or a telephone line. The smart utility
meter includes an electronic meter reader, a processor unit, a memory, a configuration interface, a network
interface, and a power supply. 21. Brief about Invention In an embodiment of the present invention, an
automated utility payment system is arranged to automatically collect utility usage information, and to allow a
customer's credit account or debit account to be directly charged for utility usage. Such a system, e.g., a self­
paying "smart" utility metering and payment service, involves the automatic collection of readings from utility
meters at a predetermined time, and the automatic generation of a credit transaction or a debit transaction
using the readings from the utility meters. By eliminating the many manually implemented steps associated with
utility payment systems, the efficiency of such systems may be increased, and the costs of such systems may
be reduced. 22. Key learning Points we learn Self­paying smart utility meter and payment service. 23. Summary
of Invention The present invention relates to a utility metering system that enables a credit account or a debit
account of a customer to be automatically billed for utility usage based on a reading that is automatically taken
by an electronic utility meter. According to one aspect of the present invention, a method for processing
information relating to usage of a utility includes receiving a utility reading that is a measure of the usage of the
utility by a customer. The utility reading is received from a first remote location across a first transmission
medium. The method also includes determining an amount using the utility reading and transmitting the amount
to a second remote location that is arranged to cause the amount to be paid. The amount is transmitted to the
second remote location across a second transmission medium. In one embodiment, the first transmission
medium and the second transmission medium are each either a network communications line, a fiberoptic line,
or a telephone line. 24. Number of Claims :1425. Patent Status :Granted Patent & In­force PatentPage 2 26.
How much this invention is related with your IDP/UDP? 71 to 90% 27. Do you have any idea to do anything
around the said invention to improve it? (Give short note in not more than 500 words) none Page 3 GUJARAT
TECHNOLOGICAL UNIVERSITY (GTU) INNOVATION COUNCIL (GIC) Patent Search & Analysis Report
(PSAR) Date of Submission : 13/10/2016Dear Patel Arpitbhai Prakashbhai, Studied Patent Number for
generation of PSAR PART 1: PATENT SEARCH DATABASE USED 1. Patent Search Database used Web link
of database 2. Keywords Used for Search 3. Search String Used 4. Number of Results/Hits getting :
16BE7_130870111023_3: USPTO Patent Database: http://patft.uspto.gov/: GSM modual,Energy
Meter,Bluetooth,energy meter,finger printscaner : smart energy system: 30 PART 2: BASIC DATA OF
PATENTED INVENTION /BIBLIOGRAPHIC DATA 5. Category/ Field of Invention 6. Invention is Related
to/Class of Invention 6 (a) : IPC class of the studied patent 7. Title of Invention 8. Patent No. 9. Application
Number 9 (a) : Web link of the studied patent 10. Date of Filing/Application (DD/MM/YYYY) 11. Priority Date
(DD/MM/YYYY) 12. Publication/Journal Number 13. Publication Date (DD/MM/YYYY) 14. First Filled Country :
Albania : Electronics and Communication Engineering: embedded: G06F: smart energy meter:
US20120053740 A1: US 12/873,386: https://www.google.ch/patents/US20120053740: 01/09/2010: 01/09/2010:
US20120053740 A1: 01/03/2012: United StatesPage 1 15. Also Published as Sr.No Country Where
FilledApplication No./Patent No.1 United StatesUS 12/873,38616. Inventor/s Details. Sr.No Name of
InventorAddress/City/Country of Inventor1 KEVIN FARRELLY NOLANLouisville17. Applicant/Assignee Details.
Sr.No Name of Applicant/AssigneeAddress/City/Country of Applicant1 General Electric CompanyLouisville18.
