Peyto HW AT Checklist

Site Information

Node Type NCS55A2


Serial Number FOC2233R0VL
NE Name Besanda
M6 Code BCE/PTA/001
City

Site Address

Inventory Sheet

S.No Type Model Serial. No Slot/Port


1 Shelf NCS55A2 Fixed Base HD Chassis FOC2233R0VL
2 MPA-2THS -1 NCS5500 2x CFP2_DCO with 100G MAC sec MPA
3 MPA-2THS -2 NCS5500 2x CFP2_DCO with 100G MAC sec MPA
4 100G SFP-1 Cisco CFP2 DCO Pluggable ACA22520003
5 100G SFP-2 Cisco CFP2 DCO Pluggable ACA22520006
6 100G SFP-3 Cisco CFP2 DCO Pluggable
7 100G SFP-4 Cisco CFP2 DCO Pluggable
8 10G SFP-1 Cisco SFP+ 10G LR AVD2228K5MF
9 10G SFP-2 Cisco SFP+ 10G LR AVD2228K7UW
10 10G SFP-3 Cisco SFP+ 10G LR AVD2228K7UG
11 10G SFP-4 Cisco SFP+ 10G LR AVD2228K7V1

Installation Checklist
The following check list is intended to act as a reminder for points to look
for/review whilst conducting an installation inspection. Judgment on the quality on
the installation is left to the individual.
Item Checklist

Racks 1.All panels earthed ☐YES ☐NO

2.Front and rear labelling ☐YES ☐NO

3.Earth/ESD bond point available - NA

4.Earth bars labelled on each rack. ☐YES ☐NO

5.Sufficient access to the front to allow proper access to equipment ☐YES ☐NO

6.Sufficient access to the rear to allow proper access to equipment ☐YES ☐NO

7. Location/footprint/orientation does not block movement to/from other rack ☐YES ☐

NO

8.Location/orientation/ventilation is does not block room airflow ☐YES ☐NO

9.Finished build is sturdy ☐YES ☐NO


10.Spare cards/equipment, if any, stored in ESD protective packaging - NA

11.Doors open/lock smoothly latches turned around where necessary - NA

12.Racks are bayed - NA

13.Racks are bolted to the floor, where applicable - NA


14.Racks do not exhibit signs of damaged- NA

15.Equipment connected with 2 power sources ☐YES ☐NO

Equipment 1.Equipment is installed as per agreed plan of the cabinet ☐YES ☐NO

2.Does not block airflow ☐YES ☐NO


3.Space is available for cable management - NA

4.Secured to guide rails, sufficient use of screws - NA

5.Screw heads are not damaged - NA

6.Front and rear labelling ☐YES ☐NO


7.Power supply labelling ☐YES ☐NO

8.Access for interface/card/power supply replacement ☐YES ☐NO

9.Power supplies labelled (hardware o r stickers) ☐YES ☐NO

10.Unused fibertoports
1.Site engineer have
verify thatprotective covers
all cards and SFPsfitted
are available as per site BoQ. ☐YES ☐NO
BoQ
Verification 2.Site engineer to verify that cards and SFPs are inserted in the planned slots of Cisco device
☐YES ☐NO
Item Checklist

Fiber Cabling 1. Labelling: source/destination as per agreed plan. ☐YES ☐NO

2.Use of cable management ☐YES ☐NO

3.Minimal length/weight/strain pulling on termination point- NA


4.Sufficient use of Velcro/cable ties. ☐YES ☐NO

5.Multiple cables are bundled - NA

6.Does not block airflow ☐YES ☐NO

7.Color coding (yellow for single mode) ☐YES ☐NO

8.Spare cables have been returned to Cisco ☐YES ☐NO

9.Cabling adheres to cable schedule ☐YES ☐NO

Power 1.FRLS cables to be used for Airtel’s Peyto site locations. ☐YES ☐NO
Cabling
2.Labelling: source/destination ☐YES ☐NO

3.Use of cable management ☐YES ☐NO


4.Minimal length/weight pulling on termination point ☐YES ☐NO

5.Sufficient use of tie wraps ☐YES ☐NO


6.Cable bundling ☐YES ☐NO

7.Tie wraps cut cleanly ☐YES ☐NO


8.Insulation sleeves are intact to point of termination ☐YES ☐NO

9.Termination has protective covers ☐YES ☐NO


10.DC has protective covers ☐YES ☐NO
11.DC breakers labelled - NA
12.DC breakers are of correct values- NA
13.Earth connections are marked with labels ☐YES ☐NO

14.No spare cables are left dangling and unsecured ☐YES ☐NO
Environment 1.Waste has been disposed of/no rubbish has been left near the
equipment onsite ☐YES ☐NO
2.Clean environment/free from dust/air filters on equipment free
from excessive dust ☐YES ☐NO
3.Air-conditioning available ☐YES ☐NO

CISCO Site Engg Name Airtel Site Engg Name

CISCO Site Engg Mobile No Airtel Site Engg Mobile No

CISCO Site Engg Sign Airtel Site Engg Sign

Date: Date: