Вы находитесь на странице: 1из 21

MINISTRY OF EDUCATION, MALAYSIA

VOCATIONAL COLLEGE STANDARD CURRICULUM

COURSE INFORMATION

COURSE NAME : FINISHING WORK II

CODE NAME : WTP 4023

LEVEL : 2 SEMESTER 4

CREDIT UNIT : 3.0

CONTACT HOUR : FACE TO FACE : 5.0 HOURS/WEEK

NON FACE TO FACE :

COURSE TYPE : VOCATIONAL

PREREQUISITE : -

CORE REQUISITE : -

1
Last Edited 10-13 Nov 2013
Module Page 1/21 Document Page 1
COURSE OUTCOMES:

At the end of the module, students should be able to:-

1. set out and lay mosaic on the wall whereby pre-cast terrazzo and cast-in-situ terrazzo are set out on the surfaces.
2. carry-out polishing and grinding work on terrazzo.
3. set out and lay square marble, broken marble, and parquet / floor board on the surfaces to be finished.
4. carry-out grinding and polishing works on the marble floor and parquet / floor board floor.
5. set out and lay polyvinyl chloride tiles on a floor surfaces.

COURSE DESCRIPTION

This module is designed as an exposure to students who plan to develop their competency and skills relating to methods of finishing works on
various wall and floor surfaces. It is a module that integrates traditional method and contemporary concept of doing finishing works. Workplace
safety and adhering to rules and regulation is being practiced simultaneously.

2
Last Edited 10-13 Nov 2013
Module Page 2/21 Document Page 2
CONTENT AND LEARNING STANDARDS

PROGRAMME : CONSTRUCTION TECHNOLOGY

COURSE NAME : FINISHING WORKS II

CODE NAME : WTP 4023

CONTENT STANDARD LEARNING STANDARD PERFORMANCE CRITERIA

1.1 Identify the location with suitability 1.1.1 determine site location suitable for laying
1. LAY MOSAIC ON WALL of work site mosaic according work order.

1.2 Prepare proper tools and 1.2.1 List out tools and equipment according work
equipment requirement.
1.2.2 Describe the usage of tools and equipment
according to their function and provided manual.
1.2.3 Select the right tools and equipment in
accordance with work requirement.

1.3 Prepare adequate materials needed 1.3.1 List out materials according to work
specification.
1.3.2 Describe the usage of materials according to
their function.
1.3.3 Select materials needed in accordance with
manufacturer's instruction and the "Product
Manual.

3
Last Edited 10-13 Nov 2013
Module Page 3/21 Document Page 3
1.4 Prepare scaffolding for high working 1.4.1 Specify the right scaffolding according to job
area specification and requirement.
1.4.2 Select the scaffolding component according to
provided manual.
1.4.3 Assemble all components according to
specification to the manual.
1.4.4 Erect scaffolding by according to
manufacturer's instruction and work
specification.

1.5 Prepare surface for laying mosaic 1.5.1 Make up surfaces for laying mosaic according
to work specification

1.6 Perform setting out and mosaic 1.6.1 Arrange mosaic into required pattern
pattern accurately according to predetermined
requirement.

1.7 Prepare required adhesive 1.7.1 State the adhesive mix ratio according
manufacturer's specification.
1.7.2 Mix required adhesive according to
manufacturer's instruction and the product
manual.

1.8 Fix mosaic on wall. 1.8.1 Describe the steps of adhering mosaics on wall
according to standard operational procedure.
1.8.2 Adhere mosaic on wall according to proper
procedures and specification in the blue print.

1.9 Fix mosaic on curved surfaces 1.9.1 Adhere mosaic to curved surfaces according to
proper procedures and specification in blue
print.
1.9.2 Describe the steps of adhering the mosaic on
curved surfaces according to standard
operational procedure.

4
Last Edited 10-13 Nov 2013
Module Page 4/21 Document Page 4
1.10 Fix mosaic on circular column 1.10.1 Describe the steps of adhering the mosaic on
circular column according to standard
operational procedure
1.10.2 Adhere mosaic to circular column according to
proper procedures and specification in the blue
print.