Applicant for Patent is :CompanyPART 3: TECHNICAL PART OF PATENTED INVENTION 19. Limitation of
Prior Technology / Art Large source codes,Unstable,And complex algorithm and system..etc 20. Specific
Problem Solved / Objective of Invention Apparatus and method for managing energy of a home or other
structure are disclosed. An energy management system for a home network comprises a central device
controller configured to communicate with energy consuming devices, energy generation devices and storage
devices at a home. Power/energy measuring devices provide consumption measurements for the home and
each device to the controller. A user interface has a client application configured to provide information to a
user/consumer and to an energy provider/utility about energy consumption, energy generation and storage. An
energy profile and a carbon footprint of an individual's home are generated along with recommendations for
energy savings and/or possible addition of on site generation or energy storage. 21. Brief about Invention Smart
file:///C:/Users/NILESH%20PADHIYAR/Documents/Plagiarism%20Detector%20reports/originality%20report%2018.10.2016%205­23­12%20­%20final%20re… 10/14
23/04/2017 originality report 18.10.2016 5­23­12 ­ final report.docx.html

grid applications improve the ability of electricity producers and consumers to communicate with one another
and make decisions about how and when to produce and consume power. Demand response (DR) technology,
for example, allows customers to shift from an event based demand response where the utility requests the
shedding of load, towards a more 24/7 based demand response where the customer sees incentives for
controlling load all the time, such as in providing "Ancillary Services." One advantage of a smart grid application
is time­based pricing. 22. Key learning Points Bu this patent we have learn that studied about smart energy
system 23. Summary of Invention The present disclosure enables energy consumers to maintain comfort,
reduce and shift energy usage and costs by providing methods, systems and devices for appliances and other
home loads such as HVAC (Heating Ventilation and Air Conditioning) systems, pool pumps, electric vehicle
charging, etc. 24. Number of Claims :1625. Patent Status :Published Application26. How much this invention is
related with your IDP/UDP? 70 % 27. Do you have any idea to do anything around the said invention to improve
it? (Give short note in not more than 500 words) Page 2 None Page 3 GUJARAT TECHNOLOGICAL
UNIVERSITY (GTU) INNOVATION COUNCIL (GIC) Patent Search & Analysis Report (PSAR) Date of
Submission : 13/10/2016Dear Patel Arpitbhai Prakashbhai, Studied Patent Number for generation of PSAR
PART 1: PATENT SEARCH DATABASE USED 1. Patent Search Database used Web link of database 2.
Keywords Used for Search 3. Search String Used 4. Number of Results/Hits getting : 16BE7_130870111023_4:
USPTO Patent Database: http://patft.uspto.gov/: Power meter,Lcd display,Sensors,Power meter,Sensor
unit,Microcontroller : 7: 23 PART 2: BASIC DATA OF PATENTED INVENTION /BIBLIOGRAPHIC DATA 5.
Category/ Field of Invention :Electronics and Communication Engineering6. Invention is Related to/Class of
Invention :embedded6 (a) : IPC class of the studied patent :G01R7. Title of Invention :SYSTEM AND METHOD
FOR READING POWER METERS8. Patent No. :US7174260 B29. Application Number :US 10/814,2559 (a) :
Web link of the studied patent :http://www.google.co.in/patents/US717426010. Date of Filing/Application
(DD/MM/YYYY) :01/04/200411. Priority Date (DD/MM/YYYY) :01/04/200412. Publication/Journal Number
:US7174260 B213. Publication Date (DD/MM/YYYY) :06/02/200714. First Filled Country : Albania :AlgeriaPage
1 15. Also Published as Sr.No Country Where FilledApplication No./Patent No.1 United StatesUS
10/814,25516. Inventor/s Details. Sr.No Name of InventorAddress/City/Country of Inventor1 Maurice
TuffWitless bay17. Applicant/Assignee Details. Sr.No Name of Applicant/AssigneeAddress/City/Country of
Applicant1 Blue Line Innovations IncSt.John's (CA)18. Applicant for Patent is :CompanyPART 3: TECHNICAL
PART OF PATENTED INVENTION 19. Limitation of Prior Technology / Art Large source codes,Unstable,And
complex algorithm and system..etc 20. Specific Problem Solved / Objective of Invention A power meter reader
system for automatically reading an indication on a power meter unit having a cyclical property that varies at a
rate indicative of power consumption. The system comprises a detection unit that includes a sensor unit for
monitoring the cyclical property of the indication and generating a consumption detection signal, a processing
unit for generating an information signal based on data related to the consumption detection signal, and a
transmitter for transmitting a transmission signal based on the information signal. 21. Brief about Invention The
invention relates to a system and method for reading power meters. More particularly, the invention relates to a
system and method for more efficiently reading power meters and providing an indication of power usage to a
user of the power meter. 22. Key learning Points The invention provides a detection unit that is mounted to the
power meter unit and a display unit that is remotely located with respect to the detection unit; one possibility is
to mount the display unit within the structure for which the power meter unit is monitoring energy consumption.
