Вы находитесь на странице: 1из 1

TIME SCHEDULE R2

PROYEK GRAHA GATSU - Jl. Gatot Subroto Jakarta Selatan


JULI-2016 AGUSTUS-2016 SEPTEMBER-2016 OKTOBER-2016 NOVEMBER-2016 DESEMBER-2016 JANUARI-2017 FEBRUARI-2017 MARET-2017 APRIL-2017 MEI-2017 JUNI-2017 JULI-2017 AGUSTUS-2017 SEPTEMBER-2017 OKTOBER-2017 NOVEMBER-2017 DESEMBER-2017 JANUARI-2018 FEBRUARI-2018 MARET-2018
Durasi M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26 M27 M28 M29 M30 M31 M32 M33 M34 M35 M36 M37 M38 M39 M40 M41 M42 M43 M44 M45 M46 M47 M48 M49 M50 M51 M52 M53 M54 M55 M56 M57 M58 M59 M60 M61 M62 M63 M64 M65 M66 M67 M68 M69 M70 M71 M72 M73 M74 M75 M76 M77 M78 M79 M80 M81 M82 M83 M84 M85 M86 M87
No. Start Finish Bobot
(hari) 18/7 25/7 1/8 8/8 15/8 22/8 29/8 5/9 12/9 19/9 26/9 3/10 10/10 17/10 24/10 31/10 7/11 14/11 21/11 28/11 5/12 12/12 19/12 26/12 2/1 9/1 16/1 23/1 30/1 6/2 13/2 20/2 27/2 6/3 13/3 20/3 27/3 3/4 10/4 17/4 24/4 1/5 8/5 15/5 22/5 29/5 5/6 12/6 19/6 26/6 3/7 10/7 17/7 24/7 31/7 7/8 14/8 21/8 28/8 4/9 11/9 18/9 25/9 2/10 9/10 16/10 23/10 30/10 6/11 13/11 20/11 27/11 4/12 11/12 18/12 25/12 1/1 8/1 15/1 22/1 29/1 5/2 12/2 19/2 26/2 5/3 12/3

A PRELIMINARIES 18/07/16 17/03/18 595 12.9659 0.1263 0.1263 0.1263 0.1263 0.1263 0.1263 0.1263 0.1263 0.1263 0.1263 0.1263 0.1263 0.1263 0.1263 0.1263 0.1263 0.1263 0.1263 0.1263 0.1263 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558 0.1558

B PEKERJAAN PERSIAPAN 18/07/16 28/11/16 133 1.0001 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500

C PEKERJAAN KONSTRUKSI 20/08/16 17/03/18

D PEKERJAAN DPT & GALIAN 20/08/16 08/04/17 149

1 Guide Wall 20/08/16 14/09/16 25 0.4832 0.1208 0.1208 0.1208 0.1208

2 Diaphragm wall 05/09/16 29/12/16 115 11.4692 0.1571 0.7070 0.7070 0.7070 0.7070 0.7070 0.7070 0.7070 0.7070 0.7070 0.7070 0.7070 0.7070 0.7070 0.7070 0.7070 0.7070

3 Capping Beam 28/11/16 20/01/17 53 0.7397 0.0822 0.0822 0.0822 0.0822 0.0822 0.0822 0.0822 0.0822 0.0822

4 Galian Tanah Keseluruhan 03/12/16 08/04/17 126 1.6749 0.0931 0.0931 0.0931 0.0931 0.0931 0.0931 0.0931 0.0931 0.0931 0.0931 0.0931 0.0931 0.0931 0.0931 0.0931 0.0931 0.0931 0.0931

5 Ground Anchor 03/12/16 31/03/17 118 3.2757 0.1927 0.1927 0.1927 0.1927 0.1927 0.1927 0.1927 0.1927 0.1927 0.1927 0.1927 0.1927 0.1927 0.1927 0.1927 0.1927 0.1927

E PEKERJAAN DEWATERING 09/02/17 07/09/17 210 0.8046 0.0260 0.0260 0.0260 0.0260 0.0260 0.0260 0.0260 0.0260 0.0260 0.0260 0.0260 0.0260 0.0260 0.0260 0.0260 0.0260 0.0260 0.0260 0.0260 0.0260 0.0260 0.0260 0.0260 0.0260 0.0260 0.0260 0.0260 0.0260 0.0260 0.0260 0.0260