1.11 Fix mosaic for skirting and plinth 1.11.1 Describe the steps of adhering mosaic for
skirting and plinth according to standard
operational procedure.
1.11.2 Adhere mosaic for skirting and plinth according
to proper procedures and specification in the
blue print.

1.12 Implement finishing on mosaic 1.12.1 Prepare finishing work and materials according
surfaces to work requirement.
1.12.2 Apply finishing on mosaic surfaces according to
related procedure and requirement.

5
Last Edited 10-13 Nov 2013
Module Page 5/21 Document Page 5
CONTENT AND LEARNING STANDARDS

PROGRAMME : CONSTRUCTION TECHNOLOGY

COURSE NAME : FINISHING WORKS II

CODE NAME : WTP 4023

CONTENT STANDARD LEARNING STANDARD PERFORMANCE CRITERIA

2. LAY PRE-CAST TERRAZZO 2.1 Identify the location with suitability of 2.1.1 Determine suitable location for pre-cast
work site terrazzo according to work order.

2.2 Arrange work to the work sequence 2.2.1 Interpret blue print according to the suitability
of placement procedure.
2.2.2 Organise works according to logical
sequence.

2.3 Prepare tools and equipment 2.3.1 List out tools according work requirement.
2.3.2 Describe the usage of tools according to their
standard function.
2.3.3 Select proper tools and equipment according
to job specification and work procedures.

2.4 Prepare materials for pre-cast terrazzo 2.4.1 List out materials according to work
requirement.
2.4.2 Describe the usage of materials according to
manual specification.
2.4.3 Select proper materials according to job
specification and work procedures.

6
Last Edited 10-13 Nov 2013
Module Page 6/21 Document Page 6
2.5 Prepare surfaces for laying precast 2.5.1 Make-up surface according to job specification.
terrazzo

2.6 Set out pre-cast terrazzo 2.6.1 Perform setting out for pre-cast terrazzo
according to lay out specification in the blue
print and work procedures.

2.7 Prepare required adhesive 2.7.1 Describe the adhesive mixture ratio according
manufacturer's specification.
2.7.2 Mix adequate required adhesive in
accordance with manufacturer's instruction
and the product manual.

2.8 Fix pre-cast terrazzo on surfaces. 2.8.1 Describe the steps of adhering terrazzo on
surfaces according to standard operational
procedure.
2.8.2 Adhere terrazzo on the surfaces according to
blue print and fixing technique.

2.9 Fix pre-cast terrazzo for skirting and 2.9.1 Describe the steps of adhering terrazzo for
plinth skirting and plinth according to standard
operational procedure
2.9.2 Adhere terrazzo for skirting and plinth by
proper procedures according to related
specification and fixing technique.

7
Last Edited 10-13 Nov 2013
Module Page 7/21 Document Page 7
CONTENT AND LEARNING STANDARDS

PROGRAMME : CONSTRUCTION TECHNOLOGY

COURSE NAME : FINISHING WORKS II

CODE NAME : WTP 4023

CONTENT STANDARD LEARNING STANDARD PERFORMANCE CRITERIA

3. CARRY OUT CAST IN- 3.1 Identify the location of work site 3.1.1 Determine location for cast-in situ terrazzo work
SITU TERRAZZO according to work order.

3.2 Arrange work into work sequence 3.2.1 Interpret blue print according to the suitability of
placement procedure.
3.2.2 Organise works according to logical sequence.

3.3 Prepare materials for cast in-situ 3.3.1 List out materials according work requirement.
terrazzo 3.3.2 Describe the usage of materials according to their
function.
3.3.3 Select proper materials according to job and work
specification.

3.4 Prepare tools and equipment 3.4.1 List out tools and equipment according work
requirement.
3.4.2 Describe the usage of tools according to their
standard function.
3.4.3 Select proper tools and equipment according to
job specification and work procedures.

8
Last Edited 10-13 Nov 2013
Module Page 8/21 Document Page 8
3.5 Prepare surface for laying cast-in situ 3.5.1 Make-up surface according to job specification.
terrazzo

3.6 Set out in-situ terrazzo design 3.6.1 Perform setting out for cast in-situ terrazzo
according to specification and work procedures.

