Вы находитесь на странице: 1из 8

This is the first part in LTE KPI Optimization and more related articles will be published soon.

So, let us get started witho ut


wasting any further time.

When the UE wants to attach or connect to the network, it needs to setup a RRC Connection as explained in my article LTE
Network Entry Steps. But before that it needs to get synchronized in uplink. This is done by sending a RACH preamble
(Msg1) to the eNB and eNB responds with a Random Access Response (RAR aka Msg2). This is where the UE sends a
Msg3 also known as the RRC Connection Request and this marks the attempt for the RRC Success Rate KPI. This
message contains the objective of the connection and based on that it is subdivided into following major categories:

 Mo-data : Usually used for UE coming back from idle mode if it has data to send or if it has to make a call
 Mo-signaling : Most commonly observed for TAUs and Attach messages
 Mt-access : Idle UE responds to a paging message
 Emergency
 High Priority Access

It also contains a UE identity which can be a TMSI value if the UE was already previously attached to LTE and had a TMSI
allocation or it can be a random value indicating that the UE does not know about its TMSI or it might be coming from
another RAT.

Based on this request, the eNB sends a RRC Connection Setup message which contains the information of SRB and some
basic radio parameters like power control, SRI & CQI periodicity.

Once, the UE gets the RRC Connection Setup, it makes the changes based on the instructions in the message and then
responds with RRC Connection Setup Complete message. This message also contains the NAS information if the UE
intends to send it.
The eNB pegs RRC attempt counter when it receives the RRC Connection Request and the process is deemed successful
on the receipt of the RRC Connection Setup Complete message.

Common Failures In RRC Setup Phase

In order to maintain and optimize the RRC KPI, one should know the major issues that can cause a RRC setup failure.

RRC Setup Failure Due To No Response

This is the most common RRC failure which is present in every network. Most of the failures in the RRC stage are due to no
response from the UE. This means that the eNB receives RRC Connection Request message from the UE and responds
with a RRC Connection Setup message but does not receive or is unable to decode the RRC Connection Setup Complete
message.
Now let’s understand why this happens. The RRC Connection message is usually around 7 bytes in length while the RRC
Connection Setup Complete message may contain the whole NAS information (like TAU or Attach Request) and its size can
vary from as small as 8 bytes to as big as over 100 bytes. Consider that a UE near cell edge with limit ed power sends a
RRC Connection Request. Since, it is only around 7 bytes, it will need a small number of RBs so power per carrier will be
high. But when it needs to send RRC Connection Setup Complete which is around 100 bytes, it will need a bigger number
of resources even if the message is fragmented. So, the average power per carrier will be reduced leading to a higher
probability that the message may not be decoded at the eNB.

This can also happen if there is interference on the cell as it will make it further difficult for the eNB to decode the message.
It can also happen if the UE fails to decode RRC Connection Setup message so it will never send the RRC Connection
Setup Complete message.

RRC Rejections

This is the second issue that can happen but it is usually much less observed in commercial networks compared to the
failures due to no response. In these cases, the eNB rejects the incoming RRC Connection Request by sending a RRC
Reject message. This is mostly observed when eNB experiences congestion and there are not enough resources left to
assign to a new user requesting a RRC Connection.

If the PUCCH is congested, the RRC connection can be rejected. PUCCH carries HARQ ACK/NACKs, CQI and SRIs. If the
PUCCH resources are not available, users will not be able to send CQIs and the eNB cannot schedule without CQI
information. Usually vendors implement PUCCH in a way that when PUCCH utilization is increased, the CQI interval is
increased. For example, users sending CQI with an interval of 10ms will be shifted towards 40ms in order to increase the
capacity of the PUCCH.

But when no further capacity is available, the eNB needs to put a limit on new incoming connections resulting in RRC
Rejections. Similarly, RRC Rejections can be seen if the active UE count increases beyond the board limit or if the CAPS
exceed the limit. The details related to troubleshooting and optimizations for such issues is given below.

Optimization For RRC Success Rate KPI

The following procedures are usually used based on different scenarios

Conventional Method : Physical Optimization


The easiest and conventional method is the physical optimization. For instance, down-tilting a cell will reduce the coverage
and remove the far-away users. This will reduce the probability of RRC failure due to no response. However, there will be
issues that might not be resolved by the conventional approach so I have listed down other methods that might come in
handy.

Relevant Timers

There are two relevant timers for RRC Success Rate KPI.

The first timer is maintained on the UE and it is the famous T300. UE starts it after sending the RRC Connection Request
and stops it at the receipt of RRC Connection Setup or Reject message. If this timer is too small, the UE will stop waiting f or
the RRC Connection Setup message and the RRC procedure will fail. So, increasing this timer can help in this phase.