F PEKERJAAN STRUKTUR 02/03/17 17/03/18 380

1 BASEMENT 3 02/03/17 08/05/17 67 15.6986 0.0000 1.5699 1.5699 1.5699 1.5699 1.5699 1.5699 1.5699 1.5699 1.5699 1.5699

2 BASEMENT 2 09/04/17 18/05/17 39 3.0271 0.0000 0.5045 0.5045 0.5045 0.5045 0.5045 0.5045
L
I
3 BASEMENT 1 30/04/17 04/06/17 35 3.0261 0.0000 0.5043 0.5043 0.5043 0.5043 0.5043 0.5043

4 SEMI BASEMENT 19/05/17 23/06/17 35 2.9940 0.4990 0.4990 0.4990 0.4990 0.4990 0.4990

6
LANTAI 1 (GROUND)

LANTAI MEZZANIN
07/06/17

17/06/17
17/07/17

11/07/17
40

24
3.8321

0.7200
0.7664 0.7664

0.2400
B 0.7664

0.2400
0.7664

0.2400
0.7664

7 LANTAI 2 11/07/17 30/07/17 19 1.8371


U 0.4593 0.4593 0.4593 0.4593

R
8 LANTAI 3 21/07/17 08/08/17 18 1.8471 0.4618 0.4618 0.4618 0.4618

9 LANTAI 4 30/07/17 17/08/17 18 1.8514 0.4629 0.4629 0.4629 0.4629

10 LANTAI 5 08/08/17 07/09/17 30 1.4705


A 0.2941 0.2941 0.2941 0.2941 0.2941

N
11 LANTAI 6 15/08/17 14/09/17 30 1.4705 0.2941 0.2941 0.2941 0.2941 0.2941

12 LANTAI 7 05/09/17 20/09/17 15 1.4705 0.4902 0.4902 0.4902

13

14
LANTAI 8

LANTAI 9
11/09/17

17/09/17
26/09/17

02/10/17
15

15
1.4705

1.4705
L 0.4902 0.4902

0.4902
0.4902

0.4902 0.4902

15 LANTAI 10 23/09/17 09/10/17 16 1.3711


E 0.4570 0.4570 0.4570

B
16 LANTAI 11 29/09/17 14/10/17 15 1.3711 0.4570 0.4570 0.4570

17 LANTAI 12 05/10/17 20/10/17 15 1.3711 0.4570 0.4570 0.4570

18 LANTAI 13 11/10/17 26/10/17 15 1.5447


A 0.5149 0.5149 0.5149

R
19 LANTAI 14 17/10/17 01/11/17 15 2.4696 0.8232 0.8232 0.8232

20 LANTAI 15 23/10/17 05/11/17 13 1.0731 0.3577 0.3577 0.3577

21

22
LANTAI 16

LANTAI 17
29/10/17

04/11/17
11/11/17

17/11/17
13

13
0.9823

0.9823
A 0.3274 0.3274

0.3274
0.3274

0.3274 0.3274

23

24
LANTAI 18

LANTAI 19
10/11/17

16/11/17
23/11/17

29/11/17
13

13
0.9823

0.9823
N 0.3274

0.3274
0.3274

0.3274
0.3274

0.3274

25 LANTAI 20 22/11/17 05/12/17 13 0.9621 0.3207 0.3207 0.3207

R2
26 LANTAI 21 28/11/17 11/12/17 13 0.9621 0.3207 0.3207 0.3207

27 LANTAI 22 04/12/17 17/12/17 13 0.9621 0.3207 0.3207 0.3207

28 LANTAI 23 10/12/17 23/12/17 13 0.9621 0.3207 0.3207 0.3207

29 LANTAI 24 16/12/17 29/12/17 13 0.9621 0.3207 0.3207 0.3207

30 LANTAI 25 22/12/17 05/01/18 14 0.9569 0.3190 0.3190 0.3190

31 LANTAI 26 28/12/17 12/01/18 15 0.9569 0.3190 0.3190 0.3190

32 LANTAI 27 04/01/18 18/01/18 14 0.9569 0.3190 0.3190 0.3190

33 LANTAI 28 11/01/18 24/01/18 13 0.9569 0.3190 0.3190 0.3190

34 LANTAI 29 (Fasilitas Bawah) 17/01/18 30/01/18 13 0.9569 0.3190 0.3190 0.3190

35 LANTAI 30 (Fasilitas Atas) 23/01/18 05/02/18 13 1.0789 0.3596 0.3596 0.3596

36 LANTAI 31 (Fasilitas ME) 29/01/18 11/02/18 13 1.0874 0.3625 0.3625 0.3625

37 LANTAI Atap LMR 08/02/18 17/03/18 37 0.5096 0.0849 0.0849 0.0849 0.0849 0.0849 0.0849

Total Bobot 100.0000 M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26 M27 M28 M29 M30 M31 M32 M33 M34 M35 M36 M37 M38 M39 M40 M41 M42 M43 M44 M45 M46 M47 M48 M49 M50 M51 M52 M53 M54 M55 M56 M57 M58 M59 M60 M61 M62 M63 M64 M65 M66 M67 M68 M69 M70 M71 M72 M73 M74 M75 M76 M77 M78 M79 M80 M81 M82 M83 M84 M85 M86 M87