The detection unit monitors the indication of power consumption on the power meter (which is usually the
rotation of the power meter disk of the power meter). 23. Summary of Invention The invention also provides an
attachment means for attaching the detection unit to the power meter unit. The attachment means is adapted
for allowing the detection unit to be attached to a wide variety of power meter units. In particular, the attachment
means includes a clamping means that is fitted around the perimeter of the body of the power meter unit. The
attachment means also includes an arm that houses a sensor unit for sensing the indication of power
consumption of the power meter unit. 24. Number of Claims :6325. Patent Status :Granted Patent & In­force
Patent26. How much this invention is related with your IDP/UDP? 71 to 90% 27. Do you have any idea to do
anything around the said invention to improve it? (Give short note in not more than 500 words) None Page 2
GUJARAT TECHNOLOGICAL UNIVERSITY (GTU) INNOVATION COUNCIL (GIC) Patent Search & Analysis
Report (PSAR) Date of Submission : 13/10/2016Dear Patel Arpitbhai Prakashbhai, Studied Patent Number for
generation of PSAR PART 1: PATENT SEARCH DATABASE USED 1. Patent Search Database used Web link
of database 2. Keywords Used for Search 3. Search String Used 4. Number of Results/Hits getting :
16BE7_130870111023_5: USPTO Patent Database: http://patft.uspto.gov/: Microcontroller,Energy
Meter,Communicationmodule,controller,energy meter,keypad modual. : 9: 19 PART 2: BASIC DATA OF
PATENTED INVENTION /BIBLIOGRAPHIC DATA 5. Category/ Field of Invention :Electronics and
Communication Engineering6. Invention is Related to/Class of Invention :embedded6 (a) : IPC class of the
studied patent :G06F7. Title of Invention :ENERGY USAGE MONITORING WITH REMOTE DISPLAY.8. Patent
No. :US20100191487 A19. Application Number :US 12/694,1719 (a) : Web link of the studied patent
:https://www.google.com/patents/US2010019148710. Date of Filing/Application (DD/MM/YYYY) :26/01/201011.
file:///C:/Users/NILESH%20PADHIYAR/Documents/Plagiarism%20Detector%20reports/originality%20report%2018.10.2016%205­23­12%20­%20final%20re… 11/14
23/04/2017 originality report 18.10.2016 5­23­12 ­ final report.docx.html

Priority Date (DD/MM/YYYY) :26/01/200912. Publication/Journal Number :US20100191487 A113. Publication
Date (DD/MM/YYYY) :29/01/201014. First Filled Country : Albania :Page 1 15. Also Published as Sr.No Country
Where FilledApplication No./Patent No.1 United StatesUS20100191487 A116. Inventor/s Details. Sr.No Name
of InventorAddress/City/Country of Inventor1 Patrick A RadaSan Jose,CA.17. Applicant/Assignee Details. Sr.No
Name of Applicant/AssigneeAddress/City/Country of Applicant1 Geneva Clean Tech IncSan Jose,CA.18.
