A 22 August 2017 QA/QC Engineer -VECC MDC – Field Engineer (Installation and Testing)
Document Review
Activity Company Name Title Signature Date
1 Method Statement Prepare Method Statement Field Per type of work Approved by Electrical N/A Review Method Statement
Construction – General – 3rd Fixed (Device Installation)
(Methodology) Engineer/QC Consultant
Contractor
Item Description
Pre-Construction Inspection or Testing
– Materials By Whom Frequencies Acceptance Criteria Test Method QA Records
(QC)
1. Installation of Lighting Inspect QA-MDC After installation Approved Method Statement Comply with the Witness Inspection and
1 Flexible, IMC & EMT Pipe & Inspect and verify delivered QC/QA-MDC Upon Delivery MC-HSS-14-002 N/A Check/Inspect Delivery Report
Fixture and Power QC-Subcontractor Approved acceptance report
fittings material submittal and sample /Field Engr. /Approved Material
MEPFS Operation Method
Submittal
Statement
2 PVC & FITTINGS Inspect and verify delivered QC/QA-MDC Upon Delivery MC-HSS-14-002 N/A Check/Inspect Delivery Report
material submittal and sample /Approved Material
Comply with the Submittal
QA-MDC
Approved Inspection and
2
3 SwitchboardPROTECTION
LIGHTNING and Panel Inspect
Inspect and verify deliveredQC-Subcontractor
QC/QA-MDC After Installation
Upon Delivery Approved Method Statement
MC-HSS-14-002 N/A Witness
Check/Inspect Delivery Report
Method acceptance report
material submittal and sampleMEPFS Operation /Approved Material
Statement
Submittal
4 GROUND ROD Inspect and verify delivered QC/QA-MDC Upon Delivery MC-HSS-14-002 N/A Check/Inspect Delivery Report
Post-Construction (Finalmaterial
Inspection/Testing)
submittal and sample /Approved Material
Submittal
Item Description Inspection or Testing By Whom Frequencies Acceptance Criteria Test Method QA Records
5 SUPPORT SYSTEM Inspect and verify delivered QC/QA-MDC Upon Delivery
(QC) MC-HSS-14-002 N/A Check/Inspect Delivery Report
material submittal and sample /Approved Material
Submittal
Work Inspection Request
QA-MDC >Approved Method Comply with the
Form
1 Work Inspection Request Inspect QC-Subcontractor Statement Approved
After installation/work is done Hold (FORM NO.: F-QM-GF-
per activity MEPFS Operation >Approved Submittals for Construction
001)
Construction Specification Specification