Вы находитесь на странице: 1из 3

Application

technical migration manager


Experience:

▪ Investment banking technology and business knowledge preferred


▪ Data centre exit projects – application focussed
▪ Optimisation /Transformation projects
▪ Physical and Virtual platforms
▪ Front office experience
▪ Strong Client facing experience


Technologies

▪ Solaris
▪ Windows
▪ AIX
▪ Managed services and cloud platforms.
▪ Database….Oracle/Sybase/SQL
▪ Character set
▪ Schema understanding
▪ Migration methodology, ie.. user lockout, export data, convert character
set, import data, set parameters, database links,
▪ Network topologies - Multicast, GSLB, DMZ, Zoning, iLO access
▪ RPE2 values
▪ SAN: EMC, 3PAR – SRDF, double take, host level copy








Job description

▪ Application migration management and Coordination between the DB


CIO business groups, HPE Delivery teams and Live services / operations as
required
▪ Submit and co-ordinate ITPM Application Questionnaire & associated
deliverables (AN&,AN8/SD11/Firewall eagle eye/CMO documentation)
▪ Create Solution agreement document (CMO-FMO)
▪ Set-up and Conduct Deep Dive meeting with application team
▪ Manage application team (ITAO/CIO) end to end – Single point of contact
▪ Manage Audit process for physical moves
▪ Initiate Equipment purchase or VM allocation
▪ Creation of All RFS submissions
▪ Single point of contact for DB Retained teams (DAP/DWEB/Networks)
▪ Firewall preparation (via IP Mover and Firewall resources)
▪ Ensuring DR plans, storage stack upgrades, and s/w patching are in line
with migration schedules (with Service Ops)
▪ Tooling Governance (Inc. maintain CLOTracker/DMT/MPM/schedule)
▪ Review / manage and execute migration schedule
▪ Scheduled migrations/activations, including handover/handback details
and touch points.
▪ Adhoc tasks (ancillary host, database, networks and storage tasks)
▪ Secure Migration resource
▪ Produce / Supplement ‘Run Book’ based on information updated from the
schedule, with detailed breakdown of migration steps.
▪ Overall management of Change Management requests (supplemented
with dedicated Change team)
▪ Go/no-go meeting to provide final decision point.
▪ E2E for all Decommission
▪ Responsible for execution of migration tasks (supplemented with
technical Project team), including:
▪ extract actionable infrastructure data from golden sources to create a
picture of an application’s current environment
▪ formulate an infrastructure optimization strategy, and prepare a master
scope list
▪ scope qualification
▪ recommend an optimization approach based on hardware, operating
system, database, support lifecycle, application complexity, or hosting
complexity or to align applications with the technology roadmap
▪ engage with CIOs and IT leaders to confirm current environment details,
validate the approach, review role and responsibilities, and create a
master schedule
▪ identify optimization program "opt-outs" based on technical attributes,
target environment characteristics, and infrastructure readiness
▪ develop a methodology to right-size new infrastructure assets based on a
review of benchmark data (e.g., RPE2), normal and peak utilization
figures, and other data points
▪ initiate, plan, execute, and manage physical-to-virtual migrations under
Windows and Linux
▪ initiate, plan, execute, and manage virtual-to-virtual migrations under
Solaris to consolidate infrastructure or bring Solaris Zones into a centrally
managed hosting environment
▪ migrate stand-alone Oracle and SQL Server database instances to a shared
service or utility environment
▪ plan and run large operating system and database "security patching"
program