Applicant for Patent is :CompanyPART 3: TECHNICAL PART OF PATENTED INVENTION 19. Limitation of
Prior Technology / Art Identifying the electrical device and the state comprises looking up the load signature in a
memory. 20. Specific Problem Solved / Objective of Invention Energy usage monitoring with remote display and
automatic detection of appliance including graphical user interface. 21. Brief about Invention The present
invention relates to the field of monitoring energy usage. More specifically, the present invention relates to
monitoring the detailed energy usage of an electrical device in a network of electrical devices such as in a
home or small office from a single point in the network. 22. Key learning Points Current solutions for reducing
home and office energy usage include monitoring total, aggregate power usage of a plurality of electrical
devices at a single power supply point, monitoring power usage at one or more wall outlet power supply points,
controlling the state of individual devices through timed, programmatic control of devices. 23. Summary of
Invention An energy monitoring device is disclosed which provides low cost, real­time monitoring of energy
usage of each electrical device in a home or business from a single, central location with no requirement for
additional hardware or wiring any electrical devices in the home or business. In an ultra­compact
implementation, the energy monitoring device is able to comprise a single integrated circuit or chip,
programmed with the features described below. 24. Number of Claims :3925. Patent Status :Published
Application26. How much this invention is related with your IDP/UDP? 70 % 27. Do you have any idea to do
anything around the said invention to improve it? (Give short note in not more than 500 words) None Page 2
GUJARAT TECHNOLOGICAL UNIVERSITY (GTU) INNOVATION COUNCIL (GIC) Patent Search & Analysis
Report (PSAR) Date of Submission : 14/10/2016Dear Padhiyar Nileshkumar Bharatbhai, Studied Patent
Number for generation of PSAR PART 1: PATENT SEARCH DATABASE USED 1. Patent Search Database
used Web link of database 2. Keywords Used for Search 3. Search String Used 4. Number of Results/Hits
getting : 16BE7_130870111019_1: USPTO Patent Database: http://patft.uspto.gov/: Microcontroller,Gsm
moduel ,Bluetooth,Microcontroller,LCDdisplay,Modual : 5: 11 PART 2: BASIC DATA OF PATENTED
INVENTION /BIBLIOGRAPHIC DATA 5. Category/ Field of Invention :Electronics and Communication
Engineering6. Invention is Related to/Class of Invention :Embedded6 (a) : IPC class of the studied patent
:G08B7. Title of Invention :Automated meter reading system, communication and controlnetwork for automated
meter reading 8. Patent No. :US7304587 B29. Application Number :US 11/120,1739 (a) : Web link of the
studied patent :https://www.google.com/patents/US730458710. Date of Filing/Application (DD/MM/YYYY)
:02/05/200511. Priority Date (DD/MM/YYYY) :14/02/200312. Publication/Journal Number :US7304587 B213.
Publication Date (DD/MM/YYYY) :04/12/200714. First Filled Country : Albania :AlbaniaPage 1 15. Also
Published as Sr.No Country Where FilledApplication No./Patent No.1 United StatesUS7304587 B216.
Inventor/s Details. Sr.No Name of InventorAddress/City/Country of Inventor1 Jon A BoazColleyville, TX (US)17.
Applicant/Assignee Details. Sr.No Name of Applicant/AssigneeAddress/City/Country of Applicant1 Energy
Technology Group IncWorth, TX (US)18. Applicant for Patent is :CompanyPART 3: TECHNICAL PART OF
PATENTED INVENTION 19. Limitation of Prior Technology / Art problem with expanding the use of control
systems technology to such distributed systems are the costs associated with the sensor­actuator infrastructure
required to monitor and control functions within such systems. 20. Specific Problem Solved / Objective of
Invention The present invention relates in general to the field of utility meters. More particularly, the present
invention relates to systems, automated equipment, networks, program products, and related methods for
remote reading of utility meters. 21. Brief about Invention Manually reading the meters often results in
numerous other expenses including those related to human error. For example, a high bill caused by an
incorrect manual read or estimated read often motivates customers to pay later, resulting in increased working
capital requirements and corresponding expenses for the utility. Additionally, the utility has to handle the
customer complaints (a call center cost) and may have to read the meter again to verify the error. As the
complaint progresses, the utility faces administrative costs associated with routing and processing the
complaint from the call center to the meter department. 22. Key learning Points Advantageously, the meter data
collectors can be located at a customer location, such as, for example, mounted to a residence or other building
structure and can each be connected to all utility meters at a respected customer location. The meter data
collectors can monitor utility usage data through multiple digital or analog inputs and/or multiple encoded inputs,
and can transmit that data to a host computer, preferably located at a utility's central office via a preferably 23.
