New Box culvert Drain - 1:400 slope New 900mm dia pipe drain - 1:400 slope

Input Data: Input Data:


Cross-sectional Area of Flow; A = 1.225 m2 Cross-sectional Area of Flow; A =
Coefficient of Roughness; n = 0.012 Coefficient of Roughness; n =
Wetted Perimeter; P = 5.400 m Wetted Perimeter; P =
Slope of Pipe; S = 0.0025 m/m Slope of Pipe; S =

Results: Results
Hydraulic Radius; R = 0.227 m Hydraulic Radius; R =
Flow Rate; Q = 2.821 m /s3
Flow Rate; Q =
Velocity = 2.303 m/s Velocity =
- 1:400 slope

0.636 m2 0.900 m dia.


0.012
2.403 m
0.0025 m/m

0.265 m
1.624 m3/s
2.553 m/s
Existing C8 - 1:400 slope
Input Data:
Cross-sectional Area of Flow; A = 0.581 m2
Coefficient of Roughness; n = 0.012
Wetted Perimeter; P = 1.850 m
Slope of Pipe; S = 0.0025 m/m

Results:
Hydraulic Radius; R = 0.314 m
Flow Rate; Q = 1.663 m3/s
Velocity = 2.862 m/s

3.3265548
New 900mm dia pipe drain - 1:400 slope
Input Data:
Cross-sectional Area of Flow; A = 1.131 m2 1.200 m dia.
Coefficient of Roughness; n = 0.012
Wetted Perimeter; P = 3.204 m
Slope of Pipe; S = 0.0025 m/m

Results
Hydraulic Radius; R = 0.353 m
Flow Rate; Q = 3.497 m3/s
Velocity = 3.092 m/s
Existing C8 - 1:400 slope
Input Data:
Cross-sectional Area of Flow; A = 0.581 m2
Coefficient of Roughness; n = 0.012
Wetted Perimeter; P = 1.850 m
Slope of Pipe; S = 0.0025 m/m

Results:
Hydraulic Radius; R = 0.314 m
Flow Rate; Q = 1.663 m3/s
Velocity = 2.862 m/s

New U-Drain - 1:400 slope


Input Data:
Cross-sectional Area of Flow; A = 0.423 m2
Coefficient of Roughness; n = 0.012
Wetted Perimeter; P = 2.822 m
Slope of Pipe; S = 0.0025 m/m

Results:
Hydraulic Radius; R = 0.150 m
Flow Rate; Q = 0.739 m3/s
Velocity = 1.747 m/s
MANNING'S FORMULA

Discharge, Q = A (1.486/n) (R2/3) (S1/2)

where;
Hydraulic Radius; R = A/P

C8 - 1:200 slope
Input Data:
Cross-sectional Area of Flow; A = 0.906 m2
Coefficient of Roughness; n = 0.014
Wetted Perimeter; P = 2.574 m
Slope of Pipe; S = 0.005 m/m

Results
Hydraulic Radius; R = 0.352 m
Flow Rate; Q = 3.391 m3/s
Velocity = 3.742 m/s

C8 - 1:400 slope
Input Data:
Cross-sectional Area of Flow; A = 0.906 m2
Coefficient of Roughness; n = 0.014 5.790
Wetted Perimeter; P = 2.574 m
Slope of Pipe; S = 0.003 m/m

Results
Hydraulic Radius; R = 0.352 m
Flow Rate; Q = 2.398 m3/s
Velocity = 2.646 m/s

Box culvert - 1:200 slope


Input Data:
Cross-sectional Area of Flow; A = 1.250 m2
Coefficient of Roughness; n = 0.014
Wetted Perimeter; P = 2.574 m
Slope of Pipe; S = 0.005 m/m

Results
Hydraulic Radius; R = 0.486 m
Flow Rate; Q = 5.796 m3/s
Velocity = 4.637 m/s
Materials Manning's "n"
Materials Brass 0.011
Cast Iron 0.013
Smooth Steel 0.012
Corrugated Metal 0.022
Glass 0.01
Clay Tile 0.014
Brickwork 0.015
Asphalt 0.016
Masonry 0.025
Finished Concrete 0.012
Non-Metals

Unfinished Concrete 0.014


Gravel 0.029
Earth 0.025
Planed Wood 0.012
Unplained Wood 0.013
Corrugated Polyethylene (PE) with smooth inner walls 0.009-0.015
Corrugated Polyethylene (PE) with corrugated inner walls 0.018-0.025
Polyvinyl Chloride (PVC) with smooth inner walls 0.009-0.011
Clean 0.022
Excavated

Channels

Gravelly 0.025
Earth

Weedy 0.03
Stony, Cobbles 0.035
Clean and Straight 0.03
Floodplains Streams
Natural

Major Rivers 0.035


Sluggish with Deep Pools 0.04
Pasture, Farmland 0.035
Light Brush 0.05
Heavy Brush 0.075
Tress 0.15
MANNING'S FORMULA:

Q = A(1.486/n)(R2/3)(S1/2)

Q = Discharge (m3/s)
A = Cross-sectional Area of Flow (m2)
n = Coefficient of Roughness
S = Slope of Pipe (m/m)
R = Hydraulic Radius (m)
= A/P
where;
P = Wetted Perimeter (m)

Existing C7 - 1:400 slope


Input Data:
Cross-sectional Area of Flow; A = 0.250 m2
Coefficient of Roughness; n = 0.012
Wetted Perimeter; P = 1.300 m
Slope of Pipe; S = 0.0025 m/m

Results
Hydraulic Radius; R = 0.192 m
Flow Rate; Q = 0.516 m3/s
Velocity = 2.063 m/s

Existing C7 - 1:400 slope


Input Data:
Cross-sectional Area of Flow; A = 0.250 m2
Coefficient of Roughness; n = 0.012
Wetted Perimeter; P = 1.300 m
Slope of Pipe; S = 0.0025 m/m

Results
Hydraulic Radius; R = 0.192 m
Flow Rate; Q = 0.516 m3/s
Velocity = 2.063 m/s
New Box culvert Drain - 1:400 slope
Input Data:
Cross-sectional Area of Flow; A = 0.261 m2 HEAVY VEHICLE PARK
Coefficient of Roughness; n = 0.012
Wetted Perimeter; P = 1.610 m
Slope of Pipe; S = 0.0025 m/m

Results:
Hydraulic Radius; R = 0.162 m
Flow Rate; Q = 0.480 m3/s
Velocity = 1.841 m/s

New Box culvert Drain - 1:400 slope


Input Data:
Cross-sectional Area of Flow; A = 0.262 m2 KJE SLIP RAOD
Coefficient of Roughness; n = 0.012
Wetted Perimeter; P = 1.610 m
Slope of Pipe; S = 0.0025 m/m

Results:
Hydraulic Radius; R = 0.163 m
Flow Rate; Q = 0.484 m3/s
Velocity = 1.846 m/s