SAP Implementation
BUSINESS BLUEPRINT
Business Blueprint
Workflow
BHARAT ELECTRONICS LIMITED
SAP IMPLEMENTATION
DOCUMENT APPROVALS
.Dev.N.V....................................... ................................
Core Team Member-1 Name Date
.Kiran.G.N..................................... ................................
Core Team Member-2 Name Date
.Maheshwaran....................... ................................
Wipro Project Manager Date
GENERAL INFORMATION
DOCUMENT INFORMATION
Version Filename Date Author Reviewed Changes from
by previous version
1.0 Business C.S.Ramanujan Raju First Version
Blueprint 03/03/2005
Workflow
1.1 Business 20/03/2005 C.S.Ramanujan Raju Reference to other
Blueprint modules changed.
Workflow
REFERENCE DOCUMENTS
B01-PP-WF-090: Workflow
Sub Process: WF-090-10: Workflow
Requirements:
SL WORKFLOW DESCRIPTION DRAFT WORKFLOW
NO
1 OARC Release/Change PLANNER-PROJECT ENGR- IED
2 MRP run PROJECT ENGR - PC HEAD
3 PCB/TCW - ST PO conversion PROJECT ENGR - PC HEAD- MM –
PCB/TRCW MRP controllers
4 Work Centre Creation / Change MRP controller – Production Dept
Heads
5 Production Order Cost Settlement Production Dept – Finance Dept
Process:
Production control / Production person will create new routing or Rate Routing using CA01
or CA21.
He will update all the information except the “Activity Time” related information, as the
same information is not available with him. The Status of the routing / rate routing will be
‘Created’.
Industrial Engineering Dept will then update the activity time for each activity using CA02
or CA22.
Hence information should flow from Production Control / Production to Industrial Engg.
Dept, indicating that a specific routing has been created or modified in the system and
they now should update the activity time.
** Industrial Engineering Dept should not have the access to change the status.
2. MRP Run
Notification of MRP Run:
In a make to order scenario, MRP run will be carried out for each sales order separately.
This is managed thru a custom transaction ZPP002, which internally refers to MD50.
3. PCB/TCW – ST PO conversion
On Hold, however some details are available:
Central Manufacturing Services Plants TCW & PCBs (Transformers & Coil Winding and
Printed Circuit Boards) receives requirements from various other plants (manufacturing
plants) for manufacture and supply of PCBs and TCW items.
When ever the planning plant runs MRP, Planned Orders are generated for both
production elements and procurement elements. These planned orders can then be
converted to PR / STPR using custom transaction ZMM004, which internally calls SAP
transaction MD14 / MD 15.
Production is responsible for planned order to purchase requisition conversion.
Purchasing is responsible for requisition to purchase order conversion.
The details of STPR and STPO have to be sent to the MRP controllers of PCB and
TRCW.
Issues:
Currently execution of MD14 / MD15 is considered as the triggering point, however, this
need to be further explored as decided upon.
ZMM004
(MD16)
Plant 1 Planned
orders
Purchase CMS
Orders
Purchase
Req
A work flow is required for production order cost settling. Once the Production Order is
fully confirmed and the status of the production order is made as TECO, the work flow
should intimate the finance for settling the cost immediately against that production order.