Summary of Invention In view of the foregoing, embodiments of the present invention advantageously provide
an automated utility meter reading network system, utility meter data collector, and methods related to an
automated data acquisition and energy management. Embodiments of the present invention also provide an
automated meter reading network system that supports bi­directional communications with a network of meter
data collectors capable of collecting digital and analog input data, as well as providing functional control of
file:///C:/Users/NILESH%20PADHIYAR/Documents/Plagiarism%20Detector%20reports/originality%20report%2018.10.2016%205­23­12%20­%20final%20re… 12/14
23/04/2017 originality report 18.10.2016 5­23­12 ­ final report.docx.html

various customer equipment via a digital output board or relay. 24. Number of Claims :5925. Patent Status
:Granted Patent & In­force Patent26. How much this invention is related with your IDP/UDP? 70 % 27. Do you
have any idea to do anything around the said invention to improve it? (Give short note in not more than 500
Page 2 words) None. Page 3 GUJARAT TECHNOLOGICAL UNIVERSITY (GTU) INNOVATION COUNCIL
(GIC) Patent Search & Analysis Report (PSAR) Date of Submission : 14/10/2016Dear Padhiyar Nileshkumar
Bharatbhai, Studied Patent Number for generation of PSAR PART 1: PATENT SEARCH DATABASE USED 1.
Patent Search Database used Web link of database 2. Keywords Used for Search 3. Search String Used 4.
Number of Results/Hits getting : 16BE7_130870111019_2: USPTO Patent Database: http://patft.uspto.gov/:
Modem,MTU.,SCU.,GSMmodule,LCDdisplay,Relay: 6: 13 PART 2: BASIC DATA OF PATENTED INVENTION
/BIBLIOGRAPHIC DATA 5. Category/ Field of Invention 6. Invention is Related to/Class of Invention 6 (a) : IPC
class of the studied patent 7. Title of Invention 8. Patent No. 9. Application Number 9 (a) : Web link of the
studied patent 10. Date of Filing/Application (DD/MM/YYYY) 11. Priority Date (DD/MM/YYYY) 12.
Publication/Journal Number 13. Publication Date (DD/MM/YYYY) 14. First Filled Country : Albania : Electronics
and Communication Engineering: Embedded: G06F: Automatic remote meter reading and control system:
US4135181 A: US 05/653,859: http://www.google.co.in/patents/US4135181: 30/01/1976: 30/01/1976:
US4135181 A: 16/01/1979: Page 1 15. Also Published as Sr.No Country Where FilledApplication No./Patent
No.1 United StatesUS4135181 A16. Inventor/s Details. Sr.No Name of InventorAddress/City/Country of
Inventor1 Anthony P BogackiChester, N­H.2 Richard G FarnsworthYork,17. Applicant/Assignee Details. Sr.No
Name of Applicant/AssigneeAddress/City/Country of Applicant1 General Electric CompanySomersworth,
NH.18. Applicant for Patent is :CompanyPART 3: TECHNICAL PART OF PATENTED INVENTION 19.
Limitation of Prior Technology / Art meter reading operation or transfer of previously stored meter data from the
transponder units to the central station in accordance with functions specified by the various commands. 20.
Specific Problem Solved / Objective of Invention An automatic meter reading and control system for
communicating with remote terminal points includes a central station which selectively communicates with a
transponder controller unit at each terminal point via a plurality of distribution units, each serving several
transponder controller units. 21. Brief about Invention This invention relates generally to remote automatic
communication systems and more particularly to a remote meter reading and load control system for reading
the measurement of commodities at terminal points along a utility power transmission network and controlling
loads at the terminal points. 22. Key learning Points The aforementioned advantages are provided by the
present invention which provides a remote automatic utility meter reading and control system for reading the
measurement of a commodity and controlling loads at a consumer or customer residence over a network of
power lines. 23. Summary of Invention A central station includes a computer with input/output equipment for the
multiplex generation of commands and the receipt of data over a plurality of communication lines. The
commands generated by the central station contain at least an address portion and a function code portion. 24.
