Вы находитесь на странице: 1из 4

TLE 10 (ICT)

Computer System Servicing NC II

BUDGET OF WORK
PERFORMANCE
WEEK # CONTENT CONTENT STANDARD LEARNING COMPETENCIES CODE
STANDARD
FIRST QUARTER:
WEEK 1  Types and parts of The learners demonstrate an The learners shall be able to 1.1 Plan unit assembly to ensure OHS policies and TLE_IACSS9-12ICCS-
computers understanding of concepts and install and configure computer procedures are followed in accordance with Ia-e-28
 Computer operating systems principles in installing systems based on established systems requirements
 Windows / MAC OS X /Linux configuring computer systems. procedures and system 1.2 Prepare unit assembly to ensure OHS policies and
 Peripheral devices requirements. procedures are followed in accordance with
 Computer systems design systems requirements
WEEK 2 & 3  Computer assembly 1.3 Identify materials necessary to complete the work
procedures in accordance with established procedures and
 Power ON self-test and check against system requirements
basic-input-output-system 1.4 Obtain materials necessary to complete the work
(BIOS) configuration in accordance with established procedures and
procedures check against system requirements
WEEK 4  CMOS 1.5 Obtain tools, equipment and testing devices
 Motherboards needed to carry out installation work in
WEEK 5  Multimedia storage devices: accordance with established procedures and
o Video cards check for correct operation and safety
o Sound cards 1.6 Assemble computer hardware in accordance with
Graphical user interface established procedures and system requirements
1.7 Perform BIOS configuration in accordance with
hardware requirements
WEEK 6  Installers preparation and The learners demonstrate an The learners shall be able to 2.1 Create portable bootable devices in accordance TLE_IACSS9-12ICCS-
OS installation procedures understanding of concepts and install and configure computer with software manufacturer instruction If-j-29
WEEK 7  Application and principles in installing systems based on established 2.2 Prepare customized installers in accordance with
devices/drivers installation configuring computer systems. procedures and system software utilization guide and end user agreement
procedures requirements. 2.3 Carry out installation of portable applications in
WEEK 8  Desktop PC interface/ hook accordance with software user guide and software
up procedures license
WEEK 9  Application packages and
use of application programs
WEEK 10  Bootable devices
o CD/DVD bootable
o USB bootable using
Rufus software
o USB bootable using
diskpart/CMD
Software installers
SECOND QUARTER:
WEEK 1 – 5  Installation of Operating The learners demonstrate an The learners shall be able to 3.1 Install Operating System (OS) in accordance with TLE_IACSS9-12ICCS-
System understanding of concepts and install and configure computer established installation procedures and to comply IIa-j-30
o Windows Server principles in installing systems based on established with end-user requirements
2008/higher version configuring computer systems. procedures and system 3.2 Install peripherals/ devices in accordance with
o Windows XP/7/8/10 requirements. manufacturer’s instructions and/ or OS installation
procedures
WEEK 6 – 7  Install and configure of 3.3 Configure peripherals/ devices in accordance with
peripherals devices manufacturer’s instructions and/ or OS installation
procedures
WEEK 8 – 9  Install /Update Operating 3.4 Access OS and drivers updates/ patches in
system accordance with manufacturer’s
recommendations and requirements
WEEK 10  Checking of work 3.5 Install OS and drivers updates/ patches in
accordance with manufacturer’s
recommendations and requirements
3.6 Check the quality of the work undertaken in
accordance with established procedures

THIRD QUARTER:
WEEK 1  Installation of applications The learners demonstrate an The learners shall be able to 4.1 Install Application Software based on software TLE_IACSS9-12ICCS-
software with different understanding of concepts and install and configure computer installation guides, end-user requirements and IIIa-e-31
variations principles in installing systems based on established software license agreement
configuring computer systems. procedures and system 4.2 Carry out variation to application software in
WEEK 2  Software updates requirements. accordance to customer/ client requirements
4.3 Access software updates in accordance with
WEEK 3  Virtualization software manufacturer’s recommendations and
 Disk management software requirements
4.4 Install software updates in accordance with
manufacturer’s recommendations and
WEEK 4  Antivirus / diagnostic software
requirements

WEEK 5  Device drivers


 Drivers/Software update
procedures
o Application software
license agreements
o Stress-testing
procedures
 - 5S and 3Rs environmental
policies
WEEK 6 & 7  Burning or testing installed 5.1 Test devices/ systems and/or installation to TLE_IACSS9-12ICCS-
equipment/devices determine whether it conforms to requirements IIIf-j-32
5.2 Conduct stress test to ensure reliability of
WEEK 8  Stress test equipment in accordance with manufacturer’s
o Processor instructions and system requirements
o Memory 5.3 Follow 5S and 3Rs according to environmental
o Hard Disk policies
o Video Card 5.4 Follow procedures in forwarding documentation to
appropriate personnel and/or authority on the test
WEEK 9  5S and 3Rs environmental conducted.
policies

WEEK 10  Reporting and documentation


procedures
THIRD QUARTER:
WEEK 1  Computer network concepts The learners demonstrate an The learners shall be able to 1.1 Plan cable routes in accordance with network TLE_IACSS9-12SUCN-
understanding of concepts and set up computer networks design and actual installation site IVa-j-33
principles in setting up computer based established procedures 1.2 Determine cable routes in accordance with
WEEK 2 – 5  Network cable installation networks. and system requirements for network design and actual installation site
 Copper cable splicing and hardware. 1.3 Identify necessary network materials in
cable testing accordance with established procedures and
 Fiber optic cables splicing check against system requirements
and installation requirements 1.4 Obtain necessary network materials in accordance
with established procedures and check against
WEEK 6  Philippine Electrical Code system requirements
relevant to data connection 1.5 Obtain tools, equipment, and testing devices in
accordance with established procedures
WEEK 7  OHS standards and 5S 1.6 Check tools, equipment and testing devices in
principles accordance with established procedures
1.7 Follow OHS policies
WEEK 8  Practicing 3Rs (reduce, 1.8 Use appropriate PPE
reuse, recycle/recover) 1.9 Perform copper cable splicing based on Electronic
Industries Alliance / Telecommunications Industry
WEEK 9  3Rs environmental policies Association (EIA/TIA) standards
WEEK 10  Managing waste from 1.10 Install network cables and cable raceways in
electrical and electronic accordance with established procedures and
equipment (WEEE) installation requirements
1.11 Perform installation work and check for
unnecessary damage that has occurred and
complies with requirements
1.12 Follow OHS standards and 5S principles
according to enterprise requirements
1.13 Dispose excess components and materials
based on WEEE directives and 3Rs waste
management program
LESSON 8: INSTALLING AND CONFIGURING COMPUTER SYSTEMS (ICCS) LESSON 9: SETTING- UP COMPUTER NETWORKS (SUCN)
Learning Outcome 1 – Assemble Computer Hardware Learning Outcome 1 – Install Network Cables
Learning Outcome 2 – Prepare Installer
Learning Outcome 3 – Installing Operating System and Drivers for Peripherals / Devices
Learning Outcome 4 – Installing Application Software
Learning Outcome 5 – Conduct Testing and Documentation

Prepared by:

ROMNE RYAN M. PORTACION


Teacher I
Sapang Dalaga NHS

Вам также может понравиться