3.7 Prepare necessary formwork 3.7.1 Prepare formwork for in-situ terrazzo according to
specification.

3.8 Prepare terrazzo materials 3.8.1 Describe the proper ratio of terrazzo material
according job specification.
3.8.2 Mix the terrazzo materials in accordance with
manufacturer's instruction and the product
manual.

3.9 Place the in-situ terrazzo 3.9.1 Describe the steps of placing, compacting and
screeding the in-situ terrazzo according to
standard operational procedure.
3.9.2 Perform placement, compaction and screeding the
in-situ terrazzo according to placement
procedure.
3.9.3 Make necessary finishing according to appropriate
method.

9
Last Edited 10-13 Nov 2013
Module Page 9/21 Document Page 9
CONTENT AND LEARNING STANDARDS

PROGRAMME : CONSTRUCTION TECHNOLOGY

COURSE NAME : FINISHING WORKS II

CODE NAME : WTP 4023

CONTENT STANDARD LEARNING STANDARD PERFORMANCE CRITERIA

4 CARRY OUT POLISHING 4.1 Prepare appropriate machineries for 4.1.1 Describe the usage of machineries according to
AND GRINDING WORK ON finishing work manual specification.
TERRAZZO 4.1.2 Identify machineries needed according to job
specification.
4.1.3 Select machineries needed according to job
specification.

4.2 Prepare the chemical and relevant 4.2.1 List out chemical and relevant materials according
materials for polishing to work requirement.
4.2.2 Describe the usage of chemical according to
manual specification.
4.2.3 Select the chemical for polishing in accordance
with manufacturer's instruction and the product
manual.

4.3 Conduct grinding and polishing work 4.3.1 Describe the steps of grinding and polishing
according to standard operational procedure.
4.3.2 Prepare works for grinding and polishing
according to work procedure.
4.3.3 Perform grinding and polishing to smoothen
surfaces according to proper procedure and
technique.
10
Last Edited 10-13 Nov 2013
Module Page 10/21 Document Page 10
CONTENT AND LEARNING STANDARDS

PROGRAMME : CONSTRUCTION TECHNOLOGY

COURSE NAME : FINISHING WORKS II

CODE NAME : WTP 4023

CONTENT STANDARD LEARNING STANDARD PERFORMANCE CRITERIA

4 LAY SQUARE MARBLE 5.1 Identify the Identify the location of work 5.1.1 Select site location suitable for square marble
site according to work order.

5.2 Arrange work into work sequence 5.2.1 Interpret blue print according to the suitability of
placement procedure.
5.2.2 Organise works according to logical work
sequence.

5.3 Prepare materials for laying square 5.3.1 List out materials according to work requirement.
marble 5.3.2 Describe the usage of the materials according to
their specification .
5.3.3 Select proper materials to be used in accordance
with work requirement.

11
Last Edited 10-13 Nov 2013
Module Page 11/21 Document Page 11
5.4 Prepare proper tools and equipment . 5.4.1 List out tools and equipment according
work requirement.
5.4.2 Describe the usage of tools according to
standard function.
5.4.3 Select tools and equipment to be used in
accordance with the list.

5.5 Prepare surfaces for laying square 5.5.1 Make-up surface for laying square marble in
marble according to laying specification.

5.6 Conduct setting-out of square marble 5.6.1 Perform setting-out of square marble
arrangement arrangement according proper setting-out
technique.

5.7 Prepare required adhesive 5.7.1 Describe the proper adhesive ratio according job
specification.
5.7.1 Mix adequate required adhesive in accordance
with recommended ratio in the product manual.

5.8 Lay square marble 5.8.1 Describe the steps of laying square marble
according to standard operational procedure.
5.8.2 Lay square marble according to proper
technique.

12
Last Edited 10-13 Nov 2013
Module Page 12/21 Document Page 12
CONTENT AND LEARNING STANDARDS

PROGRAMME : CONSTRUCTION TECHNOLOGY

COURSE NAME : FINISHING WORKS II

CODE NAME : WTP 4023

CONTENT STANDARD LEARNING STANDARD PERFORMANCE CRITERIA

6.1 Identify the location with suitability of 6.1.1 Select site location suitable for square marble
6. SET OUT AND LAY work site. according to work order.
BROKEN MARBLE
6.2 Plan work procedure relating to the 6.2.1 Interpret blue print according to the suitability of
work sequence. placement procedure.
6.2.2 Organise works according to logical work
sequence.