Number of Claims :1425. Patent Status :Granted Patent & In­force Patent26. How much this invention is related
with your IDP/UDP? 70 % 27. Do you have any idea to do anything around the said invention to improve it?
(Give short note in not more than 500 words) None. Page 2 GUJARAT TECHNOLOGICAL UNIVERSITY (GTU)
INNOVATION COUNCIL (GIC) Patent Search & Analysis Report (PSAR) Date of Submission : 16/10/2016Dear
Padhiyar Nileshkumar Bharatbhai, Studied Patent Number for generation of PSAR PART 1: PATENT SEARCH
DATABASE USED 1. Patent Search Database used Web link of database 2. Keywords Used for Search 3.
Search String Used 4. Number of Results/Hits getting : 16BE7_130870111019_3: Espacenet (EPO Patent
database): http://worldwide.espacenet.com/advancedSearch: Energy
meter,Electricity,Transmission,Microcontroller,Relay,Modual: 11: 21 PART 2: BASIC DATA OF PATENTED
INVENTION /BIBLIOGRAPHIC DATA 5. Category/ Field of Invention 6. Invention is Related to/Class of
Invention 6 (a) : IPC class of the studied patent 7. Title of Invention 8. Patent No. 9. Application Number 9 (a) :
Web link of the studied patent 10. Date of Filing/Application (DD/MM/YYYY) 11. Priority Date (DD/MM/YYYY)
12. Publication/Journal Number 13. Publication Date (DD/MM/YYYY) 14. First Filled Country : Albania :
Electronics and Communication Engineering: Embedded: G06F LKH: Method of automatic meter reading:
EP1677270 A1: EP20040466035: https://www.google.com/patents/EP1677270A1?cl=en: 31/12/2004:
31/12/2004: EP1677270 A1: 05/07/2016: AustraliaPage 1 15. Also Published as Sr.No Country Where
FilledApplication No./Patent No.1 United StatesEP1677270 A116. Inventor/s Details. Sr.No Name of
InventorAddress/City/Country of Inventor1 tomasprague17. Applicant/Assignee Details. Sr.No Name of
Applicant/AssigneeAddress/City/Country of Applicant1 tomasprague18. Applicant for Patent is :CompanyPART
3: TECHNICAL PART OF PATENTED INVENTION 19. Limitation of Prior Technology / Art Large source code
,Unstable and complex algorithm and system etc. 20. Specific Problem Solved / Objective of Invention A new
method how to construct AMR networks is suggested, using the gathering units, which perform the conversion
of LPRB to PLC 21. Brief about Invention Automatic meter reading (AMR) is measuring of consumption of
media (e.g. electricity, cold water, hot water, gas, heat energy), transmission and processing of measured
values. The measuring is performed by meters the measured values are gathered by gathering units and
transmitted to concentrator 22. Key learning Points at least one LPRB connection with the meter and PLC
file:///C:/Users/NILESH%20PADHIYAR/Documents/Plagiarism%20Detector%20reports/originality%20report%2018.10.2016%205­23­12%20­%20final%20re… 13/14
23/04/2017 originality report 18.10.2016 5­23­12 ­ final report.docx.html

connection with the concentrator. should have which perform the LPRB­ PLC conversion, 23. Summary of
Invention using this method, optimal connections in AMR networks can be realized 24. Number of Claims
:1925. Patent Status :Granted Patent & In­force Patent26. How much this invention is related with your
IDP/UDP? 70 % 27. Do you have any idea to do anything around the said invention to improve it? (Give short
note in not more than 500 words) none Page 2

Plagiarism Detector
Your right to know the authenticity!

file:///C:/Users/NILESH%20PADHIYAR/Documents/Plagiarism%20Detector%20reports/originality%20report%2018.10.2016%205­23­12%20­%20final%20re… 14/14

Вам также может понравиться