This document contains a standard test format for commissioning voltage transformers (VTs). It includes sections to record the results of (1) insulation resistance tests between phases and ground, (2) winding resistance measurements, (3) ratio accuracy tests, and (4) polarity checks. Engineering technicians will use this form to document testing and ensure VTs meet specifications before energization.
This document contains a standard test format for commissioning voltage transformers (VTs). It includes sections to record the results of (1) insulation resistance tests between phases and ground, (2) winding resistance measurements, (3) ratio accuracy tests, and (4) polarity checks. Engineering technicians will use this form to document testing and ensure VTs meet specifications before energization.
This document contains a standard test format for commissioning voltage transformers (VTs). It includes sections to record the results of (1) insulation resistance tests between phases and ground, (2) winding resistance measurements, (3) ratio accuracy tests, and (4) polarity checks. Engineering technicians will use this form to document testing and ensure VTs meet specifications before energization.
Commissioning Service Department Commissioning Standard Test Formats Description: VT TEST Record No. : Bay no.: Drawing ref.: Sheet : 2 of 2 Contractor : Contract no.: Substation No :
3. VOLTAGE TRANSFORMER RATIO TEST:
Secondary Voltage (V)
Primary Phase Voltage (V) Measured Calculated Error %