Bobot rencana per minggu 0.176 0.176 0.176 0.176 0.176 0.297 0.297 0.454 1.004 0.883 0.883 0.883 0.883 0.883 0.883 0.883 0.883 0.883 0.883 0.966 1.138 1.231 1.231 1.231 0.524 0.524 0.524 0.524 0.442 0.468 0.468 0.468 0.468 2.037 2.037 2.037 2.037 1.845 2.349 2.256 2.256 2.760 2.760 1.191 1.185 1.185 1.952 1.687 0.182 0.182 1.687 2.146 1.869 1.103 1.566 1.400 1.233 1.233 0.770 1.260 1.430 1.626 1.593 2.017 2.042 2.408 1.852 1.664 1.168 1.466 1.459 1.452 1.118 1.118 1.118 1.435 1.433 1.432 1.113 1.153 1.197 0.963 0.603 0.241 0.241 0.241 0.241

Kumulatif bobot rencana per minggu 0 0.176 0.353 0.529 0.705 0.882 1.179 1.476 1.930 2.934 3.817 4.701 5.584 6.467 7.351 8.234 9.117 10.001 10.884 11.767 12.733 13.870 15.101 16.332 17.563 18.086 18.610 19.134 19.658 20.099 20.567 21.034 21.502 21.969 24.007 26.044 28.081 30.119 31.963 34.313 36.569 38.825 41.585 44.346 45.537 46.722 47.907 49.858 51.546 51.727 51.909 53.596 55.743 57.612 58.715 60.280 61.681 62.914 64.147 64.917 66.177 67.607 69.233 70.826 72.843 74.885 77.293 79.145 80.809 81.977 83.443 84.902 86.354 87.472 88.590 89.708 91.143 92.576 94.008 95.121 96.274 97.471 98.434 99.037 99.278 99.518 99.759 100.000

Bobot aktual per minggu 0 0.316 0.316 0.316 0.316 0.316 0.332 0.429 0.586 0.173 0.173 0.716 0.720 0.698 0.709 0.893 1.339 0.956 0.956 1.084 0.969 0.960 0.861 1.139 1.302 1.144 0.778 0.678 0.428 0.439 0.439 0.439 0.439 0.228 0.242 0.242 1.633 0.855 0.859 3.308 1.142 1.042 1.042 1.671 1.671 4.617 1.131 2.236 2.236 0.319 0.433 0.896 1.096 1.996 0.796 0.437 0.937 1.037 1.337 1.206 2.215 0.723 1.007

Kumulatif bobot aktual per minggu 0 0.316 0.632 0.948 1.265 1.581 1.913 2.342 2.928 3.101 3.274 3.990 4.710 5.408 6.117 7.010 8.349 9.305 10.260 11.344 12.313 13.273 14.134 15.273 16.575 17.719 18.497 19.176 19.603 20.043 20.482 20.921 21.360 21.588 21.830 22.072 23.705 24.560 25.419 28.727 29.869 30.911 31.954 33.624 35.295 39.912 41.043 43.278 45.514 45.833 46.267 47.162 48.258 50.253 51.049 51.485 52.422 53.458 54.795 56.001 58.216 58.939 59.946

Deviasi 0.140 0.280 0.419 0.559 0.699 0.734 0.866 0.998 0.167 (0.543) (0.711) (0.874) (1.060) (1.234) (1.224) (0.768) (0.696) (0.624) (0.423) (0.420) (0.597) (0.967) (1.059) (0.988) (0.368) (0.113) 0.042 (0.054) (0.057) (0.085) (0.113) (0.142) (0.382) (2.177) (3.972) (4.377) (5.559) (6.545) (5.586) (6.700) (7.914) (9.632) (10.722) (10.242) (6.810) (6.864) (6.580) (6.031) (5.894) (5.642) (6.434) (7.485) (7.359) (7.666) (8.795) (9.259) (9.455) (9.352) (8.916) (7.961) (8.668) (9.287)

DISETUJUI OLEH DIBUAT OLEH,


OWNER REPRESENTATIF KONTRAKTOR
PT KURNIADI REKAJASA PT TOTAL BANGUN PERSADA Tbk

Ir. Ugik Kurniadi Ir. Agus Gunawan


DIREKTUR PROJECT MANAGER

424623743.xlsx 06/18/2019

Вам также может понравиться