Secondly, eNB has an internal timer (different vendors have different names for it) which the eNB starts after sending the
RRC Connection Setup message. It stops this timer after successfully receiving the RRC Connection Setup Complete
message. So, if this timer is small and the UE is trying to send the RRC Connection Setup Complete with retransmissions,
then the eNB will consider it a failure as soon as the timer expires. So, increasing this timer might also help in certain
scenarios.

Coverage Enhancement & Power Control

The RRC failures due to lack of response from UE can also be caused if the power control on the PUSCH is not correct or if
it is too conservative. For instance, the power control on PUSCH depends on the P0 Nominal value as well as Alpha factor.
Different vendors use different settings here like using a low P0 Nominal value (for example -100 dBm) with a higher Alpha
factor of around 0.9 or 1 or a using a high P0 Nominal value (for example -70dBm) with a smaller Alpha factor of 0.7 or 0.8.
But if both the P0 Nominal and Alpha factor are low then the UE will use a smaller power value to send the RRC
Connection Setup Complete and therefore, the chances are that it will not be decoded correctly.

In case there is interference on the cell, then features which mitigate interference should be enabled. For instance, enablin g
Interference Rejection Combining can provide good gains in such scenarios.

Mobile Originating Signalling RRC Success Rate


Usually Mo-Sig RRC Success Rate is lower than others. The reason is once again linked to the size of the MSG-5 (RRC
Connection Setup Complete). For a normal Mo-data or Mt-access, the size of RRC Connection Setup Complete message is
around 8 to 10 bytes but for Mo-signalling, it can vary and usually is above 50 bytes. This is because Mo-signalling RRC
Request is usually used for NAS signalling messages like Attach Request or Tracking Area Update Requests. These
messages are big in size and are sent inside the RRC Connection Setup Complete message as NAS. So, this reduces the
RRC Success Rate of RRC Mo-Signalling compared to other RRC Request types.

This means that if the network has a higher ratio of RRC Mo-Signalling requests then it will have a lower RRC Success
Rate. Usually, Mo-Signalling is around 20 to 25% while Mo-data has the highest percentage. Still it can vary from network
to network based on TAC planning and mobility strategy. However, if you have very high Mo-Signalling percentage then the
chances are that RRC Success Rate will be relatively lower compared to another similar network with lower Mo-Signalling
percentage.

Incompatible UEs

It has been seen that sometimes there are users that are not compatible with the configuration of the network. So, once
they receive the RRC Connection Setup message and they find out that they are not compatible with the configuration
provided, they do not respond with a RRC Connection Setup Complete message resulting in a RRC failure on the eNB.
However, such users keep trying again and again impacting the KPI. This kind of issue can be seen from the traces or
CHRs that verifies that it is a single user. It might be inferred from the RRC counters as well since the number of failu res
are relatively same in consecutive intervals. However, such cases usually go unsolved as it is not a network issue but an
abnormal UE problem.

PUCCH Based RRC Rejections

RRC Rejections due to PUCCH congestion can be solved by simply increasing the PUCCH Resource Blocks. Vendors have
parameters for PUCCH allocations and minimum PUCCH Resource Block allocation is 4 per subframe. This is because
each slot has PUCCH RB allocation on both ends of the band so that means that each slot will have atleast 2 Reso urce
Blocks for PUCCH – one at the top of the frequency band and the other at the bottom of the band. Since, each subframe
has two slots so that means that the subframe will have atleast 4 PUCCH Resource Blocks.

When 4 PUCCH RBs are not enough, they can be expanded to a higher value using parameter or in some implementations,
an adaptive approach can be maintained where the eNB changes the PUCCH RB count dynamically based on the load
requirement. This approach solves the issue completely.

User Count Based or Flow Control Based RRC Rejections


Different baseband boards and vendors have different limitations on active user count and CAPS (Call Attempts Per
Second). When such limitation is reached, incoming RRC Connection Requests are rejected by the eNB based on flow
control or resource issue. In such cases, the following basic steps can be done

 Decrease the UE Inactivity Timer to a smaller value. This will initiate early release for the users and load due to user
count will be reduced. However, this can increase the signalling load as idle users can try to come back to network more
frequently which can increase CPU usage of the eNB. So, only use this if the issue is related to user limitation while CPU
usage is fine.
 T302 should be increased to limit the RRC signalling load. When a UE gets a RRC Reject from eNB, it has to wait for
T302 seconds before sending another RRC Connection Request. So, increasing T302 will increase the interval between
such RRC Connection Requests and therefore, reduce the signalling load on the eNB.
 Mobility Load Balancing is another feature that can help in such a scenario by moving users away from the congested
carrier to another less utilized carrier.

If you have any questions or feedback regarding this article, simply drop a comment below. I will respond accordingly and