6.3 Prepare proper materials. 6.3.1 List out materials according to work requirement.
6.3.2 Describe the usage of the materials according to
their specification .
6.3.3 Select proper materials to be used in accordance
with work requirement.

6.4 Prepare proper tools and equipment 6.4.1 List out tools and equipment according
work requirement.
6.4.2 Describe the usage of tools according to standard
function.
6.4.3 Select tools and equipment to be used in
accordance with the list.

6.5 Prepare surfaces for laying broken 6.5.1 Make-up surface for laying broken marble in
13
Last Edited 10-13 Nov 2013
Module Page 13/21 Document Page 13
marble according to laying specification.

6.6 Set-out broken marble arrangement 6.6.1 Perform setting-out of broken marble
arrangement according proper setting-out technique.

6.7.1 Describe the proper adhesive ratio according job


6.7 Prepare required adhesive specification.
6.8.1 Mix adequate required adhesive in accordance
with recommended ratio in the product manual.

6.8 Lay broken marble 6.8.1 Describe the steps of laying broken marble
according to standard operational procedure.
6.8.2 Lay broken marble according to proper technique.

CONTENT AND LEARNING STANDARDS

14
Last Edited 10-13 Nov 2013
Module Page 14/21 Document Page 14
PROGRAMME : CONSTRUCTION TECHNOLOGY

COURSE NAME : FINISHING WORKS II

CODE NAME : WTP 4023

CONTENT STANDARD LEARNING STANDARD PERFORMANCE CRITERIA

7.1 Prepare appropriate machineries for 7.1.1 Describe the usage of machineries according to
7. CARRY- OUT GRINDING finishing work manual specification.
AND POLISHING WORKS 7.1.2 Identify machineries needed according to job
ON MARBLE specification.
FLOOR. 7.1.3 Select machineries needed according to job
specification.

7.2 Prepare the chemical and relevant 7.2.1 List out chemical and relevant materials
materials for polishing according to work requirement.
7.2.2 Describe the usage of chemical according to its
function.
7.2.3 Select the chemical for polishing in accordance
with manufacturer's instruction and the product
manual.

7.3 Conduct grinding and polishing work 7.3.1 Describe the steps of grinding and polishing
according to standard operational procedure.
7.3.2 Prepare works for grinding and polishing
according to work procedure.
7.3.3 Perform grinding and polishing to smoothen
surface by proper procedure according blue print
and specification.

15
Last Edited 10-13 Nov 2013
Module Page 15/21 Document Page 15
CONTENT AND LEARNING STANDARDS

PROGRAMME : CONSTRUCTION TECHNOLOGY

COURSE NAME : FINISHING WORKS II

CODE NAME : WTP 4023

CONTENT STANDARD LEARNING STANDARD PERFORMANCE CRITERIA

8.1 Identify the location of work site 8.1.1 Determine site location for parquet / floor board
8. LAY PARQUET / FLOOR according to work order.
BOARD ON FLOOR 8.2 Arrange work into to the work
sequence 8.2.1 Interpret blue print according to the suitability of
placement procedure.
8.2.2 Organise works according to logical work
sequence.

8.3 Prepare materials needed 8.3.1 List out materials according to work
requirement.
8.3.2 Describe the usage of the materials according
to their specification .
8.3.3 Select proper materials to be used in
accordance with work requirement.

8.4 Prepare surface for fixing parquet/floor 8.4.1 Make-up surface for laying parquet/floor board in
board according to laying specification.

8.5 Prepare tools and equipment 8.5.1 List out tools and equipment according work
requirement.
8.5.2 Describe the usage of tools according to
standard function.
8.5.3 Select tools and equipment to be used in
accordance with the list.
16
Last Edited 10-13 Nov 2013
Module Page 16/21 Document Page 16
8.6 Prepare required adhesive 8.6.1 Describe the proper adhesive ratio according job
specification.
8.6.2 Mix adequate required adhesive in accordance
with recommended ratio in the product manual.

