Bill of Quantity

Project : Centralisasi Panel Project (Pekerjaan Steel Structure, Arsitecture, dan Finishing )
Date : 2019
Location : Process House

No Description Specification Unit Quantity

A Pekerjaan Persiapan
1 Material
- Terpal/Paranet A2 Naga ( 8 x 12 m ) Lbr 6,00
- Kawat Bendrat Kg 5,00

C Pekerjaan Struktur ( Steel Structure dan Pelat Lantai )


Steel Structure
1 Material
- Kolom HB 250.250.9.14 SS 400 Lgs 3
- Kolom Praktis wf 150.75.5.7 SS 400 Lgs 15
- Balok 1 WF 300.150.6,5.9 SS 400 Lgs 10
- Balok 2 WF 250.125.6.9 SS 400 Lgs 8
- Balok 3 WF 200.100.5,5.8 SS 400 Lgs 2
- UNP 150.75.9 SS 400 Lgs 15
- Bracing Double Angle 60.60.5 SS 400 Lgs 15
- Dudukan Plateform L 50.50.4 SS 400 Lgs 10
- Tiang Hendrail Pipa 1 1/4" Lgs 8
- Hendrail Pipa 1" Lgs 16
- Connecting Plate 8 mm SS 400 Lbr 5
- Base Plate t = 12 mm SS 400 Lbr 2
- Base Plate t = 20 mm SS 400 Lbr 1
- Plateform Non Slip Lbr 9
- Baut M20 + Nut & Washer A325 Pcs 200
- Kawat Las RB 26 E 6013 Kg 70
- Grinding Whell 4" Box 5
- Cutting Whell 4'' Box 5
2 Alat
- Chain Block 2 ton + Sling Belt Unit 3
- Welding Machine Unit 2
- Torque Wrench (Kunci Torsi) Unit 2
- Mesin Gerinda Tangan Unit 3
- Oxyacetilene ( Blander ), Include : Set 1
- Tabung O2
- Tabung Oxyacitilene
- Cutting Torch
- Selang Gas (Karbit)
- Regulator
Pelat Lantai
1 Material
- Beton Ready Mix K 300 m3 26,00
2
- Wiremaesh M10 - 150 mm ( 2,1 x 5,4 m ) Lbr 18,00
- Bondek t = 1 mm m2 118,00
- Stud Ø 10 L = 75 mm Pcs 400,00
- Raised Floor + 0.700 m ( Include : Panel, Rangka, dan Pedestal ) m2 215,00

2 Alat
- Scaffolding Frame Complate Set Set 15,00