8.7 Set out of parquet / floor board 8.7.1 Perform setting-out of parquet / floor board
arrangement according proper setting-out
technique.

8.8 Lay parquet / floor board 8.8.1 Describe the steps of laying parquet / floor board
according to standard operational procedure.
8.8.2 Lay parquet / floor board according to proper
technique.

CONTENT AND LEARNING STANDARDS

17
Last Edited 10-13 Nov 2013
Module Page 17/21 Document Page 17
PROGRAMME : CONSTRUCTION TECHNOLOGY

COURSE NAME : FINISHING WORKS II

CODE NAME : WTP 4023

CONTENT STANDARD LEARNING STANDARD PERFORMANCE CRITERIA

9.1 Identify the location of work site 9.1.1 Describe the usage of machineries according to
9. CARRY OUT GRINDING manual specification.
AND POLISHING 9.1.2 Identify machineries needed according to job
WORK ON PARQUET / specification.
FLOOR BOARD ON FLOOR 9.1.3 Select machineries needed according to job
specification.

9.2 Prepare the chemical and relevant 9.2.1 List out chemical and relevant materials
materials for polishing according to work requirement.
9.2.2 Describe the usage of chemical according to its
function.
9.2.3 Select the chemical for polishing in accordance
with manufacturer's instruction and the product
manual.

9.2 Conduct grinding and polishing work 9.3.1 Describe the steps of grinding and polishing
according to standard operational procedure.
9.3.2 Prepare works for grinding and polishing
according to work procedure.
9.3.3 Perform grinding and polishing to smoothen
surface by proper procedure according blue print
and specification.

18
Last Edited 10-13 Nov 2013
Module Page 18/21 Document Page 18
CONTENT AND LEARNING STANDARDS

19
Last Edited 10-13 Nov 2013
Module Page 19/21 Document Page 19
PROGRAMME : CONSTRUCTION TECHNOLOGY

COURSE NAME : FINISHING WORKS II

CODE NAME : WTP 4023

LEARNING STANDARD
CONTENT STANDARD PERFORMANCE CRITERIA

10. LAY POLYVINYL CHLORIDE 10.1 Identify the location of work site 10.1.1 Select site location suitable for to work order.
TILES
10.2 Arrange work into to the work 10.2.1 Interpret blue print according to the suitability of
sequence placement procedure.
10.2.2 Organise works according to logical work
sequence.

10.3 Prepare required materials 10.3.1 List out materials according to work requirement.
10.3.2 Describe the usage of the materials according to
their specification .
10.3.3 Select proper materials to be used in accordance
with work requirement.

10.4 Prepare proper tools and equipment 10.4.1 List out tools and equipment according work
requirement.
10.4.2 Describe the usage of tools according to
standard function.
10.4.3 Select tools and equipment to be used in
accordance with the list.

20
Last Edited 10-13 Nov 2013
Module Page 20/21 Document Page 20
10.5.1 Make-up surface for laying polyvinyl chloride tiles
10.5 Prepare surfaces for laying polyvinyl in according to laying specification.
chloride tiles
10.6.1 Perform setting out of polyvinyl chloride tiles
10.6 Set- out and polyvinyl chloride tiles arrangement according proper setting-out
arrangement technique.

10.7.1 Describe the proper adhesive ratio according job


10.7 Prepare required adhesive specification.
10.7.2 Mix adequate required adhesive in accordance with
recommended ratio in the product manual.

10.8.1 Adhere polyvinyl chloride tiles by proper


10.8 Fix polyvinyl chloride tiles procedures according to proper technique and
method.
10.8.2 Describe the steps of fixing polyvinyl chloride tiles
according to standard operational procedure

10.9.1 Describe the steps of finishing process on


10.9 Apply finishing on polyvinyl polyvinyl chloride floor tiles according to standard
chloride floor tiles . operational procedure.
10.9.2 Select finishing materials in accordance with
manufacturer's instruction and the product manual.
10.9.3 Perform finishing on polyvinyl chloride floor tiles
according to proper technique.

21
Last Edited 10-13 Nov 2013
Module Page 21/21 Document Page 21

Вам также может понравиться